20.07.2015 Views

CIC Operator Guide - ANCIC

CIC Operator Guide - ANCIC

CIC Operator Guide - ANCIC

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

GRASP-AN<strong>CIC</strong>Cooperation


History of GRASP-AN<strong>CIC</strong>cooperation1. AN<strong>CIC</strong> general assembly meeting – June 2003 (Result: InformalCommunication Network created and in place)2. AN<strong>CIC</strong>-GRASP workshop to develop AN<strong>CIC</strong> Strategy for 2003-2006 – September 2003 (Result: Strategy developed)3. AN<strong>CIC</strong> general assembly meeting – November 2003 (Result:Bylaw updated and AN<strong>CIC</strong> Strategy adopted and in place)


4. Training of Trainers andconsultants on <strong>CIC</strong> operation –March 2004 (Result: 25 civilservants trained as trainers andconsultants on <strong>CIC</strong> operation andmanagement)• AN<strong>CIC</strong>-GRASP work groups meetings – February-April 2004Groups results: Set up the AN<strong>CIC</strong> standards of performance (Result: Standards developedand will be posted on AN<strong>CIC</strong> website and included in the <strong>CIC</strong> <strong>Operator</strong><strong>Guide</strong>)Set up the <strong>CIC</strong> standards of performance (Result: Standards developedand will be included in the <strong>CIC</strong> <strong>Operator</strong> <strong>Guide</strong>)Develop the content of the <strong>CIC</strong> <strong>Operator</strong> <strong>Guide</strong> (Result: <strong>CIC</strong> <strong>Operator</strong><strong>Guide</strong> in process, printed by June 30, CD included) The National Catalog of <strong>CIC</strong> (Result: Catalog printed by May 30)


Groups results:Set up the <strong>CIC</strong> software – user requirements (Result:User requirements developed, basis for Terms ofRefference when purchasing the <strong>CIC</strong> software)


Next steps(grant coverage)1. AN<strong>CIC</strong> technical assistance to create new <strong>CIC</strong>(requests from 31 LGUs)2. AN<strong>CIC</strong> technical assistance to improve existing <strong>CIC</strong>performance (requests from 55 LGUs)3. AN<strong>CIC</strong> training for public servants operating <strong>CIC</strong>(requets from 63 LGUs)3. AN<strong>CIC</strong> exchange of experience visits in betweenLGUs5. Regional workshops to disseminate best practices


GRASP Support1. Provide training to design the technicalassistance interventions using standardprocedures2. Materials for providing technical assistanceThe consultant manualThe <strong>CIC</strong> <strong>Operator</strong> <strong>Guide</strong>3. Provide training for designing and conductingthe training sessions4. Materials for providing the training sessionsThe trainer’s manualThe <strong>CIC</strong> <strong>Operator</strong> <strong>Guide</strong>


GRASP supportEdit and print the <strong>CIC</strong> support materialsThe National Catalog ofCitizen InformationCenters/PR departments –2004 (500 copies)FOIA User’s <strong>Guide</strong> forCitizens and PublicServants (1000 copies)


GRASP supportEdit and print the <strong>CIC</strong> support materials <strong>CIC</strong> <strong>Operator</strong> <strong>Guide</strong> (including the AN<strong>CIC</strong> and <strong>CIC</strong>standards of performance) Budget Transparency <strong>Guide</strong> Public Service Monitoring <strong>Guide</strong>


GRASPCitizen Participation TeamKristina Creoşteanu – BucharestElena Negrea – SibiuGheorghe Ioniţă –IaşiEugen Cozma – Oradea

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!