10.12.2012 Views

MANASOTA & PEACE RIVER BBDs Meeting Notebook 10-21-09.docx

MANASOTA & PEACE RIVER BBDs Meeting Notebook 10-21-09.docx

MANASOTA & PEACE RIVER BBDs Meeting Notebook 10-21-09.docx

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

MEETING NOTEBOOK<br />

<strong>MANASOTA</strong> BASIN BOARD<br />

and<br />

<strong>PEACE</strong> <strong>RIVER</strong> BASIN BOARD<br />

JOINT MEETING AND WORKSHOP<br />

WEDNESDAY<br />

OCTOBER <strong>21</strong>, 2009<br />

9:00 A.M.<br />

Turner Agri-Civic Center<br />

2250 NE Roan Street<br />

Arcadia, Florida 334266<br />

(863) 993-4807


Manasota Basin Board<br />

Basin Board Land Resources<br />

Primary Representative: Frank Strelec<br />

Alternate: Mike McCoy<br />

Basin Board Education<br />

Primary Representative: Mac Carraway<br />

Alternate: Betsy Benac<br />

Sarasota Bay Estuary Program<br />

Policy Board<br />

Jack Bispham<br />

<strong>MANASOTA</strong> BASIN BOARD<br />

Albert G. Joerger, Co-Chair<br />

Carlos M. Beruff, Co-Chair<br />

Frank E. Strelec, Vice Chair<br />

J. Mac Carraway, Secretary<br />

Elizabeth "Betsy" O. Benac, Member<br />

Paul “Jack” J. Bispham, Member<br />

Michael P. McCoy, Member<br />

<strong>PEACE</strong> <strong>RIVER</strong> BASIN BOARD<br />

H. Paul Senft, Jr., Co-Chair<br />

Bryan K. Beswick, Co-Chair<br />

C. A. "Neil" Combee, Jr., Co-Chair<br />

J. Kenneth Harrison, Vice Chair<br />

Rufus C. Lazzell, Secretary<br />

Paul G. Samuels, Member<br />

Fred W. Trippensee, III, Member<br />

Patricia C. Crisman, Member<br />

COMMITTEE REPRESENTATIVES<br />

Peace River Basin Board<br />

Basin Board Land Resources<br />

Primary Representative: Ken Harrison<br />

Alternate: Fred Trippensee<br />

Basin Board Education<br />

Primary Representative: Pat Crisman<br />

Alternate: Fred Trippensee<br />

Charlotte Harbor National Estuary<br />

Program - Policy Committee<br />

Rufus Lazzell


AGENDA<br />

Southwest Florida Water Management District<br />

Joint <strong>Meeting</strong>/Workshop<br />

<strong>MANASOTA</strong> BASIN BOARD AND<br />

<strong>PEACE</strong> <strong>RIVER</strong> BASIN BOARD<br />

Arcadia, Florida October <strong>21</strong>, 2009<br />

9 a.m.<br />

Item Presenter<br />

1. Call to Order, Introductions, and Roll Call Co-Chairs Beruff, Beswick, Joerger, and Senft/<br />

Phyllis Young<br />

2. Pledge of Allegiance to the American Flag Basin Board Co-Chairs<br />

3. Additions and Deletions to the Agenda Lou Kavouras<br />

4. Ceremony to Honor Former Peace River Basin Board Member Jim Hageman Rufus Lazzell<br />

5. Florida Water Star SM Gold – Recognition of Polk County Builders Beth Putnam<br />

6. Consent Items:<br />

a. Manasota Basin Board<br />

1. Minutes of the August 12, 2009, <strong>Meeting</strong> [Exhibit 1] Lou Kavouras<br />

2. Appraisals and Purchase/Sale Agreement - Myakka Prairie Project Eric Sutton<br />

SWF Parcel No. <strong>21</strong>-199-<strong>10</strong>6C [Exhibit 2]<br />

3. Appraisals and Purchase/Sale Agreement - Myakka Prairie Project Eric Sutton<br />

SWF Parcel No. <strong>21</strong>-199-<strong>10</strong>7C [Exhibit 3]<br />

4. Proclamation: Fiscal Year 2009 Sarasota County Virginia Sternberger<br />

Watershed Awareness Week [Exhibit 4]<br />

b. Peace River Basin Board<br />

1. Minutes of the August 7, 2009, <strong>Meeting</strong> [Exhibit 5] Lou Kavouras<br />

2. Facilitating Agricultural Resource Management Systems (FARMS) Eric DeHaven<br />

i. Bermont Properties, LLC., Charlotte County [Exhibit 6]<br />

ii. FLM, Inc., Prairie River Ranch Phase II a – Culverts, DeSoto<br />

County [Exhibit 7]<br />

iii. Roper Growers Cooperative, DeSoto County [Exhibit 8]<br />

3. Land Use and Management Plan for the Circle B Bar Reserve [Exhibit 9] Chuck Lane<br />

4. Approval of Resolution No. <strong>10</strong>7 for the Fiscal Year 20<strong>10</strong> Budget Mark Hammond/<br />

Amendment to include Reallocated Funds from Water Protection Linda Pilcher<br />

and Sustainability Trust Fund [Exhibit <strong>10</strong>]<br />

5. Lake Gibson Southwest Sub-Basin Stormwater Management Mark Hammond<br />

System Retrofit<br />

7. Discussion Item:<br />

a. Lake Hancock Land Use Alternatives Study [Exhibit 11] Eric Sutton<br />

8. Workshop Agenda<br />

a. Purpose Vice Chair Frank Strelec<br />

b. Regional Overview<br />

1. FY2009 Basin Accomplishments and FY20<strong>10</strong> Strategic Dianne Davies/<br />

Budget Priorities Chan Springstead<br />

2. Peace River/Manasota Regional Water Supply Pat Lehman, PR/MRWSA<br />

Authority (PR/MRWSA) Emerging Issues


Manasota and Peace River Basin Boards October <strong>21</strong>, 2009<br />

Joint <strong>Meeting</strong> and Workshop Page 2 of 2<br />

3. Charlotte Harbor National Estuary Program (CHNEP) Jennette Seachrist/<br />

Lisa Beever, CHNEP<br />

4. Tampa Bay Estuary Program (TBEP) Jennette Seachrist/<br />

Holly Greening, TBEP<br />

5. Sarasota Bay Estuary Program (SBEP) Jennette Seachrist/<br />

Mark Alderson, SBEP<br />

6. Summary of Emerging Issues Basin Planners<br />

c. Financial and Legislative Outlook<br />

1. District Financial Overview Gene Schiller<br />

2. Fiscal Impacts of Legislative Activities David Rathke<br />

3. Basin Budget Evaluations Basin Planners/Brian Armstrong<br />

d. Open Discussion<br />

1. Cooperative Funding Program Considerations Basin Planners/ Board Members<br />

2. Future Budget Allocations and Funding Prioritization Basin Planners/ Board Members<br />

3. Topics of Discussion for December Joint GB/BB Workshop Lou Kavouras<br />

9. Announcements: Lou Kavouras<br />

a. Basin Board Education Committee: Wednesday, November 4, 2009,<br />

9:30 a.m., Tampa Service Office<br />

b. “Get Outside:” Saturday, November 7, 2009, 9:30 a.m., Green Swamp<br />

Wilderness Preserve Hampton Tract<br />

c. Basin Board Land Resources Committee: Tuesday, December 1, 2009,<br />

9:30 a.m., Green Swamp West Field Office, Dade City<br />

d. Joint Governing/Basin Boards Workshop: Tuesday, December 15, 2009,<br />

9 a.m., Nature’s Classroom, Thonotosassa<br />

e. Other<br />

<strong>10</strong>. Adjournment Basin Board Co-Chairs<br />

Lunch and a FARMS Tour will follow the meeting.<br />

****Information Items may be found at the end of the Summary Agenda****


1. Call to Order, Introductions and Roll Call<br />

SUMMARY AGENDA<br />

Joint <strong>Meeting</strong> and Workshop<br />

Manasota Basin Board<br />

and<br />

Peace River Basin Board<br />

Arcadia, Florida October <strong>21</strong>, 2009<br />

9:00 a.m.<br />

Presenters: Basin Board Co-Chairs Beruff, Beswick, Joerger, and Senft<br />

Phyllis Young, Senior Administrative Assistant<br />

Boards and Executive Services<br />

2. Pledge of Allegiance to the American Flag<br />

Presenters: Basin Board Co-Chairs<br />

3. Additions and Deletions to the Agenda<br />

Presenter: Lou Kavouras, Deputy Executive Director<br />

Outreach, Planning and Board Services<br />

4. Ceremony to Honor Former Peace River Basin Board Member Jim Hageman<br />

Presenter: Rufus Lazzell, Secretary<br />

Peace River Basin Board<br />

5. Florida Water Star SM Gold – Recognition of Polk County Builders<br />

Presenter: Beth Putnam, Communications Manager<br />

Communications Department<br />

6. Consent Items:<br />

a. Manasota Basin Board<br />

1. Minutes of the August 12, 2009, <strong>Meeting</strong><br />

Minutes of the August 2009 meeting were provided to Board members for review.<br />

Staff Recommendation:<br />

Approve the August minutes, as presented. Exhibit 1<br />

Presenter: Lou Kavouras


Summary Agenda<br />

Joint <strong>Meeting</strong> and Workshop October <strong>21</strong>, 2009<br />

Manasota and Peace River Basin Boards Page 2 of 29<br />

2. Appraisals and Purchase/Sale Agreement - Myakka Prairie Project SWF Parcel<br />

No. <strong>21</strong>-199-<strong>10</strong>6C<br />

Purpose<br />

The purpose of this item is to recommend the Governing Board approve the<br />

purchase of a perpetual conservation easement over 233.42 acres, owned by<br />

Kendall S. Carithers, as part of the District’s Myakka Prairie project and the United<br />

States Department of Agriculture (USDA) Natural Resources Conservation Service<br />

(NRCS) Farm and Ranchland Protection Program (FRPP). The total negotiated<br />

amount is $613,500, of which the District’s portion is $204,500. To date,<br />

approximately 8,909 acres have been acquired in fee or less-than-fee interests within<br />

the project. A general location map of the parcel is included in the board packet.<br />

This acquisition is consistent with the District’s Florida Forever Work Plan, which<br />

specifically identifies the Myakka Prairie project for acquisition.<br />

Background/History<br />

Acquisition of these lands will meet the following Florida Forever program goals:<br />

� Enhance the coordination and completion of Land Acquisition projects<br />

� Increase the protection of Florida's biodiversity at the species, natural<br />

community, and landscape levels<br />

� Protect, restore, and maintain the quality and natural functions of land, water,<br />

and wetland systems of the state<br />

� Ensure that sufficient quantities of water are available to meet the current and<br />

future needs of natural systems and the citizens of the state<br />

These Florida Forever goals are consistent with the District's goals for water<br />

resource management.<br />

The encumbrance of the parcel with a conservation easement will provide a natural<br />

buffer to the District's adjoining Myakka Prairie Project by ensuring a compatible,<br />

adjacent land use to the core conservation area in the Myakka Basin.<br />

The Farm and Ranch Land Protection Program (FRPP)<br />

The FRPP is a federal government program which provides matching funds to help<br />

purchase development rights to keep productive farm and ranchland in agricultural<br />

uses. Working through existing programs, USDA partners with state, tribal, or local<br />

governments and non-governmental organizations to acquire conservation<br />

easements or other interests in land from landowners. USDA provides up to<br />

50 percent of the fair market easement value of the conservation easement.<br />

To qualify, farmland must: be part of a pending offer from a state, tribe, or local<br />

farmland protection program; be privately owned; have a conservation plan for highly<br />

erodible land; be large enough to sustain agricultural production; be accessible to<br />

markets for what the land produces; have adequate infrastructure and agricultural<br />

support services; and have surrounding parcels of land that can support long-term<br />

agricultural production.<br />

Property Description<br />

Location and Access – The property is located in the southeastern part of Manatee<br />

County. Access to the property is via a 50-foot easement from Clay Gully Road<br />

approximately 2.5 miles north.


Summary Agenda<br />

Joint <strong>Meeting</strong> and Workshop October <strong>21</strong>, 2009<br />

Manasota and Peace River Basin Boards Page 3 of 29<br />

Description and Proximity – The property is rectangular in shape. The north quarter<br />

of the property is bisected west to east by Mossy Island Slough and consists of about<br />

75 percent of natural uplands and improved pasture and <strong>21</strong> percent of wetlands.<br />

The encumbrance of the parcel with a conservation easement will provide a natural<br />

buffer to the adjoining Myakka River State Park, which adjoins the parcel on the<br />

south, by ensuring that development or more intensive land uses will not occur on<br />

the parcel. The property features are a matrix of open pasture (58 percent), native<br />

scrub, hardwood/conifer hammocks, marshes, slough, and wet prairie. The<br />

preservation of this parcel will complement the District’s resource protection efforts<br />

for the Myakka River and the associated Myakka Prairie.<br />

Utilities and/or Improvements – Electric and telephone service are available but not<br />

extended to the property. The FRPP easement does not encumber a one-acre<br />

farmstead which is surrounded by encumbered property. This property is not<br />

improved with any residential structures, equipment or storage sheds. It is fenced<br />

and cross fenced with metal gates providing access between pastures, and has a<br />

reasonable system of interior dirt roads suitable for machinery access and cattle<br />

movement between pastures.<br />

Zoning – The property is zoned A – Agriculture and the Future Land Use is AG/R –<br />

Agriculture Rural. Both allow one residence per five acres with the future land use<br />

allowing a potential density of one per five acres. The potential uses are agriculture,<br />

rural residential, farm worker housing, small retail and office, low intensity<br />

recreational, rural recreational, public or semi-public uses, schools, mining, agroindustrial,<br />

commercial uses related to agriculture, and convenience retail.<br />

Summary of Appraisals and Value Comparisons<br />

In accordance with District policy, two appraisals were obtained for the parcel from<br />

Edwin Jones, ARA, with Angus Investments, Inc., and Tod Marr, MAI, with Marr and<br />

Associates Appraisal Company, Inc. The appraisals were reviewed by Andrew Hupp,<br />

MAI, with Hupp Realty Advisors. The appraisal reports were prepared on May 7 and<br />

May 13, 2009. The reports have an effective valuation date of May 1, 2009, and<br />

meet the necessary legal or District requirements and contain the appraisers’ factual<br />

data leading to the value conclusion.<br />

Highest and Best Use – The highest and best use as determined by the appraisers,<br />

based on the physically possible, legally permissible and financially feasible uses for<br />

this property, would be for agriculture.<br />

The appraisers applied the Sales Comparison Approach (Market Approach) to<br />

determine the value of this property. The appraisers relied on recent sales of<br />

comparable property in Manatee, Hardee, Polk, DeSoto, and Volusia counties. The<br />

sales were adjusted for differences that included, date of sale, location/access<br />

easement restrictions and physical characteristics including size and topography.<br />

The following is a comparison of the total proposed purchase price to the appraised<br />

values:<br />

Negotiated<br />

Amount<br />

Appraised Value<br />

Jones<br />

Appraised Value<br />

Marr<br />

Total Cost $ 613,500 $ 799,463 $ 860,000<br />

Per Acre Cost $ 2,628 $ 3,425 $ 3,684


Summary Agenda<br />

Joint <strong>Meeting</strong> and Workshop October <strong>21</strong>, 2009<br />

Manasota and Peace River Basin Boards Page 4 of 29<br />

The transaction includes the property owner making a 25 percent contribution of the<br />

cost/value for the easement. The negotiated amount, less the owner contribution, is<br />

23.3 percent and 28.7 percent below the Jones and Marr appraisals, respectively.<br />

The allocation of the total transaction is shown as follows:<br />

Party Contribution<br />

Owner Cost/Value $204,500<br />

NRCS $409,000<br />

District $204,500<br />

Total $818,000<br />

Purchase Agreement<br />

� Purchase is contingent on the award of funds through the FRPP.<br />

� The seller agrees to deliver a Perpetual Conservation Easement free of all<br />

encumbrances objectionable to the District.<br />

� A survey has been completed and the final total purchase price of $613,500 is<br />

based on the surveyed acres, not to include any sovereign lands.<br />

� An environmental site assessment and baseline documentation will be completed<br />

prior to closing.<br />

� A District conservation easement will be utilized with contingent rights held by the<br />

United States of America through the United States Department of Agriculture<br />

(NRCS-FRPP).<br />

Terms and Conditions of the Perpetual Conservation Easement<br />

The final terms and conditions of the SWFWMD conservation easement are subject<br />

to review by the NRCS General Counsel and may be modified from those below.<br />

� No additional single family residential units may be constructed.<br />

� All other future residential, commercial, industrial and incidental development<br />

rights will be terminated and extinguished and may not be used on or transferred<br />

to other property.<br />

� The District may enter the property upon a 24-hour notice to check for<br />

compliance.<br />

� Subdivision of the property is prohibited.<br />

� No dumping of solid or liquid waste, including sludge.<br />

� No mining is allowed.<br />

� Agricultural/silvicultural activities are permitted as identified in the baseline<br />

natural resources inventory.<br />

� No conversion of native range.<br />

� Planting of commercial row crops or citrus is not permitted.<br />

� Property may not be utilized for livestock feed lots or for swine, poultry or dairy<br />

farming.<br />

� No release of non-indigenous species, including wild game animals.<br />

� Existing wetlands, natural areas, and water bodies/courses shall not be<br />

disturbed.<br />

� No timber harvesting in wetlands and no harvesting of cypress.<br />

� Commercial and industrial activities are prohibited.<br />

� To the extent practical and economically feasible, sellers are required to control<br />

exotics.<br />

� Agricultural chemicals shall be applied by non aerial means and must be used in<br />

accordance with State and Federal laws; biological control is prohibited without<br />

District approval.


Summary Agenda<br />

Joint <strong>Meeting</strong> and Workshop October <strong>21</strong>, 2009<br />

Manasota and Peace River Basin Boards Page 5 of 29<br />

� No action that will negatively impact threatened or endangered species.<br />

� Identified archaeological, cultural, and historical sites will not be impacted.<br />

� Best management practices (BMPs) will be followed for all permitted<br />

agriculture/silviculture uses.<br />

� Commercial nursery operations including ornamentals and tree farms are not<br />

permitted.<br />

� No leasing of hunting or fishing rights without an acceptable wildlife management<br />

plan.<br />

� The Sellers will be responsible for payment of all ad valorem taxes.<br />

Enforcement conditions - Violations are given 30 days for correction. Legal remedies<br />

then begin with pretrial mediation.<br />

Benefits/Costs<br />

Management Costs<br />

The District's management of the property will consist only of the annual inspection<br />

to monitor compliance with the terms of the conservation easement. The property<br />

owner will remain responsible for management costs such as fencing, prescribed<br />

burning, exotic species control, road maintenance and security for the area<br />

encumbered by the conservation easement.<br />

Impact If Not Funded/Funding<br />

Land Acquisition Partnership<br />

The landowner has agreed to contribute 25 percent of the purchase price of the<br />

easement and 50 percent of the acquisition funding is provided by the USDA NRCS<br />

through their Farm and Ranchland Protection Program. The District’s 25 percent<br />

share ($204,500) is available from the Florida Forever Trust Fund and the Florida<br />

Department of Transportation mitigation funds previously reimbursed to the District.<br />

In order for Florida Forever funds to be released from the Trust Fund by the Florida<br />

Department of Environmental Protection, a resolution signed by the Governing Board<br />

must accompany the request.<br />

Staff Recommendation: Exhibit 2<br />

Recommend the Governing Board:<br />

� Accept the appraisals;<br />

� Approve the resolution requesting funds in the amount of $204,500;<br />

� Approve the Purchase/Sale Agreement; and<br />

� Designate SWF Parcel No. <strong>21</strong>-199-<strong>10</strong>6C as being acquired for conservation<br />

purposes.<br />

Presenter: Eric Sutton, Director<br />

Land Resources Department<br />

3. Appraisals and Purchase/Sale Agreement - Myakka Prairie Project SWF<br />

Parcel No. <strong>21</strong>-199-<strong>10</strong>7C<br />

Purpose<br />

The purpose of this item is to recommend the Governing Board approve the<br />

purchase of a perpetual conservation easement over 185.46 acres, owned by<br />

Clifford E. Chapman, as Trustee of the Clifford E. Chapman Revocable Trust<br />

Agreement dated May 11, 1977, as part of the District’s Myakka Prairie project and<br />

the United States Department of Agriculture (USDA) Natural Resources


Summary Agenda<br />

Joint <strong>Meeting</strong> and Workshop October <strong>21</strong>, 2009<br />

Manasota and Peace River Basin Boards Page 6 of 29<br />

Conservation Service (NRCS) Farm and Ranchland Protection Program (FRPP).<br />

The total negotiated amount is $487,500, of which the District’s portion is $162,500.<br />

To date, approximately 8,909 acres have been acquired in fee or less-than-fee<br />

interests within the project. A general location map of the parcel is included in the<br />

board packet.<br />

This acquisition is consistent with the District’s Florida Forever Work Plan, which<br />

specifically identifies the Myakka Prairie project for acquisition.<br />

Background/History<br />

Acquisition of these lands will meet the following Florida Forever program goals:<br />

� Enhance the coordination and completion of Land Acquisition projects<br />

� Increase the protection of Florida's biodiversity at the species, natural<br />

community, and landscape levels<br />

� Protect, restore, and maintain the quality and natural functions of land, water,<br />

and wetland systems of the state<br />

� Ensure that sufficient quantities of water are available to meet the current and<br />

future needs of natural systems and the citizens of the state<br />

These Florida Forever goals are consistent with the District's goals for water<br />

resource management.<br />

The encumbrance of the parcel with a conservation easement will provide a natural<br />

buffer to the District's adjoining Myakka Prairie Project by ensuring a compatible,<br />

adjacent land use to the core conservation area in the Myakka basin.<br />

The Farm and Ranch Land Protection Program (FRPP)<br />

The FRPP is a federal government program which provides matching funds to help<br />

purchase development rights to keep productive farm and ranchland in agricultural<br />

uses. Working through existing programs, USDA partners with state, tribal, or local<br />

governments and non-governmental organizations to acquire conservation<br />

easements or other interests in land from landowners. USDA provides up to<br />

50 percent of the fair market easement value of the conservation easement.<br />

To qualify, farmland must: be part of a pending offer from a state, tribe, or local<br />

farmland protection program; be privately owned; have a conservation plan for highly<br />

erodible land; be large enough to sustain agricultural production; be accessible to<br />

markets for what the land produces; have adequate infrastructure and agricultural<br />

support services; and have surrounding parcels of land that can support long-term<br />

agricultural production.<br />

Property Description<br />

Location and Access – The property is located in the southeastern part of Manatee<br />

County. Access to the property is via a 50-foot easement from Clay Gully Road<br />

approximately 2.5 miles north.<br />

Description and Proximity – The property is rectangular in shape. The north quarter<br />

of the property is bisected west to east by Mossy Island Slough and consists of about<br />

77 percent of natural uplands and improved pasture, and 23 percent of wetlands.<br />

The encumbrance of the parcel with a conservation easement will provide a natural<br />

buffer to the adjoining Myakka River State Park which adjoins the parcel on the<br />

south, by ensuring that development or more intensive land uses will not occur on<br />

the parcel. The property features are a matrix of open improved pasture, native<br />

scrub, hardwood/conifer hammocks, marshes, slough, and wet prairie. The


Summary Agenda<br />

Joint <strong>Meeting</strong> and Workshop October <strong>21</strong>, 2009<br />

Manasota and Peace River Basin Boards Page 7 of 29<br />

preservation of this parcel will complement the District’s resource protection efforts<br />

for the Myakka River and the associated Myakka Prairie.<br />

Utilities and/or Improvements – Electric and telephone service are available but not<br />

extended to the property. The FRPP easement does not encumber a five-acre<br />

farmstead which is surrounded by encumbered property. This property is not<br />

improved with any residential structures, equipment or storage sheds. It is fenced<br />

and cross fenced, and has a reasonable system of interior dirt roads suitable for<br />

machinery access and cattle movement between pastures.<br />

Zoning – The property is zoned A – Agriculture and the Future Land Use is AG/R –<br />

Agriculture Rural. Both allow one residence per five acres with the future land use<br />

allowing a potential density of one per five acres. The potential uses are agriculture,<br />

rural residential, farm worker housing, small retail and office, low intensity<br />

recreational, rural recreational, public or semi-public uses, schools, mining, agroindustrial,<br />

commercial uses related to agriculture, and convenience retail.<br />

Summary of Appraisals and Value Comparisons<br />

In accordance with District policy, two appraisals were obtained for the parcel from<br />

Edwin Jones, ARA, with Angus Investments, Inc, and Tod Marr, MAI, with Marr and<br />

Associates Appraisal Company, Inc. The appraisals were reviewed by Andrew Hupp,<br />

MAI, with Hupp Realty Advisors. The appraisal reports were prepared on May 5 and<br />

May 13, 2009. The reports have an effective valuation date of May 1, 2009, and<br />

meet the necessary legal or District requirements and contain the appraisers’ factual<br />

data leading to the value conclusion.<br />

Highest and Best Use – The highest and best use as determined by the appraisers,<br />

based on the physically possible, legally permissible and financially feasible uses for<br />

this property, would be for agriculture.<br />

The appraisers applied the Sales Comparison Approach (Market Approach) to<br />

determine the value of this property. The appraisers relied on recent sales of<br />

comparable property in Manatee, Hardee, Polk, DeSoto, and Volusia counties. The<br />

sales were adjusted for differences that included date of sale, location/access<br />

easement restrictions, and physical characteristics including size and topography.<br />

The following is a comparison of the total proposed purchase price to the appraised<br />

values:<br />

Negotiated<br />

Amount<br />

Appraised Value<br />

Jones<br />

Appraised Value<br />

Marr<br />

Total Cost $487,500 $ 635,200 $685,000<br />

Per Acre Cost $ 2,629 $ 3,425 $ 3,694<br />

The transaction includes the property owner making a 25 percent contribution of the<br />

cost/value for the easement. The negotiated amount, less the owner contribution, is<br />

23.3 percent and 28.8 percent below the Jones and Marr appraisals, respectively.<br />

The allocation of the total transaction is shown as follows:


Summary Agenda<br />

Joint <strong>Meeting</strong> and Workshop October <strong>21</strong>, 2009<br />

Manasota and Peace River Basin Boards Page 8 of 29<br />

Party Contribution<br />

Owner Cost/Value $162,500<br />

NRCS $325,000<br />

District $162,500<br />

Total $650,000<br />

Purchase Agreement<br />

� Purchase is contingent on the award of funds through the FRPP.<br />

� The seller agrees to deliver a Perpetual Conservation Easement free of all<br />

encumbrances objectionable to the District.<br />

� A survey has been completed and the final total purchase price of $487,500 is<br />

based on the surveyed acres, not to include any sovereign lands.<br />

� An environmental site assessment and baseline documentation will be completed<br />

prior to closing.<br />

� A District conservation easement will be utilized with contingent rights held by the<br />

United States of America through the United States Department of Agriculture<br />

(NRCS-FRPP).<br />

Terms and Conditions of the Perpetual Conservation Easement<br />

The final terms and conditions of the SWFWMD conservation easement are subject<br />

to review by the NRCS General Counsel and may be modified from those below.<br />

� No additional single family residential units may be constructed.<br />

� All other future residential, commercial, industrial and incidental development<br />

rights will be terminated and extinguished and may not be used on or transferred<br />

to other property.<br />

� The District may enter the property upon a 24-hour notice to check for<br />

compliance.<br />

� Subdivision of the property is prohibited.<br />

� No dumping of solid or liquid waste, including sludge.<br />

� No mining is allowed.<br />

� Agricultural/silvicultural activities are permitted as identified in the baseline<br />

natural resources inventory.<br />

� No conversion of native range.<br />

� Planting of commercial row crops or citrus is not permitted.<br />

� Property may not be utilized for livestock feed lots or for swine, poultry or dairy<br />

farming.<br />

� No release of non-indigenous species, including wild game animals.<br />

� Existing wetlands, natural areas, and water bodies/courses shall not be<br />

disturbed.<br />

� No timber harvesting in wetlands and no harvesting of cypress.<br />

� Commercial and industrial activities are prohibited.<br />

� To the extent practical and economically feasible, sellers are required to control<br />

exotics.<br />

� Agricultural chemicals shall be applied by non aerial means and must be used in<br />

accordance with State and Federal laws; biological control is prohibited without<br />

District approval.<br />

� No action that will negatively impact threatened or endangered species.<br />

� Identified archaeological, cultural, and historical sites will not be impacted.<br />

� Best management practices (BMPs) will be followed for all permitted<br />

agriculture/silviculture uses.<br />

� Commercial nursery operations including ornamentals and tree farms are not<br />

permitted.


Summary Agenda<br />

Joint <strong>Meeting</strong> and Workshop October <strong>21</strong>, 2009<br />

Manasota and Peace River Basin Boards Page 9 of 29<br />

� No leasing of hunting or fishing rights without an acceptable wildlife management<br />

plan.<br />

� The Sellers will be responsible for payment of all ad valorem taxes.<br />

Enforcement conditions - Violations are given 30 days for correction. Legal remedies<br />

then begin with pretrial mediation.<br />

Benefits/Costs<br />

Management Costs<br />

The District's management of the property will consist only of the annual inspection<br />

to monitor compliance with the terms of the conservation easement. The property<br />

owner will remain responsible for management costs such as fencing, prescribed<br />

burning, exotic species control, road maintenance and security for the area<br />

encumbered by the conservation easement.<br />

Impact If Not Funded/Funding<br />

Land Acquisition Partnership<br />

The landowner has agreed to contribute 25 percent of the purchase price of the<br />

easement and 50 percent of the acquisition funding is provided by the USDA NRCS<br />

through their Farm and Ranchland Protection Program. The District’s 25 percent<br />

share ($162,500) is available from the Florida Forever Trust Fund and the Florida<br />

Department of Transportation mitigation funds previously reimbursed to the District.<br />

In order for Florida Forever funds to be released from the Trust Fund by the Florida<br />

Department of Environmental Protection, a resolution signed by the Governing Board<br />

must accompany the request.<br />

Staff Recommendation: Exhibit 3<br />

Recommend the Governing Board:<br />

� Accept the appraisals;<br />

� Approve resolution requesting funds in the amount of $162,500;<br />

� Approve the Purchase/Sale Agreement; and<br />

� Designate SWF Parcel No. <strong>21</strong>-199-<strong>10</strong>7C as being acquired for conservation<br />

purposes.<br />

Presenter: Eric Sutton, Director<br />

Land Resources Department<br />

4. Proclamation: Fiscal Year 2009 Sarasota County Watershed Awareness Week<br />

Purpose<br />

This is an action item. Staff is asking the Basin Board to declare the week of<br />

October 12–18, 2009, as Watershed Awareness Week in Sarasota County.<br />

Background/History<br />

To support the District's mission, the Communications Department's education<br />

efforts focus on developing an environmentally conscious and responsible public.<br />

One method used by the District involves creating watershed education programs<br />

that engage the individual and community in protecting watersheds and the water<br />

resources within them.<br />

The Science and Environment Council (SEC) is a collaboration of nonprofit and<br />

government organizations that operate or support conservation and science-based<br />

facilities. Its mission is to promote and advocate science, conservation and


Summary Agenda<br />

Joint <strong>Meeting</strong> and Workshop October <strong>21</strong>, 2009<br />

Manasota and Peace River Basin Boards Page <strong>10</strong> of 29<br />

environmental issues in Sarasota County. Many of SEC's members are highly visible<br />

organizations and can effectively promote watershed awareness and conservation.<br />

The District has partnered with the SEC to coordinate Watershed Awareness Week<br />

scheduled for October 12–18. Actual events begin on Thursday, October 8. The<br />

week will include a variety of educational activities at Mote Marine Laboratory and<br />

Aquarium, New College, Historic Spanish Point and various local parks.<br />

To gain local government commitment to watershed protection, SEC will coordinate<br />

with Sarasota County to join the Manasota Basin Board in declaring October 12–18,<br />

2009, as Watershed Awareness Week.<br />

Benefits/Costs<br />

These watershed education efforts will result in a more educated population,<br />

minimizing further water quality impacts. More than 7,000 people are expected to<br />

participate in the events, with associated media coverage expanding awareness<br />

even further. The Manasota Basin Board is contributing $19,000 to SEC for<br />

coordinating the Watershed Awareness Week's activities.<br />

Staff Recommendation: Exhibit 4<br />

Recommend the Manasota Basin Board declare the week of October 12–18, 2009,<br />

as Watershed Awareness Week.<br />

Presenter: Virginia Sternberger, Senior Communications Coordinator<br />

Communications Department<br />

b. Peace River Basin Board<br />

1. Minutes of the August 7, 2009, <strong>Meeting</strong><br />

Minutes of the August 2009 meeting were provided to Board members for review.<br />

Staff Recommendation:<br />

Approve the August minutes, as presented. Exhibit 5<br />

Presenter: Lou Kavouras<br />

2. Facilitating Agricultural Resource Management Systems (FARMS)<br />

i. Bermont Properties, LLC, Charlotte County<br />

Purpose<br />

To request approval for a Facilitating Agricultural Resource Management<br />

Systems (FARMS) project with Bermont Properties, LLC, and approval to<br />

reimburse FARMS eligible costs up to a not-to-exceed limit of $191,250<br />

(75 percent of total project costs). Of this amount, the balance of the 2006<br />

($18,084) and 2007 ($2,342) State Appropriations and $75,199 of the 2009 State<br />

Appropriations will be used for one-half of the project, the Peace River Basin<br />

Board is requested to fund $47,813, and the Governing Board is requested to<br />

fund $47,812. Total project costs are estimated at $255,000.<br />

Background/History<br />

The District's FARMS Program, developed by the District and Florida Department<br />

of Agriculture and Consumer Services, is a public/private agricultural Best<br />

Management Practice (BMP) cost-share reimbursement program. FARMS is


Summary Agenda<br />

Joint <strong>Meeting</strong> and Workshop October <strong>21</strong>, 2009<br />

Manasota and Peace River Basin Boards Page 11 of 29<br />

intended to expedite the implementation of production-scale agricultural BMPs<br />

that provide water resource benefits. Resource benefits of the FARMS Program<br />

include reduced Upper Floridan aquifer withdrawals, water quality improvements<br />

(both from groundwater and surface water sources) and/or conservation,<br />

restoration, and augmentation of the area's water resources and ecology. The<br />

District's emphasis through the FARMS Program is on reductions in Upper<br />

Floridan aquifer withdrawals that will improve groundwater conditions as<br />

documented in the Southern Water Use Caution Area (SWUCA)<br />

recovery strategy. In addition, the District also provides funding for projects that<br />

improve water quality affected by the use of mineralized groundwater as<br />

documented in the Shell and Prairie Creek Watershed Management Plan –<br />

Reasonable Assurance Documentation. Per FARMS Rule 40D-26, Florida<br />

Administrative Code, reimbursement cost-share rates are capped at 50 percent<br />

for water quantity withdrawal reductions from the Upper Floridan aquifer; or from<br />

any combination of ground, surface, or reclaimed water sources; or water quality<br />

improvements realized from decreasing the use of mineralized groundwater; or<br />

natural system improvements in the Upper Myakka River Watershed (UMRW).<br />

Reimbursement cost-share rates are capped at 75 percent for both water<br />

quantity and water quality or natural systems improvements.<br />

FARMS Program staff received a project proposal from Bermont Properties, LLC,<br />

for their 1,500-acres of citrus grove located within the East Charlotte Drainage<br />

District (ECDD) in eastern Charlotte County. The ECDD Water Use Permit<br />

authorizes an annual average groundwater withdrawal of 2,919,800 gallons per<br />

day (gpd) to irrigate over 3,300-acres of citrus groves owned by multiple property<br />

owners and irrigated by a variety of methods. Since January 2006, an average<br />

of 90 percent of the ECDD’s permitted quantities was used to irrigate all of the<br />

groves served under this permit. The primary goal of this project is to increase<br />

the efficiency of irrigation events to the groves owned and maintained by<br />

Bermont Properties by installing hydraulic valves that will be controlled by a<br />

timer at each irrigation zone and rain sensors to shut down each zone during<br />

rainfall events. FARMS project components will consist of several dozen<br />

hydraulically controlled irrigation valves, five irrigation control stations with rain<br />

sensors, and the piping necessary to connect the new valves to the existing<br />

irrigation system. The proposed project is expected to offset a minimum of<br />

146,000 gpd, or five percent, of the permitted irrigation quantities of the ECDD’s<br />

Water Use Permit. The specific conductance of ground water sampled from<br />

several wells within this project area is over 3,000 micro Siemens per centimeter<br />

(µS/cm), which is well above the target level of 775 µS/cm as referenced in the<br />

Shell Creek and Prairie Creek Watershed Management Plan. The reduction in<br />

groundwater use will benefit Upper Floridan aquifer system by reducing<br />

groundwater quantity withdrawals and will improve the water quality of Myrtle<br />

Slough and Shell Creek through a reduction in runoff of mineralized groundwater.<br />

Benefits/Costs<br />

The proposed project involves water quantity and water quality BMPs which<br />

qualifies for a 75 percent cost-share reimbursement rate under the FARMS<br />

Program. Using an estimated five percent savings of permitted quantities, or<br />

146,000 gpd yields a daily cost of $1.<strong>10</strong> per thousand gallons of groundwater<br />

reduced over the proposed five-year contract term, and $0.33 per thousand<br />

gallons of groundwater reduced over a thirty-year term. Both values are within<br />

the guidelines for the generally accepted average cost savings per thousand<br />

gallons for the implementation of alternative supplies and improved irrigation<br />

techniques for flatwood citrus operations. Total project costs are estimated at<br />

$255,000. Fiscal years 2006, 2007, and 2009 State Appropriations will be used


Summary Agenda<br />

Joint <strong>Meeting</strong> and Workshop October <strong>21</strong>, 2009<br />

Manasota and Peace River Basin Boards Page 12 of 29<br />

for one-half of the reimbursement, with the remainder divided evenly between the<br />

Peace River Basin Board and the Governing Board. Upon approval, the Peace<br />

River Basin Board and Governing Board will have $397,517 and $1,359,325,<br />

respectively, remaining in their FARMS Program budgets.<br />

Staff Recommendation: Exhibit 6<br />

1) Approve the Bermont Properties, LLC, project for a not-to-exceed project<br />

reimbursement of $191,250 with $47,813 provided by the Peace River Basin<br />

Board; $47,812 provided by the Governing Board; and $95,625 provided from<br />

State Appropriations to the Peace River Basin Board and Governing Board;<br />

2) Authorize the transfer of $47,813 from Fund 020 H017 Peace River Basin<br />

FARMS funds; $47,812 from Fund 0<strong>10</strong> H017 Governing Board FARMS<br />

funds; $18,084 from the 2006 State Appropriations allocated to Fund 020<br />

H017 FARMS funds; $2,342 from the 2007 State Appropriations allocated to<br />

Fund 020 H017 FARMS funds; and $75,199 from the 2009 State<br />

Appropriations allocated to Fund 0<strong>10</strong> H017 FARMS funds, to H588 Bermont<br />

Properties, LLC, project fund;<br />

3) Authorize the Executive Director to sign the agreement.<br />

Presenter: Eric C. DeHaven, P.G., Director<br />

Resource Data and Restoration Department<br />

ii. FLM, Inc., Prairie River Ranch Phase II a – Culverts, DeSoto County<br />

Purpose<br />

To request approval for a Facilitating Agricultural Resource Management<br />

Systems (FARMS) project with FLM, Inc. Prairie River Ranch and approval to<br />

reimburse FARMS eligible costs up to a not-to-exceed limit of $37,500<br />

(75 percent of total project costs). Of this amount, the 2009 State Appropriations<br />

will be used for $18,750 of the reimbursement, the Peace River Basin is<br />

requested to fund $9,375, and the Governing Board is requested to fund $9,375.<br />

Total project costs are estimated at $50,000.<br />

Background/History<br />

The District's FARMS Program, developed by the District and Florida Department<br />

of Agriculture and Consumer Services, is a public/private agricultural Best<br />

Management Practice (BMP) cost-share reimbursement program. FARMS is<br />

intended to expedite the implementation of production-scale agricultural BMPs<br />

that provide water resource benefits. Resource benefits of the FARMS Program<br />

include reduced Upper Floridan aquifer withdrawals, water quality improvements<br />

(both from groundwater and surface water sources) and/or conservation,<br />

restoration, and augmentation of the area's water resources and ecology. The<br />

District's emphasis through the FARMS Program is on reductions in Upper<br />

Floridan aquifer withdrawals that will improve groundwater conditions as<br />

documented in the Southern Water Use Caution Area (SWUCA) recovery<br />

strategy. In addition, the District also provides funding for projects that improve<br />

water quality affected by the use of mineralized groundwater as documented in<br />

the Shell and Prairie Creek Watershed Management Plan – Reasonable<br />

Assurance Documentation. Per FARMS Rule 40D-26, Florida Administrative<br />

Code, reimbursement cost-share rates are capped at 50 percent for water<br />

quantity withdrawal reductions from the Upper Floridan aquifer; or from any<br />

combination of ground, surface, or reclaimed water sources; or water quality<br />

improvements realized from decreasing the use of mineralized groundwater; or


Summary Agenda<br />

Joint <strong>Meeting</strong> and Workshop October <strong>21</strong>, 2009<br />

Manasota and Peace River Basin Boards Page 13 of 29<br />

natural system improvements in the Upper Myakka River Watershed (UMRW).<br />

Reimbursement cost-share rates are capped at 75 percent for both water<br />

quantity and water quality or natural systems improvements.<br />

FARMS Program staff received a project proposal from FLM, Inc. for an<br />

addendum to their Phase II project on Prairie River Ranch Grove. The grove is a<br />

1,888-acre citrus grove north of County Road 763 along the west side of State<br />

Highway 31, within DeSoto County. The property drains into and is bisected by<br />

Hog Bay Slough, a tributary of Joshua Creek. The Phase I FARMS project<br />

added a pump station to an existing reservoir on the portion of the property north<br />

of Hog Bay Slough. The Phase II FARMS project involved the excavation of a<br />

reservoir and installation of a pump station on a portion of the property south of<br />

Hog Bay Slough. The Phase II project was completed in July 2009. This<br />

addendum to the Phase II project will add water control structures to the southern<br />

half of the property to better direct water to the Phase II reservoir. The Water<br />

Use Permit authorizes an annual average groundwater withdrawal of 1,709,400<br />

gallons per day (gpd) to irrigate 1,615-acres of the citrus with under tree spray.<br />

The moving annual average indicates that FLM, Inc. Prairie River Ranch is<br />

currently using 87 percent of its permitted quantities and 15 percent of these<br />

quantities are from surface water, constructed as a part of the Phase I FARMS<br />

project. The site has 15 Upper Floridan wells, eight of which have been backplugged<br />

with District assistance. Groundwater sampled from the majority of wells<br />

in the project area has specific conductance valves above 1,000 uS/cm.<br />

Backplugging has improved water quality substantially, but due to the extreme<br />

levels of salinity prior to back-plugging and the inability to pursue backplugging<br />

on additional wells due to yield loss, staff believes the site is highly susceptible to<br />

future groundwater degradation. The primary goal of the project is to reduce the<br />

withdrawal of groundwater through the installation of 14 culverts with risers to<br />

better direct surface water to the Phase II reservoir. The reduction in<br />

groundwater use will benefit the Upper Floridan aquifer system and surface water<br />

quality by replacing groundwater withdrawals with recovered tailwater and<br />

surface water.<br />

Benefits/Costs<br />

The proposed project involves water quantity and water quality BMPs which<br />

qualifies for a 75 percent cost-share reimbursement rate under the FARMS<br />

Program. Using an estimated two percent savings of permitted quantities, or<br />

approximately 35,000 gpd yields a daily cost of $0.90 per thousand gallons of<br />

groundwater reduced over the proposed five-year contract term, and $0.28 per<br />

thousand gallons of groundwater reduced over a thirty-year term. Both values<br />

are within the guidelines for the generally accepted average cost savings per<br />

thousand gallons for the implementation of alternative supplies and improved<br />

irrigation techniques for flatwood citrus operations. Total project costs are<br />

estimated at $50,000. Fiscal year (FY) 2009 State Appropriations will be used<br />

for one-half of the reimbursement with the remainder divided evenly between the<br />

Peace River Basin Board and the Governing Board. Upon approval, the Peace<br />

River Basin Board and Governing Board will have $388,142 and $1,331,200<br />

respectively, remaining in their FARMS Program budgets.<br />

Staff Recommendation: Exhibit 7<br />

1) Approve the FLM, Inc., Prairie River Ranch Phase II a - Culverts Project for a<br />

not-to-exceed project reimbursement of $37,500 with $9,375 provided by the


Summary Agenda<br />

Joint <strong>Meeting</strong> and Workshop October <strong>21</strong>, 2009<br />

Manasota and Peace River Basin Boards Page 14 of 29<br />

Peace River Basin; $9,375 provided by the Governing Board; and $18,750<br />

provided from 2009 State Appropriations to the Governing Board;<br />

2) Authorize the transfer of $9,375 from Fund 020 H017 Peace River Basin<br />

FARMS funds; $9,375 from Fund 0<strong>10</strong> H017 Governing Board FARMS funds;<br />

and $18,750 from the 2009 State Appropriations allocated to Fund 0<strong>10</strong> H017<br />

FARMS funds, to 0<strong>10</strong> H569 and 020 H569 FLM, Inc., Prairie River Ranch<br />

Phase II a - Culverts Project fund;<br />

3) Authorize the Executive Director to sign the agreement.<br />

Presenter: Eric C. DeHaven<br />

iii. Roper Growers Cooperative, DeSoto County<br />

Purpose<br />

To request approval for a Facilitating Agricultural Resource Management<br />

Systems (FARMS) project with Roper Growers Cooperative and approval to<br />

reimburse FARMS eligible costs up to a not-to-exceed limit of $37,500<br />

(75 percent of total project costs). Of this amount, the 2009 State Appropriations<br />

will be used for $18,750 of the reimbursement, the Peace River Basin is<br />

requested to fund $9,375, and the Governing Board is requested to fund $9,375.<br />

Total project costs are estimated at $50,000.<br />

Background/History<br />

The District's FARMS Program, developed by the District and Florida Department<br />

of Agriculture and Consumer Services, is a public/private agricultural Best<br />

Management Practice (BMP) cost-share reimbursement program. FARMS is<br />

intended to expedite the implementation of production-scale agricultural BMPs<br />

that provide water resource benefits. Resource benefits of the FARMS Program<br />

include reduced Upper Floridan aquifer withdrawals, water quality improvements<br />

(both from groundwater and surface water sources) and/or conservation,<br />

restoration, and augmentation of the area's water resources and ecology. The<br />

District's emphasis through the FARMS Program is on reductions in Upper<br />

Floridan aquifer withdrawals that will improve groundwater conditions as<br />

documented in the Southern Water Use Caution Area (SWUCA) recovery<br />

strategy. In addition, the District also provides funding for projects that improve<br />

water quality affected by the use of mineralized groundwater as documented in<br />

the Shell and Prairie Creek Watershed Management Plan – Reasonable<br />

Assurance Documentation. Per FARMS Rule 40D-26, Florida Administrative<br />

Code, reimbursement cost-share rates are capped at 50 percent for water<br />

quantity withdrawal reductions from the Upper Floridan aquifer; or from any<br />

combination of ground, surface, or reclaimed water sources; or water quality<br />

improvements realized from decreasing the use of mineralized groundwater; or<br />

natural system improvements in the Upper Myakka River Watershed (UMRW).<br />

Reimbursement cost-share rates are capped at 75 percent for both water<br />

quantity and water quality or natural systems improvements.<br />

FARMS Program staff received a project proposal from Roper Growers<br />

Cooperative, for their 1,4<strong>10</strong>-acre citrus grove located 2.3 miles north of Prairie<br />

Creek, in southern DeSoto County. The property drains into Hawthorne Creek<br />

and Prairie Creek. This project will integrate soil moisture sensors, hydraulic<br />

valve controls, and automated pump controls to conserve groundwater. The<br />

Water Use Permit authorizes an annual average groundwater withdrawal of<br />

1,167,000 gallons per day (gpd) for the 1,4<strong>10</strong>-acre property. The project area<br />

consists of approximately 312-acres of citrus, which represents 315,900 gpd of


Summary Agenda<br />

Joint <strong>Meeting</strong> and Workshop October <strong>21</strong>, 2009<br />

Manasota and Peace River Basin Boards Page 15 of 29<br />

the total permitted quantity. Since May 1994, groundwater use has averaged<br />

3<strong>10</strong>,000 gpd in the project area which is approximately 98 percent of permitted<br />

quantities for this area. The primary goal of the project is to reduce Upper<br />

Floridan and Intermediate aquifer withdrawals by efficiently controlling irrigation<br />

events through the automated operation of pumps and hydraulic valves<br />

controlled by soil moisture sensors. Because conductivity measured in<br />

groundwater sampled from a well located in the grove averaged over<br />

1,500 µS/cm, the secondary goal of the proposed project is to reduce mineralized<br />

groundwater withdrawals and enhance surface water quality in the Prairie Creek<br />

watershed.<br />

Benefits/Costs<br />

The project involves both water quantity and quality BMPs, consequently, the<br />

project qualifies for a 75 percent cost-share reimbursement rate under the<br />

FARMS Program. Using an estimated ten percent savings of permitted quantities<br />

associated with the project area, or approximately 32,000 gpd, yields a daily cost<br />

of $0.98 per thousand gallons of groundwater reduced over the proposed fiveyear<br />

contract term, and $0.30 per thousand gallons of groundwater reduced over<br />

a thirty-year term. Both values are within the guidelines for the generally<br />

accepted average cost savings per thousand gallons for the implementation of<br />

improved irrigation techniques for flatwood citrus operations. Total project costs<br />

are estimated at $50,000. Fiscal year 2009 State Appropriations will be used for<br />

one-half of the reimbursement, with the remainder divided evenly between the<br />

Peace River Basin Board and the Governing Board. Upon approval, the Peace<br />

River Basin Board and Governing Board will have $378,767 and $1,303,075,<br />

respectively, remaining in their FARMS Program budgets.<br />

Staff Recommendation: See Exhibit 8<br />

1) Approve the Roper Growers Cooperative Project for a not-to-exceed project<br />

reimbursement of $37,500 with $9,375 provided by the Peace River Basin<br />

Board; $9,375 provided by the Governing Board; $18,750 provided from 2009<br />

State Appropriations to the Governing Board;<br />

2) Authorize the transfer of $9,375 from Fund 020 H017 Peace River Basin<br />

Board FARMS funds; $9,375 from Fund 0<strong>10</strong> H017 Governing Board FARMS<br />

funds; $18,750 from the 2009 State Appropriations allocated to Fund 0<strong>10</strong><br />

H017 FARMS funds to 0<strong>10</strong> H594 and 020 H594, Roper Growers<br />

Cooperative, project fund;<br />

3) Authorize the Executive Director to sign the agreement.<br />

Presenter: Eric C. DeHaven<br />

3. Land Use and Management Plan for the Circle B Bar Reserve<br />

Purpose<br />

To recommend the Governing Board approve the Land Use and Management Plan<br />

for the Circle B Bar Reserve.<br />

Background and History<br />

The Circle B Bar Reserve encompasses 1,267 acres in the eastern central portion of<br />

Polk County on the northwest shoreline of Lake Hancock. A map showing the<br />

location of the Reserve is included in the attached management plan included in the<br />

Board packet as an exhibit to this item. The Reserve was acquired through a joint<br />

partnership between the District and Polk County.


Summary Agenda<br />

Joint <strong>Meeting</strong> and Workshop October <strong>21</strong>, 2009<br />

Manasota and Peace River Basin Boards Page 16 of 29<br />

The District and the County entered into a management agreement in 2001, under<br />

which the County was designated as the lead managing entity for all management<br />

activities associated with the Reserve. As such, the County is responsible for the<br />

development of a Land Use and Management Plan (LUMP) for the Reserve. The<br />

proposed LUMP was approved by the Board of County Commissioners and has<br />

been submitted to the District for Governing Board approval.<br />

There are some notable changes among the proposed uses of the Reserve from the<br />

initial LUMP completed in 2003. Limited waterfowl hunting has been an authorized<br />

activity at the Reserve; however, according to the proposed draft, this activity has<br />

been determined to be an incompatible use of the Reserve due to present and<br />

anticipated uses. Hog hunting is a newly authorized activity and will be conducted as<br />

a land management tool. The recent completion of Polk’s Nature Discovery Center<br />

and associated parking have increased the feasibility of newly authorized<br />

recreational opportunities including nature festivals and tram tour rides, as well as<br />

the designation of open play areas and a hot-air balloon stopover area.<br />

The County identified the following goals to be accomplished through the five-year<br />

administration of the proposed LUMP:<br />

Overall site goals:<br />

� To conduct resource protection/management of the natural resources<br />

� To assist with serving as an environmental education center for Polk County<br />

� To provide appropriate nature-based recreation, when compatible and desired<br />

Natural resource goals:<br />

� To preserve, maintain, enhance and restore natural communities and wildlife<br />

habitat<br />

� To protect and sustain populations of threatened and endangered species<br />

� To provide environmental education that reconnects youth and visitors to Polk<br />

County’s water and natural resources<br />

� To provide appropriate nature-based recreation that offers public enjoyment of<br />

the site without damaging the unique natural resources<br />

� To periodically review, evaluate and modify the management of the Circle B Bar<br />

Reserve tract<br />

The County further identified the major management actions to be undertaken:<br />

� Restore natural communities (restoration of Banana Creek and the associated<br />

marshes), and restore uplands (scrub, sandhill and flatwoods)<br />

� Control non-native invasive species (present species of concern – tropical soda<br />

apple, Chinese tallow, Brazilian pepper, cogon grass, Japanese climbing fern<br />

and feral hogs).<br />

� Monitor rare species populations and natural communities<br />

The LUMP has been drafted with the understanding that other District-owned lands<br />

adjacent to the Reserve may be available for natural resource-based recreational<br />

and other opportunities. The District has hired a consultant to develop a Land Use<br />

Alternatives Study to determine the most effective use of lands the District has<br />

acquired around Lake Hancock. The results of the study are included as a separate<br />

agenda item for the joint meeting.


Summary Agenda<br />

Joint <strong>Meeting</strong> and Workshop October <strong>21</strong>, 2009<br />

Manasota and Peace River Basin Boards Page 17 of 29<br />

Benefits and Costs<br />

The plan establishes future management needs for the Reserve and outlines<br />

strategic initiatives for the next five years.<br />

Staff Recommendation: Exhibit 9<br />

Recommend the Governing Board approve the Land Use and Management Plan for<br />

the Circle B Bar Reserve.<br />

Presenter: Chuck Lane, Senior Land Use Specialist<br />

Land Resources Department<br />

4. Approval of Resolution No. <strong>10</strong>7 for the Fiscal Year 20<strong>10</strong> Budget Amendment to<br />

include Reallocated Funds from Water Protection and Sustainability Trust<br />

Fund<br />

Purpose<br />

Request to approve Resolution No. <strong>10</strong>7 for the FY20<strong>10</strong> budget amendment to<br />

include reallocated prior year funds from the State’s Water Protection and<br />

Sustainability Trust Fund (WPSTF) with a corresponding increase to the expenditure<br />

appropriation for the Charlotte County Regional Reclaimed Water Expansion project<br />

(H027).<br />

Background<br />

In 2005, the Florida Legislature passed Senate Bill 444, which established the<br />

WPSTF, a mechanism for water management districts to provide financial assistance<br />

to local entities to develop alternative water supplies. The WPSTF can be used to<br />

fund up to 20 percent of the construction component of alternative water supply<br />

projects.<br />

The legislation requires the Governing Board to approve, by resolution, any changes<br />

to the list of projects to receive the funds that have been allocated in prior years by<br />

the State for the WPSTF, but have not yet been expended. No new state funds were<br />

appropriated for the WPSTF for FY20<strong>10</strong>. In August 2009, the Governing Board<br />

adopted Resolution No. 09-15, that included the reallocation of $243,660 to the<br />

Charlotte County Regional Reclaimed Water Expansion project. The Charlotte<br />

County Regional Reclaimed Water Expansion project is a Water Supply and<br />

Resource Development project that is jointly funded by the General Fund<br />

(50 percent) and the Peace River Basin (50 percent). The funds from the State’s<br />

WPSTF are available for reallocation due to the cancellation of a Coastal Rivers<br />

Basin project with the City of New Port Richey for the Midwest/Northwest Reclaimed<br />

Water Distribution System (L812). The project was cancelled due to the lack of<br />

residential commitments required for the project.<br />

Benefits/Costs<br />

This budget amendment is to include $1<strong>21</strong>,830 in reallocated prior year funds from<br />

the State’s WPSTF to the Peace River Basin’s FY20<strong>10</strong> budget for the ongoing<br />

Charlotte County Regional Reclaimed Water Expansion project (H027). (The<br />

General Fund budget will be amended by this same amount to include its 50 percent<br />

share of funding from the WPSTF, $1<strong>21</strong>,830, for the project.) This amendment will<br />

provide supplemental state funding from the WPSTF for the Charlotte County<br />

Regional Reclaimed Water Expansion project to equally benefit the District and its<br />

Cooperator.<br />

The proposed amendment will not impact the Basin millage.


Summary Agenda<br />

Joint <strong>Meeting</strong> and Workshop October <strong>21</strong>, 2009<br />

Manasota and Peace River Basin Boards Page 18 of 29<br />

Impact If Not Funded<br />

If the amendment is not approved, the District will miss the opportunity to leverage<br />

Basin and cooperator dollars with state funds.<br />

Staff Recommendation: Exhibit <strong>10</strong><br />

Approve Resolution No. <strong>10</strong>7 to amend the FY20<strong>10</strong> budget of the Peace River Basin<br />

by an increase of $1<strong>21</strong>,830 from $11,307,353 to $11,429,183 to reflect the additional<br />

revenue from the State’s Water Protection and Sustainability Trust Fund.<br />

Presenters: Mark A. Hammond, P.E., Director<br />

Resource Projects Department<br />

Linda R. Pilcher, Assistant Director<br />

Finance Department<br />

5. Lake Gibson Southwest Sub-Basin Stormwater Management System Retrofit<br />

Purpose<br />

To approve the Second Amendment to the Cooperative Funding Agreement with the<br />

City of Lakeland (City) for the Lake Gibson Southwest Sub-Basin Stormwater<br />

Management System Retrofit Project. This Second Amendment adds FY20<strong>10</strong> funds<br />

and clarifies the use of land acquisition costs as part of the cooperator’s match.<br />

Background/History<br />

This project involves the design, permitting, and construction of a stormwater<br />

treatment system within the southwest sub-basin of Lake Gibson, a highly urbanized<br />

basin draining to Lake Gibson. Earlier studies completed for Lake Gibson indicated<br />

that this basin discharges high pollutant loads into the lake. This project will involve<br />

the construction of three wet detention ponds designed to capture and treat<br />

stormwater runoff prior to discharging into Lake Gibson.<br />

Benefits/Costs<br />

The total project budget is $4,500,000 with the District contributing $950,132 and the<br />

City contributing $3,549,868. The City has acquired the lands necessary to complete<br />

the project. A total of 17.14 acres has been purchased from four separate<br />

landowners at a cost of $3,304,981. These parcels of land will be used solely for this<br />

project. The City is requesting to use land acquisition costs as part of their match<br />

toward the total project cost. The District will contribute $950,132 (budgeted over<br />

fiscal years 2008, 2009, and 20<strong>10</strong>) toward construction of the stormwater treatment<br />

system and no funds will be expended until construction begins. The City will<br />

contribute $244,887 toward construction costs. The District’s contribution to this<br />

project will not exceed the City’s. The long-term benefits of the project include a<br />

reduction in the loading of sediments, trash, and nutrients to Lake Gibson. The<br />

project budget is shown in the table below.<br />

City District Total<br />

Land Acquisition $3,304,981 $ 0 $3,304,981<br />

Construction $ 244,887 $950,132 $1,195,019<br />

Total $3,549,868 $950,132 $4,500,000


Summary Agenda<br />

Joint <strong>Meeting</strong> and Workshop October <strong>21</strong>, 2009<br />

Manasota and Peace River Basin Boards Page 19 of 29<br />

Staff Recommendation:<br />

Recommend the Governing Board approve the Second Amendment to the<br />

Agreement with the City of Lakeland for $4,500,000 with the Basin’s share not to<br />

exceed $950,132; authorize the Executive Director to sign the agreement.<br />

7. Discussion Item:<br />

Presenter: Mark Hammond<br />

a. Lake Hancock Land Use Alternatives Study<br />

Purpose<br />

To present to the Peace River Basin Board the preliminary draft of the Lake Hancock<br />

Land Use Alternatives Study. No action is required. District staff will present the draft<br />

land use and management plan for the lands acquired for the multiple Lake Hancock<br />

projects. This plan has been presented to the Governing Board at its August meeting as<br />

an information item. The final plan will be presented to the Peace River Basin Board and<br />

the Governing Board at future meetings (February 20<strong>10</strong>) for approval.<br />

Background and History<br />

The Governing Board first authorized acquisition of lands in the Lake Hancock region in<br />

1999, to further its goal of establishing a greenway that is envisioned to extend from<br />

Charlotte Harbor, a designated estuary of national significance, through the Peace River<br />

watershed north to the Green Swamp. Beginning in 2001, the District began purchasing<br />

lands as part of the greenway, and completed acquisitions within the Lake Hancock<br />

portion of the greenway in April 2008. Beginning in the early 2000s, the District’s interest<br />

in acquiring lands in the Lake Hancock area expanded from primarily a greenway<br />

corridor (conservation) to one of resource development associated with recovery of<br />

minimum flows and levels in the upper Peace River. Additionally, in November 2001, the<br />

Charlotte Harbor Surface Water Improvement and Management (SWIM) Plan was<br />

completed, and identified an opportunity to implement a water quality treatment project<br />

to improve water quality leaving Lake Hancock to benefit the Peace River and Charlotte<br />

Harbor. In February 2006, the Board approved using wetland treatment as the primary<br />

technology for improving water quality and adopted a 27 percent nitrogen load reduction<br />

goal. The land needed for the project had already been purchased in 2003 as part of the<br />

Old Florida Plantation acquisition, an acquisition that met the District’s greenway corridor<br />

and resource development goals. In October 2004, the Governing Board authorized staff<br />

to proceed with the preliminary design and engineering to prepare a conceptual<br />

Environmental Resource Permit (ERP) application for the Lake Hancock Lake Level<br />

Modification Project with a target operating level of up to <strong>10</strong>0 feet. Similar to the outfall<br />

treatment project, a substantial portion of the lands necessary for the Lake Level<br />

Modification Project had already been acquired through the greenway acquisitions. In<br />

September 2007, the Governing Board authorized staff to implement the Lake Hancock<br />

Lake Level Modification Project including adopting a Resolution Authorizing Proceedings<br />

in Eminent Domain, and a Declaration of Taking in order to acquire the remaining lands<br />

necessary for the Lake Level Modification Project.<br />

As mentioned above, several projects are under development in the Lake Hancock area<br />

that are intended to accomplish multiple water resource management benefits including<br />

restoring minimum flows in the Upper Peace River, improving water quality in the Peace<br />

River and Charlotte Harbor. The acquisition of lands for these projects has been a key<br />

component to realize those outcomes. To date, the District has acquired 7,173 acres in


Summary Agenda<br />

Joint <strong>Meeting</strong> and Workshop October <strong>21</strong>, 2009<br />

Manasota and Peace River Basin Boards Page 20 of 29<br />

fee and 1,015 acres in less than fee rights. An additional 81 acres have been identified<br />

for fee acquisition along with 190 acres of less than fee rights. Some of the land<br />

acquired that will not be necessary for the Lake Hancock projects may be surplused in<br />

the future. A general location map of Lake Hancock and District ownership is included in<br />

the Board packet as an exhibit to this item.<br />

The Lake Hancock projects are unique to the District with respect to the types of lands<br />

that have been acquired to accommodate the multiple projects, and as such provide<br />

unique opportunities for public use and natural system management not found on other<br />

District lands. The lands acquired consist of residential enclaves, forested wetlands,<br />

grazing lands, former phosphate mines and other altered lands. In September of 2007,<br />

the District, with financial contribution by Polk County, selected Glatting Jackson Kercher<br />

and Anglin (consultant) to develop a land use and management plan with two major<br />

components: recreation management and natural resource management. The goals of<br />

the plan were to identify land use alternatives including recreation, restoration, water<br />

quality improvements, management partnership opportunities, and linkages with other<br />

public lands.<br />

The future management of lands for the Lake Hancock Project has generated a<br />

substantial interest by the public and other public agencies. As a result of this interest,<br />

the District and consultant have routinely engaged a variety of stakeholders including<br />

Polk County, Cities of Lakeland and Bartow, Sierra Club, the regional planning council,<br />

user groups (e.g., duck hunters), and others. Numerous meetings were held to garner<br />

stakeholders’ input and vision for these properties.<br />

Prior to staff presenting the final plan to the Peace River Basin and Governing Boards<br />

for approval, staff and the consultant will have held meetings with stakeholders and the<br />

public to allow additional review and input.<br />

Benefits and Costs<br />

Stakeholders’ concepts and visions for public use, recreation, and restoration for the<br />

project lands have been compiled and included, when consistent with the District’s goals<br />

and objectives, in the development of a comprehensive land use and management<br />

strategy. These efforts will result in establishing significant public use opportunities in<br />

this region. Opportunities for partnerships resulting in delegation of some management<br />

responsibilities will be identified, possibly resulting in a reduction of District long term<br />

management costs. Restoration and mitigation opportunities will also be identified as<br />

well as long term resource management strategies.<br />

Staff Recommendation: Exhibit 11<br />

This item is presented for the Board’s information; no action is required.<br />

Presenter: Eric Sutton, Director<br />

Land Resources Department<br />

8. Workshop Agenda:<br />

a. Purpose<br />

Manasota Basin Board Vice Chair Frank Strelec will welcome Board members, staff, and<br />

attendees to the workshop and provide introductory remarks. The workshop will begin<br />

with a discussion of the purpose for a joint planning workshop. This is an opportunity for<br />

the Boards to discuss shared resources, emerging issues, and innovative budget<br />

strategies. Annual Basin Board workshops provide guidance to the Board members,


Summary Agenda<br />

Joint <strong>Meeting</strong> and Workshop October <strong>21</strong>, 2009<br />

Manasota and Peace River Basin Boards Page <strong>21</strong> of 29<br />

staff, cooperators, and citizens as the Boards begin the next year’s budget deliberations.<br />

Staff will provide a written summary of the Basin Board's major accomplishments over<br />

the past year, but the workshop is designed to focus primarily on future trends relevant<br />

to these two Basins. The intended outcome of the workshop is an understanding of the<br />

importance of coordination between the Governing Board, Basin Boards, and<br />

cooperative partners to achieve the District's objectives and to explore changes that may<br />

be needed in light of the current economic climate.<br />

Presenter: Frank Strelec, Vice Chair<br />

Manasota Basin Board<br />

b. Regional Overview<br />

1. FY2009 Basin Accomplishments and FY2011 Strategic Budget Priorities<br />

Staff will provide written summaries of the major Basin accomplishments of the past<br />

year and discuss recent budget allocations by the Basin Priorities that were<br />

reaffirmed during the August 2009 Board meetings.<br />

Presenters: Dianne Davies, Manasota Basin Planner<br />

Chancey Springstead, Peace River Basin Planner<br />

2. Peace River/Manasota Regional Water Supply Authority (PR/MRWSA)<br />

Emerging Issues<br />

The PR/MRWSA will provide an overview of emerging regional water supply and<br />

resource issues. The overview will include environmental protection and recovery,<br />

proposed future water supply sources, and implications for long-term funding.<br />

Presenter: Pat Lehman, Executive Director<br />

Peace River/Manasota Regional Water Supply Authority<br />

3. Charlotte Harbor National Estuary Program (CHNEP)<br />

Purpose<br />

This item is provided for Board information only and no Board action is required.<br />

Ms. Lisa Beever, Executive Director of the Charlotte Harbor National Estuary<br />

Program (CHNEP), will provide an update of recent activities, the contributions local<br />

agencies have made to the Harbor’s recovery, the benefits the CHNEP provides to<br />

the region, and challenges the partners face.<br />

Background/History<br />

Charlotte Harbor is generally viewed as one of the most productive estuarine<br />

systems in Southwest Florida. This estuary serves as nursery grounds for the<br />

majority of commercial and recreational fish and shellfish in the area, improves water<br />

quality by filtering pollutants, acts as a buffer to protect shorelines from erosion and<br />

flooding, and provides essential food and habitat for birds, fish, and other wildlife.<br />

Due to its environmental significance, Charlotte Harbor was included on the District's<br />

Surface Water Improvement and Management (SWIM) Priority list and the first SWIM<br />

Plan was prepared in 1993. In 1995, Charlotte Harbor was designated by the United<br />

States Environmental Protection Agency as an “estuary of national significance “and<br />

accepted into the National Estuary Program, one of four in the State of Florida and<br />

one of only 28 in the entire United States. The CHNEP was established in 1996 and<br />

is a partnership of citizens, elected officials, resource managers, commercial, and


Summary Agenda<br />

Joint <strong>Meeting</strong> and Workshop October <strong>21</strong>, 2009<br />

Manasota and Peace River Basin Boards Page 22 of 29<br />

recreational resource users who are working to improve the ecological integrity of the<br />

Greater Charlotte Harbor Watershed. The District has participated in funding the<br />

CHNEP and provided a representative for the Management and Policy Committees<br />

since 1997.<br />

The partners of the CHNEP jointly developed and approved a Comprehensive<br />

Conservation and Management Plan (CCMP) for the Charlotte Harbor Watershed in<br />

February 2000 to restore and protect Charlotte Harbor. Subsequently, the District<br />

updated its SWIM Plan in 2000 to include the information gathered during diagnostic<br />

studies conducted under the first SWIM Plan and to incorporate the management<br />

issues identified by the CHNEP. The three priority management issues are:<br />

(1) Hydrologic alteration; (2) Water quality degradation; and (3) Fish and wildlife<br />

habitat loss.<br />

Since 1997, the District and the CHNEP have completed several studies to increase<br />

the understanding of the Charlotte Harbor watershed as well as projects that address<br />

the three priority issues. The CHNEP recently completed an update of the CCMP at<br />

the end of 2008. The District provides $1<strong>10</strong>,000 to the CHNEP annually. The<br />

District's annual contribution has been funded by the Manasota and Peace River<br />

Basin Boards and State SWIM funds.<br />

Staff Recommendation:<br />

This item is presented for Board’s information; no action is required.<br />

Presenters: Jennette Seachrist, SWIM Program Manager<br />

Resource Data and Restoration<br />

Lisa Beever, Executive Director<br />

Charlotte Harbor National Estuary Program<br />

4. Tampa Bay Estuary Program (TBEP)<br />

Purpose<br />

This item is provided for Board information only and no Board action is required.<br />

Ms. Holly Greening, Executive Director of the Tampa Bay Estuary Program (TBEP),<br />

will provide an update of recent activities, the contributions local agencies have<br />

made to Bay recovery, the benefits the TBEP provides to the region and the<br />

challenges the partners face. She will also provide a brief overview of the model<br />

fertilizer ordinance endorsed by the TBEP's Policy Board, as this has been an item of<br />

interest to several Board members.<br />

Background/History<br />

In 1987, the Florida Legislature established the Surface Water Improvement and<br />

Management Program (SWIM) Act having recognized that water quality and habitat<br />

in surface waters throughout the state have degraded or were in danger of being<br />

degraded. The Act requires the District maintain a priority list of water bodies of<br />

regional or statewide significance within their boundaries. The Act listed Tampa Bay<br />

as the District's number one priority. The District prepared the first SWIM Plan for<br />

Tampa Bay in 1988 with updates in 1992 and 1999. A fourth update is underway.<br />

In 1990, the United States Environmental Protection Agency (USEPA) identified<br />

Tampa Bay as an estuary of Federal Significance and included it in the National<br />

Estuary Program. As a result of this designation, the Tampa Bay National Estuary


Summary Agenda<br />

Joint <strong>Meeting</strong> and Workshop October <strong>21</strong>, 2009<br />

Manasota and Peace River Basin Boards Page 23 of 29<br />

Program was established in 1991 to assist the region in developing a comprehensive<br />

plan for the restoration and protection of Tampa Bay. The first Comprehensive<br />

Conservation and Management Plan (CCMP) for Tampa Bay, entitled "Charting the<br />

Course", was prepared in 1996 and updated in 2006. The Federal government<br />

provided the majority of funding during the first five years. The members of the<br />

original effort decided to continue with the program and in 1998, through an Interlocal<br />

Agreement, formed the Tampa Bay Estuary Program (dropping the Federal<br />

designation) as a partnership of federal, state, and local agencies and governments<br />

including several private industries. These entities include the USEPA, Florida<br />

Department of Environmental Protection, the District, Hillsborough, Manatee, and<br />

Pinellas counties and the cities of St. Petersburg, Tampa, and Clearwater. In<br />

accordance with the Interlocal Agreement, the District provides $138,335 to the<br />

TBEP annually. The District's annual contribution has been funded by the Basin<br />

Boards surrounding Tampa Bay and State SWIM funds. The District also provides a<br />

representative for the Management and Policy Boards. Since 1998 the District and<br />

other partners have completed numerous stormwater retrofit and habitat restoration<br />

projects toward achieving the goals of the CCMP and the SWIM Plan.<br />

Staff Recommendation:<br />

This item is presented for the Board’s information; no action is required.<br />

Presenters: Jennette Seachrist, SWIM Program Manager<br />

Resource Data and Restoration<br />

Holly Greening, Executive Director<br />

Tampa Bay Estuary Program<br />

5. Sarasota Bay Estuary Program (SBEP)<br />

Purpose<br />

This item is provided for Board information only and no Board action is required.<br />

Mr. Mark Alderson, Executive Director of the Sarasota Bay Estuary Program (SBEP),<br />

will provide an update of recent activities, the contributions local agencies have<br />

made to Bay recovery, the benefits the SBEP provides to the region and the<br />

challenges the partners face.<br />

Background/History<br />

In 1989, Sarasota Bay was designated by the United States Environmental<br />

Protection Agency as an estuary of Federal Significance. As a result of this<br />

designation, the Sarasota Bay National Estuary Program (SBNEP) was established<br />

to develop a comprehensive plan for the restoration and protection of Sarasota Bay.<br />

The SBNEP is a partnership of citizens, elected officials, resource managers,<br />

commercial, and recreational resource users working to improve the ecological<br />

integrity of Sarasota Bay and its watershed. In 1995, the District identified Sarasota<br />

Bay as a Surface Water Improvement and Management (SWIM) priority water body.<br />

In 2004, the partners in the SBNEP entered into an Interlocal Agreement which<br />

established the SBEP as an independent special district. The District has provided<br />

annual funding to the SBEP and provided a representative for the Management and<br />

Policy Committees since 1990.<br />

The partners of the SBEP jointly developed and approved a Comprehensive<br />

Conservation and Management Plan to protect and restore Sarasota Bay in 1995.<br />

Subsequently, the District approved the first Sarasota Bay SWIM Plan in 1997, and it


Summary Agenda<br />

Joint <strong>Meeting</strong> and Workshop October <strong>21</strong>, 2009<br />

Manasota and Peace River Basin Boards Page 24 of 29<br />

was last updated in 2002. Through the implementation of these plans, a number of<br />

restoration and diagnostic projects have been completed, including: (1) investigation<br />

of pollutant loading sources to the Bay; (2) seagrass mapping; (3) development of<br />

stormwater master plans; (4) habitat restoration projects; (5) construction of artificial<br />

reefs and oyster reefs; and (6) public outreach and education activities.<br />

In accordance with the Interlocal Agreement, the District provides $133,000 to the<br />

SBEP annually. The District's annual contribution has been funded by the Manasota<br />

Basin Board and State SWIM funds.<br />

Staff Recommendation:<br />

This item is presented for the Board’s information; no action is required.<br />

Presenter: Jennette Seachrist, SWIM Program Manager<br />

Resource Data and Restoration<br />

Mark Alderson, Executive Director<br />

Sarasota Bay Estuary Program<br />

6. Summary of Emerging Issues<br />

Staff will lead a discussion summarizing the emerging issues that have been<br />

presented by the workshop speakers or raised by Board members. This discussion<br />

will assist the Basin budget evaluations later in the workshop and may result in<br />

suggested topics for the December 15 joint workshop of the Governing and Basin<br />

Boards.<br />

Presenters: Basin Planners<br />

c. Financial and Legislative Outlook<br />

1. District Financial Overview<br />

Staff will provide a discussion of the State and District’s current economic picture and<br />

an evaluation of potential changes and future concerns in light of existing<br />

information.<br />

Presenter: Gene Schiller, Deputy Executive Director<br />

Management Services<br />

2. Fiscal Impacts of Legislative Activities<br />

Staff will brief Board members on potential water-related and funding issues that may<br />

be of concern during the upcoming legislative session.<br />

Presenter: David Rathke, Director<br />

Community and Legislative Affairs<br />

3. Basin Budget Evaluations<br />

Staff will review the various programmatic budget categories and provide analyses of<br />

historical Basin spending by strategic budget priorities, programmatic budget<br />

categories, and funding sources. Staff will also provide budget projections based<br />

upon anticipated obligations and revenues. This information will set the stage for<br />

open discussion to address the uncertainty of specific programs through creative


Summary Agenda<br />

Joint <strong>Meeting</strong> and Workshop October <strong>21</strong>, 2009<br />

Manasota and Peace River Basin Boards Page 25 of 29<br />

funding strategies, an alternative budget review process, or other policy<br />

mechanisms.<br />

Presenters: Basin Planners/Brian Armstrong<br />

d. Open Discussion<br />

This is an opportunity for Board members to expand on topics presented during the<br />

workshop and to discuss issues and ideas that are important to them. Staff will lead a<br />

discussion to assist the Board members in evaluating potential future funding scenarios<br />

in light of emerging issues, an environment of fiscal uncertainty, and the continuing<br />

water management needs presented during the workshop. This may include creative<br />

funding and budget allocation considerations. Staff will also seek topics for the<br />

December joint workshop of the Governing and Basin Boards<br />

Presenters: Basin Planners/Board Members/Lou Kavouras<br />

9. Announcements: Lou Kavouras<br />

a. Basin Board Education Committee: Wednesday, November 4, 2009, 9:30 a.m., Tampa<br />

Service Office<br />

b. “Get Outside:” Saturday, November 7, 2009, 9:30 a.m., Green Swamp Wilderness<br />

Preserve Hampton Tract<br />

c. Basin Board Land Resources Committee: Tuesday, December 1, 2009, 9:30 a.m., Green<br />

Swamp West Field Office, Dade City<br />

d. Joint Governing/Basin Boards Workshop: Tuesday, December 15, 2009, 9 a.m.,<br />

Nature’s Classroom, Thonotosassa<br />

e. Other<br />

<strong>10</strong>. Adjournment Basin Board Co-Chairs<br />

****Information Items****<br />

The items listed below are for the Board's information, intended to keep the Board apprised<br />

of completed projects, cancelled projects, and projects that have executed contracts and are<br />

ready to begin. These items do not require Board action at this time.<br />

1. Budget Transfer Report<br />

<strong>MANASOTA</strong> BASIN BOARD<br />

Purpose – This item is to provide the Basin Board with information regarding a Basin<br />

budget transfer that has been approved by the Executive Director since the date of the<br />

last report.<br />

Background – In accordance with Board Policy No.130-8, the Executive Director is<br />

delegated authority to execute budget transfers of $50,000 or less that do not involve<br />

contingency funds. The Governing Board via the Consent Agenda subsequently ratifies<br />

all such transfers. The delegated budget transfers, if related to a Basin budget, are also<br />

presented as an information item to the appropriate Basin Board.<br />

The Executive Director approved a Manasota Basin budget transfer of $30,000 on<br />

August <strong>10</strong>, 2009, which was ratified by the Governing Board on August 25, 2009. The<br />

funds were originally budgeted to treat and control infestations of Old World Climbing


Summary Agenda<br />

Joint <strong>Meeting</strong> and Workshop October <strong>21</strong>, 2009<br />

Manasota and Peace River Basin Boards Page 26 of 29<br />

Fern within Coker Prairie. The funds were transferred for use instead at Flatford<br />

Swamp. It was determined that there was a larger infestation of Old World Climbing<br />

Fern at Flatford Swamp, and there was better access to the infestation area which is<br />

required for monitoring the treatment results.<br />

2. FARMS – WCB Properties, LLC (H576) - Cancellation Notice, Manatee County<br />

The cooperator for WCB Properties has voluntarily canceled an executed agreement for<br />

a FARMS project on their 35-acre citrus grove in eastern Manatee County. This project<br />

was approved by the Manasota Basin Board on April 15, 2009, and by the Governing<br />

Board on April 28, 2009. No work had started on this project prior to cancellation. The<br />

primary goal of the project was to reduce Upper Floridan aquifer withdrawals and reduce<br />

agricultural runoff through the installation of a solar-powered soil moisture sensor system<br />

to optimize irrigation scheduling and a water meter to monitor the grove water<br />

requirements. The proposed project was expected to save a minimum of five percent of<br />

the permitted quantities of the grove, which is equivalent to about 1,500 gallons per day.<br />

Total project costs were estimated to be $4,000 with a not-to-exceed FARMS eligible<br />

reimbursement of $3,000 (75 percent of total project costs). This project was to be<br />

funded by 2003 State Appropriations, with no District match required. These funds will<br />

be returned to the FARMS general fund for reallocation to new projects.<br />

3. North Port Water Enhancement Program (W437) - Completion<br />

In response to a cooperative funding request from the City of North Port, the Manasota<br />

Basin Board included funding for the North Port Water Enhancement Program in its<br />

FY2008 budget. This project included preparation of a sampling plan, data collection,<br />

data analysis, reporting, and development of conceptual alternatives. Results from this<br />

project indicated that water quality was better than expected and is not contributing poor<br />

water quality to Charlotte Harbor. The total cost of the project was $380,960.08, with the<br />

Districts share ($190,480.04) split between the Manasota Basin Board ($95,240.02) and<br />

State SWIM ($95,240.02).<br />

4. Myakka River Watershed Initiative First Amendment (H048) - Execution Notice<br />

This FY2007 Water Supply and Resource Development project with Singhofen &<br />

Associates is for developing a comprehensive strategy in the Myakka River Watershed<br />

by illustrating the effects of land use conversions and alterations in addition to evaluating<br />

best management practices for restoration alternatives that can provide a benefit to<br />

water supplies in the Southern Water Use Caution Area while addressing water quality,<br />

natural system, and floodplain impacts in the watershed. The effective date of the first<br />

amendment is May 22, 2009, and will remain in effect through January <strong>10</strong>, 2011. This<br />

amendment added Ecosystem Management and Restoration Trust Funds to the<br />

agreement, increasing the total project cost by $276,000 from $4,550,000 to $4,876,000.<br />

The funding increase will be distributed between the Governing Board ($138,604) and<br />

Manasota ($123,554) and Peace River ($13,842) Basin Boards. For detailed<br />

information, please refer to the write-up in the Projects section of the meeting notebook<br />

or on the District's web site where the meeting notebook is posted. The Executive<br />

Director signed this agreement, and copies of the executed agreement and scope of<br />

work are available upon request.<br />

5. Sarasota Bay Habitat Restoration Project (W616) - Execution Notice<br />

This FY2009 project with the Sarasota Bay Estuary Program is for the implementation of<br />

restoration projects in Sarasota Bay. The effective date of the first amendment is<br />

October 1, 2008, and will remain in effect through December 31, 2009. The total project<br />

cost is $480,000 with the District's portion totaling $240,000, of which 50 percent<br />

($120,000) is from the State Surface Water Improvement and Management funds and<br />

50 percent ($120,000) is from the Manasota Basin Board. For detailed information,


Summary Agenda<br />

Joint <strong>Meeting</strong> and Workshop October <strong>21</strong>, 2009<br />

Manasota and Peace River Basin Boards Page 27 of 29<br />

please refer to the write-up in the Projects section of the meeting notebook or on the<br />

District’s web site where the meeting notebook is posted. The Executive Director signed<br />

this agreement on April 17, 2009; copies of the executed agreement and scope of work<br />

are available upon request.<br />

<strong>PEACE</strong> <strong>RIVER</strong> BASIN BOARD<br />

1. FARMS – The Groves of Peace River, Inc. (H552) - Cancellation Notice, Hardee<br />

County<br />

The cooperator for The Groves of Peace River has voluntarily canceled an executed<br />

agreement for a FARMS project on their 444-acre citrus grove in Hardee County. This<br />

project was approved by the Peace River Basin Board on April 4, 2008, and by the<br />

Governing Board on April 29, 2008. No work had started on this project prior to<br />

cancellation. The primary goal of the project was to reduce groundwater withdrawals<br />

from the Upper Floridan aquifer by installing and operating two soil moisture probes and<br />

a weather station within the grove to reduce the frequency and duration of irrigation<br />

events. The proposed project was expected to save a minimum of five percent of the<br />

permitted quantities of the grove, which is equivalent to about 29,500 gallons per day.<br />

Total project costs were estimated to be $25,000 with a not-to-exceed FARMS eligible<br />

reimbursement of $12,500 (50 percent of total project costs). Of this amount, $6,250 of<br />

2008 State Appropriations was requested for the reimbursement, the Governing Board<br />

was requested to fund $3,125, and the Peace River Basin was requested to fund<br />

$3,125. These funds will be returned to the FARMS general fund for reallocation to new<br />

projects.<br />

2. FARMS – Las Lomas Holdings, Inc. (H553) - Cancellation Notice, Hardee County<br />

The cooperator for Las Lomas Holdings has voluntarily canceled an executed<br />

agreement for a FARMS project on their 1,170-acre citrus grove in Hardee County. This<br />

project was approved by the Peace River Basin Board on April 4, 2008, and by the<br />

Governing Board on April 29, 2008. No work had started on this project prior to<br />

cancellation. The primary goal of the project was to reduce groundwater withdrawals<br />

from the Upper Floridan aquifer by installing and operating four soil moisture probes and<br />

two weather stations within the grove to reduce the frequency and duration of irrigation<br />

events. The proposed project was expected to save a minimum of five percent of the<br />

permitted quantities of the grove, which is equivalent to about 45,500 gallons per day.<br />

Total project costs were estimated to be $40,000 with a not-to-exceed FARMS eligible<br />

reimbursement of $20,000 (50 percent of total project costs). Of this amount, $<strong>10</strong>,000 of<br />

2008 State Appropriations was requested for the reimbursement, the Governing Board<br />

was requested to fund $5,000 and the Peace River Basin was requested to fund $5,000.<br />

These funds will be returned to the FARMS general fund for reallocation to new projects.<br />

3. Lake Menzie Stormwater Improvement (B<strong>21</strong>7) – Completion Notice<br />

This FY2007 Basin Initiative was for the construction of the Lake Menzie stormwater<br />

project. This recently completed retrofit treats runoff from 17 acres of urban and<br />

commercial land within the center of the Town of Dundee. The major project<br />

components included excavation of a small stormwater pond and installation of two<br />

French Drains. The total construction cost was $142,807 with 50 percent ($71,403.50)<br />

funded by the Florida Department of Transportation, 25 percent ($35,701.75) funded by<br />

State Water Protection and Sustainability Trust Fund, and 25 percent ($35,701.75)<br />

funded by the Peace River Basin Board. The Town of Dundee is contributing to the<br />

project by providing long-term maintenance of the project. Detailed design plans and asbuilts<br />

are available upon request.


Summary Agenda<br />

Joint <strong>Meeting</strong> and Workshop October <strong>21</strong>, 2009<br />

Manasota and Peace River Basin Boards Page 28 of 29<br />

4. Predevelopment Land Cover and Hydrologic Mapping of the Peace River Basin,<br />

Phase IV (B163) - Execution Notice<br />

This FY2009 Basin Initiative with HDR Engineering, Inc., is to refine the predevelopment<br />

hydrology maps of the Peace Creek basin using recently acquired historical drainage<br />

maps and data. HDR Engineering, Inc., will also compile the existing pre-development<br />

data and maps completed for the various counties in the Peace River Basin and merge<br />

these data sets into one comprehensive geodatabase. The effective date of the contract<br />

is May 13, 2009, and will remain in effect through February 28, 2011. The total project<br />

cost is $50,000, which is being funded completely by the Peace River Basin. For<br />

detailed information, please refer to the write-up in the Projects section of the meeting<br />

notebook or on the District's web site where the meeting notebook is posted. The<br />

Executive Director signed this agreement, and copies of the executed agreement and<br />

scope of work are available upon request.<br />

5. Peace Creek Canal Watershed Management Program (H034) - Execution Notice<br />

In 2005, the Governing Board and Peace River Basin Board agreed to undertake the<br />

responsibility to maintain and, where possible, improve the water conveyance/storage<br />

capabilities of the Peace Creek Canal. In May 2005, PBS&J completed a Maintenance<br />

Evaluation Report identifying short and long term maintenance projects which would<br />

improve conveyance within the Peace Creek Canal. This agreement with Westwind<br />

Contracting, Inc., is for the construction activities associated with sediment removal in<br />

four parcels. The effective date of the contract is June <strong>10</strong>, 2009, and will remain in effect<br />

through December 31, 2009. The total project cost is $775,000, of which 50 percent<br />

($387,500) is from Governing Board funds and 50 percent ($387,500) is from the Peace<br />

River Basin Board. For detailed information, please refer to the write-up in the Projects<br />

section of the meeting notebook or on the District’s web site where the meeting<br />

notebook is posted. The Executive Director signed this agreement, and copies of the<br />

executed agreement and scope of work are available upon request.<br />

6. Myakka River Watershed Initiative First Amendment (H048) - Execution Notice<br />

This FY2007 Water Supply and Resource Development project with Singhofen &<br />

Associates is for developing a comprehensive strategy in the Myakka River Watershed<br />

by illustrating the effects of land use conversions and alterations in addition to evaluating<br />

best management practices for restoration alternatives that can provide a benefit to<br />

water supplies in the Southern Water Use Caution Area while addressing water quality,<br />

natural system, and floodplain impacts in the watershed. The effective date of the first<br />

amendment is May 22, 2009, and will remain in effect through January <strong>10</strong>, 2011. This<br />

amendment added Ecosystem Management and Restoration Trust Funds to the<br />

agreement, increasing the total project cost by $276,000 from $4,550,000 to $4,876,000.<br />

The funding increase will be distributed between the Governing Board ($138,604) and<br />

Manasota ($123,554) and Peace River ($13,842) Basin Boards. For detailed<br />

information, please refer to the write-up in the Projects section of the meeting notebook<br />

or on the District's web site where the meeting notebook is posted. The Executive<br />

Director signed this agreement, and copies of the executed agreement and scope of<br />

work are available upon request.<br />

7. Watershed Management Consulting Services in the Polk County Watershed - Third<br />

Amendment (L672) - Execution Notice<br />

This FY2009 Cooperative Funding project with Polk County includes the performance of<br />

tasks related to the Digital Topographic Information, Watershed Evaluation, and<br />

Watershed Management Plan elements of the District's Watershed Management<br />

Program. The effective date of the Third Amendment is July 31, 2009, and will remain in<br />

effect through January 31, 20<strong>10</strong>. The total project cost is $457,027 with the Basin Board<br />

contributing $228,513.50. For detailed information, please refer to the write-up in the


Summary Agenda<br />

Joint <strong>Meeting</strong> and Workshop October <strong>21</strong>, 2009<br />

Manasota and Peace River Basin Boards Page 29 of 29<br />

Projects section of the meeting notebook or on the District’s web site where the meeting<br />

notebook is posted. The Executive Director signed this amendment, and copies of the<br />

executed agreement, amendment, and scope of work are available upon request.<br />

8. City of Auburndale Reuse and Alternative Sources Study (N001) - Execution<br />

Notice<br />

This FY2009 Cooperative Funding project with the City of Auburndale is for a reclaimed<br />

master plan to examine the feasibility of expanding the City of Auburndale’s existing<br />

reclaimed water system. The effective date of the contract is July 16, 2009, and will<br />

remain in effect through December 31, 2009. The total project cost is $50,000 with the<br />

Basin Board contributing 50 percent ($25,000). For detailed information, please refer to<br />

the write-up in the Projects section of the meeting notebook or on the District's web site<br />

where the meeting notebook is posted. The Executive Director signed this agreement,<br />

and copies of the executed agreement and scope of work are available upon request.<br />

9. Lake Eva Stormwater Improvement Project (N072) - Execution Notice<br />

This FY2009 Cooperative Funding project with Haines City is for the design, permitting,<br />

and construction of a stormwater treatment facility to reduce non-point source pollution<br />

to Lake Eva. The effective date of the contract is October 1, 2008, and will remain in<br />

effect through December 30, 20<strong>10</strong>. The total project cost is $472,000 with the Peace<br />

River Basin Board contributing 50 percent ($236,000). For detailed information, please<br />

refer to the write-up in the Projects section of the meeting notebook or on the District's<br />

web site where the meeting notebook is posted. The Executive Director signed this<br />

agreement; copies of the executed agreement and scope of work are available upon<br />

request.<br />

<strong>10</strong>. Implementation of Best Management Practices in the Charlotte Harbor Watershed<br />

(N126) - Execution Notice<br />

This FY2009 Cooperative Funding project with Charlotte County is for the design and<br />

construction of a stormwater conveyance system that will provide attenuation, treatment,<br />

and conveyance of stormwater runoff within the Charlotte Harbor Redevelopment Area.<br />

The effective date of the contract is August <strong>21</strong>, 2009, and will remain in effect through<br />

December 31, 2012. The total project cost is $1,500,000 with the Basin Board<br />

contributing $750,000. For FY2009, the Basin Board budgeted $125,000 and the<br />

County also budgeted $125,000. Future funding will be required to complete the project.<br />

For detailed information, please refer to the write-up in the Projects section of the<br />

meeting notebook or on the District's web site where the meeting notebook is posted.<br />

The Executive Director signed this agreement; copies of the executed agreement and<br />

scope of work are available upon request.<br />

The Southwest Florida Water Management District (District) does not discriminate on the basis of disability. This nondiscrimination<br />

policy involves every aspect of the District's functions, including access to and participation in the District's programs and activities.<br />

Anyone requiring reasonable accommodation as provided for in the Americans with Disabilities Act should contact the District's<br />

Human Resources Director, 2379 Broad Street, Brooksville, Florida 34604-6899; telephone (352) 796-7<strong>21</strong>1, ext. 4702 or 1-800-<br />

423-1476 (FL only), ext. 4702; TDD (FL only) 1-800-231-6<strong>10</strong>3; or email to ADACoordinator@swfwmd.state.fl.us.


DRAFT<br />

Minutes of the <strong>Meeting</strong><br />

<strong>MANASOTA</strong> BASIN BOARD<br />

Southwest Florida Water Management District<br />

Sarasota, Florida August 12, 2009<br />

The Manasota Basin Board of the Southwest Florida Water Management District convened for a<br />

regular meeting on August 12, 2009, at 9:04 a.m., in the Sarasota Service Office, Sarasota,<br />

Florida.<br />

Board Members Present<br />

Carlos M. Beruff, Co-Chair<br />

Frank E. Strelec, Vice Chair<br />

J. Mac Carraway, Secretary<br />

Elizabeth "Betsy" O. Benac, Member<br />

Paul J. "Jack" Bispham, Member<br />

Board Members Absent<br />

Albert G. Joerger, Co-Chair<br />

Michael P. McCoy, Member<br />

Staff Present<br />

Lou Kavouras Bruce Wirth<br />

Mark Hammond Eric Sutton<br />

Anthony Andrade Terri Behling<br />

Randy Emberg Jennette Seachrist<br />

Via Video Conference<br />

Linda Pilcher<br />

Rand Frahm<br />

Recording Secretary<br />

Phyllis Young<br />

Beth Putnam<br />

Cathy Linsbeck<br />

A roster of other attendees is filed in the permanent files of the Basin. Compact disks of the<br />

audio and copies of the materials and handouts, as set forth in full herein, are also filed in the<br />

permanent files of the Basin.<br />

1. Call to Order and Roll Call<br />

Co-Chair Carlos Beruff, newly appointed Governing Board member, called the meeting to<br />

order at 9:04 a.m., thanked everyone for attending, and passed the gavel to<br />

Vice Chair Strelec. Ms. Phyllis Young, Senior Administrative Assistant, Boards and<br />

Executive Services, called the roll and noted a quorum was present. (CD 1/Track 1)<br />

2. Pledge of Allegiance<br />

Vice Chair Strelec led the Pledge of Allegiance to the American Flag. (CD 1/Track 1)<br />

3. Additions and Deletions to the Agenda<br />

Ms. Lou Kavouras, Deputy Executive Director, Outreach, Planning, and Board Services,<br />

reported that Agenda Item 7e, Number ii, was deleted from the agenda. (CD 1/Track 1)<br />

4. Ceremony to Honor Former Manasota Basin Board Co-Chair Pat Glass<br />

Basin Board Member Betsy Benac began by stating how sad it is to see Ms. Glass leave the<br />

Governing and Basin Boards and praised Ms. Glass for her dedication to the Basin and<br />

involvement with issues important to the area. She presented a plaque to Ms. Glass and<br />

highlighted projects the Board approved during her tenure. She particularly noted<br />

Ms. Glass’s passion for the District’s mission and emphasized that Ms. Glass had made a<br />

difference during her time on the Governing Board and on the vast number of other Boards<br />

and Commissions on which she has served. In turn, Ms. Glass thanked the Board and<br />

citizens of the region for allowing her to serve, adding it had been an honor to work with<br />

Board members and staff. She spoke briefly of the Manatee Agricultural Reuse System<br />

(MARS) project, the Foundation for Sarasota Bay, and of former Governing Board Member<br />

Ed Chance who, she said, had inspired her. (CD 1/Track 1/15:48)


Minutes of the <strong>Meeting</strong> August 12, 2009<br />

Manasota Basin Board DRAFT Page 2 of 6<br />

At this time, Vice Chair Strelec recognized Commissioner Jim Blucher and Commissioner<br />

Tom Jones, City of North Port, and Manatee County Commissioner Larry Bustle who were in<br />

attendance.<br />

5. Oath of Office for Newly Appointed/Re-appointed Board Members<br />

Ms. Young administered the Oath of Office to reappointed Board Members Jack Bispham<br />

and Frank Strelec. (CD 1/Track 1/15:57)<br />

6. Basin Activities Report and Agenda Review<br />

Mr. Rand Frahm, Southern District Planning Manager, presented this item for<br />

Ms. Dianne Davies, Basin Planner, who could not attend today’s meeting. He reminded the<br />

Board that this item will be part of each Basin Board agenda, providing an opportunity for<br />

the Basin Planner to give an overview of relevant items on the agenda, information items,<br />

and other topics of interest.<br />

His report included the following:<br />

� The “Get Outside!” campaign is scheduled to begin September 26, 2009, in conjunction<br />

with National Public Lands Day;<br />

� Local airports are providing signage space in their facilities, free of charge, when ad<br />

space is not sold; and<br />

� An update to the Strategic Plan is underway. The latest draft was provided to Board<br />

members for review; input is due to the Planning Department by the end of the month.<br />

With regard to the Basin’s Strategic Budget Priorities that were established at the Board’s<br />

planning workshop in October 2008, Mr. Frahm stated those priorities have served the<br />

Board well, and staff believes the Basin Board’s issues and concerns have not changed<br />

substantially from the previous year. Therefore, staff is recommending the Board reaffirm<br />

these Strategic Budget Priorities for fiscal year (FY) 2011:<br />

� alternative water source research, planning, and development;<br />

� water conservation programs, initiatives, and projects;<br />

� regional approach to water resource sustainability, both within and across District<br />

boundaries;<br />

� balance Basin funding with needs of the Basin; and<br />

� public and youth education programs and initiatives.<br />

After consideration, Mr. Carraway moved, seconded by Ms. Benac, to re-affirm the<br />

current Basin strategic budget priorities for FY20<strong>10</strong>-FY2011. Motion carried<br />

unanimously. (CD 1/Track 15:59)<br />

7. Consent Items:<br />

After consideration, Mr. Carraway moved, seconded by Ms. Benac, to approve the<br />

following Consent Items:<br />

a. Minutes of the June <strong>10</strong>, 2009, <strong>Meeting</strong><br />

Approve the June 2009 minutes, as presented.<br />

b. Appraisals and Purchase/Sale Agreement – Myakka Prairie Project, SWF Parcel<br />

No. <strong>21</strong>-199-1<strong>10</strong>C<br />

Recommend the Governing Board: accept the appraisals; approve resolution<br />

requesting funds; approve the Purchase/Sale Agreement; and designate SWF<br />

Parcel No. <strong>21</strong>-199-1<strong>10</strong>C as being acquired for conservation purposes.


