TTI-P-G 157/97-10<br />

<strong>Institute</strong> <strong>for</strong> <strong>Quality</strong> <strong>Engineering</strong> <strong>and</strong> <strong><strong>Test</strong>ing</strong><br />

<strong>Test</strong> <strong>Report</strong> <strong>No</strong>.: R006SR1K<br />

Order <strong>No</strong>.: R006 Pages: 25 Enclosures: 3 Munich, 28 Apr. 2003<br />

Client:<br />

Siemens AG, ICN CP D NP A3<br />

Equipment under test: Rack R21:hiQ<br />

Manufacturer: Siemens AG<br />

Task: Con<strong>for</strong>mance <strong>Test</strong> acc. to the below listed specifications<br />

<strong>Test</strong> Specification(s)<br />

accredited:<br />

Result:<br />

ETSI EN 300 019-2-2 V2.1.2<br />

T2.3 Public Transportation – mechanical <strong>Test</strong>s<br />

ETSI EN 300 019-2-4 V2.1.2<br />

T4.1 Earthquake<br />

<strong>No</strong> mechanical deviations of the EUT could be ascertained<br />

during <strong>and</strong> after the test.<br />

The tested Rack R21: hiQ CONFORMS with the<br />

requirements ETSI EN 300 019-2-2, V2.1.2 (1999-09), T2.3<br />

Transportation - mechanical tests <strong>and</strong><br />

ETSI EN 300 019-2-3, V2.1.2 (1999-09) Earthquake.<br />

The results relate only to the items tested as described in this test report.<br />

<strong>Test</strong>ed by: Approved by: Position<br />

Knier<br />

+49 89 722 48726<br />

___________________<br />

Signature/Date:<br />

Alt<br />

+49 89 722 26105<br />

Director 'Env. <strong>Engineering</strong>'<br />

___________________<br />

Signature/Date:<br />

The <strong>Institute</strong> <strong>for</strong> <strong>Quality</strong> <strong>Engineering</strong> <strong>and</strong> <strong><strong>Test</strong>ing</strong> of the In<strong>for</strong>mation <strong>and</strong> Communication Networks Group of the Siemens AG is<br />

accredited by the DATech <strong>for</strong><br />

COMPONENTS TESTING ENVIRONMENTAL ENGINEERING ELECTROMAGNETIC COMPATIBILITY PRODUCT SAFETY<br />

TELECOM CONFORMANCE TESTS<br />

Address: Siemens AG, ICN TQM QE, Hofmannstr. 51, D-81359 München, Phone +49 89-722-48793, Fax +49 89-722-22648, Internet http://www.pruefinstitut.de


The test report shall not be reproduced except in full without<br />

the written approval of the testing laboratory<br />

CONTENTS<br />

<strong>Test</strong> <strong>Report</strong> <strong>No</strong>.:<br />

R006SR1K<br />

1 SUMMARY.................................................................................................................................3<br />

1.1 Introduction 3<br />

1.2 <strong>Test</strong> Result Summary 3<br />

2 REFERENCES...........................................................................................................................4<br />

2.1 Specifications 4<br />

2.2 Bibliographical Data 4<br />

3 GENERAL INFORMATION.......................................................................................................5<br />

3.1 Identification of Client 5<br />

3.2 <strong>Test</strong> Laboratory 5<br />

3.3 Storage of Records 5<br />

3.4 Time Schedule 5<br />

3.5 Participants 5<br />

4 EQUIPMENT UNDER TEST .....................................................................................................6<br />

4.1 Description of EUT 6<br />

4.2 Configuration of EUT 6<br />

4.2.1 HW: Rack 9<br />

4.2.2 HW & SW: Open Service Plat<strong>for</strong>m (OSP) 9<br />

4.2.3 HW & SW: Single server unit 11<br />

4.2.4 HW: Additional network components 12<br />

4.3 Operating Conditions 13<br />

5 TEST EQUIPMENT .................................................................................................................14<br />

5.1 <strong>Test</strong> Facility 14<br />

6 REQUIREMENTS, TESTS AND RESULTS...........................................................................16<br />

6.1 Requirements Specification 16<br />

6.2 <strong>Test</strong> Specification 16<br />

6.2.1 Public Transportation – Mechanical <strong>Test</strong>s (2.3) 16<br />

6.2.2 Earthquake (cl. 4.1 / 4.1E) 17<br />

6.3 <strong>Test</strong> Per<strong>for</strong>mance 17<br />

6.3.1 Public Transportation – Mechanical <strong>Test</strong>s (2.3) 17<br />

6.3.2 Earthquake (cl. 4.1 / 4.1E) 20<br />

6.4 <strong>Test</strong> Results 22<br />

6.4.1 Public Transportation – Mechanical <strong>Test</strong>s (2.3) 22<br />

6.4.2 Earthquake (cl. 4.1 / 4.1E) 22<br />

6.4.2.1 Earthquake tests results - TRS vs. RRS measured at the earthquake table 22<br />

6.4.2.2 Displacement results 25<br />

6.5 Evaluation 25<br />

7 ENCLOSURES..........................................................................................................................1<br />

7.1 Accreditation Certificate 1<br />

7.2 Diagrams of vibration <strong>and</strong> shock response measured at vibrator table 2<br />

7.2.1 R<strong>and</strong>om Vibration <strong>Test</strong> 2<br />

7.2.2 Shock <strong>Test</strong> 3<br />

Depart.: ICN TQM QE 31 <strong>Test</strong> <strong>Report</strong> Date: 28 Apr. 2003<br />

Author: Knier Rack R:21 hiQ<br />

2/25


The test report shall not be reproduced except in full without<br />

the written approval of the testing laboratory<br />

1 Summary<br />

1.1 Introduction<br />

<strong>Test</strong> <strong>Report</strong> <strong>No</strong>.:<br />

R006SR1K<br />

The report contains the results from the environmentel compatability technical analysis of the<br />

Rack R21:hiQ with regard to ETSI EN 300 019-2-2, V2.1.2 (1999-09), T2.3 <strong>and</strong> ETSI EN<br />

300 019-2-3, V2.1.2 (1999-09).<br />

<strong><strong>Test</strong>ing</strong> was per<strong>for</strong>med by Siemens AG, ICN TQM QE at their test-facilities.<br />

1.2 <strong>Test</strong> Result Summary<br />

Requirement Criteria<br />

met<br />

(y/n)<br />

Vibration r<strong>and</strong>om T 2.3 y<br />

Shocks T 2.3 y<br />

Free Fall T 2.3 y<br />

Earthquake y<br />

Depart.: ICN TQM QE 31 <strong>Test</strong> <strong>Report</strong> Date: 28 Apr. 2003<br />

