Page 45 of 86<br />
Narrative Section<br />
UV to IR Conversion-12-99-Production<br />
facility fire protection systems are required<br />
to ensure the safety envelope of weapons<br />
operations during assembly/disassembly<br />
phases. The current Ultraviolet (UV) high<br />
speed deluge trip system will be supported<br />
by the manufacturer until 2012, assuming<br />
component parts are available.<br />
RAMS Replacement-12-99-The project<br />
replaces all alpha and tritium continuous air<br />
monitors (CAMs) equipment located in bays<br />
and cells and the field processors and<br />
reporting system. Project also replaces the<br />
individual area evacuation alarm units<br />
(EAUs) and the RAMS field processors and<br />
central alarm monitoring systems.<br />
Metrology Lab Environmental Controls<br />
Upgrade-The project will replace aged and<br />
failing HVAC and dehumidification systems<br />
in metrology calibration laboratory.<br />
Metrology calibrates tooling and equipment<br />
required to support all surveillance, Life<br />
Extension Programs, and dismantlement<br />
activities. Existing systems will not<br />
adequately support projected workload<br />
including calibration of over 80 new tools,<br />
additional copies of tooling, and tooling<br />
requirements for dismantlement, and the<br />
SS21 process.<br />
Environmental Controls for LEP in<br />
Production Facilities-Replace old<br />
pneumatic controls and devices prone to<br />
failure and thereby compromising the<br />
environment required to support<br />
surveillance and dismantlement activities.<br />
Replacing this equipment addresses<br />
deferred maintenance, supports energy<br />
savings initiatives, and supports the Life<br />
Extension Programs. Methodically<br />
upgrading and commissioning<br />
environmental control systems will<br />
significantly improve energy efficiency and<br />
ensure temperature and humidity is<br />
controlled within the strict parameters<br />
required to support production.<br />
Lightning Location and Protection<br />
System (LLPS) Replacement-The LLPS is<br />
a safety class system that is required for<br />
certain lightning sensitive operations in<br />
multiple weapon programs and is used for<br />
personnel safety warnings. It is credited in<br />
sitewide safety documents. The LLPS<br />
system sensors and software are the<br />
primary items that have reached end of life<br />
and the manufacturer is no longer<br />
supporting our existing units. The software<br />
upgrade will be running on PCs instead of<br />
the present Unix computers and the new<br />
configuration will be simpler and more<br />
reliable. The National Lightning Detection<br />
System is upgrading their sites now and in<br />
order to remain compatible, Pantex must<br />
also upgrade the system.<br />
Explosive Facility Lightning and Surge<br />
Protection-Upgrade 43 facilities to protect<br />
operations from a lightning assault.<br />
Protection is required on both the primary<br />
side of the facility transformer and/or at the<br />
secondary feed in the facility’s main<br />
distribution panel. Additionally, some<br />
facilities require upgrade and certification of<br />
the aerial lightning protection system.<br />
Upgrade ensures compliance with DOE<br />
Explosives Safety Manual-Pantex version,<br />
Chapter 2, Sections 8.3.a and 8.3.b., as well<br />
as safe and compliant operations in<br />
explosive category facilities.<br />
Asset Management Support<br />
(Roof/Roads)-The project rehabilitates<br />
roadways in Zones 12, 11, and 4, which are<br />
required for safe and secure transport of<br />
weapon systems. Additionally, roof<br />
coatings are required every five years to<br />
protect roofing membranes from damage<br />
caused by infrared and ultraviolet<br />
deterioration and resulting leaks.<br />
Seismic Upgrades (Ceiling & Wall<br />
Modifications-The project continues<br />
seismic upgrades and related improvements<br />
to walls and ceilings of specific mission<br />
critical production bay and cell facilities.<br />
Includes procurement and installation of<br />
ground motion monitoring capability at<br />
Pantex. Provides for the continuation of<br />
planned improvements as documented and