17.07.2015 Views

Bid Results and/or Awards

Bid Results and/or Awards

Bid Results and/or Awards

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CCBE Weekly Newsletter <strong>Bid</strong> <strong>Results</strong> <strong>and</strong>/<strong>or</strong> <strong>Awards</strong> September 19, 2013Location Project Details <strong>Bid</strong> DateBaseAlert-O-Lite, Inc. $7,580Safety Netw<strong>or</strong>k $7,980Traffic Management, Inc. $10,300(Total of 3 <strong>Bid</strong>s Received)<strong>Bid</strong> <strong>Results</strong> Status: <strong>Results</strong> published. No subs were listed. CCBE will follow up on award.San JoaquinCo.2013 LEVEE TOE BERM PROJECT BETWEEN STATION 470+50 & STATION 523+50,RECLAMATION DISTRICT # 773Estimate: $75,000.00BasePay Dirt Construction $57,778Cal-Neva Construction $58,742Stephens, AM, Construction $72,440Asta Construction $128,513Burns, Robert, Construction $131,456MCI Engineering $141,004(Total of 6 <strong>Bid</strong>s Received)<strong>Bid</strong> <strong>Results</strong> Status: <strong>Results</strong> published. No subs were listed. CCBE will follow up onAward.9/10/20133:00 PMFresno HERNDON AVE. EASTBOUND WIDENING FROM BRAWLEY TO BLYTHE AVE., CITY OF FRESNOEstimate:Owner: Fresno, City of, PurchasingBaseMass X, Inc. $1,252,853Granite Construction Co. $1,357,323Emmett's Excavation, Inc. $1,377,302American Paving Co. $1,446,760Teichert Construction (Fresno) $1,471,646Crawf<strong>or</strong>d, Jim, Const. Co., Inc. $1,478,986Yarbs Grading <strong>and</strong> Paving, Inc. $1,483,003Christian, Dave, Const. Co., Inc. $1,499,500(Total of 8 <strong>Bid</strong>s Received)SUBCONTRACTORS LISTED BY Mass X, Inc.Berry, Don, Construction, Inc.Allante Fence Co.A-C Electric CompanyJohnston, Floyd, Construction Co., Inc.Place AsphaltFencing <strong>and</strong> Related W<strong>or</strong>kElectrical, Street LightsUnderground <strong>and</strong> Related W<strong>or</strong>kJ. Mack Enterprises, Inc. Asphalt GrindingStatewide Safety (dba)Safety Striping Service, Inc.Halopoff & Sons, Inc.Traffic ControlStriping <strong>and</strong> Related W<strong>or</strong>kConcrete <strong>and</strong> Related W<strong>or</strong>k9/10/20133:00 PM<strong>Bid</strong> <strong>Results</strong> Status: <strong>Results</strong> & Sublist published. CCBE will follow up on award.4


