<strong>SKID</strong> MOUNTED INCINERATOR UNIT<br />

<strong>SKID</strong> <strong>1000</strong><br />

Incinerator and flue gas cleaning/filter plant,<br />

constructed on a frame.<br />

made<br />

in<br />

Germany<br />

Hazardous waste Incinerators<br />

for a clean environment !


<strong>SKID</strong> MOUNTED INCINERATOR UNIT<br />

<strong>SKID</strong> <strong>1000</strong> - 5G<br />

In the field of combustion technology, we have an extensive know-how, experience and references.<br />

We guarantee our customers high availability of made-to-order equipment.<br />

BASIC<br />

A <strong>SKID</strong> mounted Incinerator Unit is an Incinerator and flue gas cleaning/filter plant, constructed on a frame and has<br />

an excellent combustion capacity (standard capacity 100 kg/hour, 200 kg/hour, 300 kg/hour, 500 kg/hour and <strong>1000</strong><br />

kg/hour), depending on the type of <strong>SKID</strong>. <strong>SKID</strong>'s are designed for local assembly.<br />

The main design demand for the construction of the incinerators are easy operability, rigid construction and long life<br />

time together with made in Germany quality and according to EU regulations.<br />

Our <strong>SKID</strong>'s are available in two versions.<br />

Designed as manual fixed bed with manual feeding and slag extraction (100 and 200 kg/hour) or automated moving<br />

bed combustion plant with automated feeding and slag extraction (300 – <strong>1000</strong> kg/hour). Both units are to be operated<br />

uncomplicated, safe and shall require only low maintenance efforts.<br />

Automatic systems are subject to engineering work. Design of automated moving bed plants are supported only<br />

project-related!<br />

Design: Fixed bed plant<br />

Design: Automated moving bed plant with heat recovery and flue gas filter<br />

MAIN DATA<br />

Capacity:<br />

up to <strong>1000</strong> kg/h<br />

Feeding :<br />

Automated feeding and slag extraction<br />

Kind of waste : Domestic waste and Hazardous waste like Industrial waste, Medical waste, Chemical<br />

residues that are solid and paste-like up to 30% moisture content.<br />

Calorific value waste: ~ 1 - 45 MJ/kg<br />

Density of waste: ~ 50 - 1.250 kg/m³<br />

Thermal capacity: ~ 3600 kW<br />

Flue gas volume: ~ 9100 Nm³/h<br />

Oil consumption: ~ 0 – 100 kg/h<br />

Electrical connection: ~ 90 kW<br />

Ash amount: ~ 10%<br />

Each incineration system will be adapted to the local requirements. The data indicated on the table are reference<br />

values. The data are calculated with a calorific value of waste of 12.500 kJ/kg and a moisture content less than<br />

10%. If the composition of the waste changes the data given will also change.<br />

STANDARD <strong>SKID</strong> CONSISTING OF<br />

1 pce. skid mounted furnace unit to be fixed on a RF concrete slab<br />

1 pce. skid mounted cooling and filtering unit to be fixed on a RF concrete slab<br />

1 pce. stack, with its supporting structure<br />

1 pce. control cabinet<br />

1 set of connection piping between units<br />

1 set of cabling materials between units and cabinet<br />

2


<strong>SKID</strong> MOUNTED INCINERATOR UNIT<br />

<strong>SKID</strong> <strong>1000</strong> - 5G<br />

OPTIONALLY<br />

- 1 pce. fuel tank and its supporting structure<br />

- 1 pce. water tank and its supporting structure<br />

- Consumables<br />

- Spare and wear parts<br />

FEATURES<br />

- Since it is delivered on skids, installation of the unit is very easy and do not need big scale construction work, i.e.<br />

if you can prepare the RF concrete slabs beforehand, the parts of the unit can be unloaded from truck directly into<br />

place and can be fixed immediately,<br />

- Automatic ash discharging: safe technology<br />

- Continuous incineration: the waste is moved over steps with a ram system<br />

- Incineration without grate: absolutely sterile ashes by a complete burnout in the combustion chamber, the waste is<br />

mechanically mixed<br />

- Postcombustion chamber: elimination of odour and organic matters<br />

- Rigid construction: use of standard components<br />

- Refractory lining: resistant against wear, high heat storage, low heat emission of the furnace<br />

- Easy operability: automatic function control<br />

- Low maintenance: all important components are clearly arranged and easy to access<br />