Minutes of the <strong>Meeting</strong> August 12, 2009<br />

Manasota Basin Board DRAFT Page 3 of 6<br />

c. Stewart Middle School Shoreline Restoration<br />

Authorize a budget transfer of $25,000 from Tampa Bay Habitat Restoration<br />

(W312) project and $50,000 from the Tampa Bay SWIM Plan Implementation<br />

(W020) project to the Stewart Middle School Shoreline Restoration Project (W399)<br />

to support the expanded construction and restoration area.<br />

d. Budget Transfer of Water Protection and Sustainability Program Trust Funds for<br />

the Bridges Stormwater Reuse<br />

Approve the transfer of $43,541 in WPSTF from the withdrawn Bridges-Stormwater<br />

Reuse project (N<strong>10</strong>5) to the ongoing City of Bradenton Reservoir Expansion<br />

(H059) pending approval of Resolution No. 09-15 at the August 25, 2009,<br />

Governing Board meeting.<br />

e. Board Encumbrances:<br />

i. Lake Hancock Lake Level Modification Project<br />

Approve the encumbrance of $500,000 (of which $250,000 is from the General<br />

Fund; $62,500 is from the Alafia River Basin Board; $125,000 is from the Peace<br />

River Basin Board; and $62,500 is from the Manasota Basin Board), without a<br />

contract, to be used in FY20<strong>10</strong> for implementation of the Lake Hancock Lake<br />

Level Modification Project.<br />

ii. Upper Peace River Resource Development – This item was deleted from the<br />

agenda.<br />

iii. Facilitating Agricultural Resource Management Systems (FARMS) Program<br />

Approve the encumbrance of up to $350,000, or the remaining dollars<br />

available, from the FY2009 budget to be used for future years FARMS projects.<br />

f. FARMS 4 Star Tomato, Inc. – Long Creek Farm<br />

1. Approve the 4 Star Tomato, Inc.–Long Creek Farm Project for a not-to-exceed<br />

project reimbursement of $187,500 with $32,140 provided by the Manasota<br />

Basin Board, $32,139 provided by the Governing Board, and $123,2<strong>21</strong> provided<br />

from 2003 and 2005 State Appropriations to the Manasota Basin Board;<br />

2. Authorize the transfer of $32,140 from Fund 0<strong>21</strong> H017 Manasota Basin Board<br />

FARMS funds; $32,139 from Fund 0<strong>10</strong> H017 Governing Board FARMS funds;<br />

$58,492 from Fund 0<strong>21</strong> 2003 State Appropriations; and $64,279 from Fund 0<strong>21</strong><br />

2005 State Appropriations to 0<strong>10</strong> H583 4 Star Tomato, Inc.–Long Creek Farm<br />

project fund and 0<strong>21</strong> H583 4 Star Tomato, Inc.–Long Creek Farm, project fund;<br />

3. Authorize the Executive Director to sign the agreement.<br />

g. Fiscal Year 20<strong>10</strong> Calendar of <strong>Meeting</strong> Dates<br />

Approve the FY20<strong>10</strong> Basin Board meeting schedule, as follows:<br />

Date Time Location<br />

*Wednesday, October <strong>21</strong>, 2009,<br />

Joint <strong>Meeting</strong> & Workshop for the<br />

Manasota and Peace River Basin Boards<br />

*Tuesday, December 15, 2009, Joint<br />

Governing/Basin Boards Workshop<br />

9 a.m.<br />

Turner Agri-Civic Center,<br />

Arcadia<br />

9 a.m. TECO Center at<br />

Nature’s Classroom<br />

Wednesday, February <strong>10</strong>, 20<strong>10</strong> 9 a.m. Sarasota Service Office<br />

Wednesday, April 14, 20<strong>10</strong> 9 a.m. Sarasota Service Office<br />

Wednesday, June 16, 20<strong>10</strong> 9 a.m. Sarasota Service Office<br />

Wednesday, August 11, 20<strong>10</strong> 9 a.m. Sarasota Service Office


Minutes of the <strong>Meeting</strong> August 12, 2009<br />

Manasota Basin Board DRAFT Page 4 of 6<br />

Motion carried unanimously. (CD 1/Track 2/14:56)<br />

8. Discussion Items:<br />

a. Results of the WateReuse Foundation Study of Reclaimed, Surface, and Groundwater<br />

Quality<br />

Mr. Anthony Andrade, Senior Water Conservation Analyst in the Conservation Projects<br />

Section, presented results of this study, which was funded by the Governing Board in<br />

2003 in response to a request from the Manasota Basin Board to investigate ways to<br />

expand reclaimed water use within the Basin. He listed project participants and project<br />

team members—seven internationally renowned members. Focus of the study was<br />

pathogens, pharmaceuticals, personal care projects, and other microconstituents.<br />

Mr. Andrade reviewed the main findings and specific implications. Results published in<br />

May 2009 indicate that reclaimed, surface, and groundwaters are more similar than<br />

dissimilar with regard to microconstituents. Surprising results were that DEET (an insect<br />

repellent), caffeine, Triclosan (found in antibacterial soap and toothpaste), and Halocedic<br />

acids (a disinfection by-product) were found in all water types.<br />

Mr. Mark Simpson, Water Division Manager for Manatee County Utilities Department,<br />

addressed the Board to express concerns with conclusions that it is safe to put reuse<br />

water in the watershed, since the EPA is still determining risks. The Manatee County<br />

Commission goal is to keep the watershed as pure as possible.<br />

Ms. Benac moved, seconded by Mr. Carraway, that the Board send a letter to the<br />

Chair of the Manatee County Commission asking to put this issue on an agenda<br />

for discussion. Motion carried unanimously.<br />

Mr. Charlie Hunsicker, Director of the Department of Natural Resources for Manatee<br />

County, conveyed that participation does not imply consent. He stated that the study is<br />

ongoing and that the Evers and Lake Manatee watersheds in Manatee County are<br />

uniquely different, if by anything, by the nature of their development patterns. Public<br />

meetings on this issue will most likely be held in the City of Bradenton, also. (CD 1/<br />

Track 3/14:56)<br />

b. Fiscal Year 20<strong>10</strong> Budget Discussion and Approval of Final Millage Rate and Budget<br />

Mr. Bruce Wirth, Deputy Executive Director, Resource Management Division, gave a<br />

brief synopsis of the budget process and stated that the Basin’s proposed budget for<br />

FY20<strong>10</strong> has been updated to reflect ad valorem revenue based on the proposed millage<br />

rate adopted by the Basin Board in June and the 2009 Certifications of Taxable Value<br />

received from the county property appraisers. He further stated that staff have worked<br />

with cooperators to project cash flow for the coming year and were able to make<br />

changes to anticipated revenues and balances making approximately $2 million more<br />

available for the FY20<strong>10</strong> budget than anticipated in June. Therefore, no transfer of<br />

funds from the Basin’s H<strong>10</strong>0 Water Supply and Resource Development reserves would<br />

be necessary to balance the budget. Mr. Wirth continued by noting significant changes<br />

to the June preliminary budget that would allow all projects through those ranked<br />

“Medium” to be funded.<br />

Mr. Wirth stressed that moving forward the Board will need to “keep an eye” on regional<br />

projects and may be asked to consider requests for out-of-cycle funding.<br />

Board members asked questions and participated in discussion of topics including the<br />

Braden River Utilities project, future funding for Save Our Rivers, and the Myakka River<br />

Watershed Initiative.


Minutes of the <strong>Meeting</strong> August 12, 2009<br />

Manasota Basin Board DRAFT Page 5 of 6<br />

9. Reports:<br />

Commissioner Blucher addressed the Board to thank the Board for its continued support<br />

for the Myakkahatchee Creek Water Treatment Plant Reliability Project. He briefly<br />

reported on the City of North Port’s natural linear reservoir, which is a new source of<br />

water for the City.<br />

For the record, Ms. Kavouras read the three-part staff recommendation, as follows:<br />

1. Approve and adopt the required final millage rate of 0.1484 mill for FY20<strong>10</strong>.<br />

2. Approve and adopt the final FY20<strong>10</strong> budget.<br />

3. Approve Resolution No. 75–Resolution Affirming the Required Final Millage Rate and<br />

Budget for Fiscal Year 20<strong>10</strong>.<br />

After consideration, Ms. Benac moved, seconded by Mr. Carraway, to approve the<br />

staff recommendation as presented. Motion carried unanimously.<br />

Ms. Benac, Mr. Carraway, and Mr. Strelec each thanked staff and expressed<br />

appreciation for their extraordinary work on the budget and for coordination with<br />

cooperators. (CD 1/Track 4 & Track 5)<br />

a. Basin Board Education Committee (BBEC)<br />

Mr. Carraway, the Board’s primary representative on the BBEC, directed members to a<br />

report on the July 7 meeting, which was included as an exhibit in the meeting notebook.<br />

He briefly mentioned the restaurant outreach program, which is celebrating its first year<br />

anniversary; conservation signage, which is being displayed in area airports; the Florida<br />

Water Star SM program; and media messaging. (CD 1/Track 6))<br />

b. Basin Board Land Resources Committee BBLRC<br />

Mr. Eric Sutton, Land Resources Director, also directed members to a report of the<br />

July 13 BBLRC meeting, which was provided as an exhibit in the meeting notebook. He<br />

briefly commented on several topics of discussion at the meeting including multiple-use<br />

management of District properties and possible opportunities to generate revenue, a<br />

summary of the Land Use Stakeholders Discussion Group <strong>Meeting</strong> held on June 4, and<br />

the funding status of Florida Forever and the Water Management Lands Trust Fund.<br />

(CD 1/Track 6/15:02)<br />

c. Governing Board Activities<br />

Board members were provided highlights of the July 28 Governing Board meeting, which<br />

was held in the Polk County Administration Building, Bartow. (CD 1/Track 7)<br />

<strong>10</strong>. Announcements<br />

Ms. Kavouras brought members’ attention to announcements listed on the agenda. (CD 1/<br />

Track 7/14:56)<br />

11. Adjournment<br />

When there was no further business to come before the Board, Vice Chair Strelec<br />

adjourned the meeting at <strong>10</strong>:28 a.m. (CD 1/Track 7/14:58)


Minutes of the <strong>Meeting</strong> August 12, 2009<br />

Manasota Basin Board DRAFT Page 6 of 6<br />

****INFORMATION ITEMS****<br />

The items listed below were for the Board's information, intended to keep the Board apprised of<br />

completed projects, cancelled projects, and projects that have executed contracts and are ready<br />

to begin. These items did not require Board action.<br />

1. FARMS – Clay Gully Tree Farm L.L.P. (H536), Manatee County – Cancellation Notice<br />

2. Sarasota County – GIS Dataset Development (L867) – Completion Notice<br />

3. Watershed Management Program Consulting Services in the Braden River Watershed<br />

(B074) – Execution Notice<br />

4. Sarasota County Watershed Monitoring Program (L015) - Execution Notice<br />

5. Development of Landscape Fertilizer Best Management Practices – Phase 1 (N013) -<br />

Execution Notice<br />

6. Pelican Cove Stormwater Project (W620) - Execution Notice<br />

The Southwest Florida Water Management District (District) does not discriminate on the basis of disability. This<br />

nondiscrimination policy involves every aspect of the District's functions, including access to and participation in the<br />

District's programs and activities. Anyone requiring reasonable accommodation as provided for in the Americans with<br />

Disabilities Act should contact the District's Human Resources Director, 2379 Broad Street, Brooksville, Florida,<br />

34604-6899; (352) 796-7<strong>21</strong>1 or 1-800-423-1476 (FL only), ext. 4702; TDD (FL only) 1-800-231-6<strong>10</strong>3;<br />

or email ADACoordinator@swfwmd.state.fl.us.


Cooper Creek<br />

Fox Creek<br />

Shakett Creek<br />

Salt Creek<br />

Cow Pen Slough<br />

Curry Creek<br />

Blackburn Canal<br />

Hatchett Creek<br />

Alligator Creek<br />

Gum Slough<br />

Braden River<br />

Forked Creek<br />

Howard Creek<br />

SWF Parcel No. <strong>21</strong>-199-<strong>10</strong>6C - Carithers<br />

SWFWMD Conservation Easement<br />

SWFWMD Ownership<br />

Other Conservation Lands<br />

SWFWMD Proposed Acquisition<br />

Gottfried Creek<br />

Myakka River<br />

Lower<br />

Myakka Lake<br />

Rock Creek<br />

SWFWMD Proposed Conservation Easement<br />

775<br />

Oyster Creek<br />

675<br />

MANATEE CO.<br />

SARASOTA CO.<br />

Indian Creek<br />

Lake Myakka<br />

777<br />

Myakka Prairie<br />

Deer Prairie Creek<br />

Verna<br />

Old Myakka<br />

780<br />

Clay Gully<br />

Deer Prairie Slough<br />

Myakka River<br />

Ogleby Creek<br />

Mossy Island Slough<br />

72<br />

75<br />

Big Slough<br />

Boggy Creek<br />

41<br />

Sam Knight Creek<br />

El Jobean<br />

776<br />

Coker Creek<br />

Tatum Gully<br />

Big Slough Canal<br />

Huckaby Creek<br />

Flopbuck Creek<br />

Sand Slough<br />

Myakka City<br />

Mud Slough<br />

Murdock<br />

Long Creek<br />

Maple Creek<br />

Sand Branch<br />

Edgeville<br />

SWF Parcel No.<br />

<strong>21</strong>-199-<strong>10</strong>6C - Carithers<br />

Sandy<br />

Bud Slough<br />

75<br />

Owen Branch<br />

Owen Creek<br />

Wildcat Slough<br />

75<br />

HARDEE CO.<br />

DESOTO CO.<br />

CHARLOTTE CO.<br />

Port Charlotte<br />

Peace River<br />

17<br />

Cypress Branch<br />

665<br />

Buzzard Roost Branch<br />

Charlotte Harbor<br />

0 2 4<br />

Miles<br />

Osborn Branc<br />

Deep Creek


Cooper Creek<br />

Fox Creek<br />

Shakett Creek<br />

Salt Creek<br />

Cow Pen Slough<br />

Curry Creek<br />

Blackburn Canal<br />

Hatchett Creek<br />

Alligator Creek<br />

Gum Slough<br />

Braden River<br />

Forked Creek<br />

Gottfried Creek<br />

Howard Creek<br />

Lower<br />

Myakka Lake<br />

SWF Parcel No. <strong>21</strong>-199-<strong>10</strong>7C - Chapman<br />

SWFWMD Conservation Easement<br />

SWFWMD Ownership<br />

Other Conservation Lands<br />

SWFWMD Proposed Acquisition<br />

Myakka River<br />

Rock Creek<br />

SWFWMD Proposed Conservation Easement<br />

775<br />

Oyster Creek<br />

675<br />

MANATEE CO.<br />

SARASOTA CO.<br />

Indian Creek<br />

Lake Myakka<br />

777<br />

Myakka Prairie<br />

Deer Prairie Creek<br />

Verna<br />

Old Myakka<br />

780<br />

Clay Gully<br />

Deer Prairie Slough<br />

Myakka River<br />

Ogleby Creek<br />

Mossy Island Slough<br />

72<br />

75<br />

Big Slough<br />

Boggy Creek<br />

41<br />

Sam Knight Creek<br />

El Jobean<br />

776<br />

Coker Creek<br />

Tatum Gully<br />

Big Slough Canal<br />

Huckaby Creek<br />

Flopbuck Creek<br />

Sand Slough<br />

Myakka City<br />

Mud Slough<br />

Murdock<br />

Long Creek<br />

Maple Creek<br />

Sand Branch<br />

Edgeville<br />

Sandy<br />

Bud Slough<br />

Owen Branch<br />

Owen Creek<br />

SWF Parcel No.<br />

<strong>21</strong>-199-<strong>10</strong>7C - Chapman<br />

75<br />

Wildcat Slough<br />

75<br />

HARDEE CO.<br />

DESOTO CO.<br />

CHARLOTTE CO.<br />

Port Charlotte<br />

Peace River<br />

17<br />

Cypress Branch<br />

665<br />

Buzzard Roost Branch<br />

Charlotte Harbor<br />

0 2 4<br />

Miles<br />

Osborn Branc<br />

Deep Creek


DRAFT<br />

Minutes of the <strong>Meeting</strong><br />

<strong>PEACE</strong> <strong>RIVER</strong> BASIN BOARD<br />

Southwest Florida Water Management District<br />

Bartow, Florida August 7, 2009<br />

The Peace River Basin Board of the Southwest Florida Water Management District convened for<br />

a regular meeting on Friday, August 7, 2009, at 9:30 a.m., in the Bartow Service Office, Bartow,<br />

Florida.<br />

Board Members Present<br />

Bryan K. Beswick, Co-Chair<br />

Ken Harrison, Vice Chair<br />

Rufus C. Lazzell, Secretary<br />

Pat Crisman, Member<br />

James L. Hageman, Member<br />

Paul G. Samuels, Member<br />

Fred W. Trippensee, III, Member<br />

Board Members Absent<br />

C. A. "Neil" Combee, Jr. , Co-Chair<br />

H. Paul Senft, Jr., Co-Chair<br />

Staff Present<br />

Lou Kavouras Bruce Wirth<br />

Eric DeHaven Mark Hammond<br />

Linda Pilcher David Rathke<br />

Terri Behling Randy Emberg<br />

Danny Kushmer Mershad Nourani<br />

Jennette Seachrist Chan Springstead<br />

Sandie Will<br />

Via Videoconference: Beth Putnam<br />

Recording Secretary: Phyllis Young<br />

A roster of other attendees is filed in the permanent files of the Basin. Compact disks of the<br />

audio and copies of materials and handouts, as set out in full herein, are also filed in the<br />

permanent files of the Basin.<br />

1. Call to Order and Roll Call<br />

Co-Chair Beswick called the meeting to order at 9:30 a.m. and thanked everyone for<br />

attending. Ms. Phyllis Young, Senior Administrative Assistant, Boards and Executive<br />

Services, called the roll and noted a quorum was present. (CD 1/Track 1)<br />

2. Invocation and Pledge of Allegiance to the American Flag<br />

Mr. Hageman provided an invocation, which was followed by the Pledge of Allegiance to the<br />

American Flag. (CD 1/Track 1)<br />

3. Additions/Deletions to the Agenda<br />

Ms. Lou Kavouras, Deputy Executive Director, Outreach, Planning, and Board Services,<br />

reported that staff would present one additional agenda item: Peace Creek Drainage<br />

District resolution would be taken as the first discussion item. (CD 1/Track 1)<br />

4. Oath of Office for Newly Appointed/Re-Appointed Board Members<br />

Ms. Young administered the Oath of Office to Mr. Lazzell, Mr. Samuels, and Mr. Trippensee,<br />

who were recently re-appointed to the Board. (CD 1/Track 1)<br />

5. Basin Activities Report and Agenda Review<br />

Mr. Chancey Springstead, Basin Planner, reminded the Board that this item will be part of<br />

each Basin Board agenda, providing an opportunity for the Basin Planner to give an<br />

overview of relevant items on the agenda, information items, and other topics of interest.<br />

Mr. Sprinstead reported recent approval of the Polk County Supplemental Water Supply Plan<br />

and the “Get Outside” campaign, which is scheduled to begin September 26, 2009, in<br />

conjunction with National Public Lands Day. He also noted that an update to the Strategic


Minutes of the <strong>Meeting</strong> August 7, 2009<br />

Peace River Basin Board DRAFT Page 2 of 7<br />

Plan is underway. The latest draft was given to the Board members for review; input is due<br />

to the Planning Department by the end of the month.<br />

With regard to the Basin’s Strategic Budget Priorities that were established at the Board’s<br />

planning workshop in October 2008, Mr. Springstead stated those priorities have served the<br />

Board well, and staff believes the Basin Board’s issues and concerns have not changed<br />

substantially from the previous year. Therefore, staff is recommending the Board reaffirm<br />

these Strategic Budget Priorities for fiscal year (FY) 2011:<br />

� alternative water source research, planning, and development;<br />

� water conservation programs, initiatives, and projects;<br />

� regional approach to water resource sustainability, both within and across<br />

District boundaries ;<br />

� balance Basin funding with needs of the Basin; and<br />

� public and youth education programs and initiatives<br />

After consideration, Mr. Lazzell moved, seconded by Mr. Harrison, to re-affirm the<br />

current Basin strategic budget priorities. Motion carried unanimously. (CD 1/Track 2)<br />

6. Consent Items:<br />

After consideration, Mr. Harrison moved, seconded by Mr. Samuels, to approve the<br />

following Consent Items:<br />

a. Minutes of the June 5, 2009, <strong>Meeting</strong><br />

Approve the June minutes, as presented.<br />

b. Facilitating Agricultural Resource Management Systems (FARMS)<br />

i. Bentley Ranch, Inc. - H586<br />

1. Approve the Bentley Ranch, Inc., project for a not-to-exceed<br />

reimbursement of $255,000, with $63,750 provided by the Peace River<br />

Basin Board; $63,750 provided by the Governing Board; and $127,500<br />

provided from State Appropriations to the Governing Board;<br />

2. Authorize the transfer of $63,750 from Fund 020 H017 Peace River Basin<br />

FARMS funds; $63,750 from Fund 0<strong>10</strong> H017 Governing Board FARMS<br />

funds; and $127,500 from the 2009 State Appropriations allocated to Fund<br />

0<strong>10</strong> H017 FARMS funds, to the H586 Bentley Ranch project fund;<br />

3. Authorize the Executive Director to sign the agreement.<br />

ii. Bishop Citrus, Inc. - H585<br />

1. Approve the Bishop Citrus, Inc., project for a not-to-exceed reimbursement<br />

of $190,000, with $47,500 provided by the Peace River Basin Board; $47,500<br />

provided by the Governing Board; and $95,000 provided from State<br />

Appropriations;<br />

2. Authorize the transfer of $47,500 from Fund 020 H017 Peace River Basin<br />

Board FARMS funds; $47,500 from Fund 0<strong>10</strong> H017 Governing Board<br />

FARMS funds; and $95,000 from the 2009 State Appropriations allocated to<br />

Fund 0<strong>10</strong> H017 FARMS funds, to the H585 Bishop Citrus project fund; and<br />

encumber these funds into FY20<strong>10</strong> in the event a contract is not executed<br />

prior to FY2009 year end;<br />

3. Authorize the Executive Director to sign the agreement.<br />

iii. Billy H. Haygood, Trustee for L. D. Hancock Marital Trust – Hancock Grove<br />

Project Phase III - H584


Minutes of the <strong>Meeting</strong> August 7, 2009<br />

Peace River Basin Board DRAFT Page 3 of 7<br />

1. Approve the Hancock Grove Phase III project for a not-to-exceed<br />

reimbursement of $375,000, with $93,750 provided by the Peace River<br />

Basin Board; $93,750 provided by the Governing Board; and $187,500<br />

provided from State Appropriations to the Governing Board;<br />

2. Authorize the transfer of $93,750 from Fund 020 H017 Peace River Basin<br />

Board FARMS funds; $93,750 from Fund 0<strong>10</strong> H017 Governing Board<br />

FARMS funds; and $187,500 from the 2009 State Appropriations allocated<br />

to Fund 0<strong>10</strong> H017 FARMS funds to the H584 Hancock Grove Phase III<br />

project fund; and encumber these funds into FY20<strong>10</strong> in the event a contract<br />

is not executed prior to FY2009 year end;<br />

3. Authorize the Executive Director to sign the agreement<br />

iv. Mixon Family Farms, Inc.<br />

1. Approve the Mixon Family Farms, Inc., project for a not-to-exceed<br />

reimbursement of $176,000, with $44,000 provided by the Peace River<br />

Basin Board; $44,000 provided by the Governing Board; and $88,000<br />

provided from State Appropriations;<br />

2. Authorize the transfer of $44,000 from Fund 020 H017 Peace River Basin<br />

Board FARMS funds; $44,000 from Fund 0<strong>10</strong> H017 Governing Board<br />

FARMS funds; and $88,000 from the 2009 State Appropriations allocated to<br />

Fund 0<strong>10</strong> H017 FARMS funds to H572 Mixon Family Farms, Inc., FARMS<br />

project fund; and encumber these funds into FY20<strong>10</strong> in the event a contract<br />

is not executed prior to FY2009 year end;<br />

3. Authorize the Executive Director to sign the agreement.<br />

c. Board Encumbrances<br />

i. FARMS Program - H017<br />

Approve the encumbrance of up to $70,747, or the remaining funds available,<br />

from the FY2009 budget to be used for future FARMS projects.<br />

ii. Lake Hancock Outfall Treatment Project - H014, SC54, W014<br />

Approve the encumbrance of $1,792,504, without a contract, for the Lake<br />

Hancock Outfall Treatment Project to be used in FY 20<strong>10</strong>.<br />

iii. Lake Hancock Lake Level Modification Project - H008<br />

Approve the encumbrance of $500,000 ($250,000 from the General Fund;<br />

$62,500 from the Alafia River Basin Board; $125,000 from the Peace River<br />

Basin Board; and $62,500 from the Manasota Basin Board), without a contract,<br />

to be used in FY20<strong>10</strong> for implementation of the Lake Hancock Lake Level<br />

Modification Project.<br />

iv. Upper Peace River Resource Development - H024<br />

Approve the encumbrance of $181,357 ($91,929 from the General Fund;<br />

$<strong>21</strong>,732 from the Alafia River Basin Board; $45,964 from the Peace River Basin<br />

Board; and $<strong>21</strong>,732 from the Manasota Basin Board), without a contract, for<br />

the Upper Peace River Resource Development project.<br />

v. Lake Placid Watershed Management Evaluation and Plan - L473<br />

Approve the encumbrance of $46,759 in Peace River Basin FY2009 funding,<br />

without a contract, for payment of FY20<strong>10</strong> Lake Placid Watershed Evaluation<br />

and Plan project monitoring program costs.<br />

d. Annual Calendar of <strong>Meeting</strong> Dates – Fiscal Year 20<strong>10</strong><br />

Approve the FY20<strong>10</strong> Basin Board meeting schedule.


Minutes of the <strong>Meeting</strong> August 7, 2009<br />

Peace River Basin Board DRAFT Page 4 of 7<br />

Motion carried unanimously. (CD 1/Track 3)<br />

7. Discussion Items:<br />

ADD-ON Peace Creek Drainage District<br />

Board members had been provided copies of the recap and draft resolution for this item.<br />

After consideration, Mr. Lazzell moved, seconded by Mr. Samuels, to approve the<br />

resolution supporting the abolishment of the Peace Creek Drainage District and<br />

transferring its ongoing operation and maintenance responsibilities and assets to the<br />

Southwest Florida Water Management District.<br />

Motion carried unanimously. (CD 1/Track 4)<br />

a. Lake Hancock Outfall Treatment Project - H014, SC54, W014<br />

Mr. Eric DeHaven, Director, Resource Data and Restoration Department, presented this<br />

agenda item to request the Board’s approval to amend the consultant agreement to add<br />

funds for final design, construction services, and start-up assistance for the project. He<br />

gave background of the project, which will primarily improve water quality discharging<br />

from Lake Hancock and will also restore natural systems and provide a small degree of<br />

assistance in meeting minimum flows in the Upper Peace River. The specific objective<br />

is to utilize large-scale constructed wetlands to reduce annual nitrogen loads up to 27<br />

percent from flow discharging from Lake Hancock. Water quality is anticipated to go<br />

from “poor” to “fair.”<br />

Mr. DeHaven explained increased costs of specific construction elements of the project,<br />

stating that the large costs are balanced by the benefit of the water quality<br />

improvements. A cost comparison of the Lake Hancock project to stormwater retrofit<br />

projects in the Tampa Bay watershed showed the cost per pound of nitrogen removed<br />

by this project is lower than any single stormwater retrofit project implemented by the<br />

District for Tampa Bay.<br />

The presentation included a budget table of all previous and FY20<strong>10</strong> proposed funding<br />

amounts and sources. Board members interacted on related discussion topics including<br />

the pumping process, vegetation/re-planting, amount of earth to be leveled, isolation of<br />

cells, and negotiation for a small parcel of land that would allow discharge into Saddle<br />

Creek.<br />

After consideration, Mr. Samuels moved, seconded by Ms. Crisman, that the Board<br />

approve amending the consultant agreement to add funds up to $2,250,000 for<br />

final design, construction services, and start-up assistance for the Lake Hancock<br />

Outfall Treatment Project. Motion carried unanimously. (CD 1/Track 5)<br />

b. Feasibility of Using Reclaimed Water for Direct and Indirect Aquifer Recharge in the<br />

Tampa Bay Area - H076<br />

Ms. Sandie Will, Professional Geologist in the Hydrologic Evaluation Section, Resource<br />

Projects Department, provided an overview of this project, which was conducted as part<br />

of the District’s Regional Reclaimed Water Partnership Initiative Project to identify<br />

options for maximizing beneficial use of reclaimed water flows. Use of reclaimed water to<br />

recharge the Upper Floridan Aquifer (UFA) to improve water levels and provide<br />

opportunity for additional groundwater withdrawals was one of the options identified.<br />

Ms. Will pointed out the project area, gave the objectives of the project, explained the<br />

types of aquifer recharge and associated water treatment requirements, and estimated<br />

costs.


Minutes of the <strong>Meeting</strong> August 7, 2009<br />

Peace River Basin Board DRAFT Page 5 of 7<br />

The study showed that it is possible to develop direct and indirect aquifer recharge<br />

projects to improve UFA water levels and provide opportunities for additional<br />

groundwater withdrawals in the area. Depending on location, potentially 90 percent of<br />

recharged quantities could be available for future additional groundwater withdrawals.<br />

An additional benefit is that area water suppliers can use the information to determine if<br />

the concepts can be incorporated into their water supply plans.<br />

This item was presented for the Board’s information; no action was required. (CD 1/<br />

Track 6)<br />

c. Town of Dundee Reclaimed Water System Project - L553<br />

Mr. Mark Hammond, Director of the Resource Projects Department, presented this item<br />

to request the Board’s approval to enter into a new agreement with the Town of Dundee<br />

(Town) for its Reclaimed Water System project. The Basin has already budgeted almost<br />

$950,000 for this project, but the Town said it could not move forward without all funding<br />

dollars. At the Board’s request during its June 5 meeting, staff was directed to present<br />

the Board an option so the project could move forward.<br />

Mr. Hammond provided specifics of the project and the Town’s inability to begin<br />

construction. The Cooperative Funding agreement for the project expired on<br />

January 31, 2009. In May 2009, the Town proposed three items for the Board’s<br />

consideration: 1) extend the construction initiation date to June 30, 2014; 2) the Basin<br />

Board would reimburse the Town for 75 percent of documented incurred engineering<br />

expenses to date, with the understanding that those funds would be reimbursed to the<br />

Basin Board in the event construction had not commenced by June 2014; and 3) the<br />

Basin Board would continue to encumber funds to ensure 75 percent funding by the<br />

Board would be available by June 2014. Mr. Hammond stressed that these proposals<br />

would be exceptions to the normal cooperative funding process and would set a<br />

precedent with other cooperators.<br />

Board members participated in a long discussion on this topic; some expressed concern<br />

of the precedent that would be set and monies set aside that would not be used for<br />

projects that are ready to begin. Other concerns included 1) construction of homes has<br />

not begun, 2) the Town’s dollars would be better spent on other more important water<br />

supply or flood protection projects, e.g. upgrade of its water treatment plant, 3) cost of<br />

the project in five years is unknown, and 4) the Board would be paying on something<br />

that would not begin until far into the future--not abiding by cooperative funding<br />

procedures.<br />

Other Board members added that the project is well along in the permitting process;<br />

small towns cannot handle the debt of water projects and need help; and supporting the<br />

small town would be good, but the concern of the standard set is great.<br />

After consideration; Mr. Lazzell moved, seconded by Ms. Crisman to approve the<br />

staff recommendation, as follows:<br />

Recommend the Board approve entering into a new agreement with the Town of<br />

Dundee for their Reclaimed Water System project for a total cost of $3,400,000<br />

with the Peace River Basin's share not to exceed $2,584,<strong>21</strong>7; and authorize the<br />

Executive Director to sign the Agreement.<br />

Motion carried with Mr. Harrison voting nay. (CD 1/Track 7)


Minutes of the <strong>Meeting</strong> August 7, 2009<br />

Peace River Basin Board DRAFT Page 6 of 7<br />

d. Fiscal Year 20<strong>10</strong> Budget Discussion and Approval of Final Millage Rate and Budget<br />

Mr. Bruce Wirth, Deputy Executive Director, Resource Management Division, presented<br />

revisions to the preliminary budget presented during the June Basin Board meeting and<br />

reported that ad valorem for fiscal year (FY) 20<strong>10</strong> is 12.4 percent below last year. He<br />

continued by noting significant changes to the June preliminary budget, which allowed<br />

the funding line to include about one-half of the projects ranked “High.” In order for the<br />

Basin to fund all projects through those ranked “Medium,” $486,939 would need to be<br />

transferred from the Basin’s H<strong>10</strong>0 Water Supply and Resource Development (WSRD)<br />

reserves, leaving a balance of $820,466 in that fund.<br />

Polk County Water Policy Manager Duke Clem addressed the Board to express<br />

appreciation to the Board for funding Projects N147 and N150, Garden Grove Pines<br />

Stormwater Retrofit and Polk County Vertical Control Densification, respectively.<br />

Mr. Ruffin Gray, Environmental Coordinator for the City of Lakeland Water Utilities, also<br />

took the podium to thank the Board for funding their Plumbing Retrofit Project N112.<br />

For the record, Ms. Kavouras read the three-part staff recommendation and suggested<br />

each part be taken separately. Ms. Linda Pilcher, Assistant Finance Director, clarified<br />

the second recommendation.<br />

After consideration, Mr. Lazzell moved, seconded by Mr. Samuels, to approve and<br />

adopt the required final millage rate of 0.1827 mill for FY20<strong>10</strong>. Motion carried<br />

unanimously.<br />

After consideration, Ms. Crisman moved, seconded by Mr. Samuels, to authorize<br />

staff to lapse $486,939 from FY2009 Water Supply and Resource Development<br />

Reserves, which will increase the Balances from Prior Years available for the<br />

FY20<strong>10</strong> budget.<br />

Mr. Harrison stated that he supports this recommendation; however, he stressed that<br />

next year may be worse, budget-wise, than this one. The Board is using part of its<br />

reserves and needs to be careful about decisions it makes. He reiterated that the Board<br />

relies heavily on staff to make the budget “fit together” and emphasized that he has faith<br />

staff can do that. Mr. Trippensee also voiced his belief that the Board must be careful in<br />

the next three or four years when, perhaps, all the Basin’s existing reserves will be<br />

depleted. Hopefully, he added, there will be more reserves by that time.<br />

When there were no further comments, the motion passed with Mr. Trippensee<br />

voting nay.<br />

After consideration, Mr. Lazzell moved, seconded by Mr. Hageman, to approve and<br />

adopt the final FY20<strong>10</strong> budget, revised to include additional Balance from Prior<br />

Years due to the $486,939 lapsed from the H<strong>10</strong>0 Water Supply and Resource<br />

Development Reserves, allowing the funding line to include all “Medium” ranked<br />

projects through Project N147.<br />

Motion carried with Mr. Trippensee voting nay.<br />

After consideration, Ms. Crisman moved, seconded by Mr. Samuels, to approve<br />

Resolution No. <strong>10</strong>5 – resolution affirming the required final millage rate and<br />

budget for FY20<strong>10</strong>. Motion carried unanimously. (CD 1/Track 8)


Minutes of the <strong>Meeting</strong> August 7, 2009<br />

Peace River Basin Board DRAFT Page 7 of 7<br />

Mr. David Gore had submitted a request to address the Board; however, he had already left the<br />

meeting when called.<br />

8. Reports:<br />

a. Basin Board Education Committee (BBEC)<br />

Ms. Crisman, the Board’s primary representative on the BBEC, directed members to a<br />

written report of the July 7, 2009, meeting, which was provided as an exhibit in the<br />

meeting notebook. She reported that District conservation/education ads are being<br />

posted in area airports. (CD 1/Track 9)<br />

b. Basin Board Land Resources Committee (BBLRC)<br />

Primary representative to the BBLRC Ken Harrison gave brief highlights of the July 13,<br />

2009, BBLRC meeting held in the Green Swamp West <strong>Meeting</strong> Facility. He commented<br />

on revenue generation on District lands and briefly reported on the recent land use<br />

stakeholders’ discussion group meeting. He specifically spoke of the service<br />

leaseholders provide the District in taking responsibility for prescribed burns on those<br />

properties. (CD 1/Track 9/11:45:40)<br />

c. Governing Board Activities<br />

Board members had been provided a written report of the July 28 Governing Board<br />

meeting, which was held in the Polk County Administration Building in Bartow. Co-Chair<br />

Beswick mentioned several topics of discussion including the Facilitating Agricultural<br />

Resource Management Systems (FARMS) program, 20-year permits, “streaming” video<br />

technology, and Basin Board millage rates. (CD 1/Track 9/11:52:30)<br />

9. Announcements<br />

Ms. Kavouras reviewed announcements listed on the agenda and reported that the Basin<br />

Boards would not meet in December. However, a joint Governing Board/Basin Boards<br />

workshop will be held on December 15 at Nature’s Classroom, Thonotosassa. (CD 1/<br />

Track 9/11:53:42)<br />

<strong>10</strong>. Adjournment<br />

When there was no further business to come before the Board, Co-Chair Beswick<br />

adjourned the meeting at 12:33 p.m. (CD 1/Track 9/11:56)<br />

****Information Items****<br />

The items listed below were for the Board's information, intended to keep the Board apprised of<br />

completed projects, cancelled projects, and projects that have executed contracts and are<br />

ready to begin. The items did not require Board action.<br />

1. FARMS - Running W Citrus, Limited Partnership (H554), Highlands County – Cancellation<br />

Notice<br />

2. FARMS - Calvin Houghland (H567), DeSoto County – Cancellation Notice<br />

3. Development of Landscape Fertilizer Best Management Practices - Phase 1 (N013) –<br />

Execution Notice<br />

The Southwest Florida Water Management District (District) does not discriminate on the basis of disability. This<br />

nondiscrimination policy involves every aspect of the District's functions, including access to and participation in the<br />

District's programs and activities. Anyone requiring reasonable accommodation as provided for in the Americans with<br />

Disabilities Act should contact the District's Human Resources Director, 2379 Broad Street, Brooksville, Florida,<br />

34604-6899; telephone (352) 796-7<strong>21</strong>1 or 1-800-423-1476 (FL only), ext. 4702; TDD (FL only) 1-800-231-6<strong>10</strong>3; or<br />

email ADACoordinator@swfwmd.state.fl.us.


Location Map<br />

Bermont Properties, LLC.<br />

FARMS Project H588 - WUP No. 20002689.005<br />

Highway 31 .<br />

State Hwy 31 State Road 31<br />

County Hwy 74<br />

Section 16<br />

Section 22N<br />

Sections <strong>21</strong>-22<br />

Section 34<br />

0 2,300 4,600 6,900 9,200<br />

Feet<br />

Project Area<br />

Section 14<br />

Bermont<br />

^_


___________________________________________________________<br />

A separate document<br />

CIRCLE B BAR RESERVE<br />

NATURAL RESOURCE MANAGEMENT PLAN<br />

was provided to Peace River Basin Board members.<br />

If you require a copy or compact disk of the Plan,<br />

please contact Sharon Pope<br />

1-800-423-1476 or 352-796-7<strong>21</strong>1, extension 4470<br />

e-mail: Sharon.Pope@watermatters.org<br />

_______________________________


<strong>PEACE</strong> <strong>RIVER</strong> BASIN OF THE<br />

SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT<br />

RESOLUTION NO. <strong>10</strong>7<br />

AMENDMENT OF THE FISCAL YEAR 20<strong>10</strong> BUDGET<br />

WHEREAS, the Peace River Basin will receive $1<strong>21</strong>,830 in previously unanticipated<br />

revenue from the Water Protection and Sustainability Trust Fund (WPSTF) for the Charlotte<br />

County Regional Reclaimed Water Expansion project.<br />

THEREFORE, BE IT RESOLVED, that the Peace River Basin fiscal year 20<strong>10</strong> budget is<br />

amended by an increase of $1<strong>21</strong>,830 from $11,307,353 to $11,429,183 to reflect the additional<br />

revenue from the WPSTF; and<br />

BE IT FURTHER RESOLVED, that the Governing Board is hereby requested to amend<br />

the District's fiscal year 20<strong>10</strong> combined budget to reflect the Peace River Basin amended<br />

budget as adopted and approved by the Peace River Basin Board on October <strong>21</strong>, 2009.<br />

Attest:<br />

APPROVED AND ADOPTED on this <strong>21</strong> st day of October, 2009.<br />

______________________________<br />

DRAFT<br />

______________________________


Southwest Florida Water Management District<br />

Peace River Basin<br />

Budget Progress Report<br />

Eleven Months Ended August 31, 2009<br />

Remaining<br />

Balance<br />

Expended<br />

To Date<br />

Encumbered<br />

To Date<br />

Modified<br />

FY2009<br />

Budget<br />

Budget<br />

Transfers/<br />

Amendment<br />

Prior Year<br />

Encumbrances<br />

Adopted<br />

FY2009<br />

Budget<br />

Board and Executive Services $25,341 $0 $0 $25,341 $0 $20,605 $4,736<br />

Planning<br />

13,031 0 0 13,031 0 9,887 3,144<br />

Information Resources<br />

<strong>10</strong>,158 0 0 <strong>10</strong>,158 0 4,538 5,620<br />

Communications<br />

33,628 0 0 33,628 0 27,674 5,954<br />

Risk Management<br />

14,500 0 0 14,500 0 <strong>10</strong>,251 4,249<br />

Community Affairs<br />

56,619 0 0 56,619 0 48,302 8,317<br />

Resource Data and Restoration<br />

45,326 0 0 45,326 0 38,389 6,937<br />

Resource Projects<br />

<strong>10</strong>0,551 0 0 <strong>10</strong>0,551 0 82,613 17,938<br />

Operations<br />

8,039 0 0 8,039 0<br />

271 7,768<br />

Land Resources<br />

14,231 0 0 14,231 0 5,606 8,625<br />

$3<strong>21</strong>,424 $0 $0 $3<strong>21</strong>,424 $0 $248,136 $73,288<br />

Projects<br />

On-Going Activities<br />

Z0<strong>10</strong><br />

Z030<br />

Z050<br />

Z060<br />

Z074<br />

Z090<br />

Z300<br />

Z500<br />

Z600<br />

Z700<br />

Total On-Going Activities<br />

Property Appraiser & Tax Collector Commissions<br />

Z9<strong>10</strong> Pr. App. & Tax Coll. Commissions $354,233 $0 $0 $354,233 $0 $345,459 $8,774<br />

$354,233 $0 $0 $354,233 $0 $345,459 $8,774<br />

Total Property Appraiser & Tax Collector Commissions<br />

Reserves<br />

Z930 Contingencies $250,000 $0 $0 $250,000 $0 $0 $250,000<br />

Total Reserves<br />

$250,000 $0 $0 $250,000 $0 $0 $250,000<br />

Save Our Rivers (SOR) Reimbursable Projects<br />

S001 Jack Creek $89,824 $8,185 $0 $98,009 $31,843 $54,522 $11,644<br />

S017 Prairie/Shell Creek 68,637 13,415 0 82,052 7,782 40,077 34,193<br />

S029 Upper Lake Marion Creek Watershed 14,308 12,856 0 27,164 7,306 <strong>10</strong>,077 9,781<br />

S030 RV Griffin Reserve 89,134 657 567 90,358 2,547 18,718 69,093<br />

S035 Bowlegs Creek 35,<strong>10</strong>0 0 0 35,<strong>10</strong>0 0 449 34,651<br />

S036 Charlotte Harbor State Buffer Preserve 3,282 0 0 3,282 0 2,590 692<br />

S040 Lower Peace River (Deep Creek) 162,745 0 (567) 162,178 5,994 73,731 82,453<br />

S051 Bright Hour Watershed 2,090 0 0 2,090 0 715 1,375<br />

S054 Lake Hancock 274,442 140,<strong>21</strong>6 92,500 507,158 299,512 98,984 <strong>10</strong>8,662<br />

S099 Save Our Rivers Administration 24,096 0 0 24,096 0 2,262 <strong>21</strong>,834<br />

SA01 Jack Creek Hydrologic & Wetlands Restoration 6,530 470,000 0 476,530 250,000 5,226 2<strong>21</strong>,304<br />

SA54 Lk Hancock Enviromental Education Center 0 4<strong>21</strong>,875 0 4<strong>21</strong>,875 0 422,905 (1,030)<br />

SB40 Deep Creek Recreational Improvements 0 118,500 0 118,500 0 118,958 (458)<br />

1


Southwest Florida Water Management District<br />

Peace River Basin<br />

Budget Progress Report<br />

Eleven Months Ended August 31, 2009<br />

Adopted Prior Year Budget Modified Encum-<br />

FY2009 Encum- Transfers/ FY2009 bered Expended Remaining<br />

Projects<br />

Budget brances Amendment Budget To Date To Date Balance<br />

SB54 Polk's Nature Discovery Center Field Trips 32,465 127,892 0 160,357 31,712 127,892 753<br />

$802,653 $1,313,596 $92,500 $2,208,749 $636,696 $977,<strong>10</strong>6 $594,947<br />

Total Save Our Rivers (SOR) Reimbursable Projects<br />

Surface Water Improvement & Management (SWIM) Projects<br />

W014 Lake Hancock Outfall Treatment System $349,627 $0 $0 $349,627 $333,933 $15,694 $0<br />

W032 Hillsborough CC Foundation Field Trip Program 2,603 226 0 2,829 2,802 27 0<br />

W331 Biennial Seagrass Mapping 29,365 15,518 17,500 62,383 39,746 5,137 17,500<br />

W436 Elizabeth Place WQ & Natural Sys Enhancement 126,829 125,000 0 251,829 234,345 17,484 0<br />

W501 SWIM Plan Implementation - Charlotte Harbor 2,438 0 0 2,438 731 1,707 0<br />

W506 CHEC Charlotte Harbor/Lemon Bay SWIM WS Edu 14,757 3,872 0 18,629 14,548 4,080 1<br />

W507 CHEC Peace River Watershed Education 18,439 6,538 0 24,977 12,840 12,137 0<br />

W511 Alligator Creek Restoration 4,000 364,471 0 368,471 367,087 1,384 0<br />

W5<strong>21</strong> Charlotte Harbor Water Quality Monitoring 17,846 9,641 14,344 41,831 17,865 9,622 14,344<br />

W526 Charlotte Harbor National Estuary Program 45,024 123,750 0 168,774 77,268 91,506 0<br />

W527 Peace River Wtr Qlty Monitoring 20,481 0 0 20,481 (9,924) 30,405 0<br />

W547 WQ Peace&Myakka Basins,CH&Lemon Bay 13,920 8,578 0 22,498 14,9<strong>21</strong> 7,577 0<br />

W553 Coral Creek Habitat Restoration 157,855 180,861 200,000 538,716 297,530 41,186 200,000<br />

W554 Annual Rpt on WQ Cond for Peace & Myakka Rvrs 362 0 0 362 266 96 0<br />

W555 Eval Effects of Rstr of Estuarine Fishes 23,325 0 0 23,325 12,075 11,250 0<br />

W556 FDOT - Cape Haze Pioneer Trail Hydrologic Rstr 3,425 15,000 0 18,425 18,287 138 0<br />

W557 Characterizing Seagrass Comm of Eastern Char Hbr 724 7,500 0 8,224 3,086 5,138 0<br />

W559 Assess 2008 Seagrass Maps - Char Hbr & Lemon Bay 5,402 0 0 5,402 948 4,454 0<br />

W776 SWIM Plan Implementation - Winter Haven 5,620 0 0 5,620 5,620 0 0<br />

W781 South Lake Conine Watershed Rstr Prj 137,7<strong>21</strong> 166,250 0 303,971 303,825 146 0<br />

W794 Chain of Lakes Sediment Removal Feasibility Stdy 2,439 15,098 0 17,537 5,624 11,913 0<br />

W796 Chain of Lakes Water Quality Management Plan 4,849 62,500 0 67,349 55,641 11,708 0<br />

$987,051 $1,<strong>10</strong>4,803 $231,844 $2,323,698 $1,809,064 $282,789 $231,845<br />

Total Surface Water Improvement & Management (SWIM) Projects<br />

Basin Initiatives<br />

B063 USGS Surface Wtr. Flow, Level, & W.Q. Data Coll 434,900 0 0 434,900 <strong>21</strong>7,450 <strong>21</strong>7,450 0<br />

B099 Quality of Water Improvement Program 157,143 54,384 0 <strong>21</strong>1,527 0 91,523 120,004<br />

B113 Effect of Karst Dev. - Peace River Flow 0 0 0 0 0 607 (607)<br />

B131 Hotel/Motel/Restaurant Water Conservation Prgm 16,734 1,200 0 17,934 1,200 <strong>10</strong>,365 6,369<br />

B136 FL Auto Weather Network (FAWN) Data Diss & Edu 6,250 4,844 0 11,094 6,719 4,375 0<br />

2


Adopted Prior Year Budget Modified Encum-<br />

FY2009 Encum- Transfers/ FY2009 bered Expended Remaining<br />

Projects<br />

Budget brances Amendment Budget To Date To Date Balance<br />

B163 Peace R. - Historical Land Cover Mapping 56,415 19,000 0 75,415 58,000 14,475 2,940<br />

B184 FL 2091 Hydrologic Charact of Charlie Ck Wtrshed 0 0 0 0 0 166 (166)<br />

B198 Lake Jackson MFL Recovery Feasibility Study 12,730 3<strong>10</strong>,000 0 322,730 3<strong>10</strong>,000 4,648 8,082<br />

B199 Water Use During Prod of Select Tropical Foliage 0 29,618 0 29,618 29,618 0 0<br />

B203 Cold/Chill Prot of Tropical Plants in Nursery 0 45,000 0 45,000 45,000 0 0<br />

B206 Maintenance of Watershed Parameters & Models 185,783 260,053 0 445,836 257,392 9,311 179,133<br />

B<strong>21</strong>7 Ridge Lakes Stormwater Improvement <strong>10</strong>3,050 372,764 46,875 522,689 278,727 170,586 73,376<br />

B<strong>21</strong>9 Land Use/Cover Mapping 39,032 7,724 0 46,756 17,1<strong>10</strong> 28,226 1,420<br />

B226 Wtr Budget & Irrig Req for Mature Blueberries 9,563 14,627 0 24,190 <strong>21</strong>,688 0 2,502<br />

B229 Field Eval of Bhiadwarf for Wtr Use Effic 13,125 9,667 0 22,792 3,458 19,333 1<br />

B238 Crop Coefficients & Wtr Use for Peppers 3,649 7,298 0 <strong>10</strong>,947 9,325 1,622 0<br />

B239 Deter Wtr Req For Genetically Alt Lantana Camara 9,3<strong>10</strong> 4,128 0 13,438 8,414 5,024 0<br />

B240 Redc Wtr Consmp in Poly-Mulched Tomato/Pepper 5,500 5,720 0 11,220 11,220 0 0<br />

B241 Reduction of Wtr Use for Citrus Cold Prot 4,000 1 0 4,001 0 4,001 0<br />

B242 Potential to Use ASR in Avon Park Formation 926 8,353 0 9,279 5,838 2,580 861<br />

B243 Long-Term Wtr Budget Analysis of Lk Starr <strong>10</strong>4,859 1 0 <strong>10</strong>4,860 50,000 50,275 4,585<br />

B244 USGS - Hydrogeology & Qlty of GW in Highlands 24,629 1 0 24,630 5,000 17,430 2,200<br />

B246 Wtr Conservation/FYN Reg Builder/Dev Specialist 14,840 5,490 0 20,330 8,784 9,881 1,665<br />

B247 Effects of Dev on the Hydrologic Budget in SWUCA 0 0 0 0 0 54 (54)<br />

B251 National Hydrography Database (NHD) 4,702 0 0 4,702 4,702 0 0<br />

B256 Auto Citrus Irrigation Mgmt to Reduce Wtr Consmp 38,500 31,570 0 70,070 70,070 0 0<br />

B257 Reduc Nursery/Landscape Wtr Use Altering Nandina 7,000 4,340 0 11,340 7,000 4,340 0<br />

B260 Upper Peace River System - Freshwater MFLs 250 35,000 0 35,250 35,000 0 250<br />

B263 Eval of Diff On-Farm Blueberry Sys Irrig Effic 9,080 0 0 9,080 9,080 0 0<br />

B264 Irrig Mgmt to Cnsrv Wtr, Incr Tree Grwth & Prod 28,<strong>10</strong>6 0 0 28,<strong>10</strong>6 24,256 3,850 0<br />

B265 Optimizing Irrig for Shade Tree Prod 5,158 0 0 5,158 5,158 0 0<br />

B266 Incpt-Sprinkler Irrig Wtr Container Grown Plants 7,471 0 0 7,471 5,946 1,525 0<br />

B268 Charlie Creek - Freshwater MFLs 26,250 0 0 26,250 25,000 0 1,250<br />

B269 Horse Creek - Freshwater MFLs 1,250 0 0 1,250 0 0 1,250<br />

B273 MFL Stream Diversion and Assessment Project 9,375 0 0 9,375 6,563 0 2,812<br />

B276 Grants for Reclaimed Irrigation Projects (GRIP) 1,609 0 0 1,609 0 0 1,609<br />

B277 Florida Water Star <strong>10</strong>,061 0 0 <strong>10</strong>,061 2,532 5,845 1,684<br />

B620 Mapping & GIS 41,784 2,880 0 44,664 3,634 23,3<strong>21</strong> 17,709<br />

B630 Field Operations 265,197 3<strong>21</strong>,930 0 587,127 325,272 117,349 144,506<br />

Southwest Florida Water Management District<br />

Peace River Basin<br />

Budget Progress Report<br />

Eleven Months Ended August 31, 2009<br />

3


Southwest Florida Water Management District<br />

Peace River Basin<br />

Budget Progress Report<br />

Eleven Months Ended August 31, 2009<br />

Remaining<br />

Balance<br />

Expended<br />

To Date<br />

Encumbered<br />

To Date<br />

Modified<br />

FY2009<br />

Budget<br />

Budget<br />

Transfers/<br />

Amendment<br />

Prior Year<br />

Encumbrances<br />

Adopted<br />

FY2009<br />

Budget<br />

Projects<br />

B670 Structure Operations <strong>21</strong>6,682 129,911 0 346,593 82,<strong>10</strong>6 167,026 97,461<br />

G004 Aquatic Plant Management 17,545 0 0 17,545 0 5,194 12,351<br />

P259 Youth Water Resources Education 209,130 193,131 0 402,261 124,247 130,3<strong>10</strong> 147,704<br />

P268 Public Education 179,511 60,923 0 240,434 69,927 131,251 39,256<br />

Total Basin Initiatives<br />

$2,281,099 $1,939,559 $46,875 $4,267,533 $2,145,437 $1,251,943 $870,153<br />

Water Supply & Resource Development<br />

F027 Natural Treatment of Storm & Waste Water Ph 2 0 451 0 451 451 0 0<br />

F032 Peace River Regional Reservoir Expansion 500,000 538,644 0 1,038,644 817,914 220,730 0<br />

F033 Peace River Facility Expansion 200,000 756,298 0 956,298 604,466 351,832 0<br />

F035 Polk County Regional Reuse 0 146,438 0 146,438 114,376 32,062 0<br />

H008 .<br />

Lake Hancock Lake Level Modification 169,794 890,453 0 1,060,247 734,343 174,779 151,125<br />

H009 .<br />

Lake Hancock Outfall Structure P-11 Modif 625,000 625,000 0 1,250,000 625,000 0 625,000<br />

H014 .<br />

Lake Hancock Outfall Treatment System 0 13,664,728 0 13,664,728 12,985,278 679,568 (118)<br />

H015 .<br />

FARMS Back-Plugging Program <strong>21</strong>,389 94,454 0 115,843 88,854 13,091 13,898<br />

H017 .<br />

Facilitating Agricultural Rsrc Mgmt Sys (FARMS) 382,313 247,982 (90,033) 540,262 119,326 92,825 328,111<br />

H024 .<br />

Upper Peace River Resource Development 63,863 318,913 0 382,776 289,<strong>10</strong>8 50,599 43,069<br />

H027 .<br />

Charlotte Co Regional Reclaimed Water Expansion 274,768 14,646 0 289,414 0 287,583 1,831<br />

H034 .<br />

Peace Creek Canal Watershed 342,081 861,462 0 1,203,543 427,987 652,519 123,037<br />

H044 .<br />

SWUCA - Pilot Lake Augmentation 0 0 0 0 0 2,781 (2,781)<br />

H048 .<br />

Myakka Rvr Watershed Initiative 62,626 139,578 0 202,204 176,346 14,380 11,478<br />

H052 .<br />

PR/MRWSA - Reg Integ Loop Sys - Ph 3 Intct 1,191,295 519,750 0 1,711,045 1,643,757 66,454 834<br />

H060 .<br />

Punta Gorda Shell Ck WTP Expans to <strong>10</strong> mgd 648 64,790 0 65,438 15,572 49,244 622<br />

H062 .<br />

CF Industries Aquifer Recharge & Recovery <strong>10</strong>3,752 364,314 0 468,066 464,516 2,697 853<br />

H063 .<br />

PR/MRWSA Reg Rsrc Dev Feasibility Std 1,118 72,163 0 73,281 14,811 59,520 (1,050)<br />

H069 .<br />

PR/MRWSA Reg Loop System Ph 1A 677,590 893,586 0 1,571,176 1,489,689 79,392 2,095<br />

H072 .<br />

Polk County Comprehensive Water Supply Plan 7,062 96,456 0 <strong>10</strong>3,518 68,940 27,516 7,062<br />

H073 .<br />

Polk SWRUSA Carter Rd 1 Billion Gallon Rclm Strg 138,532 0 0 138,532 0 25 138,507<br />

H076 .<br />

Regional Reclaimed Water Partnership Initiative 528,269 0 1,250,000 1,778,269 1,771,640 12,574 (5,945)<br />

H079 .<br />

PR/MRWSA Regional Rsc Dev Ph 1 84,643 0 0 84,643 81,000 14 3,629<br />

H080 .<br />

Polk Central Florida Wtr Resource Dev Prj 2,506,875 0 (2,030,764) 476,111 0 516 475,595<br />

H090 Polk Co NERUSA Holly Hill Rclm Wtr Strg, Pmp&LFA 0 0 505,486 505,486 0 0 505,486<br />

H091 Polk Co SWRUSA Rclm Wtr Connection to TECO 0 0 208,333 208,333 0 0 208,333<br />

H<strong>10</strong>0 .<br />

Water Supply & Resource Development Reserves 0 1,307,405 0 1,307,405 1,307,405 0 0<br />

4


Southwest Florida Water Management District<br />

Peace River Basin<br />

Budget Progress Report<br />

Eleven Months Ended August 31, 2009<br />

Adopted Prior Year Budget Modified Encum-<br />

FY2009 Encum- Transfers/ FY2009 bered Expended Remaining<br />

Projects<br />

Budget brances Amendment Budget To Date To Date Balance<br />

H501 .<br />

FARMS - TRB Groves, L.L.C. 0 252,815 0 252,815 232,591 20,224 0<br />

H509 .<br />

FARMS - LallyMix 0 470 (469) 1 0 0 1<br />

H512 FARMS - Williams Farms Partners Prj 0 334,835 0 334,835 334,835 0 0<br />

H516 FARMS - Hancock Grove 0 40,242 18,315 58,557 0 58,556 1<br />

H522 FARMS - Island Grove #5 0 4,449 0 4,449 0 4,449 0<br />

H523 FARMS - The Mosaic Company (Ref H017) 0 0 1,113 1,113 0 0 1,113<br />

H530 FARMS - Island Grove LLC 0 7,085 (7,084) 1 0 0 1<br />

H534 FARMS - Diner Citrus/Cattle Co & OSS 0 9,598 (9,598) 0 0 0 0<br />

H537 FARMS - Royce Ranch Citrus 0 0 25,617 25,617 25,617 0 0<br />

H539 FARMS - Ben Hill Griffin, C&S Grove 0 43,846 (20,336) 23,5<strong>10</strong> 0 23,5<strong>10</strong> 0<br />

H540 FARMS - Classic Caladiums, L.L.C. 0 49,500 6,000 55,500 36,666 18,834 0<br />

H546 FARMS - Keystone Grove LLC 0 4,117 3,328 7,445 7,445 0 0<br />

H547 FARMS - Walters Grove 0 1,373 0 1,373 1,373 0 0<br />

H551 FARMS - I.M.G. Enterprises, Inc. 0 2,747 0 2,747 0 2,747 0<br />

H552 FARMS - The Groves of Peace River 0 2,386 0 2,386 2,386 0 0<br />

H553 FARMS - Las Lomas Holdings, Inc. 0 4,297 0 4,297 4,297 0 0<br />

H555 FARMS - Orange-Co, LP 0 38,604 (175) 38,429 0 38,429 0<br />

H556 FARMS - Island Grove, Farm #6 0 66,869 0 66,869 3,179 63,690 0<br />

H557 FARMS - Landscaping, Sod & Irrigation, Inc. 0 30,585 0 30,585 30,585 0 0<br />

H560 FARMS - Island Grove Integrated/Automated Irrig 0 35,850 0 35,850 35,850 0 0<br />

H563 FARMS - T. J. Chastain 0 0 38,905 38,905 26,082 12,823 0<br />

H564 FARMS - Blue Field USA, LLC 0 0 63,967 63,967 63,967 0 0<br />

H568 FARMS - Bethel Farms 0 0 15,235 15,235 15,235 0 0<br />

H569 FARMS - FLM - Prairie River Ranch Phase II 0 0 36,700 36,700 36,700 0 0<br />

H570 FARMS - Down South Blues 0 0 50,500 50,500 50,500 0 0<br />

H573 FARMS - T.J. Chastain - Neal Road Grove 0 0 24,186 24,186 24,186 0 0<br />

H575 FARMS - Citrus Creek Grove - Ph 2 0 0 <strong>10</strong>8,372 <strong>10</strong>8,372 <strong>10</strong>8,372 0 0<br />

H580 FARMS - Cornerstone Grove, LLC 0 0 1,700 1,700 1,700 0 0<br />

H582 FARMS - Island Grove Farm 8 - Parsley 0 0 27,500 27,500 27,500 0 0<br />

$7,881,618 $22,547,179 $226,798 $30,655,595 $24,909,845 $3,113,963 $2,631,787<br />

Total Water Supply & Resource Development<br />

Cooperative Funding<br />

K280 Charotte Co<br />

Imp. BMPs - Greater Port Charlotte 202,406 501,935 0 704,341 294,613 4<strong>10</strong>,448 (720)<br />

K300 Polk Co<br />

Utilities Northeast Service Area Reuse 0 0 0 0 0 150 (150)<br />

5


Southwest Florida Water Management District<br />

Peace River Basin<br />

Budget Progress Report<br />

Eleven Months Ended August 31, 2009<br />

Adopted Prior Year Budget Modified Encum-<br />

FY2009 Encum- Transfers/ FY2009 bered Expended Remaining<br />

Projects<br />

Budget brances Amendment Budget To Date To Date Balance<br />

K459 Charlotte Co SB<br />

Impl of BMPs - Punta Gorda Campus Watershed 1,017 1 0 1,018 1 122 895<br />

K725 Polk Co<br />

FYN Polk County 39,494 0 0 39,494 18,947 20,517 30<br />

K734 Lake Wales<br />

WMPlan Lake Wales 0 1,945 0 1,945 1,945 0 0<br />

L028 Englewood WD<br />

Lemon Bay High School Reuse Extension 2,929 22,760 0 25,689 22,760 0 2,929<br />

L151 Sebring<br />

WMPlan Sebring 3,194 45,570 0 48,764 45,570 4,263 (1,069)<br />

L152 Avon Park<br />

WMPlan Avon Park 7,116 31,5<strong>10</strong> 0 38,626 31,5<strong>10</strong> 8,434 (1,318)<br />

L153 Lake Placid<br />

Lake Placid Reuse (REDI) 1,299 620,986 0 622,285 75,998 545,3<strong>21</strong> 966<br />

L206 Char/Sara/Manatee FYN Builder/Dev Charlotte, Manatee, Sarasota 20,005 0 0 20,005 7,344 12,092 569<br />

L<strong>21</strong>5 Charlotte Co BCC Rotunda ASR Well Conversion for Reuse Water <strong>21</strong>9,646 419,399 0 639,045 635,649 242 3,154<br />

L314 Highlands Co<br />

Highlands WMPlan Carter Creek (REDI) 9,840 351,835 0 361,675 325,075 30,044 6,556<br />

L316 Polk Co Utilities<br />

Lower Floridan Exploratory/Test Production Well 0 0 0 0 0 685 (685)<br />

L324 Lakeland<br />

Lakeland - Lk Parker Stormwater BMP Imp 193,137 845,480 0 1,038,617 1,033,112 2,597 2,908<br />

L352 Frostproof/Polk Co Polk Imp. BMPs Lake Clinch Outfall Replacement 0 1 0 1 0 200 (199)<br />

L353 Frostproof/Polk<br />

Polk WMPlan Lakes Crooked, Clinch, and Reedy 5,255 500,000 0 505,255 500,000 637 4,618<br />

L473 Highlands Co<br />

Highlands WMPlan Lake Placid (REDI) 360,667 375,760 0 736,427 602,015 84,681 49,731<br />

L475 Polk Co<br />

Utilities NE Reg Reclaimed Storage Expansion 0 1 0 1 0 36 (35)<br />

L479 Lakeland<br />

Lk Hollingsworth Westside Stormwater Treatment 191,848 189,<strong>21</strong>6 0 381,064 376,848 416 3,800<br />

L485 Charlotte Co<br />

Charlotte Co Golf Course Reuse Storage 1,299 414,071 (414,071) 1,299 0 0 1,299<br />

L486 Charlotte Co<br />

WMPlan Charlotte Harbor 7,273 228,5<strong>21</strong> 0 235,794 209,009 24,<strong>21</strong>6 2,569<br />

L553 Dundee<br />

Reclaimed Water Use System Project 542,039 758,747 (337,500) 963,286 758,747 3,659 200,880<br />

L633 DeSoto Co<br />

WMPlan Desoto County 3,6<strong>21</strong> 225,000 0 228,6<strong>21</strong> <strong>21</strong>7,464 8,464 2,693<br />

L640 Punta Gorda<br />

Punta Gorda Reuse Feasibility Study 1,299 0 0 1,299 0 0 1,299<br />

L649 FDEP<br />

Hydrologic Rstr of Highlands Hammock SP 3,560 36,247 0 39,807 11,247 25,362 3,198<br />

L671 Polk Co<br />

Aquifer Recharge to Relieve Flooding 4,491 117,127 0 1<strong>21</strong>,618 115,656 8,173 (2,<strong>21</strong>1)<br />

L672 Polk Co<br />

WMPlan Polk County 0 37,616 0 37,616 37,616 29 (29)<br />

L673 Polk Co<br />

Imp. BMPs - Lk Belle & Tractor Lk 2,594 478,792 0 481,386 478,792 164 2,430<br />

L674 Polk Co<br />

Imp. BMPs - Saddlebag Lake 2,594 993,248 (275,000) 720,842 82,897 262,024 375,9<strong>21</strong><br />

L679 Hardee Co<br />

WMPlan Horse Creek 3,6<strong>21</strong> 0 0 3,6<strong>21</strong> 0 6,<strong>10</strong>8 (2,487)<br />

L680 Polk Co<br />

WMPlan Bartow 2,594 199,228 0 201,822 73,226 126,379 2,<strong>21</strong>7<br />

L693 Child's Museum<br />

Water Exhibits-Glazer Childrens Museum of Tampa <strong>21</strong>,302 20,550 0 41,852 20,550 5<strong>21</strong> 20,781<br />

L770 Lakeland<br />

Lk Gibson Stormwater Mgmt System Retrofit 192,526 562,501 0 755,027 750,133 681 4,<strong>21</strong>3<br />

L856 Charlotte Co<br />

Charlotte Co Toilet Rebate Program 1,718 38,050 0 39,768 22,959 15,881 928<br />

L897 Highlands Co<br />

Lake Clay Stormwater Retrofit (REDI) 7,383 171,875 (46,875) 132,383 <strong>10</strong>8,555 22,294 1,534<br />

L900 LE/AD<br />

LE/AD Polk County Watershed Education 11,312 1,894 0 13,206 9,461 3,982 (237)<br />

6


Southwest Florida Water Management District<br />

Peace River Basin<br />

Budget Progress Report<br />

Eleven Months Ended August 31, 2009<br />

Adopted Prior Year Budget Modified Encum-<br />

FY2009 Encum- Transfers/ FY2009 bered Expended Remaining<br />

Projects<br />

Budget brances Amendment Budget To Date To Date Balance<br />

L902 Lake Wales<br />

Imp. BMPs Twin Lakes 153,224 140,000 0 293,224 290,000 811 2,413<br />

L912 Dundee<br />

Lower Floridan Aquif Reuse Sppl Well Feas (REDI) 6,073 1 0 6,074 1 1,924 4,149<br />

L914 Lakeland<br />

Plumbing Retrofit Project 1,162 205,205 0 206,367 195,765 9,751 851<br />

L915 Lakeland<br />

Pre-Rinse Spray Valve Retrofit 1,114 7,245 0 8,359 5,868 1,601 890<br />

L917 Polk Co<br />

Lake Bathymetric Mapping 1,795 1 0 1,796 1 501 1,294<br />

L918 Polk Co<br />

Lake Gwyn Surface Wtr Rstr & Flood Protection 129,441 75,000 0 204,441 176,228 25,282 2,931<br />

L999 Reduced State Funding for AWS-WPSTF 0 0 337,500 337,500 0 0 337,500<br />

N001 Auburndale<br />

Reclaimed Water Master Plan 53,141 0 0 53,141 25,000 <strong>21</strong>5 27,926<br />

N004 Polk Co Bldrs<br />

Polk IS Florida-Friendly 18,330 0 0 18,330 13,164 4,508 658<br />

N013 Univ of FL<br />

Dev of Landscape Fertilizer BMPs - Phase 1 4,962 0 0 4,962 4,962 0 0<br />

N014 FL Aquarium<br />

Florida Aquarium Watershed Edu Initiative 1,807 0 0 1,807 1,055 0 752<br />

N024 Polk Co<br />

NWRUSA Rclm Wtr Storage & Pumping Station 26,225 0 66,945 93,170 26,225 0 66,945<br />

N063 Winter Haven<br />

Chain of Lks Natural Resource Center Edu Prgm 47,275 0 0 47,275 23,249 23,250 776<br />

N065 Haines City<br />

Southern Area Reuse Transmission Extension 1,003,398 0 0 1,003,398 1,000,000 1<strong>21</strong> 3,277<br />

N072 Haines City<br />

Lk Eva Wtr Qlty Improvement 252,846 0 0 252,846 236,000 3,052 13,794<br />

N074 Winter Haven<br />

Winter Haven Toilet Rebate Proj 55,684 0 0 55,684 23,482 30,857 1,345<br />

N075 Winter Haven<br />

Northern Reuse Srv Area Rclm Main Ext 203,348 0 120,328 323,676 320,328 1<strong>21</strong> 3,227<br />

N122 Polk Co<br />

Imp. BMPs - Saddle Creek Watershed 273,825 0 275,000 548,825 545,000 1,256 2,569<br />

N126 Charlotte Co<br />

Imp. BMPs at Charlotte Harbor Redevelopment Area 127,<strong>21</strong>7 0 0 127,<strong>21</strong>7 125,000 593 1,624<br />

P727 Lake Wales<br />

Lake Wales Reuse Project 4,368 601,428 0 605,796 601,428 357 4,011<br />

P729 Polk Co<br />

Polk - WMPlan Itchepackesassa Creek 0 676,150 0 676,150 338,075 0 338,075<br />

$4,432,314 $9,894,896 $(273,673 ) $14,053,537 $<strong>10</strong>,818,530 $1,733,022 $1,501,985<br />

Total Cooperative Funding<br />

$324,344 $54,434,768 $40,319,572 $7,952,418 $6,162,778<br />

$17,3<strong>10</strong>,392 $36,800,032<br />

Total Peace River Basin<br />

7


Southwest Florida Water Management District<br />

Peace River Basin<br />

Budget Comparison Report<br />

October 01, 2009<br />

Funded By Increase/<br />

Adopted Adopted Funded By Ad Valorem (Decrease)<br />

Budget Budget Outside Based<br />

From<br />

Projects<br />

FY2009 FY20<strong>10</strong> Revenue Budget FY2009<br />

On-Going Activities<br />

Z0<strong>10</strong> Board and Executive Services<br />

$25,341 $24,924 $0 $24,924 ($417)<br />

Z030 Planning<br />

13,031 13,227 0 13,227 196<br />

Z050 Information Resources<br />

<strong>10</strong>,158 9,860 0 9,860 (298)<br />

Z060 Communications<br />

33,628 37,908 0 37,908 4,280<br />

Z074 Risk Management<br />

14,500 12,000 0 12,000 (2,500)<br />

Z090 Community Affairs<br />

56,619 61,496 0 61,496 4,877<br />

Z300 Resource Data & Restoration<br />

45,326 36,947 0 36,947 (8,379)<br />

Z500 Resource Projects<br />

<strong>10</strong>0,551 89,116 0 89,116 (11,435)<br />

Z600 Operations<br />

8,039 8,116 0 8,116 77<br />

Z700 Land Resources<br />

14,231 11,365 0 11,365 (2,866)<br />

Total On-Going Activities $3<strong>21</strong>,424 $304,959 $0 $304,959 ($16,465)<br />

Property Appraiser & Tax Collector Commissions<br />

Z9<strong>10</strong> Pr. App. & Tax Coll. Commissions<br />

$354,233 $311,725 $0 $311,725 ($42,508)<br />

Total Property Appraiser & Tax Collector Commissions $354,233 $311,725 $0 $311,725 ($42,508)<br />

Reserves<br />

Z930 Contingencies<br />

$250,000 $250,000 $0 $250,000 $0<br />

Total Reserves $250,000 $250,000 $0 $250,000<br />

$0<br />

Save Our Rivers (SOR) Reimbursable Projects<br />

S001 Jack Creek<br />

$89,824 $58,603 $58,603 $0 ($31,2<strong>21</strong>)<br />

S017 Prairie/Shell Creek<br />

68,637 63,339 63,339 0 (5,298)<br />

S029 Upper Lake Marion Creek Watershed<br />

14,308 9,620 9,620 0 (4,688)<br />

S030 RV Griffin Reserve<br />

89,134 12,799 12,799 0 (76,335)<br />

S035 Bowlegs Creek<br />

35,<strong>10</strong>0 35,<strong>10</strong>0 35,<strong>10</strong>0 0 0<br />

S036 Charlotte Harbor State Buffer Preserve<br />

3,282 3,434 3,434 0 152<br />

S040 Lower Peace River (Deep Creek)<br />

162,745 91,091 91,091 0 (71,654)<br />

S051 Bright Hour Watershed<br />

2,090 2,156 2,156 0 66<br />

S054 Lake Hancock<br />

274,442 222,662 222,662 0 (51,780)<br />

S099 Save Our Rivers Administration<br />

24,096 7,549 7,549 0 (16,547)<br />

SA01 Jack Creek Hydrologic & Wetlands Restoration<br />

6,530 <strong>10</strong>,772 <strong>10</strong>,772 0 4,242<br />

SB54 Polk's Nature Discovery Center Field Trips<br />

32,465 18,527 18,527 0 (13,938)<br />

Total Save Our Rivers (SOR) Reimbursable Projects $802,653 $535,652 $535,652<br />

$0 ($267,001)<br />

Surface Water Improvement & Management (SWIM) Projects<br />

W014 Lake Hancock Outfall Treatment System<br />

$349,627 $0 $0 $0 ($349,627)<br />

W032 Hillsborough CC Foundation Field Trip Program<br />

2,603 5,<strong>10</strong>6 0 5,<strong>10</strong>6 2,503<br />

W331 Biennial Seagrass Mapping<br />

29,365 22,508 2,504 20,004 (6,857)<br />

W436 Elizabeth Place WQ & Natural Sys Enhancement<br />

126,829 4,436 2,<strong>21</strong>8 2,<strong>21</strong>8 (122,393)<br />

W501 SWIM Plan Implementation - Charlotte Harbor<br />

2,438 1,718 859 859 (720)<br />

W506 CHEC Charlotte Harbor/Lemon Bay SWIM WS Edu 14,757 32,566 16,283 16,283 17,809<br />

8


Southwest Florida Water Management District<br />

Peace River Basin<br />

Budget Comparison Report<br />

October 01, 2009<br />

Funded By Increase/<br />

Adopted Adopted Funded By Ad Valorem (Decrease)<br />

Budget Budget Outside Based<br />

From<br />

Projects<br />

FY2009 FY20<strong>10</strong> Revenue Budget FY2009<br />

W507 CHEC Peace River Watershed Education<br />

18,439 30,493 15,246 15,247 12,054<br />

W5<strong>10</strong> Thornton Key Restoration<br />

0 18,145 9,073 9,072 18,145<br />

W511 Alligator Creek Restoration<br />

4,000 7,574 3,787 3,787 3,574<br />

W513 Charlotte County 4th Grade Field Trip Program<br />

0 34,000 17,000 17,000 34,000<br />

W5<strong>21</strong> Charlotte Harbor Water Quality Monitoring<br />

17,846 25,986 2,071 23,915 8,140<br />

W526 Charlotte Harbor National Estuary Program<br />

45,024 87,452 43,726 43,726 42,428<br />

W527 Peace River Wtr Qlty Monitoring<br />

20,481 77,865 38,932 38,933 57,384<br />

W547 WQ Peace&Myakka Basins,CH&Lemon Bay<br />

13,920 0 0 0 (13,920)<br />

W553 Coral Creek Habitat Restoration<br />

157,855 288,0<strong>21</strong> 79,760 208,261 130,166<br />

W554 Annual Rpt on WQ Cond for Peace & Myakka Rvrs<br />

362 0 0 0 (362)<br />

W555 Eval Effects of Rstr of Estuarine Fishes<br />

23,325 950 475 475 (22,375)<br />

W556 FDOT - Cape Haze Pioneer Trail Hydrologic Rstr<br />

3,425 2,427 1,<strong>21</strong>3 1,<strong>21</strong>4 (998)<br />

W557 Characterizing Seagrass Comm of Eastern Char Hbr<br />

724 1,418 709 709 694<br />

W559 Assess 2008 Seagrass Maps - Char Hbr & Lemon Ba 5,402 1,418 709 709 (3,984)<br />

W776 SWIM Plan Implementation - Winter Haven<br />

5,620 6,178 3,089 3,089 558<br />

W781 South Lake Conine Watershed Rstr Prj<br />

137,7<strong>21</strong> 4,961 2,480 2,481 (132,760)<br />

W794 Chain of Lakes Sediment Removal Feasibility Stdy<br />

2,439 4,924 2,462 2,462 2,485<br />

W796 Chain of Lakes Water Quality Management Plan<br />

4,849 5,535 2,767 2,768 686<br />

W798 Winter Haven Downtown Watershed Imprv Plan<br />

0 62,733 31,366 31,367 62,733<br />

Total Surface Water Improvement & Management (SWIM) Projects $987,051 $726,414 $276,729 $449,685 ($260,637)<br />

Basin Initiatives<br />

B063 USGS Surface Wtr. Flow, Level, & W.Q. Data Coll $434,900 $0 $0 $0 ($434,900)<br />

B099 Quality of Water Improvement Program<br />

157,143 0 0 0 (157,143)<br />

B131 Hotel/Motel/Restaurant Water Conservation Prgm<br />

16,734 17,305 0 17,305 571<br />

B136 FL Auto Weather Network (FAWN) Data Diss & Edu<br />

6,250 0 0 0 (6,250)<br />

B163 Peace R. - Historical Land Cover Mapping<br />

56,415 1,977 0 1,977 (54,438)<br />

B198 Lake Jackson MFL Recovery Feasibility Study<br />

12,730 19,0<strong>21</strong> 0 19,0<strong>21</strong> 6,291<br />

B206 Maintenance of Watershed Parameters & Models<br />

185,783 0 0 0 (185,783)<br />

B<strong>21</strong>7 Ridge Lakes Stormwater Improvement<br />

<strong>10</strong>3,050 145,601 0 145,601 42,551<br />

B<strong>21</strong>9 Land Use/Cover Mapping<br />

39,032 0 0 0 (39,032)<br />

B226 Wtr Budget & Irrig Req for Mature Blueberries<br />

9,563 0 0 0 (9,563)<br />

B229 Field Eval of Bhiadwarf for Wtr Use Effic<br />

13,125 0 0 0 (13,125)<br />

B238 Crop Coefficients & Wtr Use for Peppers<br />

3,649 0 0 0 (3,649)<br />

B239 Deter Wtr Req For Genetically Alt Lantana Camara<br />

9,3<strong>10</strong> 0 0 0 (9,3<strong>10</strong>)<br />

B240 Redc Wtr Consmp in Poly-Mulched Tomato/Pepper<br />

5,500 0 0 0 (5,500)<br />

B241 Reduction of Wtr Use for Citrus Cold Prot<br />

4,000 0 0 0 (4,000)<br />

B242 Potential to Use ASR in Avon Park Formation<br />

926 0 0 0 (926)<br />

B243 Long-Term Wtr Budget Analysis of Lk Starr<br />

<strong>10</strong>4,859 0 0 0 (<strong>10</strong>4,859)<br />

B244 USGS - Hydrogeology & Qlty of GW in Highlands<br />

24,629 0 0 0 (24,629)<br />

B246 Wtr Conservation/FYN Reg Builder/Dev Specialist<br />

14,840 13,278 0 13,278 (1,562)<br />

B251 National Hydrography Database (NHD)<br />

4,702 0 0 0 (4,702)<br />

B256 Auto Citrus Irrigation Mgmt to Reduce Wtr Consmp<br />

38,500 0 0 0 (38,500)<br />

9


Southwest Florida Water Management District<br />

Peace River Basin<br />

Budget Comparison Report<br />

October 01, 2009<br />

Funded By Increase/<br />

Adopted Adopted Funded By Ad Valorem (Decrease)<br />

Budget Budget Outside Based<br />

From<br />

Projects<br />

FY2009 FY20<strong>10</strong> Revenue Budget FY2009<br />

B257 Reduc Nursery/Landscape Wtr Use Altering Nandina 7,000 0 0 0 (7,000)<br />

B260 Upper Peace River System - Freshwater MFLs<br />

250 0 0 0 (250)<br />

B263 Eval of Diff On-Farm Blueberry Sys Irrig Effic<br />

9,080 0 0 0 (9,080)<br />

B264 Irrig Mgmt to Cnsrv Wtr, Incr Tree Grwth & Prod<br />

28,<strong>10</strong>6 0 0 0 (28,<strong>10</strong>6)<br />

B265 Optimizing Irrig for Shade Tree Prod<br />

5,158 0 0 0 (5,158)<br />

B266 Incpt-Sprinkler Irrig Wtr Container Grown Plants<br />

7,471 0 0 0 (7,471)<br />

B268 Charlie Creek - Freshwater MFLs<br />

26,250 0 0 0 (26,250)<br />

B269 Horse Creek - Freshwater MFLs<br />

1,250 0 0 0 (1,250)<br />

B273 MFL Stream Diversion and Assessment Project<br />

9,375 0 0 0 (9,375)<br />

B276 Grants for Reclaimed Irrigation Projects (GRIP)<br />

1,609 0 0 0 (1,609)<br />

B277 Florida Water Star<br />

<strong>10</strong>,061 9,651 0 9,651 (4<strong>10</strong>)<br />

B301 Maint WS Para & Models - Charlotte Co (was B206)<br />

0 42,705 0 42,705 42,705<br />

B303 Maint WS Para & Models - DeSoto Co (was B206)<br />

0 6,497 0 6,497 6,497<br />

B304 Maint WS Para & Models - Hardee Co (was B206)<br />

0 6,136 0 6,136 6,136<br />

B306 Maint WS Para & Models - Highlands Co (was B206)<br />

0 14,807 0 14,807 14,807<br />

B314 Maint WS Para & Models - Polk Co (was B206)<br />

0 78,226 0 78,226 78,226<br />

B620 Mapping & GIS<br />

41,784 27,245 0 27,245 (14,539)<br />

B630 Field Operations<br />

265,197 145,889 0 145,889 (119,308)<br />

B670 Structure Operations<br />

<strong>21</strong>6,682 209,317 0 209,317 (7,365)<br />

G004 Aquatic Plant Management<br />

17,545 14,272 0 14,272 (3,273)<br />

P259 Youth Water Resources Education<br />

209,130 <strong>21</strong>5,064 0 <strong>21</strong>5,064 5,934<br />

P268 Public Education<br />

179,511 179,826 0 179,826 315<br />

Total Basin Initiatives $2,281,099 $1,146,817 $0 $1,146,817 ($1,134,282)<br />

Water Supply & Resource Development<br />

F032 Peace River Regional Reservoir Expansion<br />

$500,000 $600,777 $0 $600,777 $<strong>10</strong>0,777<br />

F033 Peace River Facility Expansion<br />

200,000 440,678 0 440,678 240,678<br />

H008 Lake Hancock Lake Level Modification<br />

169,794 836,759 0 836,759 666,965<br />

H009 Lake Hancock Outfall Structure P-11 Modif<br />

625,000 825 0 825 (624,175)<br />

H014 Lake Hancock Outfall Treatment System<br />

0 737,479 400,000 337,479 737,479<br />

H015 FARMS Back-Plugging Program<br />

<strong>21</strong>,389 23,067 0 23,067 1,678<br />

H017 Facilitating Agricultural Rsrc Mgmt Sys (FARMS)<br />

382,313 485,303 0 485,303 <strong>10</strong>2,990<br />

H024 Upper Peace River Resource Development<br />

63,863 65,111 0 65,111 1,248<br />

H027 Charlotte Co Regional Reclaimed Water Expansion 274,768 275,941 0 275,941 1,173<br />

H034 Peace Creek Canal Watershed<br />

342,081 257,596 0 257,596 (84,485)<br />

H048 Myakka Rvr Watershed Initiative<br />

62,626 4,919 0 4,919 (57,707)<br />

H051 PR/MRWSA - Reg Integ Loop Sys - Ph 2 Intct<br />

0 200,860 0 200,860 200,860<br />

H052 PR/MRWSA - Reg Integ Loop Sys - Ph 3 Intct<br />

1,191,295 2,612 0 2,612 (1,188,683)<br />

H060 Punta Gorda Shell Ck WTP Expans to <strong>10</strong> mgd<br />

648 0 0 0 (648)<br />

H062 CF Industries Aquifer Recharge & Recovery<br />

<strong>10</strong>3,752 1,048 0 1,048 (<strong>10</strong>2,704)<br />

H063 PR/MRWSA Reg Rsrc Dev Feasibility Std<br />

1,118 0 0 0 (1,118)<br />

H069 PR/MRWSA Reg Loop System Ph 1A<br />

677,590 2,009 0 2,009 (675,581)<br />

H072 Polk County Comprehensive Water Supply Plan<br />

7,062 6,270 0 6,270 (792)<br />

<strong>10</strong>


Southwest Florida Water Management District<br />

Peace River Basin<br />

Budget Comparison Report<br />

October 01, 2009<br />

Funded By Increase/<br />

Adopted Adopted Funded By Ad Valorem (Decrease)<br />

Budget Budget Outside Based<br />

From<br />

Projects<br />

FY2009 FY20<strong>10</strong> Revenue Budget FY2009<br />

H073 Polk SWRUSA Carter Rd 1 Billion Gallon Rclm Strg 138,532 0 0 0 (138,532)<br />

H076 Regional Reclaimed Water Partnership Initiative<br />

528,269 608,260 0 608,260 79,991<br />

H079 PR/MRWSA Regional Rsc Dev Ph 1<br />

84,643 2,553 0 2,553 (82,090)<br />

H080 Polk Central Florida Wtr Resource Dev Prj<br />

2,506,875 0 0 0 (2,506,875)<br />

H084 Arcadia-DeSoto Interconnect (REDI) (was N145)<br />

0 57,098 0 57,098 57,098<br />

H085 Charlotte Co Reg Rclm Water Exp Ph 2 (was N154)<br />

0 201,395 0 201,395 201,395<br />

H087 Punta Gorda Reverse Osmosis Fac<br />

0 272,607 0 272,607 272,607<br />

H088 Dona Bay Water Supply Dev & Mgmt Proj<br />

0 4,944 0 4,944 4,944<br />

H090 Polk Co NERUSA Holly Hill Rclm Wtr Strg, Pmp&LFA<br />

0 304,014 0 304,014 304,014<br />

H091 Polk Co SWRUSA Rclm Wtr Connection to TECO<br />

0 138,450 0 138,450 138,450<br />

Total Water Supply & Resource Development $7,881,618 $5,530,575 $400,000 $5,130,575 ($2,351,043)<br />

Cooperative Funding<br />

K280 Charotte Co Imp. BMPs - Greater Port Charlotte<br />

$202,406 $202,420 $0 $202,420 $14<br />

K459 Charlotte Co SB Impl of BMPs - Punta Gorda Campus Watershed<br />

1,017 0 0 0 (1,017)<br />

K725 Polk Co FYN Polk County<br />

39,494 37,982 0 37,982 (1,512)<br />

L028 Englewood WD Lemon Bay High School Reuse Extension<br />

2,929 0 0 0 (2,929)<br />

L151 Sebring WMPlan Sebring<br />

3,194 2,204 0 2,204 (990)<br />

L152 Avon Park WMPlan Avon Park<br />

7,116 2,250 0 2,250 (4,866)<br />

L153 Lake Placid Lake Placid Reuse (REDI)<br />

1,299 8<strong>10</strong> 0 8<strong>10</strong> (489)<br />

L206 Char/Sara/Manatee FYN Builder/Dev Charlotte, Manatee, Sarasota<br />

20,005 0 0 0 (20,005)<br />

L<strong>21</strong>5 Charlotte Co BCC Rotunda ASR Well Conversion for Reuse Water<br />

<strong>21</strong>9,646 228,441 0 228,441 8,795<br />

L314 Highlands Co Highlands WMPlan Carter Creek (REDI)<br />

9,840 7,837 0 7,837 (2,003)<br />

L324 Lakeland Lakeland - Lk Parker Stormwater BMP Imp<br />

193,137 204,520 0 204,520 11,383<br />

L353 Frostproof/Polk Polk WMPlan Lakes Crooked, Clinch, and Reedy<br />

5,255 5,339 0 5,339 84<br />

L473 Highlands Co Highlands WMPlan Lake Placid (REDI)<br />

360,667 20,733 0 20,733 (339,934)<br />

L479 Lakeland Lk Hollingsworth Westside Stormwater Treatment<br />

191,848 1,752 0 1,752 (190,096)<br />

L485 Charlotte Co Charlotte Co Golf Course Reuse Storage<br />

1,299 0 0 0 (1,299)<br />

L486 Charlotte Co WMPlan Charlotte Harbor<br />

7,273 0 0 0 (7,273)<br />

L553 Dundee Reclaimed Water Use System Project<br />

542,039 203,8<strong>21</strong> 0 203,8<strong>21</strong> (338,<strong>21</strong>8)<br />

L633 DeSoto Co WMPlan Desoto County<br />

3,6<strong>21</strong> 4,278 0 4,278 657<br />

L640 Punta Gorda Punta Gorda Reuse Feasibility Study<br />

1,299 0 0 0 (1,299)<br />

L649 FDEP Hydrologic Rstr of Highlands Hammock SP<br />

3,560 0 0 0 (3,560)<br />

L671 Polk Co Aquifer Recharge to Relieve Flooding<br />

4,491 6,293 0 6,293 1,802<br />

L672 Polk Co WMPlan Polk County<br />

0 132,636 65,6<strong>10</strong> 67,026 132,636<br />

L673 Polk Co Imp. BMPs - Lk Belle & Tractor Lk<br />

2,594 2,625 0 2,625 31<br />

L674 Polk Co Imp. BMPs - Saddlebag Lake<br />

2,594 2,625 0 2,625 31<br />

L679 Hardee Co WMPlan Horse Creek<br />

3,6<strong>21</strong> 982 0 982 (2,639)<br />

L680 Polk Co WMPlan Bartow<br />

2,594 1,233 0 1,233 (1,361)<br />

L693 Child's Museum Water Exhibits-Glazer Childrens Museum of Tampa <strong>21</strong>,302 777 0 777 (20,525)<br />

L770 Lakeland Lk Gibson Stormwater Mgmt System Retrofit<br />

192,526 206,055 0 206,055 13,529<br />

L856 Charlotte Co Charlotte Co Toilet Rebate Program<br />

1,718 1,802 0 1,802 84<br />

L897 Highlands Co Lake Clay Stormwater Retrofit (REDI)<br />

7,383 22,230 0 22,230 14,847<br />

11


Southwest Florida Water Management District<br />

Peace River Basin<br />

Budget Comparison Report<br />

October 01, 2009<br />

Funded By Increase/<br />

Adopted Adopted Funded By Ad Valorem (Decrease)<br />

Budget Budget Outside Based<br />

From<br />

Projects<br />

FY2009 FY20<strong>10</strong> Revenue Budget FY2009<br />

L900 LE/AD LE/AD Polk County Watershed Education<br />

11,312 9,065 0 9,065 (2,247)<br />

L902 Lake Wales Imp. BMPs Twin Lakes<br />

153,224 3,264 0 3,264 (149,960)<br />

L912 Dundee Lower Floridan Aquif Reuse Sppl Well Feas (REDI)<br />

6,073 0 0 0 (6,073)<br />

L914 Lakeland Plumbing Retrofit Project<br />

1,162 631 0 631 (531)<br />

L915 Lakeland Pre-Rinse Spray Valve Retrofit<br />

1,114 635 0 635 (479)<br />

L917 Polk Co Lake Bathymetric Mapping<br />

1,795 8,403 0 8,403 6,608<br />

L918 Polk Co Lake Gwyn Surface Wtr Rstr & Flood Protection<br />

129,441 6,294 0 6,294 (123,147)<br />

N001 Auburndale Reclaimed Water Master Plan<br />

53,141 3,765 0 3,765 (49,376)<br />

N004 Polk Co Bldrs Polk IS Florida-Friendly<br />

18,330 0 0 0 (18,330)<br />

N013 Univ of FL Dev of Landscape Fertilizer BMPs - Phase 1<br />

4,962 0 0 0 (4,962)<br />

N014 FL Aquarium Florida Aquarium Watershed Edu Initiative<br />

1,807 1,885 0 1,885 78<br />

N024 Polk Co NWRUSA Rclm Wtr Storage & Pumping Station<br />

26,225 55,299 0 55,299 29,074<br />

N063 Winter Haven Chain of Lks Natural Resource Center Edu Prgm<br />

47,275 56,234 0 56,234 8,959<br />

N065 Haines City Southern Area Reuse Transmission Extension<br />

1,003,398 227,866 0 227,866 (775,532)<br />

N072 Haines City Lk Eva Wtr Qlty Improvement<br />

252,846 1,977 0 1,977 (250,869)<br />

N074 Winter Haven Winter Haven Toilet Rebate Proj<br />

55,684 0 0 0 (55,684)<br />

N075 Winter Haven Northern Reuse Srv Area Rclm Main Ext<br />

203,348 227,691 0 227,691 24,343<br />

N112 Lakeland Lakeland Plumbing Retrofit Prj<br />

0 52,441 0 52,441 52,441<br />

N113 Charlotte Co Charlotte Co Toilet Replacement<br />

0 59,451 0 59,451 59,451<br />

N122 Polk Co Imp. BMPs - Saddle Creek Watershed<br />

273,825 1,407 0 1,407 (272,418)<br />

N126 Charlotte Co Imp. BMPs at Charlotte Harbor Redevelopment Area 127,<strong>21</strong>7 3,273 0 3,273 (123,944)<br />

N147 Polk Co Garden Grove Pines Stormwater Retrofit<br />

0 201,893 0 201,893 201,893<br />

N150 Polk Co Polk Co Vertical Control Densification<br />

0 1<strong>21</strong>,949 60,000 61,949 1<strong>21</strong>,949<br />

N156 Polk Co Polk Co SWRUSA Carter Rd RW Main<br />

0 2,641 0 2,641 2,641<br />

N161 Polk Co Polk Co Rain Sensor Rebate<br />

0 23,182 0 23,182 23,182<br />

N162 Charlotte Co FYN Charlotte County<br />

0 29,085 0 29,085 29,085<br />

N165 Highlands Mobile Irrig Lab-Highlands Soil&Wtr Cnsv (REDI)<br />

0 <strong>10</strong>,036 0 <strong>10</strong>,036 <strong>10</strong>,036<br />

N<strong>21</strong>8 Englewood WD Englewood Reclaimed Wtr Supply Project<br />

0 65,000 0 65,000 65,000<br />

N2<strong>21</strong> Winter Haven Smart Controller Pilot Project<br />

0 25,241 0 25,241 25,241<br />

P727 Lake Wales Lake Wales Reuse Project<br />

4,368 2,958 0 2,958 (1,4<strong>10</strong>)<br />

Total Cooperative Funding $4,432,314 $2,501,<strong>21</strong>1 $125,6<strong>10</strong> $2,375,601 ($1,931,<strong>10</strong>3)<br />

$17,3<strong>10</strong>,392 $11,307,353 $1,337,991 $9,969,362 ($6,003,039)<br />

Total Appropriation Peace River Basin<br />

12


Southwest Florida Water Management District<br />

Peace River Basin<br />

Budget Comparison Report<br />

October 01, 2009<br />

Increase/<br />

(Decrease)<br />

From<br />

FY2009<br />

Funded By<br />

Ad Valorem<br />

Based<br />

Budget<br />

Funded By<br />

Outside<br />

Revenue<br />

Adopted<br />

Budget<br />

FY20<strong>10</strong><br />

Adopted<br />

Budget<br />

FY2009<br />

Projects<br />

Anticipated Revenues and Balances<br />

Ad Valorem Taxes $8,350,143 $7,314,826<br />

$0 $7,314,826 ($1,035,317)<br />

Balance from Prior Years 2,583,538 2,404,536<br />

0 2,404,536 (179,002)<br />

Charlotte Co - Coral Creek (W553) 0 71,500 71,500 0<br />

71,500<br />

Highlands Co - Lake Placid WMP (L473) 87,500 0<br />

0 0 (87,500)<br />

Polk Co - Maint of W/S Para & Models (B314) 12,433 0<br />

0 0 (12,433)<br />

Polk Co - Vertical Control Densification (N150) 0 60,000 60,000 0<br />

60,000<br />

Polk Co - WMPlan Polk County (L672) 0 65,6<strong>10</strong> 65,6<strong>10</strong> 0<br />