CCBE Weekly Newsletter <strong>Bid</strong> <strong>Results</strong> <strong>and</strong>/<strong>or</strong> <strong>Awards</strong> September 19, 2013Location Project Details <strong>Bid</strong> DateBakersfield CENTRAL CHILLER PLANT REPLACEMENT PROJECT, KERN COMMUNITY COLLEGE DISTRICTEstimate:Owner: Kern Community College DistrictBaseEmc<strong>or</strong> Service $2,071,000Strategic Mechanical, Inc. $2,219,000HPS Plumbing Services, Inc. $2,250,898(Total of 3 <strong>Bid</strong>s Received)<strong>Bid</strong> <strong>Results</strong> Status: <strong>Results</strong> published. CCBE will follow up on sublist & award. A bidprotest has been sent to the District <strong>and</strong> is currently being reviewed by legal counsel.9/10/20132:00 PMLivingston PEDESTRIAN IMPROVEMENT SIDEWALK INSTALLATION PROJECT, CITY OF LIVINGSTON,REBIDEstimate:Owner: Livingston, City of, Public W<strong>or</strong>ksBase Alternate A Alternate BFBD Vanguard Construction, Inc. $503,172 $70,193 $64,400Tayl<strong>or</strong> Backhoe Service $507,341 $50,060 $58,541Rolfe Construction $549,460 $96,407 $36,225Hobbs Construction $552,189 $81,450 69,225(Total of 4 <strong>Bid</strong>s Received)SUBCONTRACTORS LISTED BY FBD Vanguard Construction, Inc.Destination Anywhere Trucking, MaterialsCalif<strong>or</strong>nia Coast SurveyingStockton Fence & MaterialChrisp CompanySurvey, StakingFencingStriping, Signage9/12/20132:00 PM<strong>Bid</strong> <strong>Results</strong> Status: <strong>Results</strong> & sublist published. CCBE will follow up on award.Fresno LIGHTHOUSE FOR CHILDREN PHASE 1, FIRST 5 FRESNO COUNTYEstimate:Owner: First 5 Fresno CountyDurhamConstructionCompany, IncJohnstonContracting,Inc.BMYConstructionGroupNelson, LewisC., & Sons,Inc.Wilson, Mark,Construction,Inc.BaseAddAlternate1AddAlternate2AddAlternate3AddAlternate4AddAlternate5Total$12,690,000 $11,350 $160,400 $108,000 $12,000 $10,400 $12,992,150$13,090,000 $17,215 $62,525 $101,425 $40,000 $55,175 $13,366,340$13,092,000 $23,000 $165,000 $100,000 $51,000 $45,000 $13,476,000$13,195,000 $25,000 $120,000 $100,000 $15,000 $12,000 $13,467,000$14,318,239 $10,000 $100,000 $136,000 $11,000 $10,000 $14,585,2399/17/20131:00 PM5


CCBE Weekly Newsletter <strong>Bid</strong> <strong>Results</strong> <strong>and</strong>/<strong>or</strong> <strong>Awards</strong> September 19, 2013Location Project Details <strong>Bid</strong> DateSeward L.SchrederConstruction,$14,992,005 $16,219 $69,300 $145,761 $66,990 $60,118 $15,350,393Inc.(Total of 6 <strong>Bid</strong>s Received)SUBCONTRACTORS LISTED BY Durham Construction Company, IncKarsyn Construction, Inc.Metal Studs, Drywall, PlasterWestmark Products, Inc.Casew<strong>or</strong>k, CountertopsSan Joaquin Glass Co.Glass, St<strong>or</strong>efront, WindowsOtis Elevat<strong>or</strong> CompanyElevat<strong>or</strong>Smoke GuardElevat<strong>or</strong> Smoke GuardWilson Fire Sprinkler Co., Inc.Fire SprinklerTodd Plumbing, Inc.PlumbingFour C's Construction (dba)Sheet MetalValley Unique Electric, Inc.ElectricalDiv 15 Tech, Inc.HVACR & C Construction A PartnershipEarthw<strong>or</strong>k, Baserock, Site ConcreteElite L<strong>and</strong>scape Construction, Inc.L<strong>and</strong>scape, IrrigationMaurin & D<strong>or</strong>is Construction, Inc.Building ConcreteHarris Rebar Fresno, Inc.RebarConcrete Preparation Systems West Vap<strong>or</strong> ControlKasco Fab, Inc.Structural SteelWestern Building Materials Co. (Fresno) Acoustical, FRP, Folding ParticiansGraham-Prewett, Inc.RoofingBallard, J. Dean & Sons Tile & Marble Co. Ceramic Tile, Thin BrickDFS Flo<strong>or</strong>ing, Inc.Flo<strong>or</strong>ingNelson's Painting (dba)Painting, Wallcovering<strong>Bid</strong> <strong>Results</strong> Status: <strong>Results</strong> & sublist published. CCBE will follow up on award.Clovis BARSTOW AVE. SEWER REPLACEMENT, VILLA TO TOLLHOUSE, CITY OF CLOVISEstimate:Owner: Clovis, City of, City HallBaseNelson, Bill, Gen. Engrg. Construction, Inc. $227,344Dawson - Mauldin Construction, Inc. $290,548Todd Companies $315,179West Valley Construction $349,706(Total of 4 <strong>Bid</strong>s Received)SUBCONTRACTORS LISTED BY Nelson, Bill, Gen. Engrg. Construction, Inc.Central Valley Engineering <strong>and</strong> Surveying (CVEAS) SurveyingSafety Striping Service, Inc.Striping, Pavement MarkingsVideo Inspection SpecialistVideoing9/17/20132:00 PM<strong>Bid</strong> <strong>Results</strong> Status: <strong>Results</strong> & sublist published. CCBE will follow up on award.6


