SKID 1000
Stationary Incinerator SKID1000 - Zanni.de
Stationary Incinerator SKID1000 - Zanni.de
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>SKID</strong> MOUNTED INCINERATOR UNIT<br />
<strong>SKID</strong> <strong>1000</strong><br />
Incinerator and flue gas cleaning/filter plant,<br />
constructed on a frame.<br />
made<br />
in<br />
Germany<br />
Hazardous waste Incinerators<br />
for a clean environment !
<strong>SKID</strong> MOUNTED INCINERATOR UNIT<br />
<strong>SKID</strong> <strong>1000</strong> - 5G<br />
In the field of combustion technology, we have an extensive know-how, experience and references.<br />
We guarantee our customers high availability of made-to-order equipment.<br />
BASIC<br />
A <strong>SKID</strong> mounted Incinerator Unit is an Incinerator and flue gas cleaning/filter plant, constructed on a frame and has<br />
an excellent combustion capacity (standard capacity 100 kg/hour, 200 kg/hour, 300 kg/hour, 500 kg/hour and <strong>1000</strong><br />
kg/hour), depending on the type of <strong>SKID</strong>. <strong>SKID</strong>'s are designed for local assembly.<br />
The main design demand for the construction of the incinerators are easy operability, rigid construction and long life<br />
time together with made in Germany quality and according to EU regulations.<br />
Our <strong>SKID</strong>'s are available in two versions.<br />
Designed as manual fixed bed with manual feeding and slag extraction (100 and 200 kg/hour) or automated moving<br />
bed combustion plant with automated feeding and slag extraction (300 – <strong>1000</strong> kg/hour). Both units are to be operated<br />
uncomplicated, safe and shall require only low maintenance efforts.<br />
Automatic systems are subject to engineering work. Design of automated moving bed plants are supported only<br />
project-related!<br />
Design: Fixed bed plant<br />
Design: Automated moving bed plant with heat recovery and flue gas filter<br />
MAIN DATA<br />
Capacity:<br />
up to <strong>1000</strong> kg/h<br />
Feeding :<br />
Automated feeding and slag extraction<br />
Kind of waste : Domestic waste and Hazardous waste like Industrial waste, Medical waste, Chemical<br />
residues that are solid and paste-like up to 30% moisture content.<br />
Calorific value waste: ~ 1 - 45 MJ/kg<br />
Density of waste: ~ 50 - 1.250 kg/m³<br />
Thermal capacity: ~ 3600 kW<br />
Flue gas volume: ~ 9100 Nm³/h<br />
Oil consumption: ~ 0 – 100 kg/h<br />
Electrical connection: ~ 90 kW<br />
Ash amount: ~ 10%<br />
Each incineration system will be adapted to the local requirements. The data indicated on the table are reference<br />
values. The data are calculated with a calorific value of waste of 12.500 kJ/kg and a moisture content less than<br />
10%. If the composition of the waste changes the data given will also change.<br />
STANDARD <strong>SKID</strong> CONSISTING OF<br />
1 pce. skid mounted furnace unit to be fixed on a RF concrete slab<br />
1 pce. skid mounted cooling and filtering unit to be fixed on a RF concrete slab<br />
1 pce. stack, with its supporting structure<br />
1 pce. control cabinet<br />
1 set of connection piping between units<br />
1 set of cabling materials between units and cabinet<br />
2
<strong>SKID</strong> MOUNTED INCINERATOR UNIT<br />
<strong>SKID</strong> <strong>1000</strong> - 5G<br />
OPTIONALLY<br />
- 1 pce. fuel tank and its supporting structure<br />
- 1 pce. water tank and its supporting structure<br />
- Consumables<br />
- Spare and wear parts<br />
FEATURES<br />
- Since it is delivered on skids, installation of the unit is very easy and do not need big scale construction work, i.e.<br />
if you can prepare the RF concrete slabs beforehand, the parts of the unit can be unloaded from truck directly into<br />
place and can be fixed immediately,<br />
- Automatic ash discharging: safe technology<br />
- Continuous incineration: the waste is moved over steps with a ram system<br />
- Incineration without grate: absolutely sterile ashes by a complete burnout in the combustion chamber, the waste is<br />
mechanically mixed<br />
- Postcombustion chamber: elimination of odour and organic matters<br />
- Rigid construction: use of standard components<br />
- Refractory lining: resistant against wear, high heat storage, low heat emission of the furnace<br />
- Easy operability: automatic function control<br />
- Low maintenance: all important components are clearly arranged and easy to access<br />
- Made in Germany quality: long-life cycle<br />
PROCESS DESCRIPTION<br />
