Massport BIM and Lean Update
ACECMA-Massport_BIM_and_Lean_12012015
ACECMA-Massport_BIM_and_Lean_12012015
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
I. GENERAL<br />
a. Applies only to projects using CM At-Risk<br />
b. <strong>BIM</strong> Exhibit is a Contract Document that bolts on to<br />
Owner’s existing Owner/Designer <strong>and</strong> Owner/CM<br />
contract forms<br />
c. Project Designer is required to bolt <strong>BIM</strong> Exhibit on to<br />
its Subconsultant agreements to the extent that such<br />
downstream vendors receive Digital Data<br />
d. Project CM (Constructor) is required to bolt <strong>BIM</strong><br />
Exhibit onto its Subcontractor <strong>and</strong> Trade Contractor<br />
agreements to the extent that such downstream<br />
vendors receive Digital Data