09.08.2016 Views

FINAL RESULTS PRESENTATION

eecNrNX

eecNrNX

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>FINAL</strong> <strong>RESULTS</strong> <strong>PRESENTATION</strong><br />

AUGUST 2016 | LONDON


<strong>FINAL</strong> <strong>RESULTS</strong> <strong>PRESENTATION</strong><br />

AUGUST 2016 | LONDON<br />

Presentation Contents:<br />

• Key Financial Results<br />

• Products<br />

• Power-to-Gas Projects<br />

• Clean Fuel Projects<br />

• Hydrogen Transportation<br />

• Detailed Financials | Andy Allen<br />

£15.81m under contract | £0.51m in negotiation | total £16.32m


Pipeline (£m) up 61% Total Income (£m) up 56% Losses (£m) down 24%<br />

18.0<br />

9.0<br />

2014 2015 2016<br />

16.0<br />

8.0<br />

0.0<br />

14.0<br />

7.0<br />

-1.0<br />

12.0<br />

6.0<br />

-2.0<br />

10.0<br />

5.0<br />

-3.0<br />

8.0<br />

4.0<br />

-4.0<br />

6.0<br />

3.0<br />

-5.0<br />

4.0<br />

2.0<br />

-6.0<br />

2.0<br />

1.0<br />

-7.0<br />

0.0<br />

2014 2015 2016<br />

0.0<br />

2014 2015 2016<br />

-8.0<br />

Cash + Debtors | £10.75m | 2.5x Losses<br />

FINANCIALS: OVERVIEW<br />

ENERGY STORAGE | CLEAN FUEL


Power-to-Gas<br />

Refuelling Stations<br />

REFUELLING STATIONS | P2G UNITS<br />

ENERGY STORAGE | CLEAN FUEL


SNAPSHOT<br />

£15.81m under contract | £0.51m in negotiation | total £16.32m<br />

Power-to-Gas Energy Storage<br />

• Reference plant in Germany with The Thuga Group<br />

• Reference plant in Germany to RWE<br />

• Contracts with National Grid<br />

• Technology Collaboration with BOC Linde<br />

Clean Fuel<br />

• Siting agreement with Shell<br />

• Fuel contract with Toyota<br />

• Refueller siting with Hyundai US<br />

• Siting and BD agreement with Arup<br />

Corporate<br />

• Strategic investment from JCB<br />

SNAPSHOT<br />

ENERGY STORAGE | CLEAN FUEL


MARKET OFFERING<br />

Rapid Response | High Pressure | High Efficiency | MW scale<br />

• Rapid response: less than 1s; for primary grid balancing<br />

• High pressure: up to 80bar; for direct injection<br />

• High efficiency: 75% measured by Thuga Group; 87% measured by RWE (with heat recovery)<br />

