13.07.2015 Views

Policy for the Implementation of Carbon Reduction in Capital Projects

Policy for the Implementation of Carbon Reduction in Capital Projects

Policy for the Implementation of Carbon Reduction in Capital Projects

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

c. All o<strong>the</strong>r miscellaneous purchases <strong>for</strong> items that that use energy shall complywith HEFCE’s Purchas<strong>in</strong>g <strong>for</strong> Susta<strong>in</strong>ability: Guidance <strong>for</strong> Higher EducationInstitutions.3. <strong>Carbon</strong> reductions need to be “real” reductions <strong>in</strong> order to meet <strong>the</strong> College'scommitment to reduce carbon emissions through <strong>the</strong> <strong>Carbon</strong> Management and<strong>Implementation</strong> Plan, and should not be achieved through <strong>the</strong> purchase <strong>of</strong>renewable energy products from energy retailers or through <strong>of</strong>fsett<strong>in</strong>g.ObjectivesThe objectives <strong>of</strong> this <strong>Policy</strong> are to: Contribute to achiev<strong>in</strong>g <strong>the</strong> College target to reduce Scope 1 and 2 carbonemissions (direct fuel and electricity consumption) by 34% from a 2005/6basel<strong>in</strong>e by 2020. This essentially means capp<strong>in</strong>g its total greenhouse gasemissions at 16,000 t/CO 2 p.a. (see <strong>the</strong> College <strong>Carbon</strong> Management and<strong>Implementation</strong> plan <strong>for</strong> more <strong>in</strong><strong>for</strong>mation). Guide College staff and consultants deliver<strong>in</strong>g projects on <strong>the</strong> <strong>in</strong>corporation <strong>of</strong>susta<strong>in</strong>able energy management pr<strong>in</strong>ciples <strong>in</strong>to <strong>the</strong> design <strong>of</strong> build<strong>in</strong>g andplant assets, construction and procurement. Create assets that m<strong>in</strong>imise energy consumption and promote renewableenergy alternatives. Fur<strong>the</strong>r develop <strong>the</strong> system <strong>for</strong> management <strong>of</strong> energy across <strong>the</strong> College. Ensure that suppliers and contractors are also work<strong>in</strong>g <strong>in</strong> a susta<strong>in</strong>ablemanner e.g. reduc<strong>in</strong>g <strong>the</strong> total mileage travelled by vehicles and suppliesused <strong>in</strong> College projects.Guidel<strong>in</strong>es:The follow<strong>in</strong>g is a list <strong>of</strong> susta<strong>in</strong>able energy management pr<strong>in</strong>ciples that are to beconsidered <strong>in</strong> <strong>the</strong> development <strong>of</strong> all assets.Build<strong>in</strong>gsAll build<strong>in</strong>gs:<strong>in</strong>corporate passive solar design to maximise daylight<strong>in</strong>g and passive heat<strong>in</strong>gand cool<strong>in</strong>g opportunities; <strong>in</strong>corporate energy efficient design to m<strong>in</strong>imise light<strong>in</strong>g, active heat<strong>in</strong>g andcool<strong>in</strong>g requirements; optimise opportunities to use renewable energy sources and <strong>in</strong>corporaterenewable energy technologies wherever possible; provide efficient control and effective ma<strong>in</strong>tenance systems that <strong>in</strong>corporatemonitor<strong>in</strong>g <strong>of</strong> energy consumption; m<strong>in</strong>imise embodied energy <strong>in</strong> construction materials; <strong>the</strong>re is a presumption aga<strong>in</strong>st provid<strong>in</strong>g cool<strong>in</strong>g plant and heat<strong>in</strong>g andcool<strong>in</strong>g is to be with<strong>in</strong> <strong>the</strong> limits prescribed by <strong>the</strong> College.Plant and equipment: Specify energy efficient equipment and light<strong>in</strong>g systems.Vehicles: Ensure <strong>the</strong> m<strong>in</strong>imum use <strong>of</strong> each vehicle.Page 2 <strong>of</strong> 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!