Docket No. E002/GR-10-971Exhibit___(KLE-1), Schedule 2Page 10 of 13Planned Major Maintenance – Nuclear Refueling Outage (Uniform Policy)be many amortizations being calculated for each reload to effectively charge the correct FERC O&Maccount. The amortization is charged to the same nuclear production O&M expense account aswould be used for direct expensing. The amortization period is the same across all FERC O&Maccount amortizations.Applicable FERC O&M Accounts to Nuclear Refueling OutagesFERCAccountAccount TitleOperations517 Operation Supervision <strong>and</strong> Engineering519 Coolants <strong>and</strong> Water520 Steam Expenses523 Electric Expenses524 Miscellaneous Nuclear Power ExpensesMaintenance528 Maintenance Supervision <strong>and</strong> Engineering529 Maintenance of Structures530 Maintenance of Reactor Plant Equipment531 Maintenance of Electric Plant532 Maintenance of Miscellaneous Nuclear PlantPick-upsThe term “pick-ups” is used to refer to the trailing costs that occur subsequent to the completion ofthe work. Business unit personnel are expected to book all known or estimable costs in the finalmonth of the outage work. By recognizing an estimate of work completed to date, the amortizationcan begin with a very close approximation of total costs in the deferred work orders. The costsincurred in the “post-outage” phase are recognized in the deferred work orders with a debit offset bya credit to account payable or unvouchered liabilities. When the final costs are determined, the entireestimate is reversed with the actual payment being recognized to the appropriate deferred work order.There is a time limit on this process. Costs not finalized within three months after the unit beginsoperating are settled to expense.Direct ExpensingAssuming a jurisdiction may not adopt this change of accounting for its customers, their portion ofthe O&M costs will be expensed when incurred. The jurisdictional split is determined at the time theset of FERC specific deferred work orders is requested for the outage. Every charge booked to thedeferred work order will be allocated between jurisdictions that allowed the deferral-<strong>and</strong>-amortizationmethod of accounting <strong>and</strong> those jurisdictions using the direct expense method. For example, if 75%Regulatory AccountingPage 10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!