1<br />

<strong>SCADA</strong>/<strong>EMS</strong> <strong>for</strong> <strong>Unified</strong> <strong>Power</strong><br />

<strong>System</strong> <strong>of</strong> <strong>Russia</strong><br />

Oxana Yakovleva – Head <strong>of</strong> <strong>SCADA</strong>/<strong>EMS</strong> PIU, <strong>System</strong><br />

Operator <strong>for</strong> UES <strong>of</strong> <strong>Russia</strong><br />

Vladimir Calovic – KEMA Consulting<br />

EPCC - les Diablerets, Switzerland, June 8, 2005


Outline<br />

2<br />

United <strong>Power</strong> <strong>System</strong> <strong>of</strong> <strong>Russia</strong> (UESR)<br />

Current Chalenges <strong>for</strong> <strong>System</strong> Operator<br />

Hierachical Dispatch Structure<br />

<strong>SCADA</strong>/<strong>EMS</strong> Project<br />

Discussion


United <strong>Power</strong> <strong>System</strong> <strong>of</strong> <strong>Russia</strong> in Brief<br />

3<br />

One <strong>of</strong> the largest power systems in the world (vs. US and UCTE)<br />

On-going restructuring/unbundling: from vertically integrated<br />

monopoly to liberalized system<br />

Geographical size creates a number <strong>of</strong> particularities:<br />

Electric power transmisson over very large distances<br />

Ultra-high voltage and high voltage lines<br />

Emergency automation<br />

High degree <strong>of</strong> interdependence and cooperation within IPS/UPS<br />

due to a <strong>for</strong>mer single USSR power system<br />

<strong>System</strong> control in <strong>Russia</strong> is deigned based on centralized<br />

dispatch but IPS/UPS synchronous zone is already using<br />

decentralized dispatch


Facts and Figures<br />

4<br />

Total generation capacity<br />

Electricity generation<br />

Total length <strong>of</strong> 110-750 kV transmission lines<br />

<strong>Power</strong> plants,<br />

including<br />

206,200 MW<br />

875.1 Billion kWh<br />

450 335 Km<br />

590<br />

Thermal 319<br />

Hydro 87<br />

TPP + HPP + NPP (owned by other ministries and agencies) 184


<strong>System</strong> Operator <strong>for</strong> UESR<br />

5<br />

Role <strong>of</strong> the SO:<br />

• Control and Operation <strong>of</strong> the <strong>Unified</strong> Energy<br />

<strong>System</strong> <strong>of</strong> <strong>Russia</strong><br />

• Ensuring the reliability <strong>of</strong> the national<br />

power system and quality <strong>of</strong> electricity<br />

supply (no major power system<br />

incidents and improve power quality in<br />

the midst <strong>of</strong> system restructuring)<br />

•Support <strong>for</strong> the implemenation and<br />

opertion <strong>of</strong> the competitive market<br />

The largest mapboard in the world, from the Baltic<br />

Sea to the Pacific Ocean – 7000 km.


Current Chalenges <strong>for</strong> <strong>System</strong> Operator<br />

6<br />

Re<strong>for</strong>m <strong>of</strong> the dispatch control in <strong>Russia</strong>:<br />

Significant change in organizational structure<br />

Changes necessary due to development and implementation <strong>of</strong> power and ancillary<br />

services markets<br />

Reliability/quality:<br />

Increase <strong>of</strong> the quality <strong>of</strong> supply maintaining a high power system reliability – main<br />

item: load/frequency control (modernization <strong>of</strong> primary, secondary regulators; ensuring<br />

necessary active power reserves quality and quantity)<br />

Transition from the centralized planning and control <strong>of</strong> a single (ex-USSR) power<br />

system to a decentralized one – elaboration and implementation <strong>of</strong> common operation<br />

rules <strong>for</strong> all partners <strong>of</strong> the synchronous zone<br />

Market Support:<br />

Ensure the necessary support to the market oriented re<strong>for</strong>ms <strong>of</strong> electricity sector due<br />

to a huge role <strong>of</strong> the <strong>System</strong> operator in competitive market infrastructure –<br />

Implementation <strong>of</strong> a modern <strong>SCADA</strong>/<strong>EMS</strong> system<br />

Elaboration and implementation <strong>of</strong> balancing and ancillary services market<br />

Integration with UCTE: Feasibility study <strong>of</strong> the synchronous interconnection will be<br />

jointly per<strong>for</strong>med by UCTE and UPS/IPS TSO-s (ISO-s)


Hierarchical Structure <strong>of</strong> the <strong>Power</strong> <strong>System</strong> Control<br />

7<br />

ODU – territorial<br />

dispatching unit<br />

7 structural units<br />

SO-CDU, the central dispatching unit<br />

ODU<br />

ODU<br />

ODU<br />

RDU<br />

RDU<br />

RDU<br />

RDU<br />

RDU<br />

RDU – regional<br />

dispatching unit<br />

55 structural units<br />

Three-tier control structure


<strong>SCADA</strong>/<strong>EMS</strong> Implementation<br />

Scope <strong>of</strong> the Project and Current Status<br />

8<br />

All existing <strong>SCADA</strong>/<strong>EMS</strong> were designed by <strong>Russia</strong>n companies. Although the<br />

system are still functioning according to specifications SO decided to replace<br />

the <strong>SCADA</strong>/<strong>EMS</strong> on all three hierarchical levels with modern state-<strong>of</strong>-the-art<br />

systems., including:<br />

Central Dispatching <strong>System</strong> (CDU) in Moscow and 7 territorial systems<br />

(ODU’s)- Center, Northwest, Middle Volga, North Caucasus, Ural, Siberia,<br />

Far East. A supplier <strong>for</strong> these systems will be selected through<br />

international tender.<br />

55 regional systems will be supplied by domestic companies.<br />

Current Status:<br />

Evaluation <strong>of</strong> Tenders <strong>for</strong> CDU and 7 ODUs<br />

Implementation <strong>of</strong> the 55 regional systems is well under way. Currently<br />

already xxx systems in operation<br />

All systems shall be in operation by the end <strong>of</strong> 2007


Reasons <strong>for</strong> Replacement<br />

9<br />

Existing systems are closed to the end <strong>of</strong> its useful life cycle<br />

New requirements <strong>for</strong> the support <strong>of</strong> the competitive Wholesale Energy Market in<br />

<strong>Russia</strong><br />

Interfacing with future automation systems <strong>of</strong> Federal Grid company and Trade<br />

<strong>System</strong> Operator<br />

Efficient synchronous interconnection with UCTE and coordination with IPS’s <strong>of</strong><br />

<strong>for</strong>mer USSR republics.<br />

Economical benefit <strong>of</strong> the system: Net present value <strong>for</strong> CDU and 7 ODUs is<br />

estimated well above 500 MEuro, due to:<br />

Increased reliability and quality <strong>of</strong> operational control<br />

Optimal Maintenance Scheduling<br />

Improved Generation Scheduling<br />

Reduced overall network losses


Key Aspects <strong>of</strong> the Project<br />

10<br />

Turn Key project: All system databases, displays and network<br />

models shall be delivered and implemented by the supplier<br />

CIM and GID Compliance<br />

Advance Generation Scheduling functionality<br />

Market support functions and market interfaces


Questions?<br />

11


Don‘t Be Too Ambitious with Deadlines<br />

12<br />

Think or Thwim


Be Prepared <strong>for</strong> Contingencies<br />

13<br />

Your trial period is over<br />

Please register now<br />

OK


Forecasting is Not Easy<br />

14<br />

Come on! It can‘t go<br />

wrong every time...