65,6<strong>10</strong><br />

Ecosystem Trust Fund - Myakka Rvr W/S Init 50,000 0<br />

0 0 (50,000)<br />

State Approp - WRAP - Prior Year Funds 4,186,625 0<br />

0 0 (4,186,625)<br />

Water Protection & Sust T.F. (Alternative Wtr) 837,500 0<br />

0 0 (837,500)<br />

WMLTF (SOR) - Prior Year Funds 802,653 535,652 535,652 0 (267,001)<br />

WMLTF (SWIM) - Prior Year Funds 0 205,229 205,229 0 205,229<br />

EPA 319 - Lake Hancock (H014) 0 400,000 400,000 0 400,000<br />

Interest on Investments 400,000 250,000<br />

0 250,000 (150,000)<br />

$17,3<strong>10</strong>,392 $11,307,353 $1,337,991 $9,969,362 ($6,003,039)<br />

Total Revenues<br />

Millage Rate .1827<br />

.1827<br />

Income Per <strong>10</strong>0th Mill $457,041 $400,374<br />

13


!.<br />

Lake Level Modification Acquisition Boundary<br />

Lands Acquired or Under Contract<br />

Easements Acquired or Under Contract<br />

IJ 542<br />

Proposed Easement Acquisition<br />

IJ 542<br />

Proposed Fee Acquisition<br />

Saddle<br />

IJ 655<br />

Creek<br />

OP 659<br />

IJ 33A<br />

Saddle Creek<br />

IJ 540<br />

Lake Lena Run<br />

!" 570<br />

Fox Hunt Dr<br />

Banana Creek<br />

./ 98<br />

Lake<br />

Hancock<br />

!.<br />

Highland City<br />

±<br />

./ 17<br />

GH 540A<br />

Phyllis Branch<br />

Peace Creek<br />

Saddle Creek<br />

Issued: 09/17/09<br />

L:\Mapping\Land_Acq\Projects\Lake_Hancock\Exhibits\Overall\Lake Hancock Acquisition Status 8_5x11.mxd


Southwest Florida Water Management District<br />

Manasota Basin<br />

Budget Progress Report<br />

Eleven Months Ended August 31, 2009<br />

Projects<br />

On-Going Activities<br />

Z0<strong>10</strong><br />

Z030<br />

Z050<br />

Z060<br />

Z090<br />

Z300<br />

Z500<br />

Z600<br />

Z700<br />

Total On-Going Activities<br />

Adopted<br />

FY2009<br />

Budget<br />

Prior Year<br />

Encumbrances<br />

Budget<br />

Transfers/<br />

Amendment<br />

Modified<br />

FY2009<br />

Budget<br />

Encumbered<br />

To Date<br />

Expended<br />

To Date<br />

Remaining<br />

Balance<br />

Board and Executive Services $24,555 $0 $0 $24,555 $0 $14,941 $9,614<br />

Planning<br />

14,269 0 0 14,269 0 <strong>10</strong>,276 3,993<br />

Information Resources<br />

6,237 0 0 6,237 0 8,712 (2,475)<br />

Communications<br />

34,769 0 0 34,769 0 26,251 8,518<br />

Community Affairs<br />

24,874 0 0 24,874 0 18,791 6,083<br />

Resource Data and Restoration<br />

32,080 0 0 32,080 0 28,303 3,777<br />

Resource Projects<br />

68,532 0 0 68,532 0 46,917 <strong>21</strong>,615<br />

Operations<br />

8,039 0 0 8,039 0<br />

0 8,039<br />

Land Resources<br />

14,231 0 0 14,231 0<br />

33 14,198<br />

$227,586 $0 $0 $227,586 $0 $154,224 $73,362<br />

Property Appraiser & Tax Collector Commissions<br />

Z9<strong>10</strong> Pr. App. & Tax Coll. Commissions $362,854 $0 $0 $362,854 $0 $319,120 $43,734<br />

Total Property Appraiser & Tax Collector Commissions<br />

$362,854 $0 $0 $362,854 $0 $319,120 $43,734<br />

Reserves<br />

Z930 Contingencies $650,000 $0 $0 $650,000 $0 $0 $650,000<br />

Total Reserves<br />

$650,000 $0 $0 $650,000 $0 $0 $650,000<br />

Save Our Rivers (SOR) Reimbursable Projects<br />

S005 Myakka River $171,464 $4,557 $0 $176,0<strong>21</strong> $48,332 $118,183 $9,506<br />

S019 Edward W. Chance Reserve (Lk Manatee Reserve) 195,589 97,871 (32,544) 260,916 75,520 209,270 (23,874)<br />

S024 Upper Myakka River Watershed 44,782 7,030 31,017 82,829 40,220 25,499 17,1<strong>10</strong><br />

S030 RV Griffin Reserve 1,481 0 0 1,481 0 364 1,117<br />

S031 Myakka Prairie 2,967 0 0 2,967 0 87 2,880<br />

S032 Little Manatee River 149,4<strong>21</strong> 0 942 150,363 3,849 75,088 71,426<br />

S041 Myakkahatachee Creek 65,461 0 0 65,461 64,000 1,681 (220)<br />

S042 Tampa Bay Estuarine Ecosystem 127,157 6,624 585 134,366 77,233 59,126 (1,993)<br />

S099 Save Our Rivers Administration 24,096 0 0 24,096 3,618 2,474 18,004<br />

SA05 Deer Prairie Creek 152,124 0 0 152,124 6,801 <strong>10</strong>9,890 35,433<br />

SA19 Lk Manatee Lower Watershed Upland Rstr 18,356 261,274 0 279,630 261,274 13,550 4,806<br />

SA31 Myakka State Forest Hydrologic Rstr (Ref D059) 337,431 295,925 0 633,356 295,925 6,802 330,629<br />

SA42 Terra Ceia Boat Ramp 0 75,000 0 75,000 75,000 0 0<br />

1


Southwest Florida Water Management District<br />

Manasota Basin<br />

Budget Progress Report<br />

Eleven Months Ended August 31, 2009<br />

Projects<br />

Adopted<br />

FY2009<br />

Budget<br />

Prior Year<br />

Encumbrances<br />

Budget<br />

Transfers/<br />

Amendment<br />

Modified<br />

FY2009<br />

Budget<br />

Encumbered<br />

To Date<br />

Expended<br />

To Date<br />

Remaining<br />

Balance<br />

SB19 Edward W. Chance Reserve Hydro Rstr (Ref D060) 1<strong>10</strong>,009 286,557 0 396,566 236,475 6,476 153,615<br />

SI99 Environmental Education Center 2,000,000 0 (2,000,000) 0 0 0 0<br />

Total Save Our Rivers (SOR) Reimbursable Projects<br />

$3,400,338 $1,034,838 $(2,000,000 ) $2,435,176 $1,188,247 $628,490 $618,439<br />

Surface Water Improvement & Management (SWIM) Projects<br />

W020 SWIM Plan Implementation - Tampa Bay $13,146 $20 $0 $13,166 $5,697 $7,469 $0<br />

W027 Tampa Bay Estuary Program 14,800 0 0 14,800 720 14,080 0<br />

W028 Bay Soundings 2,571 619 0 3,190 1,893 1,297 0<br />

W030 Tampa Bay Watch Field Trip Program 7,508 0 0 7,508 3,268 4,240 0<br />

W226 City of Anna Maria - Imp. BMPs 60,681 311,000 0 371,681 205,657 166,024 0<br />

W312 Tampa Bay Habitat Restoration 7,703 0 0 7,703 5,450 2,253 0<br />

W331 Biennial Seagrass Mapping 28,334 14,973 17,500 60,807 37,265 6,042 17,500<br />

W348 Terra Ceia Isles Habitat Restoration 6,927 579,402 0 586,329 572,306 14,023 0<br />

W364 Palmetto Estuary 4,408 0 0 4,408 4,260 148 0<br />

W393 Robinson Preserve Environmental Restoration 0 2 0 2 2 0 0<br />

W394 FELTS Preserve Restoration 9,275 0 0 9,275 8,423 852 0<br />

W437 North Port Water Enhancement Prgm 3,200 54,899 0 58,099 56,364 1,734 1<br />

W501 SWIM Plan Implementation - Charlotte Harbor 813 0 0 813 244 569 0<br />

W506 CHEC Charlotte Harbor/Lemon Bay SWIM WS Edu 3,689 968 0 4,657 3,637 1,020 0<br />

W5<strong>21</strong> Charlotte Harbor Water Quality Monitoring 5,949 3,<strong>21</strong>4 4,781 13,944 5,955 3,207 4,782<br />

W526 Charlotte Harbor National Estuary Program 15,008 41,250 0 56,258 25,756 30,502 0<br />

W528 Myakka Rvr Water Quality Monitoring 12,328 0 0 12,328 (8,756) <strong>21</strong>,084 0<br />

W547 WQ Peace&Myakka Basins,CH&Lemon Bay 4,640 2,859 0 7,499 4,974 2,526 (1)<br />

W552 Sarasota Co Pollutant Model Development 3,223 7,500 0 <strong>10</strong>,723 9,951 772 0<br />

W554 Annual Rpt on WQ Cond for Peace & Myakka Rvrs 361 0 0 361 <strong>21</strong>6 145 0<br />

W558 Venice Hatchett Creek Stormwater Facility 76,061 75,000 0 151,061 150,593 468 0<br />

W559 Assess 2008 Seagrass Maps - Char Hbr & Lemon Bay 5,402 0 0 5,402 948 4,454 0<br />

W601 SWIM Plan Implementation - Sarasota Bay 2,596 0 0 2,596 1,141 1,455 0<br />

W602 Neal Preserve Environmental Restoration 1,283 325,000 0 326,283 326,283 0 0<br />

W611 Sarasota Bay Spoil Island Restoration Prj <strong>21</strong>4,383 96,375 0 3<strong>10</strong>,758 3<strong>10</strong>,118 640 0<br />

W612 Sarasota Bay Estuary Program 70,343 0 0 70,343 2,522 67,8<strong>21</strong> 0<br />

W613 Sarasota Catfish Ck Stormwater Facility 140,714 1,137,500 0 1,278,<strong>21</strong>4 9<strong>21</strong>,<strong>10</strong>2 357,112 0<br />

W615 Sarasota County Tidal Creek Biological Index 1,187 0 0 1,187 1,117 70 0<br />

W616 Sarasota Bay Habitat Restoration 61,167 49,383 60,000 170,550 162,295 8,255 0<br />

2


Southwest Florida Water Management District<br />

Manasota Basin<br />

Budget Progress Report<br />

Eleven Months Ended August 31, 2009<br />

Projects<br />

Adopted<br />

FY2009<br />

Budget<br />

Prior Year<br />

Encumbrances<br />

Budget<br />

Transfers/<br />

Amendment<br />

Modified<br />

FY2009<br />

Budget<br />

Encumbered<br />

To Date<br />

Expended<br />

To Date<br />

Remaining<br />

Balance<br />

W617 Sarasota Imp. BMPs Coastal Basin Beach Road 123,961 243,750 1<strong>21</strong>,875 489,586 367,428 283 1<strong>21</strong>,875<br />

W618 Sarasota Imp. BMPs Hudson Bayou 3,042 2,500 0 5,542 2,870 2,672 0<br />

W619 Perico Preserve Environmental Rstr 228,142 0 0 228,142 227,919 223 0<br />

W620 Pelican Cove Stormwater Project 8,905 0 0 8,905 6,986 1,919 0<br />

W6<strong>21</strong> Little Sarasota Bay Wtr Qlty Mgmt Plan 29,8<strong>21</strong> 0 75,000 <strong>10</strong>4,8<strong>21</strong> 29,529 292 75,000<br />

W622 Sarasota Bay Water Quality Management Plan 29,8<strong>21</strong> 0 75,000 <strong>10</strong>4,8<strong>21</strong> 29,529 292 75,000<br />

Total Surface Water Improvement & Management (SWIM) Projects<br />

$1,201,392 $2,946,<strong>21</strong>4 $354,156 $4,501,762 $3,483,662 $723,943 $294,157<br />

Basin Initiatives<br />

B063 USGS Surface Wtr. Flow, Level, & W.Q. Data Coll 231,900 0 0 231,900 115,950 115,950 0<br />

B074 Manatee - WMPlan Braden River 207,136 156,645 0 363,781 244,183 117,532 2,066<br />

B082 Braden River - Establishment of MFLs 0 30,000 0 30,000 30,000 0 0<br />

B092 USGS - Flatford Swamp Surface Water Monitoring 160,805 0 0 160,805 79,050 79,460 2,295<br />

B099 Quality of Water Improvement Program 200,434 19,815 0 220,249 2,800 140,579 76,870<br />

B<strong>10</strong>6 Enhancing Irrig & Nutrient BMP 0 50,000 0 50,000 30,000 20,000 0<br />

B115 Myakka River and Cow Pen Slough MFL 0 4 0 4 4 0 0<br />

B131 Hotel/Motel/Restaurant Water Conservation Prgm 14,<strong>10</strong>5 450 0 14,555 450 8,759 5,346<br />

B136 FL Auto Weather Network (FAWN) Data Diss & Edu 6,250 4,844 0 11,094 6,719 4,375 0<br />

B139 Impact of Organic Amendments/Soil Wtr Retention 0 97,500 0 97,500 50,500 47,000 0<br />

B182 USGS MFL Data Collection 84,900 0 0 84,900 40,393 44,507 0<br />

B183 Sarasota Co Model Review 0 2 0 2 2 0 0<br />

B201 Tailwater Recovery 0 15,000 0 15,000 0 15,000 0<br />

B203 Cold/Chill Prot of Tropical Plants in Nursery 0 45,000 0 45,000 45,000 0 0<br />

B204 Manatee/Braden River - Estuary MFL 0 12,600 0 12,600 0 12,600 0<br />

B205 Manatee River - Freshwater MFL 0 31,685 0 31,685 31,685 0 0<br />

B206 Maintenance of Watershed Parameters & Models 161,892 228,046 0 389,938 153,688 135,573 <strong>10</strong>0,677<br />

B<strong>21</strong>9 Land Use/Cover Mapping 17,778 3,638 0 <strong>21</strong>,416 7,442 12,554 1,420<br />

B228 Eval & Demo of Soil Moisture Based on Irrig Cont 35,725 12,175 0 47,900 37,900 <strong>10</strong>,000 0<br />

B229 Field Eval of Bhiadwarf for Wtr Use Effic 13,125 9,667 0 22,792 3,458 19,333 1<br />

B238 Crop Coefficients & Wtr Use for Peppers 4,257 8,514 0 12,771 <strong>10</strong>,879 1,892 0<br />

B239 Deter Wtr Req For Genetically Alt Lantana Camara 7,315 3,272 0 <strong>10</strong>,587 6,611 3,976 0<br />

B240 Redc Wtr Consmp in Poly-Mulched Tomato/Pepper 11,000 11,440 0 22,440 22,440 0 0<br />

B241 Reduction of Wtr Use for Citrus Cold Prot 400 0 0 400 0 400 0<br />

B242 Potential to Use ASR in Avon Park Formation 926 8,353 0 9,279 5,838 2,580 861<br />

3


Southwest Florida Water Management District<br />

Manasota Basin<br />

Budget Progress Report<br />

Eleven Months Ended August 31, 2009<br />

Projects<br />

Adopted<br />

FY2009<br />

Budget<br />

Prior Year<br />

Encumbrances<br />

Budget<br />

Transfers/<br />

Amendment<br />

Modified<br />

FY2009<br />

Budget<br />

Encumbered<br />

To Date<br />

Expended<br />

To Date<br />

Remaining<br />

Balance<br />

B246 Wtr Conservation/FYN Reg Builder/Dev Specialist 13,336 4,844 0 18,180 7,751 9,360 1,069<br />

B251 National Hydrography Database (NHD) 2,045 0 0 2,045 2,045 0 0<br />

B256 Auto Citrus Irrigation Mgmt to Reduce Wtr Consmp 3,000 2,460 0 5,460 5,460 0 0<br />

B257 Reduc Nursery/Landscape Wtr Use Altering Nandina 5,500 3,4<strong>10</strong> 0 8,9<strong>10</strong> 5,500 3,4<strong>10</strong> 0<br />

B264 Irrig Mgmt to Cnsrv Wtr, Incr Tree Grwth & Prod 2,079 0 0 2,079 1,794 285 0<br />

B265 Optimizing Irrig for Shade Tree Prod 4,<strong>10</strong>3 0 0 4,<strong>10</strong>3 4,<strong>10</strong>3 0 0<br />

B266 Incpt-Sprinkler Irrig Wtr Container Grown Plants 5,945 0 0 5,945 4,732 1,<strong>21</strong>3 0<br />

B273 MFL Stream Diversion and Assessment Project 9,375 0 0 9,375 6,563 0 2,812<br />

B274 Salt Water Intrusion Monitoring Network 22,115 0 0 22,115 8,515 12,047 1,553<br />

B276 Grants for Reclaimed Irrigation Projects (GRIP) 501,540 0 0 501,540 0 207 501,333<br />

B277 Florida Water Star 9,061 0 0 9,061 2,234 5,356 1,471<br />

B620 Mapping & GIS 40,829 1,779 0 42,608 2,737 19,675 20,196<br />

B630 Field Operations 36,079 0 0 36,079 0 11,733 24,346<br />

P259 Youth Water Resources Education <strong>10</strong>0,493 75,668 0 176,161 43,068 66,185 66,908<br />

P268 Public Education 118,800 43,045 0 161,845 44,297 <strong>10</strong>5,228 12,320<br />

Total Basin Initiatives<br />

$2,032,248 $879,858 $0 $2,912,<strong>10</strong>6 $1,063,793 $1,026,769 $8<strong>21</strong>,544<br />

Water Supply & Resource Development<br />

F027 Natural Treatment of Storm & Waste Water Ph 2 0 451 0 451 451 0 0<br />

F032 Peace River Regional Reservoir Expansion 3,085,656 1,703,731 0 4,789,387 4,205,969 583,418 0<br />

F033 Peace River Facility Expansion 2,012,071 1,976,856 0 3,988,927 1,634,299 2,354,629 (1)<br />

H008 .<br />

Lake Hancock Lake Level Modification 66,756 445,226 0 511,982 380,115 87,175 44,692<br />

H009 .<br />

Lake Hancock Outfall Structure P-11 Modif 312,500 312,500 0 625,000 312,500 0 312,500<br />

H015 .<br />

FARMS Back-Plugging Program 8,034 11,940 0 19,974 11,940 0 8,034<br />

H017 .<br />

Facilitating Agricultural Rsrc Mgmt Sys (FARMS) 168,237 1,288,308 (206,129) 1,250,416 1,076,933 56,793 116,690<br />

H024 .<br />

Upper Peace River Resource Development 32,613 159,457 0 192,070 144,554 25,291 22,225<br />

H048 .<br />

Myakka Rvr Watershed Initiative 477,341 1,256,198 0 1,733,539 1,594,987 129,064 9,488<br />

H052 .<br />

PR/MRWSA - Reg Integ Loop Sys - Ph 3 Intct 3,061,943 1,405,250 0 4,467,193 4,286,825 179,691 677<br />

H058 .<br />

Sarasota Co Exploratory Wells of Inter Aquif Sys 0 25,637 0 25,637 25,637 0 0<br />

H059 .<br />

City of Bradenton Reservoir Expansion 503,414 125,000 0 628,414 625,000 1,425 1,989<br />

H060 .<br />

Punta Gorda Shell Ck WTP Expans to <strong>10</strong> mgd 648 175,173 0 175,8<strong>21</strong> 42,<strong>10</strong>1 133,142 578<br />

H062 .<br />

CF Industries Aquifer Recharge & Recovery 51,571 182,156 0 233,727 232,240 1,347 140<br />

H063 .<br />

PR/MRWSA Reg Rsrc Dev Feasibility Std 2,236 195,<strong>10</strong>7 0 197,343 40,043 160,922 (3,622)<br />

H069 .<br />

PR/MRWSA Reg Loop System Ph 1A 1,825,648 2,415,994 0 4,241,642 4,027,680 <strong>21</strong>4,707 (745)<br />

4


Southwest Florida Water Management District<br />

Manasota Basin<br />

Budget Progress Report<br />

Eleven Months Ended August 31, 2009<br />

Projects<br />

Adopted<br />

FY2009<br />

Budget<br />

Prior Year<br />

Encumbrances<br />

Budget<br />

Transfers/<br />

Amendment<br />

Modified<br />

FY2009<br />

Budget<br />

Encumbered<br />

To Date<br />

Expended<br />

To Date<br />

Remaining<br />

Balance<br />

H076 .<br />

Regional Reclaimed Water Partnership Initiative 32,701 0 0 32,701 0 0 32,701<br />

H079 .<br />

PR/MRWSA Regional Rsc Dev Ph 1 227,550 0 0 227,550 <strong>21</strong>9,000 38 8,512<br />

H<strong>10</strong>0 .<br />

Water Supply & Resource Development Reserves 0 5,233,869 0 5,233,869 5,233,869 0 0<br />

H511 FARMS - ESDA Inc. (Ref H017) 0 0 25,000 25,000 25,000 0 0<br />

H532 FARMS - CFI USA, Inc.Venus Grove (Ref H017) 0 0 <strong>10</strong>8,750 <strong>10</strong>8,750 <strong>10</strong>8,750 0 0<br />

H536 FARMS - Clay Gully Tree Farm 0 325,000 0 325,000 0 0 325,000<br />

H538 FARMS - FFD Land Company, Inc. 0 44,606 (44,605) 1 0 0 1<br />

H558 FARMS - WFA Land Co., Inc. 0 <strong>10</strong>0,584 0 <strong>10</strong>0,584 <strong>10</strong>0,584 0 0<br />

H565 FARMS - Sandy Beach Ranch 0 0 63,750 63,750 62,262 0 1,488<br />

H566 FARMS - Old Florida Investments, Inc 0 0 32,625 32,625 32,625 0 0<br />

H576 FARMS - WCB Properties, LLC 0 0 3,000 3,000 0 0 3,000<br />

H577 FARMS - Gemstone Grove, LLC 0 0 12,740 12,740 12,740 0 0<br />

H578 FARMS - Lakeshore Knolls, LLC 0 0 4,869 4,869 4,869 0 0<br />

Total Water Supply & Resource Development<br />

$11,868,919 $17,383,044 $0 $29,251,963 $24,440,974 $3,927,642 $883,347<br />

Cooperative Funding<br />

K114 Bradenton<br />

Bradenton ASR Program 12,271 420,451 0 432,722 420,451 4,117 8,154<br />

K120 North Port<br />

City of North Port Water ASR, Phase V 113,147 151,001 0 264,148 241,661 <strong>21</strong>,453 1,034<br />

K253 Manatee Co<br />

Imp. BMPs - Wares Creek 4,170 6,953,755 0 6,957,925 6,953,755 1,859 2,311<br />

K269 Sarasota Co<br />

North Sarasota County Reclaimed Water ASRs 3,661 1,649,289 0 1,652,950 1,649,289 0 3,661<br />

K883 North Port<br />

North Port WMPlan Big Slough 3,342 220,712 0 224,054 220,712 1,435 1,907<br />

L007 Manatee Co<br />

WMPlan Buffalo Canal/Frog Creek 7,175 38,609 0 45,784 38,609 6,271 904<br />

L0<strong>10</strong> Manatee Co<br />

WMPlan Gamble Creek 7,175 514,056 0 5<strong>21</strong>,231 352,908 173,350 (5,027)<br />

L015 Sarasota Co<br />

Sarasota County Surface Water Monitoring Program 63,463 22,481 0 85,944 19,730 63,175 3,039<br />

L019 Sarasota Co<br />

Sarasota Maint of Watershed Para & Models 2<strong>10</strong>,890 514,548 0 725,438 441,077 277,876 6,485<br />

L200 Bradenton<br />

Wares Creek Bridge Replacement 503,200 940,000 0 1,443,200 1,440,000 1,933 1,267<br />

L206 Char/Sara/Manatee FYN Builder/Dev Charlotte, Manatee, Sarasota 53,708 0 0 53,708 22,031 33,633 (1,956)<br />

L2<strong>10</strong> Sarasota Co<br />

Imp. BMPs - Phillippi Creek/Celery Fields 4,171 2,602,696 0 2,606,867 2,602,696 1,469 2,702<br />

L230 Longboat Key<br />

Backup Potable Water Supply Interconnect 4,629 689,391 0 694,020 689,391 6,280 (1,651)<br />

L238 SEC<br />

SEC Watershed Leadership & Education Program 62,070 <strong>21</strong>,800 0 83,870 34,000 48,960 9<strong>10</strong><br />

L498 Sarasota Co<br />

Sarasota County NEST Program 0 25,000 0 25,000 591 26,514 (2,<strong>10</strong>5)<br />

L500 Sarasota<br />

City of Sarasota Payne Park Reuse Project 0 39,789 (39,789) 0 0 0 0<br />

L505 North Port<br />

WMPlan Charlotte Hbr/Myakka Rvr/Coastal Areas 0 0 0 0 0 90 (90)<br />

L506 North Port<br />

North Port Water Conservation and Retrofit Prg 645 1 0 646 1 275 370<br />

5


Southwest Florida Water Management District<br />

Manasota Basin<br />

Budget Progress Report<br />

Eleven Months Ended August 31, 2009<br />

Projects<br />

Adopted<br />

FY2009<br />

Budget<br />

Prior Year<br />

Encumbrances<br />

Budget<br />

Transfers/<br />

Amendment<br />

Modified<br />

FY2009<br />

Budget<br />

Encumbered<br />

To Date<br />

Expended<br />

To Date<br />

Remaining<br />

Balance<br />

L509 Manatee Co<br />

Rain Sensor Installation Project 1,670 6,125 0 7,795 6,125 88 1,582<br />

L5<strong>10</strong> Manatee Co<br />

FYN Manatee County 51,622 0 0 51,622 37,500 14,045 77<br />

L512 Manatee Co<br />

Shallow Well Rebate Program 3,661 16,500 0 20,161 14,500 2,682 2,979<br />

L518 Univ of FL<br />

Char Nitrogen Fertilizer Usage & Leaching 0 3,500 0 3,500 500 3,000 0<br />

L520 Around the Bend<br />

Around the Bend Nature Tours Manatee/Sarasota 28,930 0 0 28,930 0 27,960 970<br />

L601 Manatee Co<br />

Indoor Water Conservation Prj 1,670 668 0 2,338 668 858 812<br />

L604 Manatee Co<br />

WMPlan Little Manatee River 8,<strong>21</strong>6 357,402 0 365,618 357,402 157 8,059<br />

L608 Palmetto<br />

Palmetto Reclaimed Water ASR 3,661 648,070 0 651,731 645,288 4,807 1,636<br />

L6<strong>10</strong> Sarasota Co<br />

Watershed Plan: Lemon Bay 8,901 <strong>21</strong>7,801 0 226,702 127,3<strong>21</strong> 99,451 (70)<br />

L611 Sarasota Co<br />

Watershed Plan: Roberts Bay 8,901 208,185 0 <strong>21</strong>7,086 155,687 60,814 585<br />

L613 Sarasota Co<br />

Imp. BMPs South Pelican Drive 3,311 200,000 0 203,311 200,000 413 2,898<br />

L614 Sarasota Co<br />

Imp. BMPs Matheny Creek 3,476 425,000 0 428,476 425,000 362 3,114<br />

L615 Sarasota Co<br />

Imp. BMPs Alligator Creek 3,476 1,125,000 0 1,128,476 1,125,000 697 2,779<br />

L617 Sarasota Co<br />

NAVD88 Control Densification 959 0 0 959 0 0 959<br />

L618 Sarasota Co<br />

Watershed Management Plan: Coastal Fringe 4,718 415,270 0 419,988 355,151 62,775 2,062<br />

L623 Venice<br />

Imp. BMPs Hatchett Ck-Eastgate 4,780 50,000 0 54,780 0 (5,000) 59,780<br />

L624 Venice<br />

Imp. BMPs Hatchett Ck-Venice Ave 6,490 130,443 0 136,933 130,443 434 6,056<br />

L627 North Port<br />

Water Conservation and Retrofit Prj 1,934 16,297 0 18,231 16,297 60 1,874<br />

L652 Englewood WD<br />

Englewood Reuse Transmission - Stillwater 0 3,752 (3,752) 0 0 0 0<br />

L693 Child's Museum<br />

Water Exhibits-Glazer Childrens Museum of Tampa 25,999 25,247 0 51,246 25,247 495 25,504<br />

L854 Bradenton<br />

Bradenton/Manatee Co/Palmetto Reuse Intct Stdy 3,661 19,667 0 23,328 19,667 3,274 387<br />

L867 Sarasota Co<br />

GIS Dataset Development <strong>10</strong>1,420 19,170 0 120,590 <strong>10</strong>0,000 19,853 737<br />

L868 Sarasota Co<br />

NAVD 1988 Vertical Control Densif (3rd Order) 0 <strong>10</strong>0,000 0 <strong>10</strong>0,000 <strong>10</strong>0,000 265 (265)<br />

L869 Englewood WD<br />

Englewood Reuse Transmission - Park Forest 1,465 <strong>10</strong>0,900 0 <strong>10</strong>2,365 41,374 60,573 418<br />

L874 Aqua Util<br />

Aqua Util Reuse Trans - Eastern Lakewood Ranch 822,335 781,350 0 1,603,685 1,599,850 3,933 (98)<br />

L879 Manatee Co<br />

SW Wastewater Rclm Fac ASR Monitoring Well Sys 6,057 0 0 6,057 0 0 6,057<br />

L949 Manatee Co<br />

Manatee Co Water Conservation Program 1,718 36,004 0 37,722 1,304 36,833 (415)<br />

N013 Univ of FL<br />

Dev of Landscape Fertilizer BMPs - Phase 1 4,962 0 0 4,962 4,962 0 0<br />

N014 FL Aquarium<br />

Florida Aquarium Watershed Edu Initiative 1,807 0 0 1,807 1,055 1,157 (405)<br />

N046 Great Explorations Great Explorations Water Planet Pinellas Co 2,452 0 0 2,452 0 0 2,452<br />

N081 North Port<br />

North Port Brackish Groundwater Explor 372,959 0 0 372,959 0 8,847 364,112<br />

N082 North Port<br />

Myakkahatchee Ck Wtr Treatment Plant Reliability 901,943 0 0 901,943 900,000 7,418 (5,475)<br />

N084 North Port<br />

Reuse Strg Tank & High Service Pump Station <strong>10</strong>1,250 0 0 <strong>10</strong>1,250 <strong>10</strong>1,250 4,028 (4,028)<br />

6


Southwest Florida Water Management District<br />

Manasota Basin<br />

Budget Progress Report<br />

Eleven Months Ended August 31, 2009<br />

Projects<br />

Adopted<br />

FY2009<br />

Budget<br />

Prior Year<br />

Encumbrances<br />

Budget<br />

Transfers/<br />

Amendment<br />

Modified<br />

FY2009<br />

Budget<br />

Encumbered<br />

To Date<br />

Expended<br />

To Date<br />

Remaining<br />

Balance<br />

N086 Venice<br />

Plumbing Rebate & Retrofit 50,298 0 0 50,298 47,000 538 2,760<br />

N087 Bradenton<br />

Palmetto Reuse Interconnect 168,661 0 0 168,661 0 72 168,589<br />

N088 Bradenton<br />

MARS Reuse Interconnection Proj 178,786 0 0 178,786 0 72 178,714<br />

N<strong>10</strong>5 Gulf Coast Strg Inv The Bridges - Stormwater Reuse 119,474 0 43,541 163,015 156,041 1,903 5,071<br />

N<strong>10</strong>7 Braden Rvr Util<br />

Braden River Soil Moisture Sensor Pilot Proj <strong>10</strong>0,125 0 0 <strong>10</strong>0,125 0 0 <strong>10</strong>0,125<br />

N115 Manatee Co<br />

Indoor Water Conservation Retrofit Program 64,792 0 0 64,792 63,072 36 1,684<br />

Total Cooperative Funding<br />

Total Manasota Basin<br />

$4,230,257 $19,709,931 $0 $23,940,188 $<strong>21</strong>,884,607 $1,091,590 $963,991<br />

$23,973,594 $41,953,880<br />

7<br />

$(1,645,844 ) $64,281,630 $52,061,283 $7,871,778 $4,348,569


Southwest Florida Water Management District<br />

Manasota Basin<br />

Budget Comparison Report<br />

October 01, 2009<br />

Projects<br />

Adopted<br />

Budget<br />

FY2009<br />

Adopted<br />

Budget<br />

FY20<strong>10</strong><br />

Funded By<br />

Outside<br />

Revenue<br />

Funded By<br />

Ad Valorem<br />

Based<br />

Budget<br />

Increase/<br />

(Decrease)<br />

From<br />

FY2009<br />

On-Going Activities<br />

Z0<strong>10</strong> Board and Executive Services<br />

$24,555 $24,400 $0 $24,400 ($155)<br />

Z030 Planning<br />

14,269 14,481 0 14,481 <strong>21</strong>2<br />

Z050 Information Resources<br />

6,237 5,8<strong>21</strong> 0 5,8<strong>21</strong> (416)<br />

Z060 Communications<br />

34,769 39,068 0 39,068 4,299<br />

Z090 Community Affairs<br />

24,874 25,844 0 25,844 970<br />

Z300 Resource Data & Restoration<br />

32,080 26,182 0 26,182 (5,898)<br />

Z500 Resource Projects<br />

68,532 76,164 0 76,164 7,632<br />

Z600 Operations<br />

8,039 8,116 0 8,116 77<br />

Z700 Land Resources<br />

14,231 11,365 0 11,365 (2,866)<br />

Total On-Going Activities $227,586 $231,441 $0 $231,441<br />

$3,855<br />

Property Appraiser & Tax Collector Commissions<br />

Z9<strong>10</strong> Pr. App. & Tax Coll. Commissions<br />

$362,854 $322,940 $0 $322,940 ($39,914)<br />

Total Property Appraiser & Tax Collector Commissions $362,854 $322,940 $0 $322,940 ($39,914)<br />

Reserves<br />

Z930 Contingencies<br />

$650,000 $600,000 $0 $600,000 ($50,000)<br />

Total Reserves $650,000 $600,000 $0 $600,000 ($50,000)<br />

Save Our Rivers (SOR) Reimbursable Projects<br />

S005 Myakka River<br />

$171,464 $<strong>10</strong>6,835 $<strong>10</strong>6,835 $0 ($64,629)<br />

S019 Edward W. Chance Reserve (Lk Manatee Reserve) 195,589 155,591 155,591 0 (39,998)<br />

S024 Upper Myakka River Watershed<br />

44,782 40,577 40,577 0 (4,205)<br />

S030 RV Griffin Reserve<br />

1,481 1,535 1,535 0 54<br />

S031 Myakka Prairie<br />

2,967 3,396 3,396 0 429<br />

S032 Little Manatee River<br />

149,4<strong>21</strong> 95,995 95,995 0 (53,426)<br />

S041 Myakkahatachee Creek<br />

65,461 37,266 37,266 0 (28,195)<br />

S042 Tampa Bay Estuarine Ecosystem<br />

127,157 18,195 18,195 0 (<strong>10</strong>8,962)<br />

S099 Save Our Rivers Administration<br />

24,096 7,549 7,549 0 (16,547)<br />

SA05 Deer Prairie Creek<br />

152,124 132,468 132,468 0 (19,656)<br />

SA19 Lk Manatee Lower Watershed Upland Rstr<br />

18,356 18,385 18,385 0 29<br />

SA31 Myakka State Forest Hydrologic Rstr (Ref D059)<br />

337,431 0 0 0 (337,431)<br />

SB19 Edward W. Chance Reserve Hydro Rstr (Ref D060) 1<strong>10</strong>,009 0 0 0 (1<strong>10</strong>,009)<br />

SI99 Environmental Education Center<br />

2,000,000 0 0 0 (2,000,000)<br />

Total Save Our Rivers (SOR) Reimbursable Projects $3,400,338 $617,792 $617,792<br />

$0 ($2,782,546)<br />

Surface Water Improvement & Management (SWIM) Projects<br />

W020 SWIM Plan Implementation - Tampa Bay<br />

$13,146 $33,896 $<strong>10</strong>,698 $23,198 $20,750<br />

W027 Tampa Bay Estuary Program<br />

14,800 38,409 1,912 36,497 23,609<br />

W028 Bay Soundings<br />

2,571 4,950 0 4,950 2,379<br />

W030 Tampa Bay Watch Field Trip Program<br />

7,508 14,785 0 14,785 7,277<br />

W226 City of Anna Maria - Imp. BMPs<br />

60,681 4,623 2,311 2,312 (56,058)<br />

8


Southwest Florida Water Management District<br />

Manasota Basin<br />

Budget Comparison Report<br />

October 01, 2009<br />

Projects<br />

Adopted<br />

Budget<br />

FY2009<br />

Adopted<br />

Budget<br />

FY20<strong>10</strong><br />

Funded By<br />

Outside<br />

Revenue<br />

Funded By<br />

Ad Valorem<br />

Based<br />

Budget<br />

Increase/<br />

(Decrease)<br />

From<br />

FY2009<br />

W312 Tampa Bay Habitat Restoration<br />

7,703 20,007 3,753 16,254 12,304<br />

W331 Biennial Seagrass Mapping<br />

28,334 22,508 2,504 20,004 (5,826)<br />

W348 Terra Ceia Isles Habitat Restoration<br />

6,927 20,538 <strong>10</strong>,269 <strong>10</strong>,269 13,611<br />

W358 Tom Bennett Park Habitat Restoration<br />

0 63,770 31,885 31,885 63,770<br />

W364 Palmetto Estuary<br />

4,408 4,330 2,165 2,165 (78)<br />

W394 FELTS Preserve Restoration<br />

9,275 <strong>10</strong>,770 885 9,885 1,495<br />

W437 North Port Water Enhancement Prgm<br />

3,200 0 0 0 (3,200)<br />

W501 SWIM Plan Implementation - Charlotte Harbor<br />

813 1,551 775 776 738<br />

W506 CHEC Charlotte Harbor/Lemon Bay SWIM WS Edu<br />

3,689 8,177 4,088 4,089 4,488<br />

W509 Alligator Creek In-stream Restoration<br />

0 157,427 78,713 78,714 157,427<br />

W5<strong>21</strong> Charlotte Harbor Water Quality Monitoring<br />

5,949 <strong>10</strong>,676 1,697 8,979 4,727<br />

W526 Charlotte Harbor National Estuary Program<br />

15,008 32,330 16,165 16,165 17,322<br />

W528 Myakka Rvr Water Quality Monitoring<br />

12,328 51,506 25,753 25,753 39,178<br />

W547 WQ Peace&Myakka Basins,CH&Lemon Bay<br />

4,640 0 0 0 (4,640)<br />

W552 Sarasota Co Pollutant Model Development<br />

3,223 0 0 0 (3,223)<br />

W554 Annual Rpt on WQ Cond for Peace & Myakka Rvrs<br />

361 0 0 0 (361)<br />

W558 Venice Hatchett Creek Stormwater Facility<br />

76,061 2,090 1,045 1,045 (73,971)<br />

W559 Assess 2008 Seagrass Maps - Char Hbr & Lemon Ba 5,402 1,418 709 709 (3,984)<br />

W601 SWIM Plan Implementation - Sarasota Bay<br />

2,596 8,494 4,247 4,247 5,898<br />

W602 Neal Preserve Environmental Restoration<br />

1,283 2,690 1,345 1,345 1,407<br />

W603 Ungarelli Preserve Habitat Restoration<br />

0 53,770 26,885 26,885 53,770<br />

W604 Phillippi Creek In-stream Restoration<br />

0 155,989 77,994 77,995 155,989<br />

W611 Sarasota Bay Spoil Island Restoration Prj<br />

<strong>21</strong>4,383 1,912 956 956 (<strong>21</strong>2,471)<br />

W612 Sarasota Bay Estuary Program<br />

70,343 140,787 70,393 70,394 70,444<br />

W613 Sarasota Catfish Ck Stormwater Facility<br />

140,714 5,468 2,734 2,734 (135,246)<br />

W615 Sarasota County Tidal Creek Biological Index<br />

1,187 0 0 0 (1,187)<br />

W616 Sarasota Bay Habitat Restoration<br />

61,167 63,280 1,640 61,640 2,113<br />

W617 Sarasota Imp. BMPs Coastal Basin Beach Road<br />

123,961 126,642 2,383 124,259 2,681<br />

W618 Sarasota Imp. BMPs Hudson Bayou<br />

3,042 0 0 0 (3,042)<br />

W619 Perico Preserve Environmental Rstr<br />

228,142 1,912 956 956 (226,230)<br />

W620 Pelican Cove Stormwater Project<br />

8,905 2,099 1,049 1,050 (6,806)<br />

W6<strong>21</strong> Little Sarasota Bay Wtr Qlty Mgmt Plan<br />

29,8<strong>21</strong> 86,948 5,974 80,974 57,127<br />

W622 Sarasota Bay Water Quality Management Plan<br />

29,8<strong>21</strong> 86,948 5,974 80,974 57,127<br />

W623 Holmes Beach Stormwater Retrofit<br />

0 86,997 43,498 43,499 86,997<br />

W624 Red Bug Slough Restoration<br />

0 404,767 202,383 202,384 404,767<br />

W625 Runaway Bay - Shoreline Restoration<br />

0 43,032 <strong>21</strong>,516 <strong>21</strong>,516 43,032<br />

W626 Blackburn Point Park Addition Project<br />

0 <strong>10</strong>5,989 52,994 52,995 <strong>10</strong>5,989<br />

W627 Bradenton Beach Stormwater Retrofits<br />

0 <strong>10</strong>4,897 52,448 52,449 <strong>10</strong>4,897<br />

Total Surface Water Improvement & Management (SWIM) Projects $1,201,392 $1,986,382 $770,696 $1,<strong>21</strong>5,686 $784,990<br />

Basin Initiatives<br />

B063 USGS Surface Wtr. Flow, Level, & W.Q. Data Coll $231,900 $0 $0 $0 ($231,900)<br />

B074 Manatee - WMPlan Braden River<br />

207,136 <strong>10</strong>,136 0 <strong>10</strong>,136 (197,000)<br />

9


Southwest Florida Water Management District<br />

Manasota Basin<br />

Budget Comparison Report<br />

October 01, 2009<br />

Projects<br />

Adopted<br />

Budget<br />

FY2009<br />

Adopted<br />

Budget<br />

FY20<strong>10</strong><br />

Funded By<br />

Outside<br />

Revenue<br />

Funded By<br />

Ad Valorem<br />

Based<br />

Budget<br />

Increase/<br />

(Decrease)<br />

From<br />

FY2009<br />

B092 USGS - Flatford Swamp Surface Water Monitoring 160,805 0 0 0 (160,805)<br />

B099 Quality of Water Improvement Program<br />

200,434 <strong>10</strong>,000 0 <strong>10</strong>,000 (190,434)<br />

B131 Hotel/Motel/Restaurant Water Conservation Prgm<br />

14,<strong>10</strong>5 14,855 0 14,855 750<br />

B136 FL Auto Weather Network (FAWN) Data Diss & Edu<br />

6,250 0 0 0 (6,250)<br />

B182 USGS MFL Data Collection<br />

84,900 0 0 0 (84,900)<br />

B206 Maintenance of Watershed Parameters & Models<br />

161,892 0 0 0 (161,892)<br />

B<strong>21</strong>9 Land Use/Cover Mapping<br />

17,778 0 0 0 (17,778)<br />

B228 Eval & Demo of Soil Moisture Based on Irrig Cont<br />

35,725 0 0 0 (35,725)<br />

B229 Field Eval of Bhiadwarf for Wtr Use Effic<br />

13,125 0 0 0 (13,125)<br />

B238 Crop Coefficients & Wtr Use for Peppers<br />

4,257 0 0 0 (4,257)<br />

B239 Deter Wtr Req For Genetically Alt Lantana Camara<br />

7,315 0 0 0 (7,315)<br />

B240 Redc Wtr Consmp in Poly-Mulched Tomato/Pepper<br />

11,000 0 0 0 (11,000)<br />

B241 Reduction of Wtr Use for Citrus Cold Prot<br />

400 0 0 0 (400)<br />

B242 Potential to Use ASR in Avon Park Formation<br />

926 0 0 0 (926)<br />

B246 Wtr Conservation/FYN Reg Builder/Dev Specialist<br />

13,336 13,266 0 13,266 (70)<br />

B251 National Hydrography Database (NHD)<br />

2,045 0 0 0 (2,045)<br />

B256 Auto Citrus Irrigation Mgmt to Reduce Wtr Consmp<br />

3,000 0 0 0 (3,000)<br />

B257 Reduc Nursery/Landscape Wtr Use Altering Nandina 5,500 0 0 0 (5,500)<br />

B264 Irrig Mgmt to Cnsrv Wtr, Incr Tree Grwth & Prod<br />

2,079 0 0 0 (2,079)<br />

B265 Optimizing Irrig for Shade Tree Prod<br />

4,<strong>10</strong>3 0 0 0 (4,<strong>10</strong>3)<br />

B266 Incpt-Sprinkler Irrig Wtr Container Grown Plants<br />

5,945 0 0 0 (5,945)<br />

B273 MFL Stream Diversion and Assessment Project<br />

9,375 0 0 0 (9,375)<br />

B274 Salt Water Intrusion Monitoring Network<br />

22,115 17,389 0 17,389 (4,726)<br />

B276 Grants for Reclaimed Irrigation Projects (GRIP)<br />

501,540 0 0 0 (501,540)<br />

B277 Florida Water Star<br />

9,061 8,870 0 8,870 (191)<br />

B3<strong>10</strong> Maint WS Para & Models - Manatee Co (was B206)<br />

0 67,635 0 67,635 67,635<br />

B315 Maint WS Para & Models - Sarasota Co (was B206)<br />

0 69,356 0 69,356 69,356<br />

B620 Mapping & GIS<br />

40,829 31,785 0 31,785 (9,044)<br />

B630 Field Operations<br />

36,079 39,785 0 39,785 3,706<br />

P259 Youth Water Resources Education<br />

<strong>10</strong>0,493 <strong>10</strong>2,236 0 <strong>10</strong>2,236 1,743<br />

P268 Public Education<br />

118,800 124,<strong>21</strong>5 0 124,<strong>21</strong>5 5,415<br />

Total Basin Initiatives $2,032,248 $509,528 $0 $509,528 ($1,522,720)<br />

Water Supply & Resource Development<br />

F032 Peace River Regional Reservoir Expansion<br />

$3,085,656 $43,917 $0 $43,917 ($3,041,739)<br />

F033 Peace River Facility Expansion<br />

2,012,071 1,724,890 0 1,724,890 (287,181)<br />

H008 Lake Hancock Lake Level Modification<br />

66,756 379,313 0 379,313 312,557<br />

H009 Lake Hancock Outfall Structure P-11 Modif<br />

312,500 825 0 825 (311,675)<br />

H015 FARMS Back-Plugging Program<br />

8,034 11,455 0 11,455 3,4<strong>21</strong><br />

H017 Facilitating Agricultural Rsrc Mgmt Sys (FARMS)<br />

168,237 65,167 0 65,167 (<strong>10</strong>3,070)<br />

H024 Upper Peace River Resource Development<br />

32,613 34,161 0 34,161 1,548<br />

H048 Myakka Rvr Watershed Initiative<br />

477,341 32,184 0 32,184 (445,157)<br />

H051 PR/MRWSA - Reg Integ Loop Sys - Ph 2 Intct<br />

0 501,913 0 501,913 501,913<br />

<strong>10</strong>


Southwest Florida Water Management District<br />

Manasota Basin<br />

Budget Comparison Report<br />

October 01, 2009<br />

Projects<br />

Adopted<br />

Budget<br />

FY2009<br />

Adopted<br />

Budget<br />

FY20<strong>10</strong><br />

Funded By<br />

Outside<br />

Revenue<br />

Funded By<br />

Ad Valorem<br />

Based<br />

Budget<br />

Increase/<br />

(Decrease)<br />

From<br />

FY2009<br />

H052 PR/MRWSA - Reg Integ Loop Sys - Ph 3 Intct<br />

3,061,943 2,123,<strong>21</strong>7 0 2,123,<strong>21</strong>7 (938,726)<br />

H059 City of Bradenton Reservoir Expansion<br />

503,414 1,006,944 0 1,006,944 503,530<br />

H060 Punta Gorda Shell Ck WTP Expans to <strong>10</strong> mgd<br />

648 0 0 0 (648)<br />

H062 CF Industries Aquifer Recharge & Recovery<br />

51,571 1,048 0 1,048 (50,523)<br />

H063 PR/MRWSA Reg Rsrc Dev Feasibility Std<br />

2,236 0 0 0 (2,236)<br />

H069 PR/MRWSA Reg Loop System Ph 1A<br />

1,825,648 4,238 0 4,238 (1,8<strong>21</strong>,4<strong>10</strong>)<br />

H076 Regional Reclaimed Water Partnership Initiative<br />

32,701 0 0 0 (32,701)<br />

H079 PR/MRWSA Regional Rsc Dev Ph 1<br />

227,550 4,046 0 4,046 (223,504)<br />

H086 Manatee Co Reg <strong>10</strong> MG RW Storage Tank<br />

0 1,126,563 0 1,126,563 1,126,563<br />

H087 Punta Gorda Reverse Osmosis Fac<br />

0 503,763 0 503,763 503,763<br />

H088 Dona Bay Water Supply Dev & Mgmt Proj<br />

0 259,593 0 259,593 259,593<br />

H089 Flatford Swamp Hydrologic Rstr/Implementation<br />

0 477,312 0 477,312 477,312<br />

Total Water Supply & Resource Development $11,868,919 $8,300,549 $0 $8,300,549 ($3,568,370)<br />

Cooperative Funding<br />

K114 Bradenton Bradenton ASR Program<br />

$12,271 $6,304 $0 $6,304 ($5,967)<br />

K120 North Port City of North Port Water ASR, Phase V<br />

113,147 65,402 0 65,402 (47,745)<br />

K253 Manatee Co Imp. BMPs - Wares Creek<br />

4,170 3,198 0 3,198 (972)<br />

K269 Sarasota Co North Sarasota County Reclaimed Water ASRs<br />

3,661 3,820 0 3,820 159<br />

K883 North Port North Port WMPlan Big Slough<br />

3,342 2,314 0 2,314 (1,028)<br />

L007 Manatee Co WMPlan Buffalo Canal/Frog Creek<br />

7,175 <strong>10</strong>,174 0 <strong>10</strong>,174 2,999<br />

L0<strong>10</strong> Manatee Co WMPlan Gamble Creek<br />

7,175 <strong>10</strong>,174 0 <strong>10</strong>,174 2,999<br />

L015 Sarasota Co Sarasota County Surface Water Monitoring Program 63,463 61,770 0 61,770 (1,693)<br />

L019 Sarasota Co Sarasota Maint of Watershed Para & Models<br />

2<strong>10</strong>,890 205,085 0 205,085 (5,805)<br />

L200 Bradenton Wares Creek Bridge Replacement<br />

503,200 503,242 0 503,242 42<br />

L206 Char/Sara/Manatee FYN Builder/Dev Charlotte, Manatee, Sarasota<br />

53,708 0 0 0 (53,708)<br />

L2<strong>10</strong> Sarasota Co Imp. BMPs - Phillippi Creek/Celery Fields<br />

4,171 12,381 0 12,381 8,2<strong>10</strong><br />

L230 Longboat Key Backup Potable Water Supply Interconnect<br />

4,629 5,016 0 5,016 387<br />

L238 SEC SEC Watershed Leadership & Education Program<br />

62,070 62,092 0 62,092 22<br />

L506 North Port North Port Water Conservation and Retrofit Prg<br />

645 0 0 0 (645)<br />

L509 Manatee Co Rain Sensor Installation Project<br />

1,670 0 0 0 (1,670)<br />

L5<strong>10</strong> Manatee Co FYN Manatee County<br />

51,622 52,435 0 52,435 813<br />

L512 Manatee Co Shallow Well Rebate Program<br />

3,661 2,281 0 2,281 (1,380)<br />

L520 Around the Bend Around the Bend Nature Tours Manatee/Sarasota<br />

28,930 28,886 0 28,886 (44)<br />

L601 Manatee Co Indoor Water Conservation Prj<br />

1,670 0 0 0 (1,670)<br />

L604 Manatee Co WMPlan Little Manatee River<br />

8,<strong>21</strong>6 0 0 0 (8,<strong>21</strong>6)<br />

L608 Palmetto Palmetto Reclaimed Water ASR<br />

3,661 3,820 0 3,820 159<br />

L6<strong>10</strong> Sarasota Co Watershed Plan: Lemon Bay<br />

8,901 5,663 0 5,663 (3,238)<br />

L611 Sarasota Co Watershed Plan: Roberts Bay<br />

8,901 5,663 0 5,663 (3,238)<br />

L613 Sarasota Co Imp. BMPs South Pelican Drive<br />

3,311 3,493 0 3,493 182<br />

L614 Sarasota Co Imp. BMPs Matheny Creek<br />

3,476 6,133 0 6,133 2,657<br />

L615 Sarasota Co Imp. BMPs Alligator Creek<br />

3,476 6,793 0 6,793 3,317<br />

L617 Sarasota Co NAVD88 Control Densification<br />

959 0 0 0 (959)<br />

11


Southwest Florida Water Management District<br />

Manasota Basin<br />

Budget Comparison Report<br />

October 01, 2009<br />

Projects<br />

Adopted<br />

Budget<br />

FY2009<br />

Adopted<br />

Budget<br />

FY20<strong>10</strong><br />

Funded By<br />

Outside<br />

Revenue<br />

Funded By<br />

Ad Valorem<br />

Based<br />

Budget<br />

Increase/<br />

(Decrease)<br />

From<br />

FY2009<br />

L618 Sarasota Co Watershed Management Plan: Coastal Fringe<br />

4,718 39,031 0 39,031 34,313<br />

L623 Venice Imp. BMPs Hatchett Ck-Eastgate<br />

4,780 0 0 0 (4,780)<br />

L624 Venice Imp. BMPs Hatchett Ck-Venice Ave<br />

6,490 3,947 0 3,947 (2,543)<br />

L627 North Port Water Conservation and Retrofit Prj<br />

1,934 3,033 0 3,033 1,099<br />

L693 Child's Museum Water Exhibits-Glazer Childrens Museum of Tampa 25,999 777 0 777 (25,222)<br />

L854 Bradenton Bradenton/Manatee Co/Palmetto Reuse Intct Stdy<br />

3,661 779 0 779 (2,882)<br />

L867 Sarasota Co GIS Dataset Development<br />

<strong>10</strong>1,420 <strong>10</strong>2,727 0 <strong>10</strong>2,727 1,307<br />

L869 Englewood WD Englewood Reuse Transmission - Park Forest<br />

1,465 0 0 0 (1,465)<br />

L874 Aqua Util Aqua Util Reuse Trans - Eastern Lakewood Ranch 822,335 2,331 0 2,331 (820,004)<br />

L879 Manatee Co SW Wastewater Rclm Fac ASR Monitoring Well Sys<br />

6,057 0 0 0 (6,057)<br />

L949 Manatee Co Manatee Co Water Conservation Program<br />

1,718 2,277 0 2,277 559<br />

N013 Univ of FL Dev of Landscape Fertilizer BMPs - Phase 1<br />

4,962 0 0 0 (4,962)<br />

N014 FL Aquarium Florida Aquarium Watershed Edu Initiative<br />

1,807 1,885 0 1,885 78<br />

N046 Great Explorations Great Explorations Water Planet Pinellas Co<br />

2,452 0 0 0 (2,452)<br />

N081 North Port North Port Brackish Groundwater Explor<br />

372,959 0 0 0 (372,959)<br />

N082 North Port Myakkahatchee Ck Wtr Treatment Plant Reliability 901,943 505,954 0 505,954 (395,989)<br />

N084 North Port Reuse Strg Tank & High Service Pump Station<br />

<strong>10</strong>1,250 953,052 0 953,052 851,802<br />

N086 Venice Plumbing Rebate & Retrofit<br />

50,298 0 0 0 (50,298)<br />

N087 Bradenton Palmetto Reuse Interconnect<br />

168,661 0 0 0 (168,661)<br />

N088 Bradenton MARS Reuse Interconnection Proj<br />

178,786 0 0 0 (178,786)<br />

N<strong>10</strong>5 Gulf Coast Strg Inv The Bridges - Stormwater Reuse<br />

119,474 0 0 0 (119,474)<br />

N<strong>10</strong>7 Braden Rvr Util Braden River Soil Moisture Sensor Pilot Proj<br />

<strong>10</strong>0,125 2,741 0 2,741 (97,384)<br />

N115 Manatee Co Indoor Water Conservation Retrofit Program<br />

64,792 5,366 0 5,366 (59,426)<br />

N139 Sarasota Co Low Impact Development Manual-Ph IV<br />

0 68,852 0 68,852 68,852<br />

N143 Sarasota Co Ext FYN Sarasota County<br />

0 53,586 0 53,586 53,586<br />

N151 Manatee Co NAVD 88 Vertical Control Densification<br />

0 76,949 0 76,949 76,949<br />

N181 SEC Science Curriculum Enhancement Prgm<br />

0 33,400 0 33,400 33,400<br />

N188 Bradenton Bradenton NAVD 88 Densification<br />

0 70,249 0 70,249 70,249<br />

N206 Science Museum G.Wiz Water Wonders Workshop<br />

0 39,616 0 39,616 39,616<br />

N<strong>21</strong>8 Englewood WD Englewood Reclaimed Wtr Supply Project<br />

0 68,077 0 68,077 68,077<br />

N231 Manatee Co Indoor Water Conservation Prj - Ph IV<br />

0 66,149 0 66,149 66,149<br />

Total Cooperative Funding $4,230,257 $3,166,917 $0 $3,166,917 ($1,063,340)<br />

Total Appropriation Manasota Basin<br />

$23,973,594 $15,735,549 $1,388,488 $14,347,061 ($8,238,045)<br />

12


Southwest Florida Water Management District<br />

Manasota Basin<br />

Budget Comparison Report<br />

October 01, 2009<br />

Projects<br />

Adopted<br />

Budget<br />

FY2009<br />

Adopted<br />

Budget<br />

FY20<strong>10</strong><br />

Funded By<br />

Outside<br />

Revenue<br />

Funded By<br />

Ad Valorem<br />

Based<br />

Budget<br />

Increase/<br />

(Decrease)<br />

From<br />

FY2009<br />

Anticipated Revenues and Balances<br />

Ad Valorem Taxes $12,095,125 $<strong>10</strong>,726,682<br />

$0 $<strong>10</strong>,726,682 ($1,368,443)<br />

Balance from Prior Years 4,854,881 3,220,379<br />

0 3,220,379 (1,634,502)<br />

Manatee - WMPlan Braden River (B074) 69,783 0<br />

0 0 (69,783)<br />

Sarasota - WMPlan Braden River (B074) 15,717 0<br />

0 0 (15,717)<br />

Ecosystem Trust Fund - Myakka Rvr W/S Init 450,000 0<br />

0 0 (450,000)<br />

Ecosystem Trust Fund - SWIM Rebudget 0 266,115 266,115 0 266,115<br />

State Approp - WRAP - Prior Year Funds 2,387,750 0<br />

0 0 (2,387,750)<br />

WMLTF (SOR) - Prior Year Funds 3,400,338 617,792 617,792 0 (2,782,546)<br />

WMLTF (SWIM) - Prior Year Funds 0 504,581 504,581 0 504,581<br />

Interest on Investments 700,000 400,000<br />

0 400,000 (300,000)<br />

Total Revenues<br />

Millage Rate .1484<br />

.1484<br />

Income Per <strong>10</strong>0th Mill $815,035 $722,822<br />

$23,973,594 $15,735,549 $1,388,488 $14,347,061 ($8,238,045)<br />

13


Southwest Florida Water Management District<br />

Peace River Basin<br />

Budget Progress Report<br />

Eleven Months Ended August 31, 2009<br />

Projects<br />

On-Going Activities<br />

Z0<strong>10</strong><br />

Z030<br />

Z050<br />

Z060<br />

Z074<br />

Z090<br />

Z300<br />

Z500<br />

Z600<br />

Z700<br />

Total On-Going Activities<br />

Adopted<br />

FY2009<br />

Budget<br />

Prior Year<br />

Encumbrances<br />

Budget<br />

Transfers/<br />

Amendment<br />

Modified<br />

FY2009<br />

Budget<br />

Encumbered<br />

To Date<br />

Expended<br />

To Date<br />

Remaining<br />

Balance<br />

Board and Executive Services $25,341 $0 $0 $25,341 $0 $20,605 $4,736<br />

Planning<br />

13,031 0 0 13,031 0 9,887 3,144<br />

Information Resources<br />

<strong>10</strong>,158 0 0 <strong>10</strong>,158 0 4,538 5,620<br />

Communications<br />

33,628 0 0 33,628 0 27,674 5,954<br />

Risk Management<br />

14,500 0 0 14,500 0 <strong>10</strong>,251 4,249<br />

Community Affairs<br />

56,619 0 0 56,619 0 48,302 8,317<br />

Resource Data and Restoration<br />

45,326 0 0 45,326 0 38,389 6,937<br />

Resource Projects<br />

<strong>10</strong>0,551 0 0 <strong>10</strong>0,551 0 82,613 17,938<br />

Operations<br />

8,039 0 0 8,039 0<br />

271 7,768<br />

Land Resources<br />

14,231 0 0 14,231 0 5,606 8,625<br />

$3<strong>21</strong>,424 $0 $0 $3<strong>21</strong>,424 $0 $248,136 $73,288<br />

Property Appraiser & Tax Collector Commissions<br />

Z9<strong>10</strong> Pr. App. & Tax Coll. Commissions $354,233 $0 $0 $354,233 $0 $345,459 $8,774<br />

Total Property Appraiser & Tax Collector Commissions<br />

$354,233 $0 $0 $354,233 $0 $345,459 $8,774<br />

Reserves<br />

Z930 Contingencies $250,000 $0 $0 $250,000 $0 $0 $250,000<br />

Total Reserves<br />

$250,000 $0 $0 $250,000 $0 $0 $250,000<br />

Save Our Rivers (SOR) Reimbursable Projects<br />

S001 Jack Creek $89,824 $8,185 $0 $98,009 $31,843 $54,522 $11,644<br />

S017 Prairie/Shell Creek 68,637 13,415 0 82,052 7,782 40,077 34,193<br />

S029 Upper Lake Marion Creek Watershed 14,308 12,856 0 27,164 7,306 <strong>10</strong>,077 9,781<br />

S030 RV Griffin Reserve 89,134 657 567 90,358 2,547 18,718 69,093<br />

S035 Bowlegs Creek 35,<strong>10</strong>0 0 0 35,<strong>10</strong>0 0 449 34,651<br />

S036 Charlotte Harbor State Buffer Preserve 3,282 0 0 3,282 0 2,590 692<br />

S040 Lower Peace River (Deep Creek) 162,745 0 (567) 162,178 5,994 73,731 82,453<br />

S051 Bright Hour Watershed 2,090 0 0 2,090 0 715 1,375<br />

S054 Lake Hancock 274,442 140,<strong>21</strong>6 92,500 507,158 299,512 98,984 <strong>10</strong>8,662<br />

S099 Save Our Rivers Administration 24,096 0 0 24,096 0 2,262 <strong>21</strong>,834<br />

SA01 Jack Creek Hydrologic & Wetlands Restoration 6,530 470,000 0 476,530 250,000 5,226 2<strong>21</strong>,304<br />

SA54 Lk Hancock Enviromental Education Center 0 4<strong>21</strong>,875 0 4<strong>21</strong>,875 0 422,905 (1,030)<br />

SB40 Deep Creek Recreational Improvements 0 118,500 0 118,500 0 118,958 (458)<br />

1


Southwest Florida Water Management District<br />

Peace River Basin<br />

Budget Progress Report<br />

Eleven Months Ended August 31, 2009<br />

Projects<br />

Adopted<br />

FY2009<br />

Budget<br />

Prior Year<br />

Encumbrances<br />

Budget<br />

Transfers/<br />

Amendment<br />

Modified<br />

FY2009<br />

Budget<br />

Encumbered<br />

To Date<br />

Expended<br />

To Date<br />

Remaining<br />

Balance<br />

SB54 Polk's Nature Discovery Center Field Trips 32,465 127,892 0 160,357 31,712 127,892 753<br />

Total Save Our Rivers (SOR) Reimbursable Projects<br />

$802,653 $1,313,596 $92,500 $2,208,749 $636,696 $977,<strong>10</strong>6 $594,947<br />

Surface Water Improvement & Management (SWIM) Projects<br />

W014 Lake Hancock Outfall Treatment System $349,627 $0 $0 $349,627 $333,933 $15,694 $0<br />

W032 Hillsborough CC Foundation Field Trip Program 2,603 226 0 2,829 2,802 27 0<br />

W331 Biennial Seagrass Mapping 29,365 15,518 17,500 62,383 39,746 5,137 17,500<br />

W436 Elizabeth Place WQ & Natural Sys Enhancement 126,829 125,000 0 251,829 234,345 17,484 0<br />

W501 SWIM Plan Implementation - Charlotte Harbor 2,438 0 0 2,438 731 1,707 0<br />

W506 CHEC Charlotte Harbor/Lemon Bay SWIM WS Edu 14,757 3,872 0 18,629 14,548 4,080 1<br />

W507 CHEC Peace River Watershed Education 18,439 6,538 0 24,977 12,840 12,137 0<br />

W511 Alligator Creek Restoration 4,000 364,471 0 368,471 367,087 1,384 0<br />

W5<strong>21</strong> Charlotte Harbor Water Quality Monitoring 17,846 9,641 14,344 41,831 17,865 9,622 14,344<br />

W526 Charlotte Harbor National Estuary Program 45,024 123,750 0 168,774 77,268 91,506 0<br />

W527 Peace River Wtr Qlty Monitoring 20,481 0 0 20,481 (9,924) 30,405 0<br />

W547 WQ Peace&Myakka Basins,CH&Lemon Bay 13,920 8,578 0 22,498 14,9<strong>21</strong> 7,577 0<br />

W553 Coral Creek Habitat Restoration 157,855 180,861 200,000 538,716 297,530 41,186 200,000<br />

W554 Annual Rpt on WQ Cond for Peace & Myakka Rvrs 362 0 0 362 266 96 0<br />

W555 Eval Effects of Rstr of Estuarine Fishes 23,325 0 0 23,325 12,075 11,250 0<br />

W556 FDOT - Cape Haze Pioneer Trail Hydrologic Rstr 3,425 15,000 0 18,425 18,287 138 0<br />

W557 Characterizing Seagrass Comm of Eastern Char Hbr 724 7,500 0 8,224 3,086 5,138 0<br />

W559 Assess 2008 Seagrass Maps - Char Hbr & Lemon Bay 5,402 0 0 5,402 948 4,454 0<br />

W776 SWIM Plan Implementation - Winter Haven 5,620 0 0 5,620 5,620 0 0<br />

W781 South Lake Conine Watershed Rstr Prj 137,7<strong>21</strong> 166,250 0 303,971 303,825 146 0<br />

W794 Chain of Lakes Sediment Removal Feasibility Stdy 2,439 15,098 0 17,537 5,624 11,913 0<br />

W796 Chain of Lakes Water Quality Management Plan 4,849 62,500 0 67,349 55,641 11,708 0<br />

Total Surface Water Improvement & Management (SWIM) Projects<br />

$987,051 $1,<strong>10</strong>4,803 $231,844 $2,323,698 $1,809,064 $282,789 $231,845<br />

Basin Initiatives<br />

B063 USGS Surface Wtr. Flow, Level, & W.Q. Data Coll 434,900 0 0 434,900 <strong>21</strong>7,450 <strong>21</strong>7,450 0<br />

B099 Quality of Water Improvement Program 157,143 54,384 0 <strong>21</strong>1,527 0 91,523 120,004<br />

B113 Effect of Karst Dev. - Peace River Flow 0 0 0 0 0 607 (607)<br />

B131 Hotel/Motel/Restaurant Water Conservation Prgm 16,734 1,200 0 17,934 1,200 <strong>10</strong>,365 6,369<br />

B136 FL Auto Weather Network (FAWN) Data Diss & Edu 6,250 4,844 0 11,094 6,719 4,375 0<br />

2


Southwest Florida Water Management District<br />

Peace River Basin<br />

Budget Progress Report<br />

Eleven Months Ended August 31, 2009<br />

Projects<br />

Adopted<br />

FY2009<br />

Budget<br />

Prior Year<br />

Encumbrances<br />

Budget<br />

Transfers/<br />

Amendment<br />

Modified<br />

FY2009<br />

Budget<br />

Encumbered<br />

To Date<br />

Expended<br />

To Date<br />

Remaining<br />

Balance<br />

B163 Peace R. - Historical Land Cover Mapping 56,415 19,000 0 75,415 58,000 14,475 2,940<br />

B184 FL 2091 Hydrologic Charact of Charlie Ck Wtrshed 0 0 0 0 0 166 (166)<br />

B198 Lake Jackson MFL Recovery Feasibility Study 12,730 3<strong>10</strong>,000 0 322,730 3<strong>10</strong>,000 4,648 8,082<br />

B199 Water Use During Prod of Select Tropical Foliage 0 29,618 0 29,618 29,618 0 0<br />

B203 Cold/Chill Prot of Tropical Plants in Nursery 0 45,000 0 45,000 45,000 0 0<br />

B206 Maintenance of Watershed Parameters & Models 185,783 260,053 0 445,836 257,392 9,311 179,133<br />

B<strong>21</strong>7 Ridge Lakes Stormwater Improvement <strong>10</strong>3,050 372,764 46,875 522,689 278,727 170,586 73,376<br />

B<strong>21</strong>9 Land Use/Cover Mapping 39,032 7,724 0 46,756 17,1<strong>10</strong> 28,226 1,420<br />

B226 Wtr Budget & Irrig Req for Mature Blueberries 9,563 14,627 0 24,190 <strong>21</strong>,688 0 2,502<br />

B229 Field Eval of Bhiadwarf for Wtr Use Effic 13,125 9,667 0 22,792 3,458 19,333 1<br />

B238 Crop Coefficients & Wtr Use for Peppers 3,649 7,298 0 <strong>10</strong>,947 9,325 1,622 0<br />

B239 Deter Wtr Req For Genetically Alt Lantana Camara 9,3<strong>10</strong> 4,128 0 13,438 8,414 5,024 0<br />

B240 Redc Wtr Consmp in Poly-Mulched Tomato/Pepper 5,500 5,720 0 11,220 11,220 0 0<br />

B241 Reduction of Wtr Use for Citrus Cold Prot 4,000 1 0 4,001 0 4,001 0<br />

B242 Potential to Use ASR in Avon Park Formation 926 8,353 0 9,279 5,838 2,580 861<br />

B243 Long-Term Wtr Budget Analysis of Lk Starr <strong>10</strong>4,859 1 0 <strong>10</strong>4,860 50,000 50,275 4,585<br />

B244 USGS - Hydrogeology & Qlty of GW in Highlands 24,629 1 0 24,630 5,000 17,430 2,200<br />

B246 Wtr Conservation/FYN Reg Builder/Dev Specialist 14,840 5,490 0 20,330 8,784 9,881 1,665<br />

B247 Effects of Dev on the Hydrologic Budget in SWUCA 0 0 0 0 0 54 (54)<br />

B251 National Hydrography Database (NHD) 4,702 0 0 4,702 4,702 0 0<br />

B256 Auto Citrus Irrigation Mgmt to Reduce Wtr Consmp 38,500 31,570 0 70,070 70,070 0 0<br />

B257 Reduc Nursery/Landscape Wtr Use Altering Nandina 7,000 4,340 0 11,340 7,000 4,340 0<br />

B260 Upper Peace River System - Freshwater MFLs 250 35,000 0 35,250 35,000 0 250<br />

B263 Eval of Diff On-Farm Blueberry Sys Irrig Effic 9,080 0 0 9,080 9,080 0 0<br />

B264 Irrig Mgmt to Cnsrv Wtr, Incr Tree Grwth & Prod 28,<strong>10</strong>6 0 0 28,<strong>10</strong>6 24,256 3,850 0<br />

B265 Optimizing Irrig for Shade Tree Prod 5,158 0 0 5,158 5,158 0 0<br />

B266 Incpt-Sprinkler Irrig Wtr Container Grown Plants 7,471 0 0 7,471 5,946 1,525 0<br />

B268 Charlie Creek - Freshwater MFLs 26,250 0 0 26,250 25,000 0 1,250<br />

B269 Horse Creek - Freshwater MFLs 1,250 0 0 1,250 0 0 1,250<br />

B273 MFL Stream Diversion and Assessment Project 9,375 0 0 9,375 6,563 0 2,812<br />

B276 Grants for Reclaimed Irrigation Projects (GRIP) 1,609 0 0 1,609 0 0 1,609<br />

B277 Florida Water Star <strong>10</strong>,061 0 0 <strong>10</strong>,061 2,532 5,845 1,684<br />

B620 Mapping & GIS 41,784 2,880 0 44,664 3,634 23,3<strong>21</strong> 17,709<br />

B630 Field Operations 265,197 3<strong>21</strong>,930 0 587,127 325,272 117,349 144,506<br />

3


Southwest Florida Water Management District<br />

Peace River Basin<br />

Budget Progress Report<br />

Eleven Months Ended August 31, 2009<br />

Projects<br />

Adopted<br />

FY2009<br />

Budget<br />

Prior Year<br />

Encumbrances<br />

Budget<br />

Transfers/<br />

Amendment<br />

Modified<br />

FY2009<br />

Budget<br />

Encumbered<br />

To Date<br />

Expended<br />

To Date<br />

Remaining<br />

Balance<br />

B670 Structure Operations <strong>21</strong>6,682 129,911 0 346,593 82,<strong>10</strong>6 167,026 97,461<br />

G004 Aquatic Plant Management 17,545 0 0 17,545 0 5,194 12,351<br />

P259 Youth Water Resources Education 209,130 193,131 0 402,261 124,247 130,3<strong>10</strong> 147,704<br />

P268 Public Education 179,511 60,923 0 240,434 69,927 131,251 39,256<br />

Total Basin Initiatives<br />

$2,281,099 $1,939,559 $46,875 $4,267,533 $2,145,437 $1,251,943 $870,153<br />

Water Supply & Resource Development<br />

F027 Natural Treatment of Storm & Waste Water Ph 2 0 451 0 451 451 0 0<br />

F032 Peace River Regional Reservoir Expansion 500,000 538,644 0 1,038,644 817,914 220,730 0<br />

F033 Peace River Facility Expansion 200,000 756,298 0 956,298 604,466 351,832 0<br />

F035 Polk County Regional Reuse 0 146,438 0 146,438 114,376 32,062 0<br />

H008 .<br />

Lake Hancock Lake Level Modification 169,794 890,453 0 1,060,247 734,343 174,779 151,125<br />

H009 .<br />

Lake Hancock Outfall Structure P-11 Modif 625,000 625,000 0 1,250,000 625,000 0 625,000<br />

H014 .<br />

Lake Hancock Outfall Treatment System 0 13,664,728 0 13,664,728 12,985,278 679,568 (118)<br />

H015 .<br />

FARMS Back-Plugging Program <strong>21</strong>,389 94,454 0 115,843 88,854 13,091 13,898<br />

H017 .<br />

Facilitating Agricultural Rsrc Mgmt Sys (FARMS) 382,313 247,982 (90,033) 540,262 119,326 92,825 328,111<br />

H024 .<br />

Upper Peace River Resource Development 63,863 318,913 0 382,776 289,<strong>10</strong>8 50,599 43,069<br />

H027 .<br />

Charlotte Co Regional Reclaimed Water Expansion 274,768 14,646 0 289,414 0 287,583 1,831<br />

H034 .<br />

Peace Creek Canal Watershed 342,081 861,462 0 1,203,543 427,987 652,519 123,037<br />

H044 .<br />

SWUCA - Pilot Lake Augmentation 0 0 0 0 0 2,781 (2,781)<br />

H048 .<br />

Myakka Rvr Watershed Initiative 62,626 139,578 0 202,204 176,346 14,380 11,478<br />

H052 .<br />

PR/MRWSA - Reg Integ Loop Sys - Ph 3 Intct 1,191,295 519,750 0 1,711,045 1,643,757 66,454 834<br />

H060 .<br />

Punta Gorda Shell Ck WTP Expans to <strong>10</strong> mgd 648 64,790 0 65,438 15,572 49,244 622<br />

H062 .<br />

CF Industries Aquifer Recharge & Recovery <strong>10</strong>3,752 364,314 0 468,066 464,516 2,697 853<br />

H063 .<br />

PR/MRWSA Reg Rsrc Dev Feasibility Std 1,118 72,163 0 73,281 14,811 59,520 (1,050)<br />

H069 .<br />

PR/MRWSA Reg Loop System Ph 1A 677,590 893,586 0 1,571,176 1,489,689 79,392 2,095<br />

H072 .<br />

Polk County Comprehensive Water Supply Plan 7,062 96,456 0 <strong>10</strong>3,518 68,940 27,516 7,062<br />

H073 .<br />

Polk SWRUSA Carter Rd 1 Billion Gallon Rclm Strg 138,532 0 0 138,532 0 25 138,507<br />

H076 .<br />

Regional Reclaimed Water Partnership Initiative 528,269 0 1,250,000 1,778,269 1,771,640 12,574 (5,945)<br />

H079 .<br />

PR/MRWSA Regional Rsc Dev Ph 1 84,643 0 0 84,643 81,000 14 3,629<br />

H080 .<br />

Polk Central Florida Wtr Resource Dev Prj 2,506,875 0 (2,030,764) 476,111 0 516 475,595<br />

H090 Polk Co NERUSA Holly Hill Rclm Wtr Strg, Pmp&LFA 0 0 505,486 505,486 0 0 505,486<br />

H091 Polk Co SWRUSA Rclm Wtr Connection to TECO 0 0 208,333 208,333 0 0 208,333<br />

H<strong>10</strong>0 .<br />

Water Supply & Resource Development Reserves 0 1,307,405 0 1,307,405 1,307,405 0 0<br />

4


Southwest Florida Water Management District<br />

Peace River Basin<br />

Budget Progress Report<br />

Eleven Months Ended August 31, 2009<br />

Projects<br />

Adopted<br />

FY2009<br />

Budget<br />

Prior Year<br />

Encumbrances<br />

Budget<br />

Transfers/<br />

Amendment<br />

Modified<br />

FY2009<br />

Budget<br />

Encumbered<br />

To Date<br />

Expended<br />

To Date<br />

Remaining<br />

Balance<br />

H501 .<br />

FARMS - TRB Groves, L.L.C. 0 252,815 0 252,815 232,591 20,224 0<br />

H509 .<br />

FARMS - LallyMix 0 470 (469) 1 0 0 1<br />

H512 FARMS - Williams Farms Partners Prj 0 334,835 0 334,835 334,835 0 0<br />

H516 FARMS - Hancock Grove 0 40,242 18,315 58,557 0 58,556 1<br />

H522 FARMS - Island Grove #5 0 4,449 0 4,449 0 4,449 0<br />

H523 FARMS - The Mosaic Company (Ref H017) 0 0 1,113 1,113 0 0 1,113<br />

H530 FARMS - Island Grove LLC 0 7,085 (7,084) 1 0 0 1<br />

H534 FARMS - Diner Citrus/Cattle Co & OSS 0 9,598 (9,598) 0 0 0 0<br />

H537 FARMS - Royce Ranch Citrus 0 0 25,617 25,617 25,617 0 0<br />

H539 FARMS - Ben Hill Griffin, C&S Grove 0 43,846 (20,336) 23,5<strong>10</strong> 0 23,5<strong>10</strong> 0<br />

H540 FARMS - Classic Caladiums, L.L.C. 0 49,500 6,000 55,500 36,666 18,834 0<br />

H546 FARMS - Keystone Grove LLC 0 4,117 3,328 7,445 7,445 0 0<br />

H547 FARMS - Walters Grove 0 1,373 0 1,373 1,373 0 0<br />

H551 FARMS - I.M.G. Enterprises, Inc. 0 2,747 0 2,747 0 2,747 0<br />

H552 FARMS - The Groves of Peace River 0 2,386 0 2,386 2,386 0 0<br />

H553 FARMS - Las Lomas Holdings, Inc. 0 4,297 0 4,297 4,297 0 0<br />

H555 FARMS - Orange-Co, LP 0 38,604 (175) 38,429 0 38,429 0<br />

H556 FARMS - Island Grove, Farm #6 0 66,869 0 66,869 3,179 63,690 0<br />

H557 FARMS - Landscaping, Sod & Irrigation, Inc. 0 30,585 0 30,585 30,585 0 0<br />

H560 FARMS - Island Grove Integrated/Automated Irrig 0 35,850 0 35,850 35,850 0 0<br />

H563 FARMS - T. J. Chastain 0 0 38,905 38,905 26,082 12,823 0<br />

H564 FARMS - Blue Field USA, LLC 0 0 63,967 63,967 63,967 0 0<br />

H568 FARMS - Bethel Farms 0 0 15,235 15,235 15,235 0 0<br />

H569 FARMS - FLM - Prairie River Ranch Phase II 0 0 36,700 36,700 36,700 0 0<br />

H570 FARMS - Down South Blues 0 0 50,500 50,500 50,500 0 0<br />

H573 FARMS - T.J. Chastain - Neal Road Grove 0 0 24,186 24,186 24,186 0 0<br />

H575 FARMS - Citrus Creek Grove - Ph 2 0 0 <strong>10</strong>8,372 <strong>10</strong>8,372 <strong>10</strong>8,372 0 0<br />

H580 FARMS - Cornerstone Grove, LLC 0 0 1,700 1,700 1,700 0 0<br />

H582 FARMS - Island Grove Farm 8 - Parsley 0 0 27,500 27,500 27,500 0 0<br />

Total Water Supply & Resource Development<br />

$7,881,618 $22,547,179 $226,798 $30,655,595 $24,909,845 $3,113,963 $2,631,787<br />

Cooperative Funding<br />

K280 Charotte Co<br />

Imp. BMPs - Greater Port Charlotte 202,406 501,935 0 704,341 294,613 4<strong>10</strong>,448 (720)<br />

K300 Polk Co<br />

Utilities Northeast Service Area Reuse 0 0 0 0 0 150 (150)<br />

5


Southwest Florida Water Management District<br />

Peace River Basin<br />

Budget Progress Report<br />

Eleven Months Ended August 31, 2009<br />

Projects<br />

Adopted<br />

FY2009<br />

Budget<br />

Prior Year<br />

Encumbrances<br />

Budget<br />

Transfers/<br />

Amendment<br />

Modified<br />

FY2009<br />

Budget<br />

Encumbered<br />

To Date<br />

Expended<br />

To Date<br />

Remaining<br />

Balance<br />

K459 Charlotte Co SB<br />

Impl of BMPs - Punta Gorda Campus Watershed 1,017 1 0 1,018 1 122 895<br />

K725 Polk Co<br />

FYN Polk County 39,494 0 0 39,494 18,947 20,517 30<br />

K734 Lake Wales<br />

WMPlan Lake Wales 0 1,945 0 1,945 1,945 0 0<br />

L028 Englewood WD<br />

Lemon Bay High School Reuse Extension 2,929 22,760 0 25,689 22,760 0 2,929<br />

L151 Sebring<br />

WMPlan Sebring 3,194 45,570 0 48,764 45,570 4,263 (1,069)<br />

L152 Avon Park<br />

WMPlan Avon Park 7,116 31,5<strong>10</strong> 0 38,626 31,5<strong>10</strong> 8,434 (1,318)<br />

L153 Lake Placid<br />

Lake Placid Reuse (REDI) 1,299 620,986 0 622,285 75,998 545,3<strong>21</strong> 966<br />

L206 Char/Sara/Manatee FYN Builder/Dev Charlotte, Manatee, Sarasota 20,005 0 0 20,005 7,344 12,092 569<br />

L<strong>21</strong>5 Charlotte Co BCC Rotunda ASR Well Conversion for Reuse Water <strong>21</strong>9,646 419,399 0 639,045 635,649 242 3,154<br />

L314 Highlands Co<br />

Highlands WMPlan Carter Creek (REDI) 9,840 351,835 0 361,675 325,075 30,044 6,556<br />

L316 Polk Co Utilities<br />

Lower Floridan Exploratory/Test Production Well 0 0 0 0 0 685 (685)<br />

L324 Lakeland<br />

Lakeland - Lk Parker Stormwater BMP Imp 193,137 845,480 0 1,038,617 1,033,112 2,597 2,908<br />

L352 Frostproof/Polk Co Polk Imp. BMPs Lake Clinch Outfall Replacement 0 1 0 1 0 200 (199)<br />

L353 Frostproof/Polk<br />

Polk WMPlan Lakes Crooked, Clinch, and Reedy 5,255 500,000 0 505,255 500,000 637 4,618<br />

L473 Highlands Co<br />

Highlands WMPlan Lake Placid (REDI) 360,667 375,760 0 736,427 602,015 84,681 49,731<br />

L475 Polk Co<br />

Utilities NE Reg Reclaimed Storage Expansion 0 1 0 1 0 36 (35)<br />

L479 Lakeland<br />

Lk Hollingsworth Westside Stormwater Treatment 191,848 189,<strong>21</strong>6 0 381,064 376,848 416 3,800<br />

L485 Charlotte Co<br />

Charlotte Co Golf Course Reuse Storage 1,299 414,071 (414,071) 1,299 0 0 1,299<br />

L486 Charlotte Co<br />

WMPlan Charlotte Harbor 7,273 228,5<strong>21</strong> 0 235,794 209,009 24,<strong>21</strong>6 2,569<br />

L553 Dundee<br />

Reclaimed Water Use System Project 542,039 758,747 (337,500) 963,286 758,747 3,659 200,880<br />

L633 DeSoto Co<br />

WMPlan Desoto County 3,6<strong>21</strong> 225,000 0 228,6<strong>21</strong> <strong>21</strong>7,464 8,464 2,693<br />

L640 Punta Gorda<br />

Punta Gorda Reuse Feasibility Study 1,299 0 0 1,299 0 0 1,299<br />

L649 FDEP<br />

Hydrologic Rstr of Highlands Hammock SP 3,560 36,247 0 39,807 11,247 25,362 3,198<br />

L671 Polk Co<br />

Aquifer Recharge to Relieve Flooding 4,491 117,127 0 1<strong>21</strong>,618 115,656 8,173 (2,<strong>21</strong>1)<br />

L672 Polk Co<br />

WMPlan Polk County 0 37,616 0 37,616 37,616 29 (29)<br />

L673 Polk Co<br />

Imp. BMPs - Lk Belle & Tractor Lk 2,594 478,792 0 481,386 478,792 164 2,430<br />

L674 Polk Co<br />

Imp. BMPs - Saddlebag Lake 2,594 993,248 (275,000) 720,842 82,897 262,024 375,9<strong>21</strong><br />

L679 Hardee Co<br />

WMPlan Horse Creek 3,6<strong>21</strong> 0 0 3,6<strong>21</strong> 0 6,<strong>10</strong>8 (2,487)<br />

L680 Polk Co<br />

WMPlan Bartow 2,594 199,228 0 201,822 73,226 126,379 2,<strong>21</strong>7<br />

L693 Child's Museum<br />

Water Exhibits-Glazer Childrens Museum of Tampa <strong>21</strong>,302 20,550 0 41,852 20,550 5<strong>21</strong> 20,781<br />

L770 Lakeland<br />

Lk Gibson Stormwater Mgmt System Retrofit 192,526 562,501 0 755,027 750,133 681 4,<strong>21</strong>3<br />

L856 Charlotte Co<br />

Charlotte Co Toilet Rebate Program 1,718 38,050 0 39,768 22,959 15,881 928<br />

L897 Highlands Co<br />

Lake Clay Stormwater Retrofit (REDI) 7,383 171,875 (46,875) 132,383 <strong>10</strong>8,555 22,294 1,534<br />

L900 LE/AD<br />

LE/AD Polk County Watershed Education 11,312 1,894 0 13,206 9,461 3,982 (237)<br />

6


Southwest Florida Water Management District<br />

Peace River Basin<br />

Budget Progress Report<br />

Eleven Months Ended August 31, 2009<br />

Projects<br />

Adopted<br />

FY2009<br />

Budget<br />

Prior Year<br />

Encumbrances<br />

Budget<br />

Transfers/<br />

Amendment<br />

Modified<br />

FY2009<br />

Budget<br />

Encumbered<br />

To Date<br />

Expended<br />

To Date<br />

Remaining<br />

Balance<br />

L902 Lake Wales<br />

Imp. BMPs Twin Lakes 153,224 140,000 0 293,224 290,000 811 2,413<br />

L912 Dundee<br />

Lower Floridan Aquif Reuse Sppl Well Feas (REDI) 6,073 1 0 6,074 1 1,924 4,149<br />

L914 Lakeland<br />

Plumbing Retrofit Project 1,162 205,205 0 206,367 195,765 9,751 851<br />

L915 Lakeland<br />

Pre-Rinse Spray Valve Retrofit 1,114 7,245 0 8,359 5,868 1,601 890<br />

L917 Polk Co<br />

Lake Bathymetric Mapping 1,795 1 0 1,796 1 501 1,294<br />

L918 Polk Co<br />

Lake Gwyn Surface Wtr Rstr & Flood Protection 129,441 75,000 0 204,441 176,228 25,282 2,931<br />

L999 Reduced State Funding for AWS-WPSTF 0 0 337,500 337,500 0 0 337,500<br />

N001 Auburndale<br />

Reclaimed Water Master Plan 53,141 0 0 53,141 25,000 <strong>21</strong>5 27,926<br />

N004 Polk Co Bldrs<br />

Polk IS Florida-Friendly 18,330 0 0 18,330 13,164 4,508 658<br />

N013 Univ of FL<br />

Dev of Landscape Fertilizer BMPs - Phase 1 4,962 0 0 4,962 4,962 0 0<br />

N014 FL Aquarium<br />

Florida Aquarium Watershed Edu Initiative 1,807 0 0 1,807 1,055 0 752<br />

N024 Polk Co<br />

NWRUSA Rclm Wtr Storage & Pumping Station 26,225 0 66,945 93,170 26,225 0 66,945<br />

N063 Winter Haven<br />

Chain of Lks Natural Resource Center Edu Prgm 47,275 0 0 47,275 23,249 23,250 776<br />

N065 Haines City<br />

Southern Area Reuse Transmission Extension 1,003,398 0 0 1,003,398 1,000,000 1<strong>21</strong> 3,277<br />

N072 Haines City<br />

Lk Eva Wtr Qlty Improvement 252,846 0 0 252,846 236,000 3,052 13,794<br />

N074 Winter Haven<br />

Winter Haven Toilet Rebate Proj 55,684 0 0 55,684 23,482 30,857 1,345<br />

N075 Winter Haven<br />

Northern Reuse Srv Area Rclm Main Ext 203,348 0 120,328 323,676 320,328 1<strong>21</strong> 3,227<br />

N122 Polk Co<br />

Imp. BMPs - Saddle Creek Watershed 273,825 0 275,000 548,825 545,000 1,256 2,569<br />

N126 Charlotte Co<br />

Imp. BMPs at Charlotte Harbor Redevelopment Area 127,<strong>21</strong>7 0 0 127,<strong>21</strong>7 125,000 593 1,624<br />

P727 Lake Wales<br />

Lake Wales Reuse Project 4,368 601,428 0 605,796 601,428 357 4,011<br />

P729 Polk Co<br />

Polk - WMPlan Itchepackesassa Creek 0 676,150 0 676,150 338,075 0 338,075<br />

Total Cooperative Funding<br />

Total Peace River Basin<br />

$4,432,314 $9,894,896 $(273,673 ) $14,053,537 $<strong>10</strong>,818,530 $1,733,022 $1,501,985<br />

$17,3<strong>10</strong>,392 $36,800,032<br />

7<br />

$324,344 $54,434,768 $40,319,572 $7,952,418 $6,162,778


Southwest Florida Water Management District<br />

Peace River Basin<br />

Budget Comparison Report<br />

October 01, 2009<br />

Projects<br />

Adopted<br />

Budget<br />

FY2009<br />

Adopted<br />

Budget<br />

FY20<strong>10</strong><br />

Funded By<br />

Outside<br />

Revenue<br />

Funded By<br />

Ad Valorem<br />

Based<br />

Budget<br />

Increase/<br />

(Decrease)<br />

From<br />

FY2009<br />

On-Going Activities<br />

Z0<strong>10</strong> Board and Executive Services<br />

$25,341 $24,924 $0 $24,924 ($417)<br />

Z030 Planning<br />

13,031 13,227 0 13,227 196<br />

Z050 Information Resources<br />

<strong>10</strong>,158 9,860 0 9,860 (298)<br />

Z060 Communications<br />

33,628 37,908 0 37,908 4,280<br />

Z074 Risk Management<br />

14,500 12,000 0 12,000 (2,500)<br />

Z090 Community Affairs<br />

56,619 61,496 0 61,496 4,877<br />

Z300 Resource Data & Restoration<br />

45,326 36,947 0 36,947 (8,379)<br />

Z500 Resource Projects<br />

<strong>10</strong>0,551 89,116 0 89,116 (11,435)<br />

Z600 Operations<br />

8,039 8,116 0 8,116 77<br />

Z700 Land Resources<br />

14,231 11,365 0 11,365 (2,866)<br />

Total On-Going Activities $3<strong>21</strong>,424 $304,959 $0 $304,959 ($16,465)<br />

Property Appraiser & Tax Collector Commissions<br />

Z9<strong>10</strong> Pr. App. & Tax Coll. Commissions<br />

$354,233 $311,725 $0 $311,725 ($42,508)<br />

Total Property Appraiser & Tax Collector Commissions $354,233 $311,725 $0 $311,725 ($42,508)<br />

Reserves<br />

Z930 Contingencies<br />

$250,000 $250,000 $0 $250,000 $0<br />

Total Reserves $250,000 $250,000 $0 $250,000<br />

$0<br />

Save Our Rivers (SOR) Reimbursable Projects<br />

S001 Jack Creek<br />

$89,824 $58,603 $58,603 $0 ($31,2<strong>21</strong>)<br />

S017 Prairie/Shell Creek<br />

68,637 63,339 63,339 0 (5,298)<br />

S029 Upper Lake Marion Creek Watershed<br />

14,308 9,620 9,620 0 (4,688)<br />

S030 RV Griffin Reserve<br />

89,134 12,799 12,799 0 (76,335)<br />

S035 Bowlegs Creek<br />

35,<strong>10</strong>0 35,<strong>10</strong>0 35,<strong>10</strong>0 0 0<br />

S036 Charlotte Harbor State Buffer Preserve<br />

3,282 3,434 3,434 0 152<br />

S040 Lower Peace River (Deep Creek)<br />

162,745 91,091 91,091 0 (71,654)<br />

S051 Bright Hour Watershed<br />

2,090 2,156 2,156 0 66<br />

S054 Lake Hancock<br />

274,442 222,662 222,662 0 (51,780)<br />

S099 Save Our Rivers Administration<br />

24,096 7,549 7,549 0 (16,547)<br />

SA01 Jack Creek Hydrologic & Wetlands Restoration<br />

6,530 <strong>10</strong>,772 <strong>10</strong>,772 0 4,242<br />

SB54 Polk's Nature Discovery Center Field Trips<br />

32,465 18,527 18,527 0 (13,938)<br />

Total Save Our Rivers (SOR) Reimbursable Projects $802,653 $535,652 $535,652<br />

$0 ($267,001)<br />

Surface Water Improvement & Management (SWIM) Projects<br />

W014 Lake Hancock Outfall Treatment System<br />

$349,627 $0 $0 $0 ($349,627)<br />

W032 Hillsborough CC Foundation Field Trip Program<br />

2,603 5,<strong>10</strong>6 0 5,<strong>10</strong>6 2,503<br />

W331 Biennial Seagrass Mapping<br />

29,365 22,508 2,504 20,004 (6,857)<br />

W436 Elizabeth Place WQ & Natural Sys Enhancement<br />

126,829 4,436 2,<strong>21</strong>8 2,<strong>21</strong>8 (122,393)<br />

W501 SWIM Plan Implementation - Charlotte Harbor<br />

2,438 1,718 859 859 (720)<br />

W506 CHEC Charlotte Harbor/Lemon Bay SWIM WS Edu 14,757 32,566 16,283 16,283 17,809<br />

8


Southwest Florida Water Management District<br />

Peace River Basin<br />

Budget Comparison Report<br />

October 01, 2009<br />

Projects<br />

Adopted<br />

Budget<br />

FY2009<br />

Adopted<br />

Budget<br />

FY20<strong>10</strong><br />

Funded By<br />

Outside<br />

Revenue<br />

Funded By<br />

Ad Valorem<br />

Based<br />

Budget<br />

Increase/<br />

(Decrease)<br />

From<br />

FY2009<br />

W507 CHEC Peace River Watershed Education<br />

18,439 30,493 15,246 15,247 12,054<br />

W5<strong>10</strong> Thornton Key Restoration<br />

0 18,145 9,073 9,072 18,145<br />

W511 Alligator Creek Restoration<br />

4,000 7,574 3,787 3,787 3,574<br />

W513 Charlotte County 4th Grade Field Trip Program<br />

0 34,000 17,000 17,000 34,000<br />

W5<strong>21</strong> Charlotte Harbor Water Quality Monitoring<br />

17,846 25,986 2,071 23,915 8,140<br />

W526 Charlotte Harbor National Estuary Program<br />

45,024 87,452 43,726 43,726 42,428<br />

W527 Peace River Wtr Qlty Monitoring<br />

20,481 77,865 38,932 38,933 57,384<br />

W547 WQ Peace&Myakka Basins,CH&Lemon Bay<br />

13,920 0 0 0 (13,920)<br />

W553 Coral Creek Habitat Restoration<br />

157,855 288,0<strong>21</strong> 79,760 208,261 130,166<br />

W554 Annual Rpt on WQ Cond for Peace & Myakka Rvrs<br />

362 0 0 0 (362)<br />

W555 Eval Effects of Rstr of Estuarine Fishes<br />

23,325 950 475 475 (22,375)<br />

W556 FDOT - Cape Haze Pioneer Trail Hydrologic Rstr<br />

3,425 2,427 1,<strong>21</strong>3 1,<strong>21</strong>4 (998)<br />

W557 Characterizing Seagrass Comm of Eastern Char Hbr<br />

724 1,418 709 709 694<br />

W559 Assess 2008 Seagrass Maps - Char Hbr & Lemon Ba 5,402 1,418 709 709 (3,984)<br />

W776 SWIM Plan Implementation - Winter Haven<br />

5,620 6,178 3,089 3,089 558<br />

W781 South Lake Conine Watershed Rstr Prj<br />

137,7<strong>21</strong> 4,961 2,480 2,481 (132,760)<br />

W794 Chain of Lakes Sediment Removal Feasibility Stdy<br />

2,439 4,924 2,462 2,462 2,485<br />

W796 Chain of Lakes Water Quality Management Plan<br />

4,849 5,535 2,767 2,768 686<br />

W798 Winter Haven Downtown Watershed Imprv Plan<br />

0 62,733 31,366 31,367 62,733<br />

Total Surface Water Improvement & Management (SWIM) Projects $987,051 $726,414 $276,729 $449,685 ($260,637)<br />

Basin Initiatives<br />

B063 USGS Surface Wtr. Flow, Level, & W.Q. Data Coll $434,900 $0 $0 $0 ($434,900)<br />

