Design Challenges in Cooling Water Systems - LAS-ANS
Design Challenges in Cooling Water Systems - LAS-ANS
Design Challenges in Cooling Water Systems - LAS-ANS
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Design</strong> <strong>Challenges</strong> / Considerations <strong>in</strong> Site Plant Layout(Cont’d) Identify<strong>in</strong>g any exist<strong>in</strong>g below grade structures and/or utilities (water,sewerage, power l<strong>in</strong>es) that could potentially impact plant layout Identify overhead limitation—transmission l<strong>in</strong>es and right of way Identify plant access roadways dur<strong>in</strong>g construction phase and when theplant is operat<strong>in</strong>g Identify support<strong>in</strong>g structures such as adm<strong>in</strong>istration build<strong>in</strong>g, securitybuild<strong>in</strong>g, ma<strong>in</strong>tenance build<strong>in</strong>g, warehouses, tra<strong>in</strong><strong>in</strong>g center, etc. Identify security requirements dur<strong>in</strong>g construction especially if at a sitewith an operat<strong>in</strong>g unit. Recommendation is to prepare two site layouts: <strong>Design</strong> Layout &Construction LayoutCopyright © 2010 URSPow erCONFIDENTIAL – This document is proprietary and competitively sensitive. Any disclosure, copy<strong>in</strong>g, or use of it is strictly prohibited.7