CCBE Weekly Newsletter <strong>Bid</strong> <strong>Results</strong> <strong>and</strong>/<strong>or</strong> <strong>Awards</strong> September 19, 2013Location Project Details <strong>Bid</strong> DateSanta Cruz BROADWAY/BROMMER MULTI-USE PATH PROJECT, CITY OF SANTA CRUZEstimate: $5,500,000.00Owner: Santa Cruz, City of, Public W<strong>or</strong>ksBaseProven Management, Inc. $4,948,245Anderson Pacific Engineering $4,994,397Granite Rock $5,157,984Bothman, Robert A., Inc. $5,291,941RGW Construction, Inc. $5,464,247(Total of 5 <strong>Bid</strong>s Received)<strong>Bid</strong> <strong>Results</strong> Status: <strong>Results</strong> published. CCBE will follow up on sublist & award.8/27/20132:00 PMManteca WOODWARD AVE. UTILITIES & STREET IMPROVEMENTS PROJECT MEDIAN IRRIGATION &LANDSCAPE PLANTING, CITY OF MANTECAEstimate:Owner: Manteca, City of, Public W<strong>or</strong>ksBaseAmerine Systems $19,916Green Growth Industries $28,737Grover L<strong>and</strong>scape Services, Inc. $29,473Emert Construction $45,591(Total of 4 <strong>Bid</strong>s Received)<strong>Bid</strong> <strong>Results</strong> Status: <strong>Results</strong> published. CCBE will follow up on sublist & award.9/12/20132:00 PMSan LuisObispo Co.WATER TREATMENT PLANT IMPROVEMENTS PLATE SETTLER INSTALLATION, HERITAGERANCH COMMUNITY SERVICES DISTRICTEstimate:Owner: Heritage Ranch Community Services DistrictBaseAddAlternate 2AddAlternate 1AddAlternate 3Raminha Construction $1,236,800 $42,000 $38,000 $12,000Madonna, John, ConstructionCo., Inc.Whitaker Construction Group,Inc.$1,247,200 $35,600 $29,000 $850$1,262,150 $41,300 $39,850 $1HPS Mechanical $1,433,720 $45,660 $5,670 $0(Total of 4 <strong>Bid</strong>s Received)<strong>Bid</strong> <strong>Results</strong> Status: <strong>Results</strong> published. CCBE will follow up on sublist & award.9/13/20131:00 PMVarious AS-NEEDED TELECOMMUNICATIONS NETWORK CABLING, RELATED ELECTRICAL SERVICES &RELATED HARDWARE INSTALLATION SERVICES FOR SPECIFIC DMV OFFICES IN THE NORTHERNCALIFORNIA REGION, DEPT. OF MOTOR VEHICLESEstimate:Owner: Mot<strong>or</strong> Vehicles, Department ofBase3D Data Com $350,181Pinnacle Telecommunications $462,887Resi Comm Electrical & Alarms $773,736(Total of 3 <strong>Bid</strong>s Received)9/12/20131:30 PM7