B099 Quality of Water Improvement Program<br />

157,143 0 0 0 (157,143)<br />

B131 Hotel/Motel/Restaurant Water Conservation Prgm<br />

16,734 17,305 0 17,305 571<br />

B136 FL Auto Weather Network (FAWN) Data Diss & Edu<br />

6,250 0 0 0 (6,250)<br />

B163 Peace R. - Historical Land Cover Mapping<br />

56,415 1,977 0 1,977 (54,438)<br />

B198 Lake Jackson MFL Recovery Feasibility Study<br />

12,730 19,0<strong>21</strong> 0 19,0<strong>21</strong> 6,291<br />

B206 Maintenance of Watershed Parameters & Models<br />

185,783 0 0 0 (185,783)<br />

B<strong>21</strong>7 Ridge Lakes Stormwater Improvement<br />

<strong>10</strong>3,050 145,601 0 145,601 42,551<br />

B<strong>21</strong>9 Land Use/Cover Mapping<br />

39,032 0 0 0 (39,032)<br />

B226 Wtr Budget & Irrig Req for Mature Blueberries<br />

9,563 0 0 0 (9,563)<br />

B229 Field Eval of Bhiadwarf for Wtr Use Effic<br />

13,125 0 0 0 (13,125)<br />

B238 Crop Coefficients & Wtr Use for Peppers<br />

3,649 0 0 0 (3,649)<br />

B239 Deter Wtr Req For Genetically Alt Lantana Camara<br />

9,3<strong>10</strong> 0 0 0 (9,3<strong>10</strong>)<br />

B240 Redc Wtr Consmp in Poly-Mulched Tomato/Pepper<br />

5,500 0 0 0 (5,500)<br />

B241 Reduction of Wtr Use for Citrus Cold Prot<br />

4,000 0 0 0 (4,000)<br />

B242 Potential to Use ASR in Avon Park Formation<br />

926 0 0 0 (926)<br />

B243 Long-Term Wtr Budget Analysis of Lk Starr<br />

<strong>10</strong>4,859 0 0 0 (<strong>10</strong>4,859)<br />

B244 USGS - Hydrogeology & Qlty of GW in Highlands<br />

24,629 0 0 0 (24,629)<br />

B246 Wtr Conservation/FYN Reg Builder/Dev Specialist<br />

14,840 13,278 0 13,278 (1,562)<br />

B251 National Hydrography Database (NHD)<br />

4,702 0 0 0 (4,702)<br />

B256 Auto Citrus Irrigation Mgmt to Reduce Wtr Consmp<br />

38,500 0 0 0 (38,500)<br />

9


Southwest Florida Water Management District<br />

Peace River Basin<br />

Budget Comparison Report<br />

October 01, 2009<br />

Projects<br />

Adopted<br />

Budget<br />

FY2009<br />

Adopted<br />

Budget<br />

FY20<strong>10</strong><br />

Funded By<br />

Outside<br />

Revenue<br />

Funded By<br />

Ad Valorem<br />

Based<br />

Budget<br />

Increase/<br />

(Decrease)<br />

From<br />

FY2009<br />

B257 Reduc Nursery/Landscape Wtr Use Altering Nandina 7,000 0 0 0 (7,000)<br />

B260 Upper Peace River System - Freshwater MFLs<br />

250 0 0 0 (250)<br />

B263 Eval of Diff On-Farm Blueberry Sys Irrig Effic<br />

9,080 0 0 0 (9,080)<br />

B264 Irrig Mgmt to Cnsrv Wtr, Incr Tree Grwth & Prod<br />

28,<strong>10</strong>6 0 0 0 (28,<strong>10</strong>6)<br />

B265 Optimizing Irrig for Shade Tree Prod<br />

5,158 0 0 0 (5,158)<br />

B266 Incpt-Sprinkler Irrig Wtr Container Grown Plants<br />

7,471 0 0 0 (7,471)<br />

B268 Charlie Creek - Freshwater MFLs<br />

26,250 0 0 0 (26,250)<br />

B269 Horse Creek - Freshwater MFLs<br />

1,250 0 0 0 (1,250)<br />

B273 MFL Stream Diversion and Assessment Project<br />

9,375 0 0 0 (9,375)<br />

B276 Grants for Reclaimed Irrigation Projects (GRIP)<br />

1,609 0 0 0 (1,609)<br />

B277 Florida Water Star<br />

<strong>10</strong>,061 9,651 0 9,651 (4<strong>10</strong>)<br />

B301 Maint WS Para & Models - Charlotte Co (was B206)<br />

0 42,705 0 42,705 42,705<br />

B303 Maint WS Para & Models - DeSoto Co (was B206)<br />

0 6,497 0 6,497 6,497<br />

B304 Maint WS Para & Models - Hardee Co (was B206)<br />

0 6,136 0 6,136 6,136<br />

B306 Maint WS Para & Models - Highlands Co (was B206)<br />

0 14,807 0 14,807 14,807<br />

B314 Maint WS Para & Models - Polk Co (was B206)<br />

0 78,226 0 78,226 78,226<br />

B620 Mapping & GIS<br />

41,784 27,245 0 27,245 (14,539)<br />

B630 Field Operations<br />

265,197 145,889 0 145,889 (119,308)<br />

B670 Structure Operations<br />

<strong>21</strong>6,682 209,317 0 209,317 (7,365)<br />

G004 Aquatic Plant Management<br />

17,545 14,272 0 14,272 (3,273)<br />

P259 Youth Water Resources Education<br />

209,130 <strong>21</strong>5,064 0 <strong>21</strong>5,064 5,934<br />

P268 Public Education<br />

179,511 179,826 0 179,826 315<br />

Total Basin Initiatives $2,281,099 $1,146,817 $0 $1,146,817 ($1,134,282)<br />

Water Supply & Resource Development<br />

F032 Peace River Regional Reservoir Expansion<br />

$500,000 $600,777 $0 $600,777 $<strong>10</strong>0,777<br />

F033 Peace River Facility Expansion<br />

200,000 440,678 0 440,678 240,678<br />

H008 Lake Hancock Lake Level Modification<br />

169,794 836,759 0 836,759 666,965<br />

H009 Lake Hancock Outfall Structure P-11 Modif<br />

625,000 825 0 825 (624,175)<br />

H014 Lake Hancock Outfall Treatment System<br />

0 737,479 400,000 337,479 737,479<br />

H015 FARMS Back-Plugging Program<br />

<strong>21</strong>,389 23,067 0 23,067 1,678<br />

H017 Facilitating Agricultural Rsrc Mgmt Sys (FARMS)<br />

382,313 485,303 0 485,303 <strong>10</strong>2,990<br />

H024 Upper Peace River Resource Development<br />

63,863 65,111 0 65,111 1,248<br />

H027 Charlotte Co Regional Reclaimed Water Expansion 274,768 275,941 0 275,941 1,173<br />

H034 Peace Creek Canal Watershed<br />

342,081 257,596 0 257,596 (84,485)<br />

H048 Myakka Rvr Watershed Initiative<br />

62,626 4,919 0 4,919 (57,707)<br />

H051 PR/MRWSA - Reg Integ Loop Sys - Ph 2 Intct<br />

0 200,860 0 200,860 200,860<br />

H052 PR/MRWSA - Reg Integ Loop Sys - Ph 3 Intct<br />

1,191,295 2,612 0 2,612 (1,188,683)<br />

H060 Punta Gorda Shell Ck WTP Expans to <strong>10</strong> mgd<br />

648 0 0 0 (648)<br />

H062 CF Industries Aquifer Recharge & Recovery<br />

<strong>10</strong>3,752 1,048 0 1,048 (<strong>10</strong>2,704)<br />

H063 PR/MRWSA Reg Rsrc Dev Feasibility Std<br />

1,118 0 0 0 (1,118)<br />

H069 PR/MRWSA Reg Loop System Ph 1A<br />

677,590 2,009 0 2,009 (675,581)<br />

H072 Polk County Comprehensive Water Supply Plan<br />

7,062 6,270 0 6,270 (792)<br />

<strong>10</strong>


Southwest Florida Water Management District<br />

Peace River Basin<br />

Budget Comparison Report<br />

October 01, 2009<br />

Projects<br />

Adopted<br />

Budget<br />

FY2009<br />

Adopted<br />

Budget<br />

FY20<strong>10</strong><br />

Funded By<br />

Outside<br />

Revenue<br />

Funded By<br />

Ad Valorem<br />

Based<br />

Budget<br />

Increase/<br />

(Decrease)<br />

From<br />

FY2009<br />

H073 Polk SWRUSA Carter Rd 1 Billion Gallon Rclm Strg 138,532 0 0 0 (138,532)<br />

H076 Regional Reclaimed Water Partnership Initiative<br />

528,269 608,260 0 608,260 79,991<br />

H079 PR/MRWSA Regional Rsc Dev Ph 1<br />

84,643 2,553 0 2,553 (82,090)<br />

H080 Polk Central Florida Wtr Resource Dev Prj<br />

2,506,875 0 0 0 (2,506,875)<br />

H084 Arcadia-DeSoto Interconnect (REDI) (was N145)<br />

0 57,098 0 57,098 57,098<br />

H085 Charlotte Co Reg Rclm Water Exp Ph 2 (was N154)<br />

0 201,395 0 201,395 201,395<br />

H087 Punta Gorda Reverse Osmosis Fac<br />

0 272,607 0 272,607 272,607<br />

H088 Dona Bay Water Supply Dev & Mgmt Proj<br />

0 4,944 0 4,944 4,944<br />

H090 Polk Co NERUSA Holly Hill Rclm Wtr Strg, Pmp&LFA<br />

0 304,014 0 304,014 304,014<br />

H091 Polk Co SWRUSA Rclm Wtr Connection to TECO<br />

0 138,450 0 138,450 138,450<br />

Total Water Supply & Resource Development $7,881,618 $5,530,575 $400,000 $5,130,575 ($2,351,043)<br />

Cooperative Funding<br />

K280 Charotte Co Imp. BMPs - Greater Port Charlotte<br />

$202,406 $202,420 $0 $202,420 $14<br />

K459 Charlotte Co SB Impl of BMPs - Punta Gorda Campus Watershed<br />

1,017 0 0 0 (1,017)<br />

K725 Polk Co FYN Polk County<br />

39,494 37,982 0 37,982 (1,512)<br />

L028 Englewood WD Lemon Bay High School Reuse Extension<br />

2,929 0 0 0 (2,929)<br />

L151 Sebring WMPlan Sebring<br />

3,194 2,204 0 2,204 (990)<br />

L152 Avon Park WMPlan Avon Park<br />

7,116 2,250 0 2,250 (4,866)<br />

L153 Lake Placid Lake Placid Reuse (REDI)<br />

1,299 8<strong>10</strong> 0 8<strong>10</strong> (489)<br />

L206 Char/Sara/Manatee FYN Builder/Dev Charlotte, Manatee, Sarasota<br />

20,005 0 0 0 (20,005)<br />

L<strong>21</strong>5 Charlotte Co BCC Rotunda ASR Well Conversion for Reuse Water<br />

<strong>21</strong>9,646 228,441 0 228,441 8,795<br />

L314 Highlands Co Highlands WMPlan Carter Creek (REDI)<br />

9,840 7,837 0 7,837 (2,003)<br />

L324 Lakeland Lakeland - Lk Parker Stormwater BMP Imp<br />

193,137 204,520 0 204,520 11,383<br />

L353 Frostproof/Polk Polk WMPlan Lakes Crooked, Clinch, and Reedy<br />

5,255 5,339 0 5,339 84<br />

L473 Highlands Co Highlands WMPlan Lake Placid (REDI)<br />

360,667 20,733 0 20,733 (339,934)<br />

L479 Lakeland Lk Hollingsworth Westside Stormwater Treatment<br />

191,848 1,752 0 1,752 (190,096)<br />

L485 Charlotte Co Charlotte Co Golf Course Reuse Storage<br />

1,299 0 0 0 (1,299)<br />

L486 Charlotte Co WMPlan Charlotte Harbor<br />

7,273 0 0 0 (7,273)<br />

L553 Dundee Reclaimed Water Use System Project<br />

542,039 203,8<strong>21</strong> 0 203,8<strong>21</strong> (338,<strong>21</strong>8)<br />

L633 DeSoto Co WMPlan Desoto County<br />

3,6<strong>21</strong> 4,278 0 4,278 657<br />

L640 Punta Gorda Punta Gorda Reuse Feasibility Study<br />

1,299 0 0 0 (1,299)<br />

L649 FDEP Hydrologic Rstr of Highlands Hammock SP<br />

3,560 0 0 0 (3,560)<br />

L671 Polk Co Aquifer Recharge to Relieve Flooding<br />

4,491 6,293 0 6,293 1,802<br />

L672 Polk Co WMPlan Polk County<br />

0 132,636 65,6<strong>10</strong> 67,026 132,636<br />

L673 Polk Co Imp. BMPs - Lk Belle & Tractor Lk<br />

2,594 2,625 0 2,625 31<br />

L674 Polk Co Imp. BMPs - Saddlebag Lake<br />

2,594 2,625 0 2,625 31<br />

L679 Hardee Co WMPlan Horse Creek<br />

3,6<strong>21</strong> 982 0 982 (2,639)<br />

L680 Polk Co WMPlan Bartow<br />

2,594 1,233 0 1,233 (1,361)<br />

L693 Child's Museum Water Exhibits-Glazer Childrens Museum of Tampa <strong>21</strong>,302 777 0 777 (20,525)<br />

L770 Lakeland Lk Gibson Stormwater Mgmt System Retrofit<br />

192,526 206,055 0 206,055 13,529<br />

L856 Charlotte Co Charlotte Co Toilet Rebate Program<br />

1,718 1,802 0 1,802 84<br />

L897 Highlands Co Lake Clay Stormwater Retrofit (REDI)<br />

7,383 22,230 0 22,230 14,847<br />

11


Southwest Florida Water Management District<br />

Peace River Basin<br />

Budget Comparison Report<br />

October 01, 2009<br />

Projects<br />

Adopted<br />

Budget<br />

FY2009<br />

Adopted<br />

Budget<br />

FY20<strong>10</strong><br />

Funded By<br />

Outside<br />

Revenue<br />

Funded By<br />

Ad Valorem<br />

Based<br />

Budget<br />

Increase/<br />

(Decrease)<br />

From<br />

FY2009<br />

L900 LE/AD LE/AD Polk County Watershed Education<br />

11,312 9,065 0 9,065 (2,247)<br />

L902 Lake Wales Imp. BMPs Twin Lakes<br />

153,224 3,264 0 3,264 (149,960)<br />

L912 Dundee Lower Floridan Aquif Reuse Sppl Well Feas (REDI)<br />

6,073 0 0 0 (6,073)<br />

L914 Lakeland Plumbing Retrofit Project<br />

1,162 631 0 631 (531)<br />

L915 Lakeland Pre-Rinse Spray Valve Retrofit<br />

1,114 635 0 635 (479)<br />

L917 Polk Co Lake Bathymetric Mapping<br />

1,795 8,403 0 8,403 6,608<br />

L918 Polk Co Lake Gwyn Surface Wtr Rstr & Flood Protection<br />

129,441 6,294 0 6,294 (123,147)<br />

N001 Auburndale Reclaimed Water Master Plan<br />

53,141 3,765 0 3,765 (49,376)<br />

N004 Polk Co Bldrs Polk IS Florida-Friendly<br />

18,330 0 0 0 (18,330)<br />

N013 Univ of FL Dev of Landscape Fertilizer BMPs - Phase 1<br />

4,962 0 0 0 (4,962)<br />

N014 FL Aquarium Florida Aquarium Watershed Edu Initiative<br />

1,807 1,885 0 1,885 78<br />

N024 Polk Co NWRUSA Rclm Wtr Storage & Pumping Station<br />

26,225 55,299 0 55,299 29,074<br />

N063 Winter Haven Chain of Lks Natural Resource Center Edu Prgm<br />

47,275 56,234 0 56,234 8,959<br />

N065 Haines City Southern Area Reuse Transmission Extension<br />

1,003,398 227,866 0 227,866 (775,532)<br />

N072 Haines City Lk Eva Wtr Qlty Improvement<br />

252,846 1,977 0 1,977 (250,869)<br />

N074 Winter Haven Winter Haven Toilet Rebate Proj<br />

55,684 0 0 0 (55,684)<br />

N075 Winter Haven Northern Reuse Srv Area Rclm Main Ext<br />

203,348 227,691 0 227,691 24,343<br />

N112 Lakeland Lakeland Plumbing Retrofit Prj<br />

0 52,441 0 52,441 52,441<br />

N113 Charlotte Co Charlotte Co Toilet Replacement<br />

0 59,451 0 59,451 59,451<br />

N122 Polk Co Imp. BMPs - Saddle Creek Watershed<br />

273,825 1,407 0 1,407 (272,418)<br />

N126 Charlotte Co Imp. BMPs at Charlotte Harbor Redevelopment Area 127,<strong>21</strong>7 3,273 0 3,273 (123,944)<br />

N147 Polk Co Garden Grove Pines Stormwater Retrofit<br />

0 201,893 0 201,893 201,893<br />

N150 Polk Co Polk Co Vertical Control Densification<br />

0 1<strong>21</strong>,949 60,000 61,949 1<strong>21</strong>,949<br />

N156 Polk Co Polk Co SWRUSA Carter Rd RW Main<br />

0 2,641 0 2,641 2,641<br />

N161 Polk Co Polk Co Rain Sensor Rebate<br />

0 23,182 0 23,182 23,182<br />

N162 Charlotte Co FYN Charlotte County<br />

0 29,085 0 29,085 29,085<br />

N165 Highlands Mobile Irrig Lab-Highlands Soil&Wtr Cnsv (REDI)<br />

0 <strong>10</strong>,036 0 <strong>10</strong>,036 <strong>10</strong>,036<br />

N<strong>21</strong>8 Englewood WD Englewood Reclaimed Wtr Supply Project<br />

0 65,000 0 65,000 65,000<br />

N2<strong>21</strong> Winter Haven Smart Controller Pilot Project<br />

0 25,241 0 25,241 25,241<br />

P727 Lake Wales Lake Wales Reuse Project<br />

4,368 2,958 0 2,958 (1,4<strong>10</strong>)<br />

Total Cooperative Funding $4,432,314 $2,501,<strong>21</strong>1 $125,6<strong>10</strong> $2,375,601 ($1,931,<strong>10</strong>3)<br />

Total Appropriation Peace River Basin<br />

$17,3<strong>10</strong>,392 $11,307,353 $1,337,991 $9,969,362 ($6,003,039)<br />

12


Southwest Florida Water Management District<br />

Peace River Basin<br />

Budget Comparison Report<br />

October 01, 2009<br />

Projects<br />

Adopted<br />

Budget<br />

FY2009<br />

Adopted<br />

Budget<br />

FY20<strong>10</strong><br />

Funded By<br />

Outside<br />

Revenue<br />

Funded By<br />

Ad Valorem<br />

Based<br />

Budget<br />

Increase/<br />

(Decrease)<br />

From<br />

FY2009<br />

Anticipated Revenues and Balances<br />

Ad Valorem Taxes $8,350,143 $7,314,826<br />

$0 $7,314,826 ($1,035,317)<br />

Balance from Prior Years 2,583,538 2,404,536<br />

0 2,404,536 (179,002)<br />

Charlotte Co - Coral Creek (W553) 0 71,500 71,500 0<br />

71,500<br />

Highlands Co - Lake Placid WMP (L473) 87,500 0<br />

0 0 (87,500)<br />

Polk Co - Maint of W/S Para & Models (B314) 12,433 0<br />

0 0 (12,433)<br />

Polk Co - Vertical Control Densification (N150) 0 60,000 60,000 0<br />

60,000<br />

Polk Co - WMPlan Polk County (L672) 0 65,6<strong>10</strong> 65,6<strong>10</strong> 0<br />

65,6<strong>10</strong><br />

Ecosystem Trust Fund - Myakka Rvr W/S Init 50,000 0<br />

0 0 (50,000)<br />

State Approp - WRAP - Prior Year Funds 4,186,625 0<br />

0 0 (4,186,625)<br />

Water Protection & Sust T.F. (Alternative Wtr) 837,500 0<br />

0 0 (837,500)<br />

WMLTF (SOR) - Prior Year Funds 802,653 535,652 535,652 0 (267,001)<br />

WMLTF (SWIM) - Prior Year Funds 0 205,229 205,229 0 205,229<br />

EPA 319 - Lake Hancock (H014) 0 400,000 400,000 0 400,000<br />

Interest on Investments 400,000 250,000<br />

0 250,000 (150,000)<br />

Total Revenues<br />

Millage Rate .1827<br />

.1827<br />

Income Per <strong>10</strong>0th Mill $457,041 $400,374<br />

$17,3<strong>10</strong>,392 $11,307,353 $1,337,991 $9,969,362 ($6,003,039)<br />

13


Table of Contents<br />

BasinBookReport-FY20<strong>10</strong> v2.0 Production September 28........................................................................................................................ 1<br />

Z0<strong>10</strong> - Boards & Executive Services - Manasota Basin.................................................................................................... 1<br />

Z030 - Planning - Manasota Basin.................................................................................................................................... 2<br />

Z050 - Information Resources - Manasota Basin.............................................................................................................. 3<br />

Z060 - Communications - Manasota Basin....................................................................................................................... 4<br />

Z090 - Community Affairs - Manasota Basin..................................................................................................................... 5<br />

Z300 - Resouce Data and Restoration Department - Manasota Basin............................................................................. 6<br />

Z500 - Resource Projects - Manasota Basin..................................................................................................................... 7<br />

Z600 - Operations - Manasota Basin................................................................................................................................ 8<br />

Z700 - Land Resources - Manasota Basin........................................................................................................................ 9<br />

Z9<strong>10</strong> - Commissions - Manasota Basin............................................................................................................................ <strong>10</strong><br />

Z930 - Contingencies - Manasota Basin........................................................................................................................... 11<br />

S005 - Myakka River......................................................................................................................................................... 12<br />

S019 - Edward W. Chance Reserve................................................................................................................................. 13<br />

S024 - Upper Myakka River Watershed............................................................................................................................ 14<br />

S030 - RV Griffin Reserve................................................................................................................................................. 15<br />

S031 - Myakka Prairie....................................................................................................................................................... 16<br />

S032 - Little Manatee River............................................................................................................................................... 17<br />

S041 - Myakkahatchee Creek........................................................................................................................................... 19<br />

S042 - Tampa Bay Estuarine Ecosystem.......................................................................................................................... 20<br />

S099 - Save Our Rivers Administration............................................................................................................................. <strong>21</strong><br />

SA05 - Deer Prairie Creek................................................................................................................................................. 22<br />

SA19 - Lake Manatee Lower Watershed Upland Restoration #1...................................................................................... 23<br />

D059 - Myakka State Forest Hydr. Rest............................................................................................................................ 25<br />

D060 - Edward W. Chance Reserve Hydr. Rest............................................................................................................... 27<br />

SI99 - Environmental Education Centers.......................................................................................................................... 29<br />

W020 - SWIM Plan Implementation - Tampa Bay............................................................................................................. 30<br />

W027 - Tampa Bay Estuary Program............................................................................................................................... 32<br />

W028 - Bay Soundings...................................................................................................................................................... 35<br />

W030 - Tampa Bay Watch Field Trip Program................................................................................................................. 37<br />

W226 - City of Anna Maria-Implementation of BMPs........................................................................................................ 39


W312 - Tampa Bay Habitat Restoration............................................................................................................................ 42<br />

W331 - Biennial Seagrass Mapping of Tampa Bay, Sarasota Bay, Charlotte Harbor...................................................... 44<br />

W348 - Terra Ceia Isles Habitat Restoration..................................................................................................................... 46<br />

W358 - Tom Bennett Park................................................................................................................................................. 49<br />

W364 - Palmetto Estuary.................................................................................................................................................. 51<br />

W394 - FELTS Preserve Restoration................................................................................................................................ 53<br />

W437 - (Completed) North Port Water Enhancement Program........................................................................................ 55<br />

W501 - SWIM Plan Implementation - Charlotte Harbor.................................................................................................... 57<br />

W506 - CHEC Charlotte Harbor/Lemon Bay SWIM Watershed Education....................................................................... 59<br />

W509 - Alligator Creek In-Stream Restoration.................................................................................................................. 61<br />

W5<strong>21</strong> - Charlotte Harbor Water Quality Monitoring........................................................................................................... 63<br />

W526 - Charlotte Harbor National Estuary Program......................................................................................................... 65<br />

W528 - Myakka River Water Quality Monitoring............................................................................................................... 67<br />

W547 - Water Quality in the Peace and Myakka Basins, Charlotte Harbor, and Lemon Bay........................................... 69<br />

W552 - Sarasota County Pollutant Model Development................................................................................................... 71<br />

W554 - (Completed) Report and Summary Analysis of Water Quality Conditions for Peace and Myakka rivers............. 73<br />

W558 - Venice Hatchett Creek Stormwater Facility.......................................................................................................... 75<br />

W559 - Assessment of 2008 Seagrass Maps in Charlotte Harbor And Lemon Bay......................................................... 77<br />

W601 - SWIM Plan Implementation - Sarasota Bay......................................................................................................... 79<br />

W602 - Neal Preserve Environmental Restoration............................................................................................................ 81<br />

W603 - Ungarelli Preserve................................................................................................................................................ 83<br />

W604 - Phillippi Creek In-stream Restoration................................................................................................................... 85<br />

W611 - Sarasota Bay Spoil Island Restoration Project..................................................................................................... 87<br />

W612 - Sarasota Bay Estuary Program............................................................................................................................ 89<br />

W613 - Sarasota-Catfish Creek SW Facility-Phase II....................................................................................................... 91<br />

W615 - (Completed) Sarasota County Tidal Creek Biological Index................................................................................. 93<br />

W616 - Sarasota Bay Habitat Restoration........................................................................................................................ 95<br />

W617 - Sarasota Imp. BMPs Coastal Basin Beach Road................................................................................................. 97<br />

W618 - (Completed) Sarasota Imp. BMPs Hudson Bayou............................................................................................... 99<br />

W619 - Perico Preserve Environmental Restoration......................................................................................................... <strong>10</strong>1


W620 - Pelican Cove Stormwater Retrofit......................................................................................................................... <strong>10</strong>3<br />

W6<strong>21</strong> - Little Sarasota Bay Water Quality Management Plan........................................................................................... <strong>10</strong>5<br />

W622 - Sarasota Bay Water Quality Management Plan................................................................................................... <strong>10</strong>7<br />

W623 - Holmes Beach Stormwater Retrofit...................................................................................................................... <strong>10</strong>9<br />

W624 - Red Bug Slough Restoration................................................................................................................................ 111<br />

W625 - Runaway Bay - Sarasota Bay Coast Line Restoration......................................................................................... 113<br />

W626 - Blackburn Point Park Addition.............................................................................................................................. 115<br />

W627 - Bradenton Beach Stormwater Retrofits................................................................................................................ 117<br />

B063 - USGS Manasota Basin Surface Water Flow, Level, and Water Quality Data Collection..................................... 119<br />

B074 - Manatee - WMPlan BRADEN <strong>RIVER</strong>.................................................................................................................... 1<strong>21</strong><br />

B092 - USGS-Flatford Swamp Surface Water Monitoring Program.................................................................................. 124<br />

B099 - Quality of Water Improvement Program - Manasota Basin................................................................................... 126<br />

B131 - Hotel/Motel/Restaurant Water Conservation Program (Water CHAMP/PRO)....................................................... 128<br />

B136 - Florida Automated Weather Network (FAWN) Data Dissemination and Education.............................................. 131<br />

B182 - USGS Minimum Flows and Levels Data Collection - Myakka and Braden Rivers and Cow Pen Slough.............. 133<br />

B206 - Maintenance of Watershed Parameters & Models................................................................................................ 135<br />

B<strong>21</strong>9 - Land Use and Cover Mapping............................................................................................................................... 139<br />

B228 - Evaluation and Demonstration of Soil Moisture Based On-demand Irrigation Controllers for Vegetable P.......... 141<br />

B229 - Field Evaluation of Bahiadwarf, For Water Use Efficiency, Turf Quality, Mowing Requirement and Persi............ 143<br />

B238 - Crop Coefficients and Water Use for Peppers in Southwest Florida..................................................................... 145<br />

B239 - Determine Water Requirements For Genetically Altered Lantana Camara Nursery and Landscape Plants......... 147<br />

B240 - Reducing Water Consumption in Polyethylene-Mulched Tomato and Pepper Fields after Methyl Bromide Pha.. 149<br />

B241 - Reduction of Water Use for Citrus Cold Protection............................................................................................... 151<br />

B242 - Potential to Use ASR in the Avon Park Formation................................................................................................ 153<br />

B246 - Water Conservation/FYN Regional Builder/Developer Specialist.......................................................................... 155<br />

B251 - National Hydrography Database (NHD)................................................................................................................ 158<br />

B256 - Automated Citrus Irrigation Management to Reduce Water Consumption............................................................ 160<br />

B257 - Reducing Nursery and Landscape Water Use by Genetically Altering Nandina Plants........................................ 162<br />

B264 - Citrus Irrigation Management to Increase Young Tree Growth & Productivity on Flatwoods Ridge Soils............ 164<br />

B265 - Optimizing Irrigation For Shade Tree Production.................................................................................................. 166


B266 - Accounting For Interception of Sprinkler Irrigation Water by Container Grown Plants.......................................... 168<br />

B273 - MFL Stream Diversion and Assessment Project................................................................................................... 170<br />

B274 - Salt Water Intrusion Monitoring Network............................................................................................................... 172<br />

B276 - (Cancelled) Grants for Reclaimed Irrigation Projects (GRIP) Program................................................................. 174<br />

B277 - Florida Water Star Gold Certification..................................................................................................................... 176<br />

B3<strong>10</strong> - Manatee - Maintenance of Watershed Parameters and Models........................................................................... 179<br />

B315 - Sarasota - Maintenance of Watershed Parameters and Models........................................................................... 181<br />

B620 - Mapping and GIS................................................................................................................................................... 183<br />

B630 - Field Operations 0<strong>21</strong>............................................................................................................................................. 185<br />

P259 - Youth Water Resources Education........................................................................................................................ 186<br />

P268 - Public Education.................................................................................................................................................... 189<br />

F032 - Peace River Regional Reservoir Expansion.......................................................................................................... 193<br />

F033 - Peace River Facility Expansion............................................................................................................................. 196<br />

H008 - Lake Hancock Lake Level Modification................................................................................................................. 199<br />

H009 - Lake Hancock Outfall Structure P-11 Modification................................................................................................ 202<br />

H015 - FARMS Back-Plug Program.................................................................................................................................. 204<br />

H017 - Facilitating Agricultural Resource Management Systems Program...................................................................... 205<br />

H024 - Upper Peace River Resource Development.......................................................................................................... 207<br />

H048 - Myakka River Watershed Initiative........................................................................................................................ <strong>21</strong>1<br />

H051 - PR/MRWSA Reg Integ Loop Sys Phase 2 Interconnect....................................................................................... <strong>21</strong>4<br />

H052 - PR/MRWSA Reg Integ Loop Sys Phase 3A Interconnect..................................................................................... <strong>21</strong>6<br />

H059 - City of Bradenton Reservoir Expansion................................................................................................................. <strong>21</strong>8<br />

H060 - Punta Gorda Shell Creek WTP Expansion to <strong>10</strong> MGD (Completed)..................................................................... 220<br />

H062 - CF Industries Aquifer Recharge and Recovery Project......................................................................................... 222<br />

H063 - PR/MRWSA Regional Resource Development Feasibility Study.......................................................................... 224<br />

H069 - PR/MRWSA Reg Loop System Ph 1A.................................................................................................................. 227<br />

H076 - Regional Reclaimed Water Partnership Initiative.................................................................................................. 229<br />

H079 - PRMRWSA Regional Resource Development - Phase I....................................................................................... 232<br />

H086 - Manatee County Regional <strong>10</strong> MG Reclaimed Water Storage Tank Project.......................................................... 234<br />

H087 - City of Punta Gorda Reverse Osmosis Facility..................................................................................................... 236


H088 - Dona Bay Water Supply Development and Management Project......................................................................... 238<br />

H089 - Flatford Swamp Hydrologic RestorationImplementation...................................................................................... 240<br />

K114 - Bradenton - ASR Program..................................................................................................................................... 241<br />

K120 - North Port - Water ASR - Phase V........................................................................................................................ 244<br />

K253 - Manatee - Imp. BMPs Wares Creek...................................................................................................................... 247<br />

K269 - Sarasota Co. - N. Sarasota Co. Reclaimed Water ASRs...................................................................................... 250<br />

K883 - North Port WMPlan Big Slough............................................................................................................................. 252<br />

L007 - Manatee - WMPlan BUFFALO CANAL/FROG CREEK......................................................................................... 254<br />

L0<strong>10</strong> - Manatee - WMPlan GAMBLE CREEK................................................................................................................... 257<br />

L015 - Sarasota County Surface Water Monitoring Program............................................................................................ 260<br />

L019 - Sarasota - Update W. Para. & Models................................................................................................................... 262<br />

L200 - Bradenton - Wares Creek Bridge Replacement..................................................................................................... 265<br />

L206 - FYN Builder/Dev Charlotte, Manatee, Sarasota.................................................................................................... 268<br />

L2<strong>10</strong> - Implementation of BMPs - Phillippi Creek/Celery Fields........................................................................................ 270<br />

L230 - Longboat Key Backup Potable Water Supply Interconnect................................................................................... 272<br />

L238 - SEC Southern Coastal Watershed Education........................................................................................................ 274<br />

L506 - North Port Water Conservation and Retrofit Program............................................................................................ 276<br />

L509 - Manatee County Rain Sensor Installation Project.................................................................................................. 278<br />

L5<strong>10</strong> - FYN Manatee County............................................................................................................................................. 280<br />

L512 - Manatee County Shallow Well Rebate Program.................................................................................................... 282<br />

L520 - Around the Bend Nature Tours Manatee/Sarasota................................................................................................ 284<br />

L601 - (Completed) Manatee County Indoor Water Conservation Project........................................................................ 286<br />

L604 - Manatee - WMPlan Little Manatee River............................................................................................................... 288<br />

L608 - Palmetto Reclaimed Water ASR............................................................................................................................ 290<br />

L6<strong>10</strong> - Sarasota County - Watershed Plan: Lemon Bay................................................................................................... 292<br />

L611 - Sarasota County - Watershed Plan: Roberts Bay.................................................................................................. 294<br />

L613 - Sarasota Imp. BMPs South Pelican Drive.............................................................................................................. 296<br />

L614 - Sarasota Imp. BMPs Matheny Creek..................................................................................................................... 298<br />

L615 - Sarasota Imp. BMPs Alligator Creek...................................................................................................................... 300<br />

L617 - Sarasota NAVD88 Vertical Control Densification................................................................................................... 302


L618 - Sarasota - Watershed Management Plan: Coastal Fringe..................................................................................... 304<br />

L623 - Venice Imp. BMPs Hatchett Creek Eastgate (Withdrawn)..................................................................................... 306<br />

L624 - Venice Imp. BMPs Hatchett Creek-Venice............................................................................................................ 308<br />

L627 - City of North Port Water Conservation and Retrofit Project................................................................................... 3<strong>10</strong><br />

L693 - Water Exhibits in the Glazer Children's Museum of Tampa................................................................................... 312<br />

L854 - Bradenton/Manatee Co./Palmetto Reuse Interconnect Study............................................................................... 314<br />

L867 - Sarasota County GIS Dataset Development.......................................................................................................... 316<br />

L869 - (Completed) Englewood Reuse Transmission - Park Forest................................................................................. 318<br />

L874 - Aqua Utilities Reuse Transmission - Eastern Lakewood Ranch............................................................................ 320<br />

L879 - Southwest Wastewater Reclamation Facility ASR Monitoring Well System (cancelled)....................................... 322<br />

L949 - Manatee County Water Conservation Program..................................................................................................... 324<br />

N013 - Development of Landscape Fertilizer BMPs - Phase 1......................................................................................... 326<br />

N014 - The Florida Aquarium Watershed Education Initiative.......................................................................................... 328<br />

N046 - Great Explorations Water Planet Pinellas............................................................................................................. 330<br />

N081 - City of North Port Brackish Groundwater Exploration........................................................................................... 332<br />

N082 - City of North Port Myakkahatchee Creek Water Treatment Plant RBF/RO Reliability Project.............................. 334<br />

N084 - City of North Port Reuse Storage Tank and High Service Pump Station.............................................................. 336<br />

N086 - (Withdrawn) City of Venice Plumbing Rebate and Retrofit.................................................................................... 338<br />

N087 - (Withdrawn) Bradenton - Palmetto Reuse Interconnect........................................................................................ 340<br />

N088 - (Withdrawn) Bradenton - MARS Reuse Interconnection Project........................................................................... 342<br />

N<strong>10</strong>5 - The Bridges - Stormwater Reuse (Withdrawn)...................................................................................................... 344<br />

N<strong>10</strong>7 - Braden River Soil Moisture Sensor Project........................................................................................................... 346<br />

N115 - Manatee County Indoor Water Conservation Project............................................................................................ 348<br />

N139 - Low Impact Development Manual......................................................................................................................... 350<br />

N143 - FYN Sarasota County............................................................................................................................................ 352<br />

N151 - Manatee County NAVD88 Vertical Control Densification...................................................................................... 354<br />

N181 - Science Curriculum Enhancement Program......................................................................................................... 356<br />

N188 - City of Bradenton NAVD88 Vertical Control Densification..................................................................................... 358<br />

N206 - G.WIZ Water Wonders Workshop......................................................................................................................... 360<br />

N<strong>21</strong>8 - Englewood Reclaimed Water Supply Project........................................................................................................ 362


N231 - Manatee County Toilet Rebate Project - Phase IV................................................................................................ 364<br />

M1<strong>10</strong> - Manatee - FEMA Map Modernization................................................................................................................... 366<br />

M115 - Sarasota - FEMA Map Modernization................................................................................................................... 368<br />

M118 - FEMA Map Modernization Management Support................................................................................................. 371


Z0<strong>10</strong><br />

Boards & Executive Services - Manasota Basin<br />

Project Type On-Going Activities<br />

AOR(s)<br />

Management Services<br />

Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers, Pinellas-Anclote River,<br />

Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

N/A<br />

Project Manager KAVOURAS, LOU<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

The Boards and Executive Services Department provides administrative support to the Basin Board. These support<br />

activities include noticing, scheduling and preparing the agenda and minutes for regular and special meetings and<br />

workshops. Other functions include preparing meeting and travel arrangements and correspondence for Board<br />

members. The Deputy Executive Director for Outreach, Planning and Board Services is the primary staff liaison for<br />

members. The Deputy also assists with the conduct of meetings, works with the Governor's staff to ensure the legal<br />

constitution of Boards, coordinates with appropriate staff to ensure follow up on meeting issues, conducts new<br />

member orientation and ensures compliance with the Sunshine Laws. In addition, the Deputy and staff coordinate<br />

Board field trips, including planning, scheduling, meals, logistics and arranging for staff support. This budget item also<br />

provides funds for equipment and facility rental, legal advertisements for meeting notices, miscellaneous office<br />

supplies and printing and Board member travel reimbursements (e.g., meals, conference registration, mileage, etc.).<br />

Status As Of: March 13, 2007<br />

As of this date, this project will not show an update. Ongoing project details are shown in the project description.<br />

0<strong>21</strong> - Manasota Basin 1


Z030<br />

Planning - Manasota Basin<br />

Project Type On-Going Activities<br />

AOR(s)<br />

Management Services<br />

Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers, Pinellas-Anclote River,<br />

Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager DAVIES, DIANNE<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

Planning is an Executive support function responsible for long-range comprehensive planning and near-term strategic<br />

planning. Department staff administer the Comprehensive Watershed Management initiative; provide Basin Board<br />

support; and assist the Basin Board with development of resource management priorities.<br />

Benefits<br />

Planning Department staff support the Basin Board through the following tasks. Project Management Database project<br />

worksheets that are used in the Budget <strong>Notebook</strong> for each Basin Board meeting are reviewed to ensure accuracy and<br />

completeness. Planning staff work with project managers to identify any significant issues and resolve any<br />

discrepancies. Staff take the lead in preparing for joint Governing and Basin Board Planning Workshops and for the<br />

Basin Board's Annual Planning Workshop. Basin Board meetings are attended and presentations are made to the<br />

Board on an as-needed basis. Staff often coordinate responses to issues raised during meetings. Staff respond to<br />

Board Member questions and requests via oral and written communications. Staff assist Basin Board members by<br />

creating and providing presentations on Basin-specific issues. At the Board's request, research is conducted and<br />

special issues are presented during Board meetings. Department staff assist the Community Affairs Coordinators with<br />

Cooperative Funding kick-off meetings held for local governments and other potential cooperators. Assistance is<br />

provided for new Board member orientations.<br />

Status As Of: March 13, 2007<br />

As of this date, this project will not show an update. Ongoing project details are shown in the project description.<br />

0<strong>21</strong> - Manasota Basin 2


Z050<br />

Information Resources - Manasota Basin<br />

Project Type On-Going Activities<br />

AOR(s)<br />

Management Services<br />

Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers, Pinellas-Anclote River,<br />

Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager LEWIS, JIM<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

Video production and conferencing staff provides audio-visual, archive tape, and video teleconferencing support for<br />

Basin Board and Governing Board meetings, including staff presentations. Audio-visual staff provides support for<br />

annual Basin Board planning workshops, and the semiannual Governing Board/Basin Board planning workshops, as<br />

well as other non-regularly scheduled workshops not held in a District office, as needed. Based on the time devoted to<br />

these activities, including travel, the appropriate salary percentage is allocated to each Basin Board.<br />

Status As Of: March 13, 2007<br />

As of this date, this project will not show an update. Ongoing project details are shown in the project description.<br />

0<strong>21</strong> - Manasota Basin 3


Z060<br />

Communications - Manasota Basin<br />

Project Type On-Going Activities<br />

AOR(s)<br />

Management Services<br />

Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers, Pinellas-Anclote River,<br />

Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

N/A<br />

Project Manager MOLLIGAN, MICHAEL<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

The Communications Department is an Executive support function responsible for a broad range of activities that<br />

support the District's mission, Governing and Basin boards, and other departments. Departmental functions include<br />

projects funded by the Governing and Basin boards, such as public information and media coordination; youth and<br />

public education programs and initiatives in coordination with local governments and other community organizations;<br />

promotion of sound water conservation practices; presentation of projects to the Basin boards in the budget adoption<br />

process; and graphics support for Basin Board presentations. Communications Department staff support the Basin<br />

Board through the following tasks. Basin Board meetings are attended on an as-needed basis to make presentations,<br />

answer questions, and participate in budget discussions. Reponses are prepared to answer Board Member questions<br />

and requests via oral and written communications. Educational materials are developed, reviewed, updated, promoted,<br />

and distributed. Assistance is provided to cooperators to develop education projects that support the District's mission.<br />

Education and grant programs are promoted at schools and to cooperators. Support is provided to the Basin Board<br />

Education Committee. Media contact summaries and articles are disseminated. The District's web site is maintained.<br />

Status As Of: March 13, 2007<br />

As of this date, this project will not show an update. Ongoing project details are shown in the project description.<br />

0<strong>21</strong> - Manasota Basin 4


Z090<br />

Community Affairs - Manasota Basin<br />

Project Type On-Going Activities<br />

AOR(s)<br />

Management Services<br />

Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers, Pinellas-Anclote River,<br />

Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager RATHKE, DAVID<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

Basin Board funds budgeted are for the administration and coordination of the Cooperative Funding program, including<br />

conducting cooperator workshops, processing applications, communicating with applicants and participating in project<br />

ranking. Basin Board funds are budgeted for the Community Affairs Coordinator (CAC) to attend and participate in<br />

Basin Board meetings and new Board member orientations and briefings and for the CAC's responses to Board<br />

member information requests, as well as other "as needed" services to the Basin Board.<br />

Status As Of: March 13, 2007<br />

As of this date, this project will not show an update. Ongoing project details are shown in the project description.<br />

0<strong>21</strong> - Manasota Basin 5


Z300<br />

Resouce Data and Restoration Department - Manasota Basin<br />

Project Type On-Going Activities<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers, Pinellas-Anclote River,<br />

Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager DEHAVEN, ERIC<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

The Resource Data and Restoration Department is involved in the collection, management, and analysis of water<br />

resource data and the development and implementation of restoration projects to improve resource conditions. The<br />

Department includes five sections comprised of professional and technical staff with oversight from an administrative<br />

section. The FARMS Section is involved in the implementation of innovative agricultural water conservation and<br />

alternative supply projects that are designed to reduce ground water withdrawals and improve water quality within the<br />

Southern Water Use Caution Area (SWUCA). The Water Quality Monitoring Program (Section) performs water quality<br />

sampling and analysis for a number of long-term ground and surface-water monitoring efforts, as well as specific,<br />

short-term projects that investigate water quality issues. The Geohydrologic Data Section supports the Regional<br />

Observation Monitor Well Program (ROMP) and the Quality of Water Improvement Program (QWIP), which provide<br />

hydrogeologic data and well construction services. The Chemistry Laboratory Section conducts the water quality<br />

analysis for District-related projects (Cooperative Funding and initiatives) and programs (regulation). Finally, the<br />

Surface Water Improvement and Management (SWIM) Section is responsible for implementing the SWIM legislation<br />

which requires that the water management districts prepare and maintain a priority list of water bodies requiring<br />

management action for restoration or preservation; write management plans consistent with the rules established by<br />

the Department of Environmental Protection; and implement the plans.<br />

Status As Of: March 13, 2007<br />

As of this date, this project will not show an update. Ongoing project details are shown in the project description.<br />

0<strong>21</strong> - Manasota Basin 6


Z500<br />

Resource Projects - Manasota Basin<br />

Project Type On-Going Activities<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers, Pinellas-Anclote River,<br />

Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

N/A<br />

Project Manager HAMMOND, MARK<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

The Resource Projects Department addresses issues related to water supply, flood protection, water quality, and<br />

natural systems and consists of the Conservation Projects, Ecologic Evaluation,<br />

Engineering, Environmental, Hydrologic Evaluation, and Water Supply and Resource Development sections. The<br />

District's goal for water supply is to ensure an adequate supply of the water resource to provide for all existing and<br />

future reasonable and beneficial uses while protecting and maintaining water resources and related natural systems.<br />

The Department's efforts involve activities associated with the regional water supply planning, alternative water<br />

supplies, conservation, and reclaimed water strategic initiatives. The District's goal for flood protection is to minimize<br />

flood damage to protect people, property, infrastructure and investment. The Department's efforts primarily involve<br />

activities associated with the floodplain management strategic initiative and support for the flood and emergency<br />

response initiative. The District's goal for natural systems is to preserve, protect, and restore natural systems in order<br />

to support their natural hydrologic and ecologic functions. The Department's efforts involve minimum flows and levels<br />

and wetland system restoration. The District's goal for water quality is to protect and improve water quality to sustain<br />

the environment, economy and quality of life. The Department's efforts involve diagnostic, monitoring and<br />

implementing water quality improvement projects. The funds budgeted here are for coordinating the Water Supply<br />

and Resource Development Program, Water Resource Assessment Projects, Minimum Flows and Levels Program,<br />

Watershed Management Program, FEMA Map Modernization, and Cooperative Funding Programs, as-requested<br />

attendance at citizen meetings, and those unforeseen basin analyses which occur during the year. The Department<br />

works on ongoing projects and reviews, evaluates, and ranks each Fiscal Year's Cooperative Funding projects related<br />

to water supply, water quality, natural systems, and flood protection. Staff makes recommendations regarding these<br />

projects, and other items proposed in each year's budget. Staff also works to address any budget issues identified at<br />

Basin Board meetings. The funds budgeted here are for staff time related to coordinating those activities that do not<br />

relate to specific budgeted projects. These include the staff time of the Director, managers and several staff.<br />

Status As Of: March 13, 2007<br />

As of this date, this project will not show an update. Ongoing project details are shown in the project description.<br />

0<strong>21</strong> - Manasota Basin 7


Z600<br />

Operations - Manasota Basin<br />

Project Type On-Going Activities<br />

Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers, Pinellas-Anclote River,<br />

Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager HOLTKAMP, MIKE<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

The Operations Department consists of six sections including Administration, Field Operations, Aquatic Plant<br />

Management, Hydrologic Data, Structure Operations and Mapping and GIS. The Administration section provides<br />

support for departmental management, planning, budgeting, and clerical functions. The Field Operations section is<br />

responsible for maintenance and restoration of all District-owned lands including fence construction, mowing, culvert<br />

installations, road and bridge maintenance and construction, fire line maintenance, prescribed burn support, erosion<br />

control, and well site preparation/restoration. The Aquatic Plant Management section is responsible for aquatic and<br />

ditch bank vegetation management operations on District flood control systems, the control of exotic aquatic plants on<br />

natural waters throughout the District, and the control of aquatic vegetation around water control structures and lake<br />

level gauges. Additionally, the Aquatic Plant Management section controls/eradicates infestations of upland invasive<br />

species including Brazilian pepper, Australian pine, cogongrass and tropical soda apple on all District-owned<br />

conservation lands. The Hydrologic Data section is responsible for designing, installing, and maintaining data<br />

collection sites in support of the District's resource monitoring and technical analysis, as well as data analysis and<br />

database management. The Structure Operations section inspects, operates, maintains, and repairs all District-owned<br />

flood and water conservation structures as well as salinity barriers throughout the District. This section also directs and<br />

operates the District's Emergency Operations Center (EOC), which is part of a state and nationwide storm tracking<br />

and emergency response network.The Mapping and GIS section is responsible for providing and maintaining all<br />

mapping and Geographical Information System database support. Included in this project are administrative salary<br />

allocations associated with overseeing field operations and maintenance, aquatic plant management, emergency<br />

operations, Supervisory Control and Data Acquisition (SCADA), and structure operations programs throughout the<br />

Basin, as applicable. Funds expended have been to prepare for Basin Board meetings as required or provide data to<br />

Board members, local agencies or the public.<br />

Status As Of: May 12, 2009<br />

Ongoing project details are shown in the project description.<br />

0<strong>21</strong> - Manasota Basin 8


Z700<br />

Land Resources - Manasota Basin<br />

Project Type On-Going Activities<br />

AOR(s)<br />

Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers, Pinellas-Anclote River,<br />

Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager SUTTON, ERIC<br />

Task Manager(s)<br />

Status Ongoing<br />

BLASCHKA, STEVEN, WALSH, TOM, LOVE, KEVIN, MILLER, WILL<br />

Description<br />

The Land Resources Department consists of five sections, including Administration, Land Acquisition, Land<br />

Management, Survey, and Land Use and Protection. The Administration section provides support for departmental<br />

management, planning, budgeting and clerical functions. The Land Acquisition section acquires lands as set forth in<br />

the District's Florida Forever Workplan. These lands are acquired for various functions including flood control, water<br />

storage and management, conservation and protection of water resources, aquifer recharge and recovery, water<br />

resource development, and preservation of wetlands, streams, lakes, and other natural systems. The Land<br />

Management section is responsible for the management and protection of natural and cultural resources on District<br />

lands. Major functions include natural systems restoration, prescribed burning, forest management, exotic species<br />

control, and monitoring. The Survey section is responsible for providing land surveying assistance in support of various<br />

projects and programs within the District. The Land Use and Protection section is responsible for land use activities on<br />

District lands including development of recreational trails and facilities, monitoring of public and private uses,<br />

management of the security officer program and maintaining visitor safety. Included in this project are activities on<br />

District-managed lands purchased with funds other than Florida Forever, Preservation 2000 and Save Our Rivers such<br />

as surveying costs (salaries and equipment rental), miscellaneous land use requests (salaries), resource protection<br />

(utilities and maintenance) and structural flood control projects.<br />

Status As Of: March 13, 2007<br />

As of this date, this project will not show an update. Ongoing project details are shown in the project description.<br />

0<strong>21</strong> - Manasota Basin 9


Z9<strong>10</strong><br />

Commissions - Manasota Basin<br />

Project Type Prop. App.&Tax Coll.<br />

AOR(s)<br />

Management Services<br />

Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers, Pinellas-Anclote River,<br />

Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager PILCHER, LINDA<br />

Task Manager(s)<br />

Status Ongoing<br />

CACIOPPO, MIKE, LINSBECK, CATHY<br />

Description<br />

These funds pay the commissions due to the counties within the Basin for tax collection and property appraisals.<br />

Status As Of: September 01, 2009<br />

During the eleven months ended August 31, 2009, $319,120 was remitted in commissions to Property Appraisers and<br />

Tax Collectors. Property Appraiser and Tax Collector commissions are statutorily prescribed and are based on property<br />

tax levies and collections, respectively. Amounts collected in excess of the underlying Property Appraiser and Tax<br />

Collector budgets are returned to the Basin as excess fees. Excess fees not recorded as accounts receivable as of<br />

September 30, 2008 are reflected as current FY2009 revenue.<br />

0<strong>21</strong> - Manasota Basin <strong>10</strong>


Z930<br />

Contingencies - Manasota Basin<br />

Project Type Reserves<br />

AOR(s)<br />

Management Services<br />

Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers, Pinellas-Anclote River,<br />

Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager PILCHER, LINDA<br />

Task Manager(s)<br />

Status Ongoing<br />

CACIOPPO, MIKE, LINSBECK, CATHY<br />

Description<br />

Funds are budgeted for contingencies to be used at the Board's discretion. The goal is to set aside an amount equal to<br />

approximately 5 percent (2.5 percent minimum target) of the ad valorem based budget (ad valorem taxes plus interest<br />

plus balance forward multiplied by 5 percent).<br />

Status As Of: September 01, 2009<br />

To date, the Basin Board has not allocated any of its contingency funds.<br />

0<strong>21</strong> - Manasota Basin 11


S005<br />

Myakka River<br />

Project Type SOR<br />

AOR(s)<br />

Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Project Manager LOVE, KEVIN<br />

Task Manager(s) NELSON, BRIAN, SOWDERS, GINA, HAGBERG, JEFFREY, MILLER, WILL, GREEN,<br />

STEPHANIE<br />

Status Ongoing<br />

Description<br />

In 1995 the Governing Board authorized the acquisition of 38,000 acres within the Myakka River/Charlotte Harbor<br />

project in Sarasota and Charlotte Counties. Most of the lands within the Myakka River project were jointly purchased<br />

with the State. Lands within the Myakka River project area are characterized by a variety of natural lands and lands<br />

altered by development including mesic pine flatwoods, oak hammocks, shell mounds, prairie hammock and improved<br />

pasture. The project area includes portions of the Myakka River and its floodplain forests. A portion of the lands are<br />

managed by the State of Florida's Division of Forestry (DOF) as the Myakka State Forest. The DOF has made the<br />

following recreational improvements/amenities available on the property: Over 13 miles of marked trials available for<br />

hiking, bicycling and horseback riding, trail shelters, primitive camping, canoe launch, and picnic area.<br />

Benefits<br />

Pursuant to Section 373.1391(1)(a), Florida Statutes, lands within the project are managed and maintained in such a<br />

way as to ensure a balance between public access, general public recreational purposes, and restoration and<br />

protection of their natural state and condition.<br />

Costs<br />

FY2009 - The Land Resources Department budget consists of salaries and central garage for prescribed burning,<br />

resource monitoring, land maintenance, fence repair and recreational monitoring. The budget also includes contractual<br />

services for security. The Aquatic Plant Management Section has budgeted funds for salaries, travel, central garage<br />

charges and herbicides to treat infestations of invasive plant species. Field Operations budgeted for salaries, rental<br />

equipment, contracted services, central garage charges, parts, supplies, and land maintenance materials to support<br />

Land Management's requirements. FY20<strong>10</strong> - The Land Resources Department budget consists of salaries and<br />

central garage for prescribed burning, resource monitoring, land maintenance, fence repair and recreational<br />

monitoring. The budget also includes contractual services for security. Recreation improvements consist of an entrace<br />

sign.<br />

Costs for these activities are <strong>10</strong>0 percent reimbursed through the state's Water Management Lands Trust Fund.<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding<br />

District Budgeted - Outside Revenue<br />

(SOR)<br />

0<strong>10</strong> General Fund (Districtwide) 0<br />

0<br />

0<strong>21</strong> Manasota Basin 171,464 <strong>10</strong>6,835<br />

Status As Of: August 27, 2009<br />

Sarasota County is coordinating with the District on plans to improve the Southern entrance for public access and<br />

recreation.<br />

0<strong>21</strong> - Manasota Basin 12


S019<br />

Edward W. Chance Reserve<br />

Project Type SOR<br />

AOR(s)<br />

Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager LOVE, KEVIN<br />

Task Manager(s) NELSON, BRIAN, SOWDERS, GINA, HAGBERG, JEFFREY, MILLER, WILL, GREEN,<br />

STEPHANIE, VANGELDER, WILL<br />

Status Ongoing<br />

Description<br />

In 1991 the Governing Board authorized the acquisition of lands within the Lake Manatee Lower Watershed project in<br />

Manatee County. The Lake Manatee Lower Watershed extends over a large area which includes narrow floodplain<br />

forests and native pine lands surrounded by vast areas of rangeland, improved pastures, croplands, and citrus groves.<br />

Lands purchased within this project protect an existing regional water resource, protect floodplains, and restore<br />

adjoining wetlands in the headwaters. To date 7,929 acres have been acquired in fee simple within the project, with an<br />

additional 25 acres protected by a conservation easement. Approximately <strong>10</strong>,368 have been approved for future fee<br />

simple acquisition. Hiking is available on the property and horseback riding is allowed by a special use permit.<br />

Management units include the Rutland Ranch and Gilley Creek Tracts. On March 2, 2007, the property was dedicated<br />

and renamed as the Edward W. Chance Reserve, in honor of departed Governing Board member, Ed Chance.<br />

Benefits<br />

Pursuant to Section 373.1391(1)(a), Florida Statutes, lands within the project are managed and maintained in such a<br />

way as to ensure a balance between public access, general public recreational purposes, and restoration and<br />

protection of their natural state and condition.<br />

Costs<br />

FY2009 - The Land Resources Department budget consists of salaries and central garage for prescribed burning,<br />

resource monitoring, land maintenance, fence repair and recreational monitoring. The Aquatic Plant Management<br />

Section has budgeted funds for salaries, central garage charges and herbicides to treat infestations of invasive plant<br />

species. Field Operations has budgeted for salaries, rental equipment, contracted services, central garage charges,<br />

parts, supplies, and land maintenance materials to support Land Management's requirements. FY20<strong>10</strong> - The Land<br />

Resources Department budget consists of salaries and central garage for prescribed burning, resource monitoring,<br />

land maintenance, fence repair and recreational monitoring. The budget also includes contractual services for security<br />

and mowing. Costs for these activities are <strong>10</strong>0 percent reimbursed through the state's Water Management Lands<br />

Trust Fund.<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding<br />

District Budgeted - Outside Revenue<br />

(SOR)<br />

0<strong>10</strong> General Fund (Districtwide) 0<br />

0<br />

0<strong>21</strong> Manasota Basin 195,589 155,591<br />

Status As Of: August 27, 2009<br />

Land Resources Department has a new agreement with Suncoast Florida Native Plant Society for plant research on<br />

multiple properties including Gilley Creek. Prescribed burning activities accounted for 391 acres during this period on the<br />

Gilley Creek tract of Ed Chance Reserve. No significant activities have occurred on the Coker Prairie tract.<br />

0<strong>21</strong> - Manasota Basin 13


S024<br />

Upper Myakka River Watershed<br />

Project Type SOR<br />

AOR(s)<br />

Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Project Manager LOVE, KEVIN<br />

Task Manager(s) NELSON, BRIAN, SOWDERS, GINA, HAGBERG, JEFFREY, MILLER, WILL, GREEN,<br />

STEPHANIE, VANGELDER, WILL<br />

Status Ongoing<br />

Description<br />

In 1991 the Governing Board authorized the acquisition of 7,670 acres within the Upper Myakka River Watershed<br />

project in Manatee County. The Upper Myakka River Watershed project area includes forested floodplain swamps and<br />

marshes along the upper portions of the Myakka River watershed. The headwater swamps function as retention and<br />

detention areas for local drainage. Wetland forests and adjoining uplands provide treatment of surface runoff. To date<br />

2,356 acres have been acquired within the project in fee simple. An additional 16,156 acres are approved for<br />

acquisition in fee simple and 2,611 are approved for acquisition using less-than-fee simple techniques. Access to the<br />

property is limited since the project lands are often flooded, thus making trail development difficult. However, the<br />

property contains narrow flatwoods roads and jeep trails that can be used for hikers during dry weather. Lands within<br />

this project are commonly referred to as Flatford Swamp.<br />

Benefits<br />

Pursuant to Section 373.1391(1)(a), Florida Statutes, lands within the project are managed and maintained in such a<br />

way as to ensure a balance between public access, general public recreational purposes, and restoration and<br />

protection of their natural state and condition.<br />

Costs<br />

FY2009 - The Land Resources Department budget consists of salaries and central garage for prescribed burning,<br />

resource monitoring, land maintenance, fence repair and recreational monitoring. The budget also includes contractual<br />

services for security. The Aquatic Plant Management Section has budgeted funds for salaries, central garage charges<br />

and herbicides to treat infestations of invasive plant species. FY20<strong>10</strong> - The Land Resources Department budget<br />

consists of salaries and central garage for prescribed burning, resource monitoring, land maintenance, fence repair<br />

and recreational monitoring. The budget also includes contractual services for security and mowing. Costs for these<br />

activities are <strong>10</strong>0 percent reimbursed through the state's Water Management Lands Trust Fund.<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding<br />

District Budgeted - Outside Revenue<br />

(SOR)<br />

0<strong>10</strong> General Fund (Districtwide) 0<br />

0<br />

0<strong>21</strong> Manasota Basin 44,782 40,577<br />

Status As Of: September 01, 2009<br />

Land Management is working with the Operations Aquatics section in an effort to introduce a biological control agent for<br />

the Old World Climbing Fern.<br />

0<strong>21</strong> - Manasota Basin 14


S030<br />

RV Griffin Reserve<br />

Project Type SOR<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager LANE, CHUCK<br />

Peace River/Manasota Regional Water Supply Auth.<br />

Task Manager(s) NELSON, BRIAN, LANE, CHUCK, HAGBERG, JEFFREY, MILLER, WILL, GREEN, STEPHANIE,<br />

ELLIOTT, PAUL<br />

Status Ongoing<br />

Description<br />

In 1991 the Governing Board authorized staff to pursue acquisition of 8,568 acres in DeSoto County, now referred to<br />

as the RV Griffin Reserve project. In 1996, the Governing Board increased the project size to 31,667 acres, with a<br />

majority of the additional lands lying in Sarasota County. The project includes lands supporting and surrounding the<br />

existing facilities at the Peace River/Manasota Regional Water Supply Authority treatment plant. Lands in the project<br />

area include mixed hardwood forests along the river; however, the majority of the lands in DeSoto County consist of<br />

pine flatwoods, rangelands, pastures, and pine plantations. The project lands support and protect present potable<br />

water supplies. To date, some 5,917 acres have been acquired in fee simple, and a conservation easement over<br />

another 3,804 acres known as the Lewis Longino Preserve. An additional 9,034acres have been approved for<br />

acquisition in fee simple, and 12,616 acres have been approved for acquisition using less-than-fee simple techniques.<br />

Benefits<br />

Pursuant to Section 373.1391(1)(a), Florida Statutes, lands within the project are managed and maintained in such a<br />

way as to ensure a balance between public access, general public recreational purposes, and restoration and<br />

protection of their natural state and condition.<br />

Costs<br />

FY2009 - The Land Resources Department Peace River Basin budget consists of salaries and central garage for<br />

prescribed burning, resource monitoring, land maintenance, fence repair and recreational monitoring. The budget also<br />

includes contractual services for security. Recreation improvements include an entrance sign, kiosk, improved parking<br />

area and trail signs. Field Operations has budgeted for salaries, rental equipment, central garage charges, parts,<br />

supplies, and land maintenance materials to support Land Management's requirements. The Aquatic Plant<br />

Management Section has budgeted funds for salaries, central garage charges and herbicides to treat infestations of<br />

invasive plant species. Monies in the Manasota Basin budget consist of salaries and central garage for conservation<br />

easement monitoring. FY20<strong>10</strong> - The Land Resources Department Peace River Basin budget consists of salaries and<br />

central garage for monitoring the land management arrangement between the District and the Peace River/Manasota<br />

Regional Water Supply Activity and monitoring the conservation easement over the Lewis Longino Preserve in the<br />

Manasota Basin. Costs for these activities are <strong>10</strong>0 percent reimbursed through the State's Water Management Lands<br />

Trust Fund.<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding<br />

District Budgeted - Outside Revenue<br />

(SOR)<br />

0<strong>10</strong> General Fund (Districtwide) 0<br />

0<br />

020 Peace River Basin 89,134 12,799<br />

0<strong>21</strong> Manasota Basin 1,481 1,535<br />

Status As Of: December 31, 2008<br />

The Peace River/Manasota Regional Water Supply Authority has taken over management of the property and<br />

construction of the new reservoir is ongoing.<br />

0<strong>21</strong> - Manasota Basin 15


S031<br />

Myakka Prairie<br />

Project Type SOR<br />

AOR(s)<br />

Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Florida State Parks<br />

Project Manager MILLER, WILL<br />

Task Manager(s)<br />

Status Ongoing<br />

SOWDERS, GINA, LOVE, KEVIN, GREEN, STEPHANIE<br />

Description<br />

In 1992 the Governing Board authorized the acquisition of lands within the Ringling-MacArthur tract (now known as<br />

Myakka Prairie). Lands within the Myakka Prairie project are characterized by the region's flat topography and include<br />

landscapes of extensive shrub and brushlands, pine flatwoods and pastures. Numerous isolated freshwater marshes<br />

dot the site's flatlands. The 8,249 acres of project lands provide surface water detention and natural water quality<br />

treatment of overland sheet flow. The District's Myakka Prairie is adjacent to lands within the Myakka River State Park<br />

and is managed by the State Division of Recreation and Parks. Recreational development/amenities on the property,<br />

made available by the Division of Recreation and Parks include several miles of hiking, bicycling and horseback riding<br />

trails. Future plans include two primitive campsites.<br />

Benefits<br />

Pursuant to Section 373.1391(1)(a), Florida Statutes, lands within the project are managed and maintained in such a<br />

way as to ensure a balance between public access, general public recreational purposes, and restoration and<br />

protection of their natural state and condition.<br />

Costs<br />

The FY2009 FY20<strong>10</strong> budgets includes salaries for Land Resources to coordinate management responsibilities with<br />

the Division of Recreation and Parks and to monitor the management agreement. Costs for these activities are <strong>10</strong>0<br />

percent reimbursed through the state's Water Management Lands Trust Fund.<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding<br />

District Budgeted - Outside Revenue<br />

(SOR)<br />

0<strong>21</strong> Manasota Basin 2,967 3,396<br />

Status As Of: August 27, 2009<br />

Land Resources Department has a site inspection with DEP scheduled for September 1, 2009<br />

0<strong>21</strong> - Manasota Basin 16


S032<br />

Little Manatee River<br />

Project Type SOR<br />

AOR(s)<br />

Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Alafia River, Manasota<br />

Cooperator(s)<br />

Hillsborough County<br />

Project Manager LOVE, KEVIN<br />

Task Manager(s) NELSON, BRIAN, SOWDERS, GINA, HAGBERG, JEFFREY, MILLER, WILL, KRUK, COLLEEN,<br />

VANGELDER, WILL<br />

Status Ongoing<br />

Description<br />

In 1992 the Governing Board authorized the acquisition of lands within the Little Manatee River project in Hillsborough<br />

and Manatee Counties. The Little Manatee River project, consisting of 7,050 acres, acquired in fee simple, contains<br />

parcels of land along the Little Manatee riverine corridor from downstream estuarine waters, to the river's headwaters.<br />

Dense forest dominates the land along the river's floodplain with the adjoining uplands being comprised of a mixture of<br />

pine flatwoods, mixed hardwoods, and shrub and brushlands. An additional 27,000 acres have been authorized for fee<br />

simple acquisition. In 1996 the District entered into a lease agreement with Hillsborough County that designated the<br />

County as manager of lands jointly purchased by the County and the District. The County manages 6,979 acres of the<br />

project lands. Recreational improvements/ amenities made available on the County managed lands include: several<br />

miles of hiking trails, fishing areas and primitive camping along the river. Lands managed by the District within the<br />

Little Manatee River project, in the Manasota Basin, consisting of 1,071 acres are referred to as the Southfork (F/K/A<br />

Cordell) Tract.<br />

Benefits<br />

Pursuant to Section 373.1391(1)(a), Florida Statutes, lands within the project are managed and maintained in such a<br />

way as to ensure a balance between public access, general public recreational purposes, and restoration and<br />

protection of their natural state and condition.<br />

Costs<br />

FY2009 - The Land Resources Department Manasota and Alafia budgets consist of salaries and central garage for<br />

prescribed burning, resource monitoring, land maintenance, fence repair and recreational monitoring. The budget also<br />

includes contractual services for 50% reimbursement to Hillsborough County for management of lands within<br />

Hillsborough County Southfork Tract in the Alafia Basin. Recreation improvements for the Upper Tract in the<br />

Manasota Basin include an entrance sign, kiosk and trail signs. The Aquatic Plant Management Section has budgeted<br />

funds for salaries, central garage charges and herbicides to treat infestations of invasive plant species. Additionally,<br />

contract funds have been budgeted to outsource vegetation management operations targeting Old World climbing<br />

fern. Old World climbing fern is spreading within as well as outside District-owned lands. Due to the difficulty of<br />

assessing known areas of infestation and moving from site to site within swampy areas, existing staff can not<br />

complete this job and stay up with required work on other properties. Field Operations has budgeted for<br />

salaries, rental equipment, central garage charges, parts, supplies, and land maintenance materials to support Land<br />

Management's requirements. FY20<strong>10</strong> - The Land Resources Department Manasota and Alafia budgets consist of<br />

salaries and central garage for prescribed burning, resource monitoring, land maintenance, fence repair and<br />

recreational monitoring. The budget also contains contractual services for security and recreational mowing.<br />

Costs for these activities are <strong>10</strong>0% reimbursed through the state's Water Management Lands Trust Fund.<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding<br />

District Budgeted - Outside Revenue<br />

(SOR)<br />

011 Alafia River Basin 34,636 16,600<br />

0<strong>21</strong> Manasota Basin 149,4<strong>21</strong> 95,995<br />

Project Funds Not Budgeted by the<br />

District<br />

Hillsborough County 20,650<br />

0<br />

0<strong>21</strong> - Manasota Basin 17


S032<br />

Little Manatee River<br />

Status As Of: August 27, 2009<br />

Land Resources Department has a joint agreement with Suncoast Florida Native Plant Society for plant research on<br />

multiple properties including Cordell/Southfork.<br />

0<strong>21</strong> - Manasota Basin 18


S041<br />

Myakkahatchee Creek<br />

Project Type SOR<br />

AOR(s)<br />

Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Project Manager MILLER, WILL<br />

Task Manager(s)<br />

Status Ongoing<br />

SOWDERS, GINA, LOVE, KEVIN, GREEN, STEPHANIE<br />

Description<br />

In 1994 the Governing Board authorized the acquisition of 11,288 acres in Sarasota County, referred to as the<br />

Myakkahatchee Creek. To date 4,458 acres have been acquired by the District via a conservation easement. The<br />

District proposes to purchase an additional 6,073 acres through less-than-fee acquisition and 667 acres in fee simple<br />

within the project. The project area consists of oak/cabbage palm hammock dominated banks along the southern<br />

portions of the creek, isolated marshes and improved pastures within the upland portions and mixed natural lands<br />

scattered throughout. The main surface water feature, Myakkahatchee Creek, is a <strong>21</strong>.5-mile long tributary creek of the<br />

Myakka River.<br />

Benefits<br />

Since the lands within the project were purchased in less-than-fee simple, no land management activities are required.<br />

Costs<br />

Funds included in the FY2009 and FY20<strong>10</strong> budgets are for staff time for contract monitoring, annual conservation<br />

easement monitoring and 50% reimbursement to Sarasota County for their management of jointly owned lands within<br />

the project. Costs for this activity are <strong>10</strong>0 percent reimbursed through the state's Water Management Lands Trust<br />

Fund.<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding<br />

District Budgeted - Outside Revenue<br />

(SOR)<br />

0<strong>10</strong> General Fund (Districtwide) 0<br />

0<br />

0<strong>21</strong> Manasota Basin 65,461 37,266<br />

Status As Of: August 27, 2009<br />

Land Resources Department has a site inspection scheduled September 1, 2009 with Sarasota County.<br />

0<strong>21</strong> - Manasota Basin 19


S042<br />

Tampa Bay Estuarine Ecosystem<br />

Project Type SOR<br />

AOR(s)<br />

Water Quality, Natural Systems<br />

Basin(s) Alafia River, Pinellas-Anclote River, Manasota<br />

Cooperator(s)<br />

Project Manager MILLER, WILL<br />

Task Manager(s)<br />

Status Ongoing<br />

Florida State Parks, Hillsborough County<br />

SOWDERS, GINA, LOVE, KEVIN, HAGBERG, JEFFREY, KRUK, COLLEEN, VANGELDER, WILL<br />

Description<br />

The Tampa Bay Estuarine Ecosystem project was authorized by the Governing Board in 1995, in an effort to further<br />

the Tampa Bay Surface Water Improvement and Management (SWIM) plan. Approximately half the project consists of<br />

mangroves and salt marsh which dominate the northern project area along Bishop Harbor and the western area<br />

associated with the tidal bays of Moses Hole, Clambar Bay, and Williams Bayou. The natural upland and wetland<br />

habitats within the project area provide natural water quality treatment of overland flows before reaching the receiving<br />

waters of Tampa Bay. A majority of the lands within the Tampa Bay Estuarine Ecosystem project were jointly<br />

purchased with the State, Hillsborough County and the City of St. Petersburg. Under an agreement with the State, the<br />

Department of Environmental Protection's Division of Recreation and Parks is the lead land manager on most tracts<br />

within the Manasota Basin and Hillsborough County is the lead manager on the Port Redwing tract within the Alafia<br />

Basin. To date a total of 4,728 have been acquired and another 13,530 acres have been approved for acquisition.<br />

Benefits<br />

Pursuant to Section 373.1391(1)(a), Florida Statutes, lands within the project are managed and maintained in such a<br />

way as to ensure a balance between public access, general public recreational purposes, and restoration and<br />

protection of their natural state and condition.<br />

Costs<br />

Monies in the FY2009 budget for the Land Resources Department consist of salaries and central garage for<br />

prescribed burning, resource monitoring, land maintenance, fence repair and recreational monitoring. The budget also<br />

includes contractual services for mowing and 50% payment of management costs to Hillsborough County for<br />

management of Port Redwing. The FY20<strong>10</strong> budget for the Land Resources Department consists of salaries and<br />

central garage for prescribed burning, resource monitoring, land maintenance, fence repair and recreational<br />

monitoring. Costs for these activities are <strong>10</strong>0 percent reimbursed through the state's Water Management Lands Trust<br />

Fund.<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding<br />

District Budgeted - Outside Revenue<br />

(SOR)<br />

011 Alafia River Basin 20,189 16,341<br />

016 Pinellas-Anclote River Basin 0<br />

0<br />

0<strong>21</strong> Manasota Basin 127,157 18,195<br />

Project Funds Not Budgeted by the<br />

District<br />

Hillsborough County 5,025<br />

0<br />

Status As Of: August 27, 2009<br />

No significant activities have occurred since last update.<br />

0<strong>21</strong> - Manasota Basin 20


S099<br />

Save Our Rivers Administration<br />

Project Type SOR<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality, Natural Systems<br />

Basin(s) General Fund (District), Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers,<br />

Pinellas-Anclote River, Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager SUTTON, ERIC<br />

Task Manager(s)<br />

Status Ongoing<br />

NELSON, BRIAN, WALSH, TOM, LOVE, KEVIN, HAGBERG, JEFFREY, MILLER, WILL<br />

Description<br />

The Save Our Rivers Administration project contains monies for those items not attributable to one unique project<br />

during the budget cycle. Examples are studies affecting all conservation lands, preparation of resource evaluation<br />

reports, heavy equipment used solely on conservation lands, overtime, staff time, vehicle charges and equipment<br />

rental.<br />

Benefits<br />

Pursuant to Section 373.1391(1)(a), Florida Statutes, lands within the project are managed and maintained in such a<br />

way as to ensure a balance between public access, general public recreational purposes, and restoration and<br />

protection of their natural state and condition.<br />

Costs<br />

In addition to salaries and central garage charges, the FY2009 budget includes funds for tree removal in cases where<br />

trees fall from District property onto adjoining owners' property in the Coastal, Hillsborough and Pinellas-Anclote<br />

Basins; and aerial flights to view exotic species in the Hillsborough, Manasota and Peace Basins. The FY20<strong>10</strong> budget<br />

includes salaries, central garage charges, tree removal in cases where trees fall from District property onto adjoining<br />

owners' property in the Coastal and Hillsborough Basins, and aerial flights to view exotics speciec in the General Fund.<br />

Costs for these activities are <strong>10</strong>0 percent reimbursed through the state's Water Management Lands Trust Fund.<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding<br />

District Budgeted - Outside Revenue<br />

(SOR)<br />

0<strong>10</strong> General Fund (Districtwide) 1,724,876 937,997<br />

011 Alafia River Basin <strong>10</strong>,596 7,549<br />

013 Hillsborough River Basin 34,096 12,549<br />

015 Coastal Rivers Basin 25,344 15,641<br />

016 Pinellas-Anclote River Basin 12,090 7,932<br />

019 Withlacoochee River Basin 7,090 7,932<br />

020 Peace River Basin 24,096 7,549<br />

0<strong>21</strong> Manasota Basin 24,096 7,549<br />

Status As Of: March 12, 2009<br />

With the exception of the District fund, the Save Our Rivers (SOR) Administration project is used primarily to budget<br />

monies for SOR, Preservation 2000 and Florida Forever (reimbursable) projects. Generally, funds are not charged to this<br />

project, but transferred to other reimbursable projects within the Basin. An example is overtime. Staff knows at budget<br />

time that overtime will be required within the basins for work on SOR projects, but does not know for which projects, so<br />

monies will be budgeted in S099. When overtime is used later in the year, the monies will show as being spent for the<br />

actual project the staff member worked on (i.e., S009- Starkey, S016 - Weekiwachee Preserve, etc.). In the District funds<br />

monies are primarily used for SOR program administration, purchase of equipment and contractual services.<br />

0<strong>21</strong> - Manasota Basin <strong>21</strong>


SA05<br />

Deer Prairie Creek<br />

Project Type SOR<br />

AOR(s)<br />

Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Sarasota County<br />

Project Manager LOVE, KEVIN<br />

Task Manager(s) FOX, AUGUST, NELSON, BRIAN, SOWDERS, GINA, HAGBERG, JEFFREY, MILLER, WILL,<br />

GREEN, STEPHANIE<br />

Status Ongoing<br />

Description<br />

In 1995 the Governing Board authorized the acquisition of 38,000 acres within the Myakka River/Charlotte Harbor<br />

project in Sarasota and Charlotte Counties. Lands within the Deer Prairie Creek project area are characterized by a<br />

variety of natural lands and lands altered by development including mesic pine flatwoods, oak hammocks, shell<br />

mounds, prairie hammock and improved pasture. The project area includes portions of the Myakka River and its<br />

floodplain forests. All lands within the project are jointly owned by the District and Sarasota County. To date, 8,043<br />

acres have been acquired in fee simple. The District and Sarasota County have entered into a management<br />

agreement wherein the County and District share management responsibilities on the project lands. The District is lead<br />

manager for prescribed burning, natural systems restoration, exotics control and timber management. The County is<br />

lead manager for land use and management plan development, public recreation, education and land use requests,<br />

wildfire response, resource monitoring, cattle grazing and security.<br />

Benefits<br />

Pursuant to Section 373.1391(1)(a), Florida Statutes, lands within the project are managed and maintained in such a<br />

way as to ensure a balance between public access, general public recreational purposes, and restoration and<br />

protection of their natural state and condition.<br />

Costs<br />

FY2009 and FY20<strong>10</strong> - The Land Resources Department budget consists of salaries and central garage for prescribed<br />

burning, resource monitoring, land maintenance, fence repair and recreational monitoring. FY2009 - Field Operations<br />

has budgeted for salaries, rental equipment, contracted services, central garage charges, parts, supplies, and land<br />

maintenance materials to support Land Management's requirements. The Aquatic Plant Management Section has<br />

budgeted funds for salaries, central garage charges and herbicides to treat infestations of invasive plant species.<br />

Costs for these activities are <strong>10</strong>0 percent reimbursed through the state's Water Management Lands Trust Fund.<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding<br />

District Budgeted - Outside Revenue<br />

(SOR)<br />

0<strong>21</strong> Manasota Basin 152,124 132,468<br />

Status As Of: August 27, 2009<br />

No significant activities have occurred since last update.<br />

0<strong>21</strong> - Manasota Basin 22


SA19<br />

Lake Manatee Lower Watershed Upland Restoration #1<br />

Project Type SOR<br />

AOR(s)<br />

Natural Systems<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Project Manager VANGELDER, WILL<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

In 1991 the Governing Board authorized the acquisition of lands within the Lake Manatee Lower Watershed project in<br />

Manatee County. The Lake Manatee Lower Watershed extends over a large area that includes narrow floodplain<br />

forests and native pinelands surrounded by vast areas of rangeland, improved pastures, croplands, and citrus groves.<br />

Lands purchased within this project protect an existing regional water resource, protect floodplains, and restore<br />

adjoining wetlands in the headwaters. To date 7,932 acres have been acquired in fee simple within the project, with an<br />

additional 11,046 approved for future fee simple acquisition. In 2002, 149 wetland acres were restored via the Florida<br />

Department of Transportation (FDOT) mitigation program. In FY2005 through FY20<strong>10</strong>, approximately 324 acres of<br />

former farm field are proposed for restoration back to upland vegetation communities, including scrub, scrubby<br />

flatwoods and dry prairie. The site is the largest contiguous altered site on the tract and ranked as a high priority for<br />

restoration. In FY2005, site work began in preparation for re-vegetation of a 25-acre portion of the site to serve as a<br />

pilot project to test planting methods. A grower was contracted to propagate plant materials for the project, including<br />

palmettos, and three species of scrub oaks, totaling 18,500 plants. The re-vegetation of this site will expand a five-acre<br />

remnant scrub patch that currently supports a family of scrub-jays. This pilot phase of the project was completed in<br />

July 2006. Subsequent monitoring has indicated that the pilot results have exceeded target levels.<br />

Benefits<br />

Pursuant to Section 373.1391(1)(a), Florida Statutes, lands within the project are managed and maintained in such a<br />

way as to ensure a balance between public access, general public recreational purposes, and restoration and<br />

protection of their natural state and condition.<br />

Costs<br />

Funds were included in the FY2008 budget to conduct phase 2 of the project, which included plant material and<br />

planting labor to re-vegetate approximately 46 acres of the site. Plant species, stocking rates and planting methods will<br />

be similar to those proving successful on the pilot phase. Future restoration efforts on the remainder of the site will be<br />

conducted in annual stages over an approximately four-year period.Funds in the FY2009 and FY20<strong>10</strong> budgets are for<br />

salaires and central garage charges. Costs for these activities are <strong>10</strong>0 percent reimbursed through the Water<br />

Management Lands Trust Fund.<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding<br />

District Budgeted - Outside Revenue<br />

(SOR)<br />

0<strong>21</strong> Manasota Basin 18,356 18,385<br />

Critical Project Milestones Projected Amended Actual<br />

Phase 1<br />

RFB 9/1/04 9/1/04<br />

Install Plants 7/31/06 7/31/06<br />

Award Contract 12/1/07 12/1/04<br />

Phase 2<br />

RFB <strong>10</strong>/1/07 11/1/07<br />

Award Contract 12/1/07 9/1/07<br />

Install Plants 7/31/09<br />

Phase 3<br />

RFB <strong>10</strong>/1/08 <strong>10</strong>/15/08<br />

0<strong>21</strong> - Manasota Basin 23


SA19<br />

Lake Manatee Lower Watershed Upland Restoration #1<br />

Award Contract 12/1/08 4/<strong>21</strong>/08<br />

Install Plants 7/31/<strong>10</strong><br />

Phase 4<br />

RFB <strong>10</strong>/1/09<br />

Award Contract 12/1/09<br />

Install Plants 7/31/11<br />

Status As Of: September 01, 2009<br />

Deliveries of plant material and installation of plants is in progress. All but one plant delivery has occurred and ten of the<br />

forty-six acres identified for planting remains to be completed. Manatee County Sheriff Office prison labor provided<br />

assistance for several weeks but are no longer able to supply crews. Land Management staff continue to work towards<br />

finalizing the project while an RFQ is being advertised for assistance for the completion of FY2009 activities as well as<br />

FY20<strong>10</strong>.<br />

0<strong>21</strong> - Manasota Basin 24


D059<br />

Myakka State Forest Hydr. Rest.<br />

Project Type SOR<br />

AOR(s)<br />

Natural Systems<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Project Manager RHINESMITH, PHILIP<br />

Task Manager(s)<br />

Status Cancelled<br />

THORNTON, SHELLEY<br />

Description<br />

The District's Governing Board approved the Hydrologic and Wetlands Restoration of District-owned Lands initiative at<br />

their January 2004 meeting. The initiative focuses on 2 goals which are: A) recovering the functions of water storage<br />

and conveyance in impacted wetlands and streams; and B) recapturing the benefits of water quality and wildlife habitat<br />

formerly provided by the impacted system in its undisturbed state. To accomplish this goal, the District retained the<br />

engineering and environmental services of PBS&J consultants to complete a feasibility study and alternatives analysis.<br />

The Myakka State Forest Hydrologic Restoration project is located in the Myakka State Forest in Sarasota County.<br />

The property is currently managed as a passive recreational facility by the Department of Agriculture and Consumer<br />

Services-Division of Forestry. The surface water impacts are to two separate creek systems both of which contribute<br />

surface water flows to Lemon Bay. These include Ainger Creek and Oyster Creek. Based on the results of the post<br />

restoration surface water modeling accomplished during the first phase of the project, a total of 557 acres of wetlands<br />

will be restored.<br />

Benefits<br />

The project will restore the functions of water storage and conveyance of Oyster Creek, Ainger Creek and numerous<br />

isolated herbaceous wetlands, and recapture the benefits of water quality and wildlife habitat formerly provided by the<br />

impacted system in its undisturbed state.<br />

Costs<br />

The design and permitting for the project will be completed in FY2008 at an estimated cost of $130,000 and<br />

construction in FY2009-<strong>10</strong> at an estimated cost of $493,400. The funding table below includes District staff time, travel<br />

and central garage charges. These activities are reimbursed at <strong>10</strong>0 percent from the Florida Department of<br />

Transportation Mitigation Program. Additional funding is being provided under project SA31.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

024 FDOT Mitigation 0 301 0 160,283<br />

0 160,584<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$160,584<br />

Critical Project Milestones Projected Amended Actual<br />

1. Contract Development & Execution<br />

RFP-CCNA Submitted 4/30/04 6/16/04<br />

Presentations 6/30/04 6/30/04<br />

Consultant Notification 7/24/04 7/24/04<br />

Project Assigned to Consultant <strong>10</strong>/31/04 8/26/04<br />

Contract Routing 11/30/04 <strong>10</strong>/13/04<br />

Contract Signed by Consultant 8/16/05 8/16/05<br />

Contract Fully Executed 8/23/05 8/23/05<br />

2. Critical Project Milestones<br />

Feasibility and Analysis Report Complete 6/30/06 8/31/07 1/15/08<br />

Design Complete 12/31/06 <strong>10</strong>/31/08<br />

Permitting Commence 1/31/07 12/31/08<br />

Permitting Complete 3/31/07 1/31/09<br />

0<strong>21</strong> - Manasota Basin 25


D059<br />

Myakka State Forest Hydr. Rest.<br />

Construction Commence 5/1/07 2/28/09<br />

Construction Complete <strong>10</strong>/30/07 5/31/09<br />

Status As Of: June 22, 2009<br />

The consultant completed the final restoration plan which identified three distinct areas where minor modifications to the<br />

ditch network will result in rehydration of degraded wetlands. These include: removal of a tidal salinity barrier to restore<br />

natural tidal fluctuation to the lower portions of Ainger Creek; installation of a berm on the south side of the forest to<br />

restore normal flows through Oyster Creek; and installation of a series of ditch plugs in the ditches connecting wetlands<br />

in the south-eastern portions of the forest. District staff presented the restoration plan to the "Myakka State Forest<br />

Liaison Committee" at their 04/22/2008 meeting with a favorable response. ACTION TO DATE: On-time. The District<br />

selected King Engineering to finish the surface water modeling for the project and complete the design, permitting and<br />

construction services. The model verification will require more time to complete than originally budgeted. There are<br />

however certain elements of the project that can be accomplished by permit exemption. Part of the construction plan is to<br />

remove a salinity barrier that interrupts flows of Ainger Creek. The District has applied for and received de minimis<br />

exemptions from the Florida Department of Environmental Protection (FDEP) for minor activities such as this. If FDEP<br />

grants the District a De minimis exemption for this, it will allow us to begin construction and accomplish a portion of the<br />

project. District staff will begin negotiating with FDEP for the exemption. If FDEP agrees that this work is minor, District<br />

crews could accomplish the demolition of the barrier by the end of July if site conditions permit.<br />

0<strong>21</strong> - Manasota Basin 26


D060<br />

Edward W. Chance Reserve Hydr. Rest.<br />

Project Type SOR<br />

AOR(s)<br />

Natural Systems<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Project Manager RHINESMITH, PHILIP<br />

Task Manager(s)<br />

Status Cancelled<br />

THORNTON, SHELLEY<br />

Description<br />

The District's Governing Board approved the Hydrologic and Wetlands Restoration of District-Owned Lands initiative at<br />

their January 2004 meeting. The project focuses on 2 goals which are: A) recovering the functions of water storage<br />

and conveyance in impacted wetlands and streams; and B) recapturing the benefits of water quality and wildlife habitat<br />

formerly provided by the impacted system in its undisturbed state. To accomplish this goal, the District will retain the<br />

engineering and environmental services of PBS&J to complete a feasibility and alternatives analysis for the site. The<br />

restoration site is located in the District's Edward W. Chance Reserve (formerly known as the Rutland Ranch). The<br />

property is currently managed by the District for passive recreation and natural resource protection. There are many<br />

isolated wetlands throughout the project area. The impacts to wetland systems are a result of linear ditches<br />

constructed to facilitate drainage off-site thereby improving lands for row crops.<br />

Benefits<br />

The project will recover the functions of water storage and conveyance of Gilley Creek and numerous isolated<br />

herbaceous wetlands and recapture the benefits of water quality and wildlife habitat formerly provided by the impacted<br />

system in its undisturbed state.<br />

Costs<br />

The design and permitting for the project will be initiated in FY2009 at an estimated cost of $75,000 and construction<br />

in FY2008-09 using the remainder of the FY2007 funds and an additional $<strong>10</strong>8,934 for a total of $386,557. The<br />

FY2009 budget is for permit fees, District staff time, travel and central garage charges. The total project cost is<br />

expected to be $450,000. These activities are reimbursed at <strong>10</strong>0 percent from the Florida Department of<br />

Transportation Mitigation Program. Previous funding can be found in project SB19.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

024 FDOT Mitigation 0 0 0 260,283<br />

0 260,283<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$260,283<br />

Critical Project Milestones Projected Amended Actual<br />

1. RFP, Consultant Selection & Contract<br />

RFP-CCNA Submitted 4/30/04 6/16/04<br />

Presentations 6/30/04 6/30/04<br />

Consultant Notification 7/24/04 7/24/04<br />

Project Assigned to Consultant <strong>10</strong>/31/04 8/26/04<br />

Contract Routing 11/1/04 <strong>10</strong>/13/04<br />

Contract Signed by Consultant 11/30/04 9/1/05<br />

Contract Fully Executed 5/31/05 9/<strong>21</strong>/05<br />

2. Critical Project Milestones<br />

Feasibility and Analysis Report Complete 6/30/06 8/31/06 2/1/08<br />

Design Complete 12/31/06 <strong>10</strong>/31/09<br />

Permitting Commence 1/31/07 12/31/09<br />

Permitting Complete 3/31/07 1/30/<strong>10</strong><br />

Construction Commence 4/1/07 2/28/<strong>10</strong><br />

0<strong>21</strong> - Manasota Basin 27


D060<br />

Edward W. Chance Reserve Hydr. Rest.<br />

Construction Complete 9/30/07 6/1/<strong>10</strong><br />

Status As Of: June 22, 2009<br />

The consultant completed the final restoration plan which identified three distinct areas where minor modifications to the<br />

ditch network will result in rehydration of degraded wetlands. ACTION TO DATE: On-time. King Engineering, the<br />

District's environmental consultant on the project is working on the model verification of the site hydrology. This is proving<br />

to be more time consuming than originally anticipated. There are however certain elements of the project that can be<br />

accomplished by permit exemption. Part of the construction plan is to plug several upland agricultural ditches that are no<br />

longer contributing surface water to Gilley Creek. Instead of incorporating this into the ERP, the District may be able to<br />

apply for and receive a de minimis exemptions from the Florida Department of Environmental Protection (FDEP) for<br />

minor activities such as this. If FDEP grants the District a De minimis exemption for this, it will allow us to begin<br />

construction and accomplish a portion of the project. District staff will begin negotiating with FDEP for the exemption. If<br />

FDEP agrees that this work is minor, District crews could accomplish the construction by the end of the year if site<br />

conditions permit.<br />

0<strong>21</strong> - Manasota Basin 28


SI99<br />

Environmental Education Centers<br />

Project Type SOR<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Withlacoochee River, Manasota<br />

Cooperator(s)<br />

Project Manager MILLER, WILL<br />

Task Manager(s)<br />

Status Proposed<br />

Description<br />

On July 12 2007, at a joint meeting of the Basin Board Land Resources and Education Committees, staff presented an<br />

analysis of existing education efforts and population density to determine the geographic regions that would most likely<br />

support environmental education centers similar to that of Nature's Classroom. The results demonstrated that the<br />

Manasota and Withlacoochee River Basins were the basins that most warrant further efforts to establish<br />

environmental education centers. Additionally, promoting education opportunities is a strategy identified in the District's<br />

Strategic Plan. Recognizing the value of nature-based experiences for children, the District has a history of supporting<br />

field trip programs and other hands-on experiences with nature. These programs not only offer immediate learning<br />

experiences for students, but also create lasting impressions. Without these programs, many students would not have<br />

the opportunity to experience the natural environment. Because of the District's mission related to natural systems and<br />

in recognition of increasing pressures on schools to streamline and meet core education standards, staff believes that<br />

it is prudent to take a comprehensive look at currently available programs and centers. One of the more successful<br />

efforts has been the Nature's Classroom partnership. Natures Classroom is located on 365 acres in northeast<br />

Hillsborough County along the Hillsborough River. The property is owned by the District and managed by the School<br />

Board of Hillsborough County as an environmental education facility. Since 1994, the Southwest Florida Water<br />

Management District has supported a unique three-day environmental education program in partnership with the<br />

Hillsborough County School Board and the Hillsborough County Education Foundation. This program makes it<br />

possible for all public school sixth-grade students in Hillsborough County to attend a three-day, hands-on field-study<br />

focusing on the hydrology and ecosystem management of the Hillsborough River. Annually, approximately 13,000<br />

students and 1,000 teachers participate in Nature's Classroom studies. Other similar efforts and District contributions<br />

to education centers include those at Starkey Wilderness Park, Weekiwachee Preserve and Circle B Bar Reserve.<br />

Although programs at education centers like these can be successful, the centers themselves are not the core reason<br />

for the successes. There are a number of other ways to achieve youth-based environmental education goals through<br />

productive partnerships.<br />

Benefits<br />

Building an education center can be a valuable catalyst to achieve environmental education goals, but only if there are<br />

partnership commitments, particularly with the school boards, to assure the long-term viability and effective education.<br />

In cases where this commitment is not as strong, the District has sought other methods and programs to educate the<br />

youth on the value of ecosystems, watersheds and conservation in general. In addition, there are a number of other<br />

environmental education programs and centers throughout the 16-county region that the District is not responsible for<br />

developing and supporting. This is important to consider in assessing needs for future District efforts in order to assure<br />

the prudent expenditure of resources and effort.<br />

Costs<br />

Staff will initiate discussions with the potential partners within the recommended regions to determine if other entities,<br />

such as school boards, would provide the necessary long term support for the education centers. District costs are<br />

<strong>10</strong>0% reimbursible from the Water Management Lands Trust Fund.<br />

Status As Of: May 28, 2009<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding<br />

The Boards approved transfer of budgeted funds to SWIM at the April Basin Board meeetings.<br />

0<strong>21</strong> - Manasota Basin 29


W020<br />

SWIM Plan Implementation - Tampa Bay<br />

Project Type SWIM<br />

AOR(s)<br />

Water Quality, Natural Systems<br />

Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Pinellas-Anclote River, Manasota<br />

Cooperator(s)<br />

Tampa Bay Estuary Program<br />

Project Manager KAUFMAN, KRIS<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This project provides for the implementation, periodic review, and update of the Tampa Bay Surface Water<br />

Improvement and Management (SWIM) Plan. The plan was originally prepared in 1988 and updated in 1992 and<br />

1999. Development and update of the SWIM plan is completed in coordination with involved stakeholders and<br />

governmental agencies and includes: an assessment of implementation progress, development of new projects<br />

(rationale and justification), and determination of pertinent Pollutant Load Reduction Goals (PLRG). Additionally, this<br />

project provides for the implementation of projects identified in the Tampa Bay SWIM Plan; including water quality<br />

assessments necessary for SWIM plan implementation, periodic Tampa Bay Estuary Program (TBEP) Technical<br />

Advisory Committee meetings, contract development, invoicing, project presentations, site visits and other relevant<br />

tasks.<br />

Benefits<br />

A SWIM Plan must be developed and approved before state SWIM funds can be spent on restoration, protection or<br />

management activities. SWIM projects are eligible for state matching funds with the state funding fifty percent of the<br />

project costs and the District funding the remaining 50 percent.<br />

Costs<br />

The FY20<strong>10</strong> ongoing costs for the Tampa Bay SWIM Plan Implementation are funded 25 percent from the<br />

Pinellas-Anclote River, 25 percent from the Manasota, 25 percent from the Hillsborough River, and 25 percent from<br />

the Alafia River Basin Boards. District funds shown in the table include staff salaries.<br />

Additional Information<br />

In 1987, the Florida Legislature established the Surface Water Improvement and Management (SWIM) Act having<br />

recognized that water quality and habitat in surface waters throughout the state have degraded or were in danger of<br />

being degraded. The Act requires the five water management districts to maintain a priority list of water bodies of<br />

regional or statewide significance within their boundaries, and develop plans and programs for the improvement of<br />

those water bodies. Tampa Bay was identified by the Legislature in the SWIM Act as the highest priority on the<br />

District's SWIM priority list. To date, ten SWIM water bodies in the District have had plans developed and approved by<br />

the state. Several plans have been updated one or more times as required by the Act.<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

011 Alafia River Basin 61,541 13,146 23,528<br />

0 98,<strong>21</strong>5<br />

013 Hillsborough River Basin 61,540 13,146 23,966<br />

0 98,652<br />

014 Northwest Hillsborough Basin 61,540 13,146<br />

0<br />

0 74,686<br />

016 Pinellas-Anclote River Basin 62,982 13,146 23,528<br />

0 99,656<br />

0<strong>21</strong> Manasota Basin 62,358 13,146 23,198<br />

0 98,702<br />

District Budgeted - Outside Revenue<br />

State Trust Funds (SWIM) 152,431 65,729<br />

0<br />

0 <strong>21</strong>8,160<br />

State Trust Funds (SWIM) - Prior 2006 236,306 0<br />

0<br />

0 236,306<br />

WMLTF (SWIM) - Prior Year Funds 0 0 44,220<br />

0 44,220<br />

0<strong>21</strong> - Manasota Basin 30<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$968,597


