28.08.2015 Views

Kiruna and Malmberget

Mining-induced ground deformations in Kiruna and ... - Impactmin

Mining-induced ground deformations in Kiruna and ... - Impactmin

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Impactmin Eurock 2012<br />

2013-04-26<br />

Mining-induced ground deformations in<br />

<strong>Kiruna</strong> <strong>and</strong> <strong>Malmberget</strong><br />

Jimmy Töyrä, LKAB


Impactmin 2012<br />

2013-04-26<br />

<strong>Kiruna</strong> year 1920…<br />

Company Hotel


Impactmin 2012<br />

2013-04-26<br />

…<strong>and</strong> 85 years later<br />

Company Hotel


Impactmin 2012<br />

2013-04-26<br />

Mining-induced ground deformations in sublevel caving<br />

Continuous<br />

deformations<br />

Discontinuous<br />

deformations<br />

Continuous<br />

deformations<br />

Deformation<br />

Zone<br />

Fracture<br />

Zone<br />

Caving<br />

Zone<br />

Deformation<br />

Zone<br />

Fracture<br />

Zone<br />

Hangingwall<br />

Caved<br />

rock<br />

Footwall<br />

Mining with sublevel caving<br />

Orebody


Impactmin 2012<br />

2013-04-26<br />

• Railroad<br />

Impact on infrastructure<br />

– New railroad has been constructed <strong>and</strong> is open for traffic.<br />

• Residential buildings<br />

– First "move-out" in 2014 ("Ullspiran" apartment complex)<br />

– Others to follow…<br />

• Other buildings<br />

– The LKAB company hotel ("Bolagshotellet") in 2015<br />

– "Hjalmar Lundbohmsgården" (the former residence of the founder<br />

of LKAB) in 2015<br />

• The bridge – mine access road (2013)<br />

• The City Hall, The Fire Brigade, etc (2017…)


Impactmin 2012<br />

2013-04-26<br />

<strong>Kiruna</strong> - view towards north<br />

City Hall<br />

<strong>Kiruna</strong> City<br />

North<br />

B Bridge<br />

LKAB Hotel<br />

"Ullspiran"<br />

Railroad<br />

Hangingwall side


Impactmin 2012<br />

2013-04-26<br />

Monitoring of ground deformations<br />

• GPS Measurements<br />

– Measurement since 2003 (total station from 1996)<br />

– 337 measurement hubs<br />

– Measurement of deformations in horizontal <strong>and</strong> vertical<br />

direction<br />

– All points measured annually; selected points measured<br />

each quarter<br />

– Reporting internally <strong>and</strong> externally each quarter:<br />

• ”Environmental criteria" – differential movement per ruling in<br />

the Swedish Environmental Court = limit for LKAB industrial<br />

area


Impactmin 2012<br />

2013-04-26<br />

Maximum allowed ground deformation<br />

Limit for allowed deformations<br />

Strain limit 0.3 % horizontally, 0.2 % vertically<br />

Example: distance 50 m<br />

max<br />

15 cm<br />

M1<br />

- more secure measurement values<br />

- shows whether mining is the cause<br />

- coupled to impact<br />

M2<br />

max<br />

10 cm


Impactmin 2012<br />

2013-04-26<br />

Monitoring results September 2012<br />

Current limit of industrial area<br />

Current limit of industrial area<br />

Environmental Criteria Criteria


Prognosis of ground deformations<br />

Impactmin 2012<br />

2013-04-26<br />

• Prognosis of location of "environmental<br />

criterion" limit for the years:<br />

- 2013<br />

- 2018<br />

- 2023<br />

Current environmental criteria<br />

2013<br />

2018<br />

2023


Impactmin 2012<br />

2013-04-26<br />

DEFORMATIONS IN THE NORTH PART OF THE MINE<br />

2010-02-08 2012-02-23<br />

2012-04-17 2012-04-25


Impactmin 2012<br />

2013-04-26<br />

Developments <strong>and</strong> Future Work<br />

• Improved deformation monitoring<br />

– Extended GPS network<br />

– InSAR-project<br />

• Improved prognosis & precision<br />

– Annually review <strong>and</strong> revision (if required) of prognosis<br />

– PhD-project at Luleå University (Ltu)


The InSAR-project<br />

Impactmin 2012<br />

2013-04-26


– High precision; few fixed hubs (except Corner<br />

Reflectors)<br />

Impactmin 2012<br />

2013-04-26<br />

– 12–15 measurements per year (24 day return period)<br />

– Further development required for winter conditions<br />

– Research project LKAB-Ltu-Cranfield University<br />

– Technology transfer MDA => LKAB


Impactmin 2012<br />

2013-04-26<br />

Thanks!<br />

Thanks!

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!