31.07.2015 Views

missouri risk-based corrective action (mrbca) process for petroleum ...

missouri risk-based corrective action (mrbca) process for petroleum ...

missouri risk-based corrective action (mrbca) process for petroleum ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

of Method 5035 requires that soil samples to be analyzed <strong>for</strong> VOCs be preserved by theaddition of trisodium phosphate dodecahydrate (TSP) to the sample rather than sodiumbisulfate.During the tank closure <strong>process</strong>, sufficient color photographs shall be collected todocument the condition of tanks, excavation, pads, etc. and submitted with the closurereport.If the sampling requirements presented in this section cannot be met due to site-specificconditions, an alternative plan must be submitted to MDNR and approved.4.4.2 Number and Location of Soil SamplesThis section presents sampling requirements <strong>for</strong> projects where fewer than 200 cubicyards of native soil (not including the backfill material) are excavated. For sites wheremore than 200 cubic yards of native soil have been contaminated, refer to Section 4.4.4<strong>for</strong> proper sampling requirements.4.4.2.1 Soil Sampling <strong>for</strong> UST Removals with No Physical EncumbrancesSamples have to be collected from beneath the tank (tank pit floor) and along the tank pitwall in the direction COCs or <strong>petroleum</strong> product is most likely to migrate. Exhibit 4-1presents the number of samples and Figures 4-1(a) to 4-1(d) present the locations wherethe samples shall be collected.Exhibit 4-1Tank Excavation Sampling <strong>for</strong> UST Removals with No Physical EncumbrancesSample LocationBeneath a UST that is 110 to 1,000gallons capacityBeneath a UST that is greater than1,000 gallons capacityDowngradient WallSample RequirementOne grab sample required under each tank. Samplebeneath the center of the UST or its <strong>for</strong>mer location[Figure 4-1(a)].Two grab samples required under each tank. One samplebeneath each end of the tank or its <strong>for</strong>mer location[Figure 4-1(b)]. One sample should be from beneath thefill port.One grab sample from each 20-foot section required.Collect the sample from the hydraulic downgradient wallof the excavation pit at the point of greatest visiblecontamination. If no contamination is visible, collect thesample from the wall at a level 12" below the bottom ofthe UST or its <strong>for</strong>mer location [Figures 4-1(c) and 4-1(d)].MRBCA Guidance Document Page 4-3February 24, 2004Final Draft

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!