CCBE Weekly Newsletter <strong>Bid</strong> <strong>Results</strong> <strong>and</strong>/<strong>or</strong> <strong>Awards</strong> September 19, 2013Location Project Details <strong>Bid</strong> Date<strong>Bid</strong> <strong>Results</strong> Status: <strong>Results</strong> published. No subs were listed. CCBE will follow up on award.Bakersfield RFQ FOR DESIGN, CONSTRUCTION AND OPERATION OF A HOTEL AND CONFERENCECENTER, CSU - BAKERSFIELDEstimate:Owner: CSU-Bakersfield, Office of ProcurementBaseRising Sun Hospitality, LLC $0(Total of 1 <strong>Bid</strong>s Received)<strong>Bid</strong> <strong>Results</strong> Status: <strong>Results</strong> published. No subs were listed. CCBE will follow up on awardin 3 to 4 weeks.9/10/20132:00 PMFresno Co. FEDERAL ASPHALT CONCRETE OVERLAYS VARIOUS LOCATIONS, COUNTY OF FRESNOEstimate: $2,728,087.00Owner: Fresno, County of, Financial ServicesBaseTeichert Construction (Fresno) $2,351,157Granite Construction Co. $2,352,393RGW Construction, Inc. $2,363,288Dawson - Mauldin Construction, Inc. $2,415,562Papich Construction (Grover Beach) $2,420,385Berry, Don, Construction, Inc. $2,463,762American Paving Co. $2,481,527Emmett's Excavation, Inc. $2,514,032Baker, W. Jaxon Inc. (Redding) (dba) $2,514,782Lee's Paving, Inc. $2,559,227(Total of 10 <strong>Bid</strong>s Received)SUBCONTRACTORS LISTED BY Teichert Construction (Fresno)Safety Striping Service, Inc. Striping, Pavement MarkersPavement Recycling Systems, Inc.Pacific N<strong>or</strong>thwest OilCold PlaneGeosynthetic Pavement Fabric9/12/20132:00 PM<strong>Bid</strong> <strong>Results</strong> Status: <strong>Results</strong> & sublist published. CCBE will follow up on award.Fresno TRANSIT WINDOW GLASS GUARDS, CITY OF FRESNOEstimate:Owner: Fresno, City of, PurchasingBaseLaird Plastics, Inc. $18,394New Flyer Industries Canada ULC $24,382Transit Products & Service $31,050Gillig LLC $38,507(Total of 4 <strong>Bid</strong>s Received)<strong>Bid</strong> <strong>Results</strong> Status: <strong>Results</strong> published. No subs were listed. CCBE will follow up on award.9/10/20132:00 PM8


CCBE Weekly Newsletter <strong>Bid</strong> <strong>Results</strong> <strong>and</strong>/<strong>or</strong> <strong>Awards</strong> September 19, 2013Location Project Details <strong>Bid</strong> DateOakley CANAL LEVEE ELIMINATION & FLOOD PROTECTION PROJECT, SEGMENT 2 - PIPELINE, CONTRACOSTA WATER DISTRICTEstimate:Owner: Contra Costa Water DistrictBaseMountain Cascade $15,650,000Rados, Steve P. , Inc. $17,376,250Shimmick Construction Co, Inc. (Oakl<strong>and</strong>) $18,764,250Preston Pipelines, Inc. (Milpitas) $19,683,290Proven Management, Inc. $20,842,250NTK Construction $21,460,000Ranger Pipelines, Inc. (S.F.) $22,127,875N<strong>or</strong>dic Industries $30,285,000(Total of 8 <strong>Bid</strong>s Received)<strong>Bid</strong> <strong>Results</strong> Status: <strong>Results</strong> published. CCBE will follow up on sublist & award.9/17/201310:00 AMSan LEVEE MAINTENANCE PROJECT, WATERBORNE EROSION REPAIRS AT VARIOUS LOCATIONS 9/17/2013Joaquin Co. ALONG THE SAN JOAQUIN RIVER, RECLAMATION DISTRICT # 4032:30 PMEstimate: $100,000.00BaseSan Rafael Rock Quarry, Inc. $198,225Burns, Robert, Construction $256,288(Total of 2 <strong>Bid</strong>s Received)<strong>Bid</strong> <strong>Results</strong> Status: <strong>Results</strong> published. CCBE will follow up on sublist & award.SanJoaquinCo.LEVEE MAINTENANCE PROJECT, 2013 EROSION REPAIR SITES, PRIORITY 1 AT VARIOUSLOCATION ALONG SAN JOAQUIN RIVER & FRENCH CAMP SLOUGH, RECLAMATION DISTRICT# 404Estimate: $350,000.00BaseStephens, AM, Construction $215,000Burns, Robert, Construction $216,995F<strong>or</strong>d Construction Co., Inc. $238,950Asta Construction $260,013Swan Engineering, Inc. $302,150(Total of 5 <strong>Bid</strong>s Received)<strong>Bid</strong> <strong>Results</strong> Status: <strong>Results</strong> published. CCBE will follow up on sublist & award.9/17/20132:00 PMFresnoCo.DELTA-MENDOTA CANAL BRIDGE SEISMIC RETROFIT ON WEST SIERRA AVENUE, COUNTY OFFRESNOEstimate: $352,000.00Owner: Fresno, County of, Financial ServicesBaseAmerican Paving Co.$297,731 (Awarded)Sierra Mountain Construction $329,769Golden State Bridge, Inc. $624,002Viking General Contract<strong>or</strong>s $665,4077/25/20132:00 PM9


