Page 45 of 86<br />

Narrative Section<br />

UV to IR Conversion-12-99-Production<br />

facility fire protection systems are required<br />

to ensure the safety envelope of weapons<br />

operations during assembly/disassembly<br />

phases. The current Ultraviolet (UV) high<br />

speed deluge trip system will be supported<br />

by the manufacturer until 2012, assuming<br />

component parts are available.<br />

RAMS Replacement-12-99-The project<br />

replaces all alpha and tritium continuous air<br />

monitors (CAMs) equipment located in bays<br />

and cells and the field processors and<br />

reporting system. Project also replaces the<br />

individual area evacuation alarm units<br />

(EAUs) and the RAMS field processors and<br />

central alarm monitoring systems.<br />

Metrology Lab Environmental Controls<br />

Upgrade-The project will replace aged and<br />

failing HVAC and dehumidification systems<br />

in metrology calibration laboratory.<br />

Metrology calibrates tooling and equipment<br />

required to support all surveillance, Life<br />

Extension Programs, and dismantlement<br />

activities. Existing systems will not<br />

adequately support projected workload<br />

including calibration of over 80 new tools,<br />

additional copies of tooling, and tooling<br />

requirements for dismantlement, and the<br />

SS21 process.<br />

Environmental Controls for LEP in<br />

Production Facilities-Replace old<br />

pneumatic controls and devices prone to<br />

failure and thereby compromising the<br />

environment required to support<br />

surveillance and dismantlement activities.<br />

Replacing this equipment addresses<br />

deferred maintenance, supports energy<br />

savings initiatives, and supports the Life<br />

Extension Programs. Methodically<br />

upgrading and commissioning<br />

environmental control systems will<br />

significantly improve energy efficiency and<br />

ensure temperature and humidity is<br />

controlled within the strict parameters<br />

required to support production.<br />

Lightning Location and Protection<br />

System (LLPS) Replacement-The LLPS is<br />

a safety class system that is required for<br />

certain lightning sensitive operations in<br />

multiple weapon programs and is used for<br />

personnel safety warnings. It is credited in<br />

sitewide safety documents. The LLPS<br />

system sensors and software are the<br />

primary items that have reached end of life<br />

and the manufacturer is no longer<br />

supporting our existing units. The software<br />

upgrade will be running on PCs instead of<br />

the present Unix computers and the new<br />

configuration will be simpler and more<br />

reliable. The National Lightning Detection<br />

System is upgrading their sites now and in<br />

order to remain compatible, Pantex must<br />

also upgrade the system.<br />

Explosive Facility Lightning and Surge<br />

Protection-Upgrade 43 facilities to protect<br />

operations from a lightning assault.<br />

Protection is required on both the primary<br />

side of the facility transformer and/or at the<br />

secondary feed in the facility’s main<br />

distribution panel. Additionally, some<br />

facilities require upgrade and certification of<br />

the aerial lightning protection system.<br />

Upgrade ensures compliance with DOE<br />

Explosives Safety Manual-Pantex version,<br />

Chapter 2, Sections 8.3.a and 8.3.b., as well<br />

as safe and compliant operations in<br />

explosive category facilities.<br />

Asset Management Support<br />

(Roof/Roads)-The project rehabilitates<br />

roadways in Zones 12, 11, and 4, which are<br />

required for safe and secure transport of<br />

weapon systems. Additionally, roof<br />

coatings are required every five years to<br />

protect roofing membranes from damage<br />

caused by infrared and ultraviolet<br />

deterioration and resulting leaks.<br />

Seismic Upgrades (Ceiling & Wall<br />

Modifications-The project continues<br />

seismic upgrades and related improvements<br />

to walls and ceilings of specific mission<br />

critical production bay and cell facilities.<br />

Includes procurement and installation of<br />

ground motion monitoring capability at<br />

Pantex. Provides for the continuation of<br />

planned improvements as documented and