13.07.2015 Views

צמנט רגיל צמנט : מסמך זה הוא הצעה בלבד מכון התקנים הישראלי

צמנט רגיל צמנט : מסמך זה הוא הצעה בלבד מכון התקנים הישראלי

צמנט רגיל צמנט : מסמך זה הוא הצעה בלבד מכון התקנים הישראלי

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ועדה 10601EN 197-1:2011 (E)PropertyTable 10 — Limit values for single results32,5L32,5N32,5RLimit values for single results42,5LStrength classEarly strength 2 days - - 8,0 - 8,0 18,0 8,0 18,0 28,0(MPa), lower limitvalue7 days 10,0 14,0 - 14,0 - - - - -Standard strength(MPa),28 days 30,0 40,0 50,0lower limit valueInitial setting time (min), lower limit value 60 50 40Soundness (expansion, mm), upper limitvalue10CEM ICEM II aCEM IV- 4,0 - 4,0 4,5 - 4,5CEM VSulfate content(as % SO 3),upper limit valueC 3A (%),upper limit valueChloride content (%) c ,upper limit valueCEM I-SR 0CEM I-SR 3CEM I-SR 5 b- 3,5 - 3,5 4,0 - 4,0CEM IV/A-SRCEM IV/B-SRCEM III/ACEM III/B4,5CEM III/C 5,0CEM I-SR 0CEM I-SR 3CEM I-SR 5CEM IV/A-SRCEM IV/B-SRPozzolanicity -Heat of hydration(J/g),upper limit valueabcdSatisfies thetest at 15days-42,5N14610100,10 dLH 30042,5RSatisfies thetest at 15daysCement types CEM II/B-T and CEM II/B-M with a T content > 20 % may contain up to 5,0 % SO 3 for all strength classes.52,5L-52,5N52,5RSatisfies thetest at 15daysFor specific applications CEM I-SR 5 may be produced according to a higher maximum sulfate content (see Table 5). If so, the upperlimit value is 0,5 % above the declared value.Cement type CEM III may contain more than 0,10 % chloride but in that case the maximum chloride content shall be declared.For pre-stressing applications cements may be produced according to a lower requirement. If so, the value of 0,10 % shall be replacedby this lower value which shall be stated in the delivery note.9.3 Conformity criteria for cement compositionThe composition of the cement shall be checked by the manufacturer at least once per month using, as a rule, a spotsample taken at the point of release of the cement. The cement composition shall meet the requirements specified inTable 1 and Table 2. The limiting quantities of the main constituents specified in Table 1 and Table 2 are referencevalues to be met by the average composition calculated from the spot samples taken in the control period. For singleresults, maximum deviations of -2 at the lower and +2 at the higher reference value are allowed. Suitable procedures28

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!