24.06.2016 Views

City of Waltham Transportation Master Plan

waltham_tmp_pub_meeting_2_5-16-16

waltham_tmp_pub_meeting_2_5-16-16

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>City</strong> <strong>of</strong> <strong>Waltham</strong><br />

<strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />

Presented by:<br />

Date: 5/17/2016<br />

2 nd Public Meeting


Agenda<br />

• 4:00 – 6:00 PM: Open House<br />

• 6:30-7:30 PM: Presentation by McMahon<br />

• Overview <strong>of</strong> Project, Schedule and Team<br />

• Recap <strong>of</strong> Previous Public Meeting & Public Survey Results<br />

• Recommended Actions<br />

• Parking Pedestrians Bicyclists<br />

• Transit Vehicles<br />

• Specific Recommendations<br />

• Select Corridors and Intersections<br />

• Next Steps<br />

• 7:30 – 7:45 PM: Public Comment Period<br />

• 7:45 – 9:00 PM: Workshop Format<br />

<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />

2 nd Public Meeting<br />

Date: 5/17/2016


Project Team<br />

<strong>City</strong> <strong>of</strong> <strong>Waltham</strong><br />

<strong>Plan</strong>ning<br />

Catherine Cagle, AICP<br />

<strong>City</strong> <strong>Plan</strong>ner<br />

Traffic<br />

Michael Garvin, P.E.<br />

Traffic Engineer<br />

Traffic<br />

Commission<br />

Maureen Chlebek, P.E., PTOE<br />

Project Manager<br />

Colleen Medeiros, P.E.<br />

Senior Traffic Engineer<br />

Transit/<strong>Transportation</strong><br />

<strong>Plan</strong>ning Group<br />

Traffic Engineering<br />

Group<br />

Roadway Design<br />

Group<br />

<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />

2 nd Public Meeting<br />

Date: 5/17/2016


Project Team<br />

• <strong>City</strong> <strong>of</strong> <strong>Waltham</strong> Traffic Commission<br />

