15.09.2015 Views

STEEL & TUBE

STEEL & TUBE

STEEL & TUBE

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

f<br />

The recently completed President Plaza at No. 1 Hobson St. The 20 storey steel framed building was constructed by Downers<br />

for The Kitchener Group. Steel & Tube supplied 400 tonnes of structural steel to the fabricator, Dixon & Haddon, and all pipe<br />

and fittings to Singer Fire Systems Ltd for the fire sprinkler system.<br />

04<br />

PRESIDENT PLAZA

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!