City of Waltham Transportation Master Plan
waltham_tmp_pub_meeting_2_5-16-16
waltham_tmp_pub_meeting_2_5-16-16
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>City</strong> <strong>of</strong> <strong>Waltham</strong><br />
<strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />
Presented by:<br />
Date: 5/17/2016<br />
2 nd Public Meeting
Agenda<br />
• 4:00 – 6:00 PM: Open House<br />
• 6:30-7:30 PM: Presentation by McMahon<br />
• Overview <strong>of</strong> Project, Schedule and Team<br />
• Recap <strong>of</strong> Previous Public Meeting & Public Survey Results<br />
• Recommended Actions<br />
• Parking Pedestrians Bicyclists<br />
• Transit Vehicles<br />
• Specific Recommendations<br />
• Select Corridors and Intersections<br />
• Next Steps<br />
• 7:30 – 7:45 PM: Public Comment Period<br />
• 7:45 – 9:00 PM: Workshop Format<br />
<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />
2 nd Public Meeting<br />
Date: 5/17/2016
Project Team<br />
<strong>City</strong> <strong>of</strong> <strong>Waltham</strong><br />
<strong>Plan</strong>ning<br />
Catherine Cagle, AICP<br />
<strong>City</strong> <strong>Plan</strong>ner<br />
Traffic<br />
Michael Garvin, P.E.<br />
Traffic Engineer<br />
Traffic<br />
Commission<br />
Maureen Chlebek, P.E., PTOE<br />
Project Manager<br />
Colleen Medeiros, P.E.<br />
Senior Traffic Engineer<br />
Transit/<strong>Transportation</strong><br />
<strong>Plan</strong>ning Group<br />
Traffic Engineering<br />
Group<br />
Roadway Design<br />
Group<br />
<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />
2 nd Public Meeting<br />
Date: 5/17/2016
Project Team<br />
• <strong>City</strong> <strong>of</strong> <strong>Waltham</strong> Traffic Commission<br />
• Meets September – June (3 rd Thursday) @ 10AM to noon<br />
• Committee includes representatives from:<br />
• Traffic Department<br />
• <strong>City</strong> Police<br />
• Public Works<br />
• <strong>Plan</strong>ning Department<br />
• Fire Department<br />
• Wires Department<br />
• <strong>City</strong> Treasurer<br />
• <strong>City</strong> Clerk<br />
<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />
2 nd Public Meeting<br />
Date: 5/17/2016
Study Tasks<br />
• Task 1: Existing Inventory and Data Collection<br />
• Task 2: Evaluate Existing & Future Conditions<br />
• Task 3: Identify Issues/Deficiencies &<br />
Develop Action <strong>Plan</strong><br />
• Task 4: <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />
• Task 5: Stakeholder Coordination<br />
<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />
2 nd Public Meeting<br />
Date: 5/17/2016
Project Schedule<br />
Public<br />
Meeting #1<br />
Traffic<br />
Public Commission<br />
Meeting #2 Meeting<br />
<strong>City</strong> Council<br />
Meeting<br />
Community Involvement Throughout Project<br />
<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />
2 nd Public Meeting<br />
Date: 5/17/2016
Recap <strong>of</strong> Public Meeting 1<br />
• Existing <strong>Transportation</strong> Network<br />
Conditions<br />
• Volumes<br />
• Crash analysis<br />
• Parking<br />
• Heathy <strong>Transportation</strong> Facilities –<br />
walking/bicycling/transit<br />
• Operations<br />
Presentation is available on <strong>City</strong><br />
website:<br />
http://www.city.waltham.ma.us/<br />
<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />
2 nd Public Meeting<br />
Date: 5/17/2016
Public Survey Results<br />
• Survey posted on <strong>City</strong> website.<br />
• Approximately 3,400 responses.<br />
• Survey ran from Nov. 19-Dec 31, 2015.<br />
• Was available online and paper copies.<br />
<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />
2 nd Public Meeting<br />
Date: 5/17/2016
Public Survey Results<br />
<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />
2 nd Public Meeting<br />
Date: 5/17/2016
Public Survey Results<br />
<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />
2 nd Public Meeting<br />
Date: 5/17/2016
Public Survey Results<br />
<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />
2 nd Public Meeting<br />
