29.01.2016 Views

150116BridonIR_Final JW A4

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Global Technology<br />

Leader<br />

Driving the world’s most advanced rope testing<br />

facility. Producing the most technically advanced<br />

products and developing bespoke solutions for<br />

customers exacting needs.<br />

A History of Innovation<br />

With a world wide heritage stretching back over two<br />

centuries, we are a customer focused group investing to<br />

deliver unique solutions.


Customer<br />

decision on<br />

future rope<br />

manageme<br />

nt policy<br />

Current<br />

inspection /<br />

maintenanc<br />

e & changeout<br />

policy<br />

Our<br />

recommende<br />

d advice to<br />

customer<br />

from Bridon<br />

Report<br />

reviewe<br />

d by<br />

Bridon<br />

Application<br />

s<br />

Specialist<br />

Forensic /<br />

Inquest<br />

report<br />

completed<br />

by Bridon<br />

Tech Centre<br />

Fully<br />

worked<br />

sample<br />

&<br />

operating<br />

parameter<br />

s sent to<br />

Bridon<br />

The MORE<br />

Programme Maximum<br />

operating rope efficiency<br />

Expert support to maximise your<br />

working rope life<br />

Bridon Technology<br />

Centre<br />

One of the world’s most advanced<br />

rope testing facilities with over 30<br />

dedicated design, manufacturing &<br />

specialist staff The hub of rope


BRIDON IS EVOLVING<br />

• Bridon has always had a close connection<br />

with our offshore customers, both directly,<br />

and through marine forums<br />

• Following feedback from customers, Bridon<br />

embarked on a “customer facing”<br />

restructuring programme driving the<br />

development of our Bridon Technology<br />

centre which opened in 2013<br />

• This has led to a series of customer<br />

focused product developments aimed at<br />

addressing industry challenges and<br />

significantly lowering our customers<br />

rope operating costs.