• Meets September – June (3 rd Thursday) @ 10AM to noon<br />

• Committee includes representatives from:<br />

• Traffic Department<br />

• <strong>City</strong> Police<br />

• Public Works<br />

• <strong>Plan</strong>ning Department<br />

• Fire Department<br />

• Wires Department<br />

• <strong>City</strong> Treasurer<br />

• <strong>City</strong> Clerk<br />

<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />

2 nd Public Meeting<br />

Date: 5/17/2016


Study Tasks<br />

• Task 1: Existing Inventory and Data Collection<br />

• Task 2: Evaluate Existing & Future Conditions<br />

• Task 3: Identify Issues/Deficiencies &<br />

Develop Action <strong>Plan</strong><br />

• Task 4: <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />

• Task 5: Stakeholder Coordination<br />

<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />

2 nd Public Meeting<br />

Date: 5/17/2016


Project Schedule<br />

Public<br />

Meeting #1<br />

Traffic<br />

Public Commission<br />

Meeting #2 Meeting<br />

<strong>City</strong> Council<br />

Meeting<br />

Community Involvement Throughout Project<br />

<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />

2 nd Public Meeting<br />

Date: 5/17/2016


Recap <strong>of</strong> Public Meeting 1<br />

• Existing <strong>Transportation</strong> Network<br />

Conditions<br />

• Volumes<br />

• Crash analysis<br />

• Parking<br />

• Heathy <strong>Transportation</strong> Facilities –<br />

walking/bicycling/transit<br />

• Operations<br />

Presentation is available on <strong>City</strong><br />

website:<br />

http://www.city.waltham.ma.us/<br />

<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />

2 nd Public Meeting<br />

Date: 5/17/2016


Public Survey Results<br />

• Survey posted on <strong>City</strong> website.<br />

• Approximately 3,400 responses.<br />

• Survey ran from Nov. 19-Dec 31, 2015.<br />

• Was available online and paper copies.<br />

<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />

2 nd Public Meeting<br />

Date: 5/17/2016


Public Survey Results<br />

<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />

2 nd Public Meeting<br />

Date: 5/17/2016


Public Survey Results<br />

<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />

2 nd Public Meeting<br />

Date: 5/17/2016


Public Survey Results<br />

<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />

2 nd Public Meeting<br />

Date: 5/17/2016


Task 3<br />

Conceptual Improvements<br />

<strong>City</strong> Wide Recommended Actions<br />

• Parking<br />

• Pedestrian<br />

• Bicyclists<br />

• Transit<br />

• Vehicles<br />

RN1<br />

<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />

2 nd Public Meeting<br />

Date: 5/17/2016


IL1<br />

IL2<br />

Downtown Parking Strategy<br />

• Reposition parking based on different<br />

users to spread demand within existing<br />

parking supply<br />

<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />

2 nd Public Meeting<br />

Date: 5/17/2016


IL3<br />

Downtown Parking Strategy<br />

• Increase customer access to downtown businesses by encouraging<br />

turnover<br />

• On-street priced parking<br />

• Premium on-street: $1.00/hr<br />

• Standard on-street: $0.50/hr<br />

• Off-street: $0.25/hr<br />

• Longer time limits<br />

• On-street 4 hour limit<br />

• Off-street unlimited<br />

• Incentivize use <strong>of</strong> <strong>of</strong>f-street<br />

parking lots<br />

Town<br />

Common<br />

Parking lots undercapacity<br />

On-street<br />

overcapacity<br />

<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />

2 nd Public Meeting<br />

8:00 PM Utilization on Moody St.<br />

Date: 5/17/2016


Downtown Parking Strategy<br />

• Improve connections<br />

• Main Street and Moody<br />

Street<br />

• On-street and <strong>of</strong>fstreet<br />

parking areas<br />

<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />

2 nd Public Meeting<br />

Date: 5/17/2016


Downtown Parking Recommendations<br />

Develop<br />

employee<br />

parking program<br />

(short term)<br />

Implement full system<br />

<strong>of</strong> parking and permits<br />

(long term)<br />

Charge for<br />

on-street<br />

parking<br />

(medium<br />

term)<br />

Set up parking<br />

fund (long<br />

term)<br />

<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />

2 nd Public Meeting<br />

Date: 5/17/2016


Downtown Parking Recommendations<br />

• Provide better connections to longer-term, lower-cost <strong>of</strong>f-street parking through<br />

