09.08.2015 Views

The largest bridge in Tunisia is waterproofed with Parafor Ponts

Download pdf - Siplast International

Download pdf - Siplast International

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Special edition #1April 2009| www.siplast-<strong>in</strong>ternational.comPont Rades-La Goulette<strong>The</strong> <strong>largest</strong> <strong>bridge</strong> <strong>in</strong> <strong>Tun<strong>is</strong>ia</strong> <strong>is</strong><strong>waterproofed</strong> <strong>with</strong> <strong>Parafor</strong> <strong>Ponts</strong>An <strong>in</strong>ternational project40,000 m² of <strong>Parafor</strong> <strong>Ponts</strong>waterproof<strong>in</strong>g systemapplied by ProbatAn <strong>in</strong>ternational project of 40,000 m² of <strong>bridge</strong>-deck waterproof<strong>in</strong>g,us<strong>in</strong>g the <strong>Parafor</strong> <strong>Ponts</strong> SystemUntil now, to bypass Tun<strong>is</strong> on its east side, it was necessary to takea boat. Today, the Rades-La Goulette Bridge crosses the lake ofTun<strong>is</strong> and, <strong>in</strong> th<strong>is</strong> way, smoothes and d<strong>is</strong>encumbers the <strong>Tun<strong>is</strong>ia</strong>ncapital’s traffic loads. Not only <strong>is</strong> the <strong>largest</strong> <strong>bridge</strong> <strong>in</strong> the country,but it <strong>is</strong> also a technical prowess.<strong>The</strong> <strong>Parafor</strong> <strong>Ponts</strong> waterproof<strong>in</strong>g system was applied by ProbatCompany/<strong>Tun<strong>is</strong>ia</strong>.Description of an ambitious project.With a total overall span of 2,000 meters, the Rades-La Goulette Bridgel<strong>in</strong>ks La Goulette at the north to Rades at the south. Th<strong>is</strong> concretestructure <strong>is</strong> divided <strong>in</strong>to three subspans of 70, 120 and 70 m and has twolanes on each side. With its variable height, its two <strong>bridge</strong> towers and itscable stays, it constitutes the most spectacular part of the project. It hastwo accesses, to the north, multiple box girders, cast on centr<strong>in</strong>g and, tothe south, a traverse of precast pre-stressed girders.<strong>The</strong> design of th<strong>is</strong> <strong>bridge</strong> <strong>is</strong> based on state-of-the-art technology,<strong>in</strong>clud<strong>in</strong>g very deep foundations for earthquake res<strong>is</strong>tance. Its deck hasfour webs of variable height, four types of pre-stressed elements, one ofwhich <strong>is</strong> extrados type (th<strong>is</strong> <strong>is</strong> a very rare feature).An <strong>in</strong>ternational projectBuilt <strong>in</strong> cooperation between Japan and <strong>Tun<strong>is</strong>ia</strong>, the project was f<strong>in</strong>ancedby Japanese banks. It was managed by a group of Japanese eng<strong>in</strong>eer<strong>in</strong>gfirms (Nippon Koei, PCI) and <strong>Tun<strong>is</strong>ia</strong>n eng<strong>in</strong>eer<strong>in</strong>g firms (Scet and Studi).As to the <strong>bridge</strong> itself, it was erected by contract<strong>in</strong>g firms from Japan(Ta<strong>is</strong>ei and Kajima), <strong>Tun<strong>is</strong>ia</strong>, Egypt (Arab Contractors) and France (VSL).A number of French eng<strong>in</strong>eer<strong>in</strong>g firms also contributed (Setec, Ingérop,JMI).40,000 m² of <strong>Parafor</strong> <strong>Ponts</strong> waterproof<strong>in</strong>g systemapplied by ProbatProbat <strong>is</strong> a <strong>Tun<strong>is</strong>ia</strong>n d<strong>is</strong>tribut<strong>in</strong>g & contract<strong>in</strong>g company, one of thespecialities of which <strong>is</strong> waterproof<strong>in</strong>g civil eng<strong>in</strong>eer<strong>in</strong>g works. It wasentrusted <strong>with</strong> the waterproof<strong>in</strong>g s<strong>in</strong>ce its craftsmen are very familiar <strong>with</strong>Siplast products, hav<strong>in</strong>g been tra<strong>in</strong>ed at the Siplast Tra<strong>in</strong><strong>in</strong>g Centre <strong>in</strong>Mondoubleau (France). <strong>The</strong> <strong>Parafor</strong> <strong>Ponts</strong> system (read the <strong>in</strong>set) wasselected for its bond<strong>in</strong>g qualities and for its light weight (5kg/m²),important requirements on th<strong>is</strong> structure. Furthermore, it <strong>is</strong> rapidly laid <strong>in</strong>one pass, then it directly receives the wear<strong>in</strong>g course. <strong>The</strong> economicaspect <strong>is</strong> also favourable to <strong>Parafor</strong> <strong>Ponts</strong>, a complex that <strong>is</strong> lessexpensive than other systems. F<strong>in</strong>ally, it was essential to propose asystem hold<strong>in</strong>g the Technical Assessment from the Setra¹, technicalbranch of the French Bridge and Roadway Authority, the reputation ofwhich <strong>is</strong> recogn<strong>is</strong>ed <strong>in</strong>ternationally.From the viewpo<strong>in</strong>t of the Japanese project management firm, Siplast-Icopal, present <strong>in</strong> Japan for nearly 15 years, can certa<strong>in</strong>ly be considered