Author: Knier Rack R:21 hiQ<br />

Remark<br />

3/25


The test report shall not be reproduced except in full without<br />

the written approval of the testing laboratory<br />

2 References<br />

2.1 Specifications<br />

[1] ETSI EN 300 019-2-3<br />

V2.1.2<br />

[2] ETSI EN 300 019-2-2<br />

V2.1.2<br />

Equipment <strong>Engineering</strong> (EE); Environmental conditions <strong>and</strong><br />

environmental tests <strong>for</strong> telecommunications equipment;<br />

Part 2-3: Specification of environmental tests;<br />

Stationary use at weatherprotected locations<br />

Equipment <strong>Engineering</strong> (EE); Environmental conditions <strong>and</strong><br />

environmental tests <strong>for</strong> telecommunications equipment;<br />

Part 2-2: Specification of environmental tests;<br />

Transportation<br />

[3] IEC 60068-2-29 Basic environmental testing procedures –<br />

Part 2: <strong>Test</strong>s – <strong>Test</strong> Eb <strong>and</strong> guidance: bump<br />

[4] IEC 60068-2-64 Environmental testing –<br />

Part 2: <strong>Test</strong> methods; <strong>Test</strong> Fh: Vibration, broad-b<strong>and</strong> r<strong>and</strong>om<br />

(digital control) <strong>and</strong> guidance:<br />

(IEC 68-2-64:1993 + Corrigendum 1993)<br />

[5] IEC 60068-2-32 Basic environmental testing procedures –<br />

Part 2: <strong>Test</strong>s – <strong>Test</strong> Ed: Free fall<br />

<strong>Test</strong> <strong>Report</strong> <strong>No</strong>.:<br />

R006SR1K<br />

[6] ISO 4180-2 Complate, filled transport packages -<br />

General rules <strong>for</strong> the compilation of per<strong>for</strong>mance test schedules<br />

Part 2: Quantitative data<br />

[7] IEC 60068-2-57 Environmental testing -<br />

Part 2-57: <strong>Test</strong>s - <strong>Test</strong> Ff: Vibration – Time-history method<br />

2.2 Bibliographical Data [1] <strong>Quality</strong> <strong>Engineering</strong> Requirement Specification<br />

(NC05IQ1L)<br />

<strong>for</strong> EWSD, SURPASS, OEM-equipment, Mobile switching<br />

Release 1-0, Date March, 16 th 2001.<br />

Depart.: ICN TQM QE 31 <strong>Test</strong> <strong>Report</strong> Date: 28 Apr. 2003<br />

Author: Knier Rack R:21 hiQ<br />

1999-09<br />

1999-09<br />

1987<br />

1993-10<br />

1975<br />

1980<br />

1999-11<br />

4/25


The test report shall not be reproduced except in full without<br />

the written approval of the testing laboratory<br />

3 General In<strong>for</strong>mation<br />

3.1 Identification of Client<br />

Client: Siemens AG, ICN CP D NP A3<br />

Address: Machtelfingerstraße 1<br />

81359 Munich<br />

Country: Germany<br />

Phone: (089) 722 35002, Hr. Bienczyk<br />

Fax: (089) 722 53974<br />

E-Mail: Wolfgang.Bienczyk@.siemens.com<br />

3.2 <strong>Test</strong> Laboratory<br />

Name: Siemens AG, ICN TQM QE 31<br />

Address: Hofmannstrasse 51<br />

81359 Munich<br />

Country: Germany<br />

Phone: (089) 722 26105 Mr. Alt<br />

Fax: (089) 722 25326<br />

E-Mail: Udo.Alt@.siemens.com<br />

3.3 Storage of Records<br />

<strong>Test</strong> <strong>Report</strong> <strong>No</strong>.:<br />

R006SR1K<br />

The original of the test report is delivered to the client. It is in the responsibility of the client to<br />

administer <strong>and</strong> store the test report <strong>for</strong> future use.<br />

The EUT-software has to be kept by the client <strong>and</strong> must be available <strong>for</strong> future examinations.<br />

3.4 Time Schedule<br />

Delivery of EUT: 31. october 2002<br />

Start of test: 06. november 2002<br />

End of test: 04. april 2003<br />

3.5 Participants<br />

Name Function Company Department Location<br />

Mr. Knier Accredited testing Siemens AG ICN TQM QE 31 Mch H<br />

Mr. Schließke Accredited testing Siemens AG ICN TQM QE 2A Mch H<br />

Mr. Tries supervision of EUTfunctionality<br />

Siemens AG ICN CP D NP A3 Mch Ma1<br />

Depart.: ICN TQM QE 31 <strong>Test</strong> <strong>Report</strong> Date: 28 Apr. 2003<br />

Author: Knier Rack R:21 hiQ<br />

5/25


The test report shall not be reproduced except in full without<br />

the written approval of the testing laboratory<br />

4 Equipment under <strong>Test</strong><br />

4.1 Description of EUT<br />

<strong>Test</strong> <strong>Report</strong> <strong>No</strong>.:<br />

R006SR1K<br />

The EUT combines different plat<strong>for</strong>ms based on OEM‘s (Original Equipment Manufacturer).<br />

These OEM components are used in the different SIEMENS products. The EUT is the<br />

maximum constellation of the components.<br />

Later, it is possible to use only a subset of components depending on the customer dem<strong>and</strong>s.<br />

There are 18 Single Server Unit components possible to mount in the rack without the OSP<br />

<strong>and</strong> up to 16 including the OSP.<br />

4.2 Configuration of EUT<br />

There are three basic components:<br />

1. OSP consisting of a two node architecture (green)<br />

2. Up to 18 Single Server Units (yellow)<br />

3. Two switches <strong>for</strong> various connections to 100BaseT or 10BaseT Ethernet (magenta)<br />

HE Einbauten Bemerkung<br />

1.<br />

2. Breakerpanel 3HE<br />

3.<br />

4.<br />

Breaker Panel 3HE 22 devices<br />

2*20 A + 20*10 A<br />

5. Ethernet cable<br />

6.<br />

24 port Switch 2HE<br />

7.<br />

+ 4 Port Extension<br />

8.<br />

24 port Switch 2HE<br />

9.<br />

+ 4 Port Extension<br />

10. Ethernet cable<br />

11. Netra 120<br />

12. Netra 120<br />

13. Netra 120<br />

14. Netra 120<br />

15.<br />

16.<br />

Netra 120<br />

17. Netra 120<br />

18. Netra 120<br />

19. Netra 120<br />

20. Netra 120<br />

21.<br />

22.<br />

Netra 120<br />

23. Netra 120<br />

24. Netra 120<br />

25. Netra 120<br />

26. Netra 120 (SAI)<br />

27.<br />

28.<br />

Netra 120 (SAI)<br />

29.<br />

30.<br />

Fachboden SAI Connector Boxes<br />

31. Netra 120 (SAI)<br />

32. Netra S1 Netra 120<br />

33. Netra S1 Netra 120<br />

Depart.: ICN TQM QE 31 <strong>Test</strong> <strong>Report</strong> Date: 28 Apr. 2003<br />

