17.09.2016 Views

OPS 571 Final Exam : OPS 571 Final Exam Answer | Studentehelp

If you have questions or can't find the tutorial then dont be upset here Studentehelp is there to solve your all questions regarding OPS 571 Final Exam, OPS 571 Final Exam, OPS 571 solved paper, UOP OPS 571 Final Exam for university of Phoenix student. http://www.studentehelp.com/university-of-phoenix/OPS-571.html

If you have questions or can't find the tutorial then dont be upset here Studentehelp is there to solve your all questions regarding OPS 571 Final Exam, OPS 571 Final Exam, OPS 571 solved paper, UOP OPS 571 Final Exam for university of Phoenix student.
http://www.studentehelp.com/university-of-phoenix/OPS-571.html

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Time management<br />

Continuous improvement management<br />

Environmental management<br />

4. Which is the one correct value stream principle?<br />

<br />

<br />

<br />

<br />

Look for efficiencies in the factory, office, physical, procedural, and technical operations.<br />

Eliminate waste that stops, slows down, or diverts the value stream.<br />

Concentrate on speeding up value-adding operations rather than removing waste.<br />

Keep the value stream moving at minimum velocity.<br />

5. What is the starting point in developing a capacity plan for a health care operation?<br />

<br />

<br />

<br />

<br />

Determining the effective capacity over time<br />

Estimating design capacity<br />

Forecasting patient demand for a reasonable length of time<br />

Discovery of the bottleneck operation<br />

6. Which of the following is considered an organizational blueprint, which prescribes the<br />

quantity and time frame for when each end product will be assembled?<br />

<br />

<br />

<br />

<br />

MRP (Material Requirements Plan)<br />

ERP (Enterprise Resource Planning)<br />

MPS (Master Production Schedule)<br />

WBS (Work Breakdown Structure)<br />

7. Which of the following is an element that addresses elimination of waste under lean<br />

production?<br />

<br />

<br />

<br />

<br />

Kanban production control system<br />

Production ahead of demand<br />

Minimized run times<br />

Group plant loading technology<br />

8. In most cases, demand for products or services can be broken into several components.<br />

Which of the following is considered a component of demand?<br />

<br />

<br />

<br />

<br />

Level elements<br />

Future elements<br />

Past elements<br />

Cyclical elements