W020<br />

SWIM Plan Implementation - Tampa Bay<br />

Critical Project Milestones Projected Amended Actual<br />

1. Critical Project Milestones<br />

Tampa Bay SWIM Plan Update 2/8/99 2/8/99<br />

Next Update of SWIM Plan 12/31/06 12/31/07<br />

2. Critical Project Milestones<br />

USF Stable Isotope Analysis Purchase Order Opened 8/25/05 8/25/05<br />

Coordination <strong>Meeting</strong> for Isotopic Investigation of OTB Pollutants 4/15/07 4/15/07<br />

Expiration of Purchase Order 12/31/07 12/31/07<br />

3. Critical Project Milestones<br />

Design and implementation of Tampa Bay Shallow Water Sampling 1/31/08 2/29/08 2/25/08<br />

3. Critical Project Milestones<br />

Completion of first year of Tampa Bay Shallow Water Sampling 12/31/08 12/31/08<br />

Completion of second year of Tampa Bay Shallow Water Sampling 12/31/09<br />

Status As Of: September 01, 2009<br />

Coordination and implementation of the Tampa Bay Shallow Water Quality Evaluation is ongoing. Sampling began in<br />

February 2008 and continues monthly. Evaluations of TBEP's existing monitoring programs and discussions of other<br />

cooperative implementation opportunities will continue to be reviewed through participation in the TAC and subcommittee<br />

meetings.<br />

0<strong>21</strong> - Manasota Basin 31


W027<br />

Tampa Bay Estuary Program<br />

Project Type SWIM<br />

AOR(s)<br />

Water Quality, Natural Systems<br />

Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Pinellas-Anclote River, Manasota<br />

Cooperator(s)<br />

Tampa Bay Estuary Program<br />

Project Manager GARCIA, LIZANNE<br />

Task Manager(s)<br />

Status Ongoing<br />

SEACHRIST, JENNETTE<br />

Description<br />

This project provides funding for the Tampa Bay Estuary Program (TBEP) as outlined in the Interlocal Agreement<br />

which established the TBEP as a independent special district in 1998. The District participates in three main areas.<br />

First the District's SWIM program, funded by the basin boards and State, carries out the projects that will address<br />

water quality and habitat restoration within the bay. Second, the basin boards and State have contributed funding to<br />

the TBEP since 1990 to carry out the administration and implement projects identified in the TBEP Comprehensive<br />

Conservation and Management Plan. And finally, the District provides staff to sit on the technical, management and<br />

policy (Governing Board Member) boards and the Nitrogen Management Consortium of the program. The District's<br />

annual budget includes funding support to the TBEP and District staff salaries, travel and central garage to administer<br />

the project, which includes attending board meetings and other workshops and invoicing.<br />

Benefits<br />

This project's support of the Tampa Bay Estuary Program creates an opportunity for a cohesive effort between the<br />

District, TBEP and other state and local agencies to implement resource management decisions and restoration<br />

activities. Additionally, this project provides for leveraging funding between the partners.<br />

Costs<br />

The District has provided funding to the TBEP on an annual basis since 1990. The District's current annual funding<br />

commitment to the TBEP is $138,335. The FY20<strong>10</strong> funding is split 25 percent from the Pinellas-Anclote River, 25<br />

percent from the Manasota, 25 percent from the Hillsborough River, and 25 percent from the Alafia River Basin<br />

Boards. If State SWIM funds are available, they will be applied to the District's contribution. District funds are used to<br />

implement projects outlined in the Annual Workplan. District funds shown in the table include staff salaries.<br />

Additional Information<br />

TBEP Background: In 1987, the Florida Legislature established the Surface Water Improvement and Management<br />

Program (SWIM) Act having recognized that water quality and habitat in surface waters through out the state have<br />

degraded or are in danger of being degraded. The Act requires the District maintain a priority list of waterbodies of<br />

regional or statewide significance within their boundaries. The Act listed Tampa Bay as the District's number one<br />

priority. Subsequently, in 1990, the United States Environmental Protection Agency identified Tampa Bay as an<br />

estuary of Federal Significance and included it in the National Estuary Program. As a result of this designation, the<br />

Tampa Bay National Estuary Program (TBNEP) was established in 1991 (with the District as a founding partner) to<br />

assist the region in developing a comprehensive plan for the restoration and protection of Tampa Bay. The TBNEP<br />

developed the first Comprehensive Conservation and Management Plan (CCMP) for Tampa Bay in 1996 which<br />

included measurable goals for restoring seagrasses and related targets for reducing nitrogen discharges to the bay.<br />

The parties unanimously adopted a "hold the line" target on nitrogen discharges that capped the load at a level that<br />

would ensure adequate water clarity and light to sustain seagrass recovery. In August 1996, the NEP's governmental<br />

partners joined with key industries in the Tampa Bay region to create a unique public/private partnership known as the<br />

Tampa Bay Nitrogen Management Consortium (Consortium) for the express purpose of developing a Consortium<br />

Action Plan to meet the "hold the line" target. The original Consortium Action Plan consisted of more than <strong>10</strong>0 projects<br />

which collectively reduced or precluded nitrogen discharges to the bay by an estimated 134 tons/year between 1995<br />

and 1999. In 1998, local government and agency partners in the TBNEP executed the Tampa Bay Estuary Program<br />

Interlocal Agreement reinforcing their commitment to the NEP and its purpose (at which time the NEP became the<br />

Tampa Bay Estuary Program or TBEP). Parties to the Interlocal Agreement include the U.S. Environmental Protection<br />

Agency (EPA), Florida Department of Environmental Protection (FDEP), the District, Hillsborough, Manatee and<br />

Pinellas counties and the cites of St. Petersburg, Tampa and Clearwater. The Interlocal Agreement requires that<br />

parties provide annual funding to the TBEP, develop an agency action plan and to participate as a member of the<br />

Consortium. Later in 1998, the public and private entities in the Consortium executed the "Resolution of the Nitrogen<br />

Management Consortium Adopting the 1995-1999 Nitrogen Management Action Plan and Committing to its<br />

Implementation" (1998 Resolution). This resolution was presented to the five Basin Boards that represent Tampa Bay<br />

(Alafia River, Northwest Hillsborough, Hillsborough River, Pinellas-Anclote River, and Manasota) and the Governing<br />

Board at their meetings in June 1998 and the Governing Board approved this resolution and the District's Action Plan<br />

June 23, 1998. Tampa Bay Total Maximum Daily Load (TMDL) Status: In 1998, pursuant to the federal Clean Water<br />

0<strong>21</strong> - Manasota Basin 32


W027<br />

Tampa Bay Estuary Program<br />

Act, FDEP submitted a TMDL for nitrogen for Tampa Bay to the EPA. The TMDL is based on the annual average total<br />

nitrogen loading to major bay segments estimated by the TBEP. These loadings are seen as the maximum loadings<br />

that can occur and still meet the seagrass restoration goals. EPA approved the submitted TMDL June 18, 1998. In<br />

1999, the Florida Legislature passed the Florida Watershed Restoration Act which established the state's TMDL<br />

process. This Act allows for stakeholders to show that existing or proposed pollution control programs will provide<br />

"Reasonable Assurance" (RA) that impaired water bodies will meet their designated uses. If FDEP accepts the<br />

documentation for RA, then the water body will not be included on the Verified List for Impaired Waters and will not<br />

require the development of a TMDL. Subsequently, the TBEP and the Consortium developed and submitted a RA<br />

document to the FDEP in 2002, based on the Consortium Action Plan. The document provided the FDEP with a<br />

complete description of the Tampa Bay Nitrogen Management Strategy. The TBEP also provided FDEP with a copy of<br />

the 1998 Resolution that committed both private and public partners to the projects identified in their action plans. The<br />

FDEP accepted the 2002 RA document submitted by the TBEP and the Consortium as adequate to address nutrient<br />

impairment in Tampa Bay segments, and removed Tampa Bay segments from the State's 303(d) list for 2002-2007.<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

011 Alafia River Basin 42,883 14,801 36,497 34,584 128,765<br />

013 Hillsborough River Basin 42,883 14,801 36,497 34,584 128,765<br />

014 Northwest Hillsborough Basin 42,883 14,801<br />

0<br />

0 57,684<br />

016 Pinellas-Anclote River Basin 42,884 14,800 36,497 34,584 128,765<br />

0<strong>21</strong> Manasota Basin 42,883 14,800 36,497 34,584 128,764<br />

District Budgeted - Outside Revenue<br />

State Trust Funds (SWIM) <strong>21</strong>4,408 74,000<br />

0<br />

0 288,408<br />

WMLTF (SWIM) - Prior Year Funds 0 0 7,648<br />

0 7,648<br />

Project Funds Not Budgeted by the<br />

District<br />

Local Government Partners 829,995 276,665 286,665<br />

0 1,393,325<br />

US EPA 1,502,133 492,600 608,250<br />

0 2,602,983<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$4,865,<strong>10</strong>7<br />

Critical Project Milestones Projected Amended Actual<br />

1. FY2009 Annual Workplan Critical Project Milestones<br />

FY2009 Draft Agreement to Management Services 9/5/08 <strong>10</strong>/22/08 <strong>10</strong>/22/08<br />

Agreement Fully Executed <strong>10</strong>/<strong>10</strong>/08 12/23/09 12/23/09<br />

FY2009 First Payment (1/2 total) 12/1/08 12/1/08<br />

FY2009 Final Payment (1/2 total) 3/1/09 3/1/09<br />

FY2009 Contract Expiration 9/30/09 9/30/09<br />

2. FY20<strong>10</strong> Annual Workplan Critical Project Milestones<br />

FY20<strong>10</strong> Draft Agreement to Management Services <strong>10</strong>/1/09<br />

FY20<strong>10</strong> Agreement sent to Cooperator <strong>10</strong>/15/09<br />

FY20<strong>10</strong> Agreement returned from cooperator <strong>10</strong>/29/09<br />

FY20<strong>10</strong> Agreement fully executed 11/12/09<br />

FY<strong>10</strong><strong>10</strong> First 1/2 payment 12/31/09<br />

FY<strong>10</strong><strong>10</strong> Second 1/2 payment 3/1/<strong>10</strong><br />

FY20<strong>10</strong> End of Contract 9/30/<strong>10</strong><br />

0<strong>21</strong> - Manasota Basin 33


W027<br />

Tampa Bay Estuary Program<br />

Status As Of: August 26, 2009<br />

FY20<strong>10</strong> Annual Work Plan: The work plan has been drafted, sent to the cooperator for review and is expected to be<br />

routed internally by September 11, 2009. TBEP Nitrogen Management Consortium (Consortium): In May 2008, the FDEP<br />

accepted the Tampa Bay 2007 Reasonable Assurance Update (RA Update) and a Declaration of Cooperation of the<br />

Consortium (Declaration). These documents were approved by the basin boards and the Governing Board at their<br />

meetings in February 2008. To comply with FDEP and EPA requirements, the RA Update includes a detailed outline and<br />

time schedule for: a) development of total nitrogen Waste Load Allocations (WLA) and Load Allocations (LA) for each<br />

bay segment, taking into account the nitrogen load reductions (existing and future) that have been documented through<br />

projects submitted by Consortium partners and other sources; and (b) development of total nitrogen WLAs for each<br />

permitted point source facility and permitted MS4 stormwater system within each bay segment. The maximum<br />

cumulative total nitrogen loading for all WLAs together with LAs will not exceed the assimilative capacity for a bay<br />

segment, as defined in the EPA accepted TMDL for Tampa Bay. The Declaration commits Consortium members,<br />

including the District, to working together to contribute funding to and work to develop the WLAs and LAs and to<br />

complete projects to reduce nitrogen loads. Once the load allocations are established, the Consortium anticipates each<br />

member signing a formal resolution accepting the revised load allocations for their permits. The District does not have<br />

any permits that are subject to this process; however, the District is a member of the TBEP and is committed to<br />

participating in the Consortium. The District's participation is primarily through the cooperative funding of projects with<br />

local governments that reduce nitrogen loading to Tampa Bay. At the February 27, 2009 meeting, the Consortium<br />

discussed the load allocations to the individual entities (i.e. load allocations for waste water treatment plants and<br />

stormwater systems for local governments and load allocations for mining and other entities). At the April 24, 2009<br />

meeting it was confirmed stated that EPA will not replace federal TMDL with RA Plan, however EPA will consider using<br />

Tampa Bay's site-specific thresholds for chlorophyll-a. Draft final load allocations were presented and there was much<br />

discussion regarding how to determine compliance by individual entities. A Guideline for nitrogen load transfers (pollutant<br />

trading) was discussed and will be a topic for a subcommittee meeting on May 8, 2009. At the meeting on May 19, 2009,<br />

the Consortium will discuss a resolution to be adopted by all members of the Consortium supporting the RA Plan which is<br />

anticipated to be submitted to FDEP in July 2009. At the June 25, 2009 meeting the Consortium discussed, 1).<br />

requesting clarification from FDEP regarding the WQBEL (Water Quality Effluent Based Limit) process proposed for the<br />

Tampa Bay RA allocations; 2). requesting a response in writing to the Consortium's question regarding whether EPA will<br />

consider replacing or revising the current TMDL bay-segment numbers with assimilative capacity estimates; 3).<br />

requesting an extension of the final RA document submittal date to September 30, 2009, given the Consortium's<br />

progress to date and the new information presented at the meeting regarding the WQBEL process and if or how that may<br />

affect allocations. Consortium participants (staff level) will vote on whether to submit Plan Update to DEP at next meeting<br />

scheduled for September 11th. The final document will be available after August 17th. Group revised the Declaration<br />

down to 1 paragraph for submittal to all parties (BoCCs, City Councils, Boards) and will reference the 500 page Plan as<br />

an exhibit. Serious concerns still exist over waiver of rights, allocations and regulatory dovetail. Several of the<br />

Consortium members are not comfortable with the Plan Update. Another potential delay is related to a challenge to a<br />

WQBEL and DEP has declared that they will take no action on the RA until this issue is resolved. If the challenge is<br />

successful, there will be NO reasonable assurance, so DEP would be unable to approve RA. The RA document will be<br />

adopted by Secretarial Order. Assuming that the RA is adopted, the new permit load allocations will become effective<br />

when the permits come up for renewal. DEP will not be opening up permits to change loads at this time. Enforcement of<br />

the permits will still be the responsibility of FDEP. The Consortium decided that all entities with allocations should get a<br />

vote, regardless of whether they participate or fund. Group questioned appropriateness of giving entities without<br />

allocations a vote (ex: Tampa Int. Airport, DEP, WMD, etc.). Response was all entities will be materially affected by Plan<br />

and have contributed funding and technical support up to this point. Most may abstain (FDEP, EPA). DEP will hold up the<br />

WQBEL process until all Declarations are received, however, will proceed with reviewing the RA Addendum. Next<br />

meeting will be morning of September 11th. At that time, group will vote to submit the Addendum to DEP (without any<br />

formal Declarations of support).<br />

0<strong>21</strong> - Manasota Basin 34


W028<br />

Bay Soundings<br />

Project Type SWIM<br />

AOR(s)<br />

Water Supply, Water Quality, Natural Systems<br />

Basin(s) Alafia River, Hillsborough River, Pinellas-Anclote River, Manasota<br />

Cooperator(s)<br />

Project Manager ROE, MELISSA<br />

Task Manager(s)<br />

Status Ongoing<br />

Tampa Bay Regional Planning Council<br />

Description<br />

This Surface Water Improvement and Management (SWIM) project consists of a full-color, 16-page, quarterly<br />

environmental journal that provides important information on issues affecting Tampa Bay, its watershed and the<br />

natural resources of the Tampa Bay region. The Bay Soundings publication supports the Tampa Bay SWIM plan and<br />

is consistent with the Tampa Bay Estuary Program goals. Through the education efforts of Bay Soundings, residents in<br />

the Tampa Bay area learn about the restoration and preservation of SWIM water bodies. This free publication is<br />

distributed throughout Pasco, Pinellas, Hillsborough and Manatee counties to government and non-government<br />

agencies, local attractions, private businesses, environmental clubs, schools, libraries, elected officials and sponsors.<br />

District staff sits on the editorial board and provides story ideas featuring District projects that meet the editorial focus<br />

of the publication. Bay Soundings' web site is www.tbsoundings.com.<br />

Benefits<br />

Bay Soundings enhances the District's educational outreach efforts on Tampa Bay by helping to increase the readers'<br />

knowledge of local environmental issues. Each edition of this publication features one or more topics pertaining to<br />

District projects or areas of responsibility. SWIM water bodies are often featured in the publication's articles.<br />

Costs<br />

The total cost for the FY20<strong>10</strong> project is $45,000 with the District contributing $22,500 (Alafia River $2,250;<br />

Hillsborough River $7,875; Pinellas-Anclote River $7,425; Manasota $4,950). No state SWIM funds were available to<br />

be applied to this project. The publication's circulation of 25,000 residents at a cost of $0.90 per resident. Budget lines<br />

below include costs for staff to manage the project.<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

011 Alafia River Basin 2,730 935 2,250<br />

0 5,915<br />

013 Hillsborough River Basin 7,507 2,571 7,875<br />

0 17,953<br />

014 Northwest Hillsborough Basin 3,754 1,286<br />

0<br />

0 5,040<br />

016 Pinellas-Anclote River Basin 12,627 4,324 7,425<br />

0 24,376<br />

0<strong>21</strong> Manasota Basin 7,507 2,571 4,950<br />

0 15,028<br />

District Budgeted - Outside Revenue<br />

State Trust Funds (SWIM) 34,122 11,684<br />

0<br />

0 45,806<br />

Project Funds Not Budgeted by the<br />

District<br />

Tampa Bay Regional Planning Council 0 0 22,500<br />

0 22,500<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$136,618<br />

Critical Project Milestones Projected Amended Actual<br />

FY2008<br />

0<strong>21</strong> - Manasota Basin 35


W028<br />

Bay Soundings<br />

Winter issue 2/20/08 2/20/08<br />

Spring issue 5/20/08 5/20/08<br />

Summer issue 8/20/08 7/29/08<br />

Fall issue 11/20/08 <strong>10</strong>/17/08<br />

FY2009<br />

PO opened <strong>10</strong>/1/08 <strong>10</strong>/20/08<br />

Winter issue 2/20/09 2/5/09<br />

Spring issue 5/20/09 5/18/09<br />

Summer issue 8/20/09 8/20/09<br />

Fall issue 11/20/09<br />

FY20<strong>10</strong><br />

PO opened <strong>10</strong>/1/09<br />

Winter issue 2/20/<strong>10</strong><br />

Spring issue 5/20/<strong>10</strong><br />

Summer issue 8/20/<strong>10</strong><br />

Fall issue 11/20/<strong>10</strong><br />

Status As Of: August 24, 2009<br />

The summer edition of Bay Soundings featured the Tampa Bay seagrass restoration project. The District and several of<br />

its cooperators were quoted regarding the health of Tampa Bay as well as the future of the watershed. ACTION TO<br />

DATE: On time<br />

0<strong>21</strong> - Manasota Basin 36


W030<br />

Tampa Bay Watch Field Trip Program<br />

Project Type SWIM<br />

AOR(s)<br />

Water Quality, Natural Systems<br />

Basin(s) Alafia River, Hillsborough River, Pinellas-Anclote River, Manasota<br />

Cooperator(s)<br />

Tampa Bay Watch<br />

Project Manager HULL, MARY MARGARET<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This Surface Water Improvement and Management (SWIM) project educates elementary, middle and high school<br />

students about estuarine science and empowers them to act as stewards of the Tampa Bay estuary by combining<br />

classroom curriculum with 300 hands-on field experiences in and around Tampa Bay Watch's new Marine Science<br />

Center. The cooperator expanded the program in FY2009 to include students in Hillsborough and Manatee counties,<br />

while still serving schools throughout Pinellas County. In FY20<strong>10</strong>, the program continues to include the educational<br />

field experiences, classroom presentations, teacher training, coastal plantings, oyster reef enhancement efforts and<br />

coastal cleanups. These efforts will provide restoration of approximately seven acres of coastal and near-shore<br />

habitat, build and install 200 new oyster domes and construct approximately 500 linear feet of new oyster shell bars.<br />

The program's effectiveness is measured with student pre/posttests, journal work and teacher surveys.<br />

Benefits<br />

This project is designed to implement an environmental education initiative in Tampa Bay. Tampa Bay was identified<br />

as the highest priority on the District's SWIM priority list in 1988. The program's goals are to educate students and<br />

teachers about the importance of estuarine habitats and restoration efforts and to empower them to become lifelong<br />

stewards of Tampa Bay. With expansion of the programs into Hillsborough and Manatee counties and the addition of<br />

Bay Grasses in Classes, this project features a more comprehensive environmental education restoration initiative,<br />

reaching 12,600 students and adults.<br />

Costs<br />

The FY20<strong>10</strong> total project cost is $307,500, with the District contributing $147,850 (Alafia River $29,570; Hillsborough<br />

River $29,570; Pinellas-Anclote River $73,925; Manasota $14,785). The dollar amount allocated for each contributing<br />

Basin Board is determined by the participating schools within each basin. District funds will be used for program<br />

implementation, 300 field trips, three teacher training workshops, aquatic supplies, and equipment and field guides.<br />

The program is projected to reach 12,600 students and adults at a cost to the District of $11.73 per person. The<br />

budget lines below include costs for staff to manage the project.<br />

Additional Information<br />

The FY2009 total project cost was $297,190, with the District's contribution of $148,450 funded by SWIM $74,225 and<br />

the remaining funding split among the following basin boards: Hillsborough River $7,423, Northwest<br />

Hillsborough $7,422, Alafia River $14,845, Pinellas-Anclote River $37,113 and Manasota $7,422. District funding<br />

is used for program implementation, 275 field trips, two teacher training workshops, aquatic supplies and equipment,<br />

and field guides. The program is projected to reach 11,600 students at a cost to the District of $12.80 per person. The<br />

District has supported this project since FY2007.<br />

0<strong>21</strong> - Manasota Basin 37


W030<br />

Tampa Bay Watch Field Trip Program<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

011 Alafia River Basin 0 15,015 29,570<br />

0 44,585<br />

013 Hillsborough River Basin 0 7,507 29,570<br />

0 37,077<br />

014 Northwest Hillsborough Basin 0 7,507<br />

0<br />

0 7,507<br />

016 Pinellas-Anclote River Basin 76,963 37,536 74,404<br />

0 188,903<br />

0<strong>21</strong> Manasota Basin 0 7,508 14,785<br />

0 22,293<br />

District Budgeted - Outside Revenue<br />

State Trust Funds (SWIM) 76,962 75,071<br />

0<br />

0 152,033<br />

WMLTF (SWIM) - Prior Year Funds 0 0 479<br />

0<br />

479<br />

Project Funds Not Budgeted by the<br />

District<br />

Tampa Bay Watch 186,950 148,740 159,650<br />

0 495,340<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$948,<strong>21</strong>7<br />

Critical Project Milestones Projected Amended Actual<br />

FY2009 Budgeted Funds<br />

Purchase order opened <strong>10</strong>/27/08 <strong>10</strong>/31/08<br />

Field trips and teacher training completed 8/30/09 8/30/09<br />

Final report and invoice due to District 9/30/09<br />

FY20<strong>10</strong> Budgeted Funds<br />

Initiate purchase order <strong>10</strong>/1/09<br />

Field trips and teacher training completed 8/31/<strong>10</strong><br />

Final report and invoice due to District 9/30/<strong>10</strong><br />

Status As Of: September <strong>10</strong>, 2009<br />

The cooperator has completed 300 field trips, including on-site Estuary EDventures, off-site field trips (Bay Grasses in<br />

Classes) and summer camps. In addition, 11 community ecotours, 9 outreach sessions, 3 community plantings and 1<br />

large (<strong>10</strong>0+) community saltmarsh planting have been completed. Teacher workshops occurred on July 30 and 31.<br />

Three issues of the student newsletter have been completed. Project manager is awaiting final report and invoice.<br />

Cooperator has been notified of approval of FY20<strong>10</strong> funding and District staff is working with cooperator to develop a<br />

scope of work for the FY20<strong>10</strong> project. ACTION-TO-DATE: On-time.<br />

0<strong>21</strong> - Manasota Basin 38


W226<br />

City of Anna Maria-Implementation of BMPs<br />

Project Type SWIM<br />

AOR(s)<br />

Flood Protection, Water Quality<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

City of Anna Maria<br />

Project Manager PRESTON, MATT<br />

Task Manager(s)<br />

Status Ongoing<br />

PRATER, CORRINA<br />

Description<br />

The City of Anna Maria has submitted this multi-phase cooperative funding project to implement water quality and<br />

flood protection best management practices (BMPs) in the Lower Tampa Bay Watershed, part of Tampa Bay and<br />

Sarasota Bay, SWIM waterbodies. The project will impact four areas within the City totaling approximately 124 acres:<br />

1) North Bay/Tarpon Basin, 2) North Shore/Jacaranda Basin, 3) South Drive/South Bay Area, and 4)<br />

Crescent/Gulf/Willow Basin. All four basins outfall into the internal canals of Anna Maria, which in turn discharge into<br />

Lower Tampa Bay. With FY2007 funding the work on the Implementation of BMPs (Phase 1) includes the following<br />

tasks: design, development of construction documents, construction permitting, bidding and contractor selection,<br />

construction of the BMPs and construction engineering and inspection for the Crescent/Gulf/Willow improvement area.<br />

The BMPs will address level of service (LOS) deficiencies. The flood protection and water quality improvements<br />

include <strong>10</strong>-ft wide shallow dry retention swales with ditch blocks, various diameter HDPE/RCP pipe, inlet/control<br />

structures and BMP baffle structures (one at each basin outfall location). The swales will provide treatment of<br />

stormwater runoff through percolation and evaporation while the baffle structures will provide treatment through<br />

sedimentation, filtration and skimming. The City submitted a request for FY2008 and FY2009 funding to complete the<br />

implementation of BMPs in the final three areas.<br />

Benefits<br />

The City of Anna Maria has initiated a program to provide capital improvement projects that will improve both the water<br />

quality and flood protection LOS provided by the City's surface water management system. The overall effect of the<br />

improvements will be a reduction in pollutant loadings to the internal man-made canal system (classified as<br />

Outstanding Florida Waters), Anna Maria Sound, Sarasota Bay, and Tampa Bay. The anticipated increase in flood<br />

protection LOS will be through an increase in storage and conveyance capacity. The stormwater filtration devices<br />

being proposed will provide suspended solids removal from stormwater runoff that previously discharged directly into<br />

the canal/bay system.<br />

Costs<br />

The total budget amount for this project is $1.47 million with the Distict and the City of Anna Maria each contributing<br />

half. The FY2009 project cost is $225,600, with the City and the District each contributing half ($112,800). The District<br />

share is split between the Manasota Basin Board ($56,400) and State SWIM ($56,400). The probable construction<br />

costs for this project are based on the BMP alternative analysis developed by the cooperator. The District funding<br />

amounts shown in the table below include staff salary, travel and central garage.<br />

Additional Information<br />

Since 1950, approximately 50 percent of Tampa Bay's natural shoreline and approximately 40 percent of Sarasota<br />

Bay's intertidal wetland habitat has been lost due to development and reduction in water quality. This resulted in a<br />

decline in the aesthetic, recreational, and commercial value of the bay, as well as loss of habitat for native plants and<br />

animals. The SWIM Plans for Tampa Bay and Sarasota Bay outline goals to restore habitat throughout the bay areas<br />

and reduce pollutant loads entering the bays. The improvements will be made in City owned alleys and right of<br />

ways. The funding should complete the following tasks for Phase 2 (North Bay/Tarpon Basin, North Shore/Jacaranda<br />

Basin, and South Drive/South Bay improvement areas): design, development of construction documents, construction<br />

permitting, bidding and contractor selection, construction of the BMPs and construction engineering and inspection.<br />

0<strong>21</strong> - Manasota Basin 39


W226<br />

City of Anna Maria-Implementation of BMPs<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 314,904 60,681 2,312<br />

0 377,897<br />

District Budgeted - Outside Revenue<br />

State Trust Funds (SWIM) 314,902 60,680<br />

0<br />

0 375,582<br />

WMLTF (SWIM) - Prior Year Funds 0 0 2,311<br />

0 2,311<br />

Project Funds Not Budgeted by the<br />

District<br />

City of Anna Maria 622,000 112,800<br />

0<br />

0 734,800<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$1,490,590<br />

Critical Project Milestones Projected Amended Actual<br />

1. Phase I - Contract Development & Execution<br />

Notice to Proceed <strong>10</strong>/1/06 <strong>10</strong>/1/06<br />

Draft Agreement sent to Management Services 11/30/06 11/30/06<br />

City Approval of Contract 12/15/06 12/15/06<br />

Contract Executed by District 12/27/06 12/27/06<br />

2. Phase I - Critical Project Milestones<br />

Project Conceptual Design Complete 6/30/07 6/30/07<br />

Design and Survey Complete 12/1/07 11/28/07<br />

Acquire Project Permits 1/30/08 6/12/08<br />

Commence Construction 3/31/08 6/15/08<br />

Preparation of Construction Documents Complete 7/30/08 12/28/07<br />

Public Bid for Project Construction 9/30/08 12/14/07<br />

Project Construction Complete 7/30/<strong>10</strong> 5/29/09<br />

As-built Record Drawings 9/30/<strong>10</strong><br />

Final Project Report with Evaluation of Improvements 9/30/<strong>10</strong><br />

Approval of Maintenance Plan <strong>10</strong>/31/<strong>10</strong><br />

3. Phase I - Close Out<br />

Contract Termination 12/31/<strong>10</strong><br />

4. Phase II - Contract Development & Execution<br />

Draft Agreement 8/9/07 8/9/07<br />

Draft Agreement to Management Services 9/4/07 9/4/07<br />

Agreement to City 9/20/07 9/20/07<br />

City Approval of Contract 9/28/07 <strong>10</strong>/11/07<br />

District Approval of Contract <strong>10</strong>/1/07 1/14/08<br />

Agreement Back to Contracts for Funding Adjustments 12/11/07 12/11/07<br />

Revised Agreement Back to City for Approval 12/31/07 1/15/08<br />

City Approval of Revised Contract 1/15/08 1/9/08<br />

Executed Contract and Notice to Proceed to City 1/31/08 1/14/08<br />

5. Phase II - Critical Project Milestone<br />

Design and Survey Complete <strong>10</strong>/17/08 3/31/09 4/30/09<br />

Commence Construction 12/31/08 <strong>10</strong>/30/09<br />

Approval of Maintenance Plan 4/17/<strong>10</strong><br />

Project Construction Complete 9/30/11<br />

As-built Record Drawings 11/30/11<br />

Final Project Report With Evaluation 11/30/11<br />

Contract Termination 12/31/11<br />

0<strong>21</strong> - Manasota Basin 40


W226<br />

City of Anna Maria-Implementation of BMPs<br />

Status As Of: September 01, 2009<br />

Phase I construction is complete and Phase II design is complete and the ERP application has been approved. An<br />

internal time extension for Phase II was requested and approved, changing the construction commencement date from<br />

December 31, 2008 to June 8, 2009; however, that date was not met and a second internal time extension has been<br />

approved for October 30, 2009. The Phase II construction bids have been opened and tabulated and the winning bid is<br />

expected to be awarded by September 24, 2009.<br />

0<strong>21</strong> - Manasota Basin 41


W312<br />

Tampa Bay Habitat Restoration<br />

Project Type SWIM<br />

AOR(s)<br />

Water Quality, Natural Systems<br />

Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Pinellas-Anclote River, Manasota<br />

Cooperator(s)<br />

Project Manager HENNINGSEN, BRANDT<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

Tampa Bay, in 1987, was identified by the Legislature in the Surface Water Improvement and Management (SWIM)<br />

Act of as the top priority on the District's SWIM priority list. This project provides funds for general support to SWIM<br />

habitat restoration efforts for Tampa Bay. Funds are provided for equipment rental, equipment repair/maintenance,<br />

advertising/public notices, parts and supplies, etc. Limited project construction expenses are also budgeted under this<br />

activity code. Additionally, this project includes funds for exotic plant maintenance at the habitat restoration sites.<br />

Lastly, funds for this project allow planning of future projects, and facilitate SWIM involvement with various<br />

environmental committees and task forces (e.g., various committees of the Tampa Bay Estuary Program, etc.)<br />

Benefits<br />

This project is important for meeting management goals of SWIM and the Tampa Bay Estuary Program (TBEP).<br />

Coordination and planning of existing and future projects is a critical component of long term success of both<br />

programs. If funds are not allocated, then SWIM's ability to successfully perform their habitat restoration projects for<br />

Tampa Bay will be compromised. Accordingly, the District will not be meeting its (and the TBEP's) goals to restore<br />

important habitats (and improve water quality) for the bay, habitats which have suffered great losses because of land<br />

development and other human uses of the resource.<br />

Costs<br />

The FY20<strong>10</strong> costs are funded 25 percent from the Pinellas-Anclote River, 25 percent from the Manasota, 25 percent<br />

from the Hillsborough River, and 25 percent from the Alafia River Basin Boards. If State SWIM funds are available,<br />

they will be applied to the District's contribution. District funds shown in the table include staff salaries. District funds<br />

shown in the table include staff salaries, travel and central garage.<br />

Additional Information<br />

Tampa Bay is the District's top priority Surface Water Improvement and Management (SWIM) program waterbody, is<br />

a category I (most in need of restoration) under the State's Unified Watershed Assessment and Watershed<br />

Restoration Priorities, and is considered an "estuary of national significance" with the designation of the Tampa Bay<br />

(National) Estuary Program. Since 1950, about 50 percent of the bay's natural shoreline and 40 percent of its<br />

seagrass acreage were lost as a result of physical destruction and water quality impairment. This resulted in a decline<br />

in the aesthetic, recreational, and commercial value of the bay, as well as a loss of habitat for native plants and<br />

animals.<br />

0<strong>21</strong> - Manasota Basin 42


W312<br />

Tampa Bay Habitat Restoration<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

011 Alafia River Basin 145,836 7,703 16,254<br />

0 169,793<br />

013 Hillsborough River Basin 143,<strong>21</strong>2 7,703 16,254<br />

0 167,169<br />

014 Northwest Hillsborough Basin 146,395 7,703<br />

0<br />

0 154,098<br />

016 Pinellas-Anclote River Basin 167,139 7,703 16,254<br />

0 191,096<br />

0<strong>21</strong> Manasota Basin 152,763 7,703 16,254<br />

0 176,720<br />

District Budgeted - Outside Revenue<br />

Ecosystem Trust Fund - Tampa-Allen's<br />

Ck (SWIM)<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

1,500,000 0<br />

0<br />

0<br />

1,500,000<br />

State Trust Funds (SWIM) 231,374 38,514<br />

0<br />

0 269,888<br />

State Trust Funds (SWIM) - Prior 2006 784,492 0<br />

0<br />

0 784,492<br />

WMLTF (SWIM) - Prior Year Funds 0 0 15,012<br />

0 15,012<br />

Status As Of: September 02, 2009<br />

Total:<br />

Future<br />

Funding<br />

SWIM personnel began working with Hillsborough County staff in the planning of the annual "Coastal Cleanup" volunteer<br />

event scheduled for Saturday, September 19, 2009; up to <strong>10</strong>0 volunteers are expected to assist with trash/debris cleanup<br />

of Marsh Creek (a tidal tributary draining to Tampa Bay) of Ruskin, Florida. In addition, SWIM staff are coordinating with<br />

the District Planning Section for a basin board field trip to the Cockroach Bay Ecosystem Restoration Project (scheduled<br />

for October 15, 2009). In addition, Jennette Seachrist (SWIM Manager) and Chief Environmental Scientist Dr. Brandt<br />

Henningsen, at the request of the Tampa Bay Estuary Program, are serving as chairpersons of two sessions being held<br />

at the upcoming Bay Area Scientific Information Symposium (i.e., "BASIS 5", October 20-23, 2009); aside from<br />

organizing each session, Ms. Seachrist and Dr. Henningsen are also invited speakers within their respective sessions.<br />

Concerning media attention, since April 23, 2009, two internet newspaper stories dealt with SWIM projects. Lastly, SWIM<br />

staff are coordinating with two Eagle Scout candidates (Boy Scouts of America) to perform their Eagle Projects at SWIM<br />

restoration sites.<br />

0<strong>21</strong> - Manasota Basin 43<br />

Total<br />

Funding<br />

$3,428,268


W331<br />

Biennial Seagrass Mapping of Tampa Bay, Sarasota Bay, Charlotte<br />

Harbor<br />

Project Type SWIM<br />

AOR(s)<br />

Water Quality, Natural Systems<br />

Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Pinellas-Anclote River, Peace River,<br />

Manasota<br />

Cooperator(s)<br />

Project Manager KAUFMAN, KRIS<br />

Task Manager(s)<br />

Status Ongoing<br />

Charlotte Harbor National Estuary Program, Pinellas County, Sarasota Bay Estuary Program,<br />

Tampa Bay Estuary Program<br />

Description<br />

This SWIM initiative project involves mapping and monitoring seagrass within four SWIM priority waterbodies: Tampa<br />

Bay, Sarasota Bay, Lemon Bay, and Charlotte Harbor. In addition to SWIM waterbodies, contractual services for the<br />

St. Joseph Sound/Clearwater Harbor Biennial GIS Mapping of Seagrass (See K150) are completed under a single<br />

agreement to benefit from economy of scale. Specifically, the District's consultant will provide digital aerial<br />

photography, photointerpretation, and GIS-based mapping in order to generate calculations of seagrass acreage and<br />

distribution within each of the named waterbodies. The project is conducted every two years to monitor the long-term<br />

health of these vital resources. Funds budgeted in FY2009 and requested for FY20<strong>10</strong> are for the 2009 - 20<strong>10</strong> effort.<br />

The digital format utilized in 2004 and 2006 allowed for more detailed GIS analysis to be conducted beyond creation of<br />

the original seagrass map product and will allow for efficient transfer of the imagery to fill agency and public requests.<br />

A new task started during the 2007-2008 effort was to scan historical photography from previous seagrass mapping<br />

efforts in the 1990s and early 2000s at high resolution. The intent is to continue this effort in 20<strong>10</strong> and complete the<br />

georeferencing needed to and create digital GIS imagery layers that will then be uploaded to the District's GIS system.<br />

SWIM is utilizing a pre-qualified firm procured under the Mapping & GIS Section's RFP 006-07 as the consultant for<br />

the 2009 - 20<strong>10</strong> phase of mapping. District funds shown in the table include staff salaries.<br />

Benefits<br />

The mapping of seagrasses within each estuary allows the District, the Estuary Programs, and other entities to monitor<br />

the health and distribution of seagrasses. Seagrass health is used as an indicator of water quality conditions. Thus,<br />

this project can assist with water resource management decision making, specifically in evaluating the effectiveness of<br />

water quality improvement projects.<br />

Costs<br />

The project costs for mapping SWIM waterbodies in 2009 - 20<strong>10</strong> is estimated at $350,000. Costs associated with this<br />

upcoming effort are included in the FY2009 and FY20<strong>10</strong> budgets. The FY2009 budget was $175,000, with 50 percent<br />

from State SWIM and 50 percent from five basin boards (Alafia River, Hillsborough River, Pinellas-Anclote River,<br />

Manasota, and Peace River). The FY20<strong>10</strong> budget is $175,000, with the five basin boards contributing. At their April<br />

meetings, the basin boards approved amending their FY2009 budgets to include reallocated State SWIM funds to<br />

cover 50 percent of the District's proposed FY20<strong>10</strong> costs ($87,500). The remaining funds ($87,500) are included in<br />

the five basin boards FY20<strong>10</strong> proposed budgets. District funds shown in the table include staff salaries.<br />

Additional Information<br />

The next phase of mapping will begin in December 2009. Seagrass mapping for SWIM waterbodies (W331) and St.<br />

Joseph Sound Clearwater Harbor (K150) will be completed under one agreement at a total estimated cost of<br />

$350,000. Seagrass meadows serve as nurseries for a variety of commercially and recreational important species of<br />

fin fish and shellfish, and they are highly dependent upon the maintenance of good water quality. The project meets<br />

the goals and objectives of the Tampa Bay, Sarasota Bay, and Charlotte Harbor SWIM Plans, the Tampa Bay Estuary<br />

Program, Sarasota Bay Estuary Program, and Charlotte Harbor National Estuary Program. The 2008 effort is ongoing,<br />

with the most recent completed mapping results from 2006. Between 2004 and 2006, seagrass coverage in Tampa<br />

Bay increased by approximately 4.7%. In Sarasota Bay, which has a more highly urbanized watershed than Tampa<br />

Bay, seagrass increased 7% in coverage from 2004 to 2006. From 2004 to 2006, Charlotte Harbor seagrass coverage<br />

increased by 1%. The only SWIM waterbody to experience a loss in coverage between 2004 and 2006 was Lemon<br />

Bay with a 1% decrease.<br />

0<strong>21</strong> - Manasota Basin 44


W331<br />

Biennial Seagrass Mapping of Tampa Bay, Sarasota Bay, Charlotte<br />

Harbor<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

41,620 11,334 20,004<br />

011 Alafia River Basin 0 72,958<br />

013 Hillsborough River Basin 41,620 11,334 20,004<br />

0 72,958<br />

014 Northwest Hillsborough Basin 41,620 11,334<br />

0<br />

0 52,954<br />

016 Pinellas-Anclote River Basin 41,620 11,334 20,004<br />

0 72,958<br />

020 Peace River Basin <strong>10</strong>8,412 29,365 20,004<br />

0 157,781<br />

0<strong>21</strong> Manasota Basin <strong>10</strong>5,499 28,334 20,004<br />

0 153,837<br />

District Budgeted - Outside Revenue<br />

State Trust Funds (SWIM) 268,877 <strong>10</strong>3,035<br />

0<br />

0 371,912<br />

State Trust Funds (SWIM) - Prior 2006 165,904 0<br />

0<br />

0 253,404<br />

WMLTF (SWIM) - Prior Year Funds 0 0 12,520<br />

0 12,520<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$1,2<strong>21</strong>,282<br />

Critical Project Milestones Projected Amended Actual<br />

1. Critical Project Milestones<br />

Request for Proposals 6/15/03 7/11/03<br />

Begin Review of Proposals 8/15/03 9/22/03<br />

Draft Agreement to Management Services <strong>10</strong>/31/03 12/17/03<br />

Contract Executed 11/15/03 1/16/04<br />

Photography Shot for 2003/2004 1/31/04 1/17/04<br />

Final Report for 2003/2004 12/31/04 12/31/04<br />

First Amendment to the 2003/2004 Agreement 12/1/05 12/13/05<br />

Consultant Notice to Proceed 12/1/05 12/13/05<br />

Acquisition of Aerial Photography 1/31/06 2/15/06 2/<strong>10</strong>/06<br />

Final Deliverables for 2005/2006 12/31/06 12/31/06<br />

Agreement Expiration Date 12/31/06 12/31/06<br />

2. Critical Project Milestones<br />

Processing of Technical Specifications and Purchase Order <strong>10</strong>/30/07 11/30/07<br />

Purchase Order with scope of work Opened 11/30/07 11/30/07<br />

Work Order #1 Opened 12/13/07 12/13/07<br />

Consultant imagery acquisition 1/30/08 2/15/08 2/15/08<br />

Consultant ortho-imagery production 3/31/08 3/31/08<br />

Consultant photointerpretation <strong>10</strong>/31/08 <strong>10</strong>/31/08<br />

Consultant GIS validation 11/30/08 11/30/08<br />

Consultant draft final deliverables 12/31/08 12/31/08<br />

Status As Of: September 14, 2009<br />

The purchase order and first work order were opened December 2007. The first work order is complete, and all final<br />

deliverables accepted by the District. District staff and cooperating agencies completed the Post Map Production<br />

Classification Accuracy Assessment in April. The 2008 District seagrass acreage estimates were presented to all three<br />

Estuary Programs at the May Seagrass Working Group <strong>Meeting</strong>. Results show increases in bay-wide acreage for St.<br />

Joe/Clearwater Harbor, Tampa Bay, Sarasota Bay, and Lemon Bay, while Charlotte Harbor experienced minor<br />

decreases in acreage. The second work order for completion of the post map production classification accuracy<br />

assessment analysis is processed and staff are compiling data to provide to the consultant. The third work order was<br />

issued to complete high resolution scanning of historical aerials.<br />

0<strong>21</strong> - Manasota Basin 45


W348<br />

Terra Ceia Isles Habitat Restoration<br />

Project Type SWIM<br />

AOR(s)<br />

Natural Systems<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Florida Department of Environmental Protection<br />

Project Manager HENNINGSEN, BRANDT<br />

Task Manager(s)<br />

Status Ongoing<br />

HENNINGSEN, BRANDT<br />

Description<br />

The Terra Ceia Aquatic and Park Preserves habitat enhancement and restoration project, a SWIM initiative, is located<br />

in the southeastern reaches of Tampa Bay (Manatee County). This large, multi-phased project is being cooperatively<br />

implemented with the Florida Department of Environmental Protection (FDEP). Currently, the project involves 2,308<br />

acres of publicly owned land (Terra Ceia Isles and the Peanut Lake parcel, with an additional 2,900 acres included in<br />

the District's five year acquisition plan. Accordingly, this project has the potential of encompassing at least 5,200 acres<br />

and will require multiple years of funding, planning, and implementation. Project updates focus primarily on just the<br />

1,745 acre Terra Ceia Isles parcel, although updates will be given on progress within Peanut Lake lands and<br />

concerning additional land purchases and potential future phases. It is anticipated that the majority of this project will<br />

be performed by private contractors.<br />

Benefits<br />

This project will be important in meeting management plan goals of SWIM and the Tampa Bay Estuary Program<br />

(TBEP). The current project involves the enhancement, restoration, and management of an estimated 700 acres of<br />

various habitats typical of coastal ecosystems (i.e., habitat mosaics): estuarine and freshwater wetlands, transitional<br />

habitats, and uplands. Salinity gradients and low salinity habitats will be emphasized to improve fisheries production.<br />

Accordingly, the project will provide valuable habitats for Tampa Bay fisheries and other coastal species. Portions of<br />

this are true restoration in that sections of the site historically were bay bottom and intertidal wetlands that were filled to<br />

create a proposed finger-fill subdivision. In addition, strides to meet bay water quality goals of both SWIM and TBEP<br />

will be addressed via improved stormwater treatment. Improved habitat values and the addition of habitat acreages will<br />

provide opportunities for many differing species of coastal wildlife, inclusive of commercial and sportfishing species,<br />

bird populations, a host of invertebrate species (crabs, shrimp, oysters, etc.), and small mammals.<br />

Costs<br />

Total cost estimate for Terra Ceia Isles is $9,400,000 and is being budgeted over multiple fiscal years. Note: exotic<br />

plant control funds (S042) have annually been budgeted under Land Resources Department using Save Our Rivers<br />

dollars; these funds have been included here to give a more complete picture of the restoration effort. Funds budgeted<br />

in FY2007 funds are for construction. Funds budgeted in FY2008 are for staff salaries, travel, and central<br />

garage. District funds are split 50/50 between the Manasota Basin Board and State SWIM Fund. Future phases<br />

associated with additional land acquisition will require future funding.<br />

Additional Information<br />

Tampa Bay is the District's top priority Surface Water Improvement and Management (SWIM) program waterbody, is<br />

a category I (most in need of restoration) under the State's Unified Watershed Assessment and Watershed<br />

Restoration Priorities, and is considered an "estuary of national significance" with the designation of the Tampa Bay<br />

(National) Estuary Program. Since 1950, about 50 percent of the bay's natural shoreline and 40 percent of its<br />

seagrass acreage were lost as a result of physical destruction and water quality impairment. This resulted in a decline<br />

in the aesthetic, recreational, and commercial value of the bay, as well as a loss of habitat for native plants and<br />

animals.<br />

0<strong>21</strong> - Manasota Basin 46


W348<br />

Terra Ceia Isles Habitat Restoration<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 1,174,764 6,927 <strong>10</strong>,269<br />

0 1,191,960<br />

041 Florida Forever/SOR/P2000 <strong>21</strong>6,189 0<br />

0<br />

0 <strong>21</strong>6,189<br />

District Budgeted - Outside Revenue<br />

Ecosystem Trust - Terra Ceia Habitat<br />

Rstr (SWIM)<br />

Nat'l Fish & Wildlife - Terra Ceia<br />

(SWIM)<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

2,312,500 0<br />

0<br />

300,000 0<br />

0<br />

0<br />

0<br />

2,312,500<br />

300,000<br />

NOAA - Terra Ceia 2,000,000 0<br />

0<br />

0 2,000,000<br />

State Trust Funds (SWIM) 323,939 6,927<br />

0<br />

0 330,866<br />

State Trust Funds (SWIM) - Prior 2006 1,276,234 0<br />

0<br />

0 1,276,234<br />

WMLTF (SWIM) - Prior Year Funds 0 0 <strong>10</strong>,269<br />

0 <strong>10</strong>,269<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$7,638,018<br />

Critical Project Milestones Projected Amended Actual<br />

1. Critical Project Milestones<br />

30% wetland design plans 9/30/02 9/30/04 12/1/04<br />

Draft Phase 3 upland restoration RFB 8/1/04 4/15/04<br />

Release Phase 3 upland restoration contract 9/1/04 8/13/04<br />

Award Phase 3 upland restoration contract 11/1/04 12/2/04<br />

Complete 60% wetland design plans 4/30/05 8/1/05 8/9/05<br />

Submit Environmental Permit Applications 12/31/05 2/1/06<br />

Complete <strong>10</strong>0% wetland design plans 12/31/05 12/22/05<br />

Draft wetland construction RFB 12/31/05 12/22/05<br />

Release Wetland Construction RFB 1/31/06 1/13/06<br />

Negotiate/process/execute const. contract 6/15/06 9/4/06<br />

Complete Phase 3 upland restoration 7/31/06 9/30/06 9/29/06<br />

Complete Phase 1 wetland construction 3/31/08 5/15/08<br />

Status As Of: September 02, 2009<br />

Processing continues by USGS of their contract with a modeler to complete the Frog Creek Hydrodynamic Modeling<br />

Study as originally envisioned; no additional funds are being requested by the USGS to complete the Frog Creek study.<br />

The study should resume during September 2009. Commercially available (non-native) seed used for grassing of the 24<br />

bare ground acres of what-used-to-be Australian pine and Brazilian pepper forests (i.e., "airplane" area) have not<br />

continued to sprout and grasses viable during winter/spring have withered under summer conditions; alternative ground<br />

cover options are being implemented to replant grass cover and replace pine trees that succumbed to the drought;<br />

guidance from a soil scientist from the U.S. Natural Resouces Conservation Service has been solicited and will be<br />

followed during the replant. Quarterly maintenance by Tampa Contracting Services (TCS) has increased for the <strong>21</strong>7 acre<br />

Phase 3 upland restoration project; persistent guinea grass problems are being addressed by TCS. Maintenance of the<br />

64 acre Phase 4 Upland Restoration also continued by a private contractor (Rick Richards, Inc.). The purchase order has<br />

been awarded and work almost finished redressing upland Phases 1 and 2 to get non-native plants back under control<br />

and allow a partial replant of plants that have been killed over the years due to drought, flooding, and/or non-native plant<br />

competition; labeled as "Phase 5" upland restoration, the purchase order includes quarterly maintenance for three years.<br />

Discussions and site visits by FDEP Regulatory and SWFWMD personnel have resolved the fate of the augmented<br />

"haul" roads within the preserve (i.e., "haul" roads used by TCS); the roads may be retained for management purposes<br />

and no additional permitting is necessary; one section of relic (i.e., farm) road immediately adjacent to a wetlands has<br />

been removed, graded, and a purchase order issued to plant with appropriate native vegetation (the road has been<br />

relocated through an upland). A second section of road will be stabilized with crushed granite. FDEP (Parks ) has<br />

completed their plans for the revamped Bishop Harbor Boat ramp. Lastly, SWIM and FDEP staff completed their GPS<br />

0<strong>21</strong> - Manasota Basin 47


W348<br />

Terra Ceia Isles Habitat Restoration<br />

mapping of the footprint and site conditions of tracts targeted for the final phase of upland restoration for the Terra Ceia<br />

Isle site: Phase 6 Upland Restoration; a RFB will be drafted and released during July/August 2009. ACTION TO DATE:<br />

On-time; Phase 5 upland restoration contract awarded; construction commenced during May 2009.<br />

0<strong>21</strong> - Manasota Basin 48


W358<br />

Tom Bennett Park<br />

Project Type SWIM<br />

AOR(s)<br />

Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Manatee County<br />

Project Manager POWERS, STEPHANIE<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This project is in response to a request from Manatee County to restore and enhance approximately 75 acres of<br />

intertidal and freshwater wetland and upland habitat along the Manatee River. Tom Bennett Park is a 180-acre site that<br />

was purchased in 2003 by Manatee County and the Florida Communities Trust. The project plan targets the<br />

restoration of degraded salt marsh habitat and associated coastal maritime forest on adjacent hummocks through<br />

minor regrading, nuisance and exotic species eradication, and supplemental plantings. The creation of freshwater,<br />

ephemeral wetlands throughout the property is also anticipated. The County will be the lead agency for the project.<br />

The District will provide project management oversight of design and construction progress.<br />

Benefits<br />

Upon completion, the project will provide significant benefits to habitat and water quality. The County also plans to<br />

provide passive recreational and educational opportunities to the public.<br />

Costs<br />

The total project cost is approximately $4.4 million, which includes $3.9 million for land acquisition. The County<br />

contributed $1.5 million for the land purchase and has budgeted $260,000 for design and construction. The District's<br />

FY20<strong>10</strong> contribution is to be $60,000. At their April 2009 meeting, the Manasota Basin Board approved amending its<br />

FY2009 budget to include reallocated State SWIM funds to cover 50 percent ($30,000) of the FY20<strong>10</strong> costs. The<br />

remaining costs ($30,000) are funded by the Manasota Basin Board. The County is requesting $200,000 for FY2011,<br />

which will be awarded upon Board approval. District funds shown in the table include staff salaries.<br />

Additional Information<br />

Since 1950, approximately 50 percent of the bay's natural shoreline has been lost due to development and reduction<br />

in water quality. This resulted in a decline in the aesthetic, recreational, and commercial value of the bay, as well as a<br />

loss of habitat for native plants and animals. The SWIM Plan for Tampa Bay outlines goals to restore habitat<br />

throughout the bay area and reduce pollutant loads entering Tampa Bay. The objectives of this project are consistent<br />

with these goals.<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 0 0 31,885 200,000 231,885<br />

District Budgeted - Outside Revenue<br />

WMLTF (SWIM) - Prior Year Funds 0 0 31,885<br />

0 31,885<br />

Project Funds Not Budgeted by the<br />

District<br />

Manatee County 0 0 260,000<br />

0 260,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$523,770<br />

Critical Project Milestones Projected Amended Actual<br />

Contract Development and Execution<br />

Receive Scope of Work from Cooperator 9/16/09<br />

0<strong>21</strong> - Manasota Basin 49


W358<br />

Tom Bennett Park<br />

Draft Agreement to Management Services <strong>10</strong>/1/09<br />

Agreement Returned from Management Services <strong>10</strong>/22/09<br />

Agreement Sent to Cooperator <strong>10</strong>/29/09<br />

Signed Agreement Returned from Cooperator 11/30/09<br />

Agreement Fully Executed 12/15/09<br />

Contract Expiration<br />

Project Close Out 12/31/11<br />

Status As Of: August 25, 2009<br />

A scope of work has been requested from the cooperator. Once received, an agreement will be drafted.<br />

0<strong>21</strong> - Manasota Basin 50


W364<br />

Palmetto Estuary<br />

Project Type SWIM<br />

AOR(s)<br />

Water Quality, Natural Systems<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Palmetto<br />

Project Manager DALSIS, MIKE<br />

Task Manager(s)<br />

Status Ongoing<br />

HAGBERG, JANIE<br />

Description<br />

This project is a District initiated cooperative project. Over the past ten years the City of Palmetto purchased 11.75<br />

acres of various coastal habitats near the mouth of the Manatee River. The parcel contains various estuarine<br />

habitats that transition to coastal uplands. The restoration project expaned to include an addtional 18 acre park<br />

referred to as "Wayside Park" adjacent to the south and east of the 11.75 acres acquired by the City of Palmetto. This<br />

is a multi-phase project with the 30 acre Phase 1 restoration completed in 2000. The proposed Phase 2 is an<br />

extension of Phase 1 and will restore an additional 7.86 acres of coastal habitat adjacent and to the north of Phase I.<br />

Habitat values of the parcel have been severely compromised due to dredge and fill impacts, illegal dumping,<br />

untreated stormwater, and dominance of most of the uplands by non-native vegetation (i.e., Brazilian pepper,<br />

Australian pine, melaleuca). Based on field investigations, portions of the site will require only non-native plant<br />

removal/native plant enhancement, while others will require excavation/regrading to create new/restored open water<br />

and intertidal habitats. The City of Palmetto is interested in partnering with the District on Phase 2 of this coastal<br />

restoration project which is envisioned to enhance coastal uplands and restore intertidal and open water wetlands.<br />

The project site will become a component of the Palmetto Estuary Nature Park to the south.<br />

Benefits<br />

This project has been and will continue to be important in meeting management goals of SWIM and the Tampa Bay<br />

Estuary Program (TBEP), including multiple phases providing low salinity habitats that create valuable nursery grounds<br />

for breeding. Improved habitat values and the addition of habitat acreages will provide opportunities for many differing<br />

species of coastal wildlife, inclusive of commercial and sportfishing species, bird populations, a host of invertebrate<br />

species (crabs, shrimp, oysters, etc.), reptiles, amphibians, and small mammals. In addition, the site will become<br />

a part of the "Palmetto Estuary Nature Park", an increasingly popular destination for the public to visit for nature<br />

activities (canoeing/kayaking, fishing, bird watching, etc.).<br />

Costs<br />

District funds shown in table include staff salaries, travel, and central garage charges.<br />

Additional Information<br />

Tampa Bay is the District's top priority Surface Water Improvement and Management (SWIM) program waterbody, is<br />

a category I (most in need of restoration) under the State's Unified Watershed Assessment and Watershed<br />

Restoration Priorities, and is considered an "estuary of national significance" with the designation of the Tampa Bay<br />

Estuary Program. Since 1950, about 50 percent of the bay's natural shoreline and 40 percent of its seagrass acreage<br />

were lost as a result of physical destruction and water quality impairment. This resulted in a decline in the aesthetic,<br />

recreational, and commercial value of the bay, as well as a loss of habitat for native plants and animals. The 2000<br />

Phase 1 project was the 2001 Environmental Project of the Year as honored by the Future of the Region Awards<br />

program of the Tampa Bay Regional Planning Council.<br />

0<strong>21</strong> - Manasota Basin 51


W364<br />

Palmetto Estuary<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 77,426 4,408 2,165<br />

0 83,999<br />

District Budgeted - Outside Revenue<br />

State Trust Funds (SWIM) 77,425 4,408<br />

0<br />

0 81,833<br />

WMLTF (SWIM) - Prior Year Funds 0 0 2,165<br />

0 2,165<br />

Project Funds Not Budgeted by the<br />

District<br />

City of Palmetto 375,000 0<br />

0<br />

0 375,000<br />

Status As Of: August 13, 2009<br />

Total:<br />

Future<br />

Funding<br />

This project represents Phase 2 of a two part series of cooperative projects with the City of Palmetto; the award winning<br />

Phase 1 project was completed in 2000. Phase 2 future funding is envisioned to cover permitting and construction costs<br />

associated with this coastal ecosytem restoration project. Recieved <strong>10</strong>0% plans signed and sealed from environmental<br />

consultant to join Phase 2 with the completed Phase 1 project, and the revised notice general permit for submittal to the<br />

FDEP. The Cooperative Agreement is currrently being drafted with the City of Palmetto.<br />

0<strong>21</strong> - Manasota Basin 52<br />

Total<br />

Funding<br />

$542,997


W394<br />

FELTS Preserve Restoration<br />

Project Type SWIM<br />

AOR(s)<br />

Water Quality, Natural Systems<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Manatee County Audubon Society<br />

Project Manager PRATER, CORRINA<br />

Task Manager(s)<br />

Status Ongoing<br />

NORTON, NANCY<br />

Description<br />

This project will restore important habitat and improve water quality functions on the FELTS Preserve which drains into<br />

Terra Ceia Bay about two miles away and ultimately discharges into Tampa Bay, a District SWIM waterbody. The<br />

FELTS Preserve, owned by Manatee County Audubon, is located at 4600 24th Avenue, East Palmetto in north<br />

Manatee County within the Manatee River Watershed. This project will result in restoration/creation/enhancement of<br />

5.5 acres of freshwater wetlands, plus restoration of 8.5 acres of adjacent uplands located within the 28.5 acre<br />

preserve through backfilling ditches, removal of exotic vegetation and planting of native vegetation. Much of the project<br />

site has been altered over time, primarily through ditching and draining to create improved pasture for agricultural<br />

purposes. The site is important because the general area is rapidly being converted from agricultural to residential<br />

development and much of the habitat has been fragmented by construction of roads. Natural sheet flow has been<br />

diverted through development and ditching. Vegetative diversity is relatively low in the existing water features due to<br />

the establishment of monocultures by invasive and exotic plants. A mosaic of diverse habitat types is proposed,<br />

including emergent marsh, existing hardwood swamp and hammock and ponded features.<br />

Benefits<br />

Best management practices will be implemented through planting of emergent and submergent plant species and the<br />

management and control of invasive exotics. Water quality benefits will be achieved and monitored as the enhanced<br />

site will provide for pollutant filtration and nutrient uptake through the creation of the proposed littoral shelves, as well<br />

as buffering against erosion. The project location will also offer exceptional habitat value through the creation of<br />

feeding platforms for wading birds.<br />

Costs<br />

The total cost of the project is $196,900. In FY2006, the District contributed $29,500 shared evenly by SWIM and the<br />

Manasota Basin Board. The FY2006 application requested funding $40,400 but the manatee Audubon was unable to<br />

acquire that amount for a match. Earthmoving was accomplished by grants from U.S. Fish & Wildlife Service and<br />

National Fish & Wildlife Foundation at a cost of $23,070. The FY2008 project cost is $32,600, with the Manatee<br />

Audubon and the District each contributing half ($16,300). The District's share is split between the Manasota Basin<br />

Board ($8,150) and State SWIM ($8,150). The FY2009 project cost is $28,700, with Manatee Audubon and the District<br />

each requested to contribute half ($14,350). The District share is split between the Manasota Basin Board ($7,175)<br />

and State SWIM ($7,175). The FY20<strong>10</strong> project cost is $18,000 with Manatee Audubon and the District each<br />

contributing half ($9,000). Total funding in the table below includes staff salary, travel and central garage.<br />

Additional Information<br />

A professional management plan has been completed by Ed Freeman, then with the Nature Conservancy when<br />

contracted by Manatee Audubon. The Mana-Teens, Native Plant Society, Manatee River Garden Club and others<br />

have helped to inventory plants on site, control exotic plants by manual removal and minimal chemical means, and<br />

performed additional habitat improvement primarily on the uplands. Five and one-half wetland acres have been<br />

planted and eight and one-half acres of pasture was restored in FY2008. Chemical and mechanical control for<br />

invasive exotic plants has been implemented on approximately 17.5 acres and a monthly maintenance program is<br />

underway. Audubon is re-creating littoral areas around the enhanced ponds by planting some 14,200 plants. Manatee<br />

Audubon will guarantee survival of 85% of planted material. In FY2009, Manatee Audubon will do a littoral shelf<br />

planting of 3 acres, install 90 plants in a 17-acre upland area and continue with exotic control.<br />

0<strong>21</strong> - Manasota Basin 53


W394<br />

FELTS Preserve Restoration<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 34,593 9,275 9,885<br />

0 53,753<br />

District Budgeted - Outside Revenue<br />

State Trust Funds (SWIM) 34,594 9,274<br />

0<br />

0 43,868<br />

WMLTF (SWIM) - Prior Year Funds 0 0 885<br />

0<br />

885<br />

Project Funds Not Budgeted by the<br />

District<br />

Manatee County Audubon Society 23,800 14,350 9,000<br />

0 47,150<br />

National Fish and Wildlife Foundation <strong>10</strong>,000 0<br />

0<br />

0 <strong>10</strong>,000<br />

Other 33,200 16,400 9,000<br />

0 58,600<br />

USFWS 12,000 0<br />

0<br />

0 12,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$226,256<br />

Critical Project Milestones Projected Amended Actual<br />

1. Consultant Agreement Development and Execution<br />

Scope of Work Developed 8/24/09 8/18/09<br />

Scope sent to finance for Purchase Order 8/31/09<br />

2. Project Tasks<br />

Plantings 8/28/<strong>10</strong><br />

Maintenance 9/5/<strong>10</strong><br />

3. Close Out<br />

Final Report and Invoice 9/6/<strong>10</strong><br />

3. Contract Termination<br />

Project Completion 9/27/<strong>10</strong><br />

Status As Of: June 17, 2009<br />

In December 2008, Manatee County Audubon provided a revised scope of work for FY2009. The purchase order for the<br />

approved FY2009 scope has been issued. The Manatee County Audobon Society was advised to mail in any invoices but<br />

none have been received at this time. The Manatee County Audubon has been performing monthly exotic removal. The<br />

District has received the FY20<strong>10</strong> scope of work and is currently working on developing the purchase order.<br />

0<strong>21</strong> - Manasota Basin 54


W437<br />

(Completed) North Port Water Enhancement Program<br />

Project Type SWIM<br />

AOR(s)<br />

Water Quality<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Project Manager SMITH, RANDY<br />

Task Manager(s)<br />

City of North Port, City of North Port - Public Utilities<br />

KAUFMAN, KRIS<br />

Status Completed<br />

Description<br />

The study will include preparation of a sampling plan, data collection, data analysis, reporting and development of<br />

conceptual alternatives. Approximately 20 stations located in the Cocoplum canal system and Myakkahatchee Creek<br />

will be sampled on a monthly basis for one year. Information collected during this project will be used to develop a<br />

conceptual plan for the implementation of projects to improve water quality in downstream receiving water bodies.<br />

Downstream receiving water bodies include the Myakka River and Charlotte Harbor, a Surface Water Improvement<br />

and Management (SWIM) priority water body. The Cocoplum canal is part of approximately 80 miles of surface water<br />

canals within the City that connects to Myakkahatchee Creek. Water quality samples will be analyzed for 31 select<br />

parameters including nutrients, metals, fecal coliform and total suspended solids. Flow and water level monitoring will<br />

be used to calculate pollutant loads. There will be an emphasis on sampling canals with frontage areas populated with<br />

septic systems as these could contribute to water quality degradation. This sampling plan will result in a strategy to<br />

prioritize areas of the City's surface water system that requires water quality enhancement.<br />

Benefits<br />

This project will identify issues contributing to the degradation of water quality so that a conceptual plan for the<br />

implementation of water quality improvements can be developed. Improving water quality in this system will improve<br />

the water quality in downstream receiving water bodies. Water quality improvements in the system will benefit multiple<br />

ecologically sensitive and important water bodies. Improving water quality in this system will also benefit local<br />

governments who utilize it for their water supply.<br />

Costs<br />

The FY2008 project cost is $390,000, with the City of North Port contributing $195,000 and the District contributing<br />

$195,000. The District's share is split between the Manasota Basin Board ($97,500) and State SWIM ($97,500). The<br />

District funding amounts shown in the table include staff salaries, travel and central garage charges.<br />

Additional Information<br />

The District currently has an ongoing cooperative funding project with the City of North Port to perform a Watershed<br />

Management Program (WMP), City of North Port Big Slough WMP (K883). The emphasis of project K883 is flood<br />

protection. The District is also currently funding the Myakka River Watershed Initiative (H048). This project will include<br />

the development of a strategy to restore water quality, natural systems, and floodplain impacts in the watershed in<br />

ways that can also provide a benefit to water supplies in the Southern Water Use Caution Area. The three of these<br />

projects (W437, K883 and H048) have the potential to compliment each other without duplicating efforts. The City of<br />

North Port's SWFWMD Water Use Permit was recently renewed in mid 2006 allowing the City to withdraw raw water<br />

from both the Myakkahatchee Creek and Cocoplum canal at an average flow rate of 4.4 mgd. The Myakkahatchee<br />

Creek is the central artery of the Big Slough watershed. The Big Slough discharges into the Myakka River, a Wild and<br />

Scenic designation and an Outstanding Florida Water. The Myakka River empties into Charlotte Harbor which is a<br />

State of Florida Aquatic Preserve, Outstanding Florida Water and a SWIM priority water body.<br />

0<strong>21</strong> - Manasota Basin 55


W437<br />

(Completed) North Port Water Enhancement Program<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 99,578 3,200<br />

0<br />

0 <strong>10</strong>2,778<br />

District Budgeted - Outside Revenue<br />

State Trust Funds (SWIM) 99,577 3,200<br />

0<br />

0 <strong>10</strong>2,777<br />

Project Funds Not Budgeted by the<br />

District<br />

City of North Port 195,000 0<br />

0<br />

0 195,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$400,555<br />

Critical Project Milestones Projected Amended Actual<br />

1. Contract Development & Execution<br />

Negotiate Cooperative Funding Agreement with City 7/15/07 7/15/07<br />

Cooperative Funding Agreement to Contract Administration 8/15/07 8/16/07<br />

Contract sent to City for Approval 8/31/07 9/18/07<br />

Signed Contract returned from City 9/15/07 11/1/07 <strong>10</strong>/17/07<br />

Contract Executed <strong>10</strong>/1/07 11/9/07 <strong>10</strong>/23/07<br />

Notice to Proceed sent to City <strong>10</strong>/1/07 11/9/07 <strong>10</strong>/25/07<br />

2. Critical Project Milestones<br />

Bidding and Consultant Selection 12/31/07 1/15/08<br />

Begin Monthly Water Quality Sampling 2/29/08 3/31/08<br />

Submit Draft of Final Report 3/31/09 5/15/09 6/4/09<br />

Submit Final Report 5/31/09 6/29/09<br />

3. Project Close Out<br />

Contract Termination 6/30/09 6/29/09<br />

Status As Of: August 26, 2009<br />

The City selected PBS&J as the consultant for the project. District staff participated in a kick off meeting with the City of<br />

North Port and PBS&J on January 31, 2008. Flow and water quality monitoring began on March 31, 2008. District staff<br />

has participated in conference calls with the City of North Port and PBS&J on May 13, 2008 and July 16, 2008 to discuss<br />

issues and preliminary results from the monthly water quality monitoring. District staff received official notice of change of<br />

project manager for the cooperator on September 12, 2008. District staff met with the new project manager on<br />

September 30, 2008. The District received the 6 month data deliverable for review on October 29, 2008. PBS&J gave a<br />

presentation on the current status of the project to District staff on December 9, 2008. PBS&J completed water quality<br />

monitoring in March 2009 and submitted the final data deliverable to the District on April 20, 2009. PBS&J submitted the<br />

draft Final Report for review and comment on June 4, 2009. The results of the study indicate that the water quality within<br />

and discharging from the City of North Port is better than expected. Calculated loads from the system are much lower<br />

than expected. Minor issues with low Dissolved Oxygen and elevated Chlorophyll levels were detected. Elevated Fecal<br />

Coloform levels were detected at several locations and the City will need to do additional analysis to determine the<br />

source. The Final Report was approved by District staff on June 29, 2009. The District received the final deliverables on<br />

June 29, 2009 and the final invoice was processed on August 27, 2009.<br />

0<strong>21</strong> - Manasota Basin 56


W501<br />

SWIM Plan Implementation - Charlotte Harbor<br />

Project Type SWIM<br />

AOR(s)<br />

Water Quality, Natural Systems<br />

Basin(s) Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager GARCIA, LIZANNE<br />

Task Manager(s)<br />

Status Ongoing<br />

Charlotte Harbor National Estuary Program<br />

KAUFMAN, KRIS<br />

Description<br />

This project provides for the administration and implementation of projects as outlined in the SWIM Plan for Charlotte<br />

Harbor. The FY2009 budget will include staff salaries and administrative costs to implement projects in the SWIM<br />

Plan. Administration and implementation includes assessment of implementation progress, a review and refinement of<br />

the Pollutant Load Reduction Goal (PLRG) for the waterbody, periodic SWIM Advisory Committee meetings, new<br />

project development (rationale and justification), development of relevant contracts and Requests for Proposals,<br />

invoicing, project related presentations, field visits, and miscellaneous duties as they arise. Included in the FY2006<br />

budget was $50,000 for a historical benthic habitat mapping and change analysis of Charlotte Harbor. The project will<br />

be similar to the effort completed for Tampa Bay in determining historical seagrass coverage from 1950s aerial<br />

photography. This benthic habitat map will allow the District and the Charlotte Harbor National Estuary Program<br />

(CHNEP) to refine goals being set for this system.<br />

Benefits<br />

This project's support of the Charlotte Harbor SWIM Plan creates an opportunity for a cohesive effort between the<br />

District, the CHNEP, and other state and local agencies to better implement resource management decisions and<br />

restoration activities. SWIM projects are eligible for state matching funds with the state funding 50 percent of the<br />

project costs and the District funding the remaining 50 percent.<br />

Costs<br />

The FY2008 and FY2009 ongoing costs for the Charlotte Harbor SWIM Plan Implementation are funded 12.5 percent<br />

from the Manasota Basin, 37.5 percent from the Peace River Basin, and 50 percent from the State SWIM Program<br />

and include staff salary, travel and central garage.<br />

Additional Information<br />

In 1987, the Florida Legislature established the Surface Water Improvement and Management (SWIM) Act having<br />

recognized that water quality and habitat in surface waters throughout the state have degraded or were in danger of<br />

being degraded. The Act requires the five water management districts to maintain a priority list of water bodies of<br />

regional or statewide significance within their boundaries, and develop plans and programs for the improvement of<br />

those water bodies. To date, ten SWIM water bodies in the District have had plans developed and approved by the<br />

state. Several plans have been updated one or more times as required by the Act. The Charlotte Harbor SWIM Plan<br />

was first approved in 1993 and last updated in November 2000. Since the first plan, the District has initiated a number<br />

of restoration and diagnostic assessment projects. Included within these are: 1) implementation of a water quality<br />

monitoring program, 2) development of a pollutant loading model, 3) investigation of a resource-based pollutant load<br />

reduction goal, 4) assessment of toxin levels, 5) identification of cumulative impacts to freshwater inflow reductions, 6)<br />

seagrass mapping efforts, 7) various habitat restoration projects, and 8) involvement in numerous public outreach and<br />

education activities.<br />

0<strong>21</strong> - Manasota Basin 57


W501<br />

SWIM Plan Implementation - Charlotte Harbor<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 86,378 2,438 859<br />

0 89,675<br />

0<strong>21</strong> Manasota Basin 28,793 813 776<br />

0 30,382<br />

District Budgeted - Outside Revenue<br />

State Trust Funds (SWIM) 62,778 3,249<br />

0<br />

0 66,027<br />

State Trust Funds (SWIM) - Prior 2006 76,230 0<br />

0<br />

0 76,230<br />

WMLTF (SWIM) - Prior Year Funds 0 0 1,634<br />

0 1,634<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$263,948<br />

Critical Project Milestones Projected Amended Actual<br />

1. SWIM Plan Critical Project Milestones<br />

Next Update of SWIM Plan 6/1/07 12/31/09<br />

Status As Of: June 23, 2009<br />

SWIM Plan Update:The last update of the SWIM Plan for Charlotte Harbor became effective in 2000. District staff<br />

continue to work with the Charlotte Harbor National Estuary Program, the Florida Department of Environmental<br />

Protection and local governments to implement projects in the 2000 Plan. Current projects being implemented in the<br />

Charlotte Harbor watershed include W506, W511, W5<strong>21</strong>, W527, W528, W553, W555, W556, W558, W559. Updates for<br />

these projects are included under the individual project numbers. Status of the activities implemented with the Charlotte<br />

Harbor National Estuary Program are provided under project number W526. The CHNEP completed the Comprehensive<br />

Conservation and Management Plan in 2008 and are working on a couple of key projects that will be completed by the<br />

end of 2009. District staff have completed the outline for the Charlotte Harbor SWIM Plan and are assembling references<br />

and other documents to update the SWIM Plan.<br />

0<strong>21</strong> - Manasota Basin 58


W506<br />

CHEC Charlotte Harbor/Lemon Bay SWIM Watershed Education<br />

Project Type SWIM<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Peace River, Manasota<br />

Cooperator(s)<br />

Charlotte Harbor Environmental Center<br />

Project Manager STERNBERGER, VIRGINIA<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This Surface Water Improvement and Management project with the Charlotte Harbor Environmental Center provides<br />

public involvement and water quality education opportunities to more than 4,000 residents in the Charlotte<br />

Harbor/Lemon Bay watersheds. The program's goal is to foster a sense of stewardship and encourage actions that<br />

benefit the watershed through focused education/outreach programs. The FY20<strong>10</strong> program components include a<br />

volunteer water quality monitoring program, estuary wading trips, a three-day water workshop for local residents,<br />

community events, estuary boat trips, hiking trips; six barrier island education trips, reprint and distribution of "Keep it<br />

Clean" Lemon Bay booklets, and reprint and distribution of "Watershed" Lemon Bay DVDs. Effectiveness will<br />

be measured by number of participants, number of materials distributed, pre- and posttests and surveys.<br />

Benefits<br />

The Peace River discharges into Charlotte Harbor, a SWIM priority water body and a designated "estuary of national<br />

significance." The project fosters a sense of stewardship for the Peace River, Charlotte Harbor, Lemon Bay and<br />

related freshwater resources through focused education opportunities for public participation and schools. The<br />

program provides an opportunity for comparison of different areas within the Charlotte Harbor and Lemon Bay<br />

watersheds. These programs are consistent with the District's watershed management and watershed education<br />

initiatives. Education was named as one of the top priorities of the Manasota and Peace River basin boards. CHEC<br />

has the expertise and experience to provide quality education in a variety of methods leading to increased knowledge<br />

and behavior modificiation among participants.<br />

Costs<br />

The total cost of the FY20<strong>10</strong> project is $89,446, with the District contributing $39,250. The District's share is split<br />

between the Peace River Basin Board ($16,283), the Manasota Basin Board ($3,342) and State SWIM (19,625).<br />

District funds will pay for materials and program expenses. Each basin's share is based on anticipated work within that<br />

basin. The program is projected to reach 4,230 residents at a cost to the District of $9 per person. The budget lines<br />

below include costs for staff to manage the project.<br />

Additional Information<br />

The total cost of the FY2009 project was $85,835, with the District contributing $34,726 (Manasota $3,473; Peace<br />

River $13,890; SWIM $17,363). This program is reaching 4,230 residents at a cost to the District of $8 per resident.<br />

District funding is allocated toward staff time, materials and program expenses. The District has supported this project<br />

since FY2000.<br />

0<strong>21</strong> - Manasota Basin 59


W506<br />

CHEC Charlotte Harbor/Lemon Bay SWIM Watershed Education<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 77,299 14,757 16,283<br />

0 <strong>10</strong>8,339<br />

0<strong>21</strong> Manasota Basin 38,134 3,689 4,089<br />

0 45,912<br />

District Budgeted - Outside Revenue<br />

State Trust Funds (SWIM) 60,432 18,445<br />

0<br />

0 78,877<br />

State Trust Funds (SWIM) - Prior 2006 76,737 0<br />

0<br />

0 76,737<br />

WMLTF (SWIM) - Prior Year Funds 0 0 20,371<br />

0 20,371<br />

Project Funds Not Budgeted by the<br />

District<br />

Charlotte Harbor Environmental Center 85,050 51,<strong>10</strong>9 35,000<br />

0 171,159<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$501,395<br />

Critical Project Milestones Projected Amended Actual<br />

FY2008 Budgeted Funds<br />

Initiate purchase order <strong>10</strong>/1/07 <strong>10</strong>/31/07 <strong>10</strong>/31/07<br />

First task report due 12/31/07 12/11/07<br />

Second task report due 3/31/08 3/31/08<br />

Third task report due 6/30/08 6/16/08<br />

Fourth task report due 9/16/08 9/29/08 9/29/08<br />

Project close 11/14/08 3/31/09 3/31/09<br />

FY2009 Budgeted Funds<br />

Initiate purchase order <strong>10</strong>/1/08 12/4/08 12/4/08<br />

First task report 12/31/08 12/29/08<br />

Second task report 3/31/09 3/31/09<br />

Third task report due 6/30/09 6/30/09<br />

Fourth task report due 9/30/09<br />

Project close 11/20/09<br />

FY20<strong>10</strong> Budgeted Funds<br />

Initiate purchase order <strong>10</strong>/12/09<br />

First task report due 12/31/09<br />

Second task report 3/31/<strong>10</strong><br />

Third task report 6/30/<strong>10</strong><br />

Fourth task report 9/15/<strong>10</strong><br />

Project close 9/30/<strong>10</strong><br />

Status As Of: August 19, 2009<br />

The cooperator planned and conducted 2 volunteer water quality monitoring training workshops in Lemon Bay (reaching<br />

32) and 1 results presentation (reaching 11); conducted a three-day SWIM Water School in March (reaching 56);<br />

implemented 7 speaking programs (reaching 2<strong>10</strong>); attended 9 educational events (reaching 3,226); held 35 wading trips<br />

(involving 654); conducted 24 Journey Through the Estuary boat trips (involving 247); led 7 hiking trips (involving 154);<br />

and reprinted 500 copies of the Lemon Bay DVD. ACTION TO DATE: On time.<br />

0<strong>21</strong> - Manasota Basin 60


W509<br />

Alligator Creek In-Stream Restoration<br />

Project Type SWIM<br />

AOR(s)<br />

Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Sarasota County<br />

Project Manager LOPEZ, MANNY<br />

Task Manager(s)<br />

Status Ongoing<br />

PECK, MICHAEL<br />

Description<br />

Sarasota County is developing the Lemon Bay North Watershed Management Plan (L6<strong>10</strong>) to protect and improve<br />

water quality and restore natural systems throughout the watershed. The Lemon Bay Plan has identified several<br />

in-stream restoration projects along Alligator Creek and nearby areas to address unstable conveyance systems that<br />

are currently degrading water quality and impacting natural systems. The goal of this project is to achieve improved<br />

water quality and increase natural habitat along Alligator Creek through the combined use of the following methods<br />

at several project locations: (1) Stream bank re-sloping and restoration through removal of exotic vegetation and<br />

replanting appropriate native wetland species of vegetation; (2) Incorporating the low impact design technique of<br />

bioswales along the top of stream banks to reduce the velocity of overland flow of stormwater and protect natural<br />

systems; (3) Installation of weirs in select locations to provide increased residence time for wetland treatment<br />

processes. The County will begin design of the two project locations in FY2009 and anticipates starting construction in<br />

FY20<strong>10</strong>.<br />

Benefits<br />

This project will improve surface water quality by reducing sedimentation and erosion by re-sloping the banks and<br />

planting appropriate native vegetation. The installation of weirs at several locations will increase residence time and<br />

thereby provide additional in-stream water quality treatment.<br />

Costs<br />

Current estimated project construction costs are estimated at $1,000,000 but will be further refined during project<br />

design. For FY2009 Sarasota County has dedicated $200,000 to fund preliminary design and permitting. For FY20<strong>10</strong>,<br />

Sarasota County is contributing $400,000 towards project construction and has requested the District contribute<br />

$600,000 through the Cooperative Funding Initiative. For FY20<strong>10</strong> the District budgeted $150,000 for the project. The<br />

District's FY20<strong>10</strong> share is split between the Manasota Basin Board ($75,000) and State SWIM ($75,000). District<br />

funds shown in the table include staff salaries, travel and central garage. If approved for future funding, the District's<br />

total contribution would be spread over several fiscal years.<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 0 0 78,714 450,000 528,714<br />

District Budgeted - Outside Revenue<br />

WMLTF (SWIM) - Prior Year Funds 0 0 78,713<br />

0 78,713<br />

Project Funds Not Budgeted by the<br />

District<br />

Sarasota County 0 200,000 400,000<br />

0 600,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$1,207,427<br />

Critical Project Milestones Projected Amended Actual<br />

1. Contract Development & Execution<br />

Develop Draft Agreement with Sarasota County <strong>10</strong>/30/09<br />

0<strong>21</strong> - Manasota Basin 61


W509<br />

Alligator Creek In-Stream Restoration<br />

Agreement to Contracts Administration 11/25/09<br />

Execution of Agreement by Sarasota County 12/<strong>21</strong>/09<br />

Execution of Agreement by SWFWMD 1/4/<strong>10</strong><br />

Notice to Proceed 1/5/<strong>10</strong><br />

2. Construction<br />

Begin Construction 2/1/<strong>10</strong><br />

End Construction 9/30/11<br />

Status As Of: August 26, 2009<br />

Sarasota County has selected an engineering consultant to begin preliminary evaluation and preliminary design for<br />

instream restoration projects/improvements at several localities within the Alligator Creek basin. County and District staff<br />

toured the sites on 8/24/2009. The agreement between the District and Sarasota County for the project is under<br />

development. Details for the proposed scope of work are still under development pending the result of preliminary<br />

evaluations and are not anticipated to be completed until late September 2009. It is anticipated the draft agreement will<br />

be undergoing review by both parties in late October 2009, with full execution by both parties expected in December<br />

2009.<br />

0<strong>21</strong> - Manasota Basin 62


W5<strong>21</strong><br />

Charlotte Harbor Water Quality Monitoring<br />

Project Type SWIM<br />

AOR(s)<br />

Water Quality<br />

Basin(s) Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager SZAFRANIEC, MARY<br />

Task Manager(s)<br />

Status Ongoing<br />

Charlotte County, Florida Fish and Wildlife Conservation Commission<br />

KAUFMAN, KRIS<br />

Description<br />

This project is an ongoing SWIM Initiative to monitor water quality in Charlotte Harbor, a SWIM priority waterbody and<br />

designated estuary of national significance. The purpose of the water quality monitoring is to establish a long-term<br />

database of water quality conditions within the estuary to provide essential data for planning and management<br />

purposes, such as implementation of the Charlotte Harbor SWIM Plan. The District began collecting and analyzing<br />

monthly water quality samples from Charlotte Harbor in 1993. In 2000, the District worked with staff from Charlotte<br />

County (County) and the Florida Fish and Wildlife Conservation Commission (FFWCC) to develop an implementation<br />

plan for long-term water quality monitoring. As a result of these discussions, the District, County, and FFWCC agreed<br />

to cooperatively monitor water quality in Charlotte Harbor. The District and the FFWCC are responsible for collection of<br />

25 samples per month. The County is responsible for analyzing each sample for 11 water quality parameters, including<br />

nutrients, color and turbidity. The District is responsible for estuarine water quality data compilation, quality<br />

assurance/quality control, updates to a District approved database and upload of the data to the State's STOrage and<br />

RETrieval (STORET) database. Internet publication of the data for this project are completed under W547.<br />

Benefits<br />

The project created a multi-agency cooperative effort that provides a long-term water quality dataset to assist in<br />

establishing the health of the Charlotte Harbor study area and provide information on changes in water quality.<br />

Costs<br />

Water quality sampling task: At their April 2009 meetings, the Peace River Basin and Manasota Basin Boards<br />

approved amending its FY2009 budget to include reallocated State SWIM funds to cover 50 percent ($19,125) of the<br />

FY20<strong>10</strong> costs. The remaining costs ($19,125) are funded by the Peace River Basin and the Manasota Basin Boards.<br />

Additional Information<br />

Charlotte Harbor is generally viewed as one of the most productive estuarine systems in southwest Florida. Although it<br />

is appropriately considered a healthy system, problems exist in the areas of hydrologic alterations, water quality<br />

degradation, and habitat loss. The SWIM Plan for Charlotte Harbor focus on management strategies for the Peace<br />

and Myakka Rivers, in addition to Charlotte Harbor proper, to reduce point and non-point source pollution and to<br />

preserve and restore habitat. The objectives of this project are consistent with these strategies. This coordinated effort<br />

involves two separate agreements: 1) an agreement between the District and the County outlining responsibilities of<br />

both parties but does not involve the transfer of funds, and 2) an agreement between the District and the FFWCC<br />

outlining sampling services and reimbursement rates for water quality monitoring.<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 136,865 17,846 23,915<br />

0 178,626<br />

0<strong>21</strong> Manasota Basin 45,623 5,949 8,979<br />

0 60,551<br />

District Budgeted - Outside Revenue<br />

State Trust Funds (SWIM) 66,371 23,794<br />

0<br />

0 90,165<br />

State Trust Funds (SWIM) - Prior 2006 174,171 0<br />

0<br />

0 193,296<br />

WMLTF (SWIM) - Prior Year Funds 0 0 3,768<br />

0 3,768<br />

0<strong>21</strong> - Manasota Basin 63<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$526,406


W5<strong>21</strong><br />

Charlotte Harbor Water Quality Monitoring<br />

Critical Project Milestones Projected Amended Actual<br />

1. Critical Project Milestones<br />

Draft Agreement to Contracts 12/31/00 11/<strong>21</strong>/00<br />

Basin Board Approval of Agreement 4/30/01 12/13/00<br />

Governing Board Approval of Agreement 4/30/01 12/19/00<br />

Contract Executed 5/1/01 5/7/01<br />

First Water Quality Monitoring Event 5/12/01 5/12/01<br />

Notice to Proceed 6/1/01 5/9/01<br />

FFWCC First Amendment to Contracts Management 3/26/04 4/2/04<br />

FFWCC First Amendment Fully Executed 5/31/04 9/27/04<br />

Charlotte County First Amendment Fully Executed 3/30/05 3/30/05<br />

FFWCC Second Amendment to Contract Fully Executed 5/22/07 5/22/07<br />

Charlotte County Second Amendment Fully Executed 3/26/08 4/28/08<br />

Status As Of: September 09, 2009<br />

A second amendment to the original agreement was executed in May 2007 with the FFWCC. A second amendment to<br />

the original with Charlotte County was executed on April 28, 2008. These amendments allow for an additional three-year<br />

"No Cost Time Extension" extending each party's committment to the project through March 31, 2011. Currently, the<br />

Charlotte Harbor Environmental Center (CHEC) is presenting the results of these efforts on its website,<br />

http://www.checflorida.org, allowing the public to view results in terms of both status and trends in water quality. CHEC<br />

submitted the second and third quarterly reports, the draft final report and invoices. For FY20<strong>10</strong>, $<strong>10</strong>,000 of the<br />

remaining funds from project W547 will be used for data management under a separate purchase order with Benchmark<br />

Labs as part of this project.<br />

0<strong>21</strong> - Manasota Basin 64


W526<br />

Charlotte Harbor National Estuary Program<br />

Project Type SWIM<br />

AOR(s)<br />

Water Quality, Natural Systems<br />

Basin(s) Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager GARCIA, LIZANNE<br />

Task Manager(s)<br />

Status Ongoing<br />

Charlotte Harbor National Estuary Program<br />

KAUFMAN, KRIS, POWERS, STEPHANIE, GARCIA, LIZANNE<br />

Description<br />

This project provides for the funding of the Annual Workplan for the Charlotte Harbor National Estuary Program<br />

(CHNEP). The District participates in three main areas. First the District's SWIM program, usually funded by the basin<br />

boards and State, carries out the projects that will address water quality and habitat restoration within the Harbor.<br />

Second, the District has contributed annual funding to the CHNEP since 1997 to carry out the administration and<br />

implement of projects identified in the CHNEP Comprehensive Conservation and Management Plan. And finally, the<br />

District provides staff to sit on the technical, management and policy (Governing or Basin Board member) committees<br />

of the program. The District's annual budget includes funding support to the CHNEP and District staff salaries, travel<br />

and central garage to administer the project, which includes attending board meetings and other workshops and<br />

invoicing.<br />

Benefits<br />

This project support of the CHNEP creates an opportunity for a cohesive effort between the District, CHNEP and other<br />

state and local agencies to implement resource management decisions and restoration activities. Additionally, this<br />

project provides for leveraging funding between the partners. Projects contained within the CHNEP Annual Workplan<br />

address management issues concerning hydrologic alterations, water quality degradation, and habitat loss within the<br />

Peace and Myakka River watersheds and the Charlotte Harbor estuary.<br />

Costs<br />

The District has provided funding to the CHNEP on an annual basis since 1997. The District's annual funding<br />

commitment for the CHNEP is $1<strong>10</strong>,000, which is split between the Manasota Basin Board (25%) and the Peace River<br />

Basin Board (75%). If State SWIM funds are available, they will be applied to the District's contribution. District funds<br />

are used to implement projects outlined in the Annual Workplan. District funds shown in the table include staff<br />

salaries.<br />

Additional Information<br />

In 1987, the Florida Legislature established the Surface Water Improvement and Management (SWIM) Act, having<br />

recognized that water quality and habitat in surface waters through out the state have degraded or were in danger of<br />

being degraded. The Act requires the District to maintain a priority list of waterbodies of regional or statewide<br />

significance within their boundaries. Charlotte Harbor is designated as a priority waterbody. Charlotte Harbor was<br />

identified by the United States Environmental Protection Agency (USEPA) in 1995 as an estuary of Federal<br />

Significance and subsequently included in the National Estuary Program. As a result of this designation, the Charlotte<br />

Harbor National Estuary Program was established to assist the region in developing a comprehensive plan for the<br />

restoration and protection of Charlotte Harbor. Partners in the CHNEP include the Southwest Florida and South<br />

Florida Water Management Districts, USEPA, Florida Department of Environmental Protection, other state and federal<br />

agencies, and local governments from the watershed. The goals and strategies for the Harbor are identified in the<br />

Comprehensive Conservation and Management Plan (CCMP) for Charlotte Harbor which provides guidance to each<br />

entity on their contribution to restore the Harbor. Since 1993, the District has completed several habitat restoration<br />

projects and diagnostic assessments, including seagrass mapping, water quality monitoring, and development of a<br />

pollutant load reduction goal for the Harbor.<br />

0<strong>21</strong> - Manasota Basin 65


W526<br />

Charlotte Harbor National Estuary Program<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 319,008 45,024 43,726 82,500 490,258<br />

0<strong>21</strong> Manasota Basin <strong>10</strong>6,335 15,008 16,165 27,500 165,008<br />

District Budgeted - Outside Revenue<br />

State Trust Funds (SWIM) 179,543 60,031<br />

0<br />

0 239,574<br />

State Trust Funds (SWIM) - Prior 2006 368,701 0<br />

0<br />

0 368,701<br />

WMLTF (SWIM) - Prior Year Funds 0 0 59,891<br />

0 59,891<br />

Project Funds Not Budgeted by the<br />

District<br />

CHNEP 1,087,725 1<strong>10</strong>,000<br />

0<br />

0 1,197,725<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$2,5<strong>21</strong>,157<br />

Critical Project Milestones Projected Amended Actual<br />

2. FY2007 Annual Workplan Critical Project Milestones<br />

FY 2007 Contract with CHNEP Executed 4/1/07 6/11/07<br />

FY 2007 Contract Close Out 12/31/09<br />

3. FY2008 Annual Workplan Critical Project Milestones<br />

FY2008 Contract with CHNEP Executed 12/1/07 8/26/08<br />

FY2008 Contract Close Out 12/31/<strong>10</strong><br />

4. FY2009 Annual Workplan Critical Project Milestones<br />

FY2009 Contract with CHNEP Executed 12/1/08 12/18/09<br />

FY2009 Contract Close Out 12/31/11<br />

Status As Of: August 27, 2009<br />

FY2007 Contract: The FY2007 Agreement was executed on 6/11/2007 and expires 12/31/2009. Projects include<br />

addressing environmental data and information needs to measure the health of the estuary, identifying opportunities for<br />

water quality and habitat restoration projects and to measuring the success of these projects. FY2008 Contract: The<br />

FY2008 agreement was executed in 08/2008 and expires 12/31/20<strong>10</strong>. Projects include refinement of water quality<br />

targets and pre-development vegetation mapping in the CHNEP watershed. FY2009 Contract: The FY2009 agreement<br />

was executed on December 13, 2009. Projects include setting seagrass targets and finalizing the water quality targets<br />

necessary to maintain seagrass health. FY20<strong>10</strong> Contract: District staff have been working with the CHNEP Director to<br />

develop a project for the work plan to replace the data reporting project that was formerly done by CHEC under contract<br />

to the NEP. Management Conference: The Management and Policy Committees met in August 2009. There were<br />

several important topics on the agenda. 1) The approval of a report summarizing the key points discussed at the<br />

workshop, including those from the presenters, the peer reviewers, and the participants. While the District does not<br />

necessarily agree with all the presentations given at the workshop or the abstracts that were submitted, the report does<br />

appear to summarize the topics discussed and the District's comments were incorporated into the report.2) The<br />

refinement of water quality targets and the setting of seagrass targets, which had not previously been set for Charlotte<br />

Harbor. Seagrass Targets. District staff have worked closely with the consultant and the CHNEP to develop the targets<br />

and the District supported this action item. The Management Committee recommended that the Policy committee<br />

approve a contract with a consultant to complete the triennial review of water quality status and trends. 3) There was<br />

considerable discussions on the CHNEP taking public interest money and that this should be discussed throughout the<br />

management conference so that a policy may be developed.<br />

0<strong>21</strong> - Manasota Basin 66


W528<br />

Myakka River Water Quality Monitoring<br />

Project Type SWIM<br />

AOR(s)<br />

Water Quality<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Project Manager KAUFMAN, KRIS<br />

Task Manager(s)<br />

Status Ongoing<br />

WOLDEN, CATHERINE<br />

Description<br />

This project is an ongoing SWIM Initiative to monitor the water quality of the Myakka River. In 1996, a<br />

SWIM watershed assessment project for Charlotte Harbor found that in order to make sound management decisions,<br />

water quality monitoring was needed in the Peace and Myakka river basins. The District participated in a multi-agency<br />

cooperative effort to monitor the Myakka River in 1999. It was determined a long term effort was needed to<br />

characterize water quality conditions and pollutant loadings in the river system. The current project began in 2000 and<br />

funding for this project will be used to continue the monthly water quality monitoring program at six United States<br />

Geological Service (USGS) stream stations on the Myakka River. The data from this project will be used in conjunction<br />

with streamflow measurements provided by an existing USGS program to estimate monthly pollutant loading at the six<br />

gauge sites (See W554 & W547). Partners in this project include the Charlotte Harbor National Estuary Program and<br />

the Charlotte Harbor Environmental Center (CHEC). Currently, CHEC is presenting results of this effort on its website,<br />

www.checflorida.org (See W547).<br />

Benefits<br />

This data will be used to develop future water quality improvement projects as needed. The project's data is regularly<br />

used to create publications such as, "Water Quality Conditions and Pollutant Loads and Yields in the Peace and<br />

Myakka River Basins" (See W554). Ongoing projects such as the Myakka River Watershed Initiative will benefit from<br />

use of the ongoing long term data set.<br />

Costs<br />

The FY20<strong>10</strong> costs for this project are funded from the Manasota Basin Board. The funds are for the District's Water<br />

Quality Monitoring Program (WQMP) staff to collect samples and the District Laboratory to analyze the samples.<br />

District funds shown in the table include staff salaries.<br />

Additional Information<br />

The Myakka River discharges into Charlotte Harbor, a SWIM priority waterbody and a Charlotte Harbor National<br />

Estuary Program (CHNEP) designated "estuary of national significance." Charlotte Harbor is generally viewed as one<br />

of the most productive estuarine systems in Southwest Florida. Although it is appropriately considered a healthy<br />

system, problems exist in the areas of hydrologic alterations, water quality degradation, and habitat loss. The SWIM<br />