CHARGING<br />
Moving Bed System<br />
Automated feeding and automated slag extraction.<br />
The feeding will be done automatically with a feeding belt through a top opening for the solid wastes.<br />
INCINERATOR<br />
MAIN COMBUSTION CHAMBER<br />
The waste is incinerated in a two stage combustion chamber. The dimensioning of the combustion chamber and the<br />
controlled incineration ensure a minimum consumption of Diesel oil. Continuous incineration because the waste is<br />
moved over steps with a ram system. Incineration will be done without grate. Absolutely sterile ashes by a complete<br />
burnout in the combustion chamber. The waste is mechanically mixed and is burned directly on the refractory lining.<br />
The continuous incineration process is ensured by an automated system. Combustion air is blown into the incinerated<br />
waste by a nozzle system controlled by the incineration parameters. A mixing takes place between the waste and the<br />
air. Depending on the calorific value of the waste the temperature in the combustion chamber is approx. 850 °C. The<br />
temperature will be controlled by combustion air injection and burner operation. Auxiliary fuel is only necessary at low<br />
calorific value and/or high moisture content of the waste. The combustion chamber is lined entirely with high quality<br />
refractory material. The refractory material of the step floor has high alumina oxide content and has high resistance<br />
against wear.<br />
Temperature : 850 °C<br />
Residence time of waste : 30 – 60 minutes<br />
LANCE SPRAY SYSTEM FOR LIQUID WASTE<br />
Option<br />
A lance system is consisting of one or more sprayers in the combustion chamber and a pumping unit for it. It will<br />
spray the waste in liquid form into the combustion chamber, but not more than 10% in weight per feeding sequence.<br />
Because, liquid spraying into combustion chamber can cause a rapid cooling down of the temperature in the<br />
chamber and endanger the incineration process in one hand, the liquid waste needs additional evaporation energy<br />
and this reduce the incineration capacity of the unit on the other hand. Burning of high-calorific-value-materials is<br />
itself a problem of overheating, not the substance. Therefore, the total amount of waste must be compensated in<br />
case of high calorific value.<br />
3
<strong>SKID</strong> MOUNTED INCINERATOR UNIT<br />
<strong>SKID</strong> <strong>1000</strong> - 5G<br />
INCINERATION OF POLYMERIC SUBSTANCES<br />
The incineration of high amounts of polymeric substances such as plastic, PVC, rubber etc. could lead into an<br />
overheating of the system and also be harmful for the environment.<br />
STANDARD AMOUNT OF POLYMERIC SUBSTANCES<br />
Not more than 3% of total waste amount per feeding batch.<br />
During combustion PVC can be broken down into water, carbon dioxide and HCl. Furthermore, combustion of HCl<br />
can cause formation of dioxins. Therefore, the polymeric substances and PVC products should not be incinerated<br />
intensively, e.g. not more than 3% per feeding sequence in standard execution.<br />
INCREASING THE AMOUNT OF POLYMERIC SUBSTANCES<br />
Option<br />
Up to 30% of total waste amount per feeding batch is possible by means of special technical arrangements of the<br />
System. To do this, the combustion chamber, the cooling system, the additive dosing system, the filter system and<br />
the plant control must be adjusted.<br />
The values can vary according to the requirements from project to project.<br />
POST COMBUSTION CHAMBER<br />
The flue gas from the combustion chamber can contain not burnt components. In a post combustion chamber<br />
(secondary combustion chamber) an additional burner ensures the complete combustion of all smell and organic<br />
components. The selected residence time of the flue gas in the combustion chamber will be 2 seconds at 1.100 °C.<br />
A burner and a temperature measurement after the post combustion chamber ensure the destruction of organic<br />
pollutants and CO.<br />
Temperature : 1.100 °C<br />
Residence time of flue gas : > 2 seconds<br />
Visualisation<br />
Option<br />
All relevant process parameters and data are monitored<br />
and stored on a PC visualisation system.<br />
Picture: Visualisation on touch screen<br />
FLUE GAS CLEANING SYSTEM<br />
A gas treatment system in accordance with EU regulation will be installed in our incineration plants.<br />
Each filter system will be adapted to the local requirements. Such systems are<br />
