13.07.2015 Views

MSC Recommended Practices for Pre-Drilling Sampling

MSC Recommended Practices for Pre-Drilling Sampling

MSC Recommended Practices for Pre-Drilling Sampling

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

APPENDIX ASITE VISIT FORMONE FORM FOR EACH WATER SOURCESAMPLING METHOD: Existing well pump <strong>Sampling</strong> pump Low flow Bailer Other: ________________________Was the water source purged be<strong>for</strong>e sampling? Yes No If yes, volume (gal.) and/or time (min) purged: __________________________Is it possible to run water <strong>for</strong> 30 minutes? Yes No If no, please explain: _______________________________________________Average water usage within last 24 hours _______________________________________________________________Chain of custody attached? Yes No Name of Certified Laboratory: __________________________________________FIELD ANALYSES:Turbidity: ____________________ pH: ___________________ Conductivity: ___________________ Temperature: ___________________Combustible Gas Reading (Describe location and method):PART G: PLAN SKETCH and PHOTOGRAPHS (use additional pages as necessary) Show compass course and provide approximate distance.Sampler/InterviewerI hereby acknowledge that I have supplied the correct in<strong>for</strong>mation to the best of my knowledgeSign ___________________________________________ Print _________________________________________ Date _____________________Company: ______________________________________ Address: ______________________________________ Phone: __________________Page 3 of 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!