21.07.2015 Views

Corporate Presentation - November 2011 - ShaMaran Petroleum ...

Corporate Presentation - November 2011 - ShaMaran Petroleum ...

Corporate Presentation - November 2011 - ShaMaran Petroleum ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Pulkhana Update: PLK-8RE13» Legacy well PLK-8 tested oil from the Shiranish at 2500-3500 bopd» Much improved rates from the 1957 & 2006 tests (av. 600-700 bopd) despite debris and mud losses from 2006 drilling» Significant fracture system providing high deliverability» Better Shiranish oil quality than expected (31.6 deg API, lowgas and very low H2S content)» Successfully drilled additional 60m reservoir section» Planning for well to be connected to Early Production Facilityduring 2012PLK-8RE Testing Shiranish formation (October <strong>2011</strong>)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!