13.07.2015 Views

Application for a Building Permit in Scofield Town - Carbon County ...

Application for a Building Permit in Scofield Town - Carbon County ...

Application for a Building Permit in Scofield Town - Carbon County ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CARBON COUNTY BUILDING DEPARTMENT<strong>Scofield</strong> <strong>Town</strong> New Home, Cab<strong>in</strong> or Commercial <strong>Build<strong>in</strong>g</strong> ChecklistPLEASE SUBMIT THE FOLLOWING FOR YOUR PERMIT: Completed and signed permit application, <strong>in</strong>clud<strong>in</strong>g the contractor’s name and license number, or: A signed and notarized Owner/Builder Certification Form, if you are a do-it yourself home builder. A site plan drawn to scale on 8 ½” x 11” paper show<strong>in</strong>g lot shape and dimensions, show<strong>in</strong>g the street, frontof the lot you are build<strong>in</strong>g on, and the set backs to property l<strong>in</strong>es of all exist<strong>in</strong>g and proposed structures,utilities. 2 sets of plans drawn to scale (not less than 1/4” = 1’) show<strong>in</strong>g:a. Foot<strong>in</strong>g and foundation plan.b. Wall fram<strong>in</strong>g, columns and beams with sizes – a cross section is preferred.c. Floor fram<strong>in</strong>g, girder, joist and block<strong>in</strong>g sizes and spans.d. Roof fram<strong>in</strong>g/rafter size and span or stamped truss sheet details (truss sheets may be deferred if on plan)e. Electrical plan.f. Plumb<strong>in</strong>g plan.g. Heat<strong>in</strong>g cool<strong>in</strong>g and ventilation plans with cool<strong>in</strong>g and heat loss calculations/ energy code compliance<strong>for</strong> Zone 6.h. Gas pipe siz<strong>in</strong>g calculations.i. Any other plans , data or <strong>in</strong><strong>for</strong>mation required by the <strong>Build<strong>in</strong>g</strong> Official, particularly <strong>for</strong> commercialprojects.j. Manufactured Home permit applications shall also <strong>in</strong>clude Manufacturer’s eng<strong>in</strong>eered foot<strong>in</strong>g andfoundation plan, or IRC approved foundation design, tie down plan, column and beam sizes & spans ifused. For site-built additions such as a porch, deck or garage: foot<strong>in</strong>g, foundation, wall and roof fram<strong>in</strong>gor truss design sheets as applicable, along with any electrical, plumb<strong>in</strong>g, heat<strong>in</strong>g plans. The floor planwith year, make, model, serial numbers <strong>for</strong> all sections along with dimensions of the home. Orig<strong>in</strong>alfactory tags must be <strong>in</strong> place. Eng<strong>in</strong>eered WET stamped plans are required <strong>for</strong> manufactured homes ona basement. No home manufactured prior to June of 1976 will be approved. Eng<strong>in</strong>eered WET stamped plans are required <strong>for</strong> all Commercial build<strong>in</strong>gs and foundations <strong>for</strong> conventionalframe homes <strong>in</strong> the <strong>Scofield</strong> area D0 Seismic zone. Log Homes and unusually shaped homes are required to beeng<strong>in</strong>eered also. Copies will not be accepted. Eng<strong>in</strong>eered plans shall be sealed and signed by registered UtahArchitects and/or Professional Eng<strong>in</strong>eers. The Eng<strong>in</strong>eer shall be tra<strong>in</strong>ed <strong>in</strong> the particular discipl<strong>in</strong>e, i.e.:Electrical, Plumb<strong>in</strong>g, Mechanical, or Structural, that is be<strong>in</strong>g designed and sealed.The <strong>County</strong> will obta<strong>in</strong> approval from <strong>Scofield</strong> <strong>Town</strong>. This will <strong>in</strong>clude zon<strong>in</strong>g approval and may require youto pay fees <strong>for</strong> water and sewer connections.NO APPLICATIONS WILL BE ACCEPTED WITHOUT ALL OF THE ITEMS LISTED ABOVE. 15BUSINESS DAYS ARE NORMALLY REQUIRED TO PROCESS YOUR APPLICATION FORAPPROVAL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!