SCADA/EMS for Unified Power System of Russia
SCADA and EMS Systems for the United Energy - Epcc-workshop.net
SCADA and EMS Systems for the United Energy - Epcc-workshop.net
- No tags were found...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
1<br />
<strong>SCADA</strong>/<strong>EMS</strong> <strong>for</strong> <strong>Unified</strong> <strong>Power</strong><br />
<strong>System</strong> <strong>of</strong> <strong>Russia</strong><br />
Oxana Yakovleva – Head <strong>of</strong> <strong>SCADA</strong>/<strong>EMS</strong> PIU, <strong>System</strong><br />
Operator <strong>for</strong> UES <strong>of</strong> <strong>Russia</strong><br />
Vladimir Calovic – KEMA Consulting<br />
EPCC - les Diablerets, Switzerland, June 8, 2005
Outline<br />
2<br />
United <strong>Power</strong> <strong>System</strong> <strong>of</strong> <strong>Russia</strong> (UESR)<br />
Current Chalenges <strong>for</strong> <strong>System</strong> Operator<br />
Hierachical Dispatch Structure<br />
<strong>SCADA</strong>/<strong>EMS</strong> Project<br />
Discussion
United <strong>Power</strong> <strong>System</strong> <strong>of</strong> <strong>Russia</strong> in Brief<br />
3<br />
One <strong>of</strong> the largest power systems in the world (vs. US and UCTE)<br />
On-going restructuring/unbundling: from vertically integrated<br />
monopoly to liberalized system<br />
Geographical size creates a number <strong>of</strong> particularities:<br />
Electric power transmisson over very large distances<br />
Ultra-high voltage and high voltage lines<br />
Emergency automation<br />
High degree <strong>of</strong> interdependence and cooperation within IPS/UPS<br />
due to a <strong>for</strong>mer single USSR power system<br />
<strong>System</strong> control in <strong>Russia</strong> is deigned based on centralized<br />
dispatch but IPS/UPS synchronous zone is already using<br />
decentralized dispatch
Facts and Figures<br />
4<br />
Total generation capacity<br />
Electricity generation<br />
Total length <strong>of</strong> 110-750 kV transmission lines<br />
<strong>Power</strong> plants,<br />
including<br />
206,200 MW<br />
875.1 Billion kWh<br />
450 335 Km<br />
590<br />
Thermal 319<br />
Hydro 87<br />
TPP + HPP + NPP (owned by other ministries and agencies) 184
<strong>System</strong> Operator <strong>for</strong> UESR<br />
5<br />
Role <strong>of</strong> the SO:<br />
• Control and Operation <strong>of</strong> the <strong>Unified</strong> Energy<br />
<strong>System</strong> <strong>of</strong> <strong>Russia</strong><br />
• Ensuring the reliability <strong>of</strong> the national<br />
power system and quality <strong>of</strong> electricity<br />
supply (no major power system<br />
incidents and improve power quality in<br />
the midst <strong>of</strong> system restructuring)<br />
•Support <strong>for</strong> the implemenation and<br />
opertion <strong>of</strong> the competitive market<br />
The largest mapboard in the world, from the Baltic<br />
Sea to the Pacific Ocean – 7000 km.
