13.07.2015 Views

WEST CENTRAL RAILWAY

WEST CENTRAL RAILWAY

WEST CENTRAL RAILWAY

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DivisionTender Notice <strong>WEST</strong> <strong>CENTRAL</strong> <strong>RAILWAY</strong> KotaCivil EngineeringDivisional Railway Manager, Works Account, West Central Railway, Kota for and on behalf of President ofUnion of India invites following open sealed tenders which will be opened as per column 6 below whichshould reach to this office on or before 15.30 Hrs on the date of opening shown against the tenders. Thetenders shall be sold up to 12.00 hrs on the same day and shall be opened at 16.00 Hrs.Tender No Description of work Approx.costEarnestMoneyComp.PeriodDate ofOpeningCostofTenderForm1 2 3 4 5 6 7 8Similarnature ofwork foreligibility20/2013 Kota Division – Transportation,loading, unloading, stacking,cement from M/s Shree CementLimited, Bangur Nagar , Beawer (Rajasthan ) to SSE/ Works ofKota Division. ( 555.61 Mt. )600000/- 12000/- 2Months5.03.13 2000/- Not Required21/2013 Kota Div. Provision of High levelPlatform at “E” category station atSalpura and Atru3527000/- 70540/- 6 Month 5.3.2013 3000/- Not Required22/2013 Kota Div. Provision of High levelPlatform at “E” category station atKhandeep, Fatehsinghpura,Narayanpurtatwara and Malarna23/2013 Keladevi – Renovation of stationMaster office by increasing it’sarea and proper housing ofBooking office.24/2013 ADEN/ Gangapur City andADEN/ Bharatpur Section-Extention of Cover over platformwith aluminium sheet andprovision of water Booth atMalarna,NImoda,Narayanpurtatwara, Piloda ,Fatehsinghpura and Keladevi.25/2013 Kota Ruthyayi Section Re-Roofingan Replacement of wood work ofQuarters ( Balance Quantity )26/2013 ADEN Swaimadhopur Section -Extention of Cover over platformwith aluminium sheet and8514000/- 170280/- 15Month941000/- 18820/- 8Months9443000/- 188860/- 11Month1305000/- 26100/- 4Months8369000/- 167380/- 11Months5.3.2013 5000/- Any CivilEngineeringWork5.3.2013 2000/- Not Required5.3.2013 5000/- Any CivilEngineeringWork5.3.2013 2000/- Not Required5.3.2013 5000/- Any CivilEngineeringWork


provision of water Booth atLahkheri, Amli and Makholi27/2013 Kota Wagon Repair Shop-Renovation of three SSE officeinside Workshop.28/2013 KOTA-Repair to drain / Sewer LineNear RE/II Quarters for disposalof sullage water and repair togood Shed.29/2013 Kota Ruthyai section-Upgradation of of LC No. 21 and38 and improvement to gatelodge and Road at LC No. 30,43and 54.794000/- 15880/- 4Months663000/- 13260/- 4Months3571000/- 71420/- 10Months5.3.2013 2000/- Not Required8.3.2013 2000/- Not Required8.3.2013 3000/- Not Required30/2013RSawaimadhopur Providing lat. andbathroom at Jaipur RPF post196000/- 3920/- 3Months8.3.2013 1000/- Not Required31/2013 R Kota-Nagda section-: provision ofBasic aminities kitchen, bathroom,tile flooaring, jaffery, plaster,Provision of water tank in staffquarters, replastering, repairs toleaky roof and replacement ofdoors and windows.32/2013 R ADEN/RMA section : repairs of tiebar fencing at level crossingbetween KTCY- KRLS section33/2013 BARAN – Improvement at BaranGoods Shed by widening theloading/ Unloading Platform34/2013 Transportation of material,removal the existing seized /corroded /broken rail screwwelding of slide chair removal ofburr fixing of guard rail anddressing of ballast under ADEN/Gangapur and ADEN BharatpurSub Section35/2013 Kota – Repairing of DRM officetoilet to arrest seepage ,improvement of toilet block inDRM office , improvement ofcommercial branch office in DRMoffice and renovation of pay anduse toilet of general waiting hall.36/2013 ADEN East Section- Provision ofguard rail & replacement of bridge13871000/- 219360/- 8Months1003000/- 20060/- 6Months859000/- 17180/- 4Months4301000/- 86020/- 8Months1053000/- 21060/- 4Months658000/- 13160/- 4Months8.3.2013 5000/- Any CivilConstructionwork8.3.2013 2000/- Not Required8.3.2013 2000/- Not Required8.3.2013 3000/- Not required8.03.13 2000/- Not Required12.03.13 2000/- Not required