BRIDON’S<br />

PHILOSOPHY<br />

International Services<br />

savings, safety<br />

assurance, risk mitigation,<br />

peace of mind<br />

Technology Centre<br />

Application Expertise<br />

• Installation<br />

• Re-lubrication<br />

• Inspection<br />

• Maintenance<br />

• NDE<br />

One of the world’s most<br />

advanced and bespoke<br />

testing facilities<br />

• Forensic Analysis<br />

• Inquest Reports<br />

• Mechanical Testing<br />

• Rope Training<br />

• Applications advice<br />

• Product Selection<br />

• User Guide<br />

An advanced NPD programme driven by a clear customer<br />

focus


BTC FACILITIES AND SERVICES<br />

Multi-layer spooling machines<br />

3 x Rope destruction test machines<br />

2 x Torque/turn machines<br />

Customer<br />

decision on<br />

future rope<br />

managemen<br />

t policy<br />

Current<br />

inspection /<br />

maintenanc<br />

e & changeout<br />

policy<br />

Our<br />

recommended<br />

advice to<br />

customer<br />

from Bridon<br />

Fully<br />

worked<br />

sample<br />

&<br />

operating<br />

parameter<br />

s sent to<br />

Bridon<br />

Report<br />

reviewed<br />

by<br />

Bridon<br />

Application<br />

s Specialist<br />

Forensic /<br />

inquest<br />

report<br />

completed<br />

by Bridon<br />

Tech Centre<br />

4 x Bend fatigue test machines<br />

M O R E<br />

Wire forensic analysis


INTERNATIONAL SERVICES PACKAGE<br />

Selection &<br />

specification<br />

Rope record<br />

management<br />

Storage &<br />

transport<br />

Guidance on<br />

discard &<br />

feedback<br />

Total<br />

Se rvic e<br />

Solutions<br />

Installation<br />

Tensile<br />

testing<br />

Delivering cost effective support to<br />

maximise the operational life of<br />

our customers ropes.<br />

Inspection &<br />

examination<br />

Maintenance


APPLICATION SPECIALISTS<br />

Bridon is one of the only rope manufacturers to<br />

employ application specialists who can deliver<br />

expert advice.<br />

These services include:<br />

•Advice on rope selection, installation and<br />

maintenance<br />

• Recommendations on increasing rope operating life<br />

• Rope life management support<br />

Rope Training<br />

BlueBook App<br />

• Rope training workshops<br />

• User manuals User and Manual installation and guides Installation Guides


OFFSHORE MARKET CHALLENGES<br />

Bridon has always had a close connection with customers, both directly,<br />

and through marine forums. Actively listening to customer feedback the<br />

following challenges were identified.<br />

• Accelerated corrosion (especially in warmer climates)<br />

• Operation in Arctic conditions<br />

• Ineffective re-lubrication methods<br />

• Effects of pressure in deeper waters<br />

• Legislation on environmental lubricant obligations (VGP 2013)<br />

• High cost of wire rope integrity management<br />

• Market perception shift on rope from commodity to capex item<br />

• Market requirement for cost savings through increasing rope


Development<br />

s


SUMMARY OF TECHNOLOGY DEVELOPMENTS<br />

Based on customer feedback, Bridon defined a series of key<br />

developments required to address these industry challenges<br />

Customer Requirement Bridon Development Product Technology<br />

Increased corrosion protection<br />

(especially in warmer climates)<br />

Environmental VGP compliance<br />

Lowering cost of in-service maintenance<br />

Ropes operating effectively in ultra<br />

deep water<br />

Operational flexibility in challenging<br />

environments<br />

Bridon NXG, Brilube<br />

20, ECO & Extreme<br />

Brilube<br />

ECO<br />

Bridon NXG, Brilube 20 &<br />

Extreme<br />

Bridon NXG, Brilube<br />

Extreme<br />

Bridon NXG, Brilube<br />

Extreme & Bristar Polar<br />

Bridon NXG, Brilube<br />

20, Extreme, ECO<br />

NXG core protection and enhanced<br />

corrosion resistance from new lubricants<br />

Fully VGP compliant service lubricants with<br />

no loss in performance<br />

NXG technology and new lubricants give longer<br />

protection between maintenance cycles<br />

Bridon NXG and Brilube Extreme combine to<br />

give pressure resistant performance and<br />

longer operating life to 4,000m depth<br />

Increased operating temperature range gives<br />

more flexibility in hot and cold environments<br />

including AHCS<br />

All of the above developments give extended<br />

rope operating life<br />

Enhanced operating rope life


CORROSION PROTECTION<br />

BARRIERS<br />

1 2<br />

LUBRICATION<br />

(Blocking<br />

Compound)<br />

POLYMER CORE<br />

(Blocking<br />

Compound)<br />

WIRE<br />

COATING<br />

(Zinc)<br />

EXTENDED<br />

ROPE LIFE<br />

3<br />

3<br />

NXG Polymer Core<br />

Sealed, plastic core keeps the<br />

rope lubricant inside and<br />

seawater and abrasive<br />

particles outside.<br />