Current Chalenges <strong>for</strong> <strong>System</strong> Operator<br />
6<br />
Re<strong>for</strong>m <strong>of</strong> the dispatch control in <strong>Russia</strong>:<br />
Significant change in organizational structure<br />
Changes necessary due to development and implementation <strong>of</strong> power and ancillary<br />
services markets<br />
Reliability/quality:<br />
Increase <strong>of</strong> the quality <strong>of</strong> supply maintaining a high power system reliability – main<br />
item: load/frequency control (modernization <strong>of</strong> primary, secondary regulators; ensuring<br />
necessary active power reserves quality and quantity)<br />
Transition from the centralized planning and control <strong>of</strong> a single (ex-USSR) power<br />
system to a decentralized one – elaboration and implementation <strong>of</strong> common operation<br />
rules <strong>for</strong> all partners <strong>of</strong> the synchronous zone<br />
Market Support:<br />
Ensure the necessary support to the market oriented re<strong>for</strong>ms <strong>of</strong> electricity sector due<br />
to a huge role <strong>of</strong> the <strong>System</strong> operator in competitive market infrastructure –<br />
Implementation <strong>of</strong> a modern <strong>SCADA</strong>/<strong>EMS</strong> system<br />
Elaboration and implementation <strong>of</strong> balancing and ancillary services market<br />
Integration with UCTE: Feasibility study <strong>of</strong> the synchronous interconnection will be<br />
jointly per<strong>for</strong>med by UCTE and UPS/IPS TSO-s (ISO-s)
Hierarchical Structure <strong>of</strong> the <strong>Power</strong> <strong>System</strong> Control<br />
7<br />
ODU – territorial<br />
dispatching unit<br />
7 structural units<br />
SO-CDU, the central dispatching unit<br />
ODU<br />
ODU<br />
ODU<br />
RDU<br />
RDU<br />
RDU<br />
RDU<br />
RDU<br />
RDU – regional<br />
dispatching unit<br />
55 structural units<br />
Three-tier control structure
<strong>SCADA</strong>/<strong>EMS</strong> Implementation<br />
Scope <strong>of</strong> the Project and Current Status<br />
8<br />
All existing <strong>SCADA</strong>/<strong>EMS</strong> were designed by <strong>Russia</strong>n companies. Although the<br />
system are still functioning according to specifications SO decided to replace<br />
the <strong>SCADA</strong>/<strong>EMS</strong> on all three hierarchical levels with modern state-<strong>of</strong>-the-art<br />
systems., including:<br />
Central Dispatching <strong>System</strong> (CDU) in Moscow and 7 territorial systems<br />
(ODU’s)- Center, Northwest, Middle Volga, North Caucasus, Ural, Siberia,<br />
Far East. A supplier <strong>for</strong> these systems will be selected through<br />
international tender.<br />
55 regional systems will be supplied by domestic companies.<br />
Current Status:<br />
Evaluation <strong>of</strong> Tenders <strong>for</strong> CDU and 7 ODUs<br />
Implementation <strong>of</strong> the 55 regional systems is well under way. Currently<br />
already xxx systems in operation<br />
All systems shall be in operation by the end <strong>of</strong> 2007
Reasons <strong>for</strong> Replacement<br />
9<br />
Existing systems are closed to the end <strong>of</strong> its useful life cycle<br />
New requirements <strong>for</strong> the support <strong>of</strong> the competitive Wholesale Energy Market in<br />
<strong>Russia</strong><br />
Interfacing with future automation systems <strong>of</strong> Federal Grid company and Trade<br />
<strong>System</strong> Operator<br />
Efficient synchronous interconnection with UCTE and coordination with IPS’s <strong>of</strong><br />
<strong>for</strong>mer USSR republics.<br />
Economical benefit <strong>of</strong> the system: Net present value <strong>for</strong> CDU and 7 ODUs is<br />
estimated well above 500 MEuro, due to:<br />
Increased reliability and quality <strong>of</strong> operational control<br />
Optimal Maintenance Scheduling<br />
Improved Generation Scheduling<br />
Reduced overall network losses
Key Aspects <strong>of</strong> the Project<br />
10<br />
Turn Key project: All system databases, displays and network<br />
models shall be delivered and implemented by the supplier<br />
CIM and GID Compliance<br />
Advance Generation Scheduling functionality<br />
Market support functions and market interfaces
Questions?<br />
11
Don‘t Be Too Ambitious with Deadlines<br />
12<br />
Think or Thwim
Be Prepared <strong>for</strong> Contingencies<br />
13<br />
Your trial period is over<br />
Please register now<br />
OK
Forecasting is Not Easy<br />
14<br />
Come on! It can‘t go<br />
wrong every time...