composed of an additive dosing system, a ceramic filter system and a draft fan.<br />
The additive can be varied according to waste characteristics. Mostly sodium<br />
bicarbonate is indicated, with addition of activated carbon. This additive is stored<br />
in big bags and fed by an air conveyor system. The sodium bicarbonate is an<br />
efficient reagent to remove SO2, HCl and HF. The activated carbon removes<br />
heavy metals and dioxin.The products from the neutralization reaction are<br />
removed by a filter with ceramic filter elements.The filter will be cleaned<br />
periodically through pressurized air impulses.<br />
4
<strong>SKID</strong> MOUNTED INCINERATOR UNIT<br />
<strong>SKID</strong> <strong>1000</strong> - 5G<br />
COOLING OF EXHAUST GASES<br />
WATER SPRAY COOLING SYSTEM<br />
As standard cooler we use a Water Spray Cooling System to reduce the temperature of the exhaust gases and also<br />
to protect the flue gas filter system.<br />
Thermal shocks generated due to the high temperature are prevented by spraying the water particles uniformly<br />
inside the exhaust gas cooler. The water droplet evaporated into a flow of exhaust gases. The spray cooler length<br />
Is optimized for an optimum mass flow rate. Water injection velocity and pressure are varied as using number of<br />
nozzles depending on the type of <strong>SKID</strong>.<br />
ENVIRONMENTAL FRIENDLY AIR COOLING SYSTEM<br />
Option<br />
The hot flue gas is cooled down from a temperature<br />
of approx. 1100 °C to 600 °C in a U–shaped pipe<br />
cooler system through natural convection and<br />
radiation by ductwork.<br />
To ensure a good cooling effect, at its downstream<br />
installed air cooled heat exchanger will cool the<br />
flue gas down to a temperature between 200 °C<br />
up to 250 °C (averagely 230 °C).<br />
The cooler system is mounted between the<br />
incinerator and the filter plant.<br />
The air cooler requires approx. 5 - 30 kW power<br />
depending on the type of plant.<br />
Pictures: Air cooling system<br />
The advantage is that this facility do not require water consumption. In contrast to a spray cooling system this facility<br />
saves approx. 8000 kg water per hour for a <strong>SKID</strong><strong>1000</strong>.<br />
Advantages on a view:<br />
- Low energy consumption<br />
- No water consumption<br />
- No steam is emitted to the atmosphere<br />
STEAM BOILER<br />
Option<br />
The hot flue gas from the combustion plant is cooled down in a steam boiler to<br />
about 230 °C. The steam boiler is a flue gas pipe type boiler with flue gas routed<br />
through the pipes. Saturated steam with a pressure of 10 bar will be produced.<br />
The steam boiler is mounted between the incinerator and the filter. Untreated flue<br />
gas passes through the boiler to the filter plant.<br />
Due to the dust emission from the incinerator a certain fouling of the steam boiler<br />
will occur. On experience a cleaning cycle of every 4 – 8 weeks is necessary.<br />
It depends on the mass and on the pollution of the flue gas. The duration of a cleaning cycle will be about 6 hours.<br />
5
<strong>SKID</strong> MOUNTED INCINERATOR UNIT<br />
<strong>SKID</strong> <strong>1000</strong> - 5G<br />
CONTINUOUS EXHAUST GAS MONITORING SYSTEM (CEGM)<br />
Option<br />
Envisaged analyses could be e.g. HCL, CL2, NOX, SOX, CO and TOC.<br />
More on request.<br />
The operation frequency can be either continuous operation<br />
or activation at a predefined frequency or upon demand.<br />
ELECTRICAL EQUIPMENT<br />
Picture: CEGM of a moving bed system<br />
- EMSR Equipment<br />
- Automatic start and shutdown<br />
- Control of all necessary process conditions<br />
- Control of all safety measurements<br />
- Control Box<br />
Control box for indoor erection incl. main switch, redundant emergency stop as well as all necessary fuses,<br />
contacts, relays and clamps, key switch for start-up, completely cabled.<br />
- Instruments: The measuring device keeps the demands for an automatic and safe system. The electrical equipment<br />
conforms to the current standard (VDE and DIN) and is produced according to the state-of-the-art.<br />
- Cabling<br />
Cabling material within battery limit of the unit will be delivered by us.<br />
STANDARDS<br />
- Construction according to DIN/EN<br />
- Electrical parts according to VDE<br />
- Documentation according to DIN<br />
- DIN EN 746<br />
- Burner section according to DIN 4788<br />
RESOURCES (requirements)<br />
