10.10.2016 Views

PRESENTATION

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

45 years in Steel Structure,<br />

Heavy Machinery & Pressure Vessels<br />

From 1971 to 2016


General Overview<br />

History:<br />

Gaziantep / TURKEY<br />

COLLECTIVE COMPANY<br />

Pressurized Vessels<br />

c<br />

JOINT STOCK COMPANY<br />

Pressurized Vessels&Steel Constructions<br />

c<br />

GROUP COMPANY<br />

Hydromechanical&Electromechanical Works For HEPP,<br />

Heavy Machinery,<br />

Wind Towers Production since-2012<br />

1971<br />

1976<br />

1980<br />

CILTUG<br />

Co.<br />

TEKTUG<br />

Co.<br />

BAYTUG<br />

Co.<br />

TUGCAN<br />

OTEL Co.<br />

TURNA<br />

Co.<br />

ASTUG<br />

Co.<br />

Production:15.000ton<br />

Total:169 MW<br />

Total 186 Room


COMPANIES OF GROUP<br />

CILTUG Heat Industry and Trade Co.<br />

• Design, Fabrication, Erection and Commissioning of Hydro-Mechanical Equipment for Hydro Power Plants and Irrigation Projects.<br />

• Fabrication and Installation of Turbine Electro-Mechanical Accessories.<br />

• Erection and Installation of Turbine-Generator Groups for Hydropower Plants.<br />

• Fabrication, Shipment and Erection works for Wind Towers and Turbine Frames.<br />

• Turn-key projects including Civil and Contracting Works for Hydropower Plants.<br />

• Heavy Machineries of parts having dimension up to (w x L x h) 12,500mm x 12,500mm x 6,000mm and 250,000kg<br />

• Piping with diameter from 600 mm to 10,000 mm and thickness from 5 mm to 110 mm, (Carbon and Stainless Steel)<br />

