13.07.2015 Views

GPE 26 The biogas and anaerobic digestion plant of Minett Kompost ...

GPE 26 The biogas and anaerobic digestion plant of Minett Kompost ...

GPE 26 The biogas and anaerobic digestion plant of Minett Kompost ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Electricity- Grant Mechanisms in Luxembourg02/08/2008 RGD (Regulations for electricity production based on renewableenergy sources)• Contract Period: 15 years (except in case <strong>of</strong> extension: 20 years)• Power < 150 kW: 15,00 c€/kWh• 150 kW < Power < 300 kW: 14,00 c€/kWh• 300 kW < Power < 500 kW : 13,00 c€/kWh• 500 kW < Power < 2,5 MW: 12,00 c€/kWh• Heat Prime: 3,00 c€/kWh thermic- if recovery <strong>of</strong> min. 25% <strong>of</strong> waste heat (installation 3 years)−Obligation to purchase a flat rate;−Only renewable electricity produced in territory <strong>of</strong> the Gr<strong>and</strong> Duchy−<strong>The</strong> costs generated by the subsidization <strong>of</strong> renewable electricity are borneby the Network Manager (impact provisions <strong>of</strong> the final consumers notspecified)−Fixed rates <strong>of</strong> contract−Volume discounts depending on the year <strong>of</strong> commissioning

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!