Date: 5/17/2016
Task 3<br />
Conceptual Improvements<br />
<strong>City</strong> Wide Recommended Actions<br />
• Parking<br />
• Pedestrian<br />
• Bicyclists<br />
• Transit<br />
• Vehicles<br />
RN1<br />
<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />
2 nd Public Meeting<br />
Date: 5/17/2016
IL1<br />
IL2<br />
Downtown Parking Strategy<br />
• Reposition parking based on different<br />
users to spread demand within existing<br />
parking supply<br />
<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />
2 nd Public Meeting<br />
Date: 5/17/2016
IL3<br />
Downtown Parking Strategy<br />
• Increase customer access to downtown businesses by encouraging<br />
turnover<br />
• On-street priced parking<br />
• Premium on-street: $1.00/hr<br />
• Standard on-street: $0.50/hr<br />
• Off-street: $0.25/hr<br />
• Longer time limits<br />
• On-street 4 hour limit<br />
• Off-street unlimited<br />
• Incentivize use <strong>of</strong> <strong>of</strong>f-street<br />
parking lots<br />
Town<br />
Common<br />
Parking lots undercapacity<br />
On-street<br />
overcapacity<br />
<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />
2 nd Public Meeting<br />
8:00 PM Utilization on Moody St.<br />
Date: 5/17/2016
Downtown Parking Strategy<br />
• Improve connections<br />
• Main Street and Moody<br />
Street<br />
• On-street and <strong>of</strong>fstreet<br />
parking areas<br />
<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />
2 nd Public Meeting<br />
Date: 5/17/2016
Downtown Parking Recommendations<br />
Develop<br />
employee<br />
parking program<br />
(short term)<br />
Implement full system<br />
<strong>of</strong> parking and permits<br />
(long term)<br />
Charge for<br />
on-street<br />
parking<br />
(medium<br />
term)<br />
Set up parking<br />
fund (long<br />
term)<br />
<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />
2 nd Public Meeting<br />
Date: 5/17/2016
Downtown Parking Recommendations<br />
• Provide better connections to longer-term, lower-cost <strong>of</strong>f-street parking through<br />
improved wayfinding and streetscape<br />
Lack <strong>of</strong><br />
wayfinding from<br />
Rail Road and<br />
<strong>of</strong>f-street lots<br />
along Moody<br />
Street<br />
Expand wayfinding signage, streetscape, and lighting improvements<br />
<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />
2 nd Public Meeting<br />
Date: 5/17/2016
IL6<br />
Comparative Parking Policies<br />
<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />
2 nd Public Meeting<br />
Date: 5/17/2016
Pedestrian <strong>City</strong> Wide Recommendations<br />
Connect missing links in sidewalk network, e.g. Banks<br />
Cedarwood and Bentley/Fernald neighborhoods<br />
Utilize ladder style crosswalks<br />
Update intersections with pedestrian countdown timers<br />
and curb ramps to meet modern standards<br />
<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />
2 nd Public Meeting<br />
Date: 5/17/2016
Bicycle <strong>City</strong> Wide Recommendations<br />
• Develop a city-wide bicycle network for a<br />
connected system:<br />
• Improve city-wide bicycle connectivity<br />
• Connect to regional multi-use paths<br />
MAPC regional bike network map<br />
• Connect to bus and commuter rail transit<br />
Implement bike sharrows and bike lanes on<br />
recommended corridors<br />
<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />
2 nd Public Meeting<br />
Date: 5/17/2016
Transit <strong>City</strong> Wide Recommendations<br />
Add amenities<br />
Optimize stop spacing<br />
Improve bus stop visibility<br />
<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />
2 nd Public Meeting<br />
Date: 5/17/2016<br />
Improve accessibility
Transit <strong>City</strong> Wide Recommendations<br />
Transit Priority Measures<br />
• Traffic signal optimization<br />
• Transit signal priority<br />
• Queue jump lanes<br />
• Shared bus/right turn lane<br />
• Exclusive bus lane<br />
• Bus stop curb extensions<br />
<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />
2 nd Public Meeting<br />
Date: 5/17/2016
