16.08.2016 Views

Weekly Report 3_revised

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PROGRESS REPORT :03<br />

15 August 2016<br />

PROPOSED 5-STOREY COMMERCIAL BUILDING WITH AVIATION, ATTRACTION FACILITIES, 5 BASEMENT CAR PARKS AND 2<br />

COVERED PEDESTRIAN LINK BRIDGES AND PROPOSED ADDITIONS AND ALTERATIONS WORKS TO PARTS OF EXISTING TERMINAL<br />

1, 2 AND 3 ON LOTS 04592N, 04594L AND 04596M, MUKIM 31 AT AIRPORT BOULEVARD - (PROJECT JEWEL)


PROGRESS REPORT : 03<br />

15 August 2016<br />

CONTENTS<br />

1 Shop Drawings Submission & Approval Status<br />

2 Sample Submission & Approval Status<br />

3 RFI Status<br />

4 VMU/PMU Status<br />

5 Fabrication Status<br />

6 Installaiton Status


1. SHOP DRAWINGS STATUS


Mero Asia Pacific Pte Ltd<br />

STATUS :<br />

APP - Approved<br />

AWC - Approved with Comments - Resubmission Required<br />

RR - Revise and Resubmit Required<br />

as of 15 August 2016<br />

SHOP DRAWING LIST BREAKDOWN<br />

1ST SUBMISSION<br />

REV.0<br />

2ND SUBMISSION<br />

REV.A1<br />

NO.<br />

DRAWING NO.<br />

DESCRIPTION OF DRAWINGS<br />

MERO - TRANSMITTAL<br />

WHOS - WORKFLOW<br />

MERO - TRANSMITTAL<br />

WHOS - WORKFLOW<br />

REMARKS<br />

SUBMISSION<br />

SUBMISSION<br />

APPROVAL<br />

SUBMISSION<br />

SUBMISSION<br />

APPROVAL<br />

DATE MERO ACONEX DATE WHOS ACONEX DATE DRAWING<br />

DATE MERO ACONEX DATE WHOS ACONEX DATE<br />

REV<br />

REV<br />

TRANSMITTAL NO.<br />

TRANSMITTAL NO.<br />

STATUS<br />

TRANSMITTAL NO.<br />

TRANSMITTAL NO.<br />

TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL<br />

DRAWING<br />

STATUS<br />

A<br />

GEOMETRY MODEL<br />

1 JWL_C_MERO_FAC_SD_FCD_AL_1500 WIREFRAME MODEL FOR RT-01. WT-01 & WT-03 (APPROVED DRAWING) 16.07.15 MERO-TRANSMIT-000031 WHOS-TRANSMIT-001204 27.07.15<br />

B<br />

RT-01 (To be Confirm Upon Submission of Drawings)<br />

APP<br />

1 JWL_C_MERO_FAC_SD_RT1_RF_7000 RT1 - SHOP DRAWING GENARAL ARRANGEMENT DRAWING<br />

2 JWL_C_MERO_FAC_SD_RT1_RF_7001 RT1 - SHOP DRAWING OVERALL ROOF PLAN<br />

3 JWL_C_MERO_FAC_SD_RT1_RF_7002 RT1 - SHOP DRAWING PANELIZATION ELEVATION VIEW<br />

4 JWL_C_MERO_FAC_SD_RT1_RF_7003 RT1 - SHOP DRAWING PARTIAL BLOW-UP ROOF PLANS SHEET-1<br />

5 JWL_C_MERO_FAC_SD_RT1_RF_7004 RT1 - SHOP DRAWING PARTIAL BLOW-UP ROOF PLANS SHEET-2<br />

6 JWL_C_MERO_FAC_SD_RT1_RF_7005 RT1 - SHOP DRAWING PARTIAL BLOW-UP ROOF PLANS SHEET-3<br />

7 JWL_C_MERO_FAC_SD_RT1_RF_7006 RT1 - SHOP DRAWING PARTIAL BLOW-UP ROOF PLANS SHEET-4<br />

8 JWL_C_MERO_FAC_SD_RT1_RF_7007 RT1 - SHOP DRAWING OVERALL ROOF SECTIONS<br />

9 JWL_C_MERO_FAC_SD_RT1_RF_7008 RT1 - SHOP DRAWING PARTIAL SECTIONS SHEET-1<br />

10 JWL_C_MERO_FAC_SD_RT1_RF_7009 RT1 - SHOP DRAWING PARTIAL SECTIONS SHEET-2<br />

11 JWL_C_MERO_FAC_SD_RT1_RF_7010 RT1 - SHOP DRAWING PARTIAL SECTIONS SHEET-3<br />

12 JWL_C_MERO_FAC_SD_RT1_RF_7011 RT1 - SHOP DRAWING PARTIAL SECTIONS SHEET-4<br />

13 JWL_C_MERO_FAC_SD_RT1_RF_7012<br />

14 JWL_C_MERO_FAC_SD_RT1_RF_7013<br />

15 JWL_C_MERO_FAC_SD_RT1_RF_7014<br />

16 JWL_C_MERO_FAC_SD_RT1_RF_7015<br />

RT1 - SHOP DRAWING PARTIAL SECTION THROUGH GATEWAY GARDENS SHEET-<br />

1<br />

RT1 - SHOP DRAWING PARTIAL SECTION THROUGH GATEWAY GARDENS SHEET-<br />

2<br />

RT1 - SHOP DRAWING PARTIAL SECTION THROUGH GATEWAY GARDENS SHEET-<br />

3<br />

RT1 - SHOP DRAWING PARTIAL SECTION THROUGH GATEWAY GARDENS SHEET-<br />

4<br />

17 JWL_C_MERO_FAC_SD_RT1_RF_7016 RT1 - SHOP DRAWING WIREFRAME MODEL<br />

18 JWL_C_MERO_FAC_SD_RT1_RF_7017 RT1 - SHOP DRAWING GLASS PIXELATION MODEL<br />

19 JWL_C_MERO_FAC_SD_RT1_RF_7018 RT1 - SHOP DRAWING TYPICAL FIXING DETAILS SHEET-1<br />

20 JWL_C_MERO_FAC_SD_RT1_RF_7019 RT1 - SHOP DRAWING TYPICAL FIXING DETAILS SHEET-2<br />

21 JWL_C_MERO_FAC_SD_RT1_RF_7020 RT1 - SHOP DRAWING TYPICAL FIXING DETAILS SHEET-3<br />

22 JWL_C_MERO_FAC_SD_RT1_RF_7021 RT1 - SHOP DRAWING TYPICAL FIXING DETAILS SHEET-4<br />

23 JWL_C_MERO_FAC_SD_RT1_RF_7022 RT1 - SHOP DRAWING TYPICAL FIXING DETAILS SHEET-5<br />

24 JWL_C_MERO_FAC_SD_RT1_RF_7023 RT1 - SHOP DRAWING TYPICAL FIXING DETAILS SHEET-6<br />

25 JWL_C_MERO_FAC_SD_RT1_RF_7024 RT1 - SHOP DRAWING TYPICAL FIXING DETAILS SHEET-7<br />

26 JWL_C_MERO_FAC_SD_RT1_RF_7025 RT1 - SHOP DRAWING GLASS PANEL 6-WAY JOINT DETAIL<br />

27 JWL_C_MERO_FAC_SD_RT1_RF_7026<br />

28 JWL_C_MERO_FAC_SD_RT1_RF_7027<br />

29 JWL_C_MERO_FAC_SD_RT1_RF_7028<br />

30 JWL_C_MERO_FAC_SD_RT1_RF_7029<br />

31 JWL_C_MERO_FAC_SD_RT1_RF_7030<br />

32 JWL_C_MERO_FAC_SD_RT1_RF_7031<br />

RT1 - SHOP DRAWING EXTRUDED ALUMINUM MULLION & GASKET JOINT DETAILS<br />

SHEET-1<br />

RT1 - SHOP DRAWING EXTRUDED ALUMINUM MULLION & GASKET JOINT DETAILS<br />

SHEET-2<br />

RT1 - SHOP DRAWING EXTRUDED ALUMINUM MULLION & GASKET JOINT DETAILS<br />

SHEET-3<br />

RT1 - SHOP DRAWING EXTRUDED ALUMINUM MULLION & GASKET JOINT DETAILS<br />

SHEET-4<br />

RT1 - SHOP DRAWING EXTRUDED ALUMINUM MULLION & GASKET JOINT DETAILS<br />

SHEET-5<br />

RT1 - SHOP DRAWING EXTRUDED ALUMINUM MULLION & GASKET JOINT DETAILS<br />

SHEET-6<br />

33 JWL_C_MERO_FAC_SD_RT1_RF_7032 RT1 - SHOP DRAWING RING BEAM LAYOUT PLAN<br />

34 JWL_C_MERO_FAC_SD_RT1_RF_7033 RT1 - SHOP DRAWING RING BEAM INTERFACE DETAILS SHEET-1<br />

35 JWL_C_MERO_FAC_SD_RT1_RF_7034 RT1 - SHOP DRAWING RING BEAM INTERFACE DETAILS SHEET-2<br />

36 JWL_C_MERO_FAC_SD_RT1_RF_7035 RT1 - SHOP DRAWING RING BEAM INTERFACE DETAILS SHEET-3<br />

37 JWL_C_MERO_FAC_SD_RT1_RF_7036 RT1 - SHOP DRAWING RING BEAM INTERFACE DETAILS SHEET-4<br />

38 JWL_C_MERO_FAC_SD_RT1_RF_7037 RT1 - SHOP DRAWING RING BEAM INTERFACE DETAILS SHEET-5<br />

39 JWL_C_MERO_FAC_SD_RT1_RF_7038 RT1 - SHOP DRAWING RING BEAM INTERFACE DETAILS SHEET-6<br />

40 JWL_C_MERO_FAC_SD_RT1_RF_7039 RT1 - SHOP DRAWING STEEL BIAS RECEIVING NODE DETAILS


Mero Asia Pacific Pte Ltd<br />

STATUS :<br />

APP - Approved<br />

AWC - Approved with Comments - Resubmission Required<br />

RR - Revise and Resubmit Required<br />

as of 15 August 2016<br />

SHOP DRAWING LIST BREAKDOWN<br />

1ST SUBMISSION<br />

REV.0<br />

2ND SUBMISSION<br />

REV.A1<br />

NO.<br />

DRAWING NO.<br />

DESCRIPTION OF DRAWINGS<br />

MERO - TRANSMITTAL<br />

WHOS - WORKFLOW<br />

MERO - TRANSMITTAL<br />

WHOS - WORKFLOW<br />

REMARKS<br />

SUBMISSION<br />

SUBMISSION<br />

APPROVAL<br />

SUBMISSION<br />

SUBMISSION<br />

APPROVAL<br />

DATE MERO ACONEX DATE WHOS ACONEX DATE DRAWING<br />

DATE MERO ACONEX DATE WHOS ACONEX DATE<br />

REV<br />

REV<br />

TRANSMITTAL NO.<br />

TRANSMITTAL NO.<br />

STATUS<br />

TRANSMITTAL NO.<br />

TRANSMITTAL NO.<br />

TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL<br />

DRAWING<br />

STATUS<br />

41 JWL_C_MERO_FAC_SD_RT1_RF_7040 RT1 - SHOP DRAWING STEEL RING BEAM WITH ARCH BEAM CONNECTION DETAIL<br />

42 JWL_C_MERO_FAC_SD_RT1_RF_7041<br />

43 JWL_C_MERO_FAC_SD_RT1_RF_7042<br />

44 JWL_C_MERO_FAC_SD_RT1_RF_7043<br />

RT1 - SHOP DRAWING STEEL RING BEAM TO FLYING RING BEAM / WT-03 / WT-02<br />

INTERFACE DETAILS<br />

RT1 - SHOP DRAWING FLYING RING BEAM / WT-03 / WT-02 INTERFACE DETAILS<br />

SHEET-1<br />

RT1 - SHOP DRAWING FLYING RING BEAM / WT-03 / WT-02 INTERFACE DETAILS<br />

SHEET-2<br />

45 JWL_C_MERO_FAC_SD_RT1_RF_7044 RT1 - SHOP DRAWING STEEL FRAME MODEL<br />

46 JWL_C_MERO_FAC_SD_RT1_RF_7045 RT1 - SHOP DRAWING STEEL SIZE LAYOUT<br />

47 JWL_C_MERO_FAC_SD_RT1_RF_7046 RT1 - SHOP DRAWING STEEL DEPTH MEMBER SIZES - HOOPS<br />

48 JWL_C_MERO_FAC_SD_RT1_RF_7047 RT1 - SHOP DRAWING STEEL DEPTH MEMBER SIZES - BIAS<br />

49 JWL_C_MERO_FAC_SD_RT1_RF_7048 RT1 - SHOP DRAWING STEEL NODE DETAIL<br />

50 JWL_C_MERO_FAC_SD_RT1_RF_7049 RT1 - SHOP DRAWING PIN CONNECTION DETAIL TO RING BEAM<br />

51 JWL_C_MERO_FAC_SD_RT1_RF_7050 RT1 - SHOP DRAWING TAPERED STEEL BEAM DETAIL<br />

52 JWL_C_MERO_FAC_SD_RT1_RF_7051 RT1 - SHOP DRAWING ISOMETRIC VIEW FOR BIAS CONNECTION TO RING BEAM<br />

53 JWL_C_MERO_FAC_SD_RT1_RF_7052 RT1 - RF BASE SETTING OUT PLAN VIEW TREE COLUMNS 0 22.04.16 MERO-TRANSMIT-000093 WHOS-TRANSMIT-003088 26.05.16 17.05.16 APP AWC A1 02.08.16 25.07.16 MERO-TRANSMIT-000132<br />

54 JWL_C_MERO_FAC_SD_RT1_RF_7053 RT1 - SHOP DRAWING TREE COLUMN SCHEMATIC OVERVIEW 0 22.04.16 MERO-TRANSMIT-000093 WHOS-TRANSMIT-003088 26.05.16 17.05.16 APP RR A1 02.08.16 25.07.16 MERO-TRANSMIT-000132<br />

55 JWL_C_MERO_FAC_SD_RT1_RF_7054 RT1 - SHOP DRAWING TREE COLUMN BASE DETAILS 0 22.04.16 MERO-TRANSMIT-000093 WHOS-TRANSMIT-003088 26.05.16 17.05.16 AWC RR A1 02.08.16 25.07.16 MERO-TRANSMIT-000132<br />

56 JWL_C_MERO_FAC_SD_RT1_RF_7055 RT1 - SHOP DRAWING TREE COLUMN TOP DETAILS - 1 0 22.04.16 MERO-TRANSMIT-000093 WHOS-TRANSMIT-003088 26.05.16 17.05.16 APP RR A1 02.08.16 25.07.16 MERO-TRANSMIT-000132<br />

57 JWL_C_MERO_FAC_SD_RT1_RF_7056 RT1 - SHOP DRAWING TREE COLUMN TOP DETAILS - 2 0 22.04.16 MERO-TRANSMIT-000093 WHOS-TRANSMIT-003088 26.05.16 17.05.16 AWC RR A1 02.08.16 25.07.16 MERO-TRANSMIT-000132<br />

58 JWL_C_MERO_FAC_SD_RT1_RF_7057 RT1 - SHOP DRAWING TREE COLUMN SUPPORT 176 + 179 0 02.08.16 25.07.16 MERO-TRANSMIT-000132<br />

59 JWL_C_MERO_FAC_SD_RT1_RF_7058 RT1 - SHOP DRAWING TREE COLUMN SUPPORT 175 + 180 0 02.08.16 25.07.16 MERO-TRANSMIT-000132<br />

60 JWL_C_MERO_FAC_SD_RT1_RF_7059 RT1 - SHOP DRAWING TREE COLUMN SUPPORT 174 + 181 0 02.08.16 25.07.16 MERO-TRANSMIT-000132<br />

61 JWL_C_MERO_FAC_SD_RT1_RF_7060 RT1 - SHOP DRAWING TREE COLUMN SUPPORT 173 + 182 0 02.08.16 25.07.16 MERO-TRANSMIT-000132<br />

62 JWL_C_MERO_FAC_SD_RT1_RF_7061 RT1 - SHOP DRAWING TREE COLUMN SUPPORT 172 + 183 0 02.08.16 25.07.16 MERO-TRANSMIT-000132<br />

63 JWL_C_MERO_FAC_SD_RT1_RF_7062 RT1 - SHOP DRAWING TREE COLUMN SUPPORT 171 + 184 0 02.08.16 25.07.16 MERO-TRANSMIT-000132<br />

64 JWL_C_MERO_FAC_SD_RT1_RF_7063<br />

RT1 - SHOP DRAWING TEMPORARY OPENING FOR TOWER CRANE AND TREE<br />

HOISTING<br />

65 JWL_C_MERO_FAC_SD_RT1_RF_7064 RT1 - SHOP DRAWING OVERALL ALUMINUM FIN LAYOUT<br />

66 JWL_C_MERO_FAC_SD_RT1_RF_7065 RT1 - SHOP DRAWING ALUMINUM FIN JOINT DETAILS SHEET-1<br />

67 JWL_C_MERO_FAC_SD_RT1_RF_7066 RT1 - SHOP DRAWING ALUMINUM FIN JOINT DETAILS SHEET-2<br />

68 JWL_C_MERO_FAC_SD_RT1_RF_7067 RT1 - SHOP DRAWING ALUMINUM FIN JOINT DETAILS SHEET-3<br />

69 JWL_C_MERO_FAC_SD_RT1_RF_7068 RT1 - SHOP DRAWING ALUMINUM FIN JOINT DETAILS SHEET-4<br />

70 JWL_C_MERO_FAC_SD_RT1_RF_7069 RT1 - SHOP DRAWING ALUMINUM FIN JOINT DETAILS SHEET-5<br />

71 JWL_C_MERO_FAC_SD_RT1_RF_7070 RT1 - SHOP DRAWING BLOW-UP PARTIAL PLAN AT OCULUS<br />

72 JWL_C_MERO_FAC_SD_RT1_RF_7071 RT1 - SHOP DRAWING BLOW-UP PARTIAL SECTION THROUGH OCULUS<br />

73 JWL_C_MERO_FAC_SD_RT1_RF_7072 RT1 - SHOP DRAWING OCULUS INTERFACE DETAILS SHEET-1<br />

74 JWL_C_MERO_FAC_SD_RT1_RF_7073 RT1 - SHOP DRAWING OCULUS INTERFACE DETAILS SHEET-2<br />

75 JWL_C_MERO_FAC_SD_RT1_RF_7074 RT1 - SHOP DRAWING OCULUS INTERFACE DETAILS SHEET-3<br />

76 JWL_C_MERO_FAC_SD_RT1_RF_7075 RT1 - SHOP DRAWING M&E INTERFACE - SMOKE VENT LAYOUT<br />

77 JWL_C_MERO_FAC_SD_RT1_RF_7076 RT1 - SHOP DRAWING SMOKE VENT INTERFACE DETAILS SHEET-1<br />

78 JWL_C_MERO_FAC_SD_RT1_RF_7077 RT1 - SHOP DRAWING SMOKE VENT INTERFACE DETAILS SHEET-2<br />

79 JWL_C_MERO_FAC_SD_RT1_RF_7078 RT1 - SHOP DRAWING SMOKE VENT INTERFACE DETAILS SHEET-3<br />

80 JWL_C_MERO_FAC_SD_RT1_RF_7079 RT1 - SHOP DRAWING M&E INTERFACE DETAILS SHEET-1<br />

81 JWL_C_MERO_FAC_SD_RT1_RF_7080 RT1 - SHOP DRAWING M&E INTERFACE DETAILS SHEET-2<br />

82 JWL_C_MERO_FAC_SD_RT1_RF_7081 RT1 - SHOP DRAWING M&E INTERFACE DETAILS SHEET-3


Mero Asia Pacific Pte Ltd<br />

STATUS :<br />

APP - Approved<br />

AWC - Approved with Comments - Resubmission Required<br />

RR - Revise and Resubmit Required<br />

as of 15 August 2016<br />

SHOP DRAWING LIST BREAKDOWN<br />

1ST SUBMISSION<br />

REV.0<br />

2ND SUBMISSION<br />

REV.A1<br />

NO.<br />

DRAWING NO.<br />

DESCRIPTION OF DRAWINGS<br />

MERO - TRANSMITTAL<br />

WHOS - WORKFLOW<br />

MERO - TRANSMITTAL<br />

WHOS - WORKFLOW<br />

REMARKS<br />

SUBMISSION<br />

SUBMISSION<br />

APPROVAL<br />

SUBMISSION<br />

SUBMISSION<br />

APPROVAL<br />

DATE MERO ACONEX DATE WHOS ACONEX DATE DRAWING<br />

DATE MERO ACONEX DATE WHOS ACONEX DATE<br />

REV<br />

REV<br />

TRANSMITTAL NO.<br />

TRANSMITTAL NO.<br />

STATUS<br />

TRANSMITTAL NO.<br />

TRANSMITTAL NO.<br />

TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL<br />

DRAWING<br />

STATUS<br />

83 JWL_C_MERO_FAC_SD_RT1_RF_7082 RT1 - SHOP DRAWING M&E INTERFACE DETAILS SHEET-4<br />

84 JWL_C_MERO_FAC_SD_RT1_RF_7083 RT1 - SHOP DRAWING M&E INTERFACE DETAILS SHEET-5<br />

85 JWL_C_MERO_FAC_SD_RT1_RF_7084 RT1 - SHOP DRAWING M&E INTERFACE DETAILS SHEET-6<br />

86 JWL_C_MERO_FAC_SD_RT1_RF_7085 RT1 - SHOP DRAWING M&E INTERFACE DETAILS SHEET-7<br />

87 JWL_C_MERO_FAC_SD_RT1_RF_7086 RT1 - SHOP DRAWING M&E INTERFACE DETAILS SHEET-8<br />

88 JWL_C_MERO_FAC_SD_RT1_RF_7087 RT1 - SHOP DRAWING M&E INTERFACE DETAILS SHEET-9<br />

89 JWL_C_MERO_FAC_SD_RT1_RF_7088 RT1 - SHOP DRAWING M&E INTERFACE DETAILS SHEET-10<br />

90 JWL_C_MERO_FAC_SD_RT1_RF_7089 RT1 - SHOP DRAWING STEEL NODE SIZING LAYOUT<br />

91 JWL_C_MERO_FAC_SD_RT1_RF_7090 RT1 - SHOP DRAWING STEEL NODE DETAILS<br />

92 JWL_C_MERO_FAC_SD_RT1_RF_7091 RT1 - SHOP DRAWING STEEL MEMBER SIZING LAYOUT<br />

93 JWL_C_MERO_FAC_SD_RT1_RF_7092 RT1 - SHOP DRAWING MANIFOLD SUPPORT LAYOUT<br />

94 JWL_C_MERO_FAC_SD_RT1_RF_7093 RT1 - SHOP DRAWING MANIFOLD SUPPORT DETAILS SHEET-1<br />

95 JWL_C_MERO_FAC_SD_RT1_RF_7094 RT1 - SHOP DRAWING MANIFOLD SUPPORT DETAILS SHEET-2<br />

C<br />

C.1<br />

WT-01<br />

WT-01 QUADRANT - D<br />

1 JWL_C_MERO_FAC_SD_WT1_1_1040<br />

2 JWL_C_MERO_FAC_SD_WT1_1_1041<br />

3 JWL_C_MERO_FAC_SD_WT1_1_1042<br />

4 JWL_C_MERO_FAC_SD_WT1_1_1043<br />

5 JWL_C_MERO_FAC_SD_WT1_1_1044<br />

6 JWL_C_MERO_FAC_SD_WT1_1_1045<br />

7 JWL_C_MERO_FAC_SD_WT1_1_1046<br />

8 JWL_C_MERO_FAC_SD_WT1_1_1047<br />

9 JWL_C_MERO_FAC_SD_WT1_1_1048<br />

10 JWL_C_MERO_FAC_SD_WT1_1_1049<br />

11 JWL_C_MERO_FAC_SD_WT1_1_1050<br />

12 JWL_C_MERO_FAC_SD_WT1_1_1051<br />

13 JWL_C_MERO_FAC_SD_WT1_1_1052<br />

14 JWL_C_MERO_FAC_SD_WT1_1_1053<br />

15 JWL_C_MERO_FAC_SD_WT1_1_1100<br />

16 JWL_C_MERO_FAC_SD_WT1_1_1101<br />

17 JWL_C_MERO_FAC_SD_WT1_1_1102<br />

18 JWL_C_MERO_FAC_SD_WT1_1_1103<br />

19 JWL_C_MERO_FAC_SD_WT1_1_1104<br />

20 JWL_C_MERO_FAC_SD_WT1_1_1105<br />

21 JWL_C_MERO_FAC_SD_WT1_1_1106<br />

22 JWL_C_MERO_FAC_SD_WT1_1_1107<br />

23 JWL_C_MERO_FAC_SD_WT1_1_1108<br />

24 JWL_C_MERO_FAC_SD_WT1_1_1109<br />

25 JWL_C_MERO_FAC_SD_WT1_1_1110<br />

26 JWL_C_MERO_FAC_SD_WT1_1_1111<br />

27 JWL_C_MERO_FAC_SD_WT1_1_1112<br />

28 JWL_C_MERO_FAC_SD_WT1_1_1113<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) NORTH-WEST 1ST STOREY OVERALL<br />

PLAN<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) NORTH-WEST 1ST STOREY PARTIAL<br />

LAYOUT PLAN (GL-K~P / GL-1~4)<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) NORTH-WEST 1ST STOREY PARTIAL<br />

LAYOUT PLAN (GL-F~K / GL-1~4)<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) NORTH-WEST 1ST STOREY PARTIAL<br />

LAYOUT PLAN (GL-D~G / GL-3~8)<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) NORTH-WEST 1ST STOREY TYPICAL<br />

INTERFACE DETAIL AT SECTION - 1 GRID LINE R11-W<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) NORTH-WEST 1ST STOREY TYPICAL<br />

BRACKET SECTION DETAILS AT SECTION - 1 GRID LINE R11-W<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) NORTH-WEST 1ST STOREY TYPICAL<br />

INTERFACE DETAIL AT SECTION - 2 GRID LINE R10-W<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) NORTH-WEST 1ST STOREY TYPICAL<br />

BRACKET SECTION DETAILS AT SECTION - 2 GRID LINE R10-W<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) NORTH-WEST 1ST STOREY TYPICAL<br />

INTERFACE DETAIL AT SECTION - 3 GRID LINE R9-W<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) NORTH-WEST 1ST STOREY TYPICAL<br />

BRACKET SECTION DETAILS AT SECTION - 2 GRID LINE R10-W<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) NORTH-WEST COMPOSITE PANEL<br />

INTERFACE WITH SOFFIT DETAIL AT 1ST STOREY @ GRIDLINE - H/3<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) NORTH-WEST LOUVER GRILL INTERFACE<br />

WITH SOFFIT DETAIL AT 1ST STOREY<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) NORTH-WEST COMPOSITE PANEL<br />

INTERFACE WITH SOFFIT DETAIL AT 1ST STOREY @ GRIDLINE-G/4<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) NORTH-WEST COMPOSITE PANEL<br />

INTERFACE WITH SOFFIT SECTION DETAIL AT 1ST STOREY<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) NORTH-WEST 1ST STOREY ACP<br />

CLADDING OVERALL LAYOUT PLAN (GL-C~Q / GL-02~07)<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) NORTH-WEST 1ST STOREY ACP<br />

CLADDING PARTIAL LAYOUT PLAN & ELEVATION (GL-N~Q / GL-02~04)<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) NORTH-WEST 1ST STOREY ACP<br />

CLADDING PARTIAL LAYOUT PLAN & ELEVATION (GL-CL3~N / GL-02~03)<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) NORTH-WEST 1ST STOREY ACP<br />

CLADDING PARTIAL LAYOUT PLAN & ELEVATION (GL-H~K / GL-02~03)<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) NORTH-WEST 1ST STOREY ACP<br />

CLADDING PARTIAL LAYOUT PLAN & ELEVATION (GL-F~G / GL-03~5.1)<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) NORTH-WEST 1ST STOREY ACP<br />

CLADDING PARTIAL LAYOUT PLAN & ELEVATION (GL-D~E / GL-05~06)<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) NORTH-WEST 1ST STOREY EGRESS<br />

DOOR & ACP CLADDING PARTIAL ELEVATIONS - SHEET-1<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) NORTH-WEST 1ST STOREY EGRESS<br />

DOOR & ACP CLADDING PARTIAL ELEVATIONS - SHEET-2<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) NORTH-WEST 1ST STOREY EGRESS<br />

DOOR & ACP CLADDING PARTIAL ELEVATIONS - SHEET-3<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) NORTH-WEST 1ST STOREY EGRESS<br />

DOOR & ACP CLADDING PARTIAL ELEVATIONS - SHEET-4<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) NORTH-WEST 1ST STOREY EGRESS<br />

DOOR & ACP CLADDING PARTIAL ELEVATIONS - SHEET-5<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) NORTH-WEST 1ST STOREY ACP<br />

CLADDING TYPICAL SECTION DETAILS - SHEET-1<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) NORTH-WEST 1ST STOREY ACP<br />

CLADDING TYPICAL SECTION DETAILS - SHEET-2<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) NORTH-WEST 1ST STOREY ACP<br />

CLADDING TYPICAL SECTION DETAILS - SHEET-3<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000096 WHOS-TRANSMIT-003579 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000138<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000096 WHOS-TRANSMIT-003579 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000138<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000096 WHOS-TRANSMIT-003579 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000138<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000096 WHOS-TRANSMIT-003579 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000138<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000096 WHOS-TRANSMIT-003579 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000138<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000096 WHOS-TRANSMIT-003579 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000138<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000096 WHOS-TRANSMIT-003579 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000138<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000096 WHOS-TRANSMIT-003579 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000138<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000096 WHOS-TRANSMIT-003579 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000138<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000096 WHOS-TRANSMIT-003579 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000138<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000096 WHOS-TRANSMIT-003579 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000138<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000096 WHOS-TRANSMIT-003579 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000138<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000096 WHOS-TRANSMIT-003579 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000138<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000096 WHOS-TRANSMIT-003579 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000138<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000096 WHOS-TRANSMIT-003579 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000138<br />

0 27.07.16 12.08.16 MERO-TRANSMIT-000138<br />

0 27.07.16 12.08.16 MERO-TRANSMIT-000138<br />

0 27.07.16 12.08.16 MERO-TRANSMIT-000138<br />

0 27.07.16 12.08.16 MERO-TRANSMIT-000138<br />

0 27.07.16 12.08.16 MERO-TRANSMIT-000139<br />

0 27.07.16 12.08.16 MERO-TRANSMIT-000139<br />

0 27.07.16 12.08.16 MERO-TRANSMIT-000139


Mero Asia Pacific Pte Ltd<br />

STATUS :<br />

APP - Approved<br />

AWC - Approved with Comments - Resubmission Required<br />

RR - Revise and Resubmit Required<br />

as of 15 August 2016<br />

SHOP DRAWING LIST BREAKDOWN<br />

1ST SUBMISSION<br />

REV.0<br />

2ND SUBMISSION<br />

REV.A1<br />

NO.<br />

DRAWING NO.<br />

DESCRIPTION OF DRAWINGS<br />

MERO - TRANSMITTAL<br />

WHOS - WORKFLOW<br />

MERO - TRANSMITTAL<br />

WHOS - WORKFLOW<br />

REMARKS<br />

SUBMISSION<br />

SUBMISSION<br />

APPROVAL<br />

SUBMISSION<br />

SUBMISSION<br />

APPROVAL<br />

DATE MERO ACONEX DATE WHOS ACONEX DATE DRAWING<br />

DATE MERO ACONEX DATE WHOS ACONEX DATE<br />

REV<br />

REV<br />

TRANSMITTAL NO.<br />

TRANSMITTAL NO.<br />

STATUS<br />

TRANSMITTAL NO.<br />

TRANSMITTAL NO.<br />

TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL<br />

DRAWING<br />

STATUS<br />

29 JWL_C_MERO_FAC_SD_WT1_1_1114<br />

30 JWL_C_MERO_FAC_SD_WT1_1_1115<br />

31 JWL_C_MERO_FAC_SD_WT1_1_1116<br />

32 JWL_C_MERO_FAC_SD_WT1_1_1117<br />

33 JWL_C_MERO_FAC_SD_WT1_1_1118<br />

34 JWL_C_MERO_FAC_SD_WT1_1_1119<br />

35 JWL_C_MERO_FAC_SD_WT1_1_1120<br />

36 JWL_C_MERO_FAC_SD_WT1_1_1121<br />

37 JWL_C_MERO_FAC_SD_WT1_1_1122<br />

38 JWL_C_MERO_FAC_SD_WT1_1_1123<br />

39 JWL_C_MERO_FAC_SD_WT1_1_1124<br />

40 JWL_C_MERO_FAC_SD_WT1_1_1125<br />

41 JWL_C_MERO_FAC_SD_WT1_2_2070<br />

42 JWL_C_MERO_FAC_SD_WT1_2_2071<br />

43 JWL_C_MERO_FAC_SD_WT1_2_2072<br />

44 JWL_C_MERO_FAC_SD_WT1_2_2073<br />

45 JWL_C_MERO_FAC_SD_WT1_2_2074<br />

46 JWL_C_MERO_FAC_SD_WT1_2_2075<br />

47 JWL_C_MERO_FAC_SD_WT1_2_2076<br />

48 JWL_C_MERO_FAC_SD_WT1_2_2077<br />

49 JWL_C_MERO_FAC_SD_WT1_2_2078<br />

50 JWL_C_MERO_FAC_SD_WT1_2_2079<br />

51 JWL_C_MERO_FAC_SD_WT1_2_2080<br />

52 JWL_C_MERO_FAC_SD_WT1_2_2081<br />

53 JWL_C_MERO_FAC_SD_WT1_2_2082<br />

54 JWL_C_MERO_FAC_SD_WT1_2_2083<br />

55 JWL_C_MERO_FAC_SD_WT1_2_2084<br />

56 JWL_C_MERO_FAC_SD_WT1_2_2085<br />

57 JWL_C_MERO_FAC_SD_WT1_2_2086<br />

58 JWL_C_MERO_FAC_SD_WT1_2_2087<br />

59 JWL_C_MERO_FAC_SD_WT1_2_2088<br />

60 JWL_C_MERO_FAC_SD_WT1_2_2089<br />

61 JWL_C_MERO_FAC_SD_WT1_2_2090<br />

62 JWL_C_MERO_FAC_SD_WT1_2_2091<br />

63 JWL_C_MERO_FAC_SD_WT1_2_2092<br />

64 JWL_C_MERO_FAC_SD_WT1_3_3065<br />

65 JWL_C_MERO_FAC_SD_WT1_3_3066<br />

66 JWL_C_MERO_FAC_SD_WT1_3_3067<br />

67 JWL_C_MERO_FAC_SD_WT1_3_3068<br />

68 JWL_C_MERO_FAC_SD_WT1_3_3069<br />

69 JWL_C_MERO_FAC_SD_WT1_3_3070<br />

70 JWL_C_MERO_FAC_SD_WT1_3_3071<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) NORTH-WEST 1ST STOREY ACP<br />

CLADDING TYPICAL SECTION DETAILS - SHEET-4<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) NORTH-WEST 1ST STOREY ACP<br />

CLADDING TYPICAL SECTION DETAILS - SHEET-5<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) NORTH-WEST 1ST STOREY EGRESS<br />

DOOR & ACP CLADDING SECTION DETAILS - SHEET-1<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) NORTH-WEST 1ST STOREY EGRESS<br />

DOOR & ACP CLADDING SECTION DETAILS - SHEET-2<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) NORTH-WEST 1ST STOREY EGRESS<br />

DOOR & ACP CLADDING SECTION DETAILS - SHEET-3<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) NORTH-WEST 1ST STOREY EGRESS<br />

DOOR & ACP CLADDING SECTION DETAILS - SHEET-4<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) NORTH-WEST 1ST STOREY EGRESS<br />

DOOR & ACP CLADDING SECTION DETAILS - SHEET-5<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) NORTH-WEST 1ST STOREY EGRESS<br />

DOOR & ACP CLADDING SECTION DETAILS - SHEET-6<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) NORTH-WEST 1ST STOREY EGRESS<br />

DOOR & ACP CLADDING SECTION DETAILS - SHEET-7<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) NORTH-WEST 1ST STOREY EGRESS<br />

DOOR & ACP CLADDING SECTION DETAILS - SHEET-8<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) NORTH-WEST 1ST STOREY EGRESS<br />

DOOR & ACP CLADDING SECTION DETAILS - SHEET-9<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) NORTH-WEST 1ST STOREY EGRESS<br />

DOOR & ACP CLADDING SECTION DETAILS - SHEET-10<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) NORTH-WEST 2ND STOREY OVERALL<br />

PLAN<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) NORTH-WEST 2ND STOREY PARTIAL<br />

LAYOUT PLAN (GL-K~P / GL-1~4)<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) NORTH-WEST 2ND STOREY PARTIAL<br />

LAYOUT PLAN (GL-F~K / GL-1~4)<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) NORTH-WEST 2ND STOREY PARTIAL<br />

LAYOUT PLAN (GL-C~F / GL-4~8)<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) NORTH-WEST 2ND STOREY PARTIAL<br />

LAYOUT PLAN (GL-B~E / GL-7~11)<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) NORTH-WEST 2ND STOREY TYPICAL<br />

INTERFACE DETAIL AT SECTION - 1 GRID LINE R11-W<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) NORTH-WEST 2ND STOREY TYPICAL<br />

BRACKET SECTION DETAILS AT SECTION - 1 GRID LINE R11-W<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) NORTH-WEST 2ND STOREY TYPICAL<br />

INTERFACE DETAIL AT SECTION - 2 GRID LINE R10-W<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) NORTH-WEST 2ND STOREY TYPICAL<br />

BRACKET SECTION DETAILS AT SECTION - 2 GRID LINE R10-W<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) NORTH-WEST 2ND STOREY TYPICAL<br />

INTERFACE DETAIL AT SECTION - 3 GRID LINE R9-W<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) NORTH-WEST 2ND STOREY TYPICAL<br />

BRACKET SECTION DETAILS AT SECTION - 3 GRID LINE R9-W<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) NORTH-WEST BRACKET CONNECTION<br />

DETAIL AT 2ND STOREY @ GRIDLINE-H/3<br />

WT-01 SHOPDRAWINGS (QUADRANT-D)NORTH-WEST BRACKET CONNECTION<br />

SECTION DETAIL AT 2ND STOREY @ GRIDLINE-H/3<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) NORTH-WEST BRACKET CONNECTION<br />

DETAIL AT 2ND STOREY SLAB - GRIDLINE-G/4<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) NORTH-WEST BRACKET CONNECTION<br />

DETAIL SECTION AT 2ND STOREY SLAB - GRIDLINE-G/4<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) NORTH-WEST BRACKET CONNECTION<br />

DETAIL AT 2ND STOREY SLAB - GRIDLINE-E/5<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) NORTH-WEST BRACKET CONNECTION<br />

SECTION DETAIL AT 2ND STOREY SLAB - GRIDLINE-E/5<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) 2ND STOREY SOFFIT INTERFACE DETAIL<br />

@LEVEL 2 - GRIDLINE R5-W<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) 2ND STOREY BRACKET CONNECTION<br />

DETAIL @LEVEL 2 - GRIDLINE R5-W<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) 2ND STOREY BASE CONNECTION<br />

SECTION DETAIL @ SECTION R4-W<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) 2ND STOREY BASE CONNECTION<br />

DETAILS @ SECTION R4-W<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) 2ND STOREY BASE CONNECTION<br />

SECTION DETAIL @ SECTION R3-W<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) 2ND STOREY BASE CONNECTION<br />

DETAILS @ SECTION R3-W<br />

WT-01 SHOP DRAWING (QUADRANT D) NORTH-WEST 3RD STOREY OVERALL<br />

PLAN<br />

WT-01 SHOP DRAWING (QUADRANT D) PARTIAL LAYOUT PLAN & DETAILS AT 3RD<br />

STOREY (GL-K~P / GL-1~4)<br />

WT-01 SHOP DRAWING (QUADRANT D) NORTH-WEST 3RD STOREY PARTIAL<br />

LAYOUT PLAN (GL-F~K / GL-1~4)<br />

WT-01 SHOP DRAWING (QUADRANT D) NORTH-WEST 3RD STOREY PARTIAL<br />

LAYOUT PLAN (GL-C~G / GL-3~7)<br />

WT-01 SHOP DRAWING (QUADRANT D) NORTH-WEST 3RD STOREY PARTIAL<br />

LAYOUT PLAN (GL-B~E / GL-7~11)<br />

WT-01 SHOP DRAWINGS (QUADRANT D) NORTH-WEST 3RD STOREY TYPICAL<br />

INTERFACE DETAIL AT SECTION-1 GRIDLINE R11-W<br />

WT-01 SHOP DRAWINGS (QUADRANT D) NORTH-WEST 3RD STOREY BRACKET<br />

SECTION DETAILS AT SECTION-1 GRIDLINE R11-W<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000096 WHOS-TRANSMIT-003579 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000139<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000096 WHOS-TRANSMIT-003579 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000139<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000096 WHOS-TRANSMIT-003579 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000139<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000096 WHOS-TRANSMIT-003579 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000139<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000096 WHOS-TRANSMIT-003579 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000139<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000096 WHOS-TRANSMIT-003579 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000139<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000096 WHOS-TRANSMIT-003579 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000139<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000096 WHOS-TRANSMIT-003579 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000139<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000096 WHOS-TRANSMIT-003579 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000139<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000096 WHOS-TRANSMIT-003579 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000139<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000097 WHOS-TRANSMIT-003581 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000139<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000097 WHOS-TRANSMIT-003581 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000139<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000097 WHOS-TRANSMIT-003581 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000139<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000097 WHOS-TRANSMIT-003581 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000139<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000097 WHOS-TRANSMIT-003581 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000139<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000097 WHOS-TRANSMIT-003581 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000139<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000097 WHOS-TRANSMIT-003581 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000139<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000097 WHOS-TRANSMIT-003581 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000139<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000097 WHOS-TRANSMIT-003581 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000139<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000097 WHOS-TRANSMIT-003581 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000139<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000097 WHOS-TRANSMIT-003581 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000139<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000097 WHOS-TRANSMIT-003581 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000139<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000097 WHOS-TRANSMIT-003581 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000140<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000097 WHOS-TRANSMIT-003581 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000140<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000097 WHOS-TRANSMIT-003581 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000140<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000097 WHOS-TRANSMIT-003581 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000140<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000097 WHOS-TRANSMIT-003581 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000140<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000097 WHOS-TRANSMIT-003581 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000140<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000097 WHOS-TRANSMIT-003581 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000140<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000097 WHOS-TRANSMIT-003581 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000140