2 2<br />

3<br />

1<br />

More accurate and durable<br />

placement of the strands<br />

resulting in even load distribution<br />

Brilube Extreme<br />

Enhanced fatigue life performance<br />

New rope lubricant with extreme<br />

pressure resistant additives,<br />

enhanced wash<br />

off resistance and improved<br />

corrosion protection additives<br />

1


IR ROPE TECHNOLOGY<br />

Delivering cutting edge polymer technology. World class developments<br />

working in collaboration with customers to achieve more from your<br />

ropes NXG Feature NXG Benefit Additional Benefits<br />

Enhanced corrosion protection<br />

Increased fatigue life<br />

Low friction polymer technology<br />

Core protection<br />

Wider operating temperature<br />

High pressure resistance<br />

Longer rope operating life<br />

More operating flexibility in<br />

challenging environments such as<br />

arctic and tropical waters<br />

Use in ultra deep waters<br />

Combined with the<br />

unique MORE programme<br />

these benefits enable<br />

customers to achieve<br />

MORE from their ropes,<br />

ultimately delivering<br />

operating cost savings<br />

M O R E


LUBRICATION DEVELOPMENTS<br />

Lubricant<br />

Lubricants applied in manufacture<br />

Lubricants<br />

applied<br />

in service<br />

Brilube 20 Brilube ECO Brilube Extreme Brilube ECO<br />

Features<br />

Benefits<br />

Enhanced corrosion<br />

resistance<br />

High performance<br />

crane rope lubricant<br />

supplied as standard<br />

Outperforms industry<br />

benchmarks in lab testing<br />

✔<br />

EcoLabel Certified<br />

lubricant with no loss<br />

of performance<br />

Fully complies with<br />

2013 VGP legislation<br />

✔<br />

Pressure resistant, tacky<br />

lubricant designed primarily<br />

for use in ultra deep waters<br />

Maintains performance up to<br />

4000m water depth. Significantly<br />

increased fling off and wash off<br />

resistance combined with<br />

enhanced corrosion protection<br />

and wider temperature operating<br />

range. ✔<br />

EcoLabel<br />

Certified<br />

lubricant with no<br />

loss of<br />

performance<br />

Fully complies<br />

with 2013 VGP<br />

legislation<br />

✔<br />

Increased wash<br />

off<br />

resistance<br />

VGP compliance<br />

✔<br />

✗<br />

✔<br />

✔<br />

✔<br />

✗<br />

✔<br />

✔<br />

Increased fatigue<br />

life<br />

✔<br />

✔<br />

✔<br />

✔<br />

Increased rope<br />

operating life<br />

✔<br />

✔<br />

✔<br />


HYBRID ROPES - LONGER STRONGER LIGHTER<br />

Steel and fibre combination rope where the fibre is an integral load bearing<br />

member As strong and robust as steel but lighter with superior bending<br />

properties.<br />

Benefits<br />

• Can be deployed on<br />

existing vessels and<br />

winch systems<br />

• Performs like steel<br />

Steel Fibre Hybrid<br />

MBL Benchmark Matched Matched<br />

Weight<br />

Benchmark<br />

Up to 80%<br />

lighter<br />

15%-40% lighter<br />

• Existing equipment can<br />

carry increased payload<br />

• Existing equipment can<br />

travel to greater depths<br />

Fatigue Benchmark +100% +85%<br />

Robustness Benchmark Very low Matched<br />

Multi layer<br />

spooling<br />

• Enhanced fatigue<br />

Field performance Trial<br />

• Six strand Triangular Hybrid currently in a field test in the deepest gold mine in South<br />

Africa<br />

Temperature<br />

performance<br />

Benchmark Low Matched<br />

Benchmark<br />

HMPE - Lower<br />

Aramid - Matched<br />

• Bridon’s Hybrid rope is installed on an electrically coupled Blair multi-rope (BMR) man<br />

material hoist at a gold mine in South Africa. It was the first hoist to operate to a depth of<br />

3,150m in a single wind with an end-load of 23 mt.<br />

• Further opportunities being discussed with key partners<br />

Matched


The Bridon MORE Programme<br />

Customer<br />

decision on<br />

future rope<br />

management<br />

policy<br />

Current<br />

inspection /<br />

maintenanc<br />

e &<br />

change-out<br />

policy<br />

Developed for:<br />

• Crane Ropes<br />

Our<br />

recommended<br />

advice to<br />

customer<br />

from Bridon<br />

Fully<br />

worked sample<br />

& operating<br />

parameters<br />

sent to Bridon<br />

• Drilling Lines<br />

• Marine Riser<br />

Tensioners<br />

• Anchor Lines<br />

Report<br />

reviewed<br />

by Bridon<br />

Applications<br />

Specialist<br />

Forensic /<br />

Inquest<br />

report<br />

completed by<br />

Bridon Tech<br />

Centre<br />

Bridon can only provide observations on the condition of the rope and relevant<br />

historic comparisons. The final decision on rope changeout policy shall always be<br />

the responsibility of the customer and Bridon will provide no warranty or<br />

assurances that the rope is suitable for continued use.


