Massport BIM and Lean Update
ACECMA-Massport_BIM_and_Lean_12012015
ACECMA-Massport_BIM_and_Lean_12012015
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
II.<br />
RESPONSIBILITY FOR MODEL<br />
DEVELOPMENT (con’t)<br />
e. Owner is responsible for defining the Model’s Level of<br />
Development (LOD) as more specifically described in the<br />
<strong>BIM</strong>xP<br />
f. Constructor is responsible to coordinate the Digital Data<br />
of its subcontractors <strong>and</strong> trade contractors <strong>and</strong> to deliver<br />
construction information to the Designer at intervals<br />
prescribed in the <strong>BIM</strong>xP.