Mero Asia Pacific Pte Ltd<br />

STATUS :<br />

APP - Approved<br />

AWC - Approved with Comments - Resubmission Required<br />

RR - Revise and Resubmit Required<br />

as of 15 August 2016<br />

SHOP DRAWING LIST BREAKDOWN<br />

1ST SUBMISSION<br />

REV.0<br />

2ND SUBMISSION<br />

REV.A1<br />

NO.<br />

DRAWING NO.<br />

DESCRIPTION OF DRAWINGS<br />

MERO - TRANSMITTAL<br />

WHOS - WORKFLOW<br />

MERO - TRANSMITTAL<br />

WHOS - WORKFLOW<br />

REMARKS<br />

SUBMISSION<br />

SUBMISSION<br />

APPROVAL<br />

SUBMISSION<br />

SUBMISSION<br />

APPROVAL<br />

DATE MERO ACONEX DATE WHOS ACONEX DATE DRAWING<br />

DATE MERO ACONEX DATE WHOS ACONEX DATE<br />

REV<br />

REV<br />

TRANSMITTAL NO.<br />

TRANSMITTAL NO.<br />

STATUS<br />

TRANSMITTAL NO.<br />

TRANSMITTAL NO.<br />

TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL<br />

DRAWING<br />

STATUS<br />

71 JWL_C_MERO_FAC_SD_WT1_3_3072<br />

72 JWL_C_MERO_FAC_SD_WT1_3_3073<br />

73 JWL_C_MERO_FAC_SD_WT1_3_3074<br />

74 JWL_C_MERO_FAC_SD_WT1_3_3076<br />

75 JWL_C_MERO_FAC_SD_WT1_3_3078<br />

76 JWL_C_MERO_FAC_SD_WT1_3_3079<br />

77 JWL_C_MERO_FAC_SD_WT1_3_3080<br />

78 JWL_C_MERO_FAC_SD_WT1_3_3081<br />

79 JWL_C_MERO_FAC_SD_WT1_3_3082<br />

80 JWL_C_MERO_FAC_SD_WT1_3_3083<br />

81 JWL_C_MERO_FAC_SD_WT1_3_3084<br />

82 JWL_C_MERO_FAC_SD_WT1_3_3085<br />

83 JWL_C_MERO_FAC_SD_WT1_3_3086<br />

84 JWL_C_MERO_FAC_SD_WT1_3_3087<br />

85 JWL_C_MERO_FAC_SD_WT1_3_3088<br />

86 JWL_C_MERO_FAC_SD_WT1_3_3089<br />

87 JWL_C_MERO_FAC_SD_WT1_4_4065<br />

88 JWL_C_MERO_FAC_SD_WT1_4_4066<br />

89 JWL_C_MERO_FAC_SD_WT1_4_4067<br />

90 JWL_C_MERO_FAC_SD_WT1_4_4068<br />

91 JWL_C_MERO_FAC_SD_WT1_4_4069<br />

92 JWL_C_MERO_FAC_SD_WT1_4_4070<br />

93 JWL_C_MERO_FAC_SD_WT1_4_4071<br />

94 JWL_C_MERO_FAC_SD_WT1_4_4072<br />

95 JWL_C_MERO_FAC_SD_WT1_4_4073<br />

96 JWL_C_MERO_FAC_SD_WT1_4_4074<br />

97 JWL_C_MERO_FAC_SD_WT1_4_4075<br />

98 JWL_C_MERO_FAC_SD_WT1_4_4076<br />

99 JWL_C_MERO_FAC_SD_WT1_4_4077<br />

100 JWL_C_MERO_FAC_SD_WT1_4_4078<br />

101 JWL_C_MERO_FAC_SD_WT1_4_4079<br />

102 JWL_C_MERO_FAC_SD_WT1_4_4080<br />

103 JWL_C_MERO_FAC_SD_WT1_4_4081<br />

104 JWL_C_MERO_FAC_SD_WT1_4_4082<br />

105 JWL_C_MERO_FAC_SD_WT1_4_4083<br />

106 JWL_C_MERO_FAC_SD_WT1_4_4084<br />

107 JWL_C_MERO_FAC_SD_WT1_4_4085<br />

108 JWL_C_MERO_FAC_SD_WT1_4_4086<br />

109 JWL_C_MERO_FAC_SD_WT1_4_4087<br />

110 JWL_C_MERO_FAC_SD_WT1_5_5020<br />

111 JWL_C_MERO_FAC_SD_WT1_5_5021<br />

112 JWL_C_MERO_FAC_SD_WT1_5_5022<br />

WT-01 SHOP DRAWINGS (QUADRANT D) NORTH-WEST 3RD STOREY TYPICAL<br />

INTERFACE DETAIL AT SECTION-2 GRIDLINE R10-W<br />

WT-01 SHOP DRAWINGS (QUADRANT D) NORTH-WEST 3RD STOREY BRACKET<br />

SECTION DETAILS AT SECTION-2 GRIDLINE R10-W<br />

WT-01 SHOP DRAWINGS (QUADRANT D) PMS WEST TOP OPENING TYPICAL<br />

DETAIL AT 3RD STOREY (SECTION-3 GRIDLINE R9-W)<br />

WT-01 SHOP DRAWINGS (QUADRANT D) PMS WEST BOTTOM OPENING TYPICAL<br />

DETAIL AT 3RD STOREY (SECTION-3 GRIDLINE R9-W)<br />

WT-01 SHOP DRAWINGS (QUADRANT D) NORTH-WEST COMPOSITE PANEL<br />

INTERFACING DETAIL AT 3RD STOREY SLAB<br />

WT-01 SHOP DRAWINGS (QUADRANT D) NORTH-WEST BRACKET CONNECTION<br />

SECTION DETAIL AT 3RD STOREY SLAB - GRIDLINE-H/3<br />

WT-01 SHOP DRAWINGS (QUADRANT D) NORTH-WEST BRACKET CONNECTION<br />

DETAIL AT 3RD STOREY SLAB - GRIDLINE-G/4<br />

WT-01 SHOP DRAWINGS (QUADRANT D) NORTH-WEST BRACKET CONNECTION<br />

SECTION DETAIL AT 3RD STOREY SLAB - GRIDLINE-G/4<br />

WT-01 SHOP DRAWINGS (QUADRANT D) NORTH-WEST BRACKET CONNECTION<br />

DETAIL AT 3RD STOREY SLAB - GRIDLINE-E/5<br />

WT-01 SHOP DRAWINGS (QUADRANT D)NORTH-WEST BRACKET CONNECTION<br />

SECTION DETAIL AT 3RD STOREY SLAB - GRIDLINE-E/5<br />

WT-01 SHOP DRAWINGS (QUADRANT D) 3RD STOREY BASE CONNECTION<br />

SECTION DETAIL @ SECTION R5-W<br />

WT-01 SHOP DRAWINGS (QUADRANT D) 3RD STOREY SUPPORT BRACKET<br />

SECTION DETAIL @ SECTION R5-W<br />

WT-01 SHOP DRAWINGS (QUADRANT D) 3RD STOREY BASE CONNECTION<br />

SECTION DETAIL @ SECTION R3-W<br />

WT-01 SHOP DRAWINGS (QUADRANT D) 3RD STOREY BASE CONNECTION<br />

SECTION DETAIL @ SECTION R4-W<br />

WT-01 SHOP DRAWINGS (QUADRANT D) NORTH-WEST BRACKET CONNECTION<br />

DETAIL AT 3RD STOREY SLAB-GRIDLINE - R3-W<br />

WT-01 SHOP DRAWINGS (QUADRANT D) NORTH-WEST BRACKET CONNECTION<br />

SECTION DETAIL AT 3RD STOREY SLAB-GRIDLINE - R3-W<br />

WT-01 SHOP DRAWING -QUADRANT- D NORTH-WEST 4TH STOREY OVERALL<br />

PLAN<br />

WT-01 SHOP DRAWING (QUADRANT D) NORTH-WEST 4TH STOREY PARTIAL<br />

LAYOUT PLAN (GL-K~P / GL-1~4)<br />

WT-01 SHOP DRAWING (QUADRANT D) NORTH-WEST 4TH STOREY PARTIAL<br />

LAYOUT PLAN (GL-G~K / GL-1~4)<br />

WT-01 SHOP DRAWING (QUADRANT D) NORTH-WEST 4TH STOREY PARTIAL<br />

LAYOUT PLAN (GL-C~G / GL-3~7)<br />

WT-01 SHOP DRAWING (QUADRANT D) NORTH-WEST 4TH STOREY PARTIAL<br />

LAYOUT PLAN (GL-B~E / GL-7~11)<br />

WT-01 SHOP DRAWING (QUADRANT D) NORTH-WEST 4TH STOREY TYPICAL<br />

INTERFACE DETAIL AT SECTION-1 GRIDLINE R11-W<br />

WT-01 SHOP DRAWING (QUADRANT D) NORTH-WEST 4TH STOREY TYPICAL<br />

BRACKET SECTION DETAIL AT SECTION-1 GRIDLINE R11-W<br />

WT-01 SHOP DRAWING (QUADRANT D) NORTH-WEST 4TH STOREY TYPICAL<br />

INTERFACE DETAIL AT SECTION-2 GRIDLINE R10-W<br />

WT-01 SHOP DRAWING (QUADRANT D) NORTH-WEST 4TH STOREY TYPICAL<br />

BRACKET SECTION DETAIL AT SECTION-2 GRIDLINE R10-W<br />

WT-01 SHOP DRAWING (QUADRANT D) NORTH-WEST 4TH STOREY TYPICAL<br />

INTERFACE DETAIL AT SECTION-3 GRIDLINE R9-W<br />

WT-01 SHOP DRAWING (QUADRANT D) NORTH-WEST 4TH STOREY TYPICAL<br />

BRACKET SECTION DETAIL AT SECTION-3 GRIDLINE R9-W<br />

WT-01 SHOP DRAWINGS (QUADRANT D) NORTH-WEST BRACKET CONNECTION<br />

DETAIL AT 4TH STOREY SLAB - GRIDLINE-H/3<br />

WT-01 SHOP DRAWINGS (QUADRANT D) NORTH-WEST COMPOSITE PANEL<br />

INTERFACING DETAIL AT 4TH STOREY SLAB @ GRIDLINE-H/3<br />

WT-01 SHOP DRAWINGS (QUADRANT D) NORTH-WEST BRACKET CONNECTION<br />

DETAIL AT 4TH STOREY SLAB - GRIDLINE-G/4<br />

WT-01 SHOP DRAWINGS (QUADRANT D) NORTH-WEST BRACKET CONNECTION<br />

SECTION DETAIL AT 4TH STOREY SLAB - GRIDLINE-G/4<br />

WT-01 SHOP DRAWINGS (QUADRANT D) NORTH-WEST COMPOSITE PANEL AND<br />

GLASS INTERFACE DETAIL AT 4TH STOREY SLAB<br />

WT-01 SHOP DRAWINGS (QUADRANT D) NORTH-WEST COMPOSITE PANEL AND<br />

GLASS INTERFACE AT 4TH STOREY SLAB @ GRIDLINE-E/5<br />

WT-01 SHOP DRAWINGS (QUADRANT D) NORTH-WEST BRACKET CONNECTION<br />

DETAIL AT 4TH STOREY SLAB - GRIDLINE-E/6<br />

WT-01 SHOP DRAWINGS (QUADRANT D) NORTH-WEST BRACKET CONNECTION<br />

SECTION DETAIL AT 4TH STOREY SLAB - GRIDLINE-E/6<br />

WT-01 SHOP DRAWINGS (QUADRANT D) NORTH-WEST BRACKET CONNECTION<br />

DETAIL AT 4TH STOREY SLAB - GRIDLINE-D/8<br />

WT-01 SHOP DRAWINGS (QUADRANT D) NORTH-WEST BRACKET CONNECTION<br />

SECTION DETAIL AT 4TH STOREY SLAB - GRIDLINE-D/8<br />

WT-01 SHOP DRAWINGS (QUADRANT D) NORTH-WEST BRACKET CONNECTION<br />

DETAIL AT 4TH STOREY SLAB - GRIDLINE-C/9<br />

WT-01 SHOP DRAWINGS (QUADRANT D) NORTH-WEST BRACKET CONNECTION<br />

SECTION DETAIL AT 4TH STOREY SLAB - GRIDLINE-C/9<br />

WT-01 SHOP DRAWING -QUADRANT- D NORTH-WEST 5TH STOREY OVERALL<br />

PLAN<br />

WT-01 SHOP DRAWING (QUADRANT D) NORTH-WEST 5TH STOREY PARTIAL<br />

LAYOUT PLAN (GL-K~P / GL-1~4)<br />

WT-01 SHOP DRAWING (QUADRANT D) NORTH-WEST 5TH STOREY PARTIAL<br />

LAYOUT PLAN (GL-G~K / GL-1~4)<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000097 WHOS-TRANSMIT-003581 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000140<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000097 WHOS-TRANSMIT-003581 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000140<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000097 WHOS-TRANSMIT-003581 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000140<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000097 WHOS-TRANSMIT-003581 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000140<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000097 WHOS-TRANSMIT-003581 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000140<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000098 WHOS-TRANSMIT-003582 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000140<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000098 WHOS-TRANSMIT-003582 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000140<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000098 WHOS-TRANSMIT-003582 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000140<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000098 WHOS-TRANSMIT-003582 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000140<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000098 WHOS-TRANSMIT-003582 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000140<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000098 WHOS-TRANSMIT-003582 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000140<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000098 WHOS-TRANSMIT-003582 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000140<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000098 WHOS-TRANSMIT-003582 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000140<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000098 WHOS-TRANSMIT-003582 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000140<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000098 WHOS-TRANSMIT-003582 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000140<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000098 WHOS-TRANSMIT-003582 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000140<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000098 WHOS-TRANSMIT-003582 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000140<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000098 WHOS-TRANSMIT-003582 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000141<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000098 WHOS-TRANSMIT-003582 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000141<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000098 WHOS-TRANSMIT-003582 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000141<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000098 WHOS-TRANSMIT-003582 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000141<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000098 WHOS-TRANSMIT-003582 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000141<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000098 WHOS-TRANSMIT-003582 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000141<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000098 WHOS-TRANSMIT-003582 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000141<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000098 WHOS-TRANSMIT-003582 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000141<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000098 WHOS-TRANSMIT-003582 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000141<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000098 WHOS-TRANSMIT-003582 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000141<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000098 WHOS-TRANSMIT-003582 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000141<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000098 WHOS-TRANSMIT-003582 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000141<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000098 WHOS-TRANSMIT-003582 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000141<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000099 WHOS-TRANSMIT-003583 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000141<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000099 WHOS-TRANSMIT-003583 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000141<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000099 WHOS-TRANSMIT-003583 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000141<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000099 WHOS-TRANSMIT-003583 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000141<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000099 WHOS-TRANSMIT-003583 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000141<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000099 WHOS-TRANSMIT-003583 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000141<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000099 WHOS-TRANSMIT-003583 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000141<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000099 WHOS-TRANSMIT-003583 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000141<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000099 WHOS-TRANSMIT-003583 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000141<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000099 WHOS-TRANSMIT-003583 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000141<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000099 WHOS-TRANSMIT-003583 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000141<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000099 WHOS-TRANSMIT-003583 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000141


Mero Asia Pacific Pte Ltd<br />

STATUS :<br />

APP - Approved<br />

AWC - Approved with Comments - Resubmission Required<br />

RR - Revise and Resubmit Required<br />

as of 15 August 2016<br />

SHOP DRAWING LIST BREAKDOWN<br />

1ST SUBMISSION<br />

REV.0<br />

2ND SUBMISSION<br />

REV.A1<br />

NO.<br />

DRAWING NO.<br />

DESCRIPTION OF DRAWINGS<br />

MERO - TRANSMITTAL<br />

WHOS - WORKFLOW<br />

MERO - TRANSMITTAL<br />

WHOS - WORKFLOW<br />

REMARKS<br />

SUBMISSION<br />

SUBMISSION<br />

APPROVAL<br />

SUBMISSION<br />

SUBMISSION<br />

APPROVAL<br />

DATE MERO ACONEX DATE WHOS ACONEX DATE DRAWING<br />

DATE MERO ACONEX DATE WHOS ACONEX DATE<br />

REV<br />

REV<br />

TRANSMITTAL NO.<br />

TRANSMITTAL NO.<br />

STATUS<br />

TRANSMITTAL NO.<br />

TRANSMITTAL NO.<br />

TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL<br />

DRAWING<br />

STATUS<br />

113 JWL_C_MERO_FAC_SD_WT1_5_5023<br />

114 JWL_C_MERO_FAC_SD_WT1_5_5024<br />

115 JWL_C_MERO_FAC_SD_WT1_5_5025<br />

116 JWL_C_MERO_FAC_SD_WT1_5_5026<br />

117 JWL_C_MERO_FAC_SD_WT1_5_5027<br />

118 JWL_C_MERO_FAC_SD_WT1_5_5028<br />

119 JWL_C_MERO_FAC_SD_WT1_5_5029<br />

120 JWL_C_MERO_FAC_SD_WT1_5_5030<br />

121 JWL_C_MERO_FAC_SD_WT1_5_5031<br />

122 JWL_C_MERO_FAC_SD_WT1_5_5032<br />

123 JWL_C_MERO_FAC_SD_WT1_5_5033<br />

124 JWL_C_MERO_FAC_SD_WT1_5_5034<br />

125 JWL_C_MERO_FAC_SD_WT1_5_5035<br />

126 JWL_C_MERO_FAC_SD_WT1_5_5036<br />

WT-01 SHOP DRAWING (QUADRANT D) NORTH-WEST 5TH STOREY PARTIAL<br />

LAYOUT PLAN (GL-C~G / GL-3~7)<br />

WT-01 SHOP DRAWING (QUADRANT D) NORTH-WEST 5TH STOREY PARTIAL<br />

LAYOUT PLAN (GL-B~E / GL-7~11)<br />

WT-01 SHOP DRAWING (QUADRANT D) NORTH-WEST 5TH STOREY TYPICAL<br />

INTERFACE DETAIL AT SECTION-1 GRIDLINE R11-W<br />

WT-01 SHOP DRAWING (QUADRANT D) NORTH-WEST 5TH STOREY CONNECTION<br />

SECTION DETAIL AT GRID LINE-N/2<br />

WT-01 SHOP DRAWING (QUADRANT D) NORTH-WEST 5TH STOREY TYPICAL<br />

INTERFACE DETAIL AT SECTION-2 GRIDLINE R10-W<br />

WT-01 SHOP DRAWING (QUADRANT D)NORTH-WEST 5TH STOREY CONNECTION<br />

SECTION DETAIL AT GRID LINE-L/2<br />

WT-01 SHOP DRAWING (QUADRANT D) NORTH-WEST 5TH STOREY TYPICAL<br />

INTERFACE DETAIL AT SECTION-3 GRIDLINE R9-W<br />

WT-01 SHOP DRAWING (QUADRANT D) NORTH-WEST 5TH STOREY CONNECTION<br />

SECTION DETAIL AT GRID LINE-K/2<br />

WT-01 SHOP DRAWINGS (QUADRANT D) NORTH-WEST 5TH STOREY CONNECTION<br />

SECTION DETAIL AT GRID LINE-H/3<br />

WT-01 SHOP DRAWINGS (QUADRANT D) NORTH-WEST COMPOSITE PANEL<br />

INTERFACE WITH RING BEAM AT 5TH STOREY<br />

WT-01 SHOP DRAWINGS (QUADRANT D) NORTH-WEST 5TH STOREY CONNECTION<br />

SECTION DETAIL AT GRID LINE-E/5<br />

WT-01 SHOP DRAWINGS (QUADRANT D) NORTH-WEST COMPOSITE PANEL<br />

INTERFACE WITH RING BEAM AT 5TH STOREY @ GRIDLINE R5-W<br />

WT-01 SHOP DRAWINGS (QUADRANT D) NORTH-WEST 5TH STOREY CONNECTION<br />

SECTION DETAIL AT GRID LINE-D/8<br />

WT-01 SHOP DRAWINGS (QUADRANT D) NORTH-WEST 5TH STOREY CONNECTION<br />

SECTION DETAIL AT GRID LINE-C/9<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000099 WHOS-TRANSMIT-003583 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000142<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000099 WHOS-TRANSMIT-003583 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000142<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000099 WHOS-TRANSMIT-003583 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000142<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000099 WHOS-TRANSMIT-003583 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000142<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000099 WHOS-TRANSMIT-003583 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000142<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000099 WHOS-TRANSMIT-003583 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000142<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000099 WHOS-TRANSMIT-003583 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000142<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000099 WHOS-TRANSMIT-003583 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000142<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000099 WHOS-TRANSMIT-003583 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000142<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000099 WHOS-TRANSMIT-003583 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000142<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000099 WHOS-TRANSMIT-003583 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000142<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000099 WHOS-TRANSMIT-003583 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000142<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000099 WHOS-TRANSMIT-003583 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000142<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000100 WHOS-TRANSMIT-003583 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000142<br />

127 JWL_C_MERO_FAC_SD_WT1_AL_8080 WT-01 SHOP DRAWING OVERALL PLAN - QUADRANT D 0 10.05.16 20.05.16 MERO-TRANSMIT-000100 WHOS-TRANSMIT-003584 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000142<br />

128 JWL_C_MERO_FAC_SD_WT1_AL_8081 WT-01 SHOP DRAWING ISOMETRIC - QUADRANT D 0 10.05.16 20.05.16 MERO-TRANSMIT-000100 WHOS-TRANSMIT-003584 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000142<br />

129 JWL_C_MERO_FAC_SD_WT1_AL_8082 WT-01 SHOP DRAWING PARTIAL ELEVATION - QUADRANT D 0 10.05.16 20.05.16 MERO-TRANSMIT-000100 WHOS-TRANSMIT-003584 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000142<br />

130 JWL_C_MERO_FAC_SD_WT1_AL_8083 WT-01 SHOP DRAWING NORTH-WEST BRACKET LAYOUT (QUADRANT D) 0 10.05.16 20.05.16 MERO-TRANSMIT-000100 WHOS-TRANSMIT-003584 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000142<br />

131 JWL_C_MERO_FAC_SD_WT1_AL_8084 WT-01 SHOP DRAWING NORTH-WEST JOINT SCHEDULE LAYOUT (QUADRANT D) 0 10.05.16 20.05.16 MERO-TRANSMIT-000100 WHOS-TRANSMIT-003584 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000142<br />

132 JWL_C_MERO_FAC_SD_WT1_AL_8085<br />

133 JWL_C_MERO_FAC_SD_WT1_AL_8086<br />

134 JWL_C_MERO_FAC_SD_WT1_AL_8087<br />

135 JWL_C_MERO_FAC_SD_WT1_AL_8088<br />

136 JWL_C_MERO_FAC_SD_WT1_AL_8089<br />

137 JWL_C_MERO_FAC_SD_WT1_AL_8090<br />

138 JWL_C_MERO_FAC_SD_WT1_AL_8091<br />

139 JWL_C_MERO_FAC_SD_WT1_AL_8092<br />

140 JWL_C_MERO_FAC_SD_WT1_AL_8093<br />

141 JWL_C_MERO_FAC_SD_WT1_AL_8094<br />

142 JWL_C_MERO_FAC_SD_WT1_AL_8095<br />

143 JWL_C_MERO_FAC_SD_WT1_AL_8096<br />

144 JWL_C_MERO_FAC_SD_WT1_AL_8097<br />

145 JWL_C_MERO_FAC_SD_WT1_AL_8098<br />

146 JWL_C_MERO_FAC_SD_WT1_AL_8099<br />

147 JWL_C_MERO_FAC_SD_WT1_AL_8100<br />

148 JWL_C_MERO_FAC_SD_WT1_AL_8101<br />

149 JWL_C_MERO_FAC_SD_WT1_AL_8102<br />

150 JWL_C_MERO_FAC_SD_WT1_AL_8103<br />

C.2 WT-01 QUADRANT - A<br />

1 JWL_C_MERO_FAC_DL_WT1_AL_2001<br />

2 JWL_C_MERO_FAC_DL_WT1_AL_2010<br />

3 JWL_C_MERO_FAC_DL_WT1_AL_2020<br />

WT-01 SHOP DRAWING NORTH-WEST STEEL MEMBER SCHEDULE LAYOUT<br />

(QUADRANT D)<br />

WT-01 SHOP DRAWING (QUADRANT D) NORTH-WEST OVERALL SECTIONS -<br />

SHEET 1<br />

WT-01 SHOP DRAWING (QUADRANT D) NORTH-WEST OVERALL SECTIONS -<br />

SHEET 2 (R8W-R6W)<br />

WT-01 SHOP DRAWING (QUADRANT D) NORTH-WEST OVERALL SECTIONS -<br />

SHEET 3 (R5W-R3W)<br />

WT-01 SHOP DRAWINGS (QUADRANT D) NORTH-WEST NODE MEMBER JOINT<br />

SCHEDULE LAYOUT<br />

WT-01 SHOP DRAWINGS (QUADRANT D) NORTH-WEST TYPICAL BRACKET<br />

SECTION DETAIL GLASS TO GLASS PANEL JOINT DETAIL<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) ALUM. COMPOSITE PANEL TO ALUM.<br />

COMPOSITE PANEL JOINT DETAILS<br />

WT-01 SHOP DRAWINGS (QUADRANT D) NORTH-WEST TYPICAL BRACKET<br />

SECTION DETAIL GLASS TO COMPOSITE PANEL JOINTS<br />

WT-01 SHOP DRAWINGS (QUADRANT D) NORTH-WEST TYPICAL BRACKET<br />

SECTION DETAIL GLASS TO LOUVER PANEL JOINTS<br />

WT-01 SHOP DRAWINGS (QUADRANT D) NORTH-WEST TYPICAL BRACKET<br />

SECTION DETAIL COMPOSITE PANEL TO LOUVER PANEL JOINTS<br />

WT-01 SHOP DRAWINGS (QUADRANT D) TYPICAL LOUVER JOINT CONNECTION<br />

DETAILS<br />

WT-01 SHOP DRAWINGS (QUADRANT D) NORTH-WEST TYPICAL BRACKET<br />

SECTION DETAIL GLASS WITH BACKPAN TO COMPOSITE PANEL JOINTS<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) FIN CONNECTION DETAILS (ALUM.<br />

COMPOSITE PANEL - DGU GLASS PANEL)<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) FIN CONNECTION DETAILS (FAP GLASS -<br />

DGU GLASS PANEL)<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) FIN CONNECTION DETAILS (FAP GLASS -<br />

ALUMINUM COMPOSITE PANEL)<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) FIN CONNECTION DETAILS (ALUM.<br />

COMPOSITE PANEL JOINT)<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) FIN CONNECTION DETAILS (ALUM.<br />

COMPOSITE PANEL - DGU GLASS PANEL WITH BACK PAN)<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) FIN CONNECTION DETAILS WITHOUT PIPE<br />

(ALUM. COMPOSITE PANEL - DGU GLASS PANEL)<br />

WT-01 SHOPDRAWINGS (QUADRANT-D) FIN CONNECTION DETAILS WITHOUT PIPE<br />

(ALUM. COMPOSITE PANEL JOINT)<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST - GLASS MATERIAL LIST -<br />

SHEET-1<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST - GASKET MATERIAL LIST -<br />

SHEET-1<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST - ALUMINUM PROFILE<br />

MATERIAL LIST - SHEET-1<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000100 WHOS-TRANSMIT-003584 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000142<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000100 WHOS-TRANSMIT-003584 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000142<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000100 WHOS-TRANSMIT-003584 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000142<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000100 WHOS-TRANSMIT-003584 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000142<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000100 WHOS-TRANSMIT-003584 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000142<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000100 WHOS-TRANSMIT-003584 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000142<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000100 WHOS-TRANSMIT-003584 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000143<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000100 WHOS-TRANSMIT-003584 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000143<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000100 WHOS-TRANSMIT-003584 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000143<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000100 WHOS-TRANSMIT-003584 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000143<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000100 WHOS-TRANSMIT-003584 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000143<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000100 WHOS-TRANSMIT-003584 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000143<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000100 WHOS-TRANSMIT-003584 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000143<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000100 WHOS-TRANSMIT-003584 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000143<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000100 WHOS-TRANSMIT-003584 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000143<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000100 WHOS-TRANSMIT-003584 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000143<br />

0 10.05.16 20.05.16 MERO-TRANSMIT-000100 WHOS-TRANSMIT-003584 10.06.16 07.07.16 AWC RR A1 27.07.16 12.08.16 MERO-TRANSMIT-000143<br />

0 27.07.16 12.08.16 MERO-TRANSMIT-000143<br />

0 27.07.16 12.08.16 MERO-TRANSMIT-000143<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000107 WHOS-TRANSMIT-003754 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000107 WHOS-TRANSMIT-003754 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000107 WHOS-TRANSMIT-003754 12.07.16 21.07.16 RR


Mero Asia Pacific Pte Ltd<br />

STATUS :<br />

APP - Approved<br />

AWC - Approved with Comments - Resubmission Required<br />

RR - Revise and Resubmit Required<br />

as of 15 August 2016<br />

SHOP DRAWING LIST BREAKDOWN<br />

1ST SUBMISSION<br />

REV.0<br />

2ND SUBMISSION<br />

REV.A1<br />

NO.<br />

DRAWING NO.<br />

DESCRIPTION OF DRAWINGS<br />

MERO - TRANSMITTAL<br />

WHOS - WORKFLOW<br />

MERO - TRANSMITTAL<br />

WHOS - WORKFLOW<br />

REMARKS<br />

SUBMISSION<br />

SUBMISSION<br />

APPROVAL<br />

SUBMISSION<br />

SUBMISSION<br />

APPROVAL<br />

DATE MERO ACONEX DATE WHOS ACONEX DATE DRAWING<br />

DATE MERO ACONEX DATE WHOS ACONEX DATE<br />

REV<br />

REV<br />

TRANSMITTAL NO.<br />

TRANSMITTAL NO.<br />

STATUS<br />

TRANSMITTAL NO.<br />

TRANSMITTAL NO.<br />

TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL<br />

DRAWING<br />

STATUS<br />

4 JWL_C_MERO_FAC_DL_WT1_AL_2030<br />

5 JWL_C_MERO_FAC_DL_WT1_AL_2040<br />

6 JWL_C_MERO_FAC_DL_WT1_AL_2050<br />

7 JWL_C_MERO_FAC_SD_WT1_1_1250<br />

8 JWL_C_MERO_FAC_SD_WT1_1_1251<br />

9 JWL_C_MERO_FAC_SD_WT1_1_1252<br />

10 JWL_C_MERO_FAC_SD_WT1_1_1253<br />

11 JWL_C_MERO_FAC_SD_WT1_1_1254<br />

12 JWL_C_MERO_FAC_SD_WT1_2_2200<br />

13 JWL_C_MERO_FAC_SD_WT1_2_2201<br />

14 JWL_C_MERO_FAC_SD_WT1_2_2202<br />

15 JWL_C_MERO_FAC_SD_WT1_2_2203<br />

16 JWL_C_MERO_FAC_SD_WT1_2_2204<br />

17 JWL_C_MERO_FAC_SD_WT1_2_2250<br />

18 JWL_C_MERO_FAC_SD_WT1_2_2251<br />

19 JWL_C_MERO_FAC_SD_WT1_2_2252<br />

20 JWL_C_MERO_FAC_SD_WT1_2_2255<br />

21 JWL_C_MERO_FAC_SD_WT1_2_2256<br />

22 JWL_C_MERO_FAC_SD_WT1_2_2257<br />

23 JWL_C_MERO_FAC_SD_WT1_2_2258<br />

24 JWL_C_MERO_FAC_SD_WT1_2_2259<br />

25 JWL_C_MERO_FAC_SD_WT1_2_2260<br />

26 JWL_C_MERO_FAC_SD_WT1_2_2261<br />

27 JWL_C_MERO_FAC_SD_WT1_3_3200<br />

28 JWL_C_MERO_FAC_SD_WT1_3_3201<br />

29 JWL_C_MERO_FAC_SD_WT1_3_3202<br />

30 JWL_C_MERO_FAC_SD_WT1_3_3203<br />

31 JWL_C_MERO_FAC_SD_WT1_3_3204<br />

32 JWL_C_MERO_FAC_SD_WT1_3_3250<br />

33 JWL_C_MERO_FAC_SD_WT1_3_3251<br />

34 JWL_C_MERO_FAC_SD_WT1_3_3252<br />

35 JWL_C_MERO_FAC_SD_WT1_3_3253<br />

36 JWL_C_MERO_FAC_SD_WT1_3_3254<br />

37 JWL_C_MERO_FAC_SD_WT1_3_3255<br />

38 JWL_C_MERO_FAC_SD_WT1_3_3256<br />

39 JWL_C_MERO_FAC_SD_WT1_3_3257<br />

40 JWL_C_MERO_FAC_SD_WT1_3_3258<br />

41 JWL_C_MERO_FAC_SD_WT1_3_3259<br />

42 JWL_C_MERO_FAC_SD_WT1_3_3260<br />

43 JWL_C_MERO_FAC_SD_WT1_3_3261<br />

44 JWL_C_MERO_FAC_SD_WT1_3_3262<br />

45 JWL_C_MERO_FAC_SD_WT1_3_3263<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST - FASTENERS MATERIAL<br />

LIST - SHEET-1<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST - MISCELLANEOUS<br />

MATERIAL LIST - SHEET-1<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST - STEEL MEMBER<br />

MATERIAL LIST - SHEET-1<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 1ST STOREY SLAB<br />

INTERFACE DETAIL (ACP W/FLASHING)<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 1ST STOREY SECTION<br />

DETAIL (ACP TO ACP TO ACP) W/ FIN AT SECTION-14<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 1ST STOREY SECTION<br />

DETAIL (ACP TO ACP TO LOUVER) W/ FIN AT SECTION-15<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 1ST STOREY SECTION<br />

DETAIL (ACP TO ACP TO ACP) AT SECTION-16 & 18<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 1ST STOREY SECTION<br />

DETAIL (ACP TO ACP TO LOUVER) AT SECTION-17<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 2ND STOREY OVERALL<br />

PLAN<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 2ND STOREY PARTIAL<br />

LAYOUT PLAN (GL-B~E / GL-18~22)<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 2ND STOREY PARTIAL<br />

LAYOUT PLAN (GL-D~F/ GL-21.1~26)<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 2ND STOREY PARTIAL<br />

LAYOUT PLAN (GL-G~K/ GL-24.1~28)<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 2ND STOREY PARTIAL<br />

LAYOUT PLAN (GL-CL3~P/ GL-24.1~28)<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 2ND STOREY SLAB<br />

INTERFACE DETAIL (ACP W/ FLASHING) AT SECTION-10 & 11<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 2ND STOREY BRACKET<br />

SECTION DETAIL (ACP TO ACP TO ACP) W/ FIN AT SECTION-10<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 2ND STOREY SECTION<br />

DETAIL (DOOR CLADDING TO ACP TO ACP) W/ FIN AT SECTION-11<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 2ND STOREY ABOVE<br />

TRANSFER SLAB INTERFACE DETAIL (ACP W/ FLASHING)<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 2ND STOREY ABOVE<br />

TRANSFER SLAB BLOW-UP DETAIL (ACP W/ FLASHING)<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 2ND STOREY ABOVE<br />

TRANSFER SLAB INTERFACE DETAIL (ACP W/ FLASHING) W/O BRACKET<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 2ND STOREY SLAB<br />

INTERFACE DETAIL (ACP TO ACP) AT SECTION-14 & 15<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 2ND STOREY BRACKET<br />

SECTION DETAIL (ACP TO ACP TO ACP) W/ FIN AT SECTION-14 & 15<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 2ND STOREY SLAB<br />

INTERFACE DETAIL (ACP TO ACP) W/O BRACKET AT SECTION-16~18<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 2ND STOREY SECTION<br />

DETAIL (ACP TO ACP TO ACP) W/O BRACKET AT SECTION-16~18<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 3RD STOREY OVERALL<br />

PLAN<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 3RD STOREY PARTIAL<br />

LAYOUT PLAN (GL-B~E / GL-18~23)<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 3RD STOREY PARTIAL<br />

LAYOUT PLAN (GL-D~G/ GL-23~26)<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 3RD STOREY PARTIAL<br />

LAYOUT PLAN (GL-G~K/ GL-24.1~28)<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 3RD STOREY PARTIAL<br />

LAYOUT PLAN (GL-CL3~P/ GL-24.1~28)<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 3RD STOREY SLAB<br />

INTERFACE DETAIL (ACP TO ACP) W/O BRACKET AT SECTION-10<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 3RD STOREY SECTION<br />

DETAIL (DGU TO ACP TO ACP) W/O BRACKET AT SECTION-10<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 3RD STOREY SLAB<br />

INTERFACE DETAIL (ACP TO ACP) W/O BRACKET AT SECTION-11<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 3RD STOREY SECTION<br />

DETAIL (ACP TO ACP TO FAP) W/O BRACKET AT SECTION-11<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 3RD STOREY SLAB<br />

INTERFACE DETAIL (ACP TO LOUVER) AT SECTION-12<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 3RD STOREY BRACKET<br />

SECTION DETAIL (FAP TO ACP TO ACP) AT SECTION-12<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 3RD STOREY SLAB<br />

INTERFACE DETAIL (ACP TO ACP) W/O BRACKET AT SECTION-13<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 3RD STOREY SECTION<br />

DETAIL (FAP TO ACP TO ACP) W/O BRACKET AT SECTION-13<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 3RD STOREY SLAB<br />

INTERFACE DETAIL (ACP TO ACP) W/O BRACKET AT SECTION-14<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 3RD STOREY SECTION<br />

DETAIL (ACP TO ACP TO ACP) W/O BRACKET AT SECTION-14<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 3RD STOREY SLAB<br />

INTERFACE DETAIL (DGU W/ BP TO ACP) W/O BRACKET AT SECTION-15<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 3RD STOREY SECTION<br />

DETAIL (ACP TO DGU W/ BP TO DGU W/ BP) W/O BRACKET AT SECTION-15<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 3RD STOREY SLAB<br />

INTERFACE DETAIL (FAP TO ACP) W/ FIN AT SECTION-16<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 3RD STOREY BRACKET<br />

SECTION DETAIL (ACP TO FAP TO ACP) W/ FIN AT SECTION-16<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000107 WHOS-TRANSMIT-003754 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000107 WHOS-TRANSMIT-003754 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000107 WHOS-TRANSMIT-003754 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000107 WHOS-TRANSMIT-003754 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000107 WHOS-TRANSMIT-003754 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000107 WHOS-TRANSMIT-003754 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000107 WHOS-TRANSMIT-003754 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000107 WHOS-TRANSMIT-003754 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000107 WHOS-TRANSMIT-003754 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000107 WHOS-TRANSMIT-003754 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000107 WHOS-TRANSMIT-003754 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000107 WHOS-TRANSMIT-003754 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000107 WHOS-TRANSMIT-003754 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000107 WHOS-TRANSMIT-003754 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000107 WHOS-TRANSMIT-003754 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000107 WHOS-TRANSMIT-003754 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000107 WHOS-TRANSMIT-003754 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000107 WHOS-TRANSMIT-003754 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000107 WHOS-TRANSMIT-003754 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000107 WHOS-TRANSMIT-003754 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000107 WHOS-TRANSMIT-003754 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000107 WHOS-TRANSMIT-003754 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000108 WHOS-TRANSMIT-003755 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000108 WHOS-TRANSMIT-003755 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000108 WHOS-TRANSMIT-003755 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000108 WHOS-TRANSMIT-003755 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000108 WHOS-TRANSMIT-003755 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000108 WHOS-TRANSMIT-003755 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000108 WHOS-TRANSMIT-003755 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000108 WHOS-TRANSMIT-003755 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000108 WHOS-TRANSMIT-003755 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000108 WHOS-TRANSMIT-003755 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000108 WHOS-TRANSMIT-003755 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000108 WHOS-TRANSMIT-003755 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000108 WHOS-TRANSMIT-003755 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000108 WHOS-TRANSMIT-003755 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000108 WHOS-TRANSMIT-003755 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000108 WHOS-TRANSMIT-003755 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000108 WHOS-TRANSMIT-003755 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000108 WHOS-TRANSMIT-003755 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000108 WHOS-TRANSMIT-003755 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000108 WHOS-TRANSMIT-003755 12.07.16 21.07.16 RR