COLLABORATIVE DEVELOPMENT<br />

FEA modelling<br />

Green energy<br />

mooring system<br />

Property<br />

stability<br />

Sheave loss<br />

testing<br />

Friction hoist<br />

testing<br />

Condition<br />

monitoring<br />

Full fibre low<br />

rotation CBOS<br />

Hoist rope<br />

Modelling dual<br />

fall cabling<br />

Rotation<br />

performance


Drilling<br />

Lines


DRILLING LINES SUMMARY<br />

Key Performance<br />

Requirement<br />

• Increased uptime through confident<br />

extension of ton mile goals<br />

• Resistance to crushing on drum<br />

• Larger surface contact area with sheaves<br />

• Maintaining diameter stability<br />

• Resistance to wear and abrasion


DRILLING LINES<br />

IR Available<br />

Enhancements<br />

• Dyform Bristar NXG with friction reducing polymer<br />

technology<br />

• Dyform Bristar Polar arctic grade polymer technology<br />

Current Best Performing<br />

• Dyform Bristar 6 x 26 or 6 x 31 with unique fluted polymer<br />

core<br />

Industry Standard - API9A<br />

• Conventional IWRC 6 x 19 or 6 x 26<br />

constructions


HOW CAN YOU BENEFIT FROM THESE PRODUCT<br />

UPGRADES<br />

Cutting edge polymer technology from Bridon to help you get more from<br />

your ropes<br />

Improvement Benefit Additional Benefits<br />

Increased fatigue<br />

resistance<br />

Increased diameter<br />

stability<br />

Reduced fling<br />

off<br />

Longer rope operating<br />

life<br />

More operational<br />

flexibility<br />

Combined with the<br />

unique MORE programme<br />

these benefits enable<br />

customers to achieve<br />

MORE from their ropes,<br />

ultimately delivering<br />

M<br />

operating<br />

O<br />

cost<br />

R<br />

savings<br />

E


CASE STUDY<br />

EXAMPLE<br />

Leading Drilling Contracto


SUMMARY<br />

The<br />

Problem<br />

Customer<br />

failing to<br />

benefit<br />

from<br />

existing<br />

ropes<br />

being used<br />

on drilling<br />

rig<br />

Current<br />

Situation<br />

Customer<br />

unaware of<br />

potential<br />

Ton-Mile<br />

performance<br />

of Bristar<br />

Drilling Lines<br />

and value add<br />

Bridon<br />

services<br />

The<br />

Solution<br />

Partnering<br />

with Bridon<br />

to fully<br />

understand<br />

rope<br />

condition at<br />

current<br />

Ton-Mile<br />

goal to<br />

safely &<br />

confidently<br />

increase<br />

ton-mile<br />

targets.<br />

Resul<br />

t<br />

Using inquest<br />

reports customer<br />

has increased<br />

Ton-Mile goal<br />

to 46 ton-mile/ft<br />

(8000 ton-miles<br />

between slip<br />

&cut) after just 1<br />

report. An<br />

increase of<br />

over 8%<br />

equivalent to<br />

savings of<br />

$171,000 p.a.


