02.09.2015 Views

(AIM BPC) THE BAHAMAS

FirstEnergy Conference Toronto – 17-18 May 2011 - Bahamas ...

FirstEnergy Conference Toronto – 17-18 May 2011 - Bahamas ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Seismic Data Analysis- February 2011, cont’d ...<br />

1) the 2010 PSTM data indicates that the structures are simple folds and that reservoir-seal strata appear to be continuous across the extent of the structures;<br />

2) continuity of reservoir-seal pairs will enhance long-distance drainage of reservoirs;<br />

3) the detachment of the compressional folds suggests the presence of a Jurassic salt layer and may provide a deeper 'subsalt' exploration play which we had<br />

believed was present but could only document in the June 2010 seismic, and;<br />

4) the size of the fold belt prospects are considerably larger than those previously defined in the 2007 Competent Persons Report ('CPR').<br />

We are waiting for completion of seismic processing of the January 2011 survey through PSTM and a new CPR to determine undrilled and unproven resource<br />

potential."<br />

Non-Executive Chairman Alan Burns, of Bahamas Petroleum Company Plc, said:<br />

"These structures are exceptional in the size and extent of the 4-way closure, indeed I am not aware of any anticlines of this size in the Gulf of Mexico - Caribbean<br />

region. We look forward to testing these structures with the drill bit to determine if hydrocarbons are present. Bahamas Petroleum intend to stay on course to drill a<br />

well within the next twelve months, once appropriate drilling and environmental regulations are in place in the Commonwealth of The Bahamas."<br />

Appendix 2 cont’d

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!