SCADA/EMS for Unified Power System of Russia
SCADA and EMS Systems for the United Energy - Epcc-workshop.net
SCADA and EMS Systems for the United Energy - Epcc-workshop.net
- No tags were found...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Current Chalenges <strong>for</strong> <strong>System</strong> Operator<br />
6<br />
Re<strong>for</strong>m <strong>of</strong> the dispatch control in <strong>Russia</strong>:<br />
Significant change in organizational structure<br />
Changes necessary due to development and implementation <strong>of</strong> power and ancillary<br />
services markets<br />
Reliability/quality:<br />
Increase <strong>of</strong> the quality <strong>of</strong> supply maintaining a high power system reliability – main<br />
item: load/frequency control (modernization <strong>of</strong> primary, secondary regulators; ensuring<br />
necessary active power reserves quality and quantity)<br />
Transition from the centralized planning and control <strong>of</strong> a single (ex-USSR) power<br />
system to a decentralized one – elaboration and implementation <strong>of</strong> common operation<br />
rules <strong>for</strong> all partners <strong>of</strong> the synchronous zone<br />
Market Support:<br />
Ensure the necessary support to the market oriented re<strong>for</strong>ms <strong>of</strong> electricity sector due<br />
to a huge role <strong>of</strong> the <strong>System</strong> operator in competitive market infrastructure –<br />
Implementation <strong>of</strong> a modern <strong>SCADA</strong>/<strong>EMS</strong> system<br />
Elaboration and implementation <strong>of</strong> balancing and ancillary services market<br />
Integration with UCTE: Feasibility study <strong>of</strong> the synchronous interconnection will be<br />
jointly per<strong>for</strong>med by UCTE and UPS/IPS TSO-s (ISO-s)