Specific Transit Recommendations<br />
• Carter Street Transit Hub<br />
• Bus only area<br />
• Enhanced pedestrian accommodations<br />
• Westbound travel lane • Improved rider amenities & environment<br />
• Kiss n’ ride & taxi stand • Transit signal priority
Vehicle <strong>City</strong> Wide Recommendations<br />
Improve safety<br />
Traffic calming<br />
Reduce congestion<br />
Modify Travel<br />
Lanes<br />
• Define lane use<br />
• Install turn lanes<br />
• Eliminated “trap<br />
turn” lanes<br />
• Balance lanes, i.e.<br />
Main Street<br />
Access<br />
Management<br />
• Shared access<br />
• Internal connections<br />
between retail sites<br />
• Reduce curb cuts<br />
<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />
2 nd Public Meeting<br />
Date: 5/17/2016
Vehicle <strong>City</strong> Wide Recommendations<br />
• Improve traffic signals<br />
Optimize timings<br />
Replace outdated equipment<br />
Improve visibility<br />
<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />
2 nd Public Meeting<br />
Date: 5/17/2016<br />
Implement coordinated signal systems
Specific Recommendations<br />
• 4 Major Corridors<br />
• Main Street<br />
• Moody Street<br />
• Lexington Street<br />
• Bear Hill Road<br />
Bear Hill<br />
Avenue /<br />
2 nd Avenue<br />
Lexington<br />
Street<br />
• 20 Study Area<br />
Intersections<br />
Main Street<br />
Moody Street<br />
<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />
2 nd Public Meeting<br />
Date: 5/17/2016
Task 3<br />
Lexington Street Corridor<br />
Existing<br />
<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />
2 nd Public Meeting<br />
Date: 5/17/2016
Task 3<br />
Bear Hill Avenue / 2 nd Avenue<br />
<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />
2 nd Public Meeting<br />
Date: 5/17/2016
Task 3<br />
Moody Street Corridor<br />
<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />
2 nd Public Meeting<br />
Date: 5/17/2016
Task 3<br />
Main Street – Western Segment<br />
<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />
2 nd Public Meeting<br />
Date: 5/17/2016
Task 3<br />
Main Street – Downtown Segment<br />
<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />
2 nd Public Meeting<br />
Date: 5/17/2016
Task 3<br />
Main Street – Eastern Segment<br />
<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />
2 nd Public Meeting<br />
Date: 5/17/2016
Task 3<br />
Winter Street<br />
Short-Term Improvements:<br />
• Optimize traffic signal<br />
timings<br />
• Coordinated signal<br />
system from West<br />
Avenue to 3 rd Avenue<br />
• Eastbound left turn at<br />
2 nd Avenue<br />
improvements<br />
<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />
2 nd Public Meeting<br />
Date: 5/17/2016
Task 3<br />
Winter Street<br />
<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />
2 nd Public Meeting<br />
Date: 5/17/2016
Task 3<br />
Winter Street<br />
Concept developed by Vanasse Hangen<br />
Brustlin (VHB) with the Winter<br />
Street/Route 128 Business Park<br />
<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />
2 nd Public Meeting<br />
Date: 5/17/2016
Task 3<br />
Piety Corner<br />
Short-Term Improvements:<br />
• Public Input from March<br />
15 th Meeting<br />
• Lane utilization signage<br />
and striping<br />
• Signal coordination with<br />
Beaver Street<br />
• Signal optimization<br />
• Maintenance <strong>of</strong><br />
pavement markings and<br />
roadway/sidewalk<br />
surfaces<br />
<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />
2 nd Public Meeting<br />
Date: 5/17/2016
Task 3<br />
Piety Corner<br />
Long-Term Improvements:<br />
• Signalized concept<br />
• Adaptive signal control<br />
• Real Time Traffic Condition<br />
Adjustments<br />
• Property acquisition<br />
• Parcel in southwest corner<br />
<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />
2 nd Public Meeting<br />
Date: 5/17/2016
Task 3<br />
Beaver Street at Warren Street<br />
Short-Term Improvements:<br />
• Install new crosswalks<br />
• Add “Intersection Ahead”<br />
Signage<br />
• Reduce westbound right<br />