Hydro-Mechanical<br />

Equipment<br />

Turbine<br />

Electro-Mechanical<br />

Equipment<br />

Turbine-Generator<br />

Groups for<br />

Hydropower Plants<br />

Wind Towers<br />

and<br />

Turbine Frames<br />

Civil and Contracting<br />

Works for<br />

Hydropower Plants


TEKTUG Electricity Generation Co.<br />

Works on energy production and sales<br />

KARGILIK HEPP / TURKEY<br />

(2 x 12 MW)<br />

KALEALTI HEPP/TURKEY<br />

(15 MW)<br />

KEBAN HEPP / TURKEY<br />

(5.5 MW)<br />

ERKENEK HEPP/TURKEY<br />

(13 MW)<br />

ANDIRIN HEPP / TURKEY<br />

(1 x 42 MW)<br />

SIRIMTAS HEPP / TURKEY<br />

(1 x 28 MW)<br />

KALEALTI-2 HEPP / TURKEY<br />

(1 x 14,24 MW)<br />

SİNCİK WEPP / TURKEY<br />

(11 x 2,5 MW)<br />

TOTAL<br />

Installed Power<br />

169 MW<br />

Future Investments<br />

• YELLIBEL WIND POWER PLANT / TURKEY…………….. 50 MW<br />

• CAGLAYAN HYDRO POWER PLANT / TURKEY………… 10 MW<br />

• ANDIRIN SOLAR POWER PLANT / TURKEY…………….. 5 MW


Organization Plan<br />

Çiltuğ A.Ş. Organization Chart<br />

Chairman of the Board<br />

(Yönetim Kurulu Başkanı)<br />

İbrahim TUĞSUZ<br />

General Manager<br />

(Genel Müdür)<br />

Zeki UĞUR<br />

Accounting<br />

Manager<br />

(Muhasebe<br />

Müdürü)<br />

Mehmet<br />

YILDIRIM<br />

External<br />

Marketing and<br />

R&D<br />

(Dış Pazarlama<br />

ve AR-GE)<br />

Tunç UĞUR<br />

Project Design<br />

Department<br />

(Proje-Dizayn<br />

Departmanı)<br />

Tamer UÇAR<br />

Contracting<br />

Manager<br />

(Teklif ve<br />

Taah.Müd.)<br />

Şevket<br />

ALACACI<br />

Contracting<br />

Department<br />

(SözleşmelerDept.)<br />

Olcay KAVALA<br />

R. Fatih KURT<br />

Muhittin MİŞE<br />

Purchasing<br />

Department<br />

(Satınalma Dept)<br />

Mehmet<br />

ŞAHİN<br />

Budget and<br />

Planning<br />

Manager<br />

(Bütçe ve<br />

Planlama Müd.)<br />

M.Can TUĞSUZ<br />

Factory-1 Manager<br />

(Fabrika-1 Müdürü)<br />

Levent AYDIN<br />

Manufacturing<br />

Engineer<br />

(İmalat Mühendisi)<br />

Faik Özer UÇAR<br />

Arif Can TEKE<br />

Foreman<br />

(Formen)<br />

Mehmet PALA<br />

OsmanYAĞCI<br />

Murat CİN<br />

Tahir YILAN<br />

Workers<br />

(İşçiler)<br />

Administrative Works<br />

and Management<br />

Systems Manager<br />

(İdari İşler ve Yönetim<br />

Sistemleri Müdürlüğü)<br />

Burçin ÖNAY<br />

Veysel KILINÇ<br />

Finance and<br />

Administrative<br />

Works Responsible<br />

(Finans ve<br />

İdari İşler Amiri)<br />

M.Hüsnü KOZAN<br />

Warehouse and Pay-Roll<br />

(Ambar ve Puantaj İşleri)<br />

Turgut TEKKANAT<br />

Mehmet BAŞAR<br />

EHS<br />

(İSG-İs Sağlığı<br />

ve Güvenliği)<br />

M.Ataman<br />

GÜRSEL<br />

Factory-2<br />

Manager<br />

(Fabrika-2 Müdürü)<br />

…………………<br />

Manufacturing<br />

Engineer<br />

(İmalat Mühendisi)<br />

Erhan Y.ALİOĞLU<br />

Musa E.DOĞANGÜL<br />

Süleyman ÖZKAYA<br />

Foreman<br />

(Formen)<br />

İbrahim ASLAN<br />

M.Sait FIRAT<br />

Emin<br />

B.OCAKOĞLU<br />

Workers<br />

(İşçiler)<br />

QA/QC Manager<br />

(Quality Assurance<br />

and Control)<br />

(Kalite Güvence ve<br />

Kontrol Müdürü)<br />

Uğur ÇALIŞIR<br />

Quality Assurance<br />

&Control Chief<br />

(Kalite Güvence ve<br />

Kontrol Şefi)<br />

Recep GÜNDÜZ<br />

Mustafa HİNTOĞLU<br />

Enes GÜN<br />

Inspector<br />

(İnspektör)<br />

Adem Almas<br />

Adil BALCI<br />

Yunus ALTINTAŞ<br />

Halil İbrahim BARAZİ


Workshop Location<br />

• Total Area 50.000 m 2 .<br />

• Total Closed Area 16.000 m 2 .<br />

• Distance to Mersin Sea Port 305 km<br />

• Distance to Iskenderun Sea Port 215 km<br />

• Distance to Highway 5 km<br />

• Distance to Railway 5 km


Human Sources and Capabilities<br />

FACTORY 1 FACTORY 2<br />

Total<br />

Employees<br />

267<br />

• Engineers 20<br />

• Technicians 8<br />

• Workers 227<br />

• Finance & Account 12<br />

• 4 International Welding Engineer<br />

• 3 NDT Level II acc. to EN ISO 9712 and SNT-TC 1a<br />

• 100 Welder Certification acc. to EN ISO 9606 and<br />

ASME Sec.IX


Management & Process Quality Certification<br />

ISO 9001:2008<br />

Quality Management Systems<br />

by Bureau Veritas<br />

OHSAS 18001:2007<br />

Occupational Health and Safety<br />

Management System<br />

by Bureau Veritas<br />

ISO 14001:2004<br />

Environmental Management System<br />

by Bureau Veritas


Management & Process Quality Certification<br />

EN ISO 3834-2<br />

Quality Requirements of Fusion Welding<br />

of Metalic Materials by Bureau Veritas<br />

EN 1090-1:2009+A1:2011<br />

Load bearing steel components with corrosion protection and structural<br />

design up to EXC 4 acc. EN 1090-2 by TUV Austria


Management & Process Quality Certification<br />

ASME U STAMP<br />

Manufacture of pressure vessels at the above location<br />

and field sites controlled by the above location.<br />

ASME S STAMP<br />

Manufacture and assembly of power boilers at the above<br />

location and field sites controlled by the above location.