CCBE Weekly Newsletter <strong>Bid</strong> <strong>Results</strong> <strong>and</strong>/<strong>or</strong> <strong>Awards</strong> September 19, 2013Location Project Details <strong>Bid</strong> Date(Total of 4 <strong>Bid</strong>s Received)SUBCONTRACTORS LISTED BY American Paving Co.Harris Salinas RebarRebarPacific Coast Drilling Company, Inc.<strong>Bid</strong> <strong>Results</strong> Status: Award published.DrillingBakersfield NEW POULTRY BUILDING, KERN HIGH SCHOOL DISTRICT AG FARM, REBIDEstimate:Owner: Kern High School DistrictBaseWysong Construction Co.Kern County Construction, Inc. $521,500Black/Hall Construction, Inc. $564,685Pickard & Butters Construction $568,000AMG & Associates $568,000Colombo Construction Co., Inc. $570,000$464,700 (Awarded)Klassen C<strong>or</strong>p. $614,638(Total of 7 <strong>Bid</strong>s Received)SUBCONTRACTORS LISTED BY Wysong Construction Co.Saleh, William B., Co.PaintingBronco ElectricElliot General, Inc.Holders Air Conditioning & Heating, Inc.Taft PlumbingRedding ExcavationElectricalMetal BuildingHVACPlumbingUnderground, Earthw<strong>or</strong>k8/28/20132:00 PM<strong>Bid</strong> <strong>Results</strong> Status: Award published.Bakersfield LANDSCAPING & IRRIGATION PHASE 3, MODERNIZATION PHASE 2-2006 SOUTH HIGHSCHOOL, KERN HIGH SCHOOL DISTRICTEstimate:Owner: Kern High School DistrictBaseKern Sprinkler & L<strong>and</strong>scapingNish-Ko, Inc. $72,931Elite L<strong>and</strong>scape Construction, Inc. $79,150$57,260 (Awarded)American Hydrotech, Inc. $87,500(Total of 4 <strong>Bid</strong>s Received)<strong>Bid</strong> <strong>Results</strong> Status: Award published. No subs were listed.8/28/20132:00 PMKernCo.DISTRICT-WIDE RENTAL AND/OR PURCHASE OF RELOCATABLE MODULAR CLASSROOMS & JOBOFFICE, KERN HIGH SCHOOL DISTRICTEstimate:Owner: Kern High School DistrictBaseMcGrath RentC<strong>or</strong>p$310,952 (Awarded)8/14/20132:00 PM10


