13.07.2015 Views

Application for a Building Permit in Scofield Town - Carbon County ...

Application for a Building Permit in Scofield Town - Carbon County ...

Application for a Building Permit in Scofield Town - Carbon County ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

120 East Ma<strong>in</strong> | Price, Utah 84501 | (435) 636-3260<strong>Application</strong> <strong>for</strong> a <strong>Build<strong>in</strong>g</strong> <strong>Permit</strong> <strong>in</strong> <strong>Scofield</strong> <strong>Town</strong>CARBON COUNTY BUILDING DEPARTMENTDave Levanger, <strong>Build<strong>in</strong>g</strong> Official435-636-3261Kathy Chatterton, Deputy <strong>Build<strong>in</strong>g</strong> Official435-636-3745Frankie Hathaway, Deputy Zon<strong>in</strong>g Adm<strong>in</strong>istrator435-636-3260January 4, 2011


APPLICATION PERMIT PROCESS FOR BUILDING, ELECTRICAL, MECHANICAL, PLUMBINGWITHIN SCOFIELD TOWNWith<strong>in</strong> <strong>Scofield</strong> <strong>Town</strong>, all improvements, additions or new construction must comply with the <strong>Scofield</strong> <strong>Town</strong> Land UseCode. Work exempt from a permit <strong>in</strong>cludes:Sheds and structures under 200 square feet, or lessFences not over 6 feet highReta<strong>in</strong><strong>in</strong>g walls that are not over 4 feet high from bottom of foot<strong>in</strong>g to top of wallSidewalks and drivewaysPa<strong>in</strong>t<strong>in</strong>g, paper<strong>in</strong>g, til<strong>in</strong>g, carpet<strong>in</strong>g, cab<strong>in</strong>ets, counter tops, and similar f<strong>in</strong>ish workPrefabricated swimm<strong>in</strong>g pools less than 24 <strong>in</strong>ches deepSw<strong>in</strong>gs and playground equipmentW<strong>in</strong>dow awn<strong>in</strong>gs supported by an exterior wallThe applicant shall request an <strong>Application</strong> <strong>Permit</strong> package <strong>for</strong> build<strong>in</strong>g, electrical, mechanical, plumb<strong>in</strong>g from the<strong>Carbon</strong> <strong>County</strong> <strong>Build<strong>in</strong>g</strong> Department located beh<strong>in</strong>d the <strong>Carbon</strong> <strong>County</strong> Courthouse, at 65 South 100 East, Price, Utah,84501; Telephone (435) 636-3260. We are on the <strong>in</strong>ternet at www.carbon.utah.gov Go to Departments, then Plann<strong>in</strong>g &<strong>Build<strong>in</strong>g</strong>.Once the applicant submits the application, plans and site plan to the <strong>Carbon</strong> <strong>County</strong> <strong>Build<strong>in</strong>g</strong> Department, <strong>Carbon</strong><strong>County</strong> will scan and e-mail the <strong>in</strong><strong>for</strong>mation to the <strong>Scofield</strong> Plann<strong>in</strong>g and Zon<strong>in</strong>g Board (here<strong>in</strong> after referred to as<strong>Scofield</strong> Board) to <strong>in</strong>sure that it meets the <strong>Scofield</strong> <strong>Town</strong> Land Use Code dated October 12, 2002. The <strong>Scofield</strong> Boardwill complete its review with<strong>in</strong> five (5) days after receipt from <strong>Carbon</strong> <strong>County</strong>. If the <strong>Scofield</strong> Board approves theapplication, the <strong>Carbon</strong> <strong>County</strong> <strong>Build<strong>in</strong>g</strong> Department will per<strong>for</strong>m a plan review and issue the permit, normally with<strong>in</strong> 15work<strong>in</strong>g days from the date all <strong>in</strong><strong>for</strong>mation is received.If the <strong>Scofield</strong> Board disapproves the application, it will list or note the deficiencies. The applicant shall correct thedeficiencies and resubmit the application to the <strong>Carbon</strong> <strong>County</strong> <strong>Build<strong>in</strong>g</strong> Department. The <strong>Carbon</strong> <strong>County</strong> <strong>Build<strong>in</strong>g</strong>Department will resubmit the application package to the <strong>Scofield</strong> Board <strong>for</strong> review. If the applicant does not want tocorrect the deficiencies he/she can request a hear<strong>in</strong>g with the <strong>Scofield</strong> <strong>Town</strong> Board of Adjustments.Below are the names and telephone numbers of the <strong>Scofield</strong> Board.Ted HelstenClay LarsenChairmanVice Chairman1339 Skyview Drive 1520 West Gordon Creek RoadSalt Lake City, UT 84124 Price, UT 84501(801) 277 9040 (435) 637-5163(801) 580-4046 clay.larsen@lpnt.netted-helsten@worldnet.att.netPaul Dowd<strong>in</strong>g Jody Knowlden Shirl PettroMember Member Member9945 South Tamara Drive 3632 North 2000 West P. O. Box 1408Sandy, UT 84094 Spr<strong>in</strong>g Glen, UT 84526 Mesquite, NV 89024-1408(801) 572-4086 (435) 448-9486 (702) 346-2021hmsp7@hotmail.com (435)472-2427 pettro@cascadeaccess.comrobertfloral@emerytelcom.net


