28.08.2015 Views

Sourcebook 2015

Sourcebook-2015OE

Sourcebook-2015OE

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Featured Project:<br />

The Church of the Annunciation<br />

of the Blessed Virgin Mary<br />

McSherrystown, PA<br />

o ject:<br />

Project Scope:<br />

Restoration of Stained Glass<br />

Fabrication and installation n of new mahogany frame<br />

Restoration of steel ventilator units<br />

Installation of new protective glazing<br />

Before<br />

After<br />

In 2013 the Church of the Annunciation of the Blessed Virgin Mary chose Stained Glass Resources to restore their stained glass choir loft<br />

window w depicting “The Last Judgement.” The lead came matrix that supports the stained glass was severely deteriorated and needed to be<br />

replaced. Additionally, the condition of the intricately-shaped wood frame needed to be addressed. Poor original design had resulted in<br />

a structurally weak frame that eventually “broke,” allowing the center of the frame to buckle and deflect several eral inches to the exterior. The<br />

deflection also caused more damage to the already deteriorated stained glass panels. To make matters worse, a layer of polycarbonate<br />

glazing had been added, covering the entire e window and wood frame. Instead of protecting the window w as intended, it caused further<br />

damage to the wood frame by trapping heat and moisture. It also obscured the beautiful architectural detail in the millwork.<br />

Completed<br />

in 2014 by:<br />

g<br />

stained<br />

glass resources,<br />

Inc.<br />

15 Commercial Drive<br />

Hampden, MA 01036<br />

800-883-5052<br />

www.stainedglassresources.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!