Author: Knier Rack R:21 hiQ<br />

6/25


The test report shall not be reproduced except in full without<br />

the written approval of the testing laboratory<br />

34.<br />

35.<br />

36.<br />

37.<br />

38.<br />

39.<br />

40.<br />

41.<br />

42.<br />

43.<br />

44.<br />

45.<br />

46.<br />

47. Kabeleinlass<br />

Netra 20 OSP<br />

Netra 20 OSP<br />

Figure 1-1: Configuration of the EUT<br />

<strong>Test</strong> <strong>Report</strong> <strong>No</strong>.:<br />

R006SR1K<br />

The following two pictures show the internal <strong>and</strong> external cabling <strong>and</strong> the IP addresses<br />

association of the EUT <strong>and</strong> the AE.<br />

4 * 30m Ethernet<br />

Type 1<br />

19 * Ethernet<br />

Type 2<br />

Cisco<br />

Switch<br />

Cisco<br />

Switch<br />

24 Port DC<br />

24 Port DC<br />

16. Netra 120<br />

15. Netra 120<br />

14. Netra 120<br />

13. Netra 120<br />

12. Netra 120<br />

11. Netra 120<br />

10. Netra 120<br />

9. Netra 120<br />

8. Netra 120<br />

7. Netra 120<br />

6. Netra 120<br />

5. Netra 120<br />

4. Netra 120<br />

3. Netra 120 (SAI)<br />

2. Netra 120 (SAI)<br />

1. Netra 120 (SAI)<br />

Netra S1<br />

Netra S1<br />

Netra 20 <strong>No</strong>de 0<br />

Netra 20 <strong>No</strong>de 1<br />

19 * Ethernet<br />

Type 2<br />

2 * Ethernet<br />

Type 3<br />

Rack<br />

Wall of<br />

anechoic<br />

chambe<br />

r<br />

Figure 1-2:Network Connections of the EUT<br />

Depart.: ICN TQM QE 31 <strong>Test</strong> <strong>Report</strong> Date: 28 Apr. 2003<br />

Author: Knier Rack R:21 hiQ<br />

Ultra 1<br />

Admin Workstation<br />

IP - Adressen auf Ultra 1:<br />

192.1.1.50 + 10.1.1.50 (optional)<br />

IP - Adressen auf Netra 120 Servern:<br />

1. 192.1.1.1 an eri0<br />

10.1.1.1 an eri1<br />

2. 192.1.1.2 an eri0<br />

10.1.1.2 an eri1<br />

� .<br />

� .<br />

� .<br />

16. 192.1.1.16 an eri0<br />

10.1.1.16 an eri1<br />

IP - Adressen auf hiQ4000:<br />

<strong>No</strong>de 0:<br />

192.1.1.100 public an NAFO - qfe0:qfe2<br />

10.1.1.100 NetM an qfe1<br />

<strong>No</strong>de 1:<br />

192.1.1.101 public an NAFO - qfe0:qfe2<br />

10.1.1.101 NetM an qfe1<br />

192.1.1.102 logical Host Public Net<br />

10.1.1.102 logical Host to NetM<br />

Cluster Interconnect net0 - net0 + qfe3 - qfe3<br />

7/25


The test report shall not be reproduced except in full without<br />

the written approval of the testing laboratory<br />

<strong>Test</strong> <strong>Report</strong> <strong>No</strong>.:<br />

R006SR1K<br />

Figure 1-3: Connection <strong>for</strong> the E1/T1 loop test <strong>and</strong> serial connection <strong>for</strong> the host consoles<br />

Cable Types :<br />

8<br />

SAI-<br />

Box<br />

Cisco Switch 24 Port DC<br />

Cisco Switch 24 Port DC<br />

16. Netra120<br />

15. Netra120<br />

14. Netra120<br />

13. Netra120<br />

12. Netra120<br />

11. Netra120<br />

10. Netra120<br />

9. Netra120<br />

8. Netra120<br />

7. Netra120<br />

6. Netra120<br />

5. Netra120<br />

4. Netra120<br />

3. Netra 120 (SAI)<br />

2. Netra 120 (SAI)<br />

SAI-<br />

Box<br />

1. Netra 120 (SAI)<br />

Netra S1<br />

Netra S1<br />

Netra20<br />

Netra20<br />

6<br />

SAI-<br />

Box<br />

2 * E1/T1<br />

2 * E1/T1<br />

Wall of<br />

anechoic<br />

chamber<br />

Type 1: External Ethernet Cat 5 Cable, cross wired V45591-A282-A300<br />

Type 2: Internal Ethernet/Serial Cat 5 Cable, 1:1 wired SUN #530-1871<br />

Type 3: Internal Null Ethernet Cat 5 Cable, cross wired SUN X3837A<br />

Type 4: External E1/T1 Cable, S30257-Z8322-A300<br />

Depart.: ICN TQM QE 31 <strong>Test</strong> <strong>Report</strong> Date: 28 Apr. 2003<br />