37/2013Rsleepers between Kota RuthyaisectionNagda Mathura Section Throughweld renewal in 60 Kg / 52 Kgrails at Site using road cum railmobile/ stationary flash buttwelding plant -5700 joints ( total93.776 Kms Up , Dn )44730000/- 373650/- 15Month12.03.13 10000/- Welding of railby flash buttwelding plant.38/2013 KOTA – Supply of Chlorine Gasfor filter plant No. 1,2 and 3.39/2013 Kota Thermal Power stationSiding ( Deposit Work ) Throughweld renewal in 60 Kg. / 52 kgrails at site using road cum railmobile / stationary Flash Buttwelding plant in Kota ThermalPower station Siding railwaysiding from Gurla/ Chambal “C”Cabin to Kota Thermal Powerstation Siding/ sakatpuraMarshalling Yard Total 1820 joints( Total 11.050 Kms )40/2013 Kota Mathura Section – Protectionof piers by gabions ( bouldercrates) , toe wall and pitching onbridge No. 448 UP & DN 475 UP& DN, 494 UP and DN underADEN Gangapur section .41/2013 Kota Ruthyai Section – Throughweld Renewal in 60 Kg/52 Kgrails at site using road cum railmobile / stationary flash buttwelding plant-750 joints KM160.00 to 163.50 ( Total 3.50 kms)424000/- 8480/- 24Months12960000/- 214800/- 12Months13056000/- 215280/- 8Months5160000/- 103200/- 6Months12.03.13 1000/- Not Required12.03.13 5000/- Welding of railby flash buttwelding plant.12.03.13 5000/- Any bridgeconstruction/rebuilding/repair work12.03.13 5000/- Welding of railby flash buttwelding plant.42/2013 Kota Div. Provision of High levelPlatform at “E” category station atMandalgarh162000/- 3240/- 4 Month 12.3.2013 1000/- Not Required43/2013 Bayana Bharatpur SectionShifting of gang chawl from midsection to nearest station / LC forgang no 77 (07 unit type IIquarters at Bayana)44/2013 Bharatpur Repairs to RCC roofinside and outside plaster,soilwaste and rain water pipe,open drain and manhole in staff5612000/- 112240/- 11months2714000/- 54280/- 8months12.03.13 5000.00 Any Civilconstructionwork.12.03.13 3000.00 Not Required


quarters of TRD colony.45/2013RGangapurcity Mathura Section-Providing flooring, pitching,Inspection steps, Retainingwall, Toe wall at variousbridges under ADEN/BTEsection and Improvement toroad surface on ROB atSEWAR-BTE and ROB no.649‘A’ between MSRP-MTJSection.5307000/- 106140/- 10Months12.03.13 5000/- Any CivilEngg. Work.Complete details are available in the tender notice uploaded on the railway web sitewww.wcr.indianrailways.gov.in and also placed on the notice board of the Divisional Railway Manager (WA)West Central Railway Kota’s office. Complete tender document can be down loaded from above web site. The tenderdocument will be prepared prior to 15 days from the date of opening of tender and can be purchased on any workingday from DRM (WA) Kota’s office.No- W.623/15Divisional Railway Manager(WA)Dt 21.01.13 For & Behalf of the President of Union of India.Copy- Notice Board of DRM (WA) Kota office, All DRMs of WCR for Notice Board, Chief Engineer, ChiefEngineer (Construction) WCR-Jabalpur and Dy CE ( C ) Kota, BPL , JBP. All ADENs, SSEs (P.Way) &(Works). Kota division Station Superintendent , Kota Division.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!