Mero Asia Pacific Pte Ltd<br />

STATUS :<br />

APP - Approved<br />

AWC - Approved with Comments - Resubmission Required<br />

RR - Revise and Resubmit Required<br />

as of 15 August 2016<br />

SHOP DRAWING LIST BREAKDOWN<br />

1ST SUBMISSION<br />

REV.0<br />

2ND SUBMISSION<br />

REV.A1<br />

NO.<br />

DRAWING NO.<br />

DESCRIPTION OF DRAWINGS<br />

MERO - TRANSMITTAL<br />

WHOS - WORKFLOW<br />

MERO - TRANSMITTAL<br />

WHOS - WORKFLOW<br />

REMARKS<br />

SUBMISSION<br />

SUBMISSION<br />

APPROVAL<br />

SUBMISSION<br />

SUBMISSION<br />

APPROVAL<br />

DATE MERO ACONEX DATE WHOS ACONEX DATE DRAWING<br />

DATE MERO ACONEX DATE WHOS ACONEX DATE<br />

REV<br />

REV<br />

TRANSMITTAL NO.<br />

TRANSMITTAL NO.<br />

STATUS<br />

TRANSMITTAL NO.<br />

TRANSMITTAL NO.<br />

TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL<br />

DRAWING<br />

STATUS<br />

46 JWL_C_MERO_FAC_SD_WT1_3_3264<br />

47 JWL_C_MERO_FAC_SD_WT1_3_3265<br />

48 JWL_C_MERO_FAC_SD_WT1_3_3266<br />

49 JWL_C_MERO_FAC_SD_WT1_3_3267<br />

50 JWL_C_MERO_FAC_SD_WT1_4_4200<br />

51 JWL_C_MERO_FAC_SD_WT1_4_4201<br />

52 JWL_C_MERO_FAC_SD_WT1_4_4202<br />

53 JWL_C_MERO_FAC_SD_WT1_4_4203<br />

54 JWL_C_MERO_FAC_SD_WT1_4_4204<br />

55 JWL_C_MERO_FAC_SD_WT1_4_4250<br />

56 JWL_C_MERO_FAC_SD_WT1_4_4251<br />

57 JWL_C_MERO_FAC_SD_WT1_4_4252<br />

58 JWL_C_MERO_FAC_SD_WT1_4_4253<br />

59 JWL_C_MERO_FAC_SD_WT1_4_4254<br />

60 JWL_C_MERO_FAC_SD_WT1_4_4255<br />

61 JWL_C_MERO_FAC_SD_WT1_4_4256<br />

62 JWL_C_MERO_FAC_SD_WT1_4_4257<br />

63 JWL_C_MERO_FAC_SD_WT1_4_4258<br />

64 JWL_C_MERO_FAC_SD_WT1_4_4259<br />

65 JWL_C_MERO_FAC_SD_WT1_4_4260<br />

66 JWL_C_MERO_FAC_SD_WT1_4_4261<br />

67 JWL_C_MERO_FAC_SD_WT1_4_4262<br />

68 JWL_C_MERO_FAC_SD_WT1_4_4263<br />

69 JWL_C_MERO_FAC_SD_WT1_4_4264<br />

70 JWL_C_MERO_FAC_SD_WT1_4_4265<br />

71 JWL_C_MERO_FAC_SD_WT1_5_5200<br />

72 JWL_C_MERO_FAC_SD_WT1_5_5201<br />

73 JWL_C_MERO_FAC_SD_WT1_5_5202<br />

74 JWL_C_MERO_FAC_SD_WT1_5_5203<br />

75 JWL_C_MERO_FAC_SD_WT1_5_5204<br />

76 JWL_C_MERO_FAC_SD_WT1_5_5250<br />

77 JWL_C_MERO_FAC_SD_WT1_5_5251<br />

78 JWL_C_MERO_FAC_SD_WT1_5_5252<br />

79 JWL_C_MERO_FAC_SD_WT1_5_5253<br />

80 JWL_C_MERO_FAC_SD_WT1_5_5254<br />

81 JWL_C_MERO_FAC_SD_WT1_5_5255<br />

82 JWL_C_MERO_FAC_SD_WT1_5_5256<br />

83 JWL_C_MERO_FAC_SD_WT1_5_5257<br />

84 JWL_C_MERO_FAC_SD_WT1_5_5258<br />

85 JWL_C_MERO_FAC_SD_WT1_5_5259<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 3RD STOREY SLAB<br />

INTERFACE DETAIL (ACP TO LOUVER) W/ FIN AT SECTION-17<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 3RD STOREY BRACKET<br />

SECTION DETAIL (ACP TO ACP TO ACP) W/ FIN AT SECTION-17<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 3RD STOREY SLAB<br />

INTERFACE DETAIL (DGU TO ACP) W/ FIN AT SECTION-18<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 3RD STOREY BRACKET<br />

SECTION DETAIL (ACP TO DGU TO DGU) W/ FIN AT SECTION-18<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 4TH STOREY OVERALL<br />

PLAN<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 4TH STOREY PARTIAL<br />

LAYOUT PLAN (GL-B~E / GL-18~23)<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 4TH STOREY PARTIAL<br />

LAYOUT PLAN (GL-D~G/ GL-23~26)<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 4TH STOREY PARTIAL<br />

LAYOUT PLAN (GL-G~CL3/ GL-24.1~28)<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 4TH STOREY PARTIAL<br />

LAYOUT PLAN (GL-CL3~P/ GL-24.1~28)<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 4TH STOREY SLAB<br />

INTERFACE DETAIL (ACP TO ACP) W/ FIN AT SECTION-10<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 4TH STOREY BRACKET<br />

SECTION DETAIL (DGU W/ BP TO ACP TO ACP) W/ FIN AT SECTION-10<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 4TH STOREY SLAB<br />

INTERFACE DETAIL (ACP TO ACP) W/ FIN AT SECTION-11<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 4TH STOREY BRACKET<br />

SECTION DETAIL (ACP TO ACP TO DGU W/ BP) W/ FIN AT SECTION-11<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 4TH STOREY SLAB<br />

INTERFACE DETAIL (FAP TO ACP) W/ FIN AT SECTION-12<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 4TH STOREY BRACKET<br />

SECTION DETAIL (ACP TO FAP TO ACP) W/ FIN AT SECTION-12<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 4TH STOREY SLAB<br />

INTERFACE DETAIL (ACP TO ACP) W/ FIN AT SECTION-13 & 15<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 4TH STOREY BRACKET<br />

SECTION DETAIL (DGU W/ BP TO ACP TO ACP) W/ FIN AT SECTION-13<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 4TH STOREY SLAB<br />

INTERFACE DETAIL (DGU W/ BP TO ACP) W/ FIN AT SECTION-14<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 4TH STOREY BRACKET<br />

SECTION DETAIL (ACP TO DGU W/ BP TO ACP) W/ FIN AT SECTION-14<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 4TH STOREY BRACKET<br />

SECTION DETAIL (ACP TO ACP TO FAP) W/ FIN AT SECTION-15<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 4TH STOREY SLAB<br />

INTERFACE DETAIL (ACP TO ACP) W/O BRACKET AT SECTION-16 & 18<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 4TH STOREY SECTION<br />

DETAIL (ACP TO ACP TO ACP) W/O BRACKET AT SECTION-16<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 4TH STOREY SLAB<br />

INTERFACE DETAIL (DGU W/ BP TO ACP) W/O BRACKET AT SECTION-17<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 4TH STOREY SECTION<br />

DETAIL (DGU W/ BP TO DGU W/ BP TO ACP) W/O BRACKET AT SECTION-17<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 4TH STOREY SECTION<br />

DETAIL (ACP TO ACP TO FAP) W/O BRACKET AT SECTION-18<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 5TH STOREY OVERALL<br />

PLAN<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 5TH STOREY PARTIAL<br />

LAYOUT PLAN (GL-B~E / GL-18~23)<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 5TH STOREY PARTIAL<br />

LAYOUT PLAN (GL-D~G/ GL-23~26)<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 5TH STOREY PARTIAL<br />

LAYOUT PLAN (GL-G~K/ GL-24~27)<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 5TH STOREY PARTIAL<br />

LAYOUT PLAN (GL-CL3~P/ GL-24.1~28)<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 5TH STOREY RING BEAM<br />

INTERFACE DETAIL (ACP TO LOUVER) AT SECTION-10<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 5TH STOREY RING BEAM<br />

TYPICAL CONNECTION BRACKET DETAIL AT SECTION-10~18<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 5TH STOREY RING BEAM<br />

INTERFACE DETAIL (DGU TO LOUVER) AT SECTION-11<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 5TH STOREY RING BEAM<br />

INTERFACE DETAIL (ACP TO ACP) AT SECTION-12<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 5TH STOREY RING BEAM<br />

INTERFACE DETAIL (ACP TO LOUVER) AT SECTION-13<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 5TH STOREY RING BEAM<br />

INTERFACE DETAIL (ACP TO ACP) AT SECTION-14<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 5TH STOREY RING BEAM<br />

INTERFACE DETAIL (ACP TO ACP) AT SECTION-15<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 5TH STOREY RING BEAM<br />

INTERFACE DETAIL (ACP TO ACP) W/ FIN AT SECTION-16<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 5TH STOREY RING BEAM<br />

INTERFACE DETAIL (DGU TO ACP) W/ FIN AT SECTION-17<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST 5TH STOREY RING BEAM<br />

INTERFACE DETAIL (DGU TO ACP) W/ FIN AT SECTION-18<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000108 WHOS-TRANSMIT-003755 12.07.16 21.07.16<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000108 WHOS-TRANSMIT-003755 12.07.16 21.07.16<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000108 WHOS-TRANSMIT-003755 12.07.16 21.07.16<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000108 WHOS-TRANSMIT-003755 12.07.16 21.07.16<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000108 WHOS-TRANSMIT-003755 12.07.16 21.07.16<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000109 WHOS-TRANSMIT-003756 12.07.16 21.07.16<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000109 WHOS-TRANSMIT-003756 12.07.16 21.07.16<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000109 WHOS-TRANSMIT-003756 12.07.16 21.07.16<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000109 WHOS-TRANSMIT-003756 12.07.16 21.07.16<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000109 WHOS-TRANSMIT-003756 12.07.16 21.07.16<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000109 WHOS-TRANSMIT-003756 12.07.16 21.07.16<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000109 WHOS-TRANSMIT-003756 12.07.16 21.07.16<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000109 WHOS-TRANSMIT-003756 12.07.16 21.07.16<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000109 WHOS-TRANSMIT-003756 12.07.16 21.07.16<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000109 WHOS-TRANSMIT-003756 12.07.16 21.07.16<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000109 WHOS-TRANSMIT-003756 12.07.16 21.07.16<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000109 WHOS-TRANSMIT-003756 12.07.16 21.07.16<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000109 WHOS-TRANSMIT-003756 12.07.16 21.07.16<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000109 WHOS-TRANSMIT-003756 12.07.16 21.07.16<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000109 WHOS-TRANSMIT-003756 12.07.16 21.07.16<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000109 WHOS-TRANSMIT-003756 12.07.16 21.07.16<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000109 WHOS-TRANSMIT-003756 12.07.16 21.07.16<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000109 WHOS-TRANSMIT-003756 12.07.16 21.07.16<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000109 WHOS-TRANSMIT-003756 12.07.16 21.07.16<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000109 WHOS-TRANSMIT-003756 12.07.16 21.07.16<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000109 WHOS-TRANSMIT-003756 12.07.16 21.07.16<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000109 WHOS-TRANSMIT-003756 12.07.16 21.07.16<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000109 WHOS-TRANSMIT-003756 12.07.16 21.07.16<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000109 WHOS-TRANSMIT-003756 12.07.16 21.07.16<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000109 WHOS-TRANSMIT-003756 12.07.16 21.07.16<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000110 WHOS-TRANSMIT-003757 12.07.16 21.07.16<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000110 WHOS-TRANSMIT-003757 12.07.16 21.07.16<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000110 WHOS-TRANSMIT-003757 12.07.16 21.07.16<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000110 WHOS-TRANSMIT-003757 12.07.16 21.07.16<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000110 WHOS-TRANSMIT-003757 12.07.16 21.07.16<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000110 WHOS-TRANSMIT-003757 12.07.16 21.07.16<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000110 WHOS-TRANSMIT-003757 12.07.16 21.07.16<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000110 WHOS-TRANSMIT-003757 12.07.16 21.07.16<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000110 WHOS-TRANSMIT-003757 12.07.16 21.07.16<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000110 WHOS-TRANSMIT-003757 12.07.16 21.07.16<br />

RR<br />

RR<br />

RR<br />

RR<br />

RR<br />

RR<br />

RR<br />

RR<br />

RR<br />

RR<br />

RR<br />

RR<br />

RR<br />

RR<br />

RR<br />

RR<br />

RR<br />

RR<br />

RR<br />

RR<br />

RR<br />

RR<br />

RR<br />

RR<br />

RR<br />

RR<br />

RR<br />

RR<br />

RR<br />

RR<br />

RR<br />

RR<br />

RR<br />

RR<br />

RR<br />

RR<br />

RR<br />

RR<br />

RR<br />

RR<br />

86 JWL_C_MERO_FAC_SD_WT1_AL_8200 WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST OVERALL PLAN 0 17.06.16 08.06.16 MERO-TRANSMIT-000110 WHOS-TRANSMIT-003757 12.07.16 21.07.16<br />

87 JWL_C_MERO_FAC_SD_WT1_AL_8201 WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST ISOMETRIC VIEW 0 17.06.16 08.06.16 MERO-TRANSMIT-000110 WHOS-TRANSMIT-003757 12.07.16 21.07.16<br />

RR<br />

RR


Mero Asia Pacific Pte Ltd<br />

STATUS :<br />

APP - Approved<br />

AWC - Approved with Comments - Resubmission Required<br />

RR - Revise and Resubmit Required<br />

as of 15 August 2016<br />

SHOP DRAWING LIST BREAKDOWN<br />

1ST SUBMISSION<br />

REV.0<br />

2ND SUBMISSION<br />

REV.A1<br />

NO.<br />

DRAWING NO.<br />

DESCRIPTION OF DRAWINGS<br />

MERO - TRANSMITTAL<br />

WHOS - WORKFLOW<br />

MERO - TRANSMITTAL<br />

WHOS - WORKFLOW<br />

REMARKS<br />

SUBMISSION<br />

SUBMISSION<br />

APPROVAL<br />

SUBMISSION<br />

SUBMISSION<br />

APPROVAL<br />

DATE MERO ACONEX DATE WHOS ACONEX DATE DRAWING<br />

DATE MERO ACONEX DATE WHOS ACONEX DATE<br />

REV<br />

REV<br />

TRANSMITTAL NO.<br />

TRANSMITTAL NO.<br />

STATUS<br />

TRANSMITTAL NO.<br />

TRANSMITTAL NO.<br />

TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL<br />

DRAWING<br />

STATUS<br />

88 JWL_C_MERO_FAC_SD_WT1_AL_8202 WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST PARTIAL ELEVATIONS 0 17.06.16 08.06.16 MERO-TRANSMIT-000110 WHOS-TRANSMIT-003757 12.07.16 21.07.16<br />

89 JWL_C_MERO_FAC_SD_WT1_AL_8203 WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST BRACKET LAYOUT 0 17.06.16 08.06.16 MERO-TRANSMIT-000110 WHOS-TRANSMIT-003757 12.07.16 21.07.16<br />

RR<br />

RR<br />

90 JWL_C_MERO_FAC_SD_WT1_AL_8204<br />

91 JWL_C_MERO_FAC_SD_WT1_AL_8205<br />

92 JWL_C_MERO_FAC_SD_WT1_AL_8230<br />

93 JWL_C_MERO_FAC_SD_WT1_AL_8231<br />

94 JWL_C_MERO_FAC_SD_WT1_AL_8232<br />

95 JWL_C_MERO_FAC_SD_WT1_AL_8250<br />

96 JWL_C_MERO_FAC_SD_WT1_AL_8251<br />

97 JWL_C_MERO_FAC_SD_WT1_AL_8252<br />

98 JWL_C_MERO_FAC_SD_WT1_AL_8253<br />

99 JWL_C_MERO_FAC_SD_WT1_AL_8254<br />

100 JWL_C_MERO_FAC_SD_WT1_AL_8255<br />

101 JWL_C_MERO_FAC_SD_WT1_AL_8256<br />

102 JWL_C_MERO_FAC_SD_WT1_AL_8257<br />

103 JWL_C_MERO_FAC_SD_WT1_AL_8258<br />

104 JWL_C_MERO_FAC_SD_WT1_AL_8259<br />

105 JWL_C_MERO_FAC_SD_WT1_AL_8260<br />

106 JWL_C_MERO_FAC_SD_WT1_AL_8261<br />

107 JWL_C_MERO_FAC_SD_WT1_AL_8262<br />

108 JWL_C_MERO_FAC_SD_WT1_AL_8263<br />

109 JWL_C_MERO_FAC_SD_WT1_AL_8264<br />

110 JWL_C_MERO_FAC_SD_WT1_AL_8265<br />

C.3 WT-01 QUADRANT - B & C<br />

1 JWL_C_MERO_FAC_DL_WT1_AL_3001<br />

2 JWL_C_MERO_FAC_DL_WT1_AL_3010<br />

3 JWL_C_MERO_FAC_DL_WT1_AL_3020<br />

4 JWL_C_MERO_FAC_DL_WT1_AL_3030<br />

5 JWL_C_MERO_FAC_DL_WT1_AL_3040<br />

6 JWL_C_MERO_FAC_DL_WT1_AL_3050<br />

7 JWL_C_MERO_FAC_SD_WT1_1_1300<br />

8 JWL_C_MERO_FAC_SD_WT1_1_1301<br />

9 JWL_C_MERO_FAC_SD_WT1_1_1302<br />

10 JWL_C_MERO_FAC_SD_WT1_1_1303<br />

11 JWL_C_MERO_FAC_SD_WT1_1_1304<br />

12 JWL_C_MERO_FAC_SD_WT1_1_1310<br />

13 JWL_C_MERO_FAC_SD_WT1_1_1311<br />

14 JWL_C_MERO_FAC_SD_WT1_1_1312<br />

15 JWL_C_MERO_FAC_SD_WT1_1_1313<br />

16 JWL_C_MERO_FAC_SD_WT1_1_1314<br />

17 JWL_C_MERO_FAC_SD_WT1_1_1315<br />

18 JWL_C_MERO_FAC_SD_WT1_1_1316<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST NODE JOINT SCHEDULE<br />

LAYOUT<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST STEEL MEMBER SCHEDULE<br />

LAYOUT<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST OVERALL SECTIONS -<br />

SHEET-1<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST OVERALL SECTIONS -<br />

SHEET-2<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST OVERALL SECTIONS -<br />

SHEET-3<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST BEAM AND NODE KNOCK-<br />

DOWN DETAILS<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST TYPICAL JOINT SECTION<br />

DETAILS (DGU TO DGU)<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST TYPICAL JOINT SECTION<br />

DETAILS (ACP TO ACP)<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST TYPICAL JOINT SECTION<br />

DETAILS (DGU TO ACP)<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST TYPICAL JOINT SECTION<br />

DETAILS (DGU TO LOUVER)<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST TYPICAL JOINT SECTION<br />

DETAILS (ACP TO LOUVER)<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST TYPICAL JOINT SECTION<br />

DETAILS (LOUVER TO LOUVER)<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST TYPICAL JOINT SECTION<br />

DETAILS (DGU W/ BP TO ACP)<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST TYPICAL JOINT SECTION<br />

DETAIL (ACP TO DGU) W/ ALUMINUM FIN<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST TYPICAL JOINT SECTION<br />

DETAIL (FAP TO DGU) W/ ALUMINUM FIN<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST TYPICAL JOINT SECTION<br />

DETAIL (ACP TO FAP) W/ ALUMINUM FIN<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST TYPICAL JOINT SECTION<br />

DETAIL (ACP TO ACP) W/ ALUMINUM FIN<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST TYPICAL JOINT SECTION<br />

DETAIL (LOUVER TO LOUVER) W/ ALUMINUM FIN<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST TYPICAL JOINT SECTION<br />

DETAIL (ACP TO DGU W/ BP) W/ ALUMINUM FIN<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST TYPICAL JOINT SECTION<br />

DETAIL (LOUVER TO ACP) W/ ALUMINUM FIN<br />

WT-01 - SHOP DRAWING - QUADRANT-A NORTH-EAST TYPICAL JOINT SECTION<br />

DETAIL (ACP TO END COVER PANEL) W/ ALUMINUM FIN<br />

WT-01 - SHOP DRAWING - QUADRANT-B & C SOUTH-EAST & SOUTH-WEST GLASS<br />

MATERIAL LIST - SHEET-1<br />

WT-01 - SHOP DRAWING - QUADRANT-B & C SOUTH-EAST & SOUTH-WEST<br />

GASKET MATERIAL LIST - SHEET-1<br />

WT-01 - SHOP DRAWING - QUADRANT-B & C SOUTH-EAST & SOUTH-WEST<br />

ALUMINUM PROFILE MATERIAL LIST - SHEET-1<br />

WT-01 - SHOP DRAWING - QUADRANT-B & C SOUTH-EAST & SOUTH-WEST<br />

FASTENERS MATERIAL LIST - SHEET-1<br />

WT-01 - SHOP DRAWING - QUADRANT-B & C SOUTH-EAST & SOUTH-WEST<br />

MISCELLANEOUS MATERIAL LIST - SHEET-1<br />

WT-01 - SHOP DRAWING - QUADRANT-B & C SOUTH-EAST & SOUTH-WEST STEEL<br />

MEMBER MATERIAL LIST - SHEET-1<br />

WT-01 SHOP DRAWING - QUADRANT-B & C SOUTH-EAST & SOUTH-WEST 1ST<br />

STOREY OVERALL PLAN<br />

WT-01 SHOP DRAWING - QUADRANT-B SOUTH-EAST 1ST STOREY PARTIAL<br />

LAYOUT PLAN (GL-S~U / 20~24)<br />

WT-01 SHOP DRAWING - QUADRANT-B SOUTH-EAST 1ST STOREY PARTIAL<br />

LAYOUT PLAN (GL-T~V / 17~21)<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 1ST STOREY PARTIAL<br />

LAYOUT PLAN (GL-T~V / 8~13)<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 1ST STOREY PARTIAL<br />

LAYOUT PLAN (GL-S~U / 5~9)<br />

WT-01 SHOP DRAWING - QUADRANT-B SOUTH-EAST 1ST STOREY ALUMINUM<br />

COMPOSITE PANEL CLADDING OVERALL LAYOUT PLAN<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 1ST STOREY ALUMINUM<br />

COMPOSITE PANEL CLADDING OVERALL LAYOUT PLAN<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 1ST STOREY EGRESS<br />

DOOR & ACP CLADDING PARTIAL PLANS - SHEET-1<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 1ST STOREY EGRESS<br />

DOOR & ACP CLADDING PARTIAL PLANS - SHEET-2<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 1ST STOREY EGRESS<br />

DOOR & ACP CLADDING PARTIAL PLANS - SHEET-3<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 1ST STOREY EGRESS<br />

DOOR & ACP CLADDING PARTIAL PLANS - SHEET-4<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 1ST STOREY EGRESS<br />

DOOR & ACP CLADDING PARTIAL PLANS - SHEET-5<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000110 WHOS-TRANSMIT-003757 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000110 WHOS-TRANSMIT-003757 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000110 WHOS-TRANSMIT-003757 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000110 WHOS-TRANSMIT-003757 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000110 WHOS-TRANSMIT-003757 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000110 WHOS-TRANSMIT-003757 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000110 WHOS-TRANSMIT-003757 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000110 WHOS-TRANSMIT-003757 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000110 WHOS-TRANSMIT-003757 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000110 WHOS-TRANSMIT-003757 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000110 WHOS-TRANSMIT-003757 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000111 WHOS-TRANSMIT-003758 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000111 WHOS-TRANSMIT-003758 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000111 WHOS-TRANSMIT-003758 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000111 WHOS-TRANSMIT-003758 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000111 WHOS-TRANSMIT-003758 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000111 WHOS-TRANSMIT-003758 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000111 WHOS-TRANSMIT-003758 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000111 WHOS-TRANSMIT-003758 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000111 WHOS-TRANSMIT-003758 12.07.16 21.07.16 RR<br />

0 17.06.16 08.06.16 MERO-TRANSMIT-000111 WHOS-TRANSMIT-003758 12.07.16 21.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000112 WHOS-TRANSMIT-003875 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000112 WHOS-TRANSMIT-003875 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000112 WHOS-TRANSMIT-003875 21.07.16 29.07.16 APP RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000112 WHOS-TRANSMIT-003875 21.07.16 29.07.16 APP RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000112 WHOS-TRANSMIT-003875 21.07.16 29.07.16 APP RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000112 WHOS-TRANSMIT-003875 21.07.16 29.07.16 APP RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000112 WHOS-TRANSMIT-003875 21.07.16 29.07.16 APP RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000112 WHOS-TRANSMIT-003875 21.07.16 29.07.16 APP RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000112 WHOS-TRANSMIT-003875 21.07.16 29.07.16 APP RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000112 WHOS-TRANSMIT-003875 21.07.16 29.07.16 APP RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000112 WHOS-TRANSMIT-003875 21.07.16 29.07.16 APP RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000112 WHOS-TRANSMIT-003875 21.07.16 29.07.16 APP RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000112 WHOS-TRANSMIT-003875 21.07.16 29.07.16 APP RR


Mero Asia Pacific Pte Ltd<br />

STATUS :<br />

APP - Approved<br />

AWC - Approved with Comments - Resubmission Required<br />

RR - Revise and Resubmit Required<br />

as of 15 August 2016<br />

SHOP DRAWING LIST BREAKDOWN<br />

1ST SUBMISSION<br />

REV.0<br />

2ND SUBMISSION<br />

REV.A1<br />

NO.<br />

DRAWING NO.<br />

DESCRIPTION OF DRAWINGS<br />

MERO - TRANSMITTAL<br />

WHOS - WORKFLOW<br />

MERO - TRANSMITTAL<br />

WHOS - WORKFLOW<br />

REMARKS<br />

SUBMISSION<br />

SUBMISSION<br />

APPROVAL<br />

SUBMISSION<br />

SUBMISSION<br />

APPROVAL<br />

DATE MERO ACONEX DATE WHOS ACONEX DATE DRAWING<br />

DATE MERO ACONEX DATE WHOS ACONEX DATE<br />

REV<br />

REV<br />

TRANSMITTAL NO.<br />

TRANSMITTAL NO.<br />

STATUS<br />

TRANSMITTAL NO.<br />

TRANSMITTAL NO.<br />

TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL<br />

DRAWING<br />

STATUS<br />

19 JWL_C_MERO_FAC_SD_WT1_1_1317<br />

20 JWL_C_MERO_FAC_SD_WT1_1_1318<br />

21 JWL_C_MERO_FAC_SD_WT1_1_1319<br />

22 JWL_C_MERO_FAC_SD_WT1_1_1320<br />

23 JWL_C_MERO_FAC_SD_WT1_1_1321<br />

24 JWL_C_MERO_FAC_SD_WT1_1_1322<br />

25 JWL_C_MERO_FAC_SD_WT1_1_1323<br />

26 JWL_C_MERO_FAC_SD_WT1_1_1324<br />

27 JWL_C_MERO_FAC_SD_WT1_1_1325<br />

28 JWL_C_MERO_FAC_SD_WT1_1_1326<br />

29 JWL_C_MERO_FAC_SD_WT1_1_1327<br />

30 JWL_C_MERO_FAC_SD_WT1_1_1328<br />

31 JWL_C_MERO_FAC_SD_WT1_1_1329<br />

32 JWL_C_MERO_FAC_SD_WT1_1_1330<br />

33 JWL_C_MERO_FAC_SD_WT1_1_1331<br />

34 JWL_C_MERO_FAC_SD_WT1_1_1332<br />

35 JWL_C_MERO_FAC_SD_WT1_1_1333<br />

36 JWL_C_MERO_FAC_SD_WT1_1_1334<br />

37 JWL_C_MERO_FAC_SD_WT1_1_1335<br />

38 JWL_C_MERO_FAC_SD_WT1_1_1336<br />

39 JWL_C_MERO_FAC_SD_WT1_1_1337<br />

40 JWL_C_MERO_FAC_SD_WT1_1_1338<br />

41 JWL_C_MERO_FAC_SD_WT1_1_1339<br />

42 JWL_C_MERO_FAC_SD_WT1_1_1340<br />

43 JWL_C_MERO_FAC_SD_WT1_1_1341<br />

44 JWL_C_MERO_FAC_SD_WT1_1_1342<br />

45 JWL_C_MERO_FAC_SD_WT1_1_1343<br />

46 JWL_C_MERO_FAC_SD_WT1_1_1344<br />

47 JWL_C_MERO_FAC_SD_WT1_1_1345<br />

48 JWL_C_MERO_FAC_SD_WT1_1_1346<br />

49 JWL_C_MERO_FAC_SD_WT1_1_1347<br />

50 JWL_C_MERO_FAC_SD_WT1_1_1348<br />

51 JWL_C_MERO_FAC_SD_WT1_1_1349<br />

52 JWL_C_MERO_FAC_SD_WT1_1_1350<br />

53 JWL_C_MERO_FAC_SD_WT1_1_1351<br />

54 JWL_C_MERO_FAC_SD_WT1_1_1352<br />

55 JWL_C_MERO_FAC_SD_WT1_1_1353<br />

56 JWL_C_MERO_FAC_SD_WT1_1_1354<br />

57 JWL_C_MERO_FAC_SD_WT1_1_1355<br />

58 JWL_C_MERO_FAC_SD_WT1_1_1357<br />

59 JWL_C_MERO_FAC_SD_WT1_1_1358<br />

60 JWL_C_MERO_FAC_SD_WT1_1_1359<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 1ST STOREY EGRESS<br />

DOOR & ACP CLADDING PARTIAL PLANS - SHEET-6<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 1ST STOREY EGRESS<br />

DOOR & ACP CLADDING PARTIAL PLANS - SHEET-7<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 1ST STOREY EGRESS<br />

DOOR & ACP CLADDING PARTIAL PLANS - SHEET-8<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 1ST STOREY EGRESS<br />

DOOR & ACP CLADDING PARTIAL ELEVATIONS - SHEET-1<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 1ST STOREY EGRESS<br />

DOOR & ACP CLADDING PARTIAL ELEVATIONS - SHEET-2<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 1ST STOREY EGRESS<br />

DOOR & ACP CLADDING PARTIAL ELEVATIONS - SHEET-3<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 1ST STOREY EGRESS<br />

DOOR & ACP CLADDING PARTIAL ELEVATIONS - SHEET-4<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 1ST STOREY EGRESS<br />

DOOR & ACP CLADDING PARTIAL ELEVATIONS - SHEET-5<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 1ST STOREY EGRESS<br />

DOOR & ACP CLADDING PARTIAL ELEVATIONS - SHEET-6<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 1ST STOREY EGRESS<br />

DOOR & ACP CLADDING PARTIAL ELEVATIONS - SHEET-7<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 1ST STOREY EGRESS<br />

DOOR & ACP CLADDING PARTIAL ELEVATIONS - SHEET-8<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 1ST STOREY EGRESS<br />

DOOR & ACP CLADDING SECTION DETAILS - SHEET-1<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 1ST STOREY EGRESS<br />

DOOR & ACP CLADDING SECTION DETAILS - SHEET-2<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 1ST STOREY EGRESS<br />

DOOR & ACP CLADDING SECTION DETAILS - SHEET-3<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 1ST STOREY EGRESS<br />

DOOR & ACP CLADDING SECTION DETAILS - SHEET-4<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 1ST STOREY EGRESS<br />

DOOR & ACP CLADDING SECTION DETAILS - SHEET-5<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 1ST STOREY EGRESS<br />

DOOR & ACP CLADDING SECTION DETAILS - SHEET-6<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 1ST STOREY EGRESS<br />

DOOR & ACP CLADDING SECTION DETAILS - SHEET-7<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 1ST STOREY EGRESS<br />

DOOR & ACP CLADDING SECTION DETAILS - SHEET-8<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 1ST STOREY EGRESS<br />

DOOR & ACP CLADDING SECTION DETAILS - SHEET-9<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 1ST STOREY EGRESS<br />

DOOR & ACP CLADDING SECTION DETAILS - SHEET-10<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 1ST STOREY EGRESS<br />

DOOR & ACP CLADDING SECTION DETAILS - SHEET-11<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 1ST STOREY EGRESS<br />

DOOR & ACP CLADDING SECTION DETAILS - SHEET-12<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 1ST STOREY EGRESS<br />

DOOR & ACP CLADDING SECTION DETAILS - SHEET-13<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 1ST STOREY EGRESS<br />

DOOR & ACP CLADDING SECTION DETAILS - SHEET-14<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 1ST STOREY EGRESS<br />

DOOR & ACP CLADDING SECTION DETAILS - SHEET-15<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 1ST STOREY EGRESS<br />

DOOR & ACP CLADDING SECTION DETAILS - SHEET-16<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 1ST STOREY EGRESS<br />

DOOR & ACP CLADDING SECTION DETAILS - SHEET-17<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 1ST STOREY EGRESS<br />

DOOR & ACP CLADDING SECTION DETAILS - SHEET-18<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 1ST STOREY EGRESS<br />

DOOR & ACP CLADDING SECTION DETAILS - SHEET-19<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 1ST STOREY EGRESS<br />

DOOR & ACP CLADDING SECTION DETAILS - SHEET-20<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 1ST STOREY EGRESS<br />

DOOR & ACP CLADDING SECTION DETAILS - SHEET-21<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 1ST STOREY EGRESS<br />

DOOR & ACP CLADDING SECTION DETAILS - SHEET-22<br />

WT-01 SHOP DRAWING - QUADRANT-B SOUTH-EAST 1ST STOREY INTERFACE<br />

DETAIL (ACP TO WALL CLADDING) W/ FIN AT SECTION-19<br />

WT-01 SHOP DRAWING - QUADRANT-B SOUTH-EAST 1ST STOREY BRACKET<br />

SECTION DETAIL (ACP TO ACP TO ACP) W/ FIN AT SECTION-19<br />

WT-01 SHOP DRAWING - QUADRANT-B SOUTH-EAST 1ST STOREY INTERFACE<br />

DETAIL (ACP TO WALL CLADDING) W/ FIN AT SECTION-20<br />

WT-01 SHOP DRAWING - QUADRANT-B SOUTH-EAST 1ST STOREY BRACKET<br />

SECTION DETAIL (ACP TO ACP TO ACP) W/ FIN AT SECTION-20<br />

WT-01 SHOP DRAWING - QUADRANT-B SOUTH-EAST 1ST STOREY INTERFACE<br />

DETAIL (ACP TO DOOR OPENING) AT SECTION-21<br />

WT-01 SHOP DRAWING - QUADRANT-B SOUTH-EAST 1ST STOREY SECTION<br />

DETAIL (DOOR OPENING TO ACP)AT SECTION-21<br />

WT-01 SHOP DRAWING - QUADRANT-B SOUTH-EAST 1ST STOREY INTERFACE<br />

DETAIL (ACP TO DOOR OPENING) AT SECTION-22<br />

WT-01 SHOP DRAWING - QUADRANT-B SOUTH-EAST 1ST STOREY SECTION<br />

DETAIL (ACP TO DOOR OPENING)AT SECTION-22<br />

WT-01 SHOP DRAWING - QUADRANT-B SOUTH-EAST 1ST STOREY INTERFACE<br />

DETAIL (ACP TO WALL CLADDING) W/ FIN AT SECTION-23<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000112 WHOS-TRANSMIT-003875 21.07.16 29.07.16<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000112 WHOS-TRANSMIT-003875 21.07.16 29.07.16<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000112 WHOS-TRANSMIT-003875 21.07.16 29.07.16<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000112 WHOS-TRANSMIT-003875 21.07.16 29.07.16<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000112 WHOS-TRANSMIT-003875 21.07.16 29.07.16<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000112 WHOS-TRANSMIT-003875 21.07.16 29.07.16<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000112 WHOS-TRANSMIT-003875 21.07.16 29.07.16<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000112 WHOS-TRANSMIT-003875 21.07.16 29.07.16<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000112 WHOS-TRANSMIT-003875 21.07.16 29.07.16<br />

RR<br />

RR<br />

RR<br />

RR<br />

RR<br />

RR<br />

RR<br />

RR<br />

RR


Mero Asia Pacific Pte Ltd<br />

STATUS :<br />

APP - Approved<br />

AWC - Approved with Comments - Resubmission Required<br />

RR - Revise and Resubmit Required<br />

as of 15 August 2016<br />

SHOP DRAWING LIST BREAKDOWN<br />

1ST SUBMISSION<br />

REV.0<br />

2ND SUBMISSION<br />

REV.A1<br />

NO.<br />

DRAWING NO.<br />

DESCRIPTION OF DRAWINGS<br />

MERO - TRANSMITTAL<br />

WHOS - WORKFLOW<br />

MERO - TRANSMITTAL<br />

WHOS - WORKFLOW<br />

REMARKS<br />

SUBMISSION<br />

SUBMISSION<br />

APPROVAL<br />

SUBMISSION<br />

SUBMISSION<br />

APPROVAL<br />

DATE MERO ACONEX DATE WHOS ACONEX DATE DRAWING<br />

DATE MERO ACONEX DATE WHOS ACONEX DATE<br />

REV<br />

REV<br />

TRANSMITTAL NO.<br />

TRANSMITTAL NO.<br />

STATUS<br />

TRANSMITTAL NO.<br />

TRANSMITTAL NO.<br />

TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL<br />

DRAWING<br />

STATUS<br />

61 JWL_C_MERO_FAC_SD_WT1_1_1360<br />

62 JWL_C_MERO_FAC_SD_WT1_1_1361<br />

63 JWL_C_MERO_FAC_SD_WT1_1_1362<br />

64 JWL_C_MERO_FAC_SD_WT1_1_1363<br />

65 JWL_C_MERO_FAC_SD_WT1_1_1368<br />

66 JWL_C_MERO_FAC_SD_WT1_1_1369<br />

67 JWL_C_MERO_FAC_SD_WT1_1_1370<br />

68 JWL_C_MERO_FAC_SD_WT1_1_1371<br />

69 JWL_C_MERO_FAC_SD_WT1_2_2300<br />

70 JWL_C_MERO_FAC_SD_WT1_2_2301<br />

71 JWL_C_MERO_FAC_SD_WT1_2_2302<br />

72 JWL_C_MERO_FAC_SD_WT1_2_2303<br />

73 JWL_C_MERO_FAC_SD_WT1_2_2304<br />

74 JWL_C_MERO_FAC_SD_WT1_2_2350<br />

75 JWL_C_MERO_FAC_SD_WT1_2_2351<br />

76 JWL_C_MERO_FAC_SD_WT1_2_2352<br />

77 JWL_C_MERO_FAC_SD_WT1_2_2353<br />

78 JWL_C_MERO_FAC_SD_WT1_2_2354<br />

79 JWL_C_MERO_FAC_SD_WT1_2_2355<br />

80 JWL_C_MERO_FAC_SD_WT1_2_2356<br />

81 JWL_C_MERO_FAC_SD_WT1_2_2357<br />

82 JWL_C_MERO_FAC_SD_WT1_2_2358<br />

83 JWL_C_MERO_FAC_SD_WT1_2_2359<br />

84 JWL_C_MERO_FAC_SD_WT1_2_2360<br />

85 JWL_C_MERO_FAC_SD_WT1_2_2361<br />

86 JWL_C_MERO_FAC_SD_WT1_2_2362<br />

87 JWL_C_MERO_FAC_SD_WT1_2_2363<br />

88 JWL_C_MERO_FAC_SD_WT1_2_2364<br />

89 JWL_C_MERO_FAC_SD_WT1_2_2365<br />

90 JWL_C_MERO_FAC_SD_WT1_3_3300<br />

91 JWL_C_MERO_FAC_SD_WT1_3_3301<br />

92 JWL_C_MERO_FAC_SD_WT1_3_3302<br />

93 JWL_C_MERO_FAC_SD_WT1_3_3303<br />

94 JWL_C_MERO_FAC_SD_WT1_3_3304<br />

95 JWL_C_MERO_FAC_SD_WT1_3_3350<br />

96 JWL_C_MERO_FAC_SD_WT1_3_3351<br />

97 JWL_C_MERO_FAC_SD_WT1_3_3352<br />

98 JWL_C_MERO_FAC_SD_WT1_3_3353<br />

99 JWL_C_MERO_FAC_SD_WT1_3_3354<br />

100 JWL_C_MERO_FAC_SD_WT1_3_3355<br />

101 JWL_C_MERO_FAC_SD_WT1_3_3356<br />

102 JWL_C_MERO_FAC_SD_WT1_3_3357<br />

WT-01 SHOP DRAWING - QUADRANT-B SOUTH-EAST 1ST STOREY SECTION<br />

DETAIL (ACP TO ACP TO ACP) W/ FIN AT SECTION-23<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 1ST STOREY INTERFACE<br />

DETAIL (ACP TO WALL CLADDING) AT SECTION-24 & 25<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 1ST STOREY SECTION<br />