• MW scale: 1MW modules available today<br />

• Compliant: EU and USA<br />

• Operations: 2yrs in the field<br />

MARKET OFFERING<br />

ENERGY STORAGE | CLEAN FUEL


STANDARD PRODUCTS<br />

255kg/day<br />

670kW<br />

85kg/day<br />

215kW<br />

545kg/day<br />

1.4MW<br />

1,365kg/day<br />

3.5MW<br />

PEM OFFERING<br />

ENERGY STORAGE | CLEAN FUEL


FLEXIBLE PLATFORM<br />

23.5 tonnes/day<br />

30MW<br />

1,365kg/day<br />

3.5MW<br />

PEM OFFERING<br />

ENERGY STORAGE | CLEAN FUEL


REGULATIONS, CODES & STANDARDS<br />

A leading role in shaping hydrogen deployment<br />

• Secretary of BCGA Technical Steering Committee 9<br />

• Secretary and UK Expert to ISO Technical Committee 197<br />

• UK Expert to ISO working groups…<br />

• …for electrolysers, dispensers & H2 quality<br />

• Next Chair of BSI PVE/3/8<br />

Code of Practice 41: H 2 Fuelling Stations<br />

Design & Construction<br />

Maintenance & Operation<br />

ISO 19880-1: H 2 Fuelling Stations<br />

ISO 22734: Electrolyser<br />

ISO 14687: H 2 Quality<br />

BSI PVE/3/8: H 2 Systems Standardisation<br />

Production & Storage<br />

Transport, Measurement & Use<br />

COMPLIANCE<br />

HYDROGEN ENERGY SYSTEMS


P2G PROJECTS<br />

WHY P2G<br />

THE THÜGA GROUP<br />

RWE<br />

ZEAG


WHY POWER-TO-GAS?<br />

Electricity cannot be stored easily | Hydrogen can be stored easily in the gas grid<br />

Source: ITM Power plc<br />

POWER-TO-GAS RATIONALE<br />

ENERGY STORAGE | CLEAN FUEL


ENERGY STORAGE TECHNOLOGIES<br />

Power-to-gas is efficient | long term | low energy cost<br />

Source: ITM Power plc<br />

ENERGY STORAGE TECHNOLOGIES<br />

ENERGY STORAGE | CLEAN FUEL


32MWH BATTERY | P2G COST COMPARISON<br />

Lithium Ion System (6,300 sqft)<br />

• Project will cost $53.5m<br />

• 8MW with 4hr duration | 32MWh<br />

• $6.7m/MW | $1.67m/MWh<br />

Power-to-Gas System (3,530 sqft)<br />

• Project will cost $21.6m<br />

• 8MW with 4hr duration | 32MWh<br />

• $2.7m/MW | $0.67m/MWh<br />

• 8MW with 12hr duration | 192MWh<br />

• $2.7m/MW | $0.22m/MWh<br />

Tehachapi Energy Storage Project<br />

The Tehachapi Energy Storage Project features 604,832 lithium-ion battery cells, housed in<br />

10,872 modules of 56 cells each, stacked in 604 racks arranged in rows.<br />

BATTERY | P2G COST COMPARISON<br />

HYDROGEN ENERGY SYSTEMS


POWER-TO-GAS<br />

ENERGY STORAGE | CLEAN FUEL


POWER-TO-GAS<br />

ENERGY STORAGE | CLEAN FUEL


1MW SALE TO ZEAG | DLR<br />

Sale in Germany by competitive tender<br />

• 1MW of electrolysis plus compressor for tube trailer filling<br />

• Indoor deployment<br />

• 5 year maintenance contract<br />

1MW SALE TO ZEAG | DLR<br />

ENERGY STORAGE | CLEAN FUEL


POWER-TO-GAS IN UK<br />

BIG HIT | Orkney<br />

Eday: Curtailed wind and tidal turbines<br />

• 0.5 MW of electrolysis | 500kg storage<br />

• Heating of school<br />

Shapinsay: Curtailed wind<br />

• 1MW of electrolysis<br />

• Heating of school<br />

Orkney Mainland:<br />

• 75 kW FC: heat and power to harbour and marina<br />

• H2 refuelling station | 10x FC vans<br />

• Transport: 5x 250 kg tube trailers<br />

POWER-TO-GAS | ORKNEY<br />

ENERGY STORAGE | CLEAN FUEL


CLEAN FUEL<br />

CARS


A W A I T I N G<br />

A N N O U N C E M E N T<br />

FUEL CELL CAR ROLLOUT<br />

ENERGY STORAGE | CLEAN FUEL


WHAT IS A FUEL CELL VEHICLE?<br />

An EV drive train that’s refuelled rather than recharged<br />

FUEL CELL VEHICLES<br />

VEHICLES | ROLL OUT


ITM POWER | TOYOTA FUEL CONTRACT<br />

11 UK stations | 1595 kg/day by the end of 2018<br />

£10/kg | Lowest cost hydrogen for cars in UK | 1595 kg/day by the end of 2018<br />

ITM POWER | TOYOTA FUEL CONTRACT<br />

HYDROGEN ENERGY SYSTEMS


ITM EXISTING AND PLANNED HRS SITES<br />

Build own and operate model<br />

• 5 operational HRS by 2016 year end<br />

• 2 further HRS sales (Chino and HDF)<br />

• Collaboration wth BOC Linde<br />

ITM Power |Owned Stations<br />

Number Project Funding Match Location Ely Dispenser Planning Build Status Delivery Notes<br />

