17.12.2016 Views

test

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Antoine Makhlouf for Trading & Contracting


Head Office<br />

Yara center , 6th floor,Blvd Sin El Fil,Beirut,<br />

Lebanon<br />

Telephone : +961.1.900458 Fax : +961.1.876130<br />

Email: info@makhloufgroup.com.lb<br />

Zgharta Office<br />

Telephone/Fax : +961.6.555391


CEO Message<br />

History can be tricky!<br />

Spend too much time reflecting on the past and you could jeopardize your future. Ignore the past and you could lose your sense of direction. The<br />

trick is to find the proper balance-to celebrate your heritage while focusing on the future. At St.Antoine Makhlouf, our focus has always been on<br />

the future. What will customer’s needs be five years from now? How will we meet expectation of shareholders and employees? What resources<br />

will be needed to carry out growth plans?<br />

What kind of company were we then? What kind of company are we now ?<br />

Incorporated in 1985. Since its foundation, this company is present in the construction of public road infrastructure , urban and inter-urban<br />

.From minute one , ST.A.M has undertaken works involving municipal , provincial , regional or state roads in whatever from, ranging from<br />

fitting out of existing roads to construction of newly designed roads, either roads, motorways or highways.<br />

With the benefit of insight, we shudder to think about the millions of tons of bituminous mixtures executed, the enormous amount of cubic<br />

meters of concrete used or the millions of cubic meters of excavated soil and rock or embankments. Many years have gone by and ST.AM<br />

continues to compete in the front line, expanding its markets, both domestic and international , with works abroad already , giving continuity to<br />

its know how and achievements anywhere in the world.<br />

Apart from infrastructure construction, ST.A.M is also present, through subsidiaries, in , in auxiliary tasks such as production of aggregates or<br />

bituminous products .<br />

All in all, we are present and would like to continue being present in people’s most important from of transport, i.e. Road transport, and we<br />

hope this report serves as an example of the jobs undertaken and gives the reader a full picture of the company’s sense of commitment.<br />

Roger Makhlouf<br />

Et. was founded in 1945 and as a way of celebrating its 50 th year in business it published a book which showcased the wide variety of activities<br />

and services it performed domestically and abroad .<br />

In the year ? Lebanon experienced fundamental changes


Company Brief<br />

Since 1991, ET. A.M has specialized in the construction of roads and road-related facilities , tunnels and<br />

other composite engineering structures . this is confirmed by a series of already completed building<br />

and these currently under construction .<br />

I very much hope that it will contribute towards a further increase in cooperation between ET.A.M and<br />

its existing and future partners that may recognize it as a reliable, responsible and highly professional<br />

company. This is the best guarantee that our excellence will continue in the future .<br />

ET.A.M has constructed roads since 1953.<br />

ET.A.M’s capacity is based on its modern machine inventory , equipped with the la<strong>test</strong> technical<br />

development and on its widely experienced and highly professional staff capable of executing reliably<br />

all assigned works.this means that quality is assured not only for the road construction works, but also<br />

for all other structures along the road alignment such as tunnels,bridges, viaducts, etc.<br />

At the same time it greatly assists in traffic safety.<br />

ET.A.M is a company with more than thirty years of experience in the construction sector. Its dedication<br />

to growth and its capacity for diversification have positioned it as one of the most dynamic companies<br />

in the sector in Spain.<br />

Since its foundation, the company’s mission has been based on the cornerstones of business ethics and<br />

transparency , the satisfaction of its clients and end users , concerns for the environment, maximum<br />

quality and safety , training and constant motivation of human resources , and the ceaseless search for<br />

innovation and technical excellence .


Key Staff


Equipment<br />

No. of each<br />

Bulldozer (D 9) N 2<br />

Bulldozer (D 8) K 2<br />

Track Excavator, Jack Hammer 5<br />

Front Shovel 1<br />

Track Loader 2<br />

Hydro-Pneumatic Crawler Drill 3<br />

Wheel Loader 8<br />

Transit Mixer 15<br />

Concrete pump 4<br />

Truck 20 ton 10<br />

Truck 40 ton 4<br />

Water Tanker 3<br />

Bitumen Tanker 2<br />

Crane Truck 2<br />

Tower Crane 2<br />

Skid Loader 10<br />

Backhoe Loader 4<br />

Air Compressor 4<br />

Pick Up 10<br />

Tandem Vibratory roller 6<br />

Smooth drum compactor 6<br />

Pneumatic Roller 6<br />

Asphalt Paver 6<br />

Grader 3<br />

Jeep 10<br />

Car 20<br />

Miscellaneous<br />

No. of Each<br />

Milling machine 2<br />

Recycling train 1<br />

Slipform paver 1<br />

Road Marking machine 2<br />

Laboratory Instruments 1<br />

Electric Generator 60 Kva 5<br />

Electric Generator 500 Kva 4<br />

Electric Generator 100 Kva 5


Project Name Project Value (USD) Category<br />

Al-Abdeh fishing boat harbor 2,250,000.00 Harbors<br />

Bsarma- kfaraaqa 938,000.00 Highways,Bridges and Roads Projects<br />

Chekka-kfarhazir Road 10,684,000.00 Highways,Bridges and Roads Projects<br />

Akkar Maintenance Roads 2,412,000.00 Highways,Bridges and Roads Projects<br />

Tripoli Maintenance Roads 23,222,000.00 Highways,Bridges and Roads Projects<br />