Author: Knier Rack R:21 hiQ<br />

4<br />

Rack<br />

18 * serial<br />

Type 2<br />

2 * E1/T1<br />

Type 4<br />

Ultra 1<br />

Admin Workstation<br />

8/25


The test report shall not be reproduced except in full without<br />

the written approval of the testing laboratory<br />

4.2.1 HW: Rack<br />

Siemens part number: S30805-C2774-X100<br />

Manufacturer: Schroff<br />

Following items are included:<br />

<strong>Test</strong> <strong>Report</strong> <strong>No</strong>.:<br />

R006SR1K<br />

Product Features ordering number serial number<br />

Rack W-D-H 600mm, 700mm, 2220mm 11295-018<br />

Breaker Panel number of breakers: 22 incl. in rack ordering<br />

no.<br />

4.2.2 HW & SW: Open Service Plat<strong>for</strong>m (OSP)<br />

Siemens part number: D21:OSP (1* im EUT)<br />

Manufacturer: SUN (except E1/T1-card)<br />

Following items are included:<br />

Product ordering number serial number<br />

2x Sun Netra 20 DC<br />

N28-900-DC<br />

- Basispaket für<br />

ATO<br />

- Hauptplatine<br />

-<br />

DC-Stromversorgung<br />

- Alarmanzeige<br />

- 19-Zoll<br />

Rackmount-Kit<br />

- 4x PCI-Steckplatz<br />

- 2x Einbauschacht<br />

für Laufwerk<br />

Hinweis:<br />

- Ohne Grafik- und<br />

Audio-I/O<br />

- für 900MHz CPUs<br />

2x 900MHz/8MB Cu<br />

UltraSPARC-III CPU<br />

- 8MB Level 2 Cache<br />

- für Sun Fire<br />

280R, Netra 20 und<br />

Sun Blade 1000/2000<br />

2x 1GB Hauptspeicher<br />

- 4x 256MB<br />

DIMM-Modul für Sun<br />

Blade 1000 u. Sun<br />

Fire 280R/3800/4800<br />

/4810/6800/15K<br />

Hinweis:<br />

7009A<br />

7053A<br />

Depart.: ICN TQM QE 31 <strong>Test</strong> <strong>Report</strong> Date: 28 Apr. 2003<br />

Author: Knier Rack R:21 hiQ<br />

9/25


The test report shall not be reproduced except in full without<br />

the written approval of the testing laboratory<br />

- Einbau erfolgt im<br />

Werk.<br />

4x 73GB/10000UPM<br />

FC-AL Festplatte,<br />

Low-Profile<br />

- 73 FC-AL<br />

Festplatte,<br />

10000UPM<br />

- Low-Profile 1"<br />

- mit Montage-Kit<br />

für A5200<br />

2x Sun Dual SCSI- / Dual Fast<br />

Ethernet PCI Card<br />

2x SCSI-Kabel, SCSI-3<br />

auf SCSI-3, 2m<br />

- SCSI-3 auf SCSI-3<br />

2x SCSI-Kabel, SCSI-3 auf VHDCI,<br />

2m<br />

2x PCI-Karte mit Quad<br />

Fast Ethernet<br />

Controller (QFE)<br />

6x 4m RJ45-RJ45 CAT5<br />

Kabel<br />

2x Serielles Kabel,<br />

DB25 Male to RJ45<br />

Male<br />

2x Null Ethernet<br />

Kabel, 5 Meter<br />

2x Sun StorEdge S1,<br />

DC, 2x36GB/10000UPM<br />

UltraSCSI<br />

Festplatte<br />

- unterstützt<br />

UltraSCSI SE,<br />

UltraSCSI 2 (LVD)<br />

u. 3 (LVD)<br />

- hotswap<br />

Festplatten<br />

- DC<br />

Stromversorgung<br />

- NEBS Level 3<br />

zertifiziert<br />

- Abmessungen: 1<br />

Rack-Höheneinheit,<br />

Tiefe: 18,6"<br />

2x Netra t1/st D130<br />

19" Rackmount -Kit<br />

- 19" Rackmount-Kit<br />

für Netra t1 oder<br />

Netra st D130<br />

6855A<br />

2222A<br />

1139A<br />

3832A<br />

1034A<br />

#530-1871<br />

2151A<br />

X3837A<br />

<strong>Test</strong> <strong>Report</strong> <strong>No</strong>.:<br />

R006SR1K<br />

Depart.: ICN TQM QE 31 <strong>Test</strong> <strong>Report</strong> Date: 28 Apr. 2003<br />

Author: Knier Rack R:21 hiQ<br />

NS-XDSKS1-236GDC<br />

X6919A<br />

10/25


The test report shall not be reproduced except in full without<br />

the written approval of the testing laboratory<br />

- geeignet für die<br />

Front- oder<br />

Zentralbefestigung<br />

- geeignet für<br />

Racks mit bis zu<br />

36" Tiefe<br />

2x Sun Cluster 3.0,<br />

Server Lizenz f. Netra 20<br />

2x E1/T1 PCI-Card (SBE HW400p+)<br />

SIEMENS components<br />

CLNIS -300-B929<br />

H4p+SMNS1<br />

Product Siemens part number<br />

1x Unified Mediation Layer, UMLA<br />

SW.: Version xxx<br />

Installed on each Netra 20<br />

4.2.3 HW & SW: Single server unit<br />

<strong>Test</strong> <strong>Report</strong> <strong>No</strong>.:<br />

R006SR1K<br />

Depart.: ICN TQM QE 31 <strong>Test</strong> <strong>Report</strong> Date: 28 Apr. 2003<br />

n.a.<br />

Siemens part number: D21:WS-N3 (13* im EUT)<br />

Manufacturer: SUN<br />

Following items are included:<br />

Product ordering number serial number<br />

Netra 120,<br />

512 MB RAM,<br />

1* 36 GB Disk<br />

N25DUTA1-9S-512AV1<br />

36.4GB NEBS<br />

Festplatte,<br />

USCSI,<br />

10000upm<br />

4m RJ45-RJ45<br />

CAT5 Kabel<br />

X5244A<br />

X1871A<br />

Siemens part number: D21:WS-N3-SAI (3* im EUT)<br />

Manufacturer: SUN<br />

Following items are included:<br />

Author: Knier Rack R:21 hiQ<br />

11/25


The test report shall not be reproduced except in full without<br />

the written approval of the testing laboratory<br />

Product ordering number serial number<br />

Netra 120,<br />

512 MB RAM,<br />

1* 36 GB Disk<br />

N25DUTA1-9S-512AV1<br />

36.4GB NEBS<br />

Festplatte,<br />

USCSI,<br />

10000upm<br />

4m RJ45-RJ45<br />

CAT5 Kabel<br />

PCI SUNSAI/P<br />

Serielle<br />

Asynchrone<br />

Interface PCI-<br />

Karte<br />

- externe 8-Port<br />

I/O Box mit<br />

RS-232<br />

Anschlüssen<br />

SIEMENS components<br />

X5244A<br />

X1871A<br />

X2156A<br />

Product Siemens part number<br />

1x Unified Mediation Layer, UMLA n.a.<br />

SW.: Version xxx<br />

Installed on each Netra120<br />

4.2.4 HW: Additional network components<br />

Siemens part number: not available (2* im EUT)<br />

Manufacturer: Cisco<br />

Following additional items are included:<br />

Product ordering number serial number<br />

Cisco Catalyst 2924 S30122-U1439-X<br />

24 port switch,<br />

DC<br />

Cisco 4port<br />

extension module<br />

S30122-U1551-X<br />

Siemens part number: not available (4* im EUT)<br />

Manufacturer: Corning<br />

<strong>Test</strong> <strong>Report</strong> <strong>No</strong>.:<br />

R006SR1K<br />

Depart.: ICN TQM QE 31 <strong>Test</strong> <strong>Report</strong> Date: 28 Apr. 2003<br />