CARBON COUNTY BUILDING DEPARTMENT<strong>Scofield</strong> <strong>Town</strong> New Home, Cab<strong>in</strong> or Commercial <strong>Build<strong>in</strong>g</strong> ChecklistPLEASE SUBMIT THE FOLLOWING FOR YOUR PERMIT: Completed and signed permit application, <strong>in</strong>clud<strong>in</strong>g the contractor’s name and license number, or: A signed and notarized Owner/Builder Certification Form, if you are a do-it yourself home builder. A site plan drawn to scale on 8 ½” x 11” paper show<strong>in</strong>g lot shape and dimensions, show<strong>in</strong>g the street, frontof the lot you are build<strong>in</strong>g on, and the set backs to property l<strong>in</strong>es of all exist<strong>in</strong>g and proposed structures,utilities. 2 sets of plans drawn to scale (not less than 1/4” = 1’) show<strong>in</strong>g:a. Foot<strong>in</strong>g and foundation plan.b. Wall fram<strong>in</strong>g, columns and beams with sizes – a cross section is preferred.c. Floor fram<strong>in</strong>g, girder, joist and block<strong>in</strong>g sizes and spans.d. Roof fram<strong>in</strong>g/rafter size and span or stamped truss sheet details (truss sheets may be deferred if on plan)e. Electrical plan.f. Plumb<strong>in</strong>g plan.g. Heat<strong>in</strong>g cool<strong>in</strong>g and ventilation plans with cool<strong>in</strong>g and heat loss calculations/ energy code compliance<strong>for</strong> Zone 6.h. Gas pipe siz<strong>in</strong>g calculations.i. Any other plans , data or <strong>in</strong><strong>for</strong>mation required by the <strong>Build<strong>in</strong>g</strong> Official, particularly <strong>for</strong> commercialprojects.j. Manufactured Home permit applications shall also <strong>in</strong>clude Manufacturer’s eng<strong>in</strong>eered foot<strong>in</strong>g andfoundation plan, or IRC approved foundation design, tie down plan, column and beam sizes & spans ifused. For site-built additions such as a porch, deck or garage: foot<strong>in</strong>g, foundation, wall and roof fram<strong>in</strong>gor truss design sheets as applicable, along with any electrical, plumb<strong>in</strong>g, heat<strong>in</strong>g plans. The floor planwith year, make, model, serial numbers <strong>for</strong> all sections along with dimensions of the home. Orig<strong>in</strong>alfactory tags must be <strong>in</strong> place. Eng<strong>in</strong>eered WET stamped plans are required <strong>for</strong> manufactured homes ona basement. No home manufactured prior to June of 1976 will be approved. Eng<strong>in</strong>eered WET stamped plans are required <strong>for</strong> all Commercial build<strong>in</strong>gs and foundations <strong>for</strong> conventionalframe homes <strong>in</strong> the <strong>Scofield</strong> area D0 Seismic zone. Log Homes and unusually shaped homes are required to beeng<strong>in</strong>eered also. Copies will not be accepted. Eng<strong>in</strong>eered plans shall be sealed and signed by registered UtahArchitects and/or Professional Eng<strong>in</strong>eers. The Eng<strong>in</strong>eer shall be tra<strong>in</strong>ed <strong>in</strong> the particular discipl<strong>in</strong>e, i.e.:Electrical, Plumb<strong>in</strong>g, Mechanical, or Structural, that is be<strong>in</strong>g designed and sealed.The <strong>County</strong> will obta<strong>in</strong> approval from <strong>Scofield</strong> <strong>Town</strong>. This will <strong>in</strong>clude zon<strong>in</strong>g approval and may require youto pay fees <strong>for</strong> water and sewer connections.NO APPLICATIONS WILL BE ACCEPTED WITHOUT ALL OF THE ITEMS LISTED ABOVE. 15BUSINESS DAYS ARE NORMALLY REQUIRED TO PROCESS YOUR APPLICATION FORAPPROVAL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!