Hamzah's - Furniture Class Assessment
Project work for Furniture for Class Assessment.....
Project work for Furniture for Class Assessment.....
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
79B, # 04-04 Jalan Jalan<br />
Singapore 543216.<br />
Telephone : 6345 6789<br />
Website: LCW@gmail.com<br />
BILL OF QUANTITY<br />
Date : 8 th July 2015<br />
Project Code : 0108/2015C<br />
: NATIONAL MUSEUM OF SINGAPORE<br />
93 Stamford Road, Singapore 178897<br />
Project Descriptions : Design, Build, Installation and Removal of Wooden Chair to be suspended on the<br />
ceiling of the NATIONAL MUSEUM OF SINGAPORE<br />
MARGIN<br />
No. Descriptions Quantity Unit Rate ($) Cost Mark up % Amount Profit<br />
1. Design and Construction of Wooden Chair with Acrylic<br />
fading legs 1 unit $1,870.00 $1,870.00 50% $3,740.00 $1,870.00<br />
2. Stainless steel Camlock Beam Clamp with clamping force<br />
to able withstand hanging weight of 300 kgs. 4 Nos. $380.00 $1,520.00 30% $2,171.43 $651.43<br />
3. Industrial grade Transparent Nylon Rod with holding<br />
strrenth of 40.5Kg/f 120 meters $25.00 $3,000.00 30% $4,285.71 $1,285.71<br />
4 Rental of Indoor Electric Hydraulics Scissors platform for 2<br />
nights during Installation & Removal only.<br />
(@ 1night per session)<br />
5. Industrial grade Rubber Cushion for protect the flooring<br />
& other internal displays against falling tools and objects<br />
during Installation and Removal.<br />
2 days $480.00 $960.00 30% $1,371.43 $411.43<br />
4 Rolls $250.00 $1,000 30% $1,428.57 $428.57<br />
6. Contracting of Professional Installers for 2 nights<br />
(@ $380 per night/ per pax) 3 pax $1,140.00 $3,420.00 30% $4,885.71 $1,465.71<br />
7. Hiring of Certified Professional Engineer to do<br />
calculations of load and submission for project approval<br />
to relevant governmental departments.<br />
1 unit $3,800.00 $3,800.00 30% $5,428.57 $ 1,628.57<br />
8. Insurance for Professional Installers for 2 Nights during<br />
Installation and Removal only. 3 pax $89.20 $267.60 10% $297.33 $29.73<br />
9. Insurance for a Third party with a $ 1 million Singapore<br />
Dollars maximum liability from 01/08/2015 to<br />
13/08/2105<br />
13 days $690.67 $8,978.71 10% $9,976.34 $997.63<br />
10. Transportation for Installation and Removal to and from<br />
the venue 2 Trips $380.00 $760.00 30% $1,085.71 $325.71<br />
TOTAL : - $25,576.31 $34,670.82 $9,094.51<br />
GST Amount<br />
7%<br />
$2,426.96<br />
$37,097.78