improved wayfinding and streetscape<br />

Lack <strong>of</strong><br />

wayfinding from<br />

Rail Road and<br />

<strong>of</strong>f-street lots<br />

along Moody<br />

Street<br />

Expand wayfinding signage, streetscape, and lighting improvements<br />

<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />

2 nd Public Meeting<br />

Date: 5/17/2016


IL6<br />

Comparative Parking Policies<br />

<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />

2 nd Public Meeting<br />

Date: 5/17/2016


Pedestrian <strong>City</strong> Wide Recommendations<br />

Connect missing links in sidewalk network, e.g. Banks<br />

Cedarwood and Bentley/Fernald neighborhoods<br />

Utilize ladder style crosswalks<br />

Update intersections with pedestrian countdown timers<br />

and curb ramps to meet modern standards<br />

<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />

2 nd Public Meeting<br />

Date: 5/17/2016


Bicycle <strong>City</strong> Wide Recommendations<br />

• Develop a city-wide bicycle network for a<br />

connected system:<br />

• Improve city-wide bicycle connectivity<br />

• Connect to regional multi-use paths<br />

MAPC regional bike network map<br />

• Connect to bus and commuter rail transit<br />

Implement bike sharrows and bike lanes on<br />

recommended corridors<br />

<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />

2 nd Public Meeting<br />

Date: 5/17/2016


Transit <strong>City</strong> Wide Recommendations<br />

Add amenities<br />

Optimize stop spacing<br />

Improve bus stop visibility<br />

<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />

2 nd Public Meeting<br />

Date: 5/17/2016<br />

Improve accessibility


Transit <strong>City</strong> Wide Recommendations<br />

Transit Priority Measures<br />

• Traffic signal optimization<br />

• Transit signal priority<br />

• Queue jump lanes<br />

• Shared bus/right turn lane<br />

• Exclusive bus lane<br />

• Bus stop curb extensions<br />

<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />

2 nd Public Meeting<br />

Date: 5/17/2016


Specific Transit Recommendations<br />

• Carter Street Transit Hub<br />

• Bus only area<br />

• Enhanced pedestrian accommodations<br />

• Westbound travel lane • Improved rider amenities & environment<br />

• Kiss n’ ride & taxi stand • Transit signal priority


Vehicle <strong>City</strong> Wide Recommendations<br />

Improve safety<br />

Traffic calming<br />

Reduce congestion<br />

Modify Travel<br />

Lanes<br />

• Define lane use<br />

• Install turn lanes<br />

• Eliminated “trap<br />

turn” lanes<br />

• Balance lanes, i.e.<br />

Main Street<br />

Access<br />

Management<br />

• Shared access<br />

• Internal connections<br />

between retail sites<br />

• Reduce curb cuts<br />

<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />

2 nd Public Meeting<br />

Date: 5/17/2016


Vehicle <strong>City</strong> Wide Recommendations<br />

• Improve traffic signals<br />

Optimize timings<br />

Replace outdated equipment<br />

Improve visibility<br />

<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />

2 nd Public Meeting<br />

Date: 5/17/2016<br />

Implement coordinated signal systems


Specific Recommendations<br />

• 4 Major Corridors<br />

• Main Street<br />

• Moody Street<br />

• Lexington Street<br />

• Bear Hill Road<br />

Bear Hill<br />

Avenue /<br />

2 nd Avenue<br />

Lexington<br />

Street<br />

• 20 Study Area<br />

Intersections<br />

Main Street<br />

Moody Street<br />

<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />

2 nd Public Meeting<br />

Date: 5/17/2016


Task 3<br />

Lexington Street Corridor<br />

Existing<br />

<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />

2 nd Public Meeting<br />

Date: 5/17/2016


Task 3<br />

Bear Hill Avenue / 2 nd Avenue<br />

<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />

2 nd Public Meeting<br />

Date: 5/17/2016


Task 3<br />

Moody Street Corridor<br />

<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />

2 nd Public Meeting<br />

Date: 5/17/2016


Task 3<br />

Main Street – Western Segment<br />

<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />

2 nd Public Meeting<br />

Date: 5/17/2016


Task 3<br />

Main Street – Downtown Segment<br />

<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />

2 nd Public Meeting<br />

Date: 5/17/2016


Task 3<br />

Main Street – Eastern Segment<br />

<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />

2 nd Public Meeting<br />

Date: 5/17/2016


Task 3<br />

Winter Street<br />

Short-Term Improvements:<br />

• Optimize traffic signal<br />

timings<br />

• Coordinated signal<br />

system from West<br />

Avenue to 3 rd Avenue<br />

• Eastbound left turn at<br />

2 nd Avenue<br />

improvements<br />

<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />

2 nd Public Meeting<br />

Date: 5/17/2016


Task 3<br />

Winter Street<br />

<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />

2 nd Public Meeting<br />

Date: 5/17/2016


Task 3<br />

Winter Street<br />

Concept developed by Vanasse Hangen<br />

Brustlin (VHB) with the Winter<br />

Street/Route 128 Business Park<br />

<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />

2 nd Public Meeting<br />

Date: 5/17/2016


Task 3<br />

Piety Corner<br />

Short-Term Improvements:<br />

• Public Input from March<br />

15 th Meeting<br />

• Lane utilization signage<br />

and striping<br />

• Signal coordination with<br />

Beaver Street<br />

• Signal optimization<br />

• Maintenance <strong>of</strong><br />

pavement markings and<br />

roadway/sidewalk<br />

surfaces<br />

<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />

2 nd Public Meeting<br />

Date: 5/17/2016


Task 3<br />

Piety Corner<br />

Long-Term Improvements:<br />

• Signalized concept<br />

• Adaptive signal control<br />

• Real Time Traffic Condition<br />

Adjustments<br />

• Property acquisition<br />

• Parcel in southwest corner<br />

<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />

2 nd Public Meeting<br />

Date: 5/17/2016


Task 3<br />

Beaver Street at Warren Street<br />

Short-Term Improvements:<br />

• Install new crosswalks<br />

• Add “Intersection Ahead”<br />

Signage<br />

• Reduce westbound right<br />

turn radius with striping<br />

<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />

2 nd Public Meeting<br />

Date: 5/17/2016


Task 3<br />

Beaver Street at Warren Street<br />

Long-Term Improvements:<br />

• Signalized Concept<br />

• Reduce westbound right<br />

turn radius with curb<br />

• Install crosswalks and<br />

curb ramps<br />

<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />

2 nd Public Meeting<br />

Date: 5/17/2016


Task 3<br />

Main Street at Weston Street/South Street<br />

Short-Term Improvements:<br />

• Add route shields on<br />

pavement<br />

• Install supplemental lane<br />

utilization signage<br />

• Update pedestrian and<br />

vehicular clearances<br />

• Optimize traffic signal<br />

timings<br />

• Improvements to traffic<br />

signal equipment<br />

<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />

2 nd Public Meeting<br />

Date: 5/17/2016


Task 3<br />

Main Street at Weston Street/South Street<br />

Long-Term Improvements:<br />

• Changes in vehicular<br />

traffic patterns expected<br />

• Signalized intersection<br />

between Main Street and<br />

Weston Street<br />

• Realign South Street to<br />

stop controlled approach<br />

on Weston Street<br />

<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />

2 nd Public Meeting<br />

Date: 5/17/2016


Task 3<br />

Main Street at Gore Street/Barbara Road<br />

Short-Term Improvements:<br />

• Install push-buttons to<br />

meet current standards<br />

• Install bike lane striping<br />

on Gore Street<br />

• Optimize traffic signal<br />

timings<br />

• Investigate access<br />

management<br />

opportunities<br />

<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />

2 nd Public Meeting<br />

Date: 5/17/2016


Task 3<br />

Main Street at Gore Street/Barbara Road<br />

Long-Term Improvements:<br />

• Remove channelized right<br />

turn from Gore Street to<br />

Warren Street<br />

• Add northbound right<br />

turn on Gore Street<br />

• Add exclusive left turn<br />

lane on Main Street to<br />

Warren Street<br />

<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />

2 nd Public Meeting<br />

Date: 5/17/2016


Task 3<br />

River Street at Elm Street<br />

Short-Term Improvements:<br />

• All-way stop controlled<br />

• Allows for improved<br />

operations on River<br />

Street and improved<br />

pedestrian access<br />

<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />

2 nd Public Meeting<br />

Date: 5/17/2016


Task 3<br />

River Street at Elm Street<br />

Long-Term Improvements:<br />

• Signalize intersection<br />

• Retain existing lanes,<br />

sidewalks, and parking<br />

• Add crosswalks with curb<br />

ramps at current<br />

standards<br />

<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />

2 nd Public Meeting<br />

Date: 5/17/2016


Task 3<br />

Newton Street at River Street/Grove Street<br />

Short-Term Improvements:<br />

• Optimize traffic signal<br />

timings<br />

• Add flashing yellow arrow<br />

for westbound left turn<br />

• Bus stop relocation<br />

• Add crosswalk spanning<br />

Grove Street<br />

<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />

2 nd Public Meeting<br />

Date: 5/17/2016


Task 3<br />

Newton Street at River Street/Grove Street<br />

Long-Term Improvements:<br />

• Signalize Grove Street<br />

intersection and<br />

coordinate with River<br />

Street<br />

• Add additional<br />

southbound lane at River<br />

Street/Newton Street<br />

• Improvements at stone<br />

wall to improve sight<br />

distance<br />

<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />

2 nd Public Meeting<br />

Date: 5/17/2016


Questions<br />

Thank You!<br />

Public Comments (please use microphone)<br />

Recommendations available at:<br />

• Traffic Engineering<br />

• Public Library<br />

• <strong>City</strong> website<br />

Comments/Questions accepted by letter or<br />

email through June 17 th,<br />

Maureen Chlebek, P.E., PTOE<br />

mchlebek@mcmahonassociates.com<br />

<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />

2 nd Public Meeting<br />

Date: 5/17/2016

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!