turn radius with striping<br />
<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />
2 nd Public Meeting<br />
Date: 5/17/2016
Task 3<br />
Beaver Street at Warren Street<br />
Long-Term Improvements:<br />
• Signalized Concept<br />
• Reduce westbound right<br />
turn radius with curb<br />
• Install crosswalks and<br />
curb ramps<br />
<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />
2 nd Public Meeting<br />
Date: 5/17/2016
Task 3<br />
Main Street at Weston Street/South Street<br />
Short-Term Improvements:<br />
• Add route shields on<br />
pavement<br />
• Install supplemental lane<br />
utilization signage<br />
• Update pedestrian and<br />
vehicular clearances<br />
• Optimize traffic signal<br />
timings<br />
• Improvements to traffic<br />
signal equipment<br />
<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />
2 nd Public Meeting<br />
Date: 5/17/2016
Task 3<br />
Main Street at Weston Street/South Street<br />
Long-Term Improvements:<br />
• Changes in vehicular<br />
traffic patterns expected<br />
• Signalized intersection<br />
between Main Street and<br />
Weston Street<br />
• Realign South Street to<br />
stop controlled approach<br />
on Weston Street<br />
<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />
2 nd Public Meeting<br />
Date: 5/17/2016
Task 3<br />
Main Street at Gore Street/Barbara Road<br />
Short-Term Improvements:<br />
• Install push-buttons to<br />
meet current standards<br />
• Install bike lane striping<br />
on Gore Street<br />
• Optimize traffic signal<br />
timings<br />
• Investigate access<br />
management<br />
opportunities<br />
<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />
2 nd Public Meeting<br />
Date: 5/17/2016
Task 3<br />
Main Street at Gore Street/Barbara Road<br />
Long-Term Improvements:<br />
• Remove channelized right<br />
turn from Gore Street to<br />
Warren Street<br />
• Add northbound right<br />
turn on Gore Street<br />
• Add exclusive left turn<br />
lane on Main Street to<br />
Warren Street<br />
<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />
2 nd Public Meeting<br />
Date: 5/17/2016
Task 3<br />
River Street at Elm Street<br />
Short-Term Improvements:<br />
• All-way stop controlled<br />
• Allows for improved<br />
operations on River<br />
Street and improved<br />
pedestrian access<br />
<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />
2 nd Public Meeting<br />
Date: 5/17/2016
Task 3<br />
River Street at Elm Street<br />
Long-Term Improvements:<br />
• Signalize intersection<br />
• Retain existing lanes,<br />
sidewalks, and parking<br />
• Add crosswalks with curb<br />
ramps at current<br />
standards<br />
<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />
2 nd Public Meeting<br />
Date: 5/17/2016
Task 3<br />
Newton Street at River Street/Grove Street<br />
Short-Term Improvements:<br />
• Optimize traffic signal<br />
timings<br />
• Add flashing yellow arrow<br />
for westbound left turn<br />
• Bus stop relocation<br />
• Add crosswalk spanning<br />
Grove Street<br />
<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />
2 nd Public Meeting<br />
Date: 5/17/2016
Task 3<br />
Newton Street at River Street/Grove Street<br />
Long-Term Improvements:<br />
• Signalize Grove Street<br />
intersection and<br />
coordinate with River<br />
Street<br />
• Add additional<br />
southbound lane at River<br />
Street/Newton Street<br />
• Improvements at stone<br />
wall to improve sight<br />
distance<br />
<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />
2 nd Public Meeting<br />
Date: 5/17/2016
Questions<br />
Thank You!<br />
Public Comments (please use microphone)<br />
Recommendations available at:<br />
• Traffic Engineering<br />
• Public Library<br />
• <strong>City</strong> website<br />
Comments/Questions accepted by letter or<br />
email through June 17 th,<br />
Maureen Chlebek, P.E., PTOE<br />
mchlebek@mcmahonassociates.com<br />
<strong>City</strong> <strong>of</strong> <strong>Waltham</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong><br />
2 nd Public Meeting<br />
Date: 5/17/2016