Summary<br />

Summery<br />

•Manufacturing period of 9 months.<br />

•Final acceptance test at <strong>Lindenberg</strong> workshop in Rösrath.<br />

•For truck transport to Bonn, parts of the modules were demounted<br />

to reduce the weight and measurements.<br />

•The final assembly was completed at Rhein river port in Bonn.<br />

•The entire module was lifted to a river barge for transportation to<br />

Rotterdam.<br />