CERTIFIED
15-10_Shaft_Wall_Brochure_Web
15-10_Shaft_Wall_Brochure_Web
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Construction Details<br />
Head of Wall<br />
Under Steel Beam with Z-Clip Connection Detail<br />
FASTENERS<br />
Z-CLIP ATTACHED<br />
TO BEAM BEFORE<br />
FIREPROOFING<br />
J-TRACK<br />
I-STUD<br />
1" SHAFTLINER<br />
BOARD<br />
ACOUSTICAL/FIRE<br />
SEALANT<br />
1<br />
/ 2” TYPE C<br />
or 5 / 8” TYPE X<br />
GYPSUM BOARD<br />
Z-CLIP MAX SPACING<br />
24" O.C. MIN. 20 GA.<br />
MIN. 2 FASTENERS PER<br />
LEG<br />
STEEL BEAM<br />
WITH<br />
FIREPROOFING<br />
Under Steel Beam Offset Connection Detail<br />
SW-12<br />
XX<br />
Under Steel Beam With Z-Clip Connection<br />
Detail<br />
STEEL BEAM<br />
WITH<br />
FIREPROOFING<br />
1<br />
2" MIN.<br />
8" MAX<br />
FASTENERS<br />
ACOUSTICAL/FIRE<br />
SEALANT<br />
J-TRACK<br />
I-STUD<br />
1<br />
/ 2” TYPE C<br />
or 5 / 8” TYPE X<br />
GYPSUM BOARD<br />
1" SHAFTLINER<br />
BOARD<br />
Effective 01/11/16 and supersedes all previous information.<br />
www.SCAFCO.com<br />
17