Domestic Manufacturing Status Certificate


Employee Qualification<br />

Welder Engineer Certificate<br />

Uğur ÇALIŞIR<br />

Welder Engineer Certificate<br />

Recep GÜNDÜZ


Employee Qualification<br />

NDT Qualification Certificate<br />

RT, PT, MT Level II<br />

Recep GÜNDÜZ<br />

NDE Qualification Certificate<br />

UT, MT, PT Level II<br />

Halil İbrahim BARAZİ


Employee Qualification<br />

NDE Qualification Certificate<br />

LPT Level II<br />

Adil BALCI<br />

Welder Certificate


PRODUCT PORTFOLIO<br />

Fabrication and Erection of:<br />

Penstocks / Pipe Works<br />

Trifurcation Pipes<br />

Atatürk DAM and HEPP / South East Part of TURKEY<br />

26,600 Tons. Penstocks Ø5.5-8mt (8 x 300 MW)<br />

Batman DAM and HEPP / South Eas Partt of TURKEY<br />

700 Tons. Trifurcation Ø9,5 / 5,5Mt. (3 x 63 MW)


Product Portfolio<br />

>> Fabrication and Erection of:<br />

Bifurcation Pipes<br />

Expansion Joints<br />

Akköy II HEPP / North part of TURKEY<br />

Material: S690QL- Th:52-80mm (2 x 116 MW)<br />

Karakaya DAM and HEPP / South of TURKEY<br />

Diameter: 6000mm (6 x 300 MW)


Product Portfolio<br />

>> Fabrication and Erection of:<br />

Transition Part- (Round to Rectangular)<br />

Penstock / Pipe Works<br />

Atatürk DAM and HEPP / TURKEY<br />

(8 x 300 MW)<br />

Batman DAM and HEPP / TURKEY<br />

Diameter: 9,500mm (3 x 63 MW)


Product Portfolio<br />

>> Fabrication and Erection of:<br />

Radial Gates<br />

Stoplog Gates & Lifting Beam<br />

Boyabat HEPP / TURKEY<br />

(3 x 170 MW)<br />

Libya Al-Khalij Power Plant Project / LIBYA<br />

Contractors: GAMA-BECHTEL


Product Portfolio<br />

>> Fabrication and Erection of:<br />

Trashracks<br />

Self Regulating Radial Gates<br />

Kalealtı II HEPP / TURKEY<br />

(14,24 MW)<br />

Şanlıurfa Plain Irrigation Project / TURKEY


Product Portfolio<br />

>> Fabrication and Erection of:<br />

Water Intake Gates<br />

Howell Bungel Valve<br />

Raqqa El-Bab &Tadeff Project / IRAQ<br />

Aksu HEPP / TURKEY<br />

Contractor: KALYON CONS.


Product Portfolio<br />

>> Fabrication and Erection of:<br />

Jet Flow Gates<br />

Sliding Gates<br />

Boyabat HEPP / TURKEY (3 x 170 MW)<br />

Contractor: DOGUS Cons.<br />

Boyabat HEPP / TURKEY (3 x 170 MW)<br />

Contractor: DOGUS Cons.


Product Portfolio<br />

>> Fabrication and Erection of:<br />

Jet Flow Gates<br />

Jet Flow Gates<br />

Artvin HEPP / TURKEY (2 x 166 MW)<br />

Contractor: ALSTOM Hydro.<br />

Artvin HEPP / TURKEY (2 x 166 MW)<br />

Contractor: ALSTOM Hydro.


Product Portfolio<br />

>> Fabrication and Erection of:<br />

LPG Tanks<br />

Horizontal Seperation Tank<br />

Nasiriyah & Dewaniyah-Project / IRAQ<br />

Contractor: Iraq Ministry of Oil.<br />

TPAO Adıyaman & Batman / TURKEY<br />

Contractor: Turkey Petroleums Co.


Product Portfolio<br />

Fabrication of Electro-Mechanical Equipment<br />

(Turbine Auxiliary Parts);<br />

Inlet Parts for Kaplan Turbine<br />

Turbine Inlet Pipes<br />

Ceyhan (Oskan & Berkman) HEPP / TURKEY<br />

Contractor: ALSTOM Hydro.<br />

Akköy HEPP / TURKEY (3 x 34,5 MW)<br />

Contractor: VOITH Hydro.


