Construction Cost SummaryITEMCOSTBid Package 1-$27,500,000<strong>Water</strong> Treatment PlantPotable Treatment Processes $23,000,000Concentrate Treatment System $4,500,000Bid Package 2-$3,500,000PipelinesBid Package 3-$2,000,000Raw <strong>Water</strong> Supply WellsTOTAL $33,000,000