- Made in Germany quality: long-life cycle<br />

PROCESS DESCRIPTION<br />

CHARGING<br />

Moving Bed System<br />

Automated feeding and automated slag extraction.<br />

The feeding will be done automatically with a feeding belt through a top opening for the solid wastes.<br />

INCINERATOR<br />

MAIN COMBUSTION CHAMBER<br />

The waste is incinerated in a two stage combustion chamber. The dimensioning of the combustion chamber and the<br />

controlled incineration ensure a minimum consumption of Diesel oil. Continuous incineration because the waste is<br />

moved over steps with a ram system. Incineration will be done without grate. Absolutely sterile ashes by a complete<br />

burnout in the combustion chamber. The waste is mechanically mixed and is burned directly on the refractory lining.<br />

The continuous incineration process is ensured by an automated system. Combustion air is blown into the incinerated<br />

waste by a nozzle system controlled by the incineration parameters. A mixing takes place between the waste and the<br />

air. Depending on the calorific value of the waste the temperature in the combustion chamber is approx. 850 °C. The<br />

temperature will be controlled by combustion air injection and burner operation. Auxiliary fuel is only necessary at low<br />

calorific value and/or high moisture content of the waste. The combustion chamber is lined entirely with high quality<br />

refractory material. The refractory material of the step floor has high alumina oxide content and has high resistance<br />

against wear.<br />

Temperature : 850 °C<br />

Residence time of waste : 30 – 60 minutes<br />

LANCE SPRAY SYSTEM FOR LIQUID WASTE<br />

Option<br />

A lance system is consisting of one or more sprayers in the combustion chamber and a pumping unit for it. It will<br />

spray the waste in liquid form into the combustion chamber, but not more than 10% in weight per feeding sequence.<br />

Because, liquid spraying into combustion chamber can cause a rapid cooling down of the temperature in the<br />

chamber and endanger the incineration process in one hand, the liquid waste needs additional evaporation energy<br />

and this reduce the incineration capacity of the unit on the other hand. Burning of high-calorific-value-materials is<br />

itself a problem of overheating, not the substance. Therefore, the total amount of waste must be compensated in<br />

case of high calorific value.<br />

3


<strong>SKID</strong> MOUNTED INCINERATOR UNIT<br />

<strong>SKID</strong> <strong>1000</strong> - 5G<br />

INCINERATION OF POLYMERIC SUBSTANCES<br />

The incineration of high amounts of polymeric substances such as plastic, PVC, rubber etc. could lead into an<br />

overheating of the system and also be harmful for the environment.<br />

STANDARD AMOUNT OF POLYMERIC SUBSTANCES<br />

Not more than 3% of total waste amount per feeding batch.<br />

During combustion PVC can be broken down into water, carbon dioxide and HCl. Furthermore, combustion of HCl<br />

can cause formation of dioxins. Therefore, the polymeric substances and PVC products should not be incinerated<br />

intensively, e.g. not more than 3% per feeding sequence in standard execution.<br />

INCREASING THE AMOUNT OF POLYMERIC SUBSTANCES<br />

Option<br />

Up to 30% of total waste amount per feeding batch is possible by means of special technical arrangements of the<br />

System. To do this, the combustion chamber, the cooling system, the additive dosing system, the filter system and<br />

the plant control must be adjusted.<br />

The values can vary according to the requirements from project to project.<br />

POST COMBUSTION CHAMBER<br />

The flue gas from the combustion chamber can contain not burnt components. In a post combustion chamber<br />

(secondary combustion chamber) an additional burner ensures the complete combustion of all smell and organic<br />

components. The selected residence time of the flue gas in the combustion chamber will be 2 seconds at 1.100 °C.<br />

A burner and a temperature measurement after the post combustion chamber ensure the destruction of organic<br />

pollutants and CO.<br />

Temperature : 1.100 °C<br />

Residence time of flue gas : > 2 seconds<br />

Visualisation<br />

Option<br />

All relevant process parameters and data are monitored<br />

and stored on a PC visualisation system.<br />

Picture: Visualisation on touch screen<br />

FLUE GAS CLEANING SYSTEM<br />

A gas treatment system in accordance with EU regulation will be installed in our incineration plants.<br />

Each filter system will be adapted to the local requirements. Such systems are<br />

composed of an additive dosing system, a ceramic filter system and a draft fan.<br />