Product Portfolio<br />

>> Fabrication of Electro-Mechanical Equipment (Turbine Auxiliary Parts);<br />

Draft Tubes<br />

Turbine Housing<br />

Hamzalı HEPP / TURKEY<br />

Contractor: VOITH Hydro<br />

Andırın HEPP / TURKEY (42 MW)<br />

Contractor: TEKTUG Co.


Product Portfolio<br />

>> Fabrication of Electro-Mechanical Equipment (Turbine Auxiliary Parts);<br />

Distributer / Collector Pipes<br />

Draft Tube Elbows<br />

Akköy-II Project / TURKEY<br />

(Pressure Test- 230 Bar / 2 x 116 MW)-Voith Hydro<br />

Yedigöze HEPP / TURKEY (2x158MW)<br />

Contractor: ALSTOM Hydro.


Product Portfolio<br />

>> Fabrication of Electro-Mechanical Equipment (Turbine Auxiliary Parts);<br />

Spiral Case & Stay Ring<br />

Spiral Case & Stay Ring<br />

Yedigöze HEPP / TURKEY<br />

(Total Weight-150 TON / 245 MW)<br />

Yedigöze HEPP<br />

(Total Weight-150 TON / 245 MW)


Product Portfolio<br />

Erection & Installation of Electro-Mechanical<br />

Equipment (Turbine & Generators Parts);<br />

Darıca HEPP / TURKEY (2 x 100 MW)<br />

Contractor: VOITH HYDRO<br />

Sır DAM and HEPP / TURKEY<br />

Contractor: TOSHIBA Co.