HRS 001 M1 TSB OLEV AMP Sheffield 80 350/700 approved Operational Delivered OLEV upgrade<br />

HRS 002 Riverside CEC USA 33 700 approved Operational Delivered US power (60 herz)<br />

HRS 003 HyFive_1 FCH JU OLEV NPL 80 350/700 approved Operational Delivered Public Access<br />

HRS 004 HyFive_2 FCH JU OLEV CEME 80 350/700 approved In build Oct-16 Opening October 11 2016<br />

HRS 005 HyFive_3 FCH JU OLEV Shell Cobham 80 700 approved In build Dec-16 Civils complete Aug 16<br />

HRS 006 BIG HIT FCH JU Orkney 450 350 pre planning In design Apr-17<br />

HRS 007 H2ME OLEV FCH JU Shell Beaconsfield 150 350/700 pre planning In build Aug-17 Full forecourt integration<br />

HRS 008 H2ME OLEV FCH JU Shell Gatwick 150 350/700 approved In build Aug-17 Toyota preferred site<br />

HRS 009 H2ME2_1 FCH JU Site TBC 164 350/700 pre planning Contracts 2017<br />

HRS 010 H2ME2_2 FCH JU Site TBC 164 350/700 pre planning Contracts 2017<br />

HRS 011 H2ME2_3 FCH JU Swindon 164 350/700 approved Contracts Mar-17<br />

STATION LOCATIONS<br />

HYDROGEN ENERGY SYSTEMS


WHAT IS AN FCEV REFUELLING STATION?<br />

FCEV REFUELLING STATION<br />

VEHICLES | ROLL OUT


WHAT IS AN FCEV REFUELLING STATION?<br />

Tube trailer connection<br />

Off take of hydrogen for back up<br />

supply and other applications<br />

Buffer Tank<br />

20bar 15m 3 tank<br />

ITM Power Electrolyser<br />

80kg/day expandable to<br />

500kg/day in 20ft container<br />

Dispenser<br />

350 and 700 bar refuelling point<br />

Payment Unit<br />

Card reader, touchscreen and<br />

printer for cash register receipt<br />

BOC | Linde Compression<br />

Ionic Compressor and gas storage,<br />

600kg/day<br />

FCEV REFUELLING STATION<br />

VEHICLES | ROLL OUT


SHELL COBHAM<br />

UK INFRASTRUCTURE ROLL OUT<br />

ENERGY STORAGE | CLEAN FUEL


SHELL EXTRA SERVICES AT COBHAM (M25)<br />

*Source: ITM Power<br />

SHELL FORECOURT AGREEMENT<br />

HYDROGEN ENERGY SYSTEMS


BUS HRS CONFIGURATIONS<br />

BUS REFUELLING STATIONS


FINANCES


£m<br />

DEAL PIPELINE<br />

£15.81m under contract | £0.51m in negotiation | total £16.32m<br />

Pipeline at Year end - Progress<br />

24m<br />

22m<br />

20m<br />

Contract Pipeline<br />

18m<br />

18.0<br />

16.0<br />

14.0<br />

12.0<br />

10.0<br />

16m<br />

14m<br />

12m<br />

10m<br />

8m<br />

8.0<br />

6m<br />

6.0<br />

4m<br />

4.0<br />

2m<br />

2.0<br />

0m<br />

0.0<br />

31/07/2014 31/07/2015 31/07/2016<br />

Results announcements<br />

Under Contract<br />

In Negotiation<br />

Under Contract<br />

In Negotiation<br />

DEAL PIPELINE<br />

ENERGY STORAGE | CLEAN FUEL


PRODUCT SALES | PROJECT INCOME<br />

£15.81m under contract | £0.51m in negotiation | total £16.32m<br />

For year ending April 30 th 2014<br />

• £3.12m total inflow<br />

• £1.16m product sales<br />

• £1.96m project funding<br />

For year ending April 30 th 2015<br />

• £5.06m total inflow<br />

• £1.63m product sales<br />

• £3.43m project funding<br />

16,000,000<br />

14,000,000<br />

12,000,000<br />

10,000,000<br />

8,000,000<br />

6,000,000<br />

Sales Revenue<br />

