board book 1-9-17
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Design Projects – Preventive Maintenance/Rehab<br />
• SH 288 from FM 2234 to Hayes Creek<br />
– Mill and PFC Overlay<br />
– Estimated Letting: Jan 20<strong>17</strong><br />
• BS 288B from Cemetery Rd to SH 332<br />
– Repair Pavement and ACP Overlay<br />
– Estimated Letting: Feb 20<strong>17</strong><br />
• SH 332 South of Levee Road<br />
– Replace Drainage Structure<br />
– Estimated Letting: Mar 20<strong>17</strong><br />
• SH 35 at Industrial Drive<br />
– Add Left Turn Lane<br />
– Estimated Letting: April 20<strong>17</strong><br />
Revised October 2016<br />
9