Plan for Charlotte Harbor focus on management strategies for the Peace and Myakka Rivers, in addition to Charlotte<br />

Harbor proper, to reduce point and non-point source pollution and to preserve and restore habitat. The objectives of<br />

this project are consistent with these strategies. The District began water quality monitoring projects along the Peace<br />

and Myakka Rivers in 2000 (See W527). Since 2001, the District has also supported sampling in the tidal portions of<br />

the Peace and Myakka Rivers by the Florida Fish and Wildlife Conservation Commission (FFWCC) (See W5<strong>21</strong>).<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 76,878 12,328 25,753<br />

0 114,959<br />

District Budgeted - Outside Revenue<br />

State Trust Funds (SWIM) 32,704 12,328<br />

0<br />

0 45,032<br />

State Trust Funds (SWIM) - Prior 2006 66,262 0<br />

0<br />

0 66,262<br />

WMLTF (SWIM) - Prior Year Funds 0 0 25,753<br />

0 25,753<br />

0<strong>21</strong> - Manasota Basin 67<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$252,006


W528<br />

Myakka River Water Quality Monitoring<br />

Critical Project Milestones Projected Amended Actual<br />

1. Critical Project Milestones<br />

First Sampling Event <strong>10</strong>/5/00 <strong>10</strong>/5/00<br />

1. Critical Project Milestones<br />

FY2008 Monthly Sampling Completed 9/30/08 9/30/08<br />

FY2009 Monthly Sampling Completed 9/30/09 9/30/09<br />

FY20<strong>10</strong> Monthly Sampling Completed 9/30/<strong>10</strong><br />

Status As Of: September 01, 2009<br />

Water quality sampling is ongoing. Samples have been collected from October 2000 through August 2009. Field data<br />

has been submitted to the laboratory for inclusion into their database through June 2009.<br />

0<strong>21</strong> - Manasota Basin 68


W547<br />

Water Quality in the Peace and Myakka Basins, Charlotte Harbor,<br />

and Lemon Bay<br />

Project Type SWIM<br />

AOR(s)<br />

Water Quality<br />

Basin(s) Peace River, Manasota<br />

Cooperator(s)<br />

Charlotte Harbor Environmental Center<br />

Project Manager SZAFRANIEC, MARY<br />

Task Manager(s)<br />

Status Ongoing<br />

KAUFMAN, KRIS<br />

Description<br />

This ongoing project is in response to a funding request from Charlotte Harbor Environmental Center (CHEC) for<br />

on-line publication of water quality maps and graphs. Water quality data from various sources collected within the<br />

Peace River Basin, Myakka River Basin, Charlotte Harbor, and Lemon Bay are included in the maps. The project<br />

involves mapping and graphing of of District Peace and Myakka River basin water quality data on the CHEC website.<br />

In FY2005, the project expanded its coverage to include Sarasota County's Northern Lemon Bay water quality<br />

sampling effort, Florida Department of Environmental Protection (FDEP) volunteer water quality project, and FDEP<br />

Lemon Bay monitoring network. An FY2009 cooperative funding request was received for continuation of the display of<br />

the project's sixth year of multi-agency monitoring. Benchmark Labs will be responsible for the data management<br />

tasks as part of this project.<br />

Benefits<br />

Information provided through this project will offer technical support for environmental management activities<br />

conducted by the District's SWIM Program, FDEP, the Peace River/ Manasota Regional Water Supply Authority, the<br />

Charlotte Harbor National Estuary Program, and other local and regional organizations. Publication of the data in the<br />

STORET databases and website provides an historical record of the changes in water quality within each system.<br />

Costs<br />

The FY2009 budget is $66,000, with the Charlotte Harbor Environmental Center and the District each contributing half<br />

($33,000). The District share is split between State SWIM ($33,000), the Peace River Basin ($16,500), and the<br />

Manatsota Basin ($4,125). The cost to each basin board is determined by its watershed's (Peace River and Myakka<br />

River watersheds) relative influence on water quality in Charlotte Harbor. District funds shown in the table include staff<br />

salaries. The District and CHEC agreed to reduce the scope of work to only cover the CHEC website display of water<br />

quality mapping and graphing for a total cost of $28,000, with the District and CHEC each contributing half ($14,000).<br />

$<strong>10</strong>,000 of the remaining funds will be used for the data management under a separate purchase order with<br />

Benchmark Labs. The Basin Boards approved the transfer of remaining funds for CHEC's fourth grade education<br />

project.<br />

Additional Information<br />

Since 2003, the CHEC has been presenting the results of these efforts on its web site www.checflorida.org/chec/water<br />

quality, allowing the public and scientists to view the results in terms of both status and trends in water quality. The<br />

cooperative project is executed through purchase orders and associated scopes of work. The SWIM Plan for<br />

Charlotte Harbor focuses on management strategies for the Peace and Myakka Rivers, in addition to Charlotte Harbor<br />

proper, to reduce point and non-point source pollution and to preserve and restore habitat. The objectives of this<br />

project are consistent with these strategies.<br />

0<strong>21</strong> - Manasota Basin 69


W547<br />

Water Quality in the Peace and Myakka Basins, Charlotte Harbor,<br />

and Lemon Bay<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

42,072 13,920<br />

0<br />

020 Peace River Basin 7,500 63,492<br />

0<strong>21</strong> Manasota Basin 25,711 4,640<br />

0 2,500 32,851<br />

District Budgeted - Outside Revenue<br />

State Trust Funds (SWIM) 47,901 18,560<br />

0<br />

0 66,461<br />

State Trust Funds (SWIM) - Prior 2006 29,817 0<br />

0<br />

0 29,817<br />

Project Funds Not Budgeted by the<br />

District<br />

Charlotte Harbor Environmental Center 112,500 33,000 34,000<br />

0 179,500<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$372,1<strong>21</strong><br />

Critical Project Milestones Projected Amended Actual<br />

1. Critical Project Milestones<br />

FY2004 First Quarter Report 12/30/03 12/19/03<br />

Second Quarter Report 3/30/04 3/24/04<br />

Third Quarter Report 6/30/04 12/<strong>21</strong>/04 12/<strong>21</strong>/04<br />

Final Report 9/30/04 5/<strong>21</strong>/05 5/<strong>21</strong>/05<br />

FY2005 P.O. Open 3/22/05 3/22/05<br />

FY2005 First Quarter Report 5/15/05 6/30/05 6/29/05<br />

Second Quarter Report 8/15/05 9/30/05 9/30/05<br />

Third Quarter Report <strong>10</strong>/15/05 11/15/05 11/15/05<br />

Fourth Quarter Report 2/15/06 3/<strong>10</strong>/06 4/13/06<br />

FY2006 P.O. Open 3/30/06 3/30/06<br />

FY2006 First Quarter Report 5/30/06 5/24/06<br />

Second Quarter Report 8/30/06 8/31/06<br />

Third Quarter and Draft Final Report 11/30/06 4/1/07 3/23/07<br />

Fourth Quarter and Final Report 2/28/07 4/1/07 3/23/07<br />

FY2007 P.O. Open 3/30/07 3/<strong>21</strong>/07<br />

FY2006 P.O. Final Invoice Paid 5/3/07 5/3/07<br />

FY2007 First Quarter Report 5/30/07 5/3/07<br />

FY2007 Second Quarter Report 8/30/07 6/30/07<br />

FY2007 Third Quarter Report 11/30/07 11/30/07<br />

FY2008 P.O. Open 1/7/08 1/7/08<br />

FY2007 Fourth Quarter Report 2/28/08 2/5/08<br />

FY2008 First Quarter Report 5/30/08 6/30/08 6/30/08<br />

FY2008 Second Quarter Report 8/30/08 1/14/09 2/27/09<br />

FY2008 Third Quarter Report 11/30/08 1/29/09 2/27/09<br />

FY2008 P.O. Terminates 12/31/08 12/31/09<br />

FY2008 Fourth Quarter Report 3/31/09 7/15/09 7/27/09<br />

Status As Of: September 09, 2009<br />

The FY2009 final scope of work was approved and the purchase order was opened, January 28, 2009. Currently, CHEC<br />

is presenting the results of these efforts on its web site, http://www.checflorida.org. The District and CHEC agreed to<br />

reduce the scope of work to only cover the CHEC website display of water quality mapping and graphing for a total cost<br />

of $28,000, with the District and CHEC each contributing half ($14,000). $<strong>10</strong>,000 of the remaining funds will be used for<br />

the data management under a separate purchase order with Benchmark Labs. The Basin Boards will be requested to<br />

approve the transfer of remaining funds for CHEC's fourth grade education project.<br />

0<strong>21</strong> - Manasota Basin 70


W552<br />

Sarasota County Pollutant Model Development<br />

Project Type SWIM<br />

AOR(s)<br />

Water Quality, Natural Systems<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Sarasota County<br />

Project Manager LOPEZ, MANNY<br />

Task Manager(s)<br />

Status Ongoing<br />

GARCIA, LIZANNE<br />

Description<br />

This project involves developing a pollutant loading model to be used to assess pollutant loading to Sarasota County<br />

surface waters. This project includes the following activities: inventory existing land use character and best<br />

management practice (BMP) facilities by watershed sub basin and incorporating information within GIS feature<br />

classes; inventory hydrologic input data by watershed sub basin for model documentation; characterize wet-season<br />

and dry-season runoff volume input data by watershed sub basin for model verification; develop models by watershed<br />

through expanding input data with the above criteria; process model results for tabulating wet season and dry season<br />

pollutant loading summary; create model/mapping geo-database for future County application needs; and perform field<br />

sampling within each Bay Watershed for use in model validation. Sarasota County continues engaged in a process to<br />

define water clarity goals for estuarine receiving waters. The model will discern the portion of water clarity conditions<br />

(chlorophyll, color, and suspended solids) that are caused by human activities rather than those caused by weather or<br />

climatic events.<br />

Benefits<br />

The pollutant load model will generate monthly loads based on daily rainfall data enabling a correlation to be made<br />

between the monthly loads and the ongoing monthly bay water quality data that can then be used to propose<br />

alternative chlorophyll criteria to the Florida DEP for Sarasota County bays. In addition, this model will provide the<br />

detail and reliability needed for local support of legitimate TMDL program load reductions. Also, as more sampling data<br />

is incorporated, the model will become more reliable to justify (via a cost-benefit analysis) the appropriate project in the<br />

proper location that will provide an improvement in water quality.<br />

Costs<br />

The original total project cost was $1,725,814, with the District's share $862,907 and the County's share $862,907,<br />

funded over two fiscal years FY2006 and FY2007. The District budgeted $431,907 in FY2006 with the Manasota Basin<br />

Board providing $<strong>21</strong>5,954 and the State SWIM fund providing $<strong>21</strong>5,953. Sarasota County provided $431,907 for<br />

FY2006. Funding for FY2007 included $431,000 from the District with the Manasota Basin Board providing $<strong>21</strong>5,500<br />

and the State SWIM fund providing $<strong>21</strong>5,500. For FY2007 Sarasota County was to provide $431,000. However, on<br />

March 2, 2007 the County indicated it wished to withdraw the request for FY2007 funding. The revised total project<br />

cost is now $863,814. FY2007 funds budgeted by the District will be released to the basin's budget. The current<br />

agreement funded with FY2006 funds will complete the current project scope. The District funding amounts listed in<br />

the table include staff salaries, travel and central garage charges.<br />

Additional Information<br />

Potential model outputs and design features will be reviewed by the Technical Advisory Committee of the Sarasota<br />

Bay Estuary Program. The model will guide the County's and District's management activities associated with water<br />

quality for the systems noted above. The proposed pollutant loading model can be used in conjunction with outputs<br />

from the existing hydrologic and hydraulic stormwater model to produce event specific pollutant loads.<br />

0<strong>21</strong> - Manasota Basin 71


W552<br />

Sarasota County Pollutant Model Development<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 439,572 3,223<br />

0<br />

0 442,795<br />

District Budgeted - Outside Revenue<br />

Ecosystem Trust Fund - Sarasota Pollut<br />

(SWIM)<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

200,000 0<br />

0<br />

0<br />

200,000<br />

State Trust Funds (SWIM) 239,570 3,223<br />

0<br />

0 242,793<br />

Project Funds Not Budgeted by the<br />

District<br />

Sarasota County 431,907 0<br />

0<br />

0 431,907<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$1,317,495<br />

Critical Project Milestones Projected Amended Actual<br />

1. Contract Development & Execution<br />

Contract Executed 5/15/06 5/31/06<br />

Notice to Proceed Sent 5/31/06 5/31/06<br />

First Ammendment Approved - Time Extension 6/15/07 6/6/07<br />

2. Critical Project Milestones<br />

Draft Verification Monitoring Plan 12/<strong>10</strong>/06 2/<strong>10</strong>/07 1/30/07<br />

Draft Model Design Memorandum 1/<strong>10</strong>/07 7/15/07 7/15/07<br />

Final Verification Monitoring Plan 3/30/07 7/30/07 7/30/07<br />

Final Model Design Memorandum 4/30/07 9/30/08 <strong>10</strong>/30/08<br />

Draft Model Operation Manual <strong>10</strong>/30/07 1/30/09 1/30/09<br />

Final Functional Model 11/30/07 6/15/09 6/15/09<br />

Final Model Operation Manual/Final Report 12/15/07 5/25/09 6/15/09<br />

2. Critical Project Milestones<br />

No-Cost Time Extension Approved 1/<strong>10</strong>/09 3/30/09 1/30/09<br />

Contract Termination 6/30/09 6/30/09<br />

Status As Of: June 25, 2009<br />

Final model calibration including review of hydrology and water quality modules is complete. The SIMPLE model<br />

installation files have been made available for trial runs. Final calibration of the water quality module was anticipated to<br />

be completed in late November or early December 2008; however, data reviews noted inconsistencies in the values<br />

reported. Further inspection revealed stormwater samples collected were not flow weighted, therefore they are not<br />

suitable for use to develop EMCs (Event Mean Concentrations) for pollutants of interest. Established literature values for<br />

EMCs were used for model simulations and calibration. Project team members met in early December for model<br />

discussions and reviews. Additional time for final model calibration and testing was needed. Likewise, additional time was<br />

needed to subsequently draft the final project report. Sarasota County requested a no-cost time extension to the<br />

agreement. District staff concurred with the request. Approval of the extension was completed by early January 2009.<br />

The approved amendment extends the contract termination date to June 30, 2009. Additional time may be needed to<br />

sort out the EMCs issues and to process final invoices.<br />

0<strong>21</strong> - Manasota Basin 72


W554<br />

(Completed) Report and Summary Analysis of Water Quality<br />

Conditions for Peace and Myakka rivers<br />

Project Type SWIM<br />

AOR(s)<br />

Water Quality<br />

Basin(s) Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager KAUFMAN, KRIS<br />

Task Manager(s)<br />

Status Completed<br />

Charlotte Harbor Environmental Center<br />

Description<br />

This SWIM cooperative funding project will create a water quality summary report for the Peace and Myakka river<br />

systems. The project is needed to compile data from multiple inter-agency monitoring efforts into a single<br />

comprehensive water quality summary and analysis. Results of this report can be incorporated into ongoing resource<br />

management efforts in the Peace River, Myakka River, and Charlotte Harbor. The project scope contains the following<br />

elements: 1) summaries and statistical analyses of water quality data collected for water year (WY) 2005 in the Peace<br />

and Myakka basins, 2) estimated loads and yields for WY2002 through WY2005, and 3) an integrative analysis of<br />

trends in surface water quality for WY2002 through WY2005. Water years are 12 month periods, starting October 1st<br />

and ending September 30th of the following year, during which a complete annual hydrologic cycle occurs.<br />

Benefits<br />

The information provided by this report will be used by District staff, the Charlotte Harbor National Estuary Program,<br />

the Florida Department of Environmental Protection, and the public for assessing the health of these systems. The<br />

reports will assist in resource management decision making and will guide future restoration efforts.<br />

Costs<br />

The total project cost is $30,000 with CHEC contributing $15,000. The District's share is $15,000. The Peace River<br />

Basin is funding $3,750, the Manasota Basin is funding $3,750, and State SWIM is funding the remaining $7,500.<br />

District funds shown in the table include staff salaries.<br />

Additional Information<br />

Charlotte Harbor is generally viewed as one of the most productive estuarine systems in Southwest Florida. Although<br />

it is appropriately considered a healthy system, problems exist in the areas of hydrologic alterations, water quality<br />

degradation, and habitat loss. The SWIM Plan for Charlotte Harbor focus on management strategies for the Peace<br />

and Myakka Rivers, in addition to Charlotte Harbor proper, to reduce point and non-point source pollution and to<br />

preserve and restore habitat. The objectives of this project are consistent with these strategies. The District began<br />

water quality monitoring projects along the Peace and Myakka Rivers in 2000 (See W527 & W528). Since 2001, the<br />

District has also supported sampling in the tidal portions of the Peace and Myakka Rivers by the Florida Fish and<br />

Wildlife Conservation Commission (FFWCC) (See W5<strong>21</strong>). The proposed project will follow the example of previous<br />

publications created by the Charlotte Harbor Environmental Center (CHEC), e.g., the 2002 publication, titled, "Water<br />

Quality Conditions and Pollutant Loads and Yields in the Peace and Myakka River Basins," which featured data from<br />

WY2001.<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 5,486 362<br />

0<br />

0 5,848<br />

0<strong>21</strong> Manasota Basin 5,487 361<br />

0<br />

0 5,848<br />

District Budgeted - Outside Revenue<br />

State Trust Funds (SWIM) <strong>10</strong>,971 723<br />

0<br />

0 11,694<br />

Project Funds Not Budgeted by the<br />

District<br />

Charlotte Harbor Environmental Center 15,000 0<br />

0<br />

0 15,000<br />

0<strong>21</strong> - Manasota Basin 73<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$38,390


W554<br />

(Completed) Report and Summary Analysis of Water Quality<br />

Conditions for Peace and Myakka rivers<br />

Critical Project Milestones Projected Amended Actual<br />

1. Critical Project Milestones<br />

Issued Purchase Order 12/31/06 5/11/07 5/<strong>10</strong>/07<br />

Notice to Proceed 12/31/06 5/11/07<br />

Project Kick Off <strong>Meeting</strong> 5/11/07 5/11/07<br />

First Progress Report 8/31/07 6/30/07<br />

Second Progress Report 9/30/07 12/17/07<br />

Third Progress Report <strong>10</strong>/31/07 3/31/08 3/31/08<br />

Fourth Progress Report and Final Report 12/15/07 3/31/08 3/31/08<br />

Final Report 12/31/07 3/31/08 3/31/08<br />

1. Critical Project Milestones<br />

Acceptance of Final Report 4/30/08 1/30/09 5/26/09<br />

Status As Of: September 01, 2009<br />

A three month no cost time extension through 03/31/2008 was approved to finish the review and editing process of the<br />

draft and final reports. Due to the highly technical nature of the document and numerous calculations, longer review and<br />

revision times were needed to ensure all data, interpretations, and conclusions contained within the document are<br />

accurate. The final draft document review was completed by District staff and changes to the document are being<br />

completed. A final draft was received by the District in January 2009, District staff responded with a second round of<br />

comments. A final report was submitted May 20, 2009 and accepted by the District May 26,2009. The final invoice has<br />

been paid and the purchase order closed. Project records have been sent to Contracts.<br />

0<strong>21</strong> - Manasota Basin 74


W558<br />

Venice Hatchett Creek Stormwater Facility<br />

Project Type SWIM<br />

AOR(s)<br />

Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

City of Venice, Venice<br />

Project Manager NORTON, NANCY<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This multi-year funded project was originally funded in FY2008 by the City of Venice, which is the lead agency for<br />

implementing the stormwater retrofit and habitat restoration goals of this effort. The project is associated with the<br />

implementation of Best Management Practices (BMPs) for the City's Hatchett Creek Basin Master Plan and the<br />

Sarasota County unified local mitigation strategy. This project includes the following tasks: land acquisition, design,<br />

development of construction documents, construction permitting, bidding and contractor selection, and construction<br />

engineering and inspection during construction of the BMPs. In 2007, the City purchased a 1.33 acre parcel at 1155<br />

US 41 Bypass South, to be converted to a stormwater pond to provide additional storage and water quality treatment<br />

for a 16.6 acre drainage area. The BMP will address water quality improvements, stormwater management level of<br />

service deficiencies and natural systems restoration along approximately 200 linear feet of intertidal shoreline of<br />

Hatchett Creek.<br />

Benefits<br />

Completion of this project improves stormwater quality prior to discharging into Hatchett Creek, restores approximately<br />

200 linear feet of intertidal shoreline, and will provide an increased stormwater management level of service on East<br />

Venice Avenue and neighboring areas.<br />

Costs<br />

The total project cost is $1,850,000, and the requested District share is $300,000 ($150,000 from the Manasota Basin<br />

Board and $150,000 from State SWIM), of which $150,000 was requested in FY2008 for design and construction and<br />

$150,000 in FY2009 for construction. The City of Venice purchased a 1.33 acre parcel in 2007 for $1,250,000 and the<br />

District funds match the City funding for design and construction. District funds shown in the table include staff<br />

salaries.<br />

Additional Information<br />

This project is located within the geographic boundaries of the Charlotte Harbor National Estuary Program and the<br />

Charlotte Harbor SWIM Plan. Charlotte Harbor is generally viewed as one of the most productive estuarine systems<br />

in Southwest Florida. Although it is appropriately considered a healthy system, problems exist in the areas of<br />

hydrologic alterations, water quality degradation, and habitat loss. The SWIM Plan for Charlotte Harbor focus on<br />

management strategies for the Peace and Myakka Rivers, in addition to Charlotte Harbor proper, to reduce point and<br />

non-point source pollution and to preserve and restore habitat. Charlotte Harbor is a District priority Surface Water<br />

Improvement and Management (SWIM) program waterbody and is considered an "estuary of national significance"<br />

with the establishment of the Charlotte Harbor National Estuary Program (CHNEP). Water quality data and seagrass<br />

mapping efforts suggest that Charlotte Harbor's water quality is not degrading, and its fisheries' habitats are mostly<br />

stable. However, data collected since its SWIM designation in 1993 indicate the system experiences annual algae<br />

blooms that appear to be related to elevated nutrient concentrations. The Hatchett Creek Stormwater Facility<br />

project is consistent with the water quality improvement goals of the District's SWIM Plan for Charlotte Harbor and the<br />

Charlotte Harbor National Estuary Program's CCMP. The City will manage the project and the District project<br />

manager must approve any agreements to accomplish project tasks.<br />

0<strong>21</strong> - Manasota Basin 75


W558<br />

Venice Hatchett Creek Stormwater Facility<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 75,641 76,061 1,045<br />

0 152,747<br />

District Budgeted - Outside Revenue<br />

State Trust Funds (SWIM) 75,641 76,060<br />

0<br />

0 151,701<br />

WMLTF (SWIM) - Prior Year Funds 0 0 1,045<br />

0 1,045<br />

Project Funds Not Budgeted by the<br />

District<br />

City of Venice 1,250,000 400,000<br />

0<br />

0 1,650,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$1,955,493<br />

Critical Project Milestones Projected Amended Actual<br />

Contract Development and Execution<br />

Draft Agreement sent to Management Services 1/29/08 2/7/08<br />

Draft Agreement returned from Management Services 2/20/08 3/11/08<br />

Agreement sent to Cooperator 2/27/08 3/12/08<br />

Signed Agreement returned from Cooperator 3/27/08 4/11/08<br />

Agreement fully executed 4/<strong>10</strong>/08 4/<strong>21</strong>/08<br />

Notice to Proceed 4/15/08 4/25/08<br />

Critical Project Milestones<br />

Complete Design and Permitting 4/25/09 3/20/09<br />

Bidding and Contractor Selection 7/25/09 9/1/09 9/27/09<br />

Building Demolition 9/25/09 1/9/09<br />

Commence Construction 11/25/09 12/31/09<br />

Complete Construction 8/25/<strong>10</strong><br />

Contract Close-Out <strong>10</strong>/25/<strong>10</strong><br />

Construction Contract Termination 12/25/<strong>10</strong><br />

Agreement Expiration 3/25/11<br />

Status As Of: September 22, 2009<br />

The City of Venice completed building demolition for the project site in January 2009, 8 months ahead of schedule. The<br />

City completed design and received an environmental resource permit (ERP) from SWFWMD for the proposed work<br />

March 20, 2008. Due to escalating construction costs, the City requested and has received additional funding from<br />

FEMA. On May 27, 2009 the City provided <strong>10</strong>0% plans to the District and is currently finalizing the specifications and bid<br />

documents for this project. The cooperator requested approximately 40 days of additional time to extend milestones for<br />

bidding and contractor selection and for commence construction due to delays associated with acquiring FEMA funding.<br />

The City has combined design of this project, Hatchett Creek Stormwater Facility, with design of L624, Implementation of<br />

BMP's Hatchett Creek. The City submitted final bid documents to the District September 22, 2009 and plans to advertise<br />

for bids September 27, 2009.<br />

0<strong>21</strong> - Manasota Basin 76


W559<br />

Assessment of 2008 Seagrass Maps in Charlotte Harbor And Lemon<br />

Bay<br />

Project Type SWIM<br />

AOR(s)<br />

Natural Systems<br />

Basin(s) Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager KAUFMAN, KRIS<br />

Task Manager(s)<br />

Status Ongoing<br />

Charlotte Harbor Environmental Center<br />

Description<br />

This FY2009 SWIM cooperative funding project will assess the accuracy of mapping classifications used in the<br />

District's ongoing Biennial Seagrass Mapping Project (See W331). This effort will supplement the District's well<br />

established accuracy assessment of the maps. While the District assesses the project's ability to correctly identify the<br />

presence of seagrass, the cooperative funding project will conduct a more in-depth evaluation of the mapping<br />

categories: patchy seagrass, continuous seagrass, and tidal flat. Estimates of inter-annual change in seagrass habitat<br />

based on aerial photos finds little change between habitat classes during the past nearly 20 years of study. However, a<br />

recent analysis of more localized data from the Florida DEP seagrass transect data (CHEC 2006) found decreases in<br />

abundance and distribution of seagrasses around Charlotte Harbor and Lemon Bay. Furthermore, of the quadrats<br />

sampled by DEP that occurred in tidal flat polygons, most did contain some seagrass, some up to 25% coverage. The<br />

following tasks regarding the 2008 seagrass maps produced by the District for the Charlotte Harbor and Lemon Bay<br />

segments are proposed for this project: 1. assess map accuracy by defining spatial variability of seagrass abundance<br />

in classified polygons using variation in percent cover by seagrass in square-meter quadrats; 2. quantify seagrass<br />

abundance in classified polygons using percent cover by seagrass in square-meter quadrats; 3. describe abundance<br />

and distribution of seagrass at its deepest depth of occurrence to verify map estimates of deep edge/maximum depth<br />

of distribution of seagrass species. The public will be able to access all data via www.checflorida.org.<br />

Benefits<br />

This project will provide the District and end users of District seagrass maps with new highly detailed information on<br />

the accuracy of classifying seagrass as patchy or continuous. The District, county governments, and Estuary Programs<br />

will be able to use the data in ongoing water quality/water clarity target setting and other resource protection projects.<br />

Costs<br />

The FY2009 project cost is $40,000, with CHEC and the District each contributing half ($20,000). The District share is<br />

split between Peace River and Manastoa Basin Boards ($5,000 each) and State SWIM ($<strong>10</strong>,000).<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 0 5,402 709<br />

0 6,111<br />

0<strong>21</strong> Manasota Basin 0 5,402 709<br />

0 6,111<br />

District Budgeted - Outside Revenue<br />

State Trust Funds (SWIM) 0 <strong>10</strong>,802<br />

0<br />

0 <strong>10</strong>,802<br />

WMLTF (SWIM) - Prior Year Funds 0 0 1,418<br />

0 1,418<br />

Project Funds Not Budgeted by the<br />

District<br />

Charlotte Harbor Environmental Center 0 20,000<br />

0<br />

0 20,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$44,442<br />

Critical Project Milestones Projected Amended Actual<br />

0<strong>21</strong> - Manasota Basin 77


W559<br />

Assessment of 2008 Seagrass Maps in Charlotte Harbor And Lemon<br />

Bay<br />

1. Contract Development and Execution<br />

Finalize scope of work and process purchase order <strong>10</strong>/1/08 12/31/08 1/<strong>21</strong>/09<br />

Notice to Proceed <strong>10</strong>/5/08 1/<strong>21</strong>/09<br />

Purchase Order Termination 9/30/09 12/31/09<br />

2. Critical Milestone<br />

Project Kick Off <strong>Meeting</strong> <strong>10</strong>/15/08 1/9/09 1/9/09<br />

Field Work Commenced 4/15/09 1/26/09 1/26/09<br />

First Progress Report 6/15/09 1/30/09 3/27/09<br />

2. Critical Milestone<br />

Second Progress Report 2/27/09 6/5/09 6/5/09<br />

Third Progress Report 3/27/09 6/5/09 6/5/09<br />

Draft Final Report 5/29/09 8/24/09<br />

Final Report 6/26/09 9/<strong>21</strong>/09<br />

Status As Of: September 01, 2009<br />

The project scope of work was finalized and submitted on December 31, 2008. A purchase order with attached scope<br />

was opened. District and CHEC staff held a project meeting January 9, 2009 to discuss project scheduling and project<br />

design. Field work for the District's classification accuracy assessment was completed April 2009. District and cooperator<br />

staff met June 4, 2009 to discuss project progress and final report formatting. The purchase order and associated scope<br />

of work were revised for time extensions of project milestones.<br />

0<strong>21</strong> - Manasota Basin 78


W601<br />

SWIM Plan Implementation - Sarasota Bay<br />

Project Type SWIM<br />

AOR(s)<br />

Water Quality, Natural Systems<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Project Manager GARCIA, LIZANNE<br />

Task Manager(s)<br />

Status Ongoing<br />

Manatee County, Sarasota Bay Estuary Program, Sarasota County<br />

LOPEZ, MANNY, POWERS, STEPHANIE<br />

Description<br />

This project provides for the administration and implementation of projects as outlined in the SWIM Plan for Sarasota<br />

Bay. Administration and implementation includes assessment of implementation progress, a review and refinement of<br />

the Pollutant Load Reduction Goal (PLRG) for the waterbody, periodic SWIM Advisory Committee meetings, new<br />

project development (rationale and justification), development of relevant contracts and Requests for Proposals,<br />

invoicing, project related presentations, field visits, and miscellaneous duties as they arise.<br />

Benefits<br />

This project's support of the Sarasota Bay SWIM Plan creates an opportunity for a cohesive effort between the District,<br />

and other state and local agencies to better implement resource management decisions and restoration activities.<br />

SWIM projects are eligible for state matching funds with the state funding 50 percent of the project costs and the<br />

District funding the remaining 50 percent.<br />

Costs<br />

The FY2008 and FY2009 ongoing costs for the Sarasota Bay SWIM Plan Implementation are funded 50 percent from<br />

the Manasota Basin and 50 percent from the State SWIM Program and include staff salary, travel and central garage.<br />

Additional Information<br />

In 1987, the Florida Legislature established the Surface Water Improvement and Management (SWIM) Act having<br />

recognized that water quality and habitat in surface waters throughout the state have degraded or were in danger of<br />

being degraded. The Act requires the five water management districts to maintain a priority list of water bodies of<br />

regional or statewide significance within their boundaries, and develop plans and programs for the improvement of<br />

those water bodies. To date, ten SWIM water bodies in the District have had plans developed and approved by the<br />

state. Several plans have been updated one or more times as required by the Act. The Sarasota Bay SWIM Plan was<br />

first approved in 1997 and last updated in 2002. Since the first plan, the District has initiated a number of restoration<br />

and diagnostic assessment projects. Included within these are: 1) investigation of toxic loading sources to the Bay, 2)<br />

seagrass mapping 3) habitat restoration, 4) development of stormawater master plans 5) various habitat restoration<br />

projects, 6) construction of artificial reefs and oyster reefs and 7) involvement in numerous public outreach and<br />

education activities.<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 260,426 2,596 4,247<br />

0 267,269<br />

District Budgeted - Outside Revenue<br />

State Trust Funds (SWIM) <strong>21</strong>,622 2,596<br />

0<br />

0 24,<strong>21</strong>8<br />

State Trust Funds (SWIM) - Prior 2006 358,202 0<br />

0<br />

0 358,202<br />

WMLTF (SWIM) - Prior Year Funds 0 0 4,247<br />

0 4,247<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$653,936<br />

Critical Project Milestones Projected Amended Actual<br />

1. Critical Project Milestones<br />

0<strong>21</strong> - Manasota Basin 79


W601<br />

SWIM Plan Implementation - Sarasota Bay<br />

Last Update of Plan 6/7/97 6/7/97<br />

Initiate Update of Plan 4/1/02 4/1/02<br />

Obtain FDEP Approval of Plan Update 9/2/02 12/20/02<br />

Initiate Next Update of Plan 1/1/09<br />

Status As Of: June 23, 2008<br />

The last update for the SWIM Plan for Sarasota Bay became effective in December 2002. District staff continue to work<br />

with local governments and the Sarasota Bay Estuary Program (SBEP) to implement projects identified in the 2002 Plan.<br />

Status of activities implemented with the SBEP are provided under project number W612. Additionally, Sarasota County<br />

is working on projects to establish water clarity and other resource management targets for the segments of Sarasota<br />

Bay. Currently the District is cooperating in this effort through the Lemon Bay and Roberts Bay Watershed Plans (L6<strong>10</strong><br />

and L611). The District convened a meeting on December 13, 2007 with scientists and agency stakeholders for Sarasota<br />

Bay to coordinate the development of water quality targets for the bay. For FY2009, Sarasota County has submitted<br />

cooperative funding applications for Sarasota Bay (W6<strong>21</strong>) and Little Sarasota Bay (W622) Water Quality Management<br />

Plans. The SBEP has begun its update of the Comprehensive Conservation and Management Plan (CCMP) for the Bay<br />

and this plan should include water quality targets. District staff will participate in this process and this and the above<br />

mentioned projects will be useful in the future update to the SWIM Plan and the SBEP's CCMP. The next update of the<br />

SWIM plan is contingent upon the progress of these projects. Updates for these projects are included under the<br />

individual project numbers. This will be the last update under this write-up until a revised timeline is developed for the<br />

SWIM plan based on the progress of the pending projects.<br />

0<strong>21</strong> - Manasota Basin 80


W602<br />

Neal Preserve Environmental Restoration<br />

Project Type SWIM<br />

AOR(s)<br />

Water Quality, Natural Systems<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Manatee County<br />

Project Manager POWERS, STEPHANIE<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This project is in response to a cooperative funding request from Manatee County to restore and enhance habitat on<br />

119 acres of intertidal wetlands and uplands in west central Manatee County. The land was purchased in July 2005 by<br />

Manatee County for $9 million. The proposed restoration will target the creation and enhancement of open water,<br />

intertidal habitats, and coastal uplands. Exotic plants such as Australian Pine and Brazilian Pepper will be removed<br />

and replaced with both planted and naturally recruiting native species. Under the current agreement, the County is<br />

responsible for managing the construction contract and will be responsible for the long-term operation and<br />

maintenance of the site. The District is providing project management overview of construction progress.<br />

Benefits<br />

Upon completion, the project will provide significant benefits to habitat through the removal of exotic plant species and<br />

replanting of native vegetation. Hydrologic alterations will also improve the habitat and water quality of the site and<br />

provide limited stormwater treatment of waters entering Tampa Bay and Sarasota Bay. Because the project site drains<br />

to both Tampa Bay and to Sarasota Bay, this project will benefit both systems.<br />

Costs<br />

The total project cost is $9,650,000. The District's contribution is $500,000, which is being split 50/50 between the<br />

Manasota Basin Board ($250,000) and State funds ($250,000). Manatee County is matching the District's contribution<br />

with $9 million used for the land purchase. District funds will be used for the construction phase of the project. District<br />

funds shown in the table include staff salaries.<br />

Additional Information<br />

Since 1950, approximately 50 percent of Tampa Bay's natural shoreline and approximately 40 percent of Sarasota<br />

Bay's intertidal wetland habitat has been lost due to development and reduction in water quality. This resulted in a<br />

decline in the aesthetic, recreational, and commercial value of the bay, as well as a loss of habitat for native plants<br />

and animals. The SWIM Plans for Tampa Bay and Sarasota Bay outline goals to restore habitat throughout the bay<br />

areas and reduce pollutant loads entering the bays. The objectives of this project are consistent with these goals.<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 329,468 1,283 1,345<br />

0 332,096<br />

District Budgeted - Outside Revenue<br />

Ecosystem Trust Fund - Sarasota Bay<br />

Rstr (SWIM)<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

250,000 0<br />

0<br />

0<br />

250,000<br />

State Trust Funds (SWIM) 79,467 1,282<br />

0<br />

0 80,749<br />

WMLTF (SWIM) - Prior Year Funds 0 0 1,345<br />

0 1,345<br />

Project Funds Not Budgeted by the<br />

District<br />

Manatee County 9,000,000 0<br />

0<br />

0 9,000,000<br />

0<strong>21</strong> - Manasota Basin 81<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$9,664,190


W602<br />

Neal Preserve Environmental Restoration<br />

Critical Project Milestones Projected Amended Actual<br />

1. Contract Development and Execution<br />

Draft Agreement to Management Services 5/14/07 7/5/07<br />

Draft Agreement returned from Management Services 6/4/07 8/22/07<br />

Agreement to Cooperator 6/8/07 8/24/07<br />

Signed Agreement from Cooperator 7/9/07 <strong>10</strong>/23/07<br />

Agreement Fully Executed 7/26/07 <strong>10</strong>/31/07<br />

Notice to Proceed 8/1/07 11/6/07<br />

2. Project Tasks<br />

Completion of Design and Permitting <strong>10</strong>/31/08 7/31/09<br />

Construction Complete 12/31/09 7/31/<strong>10</strong><br />

3. Agreement Expiration Dates<br />

Contract Expiration 12/31/08<br />

Status As Of: August 25, 2009<br />

The County solicited a request for proposals on August 11, 2008, for a contractor to conduct the exotic plant removal on<br />

the project site. The kick off meeting scheduled in January was postponed. District staff is currently waiting on new<br />

meeting date information from the County.<br />

0<strong>21</strong> - Manasota Basin 82


W603<br />

Ungarelli Preserve<br />

Project Type SWIM<br />

AOR(s)<br />

Water Quality, Natural Systems<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Manatee County<br />

Project Manager POWERS, STEPHANIE<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This proposed project is in response to a request from Manatee County to restore and enhance approximately <strong>10</strong><br />

acres of intertidal wetland and upland habitat along the Manatee River. The Ungarelli Preserve is a 35-acre site that<br />

was purchased in 2008 by Manatee County. The proposed plan targets the restoration of degraded salt marsh habitat<br />

and associated coastal maritime forest on adjacent hummocks through nuisance and exotic species eradication and<br />

supplemental native plantings. The County will be the lead agency for the project. The District will provide project<br />

management oversight of design and construction progress.<br />

Benefits<br />

Upon completion, the project will provide significant benefits to habitat and water quality. The County also plans to<br />

provide passive recreational and educational opportunities to the public.<br />

Costs<br />

The total project cost is approximately $250,000, which includes $150,000 for land acquisition. The District's FY20<strong>10</strong><br />

contribution is $50,000. At their April 2009 meeting, the Manasota Basin Board approved amending its FY2009<br />

budget to include reallocated State SWIM funds to cover 50 percent ($25,000) of the FY20<strong>10</strong> costs. The remaining<br />

costs ($25,000) are funded by the Manasota Basin Board. The County fully funded the land purchase in 2008 and will<br />

use the land as a match to District funding. District funds shown in the table include staff salaries.<br />

Additional Information<br />

Since 1950, approximately 40 percent of Sarasota Bay's intertidal wetland habitat has been lost due to development<br />

and reduction in water quality. This resulted in a decline in the aesthetic, recreational, and commercial value of the<br />

bay, as well as a loss of habitat for native plants and animals. The SWIM Plans for Sarasota Bay outline goals to<br />

restore habitat throughout the bay areas and reduce pollutant loads entering the bays. The objectives of this project<br />

are consistent with these goals.<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 0 0 26,885 <strong>10</strong>0,000 126,885<br />

District Budgeted - Outside Revenue<br />

Ecosystem Trust Fund - SWIM<br />

Rebudget<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

0 0 25,000<br />

0<br />

25,000<br />

WMLTF (SWIM) - Prior Year Funds 0 0 1,885<br />

0 1,885<br />

Project Funds Not Budgeted by the<br />

District<br />

Manatee County 0 0 50,000 <strong>10</strong>0,000 150,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$303,770<br />

Critical Project Milestones Projected Amended Actual<br />

Contract Development and Execution<br />

Receive Scope of Work from Cooperator 9/16/09<br />

0<strong>21</strong> - Manasota Basin 83


W603<br />

Ungarelli Preserve<br />

Draft Agreement to Management Services <strong>10</strong>/1/09<br />

Agreement Returned from Management Services <strong>10</strong>/22/09<br />

Agreement Sent to Cooperator <strong>10</strong>/29/09<br />

Signed Agreement Returned from Cooperator 11/30/09<br />

Agreement Fully Executed 12/15/09<br />

Contract Expiration<br />

Project Close Out 12/31/11<br />

Status As Of: August 25, 2009<br />

A scope of work has been requested from the cooperator. Once the scope has been received, an agreement will be<br />

drafted.<br />

0<strong>21</strong> - Manasota Basin 84


W604<br />

Phillippi Creek In-stream Restoration<br />

Project Type SWIM<br />

AOR(s)<br />

Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Sarasota County<br />

Project Manager LOPEZ, MANNY<br />

Task Manager(s)<br />

Status Ongoing<br />

PECK, MICHAEL<br />

Description<br />

Sarasota County is developing the Roberts Bay North Watershed Management Plan (see L611), to protect and<br />

improve water quality and restore natural systems throughout the watershed. This plan has identified several in-stream<br />

restoration projects along Phillippi Creek (and nearby areas) to address unstable systems that are currently degrading<br />

water quality and impacting natural systems. The goal of this project is to achieve measurable, improved water quality<br />

and increase natural habitat along Phillippi Creek through the combined use of the following methods at five project<br />

locations: (1) Stream bank resloping and removal of exotic vegetation and replanting appropriate native species of<br />

vegetation; (2) Incorporating the low impact design technique of bioswales along the top of stream banks to reduce the<br />

velocity of overland flow of stormwater and protect natural systems; (3) Creating wetland treatment systems to restore<br />

habitat at the confluence of stream branches; (4) Constructing sediment sumps to reduce the amount of nutrient<br />

transport associated with unstable systems; and (5) Installation of weirs in select locations to provide increased<br />

residence time for wetland treatment processes. The County will begin design for several project locations in late<br />

FY2009 and anticipates starting construction in FY20<strong>10</strong>. District funds are requested for construction. Current<br />

estimated construction costs are around $1,800,000 but will be further refined during design. This request is for<br />

construction costs beginning in FY 20<strong>10</strong>, but the County anticipates requesting additional funding to complete<br />

construction.<br />

Benefits<br />

Upon implementation, this project will improve surface water quality by reducing sedimentation and erosion through<br />

bank re-sloping and stabilization with appropriate native vegetation. The installation of weirs at several locations will<br />

increase residence time and thereby provide additional in-stream water quality treatment.<br />

Costs<br />

The total project cost is $2,000,000. For FY2009 Sarasota County allocated $200,000 for the design and permitting of<br />

the project. The FY20<strong>10</strong> total project cost is $1,000,000 with Sarasota County contributing $400,000 and the<br />

District was requested to contribute $600,000. Due to FY20<strong>10</strong> budget constraints, the District budgeted $150,000 for<br />

the project. The District's FY20<strong>10</strong> share is split between the Manasota Basin Board ($75,000) and State<br />

SWIM ($75,000). District funds shown in the table include staff salaries. If approved for future funding, the District's<br />

total contribution would be spread over several fiscal years.<br />

Additional Information<br />

In 1987, the Florida Legislature established the Surface Water Improvement and Management (SWIM) Act having<br />

recognized that water quality and habitat in surface waters throughout the state have degraded or were in danger of<br />

being degraded. The Act requires the five water management districts to maintain a priority list of water bodies of<br />

regional or statewide significance within their boundaries, and develop plans and programs for the improvement of<br />

those water bodies. To date, ten SWIM water bodies in the District have had plans developed and approved by the<br />

state. Several plans have been updated one or more times as required by the Act. The Sarasota Bay SWIM Plan was<br />

first approved in 1997 and last updated in 2002. Since the first plan, the District has initiated a number of restoration<br />

and diagnostic assessment projects. Included within these are: 1) investigation of toxic loading sources to the Bay, 2)<br />

seagrass mapping 3) habitat restoration, 4) development of stormawater master plans 5) various habitat restoration<br />

projects, 6) construction of artificial reefs and oyster reefs and 7) involvement in numerous public outreach and<br />

education activities.<br />

0<strong>21</strong> - Manasota Basin 85


W604<br />

Phillippi Creek In-stream Restoration<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 0 0 77,995 850,000 927,995<br />

District Budgeted - Outside Revenue<br />

WMLTF (SWIM) - Prior Year Funds 0 0 77,994<br />

0 77,994<br />

Project Funds Not Budgeted by the<br />

District<br />

Sarasota County 0 200,000 400,000 400,000 1,000,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$2,005,989<br />

Critical Project Milestones Projected Amended Actual<br />

1. Contract Development & Execution<br />

Develop Draft Agreement with Sarasota County <strong>10</strong>/16/09<br />

Agreement to Contract Administration 11/13/09<br />

Execution of Agreement by Sarasota County 12/11/09<br />

Execution of Agreement by SWFWMD 12/18/09<br />

Issue Notice to Proceed 12/30/09<br />

Status As Of: August 26, 2009<br />

Sarasota County has selected an engineering consultant to begin preliminary evaluation and preliminary design for<br />

in-stream restoration projects /improvements at several localities. District staff toured the sites 8/24/2009. The<br />

agreement between the District and the County for the project is under development. Details for the proposed scope of<br />

work are still under development and are not anticipated to be completed until mid to late September 2009. It is<br />

anticipated the draft agreement would be undergoing review by both parties in late October 2009 with full execution by<br />

both parties in December 2009.<br />

0<strong>21</strong> - Manasota Basin 86


W611<br />

Sarasota Bay Spoil Island Restoration Project<br />

Project Type SWIM<br />

AOR(s)<br />

Water Quality, Natural Systems<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Project Manager GARCIA, LIZANNE<br />

Task Manager(s)<br />

Status Ongoing<br />

Sarasota County, Sarasota County Watershed Management<br />

Description<br />

This project originally proposed to restore degraded habitat on three groups of islands in Sarasota Bay, a SWIM<br />

priority water body. The islands were Bird Colony Islands, Jim Neville Marine Preserve and Palmer Point Park. These<br />

islands have been impacted by spoil deposition from the dredging of the Intracoastal Waterway, and have been<br />

colonized by exotic vegetation consisting mostly of Australian pines and Brazilian peppers. The project proposes to<br />

restore habitat through the removal of exotic vegetation, excavation of tidal channels and excess spoil, planting of<br />

native vegetation and shoreline stabilization. The project at Bird Colony Islands is primarily focused on shoreline<br />

stabilization while the other two projects focused more on comprehensive coastal ecosystem restoration. Due to the<br />

significant construction cost estimate for the Jim Neville Marine Preserve and a shortfall in expected federal funding<br />

the cooperative funding agreement was amended to remove the Jim Neville Preserve Marine Preserve site from this<br />

project.<br />

Benefits<br />

These projects focus on intertidal hydrologic restoration, removal of exotic vegetation, and re-vegetation with native<br />

plants to increase and improve wildlife habitat. This habitat restoration project is consistent with and specifically<br />

identified in the the Sarasota Bay SWIM Plan, 2002.<br />

Costs<br />

The total project cost is approximately $2.6 million. The District share totals $945,000 with $402,500 from the<br />

Manasota Basin Board, $322,500 from State SWIM and $220,000 in State Appropriations. The county's share totals<br />

$1,608,453, with $637,953 from the county, $300,000 from the West Coast Inland Navigation District, $520,500 from a<br />

Jacksonville Community Foundation Grant and $150,000 from the United State Army Corps of Engineers. FY2009<br />

project funding is $750,000, with the District contributing $325,000 and the County contributing $425,000. The<br />

District's share is split 50/50 between the Manasota Basin Board and State SWIM ($162,500). District funds shown in<br />

the table include staff salaries.<br />

Additional Information<br />

Since 1950, approximately 40 percent of Sarasota Bay's intertidal wetland habitat has been lost due to development<br />

and reduction in water quality. This resulted in a decline in the aesthetic, recreational, and commercial value of the<br />

bay, as well as a loss of habitat for native plants and animals. The SWIM Plans for Sarasota Bay outline goals to<br />

restore habitat throughout the bay areas and reduce pollutant loads entering the bays. The objectives of this project<br />

are consistent with these goals.<br />

0<strong>21</strong> - Manasota Basin 87


W611<br />

Sarasota Bay Spoil Island Restoration Project<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 271,494 <strong>21</strong>4,383 956<br />

0 486,833<br />

District Budgeted - Outside Revenue<br />

Ecosystem Trust Fund - Sarasota Bay<br />

Impl (SWIM)<br />

Ecosystem Trust Fund - Sarasota Spoil<br />

(SWIM)<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

120,000 0<br />

0<br />

<strong>10</strong>0,000 0<br />

0<br />

0<br />

0<br />

120,000<br />

<strong>10</strong>0,000<br />

State Trust Funds (SWIM) 130,425 <strong>21</strong>4,383<br />

0<br />

0 344,808<br />

State Trust Funds (SWIM) - Prior 2006 61,606 0<br />

0<br />

0 61,606<br />

WMLTF (SWIM) - Prior Year Funds 0 0 956<br />

0<br />

956<br />

Project Funds Not Budgeted by the<br />

District<br />

Jacksonville Community Foundation 520,500 0<br />

0<br />

0 520,500<br />

Sarasota County <strong>21</strong>2,953 425,000<br />

0<br />

0 637,953<br />

USACE 150,000 0<br />

0<br />

0 150,000<br />

West Coast Inland Navagation District 300,000 0<br />

0<br />

0 300,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$2,722,656<br />

Critical Project Milestones Projected Amended Actual<br />

1. Contract Development and Execution<br />

Draft agreement sent to Management Services 2/18/05 2/18/05<br />

Draft agreement returned from Management Services 3/11/05 3/11/05<br />

Agreement sent to Cooperator 3/18/05 3/18/05<br />

Signed agreement returned from Cooperator 4/15/05 4/15/05<br />

Agreement fully executed 4/29/05 4/29/05<br />

Notice to Proceed 5/6/05 5/3/05<br />

2. Project Tasks<br />

Completion of Design and Permitting for Bird Colony Island <strong>10</strong>/31/05 <strong>10</strong>/31/05<br />

Construction complete for Bird Colony Island 3/30/08 2/22/08<br />

Completion of Design and Permitting for Palmer Point Park 9/30/08 1/1/<strong>10</strong><br />

Construction complete for Palmer Point Park 5/30/09 11/30/<strong>10</strong><br />

3. Agreement Expiration Date<br />

Contract Expiration 12/31/11<br />

Status As Of: August 26, 2009<br />

Construction at Bird Colony Island commenced in late 2007 and was completed on 2/22/08. The County submitted an<br />

Environmental Resource Permit Application for the Palmer Point Park project on 5/16/08. The Department of<br />

Environmental Protection is reviewing the permit and has issued Sarasota County two Requests for Additional<br />

Information (RAI). Since the last update, the County and DEP are continuing to negotiate on the information required in<br />

the RAI. This has delayed the date by which the County had hoped to complete design. Completion of design is now<br />

anticipated by January 1, 20<strong>10</strong> at which time the County will advertise for construction. Construction is anticipated to<br />

begin in June 20<strong>10</strong>. An amendment has been drafted to encumber the FY2009 funds, revise the project completion<br />

schedule for Palmer Point and change the District's project manager. The Project Milestones section of this write-up has<br />

been revised to show these changes. Currently, the County has this amendment scheduled for approval at its September<br />

8, 2009 Board of County Commissioners meeting.<br />

0<strong>21</strong> - Manasota Basin 88


W612<br />

Sarasota Bay Estuary Program<br />

Project Type SWIM<br />

AOR(s)<br />

Water Quality, Natural Systems<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Sarasota Bay Estuary Program<br />

Project Manager GARCIA, LIZANNE<br />

Task Manager(s)<br />

Status Ongoing<br />

POWERS, STEPHANIE<br />

Description<br />

This project provides for the funding for the Sarasota Bay Estuary Program (SBEP) as outlined in the Interlocal<br />

Agreement which established the SBEP as a independent special district in 2005. The District participates in three<br />

main areas. First the District's SWIM program, funded by the basin boards and State, carries out the projects that will<br />

address water quality and habitat restoration within the bay. Second, the District, through the basin boards and State,<br />

have contributed annual funding to the SBEP since 1990 to carry out the administration and implement of projects<br />

identified in the SBEP Comprehensive Conservation and Management Plan. And finally, the District provides staff to sit<br />

on the technical, management and policy (Governing Board member) committees of the program. The District's<br />

annual budget includes funding support to the SBEP and District staff salaries, travel and central garage to administer<br />

the project, which includes attending board meetings and other workshops and invoicing.<br />

Benefits<br />

This project's support of the Sarasota Bay Estuary Program creates an opportunity for a cohesive effort between the<br />

District, SBEP and other state and local agencies to implement resource management decisions and restoration<br />

activities. Additionally, this project provides for leveraging funding between the partners.<br />

Costs<br />

The District has provided funding to the SBEP on an annual basis since 1990. The District's annual funding<br />

commitment for the SBEP is $133,000. The District share is split between the Manasota Basin Board (50%,<br />

$66,500) and State SWIM (50%, $66,500) funds. District funds are used to implement projects outlined in the Annual<br />

Workplan. District funds in the table include staff salaries, travel and central garage.<br />

Additional Information<br />

In 1987, the Florida Legislature established the Surface Water Improvement and Management Program. (SWIM) Act<br />

having recognized that water quality and habitat in surface waters through out the state have degraded or in danger of<br />

being degraded. The Act requires the District maintain a priority list of waterbodies of regional or statewide<br />

significance within their boundaries. Sarasota Bay is designated as a priority waterbody. Sarasota Bay was identified<br />

by the United States Environmental Protection Agency in 1989 as an estuary of Federal Significance and subsequently<br />

included in the National Estuary Program. As a result of this designation, the Sarasota Bay National Estuary Program<br />

was established in 1989 to assist the region in developing a comprehensive plan for the restoration and protection of<br />

Sarasota Bay. In 2004, the "National" designation was dropped from the program name as a result of the execution of<br />

an interlocal agreement between the program partners. The Interlocal Agreement commits the partners to an annual<br />

funding commitment. Partners in the SBEP include the District, USEPA, Florida Department of Environmental<br />

Protection, Sarasota and Manatee counties, the cities of Sarasota and Bradenton, and the town of Longboat Key. The<br />

goals and strategies for the Bay are identified in the Comprehensive Conservation and Management Plan (CCMP) for<br />

Sarasota Bay which provides the guidance for each entity on their contribution to restore the Bay. Since 1998, the<br />

District and other partners have completed several habitat restoration projects and diagnostic assessments, including<br />

seagrass mapping, assessment of atmospheric deposition and identification of toxic load sources in the Bay.<br />

0<strong>21</strong> - Manasota Basin 89


W612<br />

Sarasota Bay Estuary Program<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 258,341 70,343 70,394 133,000 532,078<br />

District Budgeted - Outside Revenue<br />

State Trust Funds (SWIM) 205,139 70,343<br />

0<br />

0 275,482<br />

State Trust Funds (SWIM) - Prior 2006 79,800 0<br />

0<br />

0 79,800<br />

WMLTF (SWIM) - Prior Year Funds 0 0 70,393<br />

0 70,393<br />

Project Funds Not Budgeted by the<br />

District<br />

Local Government Partners 794,800 2<strong>10</strong>,600 163,000<br />

0 1,168,400<br />

US EPA 1,994,150 492,600 600,000<br />

0 3,086,750<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$5,<strong>21</strong>2,903<br />

Critical Project Milestones Projected Amended Actual<br />

1. FY2009 Annual Workplan Critical Project Milestones<br />

FY2009 Draft Agreement to Management Services 9/5/08 11/<strong>10</strong>/08<br />

FY2009 Agreement Sent to Cooperator 9/19/08 12/18/08<br />

FY2009 Agreement returned from Cooperator <strong>10</strong>/3/08 12/24/08<br />

FY2009 Agreement fully executed <strong>10</strong>/<strong>10</strong>/08 12/28/08<br />

FY2009 first payment (1/2 total) 12/1/08 4/6/09<br />

FY2009 Second/final payment 3/1/09 4/6/09<br />

FY2009 End of contract 9/30/09 9/30/09<br />

2. FY20<strong>10</strong> Annual Workplan Critical Project Milestones<br />

FY20<strong>10</strong> Draft Agreement to Management Services <strong>10</strong>/1/09<br />

FY20<strong>10</strong> Agreement Sent to Cooperator <strong>10</strong>/15/09<br />

FY20<strong>10</strong> Agreement returned from Cooperator <strong>10</strong>/29/09<br />

FY20<strong>10</strong> Agreement fully executed 11/12/09<br />

FY20<strong>10</strong> first payment (1/2 total) 12/31/09<br />

FY20<strong>10</strong> Second/final payment 3/1/<strong>10</strong><br />

FY20<strong>10</strong> End of contract 9/30/<strong>10</strong> 9/30/<strong>10</strong><br />

Status As Of: August 26, 2009<br />

FY20<strong>10</strong> Annual Workplan: The FY20<strong>10</strong> agreement has been drafted and sent to the cooperator for review. Management<br />

Conference: The Management Board of the SBEP met on January 5, 2009 to discuss the process for the Executive<br />

Director's performance appraisal. This appraisal is scheduled to be presented at the Management Board meeting on May<br />

8, 2009. At the Management Board <strong>Meeting</strong> on February 6, 2009, the Board approved several contracts: 1) a study with<br />

Florida Atlantic University to evaluate macro-algae in the bay; 2) a contract with FDEP to accept State appropriations for<br />

the Whitaker Bayou Greenway Park and Indian Beach-Sapphire Shores Stormwater Retrofit projects. At this meeting,<br />

the Bay Partner mini-grants were approved. At the Management Board on May 8, 2009, the Board approved a contract<br />

with Around the Bend Nature Tours, the financial status report and the 20<strong>10</strong> Annual Workplan. The Board discussed the<br />

EPA Performance Review of the SBEP and the Director's Performance Review. The SBEP has contracted with Mote<br />

Marine Laboratory to evaluate a process to set water quality targets based on light requirements of seagrass.<br />

Environmental Scientists from the District are participating in this process.<br />

0<strong>21</strong> - Manasota Basin 90


W613<br />

Sarasota-Catfish Creek SW Facility-Phase II<br />

Project Type SWIM<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Project Manager LOPEZ, MANNY<br />

Task Manager(s)<br />

Status Ongoing<br />

Sarasota County, Sarasota County Watershed Management<br />

THORNTON, SHELLEY<br />

Description<br />

This FY2005 project is to implement Best Management Practices (BMPs) for the Catfish Creek Watershed which<br />

drains into Sarasota Bay, a District SWIM waterbody. The Catfish Creek watershed covers an area of approximately<br />

6.22 square miles and is located in Sarasota County. Implementation of BMPs includes design, development of<br />

construction documents, construction permitting, land acquisition, bidding, contractor selection, construction of the<br />

BMPs and construction engineering and inspection. Current plans call for the construction of one stormwater treatment<br />

pond totaling 23.75 acres. The County's prior funding includes the property purchased by the County for the project.<br />

With FY2005 funding budgeted and additional funding requested in FY2008, work on the Implementation of BMPs will<br />

be completed and includes the following tasks: construction of the BMPs and construction engineering and inspection.<br />

Benefits<br />

The combined pond acreage will be sufficiently large that stormwater runoff from approximately 8<strong>10</strong> acres of<br />

watershed will receive adequate treatment to meet design criteria for existing stormwater regulations and will improve<br />

water quality by increasing residence time.<br />

Costs<br />

The total current projected project cost is $9,903,703, which includes land costs to date of $1,788,129 with additional<br />

lands remaining to be acquired. The District's share in FY2005 was $2,500,000 split 40/60 between the Manasota<br />

Basin Board ($1,000,000) and State SWIM ($1,500,000). Sarasota County's share in prior years was $6,229,949 in<br />

addition to an FDEP grant for $504,413. Sarasota County will contribute $275,000 to the project in FY2008 with the<br />

District providing a matching contribution shared evenly between the Manasota Basin Board ($137,500) and State<br />

SWIM ($137,500). The County requested the final $275,000 in FY2009 (shared evenly between the Manasota Basin<br />

Board ($137,500) and State SWIM ($137,500)) and will contribute an equal amount. The total District funding<br />

reflected in the table below includes staff salary, travel and central garage costs.<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 1,156,189 140,714 2,734<br />

0 1,299,637<br />

District Budgeted - Outside Revenue<br />

State Trust Funds (SWIM) 150,451 140,714<br />

0<br />

0 291,165<br />

State Trust Funds (SWIM) - Prior 2006 1,500,000 0<br />

0<br />

0 1,500,000<br />

WMLTF (SWIM) - Prior Year Funds 0 0 2,734<br />

0 2,734<br />

Project Funds Not Budgeted by the<br />

District<br />

Florida Department of Environmental<br />

Protection<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

504,413 0<br />

0<br />

0<br />

504,413<br />

Sarasota County 6,504,949 275,000<br />

0<br />

0 6,779,949<br />

0<strong>21</strong> - Manasota Basin 91<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$<strong>10</strong>,377,898


W613<br />

Sarasota-Catfish Creek SW Facility-Phase II<br />

Critical Project Milestones Projected Amended Actual<br />

1. Contract Development & Execution<br />

Draft Agreement for Construction to Management Services 11/19/04 12/19/04<br />

Agreement returned from Management Services 12/9/04 1/7/05<br />

Agreement returned from Executive Review 12/17/04 1/14/05<br />

Agreement to Sarasota County 12/27/04 1/19/05<br />

Execution by District 1/31/05 1/31/05<br />

Sarasota County Approval of Agreement 2/8/05 4/26/05 4/26/05<br />

Draft SWIM Agreement for Construction to Managemt Services 7/26/05 8/17/05<br />

Agreement returned from Management Services 8/12/05 9/19/05<br />

Agreement returned from Executive Review 9/1/05 9/<strong>21</strong>/05<br />

Agreement to Sarasota County 9/4/05 9/23/05<br />

Sarasota County Approval of Agreement 11/30/05 11/8/05 11/8/05<br />

Execution by District 12/15/05 12/2/05<br />

Notice to Proceed 1/31/07 12/2/05<br />

2. Contract Development & Execution<br />

Prepare Amendment for FY2008 Funding 8/28/07 8/28/07<br />

Amendment to County for Approval 11/30/07 1/15/08 1/4/08<br />

Amendment Approved by County 3/1/08 3/11/08 3/18/08<br />

Amendment Approved by District 5/22/08 3/25/08<br />

Notice to Proceed 5/26/08 9/30/08 9/<strong>10</strong>/08<br />

2. Critical Project Milestones<br />

Permits Issued 3/11/04 7/3/07<br />

Construction Begins 4/30/08 2/28/09 <strong>10</strong>/1/08<br />

Construction Substantially Completed 1/31/<strong>10</strong> 9/30/09<br />

As-Builts Received and Approved 4/30/<strong>10</strong> 11/20/09<br />

Maintenance Plan Received 4/30/<strong>10</strong> <strong>10</strong>/30/09<br />

Final Project Report 4/30/<strong>10</strong> 1/15/<strong>10</strong><br />

3. Close Out<br />

Contract Termination 5/31/<strong>10</strong><br />

Status As Of: August 27, 2009<br />

The Catfish Creek stormwater facility project continues in the construction phase with Oklawaha Farms Inc., as the<br />

primary contractor. Construction is estimated to be 85% complete and is expected to be completed by late September<br />

2009 - early October 2009. ACTIONS-TO-DATE: On schedule. Reasonably good weather and site management have<br />

kept operations running.<br />

0<strong>21</strong> - Manasota Basin 92


W615<br />

(Completed) Sarasota County Tidal Creek Biological Index<br />

Project Type SWIM<br />

AOR(s)<br />

Water Quality, Natural Systems<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Sarasota County<br />

Project Manager LOPEZ, MANNY<br />

Task Manager(s)<br />

GARCIA, LIZANNE<br />

Status Completed<br />

Description<br />

The intent of this study is to provide the tools, in this case the development of biological criteria (macroinvertebrates<br />

and seagrasses/shoreline vegetation), that may be used to quantify, characterize, rank, and define biological function<br />

and ecosystem integrity of sixteen tidal systems in Sarasota County including Sarasota Bay and Charlotte Harbor. In<br />

FY2008, the project will complete the development of the Tidal Creek Biological Index for the County, develop and<br />

implement the sampling design, and develop the water atlas database and displays of the index data.<br />

Benefits<br />

The Index will be used to evaluate and monitor the overall ecological condition of tidal streams, and to justify listing and<br />

delisting waterbodies for their Total Maximum Daily Load (TMDL) requirements. The Index will also be used in<br />

conjunction with the Sarasota County Pollutant Load Model (W552) to confirm that the established water quality level<br />

of service is adequately protecting downstream ecosystems.<br />

Costs<br />

The total project cost is $400,000. The District's share is $200,000, and the County's share is $200,000. For FY2007<br />

the Manasota Basin Board budgeted $<strong>10</strong>0,000 along with $<strong>10</strong>0,000 from State SWIM. For FY2007 the County's<br />

share was to be $200,000, however, on January 16, 2007 County staff indicated the County would only be able to<br />

provide $60,000 in matching funds. The County's match was revised to $67,770 in March 2007. The revised<br />

total project budget is $135,540 (as of March 29, 2007) with the District's share of $67,770 ($33,885 from the Basin<br />

Board and $33,885 from State SWIM) to match the County's $67,770. The project's scope was modified accordingly to<br />

reflect available funding. The County's prior expenditures on the project's early phases include a total of $255,573.<br />

The District funding amounts shown in the table include staff salaries, travel and central garage charges.<br />

Additional Information<br />

In 2005, Sarasota County funded work by Mote Marine Laboratory to determine the steps needed to define and apply<br />

an ecologically-based index of tidal creek condition, by which the maintenance of high-quality creeks and/or the<br />

restoration of impaired creeks can be documented. As stream restorations proceed, the Index will be used to monitor<br />

resulting changes in biological condition, and thus, the effectiveness of the restoration. The design and effectiveness<br />

of best management practices (BMPs) in urban areas (stormwater detention ponds, stream bank stabilization, riparian<br />

vegetation or grassy swales) will also be judged using the Index. This process requires comparisons of a target creek<br />

to a "reference" creek. Reference waterbodies should be unimpaired or minimally impaired by human activities.<br />

Preliminary work indicates that Gottfried Creek is the most appropriate reference system.<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin <strong>10</strong>3,843 1,187<br />

0<br />

0 <strong>10</strong>5,030<br />

District Budgeted - Outside Revenue<br />

Ecosystem Trust Fund - Sarasota Tidal<br />

(SWIM)<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

<strong>10</strong>0,000 0<br />

0<br />

0<br />

<strong>10</strong>0,000<br />

State Trust Funds (SWIM) 3,841 1,186<br />

0<br />

0 5,027<br />

Project Funds Not Budgeted by the<br />

District<br />

Sarasota County 323,343 0<br />

0<br />

0 323,343<br />

0<strong>21</strong> - Manasota Basin 93<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$533,400


W615<br />

(Completed) Sarasota County Tidal Creek Biological Index<br />

Critical Project Milestones Projected Amended Actual<br />

1. Contract Development & Execution<br />

Develop Draft Agreement with Sarasota County 12/20/06 3/30/07 4/25/07<br />

Cooperative Funding Agreement to Contract Administration 1/8/07 5/25/07 5/11/07<br />

Execution of Cooperative Agreement by Sarasota County 2/28/07 6/25/07 6/26/07<br />

Execution of Cooperative Agreement by SWFWMD 3/12/07 7/15/07 7/11/07<br />

Issue Notice to Proceed (Effective 3/20/2007) 3/15/07 3/20/07 3/20/07<br />

2. Critical Project Milestones<br />

Element 1 - Field Data Collection 6/1/07 6/8/07<br />

Element 2 - Index Application & Creek Assessments 12/15/07 1/31/08 1/31/08<br />

Tidal Creek Index Workshop - Peer Review 2/15/08 6/27/08 6/27/08<br />

Tidal Creek Index - Final Report <strong>10</strong>/30/08 9/30/08<br />

Status As Of: December 18, 2008<br />

The project is considered complete. All project work was successfully completed on schedule and within budget. All<br />

project deliverables have been received and approved. The comments and recommendations from the Tidal Creek<br />

Index Workshop were incorporated into the final report. The final invoice has been paid. G-3 Form for contract closure<br />

has been submitted.<br />

0<strong>21</strong> - Manasota Basin 94


W616<br />

Sarasota Bay Habitat Restoration<br />

Project Type SWIM<br />

AOR(s)<br />

Water Quality, Natural Systems<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Sarasota Bay Estuary Program<br />

Project Manager POWERS, STEPHANIE<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This proposed project is in repsonse to a cooperative funding request from the Sarasota Bay Estuary Program (SBEP)<br />

for the restoration and enhancement of several coastal dune/coastal hammock systems in the Sarasota Bay<br />

watershed. The SBEP has developed a comprehensive plan for restoring intertidal and submerged aquatic habitats at<br />

20 locations throughout Sarasota Bay. This project will help to fund restoration and management plans for several of<br />

the locations in addition to exotic plant species removal and control.<br />

Benefits<br />

This project provides improved natural systems through habitat enhancement and creation.<br />

Costs<br />

The total estimated project budget is $720,000. The current FY2009 project cost is $240,000, with the SBEP and the<br />

District each contributing half ($120,000). The District share is split between the Manasota Basin Board ($60,000) and<br />

State SWIM ($60,000). The FY2009 funds will be used to implement restoration projects for Sarasota Bay. The<br />

FY20<strong>10</strong> proposed project cost is $240,000, with the SBEP contributing half ($120,000) and requesting half ($120,000)<br />

from the District. At their April 2009 meeting, the Manasota Basin Board approved amending its FY2009 budget to<br />

include reallocated State SWIM funds to cover 50 percent of the District's proposed FY20<strong>10</strong> costs ($60,000). The<br />

remaining funds ($60,000) are included in the Manasota Basin Board's FY20<strong>10</strong> proposed budget. District funds shown<br />

in the table include staff salaries.<br />

Additional Information<br />

Since 1950, approximately 40 percent of Sarasota Bay's intertidal wetland habitat has been lost due to development<br />

and reduction in water quality. This resulted in a decline in the aesthetic, recreational, and commercial value of the<br />

bay, as well as a loss of habitat for native plants and animals. The SWIM Plans for Sarasota Bay outline goals to<br />

restore habitat throughout the bay areas and reduce pollutant loads entering the bays. The objectives of this project<br />

are consistent with these goals.<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 61,135 61,167 61,640 120,000 303,942<br />

District Budgeted - Outside Revenue<br />

State Trust Funds (SWIM) 61,134 61,167<br />

0<br />

0 122,301<br />

State Trust Funds (SWIM) - Prior 2006 0 0<br />

0<br />

0 60,000<br />

WMLTF (SWIM) - Prior Year Funds 0 0 1,640<br />

0 1,640<br />

Project Funds Not Budgeted by the<br />

District<br />

Sarasota Bay Estuary Program 120,000 125,000 120,000<br />

0 365,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$852,883<br />

Critical Project Milestones Projected Amended Actual<br />

0<strong>21</strong> - Manasota Basin 95


W616<br />

Sarasota Bay Habitat Restoration<br />

1. Contract Development and Execution<br />

Draft agreement Sent to Management Services 9/12/07 1/3/08<br />

Agreement Returned from Management Services <strong>10</strong>/3/07 2/20/08<br />

Agreement Sent to Cooperator <strong>10</strong>/<strong>10</strong>/07 2/28/08<br />

Signed Agreement Returned from Cooperator 11/7/07 4/1/08 3/24/08<br />

Agreement Fully Executed 11/<strong>21</strong>/07 4/15/08 4/7/08<br />

Notice To Proceed 11/27/07 4/30/08 4/9/08<br />

1. Contract Development and Execution<br />

First Amendment to Original Agreement 4/1/09<br />

Status As Of: August 25, 2009<br />

Additional projects are being chosen for implementation under this agreement with SBEP. As they are chosen, District<br />

staff will evaluate the projects and objectives to ensure they coincide with District and SWIM Program goals.<br />

0<strong>21</strong> - Manasota Basin 96


W617<br />

Sarasota Imp. BMPs Coastal Basin Beach Road<br />

Project Type SWIM<br />

AOR(s)<br />

Flood Protection, Water Quality<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Project Manager PRESTON, MATT<br />

Task Manager(s)<br />

Status Ongoing<br />

Sarasota County, Sarasota County Watershed Management<br />

Description<br />

In response to a cooperative funding request from Sarasota County, this regional initiative conforms with, and furthers,<br />

the implementation of the Sarasota Bay's CCMP, SWFWMD's Southern Coastal Watershed CWM Plan, and Sarasota<br />

County's Comprehensive Plan. The project is designed to improve water quality standards and reduce street flooding<br />

on Beach Road located in the Sarasota Bay Coastal basin. The water quality in the drainage piping system along<br />

Beach Road near Siesta Key Public Beach does not meet water quality standards and has impacted the Public Beach<br />

through a ditch outfall system to the Gulf of Mexico. This project entails the design and construction of a stormwater<br />

treatment system to protect the public health and safety to meet recreational water quality standards. A feasibility study<br />

report was completed in January 2006. The design includes construction of a linear estuarine lagoon system for<br />

stormwater biological treatment, removal of the existing outfall ditch crossing the public beach and rerouting the<br />

treated stormwater discharge to the Grand Canal. Alternate ideas for a stormwater vault system will be considered. A<br />

stormwater pump station will be planned with an in-line UV treatment system to kill bacteria. The project is expected to<br />

improve water quality by increasing the residence time in the new lagoon system. This FY20<strong>10</strong> request is being made<br />

for construction cost funding.<br />

Benefits<br />

The project will be designed to take stormwater runoff that presently discharges across Siesta Key Beach and redirect<br />

it through a water quality treatment marsh and discharge to a residential canal system that connects with Sarasota<br />

Bay. The primary benefits of the project would be reduced flooding on Beach Road with water quality improvement<br />

from biological contamination and natural systems enhancement.<br />

Costs<br />

The total project cost is $2,227,000. The County had a feasibility study completed in January 2006 at a cost of $77,000<br />

and budgeted $200,000 for design in FY2007, leaving a balance of $1,950,000 estimated to be required for the<br />

construction of the project. Sarasota County contributed $487,500 to the project in FY2008 while the District provided<br />

a matching contribution shared evenly between the Manasota Basin Board ($243,750) and State SWIM ($243,750).<br />

The County requested the remaining funding in FY2009, with the County and the District each contributing half<br />

($487,500). Since the County could not commit to spending all of the funding in FY2009, they contributed half of the<br />

requested amount or $243,750 in FY2009 and the District contributed $243,750 split evening between the Manasota<br />

Basin Board ($1<strong>21</strong>,875) and State SWIM ($1<strong>21</strong>,875). The County will contribute $243,750 for FY20<strong>10</strong> and is<br />

requesting FY20<strong>10</strong> funding of $243,750 from the District. At their April 8, 2009 meeting, the Manasota Basin Board<br />

approved amending its FY2009 budget to include reallocated State SWIM funds to cover 50 percent of the District's<br />

proposed FY20<strong>10</strong> costs ($1<strong>21</strong>,875). The remaining funds ($1<strong>21</strong>,875) are included in the Manasota Basin Board's<br />

FY20<strong>10</strong> proposed budget. District funds shown in the table include staff salaries.<br />

Additional Information<br />

This regional initiative conforms with, and furthers, the implementation of the Sarasota Bay's CCMP, SWFWMD's<br />

Southern Coastal Watershed CWM Plan, and Sarasota County's Comprehensive Plan.<br />

0<strong>21</strong> - Manasota Basin 97


W617<br />

Sarasota Imp. BMPs Coastal Basin Beach Road<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 245,916 123,961 124,259<br />

0 494,136<br />

District Budgeted - Outside Revenue<br />

State Trust Funds (SWIM) 245,915 123,960<br />

0<br />

0 369,875<br />

State Trust Funds (SWIM) - Prior 2006 0 0<br />

0<br />

0 1<strong>21</strong>,875<br />

WMLTF (SWIM) - Prior Year Funds 0 0 2,383<br />

0 2,383<br />

Project Funds Not Budgeted by the<br />

District<br />

Sarasota County 764,500 243,750 243,750<br />

0 1,252,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$2,240,269<br />

Critical Project Milestones Projected Amended Actual<br />

1. Implementation of BMPs for Coastal Basin Beach Road<br />

Draft Contract and Scope of Work 9/30/07 7/25/07<br />

Contract Executed by the County 11/30/07 12/18/07 12/18/07<br />

Application for FY2009 Funding 12/<strong>10</strong>/07 12/7/07<br />

Contract Executed by the District 12/31/07 3/6/08<br />

Notice to Proceed 1/15/08 3/12/08<br />

Commence Design and Permitting 3/30/08 3/30/08<br />

Complete Design and Permitting 3/30/09 12/1/08<br />

Commence Construction 4/30/<strong>10</strong><br />

Complete Construction 4/30/11<br />

Final Report and As-Builts 12/31/11<br />

Final Report and As-Builts 12/31/11<br />

Contract Termination 3/31/12<br />

Status As Of: June 30, 2009<br />

The contract was fully executed on 03/06/2008 and originals returned to the County with a Notice to Proceed on<br />

3/11/2008. The original design has been completed and the ERP has been issued, however, there is significant<br />

opposition to the proposed project among citizens living near the proposed stormwater system outfall on Grande Canal.<br />

The County has been and is seeking to address this through both public education and investigation into alternate outfall<br />

locations. The consultant is currently preparing calculations to compare existing nutrient loadings at the proposed outfall<br />

with post-developed nutrient loadings. An alternative design plan with a Gulf outfall location is also being prepared in<br />

order to compare construction costs.<br />

0<strong>21</strong> - Manasota Basin 98


W618<br />

(Completed) Sarasota Imp. BMPs Hudson Bayou<br />

Project Type SWIM<br />

AOR(s)<br />

Water Quality<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Sarasota County<br />

Project Manager SMITH, RANDY<br />

Task Manager(s)<br />

NORTON, NANCY<br />

Status Completed<br />

Description<br />

This project is to perform the Implementation of Best Management Practices (BMPs) element of the District's<br />

Watershed Management Program (WMP) for the Hudson Bayou Watershed in Sarasota County. The proposed project<br />

is designed to improve water quality discharged to Hudson Bayou and eliminate structural flooding at the intersection<br />

of Pineapple Avenue, Orange Avenue and Oak Street located in the Hudson Bayou subbasin. Improvements include a<br />

baffle box water quality treatment system, upsizing of old drainage pipes and relocating curb inlets. The County only<br />

requested cooperative funding for the construction of the baffle box treatment system (water quality component) and<br />

associated engineering and inspection costs. The flood protection components are associated with a local stormwater<br />

management system and the District prioritizes flood protection projects that are associated with intermediate and<br />

regional systems, and water quality improvements. The baffle box treatment system will improve water quality<br />

discharged to Hudson Bayou and ultimately Sarasota Bay, a Surface Water Improvement and Management (SWIM)<br />

water body.<br />

Benefits<br />

Water quality enhancement will be achieved by utilizing a stormwater nutrient separating baffle box to reduce<br />

sediment, hydrocarbon, and nutrients discharged to the Alderman Street ditch canal system which discharges into<br />

Hudson Bayou and ultimately Sarasota Bay, a SWIM water body. This project is also expected to meet level of service<br />

criteria for a <strong>10</strong>0-year storm event and reduce street flooding.<br />

Costs<br />

The total budget amount for this project is $717,000, with Sarasota County contributing $287,000 in FY2006, $300,000<br />

in FY2007, and $65,000 in FY2008. The District is contributing $65,000 in FY2008. The District's share is split<br />

between the Manasota Basin Board ($32,500) and State SWIM ($32,500). The County is funding design, permitting<br />

and construction of the flood protection component and requested funding from the District for construction costs of<br />

the water quality component (baffle box) only. The District funding amounts shown in the table include staff salaries,<br />

travel and central garage charges.<br />

Additional Information<br />

The WMP includes five major elements: 1) Topographic Information, 2) Watershed Evaluation, 3) Watershed<br />

Management Plan, 4) Implementation of BMPs, and 5) Maintenance of Watershed Parameters and Models.<br />

Implementing elements of the WMP with local governments is one of the Comprehensive Watershed Management<br />

(CWM) initiative strategies. The County previously budgeted funds for the project design, development of construction<br />

documents, construction permitting, land acquisition, and bidding and contractor selection. The County and the City of<br />

Sarasota are currently acquiring a joint drainage easement to implement the BMP. This project was originally<br />

submitted as a flood protection and water quality improvement project. The County decided to modify their FY2008<br />

application to only include the water quality component. The County will manage the project, where the District project<br />

manager must approve any agreements to accomplish project tasks.<br />

0<strong>21</strong> - Manasota Basin 99


W618<br />

(Completed) Sarasota Imp. BMPs Hudson Bayou<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 35,908 3,042<br />

0<br />

0 38,950<br />

District Budgeted - Outside Revenue<br />

State Trust Funds (SWIM) 35,908 3,041<br />

0<br />

0 38,949<br />

Project Funds Not Budgeted by the<br />

District<br />

Sarasota County 652,000 0<br />

0<br />

0 652,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$729,899<br />

Critical Project Milestones Projected Amended Actual<br />

1. Contract Development & Execution<br />

Cooperative Funding Agreement with the County 7/15/07 7/15/07<br />

Cooperative Funding Agreement Sent to Contract Administration 8/15/07 8/16/07<br />

Agreement sent to Cooperator 8/31/07 9/18/07<br />

Signed Agreement returned from Cooperator 9/15/07 11/1/07 12/4/07<br />

Agreement executed <strong>10</strong>/1/07 11/9/07 12/12/07<br />

Notice to Proceed <strong>10</strong>/1/07 11/9/07 12/12/07<br />

2. Critical Project Milestones<br />

Complete Design and Permitting 12/31/07 12/31/07<br />

Bidding and Contractor Selection 6/30/08 3/11/08<br />

Commence Construction 12/31/08 4/7/08<br />

Complete Construction 7/31/09 12/31/08 12/30/08<br />

Submit As-Builts <strong>10</strong>/31/09 1/31/09 2/23/09<br />

3. Project Close Out<br />

Contract Termination 11/30/09 2/25/09<br />

Status As Of: February 25, 2009<br />

The first draft of the FY2008 Cooperative Funding Agreement was sent to the cooperator electronically for review and<br />

comment on July 17, 2007. The cooperator gave approval for the draft agreement on July 15, 2007. The Manasota Basin<br />

Board approved the FY2008 funding request of $32,500 at their July 25, 2007 meeting. The Agreement was approved by<br />

the Environmental section manager on August <strong>10</strong>, 2007 and was sent to Contract Administration on August 16, 2007.<br />

The Agreement was sent to the cooperator for signature on September 18, 2007. The Governing Board approved<br />

FY2008 project funding at their September 2007 meeting. The Agreement was executed on December 12, 2007 and the<br />

Notice to Proceed letter was sent to the cooperator on December 12, 2007. On March 11, 2008 the Sarasota County<br />

BOCC approved the construction contract with Mcleod Land Services, Inc. Project construction began on April 7, 2008.<br />

The baffle box treatment system has been constructed and installed. The County submitted the final deiverables for the<br />

project and the final payment was processed on 2/25/2009.<br />

0<strong>21</strong> - Manasota Basin <strong>10</strong>0


W619<br />

Perico Preserve Environmental Restoration<br />

Project Type SWIM<br />

AOR(s)<br />

Water Quality, Natural Systems<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Manatee County<br />

Project Manager POWERS, STEPHANIE<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This project is in response to a FY2009 cooperative funding request from Manatee County to restore and enhance<br />

approximately 57 acres of intertidal wetlands and uplands in west central Manatee County. The land was purchases in<br />

June 2007 by Manatee County for $6 million. The proposed restoration will target the creation and enhancement of<br />

open water, intertidal, and coastal upland habitats. Exotic plants such as Australian Pine and Brazilian Pepper will be<br />

removed and replaced with both planted and naturally recruiting native species. The funding request for FY2009 is to<br />

complete an existing resource investigation and restoration project design.<br />

Benefits<br />

Upon completion, the project will provide significant benefits to habitat through the removal of exotic species and<br />

replanting of native vegetation. Improved hydrologic conditions will also improve the habitat and water quality of the site<br />

and provide limited stormwater treatment of waters entering both Tampa Bay and Sarasota Bay. Because the project<br />

site drains to both Tampa Bay and Sarasota Bay, this project will benefit both systems.<br />

Costs<br />

The total project cost is $9,250,000. The FY2009 project cost is $450,000, which is being split 50/50 between<br />

Manasota Basin Board ($225,000) and State SWIM funds ($225,000). Manatee County is matching the District's<br />

contribution with the $6 million used for land purchase. District funds for FY2009 will be used for the Design and<br />

Permitting phase of the project.The remaining funds for construction would be budgeted in future years and contingent<br />

upon Basin approval. District funds shown in the table include staff salaries.<br />

Additional Information<br />

Since 1950, approximately 50 percent of Tampa Bay's natural shoreline and approximately 40 percent of Sarasota<br />

Bay's intertidal wetland habitat has been lost due to development and reduction in water quality. This resulted in a<br />

decline in the aesthetic, recreational, and commercial value of the bay, as well as a loss of habitat for native plants<br />

and animals. The SWIM Plans for Tampa Bay and Sarasota Bay outline goals to restore habitat throughout the bay<br />

areas and reduce pollutant loads entering the bays. The objectives of this project are consistent with these goals.<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 0 228,142 956 3,000,000 3,229,098<br />

District Budgeted - Outside Revenue<br />

State Trust Funds (SWIM) 0 228,141<br />

0<br />

0 228,141<br />

WMLTF (SWIM) - Prior Year Funds 0 0 956<br />

0<br />

956<br />

Project Funds Not Budgeted by the<br />

District<br />

Manatee County 6,000,000 0<br />

0<br />

0 6,000,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$9,458,195<br />

Critical Project Milestones Projected Amended Actual<br />

0<strong>21</strong> - Manasota Basin <strong>10</strong>1


W619<br />

Perico Preserve Environmental Restoration<br />

1. Contract Development and Execution<br />

Draft agreement sent to Management Services <strong>10</strong>/31/08 3/16/09 5/13/09<br />

Draft agreement returned from Management Services 11/<strong>21</strong>/08 4/6/09<br />

Agreement Sent to Cooperator 11/28/08 4/9/09<br />

Signed Agreement returned from Cooperator 12/26/08 5/7/09<br />

Agreement fully executed 1/16/09 5/<strong>21</strong>/09<br />

Notice to Proceed 1/23/09 5/25/09<br />

2. Project Tasks<br />

Design and Permitting Complete 12/31/09 5/30/<strong>10</strong><br />

Construction Complete 12/30/<strong>10</strong><br />

3. Agreement Expiration Date<br />

Contract Expiration 6/30/11<br />

Status As Of: July 02, 2009<br />

A scope of work was received from the cooperator on March 11, 2009. An agreement has since been drafted and is<br />

currently routing for review and approval.<br />

0<strong>21</strong> - Manasota Basin <strong>10</strong>2


W620<br />

Pelican Cove Stormwater Retrofit<br />

Project Type SWIM<br />

AOR(s)<br />

Water Quality<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Pelican Cove, Sarasota County<br />

Project Manager NORTON, NANCY<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This project is in response to a FY2009 cooperative funding request from Pelican Cove Condominium Association.<br />

Pelican Cove is a Sarasota County Neighborhood Environment Stewardship Team (NEST) community which has<br />

begun to retrofit stormwater BMPs in the 1970's property. This project involves the design and construction of berms to<br />

redirect the flow of stormwater runoff into detention areas and swales designed to reduce the amount of flow<br />

and pollutants entering Little Sarasota Bay by as much as 80% to 90%. The project will provide treatment for<br />

stormwater from approximately 20 acres of Pelican Cove Condominiums. Maintenance will be provided by Pelican<br />

Cove Condominium Association which has a staff of over 40 grounds and maintenance employees.<br />

Benefits<br />

The stormwater treatment system will redirect stormwater runoff from approximately 20 acres of the site, reducing<br />

nutrients and sediments that currently flow untreated to Little Sarasota Bay.<br />

Costs<br />

The FY2009 project cost is $35,000, with the Pelican Cove Condominium Association and the District each<br />

contributing half ($17,500). The District share is split between the Manasota Basin Board ($8,750) and State SWIM<br />

($8,750). District funds shown in the table includes staff salaries.<br />

Additional Information<br />

Since 1950, approximately 50 percent of Tampa Bay's natural shoreline and approximately 40 percent of Sarasota<br />

Bay's intertidal wetland habitat has been lost due to development and reduction in water quality. This resulted in a<br />

decline in the aesthetic, recreational, and commercial value of the bay, as well as a loss of habitat for native plants<br />

and animals. The SWIM Plans for Tampa Bay and Sarasota Bay outline goals to restore habitat throughout the bay<br />

areas and reduce pollutant loads entering the bays. The objectives of this project are consistent with these goals.<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 0 8,905 1,050<br />

0 9,955<br />

District Budgeted - Outside Revenue<br />

State Trust Funds (SWIM) 0 8,905<br />

0<br />

0 8,905<br />

WMLTF (SWIM) - Prior Year Funds 0 0 1,049<br />

0 1,049<br />

Project Funds Not Budgeted by the<br />

District<br />

Pelican Cove Condominiums 0 17,500<br />

0<br />

0 17,500<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$37,409<br />

Critical Project Milestones Projected Amended Actual<br />

Contract Development and Execution<br />

Draft Agreement Sent to Management Services 9/2/08 9/9/08<br />

Draft Agreement Returned from Management Services 9/23/08 12/18/08<br />

0<strong>21</strong> - Manasota Basin <strong>10</strong>3


W620<br />

Pelican Cove Stormwater Retrofit<br />

Agreement Sent to Cooperator 9/30/08 12/18/08 4/30/09<br />

Signed Agreement Returned from Cooperator <strong>10</strong>/28/08 5/12/09<br />

Agreement Fully Executed 11/11/08 5/22/09<br />

Notice to Proceed 11/17/08 6/8/09<br />

Critical Project Milestones<br />

Complete Project Design and Permitting 12/31/09<br />

Complete Construction 12/31/<strong>10</strong><br />

Agreement Expiration 12/31/12<br />

Status As Of: August 26, 2009<br />

The Pelican Cove Condominium Association provided a Scope of Work in August 2008 and a preliminary draft<br />

Agreement for the project was sent to both Sarasota County and the Association in September 2008. The final<br />

agreement was forwarded to Sarasota County for signatures in December 2008. In lieu of entering into the tri-party<br />

agreement, the County Water Resource Manager stated that the County ordinance, Stormwater Conveyance<br />

Maintenance, provides for the County to enforce maintenance of private stormwater drainage systems. The revised<br />

Agreement between Pelican Cove and the District was executed May 22, 2009 and Notice to Proceed was issued June<br />

8, 2009. Pelican Cove contracted with a consultant to design the project and design is under way.<br />

0<strong>21</strong> - Manasota Basin <strong>10</strong>4


W6<strong>21</strong><br />

Little Sarasota Bay Water Quality Management Plan<br />

Project Type SWIM<br />

AOR(s)<br />

Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Project Manager GARCIA, LIZANNE<br />

Task Manager(s)<br />

Sarasota County, Sarasota County Watershed Management<br />

LOPEZ, MANNY<br />

Status Ongoing<br />

Description<br />

This project will develop a water quality management plan for Little Sarasota Bay that includes the Little Sarasota Bay,<br />

Elligraw Bayou, Holiday Bayou, Clower Creek, Catfish Creek, North Creek, South Creek and direct runoff to the bay<br />

from Siesta Key and Casey Key. The plan will focus on water resource issues such as restoration of historic or more<br />

natural hydrologic regimes in the basin, and improvements to water quality and habitat. Through this plan, the County<br />

and District will work with the Sarasota Bay Estuary Program and its partners to develop water quality and habitat<br />

restoration goals and identify projects that will assist in meeting these goals. The plan will include short term and long<br />

term projects for improvements that may include wastewater reuse, stormwater reuse, smart growth, revised land<br />

development standards, sediment control, wetland or floodplain restoration, flood level abatement, aquifer protection,<br />

and restoration of natural flow regimes. The County will post deliverables and reports on the Sarasota County Water<br />

Atlas website. Additionally, the plan will identify the monitoring needed to evaluate the progress made toward meeting<br />

the established goals.<br />

Benefits<br />

Development of this plan will assist the District in its update of the SWIM Plan for Sarasota Bay by developing pollutant<br />

load reduction goals and specific projects to meet those goals. Implementation of the plan by Sarasota County and<br />

others will result in protecting and restoring water quality and natural systems within the watershed of Little Sarasota<br />

Bay.<br />

Costs<br />

The total estimated project cost for this development of the Water Quality Management Plan is $600,000. This will be<br />

a multi-year funded project. The current FY2009 cost is $<strong>10</strong>0,000, with the Sarasota County and the District each<br />

contributing half ($50,000). The District share is split between the Manasota Basin Board ($25,000) and State SWIM<br />

($25,000). The FY2009 funds will be used to compile and evaluate all existing studies, studies, models and data,<br />

identify pollutant sources and develop a data collection plan. The FY20<strong>10</strong> funding is $300,000, with the County<br />

contributing half ($150,000) and requesting half from the District ($150,000). At their April 15, 2009 meeting, the<br />

Manasota Basin Board approved amending its FY2009 budget to include reallocating State SWIM funds to cover<br />

50 percent of the District's FY20<strong>10</strong> costs ($75,000). The other half of the funds ($75,000) are included in the<br />

Manasota Basin Board's FY20<strong>10</strong> budget. It is anticipated that the County will request the remainder of the funds<br />

($<strong>10</strong>0,000) during the FY2011 cooperative funding cycle. District funds shown in the table include staff salaries.<br />

Additional Information<br />

Since 1950, approximately 40 percent of Sarasota Bay's intertidal wetland habitat has been lost due to development<br />

and reduction in water quality. This resulted in a decline in the aesthetic, recreational, and commercial value of the<br />

bay, as well as a loss of habitat for native plants and animals. The SWIM Plans for Sarasota Bay outline goals to<br />

restore habitat throughout the bay areas and reduce pollutant loads entering the bays. The objectives of this project<br />

are consistent with these goals.<br />

0<strong>21</strong> - Manasota Basin <strong>10</strong>5


W6<strong>21</strong><br />

Little Sarasota Bay Water Quality Management Plan<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 0 29,8<strong>21</strong> 80,974 <strong>10</strong>0,000 2<strong>10</strong>,795<br />

District Budgeted - Outside Revenue<br />

State Trust Funds (SWIM) 0 29,820<br />

0<br />

0 29,820<br />

State Trust Funds (SWIM) - Prior 2006 0 0<br />

0<br />

0 75,000<br />

WMLTF (SWIM) - Prior Year Funds 0 0 5,974<br />

0 5,974<br />

Project Funds Not Budgeted by the<br />

District<br />

Sarasota County 0 50,000 150,000 <strong>10</strong>0,000 300,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$6<strong>21</strong>,589<br />

Critical Project Milestones Projected Amended Actual<br />

1. Cooperator Contract Development and Execution<br />

Draft Agreement sent to Management Services <strong>10</strong>/1/08 1/29/09<br />

Agreement Returned from Management Services <strong>10</strong>/15/08 2/16/09<br />

Agreement sent to Cooperator <strong>10</strong>/15/08 2/25/09<br />

Signed Agreement Returned from Cooperator <strong>10</strong>/29/08 3/13/09 3/20/09<br />

Agreement Fully Executed 11/7/08 3/16/09 3/27/09<br />

2. Project Tasks<br />

Consultant Selction, Negotiation and Contract Execution 11/17/09<br />

Compile and evaluate existing data, identify projects, outline final report 6/1/11<br />

Final Report 6/29/12<br />

3. Cooperative Agreement Expiration<br />

Agreement Expiration 12/31/12<br />

Status As Of: June 23, 2009<br />

The agreement was fully executed in March 2009. A kick-off meeting with the County was held May 5, 2009. At the<br />

meeting, the selection of a consultant to conduct the study and a timeline was discussed. It is anticipated that the County<br />

will issue and RFP for this project in June/July 2009 and have a consultant under contract by September 2009. This<br />

schedule is somewhat contingent upon the completion of the Lemon Bay and Roberts Bay WMP as the County has<br />

indicated that they would prefer to have those two plans completed before they enter into contracts for these plans.<br />

These plans (L6<strong>10</strong> and L611) are nearing completion.<br />

0<strong>21</strong> - Manasota Basin <strong>10</strong>6


W622<br />

Sarasota Bay Water Quality Management Plan<br />

Project Type SWIM<br />

AOR(s)<br />

Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Project Manager GARCIA, LIZANNE<br />

Task Manager(s)<br />

Sarasota County, Sarasota County Watershed Management<br />

LOPEZ, MANNY<br />

Status Ongoing<br />

Description<br />

This project will develop a water quality management plan for Sarasota Bay that includes the watersheds within<br />

Sarasota County for Sarasota Bay, Hudson Bayou, Whitaker Bayou, Lido Key, and direct runoff to the bay. The plan<br />

will focus on water resource issues such as restoration of historic or more natural hydrologic regimes in the basin, and<br />

improvements to water quality and habitat. Through this plan, the County and District will work with the Sarasota Bay<br />

Estuary Program and its partners to develop water quality and habitat restoration goals and identify projects that will<br />

assist in meeting these goals. The plan will include short term and long term projects for improvements that may<br />

include wastewater reuse, stormwater reuse, smart growth, revised land development standards, sediment control,<br />

wetland or floodplain restoration, flood level abatement, aquifer protection, and restoration of natural flow regimes. The<br />

County will post deliverables and reports on the Sarasota County Water Atlas website. Additionally, the plan will<br />

identify the monitoring needed to evaluate the progress made toward meeting the established goals.<br />

Benefits<br />

Development of this plan will assist the District in its update of the SWIM Plan for Sarasota Bay by developing pollutant<br />

load reduction goals and specific projects to meet those goals. Implementation of the plan by Sarasota County and<br />

others will result in protecting and restoring water quality and natural systems within the watershed of Sarasota Bay.<br />

Costs<br />

The total estimated project cost for this development of the Water Quality Management Plan is $600,000. This will be<br />

a multi-year funded project. The current FY2009 cost is $<strong>10</strong>0,000, with the Sarasota County and the District each<br />

contributing half ($50,000). The District share is split between the Manasota Basin Board ($25,000) and State SWIM<br />

($25,000). The FY2009 funds will be used to compile and evaluate all existing studies, studies, models and data,<br />

identify pollutant sources and develop a data collection plan. The FY20<strong>10</strong> funding is $300,000, with the County<br />

contributing half ($150,000) and requesting half from the District ($150,000). At their April 15, 2009 meeting, the<br />

Manasota Basin Board approved amending its FY2009 budget to include reallocating State SWIM funds to cover<br />

50 percent of the District's FY20<strong>10</strong> costs ($75,000). The other half of the funds ($75,000) are included in the<br />

