<strong>ACS</strong> <strong>Lite</strong>Evaluation Results – Phase FailuresTRB - Adaptive <strong>Traffic</strong> <strong>Signal</strong> Control WorkshopWashington, DCJanuary 11, 2004Slide 54454035Synchro Baseline<strong>ACS</strong>-<strong>Lite</strong>Worst CaseTotal Number of Phase Failures:Synchro Baseline: 17<strong>ACS</strong>-<strong>Lite</strong>: 24Worst Case: 88 ~70%improvement30Number of Failures2520151050103-1101-1104-12-1105-21-2106-23-2107-32-3108-34-3109-43-4110-45-4111-54-5112-56-5113-65-6114-67-6115-76-7116-7102-7Approach LinkU.S. Department of TransportationFederal Highway AdministrationFHWA Contract No.DTFH61-02-C-00047