EXISTING SET UP<br />

• 2” 6X31<br />

Drilling Line x 15,000 ft<br />

• NOV SSGD-5750 active heave<br />

compensated drawworks<br />

• Current Ton-Mile target<br />

- Automated ton-mile recorder<br />

- 42.5 Ton-Miles/ft reference point<br />

- 7,360 Ton-Miles with cut length of 174<br />

ft


THE PROCESS<br />

Current<br />

operating<br />

parameters<br />

(Start point –<br />

42.5 tonmile/ft)<br />

Fully worked<br />

sample<br />

removed at<br />

Bridon<br />

first slip & cut<br />

recommendation<br />

and returned to<br />

for extended life<br />

BTC<br />

utilising Bridon<br />

Bristar drilling<br />

lines supported by<br />

MORE program.<br />

Strip down<br />

analysis complete<br />

& report issued<br />

to customer with<br />

recommendatio<br />

ns<br />

Extended<br />

interval<br />

between slip &<br />

Customer cut operation by<br />

confident to >500 ton-miles<br />

increase Tonmile<br />

goal to<br />

46 ton-mile/ft<br />

Increase of Tonmile/ft<br />

goal of<br />

8%<br />

following first<br />

report<br />

8% increase in ton-mile goal equates to ~$171k per annum on 1<br />

rope


THE<br />

NUMBERS<br />

4 x<br />

$42,750 =<br />

estimated<br />

saving of $171k<br />

per annum<br />

This 8%<br />

improvement<br />

($171k) is<br />

from the first<br />

report<br />

analysis<br />

Increase<br />

d Ton-<br />

Miles<br />

means 4 less<br />

slip & cuts per<br />

annum<br />

A potential<br />

of >25% gain<br />

when a full<br />

cycle report<br />

analysis is<br />

complete<br />

This would<br />

equate to ~<br />

$513<br />

k<br />

Savings (or a free<br />

day)<br />

Increase<br />

from 7,500 to<br />

8,000<br />

Ton-Miles<br />

Rig day<br />

rate:<br />

$513,000<br />

Calculated<br />

cost per slip &<br />

cut: $42,750<br />

(day rate)<br />

Estimated slip<br />

and cut time:<br />

2 hours


SUMMARY COMMENTS<br />

Through partnering with Bridon customers have<br />

been to reduce downtime costs<br />

Bridon has achieved this through the knowledge and<br />

experience of our Application Specialists and technology<br />

centre to produce condition assessments and offer expert<br />

advice<br />

This is an ongoing process and through collaboration<br />

Bridon can help maximise Ton-Mile goal<br />

M O R E


Marine Riser<br />

Tensioners


MARINE RISER TENSIONER SUMMARY<br />

Key Performance<br />

Requirement<br />

Key Performance<br />

Requirement<br />

• Increased uptime through<br />

improved Ton-Cycle targets<br />

• High bend fatigue resistance<br />

• Corrosion resistance<br />

• High operating temperature<br />

range


MARINE RISER TENSIONERS<br />

IR available<br />

enhancements<br />

• Dyform Bristar NXG with friction reducing polymer<br />

technology<br />

• Dyform Bristar Polar arctic grade polymer technology<br />

Current best performing<br />

• Dyform Bristar 6 or 8 x 36 class and 6 or 8 x 37<br />

class with unique fluted polymer core<br />

Industry standard - API9A<br />

• Conventional 6 or 8 x 36 class and 6 or 8 x<br />

37 class


SUMMARY OF TEST DATA<br />

Significant improvement in bend fatigue performance over<br />

benchmark ropes<br />

7.5 x improvement in laboratory tests<br />

Number of cycles to<br />

failure<br />

Cycles<br />

to<br />

failure<br />

100<br />

%<br />

Cycles<br />

to failure<br />

490%<br />

Cycles<br />

to<br />

failure<br />

750%<br />

Tested under<br />

laboratory<br />

conditions FOS<br />

5:1<br />

D:d 20:1<br />

Rope<br />

Constructio<br />

n<br />

Benchmark<br />

6 x 36 IWRC<br />

Rope<br />

Constructio<br />

n<br />

DYF 8 x 36 PI<br />

Rope<br />

Constructio<br />

n<br />

Bristar 8 NXG


HOW CAN YOU BENEFIT FROM THESE PRODUCT<br />

UPGRADES<br />

Improvement Benefit Additional Benefits<br />

Improved bend fatigue<br />

performance<br />

Improved corrosion<br />

resistance<br />

Wider operating temperature<br />

range<br />

Longer rope operating<br />

life<br />

More operational<br />

flexibility in arctic and<br />

tropical waters<br />

Combined with the<br />

unique MORE programme<br />

these benefits enable<br />

customers to achieve<br />

MORE from their ropes,<br />

ultimately delivering<br />