Project Income<br />

For year ending April 30 th 2016<br />

• £8.18m total inflow<br />

• £1.93m product sales<br />

• £6.25m project funding<br />

4,000,000<br />

2,000,000<br />

-<br />

2010 2011 2012 2013 2014 2015 2016 2017<br />

Broker<br />

note<br />

2018<br />

Broker<br />

note<br />

PRODUCT SALES | PROJECT INCOME<br />

ENERGY STORAGE | CLEAN FUEL


PROJECT INCOME<br />

£15.81m under contract | £0.51m in negotiation | total £16.32m<br />

For year ending April 30 th 2014<br />

• £3.12m total inflow<br />

• £1.16m product sales<br />

• £1.96m project funding<br />

For year ending April 30 th 2015<br />

• £5.06m total inflow<br />

• £1.63m product sales<br />

• £3.43m project funding<br />

For year ending April 30 th 2016<br />

• £8.18m total inflow<br />

• £1.93m product sales<br />

• £6.25m project funding<br />

£7,000,000<br />

£6,000,000<br />

£5,000,000<br />

£4,000,000<br />

£3,000,000<br />

£2,000,000<br />

£1,000,000<br />

Collaborative Project Funding<br />

In negotiation<br />

Secured<br />

Paid<br />

£0<br />

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019<br />

PROJECT INCOME<br />

ENERGY STORAGE | CLEAN FUEL


LOSSES | FINANCIAL ASSETS<br />

£15.81m under contract | £0.51m in negotiation | total £16.32m<br />

• Post 2014, starting with Mainova<br />

• Continued cost control<br />

• Reductions in losses<br />

• 2016 Financial Assets = 2x losses<br />

LOSSES | FINANCIAL ASSETS<br />

ENERGY STORAGE | CLEAN FUEL


COMPANY RESEARCH<br />

Zeus Capital<br />

• In-house broker and NOMAD<br />

• Tom McColm<br />

Roth Capital<br />

• US placing agent<br />

• Craig Irwin<br />

Align Research<br />

• Equity holder<br />

• Mark Parfitt<br />

COMPANY RESEARCH<br />

HYDROGEN ENERGY SYSTEMS


<strong>FINAL</strong> <strong>RESULTS</strong> <strong>PRESENTATION</strong><br />

AUGUST 2016 | LONDON<br />

Key Financial Results for the period ended 30 April 2015:<br />

Total Revenue & Grant Funding of £8.19m (2015: £5,061m) up 56%, comprising:<br />

Revenue - £1.930m (2015: £1.635m) up 18%<br />

Grant income - £3.188m (2015: £1.777m) up 80%<br />

Grants receivable for capital projects - £3.069m (2015: £1.649), up 86%<br />

Increase in property, plant and equipment to £3.024m from £2.546m, up 19%<br />

Loss from operations £4.359m (2015: £5.723m), down 24%<br />

Cash balance £3.336m (2015: £6.576m), down 49%<br />

Debtors £6.487m (2015: 4.113m), up 58%<br />

Development costs of £0.252m recognised in the year


<strong>FINAL</strong> <strong>RESULTS</strong> <strong>PRESENTATION</strong><br />

AUGUST 2016 | LONDON<br />

Commercial progress to date:<br />

<br />

<br />

<br />

<br />

A Total of £16.32m of projects under contract or in the final stages of negotiation<br />

£15.81m of projects under contract<br />

£0.51m of contracts in the final stages of negotiation<br />

Strongly developing pipeline of commercial sales and funded projects


<strong>FINAL</strong> <strong>RESULTS</strong> <strong>PRESENTATION</strong><br />

AUGUST 2016 | LONDON

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!