The additive can be varied according to waste characteristics. Mostly sodium<br />

bicarbonate is indicated, with addition of activated carbon. This additive is stored<br />

in big bags and fed by an air conveyor system. The sodium bicarbonate is an<br />

efficient reagent to remove SO2, HCl and HF. The activated carbon removes<br />

heavy metals and dioxin.The products from the neutralization reaction are<br />

removed by a filter with ceramic filter elements.The filter will be cleaned<br />

periodically through pressurized air impulses.<br />

4


<strong>SKID</strong> MOUNTED INCINERATOR UNIT<br />

<strong>SKID</strong> <strong>1000</strong> - 5G<br />

COOLING OF EXHAUST GASES<br />

WATER SPRAY COOLING SYSTEM<br />

As standard cooler we use a Water Spray Cooling System to reduce the temperature of the exhaust gases and also<br />

to protect the flue gas filter system.<br />

Thermal shocks generated due to the high temperature are prevented by spraying the water particles uniformly<br />

inside the exhaust gas cooler. The water droplet evaporated into a flow of exhaust gases. The spray cooler length<br />

Is optimized for an optimum mass flow rate. Water injection velocity and pressure are varied as using number of<br />

nozzles depending on the type of <strong>SKID</strong>.<br />

ENVIRONMENTAL FRIENDLY AIR COOLING SYSTEM<br />

Option<br />

The hot flue gas is cooled down from a temperature<br />

of approx. 1100 °C to 600 °C in a U–shaped pipe<br />

cooler system through natural convection and<br />

radiation by ductwork.<br />

To ensure a good cooling effect, at its downstream<br />

installed air cooled heat exchanger will cool the<br />

flue gas down to a temperature between 200 °C<br />

up to 250 °C (averagely 230 °C).<br />

The cooler system is mounted between the<br />

incinerator and the filter plant.<br />

The air cooler requires approx. 5 - 30 kW power<br />

depending on the type of plant.<br />

Pictures: Air cooling system<br />

The advantage is that this facility do not require water consumption. In contrast to a spray cooling system this facility<br />

saves approx. 8000 kg water per hour for a <strong>SKID</strong><strong>1000</strong>.<br />

Advantages on a view:<br />

- Low energy consumption<br />

- No water consumption<br />

- No steam is emitted to the atmosphere<br />

STEAM BOILER<br />

Option<br />

The hot flue gas from the combustion plant is cooled down in a steam boiler to<br />

about 230 °C. The steam boiler is a flue gas pipe type boiler with flue gas routed<br />

through the pipes. Saturated steam with a pressure of 10 bar will be produced.<br />

The steam boiler is mounted between the incinerator and the filter. Untreated flue<br />

gas passes through the boiler to the filter plant.<br />

Due to the dust emission from the incinerator a certain fouling of the steam boiler<br />

will occur. On experience a cleaning cycle of every 4 – 8 weeks is necessary.<br />

It depends on the mass and on the pollution of the flue gas. The duration of a cleaning cycle will be about 6 hours.<br />

5


<strong>SKID</strong> MOUNTED INCINERATOR UNIT<br />

<strong>SKID</strong> <strong>1000</strong> - 5G<br />

CONTINUOUS EXHAUST GAS MONITORING SYSTEM (CEGM)<br />

Option<br />

Envisaged analyses could be e.g. HCL, CL2, NOX, SOX, CO and TOC.<br />

More on request.<br />

The operation frequency can be either continuous operation<br />

or activation at a predefined frequency or upon demand.<br />

ELECTRICAL EQUIPMENT<br />

Picture: CEGM of a moving bed system<br />

- EMSR Equipment<br />

- Automatic start and shutdown<br />

- Control of all necessary process conditions<br />

- Control of all safety measurements<br />

- Control Box<br />

Control box for indoor erection incl. main switch, redundant emergency stop as well as all necessary fuses,<br />

contacts, relays and clamps, key switch for start-up, completely cabled.<br />

- Instruments: The measuring device keeps the demands for an automatic and safe system. The electrical equipment<br />

conforms to the current standard (VDE and DIN) and is produced according to the state-of-the-art.<br />

- Cabling<br />

Cabling material within battery limit of the unit will be delivered by us.<br />

STANDARDS<br />

- Construction according to DIN/EN<br />

- Electrical parts according to VDE<br />

- Documentation according to DIN<br />

- DIN EN 746<br />

- Burner section according to DIN 4788<br />

RESOURCES (requirements)<br />

- Electric Power: Voltage 230 / 400 V<br />

Frequency 50 Hz<br />

- Fuel<br />

- Compressed air<br />

- Water<br />

CONSUMABLES<br />

Additive (Sodiumbicarbonate): approx. 24 kg/h *<br />

Activated carbon (if necessary): approx. 1,0 kg/h<br />

Filterash: approx. 22 kg/h *<br />

Ash from incinerator: approx. 100 kg/h *<br />

Compressed air: 60 Nm3/h<br />

Electrical power: 90 kWh/h<br />

Diesel oil: < 0,10 l/kg waste *<br />

* Data may change, depending on the composition of the waste (please see also the “main data” on page two).<br />