Manasota Basin Board's FY20<strong>10</strong> budget. It is anticipated that the County will request the remainder of the funds<br />

($<strong>10</strong>0,000) during the FY2011 cooperative funding cycle. District funds shown in the table include staff salaries.<br />

Additional Information<br />

Since 1950, approximately 40 percent of Sarasota Bay's intertidal wetland habitat has been lost due to development<br />

and reduction in water quality. This resulted in a decline in the aesthetic, recreational, and commercial value of the<br />

bay, as well as a loss of habitat for native plants and animals. The SWIM Plans for Sarasota Bay outline goals to<br />

restore habitat throughout the bay areas and reduce pollutant loads entering the bays. The objectives of this project<br />

are consistent with these goals.<br />

0<strong>21</strong> - Manasota Basin <strong>10</strong>7


W622<br />

Sarasota Bay Water Quality Management Plan<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 0 29,8<strong>21</strong> 80,974 <strong>10</strong>0,000 2<strong>10</strong>,795<br />

District Budgeted - Outside Revenue<br />

State Trust Funds (SWIM) 0 29,820<br />

0<br />

0 29,820<br />

State Trust Funds (SWIM) - Prior 2006 0 0<br />

0<br />

0 75,000<br />

WMLTF (SWIM) - Prior Year Funds 0 0 5,974<br />

0 5,974<br />

Project Funds Not Budgeted by the<br />

District<br />

Sarasota County 0 50,000 150,000 <strong>10</strong>0,000 300,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$6<strong>21</strong>,589<br />

Critical Project Milestones Projected Amended Actual<br />

1. Cooperator Contract Development and Execution<br />

Draft Agreement sent to Management Services <strong>10</strong>/1/08 1/29/09<br />

Agreement Returned from Management Services <strong>10</strong>/15/08 2/16/09<br />

Agreement sent to Cooperator <strong>10</strong>/15/08 2/25/09<br />

Signed Agreement Returned from Cooperator <strong>10</strong>/29/08 3/13/09<br />

Agreement Fully Executed 11/7/08 3/16/09<br />

2. Project Tasks<br />

Consultant selection, negotiation and Contract execution 11/17/09<br />

Compile evaluate existing data, identify projects 6/1/11<br />

Final Report 6/29/12<br />

3. Cooperative Agreement Expiration<br />

Agreement Expiration 12/31/12<br />

Status As Of: August 27, 2009<br />

The agreement was fully executed in March 2009. A kick-off meeting with the County was held May 5, 2009. At the<br />

meeting, the selection of a consultant to conduct the study and a timeline was discussed. It was anticipated that the<br />

County would issue an RFP for this project in June/July 2009 and have a consultant under contract by September 2009.<br />

However this schedule is contingent upon the completion of the Lemon Bay and Roberts Bay WMP as the County has<br />

indicated that they would prefer to have those two plans completed before they enter into contracts for these plans. Draft<br />

final reports for these plans have been completed (L6<strong>10</strong> and L611). The County's project manager has indicated that the<br />

County is beginning to prepare the RFPs for this project and the Sarasota Bay Project and that they are planning on<br />

going to the Board of County Commissioners in mid-November for approval of the consultant contract.<br />

0<strong>21</strong> - Manasota Basin <strong>10</strong>8


W623<br />

Holmes Beach Stormwater Retrofit<br />

Project Type SWIM<br />

AOR(s)<br />

Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Holmes Beach<br />

Project Manager PRESTON, MATT<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This project is in response to a cooperative funding request from the City of Holmes Beach. The project will impact two<br />

drainage basins within the City of Holmes Beach totaling approximately <strong>10</strong>7 acres. Both basins have a total of 16<br />

outfall locations that discharge into the finger canals within the City, which discharge into Sarasota Bay. The objective<br />

of this project is to reduce pollutants being received by Sarasota Bay by improving the water quality discharge to the<br />

bay and reduce flooding within the basins. The project includes the construction of a new retention area at the<br />

southwest intersection of 62nd Street and Flotilla Drive. Additional improvements will include reconstruction of the city<br />

owned land to accommodate shallow grassed swales and installation of new baffle box structures at each outfall<br />

location. The swales provide treatment of stormwater through percolation and evaporation. Treated stormwater will<br />

discharge into the bay through the new baffle structures which provide additional treatment through sedimentation,<br />

filtration and skimming.<br />

Benefits<br />

This project will improve the water quality and flood protection by removing pollutants and increasing storage and<br />

conveyance capacity. The stormwater filtration devices being proposed will provide suspended solids removal from<br />

stormwater runoff that previously discharged directly into the canal/bay system. The project is anticipated to reduce<br />

TSS by 80%.<br />

Costs<br />

The total project budget is $515,000, of which the City and the District are funding half ($257,500). The District's share<br />

is split between the Manasota Basin Board ($128,750) and State SWIM ($128,750). District funds shown in the table<br />

include staff salaries.<br />

Additional Information<br />

The State of Florida has designated Sarasota Bay as an OFW. In 1997, a Sarasota Bay Surface Water Improvement<br />

and Management (SWIM) Plan was created to outline a series of research and/or restoration projects that will allow<br />

for the preservation and continued restoration of the health of Sarasota Bay. The goals of the SWIM plan include<br />

improvement of water transparency in Sarasota Bay to decrease the quantity and increase the quality of stormwater<br />

runoff to Sarasota Bay, to restore shoreline habitats in Sarasota Bay and to continue monitoring programs in Sarasota<br />

Bay. This project will help to accomplish those objectives and increase the overall health, welfare and safety of the<br />

residents living within these basins.<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 0 0 43,499 175,270 <strong>21</strong>8,769<br />

District Budgeted - Outside Revenue<br />

Ecosystem Trust Fund - SWIM<br />

Rebudget<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

0 0 41,115<br />

0<br />

41,115<br />

WMLTF (SWIM) - Prior Year Funds 0 0 2,383<br />

0 2,383<br />

Project Funds Not Budgeted by the<br />

District<br />

City of Holmes Beach 0 0 82,230 175,270 257,500<br />

0<strong>21</strong> - Manasota Basin <strong>10</strong>9<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$519,767


W623<br />

Holmes Beach Stormwater Retrofit<br />

Status As Of: September 01, 2009<br />

The cooperative funding agreement will be routed for approval as soon as a scope of work is received from the<br />

cooperator.<br />

0<strong>21</strong> - Manasota Basin 1<strong>10</strong>


W624<br />

Red Bug Slough Restoration<br />

Project Type SWIM<br />

AOR(s)<br />

Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Sarasota County<br />

Project Manager PRESTON, MATT<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This project is in response to a cooperative funding request from Sarasota County. Sarasota County and SWFWMD<br />

are jointly developing the Roberts Bay North Watershed Management Plan which has identified the Red Bug Slough<br />

Restoration project to improve water quality and restore habitat in the watershed. This project was also identified in the<br />

2002 Sarasota Bay SWIM Plan to improve the quality of stormwater runoff to Sarasota Bay. Red Bug Slough is a<br />

tributary to Philippi Creek, which eventually discharges to Roberts Bay, and is part of the larger Sarasota Bay system.<br />

The Red Bug Slough basin is 600 acres and includes a series of four interconnected lakes: West Clark Lake, East<br />

Clark Lake, Mirror Lake and Red Bug Slough Lake. There are four proposed restoration components identified for<br />

design that will partially restore a historical wetland, enhance native plant communities, and improve the quality of<br />

water entering Phillippi Creek and ultimately Sarasota Bay.<br />

Benefits<br />

The project will create additional storage within the watershed and, thereby, provide an improved level of service for<br />

flooding. The project will also provide improved water quality treatment by increasing residence times and providing<br />

additional biological treatment through restoration of historical marshes and creation of new wetland systems within<br />

Red Bug Sough. This will improve the quality of water entering Phillippi Creek and ultimately Sarasota Bay, and will<br />

have a positive impact on waterbodies on the TMDL verified list for the Sarasota Bay Group 3 segments, including<br />

Roberts Bay for nutrients and Chl (a); and Phillippi Creek for coliform bacteria.<br />

Costs<br />

The total project budget is $1,000,000, of which the County and the District are funding half ($500,000). Sarasota<br />

County has budgeted $250,000 for FY2009 and $250,000 for FY20<strong>10</strong>. The District has budgeted $400,000 for FY20<strong>10</strong><br />

and $<strong>10</strong>0,000 in future funding. The District's FY20<strong>10</strong> share is split between the Manasota Basin Board ($200,000)<br />

and State SWIM ($200,000). District funds shown in the table include staff salaries.<br />

Additional Information<br />

Since 1950, approximately 40 percent of Sarasota Bay's intertidal wetland habitat has been lost due to development<br />

and reduction in water quality. This resulted in a decline in the aesthetic, recreational, and commercial value of the<br />

bay, as well as a loss of habitat for native plants and animals. The SWIM Plans for Sarasota Bay outline goals to<br />

restore habitat throughout the bay areas and reduce pollutant loads entering the bays. The objectives of this project<br />

are consistent with these goals.<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 0 0 202,384 <strong>10</strong>0,000 302,384<br />

District Budgeted - Outside Revenue<br />

Ecosystem Trust Fund - SWIM<br />

Rebudget<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

0 0 200,000<br />

0<br />

200,000<br />

WMLTF (SWIM) - Prior Year Funds 0 0 2,383<br />

0 2,383<br />

Project Funds Not Budgeted by the<br />

District<br />

Sarasota County 0 250,000 250,000<br />

0 500,000<br />

0<strong>21</strong> - Manasota Basin 111<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$1,004,767


W624<br />

Red Bug Slough Restoration<br />

Status As Of: September 01, 2009<br />

The cooperative funding agreement will be routed for approval as soon as a scope of work is received from the<br />

cooperator.<br />

0<strong>21</strong> - Manasota Basin 112


W625<br />

Runaway Bay - Sarasota Bay Coast Line Restoration<br />

Project Type SWIM<br />

AOR(s)<br />

Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Project Manager NORTON, NANCY<br />

Task Manager(s)<br />

Status Ongoing<br />

Runaway Bay Condominium Association<br />

Description<br />

This project is in response to a FY20<strong>10</strong> Cooperative Funding request from Runaway Bay Condominium Association.<br />

Runaway Bay is a waterfront condominium association located between Gulf Drive North and Sarasota Bay. The<br />

objective of this project is to restore approximately 900 linear feet of shoreline. This project will also reduce pollutants<br />

being received by Sarasota Bay. Through the years, this shoreline has experienced serious erosion which has<br />

negatively impacted the habitat and wetland function. Best Management Practices will be implemented to remove<br />

non-permitted structures and sea walls, restore the shoreline and improve water quality. Runaway Bay will be<br />

responsible for ongoing maintenance once the project is completed.<br />

Benefits<br />

Implementation of restoration practices on the Runaway Bay Condominium's 900 linear feet of Sarasota Bay shoreline<br />

will restore shoreline habitat and improve water quality.<br />

Costs<br />

The total project budget is $80,000, with Runaway Bay Condominium Association and the District each contributing<br />

half ($40,000). The District's share is split between the Manasota Basin Board ($20,000) and State SWIM ($20,000).<br />

District funds shown in the table include staff salaries.<br />

Additional Information<br />

Since 1950, approximately 40 percent of Sarasota Bay's intertidal wetland habitat has been lost due to development<br />

and reduction in water quality. This resulted in a decline in the aesthetic, recreational, and commercial value of the<br />

bay, as well as a loss of habitat for native plants and animals. The SWIM Plan for Sarasota Bay outlines goals to<br />

restore habitat throughout the bay area and reduce pollutant loads entering the bay. The objectives of this project are<br />

consistent with these goals.<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 0 0 <strong>21</strong>,516<br />

0 <strong>21</strong>,516<br />

District Budgeted - Outside Revenue<br />

WMLTF (SWIM) - Prior Year Funds 0 0 <strong>21</strong>,516<br />

0 <strong>21</strong>,516<br />

Project Funds Not Budgeted by the<br />

District<br />

Runaway Bay Condominium<br />

Association<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

80,000 19,000 40,000<br />

Total:<br />

Future<br />

Funding<br />

0<br />

Total<br />

Funding<br />

139,000<br />

$182,032<br />

Critical Project Milestones Projected Amended Actual<br />

Contract Development and Execution<br />

Draft Agreement to Management Services 9/15/09<br />

Draft Agreement Returned from Management Services <strong>10</strong>/6/09<br />

Agreement Sent to Cooperator <strong>10</strong>/13/09<br />

0<strong>21</strong> - Manasota Basin 113


W625<br />

Runaway Bay - Sarasota Bay Coast Line Restoration<br />

Signed Agreement Returned from Cooperator 11/11/09<br />

Agreement Fully Executed 11/25/09<br />

Notice to Proceed 12/2/09<br />

Status As Of:<br />

0<strong>21</strong> - Manasota Basin 114


W626<br />

Blackburn Point Park Addition<br />

Project Type SWIM<br />

AOR(s)<br />

Water Quality, Natural Systems<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Sarasota County<br />

Project Manager LOPEZ, MANNY<br />

Task Manager(s)<br />

Status Ongoing<br />

PECK, MICHAEL<br />

Description<br />

Sarasota County purchased Blackburn Point Park Addition to meet the needs of the County's Comprehensive Plan<br />

objectives for public water access, open space, and recreational opportunities. Blackburn Point Park Addition is a<br />

<strong>10</strong>.94 acre parcel located at 477 Blackburn Point Road in Osprey, Florida and is the primary landward access to<br />

Casey Key. The eastern portion of the park will provide boat launch access to Blackburn Bay and the western portion<br />

will provide boat launch access to Little Sarasota Bay. Both waterbodies are designated SWIM waterbodies. Park<br />

development will include construction of a public boat ramp, pavilions, walkways, nature trails, restrooms, playground,<br />

fishing piers, parking for cars and boat trailers, wetlands, stormwater system, and landscape buffers. Stormwater<br />

management is challenging in this area because of its proximity to bay waters and will require treatment of 1.5 times<br />

the volume; however, attenuation is not required. The cooperative funding project will enhance stormwater treatment in<br />

the park by adding Low Impact Development (LID) techniques where feasible, including permeable pavers, porous<br />

concrete, and biofiltration.<br />

Benefits<br />

The project will be designed to enhance stormwater treatment through implementation of Low Impact Development<br />

(LID) techniques. Water quality treatment will be enhanced through a series of LID techniques that will be compatible<br />

with the park setting and require less structural components.<br />

Costs<br />

The overall project cost for the development of Blackburn Point Park (including land acquisition) is estimated to be<br />

$19,322,333. The total project cost for implementation of LID elements is $275,000, with the District requested to<br />

contribute $275,000. Sarasota County has proposed using a portion of their anticipated construction costs as their<br />

funding match. For FY20<strong>10</strong> the District has budgeted $<strong>10</strong>0,000 for the project. The District's FY<strong>10</strong> share is split<br />

between the Manasota Basin Board ($50,000) and State SWIM ($50,000). District funds shown in the table include<br />

staff salaries, travel and central garage. If approved for future funding, the District's total contribution would be spread<br />

over several fiscal years.<br />

Additional Information<br />

Economic feasibility and permittability: All aspects of the final design will require extensive permitting. The District will<br />

require an Environmental Resource Permit and may require a Water Use Permit. The District may claim jurisdiction<br />

over any wetlands or other surface waters that may be found on site and the Army Corps of Engineers will be copied<br />

for concurrent review. The Florida Department of Environmental Protection (DEP) will require water and sewer permits<br />

and will be coordinated with Sarasota County and the Health Department. A Generic Permit for Stormwater Discharge<br />

from Large and Small Construction Activities is required in accordance with DEP regulations. Several public<br />

workshops regarding the park's development have been held and the input was utilized in the creation of the concept<br />

plan to date. The Sarasota County Development Review Committee provided comments on the concept plan on April<br />

7, 2008 and will review the project development plans. A Scope of Services is being prepared.<br />

0<strong>21</strong> - Manasota Basin 115


W626<br />

Blackburn Point Park Addition<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 0 0 52,995 175,000 227,995<br />

District Budgeted - Outside Revenue<br />

WMLTF (SWIM) - Prior Year Funds 0 0 52,994<br />

0 52,994<br />

Project Funds Not Budgeted by the<br />

District<br />

Florida Boating Improvement Grant 0 190,000<br />

0<br />

0 190,000<br />

Florida Community Trust 5,175,146 0<br />

0<br />

0 5,175,146<br />

Sarasota County 11,926,198 0<br />

0 1,750,000 13,676,198<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$19,322,333<br />

Critical Project Milestones Projected Amended Actual<br />

1. Contract Development & Execution<br />

Develop Draft Agreement with Sarasota County <strong>10</strong>/20/09<br />

Agreement to Contracts Administration <strong>10</strong>/30/09<br />

Execution of Agreement by Sarasota County 12/15/09<br />

Agreement Executed by SWFWMD 12/<strong>21</strong>/09<br />

Notice to Proceed 12/30/09<br />

2. Construction<br />

Construction Start 1/25/<strong>10</strong><br />

Construction Complete <strong>10</strong>/28/11<br />

Status As Of: August 26, 2009<br />

The agreement between the District and Sarasota County for the project is under development. Details for the project's<br />

scope of work are still pending the development of preliminary designs (and cost estimates) and are not anticipated to be<br />

completed until late September early October 2009. It is anticipated the draft agreement will be undergoing review by<br />

both parties in late October 2009 early November 2009, with full execution by both parties in December 2009.<br />

0<strong>21</strong> - Manasota Basin 116


W627<br />

Bradenton Beach Stormwater Retrofits<br />

Project Type SWIM<br />

AOR(s)<br />

Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Bradenton Beach<br />

Project Manager NORTON, NANCY<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This project is in response to the FY20<strong>10</strong> Cooperative Funding request by the City of Bradenton Beach to design,<br />

permit and construct stormwater retrofit Best Management Practices within five sub basins that discharge to Sarasota<br />

Bay. The sub basins are delineated as; Avenue A between 24th Street and 25th Street comprising 17.5 acres, Gulf<br />

Drive Basin at Runaway Bay and Avenue B comprising 24.2 acres, Bay Drive South from 3rd Street South to 5th<br />

Street South draining 11.09 acres, First Street North to Bridge Street comprising 11.11 acres and Bay Drive North<br />

between 12th Street North and <strong>10</strong>th Street North comprising 6.5 acres. The objectives of the project include improving<br />

water quality, providing shoreline stabilization, enhancing shoreline functions, and reducing flooding. Best<br />

Management Practices will be implemented to stabilize the shoreline and protect existing mangroves. Project limits<br />

include reconstruction of the city owned land for the construction of shallow grassed swales with outfall pipes. The<br />

swales will provide treatment of stormwater through percolation and evaporation. The baffle structures will be installed<br />

at outfall locations to provide additional treatment. The shoreline will be repaired and restored to enhance the quality<br />

and function of the existing wetlands habitat. The City of Bradenton Beach will be responsible for ongoing maintenance<br />

and will perform monitoring at each outfall location to establish the treatment effectiveness.<br />

Benefits<br />

The project is anticipated to reduce total suspended solids (TSS) by approximately 15,000 pounds per year (80%<br />

reduction) with implementation of the BMP's proposed in this project.<br />

Costs<br />

The total estimated project cost is $3,120,650. The FY20<strong>10</strong> total project cost is $200,000, with the City of Bradenton<br />

Beach and the District each contributing half ($<strong>10</strong>0,000). The District's share is split between the Manasota Basin<br />

Board ($50,000) and State SWIM ($50,000). Additional funds for design and construction will be budgeted in future<br />

fiscal years. District funds shown in the table include staff salaries.<br />

Additional Information<br />

Since 1950, approximately 40 percent of Sarasota Bay's intertidal wetland habitat has been lost due to development<br />

and reduction in water quality. This resulted in a decline in the aesthetic, recreational, and commercial value of the<br />

bay, as well as a loss of habitat for native plants and animals. The SWIM Plan for Sarasota Bay outlines goals to<br />

restore habitat throughout the bay area and reduce pollutant loads entering the bay. The objectives of this project are<br />

consistent with these goals.<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 0 0 52,449 1,375,575 1,428,024<br />

District Budgeted - Outside Revenue<br />

WMLTF (SWIM) - Prior Year Funds 0 0 52,448<br />

0 52,448<br />

Project Funds Not Budgeted by the<br />

District<br />

City of Bradenton Beach 25,000 144,500 <strong>10</strong>0,000 1,375,575 1,645,075<br />

0<strong>21</strong> - Manasota Basin 117<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$3,125,547


W627<br />

Bradenton Beach Stormwater Retrofits<br />

Critical Project Milestones Projected Amended Actual<br />

Contract Development and Execution<br />

Draft Agreement to Management Services 9/15/09<br />

Draft Agreement Returned from Management Services <strong>10</strong>/6/09<br />

Agreement Sent to Cooperator <strong>10</strong>/13/09<br />

Signed Agreement Returned from Cooperator 11/11/09<br />

Agreement Fully Executed 11/25/09<br />

Notice to Proceed 12/2/09<br />

Status As Of:<br />

0<strong>21</strong> - Manasota Basin 118


B063<br />

USGS Manasota Basin Surface Water Flow, Level, and Water<br />

Quality Data Collection<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers, Pinellas-Anclote River,<br />

Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

United States Geological Survey<br />

Project Manager KINSMAN, GRANVILLE<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This initiative is to establish and maintain the Manasota Basin's surface water monitoring network, and is jointly funded<br />

by the Manasota Basin Board and the United States Geological Survey (USGS).<br />

Benefits<br />

This project provides basic surface water stage, discharge and/or water quality data collection to support assessing<br />

flooding events, developing surface water management plans, facilitating habitat restoration projects, establishment<br />

and monitoring of minimum flows and levels (MFLs), establishment of total maximum daily loads (TMDLs), land<br />

acquisition and management, and other critical water management activities.<br />

Costs<br />

In FY2009, surface water stage, discharge, and/or water quality is measured at 16 sites in the Manasota Basin for a<br />

cost of $231,900. These sites are: Myakka River at Myakka City, Howard Creek near Sarasota, Myakka River near<br />

Sarasota, South Fork Little Manatee River near Parrish, Gamble Creek near Parrish, Big Slough Canal near Myakka<br />

City, and South Fork Little Manatee River near Duette. In FY2009, two flow monitoring sites (Myakka at Control near<br />

Laurel and Cow Pen Slough near Bee Ridge) that were budgeted in FY2008 under Project H057 were added to this<br />

project for long-term monitoring. The cost increase in FY2009 reflects addition of these two new monitoring sites and<br />

an annual adjustment of pricing by the USGS. In FY20<strong>10</strong>, funding for this program will be transferred from the<br />

Manasota Basin Board to the Governing Board, and will be funded under the project code Z661.<br />

0<strong>21</strong> - Manasota Basin 119


B063<br />

USGS Manasota Basin Surface Water Flow, Level, and Water<br />

Quality Data Collection<br />

Prior Cumulative FY 2009 FY20<strong>10</strong><br />

Funding Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

887,995 0 <strong>10</strong>8,500<br />

0<br />

011 Alafia River Basin 0 996,495<br />

013 Hillsborough River Basin 1,316,655 0 1<strong>21</strong>,600<br />

0<br />

0 1,438,255<br />

014 Northwest Hillsborough Basin 227,774 0 44,700<br />

0<br />

0 272,474<br />

015 Coastal Rivers Basin 1,489,207 0 243,900<br />

0<br />

0 1,733,<strong>10</strong>7<br />

016 Pinellas-Anclote River Basin 397,932 0 57,<strong>10</strong>0<br />

0<br />

0 455,032<br />

019 Withlacoochee River Basin 1,630,847 0 296,880<br />

0<br />

0 1,927,727<br />

020 Peace River Basin 2,295,165 0 434,900<br />

0<br />

0 2,730,065<br />

0<strong>21</strong> Manasota Basin 1,036,520 0 231,900<br />

0<br />

0 1,268,420<br />

Project Funds Not Budgeted by the<br />

District<br />

USGS Alafia River Basin 585,822 0 0<br />

0<br />

0 585,822<br />

USGS Coastal Rivers Basin 409,438 0 0<br />

0<br />

0 409,438<br />

USGS Hillsborough River Basin 675,390 0 0<br />

0<br />

0 675,390<br />

USGS Manasota Basin 202,806 0 0<br />

0<br />

0 202,806<br />

USGS Northwest Hillsborough Basin 23,690 0 0<br />

0<br />

0 23,690<br />

USGS PA Basin 202,338 0 0<br />

0<br />

0 202,338<br />

USGS Peace River Basin 1,356,566 0 0<br />

0<br />

0 1,356,566<br />

USGS Withlacoochee River 789,429 0 0<br />

0<br />

0 789,429<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$15,067,054<br />

Critical Project Milestones Projected Amended Actual<br />

Install Stage/Conductance site Manatee R @ Ft. Hamer <strong>10</strong>/1/00 1/24/01<br />

Install Stage/Conductance site on Manatee R @ Devil's Elbow <strong>10</strong>/1/00 1/26/01<br />

Install two new stage sites on Myakka River 4/30/02 7/9/02<br />

Install three new tidal stage/conductance sites on Myakka River 4/30/02 1/31/03 1/31/03<br />

Install two new stage sites on Braden River 4/30/02 5/1/03 3/31/02<br />

Install fourth tidal stage/conductance site on Myakka River <strong>10</strong>/1/02 5/1/03 3/28/03<br />

Install two stage/discharge sites on Cow Pen Slough <strong>10</strong>/1/02 5/1/03 4/30/03<br />

Install two new tidal stage/conductance sites on Donna/Roberts Bay <strong>10</strong>/1/02 5/1/03 5/15/03<br />

Site Installation Cancelled<br />

Install new water level gauging station on Gamble Creek <strong>10</strong>/1/01<br />

Status As Of: August <strong>21</strong>, 2009<br />

FY2009 data collection is ongoing, with no problems to report. The District's FY2009 commitment to the project is<br />

$231,900, of which $115,950 has been expended (the USGS bills us every six months for these activities).<br />

Accelerated Action-To-Date: On-time<br />

0<strong>21</strong> - Manasota Basin 120


B074<br />

Manatee - WMPlan BRADEN <strong>RIVER</strong><br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply, Flood Protection, Natural Systems<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Project Manager NGUYEN, NAM<br />

Task Manager(s)<br />

Status Ongoing<br />

City of Bradenton, Manatee County, Sarasota County<br />

Description<br />

This multi-year funded project is to perform the 1) Topographic Information, 2) Watershed Evaluation, and 3)<br />

Watershed Management Plan elements of the District's Watershed Management Program (WMP) for the BRADEN<br />

<strong>RIVER</strong> Watershed beginning at the Bill Evers Reservoir dam and progressing upstream in southwestern Manatee<br />

County. The watershed occupies approximately 59.0 square miles within southern Manatee County and ultimately<br />

discharges into Manatee River and Tampa Bay, a SWIM waterbody. The WMP will address watershed issues of rapid<br />

growth, flood damage, and water supply. Residential development is occurring in the upper portions of the watershed<br />

where Federal Emergency Management Agency (FEMA) flood level information is suspect. In addition, competition for<br />

the surface water resource has increased as a result of residential development within the watershed. Surface water<br />

runoff is currently used as a potable supply for the City of Bradenton via the Bill Evers Reservoir. In the future, surface<br />

water use will be expanded through the use of stormwater as a non-potable source for irrigation of new residential<br />

developments.<br />

Benefits<br />

The WMP provides a method to evaluate the capacity of a watershed to protect, enhance, and restore water quality<br />

and natural systems, while achieving flood protection. The information developed provides the science for the District's<br />

Resource Management and Environmental Resource Permitting (ERP). It assists local governments: 1) With their land<br />

management responsibilities by establishing a level of service and developing Best Management Practices (BMPs) to<br />

address level of service deficiencies and 2) Provides a Geodatabase and projected results from watershed model<br />

simulations for floodplain management and water quality management .<br />

Costs<br />

The current, total budget amount for this project is $1.279 million, of which the District's share is $654,000 funded by<br />

the Manasota Basin. Manatee County is contributing $379,700, Sarasota County is contributing $89,200, and the City<br />

of Bradenton is contributing $156,<strong>10</strong>0. FY2009 funding includes $200,000 with the Manasota Basin funding $114,500<br />

and revenue of $69,800 from Manatee County and $15,700 from Sarasota County. Previously approved FY2005<br />

funding included $1<strong>10</strong>,000 with the Manasota Basin funded $55,000 and revenue of $31,600 from Manatee County,<br />

$7,500 from Sarasota County, and $15,900 from the City of Bradenton. Previously approved FY2004 funding included<br />

$280,500 with revenue of $157,300 from Manatee County, $33,000 from Sarasota County, and $90,200 from the City<br />

of Bradenton. Previously approved FY2003 funding included $484,500 with the Manasota Basin funded $280,500 and<br />

revenue of $1<strong>21</strong>,000 from Manatee County, $33,000 from Sarasota County, and $50,000 from the City of Bradenton.<br />

Previously approved FY2002 funding included $204,000 with the Manasota Basin funded $204,000. When each<br />

element is completed the project budget may require refinement based on the information gathered. The District<br />

funding amounts shown in the table include staff salaries.<br />

Additional Information<br />

A WMP includes five major elements: 1) Topographic Information, 2) Watershed Evaluation, 3) Watershed<br />

Management Plan, 4) Implementation of Best Management Practices, and 5) Maintenance of Watershed Parameters<br />

and Models. Implementing elements of the WMP with local governments is one of the Comprehensive Watershed<br />

Management (CWM) initiative strategies and one of the District's Strategic Priorities. A cooperative funding revenue<br />

agreement with Manatee County, Sarasota County, and the City of Bradenton has been executed as a multi-year<br />

funded project. District staff is managing the project and has entered into a consultant services agreement to<br />

accomplish project tasks. As part of the project, a surface water capacity assessment will be performed concurrently<br />

with the Watershed Management Plan to evaluate surface water management policies and their effect on existing<br />

users, water quantity, and water quality. Future cooperative funding requests and agreements will be required for<br />

establishment of LOS, the analysis of BMP alternatives, the Implementation of BMPs, and Maintenance of Watershed<br />

Parameters and Models.<br />

0<strong>21</strong> - Manasota Basin 1<strong>21</strong>


B074<br />

Manatee - WMPlan BRADEN <strong>RIVER</strong><br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 709,203 0 1<strong>21</strong>,636 <strong>10</strong>,136<br />

0 840,975<br />

District Budgeted - Outside Revenue<br />

Bradenton - WMPlan Braden River<br />

(B074)<br />

Manatee - WMPlan Braden River<br />

(B074)<br />

Sarasota - WMPlan Braden River<br />

(B074)<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

156,<strong>10</strong>0 0 0<br />

0<br />

309,900 0 69,783<br />

0<br />

73,500 0 15,717<br />

0<br />

Total:<br />

Future<br />

Funding<br />

0<br />

0<br />

0<br />

Total<br />

Funding<br />

156,<strong>10</strong>0<br />

379,683<br />

89,<strong>21</strong>7<br />

$1,465,975<br />

Critical Project Milestones Projected Amended Actual<br />

1. Critical Project Milestones<br />

Recognition of District, Basin Board, City & County on reports 12/17/02<br />

2. Cooperative Agreement<br />

Coop Agreement Executed by Manatee County 5/30/02 12/17/02<br />

Coop Executed by Sarasota County 5/30/02 3/11/03<br />

Coop Executed by City of Bradenton 5/30/02 3/17/03<br />

Coop Executed by the District 7/30/02 4/23/03<br />

Execute Amendment #1 to Cooperative Agmt 1/30/05 1/27/05<br />

Execute Expired Coop. Agreement 2003REV0020-A 1/31/07 3/7/07<br />

Execute Expired Coop. Agreement 2003REV0020-B 1/31/08 7/9/08<br />

Execute new Coop. Agrmt. (2003REV0020-C) 11/1/09<br />

Cooperative Agmt Close-out 9/30/<strong>10</strong><br />

3. Consultant Services Agreement<br />

Execute new Consultant Agrmt. (03CONC00015-B) 6/15/09 6/15/09<br />

3. Consultant Services Agreement<br />

Executed Consultant Agmt 7/20/03 7/<strong>21</strong>/03<br />

Notice to Proceed 7/20/03 7/<strong>21</strong>/03<br />

Commence Element 1, Digital Topographic Information 7/<strong>21</strong>/03 7/<strong>21</strong>/03<br />

Commence Element 2, Watershed Evaluation 7/<strong>21</strong>/03 7/<strong>21</strong>/03<br />

Complete Element 1, Digital Topographic Information 5/11/04 9/<strong>21</strong>/04 7/1/05<br />

Execute Amendment #1 to Consultant Agmt 12/29/04 12/29/04<br />

Complete Element 2, Watershed Evaluation 1/<strong>21</strong>/05 7/<strong>21</strong>/06<br />

Commence Element 3, Watershed Management Plan 1/<strong>21</strong>/05 9/30/06 12/15/04<br />

Execute Expired Consultant Agmt (03CONC00015-A) 9/<strong>21</strong>/06 8/29/06<br />

Execute Amendment #1 to Expired Consultant Agmt (03CONC00015-A) 1/31/08 1/28/08<br />

Complete Element 3, Watershed Management Plan 3/22/<strong>10</strong><br />

Consultant Agmt Close-out 6/30/<strong>10</strong><br />

Status As Of: September 03, 2009<br />

A Request for Proposals was advertised on October 4, 2002 to perform the Braden River Watershed Management<br />

Program from which 8 responses were received. Singhofen and Associates (SAI) was chosen as the top consultant and<br />

board recommendation to negotiate and enter into a contract with SAI. The Cooperative Funding Agreement between the<br />

District, the City of Bradenton, and Manatee and Sarasota Counties was executed on April 23, 2003. The First<br />

Amendment to the Revenue Agreement to include additional FY2005 funds was executed on January 27, 2005.<br />

Likewise, the amendment to the Consultant Services Agreement with Singhofen and Associates (SAI) was executed and<br />

was effective as of December 1, 2004. The consultant services agreement has been amended to extend the contract<br />

termination date and revise the project schedule. The cooperative agreement has, likewise, been amended to extend the<br />

contract termination date to December 31, 2007. SAI's Work Order #2 was executed on February 11, 2004. Work Order<br />

#2 tasks include a detailed watershed reconnaissance, the development of a Digital Terrain Model that represents the<br />

0<strong>21</strong> - Manasota Basin 122


B074<br />

Manatee - WMPlan BRADEN <strong>RIVER</strong><br />

current watershed conditions, and a subbasin and watershed connectivity inventory in GIS database format. SAI has<br />

completed all the deliverables for Work Order #2, which includes recent color orthophotographs, digital topographic<br />

information, GIS geodatabase of field reconnaissance/secondary survey data to date (40% effort), and supporting<br />

documentation for the selection of storm events for model calibration and verification. Work Order #3 with SAI, to<br />

complete the Watershed Evaluation element and begin development of the Watershed Management Plan, has been<br />

executed. Notice to Proceed on Work Order #3 was effective as of December 15, 2004. Work Order #4 for the Phase 1<br />

survey effort was executed on March 28, 2006. All task and deliverables under Work Order #4 are completed. SAI has<br />

completed the draft final Watershed Evaluation report under Work Order #3 and additional staff comments are being<br />

addressed. Work Order #5 for the surface water resource assessment has been executed and is currently in progress.<br />

The consultant team has prepared a spreadsheet water budget to quantify the amount of water entering the Bill Evers<br />

Reservoir (Ward Lake) and will serve as an input to the water quality model that is currently being calibrated. This model<br />

and associated write-up have been transmitted to the District and local cooperators for review and comments. The draft<br />

report on the water quality modeling effort is still being completed by the sub-consultant. The consultant is currently<br />

developing a refined schedule and budget to complete remaining tasks. Both schedule and budget are contingent upon<br />

collecting field measurements for remaining cross sections and hydraulic features. Two additional work orders will be<br />

developed to complete the project--first for the remaining survey/field measurements and the second to complete the<br />

Watershed Management Plan. SAI has selected a survey firm and is currently developing the detail scope of work,<br />

including how the information will be delivered. Both the consultant services agreement and the cooperative agreement<br />

for this project will need to be amended because it does not appear that the project will be completed by the end of<br />

December 2007. The surface water resource assessment final reports (quantity & quality) are being reviewed by District<br />

staff and cooperators. Work Order #6 is currently being developed to complete the remaining survey/field measurements<br />

(Phase 2). The cooperative agreement and consultant services agreement have been finalized for execution, to extend<br />

from December 31, 2007 to December 31, 2008. The surface water resource assessment (SWRA) final reports (quantity<br />

& quality) review comments from District staff and cooperators are being addressed by the consultants. Work Order #6 is<br />

currently being executed by the department's director and work will begin soon by the consultant to complete the<br />

remaining survey/field measurements (Phase 2). The cooperative agreement is being routed to the cooperators for<br />

execution to extend from December 31, 2007 to January 31, 2009. The consultant services agreement has been<br />

executed by the District on January 28, 2008. The consultant has developed a refined schedule and budget to complete<br />

remaining tasks. Two additional work orders will be developed to complete the project--first for the public notification,<br />

limited public meetings with large property owners or consultant firms, and watershed parameterization and the second<br />

to finish out the Watershed Management Plan. An additional funding of $220,000 has been requested for FY2009 to<br />

complete the project. This cost is associated with the increased survey costs, significantly more structures in watershed<br />

than anticipated and costs to cover public involvement not in original scope. District staff is currently developing a letter<br />

asking the cooperators for their participation in contributing to the requested additional funding. The consultants are near<br />

completion with the SWRA final reports, addressing comments from the District and the cooperators. Work Order #6 -<br />

Phase 2 of the survey/field measurements has been executed and the consultant has been given notice to proceed, May<br />

28, 2008. The cooperative agreement to extend the expiration date from December 31, 2007 to January 31, 2209 is<br />

currently with Manatee County. The requested additional funding for FY2009 to complete the project has been refined<br />

from $220,000 to $200,000. This additional amount will be shared among Manatee County, Sarasota County and the<br />

District. City of Bradenton is unable to contribute and their portion of contribution will be splitted among the remaining 3<br />

sources. The cooperative agreement to extend the expiration date to January 31, 2009 has been executed on July 9,<br />

2008. The SWRA water quality report has been finalized. The water quantity portion is being updated by the consultant.<br />

The consultant is near completion with WO#6, Phase 2 of the survey. Work Order #7, deliverable 1 was submitted to the<br />

District on July 14, 2008. The District provided comments to the consultant on December 9, 2008. The consultant is<br />

currently evaluating the inclusion of the hydraulic features for some of the 192 small ponds, where construction drawings<br />

do exist. The consultant will provide to the District a GIS layer summarizing the findings. A new cooperative agreement,<br />

extending the termination date to September 30, 20<strong>10</strong>, has been sent to the cooperators for signatures. Likewise, a new<br />

consultant agreement, extending the termination date to June 30, 20<strong>10</strong>, has been sent to SAI for signature. The SWRA<br />

final reports - Quantity & Quality have been sent to the cooperators. The final deliverable for survey phase 2, WO#6 has<br />

been submitted to the District on May 14, 2009. Current Status: The new cooperative agreement is still being routed for<br />

signatures. It's currently with Sarasota County. The new consultant agreement with SAI has been executed on 6/15/09.<br />

The last deliverable for WO#7 has been submitted to the District and the District has completed the review. SAI is<br />

addressing the District's comments at the moment and a GoTo meeting will be set up to discuss the results. SAI and the<br />

District will begin coordination for WO#8 to finish the remaining tasks of the project.<br />

0<strong>21</strong> - Manasota Basin 123


B092<br />

USGS-Flatford Swamp Surface Water Monitoring Program<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality, Natural Systems<br />

Basin(s) General Fund (District), Manasota<br />

Cooperator(s)<br />

Project Manager MORRIS, LISANN<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

Since this project began, six continuous recording discharge gages and a water level gage within the Flatford Swamp<br />

were constructed and maintained by the USGS. Data has been collected since 1999. This data is used to monitor the<br />

health of the Swamp and also to gauge the progress of the Falkner Farms and Pacific Tomato Growers projects to<br />

replace groundwater with surface water. In addition to monitoring the success of the two constructed projects, data will<br />

be used to monitor new projects being developed as part of the District's Facilitating Agricultural Resource<br />

Management Systems (FARMS) program. Through the development of cooperative projects, these projects can assist<br />

in returning a natural hydroperiod in the swamp. This data was used in the development of the Upper Myakka water<br />

budget computer model for the Myakka River Watershed Initiative.<br />

Benefits<br />

This project provides basic surface water stage, discharge and/or water quality data collection to support assessing<br />

flooding events, developing surface water management plans, facilitating habitat restoration projects, establishment<br />

and monitoring of minimum flows and levels (MFLs), establishment of total maximum daily loads (TMDLs), land<br />

acquisition and management, and other critical water management activities.<br />

Costs<br />

The estimate for the FY20<strong>10</strong> budget for surface water stage, discharge, and/or water quality measurements at the<br />

seven sites in the Manasota Basin has stayed the same as last year's estimate of $158,<strong>10</strong>0. These sites are: Maple<br />

Creek near Myakka City (02298495), Myakka River near Myakka City (02298554), Coker Creek near Myakka City<br />

(02298530), Myakka River Upstream Youngs Creek (02298488), Flatford Swamp near Myakka River (02298494),<br />

Ogleby Creek Downstream Boggy Creek near Myakka City, FL (02298527), and Long Creek near Myakka City<br />

(02298492).<br />

Additional Information<br />

The District funded a study on the tree die-off in Flatford Swamp in FY1997. The results of this study were presented<br />

in a public workshop in Palmetto in October 1997, and a draft final report was produced in December 1997. The<br />

original study determined that tree die-off on Flatford Swamp was associated with increased water levels and/or<br />

extended hydroperiods. Affected areas extended below the swamp down to the Crowley Nature Center and possibly<br />

the Myakka River State Park. For FY2007, data collected from water quality sensors (conductance probes) at each<br />

site was included to provide more accurate information to reflect the variably of agricultural irrigation practices.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 0 6,600 0 160,820<br />

0 167,420<br />

0<strong>21</strong> Manasota Basin 797,991 0 160,805<br />

0 162,000 1,120,796<br />

Project Funds Not Budgeted by the<br />

District<br />

USGS 207,000 0 0<br />

0<br />

0 207,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$1,495,<strong>21</strong>6<br />

Critical Project Milestones Projected Amended Actual<br />

0<strong>21</strong> - Manasota Basin 124


B092<br />

USGS-Flatford Swamp Surface Water Monitoring Program<br />

Project Initiated 12/<strong>10</strong>/98 12/<strong>10</strong>/98<br />

Status As Of: August 31, 2009<br />

Collected stage data and serviced streamflow gages during regularly scheduled field trips. Station levels were run at<br />

Flatfor Swamp (02298494) to rectify minor discrepencies. No datum corrections were need to any prior year data. USGS<br />

will continue to monitor all sites via satelite transmission for problems that need immediate attention and correction.<br />

.Data for the 2008 water year have been reviewed and published at http://wdr.water.usgs.gov/ Safety rails were added to<br />

all gages in the Flatford network to comply with OSHA standards. New shaft encoder was installed at Long Creek as the<br />

old one malfunctioned and failed to provide data to be transmitted.<br />

0<strong>21</strong> - Manasota Basin 125


B099<br />

Quality of Water Improvement Program - Manasota Basin<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply, Water Quality, Natural Systems<br />

Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Pinellas-Anclote River, Peace River,<br />

Manasota<br />

Cooperator(s)<br />

Project Manager STOVER, KEVIN<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

Pursuant to F.S. Ch. 373.206, any abandoned artesian well having a detrimental impact on the District's water<br />

resources must be properly plugged. The District's Quality of Water Improvement Program (QWIP) provides funding<br />

assistance to landowners to come into compliance with the statute. To increase landowner cooperation and the<br />

number of abandoned artesian wells plugged annually, without increasing staff levels, the District's Governing Board<br />

has allocated matching funds to augment the Alafia River, Hillsborough River, Northwest Hillsborough,<br />

Pinellas-Anclote River, Peace River, and Manasota Basins QWIP budget to maintain the Funding Assistance Initiative<br />

since January 1, 1994. The Funding Assistance Initiative was designed to reimburse landowners up to <strong>10</strong>0 percent of<br />

the cost to have their abandoned artesian wells plugged, with a maximum District reimbursement of $5,000 per well<br />

and $15,000 annually per landowner. This incentive has increased landowner cooperation and the number of wells<br />

plugged annually. Under the 50/50 cost sharing program, QWIP plugged an average of 50 wells per year. Under the<br />

Funding Assistance Initiative, the QWIP has reimbursed an average of approximately 200 wells per year.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 1,027,270 76,8<strong>10</strong> 389,793 659,341<br />

0 2,153,<strong>21</strong>4<br />

011 Alafia River Basin 489,957 29,850 113,808<br />

0<br />

0 633,615<br />

013 Hillsborough River Basin 185,860 <strong>10</strong>,000 29,498<br />

0<br />

0 225,358<br />

014 Northwest Hillsborough Basin 126,551 0 <strong>10</strong>,067<br />

0<br />

0 136,618<br />

016 Pinellas-Anclote River Basin <strong>10</strong>0,746 0 11,703<br />

0<br />

0 112,449<br />

020 Peace River Basin 858,005 36,960 157,143<br />

0<br />

0 1,052,<strong>10</strong>8<br />

0<strong>21</strong> Manasota Basin 1,483,799 0 200,434 <strong>10</strong>,000<br />

0 1,694,233<br />

Status As Of: August 25, 2009<br />

Total:<br />

Future<br />

Funding<br />

Since the last update 24 wells have been plugged in the Manasota Basin for a total of 2,935 wells plugged in the basin<br />

since the program's inception. There are 24 additional wells that have been inspected and approved for plugging. Wells<br />

plugged since last update are as follows: Sarasota County - (1) Villa Flore HOA - four inch well casing to 47 feet - total<br />

well depth 90 feet - plugging for a well no longer in use - District Reimbursement $838; (2) Pauline Curry - four inch well<br />

casing to 37 feet - total well depth 75 feet - plugging for a well no longer in use with poor WQ - District Reimbursement<br />

$994; (3) Pauline Curry - four inch well casing to 220 feet - total well depth 538 feet - plugging for a well no longer in use<br />

with poor WQ - District Reimbursement $2,702; (4) Sandra Genersich - four inch well casing to 34 feet with a total well<br />

depth of 127 feet - plugging for a well no longer in use - District Reimbursement $1,126; (5) Sarasota County - four inch<br />

well casing to 80 feet - total well depth 151 feet - plugging for a well no longer in use - District Reimbursement $1,222; (6)<br />

Sarasota County - four inch well casing to 82 feet with a total depth of 188 ft. - plugging for a well no longer in use -<br />

District Reimbursement $1,437; (7) Sarasota County - four inch well casing to 76 feet with a total well depth 149 feet -<br />

plugging for a well no longer in use - District Reimbursement $1,263; (8) Paul Whilhite - four inch well casing to 38 feet -<br />

total well depth 86 feet - plugging for a well no longer in use - District Reimbursement $471; (9) Leroy Wagler - four inch<br />

well casing to 91 feet with a total well depth of 131 feet - plugging for a well no longer in use - District Reimbursement<br />

$1,063; (<strong>10</strong>) Amy Sergent - four inch well casing to 36 feet - total well depth 111 feet - plugging for a well no longer in use<br />

0<strong>21</strong> - Manasota Basin 126<br />

Total<br />

Funding<br />

$6,007,595


B099<br />

Quality of Water Improvement Program - Manasota Basin<br />

- District Reimbursement $1,067; (11) John Riker - four inch well casing to 41 feet - total well depth 95 feet - plugging for<br />

an obstructed well no longer in use with poor WQ - District Reimbursement $1,458; (12) Mark Levy - four inch well<br />

casing to 60 feet with a total well depth of <strong>10</strong>0 feet - plugging for a well no longer in use with poor WQ - District<br />

reimbursement $893: (13) Ilya Vitievsky - four inch well casing to 44 feet - with a total well depth of 55 feet - plugging for<br />

a well no longer in use - District reimbursement $646: (14) Mark Pierson - four inch well casing to 27 feet - total well<br />

depth 151 feet - plugging for a well no longer in use - District Reimbursement $1,275; (15) Sarasots Co. Office of budget<br />

- four inch well casing to 53 ft. with a total depth of 147 ft - plugging for a well no longer in use - District Reimbursement<br />

$1,199; (16) Ben Raber - four inch well casing to 45 feet - total well depth 65 feet - plugging for an obstructed well no<br />

longer in use - District Reimbursement $1,279; (17) Edmund Witkowski - four inch well casing to 62 feet - total well depth<br />

79 feet - plugging for a well no longer in use - District Reimbursement $778; (18) Bruce Cilo - four inch well casing to 64<br />

feet - total well depth 359 feet - plugging for a well no longer in use - District Reimbursement $2,679; (19) Mike Keame -<br />

four inch well casing to 55 feet with a total well depth unknown - plugging for an obstructed well no longer in use with<br />

poor WQ - District Reimbursement $826; (20) Sarasota Co. - four inch well casing to 63 feet - total well depth 135 feet -<br />

plugging for a well no longer in use with poor WQ - District Reimbursement $1,085; Manatee County - (1) William Ayers -<br />

five inch well casing to 118 feet - total well depth <strong>21</strong>1 feet - plugging for a well no longer in use - District Reimbursement<br />

$1,134; (2) Richard Helmer - four inch well casing to 144 feet - total well depth <strong>21</strong>8 feet - plugging for a well no longer in<br />

use - District Reimbursement $1,540; (3) Waters edge of Bradenton - five inch well casing to unknown depth - total well<br />

depth 200 feet - plugging for a well no longer in use - District Reimbursement $1,828; (4) University Parkway Assoc. -<br />

four inch well casing to unknown depth with a total well depth of 130 feet - plugging for a well no longer in use - District<br />

Reimbursement $1,057;<br />

0<strong>21</strong> - Manasota Basin 127


B131<br />

Hotel/Motel/Restaurant Water Conservation Program (Water<br />

CHAMP/PRO)<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply, Water Quality<br />

Basin(s) General Fund (District), Alafia River, Hillsborough River, Coastal Rivers, Pinellas-Anclote River,<br />

Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager ROE, MELISSA<br />

Task Manager(s)<br />

Status Ongoing<br />

Citrus 20/20, Inc., Citrus County, City of Bradenton, City of North Port - Public Utilities, City of<br />

Tampa, City of Venice, Hillsborough County, Longboat Key, Manatee County, Peace<br />

River/Manasota Regional Water Supply Auth., Progress Energy, Sarasota, Sarasota County,<br />

Tampa Water Department<br />

RYAN, GERALYN<br />

Description<br />

This Basin Initiative (BI) project provides education to hotel/motel management and guests with the goal of reducing<br />

water use. The District provides printed materials to all participating properties to assist owners/managers in<br />

determining ways to save water through their properties' operational processes, including, but not limited to, a towel<br />

and linen reuse program. To build on the success of Water CHAMP, the District created the Water Program for<br />

Restaurant Outreach (Water PRO) to promote water conservation in restaurants. The CHAMP coordinator will<br />

promote the program through the Florida Restaurant and Lodging Association, partnerships with utility companies,<br />

direct mail and site visits to association members and independent restaurants. Materials include a button for wait staff<br />

to wear declaring that the restaurant serves water only upon request, information tabletop displays, children's coloring<br />

sheets, coasters and bathroom mirror cling stickers promoting water conservation to be placed on bathroom<br />

mirrors. Both Water CHAMP and PRO are measured for effectiveness by number of participating properties. In<br />

addition, Water CHAMP has proven its success by conducting two water audits on participating properties in 2003 and<br />

2008.<br />

Benefits<br />

Water CHAMP provides the tools and education needed to help hotel/motel staff and guests learn to conserve water.<br />

This program measures the effectiveness of this education effort via actual water savings. The first evaluation of water<br />

savings was conducted by the City of Tampa and Pinellas County Utilities in 2002 and showed that participants saved<br />

an average of 20 gallons of water per occupied room per day. A five-year follow-up water audit was conducted in<br />

cooperation with 16 utility companies to determine the current level of water savings. The audit compared water<br />

consumption of 115 Water CHAMP participants before the program's implementation in 2002 to the amount used<br />

in 2007. The Districtwide audit showed that participants saved an average of 17 gallons of water per occupied room<br />

per day. The slight adjustment in water savings from the first audit to the five-year follow-up audit is attributed to a<br />

larger representative sample of the entire District. Based on the audit results and occupancy rates it is projected<br />

that more than 185 million gallons of water was saved by participating properties in 2009. In addition to water savings,<br />

this program has successfully prompted a change in water-use behavior as well as increased knowledge<br />

and awareness of the need for water conservation to protect the water resources.<br />

Costs<br />

The total cost of the FY20<strong>10</strong> program is $83,692 (District - $7,768; Alafia River - $3,941; Hillsborough River - $13,274;<br />

Coastal Rivers - $6,866; Pinellas-Anclote - $16,613; Withlacoochee River - $6,<strong>10</strong>7; Peace River - $15,113; Manasota -<br />

$14,0<strong>10</strong>.) District funds will be used for CHAMP/PRO properties in the Green Swamp Basin. Funds will be used to<br />

pay for CHAMP/PRO coordinator (District temporary employee) salary, travel, printed materials and costs to educate<br />

the audience and promote the programs through advertising, workshops, tradeshows, professional memberships, etc.<br />

The dollar amount allocated per basin is based on anticipated work within that basin. Based on the average number of<br />

guests exposed to the program, the estimated per person cost for the program is less than $.01. As the program<br />

grows, the cost per person decreases. The cost benefit for the project, using the total cost amortized over five years, is<br />

$0.47 per thousand gallons of water.<br />

Additional Information<br />

The total cost of the program in FY2009 was $83,692, with District funds budgeted for the first time to expand the<br />

program to support the ten hotels/motels in the Green Swamp Basin, which is administered by the Governing Board.<br />

Costs were shared as follows: District - $7,828; Alafia River - $3,550; Hillsborough River - $8,<strong>10</strong>7; Northwest<br />

Hillsborough - $4,070; Pinellas-Anclote - $17,372; Coastal Rivers - $6,563; Withlacoochee River - $6,207; Peace<br />

River - $16,271; and Manasota - $13,724. The District has supported this project since FY2002.<br />

Survey results show a 98 percent approval rating from hotel/motel guests.<br />

0<strong>21</strong> - Manasota Basin 128


B131<br />

Hotel/Motel/Restaurant Water Conservation Program (Water<br />

CHAMP/PRO)<br />

Prior Cumulative FY 2009 FY20<strong>10</strong><br />

Funding Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0 0 7,909 8,047<br />

0<strong>10</strong> General Fund (Districtwide) 0 15,956<br />

011 Alafia River Basin 16,611 0 3,713 4,096<br />

0 24,420<br />

013 Hillsborough River Basin 32,034 0 8,488 13,999<br />

0 54,5<strong>21</strong><br />

014 Northwest Hillsborough Basin 17,984 0 4,261<br />

0<br />

0 22,245<br />

015 Coastal Rivers Basin 16,614 0 6,781 7,193<br />

0 30,588<br />

016 Pinellas-Anclote River Basin 185,709 0 18,027 19,046<br />

0 222,782<br />

019 Withlacoochee River Basin 15,595 0 6,398 6,712<br />

0 28,705<br />

020 Peace River Basin 72,735 0 16,734 17,305<br />

0 <strong>10</strong>6,774<br />

0<strong>21</strong> Manasota Basin 72,491 0 14,<strong>10</strong>5 14,855<br />

0 <strong>10</strong>1,451<br />

District Budgeted - Outside Revenue<br />

Tampa - Water CHAMP (B131) 0 0 0 5,000<br />

0 5,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$612,442<br />

Critical Project Milestones Projected Amended Actual<br />

Program begins in Pinellas 6/<strong>10</strong>/02 6/<strong>10</strong>/02<br />

Program begins in Hillsborough 6/1/03 6/1/03<br />

Program begins in Citrus and Hernando 9/15/04 11/<strong>10</strong>/04 11/<strong>10</strong>/04<br />

Program begins in Manasota <strong>10</strong>/1/04 <strong>10</strong>/1/04<br />

Program begins in Peace River <strong>10</strong>/1/05 <strong>10</strong>/1/05<br />

Pilot continuing education program in Pinellas 9/1/06 8/1/08<br />

300th property signs up 6/29/07 6/29/07<br />

Education pilot program evaluation complete 1/31/08 4/1/<strong>10</strong><br />

Water PRO developed 5/15/08 5/15/08<br />

400th property signs up 6/26/08 6/26/08<br />

Districtwide water audit 12/31/08 <strong>10</strong>/31/08 <strong>10</strong>/31/08<br />

Pilot restaurant conservation kit in Hillsborough 3/16/09 7/31/09 7/28/09<br />

200th restaurant signs up 9/1/09 5/15/09<br />

Restaurant conservation kit evaluation complete 11/1/09<br />

300th restaurant signs up 12/31/09<br />

Status As Of: August 25, 2009<br />

Water CHAMP: (1) Currently, Water CHAMP has 459 participants, representing more than 49 percent of all the hotels<br />

and 68 percent of all available rooms in the District. (2) The "Sleep Well at a Water-Saving Hotel/Motel" directories have<br />

been updated and distributed to all five Florida welcome centers, the Tampa International Airport's Travelers AID office,<br />

Sarasota Convention and Visitors Bureau, Tampa Bay Beaches Chamber of Commerce in St. Pete Beach, and the<br />

Citrus County Convention and Visitors Bureau. District staff is also working with other local tourist centers to display and<br />

distribute the Water CHAMP hotel directories. (3) Basin updates are as follows: Pinellas-Anclote River Basin has<br />

approximately 322 properties; 136 are CHAMP properties. District staff cooperated with Progress Energy to complete a<br />

housekeeping manual for hotels that emphasizes conserving water and energy. The manual will be distributed during<br />

workshops in the Pinellas-Anclote, Coastal Rivers and Withlacoochee River basins. In partnership with Progress Energy,<br />

"Do Not Disturb, We are Conserving Our Energy" door hangers were purchased from Project Planet Corporation and are<br />

being distributed to hotels/motels within the Pinellas-Anclote River, Withlacoochee River and Coastal Rivers basins.<br />

Hillsborough River and Alafia River basins have approximately 186 properties; 129 are CHAMP properties. Coastal<br />

Rivers and Withlacoochee River basins have approximately 89 properties; 59 are CHAMP properties. Manasota Basin<br />

has approximately 186 properties; 77 are CHAMP properties. Peace River Basin has approximately 144 properties; 57<br />

are CHAMP properties. (4) The following city and county government cable channels are running commercials promoting<br />

0<strong>21</strong> - Manasota Basin 129


B131<br />

Hotel/Motel/Restaurant Water Conservation Program (Water<br />

CHAMP/PRO)<br />

Water CHAMP and Water PRO: the cities of Lakeland, St. Petersburg, Oldsmar and New Port Richey, and the counties<br />

of Polk, Pinellas and Manatee. Water PRO: Water PRO, an extension of the Water CHAMP program that promotes<br />

water conservation in restaurants, began in May 2008. The CHAMP coordinator promotes the program through the<br />

Florida Restaurant and Lodging Association, partnerships with utility companies, direct mail and site visits to association<br />

members and independent restaurants. In cooperation with the City of Tampa and Hillsborough County, District staff<br />

created a children's restaurant conservation kit to be distributed in Hillsborough County. Each kit includes a children's<br />

activity book, crayons and a child's tattoo. While Hillsborough County purchased the kits ($1 each) directly from the<br />

vendor, the City of Tampa is reimbursing the District $5,000 for 5,000 kits. Currently, there are 228 restaurants<br />

participating in Water PRO. ACTION TO DATE: On time.<br />

0<strong>21</strong> - Manasota Basin 130


B136<br />

Florida Automated Weather Network (FAWN) Data Dissemination<br />

and Education<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply, Water Quality<br />

Basin(s) General Fund (District), Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers,<br />

Pinellas-Anclote River, Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

University of Florida<br />

Project Manager COHEN, RON<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

The FAWN project started in 1997 and the District's involvement with the project started in 2003. This project collects<br />

and distributes weather and climatic data, and has an educational component to teach the public how to use the data<br />

to conserve water. Funding for the project was distributed over several years and is needed to continue data collection<br />

and dissemination. In FY2009 FAWN is planning additional weather schools, fact sheets and enhanced irrigation<br />

management tools. These elements will help conserve water and reduce fertilizer leaching.<br />

Benefits<br />

Increase the growers' knowledge and provide climatic data to help them reduce water use. The amount of water saved<br />

will be a function of the number of acres planted and their water use, which will change annually based on market and<br />

climatic conditions. Estimated savings are in excess of one billion gallons of water and $500,000 per hour. Therefore<br />

during a cold winter where growers could use cold protection five (5) to ten (<strong>10</strong>) nights, annual savings could be as<br />

much as ten billion gallons of water and $5 million to producers. Few winters require no cold protection, and it would be<br />

reasonable to assume this management tool would average saving five billion gallons of water and $2.5 million<br />

annually. The key to realizing these water use savings is educating the public through schools, written material, trade<br />

shows, etc. In addition to collecting the data, FAWN information is used for workshops and other public events to help<br />

teach the public the significance of weather and climatic data for water conservation and how to use the data. An<br />

in-depth weather school is held annually. FAWN has developed a youth training curriculum. In FY2008-2009 FAWN<br />

will enhance its urban program, develop more educational components and add new weather tools.<br />

Costs<br />

The FY2008 budget includes $<strong>10</strong>0,000 for the FAWN project. Half this funding ($50,000) will come from general<br />

revenue and the remaining amount will be divided evenly between the eight Basin Boards with each budgeting $6,250.<br />

Additional Information<br />

The Florida Automated Weather Network (FAWN) has been a successful, on-going, multi Agency (IFAS, FDAC,<br />

SFWMD, SJRWMD, and Industry) project with about a $500,000 annual budget. They are asking for continued<br />

funding in FY2008. The other cooperators have not yet determined their level of continued support for FAWN.<br />

FAWN's weather data has been used by local Emergency Management personal to supplement the District's and<br />

other sources' climatic data. The project was first funded by the Peace River Basin Board and later expanded to the<br />

Manasota Basin Board. This proposal is to expand the project into the Hillsborough River, Alafia and Withlacoochee<br />

Basin Boards. FAWN has recently received new commitments for additional funds from FDACS, SFWMD and<br />

SJRWMD. FAWN was created in 1997 with a legislative appropriation to the University of Florida, Institute of Food<br />

and Agricultural Sciences (UF/IFAS). These funds were used to create infrastructure and to establish 11 weather sites<br />

that were incorporated with a small UF/IFAS network of five sites in Central Florida. Over the next few years there is a<br />

plan to expand FAWN's network to 33 sites. In 2002 additional funding was obtained from the Florida Division of<br />

Emergency Management to complete the system and in 2003 the Peace River Basin Board recognized the<br />

significance of FAWN and provided a $5,000 grant. A year later the Peace River and the Manasota Basin Boards<br />

entered into a three-year agreement to provide FAWN with $15,000 per year. These funds were to help continue<br />

FAWN's data collection efforts and to expand the program's educational components. That same year FDACS,<br />

SJRWMD and SFWMD approved funds for FAWN. Currently there are <strong>10</strong> FAWN sites within the District located at:<br />

Arcadia, Balm, Bradenton, Bronson, Brooksville, Dover, Frostproof, Lake Alfred, Ona and Sebring. In addition there<br />

are several sites surrounding the District that provide useful information to the citizens of the District. Current and<br />

historical climatic data from these sites, and FAWN irrigation tools, can be accessed on the web at:<br />

http://fawn.ifas.ufl.edu/. The FAWN program was developed to provide real time weather information to help Florida<br />

citizens make informed weather related decisions. This information is used to help conserve water and protect<br />

Florida's natural systems. Irrigators use FAWN data to help determine when and how much to water. Also, FAWN<br />

data is used to assist individuals to determine when to turn off irrigation systems used for cold protection. Urban and<br />

agricultural chemical applicators use FAWN to help make decisions relative to the application of chemicals and<br />

fertilizer. FAWN has been expanded to provide on-line water/irrigation management tools that require weather inputs.<br />

Examples of these tools include insect and disease control, cold protection, irrigation, nutrient management and many<br />

more. The District's Agricultural Advisory Committee has expressed their support for the FAWN program. In addition<br />

0<strong>21</strong> - Manasota Basin 131


B136<br />

Florida Automated Weather Network (FAWN) Data Dissemination<br />

and Education<br />

to the current tools, FAWN is working with University of Florida scientists to develop others. Some of the studies<br />

already funded by the District will be used to enhance the FAWN program. For example, the Wet Bulb Irrigation Cut<br />

Off management tool has been able to allow strawberry, citrus, fern, vegetable, ornamental growers and home owners<br />

determine when it is safe to shut off irrigation systems used for cold protection.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 137,500 0 50,000 <strong>10</strong>0,000<br />

0 287,500<br />

011 Alafia River Basin 17,187 0 6,250<br />

0<br />

0 23,437<br />

013 Hillsborough River Basin 17,188 0 6,250<br />

0<br />

0 23,438<br />

014 Northwest Hillsborough Basin 17,187 0 6,250<br />

0<br />

0 23,437<br />

015 Coastal Rivers Basin 17,188 0 6,250<br />

0<br />

0 23,438<br />

016 Pinellas-Anclote River Basin 17,187 0 6,250<br />

0<br />

0 23,437<br />

019 Withlacoochee River Basin 17,188 0 6,250<br />

0<br />

0 23,438<br />

020 Peace River Basin 32,187 0 6,250<br />

0<br />

0 38,437<br />

0<strong>21</strong> Manasota Basin 32,188 0 6,250<br />

0<br />

0 38,438<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$505,000<br />

Critical Project Milestones Projected Amended Actual<br />

FY2007 Governing Board Notification 1/2/07 1/1/07<br />

Basin Board Notification 1/3/07 1/3/07<br />

FY2006 Project Ends 3/1/07 3/1/07<br />

FY2007 Data Collection 12/1/07 12/1/07<br />

FY2007 Completion Report 2/27/08 3/1/08<br />

FY2007 Project Ends 2/28/08 7/31/08 7/31/08<br />

FY2008 Contract to Cooperator 3/1/08 2/26/08<br />

FY2007 No Cost Time Extension 3/31/08 3/31/08<br />

FY2009 Contract to Cooperator <strong>10</strong>/1/08 <strong>10</strong>/1/08<br />

FY2008 Data Collection 12/31/08 12/31/08<br />

FY2008 Project Ends 2/28/09 8/31/09<br />

FY2009 Data Collection Ends 12/31/09<br />

FY2009 Completion Report 2/1/<strong>10</strong><br />

Status As Of: August 27, 2009<br />

7/1/2008 - Reviewed task 11. New years data collection has started. 9/1/2008 - Data collection continuing as planned.<br />

11/1/2008 - Reviewed irrigation and Timer fact sheets. 12/<strong>10</strong>/08 - Processed payment. 12/17/2008 - Waiting for new<br />

agreement to be executed. 3/16/2009 - Added National Weather Service forecasting tool. 4/20/2009 - Workshop in<br />

Apopka and annual meeting. 6/<strong>10</strong>/2009 - Data collection, project continuing as planned. 9/1/2009 - Reviewed task<br />

completion report and processed payments. Data collection project continuing as planned.<br />

0<strong>21</strong> - Manasota Basin 132


B182<br />

USGS Minimum Flows and Levels Data Collection - Myakka and<br />

Braden Rivers and Cow Pen Slough<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply, Natural Systems<br />

Basin(s) General Fund (District), Alafia River, Hillsborough River, Coastal Rivers, Pinellas-Anclote River,<br />

Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

United States Geological Survey<br />

Project Manager KELLY, MARTY<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This initiative is to establish and maintain the District's gaging network needed to establish/re-evaluate minimum flows<br />

and levels (MFLs) on priority waterbodies throughout the District. Beginning in FY2004, data collection associated with<br />

MFLs was funded under a separate agreement with the U.S. Geological Survey (USGS). Until this time, funding for<br />

these sites was included in a single activity with all other services provided by USGS (B063). For efficiency of project<br />

administration, budget tracking, and because MFLs sites are funded by the respective basin boards, these sites are<br />

now the subject of a separate agreement (B182). MFLs gage sites are viewed as "short term," and it is envisioned that<br />

most sites will be maintained for approximately three to five years. While the USGS (with cooperative funding from the<br />

District in recent years) has long maintained a stream gaging network in the state, coverage is not adequate for<br />

establishing the most defensible MFLs. It is envisioned that short-term gage sites will routinely be established along<br />

rivers to estimate flow at various distances along the river's length. Coupled with information from long-term gage<br />

sites, a few years' records at these short-term gages can be used to establish more accurate flows in the vicinity of<br />

biological monitoring sites used to evaluate and establish MFLs. Based on empirical relationships to be established<br />

with long-term gages and using hydraulic modeling results, flow records can be re-created at short-term sites using<br />

flow records at long-term sites. In addition, while the flow regimes of many of the District's rivers have been historically<br />

monitored along their freshwater reaches, flow data for rivers where they enter their respective estuarine areas is often<br />

lacking or has not adequately been monitored. The influence of tide and the braided nature of some of the rivers in<br />

their estuarine reaches make discharge measurements difficult and costly. In addition to stage and flow data,<br />

monitoring in tidal areas involves increased instrumentation to allow for salinity and sometimes dissolved oxygen<br />

measurements to be made. Flows can greatly affect the distribution of salinity and low dissolved oxygen zones in<br />

estuarine river reaches.<br />

Benefits<br />

Funding of this initiative allows for the development and establishment of MFLs according to the Board approved<br />

priority list as mandated by state statute.<br />

Costs<br />

Funding is to maintain and in some cases to establish flow gaging sites which provide the fundamental flow data<br />

necessary for establishing MFLs. Total requested funding in FY2009 is for $557,200. The cost split is 50<br />

percent Governing Board ($278,600) with the remaining 50 percent from the Basin Boards apportioned according to<br />

gage sites within their respective Basin. The increase in FY2009 funding reflects an annual adjustment to pricing by<br />

the USGS and the addition of four new gage sites located on: 1) Brooker Creek (PA Basin), 2) North Prong Alafia<br />

(Alafia Basin Board), 3) South Prong Alafia River (Alafia River Basin Board), and 4) Hillsborough River at Fowler<br />

(Hillsborough River Basin Board). Monitoring in the Manasota Basin is projected to cost $169,800 in FY2009 with the<br />

Basin's 50 percent share equal to $84,900 for continued monitoring at all pre-existing sites. The FY20<strong>10</strong> budget is<br />

projected to be $533,900 and will reflect the Governing Board's decision to completely fund MFL related projects<br />

without matching Basin Board funds.<br />

0<strong>21</strong> - Manasota Basin 133


B182<br />

USGS Minimum Flows and Levels Data Collection - Myakka and<br />

Braden Rivers and Cow Pen Slough<br />

Prior Cumulative FY 2009 FY20<strong>10</strong><br />

Funding Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

3,264,664 13,400 292,679 548,408<br />

0<strong>10</strong> General Fund (Districtwide) 0 4,119,151<br />

011 Alafia River Basin 76,466 0 19,<strong>10</strong>0<br />

0<br />

0 95,566<br />

013 Hillsborough River Basin 247,450 0 51,150<br />

0<br />

0 298,600<br />

015 Coastal Rivers Basin 274,563 0 88,950<br />

0<br />

0 363,513<br />

016 Pinellas-Anclote River Basin 72,166 0 16,300<br />

0<br />

0 88,466<br />

019 Withlacoochee River Basin 59,795 0 18,200<br />

0<br />

0 77,995<br />

020 Peace River Basin 31,246 0 0<br />

0<br />

0 31,246<br />

0<strong>21</strong> Manasota Basin 400,503 0 84,900<br />

0<br />

0 485,403<br />

Status As Of: September 14, 2009<br />

Total:<br />

Monitoring is ongoing at all established sites. The FY20<strong>10</strong> budget is projected to be $533,900 and will reflect the<br />

Governing Board's decision to completely fund MFL related projects without matching Basin Board funds.<br />

0<strong>21</strong> - Manasota Basin 134<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$5,559,940


B206<br />

Maintenance of Watershed Parameters & Models<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Flood Protection, Water Quality, Natural Systems<br />

Basin(s) General Fund (District), Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers,<br />

Pinellas-Anclote River, Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager MCCLUNG, GORDON<br />

Task Manager(s)<br />

Status Ongoing<br />

Citrus County, Hernando County, Pasco County, Polk County<br />

ALTMAN, GENE, LETASI, SCOTT, TURNER, DAWN, MAYER, RICHARD, WALKER, LARRY<br />

Description<br />

This was a basin initiative to fund the Maintenance of Watershed Parameters and Models element of the District's<br />

Watershed Management Program (WMP) for FY2006 to FY2009. For FY20<strong>10</strong> the unit code is being changed from<br />

B206 to a B300 series, 300 general, and B301 to B316 to better account for the maintenance by county.<br />

Benefits<br />

A WMP provides a method to evaluate the capacity of a watershed to protect, enhance, and restore water quality and<br />

natural systems, while achieving flood protection. The information developed assists local governments with their land<br />

management responsibilities by establishing a level of service and developing Best Management Practices (BMPs) to<br />

address level of service deficiencies. In addition, the information provides the District with the best available<br />

information to evaluate adverse impacts and mitigation of floodplain impacts for proposed ERPs. The continuous<br />

maintenance of watershed parameters in the GIS database as ERP permits are approved and new information is<br />

provided to the District through either aerial topographic mapping and its public review and comment period will<br />

provide the most up to date information about the watershed. If a watershed model has not been developed, the<br />

maintenance of parameters in the GIS processes the information in a format that will save time and funding when the<br />

watershed is modeled.<br />

Costs<br />

In FY2005, the Governing Board contributed $80,000 and each Basin Board contributed an additional $<strong>10</strong>,000 each to<br />

support the development of the District's maintenance process. The maintenance budget for FY2006 is $848,000, of<br />

which the District's share is $808,000. Hernando and Polk Counties contributed $20,000 each in FY2006 for<br />

maintenance within their jurisdiction. The maintenance budget for FY2007 is $1,094,200, the District's share is<br />

$924,200. Hernando County ($25,000), Pasco County ($125,000) and Polk County ($20,000) are contributing the<br />

indicated funding in FY2007 for maintenance. An additional $75,000 in FY2007 funds budgeted by the Coastal Rivers<br />

Basin Board for Spring Hill Lakes Management Plan (L775) has been transferred to this project after the Basin Board<br />

approved Hernando County's request to use these funds to perform maintenance based on percolation information<br />

collected from ERPs and Hernando County. The maintenance budget for FY2008 was $2.167 million, of which the<br />

District's share is approximately $1.597 million. For FY2009 Citrus, Hernando, Marion, and Pasco counties are<br />

contributing funds. For FY2009, funding distribution is as follows: Governing Board $1,797,250 (includes Green<br />

Swamp $57,284) Alafia River $78,203; Hillsborough River $366,486; Northwest Hillsborough $13,050; Coastal Rivers<br />

$431,638; Pinellas-Anclote $86,<strong>21</strong>1; Withlacoochee River $181,495; Peace River $182,333; Manasota $154,450. The<br />

following revenue will be received: Citrus County $90,000; Marion County $31,000; Pasco County $500,000; Polk<br />

County $20,000. The revenue will be distributed as follows: Green Swamp $3,684; Alafia River $3,553; Hillsborough<br />

River $<strong>21</strong>5,980; Coastal Rivers $271,460; Pinellas-Anclote $40,950; Withlacoochee River $92,940; Peace River<br />

$12,433.The budget is based on the projected number of approved ERP permits and the average development area<br />

within each Basin. Local government funds are equally matched by Governing Board and Basin Board funds. The<br />

Governing Board is also providing funds specifically to address public meetings and unforeseen issues with projecting<br />

the floodplains to be used in the FEMA mapping process.<br />

Additional Information<br />

A WMP includes five major elements: 1) Topographic Information, 2) Watershed Evaluation, 3) Watershed<br />

Management Plan, 4) Implementation of Best Management Practices, and 5) Maintenance of Watershed Parameters<br />

and Models. Implementing elements of the WMP with local governments is one of the Comprehensive Watershed<br />

Management (CWM) initiative strategies and one of the District's Strategic Priorities. After the Topographic<br />

Information, Watershed Evaluation and Management Plan elements are completed, the watershed parameters and<br />

models require continuous maintenance to simulate the watershed's characteristics as the land form changes. The<br />

watershed's parameters change with the rapid growth being experienced in the District. If continued maintenance of<br />

the models is not performed, the watershed parameters and model will no longer represent the system. This limits<br />

their value in the areas of ERP and flood protection programs. For FY2005, the District managed this project by<br />

issuing work orders for the tasks needed to develop the maintenance process, and then by monitoring the efforts.<br />

FY2006 funds will be used to begin implementing the maintenance process throughout the District in watersheds with<br />

ongoing or completed Watershed Management Plans. For FY2007 this effort will be continued District wide for all<br />

0<strong>21</strong> - Manasota Basin 135


B206<br />

Maintenance of Watershed Parameters & Models<br />

watershed where ERPs are approved. Both Hernando County and Polk County contributed funds in FY2006 and<br />

FY2007 for maintenance in their jurisdictions. In addition, Pasco County contributed funds in FY2007 for maintenance<br />

within their jurisdiction. A cooperative funding revenue agreement will be developed with each community contributing<br />

funds towards maintenance. The District will manage the project and enter into purchase orders and agreements to<br />

accomplish project tasks. Future funding will be required each fiscal year to continue maintenance of watershed<br />

parameters and models. In the future those local governments with the technical abilities to perform the maintenance<br />

activities will be encouraged to manage this effort. The District will provide funding assistance to communities that can<br />

and those that cannot provide matching funds. Matching funds will be requested from the Federal Emergency<br />

Management Agency (FEMA) for this basin initiative. Failure to provide ongoing maintenance will diminish the return<br />

on the investment the District has made in their respective Watershed Management Plans.<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 2,551,505 977,172 1,816,661 9,3<strong>10</strong> 947,900 6,302,548<br />

011 Alafia River Basin 143,962 0 76,020<br />

0 89,050 309,032<br />

013 Hillsborough River Basin 315,362 0 156,640<br />

0 6,450 478,452<br />

014 Northwest Hillsborough Basin 76,570 0 13,050<br />

0 15,150 <strong>10</strong>4,770<br />

015 Coastal Rivers Basin 400,933 75,000 178,728<br />

0 611,400 1,266,061<br />

016 Pinellas-Anclote River Basin 156,861 0 48,990<br />

0 163,800 369,651<br />

019 Withlacoochee River Basin 303,723 0 <strong>10</strong>5,913<br />

0 1,415,000 1,824,636<br />

020 Peace River Basin 265,199 0 173,350<br />

0 137,250 575,799<br />

0<strong>21</strong> Manasota Basin 346,020 0 161,892<br />

0 <strong>21</strong>4,400 722,312<br />

District Budgeted - Outside Revenue<br />

Citrus Co - Maint of WS Para & Models<br />

(B302)<br />

Hernando Co - Maint of W/S Para &<br />

Models (B305)<br />

Marion Co - Maint of WS Para & Models<br />

(B311)<br />

Pasco Co - Maint of W/S Para & Models<br />

(B312)<br />

Polk Co - Maint of W/S Para & Models<br />

(B314)<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

0 0 90,000<br />

0<br />

345,000 11,1<strong>10</strong> 0<br />

0<br />

0 0 31,000<br />

0<br />

375,000 0 500,000<br />

0<br />

60,000 0 20,000<br />

0<br />

0<br />

0<br />

0<br />

1,222,400<br />

Total:<br />

Future<br />

Funding<br />

160,000<br />

Total<br />

Funding<br />

90,000<br />

356,1<strong>10</strong><br />

31,000<br />

2,097,400<br />

240,000<br />

$14,767,771<br />

Critical Project Milestones Projected Amended Actual<br />

1. Critical Project Milestones<br />

Recognition of District, Basin Board, & Governing Board on reports 5/31/05 12/18/08<br />

2. FY2005 Consultant Services Agreement (URS)<br />

Draft Agreement to Management Services 3/14/05 4/<strong>21</strong>/05<br />

Draft Agreement returned from Management Services 4/4/05 5/23/05<br />

Contract Execution 5/31/05 6/6/05<br />

Notice to Proceed 5/31/05 6/6/05<br />

Maintenance of Watershed Parameters and Models Planning 7/<strong>21</strong>/06 4/30/07 3/22/06<br />

Contract Termination 7/<strong>21</strong>/06 5/31/07 5/31/07<br />

3. FY2006 Consultant Services Agreements<br />

Draft Agreement to Management Services 6/30/06 8/4/06<br />

Draft Agreements returned from Management Services 7/17/06 8/24/06<br />

0<strong>21</strong> - Manasota Basin 136


B206<br />

Maintenance of Watershed Parameters & Models<br />

Ten (<strong>10</strong>) Consultant Agreements Execution 9/30/06 11/15/06<br />

First Amendment to Management Services 4/16/07 4/18/07<br />

First Amendment Execution 6/19/07 7/30/07<br />

Contract Termination <strong>10</strong>/31/08 5/31/11<br />

4. FY2007 Consultant Services Agreements<br />

Draft Agreements to Management Services 3/12/07 4/17/07<br />

Draft Agreements returned from Management Services 5/22/07 5/15/07<br />

Consultant Agreements Execution 6/19/07 8/1/07<br />

Notice to Proceed to Consultants 7/1/07 8/<strong>10</strong>/07<br />

Contract Termination 5/31/11<br />

5. Hernando County Maintenance<br />

Draft Agreement to Management Services 3/31/05 3/25/05<br />

Draft Agreement returned from Management Services 4/15/05 4/20/05<br />

Contract sent to County for signature 8/20/06 11/9/06<br />

County Contract Execution 12/<strong>10</strong>/06 12/12/07<br />

County Contract Expiration <strong>10</strong>/31/<strong>10</strong><br />

6. Polk County Maintenance<br />

Draft Agreement to Management Services 8/9/05 8/9/05<br />

Draft Agreement returned from Management Services 8/23/05 8/23/05<br />

Contract sent to County for signature 8/25/05 8/25/05<br />

Contract Execution <strong>10</strong>/31/05 12/2/05<br />

Draft First Amendment to Management Services 7/24/07<br />

Draft First Amendment returned from Management Services 8/24/07<br />

First Amendment sent to County for signature 9/4/07<br />

First Amendment Execution <strong>10</strong>/1/07<br />

Contract Termination 6/30/09<br />

7. Pasco County Maintenance<br />

Draft Agreement to Management Services 4/3/07 4/3/07<br />

Draft Agreement returned from Management Services 4/23/07 4/23/07<br />

Contract sent to County for signature 5/4/07 5/4/07<br />

Contract Execution 7/28/07 7/28/07<br />

Contract Termination 12/31/09<br />

Status As Of: July 15, 2008<br />

FY2005: The consultant services agreement with URS Corporation Southern was executed on June 6, 2005. Notice to<br />

proceed was issued on the same date. Work Order #1 has been developed to investigate the current data (type, quality,<br />

quantity, etc.) entering the District through ERP and to develop a proposed work flow to maintain the watershed<br />

parameters and models as permits are approved. A kick-off meeting with the consultant team and District staff was held<br />

on June 14th to introduce and plan the project with all departments that will be involved, including: Technical Services,<br />

Legal, and Resource Management. The final report has been accepted. Remaining funds are being used to develop<br />

presentation and documentation of an example project to be distributed to cooperators, FEMA, and other District WMP<br />

consultants who will be performing maintenance beginning with FY2006 funds. Work Order #2 has been executed to<br />

document the maintenance process step-by-step. The consultant has completed the example maintenance project along<br />

with accompanying documentation and presentation. This contract has been terminated and the final payment<br />

processed. FY2006 : Staff has developed consultant services agreements with ten (<strong>10</strong>) WMP consultants to begin<br />

maintenance of watershed parameters and models. Maintenance efforts will first be directed at completed and ongoing<br />

Watershed Management Plans. The District's consultants who originally prepared the Watershed Management Plans will<br />

be typically tasked with maintenance of their respective watershed(s). Work orders will be issued as project(s) with<br />

approved ERP(s) are identified or new site conditions data become available. Basin Board funding will only be used for<br />

maintenance activities within the Basin. Consulting services agreements were executed by November 15, 2006, with all<br />

<strong>10</strong> consultants including: Ardaman; Ayres & Associates; BCI; Dyer Riddle Mills & Precourt; Jones Edmunds; Keith<br />

Parsons; Post Buckley Schuh & Jernigan; TBE Group; and URS. Amendments have been executed for these <strong>10</strong><br />

agreements to increase the total compensation for approved FY2007 and anticipated FY2008-2011 funding, extend the<br />

contract termination date, and revise the scope of work to be consistent with current WMP agreement language.<br />

FY2007: An additional nine (9) agreements have been executed with the remaining consultants approved to perform<br />

elements of the District's WMP. All 19 consultant services agreements will support District-wide maintenance. Each<br />

consultant has been assigned specific watersheds for maintenance. Project managers within the Engineering Sections<br />

will be responsible for developing and executing work orders with each of these consultants. Guidelines and<br />

0<strong>21</strong> - Manasota Basin 137


B206<br />

Maintenance of Watershed Parameters & Models<br />

specifications are being developed for specific maintenance activities. FY2008: Recent maintenance efforts have<br />

included conducting public information meetings in Pasco and Hernando County and maintenance evaluations for<br />

several of the District's watersheds. Hernando Co. Maintenance: Previously performed under Unit Number B705. Fiscal<br />

year budgeted funds are as follows; FY2005 = $11,1<strong>10</strong>, FY2006 = $40,000, FY2007 = $50,000, FY2008 = $600,000,<br />

proposed FY2009 = $400,000; with 50% revenue from the County for continued maintenance of the County's WMPs.<br />

Public review and comment meetings, 3 total, concluded on 08/06/2007. The agreement transmitted to the County on<br />

11/09/2006 for signature was executed on 12/12/2007. Work orders and data sets for countywide ERP evaluation,<br />

inclusion of infiltration as an outfall, and inclusion of LiDAR were transmitted to the consultants to develop cost. E-mail<br />

authorizations providing an upset amount were provided to the firms based on 02/22/2008 cost estimates. Staff is<br />

developing and executing work orders. Most of the hydrologic and hydraulic information has been revised in GIS and the<br />

models. Cost estimates provided on 02/22/2008. Thirty-one watersheds are being maintained. The floodplain results<br />

have been submitted to the District for review for the Hernando County Watersheds. Comments have been provided to<br />

the consultants and are being addressed. A schedule is being developed for the peer review meetings. The Pasco<br />

watersheds are being turned into the District for reviewed. The Sarasota watersheds are on hold until the LiDAR data is<br />

delivered. Polk Co. Maintenance: Previously performed under Project B723. The Cooperative Funding Agreement with<br />

Polk County was executed on December 2, 2005. A total of $80,000 has been encumbered ($40,000 in FY2006, and<br />

$40,000 in FY2007) for continued maintenance of Polk County's WMPs. Work Orders have been issued for maintenance<br />

of the Gator Creek and Itchepackesassa Creek watershed parameters and models. Pasco Co. Maintenance: The<br />

cooperative funding agreement has been executed.<br />

0<strong>21</strong> - Manasota Basin 138


B<strong>21</strong>9<br />

Land Use and Cover Mapping<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality, Natural Systems<br />

Basin(s) General Fund (District), Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers,<br />

Pinellas-Anclote River, Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

N/A<br />

Project Manager DAVIS, APRIL<br />

Task Manager(s)<br />

DICKS, STEVE<br />

Status Ongoing<br />

Description<br />

Beginning in 1989, the District initiated a comprehensive Land Use and Cover (LULC) mapping program. This program<br />

results in a Geographic Information System (GIS) data set that identifies over 50 categories of land use and cover (for<br />

example: single family residential, pine forest, wetland forest, row crops, citrus). The mapping categories adhere to the<br />

Florida Department of Transportations Florida Land Use and Cover Classification System (FLUCCS) and are<br />

compatible with similar efforts at the other water management districts. Until 2005 the program was on a five year<br />

update cycle (1989, 1994, 1999, 2004). The rapid development within the District has made the five year update cycle<br />

inadequate. Beginning with the 2005 orthophotos, the update is done on an annual basis.<br />

Benefits<br />

The LULC data collected under this project are widely used to support the District's planning, modeling and land<br />

acquisition programs. These data are also among the most commonly requested by external customers. Accurate<br />

tracking of acreages and locations of key agricultural land use and cover is a key component of the Southern Water<br />

Use Caution Area (SWUCA) Recovery strategy. This information, when coupled with data collected through the<br />

District's Water Use Permitting (WUP) process, provide the most accurate means for tracking these significant water<br />

uses within the SWUCA. These data also provide an important source of information for monitoring permit compliance.<br />

A significant benefit of this program is a consistent, and therefore defensible, estimation of agricultural trends.<br />

Costs<br />

This project was initially funded in FY1989 with updates in FY1994, FY1999, and FY2004. Since FY2005 this project<br />

has been included in the Governing and Basin Board's budgets. The Governing Board contributes fifty percent of the<br />

project cost and the remainder is distributed using a formula that accounts for the relative areas of each basin. This is<br />

an annual funding request to support the continued update of the database. The District does not currently have<br />

sufficient in-house staff resources to support this effort and the funding is used for staff augmentation, consulting<br />

services and fieldwork associated with the project. The budget for FY2009 Land Use Mapping is $240,000 and the<br />

proposed budget for FY20<strong>10</strong> is also $240,000.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 571,<strong>10</strong>1 (123,146) 162,445 254,936 1,604,624 2,469,960<br />

011 Alafia River Basin 37,986 0 9,9<strong>10</strong><br />

0 <strong>10</strong>7,333 155,229<br />

013 Hillsborough River Basin 52,234 0 <strong>10</strong>,631<br />

0 116,463 179,328<br />

014 Northwest Hillsborough Basin 22,993 0 3,374<br />

0 24,701 51,068<br />

015 Coastal Rivers Basin 46,533 0 11,465<br />

0 127,002 185,000<br />

016 Pinellas-Anclote River Basin 56,925 0 6,006<br />

0 57,976 120,907<br />

019 Withlacoochee River Basin 78,772 0 26,246<br />

0 313,875 418,893<br />

020 Peace River Basin 124,307 0 39,032<br />

0 475,627 638,966<br />

0<strong>21</strong> Manasota Basin 70,311 0 17,778<br />

0 206,823 294,912<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$4,514,263<br />

Critical Project Milestones Projected Amended Actual<br />

0<strong>21</strong> - Manasota Basin 139


B<strong>21</strong>9<br />

Land Use and Cover Mapping<br />

2. FY2005 Annual Update<br />

Complete Update 4/30/07 6/30/07 7/6/07<br />

3. FY2006 Annual Update<br />

Begin Update 5/1/07 7/1/07 7/9/07<br />

Complete Update 9/30/07 9/30/07 9/30/07<br />

4. 1995/1999 Northern District Backdating Update<br />

Begin Update <strong>10</strong>/1/07 <strong>10</strong>/15/07 <strong>10</strong>/15/07<br />

Complete Update 9/30/08 3/7/08 3/7/08<br />

4. FY2007 Annual Update<br />

Begin Update <strong>10</strong>/1/07 3/<strong>10</strong>/08 3/17/08<br />

Complete Update 5/30/08 <strong>10</strong>/15/08 <strong>10</strong>/31/08<br />

4. FY2008 Annual Update<br />

Begin Update <strong>10</strong>/16/08 3/2/09 3/27/08<br />

Complete Update 7/31/09 12/31/09<br />

Status As Of: September 25, 2009<br />

The 2007 Land Use and Cover update is complete. The data have been made available to all District staff. The 2008<br />

citrus land use layer is also complete, and has been made available to all District staff. Staff is currently in the process of<br />

updating the 2008 Land Use and Cover dataset and approximately 20% of the District is complete.<br />

0<strong>21</strong> - Manasota Basin 140


B228<br />

Evaluation and Demonstration of Soil Moisture Based On-demand<br />

Irrigation Controllers for Vegetable P<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply, Water Quality<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

University of Florida<br />

Project Manager COHEN, RON<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

Agricultural water use is the largest single permitted category of water use in Florida. As population pressure continues<br />

to grow and water availability becomes more limited, agricultural irrigation water users will be forced to become more<br />

efficient. This problem is exacerbated in areas such as the Southern Water Use Caution Area where water demand<br />

continues to increase where supply is limited. One potential method to increase irrigation water availability is to<br />

improve irrigation scheduling. Knowing when and how much to irrigate is the key to irrigation scheduling and water<br />

conservation. Soil moisture sensors can play an important role in irrigation scheduling. This four budget year project<br />

will identify and test a commercially available on-demand soil moisture based control system in a vegetable production<br />

system.<br />

Benefits<br />

Water use information from this project will be used by growers to save water and reduce pollutant loading. The<br />

amount of water saved will be a function of the number of acres planted and their water use, which will change<br />

annually based on market and climatic conditions. Assuming that results from this project will help reduce, at a<br />

minimum, 5% of the permitted water, the savings would be about 17 Mgd of the permitted amount. Using the most<br />

recent published water use estimates and assuming a <strong>10</strong>% savings, this project could reduce water agricultural water<br />

use in the Basin by about <strong>10</strong> Mgd.<br />

Costs<br />

This project will cost $142,900 and will be budgeted over four fiscal years. The Manasota Basin Board will budget<br />

$35,725 in FY2006, FY2007, FY2008 and FY2009.<br />

Additional Information<br />

The project sites will be representative of a typical crop grown in the District, such as green bell pepper or tomato. The<br />

production system will consist of raised beds, drip irrigation and plastic mulch according to typical practices in the<br />

region. Horticultural guidelines published by the Institute of Food and Agricultural Sciences (IFAS) at the University of<br />

Florida will be followed. Results from the project will help the growers reduce water use and potential runoff with<br />

possible water quality problems. The soil moisture sensor control system will be configured as an interrupt to a timer<br />

that is set to irrigate the vegetable production system in 4-5 irrigation windows per day. The irrigation timer will be set<br />

to provide the maximum crop water requirement. The soil moisture sensor will be set at or slightly above field capacity<br />

for the field soil such that under low water use conditions (e.g. immediately after transplanting) the soil moisture<br />

sensor will bypass scheduled irrigation events, thus conserving water. The amount of water saved will be documented<br />

and presented to growers as another method for them to conserve water. Although soil moisture based control has<br />

been investigated in the past, the systems tested required either too much maintenance (e.g. tensiometers) or were<br />

too expensive to be practical for farmers. The technology being tested in this project will consist of commercially<br />

available controllers that have been marketed for irrigation control but have not been tested under Florida conditions<br />

for vegetable crops. It is anticipated that results from this project will help expedite the growers acceptance of this<br />

water conserving technology. The project's statistical design will be a randomized complete block design with four<br />

replicates. Treatments will consist of three soil moisture sensor control treatments with irrigation thresholds 2-3%<br />

volumetric water content (VWC) below field capacity, at field capacity, and 2-3% above field capacity. One timer based<br />

treatment will be established to represent typical farmer irrigation practices where irrigation is scheduled 1-2 times<br />

each day. The field trial will be conducted for the first two years. Based on field trial results, in year three a<br />

demonstration trial will be conducted in a vegetable field within the District using one soil moisture sensor control<br />

treatment (i.e. one moisture threshold).<br />

0<strong>21</strong> - Manasota Basin 141


B228<br />

Evaluation and Demonstration of Soil Moisture Based On-demand<br />

Irrigation Controllers for Vegetable P<br />

Prior Cumulative FY 2009 FY20<strong>10</strong><br />

Funding Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

<strong>10</strong>7,175 0 35,725<br />

0<br />

0<strong>21</strong> Manasota Basin 0 142,900<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$142,900<br />

Critical Project Milestones Projected Amended Actual<br />

Agreement to Contracts 8/1/05 8/1/05<br />

Agreement to Cooperator 9/1/05 9/1/05<br />

District Executes Agreement <strong>10</strong>/1/05 <strong>10</strong>/1/05<br />

Notice to Proceed 11/1/05 11/1/05<br />

Basin Board Notification 12/1/05 12/1/05<br />

Governing Board Notification 12/1/05 12/1/05<br />

Year 1. Data Collection 12/1/06 12/31/06<br />

Year 2. Data Collection 12/1/07 12/31/07<br />

Year 3. Data Collection 12/1/08<br />

Completion Report 12/1/09<br />

Project Ends 3/1/<strong>10</strong><br />

Status As Of: August 27, 2009<br />

9/15/2005 - Developing final scope of work. 12/30/2005 - Mailed Agreement to Cooperator. 1/11/06 - Cooperator<br />

reviewing agreement. 2/22/06 - Mailed notice to proceed. 3/2/2006 - Mobilizing equipment. 4/17/2006 - Instrumenting<br />

site. 6/5/2006 - reviewed task 1 and 2. Normal research issues (calibrating controls) project continuing as planned.<br />

7/18/06 - Process payment. 8/15/2006 - Dormant for summer. <strong>10</strong>/12/2006 - Data collection continuing as planned.<br />

12/4/2006 - Dormant for winter. 2/28/2007 - Planted crop data collection continuing as planned. 5/1/2007 - Data<br />

collection continuing as planned. 67/26/2007 - Data collection continuing as planned. 8/31/2007 - Looking for cooperator<br />

in Manasota Basin. The extension Agent has retired and there are problems finding a cooperator. 1/2/2008 - Continuing<br />

to look for cooperator. Might have found site, but could have problems with irrigation system. 2/29/2008 - May have found<br />

cooperator, working out details. 5/1/2008 - Working with cooperator in Manasota watershed. 7/1/2008 - Field testing<br />

equipment. 9/1/2007 - Data collection on commerical growers site, continuing as planned 11/1/2008 - 9/1/2007 - Data<br />

collection on commerical growers site, continuing as planned. 12/6/2008 - Palmetto growers event. 3/6/2009 - waiting for<br />

report 5/18/2009 - waiting for report 6/<strong>10</strong>/2009 - waiting for report 9/1/2009 - Statring data collection, project continuing<br />

as planned.<br />

0<strong>21</strong> - Manasota Basin 142


B229<br />

Field Evaluation of Bahiadwarf, For Water Use Efficiency, Turf<br />

Quality, Mowing Requirement and Persi<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply, Water Quality<br />

Basin(s) Hillsborough River, Peace River, Manasota<br />

Cooperator(s)<br />

University of Florida<br />

Project Manager COHEN, RON<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

Lawn and landscape is one of the largest permitted and actual uses of water in the District. Most of this water is used<br />

for turf grass irrigation. It is estimated that about 50% of per capita use is for exterior irrigation. As growth in the District<br />

continues the demand for lawn irrigation will too. In addition, sod production and the associated water use will also<br />

increase. This multi agency year research project will investigate a potentially viable drought tolerant alternative to<br />

current popular grass varieties.<br />

Benefits<br />

Results from this project can be used to reduce and conserve urban turf irrigation, agricultural pasture and sod<br />

production water use. Reduced irrigation will reduce the runoff potential and water quality impacts. The District will use<br />

results from this project in its conservation, planning and regulation programs.<br />

Costs<br />

This multi-agency, 3-year project will cost $317,500. Part of the project cost ($160,000 - $53,333 annually) will come<br />

from a Consortium for Plant Biotechnology Research (CPBR - http://www.cpbr.org) grant. The remaining funds will be<br />

divided evenly between the Hillsborough River, Manasota and Peace River Basin Boards. Each Basin Board will<br />

budget $13,125 in FY2006, FY2007, FY2008 and FY2009.<br />

Additional Information<br />

Part of the project's funding will come from the Consortium for Plant Biotechnology Research (CPBR -<br />

http://www.cpbr.org). Overall project costs have been reduced because of the ability to leverage previous CPBR and<br />