- Electric Power: Voltage 230 / 400 V<br />
Frequency 50 Hz<br />
- Fuel<br />
- Compressed air<br />
- Water<br />
CONSUMABLES<br />
Additive (Sodiumbicarbonate): approx. 24 kg/h *<br />
Activated carbon (if necessary): approx. 1,0 kg/h<br />
Filterash: approx. 22 kg/h *<br />
Ash from incinerator: approx. 100 kg/h *<br />
Compressed air: 60 Nm3/h<br />
Electrical power: 90 kWh/h<br />
Diesel oil: < 0,10 l/kg waste *<br />
* Data may change, depending on the composition of the waste (please see also the “main data” on page two).<br />
6
<strong>SKID</strong> MOUNTED INCINERATOR UNIT<br />
<strong>SKID</strong> <strong>1000</strong> - 5G<br />
FORBIDDEN MATERIALS<br />
- Amunitions and other explosives<br />
- Lightning amunition<br />
- Akkus und Batteries<br />
- Mercury containing thermometer<br />
- PVC, only smaller amounts per feeding sequence<br />
SUPERVISING<br />
We can send two supervisors, one for mechanical and one for electrical erection, during the local erection period.<br />
The cost of supervisors shall be paid separately, in accordance to the current rates of services.<br />
DOCUMENTATION<br />
- Description and list of components<br />
- Layout drawing and process flow diagram<br />
- Instruction manual in English<br />
- Spare/Wear part list<br />
LIMIT OF SUPPLY<br />
- Additional access, stairs, etc. if necessary<br />
- Big bags for residuals<br />
- Buildings<br />
- Civil works (also civil works drawings must be prepared locally acc. to local legal regulations)<br />
- Connection to the Control Cabinet<br />
- Consumables supply, including compressed air<br />
- Emission measurements if necessary<br />
- Electric Power<br />
- Erection<br />
- Fuel<br />
- Insulation<br />
- Lighting<br />
- Lightning protection if necessary<br />
- Local approvals and permissions<br />
- Main electrical cabling to the control system<br />
- Official permits to install and operate the system<br />
- Oil and lubricants, except the first filling<br />
- Scaffolding, lifting devices, cranes, if necessary<br />
- Transportation and customs clearance<br />
- Unloading of equipment<br />
- Water<br />
WARRANTEES<br />
Material:<br />
In respect of the components supplied by us, we undertake a warranty of 12 months following commissioning, but<br />
not exceeding 18 months following notice of the readiness for dispatch of the main equipment. The warranty<br />
includes the quality of the materials, the structural design and the workmanship of the plant components supplied<br />
ex works, as well as the mechanical and thermal functioning of the correctly installed equipment. Wearing parts are<br />
not included in our warranty. In the event of defects in respect of our supplies and services notified to us in writing<br />
within the above-mentioned warranty period, we will undertake improvement work within a reasonable period. Our<br />
warranties are subject to the uninterrupted, total prove of the operating conditions of the plant, available to us.<br />
Claims for reparation of consequential damages, lost profit and production failure - irrespective of the legal basis on<br />
which the claims are asserted - are precluded.<br />
7
<strong>SKID</strong> MOUNTED INCINERATOR UNIT<br />
<strong>SKID</strong> <strong>1000</strong> - 5G<br />
8
<strong>SKID</strong> MOUNTED INCINERATOR UNIT<br />
<strong>SKID</strong> <strong>1000</strong> - 5G<br />
Pictures:<br />
Automated Moving Bed Plant with Heat Recovery<br />
Funded by the Government and the EU<br />
MORE INFORMATION ONLINE<br />
ZANNI.DE<br />
ZANNI-TECH.DE<br />
- ZANNI-TECH INCINERATOR <strong>SKID</strong>S<br />
EU DIRECTIVES<br />
- Protection of Groundwater<br />
- Hazardous Waste<br />
- Criteria and procedures for the acceptance of waste at landfills<br />
- Landfill of waste<br />
- Incineration of waste<br />
- Hazardous Waste<br />
- National emission ceilings for certain atmospheric pollutants<br />
- 10 years program on reducing emissions<br />
- Criteria and procedures for the acceptance of waste at landfills<br />
- Waste<br />
- Machinery<br />
- Waste and repealing certain Directives<br />
- Limitation of emissions of volatile organic compounds due to the use of organic solvents in certain paints and ...<br />
9
CONTACT<br />
ZANNI + PARTNER Ltd.<br />
Prinzenallee 7<br />
40549 Düsseldorf<br />
Germany<br />
Phone: +49 211 52391406<br />
Fax: +49 211 52391200<br />
email: mail@zanni.de<br />
web: http://www.zanni.de<br />
LOCAL OFFICE<br />
(C) Zanni + Partner Ltd. - <strong>SKID</strong><strong>1000</strong> - 5G - 20140825