Technical and Institutional Issues• Development in a high end commercial park• Fouling of RO membranes due towastewater colloidal particles• Treatment of RO brine to removephosphorus and other permit requirements• Impacts of waste streams to the sewersystem• Accumulation of salts in the alluvium due toRO brine discharge• Challenges in developing the raw watersystem, including yield and locating wellswith acceptable water quality for membranesSignificant capital andO&M costs are realized forthe RO brine treatmentsystem