City of Waltham Transportation Master Plan
waltham_tmp_pub_meeting_2_5-16-16
waltham_tmp_pub_meeting_2_5-16-16
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Task 3<br />
Main Street at Gore Street/Barbara Road<br />
Short-Term Improvements:<br />
• Install push-buttons to<br />
meet current standards<br />
• Install bike lane striping<br />
on Gore Street<br />
• Optimize traffic signal<br />
timings<br />
• Investigate access<br />
management<br />
opportunities<br />
<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />
2 nd Public Meeting<br />
Date: 5/17/2016