DETAIL (ACP TO ACP TO ACP) W/ FIN AT SECTION-24<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 1ST STOREY SECTION<br />

DETAIL (ACP TO ACP TO ACP) W/ FIN AT SECTION-25<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 1ST STOREY INTERFACE<br />

DETAIL (ACP TO WALL CLADDING) AT SECTION-27<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 1ST STOREY BRACKET<br />

SECTION DETAIL (ACP TO ACP TO ACP) AT SECTION-27<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 1ST STOREY INTERFACE<br />

DETAIL (ACP TO WALL CLADDING) AT SECTION-28<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 1ST STOREY BRACKET<br />

SECTION DETAIL (ACP TO ACP TO ACP) AT SECTION-28<br />

WT-01 SHOP DRAWING - QUADRANT-B & C SOUTH-EAST & SOUTH-WEST 2ND<br />

STOREY OVERALL PLAN<br />

WT-01 SHOP DRAWING - QUADRANT-B SOUTH-EAST 2ND STOREY PARTIAL<br />

LAYOUT PLAN (GL-S~U / 20~24)<br />

WT-01 SHOP DRAWING - QUADRANT-B SOUTH-EAST 2ND STOREY PARTIAL<br />

LAYOUT PLAN (GL-T~V / 17~21)<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 2ND STOREY PARTIAL<br />

LAYOUT PLAN (GL-T~V / 8~13)<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 2ND STOREY PARTIAL<br />

LAYOUT PLAN (GL-S~U / 5~9)<br />

WT-01 SHOP DRAWING - QUADRANT-B SOUTH-EAST 2ND STOREY SLAB<br />

INTERFACE DETAIL (DGU W/ BP TO ACP) AT SECTION-19<br />

WT-01 SHOP DRAWING - QUADRANT-B SOUTH-EAST 2ND STOREY BRACKET<br />

SECTION DETAIL (FAP TO DGU W/ BP TO ACP) AT SECTION-19<br />

WT-01 SHOP DRAWING - QUADRANT-B SOUTH-EAST 2ND STOREY SLAB<br />

INTERFACE DETAIL (ACP TO ACP) AT SECTION-20 & 23<br />

WT-01 SHOP DRAWING - QUADRANT-B & C SOUTH-EAST & SOUTH-WEST 2ND<br />

STOREY BRACKET SECTION DETAIL (ACP TO ACP TO ACP) AT SECTION-20 & 26<br />

WT-01 SHOP DRAWING - QUADRANT-B & C S-E & S-W 2ND STOREY SLAB<br />

INTERFACE DETAIL (ACP TO ACP) W/ FIN & W/O BRACKET AT SECTION-21 & 27<br />

WT-01 SHOP DRAWING - QUADRANT-B SOUTH-EAST 2ND STOREY SECTION<br />

DETAIL (ACP TO ACP TO ACP) W/ FIN & W/O BRACKET AT SECTION-21<br />

WT-01 SHOP DRAWING - QUADRANT-B & C S-E & S-W 2ND STOREY SLAB<br />

INTERFACE DETAIL (DGU W/ BP TO LOUVER) W/ FIN & W/O BRACKET AT SECTION-<br />

22 & 25<br />

WT-01 SHOP DRAWING - QUADRANT-B SOUTH-EAST 2ND STOREY SECTION<br />

DETAIL (DGU W/ BP TO DGU W/ BP TO ACP) W/ FIN & W/O BRACKET AT SECTION-<br />

22<br />

WT-01 SHOP DRAWING - QUADRANT-B SOUTH-EAST 2ND STOREY BRACKET<br />

SECTION DETAIL (ACP TO ACP TO FAP) AT SECTION-23<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 2ND STOREY SLAB<br />

INTERFACE DETAIL (ACP TO LOUVER) W/ FIN AT SECTION-24<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 2ND STOREY BRACKET<br />

SECTION DETAIL (ACP TO ACP TO FAP) W/ FIN AT SECTION-24<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 2ND STOREY SECTION<br />

DETAIL (DGU TO DGU W/ BP TO ACP) W/ FIN AT SECTION-25<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 2ND STOREY SLAB<br />

INTERFACE DETAIL (ACP TO LOUVER) AT SECTION-26<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 2ND STOREY SECTION<br />

DETAIL (ACP TO ACP TO FAP) W/ FIN AT SECTION-27<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 2ND STOREY SLAB<br />

INTERFACE DETAIL (DGU W/ BP TO ACP) W/ FIN AT SECTION-28<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 2ND STOREY SECTION<br />

DETAIL (ACP TO DGU W/ BP TO FAP) W/ FIN AT SECTION-28<br />

WT-01 SHOP DRAWING - QUADRANT-B & C SOUTH-EAST & SOUTH-WEST 3RD<br />

STOREY OVERALL PLAN<br />

WT-01 SHOP DRAWING - QUADRANT-B SOUTH-EAST 3RD STOREY PARTIAL<br />

LAYOUT PLAN (GL-S~U / 20~24)<br />

WT-01 SHOP DRAWING - QUADRANT-B SOUTH-EAST 3RD STOREY PARTIAL<br />

LAYOUT PLAN (GL-T~V / 16~21)<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 3RD STOREY PARTIAL<br />

LAYOUT PLAN (GL-T~V / 8~13)<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 3RD STOREY PARTIAL<br />

LAYOUT PLAN (GL-S~U / 5~9)<br />

WT-01 SHOP DRAWING - QUADRANT-B SOUTH-EAST 3RD STOREY SLAB<br />

INTERFACE DETAIL (ACP TO LOUVER) W/ FIN & W/0 BRACKET AT SECTION-19<br />

WT-01 SHOP DRAWING - QUADRANT-B SOUTH-EAST 3RD STOREY SECTION<br />

DETAIL (ACP TO ACP TO ACP) W/ FIN & W/0 BRACKET AT SECTION-19<br />

WT-01 SHOP DRAWING - QUADRANT-B SOUTH-EAST 3RD STOREY SLAB<br />

INTERFACE DETAIL (FAP TO LOUVER) W/ FIN & W/0 BRACKET AT SECTION-20<br />

WT-01 SHOP DRAWING - QUADRANT-B SOUTH-EAST 3RD STOREY SECTION<br />

DETAIL (DGU TO FAP TO ACP) W/ FIN & W/0 BRACKET AT SECTION-20<br />

WT-01 SHOP DRAWING - QUADRANT-B SOUTH-EAST 3RD STOREY SLAB<br />

INTERFACE DETAIL (ACP TO ACP) AT SECTION-21<br />

WT-01 SHOP DRAWING - QUADRANT-B SOUTH-EAST 3RD STOREY BRACKET<br />

SECTION DETAIL (FAP TO ACP TO ACP) AT SECTION-21<br />

WT-01 SHOP DRAWING - QUADRANT-B SOUTH-EAST 3RD STOREY BRACKET<br />

SECTION DETAIL (FAP TO ACP TO ACP) AT SECTION-21<br />

WT-01 SHOP DRAWING - QUADRANT-B SOUTH-EAST 3RD STOREY BRACKET<br />

SECTION DETAIL (ACP TO DGU W/ BP TO DGU W/ BP) AT SECTION-22<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000112 WHOS-TRANSMIT-003875 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000112 WHOS-TRANSMIT-003875 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000112 WHOS-TRANSMIT-003875 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000113 WHOS-TRANSMIT-003876 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000113 WHOS-TRANSMIT-003876 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000113 WHOS-TRANSMIT-003876 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000113 WHOS-TRANSMIT-003876 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000113 WHOS-TRANSMIT-003876 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000113 WHOS-TRANSMIT-003876 21.07.16 29.07.16 APP RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000113 WHOS-TRANSMIT-003876 21.07.16 29.07.16 APP RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000113 WHOS-TRANSMIT-003876 21.07.16 29.07.16 APP RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000113 WHOS-TRANSMIT-003876 21.07.16 29.07.16 APP RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000113 WHOS-TRANSMIT-003876 21.07.16 29.07.16 APP RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000113 WHOS-TRANSMIT-003876 21.07.16 29.07.16<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000113 WHOS-TRANSMIT-003876 21.07.16 29.07.16<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000113 WHOS-TRANSMIT-003876 21.07.16 29.07.16<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000113 WHOS-TRANSMIT-003876 21.07.16 29.07.16<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000113 WHOS-TRANSMIT-003876 21.07.16 29.07.16<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000113 WHOS-TRANSMIT-003876 21.07.16 29.07.16<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000113 WHOS-TRANSMIT-003876 21.07.16 29.07.16<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000113 WHOS-TRANSMIT-003876 21.07.16 29.07.16<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000113 WHOS-TRANSMIT-003876 21.07.16 29.07.16<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000113 WHOS-TRANSMIT-003876 21.07.16 29.07.16<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000113 WHOS-TRANSMIT-003876 21.07.16 29.07.16<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000113 WHOS-TRANSMIT-003876 21.07.16 29.07.16<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000113 WHOS-TRANSMIT-003876 21.07.16 29.07.16<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000113 WHOS-TRANSMIT-003876 21.07.16 29.07.16<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000113 WHOS-TRANSMIT-003876 21.07.16 29.07.16<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000114 WHOS-TRANSMIT-003877 21.07.16 29.07.16<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000114 WHOS-TRANSMIT-003877 21.07.16 29.07.16 APP RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000114 WHOS-TRANSMIT-003877 21.07.16 29.07.16 APP RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000114 WHOS-TRANSMIT-003877 21.07.16 29.07.16 APP RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000114 WHOS-TRANSMIT-003877 21.07.16 29.07.16 APP RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000114 WHOS-TRANSMIT-003877 21.07.16 29.07.16 APP RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000114 WHOS-TRANSMIT-003877 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000114 WHOS-TRANSMIT-003877 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000114 WHOS-TRANSMIT-003877 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000114 WHOS-TRANSMIT-003877 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000114 WHOS-TRANSMIT-003877 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000114 WHOS-TRANSMIT-003877 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000114 WHOS-TRANSMIT-003877 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000114 WHOS-TRANSMIT-003877 21.07.16 29.07.16 RR<br />

RR<br />

RR<br />

RR<br />

RR<br />

RR<br />

RR<br />

RR<br />

RR<br />

RR<br />

RR<br />

RR<br />

RR<br />

RR<br />

RR<br />

RR<br />

RR


Mero Asia Pacific Pte Ltd<br />

STATUS :<br />

APP - Approved<br />

AWC - Approved with Comments - Resubmission Required<br />

RR - Revise and Resubmit Required<br />

as of 15 August 2016<br />

SHOP DRAWING LIST BREAKDOWN<br />

1ST SUBMISSION<br />

REV.0<br />

2ND SUBMISSION<br />

REV.A1<br />

NO.<br />

DRAWING NO.<br />

DESCRIPTION OF DRAWINGS<br />

MERO - TRANSMITTAL<br />

WHOS - WORKFLOW<br />

MERO - TRANSMITTAL<br />

WHOS - WORKFLOW<br />

REMARKS<br />

SUBMISSION<br />

SUBMISSION<br />

APPROVAL<br />

SUBMISSION<br />

SUBMISSION<br />

APPROVAL<br />

DATE MERO ACONEX DATE WHOS ACONEX DATE DRAWING<br />

DATE MERO ACONEX DATE WHOS ACONEX DATE<br />

REV<br />

REV<br />

TRANSMITTAL NO.<br />

TRANSMITTAL NO.<br />

STATUS<br />

TRANSMITTAL NO.<br />

TRANSMITTAL NO.<br />

TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL<br />

DRAWING<br />

STATUS<br />

103 JWL_C_MERO_FAC_SD_WT1_3_3358<br />

104 JWL_C_MERO_FAC_SD_WT1_3_3359<br />

105 JWL_C_MERO_FAC_SD_WT1_3_3360<br />

106 JWL_C_MERO_FAC_SD_WT1_3_3361<br />

107 JWL_C_MERO_FAC_SD_WT1_3_3362<br />

108 JWL_C_MERO_FAC_SD_WT1_3_3363<br />

109 JWL_C_MERO_FAC_SD_WT1_3_3364<br />

110 JWL_C_MERO_FAC_SD_WT1_3_3365<br />

111 JWL_C_MERO_FAC_SD_WT1_3_3366<br />

112 JWL_C_MERO_FAC_SD_WT1_3_3367<br />

113 JWL_C_MERO_FAC_SD_WT1_3_3368<br />

114 JWL_C_MERO_FAC_SD_WT1_4_4300<br />

115 JWL_C_MERO_FAC_SD_WT1_4_4301<br />

116 JWL_C_MERO_FAC_SD_WT1_4_4302<br />

117 JWL_C_MERO_FAC_SD_WT1_4_4303<br />

118 JWL_C_MERO_FAC_SD_WT1_4_4304<br />

119 JWL_C_MERO_FAC_SD_WT1_4_4350<br />

120 JWL_C_MERO_FAC_SD_WT1_4_4351<br />

121 JWL_C_MERO_FAC_SD_WT1_4_4352<br />

122 JWL_C_MERO_FAC_SD_WT1_4_4353<br />

123 JWL_C_MERO_FAC_SD_WT1_4_4354<br />

124 JWL_C_MERO_FAC_SD_WT1_4_4355<br />

125 JWL_C_MERO_FAC_SD_WT1_4_4356<br />

126 JWL_C_MERO_FAC_SD_WT1_4_4357<br />

127 JWL_C_MERO_FAC_SD_WT1_4_4358<br />

128 JWL_C_MERO_FAC_SD_WT1_4_4359<br />

129 JWL_C_MERO_FAC_SD_WT1_4_4360<br />

130 JWL_C_MERO_FAC_SD_WT1_4_4361<br />

131 JWL_C_MERO_FAC_SD_WT1_4_4362<br />

132 JWL_C_MERO_FAC_SD_WT1_5_5300<br />

133 JWL_C_MERO_FAC_SD_WT1_5_5301<br />

134 JWL_C_MERO_FAC_SD_WT1_5_5302<br />

135 JWL_C_MERO_FAC_SD_WT1_5_5303<br />

136 JWL_C_MERO_FAC_SD_WT1_5_5304<br />

137 JWL_C_MERO_FAC_SD_WT1_5_5350<br />

138 JWL_C_MERO_FAC_SD_WT1_5_5351<br />

139 JWL_C_MERO_FAC_SD_WT1_5_5352<br />

140 JWL_C_MERO_FAC_SD_WT1_5_5353<br />

141 JWL_C_MERO_FAC_SD_WT1_5_5354<br />

142 JWL_C_MERO_FAC_SD_WT1_5_5355<br />

143 JWL_C_MERO_FAC_SD_WT1_AL_8300<br />

144 JWL_C_MERO_FAC_SD_WT1_AL_8301<br />

WT-01 SHOP DRAWING - QUADRANT-B SOUTH-EAST 3RD STOREY SLAB<br />

INTERFACE DETAIL (DGU TO LOUVER) W/ FIN & W/O BRACKET AT SECTION-23<br />

WT-01 SHOP DRAWING - QUADRANT-B SOUTH-EAST 3RD STOREY SECTION<br />

DETAIL (ACP TO DGU TO ACP) W/ FIN & W/O BRACKET AT SECTION-23<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 3RD STOREY SLAB<br />

INTERFACE DETAIL (ACP TO LOUVER) W/O BRACKET AT SECTION-24 & 28<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 3RD STOREY SECTION<br />

DETAIL (ACP TO ACP TO DGU) W/O BRACKET AT SECTION-24<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 3RD STOREY SLAB<br />

INTERFACE DETAIL (DGU W/ BP TO ACP) W/O BRACKET AT SECTION-25<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 3RD STOREY SECTION<br />

DETAIL (DGU W/ BP TO DGU W/ BP TO ACP) W/O BRACKET AT SECTION-25<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 3RD STOREY SLAB<br />

INTERFACE DETAIL (ACP TO ACP) W/FIN AT SECTION-26<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 3RD STOREY BRACKET<br />

SECTION DETAIL (ACP TO ACP TO ACP) W/FIN AT SECTION-26<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 3RD STOREY SLAB<br />

INTERFACE DETAIL (FAP TO LOUVER) W/O BRACKET AT SECTION-27<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 3RD STOREY SECTION<br />

DETAIL (ACP TO FAP TO ACP) W/O BRACKET AT SECTION-27<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 3RD STOREY SECTION<br />

DETAIL (ACP TO ACP TO FAP) W/O BRACKET AT SECTION-28<br />

WT-01 SHOP DRAWING - QUADRANT-B & C SOUTH-EAST & SOUTH-WEST 4TH<br />

STOREY OVERALL PLAN<br />

WT-01 SHOP DRAWING - QUADRANT-B SOUTH-EAST 4TH STOREY PARTIAL<br />

LAYOUT PLAN (GL-S~U / 20~24)<br />

WT-01 SHOP DRAWING - QUADRANT-B SOUTH-EAST 4TH STOREY PARTIAL<br />

LAYOUT PLAN (GL-T~V / 16~21)<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 4TH STOREY PARTIAL<br />

LAYOUT PLAN (GL-T~V / 8~13)<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 4TH STOREY PARTIAL<br />

LAYOUT PLAN (GL-S~U / 5~9)<br />

WT-01 SHOP DRAWING - QUADRANT-B SOUTH-EAST 4TH STOREY SLAB<br />

INTERFACE DETAIL (ACP TO LOUVER) AT SECTION-19, 20 & 23<br />

WT-01 SHOP DRAWING - QUADRANT-B SOUTH-EAST 4TH STOREY BRACKET<br />

SECTION DETAIL (FAP TO ACP TO ACP) AT SECTION-19 & 20<br />

WT-01 SHOP DRAWING - QUADRANT-B SOUTH-EAST 4TH STOREY SLAB<br />

INTERFACE DETAIL (ACP TO ACP) W/ FIN & W/O BRACKET AT SECTION-21<br />

WT-01 SHOP DRAWING - QUADRANT-B SOUTH-EAST 4TH STOREY SECTION<br />

DETAIL (ACP TO ACP TO ACP) W/ FIN & W/O BRACKET AT SECTION-21 & 22<br />

WT-01 SHOP DRAWING - QUADRANT-B SOUTH-EAST 4TH STOREY SLAB<br />

INTERFACE DETAIL (ACP TO LOUVER) W/ FIN & W/O BRACKET AT SECTION-22<br />

WT-01 SHOP DRAWING - QUADRANT-B SOUTH-EAST 4TH STOREY BRACKET<br />

SECTION DETAIL (ACP TO ACP TO DGU) AT SECTION-23<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 4TH STOREY SLAB<br />

INTERFACE DETAIL (ACP TO LOUVER) W/ FIN AT SECTION-24, 25, 27 & 28<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 4TH STOREY BRACKET<br />

SECTION DETAIL (DGU TO ACP TO ACP) W/ FIN AT SECTION-24<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 4TH STOREY BRACKET<br />

SECTION DETAIL (ACP TO ACP TO ACP) W/ FIN AT SECTION-25<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 4TH STOREY SLAB<br />

INTERFACE DETAIL (ACP TO ACP) AT SECTION-26<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 4TH STOREY SECTION<br />

DETAIL (ACP TO ACP TO ACP) AT SECTION-26<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 4TH STOREY BRACKET<br />

SECTION DETAIL (ACP TO ACP TO DGU W/ BP) W/ FIN AT SECTION-27<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 4TH STOREY BRACKET<br />

SECTION DETAIL (ACP TO ACP TO DGU) W/ FIN AT SECTION-28<br />

WT-01 SHOP DRAWING - QUADRANT-B & C SOUTH-EAST & SOUTH-WEST 5TH<br />

STOREY OVERALL PLAN<br />

WT-01 SHOP DRAWING - QUADRANT-B SOUTH-EAST 5TH STOREY PARTIAL<br />

LAYOUT PLAN (GL-R~U / 20~24)<br />

WT-01 SHOP DRAWING - QUADRANT-B SOUTH-EAST 5TH STOREY PARTIAL<br />

LAYOUT PLAN (GL-T~V / 16~21)<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 5TH STOREY PARTIAL<br />

LAYOUT PLAN (GL-T~V / 8~13)<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 5TH STOREY PARTIAL<br />

LAYOUT PLAN (GL-R~U / 5~9)<br />

WT-01 SHOP DRAWING - QUADRANT-B & C S-E & S-W 5TH STOREY RING BEAM<br />

INTERFACE DETAIL (ACP TO ACP) AT SECTION-19, 22, 24 & 27<br />

WT-01 SHOP DRAWING - QUADRANT-B & C SOUTH-EAST & SOUTH-WEST 5TH<br />

STOREY RING BEAM TYPICAL CONNECTION DETAIL AT SECTION-19~28<br />

WT-01 SHOP DRAWING - QUADRANT-B SOUTH-EAST 5TH STOREY RING BEAM<br />

INTERFACE DETAIL (ACP TO ACP) W/ FIN AT SECTION-20 & 23<br />

WT-01 SHOP DRAWING - QUADRANT-B SOUTH-EAST 5TH STOREY RING BEAM<br />

INTERFACE DETAIL (DGU TO ACP) AT SECTION-21<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 5TH STOREY RING BEAM<br />

INTERFACE DETAIL (DGU TO ACP) AT SECTION-25 & 27<br />

WT-01 SHOP DRAWING - QUADRANT-C SOUTH-WEST 5TH STOREY RING BEAM<br />

INTERFACE DETAIL (ACP TO LOUVER) AT SECTION-28<br />

WT-01 - SHOP DRAWING - QUADRANT-B & C SOUTH-EAST & SOUTH-WEST<br />

OVERALL PLAN<br />

WT-01 - SHOP DRAWING - QUADRANT-B & C SOUTH-EAST & SOUTH-WEST<br />

ISOMETRIC VIEW<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000114 WHOS-TRANSMIT-003877 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000114 WHOS-TRANSMIT-003877 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000114 WHOS-TRANSMIT-003877 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000114 WHOS-TRANSMIT-003877 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000114 WHOS-TRANSMIT-003877 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000114 WHOS-TRANSMIT-003877 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000114 WHOS-TRANSMIT-003877 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000114 WHOS-TRANSMIT-003877 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000114 WHOS-TRANSMIT-003877 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000114 WHOS-TRANSMIT-003877 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000114 WHOS-TRANSMIT-003877 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000115 WHOS-TRANSMIT-003878 21.07.16 29.07.16 APP RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000115 WHOS-TRANSMIT-003878 21.07.16 29.07.16 APP RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000115 WHOS-TRANSMIT-003878 21.07.16 29.07.16 APP RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000115 WHOS-TRANSMIT-003878 21.07.16 29.07.16 APP RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000115 WHOS-TRANSMIT-003878 21.07.16 29.07.16 APP RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000115 WHOS-TRANSMIT-003878 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000115 WHOS-TRANSMIT-003878 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000115 WHOS-TRANSMIT-003878 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000115 WHOS-TRANSMIT-003878 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000115 WHOS-TRANSMIT-003878 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000115 WHOS-TRANSMIT-003878 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000115 WHOS-TRANSMIT-003878 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000115 WHOS-TRANSMIT-003878 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000115 WHOS-TRANSMIT-003878 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000115 WHOS-TRANSMIT-003878 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000115 WHOS-TRANSMIT-003878 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000115 WHOS-TRANSMIT-003878 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000115 WHOS-TRANSMIT-003878 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000115 WHOS-TRANSMIT-003878 21.07.16 29.07.16 APP RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000115 WHOS-TRANSMIT-003878 21.07.16 29.07.16 APP RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000115 WHOS-TRANSMIT-003878 21.07.16 29.07.16 APP RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000115 WHOS-TRANSMIT-003878 21.07.16 29.07.16 APP RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000115 WHOS-TRANSMIT-003878 21.07.16 29.07.16 APP RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000115 WHOS-TRANSMIT-003878 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000115 WHOS-TRANSMIT-003878 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000116 WHOS-TRANSMIT-003880 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000116 WHOS-TRANSMIT-003880 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000116 WHOS-TRANSMIT-003880 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000116 WHOS-TRANSMIT-003880 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000116 WHOS-TRANSMIT-003880 21.07.16 29.07.16 APP RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000116 WHOS-TRANSMIT-003880 21.07.16 29.07.16 APP RR


Mero Asia Pacific Pte Ltd<br />

STATUS :<br />

APP - Approved<br />

AWC - Approved with Comments - Resubmission Required<br />

RR - Revise and Resubmit Required<br />

as of 15 August 2016<br />

SHOP DRAWING LIST BREAKDOWN<br />

1ST SUBMISSION<br />

REV.0<br />

2ND SUBMISSION<br />

REV.A1<br />

NO.<br />

DRAWING NO.<br />

DESCRIPTION OF DRAWINGS<br />

MERO - TRANSMITTAL<br />

WHOS - WORKFLOW<br />

MERO - TRANSMITTAL<br />

WHOS - WORKFLOW<br />

REMARKS<br />

SUBMISSION<br />

SUBMISSION<br />

APPROVAL<br />

SUBMISSION<br />

SUBMISSION<br />

APPROVAL<br />

DATE MERO ACONEX DATE WHOS ACONEX DATE DRAWING<br />

DATE MERO ACONEX DATE WHOS ACONEX DATE<br />

REV<br />

REV<br />

TRANSMITTAL NO.<br />

TRANSMITTAL NO.<br />

STATUS<br />

TRANSMITTAL NO.<br />

TRANSMITTAL NO.<br />

TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL<br />

DRAWING<br />

STATUS<br />

145 JWL_C_MERO_FAC_SD_WT1_AL_8302<br />

146 JWL_C_MERO_FAC_SD_WT1_AL_8303<br />

147 JWL_C_MERO_FAC_SD_WT1_AL_8304<br />

148 JWL_C_MERO_FAC_SD_WT1_AL_8305<br />

149 JWL_C_MERO_FAC_SD_WT1_AL_8330<br />

150 JWL_C_MERO_FAC_SD_WT1_AL_8331<br />

151 JWL_C_MERO_FAC_SD_WT1_AL_8332<br />

152 JWL_C_MERO_FAC_SD_WT1_AL_8333<br />

153 JWL_C_MERO_FAC_SD_WT1_AL_8350<br />

154 JWL_C_MERO_FAC_SD_WT1_AL_8351<br />

155 JWL_C_MERO_FAC_SD_WT1_AL_8352<br />

156 JWL_C_MERO_FAC_SD_WT1_AL_8353<br />

157 JWL_C_MERO_FAC_SD_WT1_AL_8354<br />

158 JWL_C_MERO_FAC_SD_WT1_AL_8355<br />

159 JWL_C_MERO_FAC_SD_WT1_AL_8356<br />

160 JWL_C_MERO_FAC_SD_WT1_AL_8357<br />

161 JWL_C_MERO_FAC_SD_WT1_AL_8358<br />

162 JWL_C_MERO_FAC_SD_WT1_AL_8359<br />

163 JWL_C_MERO_FAC_SD_WT1_AL_8360<br />

164 JWL_C_MERO_FAC_SD_WT1_AL_8361<br />

165 JWL_C_MERO_FAC_SD_WT1_AL_8362<br />

166 JWL_C_MERO_FAC_SD_WT1_AL_8363<br />

167 JWL_C_MERO_FAC_SD_WT1_AL_8364<br />

168 JWL_C_MERO_FAC_SD_WT1_AL_8365<br />

169 JWL_C_MERO_FAC_SD_WT1_AL_8366<br />

D<br />

D.1<br />

WT-02<br />

WT-02 NORTH GATEWAY<br />

1 JWL_C_MERO_FAC_SD_WT2_1_1000<br />

2 JWL_C_MERO_FAC_SD_WT2_1_1001<br />

3 JWL_C_MERO_FAC_SD_WT2_1_1002<br />

4 JWL_C_MERO_FAC_SD_WT2_1_1003<br />

5 JWL_C_MERO_FAC_SD_WT2_1_1004<br />

6 JWL_C_MERO_FAC_SD_WT2_1_1005<br />

7 JWL_C_MERO_FAC_SD_WT2_1_1006<br />

8 JWL_C_MERO_FAC_SD_WT2_1_1007<br />

9 JWL_C_MERO_FAC_SD_WT2_1_1008<br />

10 JWL_C_MERO_FAC_SD_WT2_2_2000<br />

11 JWL_C_MERO_FAC_SD_WT2_2_2001<br />

12 JWL_C_MERO_FAC_SD_WT2_2_2002<br />

13 JWL_C_MERO_FAC_SD_WT2_2_2003<br />

14 JWL_C_MERO_FAC_SD_WT2_2_2004<br />

15 JWL_C_MERO_FAC_SD_WT2_2_2005<br />

16 JWL_C_MERO_FAC_SD_WT2_2_2006<br />

WT-01 - SHOP DRAWING - QUADRANT-B & C SOUTH-EAST & SOUTH-WEST<br />

PARTIAL ELEVATIONS<br />

WT-01 - SHOP DRAWING - QUADRANT-B & C SOUTH-EAST & SOUTH-WEST<br />

BRACKET LAYOUT<br />

WT-01 - SHOP DRAWING - QUADRANT-B & C SOUTH-EAST & SOUTH-WEST NODE<br />

JOINT SCHEDULE LAYOUT<br />

WT-01 - SHOP DRAWING - QUADRANT-B & C SOUTH-EAST & SOUTH-WEST STEEL<br />

MEMBER SCHEDULE LAYOUT<br />

WT-01 - SHOP DRAWING - QUADRANT-B SOUTH-EAST OVERALL SECTIONS -<br />

SHEET-1<br />

WT-01 - SHOP DRAWING - QUADRANT-B SOUTH-EAST OVERALL SECTIONS -<br />

SHEET-2<br />

WT-01 - SHOP DRAWING - QUADRANT-C SOUTH-WEST OVERALL SECTIONS -<br />

SHEET-1<br />

WT-01 - SHOP DRAWING - QUADRANT-C SOUTH-WEST OVERALL SECTIONS -<br />

SHEET-2<br />

WT-01 - SHOP DRAWING - QUADRANT-B & C SOUTH-EAST & SOUTH-WEST BEAM<br />

AND NODE KNOCK-DOWN DETAILS<br />

WT-01 - SHOP DRAWING - QUADRANT-B & C SOUTH-EAST & SOUTH-WEST<br />

TYPICAL JOINT SECTION DETAILS (DGU TO DGU)<br />

WT-01 - SHOP DRAWING - QUADRANT-B & C SOUTH-EAST & SOUTH-WEST<br />

TYPICAL JOINT SECTION DETAILS (ACP TO ACP)<br />

WT-01 - SHOP DRAWING - QUADRANT-B & C SOUTH-EAST & SOUTH-WEST<br />

TYPICAL JOINT SECTION DETAILS (DGU TO ACP)<br />

WT-01 - SHOP DRAWING - QUADRANT-B & C SOUTH-EAST & SOUTH-WEST<br />

TYPICAL JOINT SECTION DETAILS (DGU TO LOUVER)<br />

WT-01 - SHOP DRAWING - QUADRANT-B & C SOUTH-EAST & SOUTH-WEST<br />

TYPICAL JOINT SECTION DETAILS (ACP TO LOUVER)<br />

WT-01 - SHOP DRAWING - QUADRANT-B & C SOUTH-EAST & SOUTH-WEST<br />

TYPICAL JOINT SECTION DETAILS (LOUVER TO LOUVER)<br />

WT-01 - SHOP DRAWING - QUADRANT-B & C SOUTH-EAST & SOUTH-WEST<br />

TYPICAL JOINT SECTION DETAILS (DGU W/ BP TO ACP)<br />

WT-01 - SHOP DRAWING - QUADRANT-B & C SOUTH-EAST & SOUTH-WEST<br />

TYPICAL JOINT SECTION DETAILS (ACP TO DGU) W/ ALUMINUM FIN<br />

WT-01 - SHOP DRAWING - QUADRANT-B & C SOUTH-EAST & SOUTH-WEST<br />

TYPICAL JOINT SECTION DETAIL (FAP TO DGU) W/ ALUMINUM FIN<br />

WT-01 - SHOP DRAWING - QUADRANT-B & C SOUTH-EAST & SOUTH-WEST<br />

TYPICAL JOINT SECTION DETAIL (ACP TO FAP) W/ ALUMINUM FIN<br />

WT-01 - SHOP DRAWING - QUADRANT-B & C SOUTH-EAST & SOUTH-WEST<br />

TYPICAL JOINT SECTION DETAIL (ACP TO ACP) W/ ALUMINUM FIN<br />

WT-01 - SHOP DRAWING - QUADRANT-B & C SOUTH-EAST & SOUTH-WEST<br />

TYPICAL JOINT SECTION DETAIL (LOUVER TO LOUVER) W/ ALUMINUM FIN<br />

WT-01 - SHOP DRAWING - QUADRANT-B & C SOUTH-EAST & SOUTH-WEST<br />

TYPICAL JOINT SECTION DETAILS (ACP TO DGU W/ BP) W/ ALUMINUM FIN<br />

WT-01 - SHOP DRAWING - QUADRANT-B & C SOUTH-EAST & SOUTH-WEST<br />

TYPICAL JOINT SECTION DETAIL (LOUVER TO ACP) W/ ALUMINUM FIN<br />

WT-01 - SHOP DRAWING - QUADRANT-B & C SOUTH-EAST & SOUTH-WEST<br />

TYPICAL JOINT SECTION DETAIL (ACP TO END COVER PANEL) W/ ALUMINUM FIN<br />

WT-01 - SHOP DRAWING - QUADRANT-B & C SOUTH-EAST & SOUTH-WEST<br />

TYPICAL JOINT SECTION DETAIL (DGU TO DGU) W/ ALUMINUM FIN<br />

SHOP DRAWING WT02 - NORTH GATEWAY GARDEN STRUCTURE 1ST STOREY -<br />

BASE SETTING OUT LAYOUT PLAN<br />

SHOP DRAWING WT02 - NORTH GATEWAY GARDEN STRUCTURE 1ST STOREY -<br />

CAST-IN PLATE DETAIL (TYPE-01) - SHEET 1<br />

SHOP DRAWING WT02 - NORTH GATEWAY GARDEN STRUCTURE 1ST STOREY -<br />

CAST-IN PLATE DETAIL (TYPE-02)<br />

SHOP DRAWING WT02 - NORTH GATEWAY GARDEN STRUCTURE 1ST STOREY -<br />

CAST-IN PLATE DETAIL (TYPE-01) - SHEET 2<br />

SHOP DRAWING WT02 - NORTH GATEWAY GARDEN STRUCTURE 1ST STOREY -<br />

CAST-IN PLATE DETAIL (TYPE-03) - SHEET 1<br />

SHOP DRAWING WT02 - NORTH GATEWAY GARDEN STRUCTURE 1ST STOREY -<br />

CAST-IN PLATE DETAIL (TYPE-01) - SHEET 3<br />

SHOP DRAWING WT02 - NORTH GATEWAY GARDEN STRUCTURE 1ST STOREY -<br />

CAST-IN PLATE DETAIL (TYPE-01) - SHEET 4<br />

SHOP DRAWING WT02 - NORTH GATEWAY GARDEN STRUCTURE 1ST STOREY -<br />

CAST-IN PLATE DETAIL (TYPE-03) - SHEET 2<br />

SHOP DRAWING WT02 - NORTH GATEWAY GARDEN STRUCTURE 1ST STOREY -<br />

STRUCTURE PARTIAL SECTION<br />

SHOP DRAWING WT02 - NORTH GATEWAY GARDEN STRUCTURE 2ND STOREY -<br />

LAYOUT PLAN<br />

SHOP DRAWING WT02 - NORTH GATEWAY GARDEN STRUCTURE 2ND STOREY -<br />

PARTIAL ELEVATION<br />

SHOP DRAWING WT02 - NORTH GATEWAY GARDEN STRUCTURE 2ND STOREY -<br />

CONNECTION DETAIL SHEET 1<br />

SHOP DRAWING WT02 - NORTH GATEWAY GARDEN STRUCTURE 2ND STOREY -<br />

CONNECTION DETAIL SHEET 2<br />

SHOP DRAWING WT02 - NORTH GATEWAY GARDEN STRUCTURE 2ND STOREY -<br />

CONNECTION DETAIL SHEET 3<br />

SHOP DRAWING WT02 -NORTH GATEWAY GARDEN STRUCTURE DETAIL -<br />

INTERSECTION TO BRIDGE 2nd STOREY<br />

SHOP DRAWING WT02 -NORTH GATEWAY GARDEN STRUCTURE 3 - WAY - BEAM -<br />

CONNECTION<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000116 WHOS-TRANSMIT-003880 21.07.16 29.07.16 APP RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000116 WHOS-TRANSMIT-003880 21.07.16 29.07.16 APP RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000116 WHOS-TRANSMIT-003880 21.07.16 29.07.16 APP RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000116 WHOS-TRANSMIT-003880 21.07.16 29.07.16 APP RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000116 WHOS-TRANSMIT-003880 21.07.16 29.07.16 APP RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000116 WHOS-TRANSMIT-003880 21.07.16 29.07.16 APP RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000116 WHOS-TRANSMIT-003880 21.07.16 29.07.16 APP RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000116 WHOS-TRANSMIT-003880 21.07.16 29.07.16 APP RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000116 WHOS-TRANSMIT-003880 21.07.16 29.07.16 APP RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000116 WHOS-TRANSMIT-003880 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000116 WHOS-TRANSMIT-003880 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000116 WHOS-TRANSMIT-003880 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000116 WHOS-TRANSMIT-003880 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000116 WHOS-TRANSMIT-003880 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000116 WHOS-TRANSMIT-003880 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000116 WHOS-TRANSMIT-003880 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000116 WHOS-TRANSMIT-003880 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000116 WHOS-TRANSMIT-003880 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000116 WHOS-TRANSMIT-003880 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000117 WHOS-TRANSMIT-003881 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000117 WHOS-TRANSMIT-003881 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000117 WHOS-TRANSMIT-003881 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000117 WHOS-TRANSMIT-003881 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000117 WHOS-TRANSMIT-003881 21.07.16 29.07.16 RR<br />