as a reliable partner. For the design of the waterproof<strong>in</strong>g work, theRades-La Goulette Bridge required a very meticulous detailed layout,given its architecture <strong>with</strong> its curves and their counter<strong>in</strong>g <strong>in</strong>flected curves.<strong>The</strong> work itself was executed on time. Th<strong>is</strong> required some work at night.Inaugurated on March 21 st , 2009, the Rades-La Goulette Bridge will becarry<strong>in</strong>g a traffic load estimated at 30,000 vehicles per day, 15 to 20% ofwhich will be heavy road vehicles. <strong>The</strong> drivers will be avoid<strong>in</strong>g the dailytraffic jams.A major step <strong>in</strong> the development of Greater Tun<strong>is</strong>.¹SETRA – Service Technique d’Etudes des Routes et Autoroutes (Road and HighwayTechnical Study and Design Agency)Jobsite identification sheetContract<strong>in</strong>g Authority:M<strong>in</strong><strong>is</strong>try of Infrastructure, ofHous<strong>in</strong>g and of TerritorialPlann<strong>in</strong>g, General Bridge andRoadway AuthorityEng<strong>in</strong>eer<strong>in</strong>g company:Nippon Koei CO ltd Group.Technical <strong>in</strong>spection body:Pacific ConsultantInternational (PCI), CentralTerritorial DevelopmentAuthority (SCET <strong>Tun<strong>is</strong>ia</strong>),<strong>Tun<strong>is</strong>ia</strong>n Eng<strong>in</strong>eer<strong>in</strong>gCompany (STUDI)Contract<strong>in</strong>g company:group compr<strong>is</strong><strong>in</strong>g Kajima(Japan) and ArabContractors (Egypt)Waterproof<strong>in</strong>g contract<strong>in</strong>gcompany: ProbatSiplast products: <strong>Parafor</strong><strong>Ponts</strong> membrane, SiplastPrimer<strong>Parafor</strong> <strong>Ponts</strong>: the reliable, fast and economical s<strong>in</strong>gle-plysolution, hold<strong>in</strong>g a Technical Assessment from Setra<strong>Parafor</strong> <strong>Ponts</strong> <strong>is</strong> a prefabricated s<strong>in</strong>gle-ply membrane (as described<strong>in</strong> Booklet 67, 1 st Chapter of the CCTG²). Full-surface welded on theSiplast Primer coated concrete deck, it can be used under certa<strong>in</strong>conditions on a metal structure. It then directly receives the macadamlayer, <strong>with</strong>out protective layer.Its benefits: No excessive load<strong>in</strong>g of the structure: the waterproof<strong>in</strong>g weighsjust 5kg/m². Fast application. Inexpensive. Allows for light traffic on the jobsite. <strong>Parafor</strong> <strong>Ponts</strong> constitutes an excellent <strong>in</strong>terface between themacadam and the concrete deck, and limits any r<strong>is</strong>k of slippagebetween the various layers.Pack<strong>in</strong>g: Standard roll: 1m x 8m, weight: 49kg. Other pack<strong>in</strong>gs <strong>in</strong> longer rolls are possible for mechan<strong>is</strong>edapplications.Reference documents: Technical Assessment for civil eng<strong>in</strong>eer<strong>in</strong>g structures, <strong>is</strong>sued bySetra. Siplast “Road-Bridges” Design and Installation Manual.²CCTG – Cahiers des Clauses Techniques Générales (General Technical ClauseBook)12 rue de la Rena<strong>is</strong>sance - 92184 ANTONY Cedex - Francecontact@siplast-<strong>in</strong>ternational.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!