06.12.2012 Views

Venues guide - London 2012 Olympics

Venues guide - London 2012 Olympics

Venues guide - London 2012 Olympics

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Sustainability<br />

Facts<br />

Sustainability was central The venues have been<br />

The ODA is on track to More than 675 bird and bat<br />

to <strong>London</strong>’s bid to host designed to be as<br />

exceed by 10 per cent a boxes using off-cut drainage<br />

the Games and has been sustainable as possible,<br />

challenging target to reduce pipes (pictured) are being<br />

a key priority throughout using innovative techniques<br />

the carbon emissions of the installed across the Park<br />

the construction of venues to reuse or recycle materials,<br />

Olympic Park by 50 per cent. to encourage new homes<br />

and infrastructure, and the<br />

staging of the Games.<br />

Where there was a long-term<br />

encourage new wildlife<br />

habitats, and reduce energy<br />

use and water consumption.<br />

Two million tonnes of soil<br />

were excavated and cleaned,<br />

with more than 80 per cent<br />

for wildlife.<br />

The UK’s largest waste water<br />

recycling facility is helping<br />

need for a new venue, we To reduce the use of materials,<br />

reused on the site – one of to reduce the consumption<br />

have built new permanent existing venues have been<br />

the UK’s largest clean-ups of non-drinking water on<br />

facilities; where there was used where possible.<br />

of contaminated land. the Park by 60 per cent.<br />

not, we have built temporary<br />

venues with materials that<br />

can be recycled and hired<br />

parts that can be reused.<br />

<strong>London</strong> <strong>2012</strong> is the fi rst ever<br />

summer Games to measure<br />

its carbon footprint over the<br />

entire project; the carbon<br />

More than 98 per cent of<br />

materials generated from the<br />

demolition works on the Park<br />

were reused or recycled.<br />

footprint of staging the<br />

Games is expected to be<br />

20 per cent lower than<br />

originally projected.<br />

<strong>London</strong> <strong>2012</strong>’s target is<br />

for no waste to be sent to<br />

landfi ll during the Games.<br />

94 95

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!