21.07.2015 Views

Corporate Presentation - November 2011 - ShaMaran Petroleum ...

Corporate Presentation - November 2011 - ShaMaran Petroleum ...

Corporate Presentation - November 2011 - ShaMaran Petroleum ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Arbat Update15» High potential exploration block (over 930 km 2 withactive petroleum system – surface seeps)EBADF» Two prospects (Potential PIIP 600 MMB*):» Arbat-A: Main prospect (Arbat-1) – regional Jurassic& Triassic reservoirs» Arbat-B: Shallow Cretaceous prospect (success couldprove the shallow Cretaceous play in the block)» Four major leads with significant mean resourcepotential in excess of 2.2 billion barrels PIIP**C» Acquisition of up to 200 kms of infill 2D seismic inprogress to firm up the leads» Arbat-A well location approved with start of civilengineering imminentArbat*McDaniel & Associates ; **Internal estimates based on 2D seismic and regional reservoir properties

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!