M operating O cost R savings E


Offshore Crane<br />

Ropes


OFFSHORE CRANE ROPE SUMMARY<br />

Key performance requirement<br />

Key Performance<br />

Requirement<br />

• Resistance to crushing<br />

• Resistance to cross over<br />

damage<br />

• High corrosion resistance<br />

• High bend fatigue resistance<br />

• Lower maintenance requirement<br />

• Increased resistance to<br />

demands of ultra deep water<br />

activities


OFFSHORE CRANE ROPES<br />

IR available<br />

enhancements<br />

• Dyform Bristar NXG with friction reducing polymer<br />

technology<br />

• Hydra 34LR NXG with friction reducing polymer<br />

technology Current best performing<br />

• Dyform Bristar 6 or 8 and 34LR /PI multistrand (Max for Boom<br />

Hoist)<br />

Industry standard - API9A<br />

• Conventional 34LR /PI and 6 or 8 strand constructions<br />

All of the above are available with Brilube Extreme for deep water<br />

operations


HOW CAN YOU BENEFIT FROM THESE PRODUCT<br />

UPGRADES<br />

Improvement Benefit Additional Benefits<br />

Improved corrosion<br />

resistance<br />

Improved fatigue<br />

resistance<br />

Improved operating<br />

design<br />

Longer rope operating<br />

life<br />

Lower<br />

maintenance<br />

requirement<br />

Combined with the<br />

unique MORE programme<br />

these benefits enable<br />

customers to achieve<br />

MORE from their ropes,<br />

ultimately delivering<br />

M operating O cost R savings E


SUMMARY OF TEST DATA<br />

Significant improvement in bend fatigue performance over<br />

benchmark ropes<br />

Number of cycles to<br />

failure<br />

Stranded rope test<br />

tesults<br />

Cycles<br />

to<br />

failure 100<br />

%<br />

Cycles<br />

to failure<br />

490<br />

%<br />

Cycles<br />

to<br />

failure<br />

750<br />

%<br />

Number of cycles to<br />

failure<br />

Low rotation rope test<br />

results<br />

Cycles<br />

to<br />

failure 100<br />

%<br />

Cycles<br />

to<br />

failure<br />

185<br />

%<br />

Rope<br />

Constructi<br />

on<br />

Benchmark<br />

6 x 36 IWRC<br />

Rope<br />

Constructi<br />

on<br />

DYF 8 x 36 PI<br />

Rope<br />

Constructi<br />

on<br />

Bristar 8<br />

Cycles to full failure tested under laboratory conditions FOS 5:1<br />

D:d 20:1<br />

Rope<br />

Constructi<br />

on<br />

Benchma<br />

rk DYF<br />

34LR<br />

Rope<br />

Constructi<br />

on<br />

iR 34LR<br />

Hydra NXG


CASE STUDY<br />

EXAMPLE<br />

Leading Subsea Construction<br />

Contractor


SUMMARY<br />

The Problem Current Situation The Solution Resul<br />

t<br />

Customer<br />

experiencing<br />

premature<br />

rope failures<br />

through<br />

accelerated<br />

corrosion in<br />

ultra deep<br />

waters<br />

Customer<br />

looking for<br />

reasons why<br />

ropes are<br />

failing early in<br />

ultra deep<br />

water<br />

operations,<br />

and a solution<br />

to stop<br />

premature<br />

failure while<br />

maintaining<br />

specified<br />

operating<br />

parameters<br />

Partnering<br />

with Bridon<br />

to fully<br />

understand<br />

reasons for<br />

rope failure<br />

and<br />

collaborative<br />

development<br />

on a new<br />

deep water<br />

rope,<br />

including a<br />

new lubricant<br />

New NXG<br />

Extreme<br />

range of ultra<br />

deep water<br />

ropes<br />

eliminated<br />

the cause of<br />

accelerated<br />

corrosion and<br />

extended the<br />

rope life to<br />

customer<br />

expectations<br />

(5-6 years)


DEEP SEA OPERATIONS<br />

Operating depths are becoming increasing deeper offshore and<br />

this poses new challenges previously unseen in the industry.<br />

Arctic Temperature Profile<br />

Tropical Temperature Profile<br />

Pressure<br />

• Pressure increases linearly with water<br />

depth: 300 bars (4409 psi) of pressure at<br />

a 3000m (10,000ft) water depth<br />

• The effect of pressure is more significant<br />

than temperature on the performance of<br />

rope lubricants<br />

• Viscosity of lubricants increases with<br />

pressure (from Barus equation)<br />

• Lubricant is expelled out when rope when<br />

it is retracted back on to the drum. This<br />

can happen at water depth from 1500m<br />

(5000 ft)