REFERENCE PROJECTS<br />

Atatürk DAM and HEPP (8 x 300 MW)<br />

Client: General Directorate of State Hydraulic<br />

Works (DSİ) of Turkey<br />

Location: Şanlıurfa, Turkey<br />

Contractor: Noell GmbH / Germany, Sulzer<br />

Escher Wyss Ltd. & Asea Brown Boveri Co.<br />

/ Switzerland<br />

Sub-Contractor: Noell GmbH and Ciltug Joint<br />

Venture<br />

Scope: Fabrication, blasting, painting,<br />

erection and testing of Penstocks, supports and<br />

expansion joints.<br />

Project Weight: 26,600 tonnes<br />

Total Painting Area: 250,000 m2<br />

Year: 1994<br />

Project Weight.………………….. 26,600 tonnes<br />

Diameter of Pipes………………... 8,000 mm<br />

Material……………………………. St 52-3


Reference Projects<br />

Karakaya DAM and HEPP (6 x 300 MW)<br />

Client: General Directorate of State Hydraulic<br />

Works (DSİ) of Turkey<br />

Location: Diyarbakır, Turkey<br />

Contractor: Italstrade-Recchi SPA/ITALY<br />

Sub-Contractor: Noell GmbH and Çiltuğ Joint<br />

Venture<br />

Scope: Fabrication, sandblasting, painting and<br />

erection of all permanent hydro-mechanical<br />

equipment such of Penstocks.<br />

Penstocks: Ø6m L:80mx6 Lines, 5,500 Tons<br />

Spillway Radial Gates: 14mx10m, 1,500 Tons<br />

Water Intake Equipment: 2,700 Tons<br />

Bottom outlet tunnel steel lining and gates: 3,250 Tons<br />

Draft tube gates: 650 Tons<br />

Power house machine hall cranes and other cranes<br />

erections : 1,900 Tons<br />

Project Weight: 15,500 tons<br />

Year: 1989<br />

Project Weight.………………….. 15,500 tonnes<br />

Diameter of Pipes………………... 6,000 mm<br />

Material……………………………. St 52-3


Reference Projects<br />

Batman DAM and HEPP (3 x 63 MW)<br />

Client: General Directorate of State Hydraulic<br />

Works (DSİ) of Turkey<br />

Location: Diyarbakır, Turkey<br />

Contractor: Onar-Gunsayıl İnşaat /Turkey<br />

Scope: Fabrication and erection of all hydromechanical<br />

equipment, Intake Gates, Trashracks,<br />

Penstocks, Tri-Furcation and bifurcation branch<br />

pipes, gantry cranes, slide and conical valves.<br />

Steel Lining and Penstocks : 3,500 tons<br />

Radial gates : 6 no’s, 1,600 tons<br />

Trashracks, stoplogs service gates and other<br />

equipment : 1,900 tons.<br />

Project Weight: 7,000 tons<br />

Year: 2000<br />

Project Weight.………………... 7,000 tonnes<br />

Diameter of Pipes……………... 5,500 & 9,500 mm<br />

Material…………………………. St 52-3


Reference Projects<br />

Jiroft DAM and HEPP (2 x 50 MW)<br />

Client: Iran Ministry of Energy / IRAN<br />

Location: Iran<br />

Contractor: Çiltuğ Heat Industry and Trade Co.<br />

Scope:Sandblasting, painting, erection and<br />

commissioning of all permanent hydro-mechanical<br />

equipment. 2 set of spillway Radial gates in dim. of<br />

12x8m. 2 set of hydraulic operated radial gate in dim. of<br />

7.8x6.2m. Fixed wheel gates in dim. of 7.2x11m. 2 set of<br />

hydraulic operated sliding gates in dim. of 1.2x1.2m. 2 set<br />

of bottom outlet Radial gates with hydraulic operated in<br />

dim. of 1.2x1.2m. 4 set of draft tube gates in dim. of<br />

2.4x1.8m. 1 set of hydraulic operated butterfly valve in<br />

dim. of Ø2600mm. Trashracks in dim. of 5x15m. Stoplog<br />

gates in dim. of 4.8x5.2m. Irrigation service gates with<br />

hydraulic operated in dim. of 4.8x5.2m. Penstocks in dim.<br />

of Ø2600, L=290m. Bifurcation branch pipe in dim. of<br />

Ø2600/2xØ1100) and all electrical control systems of<br />

hydro-mech. Equip.<br />

Project Weight: 2,200 tons<br />

Year: 1992


Reference Projects<br />

Boyabat DAM and HEPP (3x170 MW)<br />

Client: Doğuş İnşaat ve Tic. A.Ş.<br />

Location: Sinop, Turkey<br />

Contractor: Çiltuğ Heat Industry and Trade Co.<br />

Scope: Fabrication and erection of<br />

Hydromechanical Equipments.<br />

Project Weight: 5000 tons<br />

Year: 2011<br />

Project Weight.………………….. 5,000 tonnes<br />

Diameter of Pipes………………. 6,000&5,600 mm<br />

Material…………………………… 490 FG


Reference Projects<br />

Boyabat DAM and HEPP (3x170 MW)<br />

Client: Doğuş İnşaat ve Tic. A.Ş.<br />

Location: Sinop, Turkey<br />

Contractor: Çiltuğ Heat Industry and Trade Co.<br />

Scope: Fabrication and erection of<br />

Hydromechanical Equipments.<br />

Project Weight: 5000 tons<br />

Year: 2011


Reference Projects<br />

ARTVİN HEPP (2x166 MW)<br />

Client: Alstom Power ve Ulaşım A.Ş. / Turkey.<br />

Location: Artvin, Turkey<br />

Contractor: Çiltuğ Heat Industry and Trade Co.<br />

Scope: Fabrication and erection of Bottom Outlet<br />

