Design /<br />

planning<br />

Pre-<br />

Construction<br />

Construction<br />

<strong>Redbank</strong> <strong>Tunnel</strong> <strong>Deviation</strong><br />

Tahmoor Colliery<br />

6 Environmental Control Measures<br />

The following mitigation measures presented in Table 6.1 are intended to ameliorate impacts on noise and vibration. The strategies below are based on the<br />

recommendations of the EA, Conditions of Approval and SoCs, Interim Construction Noise Guidelines (ICNG), Construction Noise Strategy (CNS).<br />

Table 6.1Environmental Control Measures<br />

Reference<br />

Mitigation Measures<br />

Documents<br />

Responsibility<br />

(if applicable)<br />

Training and Inductions<br />

Education on noise responsibilities will be provided as part of the site induction for staff and<br />

subcontractors. The information within the induction will include:<br />

all relevant project specific and standard noise and vibration mitigation measures<br />

relevant licence and approval conditions<br />

NV1<br />

permissible hours of work<br />

any limitations on high noise generating activities<br />

location of nearest sensitive receivers<br />

construction employee parking areas<br />

• •<br />

EA section 8.5<br />

SoC24<br />

CNS table 1<br />

Foreman<br />

Environmental<br />

Coordinator (EC)<br />

Superintendent<br />

designated loading/unloading areas and procedures<br />

site opening/closing times (including deliveries); and<br />

Environmental incident procedures.<br />

NV2<br />

Ongoing education and feedback in relation to noise and vibration will be provided at<br />

toolbox meetings and onsite training.<br />

• Good Practice<br />

Foreman<br />

EC<br />

NV3<br />

All relevant staff and sub-contractors will be informed of areas and work practises where<br />

potential noise impacts have been identified.<br />

• SoC24<br />

EC<br />

Superintendent<br />

RTD Annexure E NVMP Rev 0<br />

Authorised: Regional Environmental Manager Revision: 0 © Abigroup Page 30