0 21.06.16 21.06.16 MERO-TRANSMIT-000117 WHOS-TRANSMIT-003881 21.07.16 29.07.16 RR<br />

0 19.03.16 MERO-MEMO-000283 WHOS-TRANSMIT-003005 21.04.16 09.05.16 APP RR<br />

0 19.03.16 MERO-MEMO-000283 WHOS-TRANSMIT-003005 21.04.16 09.05.16 APP RR<br />

0 19.03.16 MERO-MEMO-000283 WHOS-TRANSMIT-003005 21.04.16 09.05.16 APP RR<br />

0 19.03.16 MERO-MEMO-000283 WHOS-TRANSMIT-003005 21.04.16 09.05.16 APP RR<br />

0 19.03.16 MERO-MEMO-000283 WHOS-TRANSMIT-003005 21.04.16 09.05.16 APP RR<br />

0 19.03.16 MERO-MEMO-000283 WHOS-TRANSMIT-003005 21.04.16 09.05.16 APP RR<br />

0 19.03.16 MERO-MEMO-000283 WHOS-TRANSMIT-003005 21.04.16 09.05.16 APP RR<br />

0 19.03.16 MERO-MEMO-000283 WHOS-TRANSMIT-003005 21.04.16 09.05.16 APP RR<br />

0 19.03.16 MERO-MEMO-000283 WHOS-TRANSMIT-003005 21.04.16 09.05.16 APP RR<br />

0 19.03.16 MERO-MEMO-000283 WHOS-TRANSMIT-003005 21.04.16 09.05.16 APP RR<br />

0 19.03.16 MERO-MEMO-000283 WHOS-TRANSMIT-003005 21.04.16 09.05.16 APP RR<br />

0 19.03.16 MERO-MEMO-000283 WHOS-TRANSMIT-003005 21.04.16 09.05.16 AWC RR<br />

0 19.03.16 MERO-MEMO-000283 WHOS-TRANSMIT-003005 21.04.16 09.05.16 APP RR<br />

0 19.03.16 MERO-MEMO-000283 WHOS-TRANSMIT-003005 21.04.16 09.05.16 APP RR<br />

0 19.03.16 MERO-MEMO-000283 WHOS-TRANSMIT-003005 21.04.16 09.05.16 APP RR<br />

0 19.03.16 MERO-MEMO-000283 WHOS-TRANSMIT-003005 21.04.16 09.05.16 AWC RR


Mero Asia Pacific Pte Ltd<br />

STATUS :<br />

APP - Approved<br />

AWC - Approved with Comments - Resubmission Required<br />

RR - Revise and Resubmit Required<br />

as of 15 August 2016<br />

SHOP DRAWING LIST BREAKDOWN<br />

1ST SUBMISSION<br />

REV.0<br />

2ND SUBMISSION<br />

REV.A1<br />

NO.<br />

DRAWING NO.<br />

DESCRIPTION OF DRAWINGS<br />

MERO - TRANSMITTAL<br />

WHOS - WORKFLOW<br />

MERO - TRANSMITTAL<br />

WHOS - WORKFLOW<br />

REMARKS<br />

SUBMISSION<br />

SUBMISSION<br />

APPROVAL<br />

SUBMISSION<br />

SUBMISSION<br />

APPROVAL<br />

DATE MERO ACONEX DATE WHOS ACONEX DATE DRAWING<br />

DATE MERO ACONEX DATE WHOS ACONEX DATE<br />

REV<br />

REV<br />

TRANSMITTAL NO.<br />

TRANSMITTAL NO.<br />

STATUS<br />

TRANSMITTAL NO.<br />

TRANSMITTAL NO.<br />

TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL<br />

DRAWING<br />

STATUS<br />

17 JWL_C_MERO_FAC_SD_WT2_3_3000<br />

18 JWL_C_MERO_FAC_SD_WT2_3_3001<br />

19 JWL_C_MERO_FAC_SD_WT2_3_3004<br />

20 JWL_C_MERO_FAC_SD_WT2_4_4000<br />

21 JWL_C_MERO_FAC_SD_WT2_4_4001<br />

22 JWL_C_MERO_FAC_SD_WT2_5_5000<br />

23 JWL_C_MERO_FAC_SD_WT2_5_5001<br />

24 JWL_C_MERO_FAC_SD_WT2_5_5002<br />

25 JWL_C_MERO_FAC_SD_WT2_5D_6000<br />

26 JWL_C_MERO_FAC_SD_WT2_5D_6001<br />

27 JWL_C_MERO_FAC_SD_WT2_5D_6002<br />

28 JWL_C_MERO_FAC_SD_WT2_5D_6006<br />

29 JWL_C_MERO_FAC_SD_WT2_AL_8001<br />

30 JWL_C_MERO_FAC_SD_WT2_AL_8002<br />

31 JWL_C_MERO_FAC_SD_WT2_AL_8003<br />

32 JWL_C_MERO_FAC_SD_WT2_AL_8004<br />

33 JWL_C_MERO_FAC_SD_WT2_AL_8005<br />

34 JWL_C_MERO_FAC_SD_WT2_AL_8006<br />

35 JWL_C_MERO_FAC_SD_WT2_AL_8007<br />

36 JWL_C_MERO_FAC_SD_WT2_AL_8008<br />

37 JWL_C_MERO_FAC_SD_WT2_AL_8009<br />

38 JWL_C_MERO_FAC_SD_WT2_AL_8010<br />

39 JWL_C_MERO_FAC_SD_WT2_AL_8011<br />

40 JWL_C_MERO_FAC_SD_WT2_AL_8012<br />

41 JWL_C_MERO_FAC_SD_WT2_AL_8013<br />

42 JWL_C_MERO_FAC_SD_WT2_AL_8014<br />

43 JWL_C_MERO_FAC_SD_WT2_AL_8015<br />

44 JWL_C_MERO_FAC_SD_WT2_AL_8016<br />

45 JWL_C_MERO_FAC_SD_WT2_AL_8017<br />

D.2 WT-02 EAST GATEWAY<br />

1 JWL_C_MERO_FAC_SD_WT2_1_1028<br />

2 JWL_C_MERO_FAC_SD_WT2_2_2027<br />

3 JWL_C_MERO_FAC_SD_WT2_2_2029<br />

4 JWL_C_MERO_FAC_SD_WT2_2_2031<br />

5 JWL_C_MERO_FAC_SD_WT2_2_2032<br />

6 JWL_C_MERO_FAC_SD_WT2_3_3022<br />

7 JWL_C_MERO_FAC_SD_WT2_3_3023<br />

8 JWL_C_MERO_FAC_SD_WT2_4_4023<br />

9 JWL_C_MERO_FAC_SD_WT2_4_4024<br />

10 JWL_C_MERO_FAC_SD_WT2_5_5022<br />

11 JWL_C_MERO_FAC_SD_WT2_5_5023<br />

12 JWL_C_MERO_FAC_SD_WT2_5D_6024<br />

SHOP DRAWING WT02 - NORTH GATEWAY GARDEN STRUCTURE 3RD STOREY -<br />

LAYOUT PLAN<br />

SHOP DRAWING WT02 - NORTH GATEWAY GARDEN STRUCTURE 3RD STOREY -<br />

CONNECTION DETAIL SHEET 1<br />

SHOP DRAWING WT02 - NORTH GATEWAY GARDEN STRUCTURE 3RD STOREY -<br />

AL. PANEL AND GLASS JOINT DETAIL<br />

SHOP DRAWING WT02 - NORTH GATEWAY GARDEN STRUCTURE 4TH STOREY -<br />

LAYOUT PLAN<br />

SHOP DRAWING WT02 - NORTH GATEWAY GARDEN STRUCTURE 4TH STOREY -<br />

CONNECTION DETAIL SHEET 1<br />

SHOP DRAWING WT02 - NORTH GATEWAY GARDEN STRUCTURE 5TH STOREY -<br />

LAYOUT PLAN<br />

SHOP DRAWING WT02 - NORTH GATEWAY GARDEN STRUCTURE 5TH STOREY -<br />

CONNECTION DETAIL SHEET 1<br />

SHOP DRAWING WT02 - NORTH GATEWAY GARDEN STRUCTURE SPACIAL BEAM<br />

CONNECTION - LEVEL 5<br />

SHOP DRAWING WT02 - NORTH GATEWAY GARDEN STRUCTURE 5TH STOREY<br />

DECK - LAYOUT PLAN<br />

SHOP DRAWING WT02 - NORTH GATEWAY GARDEN STRUCTURE 5TH STOREY<br />

DECK - CONNECTION DETAIL SHEET 1<br />

SHOP DRAWING WT02 - NORTH GATEWAY GARDEN STRUCTURE 5TH STOREY<br />

DECK - CONNECTION DETAIL SHEET 2<br />

SHOP DRAWING WT02 - NORTH GATEWAY GARDEN STRUCTURE 5TH STOREY<br />

DECK - GLASS JOINT DETAIL<br />

SHOP DRAWING WT02 - NORTH GATEWAY GARDEN STRUCTURE WIREFRAME<br />

MODEL<br />

SHOP DRAWING WT02 - NORTH GATEWAY GARDEN STRUCTURE STEEL FRAME<br />

MODEL<br />

SHOP DRAWING WT02 - NORTH GATEWAY GARDEN STRUCTURE PIXELATION<br />

MODEL<br />

SHOP DRAWING WT02 - NORTH GATEWAY GARDEN STRUCTURE OVERALL<br />

ELEVATION<br />

SHOP DRAWING WT02 - NORTH GATEWAY GARDEN STRUCTURE OVERALL PLAN<br />

VIEW<br />

SHOP DRAWING WT02 - NORTH GATEWAY GARDEN STRUCTURE OVERALL<br />

SECTION SHEET 1<br />

SHOP DRAWING WT02 - NORTH GATEWAY GARDEN STRUCTURE OVERALL<br />

SECTION SHEET 2<br />

SHOP DRAWING WT02 - NORTH GATEWAY GARDEN STRUCTURE GENERAL<br />

LAYOUT - PROFILE SECTIONS<br />

SHOP DRAWING WT02 - NORTH GATEWAY GARDEN STRUCTURE ELECTRICAL<br />

FACADE INTERFACING LAYOUT - NGG<br />

SHOP DRAWING WT02 - NORTH GATEWAY GARDEN STRUCTURE ELECTRICAL<br />

FACADE INTERFACING DETAILS - NGG<br />

SHOP DRAWING WT02 - NORTH GATEWAY GARDEN STRUCTURE TYPICAL NODE<br />

DESIGN<br />

SHOP DRAWING WT02 - NORTH GATEWAY GARDEN STRUCTURE LAYOUT/<br />

DETAILS ARCH-BEAM<br />

SHOP DRAWING WT02 - NORTH GATEWAY GARDEN STRUCTURE HORIZONTAL<br />

SUPPORT TYPES<br />

SHOP DRAWING WT02 - NORTH GATEWAY GARDEN STRUCTURE TYPICAL<br />

DETAILS SHEET 1<br />

SHOP DRAWING WT02 - NORTH GATEWAY GARDEN STRUCTURE TYPICAL<br />

DETAILS SHEET 2<br />

SHOP DRAWING WT02 - NORTH GATEWAY GARDEN STRUCTURE TYPICAL<br />

DETAILS SHEET 3<br />

SHOP DRAWING WT02 - NORTH GATEWAY GARDEN STRUCTURE TYPICAL<br />

DETAILS SHEET 4<br />

SHOP DRAWING WT02 - EAST GATEWAY GARDEN STRUCTURE ARCH BOTTOM<br />

DETAIL<br />

SHOP DRAWING WT02 - EAST GATEWAY GARDEN STRUCTURE 2ND STOREY -<br />

LAYOUT PLAN<br />

SHOP DRAWING WT02 - EAST GATEWAY GARDEN STRUCTURE 2ND STOREY -<br />

PARTIAL VIEW<br />

SHOP DRAWING WT02 - EAST GATEWAY GARDEN STRUCTURE 2ND STOREY -<br />

CAST-IN PLATE DETAIL (TYPE-01)<br />

SHOP DRAWING WT02 - EAST GATEWAY GARDEN STRUCTURE PLATE DETAILS<br />

(TYPE-02) AT 2ND STOREY<br />

SHOP DRAWING WT02 - EAST GATEWAY GARDEN STRUCTURE 3RD STOREY -<br />

LAYOUT PLAN<br />

SHOP DRAWING WT02 - EAST GATEWAY GARDEN STRUCTURE 3RD STOREY -<br />

CONNECTION DETAIL SHEET1<br />

SHOP DRAWING WT02 - EAST GATEWAY GARDEN STRUCTURE 4TH STOREY -<br />

LAYOUT PLAN<br />

SHOP DRAWING WT02 - EAST GATEWAY GARDEN STRUCTURE 4TH STOREY -<br />

CONNECTION DETAIL SHEET1<br />

SHOP DRAWING WT02 - EAST GATEWAY GARDEN STRUCTURE 5TH STOREY -<br />

LAYOUT PLAN<br />

SHOP DRAWING WT02 - EAST GATEWAY GARDEN STRUCTURE 5TH STOREY -<br />

CONNECTION DETAIL SHEET1<br />

SHOP DRAWING WT02 - EAST GATEWAY GARDEN STRUCTURE 5TH STOREY<br />

DECK - LAYOUT PLAN<br />

0 19.03.16 MERO-MEMO-000283 WHOS-TRANSMIT-003005 21.04.16 09.05.16 APP RR<br />

0 19.03.16 MERO-MEMO-000283 WHOS-TRANSMIT-003005 21.04.16 09.05.16 APP RR<br />

0 19.03.16 MERO-MEMO-000283 WHOS-TRANSMIT-003005 21.04.16 09.05.16 APP RR<br />

0 19.03.16 MERO-MEMO-000283 WHOS-TRANSMIT-003005 21.04.16 09.05.16 APP RR<br />

0 19.03.16 MERO-MEMO-000283 WHOS-TRANSMIT-003005 21.04.16 09.05.16 APP RR<br />

0 19.03.16 MERO-MEMO-000283 WHOS-TRANSMIT-003009 21.04.16 09.05.16 APP RR<br />

0 19.03.16 MERO-MEMO-000283 WHOS-TRANSMIT-003009 21.04.16 09.05.16 AWC RR<br />

0 19.03.16 MERO-MEMO-000283 WHOS-TRANSMIT-003009 21.04.16 09.05.16 APP RR<br />

0 19.03.16 MERO-MEMO-000283 WHOS-TRANSMIT-003009 21.04.16 09.05.16 APP RR<br />

0 19.03.16 MERO-MEMO-000283 WHOS-TRANSMIT-003009 21.04.16 09.05.16 APP RR<br />

0 19.03.16 MERO-MEMO-000283 WHOS-TRANSMIT-003009 21.04.16 09.05.16 APP RR<br />

0 19.03.16 MERO-MEMO-000283 WHOS-TRANSMIT-003009 21.04.16 09.05.16 APP RR<br />

0 19.03.16 MERO-MEMO-000283 WHOS-TRANSMIT-003009 21.04.16 09.05.16 APP RR<br />

0 19.03.16 MERO-MEMO-000283 WHOS-TRANSMIT-003009 21.04.16 09.05.16 APP RR<br />

0 19.03.16 MERO-MEMO-000283 WHOS-TRANSMIT-003009 21.04.16 09.05.16 APP RR<br />

0 19.03.16 MERO-MEMO-000283 WHOS-TRANSMIT-003009 21.04.16 09.05.16 APP RR<br />

0 19.03.16 MERO-MEMO-000283 WHOS-TRANSMIT-003009 21.04.16 09.05.16 APP RR<br />

0 19.03.16 MERO-MEMO-000283 WHOS-TRANSMIT-003009 21.04.16 09.05.16 APP RR<br />

0 19.03.16 MERO-MEMO-000283 WHOS-TRANSMIT-003009 21.04.16 09.05.16 APP RR<br />

0 19.03.16 MERO-MEMO-000283 WHOS-TRANSMIT-003009 21.04.16 09.05.16 APP RR<br />

0 19.03.16 MERO-MEMO-000283 WHOS-TRANSMIT-003009 21.04.16 09.05.16 APP RR<br />

0 19.03.16 MERO-MEMO-000283 WHOS-TRANSMIT-003009 21.04.16 09.05.16 APP RR<br />

0 19.03.16 MERO-MEMO-000283 WHOS-TRANSMIT-003009 21.04.16 09.05.16 APP RR<br />

0 19.03.16 MERO-MEMO-000283 WHOS-TRANSMIT-003009 21.04.16 09.05.16 APP RR<br />

0 19.03.16 MERO-MEMO-000283 WHOS-TRANSMIT-003009 21.04.16 09.05.16 APP RR<br />

0 19.03.16 MERO-MEMO-000283 WHOS-TRANSMIT-003009 21.04.16 09.05.16 APP RR<br />

0 19.03.16 MERO-MEMO-000283 WHOS-TRANSMIT-003009 21.04.16 09.05.16 APP RR


Mero Asia Pacific Pte Ltd<br />

STATUS :<br />

APP - Approved<br />

AWC - Approved with Comments - Resubmission Required<br />

RR - Revise and Resubmit Required<br />

as of 15 August 2016<br />

SHOP DRAWING LIST BREAKDOWN<br />

1ST SUBMISSION<br />

REV.0<br />

2ND SUBMISSION<br />

REV.A1<br />

NO.<br />

DRAWING NO.<br />

DESCRIPTION OF DRAWINGS<br />

MERO - TRANSMITTAL<br />

WHOS - WORKFLOW<br />

MERO - TRANSMITTAL<br />

WHOS - WORKFLOW<br />

REMARKS<br />

SUBMISSION<br />

SUBMISSION<br />

APPROVAL<br />

SUBMISSION<br />

SUBMISSION<br />

APPROVAL<br />

DATE MERO ACONEX DATE WHOS ACONEX DATE DRAWING<br />

DATE MERO ACONEX DATE WHOS ACONEX DATE<br />

REV<br />

REV<br />

TRANSMITTAL NO.<br />

TRANSMITTAL NO.<br />

STATUS<br />

TRANSMITTAL NO.<br />

TRANSMITTAL NO.<br />

TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL<br />

DRAWING<br />

STATUS<br />

13 JWL_C_MERO_FAC_SD_WT2_5D_6025<br />

14 JWL_C_MERO_FAC_SD_WT2_AL_8034<br />

15 JWL_C_MERO_FAC_SD_WT2_AL_8035<br />

16 JWL_C_MERO_FAC_SD_WT2_AL_8036<br />

17 JWL_C_MERO_FAC_SD_WT2_AL_8037<br />

18 JWL_C_MERO_FAC_SD_WT2_AL_8038<br />

19 JWL_C_MERO_FAC_SD_WT2_AL_8039<br />

20 JWL_C_MERO_FAC_SD_WT2_AL_8040<br />

21 JWL_C_MERO_FAC_SD_WT2_AL_8041<br />

22 JWL_C_MERO_FAC_SD_WT2_AL_8042<br />

23 JWL_C_MERO_FAC_SD_WT2_AL_8043<br />

24 JWL_C_MERO_FAC_SD_WT2_AL_8044<br />

25 JWL_C_MERO_FAC_SD_WT2_AL_8045<br />

26 JWL_C_MERO_FAC_SD_WT2_AL_8046<br />

D.3 WT-02 SOUTH GATEWAY<br />

1 JWL_C_MERO_FAC_SD_WT2_1_1016<br />

2 JWL_C_MERO_FAC_SD_WT2_2_2016<br />

3 JWL_C_MERO_FAC_SD_WT2_2_2018<br />

4 JWL_C_MERO_FAC_SD_WT2_2_2020<br />

5 JWL_C_MERO_FAC_SD_WT2_2_2021<br />

6 JWL_C_MERO_FAC_SD_WT2_3_3011<br />

7 JWL_C_MERO_FAC_SD_WT2_3_3012<br />

8 JWL_C_MERO_FAC_SD_WT2_4_4012<br />

9 JWL_C_MERO_FAC_SD_WT2_4_4013<br />

10 JWL_C_MERO_FAC_SD_WT2_5_5011<br />

11 JWL_C_MERO_FAC_SD_WT2_5_5012<br />

12 JWL_C_MERO_FAC_SD_WT2_5D_6013<br />

13 JWL_C_MERO_FAC_SD_WT2_5D_6014<br />

14 JWL_C_MERO_FAC_SD_WT2_AL_8019<br />

15 JWL_C_MERO_FAC_SD_WT2_AL_8020<br />

16 JWL_C_MERO_FAC_SD_WT2_AL_8021<br />

17 JWL_C_MERO_FAC_SD_WT2_AL_8022<br />

18 JWL_C_MERO_FAC_SD_WT2_AL_8023<br />

19 JWL_C_MERO_FAC_SD_WT2_AL_8024<br />

20 JWL_C_MERO_FAC_SD_WT2_AL_8025<br />

21 JWL_C_MERO_FAC_SD_WT2_AL_8026<br />

22 JWL_C_MERO_FAC_SD_WT2_AL_8027<br />

23 JWL_C_MERO_FAC_SD_WT2_AL_8028<br />

24 JWL_C_MERO_FAC_SD_WT2_AL_8030<br />

25 JWL_C_MERO_FAC_SD_WT2_AL_8031<br />

26 JWL_C_MERO_FAC_SD_WT2_AL_8032<br />

D.4 WT-02 WEST GATEWAY<br />

1 JWL_C_MERO_FAC_SD_WT2_1_1039<br />

SHOP DRAWING WT02 - EAST GATEWAY GARDEN STRUCTURE 5TH STOREY<br />

DECK - CONNECTION DETAIL SHEET1<br />

SHOP DRAWING WT02 - EAST GATEWAY GARDEN STRUCTURE WIREFRAME<br />

MODEL<br />

SHOP DRAWING WT02 - EAST GATEWAY GARDEN STRUCTURE STEEL FRAME<br />

MODEL<br />

SHOP DRAWING WT02 - EAST GATEWAY GARDEN STRUCTURE PIXELATION<br />

MODEL<br />

SHOP DRAWING WT02 - EAST GATEWAY GARDEN STRUCTURE OVERALL<br />

ELEVATION<br />

SHOP DRAWING WT02 - EAST GATEWAY GARDEN STRUCTURE GENERAL<br />

LAYOUT - PROFILE SECTIONS<br />

SHOP DRAWING WT02 - EAST GATEWAY GARDEN STRUCTURE GENERAL<br />

LAYOUT - TYPICAL NODE<br />

SHOP DRAWING WT02 - EAST GATEWAY GARDEN STRUCTURE OVERALL PLAN<br />

VIEW<br />

SHOP DRAWING WT02 - EAST GATEWAY GARDEN STRUCTURE OVERALL<br />

SECTION SHEET 1<br />

SHOP DRAWING WT02 - EAST GATEWAY GARDEN STRUCTURE LAYOUT /<br />

DETAILS ARCH-BEAM<br />

SHOP DRAWING WT02 - EAST GATEWAY GARDEN STRUCTURE TYPICAL DETAILS<br />

SHEET 1<br />

SHOP DRAWING WT02 - EAST GATEWAY GARDEN STRUCTURE TYPICAL DETAILS<br />

SHEET 2<br />

SHOP DRAWING WT02 - EAST GATEWAY GARDEN STRUCTURE TYPICAL DETAILS<br />

SHEET 3<br />

SHOP DRAWING WT02 - EAST GATEWAY GARDEN STRUCTURE HORIZONTAL<br />

SUPPORT TYPES<br />

SHOP DRAWING WT02 - SOUTH GATEWAY GARDEN STRUCTURE ARCH BOTTOM<br />

DETAIL<br />

SHOP DRAWING WT02 - SOUTH GATEWAY GARDEN STRUCTURE 2ND STOREY -<br />

LAYOUT PLAN<br />

SHOP DRAWING WT02 - SOUTH GATEWAY GARDEN STRUCTURE 2ND STOREY -<br />

PARTIAL ELEVATION<br />

SHOP DRAWING WT02 - SOUTH GATEWAY GARDEN STRUCTURE PLATE DETAILS<br />

(TYPE-01) AT 2ND STOREY<br />

SHOP DRAWING WT02 - SOUTH GATEWAY GARDEN STRUCTURE PLATE DETAILS<br />

(TYPE-02) AT 2ND STOREY<br />

SHOP DRAWING WT02 - SOUTH GATEWAY GARDEN STRUCTURE 3RD STOREY -<br />

LAYOUT PLAN<br />

SHOP DRAWING WT02 - SOUTH GATEWAY GARDEN STRUCTURE 3RD STOREY -<br />

CONNECTION DETAIL SHEET1<br />

SHOP DRAWING WT02 - SOUTH GATEWAY GARDEN STRUCTURE 4TH STOREY -<br />

LAYOUT PLAN<br />

SHOP DRAWING WT02 - SOUTH GATEWAY GARDEN STRUCTURE 4TH STOREY -<br />

CONNECTION DETAIL SHEET1<br />

SHOP DRAWING WT02 - SOUTH GATEWAY GARDEN STRUCTURE 5TH STOREY -<br />

LAYOUT PLAN<br />

SHOP DRAWING WT02 - SOUTH GATEWAY GARDEN STRUCTURE 5TH STOREY -<br />

CONNECTION DETAIL SHEET1<br />

SHOP DRAWING WT02 - SOUTH GATEWAY GARDEN STRUCTURE 5TH STOREY<br />

DECK - LAYOUT PLAN<br />

SHOP DRAWING WT02 - SOUTH GATEWAY GARDEN STRUCTURE 5TH STOREY<br />

DECK - CONNECTION DETAIL SHEET1<br />

SHOP DRAWING WT02 - SOUTH GATEWAY GARDEN STRUCTURE WIREFRAME<br />

MODEL<br />

SHOP DRAWING WT02 - SOUTH GATEWAY GARDEN STRUCTURE STEEL FRAME<br />

MODEL<br />

SHOP DRAWING WT02 - SOUTH GATEWAY GARDEN STRUCTURE PIXELATION<br />

MODEL<br />

SHOP DRAWING WT02 - SOUTH GATEWAY GARDEN STRUCTURE OVERALL<br />

ELEVATION<br />

SHOP DRAWING WT02 - SOUTH GATEWAY GARDEN STRUCTURE GENERAL<br />

LAYOUT - PROFILE SECTIONS<br />

SHOP DRAWING WT02 - SOUTH GATEWAY GARDEN STRUCTURE GENERAL<br />

LAYOUT - TYPICAL NODE<br />

SHOP DRAWING WT02 - SOUTH GATEWAY GARDEN STRUCTURE OVERALL PLAN<br />

VIEW<br />

SHOP DRAWING WT02 - SOUTH GATEWAY GARDEN STRUCTURE OVERALL<br />

SECTION SHEET 1<br />

SHOP DRAWING WT02 - SOUTH GATEWAY GARDEN STRUCTURE LAYOUT /<br />

DETAILS ARCH-BEAM<br />

SHOP DRAWING WT02 - SOUTH GATEWAY GARDEN STRUCTURE HORIZONTAL<br />

SUPPORT TYPES<br />

SHOP DRAWING WT02 - SOUTH GATEWAY GARDEN STRUCTURE TYPICAL<br />

DETAILS SHEET 1<br />

SHOP DRAWING WT02 - SOUTH GATEWAY GARDEN STRUCTURE TYPICAL<br />

DETAILS SHEET 2<br />

SHOP DRAWING WT02 - SOUTH GATEWAY GARDEN STRUCTURE TYPICAL<br />

DETAILS SHEET 3<br />

SHOP DRAWING WT02 - WEST GATEWAY GARDEN STRUCTURE ARCH BOTTOM<br />

DETAIL


Mero Asia Pacific Pte Ltd<br />

STATUS :<br />

APP - Approved<br />

AWC - Approved with Comments - Resubmission Required<br />

RR - Revise and Resubmit Required<br />

as of 15 August 2016<br />

SHOP DRAWING LIST BREAKDOWN<br />

1ST SUBMISSION<br />

REV.0<br />

2ND SUBMISSION<br />

REV.A1<br />

NO.<br />

DRAWING NO.<br />

DESCRIPTION OF DRAWINGS<br />

MERO - TRANSMITTAL<br />

WHOS - WORKFLOW<br />

MERO - TRANSMITTAL<br />

WHOS - WORKFLOW<br />

REMARKS<br />

SUBMISSION<br />

SUBMISSION<br />

APPROVAL<br />

SUBMISSION<br />

SUBMISSION<br />

APPROVAL<br />

DATE MERO ACONEX DATE WHOS ACONEX DATE DRAWING<br />

DATE MERO ACONEX DATE WHOS ACONEX DATE<br />

REV<br />

REV<br />

TRANSMITTAL NO.<br />

TRANSMITTAL NO.<br />

STATUS<br />

TRANSMITTAL NO.<br />

TRANSMITTAL NO.<br />

TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL<br />

DRAWING<br />

STATUS<br />

2 JWL_C_MERO_FAC_SD_WT2_2_2038<br />

3 JWL_C_MERO_FAC_SD_WT2_2_2040<br />

4 JWL_C_MERO_FAC_SD_WT2_2_2042<br />

5 JWL_C_MERO_FAC_SD_WT2_2_2043<br />

6 JWL_C_MERO_FAC_SD_WT2_3_3033<br />

7 JWL_C_MERO_FAC_SD_WT2_3_3034<br />

8 JWL_C_MERO_FAC_SD_WT2_4_4034<br />

9 JWL_C_MERO_FAC_SD_WT2_4_4035<br />

10 JWL_C_MERO_FAC_SD_WT2_5_5033<br />

11 JWL_C_MERO_FAC_SD_WT2_5_5034<br />

12 JWL_C_MERO_FAC_SD_WT2_5D_6035<br />

13 JWL_C_MERO_FAC_SD_WT2_5D_6036<br />

14 JWL_C_MERO_FAC_SD_WT2_AL_8047<br />

15 JWL_C_MERO_FAC_SD_WT2_AL_8048<br />

16 JWL_C_MERO_FAC_SD_WT2_AL_8049<br />

17 JWL_C_MERO_FAC_SD_WT2_AL_8050<br />

18 JWL_C_MERO_FAC_SD_WT2_AL_8051<br />

19 JWL_C_MERO_FAC_SD_WT2_AL_8052<br />

20 JWL_C_MERO_FAC_SD_WT2_AL_8053<br />

21 JWL_C_MERO_FAC_SD_WT2_AL_8054<br />

22 JWL_C_MERO_FAC_SD_WT2_AL_8055<br />

23 JWL_C_MERO_FAC_SD_WT2_AL_8056<br />

24 JWL_C_MERO_FAC_SD_WT2_AL_8057<br />

25 JWL_C_MERO_FAC_SD_WT2_AL_8058<br />

26 JWL_C_MERO_FAC_SD_WT2_AL_8059<br />

E<br />

E.1<br />

WT-03<br />

WT-03 NODE DESIGN<br />

SHOP DRAWING WT02 - WEST GATEWAY GARDEN STRUCTURE 2ND STOREY -<br />

LAYOUT PLAN<br />

SHOP DRAWING WT02 - WEST GATEWAY GARDEN STRUCTURE 2ND STOREY -<br />

PARTIAL ELEVATION<br />

SHOP DRAWING WT02 - WEST GATEWAY GARDEN STRUCTURE 2ND STOREY<br />

CAST-IN PLATE DETAIL (TYPE-01)<br />

SHOP DRAWING WT02 - WEST GATEWAY GARDEN STRUCTURE 2ND STOREY -<br />

ARCH BEAM SUPPORT<br />

SHOP DRAWING WT02 - WEST GATEWAY GARDEN STRUCTURE 3RD STOREY -<br />

LAYOUT PLAN<br />

SHOP DRAWING WT02 - WEST GATEWAY GARDEN STRUCTURE 3RD STOREY -<br />

CONNECTION DETAIL SHEET1<br />

SHOP DRAWING WT02 - WEST GATEWAY GARDEN STRUCTURE 4TH STOREY -<br />

LAYOUT PLAN<br />

SHOP DRAWING WT02 - WEST GATEWAY GARDEN STRUCTURE 4TH STOREY -<br />

CONNECTION DETAIL SHEET1<br />

SHOP DRAWING WT02 - WEST GATEWAY GARDEN STRUCTURE 5TH STOREY -<br />

LAYOUT PLAN<br />

SHOP DRAWING WT02 - WEST GATEWAY GARDEN STRUCTURE 5TH STOREY -<br />

CONNECTION DETAIL SHEET1<br />

SHOP DRAWING WT02 - WEST GATEWAY GARDEN STRUCTURE 5TH STOREY<br />

DECK - LAYOUT PLAN<br />

SHOP DRAWING WT02 - WEST GATEWAY GARDEN STRUCTURE 5TH STOREY<br />

DECK - CONNECTION DETAIL SHEET1<br />

SHOP DRAWING WT02 - WEST GATEWAY GARDEN STRUCTURE WIREFRAME<br />

MODEL<br />

SHOP DRAWING WT02 - WEST GATEWAY GARDEN STRUCTURE STEEL FRAME<br />

MODEL<br />

SHOP DRAWING WT02 - WEST GATEWAY GARDEN STRUCTURE PIXELATION<br />

MODEL<br />

SHOP DRAWING WT02 - WEST GATEWAY GARDEN STRUCTURE OVERALL<br />

ELEVATION<br />

SHOP DRAWING WT02 - WEST GATEWAY GARDEN STRUCTURE GENERAL<br />

LAYOUT - PROFILE SECTIONS<br />

SHOP DRAWING WT02 - WEST GATEWAY GARDEN STRUCTURE GENERAL<br />

LAYOUT - TYPICAL NODE<br />

SHOP DRAWING WT02 - WEST GATEWAY GARDEN STRUCTURE OVERALL PLAN<br />

VIEW<br />

SHOP DRAWING WT02 - WEST GATEWAY GARDEN STRUCTURE OVERALL<br />

SECTION SHEET 1<br />

SHOP DRAWING WT02 - WEST GATEWAY GARDEN STRUCTURE LAYOUT /<br />

DETAILS ARCH-BEAM<br />

SHOP DRAWING WT02 - WEST GATEWAY GARDEN STRUCTURE TYPICAL DETAILS<br />

SHEET 1<br />

SHOP DRAWING WT02 - WEST GATEWAY GARDEN STRUCTURE TYPICAL DETAILS<br />

SHEET 2<br />

SHOP DRAWING WT02 - WEST GATEWAY GARDEN STRUCTURE TYPICAL DETAILS<br />

SHEET 3<br />

SHOP DRAWING WT02 - WEST GATEWAY GARDEN STRUCTURE HORIZONTAL<br />

SUPPORT TYPES<br />

1 JWL_C_MERO_FAC_SD_WT3_AL_8100 SHOP DRAWING WT03 - TYPICAL NODE DESIGN 3D-MODEL NODES & MEMBERS 0 31.03.16 MERO-TRANSMIT-000087<br />

2 JWL_C_MERO_FAC_SD_WT3_AL_8101<br />

E.2 WT-03 NORTH GATEWAY<br />

1 JWL_C_MERO_FAC_SD_WT3_2_2000<br />

2 JWL_C_MERO_FAC_SD_WT3_2_2001<br />

3 JWL_C_MERO_FAC_SD_WT3_2_2002<br />

4 JWL_C_MERO_FAC_SD_WT3_2_2003<br />

5 JWL_C_MERO_FAC_SD_WT3_2_2004<br />

6 JWL_C_MERO_FAC_SD_WT3_2_2005<br />

7 JWL_C_MERO_FAC_SD_WT3_2_2006<br />

8 JWL_C_MERO_FAC_SD_WT3_2_2007<br />

SHOP DRAWING WT03 - TYPICAL NODE DESIGN PARAMETERS FOR NODE<br />

DESIGN<br />

SHOP DRAWING WT03 - NORTH GATEWAY GARDEN 2ND STOREY BASE SETTING<br />

OUT LAYOUT<br />

SHOP DRAWING WT03 - NORTH GATEWAY GARDEN - PARTIAL PLAN 2ND STOREY<br />

BASE SETTING OUT LAYOUT<br />

SHOP DRAWING WT-03 NORTH GATEWAY ENTRY 2nd STOREY TYPICAL TYPE-1<br />

BASE BRACKET DETAIL<br />

SHOP DRAWING WT-03 NORTH GATEWAY GARDEN TYPICAL TYPE-1 BASE PLATE<br />

BACK SECTION DETAIL AT 2ND STOREY<br />

SHOP DRAWING WT-03 NORTH GATEWAY GARDEN PARTIAL PLAN 2ND STOREY<br />

BASE SETTING OUT LAYOUT - SHEET -1<br />

SHOP DRAWING WT-03 NORTH GATEWAY GARDEN PARTIAL PLAN 2ND STOREY<br />

BASE SETTING OUT LAYOUT - SHEET -2<br />

SHOP DRAWING WT-03 NORTH GATEWAY GARDEN TYPICAL TYPE-2 BASE PLATE<br />

SIDE SECTION DETAIL AT 2ND STOREY<br />

SHOP DRAWING WT-03 NORTH GATEWAY GARDEN TYPICAL TYPE-2 BASE PLATE<br />

BACK SECTION DETAIL AT 2ND STOREY<br />

0 31.03.16 MERO-TRANSMIT-000087<br />

0 13.04.16 MERO-TRANSMIT-000091 WHOS-TRANSMIT-003080 17.05.16 16.05.16 APP RR A1 25.07.16 02.08.16 MERO-TRANSMIT-000134<br />

0 13.04.16 MERO-TRANSMIT-000091 WHOS-TRANSMIT-003080 17.05.16 16.05.16 APP RR A1 25.07.16 02.08.16 MERO-TRANSMIT-000134<br />

0 13.04.16 MERO-TRANSMIT-000091 WHOS-TRANSMIT-003080 17.05.16 16.05.16 AWC RR A1 25.07.16 02.08.16 MERO-TRANSMIT-000134<br />

0 13.04.16 MERO-TRANSMIT-000091 WHOS-TRANSMIT-003080 17.05.16 16.05.16 APP RR A1 25.07.16 02.08.16 MERO-TRANSMIT-000134<br />

0 13.04.16 MERO-TRANSMIT-000091 WHOS-TRANSMIT-003080 17.05.16 16.05.16 APP RR A1 25.07.16 02.08.16 MERO-TRANSMIT-000134<br />

0 13.04.16 MERO-TRANSMIT-000091 WHOS-TRANSMIT-003080 17.05.16 16.05.16 APP RR A1 25.07.16 02.08.16 MERO-TRANSMIT-000134<br />

0 13.04.16 MERO-TRANSMIT-000091 WHOS-TRANSMIT-003080 17.05.16 16.05.16 APP RR A1 25.07.16 02.08.16 MERO-TRANSMIT-000134<br />

0 13.04.16 MERO-TRANSMIT-000091 WHOS-TRANSMIT-003080 17.05.16 16.05.16 APP RR A1 25.07.16 02.08.16 MERO-TRANSMIT-000134<br />

9 JWL_C_MERO_FAC_SD_WT3_2_2010 WT-03 - SHOP DRAWING - QUADRANT-A & D NORTH 2ND STOREY OVERALL PLAN 0 25.07.16 02.08.16 MERO-TRANSMIT-000134<br />

10 JWL_C_MERO_FAC_SD_WT3_2_2011<br />

WT-03 - NORTH ENTRANCE DOOR 2ND STOREY PARTIAL ELEVATION, SECTION<br />

AND PLAN AT QUADRANT A & D, GL 13~ / GL B~C<br />

0 25.07.16 02.08.16 MERO-TRANSMIT-000134<br />

11 JWL_C_MERO_FAC_SD_WT3_2_2012 WT03-NORTH ENTRANCE DOOR 2ND STOREY SECTION DETAIL SHEET-1 0 25.07.16 02.08.16 MERO-TRANSMIT-000134<br />

12 JWL_C_MERO_FAC_SD_WT3_2_2013 WT03-NORTH ENTRANCE DOOR 2ND STOREY SECTION DETAIL SHEET-2 0 25.07.16 02.08.16 MERO-TRANSMIT-000134<br />

13 JWL_C_MERO_FAC_SD_WT3_2_2014 WT03-NORTH ENTRANCE DOOR 2ND STOREY SECTION DETAIL SHEET-3 0 25.07.16 02.08.16 MERO-TRANSMIT-000134


Mero Asia Pacific Pte Ltd<br />

STATUS :<br />

APP - Approved<br />

AWC - Approved with Comments - Resubmission Required<br />

RR - Revise and Resubmit Required<br />

as of 15 August 2016<br />

SHOP DRAWING LIST BREAKDOWN<br />

1ST SUBMISSION<br />

REV.0<br />

2ND SUBMISSION<br />

REV.A1<br />

NO.<br />

DRAWING NO.<br />

DESCRIPTION OF DRAWINGS<br />

MERO - TRANSMITTAL<br />

WHOS - WORKFLOW<br />

MERO - TRANSMITTAL<br />

WHOS - WORKFLOW<br />

REMARKS<br />

SUBMISSION<br />

SUBMISSION<br />

APPROVAL<br />

SUBMISSION<br />

SUBMISSION<br />

APPROVAL<br />

DATE MERO ACONEX DATE WHOS ACONEX DATE DRAWING<br />

DATE MERO ACONEX DATE WHOS ACONEX DATE<br />

REV<br />

REV<br />

TRANSMITTAL NO.<br />

TRANSMITTAL NO.<br />

STATUS<br />

TRANSMITTAL NO.<br />

TRANSMITTAL NO.<br />

TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL<br />

DRAWING<br />

STATUS<br />

14 JWL_C_MERO_FAC_SD_WT3_2_2015 WT03-NORTH ENTRANCE DOOR 2ND STOREY SECTION DETAIL SHEET-4 0 25.07.16 02.08.16 MERO-TRANSMIT-000134<br />

15 JWL_C_MERO_FAC_SD_WT3_2_2016 WT03-NORTH ENTRANCE DOOR 2ND STOREY SECTION DETAIL SHEET-5 0 25.07.16 02.08.16 MERO-TRANSMIT-000134<br />

16 JWL_C_MERO_FAC_SD_WT3_2_2017 WT03-NORTH ENTRANCE DOOR 2ND STOREY SECTION DETAIL SHEET-6 0 25.07.16 02.08.16 MERO-TRANSMIT-000134<br />

17 JWL_C_MERO_FAC_SD_WT3_2_2018<br />

18 JWL_C_MERO_FAC_SD_WT3_AL_8002<br />

WT03-NORTH ENTRANCE DOOR 2ND STOREY SECTION DETAIL SOFFIT<br />

INTERFACE<br />

SHOP DRAWING WT-03 NORTH GATEWAY GARDEN STRUCTURE ISOMETRIC<br />

VIEW<br />

0 25.07.16 02.08.16 MERO-TRANSMIT-000134<br />

0 13.04.16 MERO-TRANSMIT-000091 WHOS-TRANSMIT-003080 17.05.16 16.05.16 APP RR A1 25.07.16 02.08.16 MERO-TRANSMIT-000135<br />

19 JWL_C_MERO_FAC_SD_WT3_AL_8004 SHOP DRAWING WT-03 NORTH GATEWAY GARDEN PIXELATION ELEVATION 0 13.04.16 MERO-TRANSMIT-000091 WHOS-TRANSMIT-003080 17.05.16 16.05.16 APP RR A1 25.07.16 02.08.16 MERO-TRANSMIT-000135<br />

20 JWL_C_MERO_FAC_SD_WT3_AL_8005 SHOP DRAWING WT-03 NORTH GATEWAY GARDEN STRUCTURE ELEVATION 0 13.04.16 MERO-TRANSMIT-000091 WHOS-TRANSMIT-003080 17.05.16 16.05.16 APP RR A1 25.07.16 02.08.16 MERO-TRANSMIT-000135<br />

21 JWL_C_MERO_FAC_SD_WT3_AL_8006 SHOP DRAWING WT-03 NORTH GATEWAY GARDEN SECTION 0 13.04.16 MERO-TRANSMIT-000091 WHOS-TRANSMIT-003080 17.05.16 16.05.16 AWC RR A1 25.07.16 02.08.16 MERO-TRANSMIT-000135<br />

22 JWL_C_MERO_FAC_SD_WT3_AL_8008<br />

SHOP DRAWING WT-03 NORTH GATEWAY GARDEN INTERFACE TO ARCH BEAM<br />

TO WT-01<br />

0 13.04.16 MERO-TRANSMIT-000091 WHOS-TRANSMIT-003080 17.05.16 16.05.16 AWC RR A1 25.07.16 02.08.16 MERO-TRANSMIT-000135<br />

23 JWL_C_MERO_FAC_SD_WT3_AL_8009 SHOP DRAWING WT-03 NORTH GATEWAY GARDEN INTERFACE TO ARCH BEAM 0 13.04.16 MERO-TRANSMIT-000092 WHOS-TRANSMIT-003082 17.05.16 16.05.16 AWC RR A1 25.07.16 02.08.16 MERO-TRANSMIT-000135<br />

24 JWL_C_MERO_FAC_SD_WT3_AL_8010<br />

SHOP DRAWING WT-03 NORTH GATEWAY CLADDING DETAIL BETWEEN CANOPY<br />

AND WT-03<br />

0 13.04.16 MERO-TRANSMIT-000092 WHOS-TRANSMIT-003082 17.05.16 16.05.16 AWC RR A1 25.07.16 02.08.16 MERO-TRANSMIT-000135<br />