6


<strong>SKID</strong> MOUNTED INCINERATOR UNIT<br />

<strong>SKID</strong> <strong>1000</strong> - 5G<br />

FORBIDDEN MATERIALS<br />

- Amunitions and other explosives<br />

- Lightning amunition<br />

- Akkus und Batteries<br />

- Mercury containing thermometer<br />

- PVC, only smaller amounts per feeding sequence<br />

SUPERVISING<br />

We can send two supervisors, one for mechanical and one for electrical erection, during the local erection period.<br />

The cost of supervisors shall be paid separately, in accordance to the current rates of services.<br />

DOCUMENTATION<br />

- Description and list of components<br />

- Layout drawing and process flow diagram<br />

- Instruction manual in English<br />

- Spare/Wear part list<br />

LIMIT OF SUPPLY<br />

- Additional access, stairs, etc. if necessary<br />

- Big bags for residuals<br />

- Buildings<br />

- Civil works (also civil works drawings must be prepared locally acc. to local legal regulations)<br />

- Connection to the Control Cabinet<br />

- Consumables supply, including compressed air<br />

- Emission measurements if necessary<br />

- Electric Power<br />

- Erection<br />

- Fuel<br />

- Insulation<br />

- Lighting<br />

- Lightning protection if necessary<br />

- Local approvals and permissions<br />

- Main electrical cabling to the control system<br />

- Official permits to install and operate the system<br />

- Oil and lubricants, except the first filling<br />

- Scaffolding, lifting devices, cranes, if necessary<br />

- Transportation and customs clearance<br />

- Unloading of equipment<br />

- Water<br />

WARRANTEES<br />

Material:<br />

In respect of the components supplied by us, we undertake a warranty of 12 months following commissioning, but<br />

not exceeding 18 months following notice of the readiness for dispatch of the main equipment. The warranty<br />

includes the quality of the materials, the structural design and the workmanship of the plant components supplied<br />

ex works, as well as the mechanical and thermal functioning of the correctly installed equipment. Wearing parts are<br />

not included in our warranty. In the event of defects in respect of our supplies and services notified to us in writing<br />

within the above-mentioned warranty period, we will undertake improvement work within a reasonable period. Our<br />

warranties are subject to the uninterrupted, total prove of the operating conditions of the plant, available to us.<br />

Claims for reparation of consequential damages, lost profit and production failure - irrespective of the legal basis on<br />

which the claims are asserted - are precluded.<br />

7


<strong>SKID</strong> MOUNTED INCINERATOR UNIT<br />

<strong>SKID</strong> <strong>1000</strong> - 5G<br />

8


<strong>SKID</strong> MOUNTED INCINERATOR UNIT<br />

<strong>SKID</strong> <strong>1000</strong> - 5G<br />

Pictures:<br />

Automated Moving Bed Plant with Heat Recovery<br />

Funded by the Government and the EU<br />

MORE INFORMATION ONLINE<br />

ZANNI.DE<br />

ZANNI-TECH.DE<br />

- ZANNI-TECH INCINERATOR <strong>SKID</strong>S<br />

EU DIRECTIVES<br />

- Protection of Groundwater<br />

- Hazardous Waste<br />

- Criteria and procedures for the acceptance of waste at landfills<br />

- Landfill of waste<br />

- Incineration of waste<br />

- Hazardous Waste<br />

- National emission ceilings for certain atmospheric pollutants<br />

- 10 years program on reducing emissions<br />

- Criteria and procedures for the acceptance of waste at landfills<br />

- Waste<br />

- Machinery<br />

- Waste and repealing certain Directives<br />

- Limitation of emissions of volatile organic compounds due to the use of organic solvents in certain paints and ...<br />

9


CONTACT<br />

ZANNI + PARTNER Ltd.<br />

Prinzenallee 7<br />

40549 Düsseldorf<br />

Germany<br />

Phone: +49 211 52391406<br />

Fax: +49 211 52391200<br />

email: mail@zanni.de<br />

web: http://www.zanni.de<br />

LOCAL OFFICE<br />

(C) Zanni + Partner Ltd. - <strong>SKID</strong><strong>1000</strong> - 5G - 20140825

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!