Author: Knier Rack R:21 hiQ<br />

12/25


The test report shall not be reproduced except in full without<br />

the written approval of the testing laboratory<br />

Following items are included:<br />

Product ordering number serial number<br />

Cross wired<br />

Ethernet Cable<br />

(external wires,<br />

30m)<br />

V45591-A282-A300<br />

Auxiliary Equipment (AE)<br />

One Ultra10 workstation with monitor (manufacturer SUN)<br />

4.3 Operating Conditions<br />

<strong>Test</strong> <strong>Report</strong> <strong>No</strong>.:<br />

R006SR1K<br />

During the earthquake test all servers in the rack are checked by sending ICMP echo requests<br />

(ping) from the Ultra10 (AE) workstation in an endless loop. The responses from the servers<br />

are displayed on the AE. Missing responses are logged in a file on the AE.<br />

The test loop works as follows:<br />

1. sending ping to 1. Netra120<br />

2. waiting <strong>for</strong> response from 1. Netra120(ICMP echo response) or waiting <strong>for</strong> timeout<br />

3. sending ping to 2. Netra120<br />

31. sending ping to 16. Netra120<br />

32. waiting <strong>for</strong> response 2. Netra120 (ICMP echo response) or waiting <strong>for</strong> timeout<br />

33. sending ping to 1. Netra20<br />

34. waiting <strong>for</strong> response from 1. Netra20 (ICMP echo response) or waiting <strong>for</strong> timeout<br />

35. sending ping to 2. Netra20<br />

36. waiting <strong>for</strong> response from 2. Netra20 (ICMP echo response) or waiting <strong>for</strong> timeout<br />

37. repeat loop from step1<br />

Be<strong>for</strong>e <strong>and</strong> after the earthquake test all disks on all servers are checked using the Sun Solaris<br />

comm<strong>and</strong> “metacheck”.<br />

Depart.: ICN TQM QE 31 <strong>Test</strong> <strong>Report</strong> Date: 28 Apr. 2003<br />

Author: Knier Rack R:21 hiQ<br />

13/25


The test report shall not be reproduced except in full without<br />

the written approval of the testing laboratory<br />

5 <strong>Test</strong> Equipment<br />

5.1 <strong>Test</strong> Facility<br />

consecutive<br />

<strong>No</strong>.<br />

Vibration <strong>Test</strong> Equipment 80A<br />

EQUIPMENT TYPE MANUF. Status of<br />

Equipment<br />

<strong>Test</strong> <strong>Report</strong> <strong>No</strong>.:<br />

R006SR1K<br />

Depart.: ICN TQM QE 31 <strong>Test</strong> <strong>Report</strong> Date: 28 Apr. 2003<br />

Author: Knier Rack R:21 hiQ<br />

Certificate Cal.-Date<br />

YYYY/MM<br />

Cal. due date<br />

YYYY/MM<br />

S0795 Frequency Counter P6101,FP2 Newport ind - - -<br />

S0854 Frequency Display L4S4RA8W Newport ind - - -<br />

S1402 Charge Amplifier D22PMG Unholtz Dickie cal 03-034 2003/02 2004/02<br />

S1418 PARAGON MAINFRAME 35650A hp cal 03-034 2003/02 2004/02<br />

2129<br />

S1419 Vibration Exciter SW9100 RMS cal 03-034 2003/02 2004/02<br />

S5004 Oscilloscope D1011 Siemens ind - - -<br />

S5325 PC Scenic L FSC not - - -<br />

S5059 Accelerometer 224C Endevco cal 20666 2002/12 2004/12<br />

cal=calibrated Equipment - cpu=checked prior to use - chk=checked equipment ( dated)<br />

ind=<strong>for</strong> indication only - not=not calibrated equipment - ref=Reference st<strong>and</strong>ards only<br />

Earthquake Vibration <strong>Test</strong> Equipment 86A<br />

<strong>No</strong>. EQUIPMENT Type Manuf. Inventory-<strong>No</strong>. Ser.-<strong>No</strong>. Cal.-<br />

Stat. Certificate<br />

S0353<br />

Earthquake<br />

system<br />

921.67 MTS A058E020384 0 not<br />

Cal.-Date<br />

YYYY/MM<br />

Cal. due<br />

date<br />

YYYY/MM/D<br />

D<br />

S8096 Control TESTSTAR IIS 761100051188 6911BW<br />

43A527<br />

not<br />

S0919 Amplifier 106 Endevco A05889000451 AD15 cal 03-037 2003/02 2004/02<br />

S5033 Power Supply 32r06 Gossen ind<br />

S5186 Accelerometer 2262C-25 Endevco FW97H cal 1401 2002/04 2004/04/02<br />

S0420<br />

Displacement<br />

Measuring<br />

Device 10000DC-D-006 Schaevitz<br />

cal=calibrated Equipment - cpu=checked prior to use - chk=checked equipment ( dated)<br />

ind=<strong>for</strong> indication only - not=not calibrated equipment - ref=Reference st<strong>and</strong>ards only<br />

cal<br />

Excel<br />

Worksheet 2003/02 2004/02<br />

14/25


The test report shall not be reproduced except in full without<br />

the written approval of the testing laboratory<br />

Figure 5.1- Earthquake <strong>Test</strong> System<br />

<strong>Test</strong> <strong>Report</strong> <strong>No</strong>.:<br />

R006SR1K<br />

Depart.: ICN TQM QE 31 <strong>Test</strong> <strong>Report</strong> Date: 28 Apr. 2003<br />

Author: Knier Rack R:21 hiQ<br />

15/25


The test report shall not be reproduced except in full without<br />

the written approval of the testing laboratory<br />

6 Requirements, <strong>Test</strong>s <strong>and</strong> Results<br />

<strong>Test</strong> <strong>Report</strong> <strong>No</strong>.:<br />

R006SR1K<br />

The test results in the report refer exclusively to the test object described in section 4 <strong>and</strong> the<br />

test period in section 3.4.<br />

6.1 Requirements Specification<br />

The EUT shall operate properly during <strong>and</strong> after the tests specified in section 6.2.2<br />