EXISTING CHALLENGES<br />

Lubrication loss causes:<br />

• Premature rope failure<br />

• Accelerated corrosion<br />

• Deck safety concerns<br />

• Environmental impact<br />

• Increased operating costs


PRESSURE RE-LUBRICATION TRIALS<br />

Lost lubricant CANNOT be replaced in multi-strand ropes<br />

54mm as supplied<br />

Brilube 70 with Viper<br />

applicator<br />

Total Bio adhesive<br />

with viper applicator<br />

Outer<br />

Improved corrosion<br />

resistance<br />

Longer rope operating<br />

life<br />

Core<br />

Inner


PROTOTYPE OF NEXT GENERATION MULTI-STRAND<br />

ROPE<br />

Sample Ropes – EN12385 class 35 (W) X K19<br />

• Benchmark rope: 63mm (2.48”) standard<br />

lube in all stranding and closing operations<br />

• Development rope: 63mm (2.48”) enhanced<br />

lubricant Brilube Extremein stranding and<br />

plastic impregnated core and NXG polymer<br />

blended


HYPERBARIC TESTING OF ROPES - EXAMINATION<br />

• NXG polymer used for plastic impregnation intact<br />

• No evidence of water trapped inside the PI core<br />

• No evidence of grease loss or weight gain in outer<br />

strands


Testing and Field Trial<br />

Lab Testing<br />

BREAK LOAD TEST<br />

Field Trial Inspection<br />

•Actual breaking load = 378.8t<br />

•Design MBL = 358t<br />

•Design parameters remain unaltered<br />

• Safety factor : 5<br />

• D/d ratio : 20:1<br />

• Speed : 13 cycles / min<br />

• Discard criteria :<br />

3 wire breaks<br />

Control rope 100%<br />

Hydra NXG 198%


1 st YEAR FORESNSIC INSPECTION CONDUCTED AT BTC<br />

Condition Assessment<br />

63mm 34LR Rope<br />

• Rope returned appeared well lubricated along<br />

the entire length with no visible signs of<br />

corrosion<br />

• No evidence of mechanical damage or wire<br />

breaks on the rope surface.<br />

Plasticated Core<br />

• No major loss in zinc coat weight when<br />

compared to a sample of the original<br />

manufacture specification<br />

M O R E<br />

• Plastic impregnated layer appeared to be in a<br />

good condition with no visible signs of damage<br />

or splitting.


