24.06.2016 Views

City of Waltham Transportation Master Plan

waltham_tmp_pub_meeting_2_5-16-16

waltham_tmp_pub_meeting_2_5-16-16

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Task 3<br />

Main Street at Gore Street/Barbara Road<br />

Short-Term Improvements:<br />

• Install push-buttons to<br />

meet current standards<br />

• Install bike lane striping<br />

on Gore Street<br />

• Optimize traffic signal<br />

timings<br />

• Investigate access<br />

management<br />

opportunities<br />

<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />

2 nd Public Meeting<br />

Date: 5/17/2016

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!