<strong>No</strong> mechanical or structural damages shall be detected after testing.<br />

6.2 <strong>Test</strong> Specification<br />

6.2.1 Public Transportation – Mechanical <strong>Test</strong>s (2.3)<br />

<strong>Test</strong> Parameter Dim <strong>Test</strong> severity Duration Reference Method<br />

Vibration ASD m<br />

r<strong>and</strong>om<br />

2 /s 3<br />

1,0<br />

EN Fh:Vibration,<br />

dB/oct.<br />

-3 3 x 30 60068-2-64 broad-b<strong>and</strong><br />

frequency range Hz 10-200;200-2000 min<br />

r<strong>and</strong>om<br />

axes of vibration 3<br />

(digital<br />

control)<br />

Shocks shock spectrum<br />

duration ms<br />

acceleration m/s 2<br />

half sine<br />

EN Eb: Bump<br />

6 11 60068-2-29<br />

180 100<br />

mass kg ≤ 50 > 50<br />

number of bumps<br />

100 in<br />

each dir.<br />

direction of bumps 6<br />

Free Fall see Table 7 IEC<br />

60068-2-32<br />

Table 7: Free Fall <strong>Test</strong> Severities <strong>for</strong> <strong>Test</strong> Specification 2.3<br />

Mass (kg) Free Fall <strong>Test</strong> Height<br />

(m)<br />

< 10 1,0<br />

< 15 1,0<br />

< 20 0,8<br />

< 30 0,6<br />

< 40 0,5<br />

< 50 0,4<br />

< 100 0,3<br />

> 100 0,1<br />

<strong>No</strong>te 1: 1 fall on each face.<br />

If the mass is > 5 kg <strong>and</strong> if the normal attitude is specified,<br />

2 falls in the specified attitude only.<br />

Depart.: ICN TQM QE 31 <strong>Test</strong> <strong>Report</strong> Date: 28 Apr. 2003<br />

Author: Knier Rack R:21 hiQ<br />

Ed:<br />

Procedure 1<br />

16/25


The test report shall not be reproduced except in full without<br />

the written approval of the testing laboratory<br />

6.2.2 Earthquake (cl. 4.1 / 4.1E)<br />

<strong>Test</strong> Specification : Earthquake <strong>Test</strong><br />

<strong>Test</strong> <strong>Report</strong> <strong>No</strong>.:<br />

R006SR1K<br />

<strong>Test</strong> Parameter Dim <strong>Test</strong> severity Duration Reference Method<br />

Earthquake<br />

Time<br />

History<br />

RRS<br />

Frequency Range Hz<br />

ZPA m/s 2<br />

Axes<br />

Damping ratio %<br />

Table 5<br />

1 – 35<br />

5<br />

3<br />

2<br />

Table 5 Acceleration Coordinates <strong>for</strong> the RRS<br />

Depart.: ICN TQM QE 31 <strong>Test</strong> <strong>Report</strong> Date: 28 Apr. 2003<br />

Author: Knier Rack R:21 hiQ<br />

30 sec<br />

EN<br />

60068-2-57<br />

Co-ordinate Point Frequency (Hz) Ground Acceleration (m/s 2 )<br />

1 1,0 6,3<br />

2 2,0 25<br />

3 11,6 25<br />

4 23,0 5<br />

5 35,0 5<br />

6.3 <strong>Test</strong> Per<strong>for</strong>mance<br />

6.3.1 Public Transportation – Mechanical <strong>Test</strong>s (2.3)<br />

Mounting of EUT<br />

Ff: Time<br />

History<br />

Method<br />

For the vibration <strong>and</strong> shock tests, the EUT were packed in a wooden transportation case <strong>and</strong><br />

mounted at vibrator table with bars <strong>and</strong> straps.<br />

Weight of EUT is 493 Kg.<br />

The test was per<strong>for</strong>med in 3 mutually perpendicular axes (see photo 1-3).<br />

Definition of vibration axes:<br />

horizontal front to back = Y axis<br />

horizontal side to side = X axis<br />

vertical = Z axis<br />

17/25


The test report shall not be reproduced except in full without<br />

the written approval of the testing laboratory<br />

Photo 1:EUT mounted at vibration table. Axis of vibration Y = front – back<br />

Photo 2: EUT mounted at vibration table. Axis of vibration X = side – side<br />

<strong>Test</strong> <strong>Report</strong> <strong>No</strong>.:<br />

R006SR1K<br />

Depart.: ICN TQM QE 31 <strong>Test</strong> <strong>Report</strong> Date: 28 Apr. 2003<br />

Author: Knier Rack R:21 hiQ<br />

Direction of<br />

vibration<br />

Direction of<br />

vibration<br />

18/25


The test report shall not be reproduced except in full without<br />

the written approval of the testing laboratory<br />

Photo 3: EUT mounted at vibration table. Axis of vibration Z = vertical<br />

Free fall<br />

Photo 4: EUT be<strong>for</strong>e free fall test, height 10cm 2 falls specified<br />

<strong>Test</strong> <strong>Report</strong> <strong>No</strong>.:<br />

R006SR1K<br />

Depart.: ICN TQM QE 31 <strong>Test</strong> <strong>Report</strong> Date: 28 Apr. 2003<br />

Author: Knier Rack R:21 hiQ<br />

Direction of<br />

vibration<br />

19/25


The test report shall not be reproduced except in full without<br />

the written approval of the testing laboratory<br />

6.3.2 Earthquake (cl. 4.1 / 4.1E)<br />

Mounting of EUT<br />

<strong>Test</strong> <strong>Report</strong> <strong>No</strong>.:<br />

R006SR1K<br />

For the Earthquake tests, the EUT were mounted at earthquake table with means of a adapter<br />

plate.<br />

The test was per<strong>for</strong>med in 3 mutually perpendicular axes (see photo 5-6).<br />

During the tests in horizontal axes (X <strong>and</strong> Y) the displacement on top of the EUT were<br />

measured.<br />

Photo 5: EUT mounted on the earthquake table. Axis of vibration X (horizontal)<br />

Depart.: ICN TQM QE 31 <strong>Test</strong> <strong>Report</strong> Date: 28 Apr. 2003<br />

Author: Knier Rack R:21 hiQ<br />

20/25


The test report shall not be reproduced except in full without<br />

the written approval of the testing laboratory<br />

Photo 6: EUT mounted on the earthquake table. Axis of vibration Y (horizontal)<br />

Photo 7: EUT mounted on the earthquake table. Axis of vibration Z (vertical)<br />

