Sustainability<br />
Facts<br />
Sustainability was central The venues have been<br />
The ODA is on track to More than 675 bird and bat<br />
to <strong>London</strong>’s bid to host designed to be as<br />
exceed by 10 per cent a boxes using off-cut drainage<br />
the Games and has been sustainable as possible,<br />
challenging target to reduce pipes (pictured) are being<br />
a key priority throughout using innovative techniques<br />
the carbon emissions of the installed across the Park<br />
the construction of venues to reuse or recycle materials,<br />
Olympic Park by 50 per cent. to encourage new homes<br />
and infrastructure, and the<br />
staging of the Games.<br />
Where there was a long-term<br />
encourage new wildlife<br />
habitats, and reduce energy<br />
use and water consumption.<br />
Two million tonnes of soil<br />
were excavated and cleaned,<br />
with more than 80 per cent<br />
for wildlife.<br />
The UK’s largest waste water<br />
recycling facility is helping<br />
need for a new venue, we To reduce the use of materials,<br />
reused on the site – one of to reduce the consumption<br />
have built new permanent existing venues have been<br />
the UK’s largest clean-ups of non-drinking water on<br />
facilities; where there was used where possible.<br />
of contaminated land. the Park by 60 per cent.<br />
not, we have built temporary<br />
venues with materials that<br />
can be recycled and hired<br />
parts that can be reused.<br />
<strong>London</strong> <strong>2012</strong> is the fi rst ever<br />
summer Games to measure<br />
its carbon footprint over the<br />
entire project; the carbon<br />
More than 98 per cent of<br />
materials generated from the<br />
demolition works on the Park<br />
were reused or recycled.<br />
footprint of staging the<br />
Games is expected to be<br />
20 per cent lower than<br />
originally projected.<br />
<strong>London</strong> <strong>2012</strong>’s target is<br />
for no waste to be sent to<br />
landfi ll during the Games.<br />