WHAT THE CUSTOMER GAINED<br />

What this meant to the Customer<br />

Utilising the NXG polymer<br />

technology the core of the rope is<br />

now protected from ingress of<br />

seawater and abrasive particles<br />

Longer rope life in deep &<br />

ultra deep water<br />

applications<br />

The NXG technology increases<br />

rope life through the reduction of<br />

inter strand fretting and locking<br />

in the lubricant within the core<br />

More confidence in rope<br />

life management cycles<br />

Brilube Extreme provides<br />

enhanced wash off and fling off<br />

resistance, increased operating<br />

temperature range, and pressure<br />

resistant properties providing all<br />

round protection to the rope in<br />

deep waters<br />

Increased rope operating<br />

life, lower cost of<br />

maintenance, lower rope<br />

operating costs


DEMONSTRATION PROJECTS<br />

NEXT GENERATION MULTI-STRAND ROPES<br />

The following ropes have been manufactured and supplied by<br />

Bridon:<br />

• 34mm x 2500m 34LR low rotation rope<br />

• 48mm x 2800m 34LR low rotation rope<br />

• 63mm x 800m Hydra low rotation rope<br />

• 109mm x 3200m Hydra low rotation rope<br />

• 92mm 6-strand high performance Bristar NXG Anchor<br />

Lines<br />

• 103mm DF6X52 BRISTAR NXG EXTREME<br />

• 76mm DF6X47 BRISTAR NXG EXTREME<br />

• 30mm DF34LR NXG EXTREME<br />

• 38mm DF34LR NXG EXTREME<br />

• 64mm DF34LR NXG EXTREME<br />

• 34mm DF34LR NXG EXTREME<br />

• 96mm x 3000m Hydra low rotation rope


Anchor<br />

Lines


ANCHOR LINES SUMMARY<br />

Key Performance<br />

performance requirement<br />

Requirement<br />

• Limited opportunity for<br />

maintenance:<br />

• Increased resistance to corrosion<br />

• Prevention of particle ingress<br />

• Complex winch arrangement<br />

• Extended fatigue performance<br />

• Increased line length & deeper<br />

operations<br />

• High strength to weight ratio


ANCHOR LINES<br />

IR available<br />

enhancements<br />

• Bristar NXG sealed, enhanced polymer core<br />

with Extreme high performance subsea<br />

lubricant<br />

Current best performing<br />

• Bridon Diamond<br />

Blue<br />

• Bridon DB2K<br />

Industry standard - API9A<br />

• Conventional 6 x 36 IWRC<br />

constructions


CORROSION PROTECTION<br />

BARRIERS<br />

1 2<br />

LUBRICATION<br />

(Blocking<br />

Compound)<br />

POLYMER CORE<br />

(Blocking<br />

Compound)<br />

WIRE<br />

COATING<br />

(Zinc)<br />

EXTENDED<br />

ROPE LIFE<br />

3<br />

3<br />

NXG Polymer Core<br />

Sealed, plastic core keeps the<br />

rope lubricant inside and<br />

seawater and abrasive<br />

particles outside.<br />

2 2<br />

3<br />

1<br />

More accurate and durable<br />

placement of the strands<br />

resulting in even load distribution<br />

Brilube Extreme<br />

Enhanced fatigue life performance<br />

New rope lubricant with extreme<br />

pressure resistant additives,<br />

enhanced wash<br />

off resistance and improved<br />

corrosion protection additives<br />

ANCHOR LINES<br />

1


HOW CAN YOU BENEFIT FROM THESE PRODUCT<br />

UPGRADES<br />

Improvement Benefit Additional Benefits<br />

Improved corrosion<br />

resistance<br />

Improved fatigue<br />

resistance<br />

Improved operating<br />

design<br />

Longer rope operating<br />

life<br />

Lower maintenance<br />

requirement<br />

Combined with the<br />

unique MORE programme<br />

these benefits enable<br />

customers to achieve<br />

MORE from their ropes,<br />

ultimately delivering<br />

M operating O cost R savings E


CASE STUDY EXAMPLE<br />

Anchor<br />

Lines


CASE STUDIES AND FIGURES<br />

• In Western Australia a rig drifted away following an anchor<br />

line breakage due to premature corrosion<br />

• Cost involved in lost rig day rates<br />

alone:<br />

• Recovery cost:<br />

Repairs cost:<br />

• All above covered by liability insurance<br />

~US$13millio<br />

n<br />

~>US$5millio<br />

n<br />

~>US$3millio<br />

n<br />

• What is not covered, is the resultant reduction of<br />

~US$187m in contract revenue backlog through<br />

reduction of contract by 1 year and ~45 days lost rig<br />

uptime


THE CHALLENGES FOR BRIDON<br />

• To maintain breaking load over time against the effects of<br />

loss of metallic area through corrosion<br />

• To provide an anchor line solution which delivers<br />

increased protection both externally and at the core<br />

(where most anchor line failures occur)<br />

• To provide anchor lines which could survive the full<br />

change-out term with as little maintenance as possible<br />

• Collaborating with customers to provide ongoing forensic<br />

analysis to become best in class for anchor line<br />

reliability and safety


ROPE LIFE MANAGEMENT<br />

Rope life management programme<br />

to be implemented on cut off<br />

samples received, comprising of:<br />

• Annual residual MBL<br />

• Annual forensic testing<br />

• Visual inspection<br />

• Lubricant effectiveness analysis<br />

M O R E


WHAT THE CUSTOMER GAINED<br />

What this meant to the Customer<br />

Utilising the Bristar technology the<br />

core of the rope is now protected<br />

from ingress of seawater and<br />

abrasive particles<br />

Longer anchor line rope<br />

life in high temperature,<br />

high corrosion<br />

environments<br />

The NXG technology increases<br />

rope life through the reduction of<br />

inter strand fretting and locking<br />

in the lubricant within the core<br />

More confidence in rope<br />

life management cycles<br />

in high corrosion<br />

environments<br />

Brilube Extreme provides<br />

enhanced wash off resistance in<br />

the splash zone delivering<br />

increased protection against<br />

corrosion whilst being able to<br />

operate at a wider temperature<br />

range<br />

Increased safety and<br />

Lower risk of costly<br />

claims through damage<br />

caused by anchor line<br />

breaks<br />

M O R E


BRIDON OFFERS<br />

M O R E


Appendix 1 - TON-MILES<br />

General<br />

Definition<br />

A unit of<br />

freight<br />

transportatio<br />

n equivalent<br />

to<br />

a ton of<br />

freight<br />

moved one<br />

mile<br />

What is<br />

drilling<br />

Ton-Mile<br />

The work of<br />

the drilling<br />

line that is<br />

commonly<br />

measured as<br />

the<br />

cumulative<br />

of the load<br />

lifted in tons<br />

and the<br />

distance<br />

lifted or<br />

lowered in<br />

miles<br />

Slip and<br />

Cut<br />

When the<br />

predetermin<br />

ed Ton-Mile<br />

limit is<br />

reached,<br />

drilling<br />

contractors<br />

will perform<br />

slip and cut<br />

to prevent<br />

further<br />

fatigue<br />

Resul<br />

t<br />

Ton-Mile is<br />

an<br />

important<br />

figure that<br />

must be<br />

recorded<br />

correctly;<br />

however, it is<br />

important to<br />

visually<br />

inspect the<br />

drilling line to<br />

see if there is<br />

any worn out<br />

wire