<strong>Test</strong> <strong>Report</strong> <strong>No</strong>.:<br />

R006SR1K<br />

Depart.: ICN TQM QE 31 <strong>Test</strong> <strong>Report</strong> Date: 28 Apr. 2003<br />

Author: Knier Rack R:21 hiQ<br />

21/25


The test report shall not be reproduced except in full without<br />

the written approval of the testing laboratory<br />

6.4 <strong>Test</strong> Results<br />

6.4.1 Public Transportation – Mechanical <strong>Test</strong>s (2.3)<br />

<strong>Test</strong> <strong>Report</strong> <strong>No</strong>.:<br />

R006SR1K<br />

During the tests the pagage were not opened.<br />

<strong>No</strong> mechanical deviations of the EUT could be ascertained after the tests.<br />

A electrical function test per<strong>for</strong>med by Mr. Tries, ICN CP D NP A3 runs failure free.<br />

6.4.2 Earthquake (cl. 4.1 / 4.1E)<br />

<strong>No</strong> mechanical deviations of the EUT could be ascertained during <strong>and</strong> after the test.<br />

During the earthquake test every ping was responded – no timeout .<br />

The metacheck comm<strong>and</strong> on all servers did not find an error – all disks were in order.<br />

6.4.2.1 Earthquake tests results - TRS vs. RRS measured at the earthquake table<br />

The shaker table’s analyzed acceleration, known as <strong>Test</strong> Response Spectrum (TRS, red line),<br />

must meet or exceed the Required Response Spectrum (RRS, blue line) <strong>for</strong> the Earthquake<br />

Risk Zone 4 in the range from 1.0 to 50 Hz.<br />

Earthquake <strong>Test</strong> Response Spectrum TRS vs Required Response Spectrum RRS<br />

X-axis:<br />

acc. (g)<br />

2<br />

1.5<br />

1<br />

0.5<br />

0<br />

-0.5<br />

-1<br />

-1.5<br />

-2<br />

R21: hiQ X-axis<br />

Time History (Table)<br />

0 5 10 15 20 25 30 35<br />

t (s)<br />

Figure 6-1 - Acceleration at Earthquake table - X-axis<br />

Depart.: ICN TQM QE 31 <strong>Test</strong> <strong>Report</strong> Date: 28 Apr. 2003<br />

Author: Knier Rack R:21 hiQ<br />

22/25


The test report shall not be reproduced except in full without<br />

the written approval of the testing laboratory<br />

10<br />

acc. (g)<br />

1<br />

Shock response (bottom)<br />

R21: hiQ X - axis<br />

1 10 100<br />

f (Hz)<br />

Figure 6-2 – <strong>Test</strong> Response Spectrum - X-axis<br />

Y-axis:<br />

acc. (g)<br />

2<br />

1.5<br />

1<br />

0.5<br />

0<br />

-0.5<br />

-1<br />

-1.5<br />

-2<br />

R21: hiQ Y-axis<br />

Time History (Table)<br />

<strong>Test</strong> <strong>Report</strong> <strong>No</strong>.:<br />

R006SR1K<br />

Depart.: ICN TQM QE 31 <strong>Test</strong> <strong>Report</strong> Date: 28 Apr. 2003<br />

Author: Knier Rack R:21 hiQ<br />

TRS<br />

RRS Bellc.<br />

0 5 10 15 20 25 30 35<br />

t (s)<br />

Figure 6-3 - Acceleration at Earthquake table - Y-axis<br />

10<br />

acc. (g)<br />

1<br />

Shock response (bottom)<br />

R21: hiQ Y - axis<br />

1 10 100<br />

f (Hz)<br />

Figure 6-4 – <strong>Test</strong> Response Spectrum - Y-axis<br />

TRS<br />

RRS Bellc.<br />

23/25


The test report shall not be reproduced except in full without<br />

the written approval of the testing laboratory<br />

Z-axis:<br />

acc. (g)<br />

2<br />

1.5<br />

1<br />

0.5<br />

0<br />

-0.5<br />

-1<br />

-1.5<br />

-2<br />

R21: hiQ Z-axis<br />

Time History (Table)<br />

<strong>Test</strong> <strong>Report</strong> <strong>No</strong>.:<br />

R006SR1K<br />

0 5 10 15 20 25 30 35<br />

t (s)<br />

Figure 6-5 - Acceleration at Earthquake table - Z-axis<br />

10<br />

acc. (g)<br />

1<br />

Shock response (bottom)<br />

R21: hiQ Z - axis<br />

1 10 100<br />

f (Hz)<br />

Figure 6-6 – <strong>Test</strong> Response Spectrum - Z-axis<br />

Depart.: ICN TQM QE 31 <strong>Test</strong> <strong>Report</strong> Date: 28 Apr. 2003<br />

Author: Knier Rack R:21 hiQ<br />

TRS<br />

RRS Bellc.<br />

24/25


The test report shall not be reproduced except in full without<br />

the written approval of the testing laboratory<br />

6.4.2.2 Displacement results<br />

<strong>Test</strong> <strong>Report</strong> <strong>No</strong>.:<br />

R006SR1K<br />

Frame-level equipment shall be constructed so that during the wave<strong>for</strong>m testing, the maximum<br />

single-amplitude deflection at the top of the framework, relative to the base does not exceed<br />

75mm (3in).<br />

displacement (mm)<br />

60<br />

40<br />

20<br />

0<br />

-20<br />

-40<br />

-60<br />

-80<br />

R21: hiQ X-axis<br />

Displacement (Top of Rack)<br />

0 5 10 15 20 25 30 35<br />

Figure 6-7 – Displacement measured at top of R21: hiQ rack - X-axis<br />

displacement (mm)<br />

25<br />

20<br />

15<br />

10<br />

5<br />

0<br />

-5<br />

-10<br />

-15<br />

-20<br />

-25<br />

t (s)<br />

R21: hiQ Y-axis<br />

Displacement (Top of Rack)<br />

0 5 10 15 20 25 30 35<br />

Figure 6-8 – Displacement measured at top of BS-240XL II rack - Y-axis<br />

In vibration direction vertical (Z-axis) no displacement was measured.<br />

<strong>No</strong> mechanical deviations of the EUT could be ascertained during <strong>and</strong> after the test.<br />

6.5 Evaluation<br />

The tested Rack R21: hiQ CONFORMS with the requirements<br />

ETSI EN 300 019-2-2, V2.1.2 (1999-09), T2.3 Transportation - mechanical tests <strong>and</strong><br />

