Design Projects – Preventive Maintenance/Rehab<br />

• SH 288 from FM 2234 to Hayes Creek<br />

– Mill and PFC Overlay<br />

– Estimated Letting: Jan 20<strong>17</strong><br />

• BS 288B from Cemetery Rd to SH 332<br />

– Repair Pavement and ACP Overlay<br />

– Estimated Letting: Feb 20<strong>17</strong><br />

• SH 332 South of Levee Road<br />

– Replace Drainage Structure<br />

– Estimated Letting: Mar 20<strong>17</strong><br />

• SH 35 at Industrial Drive<br />

– Add Left Turn Lane<br />

– Estimated Letting: April 20<strong>17</strong><br />

Revised October 2016<br />