Araman - Abdeh Highway 12,101,000.00 Highways,Bridges and Roads Projects<br />

International Security Force Building<br />

Public & Civil Building<br />

Koura Maintenance Roads 1,873,000.00 Highways,Bridges and Roads Projects<br />

Residential Villa-Ehden<br />

Public & Civil Building<br />

Makhlouf Workshop & Offices- Bchenine<br />

Public & Civil Building<br />

Chekka-Tripoli Highway 21,134,769.63 Highways,Bridges and Roads Projects<br />

Kousba-Tourza Road 1,621,306.80 Highways,Bridges and Roads Projects<br />

Strom Water Collector OH 46 332,757.00 infrastructural works<br />

Khalde- Damour Highway 6,379,986.76 Highways,Bridges and Roads Projects<br />

Zgharta-Ehden Road 5,839,950.00 Highways,Bridges and Roads Projects<br />

Tripoli Maintenance road 3,350,968.00 Highways,Bridges and Roads Projects<br />

Tripoli- El Mina Gardens & Sewage lifting Station 10,150,027.90 infrastructural works<br />

Nahr Ibrahim- Jbeil portable water line and basin 1,979,925.75 infrastructural works<br />

Tabarja- Chekka Highway 26,317,170.66 Highways,Bridges and Roads Projects<br />

Bahsas-Mina Highway 3,831,762.18 Highways,Bridges and Roads Projects<br />

Halba-Qoubayat Road & Bridges 11,724,661.00 Highways,Bridges and Roads Projects<br />

Rehabilitation of Mafrak Homs-Arida Road 6,640,975.22 Highways,Bridges and Roads Projects<br />

Zouk Mosbeh- Faraya 6,227,162.01 Highways,Bridges and Roads Projects<br />

Sir Jbab el Homr Road 18,124,359.44 Highways,Bridges and Roads Projects<br />

Chekka Tunnel 4,343,515.32 Highways,Bridges and Roads Projects<br />

Tabarja - Dora Highway 24,473,278.05 Highways,Bridges and Roads Projects<br />

Mejdlaya Asphalt & Concrete Batching Plant 4,000,000.00 Public & Civil Building<br />

Annaya-Ehmej-Laklouk 15,688,307.37 Highways,Bridges and Roads Projects


Project Name Project Value (USD) Category<br />

Abboudieh-Menjez-Road 17,487,928.33 Highways,Bridges and Roads Projects<br />

Saoufar-Mdeirej Highway 4,653,412.75 Highways,Bridges and Roads Projects<br />

Adma Interchange 2,640,529.76 Highways,Bridges and Roads Projects<br />

ADMA Residence- 550 4,200,000.00 Public & Civil Building<br />

Zgharta Roads Improvments<br />

Highways,Bridges and Roads Projects<br />

Beirut Justice Palace $15,635,246.13 Public & Civil Building<br />

Ehden Retaining Wall $62,479.33 Public & Civil Building<br />

monte verde roads reinstatments $4,076,923.83<br />

street lighting works beirut municipality $1,113,515.70<br />

maintenace works beirut municipality $6,163,706.67<br />

zgharta Maintenance Roads 2010<br />

zgharta Maintenance Roads 2011 $1,244,826.12<br />

zgharta Maintenance Roads 2012 $1,581,100.37<br />

zgharta Maintenance Roads 2013<br />

zgharta Maintenance Roads 2014<br />

zgharta Maintenance Roads 2015 $645,230.80<br />

zgharta Maintenance Roads 2016 $298,137.60


Name of Project: Sir el Dannyeh Jbab el Homr<br />

Employer: Council for Development and Reconstruction<br />

Location: Sir el Dannyeh north Lebanon to Jbab el Homr Hermel Bekaa<br />

Construction Period: 2003-2009<br />

Value USD($) :<br />

Performed works: The works include the construction of 28 km lenght of completely<br />

new road works and the Rehabilitation of 9.5 km length of old road.<br />

The roadways section consists of 7.0 m wide pavement with 1.00 m shoulder on each side.<br />

1. The first section of this road passes by the village of Nabaa al sukkar (P.K. 0+000),<br />

Brisa, Jbab al Homr (P.K 25+000)the ending point of this section. The total length<br />

of this section is approximately 25 km, and the alignment crosses a mountainous terrain.<br />

1. The second section begins at Jbab al Homr (P.K. 0+000) and ends at the road to<br />

Hermel village in the Bekaa Valley (P.K. 3+200). The total length of this section is<br />

approximately 3.2 km. The alignment crosses also a mountainous terrain.<br />

1. The third section is a link section between Sir el Dannyeh village (P.K. 0+000),<br />

and the begining of the project at Nabaa al sukkar (P.K. 9+500). The total length of<br />

this section is approximately 9.5 km. The alignment crosses a hard mountainous area<br />

and The land use is in majority agricultural.<br />

The works were performed on the full width of the road including the following:<br />