CCBE Weekly Newsletter <strong>Bid</strong> <strong>Results</strong> <strong>and</strong>/<strong>or</strong> <strong>Awards</strong> September 19, 2013Location Project Details <strong>Bid</strong> Date<strong>Bid</strong> <strong>Results</strong> Status: Award published. No subs were listed.Fresno TRANSIT BENCHES & TRASH RECEPTACLES, CITY OF FRESNOEstimate:Owner: Fresno, City of, PurchasingBaseMRCO'Keefe, David, F., Company$104,783 (Non-responsive)$117,738 (Awarded)Brisco, Dale, Inc. $182,765(Total of 3 <strong>Bid</strong>s Received)<strong>Bid</strong> <strong>Results</strong> Status: Award published. No subs were listed. MRC bid was found non-responsive.9/5/20132:00 PMFresno REROOF POLICE DEPARTMENT HEADQUARTERS, CITY OF FRESNOEstimate: $270,000.00Owner: Fresno, City of, PurchasingBaseNations Roof West (dba)$260,120 (Awarded)8/27/20133:00 PMSUBCONTRACTORS LISTED BY Nations Roof West (dba)Four C's Construction (dba) MechanicalPARC Environmental Contract<strong>or</strong>sAsbestos Roof Removal<strong>Bid</strong> <strong>Results</strong> Status: Award published.Modesto HIGH TECH CENTER, MODESTO JUNIOR COLLEGE EAST CAMPUS, YOSEMITE COMMUNITYCOLLEGE DISTRICTEstimate:Owner: Yosemite Community College District, PurchasingBaseAddAlternate 1AddAlternate 3AddAlternate 4Acme Construction $10,390,000 $721,000 $29,500 $177,000(Awarded)Diede Construction, Inc. $10,912,000 $408,000 $18,000 $89,000Roebbelen Contracting, Inc. $10,995,000 $592,000 $26,000 $153,000Simile Construction $11,345,000 $326,000 $18,000 $81,000Zovich Construction $11,355,000 $500,000 $20,000 $135,000Soltek Pacific ConstructionCompany (dba)$11,450,000 $515,000 $23,000 $80,000Lewis C. Nelson <strong>and</strong> Sons,Inc.$11,645,000 $581,000 $40,000 $85,000(Total of 7 <strong>Bid</strong>s Received)SUBCONTRACTORS LISTED BY Acme ConstructionMaloney, W.C., Inc.Building Demolition, Concrete Demolition,SawcuttingCamblin SteelFibrwrap ConstructionBallard, J. Dean & Sons Tile &Marble Co.Kent Lathing, Inc.Reinf<strong>or</strong>cing SteelFRP Strength SystemMasonry, Brick VeneerMetal Frame, Suspension, Drywall, Water Barrier8/5/20134:00 PM11


CCBE Weekly Newsletter <strong>Bid</strong> <strong>Results</strong> <strong>and</strong>/<strong>or</strong> <strong>Awards</strong> September 19, 2013Location Project Details <strong>Bid</strong> DateBoeger, Robert, Plastering, Inc.Thompson, HWGolden State Steel (dba)Kings RoofingCollins Electrical Co., Inc.(Modesto)DDK Mechanical, Inc.N<strong>or</strong>-Cal GlassMancini, B.T., Co., Inc.(Sacramento)Western Building Materials Co.(Fresno)2S2G Contracting, Inc.Ro's Precise Painting, Inc.Summit Plumbing & Mechanical,Inc.Lath, PlasterResilient Flo<strong>or</strong>, Carpet TileStructural SteelTPO Roofing, Roof InsulationElectricalMechanical, HVACGlass, Fire Rated Glass, Aluminum St<strong>or</strong>efront,Curtain WallExt. Phenolic Wood PanelsAcoustical CeilingVap<strong>or</strong> Emission SystemPaintingPlumbing<strong>Bid</strong> <strong>Results</strong> Status: Award published.12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!