20.08.2015 Views

FIRE PRE-PLANS

Fire Pre-plans (pdf) - Marsh

Fire Pre-plans (pdf) - Marsh

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

RISK ENGINEERING POSITION PAPER5. SPECIFIC REQUIREMENTS5.1 POLICY AND PROCEDUREThe Health, Safety and Environment Management System(HSE-MS) should include the procedure for thedevelopment and application of Fire Pre-plans. A copy ofthe Fire Pre-plans should be included in the EmergencyProcedures Manual for the site. Fire Pre-plans should bemanaged in the same way as all other controlleddocuments.Corporate standards for Fire Pre-plans should be availableto member sites.5.2 OWNERSHIP ANDDEVELOPMENTFire Pre-plans should be owned by the EmergencyResponse organisation at the site. There should be inputfrom all involved and affected groups and disciplines –particularly the operations teams. Where the external /local fire brigade plays a significant part in the emergencyresponse, they should be familiar with the Fire Pre-plans.Specific evacuation plans, muster points, headcount, etc.should be covered under a separate procedure in the SiteEmergency Response Plans.By definition, a Fire Pre-plan is a ‘desk-top’ derived plan,with additional input from exercise and incident feedback.The Pre-plan is best developed by a team effort. Teammembers should include:••Person responsible for site tactical emergency responseteam e.g. Fire Chief/Fire Engineer••Person responsible for first-line response e.g. ShiftSupervisor••Operations Representative - Area specific••Firefighting Team Representative••Risk Engineer••Safety OfficerThe Pre-plan should be seen as an evaluation of the type ofresponse required for typical scenarios. In the event of anactual incident, the Pre-plan should be seen as a guide andwould need to be adjusted to suit local factors, e.g.weather conditions, actual process conditions. The FirePre-plan acts as an aide-memoire in crisis situations whererational thinking time could be limited. The developmentof a Fire Pre-plan may also highlight where there may bedeficiencies in response capability or particular problemswith the subject scenario.Scenarios to be documented should be as comprehensiveas time and resource allows. Good starting points areevents typically highlighted in a Safety Case, or by highlevelunit assessment looking at other property damageevents.5.3 <strong>FIRE</strong> <strong>PRE</strong>-PLAN PORTFOLIOA comprehensive portfolio of Fire Pre-plans should include:••A Fire Pre-plan for each major storage tank and eachbund area (although these can often be combined foridentical tanks in a single local area).••A Fire Pre-plan for each pressurised storage vessel andcontainment area, including protection of the run-offand impounding area, and key steps to avoid a BLEVE.••A Fire Pre-plan for refrigerated storage tanks includingprotection of the run-off and impounding area.••A Fire Pre-plan for each berth at the marine terminal.••A Fire Pre-plan for each rail and truck loading gantry.••A Fire Pre-plan for each defined “fire area” of the unite.g. as limited by layout/drainage where this is practical/meaningful. At least the two or three most severe firecases for each process unit should be defined.••Any other specific cases that are equivalent to one of theabove.Marsh • 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!