BUILDING FOR THE FUTURE<br />

article by alper guder<br />

Recent investigations confirm that Silas Willard<br />

Elementary School was founded more than 100<br />

years ago by Silas Willard himself. Prior to our<br />

demolition, the building itself was a potential<br />

historical building candidate. The cost fo the<br />

new facility is $16 million, which is built on<br />

73,000 square feet. Initially, there was debate<br />

over whether the school should be rebuilt or<br />

remodeled. Thanks to our estimating group, it<br />

turned out to be far more feasible to construct a<br />

brand new school.<br />

The new building consists of a cafeteria,<br />

gymnasium, music / art room, and 33<br />

classrooms. Over the next four months,<br />

masonry, glazing, roofing, and interior<br />

decorations will make up the majority of the<br />

work.<br />

Construction is estimated to be completed in<br />

early 2016. Though the rain and severe winter<br />

impeded progress of the exterior work, we have<br />

already gotten half-way through the scope of<br />

work, including:<br />

• Footing and Foundations<br />

• Steel Structure Erection<br />

• Precast Wall Installation<br />

• Plumbing Work Completion<br />

• Decking and Detailing Finalization<br />

• Implementation Divison 3 (concrete)<br />

• Framing<br />

To view the progress that is being made at<br />

Galesburg High School, check out the LIVE<br />

webcam:<br />

http://50.200.60.154/

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!