ETSI EN 300 019-2-3, V2.1.2 (1999-09) Earthquake.<br />

t (s)<br />

Depart.: ICN TQM QE 31 <strong>Test</strong> <strong>Report</strong> Date: 28 Apr. 2003<br />

Author: Knier Rack R:21 hiQ<br />

25/25


The test report shall not be reproduced except in full without<br />

the written approval of the testing laboratory<br />

7 Enclosures<br />

7.1 Accreditation Certificate<br />

<strong>Test</strong> <strong>Report</strong> <strong>No</strong>.:<br />

R006SR1K<br />

Depart.: ICN TQM QE 31 <strong>Test</strong> <strong>Report</strong> Enclosures Date: 28 Apr. 2003<br />

Author: Knier Rack R:21 hiQ<br />

1/3


The test report shall not be reproduced except in full without<br />

the written approval of the testing laboratory<br />

<strong>Test</strong> <strong>Report</strong> <strong>No</strong>.:<br />

R006SR1K<br />

7.2 Diagrams of vibration <strong>and</strong> shock response measured at vibrator table<br />

7.2.1 R<strong>and</strong>om Vibration <strong>Test</strong><br />

R<strong>and</strong>om<br />

[(m/s²)²/Hz]<br />

10<br />

1<br />

0,1<br />

0,01<br />

0,001<br />

R<strong>and</strong>om<br />

5 10 100 200<br />

[(m/s²)²/Hz]<br />

10<br />

1<br />

0,1<br />

0,01<br />

0,001<br />

acceleration at shaker table<br />

acceleration at shaker table<br />

Depart.: ICN TQM QE 31 <strong>Test</strong> <strong>Report</strong> Enclosures Date: 28 Apr. 2003<br />

Author: Knier Rack R:21 hiQ<br />

[Hz]<br />

5 10 100 200<br />

[Hz]<br />

Chan.no: 1<br />

Chan.type: C<br />

DOF: 144<br />

Level: 0,0 dB<br />

Resolution: 1 Hz<br />

Contr.strat.: Average<br />

Unit: (m/s²)²/Hz<br />

RMS (act.): 2,541 m/s²<br />

RMS (req.): 2,504 m/s²<br />

Contr.strat.: Closed loop<br />

-- Time on act. level -elapsed:<br />

000:05:00<br />

remaining: 000:25:00<br />

-- Time total -elapsed:<br />

000:06:00<br />

remaining: 000:25:00<br />

Date: 11-06-02<br />

Time: 13:22:27<br />

R:21<br />

Transportation<br />

horizontal X,Y-axis<br />

Chan.no: 1<br />

Chan.type: C<br />

DOF: 144<br />

Level: 0,0 dB<br />

Resolution: 1 Hz<br />

Contr.strat.: Average<br />

Unit: (m/s²)²/Hz<br />

RMS (act.): 7,906 m/s²<br />

RMS (req.): 7,861 m/s²<br />

Contr.strat.: Closed loop<br />

-- Time on act. level -elapsed:<br />

000:30:00<br />

remaining: 000:00:00<br />

-- Time total -elapsed:<br />

000:31:01<br />

remaining: 000:00:00<br />

Date: 11-06-02<br />

Time: 10:50:30<br />

R:21<br />

Transportation<br />

Vertical Z-axis<br />

2/3


The test report shall not be reproduced except in full without<br />

the written approval of the testing laboratory<br />

7.2.2 Shock <strong>Test</strong><br />

Classical Shock<br />

[g]<br />

15,0<br />

12,5<br />

10,0<br />

7,5<br />

5,0<br />

2,5<br />

0,0<br />

-2,5<br />

-5,0<br />

-7,5<br />

-10,0<br />

-12,5<br />

-15,0<br />

0,00 0,05 0,10 0,15 0,20 0,25 0,30 0,35 0,40 0,45 0,50<br />

Classical Shock<br />

[g]<br />

15,0<br />

12,5<br />

10,0<br />

7,5<br />

5,0<br />

2,5<br />

0,0<br />

-2,5<br />

-5,0<br />

-7,5<br />

-10,0<br />

-12,5<br />

-15,0<br />

Anregung<br />

Anregung<br />

0,00 0,05 0,10 0,15 0,20 0,25 0,30 0,35 0,40 0,45 0,50<br />

<strong>Test</strong> <strong>Report</strong> <strong>No</strong>.:<br />

R006SR1K<br />

Depart.: ICN TQM QE 31 <strong>Test</strong> <strong>Report</strong> Enclosures Date: 28 Apr. 2003<br />

Author: Knier Rack R:21 hiQ<br />

[s]<br />

[s]<br />

Chan.no: 1<br />

Chan.type: C<br />

Level: 0,0 dB<br />

Resolution: 1,22e-004 s<br />

Unit: g<br />

RMS (act.): 1,089 g<br />

RMS (req.): 1,088 g<br />

-- Pulses on act. level -done:<br />

50<br />

remaining: 50<br />

-- Pulses total -done:<br />

80<br />

remaining: 50<br />

Date: 11-06-02<br />

Time: 10:55:18<br />

Chan.no: 1<br />

Chan.type: C<br />

Level: 0,0 dB<br />

Resolution: 1,22e-004 s<br />

Unit: g<br />

RMS (act.): 1,089 g<br />

RMS (req.): 1,088 g<br />

-- Pulses on act. level -done:<br />

10<br />

remaining: 90<br />

-- Pulses total -done:<br />

140<br />

remaining: -10<br />

Date: 11-06-02<br />

Time: 10:57:38<br />

R21<br />

Transportation<br />

Shock acceleration<br />

<strong>for</strong> ,Z axsis<br />

3/3


The test report shall not be reproduced except in full without<br />

the written approval of the testing laboratory<br />

Distributor to <strong>Test</strong> <strong>Report</strong> <strong>No</strong>. R006SR1K<br />

<strong>for</strong> Rack R:21 hiQ<br />

Name: Department: Location:<br />

Mch H, 28 Apr. 2003<br />

Mr. Bienczyk ICN CP D NP A3 Mch H/Ma1 (o+pdf)<br />

Mr. Tries ICN CP D NP A3 Mch H/Ma1 (pdf)<br />

Mr. Klein ICN TQM QE Mch H (pdf)<br />

Mr. Dr. Frentzel ICN TQM QE 3 Mch H (pdf)<br />

Mr. Alt/Knier ICN TQM QE 31 Mch H (cc)<br />

(o): original of test report<br />

(s): summary<br />

(we): without enclosure<br />

(cc): colour copy<br />

(pdf): only as pdf-file via e-mail

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!