25 JWL_C_MERO_FAC_SD_WT3_AL_8011 SHOP DRAWING WT-03 NORTH GATEWAY GARDEN JOINT INTERSECTION 0 13.04.16 MERO-TRANSMIT-000092 WHOS-TRANSMIT-003082 17.05.16 16.05.16 APP RR A1 25.07.16 02.08.16 MERO-TRANSMIT-000135<br />

26 JWL_C_MERO_FAC_SD_WT3_AL_8014 SHOP DRAWING WT-03 TYPICAL HOOP MEMBER WITH SECONDARY GASKET 0 13.04.16 MERO-TRANSMIT-000092 WHOS-TRANSMIT-003082 17.05.16 16.05.16 AWC RR A1 25.07.16 02.08.16 MERO-TRANSMIT-000135<br />

27 JWL_C_MERO_FAC_SD_WT3_AL_8015 SHOP DRAWING WT-03 TYPICAL BIAS MEMBER WITH PRIMARY GASKET DETAIL 0 13.04.16 MERO-TRANSMIT-000092 WHOS-TRANSMIT-003082 17.05.16 16.05.16 AWC RR A1 25.07.16 02.08.16 MERO-TRANSMIT-000135<br />

28 JWL_C_MERO_FAC_SD_WT3_AL_8016<br />

29 JWL_C_MERO_FAC_SD_WT3_AL_8017<br />

30 JWL_C_MERO_FAC_SD_WT3_AL_8018<br />

31 JWL_C_MERO_FAC_SD_WT3_AL_8019<br />

32 JWL_C_MERO_FAC_SD_WT3_AL_8020<br />

SHOP DRAWING WT-03 TYPICAL BIAS MEMBER WITH SECONDARY GASKET<br />

DETAIL<br />

SHOP DRAWING WT-03 NORTH GATEWAY GARDEN TYPICAL GLASS JOINT<br />

DETAIL AND BLOW-UP DETAILS<br />

SHOP DRAWING WT-03 NORTH GATEWAY GARDEN TYPICAL GLASS JOINT<br />

DETAIL ELEVATION AND ISOMETRIC VIEW<br />

SHOP DRAWING WT-03 NORTH GATEWAY GARDEN STRUCTURE GENERAL<br />

LAYOUT - PROFILE SECTIONS - SHEET-1<br />

SHOP DRAWING WT-03 NORTH GATEWAY GARDEN STRUCTURE GENERAL<br />

LAYOUT - PROFILE SECTIONS - SHEET-2<br />

0 13.04.16 MERO-TRANSMIT-000092 WHOS-TRANSMIT-003082 17.05.16 16.05.16 AWC RR A1 25.07.16 02.08.16 MERO-TRANSMIT-000135<br />

0 13.04.16 MERO-TRANSMIT-000092 WHOS-TRANSMIT-003082 17.05.16 16.05.16 AWC RR A1 25.07.16 02.08.16 MERO-TRANSMIT-000135<br />

0 13.04.16 MERO-TRANSMIT-000092 WHOS-TRANSMIT-003082 17.05.16 16.05.16 AWC RR A1 25.07.16 02.08.16 MERO-TRANSMIT-000135<br />

0 13.04.16 MERO-TRANSMIT-000092 WHOS-TRANSMIT-003082 17.05.16 16.05.16 APP RR A1 25.07.16 02.08.16 MERO-TRANSMIT-000135<br />

0 13.04.16 MERO-TRANSMIT-000092 WHOS-TRANSMIT-003082 17.05.16 16.05.16 APP RR A1 25.07.16 02.08.16 MERO-TRANSMIT-000135<br />

33 JWL_C_MERO_FAC_SD_WT3_AL_8021 SHOP DRAWING WT-03 NORTH GATEWAY STEEL CONNECTION DETAILS SHEET-1 0 13.04.16 MERO-TRANSMIT-000092 WHOS-TRANSMIT-003082 17.05.16 16.05.16 APP RR A1 25.07.16 02.08.16 MERO-TRANSMIT-000135<br />

34 JWL_C_MERO_FAC_SD_WT3_AL_8022<br />

35 JWL_C_MERO_FAC_SD_WT3_AL_8023<br />

36 JWL_C_MERO_FAC_SD_WT3_AL_8024<br />

SHOP DRAWING WT-03 NORTH GATEWAY TYPICAL CONNECTION DETAIL ARCH<br />

BEAM WITH BOLTED AND WELDED MEMBER<br />

SHOP DRAWING WT-03 NORTH GATEWAY SPECIAL CONNECTION DETAIL ARCH<br />

BEAM WITH HOOP AND BIAS MEMBER - SHEET-1<br />

SHOP DRAWING WT-03 NORTH GATEWAY SPECIAL CONNECTION DETAIL ARCH<br />

BEAM WITH HOOP AND BIAS MEMBER - SHEET-2<br />

0 13.04.16 MERO-TRANSMIT-000092 WHOS-TRANSMIT-003082 17.05.16 16.05.16 APP RR A1 25.07.16 02.08.16 MERO-TRANSMIT-000135<br />

0 13.04.16 MERO-TRANSMIT-000092 WHOS-TRANSMIT-003082 17.05.16 16.05.16 APP RR A1 25.07.16 02.08.16 MERO-TRANSMIT-000135<br />

0 13.04.16 MERO-TRANSMIT-000092 WHOS-TRANSMIT-003082 17.05.16 16.05.16 APP RR A1 25.07.16 02.08.16 MERO-TRANSMIT-000135<br />

37 JWL_C_MERO_FAC_SD_WT3_AL_8025 SHOP DRAWING WT-03 NORTH GATEWAY EDGE DETAILS AXIS 11 AND 13.1 0 25.07.16 02.08.16 MERO-TRANSMIT-000135<br />

E.3<br />

WT-03 SOUTH GATEWAY (To be Confirm Upon Submission of Drawings)<br />

1 JWL_C_MERO_FAC_SD_WT3_1_1000<br />

2 JWL_C_MERO_FAC_SD_WT3_1_1002<br />

3 JWL_C_MERO_FAC_SD_WT3_1_1004<br />

4 JWL_C_MERO_FAC_SD_WT3_2_2019<br />

5 JWL_C_MERO_FAC_SD_WT3_2_2020<br />

6 JWL_C_MERO_FAC_SD_WT3_2_2021<br />

7 JWL_C_MERO_FAC_SD_WT3_2_2022<br />

8 JWL_C_MERO_FAC_SD_WT3_2_2024<br />

9 JWL_C_MERO_FAC_SD_WT3_2_2025<br />

10 JWL_C_MERO_FAC_SD_WT3_AL_8027<br />

SHOP DRAWING WT-03 SOUTH GATEWAY GARDEN TYPICAL VERTICAL SUPPORT<br />

DETAIL LEVEL-1<br />

SHOP DRAWING WT-03 SOUTH GATEWAY GARDEN TYPICAL DETAIL AT 1ST<br />

STOREY<br />

SHOP DRAWING WT-03 SOUTH GATEWAY GARDEN TYPICAL HORIZONTAL<br />

SUPPORT DETAIL LEVEL-1<br />

SHOP DRAWING WT-03 SOUTH GATEWAY GARDEN 2ND STOREY PLAN LAYOUT<br />

SUPPORTS<br />

SHOP DRAWING WT-03 SOUTH GATEWAY GARDEN SUPPORT TYPE-1 VERTICAL<br />

DETAIL LEVEL 2<br />

SHOP DRAWING WT-03 SOUTH GATEWAY GARDEN SUPPORT TYPE-2 VERTICAL<br />

DETAIL LEVEL 2<br />

SHOP DRAWING WT-03 SOUTH GATEWAY GARDEN INTERFACE DETAIL AT 2ND<br />

STOREY<br />

SHOP DRAWING WT-03 SOUTH GATEWAY GARDEN SUPPORT TYPE-1<br />

HORIZONTAL DETAIL LEVEL 2<br />

SHOP DRAWING WT-03 SOUTH GATEWAY GARDEN SUPPORT TYPE-2<br />

HORIZONTAL DETAIL LEVEL 2<br />

SHOP DRAWING WT-03 SOUTH GATEWAY GARDEN STEEL STRUCTURE<br />

ISOMETRIC VIEW<br />

11 JWL_C_MERO_FAC_SD_WT3_AL_8029 SHOP DRAWING WT-03 SOUTH GATEWAY GARDEN PIXELATION ELEVATION<br />

12 JWL_C_MERO_FAC_SD_WT3_AL_8030<br />

SHOP DRAWING WT-03 SOUTH GATEWAY GARDEN ELEVATION STEEL<br />

STRUCTURE<br />

13 JWL_C_MERO_FAC_SD_WT3_AL_8031 SHOP DRAWING WT-03 SOUTH GATEWAY GARDEN OVERALL SECTION-1<br />

14 JWL_C_MERO_FAC_SD_WT3_AL_8033<br />

15 JWL_C_MERO_FAC_SD_WT3_AL_8036<br />

SHOP DRAWING WT-03 SOUTH GATEWAY GARDEN INTERFACE TO ARCH BEAM<br />

TO WT-01<br />

SHOP DRAWING WT-03 SOUTH GATEWAY GARDEN INTERFACE TO ARCH BEAM<br />

TO RT-01<br />

16 JWL_C_MERO_FAC_SD_WT3_AL_8037 SHOP DRAWING WT-03 SOUTH GATEWAY GARDEN JOINT INTERSECTION<br />

17 JWL_C_MERO_FAC_SD_WT3_AL_8039<br />

SHOP DRAWING WT-03 SOUTH GATEWAY GARDEN TYPICAL GLASS JOINT<br />

DETAIL AND BLOW-UP DETAILS


Mero Asia Pacific Pte Ltd<br />

STATUS :<br />

APP - Approved<br />

AWC - Approved with Comments - Resubmission Required<br />

RR - Revise and Resubmit Required<br />

as of 15 August 2016<br />

SHOP DRAWING LIST BREAKDOWN<br />

1ST SUBMISSION<br />

REV.0<br />

2ND SUBMISSION<br />

REV.A1<br />

NO.<br />

DRAWING NO.<br />

DESCRIPTION OF DRAWINGS<br />

MERO - TRANSMITTAL<br />

WHOS - WORKFLOW<br />

MERO - TRANSMITTAL<br />

WHOS - WORKFLOW<br />

REMARKS<br />

SUBMISSION<br />

SUBMISSION<br />

APPROVAL<br />

SUBMISSION<br />

SUBMISSION<br />

APPROVAL<br />

DATE MERO ACONEX DATE WHOS ACONEX DATE DRAWING<br />

DATE MERO ACONEX DATE WHOS ACONEX DATE<br />

REV<br />

REV<br />

TRANSMITTAL NO.<br />

TRANSMITTAL NO.<br />

STATUS<br />

TRANSMITTAL NO.<br />

TRANSMITTAL NO.<br />

TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL<br />

DRAWING<br />

STATUS<br />

18 JWL_C_MERO_FAC_SD_WT3_AL_8040<br />

19 JWL_C_MERO_FAC_SD_WT3_AL_8041<br />

20 JWL_C_MERO_FAC_SD_WT3_AL_8042<br />

21 JWL_C_MERO_FAC_SD_WT3_AL_8043<br />

22 JWL_C_MERO_FAC_SD_WT3_AL_8044<br />

23 JWL_C_MERO_FAC_SD_WT3_AL_8045<br />

24 JWL_C_MERO_FAC_SD_WT3_AL_8046<br />

E.4<br />

1 JWL_C_MERO_FAC_SD_WT3_2_2027<br />

2 JWL_C_MERO_FAC_SD_WT3_2_2028<br />

3 JWL_C_MERO_FAC_SD_WT3_2_2029<br />

4 JWL_C_MERO_FAC_SD_WT3_2_2030<br />

SHOP DRAWING WT-03 SOUTH GATEWAY GARDEN TYPICAL HOOP MEMBER<br />

DETAIL<br />

SHOP DRAWING WT-03 SOUTH GATEWAY GARDEN TYPICAL BIAS DETAIL WITH<br />

SECONDARY GASKET<br />

SHOP DRAWING WT-03 SOUTH GATEWAY GARDEN TYPICAL BIAS DETAIL WITH<br />

PRIMARY GASKET<br />

SHOP DRAWING WT-03 SOUTH GATEWAY GARDEN GENERAL LAYOUT<br />

STRUCTURE-PROFILE SECTIONS - SHEET-1<br />

SHOP DRAWING WT-03 SOUTH GATEWAY GARDEN GENERAL LAYOUT<br />

STRUCTURE-PROFILE SECTIONS - SHEET-2<br />

SHOP DRAWING WT-03 SOUTH GATEWAY GARDEN STEEL CONNECTION DETAILS<br />

- SHEET-1<br />

SHOP DRAWING WT-03 SOUTH GATEWAY GARDEN STEEL CONNECTION DETAILS<br />

- SHEET-2<br />

WT-03 EAST GATEWAY (To be Confirm Upon Submission of Drawings)<br />

5 JWL_C_MERO_FAC_SD_WT3_2_2031<br />

6 JWL_C_MERO_FAC_SD_WT3_2_2032<br />

7 JWL_C_MERO_FAC_SD_WT3_2_2033<br />

8 JWL_C_MERO_FAC_SD_WT3_3_3001<br />

SHOP DRAWING WT-03 EAST GATEWAY GARDEN 2ND STOREY LAYOUT PLAN<br />

SUPPORTS<br />

SHOP DRAWING WT-03 EAST GATEWAY GARDEN SUPPORT TYPE-1 VERTICAL<br />

DETAIL LEVEL 2<br />

SHOP DRAWING WT-03 EAST GATEWAY GARDEN SUPPORT TYPE-2 VERTICAL<br />

DETAIL LEVEL 2<br />

SHOP DRAWING WT-03 EAST GATEWAY GARDEN INTERFACE DETAIL AT 2ND<br />

STOREY<br />

SHOP DRAWING WT-03 EAST GATEWAY GARDEN TYPICAL LIFT PASSAGE<br />

INTERFACE DETAIL AT 2ND STOREY<br />

SHOP DRAWING WT-03 EAST GATEWAY GARDEN SUPPORT TYPE-1 HORIZONTAL<br />

DETAIL LEVEL 2<br />

SHOP DRAWING WT-03 EAST GATEWAY GARDEN SUPPORT TYPE-2 HORIZONTAL<br />

DETAIL LEVEL 2<br />

SHOP DRAWING WT-03 EAST GATEWAY GARDEN TYPICAL BRIDGE INTERFACE<br />

DETAIL AT 3RD STOREY<br />

9 JWL_C_MERO_FAC_SD_WT3_AL_8051 SHOP DRAWING WT-03 EAST GATEWAY GARDEN ISOMETRIC VIEW<br />

10 JWL_C_MERO_FAC_SD_WT3_AL_8053 SHOP DRAWING WT-03 EAST GATEWAY GARDEN PIXELATION ELEVATION<br />

11 JWL_C_MERO_FAC_SD_WT3_AL_8054 SHOP DRAWING WT-03 EAST GATEWAY GARDEN ELEVATION<br />

12 JWL_C_MERO_FAC_SD_WT3_AL_8055 SHOP DRAWING WT-03 EAST GATEWAY GARDEN OVERALL SECTION - SHEET-1<br />

13 JWL_C_MERO_FAC_SD_WT3_AL_8057<br />

14 JWL_C_MERO_FAC_SD_WT3_AL_8060<br />

SHOP DRAWING WT-03 EAST GATEWAY GARDEN INTERFACE TO ARCH BEAM TO<br />

WT-01<br />

SHOP DRAWING WT-03 EAST GATEWAY GARDEN INTERFACE TO ARCH BEAM TO<br />

RT-01<br />

15 JWL_C_MERO_FAC_SD_WT3_AL_8061 SHOP DRAWING WT-03 EAST GATEWAY GARDEN JOINT INTERSECTION<br />

16 JWL_C_MERO_FAC_SD_WT3_AL_8063<br />

17 JWL_C_MERO_FAC_SD_WT3_AL_8064<br />

18 JWL_C_MERO_FAC_SD_WT3_AL_8065<br />

19 JWL_C_MERO_FAC_SD_WT3_AL_8066<br />

20 JWL_C_MERO_FAC_SD_WT3_AL_8067<br />

21 JWL_C_MERO_FAC_SD_WT3_AL_8068<br />

22 JWL_C_MERO_FAC_SD_WT3_AL_8069<br />

23 JWL_C_MERO_FAC_SD_WT3_AL_8070<br />

E.5<br />

1 JWL_C_MERO_FAC_SD_WT3_1_1014<br />

2 JWL_C_MERO_FAC_SD_WT3_1_1015<br />

3 JWL_C_MERO_FAC_SD_WT3_2_2035<br />

4 JWL_C_MERO_FAC_SD_WT3_2_2036<br />

5 JWL_C_MERO_FAC_SD_WT3_2_2037<br />

SHOP DRAWING WT-03 EAST GATEWAY GARDEN TYPICAL GLASS JOINT DETAIL<br />

AND BLOW-UP DETAILS<br />

SHOP DRAWING WT-03 EAST GATEWAY GARDEN TYPICAL HOOP MEMBER<br />

DETAIL<br />

SHOP DRAWING WT-03 EAST GATEWAY GARDEN TYPICAL BIAS DETAIL WITH<br />

SECONDARY GASKET<br />

SHOP DRAWING WT-03 EAST GATEWAY GARDEN TYPICAL BIAS DETAIL WITH<br />

PRIMARY GASKET<br />

SHOP DRAWING WT-03 EAST GATEWAY GARDEN GENERAL LAYOUT STRUCTURE-<br />

PROFILE SECTIONS - SHEET-1<br />

SHOP DRAWING WT-03 EAST GATEWAY GARDEN GENERAL LAYOUT STRUCTURE-<br />

PROFILE SECTIONS - SHEET-2<br />

SHOP DRAWING WT-03 EAST GATEWAY GARDEN STEEL CONNECTION DETAILS -<br />

SHEET-1<br />

SHOP DRAWING WT-03 EAST GATEWAY GARDEN STEEL CONNECTION DETAILS -<br />

SHEET-2<br />

WT-03 WEST GATEWAY (To be Confirm Upon Submission of Drawings)<br />

6 JWL_C_MERO_FAC_SD_WT3_2_2038<br />

7 JWL_C_MERO_FAC_SD_WT3_2_2039<br />

8 JWL_C_MERO_FAC_SD_WT3_2_2040<br />

9 JWL_C_MERO_FAC_SD_WT3_2_2041<br />

10 JWL_C_MERO_FAC_SD_WT3_3_3009<br />

11 JWL_C_MERO_FAC_SD_WT3_AL_8075<br />

SHOP DRAWING WT-03 WEST GATEWAY GARDEN TYPICAL VERTICAL SUPPORT<br />

DETAIL LEVEL-1<br />

SHOP DRAWING WT-03 WEST GATEWAY GARDEN TYPICAL HORIZONTAL<br />

SUPPORT DETAIL LEVEL-1<br />

SHOP DRAWING WT-03 WEST GATEWAY GARDEN 2ND STOREY PLAN LAYOUT<br />

SUPPORTS<br />

SHOP DRAWING WT-03 WEST GATEWAY GARDEN SUPPORT TYPE-1 VERTICAL<br />

DETAIL LEVEL 2<br />

SHOP DRAWING WT-03 WEST GATEWAY GARDEN SUPPORT TYPE-2 VERTICAL<br />

DETAIL LEVEL 2<br />

SHOP DRAWING WT-03 WEST GATEWAY GARDEN TYPICAL LIFT PASSAGE<br />

INTERFACE DETAIL AT 2ND STOREY<br />

SHOP DRAWING WT-03 WEST GATEWAY GARDEN INTERFACE DETAIL AT 2ND<br />

STOREY<br />

SHOP DRAWING WT-03 WEST GATEWAY GARDEN SUPPORT TYPE-1<br />

HORIZONTAL DETAIL LEVEL 2<br />

SHOP DRAWING WT-03 WEST GATEWAY GARDEN SUPPORT TYPE-2<br />

HORIZONTAL DETAIL LEVEL 2<br />

SHOP DRAWING WT-03 WEST GATEWAY GARDEN TYPICAL BRIDGE INTERFACE<br />

DETAIL AT 3RD STOREY<br />

SHOP DRAWING WT-03 WEST GATEWAY GARDEN STEEL STRUCTURE<br />

ISOMETRIC VIEW


Mero Asia Pacific Pte Ltd<br />

STATUS :<br />

APP - Approved<br />

AWC - Approved with Comments - Resubmission Required<br />

RR - Revise and Resubmit Required<br />

as of 15 August 2016<br />

SHOP DRAWING LIST BREAKDOWN<br />

1ST SUBMISSION<br />

REV.0<br />

2ND SUBMISSION<br />

REV.A1<br />

NO.<br />

DRAWING NO.<br />

DESCRIPTION OF DRAWINGS<br />

MERO - TRANSMITTAL<br />

WHOS - WORKFLOW<br />

MERO - TRANSMITTAL<br />

WHOS - WORKFLOW<br />

REMARKS<br />

SUBMISSION<br />

SUBMISSION<br />

APPROVAL<br />

SUBMISSION<br />

SUBMISSION<br />

APPROVAL<br />

DATE MERO ACONEX DATE WHOS ACONEX DATE DRAWING<br />

DATE MERO ACONEX DATE WHOS ACONEX DATE<br />

REV<br />

REV<br />

TRANSMITTAL NO.<br />

TRANSMITTAL NO.<br />

STATUS<br />

TRANSMITTAL NO.<br />

TRANSMITTAL NO.<br />

TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL<br />

DRAWING<br />

STATUS<br />

12 JWL_C_MERO_FAC_SD_WT3_AL_8077 SHOP DRAWING WT-03 WEST GATEWAY GARDEN PIXELATION ELEVATION<br />

13 JWL_C_MERO_FAC_SD_WT3_AL_8078<br />

SHOP DRAWING WT-03 WEST GATEWAY GARDEN ELEVATION STEEL<br />

STRUCTURE<br />

14 JWL_C_MERO_FAC_SD_WT3_AL_8079 SHOP DRAWING WT-03 WEST GATEWAY GARDEN OVERALL SECTION-1<br />

15 JWL_C_MERO_FAC_SD_WT3_AL_8081<br />

16 JWL_C_MERO_FAC_SD_WT3_AL_8084<br />

SHOP DRAWING WT-03 WEST GATEWAY GARDEN INTERFACE TO ARCH BEAM TO<br />

WT-01<br />

SHOP DRAWING WT-03 WEST GATEWAY GARDEN INTERFACE TO ARCH BEAM TO<br />

RT-01<br />

17 JWL_C_MERO_FAC_SD_WT3_AL_8085 SHOP DRAWING WT-03 WEST GATEWAY GARDEN JOINT INTERSECTION<br />

18 JWL_C_MERO_FAC_SD_WT3_AL_8087<br />

19 JWL_C_MERO_FAC_SD_WT3_AL_8088<br />

20 JWL_C_MERO_FAC_SD_WT3_AL_8089<br />

21 JWL_C_MERO_FAC_SD_WT3_AL_8090<br />

22 JWL_C_MERO_FAC_SD_WT3_AL_8091<br />

23 JWL_C_MERO_FAC_SD_WT3_AL_8092<br />

24 JWL_C_MERO_FAC_SD_WT3_AL_8093<br />

25 JWL_C_MERO_FAC_SD_WT3_AL_8094<br />

F WT-04 (LEVEL-1)<br />

1 JWL_C_MERO_FAC_DL_WT4_1_2001<br />

2 JWL_C_MERO_FAC_DL_WT4_1_2010<br />

3 JWL_C_MERO_FAC_DL_WT4_1_2020<br />

4 JWL_C_MERO_FAC_DL_WT4_1_2030<br />

5 JWL_C_MERO_FAC_DL_WT4_1_2040<br />

6 JWL_C_MERO_FAC_DL_WT4_1_2050<br />

7 JWL_C_MERO_FAC_DL_WT4_1_2051<br />

8 JWL_C_MERO_FAC_SD_WT4_1_0001<br />

9 JWL_C_MERO_FAC_SD_WT4_1_0002<br />

SHOP DRAWING WT-03 WEST GATEWAY GARDEN TYPICAL GLASS JOINT DETAIL<br />

AND BLOW-UP DETAILS<br />

SHOP DRAWING WT-03 WEST GATEWAY GARDEN TYPICAL HOOP MEMBER<br />

DETAIL<br />

SHOP DRAWING WT-03 WEST GATEWAY GARDEN TYPICAL BIAS DETAIL WITH<br />

SECONDARY GASKET<br />

SHOP DRAWING WT-03 WEST GATEWAY GARDEN TYPICAL BIAS DETAIL WITH<br />

PRIMARY GASKET<br />

SHOP DRAWING WT-03 WEST GATEWAY GARDEN GENERAL LAYOUT<br />

STRUCTURE-PROFILE SECTIONS - SHEET-1<br />

SHOP DRAWING WT-03 WEST GATEWAY GARDEN GENERAL LAYOUT<br />

STRUCTURE-PROFILE SECTIONS - SHEET-2<br />

SHOP DRAWING WT-03 WEST GATEWAY GARDEN STEEL CONNECTION DETAILS -<br />

SHEET-1<br />

SHOP DRAWING WT-03 WEST GATEWAY GARDEN STEEL CONNECTION DETAILS -<br />

SHEET-2<br />

WT04 - SHOP DRAWING - QUADRANT-A & B AT 1ST STOREY - GLASS MATERIAL<br />

LIST - SHEET-1<br />

WT04 - SHOP DRAWING - QUADRANT-A & B AT 1ST STOREY - GASKETS<br />

MATERIAL LIST - SHEET-1<br />

WT04 - SHOP DRAWING - QUADRANT-A & B AT 1ST STOREY - ALUMINUM<br />

PROFILES MATERIAL LIST - SHEET-1<br />

WT04 - SHOP DRAWING - QUADRANT-A & B AT 1ST STOREY - FASTENERS<br />

MATERIAL LIST - SHEET-1<br />

WT04 - SHOP DRAWING - QUADRANT-A & B AT 1ST STOREY - MISCELLANEOUS<br />

MATERIAL LIST - SHEET-1<br />

WT04 - SHOP DRAWING - QUADRANT-A & B AT 1ST STOREY - STEEL MATERIAL<br />

LIST - SHEET-1<br />

WT04 - SHOP DRAWING - QUADRANT-A & B AT 1ST STOREY - STAINLESS STEEL<br />

MATERIAL LIST - SHEET-1<br />

WT04 - SHOP DRAWING - QUADRANT-A & B NORTH-EAST 1ST STOREY OVERALL<br />

PLAN<br />

WT04 GLAZING MODULATION 1st STOREY AT QUADRANT A & B GL-24~26 / GL-<br />

E~Q<br />

0 20.06.16 22.06.16 MERO-TRANSMIT-000118<br />

0 20.06.16 22.06.16 MERO-TRANSMIT-000118<br />

0 20.06.16 22.06.16 MERO-TRANSMIT-000118<br />

0 20.06.16 22.06.16 MERO-TRANSMIT-000118<br />

0 20.06.16 22.06.16 MERO-TRANSMIT-000118<br />

0 20.06.16 22.06.16 MERO-TRANSMIT-000118<br />

0 20.06.16 22.06.16 MERO-TRANSMIT-000118<br />

0 20.06.16 22.06.16 MERO-TRANSMIT-000118<br />

0 20.06.16 22.06.16 MERO-TRANSMIT-000118<br />

10 JWL_C_MERO_FAC_SD_WT4_1_1001 WT04 - 1st STOREY ELEVATION AT QUADRANT A & B GL-24~26 / GL-E~Q 0 20.06.16 22.06.16 MERO-TRANSMIT-000118<br />

11 JWL_C_MERO_FAC_SD_WT4_1_1101<br />

12 JWL_C_MERO_FAC_SD_WT4_1_1102<br />

13 JWL_C_MERO_FAC_SD_WT4_1_1103<br />

14 JWL_C_MERO_FAC_SD_WT4_1_1104<br />

WT04 - 1st STOREY PARTIAL ELEVATION SECTION AND PLAN, AT QUADRANT A &<br />

B GL 24~26 / GL Q-P AND GL N-M<br />

WT04 - 1st STOREY PARTIAL ELEVATION SECTION AND PLAN, AT QUADRANT A &<br />

B GL 24~26 / GL L~J<br />

WT04 - 1st STOREY PARTIAL ELEVATION SECTION AND PLAN, AT QUADRANT A &<br />

B GL 24~26 / GL G-F<br />

WT04 - 1st STOREY PARTIAL ELEVATION SECTION AND PLAN, AT QUADRANT A &<br />

B GL 24~26 / GL F-E<br />

0 20.06.16 22.06.16 MERO-TRANSMIT-000118<br />

0 20.06.16 22.06.16 MERO-TRANSMIT-000118<br />

0 20.06.16 22.06.16 MERO-TRANSMIT-000119<br />

0 20.06.16 22.06.16 MERO-TRANSMIT-000119<br />

15 JWL_C_MERO_FAC_SD_WT4_1_2001 WT04 SECTION DETAIL AT 1ST STOREY SHEET-1 0 20.06.16 22.06.16 MERO-TRANSMIT-000119<br />

16 JWL_C_MERO_FAC_SD_WT4_1_2002 WT04 SECTION DETAIL AT 1ST STOREY SHEET-2 0 20.06.16 22.06.16 MERO-TRANSMIT-000119<br />

17 JWL_C_MERO_FAC_SD_WT4_1_2003 WT04 SECTION DETAIL AT 1ST STOREY SHEET-3 0 20.06.16 22.06.16 MERO-TRANSMIT-000119<br />

18 JWL_C_MERO_FAC_SD_WT4_1_2004 WT04 SECTION DETAIL AT 1ST STOREY SHEET-4 0 20.06.16 22.06.16 MERO-TRANSMIT-000119<br />

19 JWL_C_MERO_FAC_SD_WT4_1_2005 WT04 SECTION DETAIL AT 1ST STOREY SHEET-5 0 20.06.16 22.06.16 MERO-TRANSMIT-000119<br />

20 JWL_C_MERO_FAC_SD_WT4_1_2006 WT04 SECTION DETAIL AT 1ST STOREY SHEET-6 0 20.06.16 22.06.16 MERO-TRANSMIT-000119<br />

21 JWL_C_MERO_FAC_SD_WT4_1_2007 WT04 SECTION DETAIL AT 1ST STOREY SHEET-7 0 20.06.16 22.06.16 MERO-TRANSMIT-000119<br />

22 JWL_C_MERO_FAC_SD_WT4_1_2008 WT04 SECTION DETAIL AT 1ST STOREY SHEET-8 0 20.06.16 22.06.16 MERO-TRANSMIT-000119<br />

23 JWL_C_MERO_FAC_SD_WT4_1_2009 WT04 SECTION DETAIL AT 1ST STOREY SHEET-9 0 20.06.16 22.06.16 MERO-TRANSMIT-000119<br />

24 JWL_C_MERO_FAC_SD_WT4_1_2010 WT04 SECTION DETAIL AT 1ST STOREY SHEET-10 0 20.06.16 22.06.16 MERO-TRANSMIT-000119<br />

G<br />

WT-05 (BASEMENT-1)<br />

1 JWL_C_MERO_FAC_SD_WT5_B1_0001 WT05 - SHOP DRAWING - QUADRANT-A & D NORTH - BASEMENT 1 OVERALL PLAN<br />

2 JWL_C_MERO_FAC_SD_WT5_B1_0002 WT05 GLAZING MODULATION AT BASEMENT 1 QUADRANT D GL-6~15/ GL-B~J<br />

3 JWL_C_MERO_FAC_SD_WT5_B1_0003 WT05 GLAZING MODULATION AT BASEMENT 1 QUADRANT A GL-15~24/ GL-B~J


Mero Asia Pacific Pte Ltd<br />

STATUS :<br />

APP - Approved<br />

AWC - Approved with Comments - Resubmission Required<br />

RR - Revise and Resubmit Required<br />

as of 15 August 2016<br />

SHOP DRAWING LIST BREAKDOWN<br />

1ST SUBMISSION<br />

REV.0<br />

2ND SUBMISSION<br />

REV.A1<br />

NO.<br />

DRAWING NO.<br />

DESCRIPTION OF DRAWINGS<br />

MERO - TRANSMITTAL<br />

WHOS - WORKFLOW<br />

MERO - TRANSMITTAL<br />

WHOS - WORKFLOW<br />

REMARKS<br />

SUBMISSION<br />

SUBMISSION<br />

APPROVAL<br />

SUBMISSION<br />

SUBMISSION<br />

APPROVAL<br />

DATE MERO ACONEX DATE WHOS ACONEX DATE DRAWING<br />

DATE MERO ACONEX DATE WHOS ACONEX DATE<br />

REV<br />

REV<br />

TRANSMITTAL NO.<br />

TRANSMITTAL NO.<br />

STATUS<br />

TRANSMITTAL NO.<br />

TRANSMITTAL NO.<br />

TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL<br />

DRAWING<br />

STATUS<br />

4 JWL_C_MERO_FAC_SD_WT5_B1_1001 WT05 BASEMENT 1 ELEVATION AT QUADRANT A & D GL-7~24 / GL-C<br />

5 JWL_C_MERO_FAC_SD_WT5_B1_1002 WT05 BASEMENT 1 ELEVATION AT QUADRANT A & D GL-9~24 / GL-E<br />

6 JWL_C_MERO_FAC_SD_WT5_B1_1101<br />

7 JWL_C_MERO_FAC_SD_WT5_B1_1102<br />

8 JWL_C_MERO_FAC_SD_WT5_B1_1103<br />

9 JWL_C_MERO_FAC_SD_WT5_B1_1104<br />

10 JWL_C_MERO_FAC_SD_WT5_B1_1105<br />

11 JWL_C_MERO_FAC_SD_WT5_B1_1106<br />

12 JWL_C_MERO_FAC_SD_WT5_B1_1107<br />

13 JWL_C_MERO_FAC_SD_WT5_B1_1108<br />

14 JWL_C_MERO_FAC_SD_WT5_B1_1109<br />

WT05 PARTIAL ELEVATION, SECTION AND PLAN AT BASEMENT 1 QUADRANT D<br />

ALONG GL-C / 11~12<br />

WT05 PARTIAL ELEVATION, SECTION AND PLAN AT BASEMENT 1 QUADRANT D<br />

ALONG GL-C / 07~09<br />

WT05 PARTIAL ELEVATION, SECTION AND PLAN AT BASEMENT 1 QUADRANT D&A<br />

ALONG GL-C / 14~15<br />

WT05 PARTIAL ELEVATION, SECTION AND PLAN AT BASEMENT 1 QUADRANT A<br />

ALONG GL-C / 20~21<br />

WT05 PARTIAL ELEVATION, SECTION AND PLAN AT BASEMENT 1 QUADRANT A<br />

ALONG GL-C / 23~24<br />

WT05 PARTIAL ELEVATION, SECTION AND PLAN AT BASEMENT 1 QUADRANT D<br />

ALONG GL-E / 09~10<br />

WT05 PARTIAL ELEVATION, SECTION AND PLAN AT BASEMENT 1 QUADRANT A<br />

ALONG GL-E / 19~20<br />

WT05 PARTIAL ELEVATION, SECTION AND PLAN AT BASEMENT 1 QUADRANT A<br />

ALONG GL-E / 23~24<br />

WT05 PARTIAL ELEVATION, SECTION AND PLAN AT BASEMENT 1 QUADRANT A<br />

ALONG GL-D / 23~24<br />

15 JWL_C_MERO_FAC_SD_WT5_B1_2001 WT05 SECTION DETAIL AT BASEMENT 1 - SHEET-1<br />

16 JWL_C_MERO_FAC_SD_WT5_B1_2002 WT05 SECTION DETAIL AT BASEMENT 1 - SHEET-2<br />

17 JWL_C_MERO_FAC_SD_WT5_B1_2003 WT05 SECTION DETAIL AT BASEMENT 1 - SHEET-3<br />

18 JWL_C_MERO_FAC_SD_WT5_B1_2004 WT05 SECTION DETAIL AT BASEMENT 1 - SHEET-4<br />

19 JWL_C_MERO_FAC_SD_WT5_B1_2005 WT05 SECTION DETAIL AT BASEMENT 1 - SHEET-5<br />

20 JWL_C_MERO_FAC_SD_WT5_B1_2006 WT05 SECTION DETAIL AT BASEMENT 1 - SHEET-6<br />

21 JWL_C_MERO_FAC_SD_WT5_B1_2007 WT05 SECTION DETAIL AT BASEMENT 1 - SHEET-7<br />

22 JWL_C_MERO_FAC_SD_WT5_B1_2008 WT05 SECTION DETAIL AT BASEMENT 1 - SHEET-8<br />

23 JWL_C_MERO_FAC_SD_WT5_B1_2009 WT05 SECTION DETAIL AT BASEMENT 1 - SHEET-9<br />

24 JWL_C_MERO_FAC_SD_WT5_B1_2010 WT05 SECTION DETAIL AT BASEMENT 1 - SHEET-10<br />

25 JWL_C_MERO_FAC_SD_WT5_B1_2011 WT05 SECTION DETAIL AT BASEMENT 1 - SHEET-11<br />

26 JWL_C_MERO_FAC_SD_WT5_B1_2012 WT05 SECTION DETAIL AT BASEMENT 1 - SHEET-12


Mero Asia Pacific Pte Ltd<br />

STATUS :<br />

APP - Approved<br />

AWC - Approved with Comments - Resubmission Required<br />

RR - Revise and Resubmit Required<br />

as of 15 August 2016<br />

CAST-IN SHOP DRAWING BREAKDOWN<br />

NO.<br />

DRAWING NO.<br />

DRAWING TITLE<br />

REV<br />

MERO - TRANSMITTAL<br />

1ST SUBMISSION<br />

REV.0<br />

WHOS - WORKFLOW<br />

MERO - TRANSMITTAL<br />

2ND SUBMISSION<br />

REV.A1<br />

WHOS - WORKFLOW<br />

MERO - TRANSMITTAL<br />

3RD SUBMISSION<br />

SUBMISSION<br />

SUBMISSION<br />

APPROVAL<br />

SUBMISSION<br />

SUBMISSION<br />

APPROVAL<br />

SUBMISSION<br />

SUBMISSION<br />

APPROVAL<br />

SUBMISSION<br />

SUBMISSION<br />

APPROVAL<br />

DATE MERO ACONEX DATE WHOS ACONEX DATE DRAWING<br />

DATE MERO ACONEX DATE WHOS ACONEX DATE DRAWING<br />

DATE MERO ACONEX DATE WHOS ACONEX DATE DRAWING<br />

DATE MERO ACONEX DATE WHOS ACONEX DATE<br />

REV<br />

REV<br />

REV<br />

TRANSMITTAL NO.<br />

TRANSMITTAL NO.<br />

STATUS<br />

TRANSMITTAL NO.<br />

TRANSMITTAL NO.<br />

STATUS<br />

TRANSMITTAL NO.<br />

TRANSMITTAL NO.<br />

STATUS<br />

TRANSMITTAL NO.<br />

TRANSMITTAL NO.<br />

TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL<br />

REV.A2<br />

WHOS - WORKFLOW<br />

MERO - TRANSMITTAL<br />

4TH SUBMISSION<br />

REV.A3<br />

WHOS - WORKFLOW<br />

DRAWING<br />

STATUS<br />

REMARKS<br />

A 1ST STOREY CAST-IN (WT-02)<br />

WT-02 North Gateway Cast-In Layout Plan &<br />

1 JWL_C_MERO_FAC_SD_WT2_1_9100<br />

0 13.02.16 05.02.16 MERO-TRANSMIT-000082 WHOS-TRANSMIT-002390 11.03.16 23.02.16 RR<br />

Details at 1st Storey<br />

WT-02 North Gateway Cast-In Plate Detail (Type-<br />

2 JWL_C_MERO_FAC_SD_WT2_1_9101<br />

0 13.02.16 05.02.16 MERO-TRANSMIT-000082 WHOS-TRANSMIT-002390 11.03.16 23.02.16 RR<br />

01) at 1st Storey<br />

WT-02 North Gateway Cast-In Plate Detail (Type-<br />

3 JWL_C_MERO_FAC_SD_WT2_1_9102<br />

0 13.02.16 05.02.16 MERO-TRANSMIT-000082 WHOS-TRANSMIT-002390 11.03.16 23.02.16 RR<br />

02) at 1st Storey<br />

WT-02 North Gateway Cast-In Plate Detail (Type-<br />

4 JWL_C_MERO_FAC_SD_WT2_1_9103<br />

0 13.02.16 05.02.16 MERO-TRANSMIT-000082 WHOS-TRANSMIT-002390 11.03.16 23.02.16 RR<br />

03) at 1st Storey<br />

WT-02 North Gateway Cast-In Plate Detail (Type-<br />

5 JWL_C_MERO_FAC_SD_WT2_1_9104<br />

04) at 1st Storey<br />

B 2ND STOREY CAST-IN (WT-01 / WT-02 / WT-03)<br />

1 JWL_C_MERO_FAC_SD_WT_2_9200 WT - Overall 2nd Storey Cast-In Marking Layout 0 13.02.16 05.02.16 MERO-TRANSMIT-000083 WHOS-TRANSMIT-002584 11.03.16 17.03.16 AWC RR A1 10.05.16 04.05.16 MERO-TRANSMIT-000095 WHOS-TRANSMIT-003128 24.05.16 24.05.16 APP RR A2 13.07.16 08.07.16 MERO-TRANSMIT-000128 WHOS-TRANSMIT-003961 01.08.16 04.08.16<br />