and Intake Trashracks, Intake Bellmouth, Bottom<br />

Outlet Penstocks, Bottom Outlet Sliding Gate and<br />

Jet Flow Gate, Intake Bulkhead Gate and<br />

Embedded Parts, Bottom Outlet Steel Liner.<br />

Project Weight: 1,574 tons<br />

Year: 2015


Reference Projects<br />

Akköy II HEPP (2 x 116 MW)<br />

Client: Kolin İnşaat Turizm Sanayi ve Tic. A.Ş.<br />

Location: Giresun, Turkey<br />

Contactor: Çiltuğ Heat Industry and Trade Co.<br />

Scope: Fabrication and erection of<br />

penstocks/pipes<br />

Project Weight: 9500 tons<br />

Year: 2011<br />

Project Weight.………….. 9,500 tonnes<br />

Diameter of Pipes………. 2,700 & 1,800 mm<br />

Material…………………… S690 QL & S550 ML


Reference Projects<br />

Yedigöze HEPP (2 x 158,5 MW)<br />

Client: Alstom Power Hidroelektrik A.Ş.<br />

Location: Adana, Turkey<br />

Scope: 2 Units Draft Tube, Spiral Case, Stay<br />

Ring, Spiral Case Sleeves and Pit Line fabrication<br />

Project Weight:<br />

433,4 tons<br />

Year:<br />

2009


Reference Projects<br />

Hacınınoğlu HEPP (130 MW)<br />

Client: Andritz Hydro Ltd. Şti., Ankara, Turkey<br />

Location: Kahramanmaraş, Turkey<br />

Contractor: Çiltuğ Heat Industry and Trade Co.<br />

Scope: Fabrication of 2 units Draft Tube, Spiral<br />

Case & Stay Ring and Pit Liner.<br />

Project Weight: 126.61 tons<br />

Year: 2009


Reference Projects<br />

Offshore Sub-Marine Pipeline Project/North Cyprus<br />

Turkish Republic<br />

Client: Sigur-Ros Kalyon Joint Venture/TURKEY<br />

Location: North Cyprus Turkey Republic<br />

Contractor: Çiltuğ Heat Industry and Trade Co.<br />

Scope: 132 pcs of Elbow (“Y” Piece)<br />

Manufacturing and Transport for North Cyprus<br />

Turkish Rebuplic Offshore (Sub-Marine) Fresh<br />

Water Supply Project<br />

Project Weight: 1,245 tons<br />

Year: 2015


Reference Projects<br />

Al-Khalij Project / Libya<br />

Client: Gama Endüstri A.Ş. / TURKEY<br />

Location: Libya<br />

Contractor: Çiltuğ Heat Industry and Trade Co.<br />

Scope: Fabrication of Stoplogs Gate, Stoplog<br />

Embedded Structures, Intake Header and test<br />

cover, Manhole Gates and embedded structure<br />

Gates Dimension :<br />

- 2 set - 5.1 x 11.4 mt<br />

- 2 set - 4.9 x 11.4 mt<br />

- 1 set - 5.84 x 11.4 mt<br />

- 1 set - 3.9 x 11.4 mt<br />

- 1 set - 2,34 x 11.4 mt<br />

Project Weight: 400 tons<br />

Year: 2011


Reference Projects<br />

Rajma Ghot Es-Sultan and Benghazi Water Irrigation<br />

Project / Libya<br />

Client: Kolin İnş. Tur. San ve Tic. A.Ş. / TURKEY<br />

Location: Libya<br />

Contractor: Çiltuğ Heat Industry and Trade Co.<br />

Scope: Fabrication and erection of Penstocks.<br />

Project Weight: 608 tons<br />

Year: 2011


Reference Projects<br />

TG01 TYPE Transportation Frame / Areva<br />

Client: Areva Wind Gmbh / GEMRANY<br />

Location: Germany<br />

Contractor: Çiltuğ Heat Industry and Trade Co.<br />

Scope: 8 Sets Transportation Frame Fabrication.<br />

Project Weight: 196 tons<br />

Year: 2013


Reference Projects<br />

SENDJE ROTOR SPIDER/RUSSIA<br />

Client: Alstom Hydro France S.A./ FRANCE<br />

Location: Sendje Project / Russia<br />

Contractor: Çiltuğ Heat Industry and Trade Co.<br />

Scope: 4 Units Rotor Spider fabrication.<br />

Project Weight: 61.3 tons<br />

Year: 2016


Reference Projects<br />

HARJAVALTA UPPER&LOWER BRACKET/FINLAND<br />

Client: Alstom Hydro Hydro/ SPAIN<br />

Location: Harjavalta Project / Finland<br />

Contractor: Çiltuğ Heat Industry and Trade Co.<br />

Scope: 1 Unit Upper&Lower Bracket fabrication.<br />

Project Weight: 32.8 tons<br />

Year: 2016


Reference Projects<br />

Nam Theun 2 Project / Cambodia<br />

Client: GE General Energy / Norway<br />

Location: Cambodia<br />

Contractor: Çiltuğ Heat Industry and Trade Co.<br />

Scope: Fabrication and delivery exworks for ; 8<br />

numbers of Francis Draft Tube Stoplogs (6.35x9<br />

mt) including lifting beams, dogging beams and<br />

spares. 4 numbers of pelton draft tube stoplogs<br />

including lifting beams, dogging beams and<br />

spares. 1 set drainage and dewatering system.<br />

Project Weight: 87 tons<br />

Year: 2007


Reference Projects<br />

Tartous Project / Syria<br />

Client: Tartous Cement&Building Material Co.<br />

Location: Tartous, SYRIA<br />

Contractor: Çiltuğ Heat Industry and Trade Co.<br />

Scope: Fabrication of 4 units of steel cylindrical<br />

links.<br />

Project Weight: 227 tons<br />

Year: 2008


REFERENCE CUSTOMERS


Thank you<br />

for your Attention

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!