13.07.2015 Views

Steel Suspension bridge over Subansiri river near Siyum

Steel Suspension bridge over Subansiri river near Siyum

Steel Suspension bridge over Subansiri river near Siyum

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ToF.No. DoNER/NLP/AP/71/2005G<strong>over</strong>nment of IndiaMinistry of Development of North Eastern Region******Vigyan Bhawan Annexe,Maulana Azad Road,New Delhi – 110011Dated: February 17, 2005Shri Tabom Bam,Chief Secretary & Principal Secretary (Planning),G<strong>over</strong>nment of Arunachal PradeshItanagar – 791 111Fax: 0360-2212161Sir,Subject: Administrative and financial approval for Central financialassistance under Non-lapsable Central Pool of Resources(NLCPR) towards the project, namely “Construction of <strong>Steel</strong><strong>Suspension</strong> Bridge <strong>over</strong> <strong>Subansiri</strong> <strong>river</strong> <strong>near</strong> <strong>Siyum</strong> (Span174.00 Mtr)”, in Arunachal Pradesh.I directed to convey administrative and financial approval of G<strong>over</strong>nment ofIndia to the amount of Rs. 775.45 lakh (90%) for the above project estimated at a costRs. 861.61 lakh as per detailed break up below.SlNo.Major components of workCost of eachcomponent(Rs. in lakhs)(1) (2) (3)1. Bridge Structurea) Site Development (Earth work) 15.90b) RCC/Concrete work 211.48c) Manufacturing, Supply & Erection of <strong>Steel</strong> <strong>Suspension</strong> 416.08<strong>bridge</strong> (174 mtr)d) Protection works for abutment 7.752. Bridge Approachesa) Formation cutting (Right & Left Bank, 3.12 km) 55.35b) Pavement 90.47c) Retaining & Breast Wall 23.26d) Kutcha drain 0.813. Cross Drainage Worksa) Slab culverts (1.50 mtr span) 29.13b) Slab culverts (6.00 mtr span) 9.754. Miscellaneousa) Repairing of existing foot suspension <strong>bridge</strong> 1.67Total 861.61


2. The approval of Ministry of Development of North Eastern Regions (M/o DoNER) issubject to the following conditions:a. M/o DoNER will release only 90% of the project cost as Grant in installmentsto the State G<strong>over</strong>nment for implementation/ execution of the project. Balance10% being loan component, would be authorized by the Ministry of Finance(Plan Finance Division I) to be raised by the State in consultation with ReserveBank of India. In the case of the State being fiscally weak and not able to raiseload component from the market, Ministry of Finance would make appropriatearrangement to raise the same and lend to the State.b. The time frame for completion of the project is 36 months. The date of thissanction letter would be reckoned as the date of start of the project. Target dateof completion of the project would be February 2009. Time frame is to befollowed strictly.c. Immediately on receipt of this sanction letter, the State G<strong>over</strong>nment keeping inview the target date, would firm up the quarterly physical and financial targetsand convey them within one month to this Ministry. Thereafter, quarterlyreport on the physical and financial program of the project shall be furnished tothe M/o DoNER within 10 days of close of the quarter.d. The project shall be implemented strictly in time and with the help of PERTand CPM.e. The funds shall be utilized strictly for the purpose for which they are beingsanctioned. No diversion of fund is allowed.f. Any escalation towards cost of the project has to be borne by the StateG<strong>over</strong>nment from their resources.g. If the project is unduly delayed without sufficient valid reasons, it wouldremain open to M/o DoNER to adjust the entire amount so released againstsome other sanctioned project under NLCPR and close this project underNLCPR scheme.h. The State Finance Department/Planning Department shall ensure transmissionof the released amount to the Department / Implementing Agency concernedwithin 30 days from the date of release by the G<strong>over</strong>nment of India and submitcertificate in this behalf within the prescribed time limit to Ministry ofDevelopment of North Eastern Region.i. The State G<strong>over</strong>nment shall properly utilize funds and submit UtilizationCertificate on prescribed proforma to Joint Secretary, Ministry ofDevelopment of North Eastern Region, Vigyan Bhavan Annexe, Maulana Azadroad, New Delhi – 110011 within a period of nine months from the date ofrelease. In case the funds are not utilized within the stipulated time, thePlanning Department of the State G<strong>over</strong>nment should approach the Ministry ofDevelopment of North Eastern Region with sound reasoning for revalidation.j. The State G<strong>over</strong>nment shall nominate a nodal officer for the project who wouldbe responsible for time implementation of the sanctioned works, within theapproved costs. The name and designation of the Nodal Officer with fulladdress along with his contact telephone number would be communicated to theMinistry.


k. The State G<strong>over</strong>nment shall get the projects inspected on ground at least oncein a quarter and submit physical progress report in prescribed proforma withintwo weeks after the close of the quarter of the year to Joint Secretary, Ministryof Development of North Eastern Region, Vigyan Bhawan Annexe, MaulanaAzad road, New Delhi – 110 011.3. It is requested that the State G<strong>over</strong>nment may send us the requirement of funds alongwith work plan during the financial year 2005-2006 to enable this Ministry toconsider release of first installment for the project. The release of next andsubsequent installments for the project would be g<strong>over</strong>ned by the specific clausementioned in the NLCPR Guidelines date 07.07.2004.4. The sanction issues with the concurrence of the Integrated Finance Division videtheir D. No. 405/Fin-V/05 dated 14.02.2006.Yours faithfully,(P.R. Meshram)Joint DirectorPhone – 011-23015184Fax: 011-23015360, 23022024Copy to:1. Chief Secretary, G<strong>over</strong>nment of Arunachal Pradesh, Itanagar.2. Finance Secretary, G<strong>over</strong>nment of Arunachal Pradesh, Itanagar.3. Commissioner, PWD, G<strong>over</strong>nment of Arunachal Pradesh, Itanagar.4. Integrated Finance Division (Fin.V), Ministry of Home Affairs, New Delhi.(P.R. Meshram)Joint Director

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!