AWC<br />

2 JWL_C_MERO_FAC_SD_WT1_2_9201<br />

3 JWL_C_MERO_FAC_SD_WT1_2_9204<br />

4 JWL_C_MERO_FAC_SD_WT1_2_9205<br />

5 JWL_C_MERO_FAC_SD_WT1_2_9206<br />

6 JWL_C_MERO_FAC_SD_WT1_2_9210<br />

7 JWL_C_MERO_FAC_SD_WT1_2_9211<br />

8 JWL_C_MERO_FAC_SD_WT1_2_9215<br />

9 JWL_C_MERO_FAC_SD_WT1_2_9216<br />

10 JWL_C_MERO_FAC_SD_WT1_2_9220<br />

11 JWL_C_MERO_FAC_SD_WT1_2_9221<br />

12 JWL_C_MERO_FAC_SD_WT2_2_9222<br />

13 JWL_C_MERO_FAC_SD_WT2_2_9223<br />

14 JWL_C_MERO_FAC_SD_WT2_2_9224<br />

15 JWL_C_MERO_FAC_SD_WT2_2_9225<br />

16 JWL_C_MERO_FAC_SD_WT2_2_9226<br />

17 JWL_C_MERO_FAC_SD_WT2_2_9227<br />

18 JWL_C_MERO_FAC_SD_WT3_2_9202<br />

19 JWL_C_MERO_FAC_SD_WT3_2_9203<br />

20 JWL_C_MERO_FAC_SD_WT3_2_9207<br />

21 JWL_C_MERO_FAC_SD_WT3_2_9212<br />

22 JWL_C_MERO_FAC_SD_WT3_2_9217<br />

23 JWL_C_MERO_FAC_SD_WT1_2_9228<br />

WT-01 North Gateway Partial Cast-In Layout Plan<br />

& Details at 2nd Storey (GL-B-E/ GL-5-11)<br />

WT-01 North Gateway Partial Cast-In Layout Plan<br />

& Details at 2nd Storey (GL-B-F/ GL-18-25)<br />

WT-01 Partial Cast-In Layout Plan & Details at 2nd<br />

Storey (GL-G-K/ GL-25-27)<br />

WT-01 Partial Cast-In Layout Plan & Details at 2nd<br />

Storey (GL-CL3-P/ GL-25.1-27)<br />

WT-01 Partial Cast-In Layout Plan & Details at 2nd<br />

Storey (GL-S~U/ GL-20-24)<br />

WT-01 Partial Cast-In Layout Plan & Details at 2nd<br />

Storey (GL-T~V/ GL-17-21)<br />

WT-01 Partial Cast-In Layout Plan & Details at 2nd<br />

Storey (GL-T~V/ GL-8-11)<br />

WT-01 Partial Cast-In Layout Plan & Details at 2nd<br />

Storey (GL-S~U/ GL-5-9)<br />

WT-01 Partial Cast-In Layout Plan & Details at 2nd<br />

Storey (GL-K~P/ GL-2-3)<br />

WT-01 Partial Cast-In Layout Plan & Details at 2nd<br />

Storey (GL-F~K/ GL-2-4)<br />

WT-02 East Gateway Cast-In Plan Layout & Detail<br />

at 2nd Storey<br />

WT-02 East Gateway Typucal Cast-In Plate Details<br />

(Type-01)at 2nd Storey<br />

WT-02 South Gateway Cast-In Layout Plan at 2nd<br />

Storey<br />

WT-02 South Gateway Typical Cast-In Plan Details<br />

(Type-01) at 2nd Storey<br />

WT-02 West Gateway Cast-In Layout Plan at 2nd<br />

Storey<br />

WT-02 West Gateway Typical Cast-In Details<br />

(Type-01) at 2nd Storey<br />

WT-03 North Gateway Partial Cast-In Layout Plan<br />

& Details at 2nd Storey (GL-B~C)/ GL-11~14)<br />

WT-03 North Gateway Partial Cast-In Layout Plan<br />

& Details at 2nd Storey (GL-B~C)/ GL-15~18)<br />

WT-03 East Gateway Cast-In Layout Plan &<br />

Details at 2nd Storey<br />

WT-03 South Cast-In Layout Plan & Details at 2nd<br />

Storey<br />

WT-03 West Gateway Cast-In Layout Plan & Detail<br />

at 2nd Storey<br />

WT-01 North Gateway Type A & B Cast-In Plate<br />

Details at 2nd Storey<br />

0 13.02.16 05.02.16 MERO-TRANSMIT-000083 WHOS-TRANSMIT-002584 11.03.16 17.03.16 AWC RR A1 10.05.16 04.05.16 MERO-TRANSMIT-000094 WHOS-TRANSMIT-003127 24.05.16 24.05.16 APP RR A2 13.07.16 08.07.16 MERO-TRANSMIT-000127 WHOS-TRANSMIT-003960 01.08.16 04.08.16 APP AWC<br />

0 13.02.16 05.02.16 MERO-TRANSMIT-000083 WHOS-TRANSMIT-002584 11.03.16 17.03.16 AWC RR A1 10.05.16 04.05.16 MERO-TRANSMIT-000094 WHOS-TRANSMIT-003127 24.05.16 24.05.16 APP RR A2 13.07.16 08.07.16 MERO-TRANSMIT-000127 WHOS-TRANSMIT-003960 01.08.16 04.08.16 APP RR A3 25.08.16 08.08.16 MERO-TRANSMIT-000136<br />

0 13.02.16 05.02.16 MERO-TRANSMIT-000083 WHOS-TRANSMIT-002584 11.03.16 17.03.16 AWC RR A1 10.05.16 04.05.16 MERO-TRANSMIT-000094 WHOS-TRANSMIT-003127 24.05.16 24.05.16 AWC RR A2 13.07.16 08.07.16 MERO-TRANSMIT-000127 WHOS-TRANSMIT-003960 01.08.16 04.08.16 APP AWC<br />

0 13.02.16 05.02.16 MERO-TRANSMIT-000083 WHOS-TRANSMIT-002584 11.03.16 17.03.16 AWC RR A1 10.05.16 04.05.16 MERO-TRANSMIT-000094 WHOS-TRANSMIT-003127 24.05.16 24.05.16 AWC RR A2 13.07.16 08.07.16 MERO-TRANSMIT-000127 WHOS-TRANSMIT-003960 01.08.16 04.08.16 APP AWC<br />

0 13.02.16 05.02.16 MERO-TRANSMIT-000083 WHOS-TRANSMIT-002584 11.03.16 17.03.16 AWC RR A1 10.05.16 04.05.16 MERO-TRANSMIT-000094 WHOS-TRANSMIT-003127 24.05.16 24.05.16 AWC RR A2 13.07.16 08.07.16 MERO-TRANSMIT-000127 WHOS-TRANSMIT-003960 01.08.16 04.08.16 APP AWC<br />

0 13.02.16 05.02.16 MERO-TRANSMIT-000083 WHOS-TRANSMIT-002584 11.03.16 17.03.16 AWC RR A1 10.05.16 04.05.16 MERO-TRANSMIT-000094 WHOS-TRANSMIT-003127 24.05.16 24.05.16 AWC RR A2 13.07.16 08.07.16 MERO-TRANSMIT-000127 WHOS-TRANSMIT-003960 01.08.16 04.08.16 APP AWC<br />

0 13.02.16 05.02.16 MERO-TRANSMIT-000083 WHOS-TRANSMIT-002584 11.03.16 17.03.16 AWC RR A1 10.05.16 04.05.16 MERO-TRANSMIT-000094 WHOS-TRANSMIT-003127 24.05.16 24.05.16 AWC RR A2 13.07.16 08.07.16 MERO-TRANSMIT-000127 WHOS-TRANSMIT-003960 01.08.16 04.08.16 APP AWC<br />

0 13.02.16 05.02.16 MERO-TRANSMIT-000083 WHOS-TRANSMIT-002584 11.03.16 17.03.16 AWC RR A1 10.05.16 04.05.16 MERO-TRANSMIT-000094 WHOS-TRANSMIT-003127 24.05.16 24.05.16 AWC RR A2 13.07.16 08.07.16 MERO-TRANSMIT-000127 WHOS-TRANSMIT-003960 01.08.16 04.08.16 APP AWC<br />

0 13.02.16 05.02.16 MERO-TRANSMIT-000083 WHOS-TRANSMIT-002584 11.03.16 17.03.16 AWC RR A1 10.05.16 04.05.16 MERO-TRANSMIT-000094 WHOS-TRANSMIT-003127 24.05.16 24.05.16 AWC RR A2 13.07.16 08.07.16 MERO-TRANSMIT-000127 WHOS-TRANSMIT-003960 01.08.16 04.08.16 APP AWC<br />

0 13.02.16 05.02.16 MERO-TRANSMIT-000083 WHOS-TRANSMIT-002584 11.03.16 17.03.16 AWC RR A1 10.05.16 04.05.16 MERO-TRANSMIT-000094 WHOS-TRANSMIT-003127 24.05.16 24.05.16 AWC RR A2 13.07.16 08.07.16 MERO-TRANSMIT-000127 WHOS-TRANSMIT-003960 01.08.16 04.08.16 APP AWC<br />

0 13.02.16 05.02.16 MERO-TRANSMIT-000084 WHOS-TRANSMIT-002585 11.03.16 17.03.16 APP RR A1 10.05.16 04.05.16 MERO-TRANSMIT-000095 WHOS-TRANSMIT-003128 24.05.16 24.05.16 AWC RR A2 13.07.16 08.07.16 MERO-TRANSMIT-000127 WHOS-TRANSMIT-003960 01.08.16 04.08.16 APP RR A3 25.08.16 08.08.16 MERO-TRANSMIT-000136<br />

0 13.02.16 05.02.16 MERO-TRANSMIT-000084 WHOS-TRANSMIT-002585 11.03.16 17.03.16 APP RR A1 10.05.16 04.05.16 MERO-TRANSMIT-000095 WHOS-TRANSMIT-003128 24.05.16 24.05.16 AWC RR A2 13.07.16 08.07.16 MERO-TRANSMIT-000127 WHOS-TRANSMIT-003960 01.08.16 04.08.16 APP AWC<br />

0 13.02.16 05.02.16 MERO-TRANSMIT-000084 WHOS-TRANSMIT-002585 11.03.16 17.03.16 APP RR A1 10.05.16 04.05.16 MERO-TRANSMIT-000095 WHOS-TRANSMIT-003128 24.05.16 24.05.16 AWC RR A2 13.07.16 08.07.16 MERO-TRANSMIT-000127 WHOS-TRANSMIT-003960 01.08.16 04.08.16 APP AWC<br />

0 13.02.16 05.02.16 MERO-TRANSMIT-000084 WHOS-TRANSMIT-002585 11.03.16 17.03.16 APP RR A1 10.05.16 04.05.16 MERO-TRANSMIT-000095 WHOS-TRANSMIT-003128 24.05.16 24.05.16 AWC RR A2 13.07.16 08.07.16 MERO-TRANSMIT-000128 WHOS-TRANSMIT-003961 01.08.16 04.08.16 APP AWC<br />

0 13.02.16 05.02.16 MERO-TRANSMIT-000084 WHOS-TRANSMIT-002585 11.03.16 17.03.16 APP RR A1 10.05.16 04.05.16 MERO-TRANSMIT-000095 WHOS-TRANSMIT-003128 24.05.16 24.05.16 AWC RR A2 13.07.16 08.07.16 MERO-TRANSMIT-000128 WHOS-TRANSMIT-003961 01.08.16 04.08.16 APP AWC<br />

0 13.02.16 05.02.16 MERO-TRANSMIT-000084 WHOS-TRANSMIT-002585 11.03.16 17.03.16 APP RR A1 10.05.16 04.05.16 MERO-TRANSMIT-000095 WHOS-TRANSMIT-003128 24.05.16 24.05.16 AWC RR A2 13.07.16 08.07.16 MERO-TRANSMIT-000128 WHOS-TRANSMIT-003961 01.08.16 04.08.16 APP AWC<br />

0 13.02.16 05.02.16 MERO-TRANSMIT-000084 WHOS-TRANSMIT-002585 11.03.16 17.03.16 AWC RR A1 10.05.16 04.05.16 MERO-TRANSMIT-000095 WHOS-TRANSMIT-003128 24.05.16 24.05.16 AWC RR A2 13.07.16 08.07.16 MERO-TRANSMIT-000128 WHOS-TRANSMIT-003961 01.08.16 04.08.16 APP RR A3 25.08.16 08.08.16 MERO-TRANSMIT-000136<br />

0 13.02.16 05.02.16 MERO-TRANSMIT-000084 WHOS-TRANSMIT-002585 11.03.16 17.03.16 AWC RR A1 10.05.16 04.05.16 MERO-TRANSMIT-000095 WHOS-TRANSMIT-003128 24.05.16 24.05.16 AWC RR A2 13.07.16 08.07.16 MERO-TRANSMIT-000128 WHOS-TRANSMIT-003961 01.08.16 04.08.16 APP RR A3 25.08.16 08.08.16 MERO-TRANSMIT-000136<br />

0 13.02.16 05.02.16 MERO-TRANSMIT-000084 WHOS-TRANSMIT-002585 11.03.16 17.03.16 AWC RR A1 10.05.16 04.05.16 MERO-TRANSMIT-000095 WHOS-TRANSMIT-003128 24.05.16 24.05.16 AWC RR A2 13.07.16 08.07.16 MERO-TRANSMIT-000128 WHOS-TRANSMIT-003961 01.08.16 04.08.16 APP AWC<br />

0 13.02.16 05.02.16 MERO-TRANSMIT-000084 WHOS-TRANSMIT-002585 11.03.16 17.03.16 AWC RR A1 10.05.16 04.05.16 MERO-TRANSMIT-000095 WHOS-TRANSMIT-003128 24.05.16 24.05.16 AWC RR A2 13.07.16 08.07.16 MERO-TRANSMIT-000128 WHOS-TRANSMIT-003961 01.08.16 04.08.16 APP AWC<br />

0 13.02.16 05.02.16 MERO-TRANSMIT-000084 WHOS-TRANSMIT-002585 11.03.16 17.03.16 AWC RR A1 10.05.16 04.05.16 MERO-TRANSMIT-000095 WHOS-TRANSMIT-003128 24.05.16 24.05.16 AWC RR A2 13.07.16 08.07.16 MERO-TRANSMIT-000128 WHOS-TRANSMIT-003961 01.08.16 04.08.16 APP AWC<br />

0 10.05.16 04.05.16 MERO-TRANSMIT-000094 WHOS-TRANSMIT-003127 24.05.16 24.05.16 APP RR A1 13.07.16 08.07.16 MERO-TRANSMIT-000127 WHOS-TRANSMIT-003960 01.08.16 04.08.16 APP RR A3 25.08.16 08.08.16 MERO-TRANSMIT-000136<br />

24 JWL_C_MERO_FAC_SD_WT1_2_9229 WT-01 2nd Storey Cast-In Isometric Details 0 10.05.16 04.05.16 MERO-TRANSMIT-000094 WHOS-TRANSMIT-003127 24.05.16 24.05.16 APP RR A1 13.07.16 08.07.16 MERO-TRANSMIT-000127 WHOS-TRANSMIT-003960 01.08.16 04.08.16 APP AWC<br />

WT-01 2nd Storey Type-A & Type-B Cast-In<br />

25 JWL_C_MERO_FAC_SD_WT1_2_9230<br />

Isometric Details<br />

WT-03 East Gateway Corner Cast-In Layout Plan<br />

26 JWL_C_MERO_FAC_SD_WT3_2_9208<br />

& Details at 2nd Storey<br />

WT-03 East Gateway Corner Typical Cast-In<br />

27 JWL_C_MERO_FAC_SD_WT3_2_9209<br />

Corner Arch Base Plate Details at 2nd Storey<br />

WT-03 South Gateway Corner Cast-In Layout Plan<br />

28 JWL_C_MERO_FAC_SD_WT3_2_9213<br />

& Details at 2nd Storey<br />

WT-03 South Gateway Corner Typical Cast-In<br />

29 JWL_C_MERO_FAC_SD_WT3_2_9214<br />

Corner Arch Base Plate Details at 2nd Storey<br />

WT-03 West Gateway Corner Cast-In Layout Plan<br />

30 JWL_C_MERO_FAC_SD_WT3_2_9218<br />

& Details at 2nd Storey<br />

WT-03 West Gateway Corner Typical Cast-In<br />

31 JWL_C_MERO_FAC_SD_WT3_2_9219<br />

Corner Arch Base Plate Details at 2nd Storey<br />

C 3RD STOREY CAST-IN (WT-01)<br />

1 JWL_C_MERO_FAC_SD_WT1_3_9300 3rd Storey - WT-01 Cast-In Bracket Overall Layout 0 07.06.16 31.05.16 MERO-TRANSMIT-000106 WHOS-TRANSMIT-003749 13.07.16 21.07.16 APP RR A1 11.08.16<br />

0 13.07.16 08.07.16 MERO-TRANSMIT-000127 WHOS-TRANSMIT-003960 01.08.16 04.08.16 APP AWC<br />

0 13.07.16 08.07.16 MERO-TRANSMIT-000128 WHOS-TRANSMIT-003961 01.08.16 04.08.16 APP AWC<br />

0 13.07.16 08.07.16 MERO-TRANSMIT-000128 WHOS-TRANSMIT-003961 01.08.16 04.08.16 APP AWC<br />

0 13.07.16 08.07.16 MERO-TRANSMIT-000128 WHOS-TRANSMIT-003961 01.08.16 04.08.16 APP AWC<br />

0 13.07.16 08.07.16 MERO-TRANSMIT-000128 WHOS-TRANSMIT-003961 01.08.16 04.08.16 APP AWC<br />

0 13.07.16 08.07.16 MERO-TRANSMIT-000128 WHOS-TRANSMIT-003961 01.08.16 04.08.16 APP AWC<br />

0 13.07.16 08.07.16 MERO-TRANSMIT-000128 WHOS-TRANSMIT-003961 01.08.16 04.08.16 APP AWC<br />

2 JWL_C_MERO_FAC_SD_WT1_3_9301<br />

3 JWL_C_MERO_FAC_SD_WT1_3_9302<br />

4 JWL_C_MERO_FAC_SD_WT1_3_9303<br />

5 JWL_C_MERO_FAC_SD_WT1_3_9304<br />

6 JWL_C_MERO_FAC_SD_WT1_3_9305<br />

7 JWL_C_MERO_FAC_SD_WT1_3_9306<br />

8 JWL_C_MERO_FAC_SD_WT1_3_9307<br />

9 JWL_C_MERO_FAC_SD_WT1_3_9308<br />

10 JWL_C_MERO_FAC_SD_WT1_3_9309<br />

11 JWL_C_MERO_FAC_SD_WT1_3_9310<br />

WT-01 Partial Cast-In Layout Plan & Details at 3rd<br />

Storey (GL-K-P/ GL-2-3)<br />

WT-01 Partial Cast-In Layout Plan & Details at 3rd<br />

Storey (GL-F-K/ GL-2-4)<br />

WT-01 Partial Cast-In Layout Plan & Details at 3rd<br />

Storey (GL-B-E/ GL-5-11)<br />

WT-01 Partial Cast-In Layout Plan & Details at 3rd<br />

Storey (GL-B-F/ GL-18-25)<br />

WT-01 Partial Cast-In Layout Plan & Details at 3rd<br />

Storey (GL-F-K/ GL-24.1-27)<br />

WT-01 Partial Cast-In Layout Plan & Details at 3rd<br />

Storey (GL-K-P/ GL-25.1-27)<br />

WT-01 Partial Cast-In Layout Plan & Details at 3rd<br />

Storey (GL-S-U/ GL-20-24)<br />

WT-01 Partial Cast-In Layout Plan & Details at 3rd<br />

Storey (GL-T-V/ GL-17-21)<br />

WT-01 Partial Cast-In Layout Plan & Details at 3rd<br />

Storey (GL-T-V/ GL-8-12)<br />

WT-01 Partial Cast-In Layout Plan & Details at 3rd<br />

Storey (GL-S-U/ GL-5-9)<br />

0 07.06.16 31.05.16 MERO-TRANSMIT-000106 WHOS-TRANSMIT-003749 13.07.16 21.07.16 APP RR A1 11.08.16<br />

0 07.06.16 31.05.16 MERO-TRANSMIT-000106 WHOS-TRANSMIT-003749 13.07.16 21.07.16 APP RR A1 11.08.16<br />

0 07.06.16 31.05.16 MERO-TRANSMIT-000106 WHOS-TRANSMIT-003749 13.07.16 21.07.16 APP RR A1 11.08.16<br />

0 07.06.16 31.05.16 MERO-TRANSMIT-000106 WHOS-TRANSMIT-003749 13.07.16 21.07.16 APP RR A1 11.08.16<br />

0 07.06.16 31.05.16 MERO-TRANSMIT-000106 WHOS-TRANSMIT-003749 13.07.16 21.07.16 APP RR A1 11.08.16<br />

0 07.06.16 31.05.16 MERO-TRANSMIT-000106 WHOS-TRANSMIT-003749 13.07.16 21.07.16 APP RR A1 11.08.16<br />

0 07.06.16 31.05.16 MERO-TRANSMIT-000106 WHOS-TRANSMIT-003749 13.07.16 21.07.16 APP RR A1 11.08.16<br />

0 07.06.16 31.05.16 MERO-TRANSMIT-000106 WHOS-TRANSMIT-003749 13.07.16 21.07.16 APP RR A1 11.08.16<br />

0 07.06.16 31.05.16 MERO-TRANSMIT-000106 WHOS-TRANSMIT-003749 13.07.16 21.07.16 APP RR A1 11.08.16<br />

0 07.06.16 31.05.16 MERO-TRANSMIT-000106 WHOS-TRANSMIT-003749 13.07.16 21.07.16 APP RR A1 11.08.16<br />

12 JWL_C_MERO_FAC_SD_WT1_3_9311 WT-01 3rd Storey Cast-In Isometric Details 0 07.06.16 31.05.16 MERO-TRANSMIT-000106 WHOS-TRANSMIT-003749 13.07.16 21.07.16 APP RR A1 11.08.16<br />

D 4TH STOREY BRACKET SET-OUT (WT-01)<br />

1 JWL_C_MERO_FAC_SD_WT1_4_9400 4th Storey - WT-01 Bracket Overall Layout<br />

2 JWL_C_MERO_FAC_SD_WT1_4_9401<br />

3 JWL_C_MERO_FAC_SD_WT1_4_9402<br />

4 JWL_C_MERO_FAC_SD_WT1_4_9403<br />

5 JWL_C_MERO_FAC_SD_WT1_4_9404<br />

6 JWL_C_MERO_FAC_SD_WT1_4_9405<br />

7 JWL_C_MERO_FAC_SD_WT1_4_9406<br />

8 JWL_C_MERO_FAC_SD_WT1_4_9407<br />

9 JWL_C_MERO_FAC_SD_WT1_4_9408<br />

10 JWL_C_MERO_FAC_SD_WT1_4_9409<br />

11 JWL_C_MERO_FAC_SD_WT1_4_9410<br />

WT-01 Partial Bracket Layout Plan and Details at<br />

4th Storey (GL-K~P / GL-2~3)<br />

WT-01 Partial Bracket Layout Plan and Details at<br />

4th Storey (GL-F~J / GL-2~5.1)<br />

WT-01 Partial Bracket Layout Plan and Details at<br />

4th Storey (GL-B~E / GL-6~11)<br />

WT-01 Partial Bracket Layout Plan and Details at<br />

4th Storey (GL-B~E / GL-18~23)<br />

WT-01 Partial Bracket Layout Plan and Details at<br />

4th Storey (GL-E~J/ GL-23.1~27)<br />

WT-01 Partial Bracket Layout Plan and Details at<br />

4th Storey (GL-K~P / GL-25.1~27)<br />

WT-01 Partial Bracket Layout Plan and Details at<br />

4th Storey (GL-S~U / GL-20~24)<br />

WT-01 Partial Bracket Layout Plan and Details at<br />

4th Storey (GL-T~V / GL-17~21)<br />

WT-01 Partial Bracket Layout Plan and Details at<br />

4th Storey (GL-T~V / GL-8~12)<br />

WT-01 Partial Bracket Layout Plan and Details at<br />

4th Storey (GL-S~U / GL-5~9)


2. SAMPLE SUBMISSION STATUS


Status<br />

Status<br />

Status<br />

Form Mo.: MR-CD-05<br />

Rev. B - Dated 28 Aug 2015<br />

STATUS :<br />

APP - Approved<br />

AWC - Approved with Comments - Resubmission Required<br />

RR - Revise and Resubmit Required Project No.: 90928<br />

OUTGOING REGISTER<br />

Project Name: The Jewel<br />

Rev. No<br />

PROJECT JEWEL - FAÇADE SAMPLE SUMMARY<br />

Rev. 0<br />

S/N Document No. Document Title<br />

MERO<br />

Aconex<br />

Transmit No.<br />

Submitted<br />

Date<br />

BH Reply<br />

SA Reply<br />

RSPA Reply<br />

WHOS<br />

Aconex<br />

Transmit No.<br />

Received<br />

Date<br />

Sample<br />

1 JWL _ C _ MERO _ FAC _ SS _ PJW _ AL _ 0005 Dongming Thermoplastic Elestometer EPDM Sealing Strip (EPDM-S)<br />

a JWL _ C _ MERO _ FAC _ SS _ PJW _ AL _ 0005 / 1 GD1 Secondary Gasket Transmit-000078 21.01.16 04.02.16 APP 04.02.16 AWC 04.02.16 AWC Transmit-002292 04.02.06<br />

b JWL _ C _ MERO _ FAC _ SS _ PJW _ AL _ 0005 / 2 GD2 Primary Gasket Transmit-000078 21.01.16 04.02.16 APP 04.02.16 AWC 04.02.16 AWC Transmit-002292 04.02.06<br />

c JWL _ C _ MERO _ FAC _ SS _ PJW _ AL _ 0005 / 3 GD03 Joint Seal Gasket Transmit-000078 21.01.16 04.02.16 APP 04.02.16 AWC 04.02.16 AWC Transmit-002292 04.02.06<br />

2 JWL _ C _ MERO _ FAC _ SS _ RT1 _ RF _ 0006<br />

3 JWL _ C _ MERO _ FAC _ SS _ WT2 _ AL _ 0007<br />

37.52mm Laminated DGU for RT-01<br />

37.52mm Laminated DGU (8mm Solarban 70XL on Clear (2) + 16mm Air + 6mm Clear +<br />

1.52mm SGP + 6mm Clear<br />

21.52mm Low Iron Laminated Glass for WT-02 Gateways<br />

21.52mm Low Iron Laminated Glass (10mm Low iron + 1.52mm Clear PVB + 10mm Low<br />

Iron)<br />

Transmit-000104 26.05.16 09.06.16 APP 09.06.16 AWC 09.06.16 AWC Transmit-003287 09.06.16<br />

Transmit-000105 26.05.16 10.06.16 RR 10.06.16 RR Transmit-003309 10.06.16<br />

4 JWL _ C _ MERO _ FAC _ SS _ PJW _ AL _ 0008 Dow Corning 991 & 791 Sealant & Backer Rod 09.06.16 APP 09.06.16 AWC 09.06.16 AWC Transmit-003286 09.06.16<br />

a JWL _ C _ MERO _ FAC _ SS _ PJW _ AL _ 0008 / 1 Dow Corning 991 Silicone High Performance Sealant Transmit-000103 26.05.16 09.06.16 APP 09.06.16 AWC 09.06.16 AWC Transmit-003286 09.06.16<br />

b JWL _ C _ MERO _ FAC _ SS _ PJW _ AL _ 0008 / 2 Dow Corning 791 Silicone High Performance Sealant Transmit-000103 26.05.16 09.06.16 APP 09.06.16 AWC 09.06.16 AWC Transmit-003286 09.06.16<br />

c JWL _ C _ MERO _ FAC _ SS _ PJW _ AL _ 0008 / 3 Closed Cell Backer Rod (8mm, 10mm, 12mm, 14mm, 22mm, dia ; 10mm x 30mm<br />

rectangular shape)<br />

Transmit-000103 26.05.16 09.06.16 APP 09.06.16 AWC 09.06.16 AWC Transmit-003286 09.06.16<br />

5<br />

TBA (SA Reviewed on 3 Aug 16)<br />

38.52 Laminated DGU for WT-03<br />

8mm UD90 Low E Low Iron HS Glass + 16mm As + 6mm HS Low Iron Glass + 2.28 SGP<br />

+ 6mm HS Low Iron Glass<br />

TBA TBA 03.08.16 APP<br />

6<br />

TBA (SA Reviewed on 3 Aug 16)<br />

21.52 Laminated Glass for WT-02<br />

10mm thk Low Iron HS Glass + 1.52 Clear SGP + 10mm Thk Iron HS Glass<br />

TBA TBA 03.08.16 APP<br />

Note: Item 5 & 6 are reviewed and accepted by SA on 03<br />

Aug 2016 and awaiting 300 x 300 samples for formal<br />

Aconex submission and sign off.<br />

Sample (90928) MERO Page 1 of 1 Printed out at 10:04 AM on 15/8/2016


Form Mo.: MR-CD-05<br />

Rev. B - Dated 28 Aug 2015<br />

STATUS :<br />

APP - Approved<br />

AWC - Approved with Comments - Resubmission Required<br />

RR - Revise and Resubmit Required Project No.: 90928<br />

Rev. No<br />

OUTGOING REGISTER<br />

Project Name: The Jewel<br />

PROJECT JEWEL - FAÇADE TECHINICAL DATA, ITP & CALCULATION SUMMARY<br />

Rev. 0<br />

Rev. A1<br />

Rev. A2<br />

S/N Document No. Document Title<br />

MERO<br />

Aconex<br />

Transmit No.<br />

Submitted<br />

Date<br />

BH Reply<br />

Status<br />

SA Reply<br />

Status<br />

RSPA Reply<br />

Status<br />

WHOS<br />

Aconex<br />

Transmit No.<br />

Received<br />

Date<br />

MERO<br />

Aconex<br />

Transmit No.<br />

Submitted<br />

Date<br />

BH Reply<br />

Status<br />

SA Reply<br />

Status<br />

RSP Reply<br />

Status<br />

WHOS<br />

Aconex<br />

Transmit No.<br />

Received<br />

Date<br />

MERO<br />

Aconex<br />

Transmit No.<br />

Submitted<br />

Date<br />

BH Reply<br />

Status<br />

SA Reply<br />

Status<br />

RSP Reply<br />

Status<br />

WHOS<br />

Aconex<br />

Transmit No.<br />

Received<br />

Date<br />

REMARK<br />

A Technical Data<br />

1 JWL _ C _ MERO _ FAC _ TD _ PJW _ AL _ 0001 Technical Data / Load Assumptions Memo-000004 14.05.15 07.05.15 APP PB-20.05.15 APP RSPE-25.05.15 AWC Transmit-000810 26.05.15<br />

2 JWL _ C _ MERO _ FAC _ TD _ PJW _ AL _ 0002 Technical Data / Façade Steel Works - JOTUN Paint System Transmit-000027 09.07.15 RSPE-30.07.15 RR Transmit-001296 05.08.15 Transmit-000039 18.08.15 07.09.15 AWC 07.09.15 APP 07.09.15 AWC Transmit-001525 07.09.15 Transmit-000074 08.01.16 04.02.16 APP 04.02.16 AWC 04.02.16 AWC Transmit-002288 04.02.16<br />

3 JWL _ C _ MERO _ FAC _ TD _ PJW _ AL _ 0003 Technical Data : Jewel Performace Test Mock-Up Method Statement Transmit-000028 13.07.15 12.08.15 AWC No Comments 12.08.15 AWC Transmit-001315 12.08.15<br />

4 JWL _ C _ MERO _ FAC _ TD _ PJW _ AL _ 0004 Technical Data : Aluminum Composite Panel Manufacturer and Glass Processor Transmit-000040 26.08.15 15.09.15 AWC 15.09.15 RR 15.09.15 RR Transmit-001568 15.09.15 Transmit-000057 15.10.15 05.11.15 RR 05.11.15 RR 05.11.15 RR<br />

5 JWL _ C _ MERO _ FAC _ TD _ PJW _ AL _ 0005 EPDM Gasket (EPDM-S) Technical Data and Test <strong>Report</strong> Transmit-000077 21.01.16 04.02.16 RR 04.02.16 RR 04.02.16 RR Transmi-002291 04.02.16<br />

6 JWL _ C _ MERO _ FAC _ TD _ RT1 _ RF _ 0006 37.52mm Laminated DGU for RT-01 Transmit-000104 26.05.16 09.06.16 APP 09.06.16 AWC 09.06.16 AWC Transmit-003287 09.06.16<br />

7 JWL _ C _ MERO _ FAC _ TD _ WT2 _ AL _ 0007 21.52mm Low Iron Laminated Glass Technical Data for WT-02 Gateways Transmit-000105 26.05.16 10.06.16 RR 10.06.16 RR Transmit-003309 10.06.16<br />

8 JWL _ C _ MERO _ FAC _ TD _ PJW _ AL _ 0008 Dow Corning 991 & 791 Sealant & Backer Rod Technical Data Transmit-000103 26.05.16 09.06.16 APP 09.06.16 AWC 09.06.16 AWC Transmit-003286 09.06.16<br />

9 JWL _ C _ MERO _ FAC _ TD _ PJW _ AL _ 0009 QA/QC Plan for GnT Glass Fabrication Transmit-000120 23.06.16<br />

B<br />

Inspection Record<br />

1 JWL _ C _ MERO _ FAC _ IR _ FCD _ AL _ 0001 Inspection Record : Inspection & Test Plan for Nodes & Bolts Transmit-000033 20.07.15 06.08.15 AWC 06.08.15 AWC 06.08.15 *AWC Memo-002706 06.08.15 Transmit-000052 21.09.15 - - 29.10.15 AWC 29.10.15 AWC<br />

2 JWL _ C _ MERO _ FAC _ IR _ FCD _ AL _ 0002 Inspection Record : Inspection & Test Plan for Fabrication and Erection Works Transmit-000037 22.07.15 06.08.15 AWC 06.08.15 AWC 06.08.15 *AWC Memo-002707 06.08.15 Transmit-000048 17.09.15 - - 29.10.15 AWC 29.10.15 AWC Transmit-001787 29.10.15 Transmit-000070 29.12.15 04.02.16 APP 04.02.16 AWC 04.02.16 AWC Transmit-002290 04.02.16<br />

3 JWL _ C _ MERO _ FAC _ IR _ FCD _ AL _ 0003 Inspection Record : Quality Plan for Glass Fabrication Transmit-000059 27.10.15 22.12.15 RR 22.12.15 RR 22.12.15 RR Transmit-002064 22.12.15 Transmit-000131 22.07.16<br />

C Calculation<br />

1 JWL _ C _ MERO _ FAC _ CN _ FCD _ AL _ 0001 Calculation of Aluminum Extrusions Transmit-000036 22.07.15 13.08.15 AWC 13.08.15 AWC 13.08.15 AWC Transmit-001331 13.08.15<br />

2 JWL _ C _ MERO _ FAC _ CN _ FCD _ AL _ 0002 Calculation of Node Conenctions Transmit-000053 01.10.15<br />

3 JWL _ C _ MERO _ FAC _ CN _ FCD _ 5 _ 0003 Calculation of PMU Glazing Structures Transmit-000081 04.02.16 07.03.16 AWC 07.03.16 AWC 07.03.16 AWC Transmit-002494 07.03.16<br />

4 JWL _ C _ MERO _ FAC _ CN _ FCD _ RF _ 0004 RT-01 Tree Columns Structural Calculation for the Spherical Bearings Transmit-000137 12.08.16<br />

5 JWL _ C _ MERO _ FAC _ CN _ WT2 _ 2 _ 0006 WT-02 - South, East, and West Arch Beam Supports Transmit-000121 27.06.16<br />

6 JWL _ C _ MERO _ FAC _ CN _ FCD _ 5 _ 0007 Calculagtion of the Special Hoop Connection at WT-02 North Gateway Transmit-000122 29.06.16<br />

7 JWL _ C _ MERO _ FAC _ CN _ RT1 _ RF _ 0008 RT-01 Starter Node Structural Calculation Transmit-000125 07.07.16 01.08.16 AWC 01.08.16 AWC 01.08.16 AWC Transmit-003888 01.08.16<br />

8 JWL _ C _ MERO _ FAC _ CN _ WT1 _ AL _ 0009 WT-01 Structural Calculation Transmit-000126 07.07.16<br />

D<br />

Brief<br />

1 JWL _ C _ MERO _ FAC _ BR _ PJW _ AL _ 0001 Brief: SAC - Accredited Independent Testing Agency (ITA) Transmit-000073 30.12.15 04.02.16 APP 03.02.16 AWC 03.02.16 AWC Transmi-002270 03.02.16<br />

E<br />

Test <strong>Report</strong><br />

1 JWL _ C _ MERO _ FAC _ TR _ PMU _ 5 _ 0001 Performance Mock-Up Final Test <strong>Report</strong> Transmit-000133 25.07.16 - - - - - - transmit-003803 25.07.16<br />

Documents (90928) MERO Page 1 of 1 Printed out at 9:48 AM on 15/8/2016


3. RFI STATUS


4. VMU / PMU STATUS


Visual Mock Up<br />

NOTE: VMU approved except Paint & Perforated Panels


Performance Mock Up<br />

Re-testing Schedule


10 photos of PMU new die cutting


THE JEWEL - PMU AIR INFILTRATION & WATER RETEST PROGRAM ( UPDATED ON 15 AUG 2016)<br />

ID Task Name Duration Start Finish<br />

1 PMU AIR INFILTRATION AND WATER RETEST 53 days 21 Jul '16 20 Sep '16<br />

2 Reorder New Extrusion Profiles - Alum & Gasket36 days 21 Jul '16 31 Aug '16<br />

3 Die Drawing Approval 1 day 21 Jul '16 21 Jul '16<br />

4 Die Cutting 14 days 21 Jul '16 5 Aug '16<br />

5 1st Article 4 days 6 Aug '16 10 Aug '16<br />

6 1st Article Approval 2 days 11 Aug '16 12 Aug '16<br />

7 Extrusion Production 7 days 13 Aug '16 20 Aug '16<br />

8 Fabrication Steel & Tube for PMU 5 days 20 Aug '16 25 Aug '16<br />

9 Extrusion (Airfreight) 5 days 26 Aug '16 31 Aug '16<br />

10 Fabrication Steel & Tube for PMU 16 days 1 Aug '16 18 Aug '16<br />

11 Installation 29 days 18 Aug '16 20 Sep '16<br />

12 PSB Testing Chamber - Takeover 1 day 18 Aug '16 18 Aug '16<br />

13 Main Steel ( YNE) 9 days 19 Aug '16 29 Aug '16<br />

14 Installation (MAP) Tubes & Nodes 3 days 30 Aug '16 1 Sep '16<br />

15 Installation Aluminium Mullion 2 days 1 Sep '16 2 Sep '16<br />

16 Installation Gasket(MAP) 2 days 3 Sep '16 5 Sep '16<br />

17 Check Gasket & 6 way Joint 1 day 6 Sep '16 6 Sep '16<br />

18 Installation Glass & Alum Panels 2 days 7 Sep '16 8 Sep '16<br />

19 Check Glass Installation 1 day 9 Sep '16 9 Sep '16<br />

20 Sealant 1 day 10 Sep '16 10 Sep '16<br />

21 Pressure Plate & Alum Fin 1 day 12 Sep '16 12 Sep '16<br />

22 Chamber Enclosure 3 days 13 Sep '16 15 Sep '16<br />

23 Trial test 1 day 16 Sep '16 16 Sep '16<br />

24 Rectification 2 days 17 Sep '16 19 Sep '16<br />

25 Actual Test 1 day 20 Sep '16 20 Sep '16<br />

July 2016 August 2016 September 2016<br />

26 29 2 5 8 11 14 17 20 23 26 29 1 4 7 10 13 16 19 22 25 28 31 3 6 9 12 15 18 21<br />