-Site and geotechnical investigation (existing utilities, boreholes at Culvert and retaining<br />

walls locations<br />

-Excavation of top soil and the open excavations accounted for1,427,000 m3, filling 100,000 m3,.<br />

The excavations were the most complex part of the works because they involved blasting first in order<br />

to level the ground and enable an approach for the bulldozers. The machinery used for excavation included<br />

texcavators , bulldozers, rticulated Dump trucks were used for handling the excavated material. Filling was<br />

carried out by bulldozers and vibrating rollers with capacities of 15 and 10 tons.<br />

-The road base works accounted for 232,900 m3 and Two Asphalt Pavement layer (75000ton).<br />

--laying reinforced concrete pipes diameter ,.<br />

-5,500 m of New Jersey type fencing were fixed.<br />

§ Construction of Gabion Walls,and geogrid walls , 60 Culvert, Concrete<br />

ditches for Stormwater drainage network (in total: 5500 Cu.m of reinforced<br />

concrete with 450 T of steel reinforcement).<br />

§ Protection works (slope protection, drainage ditch, grouted riprap).<br />

§ Utilities works and relocation of existing utilities.<br />

§ Road accessories: Guard rails, signing and marking.


Name of Project: Abboudieh Mounjez<br />

Employer: Council for Development and Reconstruction<br />

Location: Akkar north Lebanon<br />

Construction Period: 2010-2011<br />

Value USD($) :<br />

Performed works: The works for the Road include the construction of 14 km lenght of road works.<br />

The roadways section consists of 7.0 m wide pavement with 0.25 m inner verge from each side<br />

and 1.50 m shoulder on each side.<br />

1. The first section of this road passes by the villages of Abboudieh (P.K. 0+000),<br />

Janine and Noura El Tahta village (P.K. 7+000), the ending point of this section.<br />

It has a bridge structure at P.K. 5+800. The total length of this section is approximately<br />

7 km, and the alignment crosses a mountainous terrain. The land use is in majority agricultural.<br />

1. The second section begins at Noura El Tahta intersection (P.K. 7+000) and ends at El Dabbabieh<br />

village (P.K. 10+500). The total length of this section is approximately 3.5 km. The pavement<br />

structure is very bad and needs reconstruction and the land use is in majority urban.<br />

1. The third section begins at El Dabbabieh village (P.K. 10+500), it passes through El Fraidis<br />

and ends at El Mounjez village (P.K. 14). The total length of this section is approximately 3.5 km.<br />

The alignment crosses a hard mountainous area and the land use is in majority semi-urban.<br />

The extent of the works includes the following main elements:<br />

Site and geotechnical investigation (existing utilities, boreholes at<br />

bridges and retaining walls locations).<br />

Earthworks (625000 Cu.m) for road construction, road widening,<br />

drainage channels, culverts, bridges, walls, etc…<br />

Road Structure works including :<br />

1- subbase and base course layers (106000 m3).<br />

2- Two Asphalt Pavement layer (52000 tons).<br />

Construction of retaining walls, Culverts, 4 bridges, Concrete<br />

ditches for Stormwater drainage network (in total: 25085 Cu.m<br />

of reinforced concrete with 2500 T of steel reinforcement).<br />

§ Protection works (slope protection, drainage ditch, grouted riprap).<br />

§ Utilities works and relocation of existing utilities.<br />

§ Lighting works at intersections.<br />

§ Road accessories: New Jersey Barier, signing and marking.


Name of Project: Kfarhata Qarabach by pass phase 1<br />

Employer: MINISTERY OF PUBLIC WORK<br />

Location: ZGHARTA NORTH LEBANON<br />

Construction Period: 2014-2015<br />

Value USD($) :<br />

Performed works: The works for the Bypass Road under Phase I.<br />

include the construction of 1,200m lenght of two-way city road.<br />

The roadways section consists of 7.0 m wide pavement with 0.25 m<br />

verge from each side and 1.50 m sidewalk on one side.<br />

The first section of this road passes by the villages of<br />

Qarabach (P.K. 0+000), Kfarhata (P.K. 1+200), the<br />

ending point of this section. It has a bridge structure<br />

at P.K. 1+100.<br />

§ Site and geotechnical investigation (existing utilities, boreholes at<br />

bridges and retaining walls locations).<br />

§ Earthworks for road construction, road widening, drainage channels,<br />

culverts, bridges, walls (approximately 34000 Cu.m).<br />

The extent of the works includes the following main elements:<br />

§ Road Structure works including :<br />

1- subbase and base course layers (4338 m3)<br />

2- Two Asphalt Pavement layer involving both new pavement and rehabilitation<br />

of existing pavement (2218 tons)<br />

Construction of approximatly 2000m length of retaining walls, 1 bridge, 1200 l.m.<br />

of concrete ditches for Stormwater drainage network (7810 Cu.m of reinforced<br />

concrete with 822 T of steel reinforcement)<br />

Road accessories: sidewalks, signing and marking.


Project Photos

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!