Extrusion Production in Progress<br />

Die Cutting has been completd 10 Aug ...<br />

Steel Fabrication: Tubes<br />

fabricated and will delivery to<br />

PSB on 16 Aug 16<br />

Task<br />

External Milestone<br />

Manual Summary Rollup<br />

Split<br />

Inactive Task<br />

Manual Summary<br />

Project: THE JEWEL<br />

Date: 15 Aug 2016<br />

Milestone<br />

Summary<br />

Inactive Milestone<br />

Inactive Summary<br />

Start-only<br />

Finish-only<br />

Project Summary<br />

Manual Task<br />

Deadline<br />

External Tasks<br />

Duration-only<br />

Progress<br />

Page 1


5. FABRICATION STATUS


Quadrant D<br />

Quadrant C<br />

Level 2<br />

Quadrant B<br />

Quadrant A<br />

Project Name : Jewel Changi Airport LEGEND :<br />

Project No. : 90928 Installed<br />

Subject : Cast-In Plate Tracking List Available<br />

S/N<br />

Demarca<br />

tion<br />

1.0 WT-01<br />

Level<br />

Quadra<br />

nt<br />

Gridline<br />

D.1-B/25-18(Cast-In<br />

M36 Threaded Rod<br />

L=435(GR. 8.8) with<br />

plate prior to casting.<br />

Issue to YNE Fab<br />

drawing 20160726<br />

K-G/27-25<br />

P-CL3/27-25.1<br />

U-S/20-24<br />

T-V/8-11<br />

K-P/2-3<br />

F-K/5-2<br />

B-E/11-5( Cast_in<br />

M36 Theaded Rod<br />

L=435(GR. 8.8) with<br />

plate prior to casting).<br />

Issued to YNE Fab<br />

Drawing 20160726<br />

Cast-in plate<br />

Quantity Installation Date<br />

Type No.<br />

Rqrd.<br />

Delivered Outstandi Installed Outstandi Available<br />

Remarks<br />

% Installed Fit-Up NDT<br />

ng<br />

ng in site<br />

A 125 1 0 1 0 1 0 T-089<br />

B 73 1 0 1 0 1 0 T-089a<br />

B 71 1 0 1 0 1 0 T-089a<br />

A 69 1 0 1 0 1 0 T-089<br />

A 66 1 0 1 0 1 0 T-089<br />

A 64 1 0 1 0 1 0 T-089<br />

A 62 1 0 1 0 1 0 T-089<br />

A 60 1 0 1 0 1 0 T-089<br />

A 58 1 0 1 0 1 0 T-089<br />

2 80 1 0 1 0 1 0<br />

2 79 1 0 1 0 1 0<br />

2 78 1 0 1 0 1 0<br />

2 77 1 0 1 0 1 0<br />

2 76 1 0 1 0 1 0<br />

2 75 1 0 1 0 1 0<br />

2 87 1 0 1 0 1 0<br />

2 86 1 0 1 0 1 0<br />

2 85 1 0 1 0 1 0<br />

2 84 1 0 1 0 1 0<br />

2 83 1 0 1 0 1 0<br />

2 82 1 0 1 0 1 0<br />

2 81 1 0 1 0 1 0<br />

2 93 1 0 1 0 1 0<br />

2 92 1 0 1 0 1 0<br />

2 91 1 0 1 0 1 0<br />

2 90 1 0 1 0 1 0<br />

2 89 1 0 1 0 1 0<br />

2 88 1 0 1 0 1 0<br />

2 302 1 0 1 0 1 0<br />

2 97 1 0 1 0 1 0<br />

2 96 1 0 1 0 1 0<br />

2 95 1 0 1 0 1 0<br />

2 94 1 0 1 0 1 0<br />

2 103 1 0 1 0 1 0<br />

2 102 1 0 1 0 1 0<br />

2 101 1 0 1 0 1 0<br />

2 100 1 0 1 0 1 0<br />

2 99 1 0 1 0 1 0<br />

2 98 1 0 1 0 1 0<br />

2 300 1 0 1 0 1 0<br />

2 107 1 0 1 0 1 0<br />

2 106 1 0 1 0 1 0<br />

2 105 1 0 1 0 1 0<br />

2 104 1 0 1 0 1 0<br />

2 114 1 0 1 0 1 0 IRN-003<br />

2 113 1 0 1 0 1 0 IRN-003<br />

2 112 1 0 1 0 1 0 IRN-003<br />

2 111 1 0 1 0 1 0 IRN-003<br />

110 1 0 1 0 1 0 IRN-003<br />

109 1 0 1 0 1 0 IRN-003<br />

2 108 1 0 1 0 1 0 IRN-003<br />

2 120 1 1 0 1 0 0 17-Jun-16 18-Jun-16 20/06/2016 IRN-003<br />

2 119 1 1 0 1 0 0 17-Jun-16 18-Jun-16 20/06/2016 IRN-003<br />

2 118 1 1 0 1 0 0 04-Jul-16 05-Jul-16 06-Jul-16 IRN-003<br />

2 117 1 0 1 0 1 0 IRN-003<br />

2 116 1 0 1 0 1 0 IRN-003<br />

2 115 1 0 1 0 1 0 IRN-003<br />

A 135 1 0 1 0 1 0<br />

A 133 1 0 1 0 1 0<br />

A 131 1 0 1 0 1 0<br />

A 129 1 0 1 0 1 0<br />

A 127 1 0 1 0 1 0<br />

T-089<br />

A 124 1 0 1 0 1 0<br />

A 123 1 0 1 0 1 0<br />

A 121 1 0 1 0 1 0<br />

65 3 62 3 62 5%


Quadrant D<br />

Quadrant C<br />

Level 3<br />

Quadrant B<br />

Quadrant A<br />

S/N<br />

Demarca<br />

tion<br />

1.1 WT-01<br />

Level<br />

Quadra<br />

nt<br />

Gridline<br />

B-F/25-18<br />

F-K/28-25<br />

28-26/P-K<br />

U-R/21-25<br />

V-U/17-21<br />

T-V/8-12<br />

R-U/4-8<br />

B-P/12-2<br />

Cast-in plate<br />

Quantity Installation<br />

Date<br />

Type No.<br />

Rqrd.<br />

Delivered Outstandi Installed Outstandi Available<br />

Remarks<br />

% Installed Fit-Up NDT<br />

ng<br />

ng in site<br />

2 147 1 0 1 0 1 0<br />

2 146 1 0 1 0 1 0<br />

2 145 1 0 1 0 1 0<br />

2 144 1 0 1 0 1 0<br />

2 143 1 0 1 0 1 0<br />

2 142 1 0 1 0 1 0<br />

2 141 1 0 1 0 1 0<br />

2 140 1 0 1 0 1 0<br />

2 139 1 0 1 0 1 0<br />

2 138 1 0 1 0 1 0<br />

2 137 1 0 1 0 1 0<br />

2 307 1 0 1 0 1 0<br />

2 153 1 0 1 0 1 0<br />

2 152 1 0 1 0 1 0<br />

2 151 1 0 1 0 1 0<br />

2 150 1 0 1 0 1 0<br />

2 149 1 0 1 0 1 0<br />

2 148 1 0 1 0 1 0<br />

2 308 1 0 1 0 1 0<br />

2 160 1 0 1 0 1 0<br />

2 159 1 0 1 0 1 0<br />

2 158 1 0 1 0 1 0<br />

2 157 1 0 1 0 1 0<br />

2 156 1 0 1 0 1 0<br />

2 155 1 0 1 0 1 0<br />

2 154 1 0 1 0 1 0<br />

2 165 1 0 1 0 1 0<br />

2 164 1 0 1 0 1 0<br />

2 163 1 0 1 0 1 0<br />

2 162 1 0 1 0 1 0<br />

2 161 1 0 1 0 1 0<br />

2 309 1 0 1 0 1 0<br />

2 171 1 0 1 0 1 0<br />

2 170 1 0 1 0 1 0<br />

2 169 1 0 1 0 1 0<br />

2 168 1 0 1 0 1 0<br />

2 167 1 0 1 0 1 0<br />

2 166 1 0 1 0 1 0<br />

2 177 1 0 1 0 1 0<br />

2 176 1 0 1 0 1 0<br />

2 175 1 0 1 0 1 0<br />

2 174 1 0 1 0 1 0<br />

2 173 1 0 1 0 1 0<br />

2 172 1 0 1 0 1 0<br />

2 304 1 0 1 0 1 0<br />

2 182 1 0 1 0 1 0<br />

2 181 1 0 1 0 1 0<br />

2 180 1 0 1 0 1 0<br />

2 179 1 0 1 0 1 0<br />

2 178 1 0 1 0 1 0<br />

2 306 1 1 0 0 1 1 IRN-009<br />

2 204 1 1 0 0 1 1 IRN-009<br />

2 203 1 1 0 0 1 1 IRN-009<br />

2 202 1 1 0 1 0 0 06-Aug-16 07-Aug-16 08-Aug-16 IRN-009<br />

2 201 1 1 0 1 0 0 06-Aug-16 07-Aug-16 08-Aug-16 IRN-009<br />

2 200 1 1 0 1 0 0 06-Aug-16 07-Aug-16 08-Aug-16 IRN-009<br />

2 199 1 1 0 1 0 0 06-Aug-16 07-Aug-16 08-Aug-16 IRN-009<br />

2 198 1 1 0 1 0 0 06-Aug-16 07-Aug-16 08-Aug-16 IRN-009<br />

2 197 1 1 0 1 0 0 06-Aug-16 07-Aug-16 08-Aug-16 IRN-009<br />

2 196 1 1 0 1 0 0 06-Aug-16 07-Aug-16 08-Aug-16 IRN-009<br />

2 195 1 1 0 1 0 0 16-Jul-16 17-Jul-16 08-Aug-16 IRN-009<br />

2 194 1 1 0 1 0 0 16-Jul-16 17-Jul-16 19-Jul-16 IRN-009<br />

2 193 1 1 0 1 0 0 16-Jul-16 17-Jul-16 19-Jul-16 IRN-009<br />

2 192 1 0 1 0 1 0<br />

2 191 1 0 1 0 1 0<br />

2 190 1 0 1 0 1 0<br />

2 189 1 0 1 0 1 0<br />

2 188 1 0 1 0 1 0<br />

2 187 1 0 1 0 1 0<br />

2 186 1 0 1 0 1 0<br />

2 185 1 0 1 0 1 0<br />

2 184 1 0 1 0 1 0<br />

2 183 1 0 1 0 1 0<br />

2 305 1 0 1 0 1 0<br />

74 13 61 10 64 3 14%


West Gateway<br />

Level 2<br />

South Gateway<br />

East Gateway<br />

LEVEL 1<br />

North Gateway<br />

S/N<br />

Demarca<br />

tion<br />

2.0 WT-02<br />

2.1 WT-02<br />

Level<br />

Quadra<br />

nt<br />

Gridline<br />

18-11<br />

N-S/23-26.1<br />

T-V/12-17<br />

N-S/3-6<br />

Cast-in plate<br />

Quantity Installation<br />

Date<br />

Type No.<br />

Rqrd.<br />

Delivered Outstandi Installed Outstandi Available<br />

ng<br />

ng in site<br />

% Installed Fit-Up NDT<br />

Type 3 01 1 1 0 1 0 0 30-Apr-16 N/A N/A<br />

Type 4 02 1 1 0 1 0 0 30-Apr-16 N/A N/A<br />

Type 4 03 1 1 0 1 0 0 30-Apr-16 N/A N/A<br />

Type 4 04 1 1 0 1 0 0 30-Apr-16 N/A N/A<br />

Type 1 05 1 1 0 1 0 0 23-Dec-15 N/A N/A<br />

Type 1 06 1 1 0 1 0 0 23-Dec-15 N/A N/A<br />

Type 2 07 1 1 0 1 0 0 23-Dec-15 N/A N/A<br />

Type 1 08 1 1 0 1 0 0 23-Dec-15 N/A N/A<br />

Type 4 09 1 1 0 1 0 0 07-May-16 N/A N/A<br />

Type 4 10 1 1 0 1 0 0 07-May-16 N/A N/A<br />

Type 4 11 1 1 0 1 0 0 07-May-16 N/A N/A<br />

Type 4 12 1 1 0 1 0 0 07-May-16 N/A N/A<br />

Type 3 13 1 1 0 1 0 0 07-May-16 N/A N/A<br />

13 13 0 13 0 0 100%<br />

1 01 1 0 1 0 1 0<br />

1 02 1 0 1 0 1 0<br />

1 03 1 0 1 0 1 0<br />

1 04 1 0 1 0 1 0<br />

1 05 1 0 1 0 1 0<br />

1 06 1 0 1 0 1 0<br />

1 07 1 0 1 0 1 0<br />

1 08 1 0 1 0 1 0<br />

1 01 1 0 1 0 1 0<br />

1 02 1 0 1 0 1 0<br />

1 03 1 0 1 0 1 0<br />

1 04 1 0 1 0 1 0<br />

1 05 1 0 1 0 1 0<br />

1 06 1 0 1 0 1 0<br />

1 07 1 0 1 0 1 0<br />

1 01 1 0 1 0 1 0<br />

1 02 1 0 1 0 1 0<br />

1 03 1 0 1 0 1 0<br />

1 04 1 0 1 0 1 0<br />

1 05 1 0 1 0 1 0<br />

1 06 1 0 1 0 1 0<br />

1 07 1 0 1 0 1 0<br />

1 08 1 0 1 0 1 0<br />

23 0 23 0 23 0 0%<br />

Remarks


West Gateway<br />

South Gateway<br />

Level 2<br />

East Gateway<br />

North Gateway<br />

Cast-in refer to T-090<br />

S/N<br />

Demarca<br />

tion<br />

3.0 WT-03<br />

Level<br />

Quadra<br />

nt<br />

Gridline<br />

18-11<br />

S-N/23-26<br />

Bolt with plate<br />

U-V/12-17<br />

Bolt with plate<br />

P-S/3-5.1<br />

Bolt with plate<br />

Cast-in plate<br />

Delivery<br />

Installation<br />

Date<br />

Type No.<br />

Rqrd.<br />

Delivered Outstandi Installed Outstandi Available<br />

ng<br />

ng in site<br />

% Installed Fit-Up NDT<br />

2 01 1 0 1 0 1 0<br />

1 02 1 0 1 0 1 0<br />

1 03 1 0 1 0 1 0<br />

1 04 1 0 1 0 1 0<br />

1 05 1 0 1 0 1 0<br />

1 06 1 0 1 0 1 0<br />

1 07 1 0 1 0 1 0<br />

1 08 1 0 1 0 1 0<br />

1 09 1 0 1 0 1 0<br />

1 10 1 0 1 0 1 0<br />

1 11 1 0 1 0 1 0<br />

1 12 1 0 1 0 1 0<br />

1 13 1 0 1 0 1 0<br />

1 14 1 0 1 0 1 0<br />

1 15 1 0 1 0 1 0<br />

2 16 1 0 1 0 1 0<br />

2 P1-T 2 1 0 1 0 1 0<br />

1 P2-T1 1 0 1 0 1 0<br />

1 P3-T1 1 0 1 0 1 0<br />

1 P4-T1 1 0 1 0 1 0<br />

1 P5-T1 1 0 1 0 1 0<br />

1 P6-T1 1 0 1 0 1 0<br />

1 P7-T1 1 0 1 0 1 0<br />

1 P8-T1 1 0 1 0 1 0<br />

1 P9-T1 1 0 1 0 1 0<br />

2 P10-T2 1 0 1 0 1 0<br />

2 P11-T2 1 0 1 0 1 0<br />

special type #13 1 0 1 0 1 0<br />

special type #12 1 0 1 0 1 0<br />

2 P1-T2 1 0 1 0 1 0<br />

1 P2-T1 1 0 1 0 1 0<br />

1 P3-T1 1 0 1 0 1 0<br />

1 P4-T1 1 0 1 0 1 0<br />

1 P5-T1 1 0 1 0 1 0<br />

1 P6-T1 1 0 1 0 1 0<br />

1 P7-T1 1 0 1 0 1 0<br />

1 P8-T1 1 0 1 0 1 0<br />

1 P9-T1 1 0 1 0 1 0<br />

1 P10-T1 1 0 1 0 1 0<br />

1 P11-T1 1 0 1 0 1 0<br />

1 P12-T1 1 0 1 0 1 0<br />

2 P13-T2 1 0 1 0 1 0<br />

P13-T2 1 0 1 0 1 0<br />

special type #8 1 0 1 0 1 0<br />

special type #9 1 0 1 0 1 0<br />

2 P1-T2 1 0 1 0 1 0<br />

2 P2-T2 1 0 1 0 1 0<br />

2 P3-T2 1 0 1 0 1 0<br />

2 P4-T2 1 0 1 0 1 0<br />

2 P5-T2 1 0 1 0 1 0<br />

1 P6-T1 1 0 1 0 1 0<br />

1 P7-T1 1 0 1 0 1 0<br />

1 P8-T1 1 0 1 0 1 0<br />

1 P9-T1 1 0 1 0 1 0<br />

2 P10-T2 1 0 1 0 1 0<br />

2 P11-T2 1 0 1 0 1 0<br />

special type #17 1 0 1 0 1 0<br />

special type #16 1 0 1 0 1 0<br />

58 0 58 0 56 0 0%<br />

Remarks


SUMMARY<br />

S/N<br />

Demarca<br />

Delivery<br />

Installation<br />

Level Quadrant Gridline Rqrd.<br />

Delivered Outsta Installed<br />

Outstandi Available<br />

tion<br />

%<br />

nding<br />

ng in site<br />

1.0 WT-01 2 A,B,C,D 65 3 62 3 62 0 5%<br />

1.1 WT-01 3 A,B,C,D 74 13 61 10 64 3 14%<br />

139 16 123 13 126 3 9%<br />

2.0 WT-02 1 NORTH 13 13 0 13 0 0 100%<br />

2.1 WT-02 2<br />

EAST, SOUTH<br />

WEST<br />

23 0 23 0 23 0 0%<br />

36 13 23 13 23 0 36%<br />

3.0 WT-03 2<br />

NORTH,EAST,<br />

SOUTH,WEST<br />

58 0 58 0 58 0 0%<br />

58 0 58 0 58 0 0%<br />

TOTAL 233 29 204 26 207 3 11%


Project Name : 90928 Jewel Changi Airport<br />

Subject<br />

: Production Forecast <strong>Report</strong> for RT-01<br />

12-Aug-16<br />

S/N<br />

Location<br />

RT-01<br />

Ring Beam Flying Ring Beam<br />

Tree Columns Node<br />

Plan<br />

Actual<br />

Plan<br />

Actual<br />

Plan<br />

Actual<br />

Plan<br />

Actual<br />

Total Qty Comp' Bal.<br />

Total Qty Comp' Bal.<br />

Total Qty Comp' Bal.<br />

Start Finish Start Finish Start Finish Start Finish Start Finish Start Finish Start Finish Start Finish<br />

1 Oculus 01/08/2016 09/08/2016 - - - 01/08/2016 09/08/2016 - - - 01/08/2016 09/08/2016 - - - 01/08/2016 29/08/2016 ######### 168 106<br />

2 BA-1 01/08/2016 09/08/2016 37 0 37 01/08/2016 09/08/2016 16 0 16 01/08/2016 09/08/2016 1 0 1 30/08/2016 15/09/2016 439 0<br />

3 BA-2 01/08/2016 20/08/2016 35 0 35 01/08/2016 20/08/2016 13 0 13 01/08/2016 20/08/2016 1 0 1 16/09/2016 29/09/2016 412 0<br />

4 BA-3 01/08/2016 13/09/2016 52 0 52 01/08/2016 13/09/2016 11 0 11 01/08/2016 13/09/2016 2 0 2 30/09/2016 12/10/2016 342 0<br />

5 BA-4 01/08/2016 19/09/2016 36 0 36 01/08/2016 19/09/2016 13 0 13 01/08/2016 19/09/2016 1 0 1 13/10/2016 13/11/2016 392 0<br />

6 BA-5 04/08/2016 20/10/2016 37 0 37 04/08/2016 20/10/2016 18 0 18 04/08/2016 20/10/2016 1 0 1 14/11/2016 17/12/2016 428 0<br />

7 BA-6 25/08/2016 19/11/2016 50 0 50 25/08/2016 19/11/2016 17 0 17 25/08/2016 19/11/2016 1 0 1 18/12/2016 18/01/2017 393 0<br />

8 BA-7 19/09/2016 20/12/2016 37 0 37 19/09/2016 20/12/2016 17 0 17 19/09/2016 20/12/2016 2 0 2 19/01/2017 22/02/2017 451 0<br />

9 BA-8 13/10/2016 13/01/2017 51 0 51 13/10/2016 13/01/2017 16 0 16 13/10/2016 13/01/2017 2 0 2 23/02/2017 23/03/2017 341 0<br />

10 BA-9 31/10/2016 31/01/2017 40 0 40 31/10/2016 31/01/2017 15 0 15 31/10/2016 31/01/2017 2 0 2 24/03/2017 28/04/2017 472 0<br />

11 BA-10 17/11/2016 28/02/2017 50 0 50 17/11/2016 28/02/2017 15 0 15 17/11/2016 28/02/2017 1 0 1 29/04/2017 29/05/2017 412 0<br />

425 425 151 151 14 14 4250<br />

Total Qty<br />

Comp'<br />

S/N<br />

Location<br />

RT-01<br />

Hoops Bias Installation<br />

Plan<br />

Actual<br />

Plan<br />

Actual<br />

Plan<br />

Actual<br />

Total Qty Comp' Bal.<br />

Total Qty Comp' Bal.<br />

Start Finish Start Finish Start Finish Start Finish Start Finish Start Finish<br />

1 Oculus 01/08/2016 15/08/2016 168 0 168 01/08/2016 15/08/2016 264 0 264 15/10/2016 15/11/2016<br />

2 BA-1 01/08/2016 15/08/2016 410 0 410 01/08/2016 15/08/2016 1017 0 1017 15/10/2016 29/11/2016<br />

3 BA-2 01/08/2016 07/09/2016 383 0 383 01/08/2016 07/09/2016 956 0 956 30/11/2016 30/12/2016<br />

4 BA-3 01/08/2016 19/09/2016 435 0 435 01/08/2016 19/09/2016 1103 0 1103 31/12/2016 30/01/2017<br />

5 BA-4 01/08/2016 19/09/2016 383 0 383 01/08/2016 19/09/2016 956 0 956 31/01/2017 01/03/2017<br />

6 BA-5 01/08/2016 30/09/2016 410 0 410 01/08/2016 30/09/2016 1018 0 1018 02/03/2017 31/03/2017<br />

7 BA-6 06/09/2016 01/12/2016 419 0 419 06/09/2016 01/12/2016 1041 0 1041 01/04/2017 29/04/2017<br />

8 BA-7 30/09/2016 31/12/2016 420 0 420 30/09/2016 31/12/2016 1002 0 1002 30/04/2017 28/05/2017<br />

9 BA-8 03/11/2016 03/02/2017 406 0 406 03/11/2016 03/02/2017 1019 0 1019 29/05/2017 26/06/2017<br />

10 BA-9 18/11/2016 18/02/2017 420 0 420 18/11/2016 18/02/2017 1043 0 1043 27/06/2017 25/07/2017<br />

11 BA-10 06/12/2016 14/03/2017 419 0 419 06/12/2016 14/03/2017 1042 0 1042 26/07/2017 24/08/2017<br />

4273 4273 10461 10461<br />

Remarks<br />

S/N<br />

Location<br />

RT-01<br />

Glass Aluminium Composite Panel / Perforated Panel Aluminium Fin Installation<br />

Plan<br />

Actual<br />

Plan<br />

Actual<br />

Plan<br />

Actual<br />

Plan<br />

Actual<br />

Total Qty Comp' Bal.<br />

Total Qty Comp' Bal.<br />

Total Qty Comp' Bal.<br />

Start Finish Start Finish Start Finish Start Finish Start Finish Start Finish Start Finish Start Finish<br />

1 Oculus 01/08/2016 20/08/2016 266 0 266 - - - 01/08/2016 20/08/2016 48 0 48<br />

2 BA-1 01/08/2016 20/08/2016 812 0 812 01/08/2016 20/08/2016 37 0 37 01/08/2016 20/08/2016 215 0 215 15/02/2017 12/03/2017<br />

3 BA-2 01/08/2016 19/09/2016 751 0 751 01/08/2016 19/09/2016 43 0 43 01/08/2016 19/09/2016 203 0 203 13/03/2017 05/04/2017<br />

4 BA-3 01/08/2016 30/09/2016 843 0 843 01/08/2016 30/09/2016 45 0 45 01/08/2016 30/09/2016 229 0 229 06/04/2017 29/04/2017<br />

5 BA-4 01/08/2016 12/10/2016 744 0 744 01/08/2016 12/10/2016 50 0 50 01/08/2016 12/10/2016 203 0 203 30/04/2017 23/05/2017<br />

6 BA-5 01/08/2016 24/10/2016 798 0 798 01/08/2016 24/10/2016 49 0 49 01/08/2016 24/10/2016 216 0 216 24/05/2017 15/06/2017<br />

7 BA-6 17/09/2016 19/12/2016 813 0 813 17/09/2016 19/12/2016 43 0 43 17/09/2016 19/12/2016 219 0 219 16/06/2017 09/07/2017<br />

8 BA-7 22/10/2016 23/01/2017 824 0 824 22/10/2016 23/01/2017 33 0 33 22/10/2016 23/01/2017 220 0 220 10/07/2017 02/08/2017<br />

9 BA-8 26/11/2016 27/02/2017 773 0 773 26/11/2016 27/02/2017 62 0 62 26/11/2016 27/02/2017 213 0 213 03/08/2017 26/08/2017<br />

10 BA-9 14/12/2016 16/03/2017 821 0 821 14/12/2016 16/03/2017 37 0 37 14/12/2016 16/03/2017 219 0 219 27/08/2017 20/09/2017<br />

11 BA-10 31/12/2016 03/04/2017 796 0 796 31/12/2016 03/04/2017 61 0 61 31/12/2016 03/04/2017 220 0 220 21/09/2017 16/10/2017<br />

8241 8241 460 460 2205 2205<br />

Remarks<br />

Note : Quantities may varies subjected to the shop drawings submission & also final confirmation of shop drawings.


WT -02 LEVEL 1 -LEVEL 2


JEWEL ROOF 15-1189<br />

WT02 NORTH FABRICATION STATUS<br />

Arch Beam<br />

10-Aug-16<br />

Id Qty Part No Cutting% FI% Welding % NDT %<br />

Dimension Sand Blast (2.5<br />

Check % SA) %<br />

Primer Coat % Painting % Delivery Date<br />

1 1 Part-201 100% 10% 0% 0% 0% 0% 0% 0%<br />

2 1 Part-213 100% 100% 100% 100% 0% 0% 0% 0%


Project Name : 90928 Jewel Changi Airport<br />

Subject<br />

: Production Forecast <strong>Report</strong> for WT-01<br />

12-Aug-16<br />

S/N<br />

Location<br />

WT-01<br />

Node Hoops Bias Installation<br />

Plan<br />

Actual<br />

Plan<br />

Actual<br />

Plan<br />

Actual<br />

Plan<br />

Actual<br />

Total Qty Comp' Bal.<br />

Total Qty Comp' Bal.<br />

Total Qty Comp' Bal.<br />

Start Finish Start Finish Start Finish Start Finish Start Finish Start Finish Start Finish Start Finish<br />

1 BA-1 23/08/2016 19/09/2016 146 0 146 01/08/2016 01/09/2016 169 0 169 01/08/2016 01/09/2016 290 0 290 05/11/2016 11/12/2016<br />

2 BA-2 23/08/2016 19/09/2016 132 0 132 01/08/2016 13/09/2016 113 0 113 01/08/2016 13/09/2016 196 0 196 12/12/2016 11/01/2017<br />

3 BA-3 20/09/2016 24/10/2016 162 0 162 01/08/2016 21/09/2016 29 0 29 01/08/2016 21/09/2016 54 0 54 12/01/2017 11/02/2017<br />

4 BA-4 25/10/2016 21/11/2016 131 0 131 01/08/2016 03/10/2016 116 0 116 01/08/2016 03/10/2016 202 0 202 12/02/2017 14/03/2017<br />

5 BA-5 22/11/2016 19/12/2016 133 0 133 06/08/2016 14/10/2016 149 0 149 06/08/2016 14/10/2016 252 0 252 15/03/2017 14/04/2017<br />

6 BA-6 20/12/2016 17/01/2017 123 0 123 31/10/2016 07/01/2017 88 0 88 31/10/2016 07/01/2017 145 0 145 15/04/2017 13/05/2017<br />

7 BA-7 18/01/2017 20/02/2017 147 0 147 11/11/2016 19/01/2017 164 0 164 11/11/2016 19/01/2017 299 0 299 14/05/2017 11/06/2017<br />

8 BA-8 21/02/2017 29/03/2017 158 0 158 23/11/2016 31/01/2017 60 0 60 23/11/2016 31/01/2017 124 0 124 12/06/2017 10/07/2017<br />

9 BA-9 30/03/2017 30/04/2017 137 0 137 05/12/2016 11/02/2017 165 0 165 05/12/2016 11/02/2017 299 0 299 11/07/2017 08/08/2017<br />

10 BA-10 01/05/2017 29/05/2017 126 0 126 16/12/2016 23/02/2017 84 0 84 16/12/2016 23/02/2017 156 0 156 09/08/2017 07/09/2017<br />

1395 1395 1137 1137 2017 2017<br />

Remarks<br />

S/N<br />

Location<br />

WT-01<br />

Glass Aluminium Composite Panel Aluminium Fin<br />

Plan<br />

Actual<br />

Plan<br />

Actual<br />

Plan<br />

Actual<br />

Total Qty Comp' Bal.<br />

Total Qty Comp' Bal.<br />

Start Finish Start Finish Start Finish Start Finish Start Finish Start Finish<br />

Total Qty Comp' Bal.<br />

1 BA-1 09/09/2016 29/11/2016 32 0 32 04/08/2016 12/10/2016 251 0 251 20/09/2016 28/11/2016 41 0 41<br />

2 BA-2 21/09/2016 10/12/2016 29 0 29 16/08/2016 24/10/2016 171 0 171 01/10/2016 09/12/2016 37 0 37<br />

3 BA-3 29/09/2016 19/12/2016 4 0 4 24/08/2016 01/11/2016 88 0 88 10/10/2016 17/12/2016 4 0 4<br />

4 BA-4 11/10/2016 30/12/2016 24 0 24 05/09/2016 12/11/2016 187 0 187 21/10/2016 29/12/2016 34 0 34<br />

5 BA-5 22/10/2016 11/01/2017 29 0 29 16/09/2016 24/11/2016 225 0 225 02/11/2016 10/01/2017 39 0 39<br />

6 BA-6 13/12/2016 25/02/2017 9 0 9 13/12/2016 20/02/2017 108 0 108 20/12/2016 27/02/2017 38 0 38<br />

7 BA-7 24/12/2016 09/03/2017 28 0 28 24/12/2016 03/03/2017 183 0 183 24/12/2016 03/03/2017 115 0 115<br />

8 BA-8 05/01/2017 21/03/2017 15 0 15 05/01/2017 15/03/2017 116 0 116 05/01/2017 15/03/2017 18 0 18<br />

9 BA-9 17/01/2017 01/04/2017 36 0 36 17/01/2017 27/03/2017 200 0 200 17/01/2017 27/03/2017 94 0 94<br />

10 BA-10 28/01/2017 13/04/2017 13 0 13 28/01/2017 07/04/2017 131 0 131 28/01/2017 07/04/2017 33 0 33<br />

219 219 1660 1660 453 453<br />

S/N<br />

Location<br />

WT-01<br />

Perforated Panel<br />

Installation<br />

Plan<br />

Actual<br />

Plan<br />

Actual<br />

Total Qty Comp' Bal.<br />

Start Finish Start Finish Start Finish Start Finish<br />

1 BA-1 35 0 35 16/03/2017 10/04/2017<br />

2 BA-2 37 0 37 11/04/2017 01/05/2017<br />

3 BA-3 30 0 30 02/05/2017 21/05/2017<br />

4 BA-4 29 0 29 22/05/2017 10/06/2017<br />

5 BA-5 35 0 35 11/06/2017 30/06/2017<br />

6 BA-6 30 0 30 21/06/2017 16/07/2017<br />

7 BA-7 35 0 35 17/07/2017 11/08/2017<br />

8 BA-8 38 0 38 12/08/2017 06/09/2017<br />

9 BA-9 34 0 34 07/09/2017 28/09/2017<br />

10 BA-10 33 0 33 29/09/2017 24/10/2017<br />

336 336<br />

Remarks<br />

Note : Quantities may varies subjected to the shop drawings submission & also final confirmation of shop drawings.


Project Name : 90928 Jewel Changi Airport<br />

Subject<br />

: Production Forecast <strong>Report</strong> for WT-02<br />

12-Aug-16<br />

WT-02<br />

S/N Location<br />

Base Support Welded Nodes Bias<br />

Plan<br />

Actual<br />

Plan<br />

Actual<br />

Plan<br />

Actual<br />

Total Qty Comp' Bal. Total Qty Comp' Bal.<br />

Total Qty Comp' Bal.<br />

Start Finish Start Finish Start Finish Start Finish Start Finish Start Finish<br />

1 North 01/08/2016 20/08/2016 25/06/2016 13 6 7 01/08/2016 20/08/2016 30/06/2016 66 0 66 01/08/2016 07/10/2016 10/07/2016 163 0 163<br />

2 East 13/09/2016 06/03/2017 10 0 10 13/09/2016 06/03/2017 23 0 23 13/09/2016 22/02/2017 87 0 87<br />

3 West 13/09/2016 06/03/2017 10 0 10 13/09/2016 06/03/2017 23 0 23 13/09/2016 22/02/2017 97 0 97<br />

4 South 13/09/2016 06/03/2017 9 0 9 13/09/2016 06/03/2017 27 0 27 13/09/2016 22/02/2017 124 0 124<br />

42 36 139 139 471 471<br />

Remarks<br />

WT-02<br />

Hoops Adjustment to Arc Installation<br />

S/N Location<br />

Plan<br />

Actual<br />

Plan<br />

Actual<br />

Plan<br />

Actual<br />

Total Qty Comp' Bal.<br />

Total Qty Comp' Bal.<br />

Start Finish Start Finish Start Finish Start Finish Start Finish Start Finish<br />

1 North 01/08/2016 07/10/2016 10/07/2016 88 0 88 13 0 13 01/08/2016 15/11/2016<br />

2 East 13/09/2016 22/02/2017 52 0 52 0 0 0 01/09/2016 12/12/2016<br />

3 West 13/09/2016 22/02/2017 54 0 54 0 0 0 15/09/2016 04/01/2017<br />

4 South 13/09/2016 22/02/2017 69 0 69 0 0 0 01/11/2016 25/02/2017<br />

263 263 13 13<br />

Remarks<br />

Shop Drawings is In progress<br />

WT-02<br />

Glass Aluminum Composite Panels Installation<br />

S/N Location<br />

Plan<br />

Actual<br />

Plan<br />

Actual<br />

Plan<br />

Actual<br />

Total Qty Comp' Bal.<br />

Total Qty Comp' Bal.<br />

Start Finish Start Finish Start Finish Start Finish Start Finish Start Finish<br />

1 North 11/08/2016 23/11/2016 52 0 52 318 0 318 20/12/2016 31/01/2017<br />

2 East 29/10/2016 17/03/2017 42 0 42 196 0 196 25/06/2017 25/07/2017<br />

3 West 29/10/2016 17/03/2017 42 0 42 193 0 193 15/09/2017 16/10/2017<br />

4 South 29/10/2016 17/03/2017 41 0 41 193 0 193 25/08/2017 24/09/2017<br />

177 177 900 900<br />

Remarks<br />

Note : Quantities may varies subjected to the shop drawings submission & also final confirmation of shop drawings.


Project Name : 90928 Jewel Changi Airport<br />

Subject<br />

: Production Forecast <strong>Report</strong> for WT-03<br />

12-Aug-16<br />

WT-03<br />

S/N Location<br />

Brackets Nodes Hoops<br />

Plan<br />

Actual<br />

Plan<br />

Actual<br />

Plan<br />

Actual<br />

Total Qty Comp' Bal.<br />

Total Qty Comp' Bal.<br />

Total Qty Comp' Bal.<br />

Start Finish Start Finish Start Finish Start Finish Start Finish Start Finish<br />

1 North 25/07/2016 20/08/2016 16 0 16 20/05/2016 28/08/2016 20/05/2016 12/08/2016 155 155 0 25/07/2016 25/10/2016 182 0 182<br />

2 East 13/09/2016 06/03/2017 28 0 28 29/08/2016 16/10/2016 12/08/2016 73 38 35 13/09/2016 22/02/2017 107 0 107<br />

3 West 13/09/2016 06/03/2017 22 0 22 17/10/2016 10/12/2016 87 0 87 13/09/2016 22/02/2017 110 0 110<br />

4 South 13/09/2016 06/03/2017 30 0 30 11/12/2016 21/02/2017 120 0 120 13/09/2016 22/02/2017 142 0 142<br />

96 96 435 242 541 541<br />

WT-03<br />

S/N Location<br />

Bias Arch Beam Installation<br />

Plan<br />

Actual<br />

Plan<br />

Actual<br />

Plan<br />

Actual<br />

Total Qty Comp' Bal.<br />

Total Qty Comp' Bal.<br />

Start Finish Start Finish Start Finish Start Finish Start Finish Start Finish<br />

1 North 25/07/2016 25/10/2016 346 0 346 65 0 65 06/09/2016 15/12/2016<br />

2 East 13/09/2016 22/02/2017 183 0 183 42 0 42 25/10/2016 02/02/2017<br />

3 West 13/09/2016 22/02/2017 204 0 204 42 0 42 15/11/2016 23/02/2017<br />

4 South 13/09/2016 22/02/2017 263 0 263 45 0 45 22/02/2017 02/06/2017<br />

996 996 194 194<br />

Remarks<br />

WT-03<br />

Glass Aluminium Composite Panel Perforated Panel Installation<br />

S/N Location<br />

Plan<br />

Actual<br />

Plan<br />

Actual<br />

Plan<br />

Actual<br />

Plan<br />

Actual<br />

Total Qty Comp' Bal.<br />

Total Qty Comp' Bal.<br />

Total Qty Comp' Bal.<br />

Start Finish Start Finish Start Finish Start Finish Start Finish Start Finish Start Finish Start Finish<br />

1 North 23/08/2016 23/11/2016 358 0 358 0 0 0 0 0 0 20/12/2016 20/01/2017<br />

2 East 21/12/2016 20/05/2017 162 0 162 22 0 22 3 0 3 25/06/2017 25/07/2017<br />

3 West 21/12/2016 20/05/2017 162 0 162 25 0 25 16 0 16 15/09/2017 16/10/2017<br />

4 South 21/12/2016 20/05/2017 218 0 218 40 0 40 15 0 15 25/08/2017 24/09/2017<br />

900 900 87 87 34 34<br />

Remarks<br />

Note : Quantities may varies subjected to the shop drawings submission & also final confirmation of shop drawings.


Fabrication Photos<br />

Node<br />

Node


Node<br />

Node


Base Support<br />

Base Support


Bias


6. INSTALLATION STATUS


Project Name : 90928 The Jewel<br />

Date : 15 August 2016<br />

Subject : WT02 Level 1- Cast-in & Steel connector Installation Monitoring (North Gateway)<br />

1<br />

13<br />

2<br />

12<br />

3<br />

4<br />

10<br />

11<br />

9-13 7/05/16<br />

inspected<br />

5<br />

6<br />

7 8<br />

9<br />

5-8 1st Inspected<br />

Dec. 2015<br />

BASE SUPPORT INSTALLATION :<br />

Plate # 3,4,5,6,7 - installed 11 Aug.<br />

2016 & Plate # 1 -installed 15 Aug.<br />

2016<br />

Installed<br />

Under Fabrication


BASE SUPPORT :<br />

INSTALLED = 6 NOS<br />

15 AUG. 2016<br />

WT02 BASE SUPPORT INSTALLATION


Project Name : 90928 The Jewel<br />

Date : 15 August 2016<br />

Subject : WT01 Level 2- Cast-in Installation Monitoring<br />

Cast-in # 119,120<br />

Installed 18/06/16<br />

Fit-Up 18/06/16<br />

NDT-20/06/16<br />

Cast-in # 118<br />

Installed 05/07/16<br />

Fit-Up 05/7/16<br />

NDT- 6/7/16<br />

Total= 03 nos. installed


WT01 LEVEL 3<br />

# 120 # 119 # 118


Project Name : 90928 The Jewel<br />

Date : 15 August 2016<br />

Subject : WT01 Level 3- Cast-in Installation Monitoring<br />

#196,197,198,199,200,201,202<br />

1. FIT-UP dated 07/08/16 WT01-L3-010<br />

2. NDT dated 08/07/16 WT01-L3-002<br />

#193,194,195<br />

1. FIT-UP dated 17/07/16 WT01-L3-001<br />

2. NDT dated 17/07/16 WT01-L3-002<br />

Total= 10 nos. installed


WT01 LEVEL 3 =7 nos Installed 08<br />

Aug. 2016<br />

( 196,197,198,199,200,201,202)<br />

WT01 LEVEL 3= CAST-IN BRACKETS INSTALLATION, TEN (10 NOS) TOTAL INSTALLED .


Summary<br />

S/N Items<br />

1<br />

Node<br />

2<br />

Bias<br />

3<br />

Hoop<br />

4 Base Support<br />

5 Ring Beam<br />

6 Arch Beam<br />

7 Flying Ring Beam<br />

8 Tree Columns<br />

9<br />

Glass<br />

10<br />

ACP<br />

11 Perforated<br />

15-Aug-16<br />

Qty<br />

Location<br />

RT-01 WT-01 WT-02 WT-03<br />

Total 4250 1395 139 435<br />

Fabricated 106 193<br />

Installed<br />

Total 10461 2017 471 996<br />

Fabricated<br />

Installed<br />

Total 4273 1137 263 541<br />

Fabricated<br />

Installed<br />

Total - - 13 -<br />

Fabricated - - 6 -<br />

Installed - - 6 -<br />

Total 425 - - -<br />

Fabricated - - -<br />

Installed - - -<br />

Total - - 282 -<br />

Fabricated - - -<br />

Installed - - -<br />

Total 151 - - -<br />

Fabricated - - -<br />

Installed - - -<br />

Total 14 - - -<br />

Fabricated - - -<br />

Installed - - -<br />

Total 8241 219 177 900<br />

Fabricated<br />

Installed<br />

Total 443 1660 900 -<br />

Fabricated -<br />

Installed -<br />

Total 17 336 - -<br />

Fabricated - -<br />

Installed - -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!