USDA grants that funded the initial research. Bahiagrass (Paspalum notatum Flugge) is a low input, drought tolerant<br />

and disease resistant warm season turfgrass used for residential lawns, pastures and along highways in the<br />

Southeastern US. However turf quality of currently available Bahiagrass cultivars is poor, due to prolific seedhead<br />

production, open growth habit and light green color. Recent laboratory research has developed a generation of<br />

transgenic Bahiagrass (Bahiadwarf) over-expressing a gibberellic acid catabolizing enzyme (GACE) for improved turf<br />

characteristics and reduced mowing requirement. Bahiadwarf prototypes have displayed characteristics such as<br />

denser growth habit, reduced seed head production and reduced mowing requirement, that make this plant more<br />

attractive for public use. A recently funded USDA project has added multiple drought stress protective genes to the<br />

Bahiadwarf, enhancing the plant's environmental friendliness. This project with the University of Florida, IFAS will<br />

investigate and document the drought tolerance of the Bahiadwarf under field conditions. They will compare the<br />

Bahiadwarf to the industry standard St. Augustine grass and wildtype Bahiagrass. To further enhance the Bahiadwarf,<br />

additional transgenic Bahiagrass lines with an improved drought stress response will be generated and compared to<br />

St. Augustine grass and wildtype Bahiagrass. In the second and third year of the project, they will evaluate water use<br />

efficiency, turf quality, mowing requirement and persistence under different irrigation regimes.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

013 Hillsborough River Basin 39,375 0 13,125<br />

0<br />

0 52,500<br />

020 Peace River Basin 39,375 0 13,125<br />

0<br />

0 52,500<br />

0<strong>21</strong> Manasota Basin 39,375 0 13,125<br />

0<br />

0 52,500<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$157,500<br />

Critical Project Milestones Projected Amended Actual<br />

0<strong>21</strong> - Manasota Basin 143


B229<br />

Field Evaluation of Bahiadwarf, For Water Use Efficiency, Turf<br />

Quality, Mowing Requirement and Persi<br />

Agreement to Contracts 8/1/05 8/1/05<br />

Agreement to Cooperator 11/1/05 11/1/05<br />

District Executes Agreement 12/1/05 12/1/05<br />

Notice to Proceed 1/1/06 1/1/06<br />

Basin Board Notification 1/1/06 1/1/06<br />

Governing Board Notification 2/1/06 2/1/06<br />

Year 1. Data Collection 12/1/06 12/1/06<br />

Year 2. Data Collection 12/1/07 12/1/07<br />

Year 3. Data Collection 12/1/08<br />

No Cost Time Extension 6/5/09 6/5/09<br />

Completion Report 9/1/09 5/31/11<br />

Project Ends 1/1/<strong>10</strong> 1/31/12<br />

Status As Of: June <strong>10</strong>, 2009<br />

9/1/2005 - Agreement is being processed by the District. 11/1/2005 - Agreement is being processed by the District.<br />

12/30/2005 - Agreement mailed to cooperator. 1/11/2006 - Cooperator reviewing agreement. 1/23/2006 - Notice to<br />

proceed mailed to IFAS. 3/1/2006 Mobilizing staff and equipment. 4/17/2006 - Data Collection 6/12/2006 - Update<br />

Agreement (Scope of Work) to incorporate enhanced data collection equipment. 8/16/2006 - Data Collection. <strong>10</strong>/12/2006<br />

- Data Collection. 12/4/2006 - Data Collection. 2/28/2007 - Reviewed report, project continuing as designed. 5/1/2007 -<br />

Plant damage because of herbicide, project continuing as designed. 7/6/2007 - Data Collection. 11/1/2007 - Reviewed<br />

task report. 1/2/2008 - Project continuing as planned. 2/29/2008 - Project continuing as planned. 5/1/2008 - Project<br />

continuing as planned. 7/1/2008 - Data collection, project continuing as planned. 9/1/2008 - Data collection, project<br />

continuing as planned. 11/1/2008 - Data collection, project continuing as planned 3/6/2009 - Data collection, project<br />

continuing as planned. 5/31/2009 - Processing no cost time extension to develop a grass that will be easier to produce.<br />

0<strong>21</strong> - Manasota Basin 144


B238<br />

Crop Coefficients and Water Use for Peppers in Southwest Florida<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply<br />

Basin(s) Alafia River, Hillsborough River, Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

University of Florida<br />

Project Manager COHEN, RON<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

Peppers are one of the major row crops grown in the District and in some regions, second only to tomatoes. The<br />

actual amount of water these crops use is based on soils, growing season and climatic conditions. To improve the<br />

crops' water use efficiency and to help conserve water, it is important for the grower and the District to know exactly<br />

how much water the crops require. This lysimeter study will determine how much water pepper plants in Southwest<br />

Florida need, determine crop coefficients and an irrigation schedule to help growers.<br />

Benefits<br />

Currently there are over 8,000 acres directly permitted for pepper production and an additional 17,000 acres that might<br />

be in a rotation with pepper. These sites are permitted for about 16.5 Mgd (27 Mgd for rotational sites). The number of<br />

acres planted and their water use will change annually based on market and climatic conditions. Assuming that results<br />

from this project will help reduce <strong>10</strong>% of that water, the savings could be about 1.7 Mgd. Added benefits to this project<br />

include a potential reduction in pollutant loading and information for AGMOD.<br />

Costs<br />

This two-year project will cost $135,000. These costs will be divided between the five basin boards that have the most<br />

acres permitted for pepper production. Project costs have been prorated between the Alafia (49%), Hillsborough River<br />

(19%), Manasota (15%), Peace River (8%) and the Withlacoochee River (9%) Basin Boards. Basin Board funds will<br />

be budgeted in FY2007, FY2008 and FY2009. Alafia River will budget $<strong>21</strong>,891, Hillsborough River will budget $8,514,<br />

Manasota will budget $4,257, Peace River will budget $3,649 and the Withlacoochee River will budget $6,689 each<br />

year.<br />

Additional Information<br />

Currently, the District and the growers use water use values developed outside of Florida. Although these values<br />

seem to be reasonable, local crop coefficients could help enhance irrigation scheduling and reduce water use. In<br />

addition, the crop coefficients will help decrease the transport of nutrients into the ground and surface water. Water<br />

use within the District is expected to increase by 2020. It is anticipated that a large portion of this increased demand<br />

will be met by water conservation. Since agricultural water use accounts for the largest fraction of the total permitted<br />

water amount in the District, efforts are needed to develop methods to help this water use sector reduce their water<br />

use.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

011 Alafia River Basin 43,782 0 <strong>21</strong>,891<br />

0<br />

0 65,673<br />

013 Hillsborough River Basin 17,028 0 8,514<br />

0<br />

0 25,542<br />

019 Withlacoochee River Basin 13,378 0 6,689<br />

0<br />

0 20,067<br />

020 Peace River Basin 7,298 0 3,649<br />

0<br />

0 <strong>10</strong>,947<br />

0<strong>21</strong> Manasota Basin 8,514 0 4,257<br />

0<br />

0 12,771<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$135,000<br />

Critical Project Milestones Projected Amended Actual<br />

Agreement to Contracts 8/1/06 5/1/07<br />

0<strong>21</strong> - Manasota Basin 145


B238<br />

Crop Coefficients and Water Use for Peppers in Southwest Florida<br />

Agreement to Cooperator 11/1/06 6/1/07<br />

District Executes Agreement 12/1/06 8/31/07<br />

Notice to Proceed 1/1/07 8/31/07<br />

Basin Board Notification 2/1/07 <strong>10</strong>/31/07<br />

Year 1. Data Collection 12/1/08 11/30/08<br />

Year 2. Data Collection 12/1/09<br />

Year 3. Data Collection 12/1/<strong>10</strong><br />

Project Ends 12/31/11<br />

Status As Of: June <strong>10</strong>, 2009<br />

8/15/2006 - Develop agreement. 12/4/2006 - Reviewed draft scope of work. 2/28/2007 - Processing agreement. 5/1/2007<br />

- Agreement in legal for review. 7/6/2007 - Waiting for IFAS to execute the Agreement. 8/31/2007 - Notice to Proceed<br />

has been issued to IFAS. 11/1/2007 - - Data collection continuing as planned. 1/9/2007 - Data collection continuing as<br />

planned. 2/29/2008 - Data collection continuing as planned. 5/1/2008 - Data collection continuing as planned. 7/1/2008 -<br />

Dormant for summer. 9/1/2008 - Field preparation for new growing season. 11/1/2008 - Data collection, project<br />

continuing as planned 12/17/2008 - Data collection, project continuing as planned 3/6/2009 - Data collection, project<br />

continuing as planned. 4/20/2009 - Data collection, project continuing as planned. 4/20/2009 - Data collection, project<br />

continuing as planned. 6/<strong>10</strong>/2009 - Data collection, project continuing as planned.<br />

0<strong>21</strong> - Manasota Basin 146


B239<br />

Determine Water Requirements For Genetically Altered Lantana<br />

Camara Nursery and Landscape Plants<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply, Water Quality, Natural Systems<br />

Basin(s) Alafia River, Hillsborough River, Peace River, Manasota<br />

Cooperator(s)<br />

University of Florida<br />

Project Manager COHEN, RON<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

A large amount of water is permitted for nursery and landscape irrigation. With the increase of urban development it is<br />

anticipated that the overall permitted amount for these uses will also increase. To reduce water use for landscape<br />

irrigation and to conserve water, the District has been promoting Florida Friendly principles. One of the first and most<br />

important principles of this practice is the selection and use of drought-tolerant plants (Koske and Owings). The intent<br />

of this project is to develop a drought tolerant variety of Lantana camara; and determining its water needs for nursery<br />

production and urban landscapes.<br />

Benefits<br />

It is estimated that each year Florida nurseries sell as many as 40 million Lantana plants to other states, of those<br />

plants about 5 million are grown within the District. The number of acres planted and their water use will change<br />

annually based on market and climatic conditions. To quantify an estimated water savings from this project lets<br />

assume one Lantana plant covers 12 square feet (3 ft x 4 ft) and the proposed Lantana plants will save 150 gallons of<br />

water a year, thus these plants could save as much as 750 million gallons of water a year for this District.<br />

Costs<br />

This three-year project will cost $112,790. Currently over 80% of the District's permitted container nursery production<br />

occurs within the jurisdictional region of four basin boards. Funding for this project is prorated between them (Alafia<br />

River (22%), Manasota (22%), Hillsborough River (28%) and Peace River (28%)) boards. The Nursery industry has<br />

provided $12,890 for this project and the Alafia Basin Board will budget $7,350, Hillsborough River will budget $9,350,<br />

Manasota will budget $7,350 and the Peace River will budget $9,350 in FY2007; and $33, 250 (Alafia River - $7,315,<br />

22% , Manasota - $7,315, 22%, Hillsborough River $9,3<strong>10</strong>, 28% and Peace River $9,3<strong>10</strong>, 28%) in both FY2008 and<br />

FY2009.<br />

Additional Information<br />

In the past the industry has provided seed money to start this project and they are supportive of this proposal. Drought<br />

tolerant plants develop various mechanisms that allow them to survive droughts, and stay green while producing<br />

flowers without much water. Lantana depressa and Lantana involucrata are some of the best drought tolerant plants<br />

available and are among the few plants recommended for desert landscaping in Arizona (City of Tucson; Hedding;<br />

Master gardeners of the University of Arizona Pima County Extension Services). In addition they have been used<br />

widely in many other states such as California (UC Sacramento County Extension) and Nevada (Southern Nevada<br />

Water Authority) for landscape water conservation. Lantana depressa and Lantana involucrate are not widely used in<br />

Florida.Several lantana species exist in Florida. Lantana depressa and Lantana involucrata provide year-round color,<br />

use little irrigation, have excellent salt tolerance (Beaulieu), attracts butterflies (Schaefer et al., 2002) and<br />

hummingbirds (Beaulieu), and have limited fertilization and pesticide requirements (Beaulieu; Owings, 2004), which<br />

helps to reduce pollutant loading. Because of these attributes, Lantana depressa and Lantana involucrata, are<br />

recommended for water saving in Florida landscapes (South Florida Water Management District). However, adoption<br />

of these species of Lantana has been poor because they do not have appealing growth habits and flower colors.<br />

Homeowners, nurseryman and landscapers prefer growing Lantana camara. This species of Lantana offers a<br />

spectrum of long-lasting colors and is widely used in the U.S. (Koske and Owings; Russ, 2004). In Florida, Lantana<br />

camara varieties produce abundance of viable pollen and hybridize with Florida's native species, Lantana depressa,<br />

contaminating the native species' gene pool. Consequently, they have been listed as a Category I invasive species by<br />

the Florida Exotic Pest Plant Council (http://www.fleppc.org/). Category I invasive species are defined as invasive<br />

exotics that are altering native plant communities by displacing native species, changing community structures or<br />

ecological functions, or hybridizing with natives. IFAS, FDACS and other entities do not recommend producing or<br />

growing Category I invasive species plants. Genetic sterilization of Lantana camara could control its invasiveness,<br />

thus protecting Florida's native species and ecosystems. Also, it will allow it to be used widely in public and residential<br />

landscapes for water conservation and butterfly attraction. Thus conserving water and reducing pollutant loading into<br />

the state's water resources. This project will develop a variety of Florida Friendly sterile Lantana camara plants. In<br />

addition it will determine the plants water requirements for nursery and landscape irrigation.<br />

0<strong>21</strong> - Manasota Basin 147


B239<br />

Determine Water Requirements For Genetically Altered Lantana<br />

Camara Nursery and Landscape Plants<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

011 Alafia River Basin 14,700 0 7,315<br />

0<br />

0 22,015<br />

013 Hillsborough River Basin 18,700 0 9,3<strong>10</strong><br />

0<br />

0 28,0<strong>10</strong><br />

020 Peace River Basin 18,700 0 9,3<strong>10</strong><br />

0<br />

0 28,0<strong>10</strong><br />

0<strong>21</strong> Manasota Basin 14,700 0 7,315<br />

0<br />

0 22,015<br />

Project Funds Not Budgeted by the<br />

District<br />

FNGLA 12,890 0 0<br />

0<br />

0 12,890<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$112,940<br />

Critical Project Milestones Projected Amended Actual<br />

Agreement to Contracts 8/1/06 8/1/06<br />

Agreement to Cooperator 11/1/06 <strong>10</strong>/1/06<br />

District Executes Agreement 12/1/06 11/1/06<br />

Notice to Proceed 1/1/07 11/1/06<br />

Basin Board Notification 2/1/07 11/1/06<br />

Governing Board Notification 2/1/07 11/1/06<br />

Year 1. Data Collection 12/1/07 12/1/07<br />

Year 2. Data Collection 12/1/08 11/30/08<br />

Year 3. Data Collection 12/1/09<br />

Completion Report <strong>10</strong>/1/<strong>10</strong><br />

Project Ends 1/31/11<br />

Status As Of: August 27, 2009<br />

8/15/2006 - Agreement to Contracts. <strong>10</strong>/12/2006 - Agreement sent to cooperator for review and execution. 11/2/2006 -<br />

Cooperator executes agreement. 11/8/2006 - NOP sent to cooperator. 12/4/2006 - Reviewed task report. 2/28/2007 -<br />

Project continuing as planned. 5/1/2007 - Reviewed task report, project continuing as planned. 7/6/2007 - Site visit<br />

project continuing as planned. 8/31/2007 - Reviewed task report, project continuing as planned. 11/1/2007 - Data<br />

collection continuing as planned 1/2/2008 - Reviewed task completion report, project continuing as designed. 2/29/2008 -<br />

Data collection continuing as planned. 5/1/2008 - Data collection continuing as planned. 7/1/2008 - Review task report,<br />

project continuing as planned. 9/1/2008 - Data collection continuing as planned. 11/1/2008 - Data collection continuing as<br />

planned. 12/17/2008 - Data collection continuing as planned. 3/6/2009 - Data collection, project continuing as planned.<br />

4/20/2009 - Data collection, project continuing as planned. 6/<strong>10</strong>/2009 - Modified scope of work to reduce irrigation<br />

application rates. 9/1/2009 - Data collection, project continuing as planned.<br />

0<strong>21</strong> - Manasota Basin 148


B240<br />

Reducing Water Consumption in Polyethylene-Mulched Tomato and<br />

Pepper Fields after Methyl Bromide Pha<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply<br />

Basin(s) Alafia River, Peace River, Manasota<br />

Cooperator(s)<br />

University of Florida<br />

Project Manager COHEN, RON<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

Tomato and pepper producers use methyl bromide (MBr) to fumigate their beds before production. About 50 to 95% of<br />

the MBr that is injected in to the soil can eventually enter the atmosphere and damage the earth's ozone layer. EPA's<br />

Clean Air Act (Amendments of 1990) requires that MBr and other similar chemicals be phased out. The loss of MBr<br />

has a major impact on the production practices of tomato and pepper producers in our District and can cause an<br />

increase in their water use. This project will provide the water use information needed to address this change in<br />

technology.<br />

Benefits<br />

Water use information from this project will be used by growers to save water and in the District's conservation,<br />

planning and permitting programs. This will help preserve ground water, reduce off-site discharge of pesticides and<br />

nutrients and flooding and improve water quality. Currently there are about 152,000 acres in the District that are<br />

permitted for the production of tomatoes and peppers. These sites are permitted for about 335 Mgd. The number of<br />

acres planted and their water use will change annually based on market and climatic conditions. Assuming that results<br />

from this project will help reduce at a minimum 5% of the permitted water, the savings would be about 17 Mgd.<br />

Costs<br />

This project will cost $150,000. About 98% of the permitted tomato and pepper production is divided between three<br />

basin boards. Project costs have been prorated between the Alafia (22%), Manasota (67%), and Peace River (11%)<br />

Basin Boards. Funds will be budgeted in FY2007 and FY2008, Alafia will budget $33,500, Manasota will budget<br />

$11,000 and the Peace River will budget $5,500 each year.<br />

Additional Information<br />

Tomato and pepper production relies on a relatively large quantity of water to provide the necessary soil moisture to<br />

establish, grow and harvest both crops. These commodities are grown with either seepage or seepage plus drip<br />

irrigation. Both systems require constant irrigation to maintain the water table relatively shallow during crop<br />

establishment, which reduces the soil storage, increases the risks of flooding, off-site discharge and nutrient leaching.<br />

A quick calculation of the irrigation volumes required to produce one acre of tomato indicates that between 4 and 6<br />

ac-inches per acre of water are used to establish and maintain the crop with seepage irrigation. Most existing<br />

recommendations for tomato and pepper production were generated when MBr was a viable option for bed<br />

fumigation. Also, relatively inexpensive low density-polyethylene mulch (LDPE) was used and current environmental<br />

regulations about water run-off and nutrient leaching were not always considered in research projects. Current<br />

production practices have changed considerably since past water and production requirements were developed. This<br />

project will look at the new technology and changes in growing practices. The University of Florida and the State of<br />

Florida have started a vigorous campaign to address the phase out of MBr and the development of Best Management<br />

Practices (BMP). Within that context, the use of new developments in fumigation techniques and mulch materials that<br />

tend to reduce water use makes sense. Current MBr alternatives, such as 1,3-dichloropropene + chloropicrin (1,3-D +<br />

Pic; Telone C-35) and methyl iodide (MI; Midas), have poor efficacy against soil borne pests when applied in saturated<br />

soils, as it was customary for MBr, because these molecules can bind more tightly to water molecules than MBr.<br />

Another reason that justifies exploring reduced water irrigation programs is the use of higher retentive mulch films<br />

(virtually impermeable (VIF) and metalized films). These mulches retain more moisture in the planting beds than<br />

previous materials, which adds another component to fumigant and water management in tomato and pepper<br />

production. No defendable scientific research has been conducted in Florida to reduce water irrigation volumes for<br />

tomato and pepper by combining the lower water requirement of new fumigants and the higher water retention of new<br />

mulch films. This project will determine the effect of varying water management regimes on tomato and pepper<br />

production, and assess the effect of high retentive mulches and MBr alternatives on the water volumes necessary for<br />

tomato and pepper irrigation.<br />

0<strong>21</strong> - Manasota Basin 149


B240<br />

Reducing Water Consumption in Polyethylene-Mulched Tomato and<br />

Pepper Fields after Methyl Bromide Pha<br />

Prior Cumulative FY 2009 FY20<strong>10</strong><br />

Funding Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

67,000 0 33,500<br />

0<br />

011 Alafia River Basin 0 <strong>10</strong>0,500<br />

020 Peace River Basin 11,000 0 5,500<br />

0<br />

0 16,500<br />

0<strong>21</strong> Manasota Basin 22,000 0 11,000<br />

0<br />

0 33,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$150,000<br />

Critical Project Milestones Projected Amended Actual<br />

Agreement to Contracts 8/1/06 8/26/06<br />

Agreement to Cooperator 11/1/06 <strong>10</strong>/1/06<br />

District Executes Agreement 12/1/06 11/1/06<br />

Notice to Proceed 1/1/07 11/1/06<br />

Basin Board Notification 2/1/07 11/1/06<br />

Governing Board Notification 2/1/07 11/1/06<br />

Year 1. Data Collection 12/1/07 12/1/07<br />

Year 2. Data Collection 12/1/08 11/30/08<br />

Completion Report - Estimated 6/1/09 6/30/<strong>10</strong><br />

Project Ends <strong>10</strong>/31/09 11/30/<strong>10</strong><br />

Year 3. Data Collection 12/1/09 1/1/<strong>10</strong><br />

Status As Of: August 27, 2009<br />

8/15/2006 - Agreement to Contracts. <strong>10</strong>/12/2006 - Agreement is being reviewed by Legal. 11/8/2006 - Sent notice to<br />

proceed. 12/4/2006 - Field preparation. 2/28/2007 - Data collection project continuing as planned. 5/1/2007 - Data<br />

collection project continuing as planned. 7/6/2007 - Dormant for summer. 8/31/2007 - Reviewed task completion report.<br />

Project continuing as designed. 11/1/2007- Data collection project continuing as planned. 1/2/2008 - Field preparation for<br />

next season. 2/29/2008 - Data collection continuing as planned. 5/1/2008 - Data collection continuing as planned.<br />

7/1/2008 - Dormant for summer. 9/1/2009 Field preparation for new season. 11/1/2008 - Data collection, project<br />

continuing as planned. 12/1/2008 - Data collection, project continuing as planned 2/23/09 - Execute no cost time<br />

extension. 4/20/2009 - Data collection, project continuing as planned 6/<strong>10</strong>/2009 - Project dormant for summer. 9/1/2009 -<br />

Starting last season.<br />

0<strong>21</strong> - Manasota Basin 150


B241<br />

Reduction of Water Use for Citrus Cold Protection<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply, Water Quality<br />

Basin(s) Alafia River, Peace River, Manasota<br />

Cooperator(s)<br />

University of Florida<br />

Project Manager COHEN, RON<br />

Task Manager(s)<br />

Status Completed<br />

Description<br />

This is a multi-agency agricultural water conservation project to assist citrus producers in reducing water use for cold<br />

protection. The project is an expansion and enhancement of a previously successful Peace River and Alafia Basin<br />

Board project (B137). That project was taken statewide by FDACS, SFWMD and SJRWMD. Florida citrus growers use<br />

low volume irrigation to conserve water and to provide a more effective method of freeze protection. One characteristic<br />

of low volume irrigation used for citrus freeze protection is that the decision to use irrigation must be made prior to the<br />

water in the lateral irrigation lines reaching freezing temperatures of 32 degrees F. This project would develop<br />

site-specific methodology to accurately determine minimum temperatures the next morning based on sunset<br />

temperatures recorded the previous evening. This allows for multiple temperature observations on cold nights from the<br />

growing area providing necessary replication of the Brunt equation. In addition, this project will help disseminate this<br />

information in newsletters and other sources, including FAWN to help the growers conserve water.<br />

Benefits<br />

The water saving would be a function of acres normally protected and gallons of water per acre per hour. Systems<br />

started at 8:00 p.m. and operated to 8:00 a.m. the following morning at <strong>10</strong>0 trees/acre and <strong>10</strong> gallon/hour emitters<br />

would require 12,000 gallons of water per acre per night of freeze protection. This volume represents a total of 0.44<br />

acre-inches of water used for freeze protection per night. Implementation of this methodology by <strong>10</strong>% of the permitted<br />

citrus acreage within the Alafia, Manasota and Peace River Basin Boards (35,526 acres) would result in a water<br />

savings of 424,458,000 gallons of water per non-critical freeze night.<br />

Costs<br />

This three-year project will cost $15,000. About 90% of the permitted citrus acres are within three basin boards and<br />

project costs have been prorated between the Alafia (12%), Manasota (8%) and Peace River (80%) Basin Boards. In<br />

FY2007, FY2008 and FY2009 Alafia will budget $600, Manasota will budget $400 and the Peace River will budget<br />

$4,000 each year.<br />

Additional Information<br />

One characteristic of low volume irrigation used for citrus freeze protection is that the decision to use irrigation must<br />

be made prior to the water in the lateral irrigation lines reaching freezing temperatures of 32 degrees F. Mature citrus<br />

foliage is subject to freeze damage at temperatures below 24 degrees F depending on acclimation and tree condition.<br />

Minimum temperatures above 24 degrees F would result in minimal freeze damage of acclimated mature citrus<br />

foliage. Temperatures that would fall between 32 and 24 degrees F would require no water resources for freeze<br />

protection, since these temperatures would be above critical values for acclimated citrus leaves. There is an<br />

opportunity to determine before a freeze event time the actual need for irrigation to protect citrus trees, thus saving<br />

water resources during a freeze event. Temperature models exist that can help predict minimum temperatures for the<br />

following morning at sunset the previous day under stable freeze conditions and are available through the FAWN<br />

(project B136) weather network. These models need to be enhanced for individual locations to develop a high level of<br />

confidence among citrus growers using the models (Brunt equation to predict minimum temperature methodology has<br />

worked for both advective and radiation type freezes). Leaf freezing methodology was developed in the early 1980's<br />

and late 1990's at the University of Florida Fruit Crops Department. Determinations of KP50 (killing point) of citrus<br />

leaves were made weekly on mature citrus leaves to quantify the level of citrus acclimation to cooler temperatures<br />

experienced in the fall and winter months. Data indicated that these leaf-freezing temperatures were dynamic in nature<br />

and changed throughout the winter in response to previous week's growing conditions. This project would develop<br />

site-specific methodology to accurately determine minimum temperatures the next morning based on sunset<br />

temperatures recorded the previous evening this allows for multiple temperature observations on cold nights from the<br />

growing area providing necessary replication of the Brunt equation. In addition, this project will help disseminate this<br />

information in newsletters and other sources, including FAWN to help the growers conserve water. Historical<br />

temperature data indicates (1941-1970) that there is a 75% chance of temperatures reaching 32 degrees F or lower<br />

during any given winter in Tampa and a 95% chance of 32 degrees F or lower in Lake Alfred during any given winter.<br />

Growers using this methodology in the 2000-2001 season based on historical weather data from the FAWN Dover and<br />

Lake Alfred locations had 6 and 7 nights of minimum temperatures below 32 degrees F, respectfully. Growers run<br />

their irrigation system for cold protection when temperatures were predicted to be 32 degrees F or below. This is in<br />

0<strong>21</strong> - Manasota Basin 151


B241<br />

Reduction of Water Use for Citrus Cold Protection<br />

response to the uncertainty of the actual minimum morning temperatures. This would have resulted in 13 nights of<br />

freeze protection-using water. Minimum temperatures on all 13 nights regardless of location did not reach a minimum<br />

temperature of 26 degrees F. Growers with accurate information of foliage freezing temperatures would not have<br />

realized any additional benefit in protecting foliage if water was used for freeze protection based on this criteria. The<br />

water saving would be a function of acres normally protected and gallons of water per acre per hour. Systems started<br />

at 8:00 p.m. and operated to 8:00 a.m. the following morning at <strong>10</strong>0 trees/acre and <strong>10</strong> gallon/hour emitters would<br />

require 12,000 gallons of water per acre per night of freeze protection. This volume represents a total of 0.44<br />

acre-inches of water used for freeze protection per night. Implementation of this methodology by <strong>10</strong>% of the permitted<br />

citrus acreage within the Alafia, Manasota and Peace River Basin Boards (35,526 acres) would result in a water<br />

savings of 424,458,000 gallons of water per noncritical freeze night. Most of the project costs (i.e., equipment) were<br />

incurred by the Polk County Citrus Advisory Committee. This project will need funds to collect leaf data and to<br />

distribute the information. In addition, the funds will be required for the educational component to help teach the<br />

growers how to use the data.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

011 Alafia River Basin 1,200 0 600<br />

0<br />

0 1,800<br />

020 Peace River Basin 8,000 0 4,000<br />

0<br />

0 12,000<br />

0<strong>21</strong> Manasota Basin 800 0 400<br />

0<br />

0 1,200<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$15,000<br />

Critical Project Milestones Projected Amended Actual<br />

Agreement to Contracts 8/1/06 8/1/06<br />

Agreement to Cooperator 11/1/06 <strong>10</strong>/1/06<br />

District Executes Agreement 12/1/06 11/1/06<br />

Notice to Proceed 1/1/07 11/1/06<br />

Basin Board Notification 2/1/07 12/1/06<br />

Governing Board Notification 2/1/07 12/1/06<br />

Year 1. Data Collection 12/1/07 12/1/07<br />

Year 2. Data Collection 12/1/08 11/30/08<br />

Completion Report 6/1/09<br />

Project Ends 11/30/09<br />

Status As Of: August 27, 2009<br />

<strong>10</strong>/12/2006 - Agreement is being reviewed by Legal. 11/8/2006 - Sent official notice to proceed. 12/4/2006 Mobilizing<br />

equipment. 2/28/2007 - Data collection, mild winter not too much to report. 5/1/2007 - Dormant for summer. 7/6/2007 -<br />

Processed payment, Dormant for summer. 8/31/2007 - Dormant for summer. 11/1/2007 - Dormant for summer. 1/2/2008<br />

- Reporting weather watch to growers and determining plant cold hardness index. 2/29/2008 - Reporting weather watch<br />

to growers and determining plant cold hardness index. 5/1/2008 - Dormant for summer. 71/2008 - Dormant for summer.<br />

9/1/2008 - Processed payment, dormant for summer. 11/1/2008 - Dormant for summer 12/17/2008 - Participated in<br />

Pasco County weather school. 3/9/2009 - Wrapping up project 4/20/2009 - Wrapping up project. Processed final<br />

payment. 9/1/2009 Project ended.<br />

0<strong>21</strong> - Manasota Basin 152


B242<br />

Potential to Use ASR in the Avon Park Formation<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply<br />

Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Pinellas-Anclote River, Peace River,<br />

Manasota<br />

Cooperator(s)<br />

Project Manager HOOD, JILL<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This study will evaluate the potential for ASR operation in the Avon Park Formation, which is not the injection zone<br />

typically used for ASR in the southern and central areas of the District. Investigators from the University of South<br />

Florida Geology Department will conduct a detailed mineralogical and chemical investigation of the Avon Park<br />

Formation that will culminate in an ASR operation model. Compounds that are regulated by primary and secondary<br />

drinking water standards will be considered, with an initial focus on arsenic and its identified source, pyrite. Major<br />

tasks of the study will include: descriptions of existing cores; sample collection; chemical analysis and interpretation of<br />

cores; collection and analysis of Avon Park Formation groundwater; and modeling a range of ASR scenarios using the<br />

collected data.<br />

Benefits<br />

Water supply continues to be a critical issue in the SWUCA, and this study compliments the District's water supply<br />

planning efforts. This project will enable the District and local governments to make knowledgeable decisions about<br />

future investment in ASR.<br />

Costs<br />

Six Basin Boards have been asked to participate in funding this project at a level of $12,000 each in FY2007 and<br />

$12,000 each in FY2008.<br />

Additional Information<br />

ASR is an important water supply option that is integral to water resources management in the SWUCA. Because of<br />

the significant benefit to future water supply that ASR can provide, the District has funded several ASR projects and<br />

investigative studies to further develop this technology. Over the past several years, there have been growing<br />

concerns about the quality of water retrieved from the current injection zone, the Suwannee Limestone. Elevated<br />

arsenic concentrations have been consistently discovered in injectate that is stored and recovered from the Suwannee<br />

Limestone. The results of this study will be an important tool that can be used to evaluate future ASR development in<br />

the SWUCA.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

011 Alafia River Basin 26,079 0 926<br />

0<br />

0 27,005<br />

013 Hillsborough River Basin 26,079 0 926<br />

0<br />

0 27,005<br />

014 Northwest Hillsborough Basin 26,079 0 926<br />

0<br />

0 27,005<br />

016 Pinellas-Anclote River Basin 26,079 0 926<br />

0<br />

0 27,005<br />

020 Peace River Basin 26,079 0 926<br />

0<br />

0 27,005<br />

0<strong>21</strong> Manasota Basin 26,079 0 926<br />

0<br />

0 27,005<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$162,030<br />

Critical Project Milestones Projected Amended Actual<br />

Contract execution 2/25/07<br />

Contract completion 2/25/09 9/30/09<br />

0<strong>21</strong> - Manasota Basin 153


B242<br />

Potential to Use ASR in the Avon Park Formation<br />

Status As Of: August <strong>21</strong>, 2009<br />

Contacted USF to remind Dr. Pichler, Principal Investigator, of the upcoming due date of the Final Report. Final Draft<br />

Report should be received by mid-September and contract expires September 30, 2009.<br />

0<strong>21</strong> - Manasota Basin 154


B246<br />

Water Conservation/FYN Regional Builder/Developer Specialist<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply, Water Quality, Natural Systems<br />

Basin(s) Alafia River, Hillsborough River, Coastal Rivers, Pinellas-Anclote River, Withlacoochee River,<br />

Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager DURELL, SYLVIA<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

The Water Conservation/FYN Regional Builder/Developer specialist, a Basin Initiative project, promotes<br />

implementation of indoor and outdoor water conservation to the members of the building industry, government<br />

employees and green building groups. The specialist also provides expert advice to participants in the District's Florida<br />

Water StarSM Gold (FSWG) program and other FWS programs the District implements. Effectiveness will be<br />

measured by the number of professional landscapers and irrigation system installers who incorporate Florida-friendly<br />

landscaping and the FWSG criteria in their projects. Education will be accomplished through one-on-one outreach,<br />

trainings and promotion of the programs' benefits at meetings of industry groups and local governments.<br />

The program's goal is to educate 15 builders, 15 landscape professionals and 15 irrigation specialists in FY20<strong>10</strong>.<br />

Benefits<br />

The program educates builders, developers, and landscape and irrigation professionals on the water conservation and<br />

water quality protection benefits of environmental landscaping best management practices. The specialist will continue<br />

to support FYN coordinators with outreach to builders and developers in their individual counties. In addition to<br />

educating on landscape best management practices, the specialist is involved in indoor water conservation education<br />

through the FWSG program.<br />

Costs<br />

The total cost of the FY20<strong>10</strong> program is $77,500 (Alafia River $5,425; Hillsborough River $18,600; Coastal Rivers<br />

$6,975; Pinellas-Anclote River $17,825; Withlacoochee River $5,425; Peace River $11,625; Manasota $11,625).<br />

Funding provides for project coordination, program expenses and travel expenses for outreach to all basins. The dollar<br />

amount allocated for each contributing basin is based on population. The budget lines below include costs for staff to<br />

manage the project.<br />

Additional Information<br />

The cost of the FY2009 program was $77,500 (Alafia River $5,425; Northwest Hillsborough $5,495; Hillsborough River<br />

$13,<strong>10</strong>5; Coastal Rivers $6,975; Pinellas-Anclote River $17,825; Withlacoochee River $5,425; Peace River $11,625;<br />

Manasota $11,625). FY20<strong>10</strong> is the third year of funding for this outreach. Education is based on the nine<br />

Florida-friendly landscaping principles that were created by the University of Florida/Institute of Food and Agricultural<br />

Sciences for the FYN program: Right Plant, Right Place, Water Efficiently, Fertilize Appropriately, Mulch, Attract<br />

Wildlife, Manage Yard Pests Responsibly, Recycle, Reduce Stormwater Runoff and Protect the Waterfront.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

011 Alafia River Basin 11,629 0 6,271 7,011<br />

0 24,911<br />

013 Hillsborough River Basin 25,947 0 12,612 <strong>21</strong>,035<br />

0 59,594<br />

014 Northwest Hillsborough Basin 14,078 0 7,056<br />

0<br />

0 <strong>21</strong>,134<br />

015 Coastal Rivers Basin 15,<strong>10</strong>1 0 7,865 8,625<br />

0 31,591<br />

016 Pinellas-Anclote River Basin 42,8<strong>21</strong> 0 20,404 18,672<br />

0 81,897<br />

019 Withlacoochee River Basin 14,993 0 7,841 7,011<br />

0 29,845<br />

020 Peace River Basin 31,038 0 14,840 13,278<br />

0 59,156<br />

0<strong>21</strong> Manasota Basin 26,769 0 13,336 13,266<br />

0 53,371<br />

0<strong>21</strong> - Manasota Basin 155<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$361,499


B246<br />

Water Conservation/FYN Regional Builder/Developer Specialist<br />

Critical Project Milestones Projected Amended Actual<br />

FY2008<br />

Purchase order created 3/1/08 3/3/08<br />

First task report 3/31/08 3/31/08<br />

Second task report 4/30/08 4/30/08<br />

Third task report 5/31/08 5/31/08<br />

Fourth task report 6/30/08 6/30/08<br />

Fifth task report 7/31/08 7/31/08<br />

Sixth task report 8/31/08 8/31/08<br />

Seventh task report 9/30/08 9/30/08<br />

Eighth task report <strong>10</strong>/31/08 <strong>10</strong>/31/08<br />

Ninth task report 11/30/08 11/28/08<br />

Tenth task report 12/31/08 12/31/08<br />

Eleventh task report 1/30/09 1/30/09<br />

Twelfth task report 2/27/09 2/27/09<br />

Project ends 2/28/<strong>10</strong> 2/28/09<br />

FY2009<br />

Purchase order created 3/1/09 3/13/09 3/13/09<br />

First task report 3/31/09 3/31/09<br />

Second task report 4/30/09 4/30/09<br />

Third task report 5/29/09 5/29/09<br />

Fourth task report 6/30/09 6/30/09<br />

Fifth task report 7/31/09 7/31/09<br />

Sixth task report 8/31/09 8/31/09<br />

Seventh task report 9/30/09<br />

FY20<strong>10</strong><br />

Purchase order created <strong>10</strong>/1/09<br />

Purchase order extended <strong>10</strong>/12/09<br />

First task report 11/5/09<br />

Second task report 12/4/09<br />

Third task report 1/5/<strong>10</strong><br />

Fourth task report 2/5/<strong>10</strong><br />

Fifth task report 3/5/<strong>10</strong><br />

Sixth task report 4/5/<strong>10</strong><br />

Seventh task report 5/5/<strong>10</strong><br />

Eighth task report 6/4/<strong>10</strong><br />

Ninth task report 7/5/<strong>10</strong><br />

Tenth task report 8/5/<strong>10</strong><br />

Eleventh task report 9/6/<strong>10</strong><br />

Twelfth task report <strong>10</strong>/5/<strong>10</strong><br />

Status As Of: September 16, 2009<br />

Angela Maraj, the water conservation/FYN regional builder/developer specialist: (1) provided guidance and input for the<br />

creation of the new FNGLA FWS Landscape Design Accredited Professional training, which will be presented for the first<br />

time on 9/30/2009 during the Landscape Show in Orlando and will promote the program to landscape designers to help<br />

more industry professionals learn about FWS; (2) reviewed six landscape plans for residential landscape retrofits for the<br />

Brooker Creek landscape project; (3) made a presentation to homeowners in Charlotte County for the irrigation pilot<br />

program; (4) will assist with the SB2080 workshops being planned by UF and the District by coordinating with FYN<br />

coordinators to ensure consistency in their presentations; (5) is a member of the planning committee for the 4th Annual<br />

Sustainable Communities workshop, scheduled for 11/3/2009 in Sarasota, which has a conference theme on the<br />

water/energy nexus; (6) conducted several FWSG inspections including Hickman Homes in Lakeland and Real building,<br />

Inc. in St. Petersburg, both of which met the certification criteria; (7) is the program liaison with the builder, landscape<br />

designer and irrigation installer for the Polk County Builders Association's Go Green Showcase Home; (8) has discussed<br />

the FWS retrofit program with staff at the Florida House; will provide landscape guidance to staff with Florida Home<br />

Partnership, Inc. for potential FWSG certification; (9) has begun discussing possible collaboration with Sarasota County<br />

0<strong>21</strong> - Manasota Basin 156


B246<br />

Water Conservation/FYN Regional Builder/Developer Specialist<br />

to present a Rainwater Harvesting Accredited Professional workshop. ACTION TO DATE: On time.<br />

0<strong>21</strong> - Manasota Basin 157


B251<br />

National Hydrography Database (NHD)<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality, Natural Systems<br />

Basin(s) General Fund (District), Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers,<br />

Pinellas-Anclote River, Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

N/A<br />

Project Manager KARLIN, AL<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

The NHD is a comprehensive set of Geographic Information System (GIS) data that contains information about<br />

surface water features such as lakes, ponds, streams, rivers, springs and wells. This dataset was created by the<br />

United States Geological Survey (USGS) in cooperation with the Environmental Protection Agency (EPA) to provide a<br />

consistent nationwide database to link water-related data to specific streams and waterbodies. The five water<br />

management districts and the FDEP cooperatively created Florida's original version of the NHD in the late 1990's and<br />

early 2000's. The dataset was created using the best available information, hydrographic features found on the USGS<br />

7.5 Minute Topographic Quadrangles. While the original NHD supports many District uses, it often does not have the<br />

level of information required to support detailed modeling efforts. The funding proposed here will be used to upgrade<br />

the NHD dataset for our jurisdiction using detailed hydrographic information captured under the District's Watershed<br />

Management Program. Similar efforts are underway at the St. Johns River Water Management District and are being<br />

evaluated at the South Florida Water Management District.<br />

Benefits<br />

Participating in the NHD update effort provides an effective mechanism for integrating our detailed hydrographic<br />

information into a nationwide database that is distributed by the USGS. Since the NHD is used by the FDEP and other<br />

water management districts, the District's modeling and data collection efforts will benefit from improved data<br />

consistency with those agencies. This project benefits federal, state, local, and private entities by providing access to<br />

the District's detailed hydrographic data in an industry standard format.<br />

Costs<br />

The requested FY2008 funds will be used to fund a contract position and supporting services at FDEP to update the<br />

NHD and transfer the data to the USGS. Funding is split between the Governing Board and Basin Boards. The<br />

Governing Board provides fifty percent of the total project cost with the remainder being split between the Basin Board<br />

based on area. It is anticipated that this will be an annual budget request that will continue to provide updates to the<br />

NHD in coordination with the District's Watershed Management Program. The FY2009 budget will increase by<br />

approximately $2000 to accommodate the FDEP changes for indirect costs.<br />

Additional Information<br />

No federal, state or local government currently updates the NHD for our area. The District does not have sufficient<br />

in-house resources to support this effort and the funding will be used to outsource this work to the FDEP. FDEP is the<br />

primary NHD coordinating body in Florida.<br />

0<strong>21</strong> - Manasota Basin 158


B251<br />

National Hydrography Database (NHD)<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 30,671 0 15,865<br />

0<br />

0 46,536<br />

011 Alafia River Basin 2,052 0 1,061<br />

0<br />

0 3,113<br />

013 Hillsborough River Basin 2,226 0 1,151<br />

0<br />

0 3,377<br />

014 Northwest Hillsborough Basin 472 0 244<br />

0<br />

0<br />

716<br />

015 Coastal Rivers Basin 2,428 0 1,256<br />

0<br />

0 3,684<br />

016 Pinellas-Anclote River Basin 1,<strong>10</strong>8 0 573<br />

0<br />

0 1,681<br />

019 Withlacoochee River Basin 6,000 0 3,<strong>10</strong>3<br />

0<br />

0 9,<strong>10</strong>3<br />

020 Peace River Basin 9,090 0 4,702<br />

0<br />

0 13,792<br />

0<strong>21</strong> Manasota Basin 3,953 0 2,045<br />

0<br />

0 5,998<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$88,000<br />

Critical Project Milestones Projected Amended Actual<br />

1. Milestone - Myakka Basin<br />

Review linear network for Myakka Sub-basin 11/1/07 6/1/08 5/30/08<br />

Revise NHD network 2/1/08 8/1/08 9/2/08<br />

Review and revise flowpaths/directions 5/1/08 <strong>10</strong>/1/08 11/4/08<br />

Capture lakes/wetlands and QA/QC 6/1/08 12/1/08 2/28/09<br />

Upload Data to National NHD 7/1/08 2/14/09 2/28/09<br />

2. Milestone - Sarasota Bay Basin<br />

Review/revise linear Network 8/1/08 <strong>10</strong>/1/08 8/1/08<br />

Review/Revise flowpaths 9/1/08 12/1/08 8/2/08<br />

Upload Data to National NHD 9/15/08 2/14/09 8/12/08<br />

3. Milestone - Withlacoochee Basin<br />

Project Initiation 3/15/09 4/1/09 4/1/09<br />

Uploading of Primary Area to USGS 12/30/09<br />

Deliver 50% of Basin to SWFWMD 12/30/09<br />

Status As Of: August 03, 2009<br />

Talked with Joe North regarding progress on the Withlacoochee. He indicated that the Sarasota County data were<br />

accepted by the USGS and that progress was being made on the Withlacoochee watershed. We will be conducting our<br />

bi-monthly meeting at SWFWMD on Tuesday, 4 August 2009.<br />

0<strong>21</strong> - Manasota Basin 159


B256<br />

Automated Citrus Irrigation Management to Reduce Water<br />

Consumption<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality<br />

Basin(s) Alafia River, Hillsborough River, Peace River, Manasota<br />

Cooperator(s)<br />

University of Florida<br />

Project Manager COHEN, RON<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

Agriculture is the largest permitted water use in the District and citrus production is the largest of those permitted uses.<br />

Over 366MGD are permitted for citrus irrigation and most of that water use is in the SWUCA. This project will help<br />

citrus growers reduce their water use by developing tools to automate and improve irrigation scheduling. These tools<br />

can be used by the District's FARMS program to further expand their conservation efforts. Although citrus acres have<br />

been on the decline it seems to have reached a stabilizing point. With the increase in the recent price of citrus the<br />

District might even see an increase in the number of acres. The permitted acres for citrus is still relatively high and<br />

even a minor reduction in water use or fertilizer application could have a significant impact on the District's water<br />

resources. The proposed project will investigate the use of new low-cost automatic irrigation pump controllers with<br />

wireless remote monitoring and control. This low cost system (


B256<br />

Automated Citrus Irrigation Management to Reduce Water<br />

Consumption<br />

Prior Cumulative FY 2009 FY20<strong>10</strong><br />

Funding Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0 0 0 50,000<br />

0<strong>10</strong> General Fund (Districtwide) 0 50,000<br />

011 Alafia River Basin 4,500 0 4,500<br />

0<br />

0 9,000<br />

013 Hillsborough River Basin 4,000 0 4,000<br />

0<br />

0 8,000<br />

020 Peace River Basin 38,500 0 38,500<br />

0<br />

0 77,000<br />

0<strong>21</strong> Manasota Basin 3,000 0 3,000<br />

0<br />

0 6,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$150,000<br />

Critical Project Milestones Projected Amended Actual<br />

Agreement To Contracts <strong>10</strong>/1/07 8/30/07<br />

Agreement To IFAS <strong>10</strong>/15/07 <strong>10</strong>/15/07<br />

Notice To Proceed 12/31/07 12/31/07<br />

Data Collection Yr. 1 12/31/08 12/18/08<br />

Data Collection Yr 2 12/31/09<br />

Data Collection Yr. 3 12/31/<strong>10</strong><br />

Grower's Field Day 12/15/11<br />

Completion Report 3/1/12<br />

Agreement Ends 12/31/12<br />

Status As Of: June <strong>10</strong>, 2009<br />

8/31/2007 - Reviewed final scope of work. 11/1/2007 - Agreement mailed to cooperator for review and execution.<br />

1/2/2008 - Notice to proceed sent to IFAS 3/7/2008 - Mobilizing equipment. 5/1/2008 - Reviewed task I report. Project<br />

continuing as planned. 7/1/2008 - Data collection project continuing as planned. 9/1/2008 - Data collection project<br />

continuing as planned. 11/1/2008 - Data collection project continuing as planned. 12/17/2008 - Data collection project<br />

continuing as planned 3/6/2009 - Data collection project continuing as planned. 4/20/2009 - Data collection project<br />

continuing as planned 6/<strong>10</strong>/2009 - Data collection project continuing as planned.<br />

0<strong>21</strong> - Manasota Basin 161


B257<br />

Reducing Nursery and Landscape Water Use by Genetically Altering<br />

Nandina Plants<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply, Water Quality, Natural Systems<br />

Basin(s) Alafia River, Hillsborough River, Peace River, Manasota<br />

Cooperator(s)<br />

University of Florida<br />

Project Manager COHEN, RON<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

There are over 5,000 acres of nursery production in the central part of our District and typically they are permitted for<br />

about 1.7 Million gallons of water per acre. With the increase of urban development it is anticipated that the number of<br />

nursery acres will increase and landscape water use will increase. To reduce landscape irrigation and to conserve<br />

water, the District has been promoting Florida Friendly principles. One of the first and most important principles of this<br />

practice is the selection and use of drought-tolerant plants (Koske and Owings). Nandina is a very popular drought<br />

tolerant plant and recently its use has been demising because of it being listed as an invasive species. This project will<br />

develop and determine nursery production and urban landscapes water requirements for a drought tolerant variety of<br />

Nandina. The industry is supportive of this project and is providing funds.<br />

Benefits<br />

It is estimated that each year about 5 million Nandina plants are grown and sold within the central part of the District.<br />

The number of acres planted and their water use will change annually based on market and climatic conditions. To<br />

quantify an estimated water savings from this project lets assume a Nandina plant covers 12 square feet (3 ft x 4 ft),<br />

3,700 plants per acre, 1,375 acres and a 1% to 5% savings for Nandina Nursery Production. This savings will reduce<br />

water use by 332,000 to 66,000 gallons per day. In addition there will be a savings from urban landscape water use.<br />

An added benefit to this project is that it will eliminate an invasive plant species. This will save the District and the<br />

public having to invest public funds to eliminate an invasive plant.<br />

Costs<br />

This five year project will cost the District $125,000. Funding for this project is prorated between four Basin Boards<br />

(Alafia River (22%), Manasota (22%), Hillsborough River (28%) and Peace River (28%)) based on the permitted<br />

nursery acres in their watershed. The Nursery industry will provided $15,000 for this project and the Alafia Basin Board<br />

will budget $5,500, Hillsborough River will budget $7,000, Manasota will budget $5,500 and the Peace River will<br />

budget $7,000 for each year in FY2008, FY2009, FY20<strong>10</strong>, FY2011 and FY2012.<br />

Additional Information<br />

Each year a large amount of water is permitted for nursery and landscape irrigation. With the rapid urban development<br />

in the District, it is anticipated that the amount of water permitted for these uses will increase. To reduce water use for<br />

landscape irrigation and to conserve water, the DISTRICT has been promoting Florida Friendly landscaping principles.<br />

One of the first and most important principles of this practice is the selection and use of drought-tolerant plants.<br />

Nandina plants are of great potential to reducing water usage in the urban landscape. They are well adapted to Florida<br />

soil conditions and well tolerant of droughts. Because of these and their aesthetic values, nandinas are very popular in<br />

nursery production and landscape use. They are particularly liked in low-maintenance landscapes and xeriscaping. In<br />

addition, these plants are extremely tough and practically pest free, thus requiring little use of pesticides. This<br />

characteristic is very beneficial and can help reduce chemical pollution from public or residential landscapes to soil<br />

and water and protect water quality. With the production of copious amounts of fruit berries and seeds, nandina plants<br />

can escape from cultivation into natural areas. Escaped nandinas can become established in natural areas, wet lands,<br />

etc., displacing native plants, disrupting natural plant communities, and changing natural ecosystems. Because of this,<br />

nandina is listed as a Class I invasive species by the Florida Exotic Pest Plant Council (http://ww.fleppc.org/) and not<br />

recommended by University of Florida for propagation, production, and sale in central Florida. The primary cause of<br />

the invasiveness of nandinas is their production of copious berries and seeds. Recent studies have shown that it is<br />

possible to find nandina varieties (one or two) that do not produce berries and seeds, thus not invasive, but this lack of<br />

berry or seed production seems to vary from region to region in Florida. For example, two nandina varieties produced<br />

lots of fruit in north Florida, but did not produce fruit and seed in south Florida. It is not known whether or not these<br />

varieties will produce fruit and seeds in central Florida. In this project, we propose to test these varieties in this District<br />

(southwest Florida) for their berry and seed production to confirm whether or not they are not invasive and safe for<br />

production and use in this District, to determine their water needs and water conservation values for nursery<br />

production and urban landscape use, and to develop new drought-tolerant nandina plants that do not produce seeds<br />

and are not invasive, but friendly to the environment.<br />

0<strong>21</strong> - Manasota Basin 162


B257<br />

Reducing Nursery and Landscape Water Use by Genetically Altering<br />

Nandina Plants<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 0 0 0 25,000<br />

0 25,000<br />

011 Alafia River Basin 5,500 0 5,500<br />

0<br />

0 11,000<br />

013 Hillsborough River Basin 7,000 0 7,000<br />

0<br />

0 14,000<br />

020 Peace River Basin 7,000 0 7,000<br />

0<br />

0 14,000<br />

0<strong>21</strong> Manasota Basin 5,500 0 5,500<br />

0<br />

0 11,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$75,000<br />

Critical Project Milestones Projected Amended Actual<br />

Agreement to Contracts 8/31/07 8/1/07<br />

Agreement to Cooperator 9/15/07 9/27/07<br />

District Executes Agr. 11/30/07 11/30/07<br />

District Issues NTP 1/5/08 11/16/07<br />

Basin Board Notification 1/31/08 1/31/08<br />

Data Collection Yr. 1 12/31/08 12/18/08<br />

Data Collection Yr. 2 12/31/09<br />

Data Collection Yr. 3. 12/31/<strong>10</strong><br />

Completion Report <strong>10</strong>/31/12<br />

Agreement Ends 5/31/13<br />

Status As Of: August 27, 2009<br />

8/31/2007 - Waiting for final scope of work. 11/1/2007 - Agreement mailed to IFAS. 11/16/2007 - NTP mailed to IFAS<br />

1/2/2008 - Mobilizing equipment to start project. 3/7/2008 - Data collection project continuing as planned. 5/1//2008 -<br />

Data collection project continuing as planned. 7/1//2008 - Data collection project continuing as planned. 9/1/2008 - Data<br />

collection project continuing as planned. 11/1/2008 - Data collection project continuing as planned. 12/17/2008 -<br />

Reviewed task completion reports, project continuing as planned. 3/6/2009 - Data collection project continuing as<br />

planned. 4/20/2009 - Reviewed task report. 6/<strong>10</strong>/2009 - Data collection project continuing as planned. 9/1/2009 - Data<br />

collection project continuing as planned.<br />

0<strong>21</strong> - Manasota Basin 163


B264<br />

Citrus Irrigation Management to Increase Young Tree Growth &<br />

Productivity on Flatwoods Ridge Soils<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply, Water Quality<br />

Basin(s) Alafia River, Hillsborough River, Peace River, Manasota<br />

Cooperator(s)<br />

University of Florida<br />

Project Manager COHEN, RON<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

Due to Citrus Greening, Canker and labor issues the industry has had the University develop different techniques for<br />

economical production of citrus in Florida. On of the most promising techniques, which includes high density planting<br />

of smaller trees, was developed in Spain and commercialized in South Africa, Australia and California. This project will<br />

develop irrigation and nutrient management recommendations for this new method of production to help conserve<br />

water and reduce nutirent loading. Although recent citrus acres have declined District wide, it is still the largest<br />

permitted agricultural water use. Also, with the decline in development and recent price increases, more citrus growers<br />

are planning to expand their operations; therefore, it is important to help find ways for citrus producers to conserve<br />

water. This water conservation project will utilize information developed in Spain and commercialized in South Africa,<br />

Australia and California. The University will investigate and develop new cultural technology including changes to plant<br />

density, nutrient and irrigation management. Plants will be grown with an intensive fertigation management technique<br />

that is designed to provide essentially a non-limiting environment to those roots. This new fertilizer program will require<br />

changes to existing irrigation management programs.<br />

Benefits<br />

Citrus production is the largest agricultural land use in the District. This project will help citrus producers conserve<br />

water and reduce pollutant loading for fertilizer leaching. In addition, the information could be used by the District's<br />

FARMS program to help design better BMP cost share systems. The amount of water saved will be a function of the<br />

number of acres planted and their water use, which will change annually based on market and climatic conditions.<br />

Costs<br />

The project costs have been reduced from $182,500 to $122,300 because some of the ridge elements were removed.<br />

Additional Information<br />

Yield fundamentally drives profit for Florida citrus growers and is thus the key element to a grower's financial success.<br />

Yield is tied directly to tree density and growth rate and is a simple function of numbers of trees and the related total<br />

canopy volume over the unit area. Research over the last several decades has proven that growth of young trees and<br />

productivity of both young and mature trees benefit from high frequency low volume irrigation. Improved tree growth<br />

from intensive irrigation management could reduce the time required from planting to economic breakeven production,<br />

thus provide management options in light of current devastating diseases such as Canker and Huanglongbing (citrus<br />

greening). Florida growers have adopted Best Management Practices (BMPs) that reduce nutrient leaching by limiting<br />

the amount of fertilizer that can be applied, and the time of year when fertilizer can be applied. These BMPs are based<br />

on research under low-intensity management systems. However, production systems that combine grove design and<br />

irrigation management to increase yield and grove operational efficiency have not been studied. High density plantings<br />

of sweet oranges on low-vigor rootstocks have known advantages, but their long-term behavior and changes in the<br />

functional relationship of tree density, growth rate, and yield over time are not well understood. The central hypothesis<br />

of this project is improved and consistent early yields, with increased tree density on low vigor trees and/or improved<br />

irrigation/nutrient management systems that would provide proactive management options in light of current<br />

devastating diseases such as Canker and Huanglongbing (citrus greening). Growers normally achieve their expected<br />

return on investment within 15 to 20 years of planting. If those goals would occur sooner (e.g., <strong>10</strong> to 12 years) through<br />

increased early yields, the grower would benefit even if the grove declines over time due to the diseases mentioned<br />

above and must be replanted. By knowing how to irrigate and manage their irrigation with this new method of<br />

production, the grower would conserve water and reduce the amount of fertilizer thats being leached from the plant<br />

root zone while maintaining an economical viable crop.<br />

0<strong>21</strong> - Manasota Basin 164


B264<br />

Citrus Irrigation Management to Increase Young Tree Growth &<br />

Productivity on Flatwoods Ridge Soils<br />

Prior Cumulative FY 2009 FY20<strong>10</strong><br />

Funding Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0 0 0 36,500<br />

0<strong>10</strong> General Fund (Districtwide) 0 36,500<br />

011 Alafia River Basin 0 0 3,336<br />

0<br />

0 3,336<br />

013 Hillsborough River Basin 0 0 2,979<br />

0<br />

0 2,979<br />

020 Peace River Basin 0 0 28,<strong>10</strong>6<br />

0<br />

0 28,<strong>10</strong>6<br />

0<strong>21</strong> Manasota Basin 0 0 2,079<br />

0<br />

0 2,079<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$73,000<br />

Critical Project Milestones Projected Amended Actual<br />

Develop Contract <strong>10</strong>/1/08 <strong>10</strong>/1/08<br />

Notice To Proceed 1/2/09 <strong>10</strong>/30/08<br />

No Cost Amendment 3/1/09 3/1/09<br />

Year 1 - Data Collection 12/30/09<br />

Year 2 - Data Collection 12/30/<strong>10</strong><br />

Year 3 - Data Collection 12/30/11<br />

Growers Field Day 7/31/12<br />

Journal Publication 7/31/12<br />

Year 4 - Data Collection 12/30/12<br />

Completion Report <strong>10</strong>/31/13<br />

Contract Ends 6/30/14<br />

Status As Of: September 09, 2009<br />

11/1/2008 - Contract to IFAS for review. 12/18/2008 - Wait for University to return executed agreement. 4/20/2009 - Data<br />

collection continuing as planned 6/<strong>10</strong>/2009 - Data collection continuing as planned 9/1/2009 - modified agreement to<br />

reduce scope and project costs.<br />

0<strong>21</strong> - Manasota Basin 165


B265<br />

Optimizing Irrigation For Shade Tree Production<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality<br />

Basin(s) Alafia River, Hillsborough River, Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

University of Florida<br />

Project Manager COHEN, RON<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

There are over 5,000 acres of nursery production in the central part of the District and typically they are permitted for<br />

about 1.7 million gallons of water per acre. With the increase of urban development, it is anticipated that the number of<br />

nursery acres will increase and landscape water use will too. This project will investigate ways to reduce nursery and<br />

landscape irrigation by studying the relationships between moderate water stress, photosynthesis and shoot growth of<br />

trees. The goal of the project is to develop irrigation management strategies that take advantage of gas exchange<br />

properties occurring at moderate water stress. These strategies would be linked to the ongoing projects modeling tree<br />

water use based on ETo, further increasing the level of irrigation precision of non-production situations beyond that<br />

which will come from the ETo projects. Plant growth is a two stage process. First, new cells are produced by<br />

meristematic tissues. Second, these cells enlarge. The first phase mainly requires new cellular components which are<br />

derived from photosynthesis and absorbed minerals. The principal requirement for the second phase of growth, cell<br />

enlargement, is hydrostatic (turgor) pressure. Plant water status, mainly as it affects cell turgor pressure, is the primary<br />

driving force in this second phase. In pecans, nearly all leaf expansion occurred at night (Anderson, 1989). This is the<br />

time when water stress in plants is the lowest, and water status and turgor pressure are the highest. This is<br />

hypothesized as the primary reason cyclic irrigation of containerized plants accelerates growth, in that it results in<br />

higher turgor pressures during the night by making more water available in the root ball late in the day. While this<br />

information on leaf expansion was reported in the scientific literature over <strong>10</strong> years ago, it was never pursued much<br />

further and will be investigated in this project.<br />

Benefits<br />

Information from this project will help nursery producers, commercial landscapers and homeowners reduce water use.<br />

The amount of water saved will be a function of the number of acres planted and their water use, which will change<br />

annually based on market and climatic conditions. Assuming an annual 5% water savings from only nursery<br />

production, there would be a total of about 1.9 mgd savings on permitted water use. In addition, information form this<br />

project can be used by the District's FARMS program to help promote water conservation.<br />

Costs<br />

This four year project will cost the District a total of $83,875. Funding for this project is prorated between five Basin<br />

Boards (Peace River - 23%, Hillsborough River 22%, Alafia - 18%, Manasota 18% and Withlacoochee 11%) based on<br />

the number of permits for nursery production in their watershed. In FY2009, FY20<strong>10</strong>, FY2011, and FY2012 the Basin<br />

Boards will budget each year: Peace River $5,159, Hillsborough River $5,008, Alafia River $4,<strong>10</strong>3, Manasota $4,<strong>10</strong>3<br />

and Withlacoochee River $2,595.<br />

Additional Information<br />

Recently, data collection of a project at MREC supported by the Southwest Florida WMD, Horticultural Research<br />

Institute and others quantified the daily water use of live oak and red maple to 7-inch calipers, and Nellie R. Stevens<br />

holly to 5-inch calipers. Preliminary modeling of red maple reported a high correlation of predicted and actual water<br />

loss based on a algorithm incorporating reference evapotranspiration (ETo) and trunk cross sectional area just below<br />

the first major branch (Beeson, 2007). A project with a similar goal using D.D. Blanchard magnolia, Aliee, Chinese elm<br />

and slash pine is currently in the second year. Maximum plant growth occurs when transpiration is maximum because<br />

transpiration and photosynthesis are tightly linked. Reductions in stomata aperture reduce the flow of carbon dioxide<br />

into leaves and water out of leaves. However, for the limited number of tree species studied, slight to moderate<br />

reductions in stomatal aperture cause no to small reductions in photosynthesis, but resulted in relatively large<br />

reductions in transpiration. Thus under moderate water stress, trees and woody plants, in general, tend become more<br />

water efficient with little reduction in photosynthesis (Noble, 1999).<br />

0<strong>21</strong> - Manasota Basin 166


B265<br />

Optimizing Irrigation For Shade Tree Production<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 0 0 0 20,969<br />

0 20,969<br />

011 Alafia River Basin 0 0 4,<strong>10</strong>3<br />

0<br />

0 4,<strong>10</strong>3<br />

013 Hillsborough River Basin 0 0 5,0<strong>10</strong><br />

0<br />

0 5,0<strong>10</strong><br />

019 Withlacoochee River Basin 0 0 2,595<br />

0<br />

0 2,595<br />

020 Peace River Basin 0 0 5,158<br />

0<br />

0 5,158<br />

0<strong>21</strong> Manasota Basin 0 0 4,<strong>10</strong>3<br />

0<br />

0 4,<strong>10</strong>3<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$41,938<br />

Critical Project Milestones Projected Amended Actual<br />

Develop Agreement <strong>10</strong>/17/08 <strong>10</strong>/6/08<br />

Notice To Proceed 1/2/09 1/30/09<br />

Year I Data Collection 12/31/<strong>10</strong><br />

Year 2 Data Collection 12/31/11<br />

Year 3 Data Collection 12/31/12<br />

Completion Report 5/31/14<br />

Agreement Ends 8/31/14<br />

Status As Of: September 23, 2009<br />

11/1/2008 - Contract sent to IFAS. 12/17/2008 - Waiting for University to return executed Agreement. 4/20/2009 - Data<br />

Collection continuing as planned. 6/<strong>10</strong>/2009 - Reviewed task completion report. 9/1/2009 - Tree growth is behind, will<br />

need to modify project deliverable dates. 9/23/2009 - First Amendment processed to extend deliverable timeframes.<br />

0<strong>21</strong> - Manasota Basin 167


B266<br />

Accounting For Interception of Sprinkler Irrigation Water by<br />

Container Grown Plants<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality<br />

Basin(s) Alafia River, Hillsborough River, Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

University of Florida<br />

Project Manager COHEN, RON<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

The plant canopy plays a critical role in the interception of sprinkler irrigation water. Depending on the size and<br />

architecture of the canopy, as well as the container spacing, interception of irrigation water can be greater than or less<br />

than the amount of irrigation water that would fall into the container. Typically, interception is considered a water loss<br />

and not accounted for when supplying irrigation water. This project will quantify the amount of water that is intercepted<br />

by the plant and funneled to the plant's container. By accounting for this intercepted water, the overall amount for<br />

irrigation management can be reduced. The industry is supportive of this project and will provide funds to reduce the<br />

overall project results.<br />

Benefits<br />

Information from this project will help container nursery producers improve their irrigation efficiency and conserve<br />

water. The amount of water saved will be a function of the number of acres planted and their water use, which will<br />

change annually based on market and climatic conditions. Using the District's regulatory database and assuming an<br />

annual 5% water savings from only nursery production, there would be an annual savings of about 1.9 mgd.<br />

Costs<br />

This three year project will cost the District a total of $91,125. Funding for this project is prorated between five Basin<br />

Boards (Peace River - 23%, Hillsborough River 22%, Alafia - 18%, Manasota 18% and Withlacoochee 11%) based on<br />

the number of permits for nursery production in their watershed. In FY2009, FY20<strong>10</strong>, and FY2011 the Basin Boards<br />

will budget each year: Peace River $7,471, Hillsborough River $7,255, Alafia River $5,945, Manasota $5,944 and<br />

Withlacoochee River $3,760.<br />

Additional Information<br />

Determining the interception factor (IF) for commonly grown plants with a wide range of plant growth habits (e.g.<br />

globose, upright spreading, broad spreading, etc.) and at different spacings between containers, will help growers<br />

improve their efficiency and reduce water use. For example, sweet viburnum, which has been found to have an IF of<br />

>2 during the last month of production, would only require ¼ inch of irrigation water to supply ½ inch to the container at<br />

that latter stage of production. In two experiments where water scheduling was based upon container weight loss, the<br />

irrigation rate averaged 0.2 inch/day using IF, but would have averaged 0.3 inch/day ignoring IF. This represented a<br />

total water savings of 14 inch (0.1 inch/day over a 140 day crop). As more and more nurseries base irrigation<br />

scheduling on evaporative demand (water loss per container) knowing the interception factor at various stages of<br />

production would be critical in determining the actual irrigation requirements of a crop. For mixed plantings, this<br />

information will add further precision to grouping plants not only by evaporative demand (current BMP), but also by<br />

their irrigation interception characteristics. Currently, this information is limited to a few species (Beeson and Yeager,<br />

2003). Data are needed for a wide range of plant growth habits at different stages (sizes) of plant growth with various<br />

container spacings in order for this information to be useful for growers and water managers.<br />

0<strong>21</strong> - Manasota Basin 168


B266<br />

Accounting For Interception of Sprinkler Irrigation Water by<br />

Container Grown Plants<br />

Prior Cumulative FY 2009 FY20<strong>10</strong><br />

Funding Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0 0 0 30,375<br />

0<strong>10</strong> General Fund (Districtwide) 0 30,375<br />

011 Alafia River Basin 0 0 5,944<br />

0<br />

0 5,944<br />

013 Hillsborough River Basin 0 0 7,255<br />

0<br />

0 7,255<br />

019 Withlacoochee River Basin 0 0 3,760<br />

0<br />

0 3,760<br />

020 Peace River Basin 0 0 7,471<br />

0<br />

0 7,471<br />

0<strong>21</strong> Manasota Basin 0 0 5,945<br />

0<br />

0 5,945<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$60,750<br />

Critical Project Milestones Projected Amended Actual<br />

Develop Contract <strong>10</strong>/1/08 <strong>10</strong>/1/08<br />

Notice To Proceed 1/2/09 1/6/09<br />

Year 1 - Data Collection 12/30/09<br />

Year 2 - Data Collection 12/30/<strong>10</strong><br />

Publish Web Page 6/30/11<br />

Completion Report 9/30/11<br />

Agreement Ends 3/31/12<br />

Status As Of: August 27, 2009<br />

11/1/2008 - Contract sent to IFAS. 12/18/2008 - Waiting for University to return Agreement. 4/20/2009 - Ordering<br />

equipment 6/<strong>10</strong>/2009 - Reviewed site design plan. 9 /1/ 2009 - Reviewed task completion report 2.<br />

0<strong>21</strong> - Manasota Basin 169


B273<br />

MFL Stream Diversion and Assessment Project<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply, Natural Systems<br />

Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers, Pinellas-Anclote River,<br />

Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager MORALES, JON<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

To further validate existing stream Minimum Flows and Levels (MFL) methodology consistent with peer review<br />

recommendation. A frequent focus of criticism of the MFL methodology applied by the District to rivers and estuaries<br />

is the use of a 15 percent habitat loss criterion as a threshold for assessing "significant harm." Quoting from the peer<br />

review of the Braden River MFL, the panel noted:<br />

" The draft report describes the metrics used to define the limit at which further withdrawals would be significantly<br />

harmful to the water resources or ecology of the area as stated in Florida statutes. The authors note that significant<br />

harm was not defined in statute. The District chose to interpret significant harm as the loss of flows associated with<br />

fish passage and maximization of stream bottom habitat with the least amount of flow and quantifiable reductions in<br />

habitat. Overall, this is a reasonable approach from an ecological perspective and likely satisfies the intent of the<br />

statute. The authors state that, [in] general, instream flow analysts consider a loss of more than 15% habitat, as<br />

compared to undisturbed or current conditions, to be a significant impact on that population or assemblage. The<br />

authors further note, in our opinion, correctly, that there are few `bright lines which can be relied upon to judge when<br />

`significant harm occurs. Rather loss of habitat in many cases occurs incrementally as flow decline, often without a<br />

clear inflection point or threshold. Nevertheless, the 15% habitat loss criterion remains one of the least rigorous, most<br />

subjective aspects of the District's approach to setting MFLs. Justification for this threshold is based on common<br />

professional practice in interpreting the results of PHABSIM analyses (Gore at al. 2002), a review of relevant literature<br />

where reported percentage changes ranged from <strong>10</strong> to 33%, and on previous peer reviews that found the 15%<br />

threshold to be reasonable and prudent, especially given the absence of clear guidance in the statute or in the<br />

scientific literature on levels of change that would constitute significant harm (e.g., Shaw et al. 2005). The draft upper<br />

Braden report continues the District's practice of using a 15% change in habitat availability as the threshold for defining<br />

significant harm and now applies this threshold broadly to include both spatial and temporal loss of habitat or<br />

connectivity. The Panel again acknowledges that the use of this criterion is rational and pragmatic, but also recognizes<br />

that the specific value of 15% is subjective and has only modest validation or support from the primary literature. . . . .<br />

More importantly, however, is the need for the District to commit the resources necessary to validate the presumption,<br />

that a 15% decrease in spatial or temporal habitat availability or a 15% increase in violations of the low-flow threshold,<br />

does not cause significant harm. "<br />

This project represents the best means for validating the effect that a given flow reduction has on available habitat and<br />

the biota of a stream segment. District staff proposes to locate an acceptable stream segment in order to conduct<br />

controlled diversions from a defined stream segment in order to evaluate the impact that a range of flow and habitat<br />

reductions has on the biota (e.g., fishes, macroinvertebrates) and water resource values. It is envisioned that such a<br />

project will require a number of years to complete (possibly a decade), and an annual commitment of significant<br />

resources to accomplish.<br />

Benefits<br />

If implemented, this project will provide as definitive a test of the 15 percent habitat loss criterion as is practical under<br />

field conditions, and the results will be widely applicable to stream assessments and the development of environmental<br />

flows though out the country.<br />

Costs<br />

Funding in FY2009 is currently for $150,000. The combined Basin Board's contribution is 50% or $75,000 or $9,375<br />

from each of the eight basin boards, with the remaining 50% ($75,000) to be funded by the Governing Board. A small<br />

amount has been budgeted for parts and supplies and travel. Total requested funding for FY20<strong>10</strong> is $150,000.00.<br />

0<strong>21</strong> - Manasota Basin 170


B273<br />

MFL Stream Diversion and Assessment Project<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 0 0 84,977 160,407<br />

0 245,384<br />

011 Alafia River Basin 0 0 9,375<br />

0<br />

0 9,375<br />

013 Hillsborough River Basin 0 0 9,375<br />

0<br />

0 9,375<br />

014 Northwest Hillsborough Basin 0 0 9,375<br />

0<br />

0 9,375<br />

015 Coastal Rivers Basin 0 0 9,375<br />

0<br />

0 9,375<br />

016 Pinellas-Anclote River Basin 0 0 9,375<br />

0<br />

0 9,375<br />

019 Withlacoochee River Basin 0 0 9,375<br />

0<br />

0 9,375<br />

020 Peace River Basin 0 0 9,375<br />

0<br />

0 9,375<br />

0<strong>21</strong> Manasota Basin 0 0 9,375<br />

0<br />

0 9,375<br />

Status As Of: September 03, 2009<br />

Total:<br />

Future<br />

Funding<br />

This project is now activated coinciding with the new fiscal year. Staff is still developing project milestones. From an<br />

operational standpoint, staff have narrowed a field site (Gum Springs) for the execution of this project. Current activity<br />

related to this project is mapping of the entire field site for placement of potential experimental and control sites.<br />

Currently, baseline assessment studies are being lined up to avail of the 150K budget for the first year. Inquiries for a<br />

hydraulic pump and a sluice gate mechanism (relative to costs and maintenance) are presently being sought. Staff also<br />

plan to explore soon how to obtain the necessary permits required to operate this flow manipulation study out in the field.<br />

A meeting with Florida DEP scheduled in July was receptive to the issuance of an Environmental Resource Permit based<br />

on certain conditions. All budget monies have already been encumbered for FY2009.<br />

0<strong>21</strong> - Manasota Basin 171<br />

Total<br />

Funding<br />

$320,384


B274<br />

Salt Water Intrusion Monitoring Network<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Quality<br />

Basin(s) Alafia River, Manasota<br />

Cooperator(s)<br />

Project Manager KRAFT, CAROL<br />

Task Manager(s)<br />

Status Ongoing<br />

STARKS, ROBERTA<br />

Description<br />

The Salt Water Intrusion Monitoring Network (SWIMN) was developed in an effort to work closely with Water Use<br />

Permit (WUP) holders along the coastal areas of the Southern Water Use Caution Area (SWUCA), who have wells<br />

that are identified through groundwater modeling efforts to be most at risk for salt-water intrusion. A water quality<br />

baseline for the wells is established through a sampling assessment of current chloride, sulfate, dissolved solids, and<br />

electrical conductivity concentrations. After the baseline assessment, the wells are sampled by the permittees for<br />

electrical conductivity at regular intervals, using District supplied conductivity meters. This provides an early warning<br />

for WUP holders to plan for alternative supplies, alternative use of the land, or to take advantage of the District's<br />

backplugging, Facilitating Agricultural Resource Management Systems (FARMS) program, and Cooperative Funding<br />

Initiative to attempt to mitigate the problem.<br />

Benefits<br />

This project monitors ground-water quality data and works closely with WUP holders to help determine the degree of<br />

salt water intrusion experienced by the permittee in an effort to help mitigate potential impacts.<br />

Costs<br />

The FY2009 project cost is $33,000, with the District's General Fund contributing half ($16,500). The remaining funds<br />

will be split between the Alafia River Basin (20 percent; $5,600) and Manasota Basin (30 percent; $<strong>10</strong>,900). This<br />

project is expected to be ongoing. District funds shown in the table include staff salaries and overhead costs.<br />

Additional Information<br />

The SWIMN was established in order to track water quality in WUP well sites along the coastal areas of the SWUCA<br />

that were predicted through modeling efforts to be at risk for salt water intrusion. Approximately 190 WUP wells have<br />

been identified by District modeling efforts to be at varying degrees of risk of salt water intrusion. These wells have<br />

been prioritized according to their degree of risk. Sampling of the wells predicted to be at the greatest risk has already<br />

been conducted. The remaining wells will be sampled and WUP holders that agree to participate will be supplied with<br />

training and equipment (conductivity meters) to periodically check water quality in their wells. All data collected is<br />

analyzed for local trends, and WUP holders are informed of negative trends in their water quality. If it is determined<br />

that a WUP holder is experiencing salt-water intrusion to the degree that ground water in the wells is no longer<br />

suitable for its intended use, the permittee can explore management actions available though the District, in an<br />

attempt to mitigate the problem.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 0 0 33,266 27,747<br />

0 61,013<br />

011 Alafia River Basin 0 0 11,153 <strong>10</strong>,357<br />

0 <strong>21</strong>,5<strong>10</strong><br />

0<strong>21</strong> Manasota Basin 0 0 22,115 17,389<br />

0 39,504<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$122,027<br />

Critical Project Milestones Projected Amended Actual<br />

Kick-Off <strong>Meeting</strong> 8/28/08 8/28/08<br />

Complete Baseline Sampling of Candidate Wells 9/30/09<br />

Provide conductivity meter training and support to select well owners 9/30/09<br />

0<strong>21</strong> - Manasota Basin 172


B274<br />

Salt Water Intrusion Monitoring Network<br />

Status As Of: September 01, 2009<br />

Reviews of associated WUPs and subsequent sampling of wells are currently ongoing. Staff is also currently evaluating<br />

operation and training for conductivity meters for associated WUP holders.<br />

0<strong>21</strong> - Manasota Basin 173


B276<br />

(Cancelled) Grants for Reclaimed Irrigation Projects (GRIP) Program<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply, Water Quality<br />

Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Pinellas-Anclote River, Peace River,<br />

Manasota<br />

Cooperator(s)<br />

Project Manager MCGOOKEY, SCOTT<br />

Task Manager(s)<br />

Status Cancelled<br />

Description<br />

This program provides funding assistance to new developments for the construction of reclaimed water distribution<br />

systems. This program was recommended by the District's Reclaimed Water Task Force (RWTF) and approved by<br />

the Governing Board for implementation at their February 2008 meeting. The program will provide an incentive to<br />

encourage developers and local governments to jointly design and construct reclaimed water distribution systems in<br />

new residential developments where other alternative water sources are not available to meet outdoor water needs in<br />

the development. The program will promote the construction of reclaimed water distribution systems during the<br />

construction of new developments and therefore reduce the need for the costly alternative of retrofiting reclaimed<br />

water distribution systems in established residential neighborhoods. The program will be available to new<br />

developments where reclaimed water will be available within five years, as indicated in a capital improvement plan.<br />

Benefits<br />

This program will promote the construction of reclaimed water distribution systems during the construction of new<br />

developments and therefore reduce the need for the costly alternative of retrofiting reclaimed water distribution<br />

systems in established residential neighborhoods. The estimated beneficial offset will be based on the number of<br />

residential units in the development and the funds available. Historical information shows an average benefit from<br />

using reclaimed water would be 300 gpd for each residential unit.<br />

Costs<br />

The Alafia River, Hillsborough River, Pinellas-Anclote River, Manasota, and Northwest Hillsborough Basin Boards<br />

have budgeted $500,000 each for this program. The estimated cost for installing the reclaimed water distribution<br />

system in a new development is $1,200 per residential unit. The District will reimburse up to 50 percent of the actual<br />

cost and no more than $600 per residential unit.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

011 Alafia River Basin 0 0 501,540<br />

0<br />

0 501,540<br />

013 Hillsborough River Basin 0 0 501,540<br />

0<br />

0 501,540<br />

014 Northwest Hillsborough Basin 0 0 501,540<br />

0<br />

0 501,540<br />

016 Pinellas-Anclote River Basin 0 0 501,609<br />

0<br />

0 501,609<br />

020 Peace River Basin 0 0 1,609<br />

0<br />

0 1,609<br />

0<strong>21</strong> Manasota Basin 0 0 501,540<br />

0<br />

0 501,540<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$2,509,378<br />

Critical Project Milestones Projected Amended Actual<br />

Start receiving applications <strong>10</strong>/1/08<br />

Close application period 12/5/08<br />

Recommend Projects to Basins 2/27/09<br />

Status As Of: June 16, 2009<br />

The Alafia River, Hillsborough River, Pinellas-Anclote River, Manasota, and Northwest Hillsborough Basin Boards<br />

0<strong>21</strong> - Manasota Basin 174


B276<br />

(Cancelled) Grants for Reclaimed Irrigation Projects (GRIP) Program<br />

budgeted $500,000 each for this program in FY2009. District staff developed a web page and a program application<br />

process. The program was introduced at the Cooperative Funding Initiative Kick-off <strong>Meeting</strong>s and a news release was<br />

issued October 1, 2008. The program was open for applications during the 20<strong>10</strong> CFI application period between October<br />

1, 2008 and December 5, 2008. Action-to-date: Delayed. No applications were received for the program. This is probably<br />

the result of the apparent economic down-turn in the housing industry. Budgeted funds for this program have been<br />

returned to the Basins to fund other requirements or projects that are ready to proceed.<br />

0<strong>21</strong> - Manasota Basin 175


B277<br />

Florida Water Star Gold Certification<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply, Water Quality, Natural Systems<br />

Basin(s) General Fund (District), Alafia River, Hillsborough River, Coastal Rivers, Pinellas-Anclote River,<br />

Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager DURELL, SYLVIA<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

Florida Water StarSM Gold (FWSG), a Basin Initiative project, is a higher-tier version of the Florida Water StarSM<br />

(FWS) program, which was originated by the St. Johns River Water Management District (SJRWMD). SJRWMD's<br />

program is now referred to as the silver level. Both certification programs provide incentives for builders and<br />

developers to include indoor and outdoor water efficiency in their new projects. The gold level was adapted to reflect<br />

the advanced level of best management practices being used by builders in this District including criteria that will<br />

reduce impacts to water quality. This higher level of commitment by the builders comes from education on<br />

Florida-friendly landscaping provided within this District for the past several years. In addition, closer alignment with the<br />

best management practices of the University of Florida/Institute of Food and Agricultural Sciences' Florida-Friendly<br />

LandscapingTM principles was necessary. This alignment also led to the added benefit of follow-up visits by FYN<br />

coordinators to new homeowners of FWSG homes to ensure that the water-conserving components of the home are<br />

maintained correctly. FYN coordinators will also act as a resource to area builders and landscape professionals for<br />

FWSG. Currently, only FWSG is being promoted in this District. Feasibility of the delivery of a residential FWS<br />

program (Bronze) in this District is being explored. This is the second year of the FWSG program. As of the end of<br />

FY2009, four properties have been certified FWSG and 11 companies have signed contracts to build <strong>21</strong>6 homes<br />

under the program. Sixty houses are expected to be built as FWSG by fiscal year end.<br />

Benefits<br />

By providing an incentive for builders, developers and homeowners that encourages them to incorporate best<br />

management practices, the District realizes water savings and water quality protection. The demand for water<br />

continues to increase with the expansion in land development, building construction and increased population.<br />

Recognizing that the majority of decisions concerning new landscapes are made by builders, developers,<br />

and landscape and irrigation professionals, the FWSG program provides a plan they can follow that positively impacts<br />

water resources. Because of its high profile and the involvement of the water management districts, this program is of<br />

high interest to the target audience. By requiring water-conserving elements for certification, this project increases<br />

knowledge of water conservation measures of builders and landscape and irrigation specialists. Changes in<br />

behavior occur when a builder signs a contract with the District to build houses according to the FWSG criteria, and<br />

agrees thereafter to include water conserving elements into future projects. Owners of FWSG properties receive the<br />

benefits of the indoor and outdoor water-conserving elements of the program and can promote the certification as a<br />

marketing edge at time of resale. The program's close partnership with the Florida Green Building Coalition<br />

(FGBC) resulted in FWSG outdoor water conservation criteria being incorporated into the FGBC standards.<br />

Costs<br />

The total cost of the FY20<strong>10</strong> program is $<strong>10</strong>0,000, with the District contributing $50,000 and the Basin Boards<br />

contributing $50,000 (Alafia River $3,500; Hillsborough River $12,000; Coastal Rivers $4,500; Pinellas-Anclote River<br />

$11,500; Withlacoochee River $3,500; Peace River $7,500; Manasota $7,500). Funding provides for salary and travel<br />

for a project coordinator to manage the program, advertising costs to promote the program, memberships in trade and<br />

professional associations and fees associated with trade shows and other promotional opportunities for outreach to all<br />

basins. The dollar amount allocated per contributing basin is based on population. The budget lines below include<br />

costs for staff to manage the project.<br />

Additional Information<br />

The total cost of the FY2009 program was $<strong>10</strong>0,000, with the District contributing $50,000 and the Basin Boards<br />

contributing $50,000 (Alafia River $3,500; Hillsborough River $12,000; Coastal Rivers $4,500; Pinellas-Anclote River<br />

$11,500; Withlacoochee River $3,500; Peace River $7,500; Manasota $7,500). This is the second year of funding for<br />

the FWSG Certification program. FWSG supports the Governor's Climate Change Initiative by promoting public<br />

protection, wise use and management of natural resources. A residential FWS program (Bronze) and programs for<br />

commercial buildings and communities are being developed and piloted by SJRWMD, with input from SFWMD and<br />

this District.<br />

0<strong>21</strong> - Manasota Basin 176


B277<br />

Florida Water Star Gold Certification<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 0 0 52,340 51,224<br />

0 <strong>10</strong>3,564<br />

011 Alafia River Basin 0 0 4,561 4,992<br />

0 9,553<br />

013 Hillsborough River Basin 0 0 8,561 14,000<br />

0 22,561<br />

014 Northwest Hillsborough Basin 0 0 5,061<br />

0<br />

0 5,061<br />

015 Coastal Rivers Basin 0 0 5,561 5,959<br />

0 11,520<br />

016 Pinellas-Anclote River Basin 0 0 14,061 12,738<br />

0 26,799<br />

019 Withlacoochee River Basin 0 0 5,561 4,989<br />

0 <strong>10</strong>,550<br />

020 Peace River Basin 0 0 <strong>10</strong>,061 9,651<br />

0 19,712<br />

0<strong>21</strong> Manasota Basin 0 0 9,061 8,870<br />

0 17,931<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$227,251<br />

Critical Project Milestones Projected Amended Actual<br />

FY2009<br />

Request for quotes issued <strong>10</strong>/15/08 <strong>10</strong>/15/08<br />

Purchase order/scope of work created 11/15/08 11/12/08<br />

First task report 11/30/08 11/30/08<br />

Second task report 12/30/08 12/30/08<br />

FWS/FWSG certifier training 1/16/09 1/16/09<br />

Third task report 1/30/09 1/30/09<br />

Fourth task report 2/27/09 2/27/09<br />

First home kick-off event 3/25/09 3/25/09<br />

Fifth task report 3/31/09 3/31/09<br />

Second house certified 4/17/09 4/17/09<br />

Sixth task report 4/30/09 5/4/09 5/4/09<br />

Seventh task report 5/29/09 5/29/09<br />

Eighth task report 6/30/09 6/30/09<br />

Ninth task report 7/31/09 7/31/09<br />

Third house certified 8/18/09 8/18/09<br />

Tenth task report 8/31/09 8/31/09<br />

Eleventh task report 9/30/09<br />

Twelfth task report <strong>10</strong>/30/09<br />

Project complete <strong>10</strong>/31/09<br />

FY20<strong>10</strong><br />

First task report 11/5/09<br />

Second task report 12/4/09<br />

Third task report 1/5/<strong>10</strong><br />

Fourth task report 2/5/<strong>10</strong><br />

Fifth task report 3/5/<strong>10</strong><br />

Sixth task report 4/5/<strong>10</strong><br />

Seventh task report 5/5/<strong>10</strong><br />

Eighth task report 6/4/<strong>10</strong><br />

Ninth task report 7/5/<strong>10</strong><br />

Tenth task report 8/5/<strong>10</strong><br />

Eleventh task report 9/6/<strong>10</strong><br />

Twelfth task report <strong>10</strong>/5/<strong>10</strong><br />

Status As Of: September 01, 2009<br />

On March 25, 2009, a model home in the Glencairn Cottages community in Dunedin (Pinellas County) was the setting for<br />

0<strong>21</strong> - Manasota Basin 177


B277<br />

Florida Water Star Gold Certification<br />

a premier event for the FWSG program. The house was the first to be certified as FWSG in the District and the state.<br />

Since then, a second home was certified in Polk County and a third house was certified in Pinellas County. As of the end<br />

of FY2009, 11 companies have signed contracts to build <strong>21</strong>6 homes under the program. Susan Douglas, program<br />

coordinator, met with eight builders in the past two months and also met with the Tampa Bay Builders Association to plan<br />

training for association members. The builder of the Polk Builders Association Parade of Homes Showcase home will<br />

receive the FWSG plaque at the Parade opening ceremony on September <strong>10</strong>. This house will be the fourth certified<br />

FWSG house in the District. Staff met with employees of Florida Home Partnership to plan a certification event for nine<br />

houses in Hillsborough County, which is tentatively planned for November 4. District staff reviewed the new FWS retrofit<br />

program for existing homes and a commercial program. Both programs will be piloted by SJRWMD. Presentations about<br />

the program were made at the Florida Green Building Coalition "Green Trends" conference, the District's Basin Board<br />

Education Committee meeting and Public Supply and Industrial advisory committee meetings. ACTION TO DATE: On<br />

time.<br />

0<strong>21</strong> - Manasota Basin 178


B3<strong>10</strong><br />

Manatee - Maintenance of Watershed Parameters and Models<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Project Manager NGUYEN, NAM<br />

Task Manager(s)<br />

Status Ongoing<br />

HAMMOND, MARK, MCCLUNG, GORDON, WEVER, DONNA, BROWN, GWEN<br />

Description<br />

This is a basin initiative to fund the Maintenance of Watershed Parameters and Models element of the District's<br />

Watershed Management Program (WMP) in Manatee County. This process will be applied to watersheds where the<br />

parameters and model(s) were developed or updated based on the District's Guidelines and Specifications (G&S) and<br />

where parameters from Environmental Resource Permitting (ERP) submittals can be converted to the District's GIS<br />

system until a model is developed. Funding will be required each year to continue maintenance. With proposed<br />

funding the work of capturing watershed parameter changes resulting from approved ERPs, and updates to<br />

topographic, soils and land use information will continue throughout the District. The funding will also support the peer<br />

review and public outreach process on the preliminary floodplain results, and presenting the results to Governing<br />

Board for approval.<br />

Benefits<br />

A WMP provides a method to evaluate the capacity of a watershed to protect, enhance, and restore water quality and<br />

natural systems, while achieving flood protection. The information developed assists local governments with their land<br />

management responsibilities by establishing a level of service and developing Best Management Practices (BMPs) to<br />

address level of service deficiencies. In addition, the information provides the District with the best available<br />

information to evaluate adverse impacts and mitigation of floodplain impacts for proposed ERPs. The most up to date<br />

information about the watershed will be available through the continuous maintenance of watershed parameters in the<br />

GIS database: as ERP permits are approved, new information is provided to the District through aerial topographic<br />

mapping and the public review and comment period. If a watershed model has not been developed, the maintenance<br />

of parameters in the GIS processes the information in a format that will save time and funding when the watershed is<br />

modeled.<br />

Costs<br />

For FY20<strong>10</strong> the funding distribution for Manatee county is as follows: Governing Board $67,635 and Manasota Basin<br />

Board $67,635. There is no revenue from Manatee County. The budget is based on the projected number of approved<br />

ERP permits and the average development area within each Basin. Local government matching funds are equally<br />

matched by Governing Board and Basin Board funds. The Governing Board is also providing funds specifically to<br />

address public meetings and unforeseen issues with projecting the floodplains to be used in the FEMA mapping<br />

process. Future funding to continue maintenance has been estimated through 2011. The projected annual funding<br />

amount for Manatee County ranges from $200,000 to $250,000. The District funding amounts shown in the table<br />

includes staff salaries.<br />

Additional Information<br />

A WMP includes five major elements: 1) Topographic Information, 2) Watershed Evaluation, 3) Watershed<br />

Management Plan, 4) Implementation of Best Management Practices, and 5) Maintenance of Watershed Parameters<br />

and Models. Implementing elements of the WMP with local governments is one of the District's Strategic Priorities.<br />

After the Topographic Information, Watershed Evaluation and Management Plan elements are completed; the<br />

watershed parameters and models require continuous maintenance to simulate the watershed's characteristics as the<br />

land form changes. The watershed's parameters change with the continued growth experienced in the District. If<br />

continued maintenance of the models is not performed, the watershed parameters and model will no longer represent<br />

the system. This limits their value in the areas of ERP and flood protection programs. A revenue agreement will be<br />

developed with each community contributing funds towards maintenance. The District will manage the project and<br />

enter into purchase orders and agreements to accomplish project tasks. Future funding will be required each fiscal<br />

year to continue maintenance of watershed parameters and models. In the future those local governments with the<br />

technical abilities to perform the maintenance activities will be encouraged to manage this effort. The District will<br />

provide funding assistance to communities that can and those that cannot provide matching funds. Matching funds will<br />

be requested from the Federal Emergency Management Agency (FEMA) for this basin initiative. Failure to provide<br />

ongoing maintenance will diminish the return on the investment the District has made in their respective Watershed<br />

Management Plans.<br />

0<strong>21</strong> - Manasota Basin 179


B3<strong>10</strong><br />

Manatee - Maintenance of Watershed Parameters and Models<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 0 0 0 68,404<br />

0 68,404<br />

0<strong>21</strong> Manasota Basin 0 0 0 67,635<br />

0 67,635<br />

Status As Of:<br />

0<strong>21</strong> - Manasota Basin 180<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$136,039


B315<br />

Sarasota - Maintenance of Watershed Parameters and Models<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Project Manager TURNER, DAWN<br />

Task Manager(s)<br />

Status Ongoing<br />

MCCLUNG, GORDON, WEVER, DONNA<br />

Description<br />

This is a basin initiative to fund the Maintenance of Watershed Parameters and Models element of the District's<br />

Watershed Management Program (WMP) in Sarasota County. This process will be applied to watersheds where the<br />

parameters and model(s) were developed or updated based on the District's Guidelines and Specifications (G&S) and<br />

where parameters from Environmental Resource Permitting (ERP) submittals can be converted to the District's GIS<br />

system until a model is developed. Funding will be required each year to continue maintenance. With proposed<br />

funding the work of capturing watershed parameter changes resulting from approved ERPs, and updates to<br />

topographic, soils and land use information will continue throughout the District. The funding will also support the peer<br />

review and public outreach process on the preliminary floodplain results, and presenting the results to Governing<br />

Board for approval.<br />

Benefits<br />

A WMP provides a method to evaluate the capacity of a watershed to protect, enhance, and restore water quality and<br />

natural systems, while achieving flood protection. The information developed assists local governments with their land<br />

management responsibilities by establishing a level of service and developing Best Management Practices (BMPs) to<br />

address level of service deficiencies. The information also provides the District with the best available information to<br />

evaluate adverse impacts and mitigation of floodplain impacts for proposed ERPs. In addition, as ERP permits are<br />

approved, new information is provided to the District through aerial topographic mapping and the public review and<br />

comment period. If a watershed model has not been developed, the maintenance of parameters in the GIS processes<br />

will allow the ERP information to be captured in a format that will save time and funding when the watershed is<br />

modeled. As a result, the most up to date information about the watershed will be available in the District's GIS<br />

database.<br />

Costs<br />

For FY20<strong>10</strong> the funding distribution for Sarasota county is as follows: Governing Board $64,420; and Manasota Basin<br />

$64,420. The budget is based on the projected number of approved ERP permits and the average development area<br />

within each Basin. The Governing Board is also providing funds specifically to address public meetings and<br />

unforeseen issues with projecting the floodplains to be used in the FEMA mapping process. Future funding to continue<br />

maintenance has been estimated through 2011. The District funding amounts shown in the table includes staff<br />

salaries.<br />

Additional Information<br />

A WMP includes five major elements: 1) Topographic Information, 2) Watershed Evaluation, 3) Watershed<br />

Management Plan, 4) Implementation of Best Management Practices, and 5) Maintenance of Watershed Parameters<br />

and Models. Implementing elements of the WMP with local governments is one of the District's Strategic Priorities.<br />

After the Topographic Information, Watershed Evaluation and Management Plan elements are completed; the<br />

watershed parameters and models require continuous maintenance to simulate the watershed's characteristics as the<br />

land form changes. The watershed's parameters change with the continued growth experienced in the District. If<br />

continued maintenance of the models is not performed, the watershed parameters and model will no longer represent<br />

the system. This limits their value in supporting the District's Resource Regulation and flood protection programs.<br />

A revenue agreement will be developed with each community contributing funds towards maintenance. The District<br />

will manage the project and enter into purchase orders and agreements to accomplish project tasks. Future funding<br />

will be required each fiscal year to continue maintenance of watershed parameters and models. In the future those<br />

local governments with the technical abilities to perform the maintenance activities will be encouraged to manage this<br />

effort. The District will provide funding assistance to communities that can manage maintenance; and accept<br />

cooperative funding from those that cannot. Matching funds will also be requested from the Federal Emergency<br />

Management Agency (FEMA) for this basin initiative. Failure to provide ongoing maintenance will diminish the return<br />

on the investment the District has made in their respective Watershed Management Plans.<br />

0<strong>21</strong> - Manasota Basin 181


B315<br />

Sarasota - Maintenance of Watershed Parameters and Models<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 0 0 0 65,189<br />

0 65,189<br />

0<strong>21</strong> Manasota Basin 0 0 0 69,356<br />

0 69,356<br />

Status As Of:<br />

0<strong>21</strong> - Manasota Basin 182<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$134,545


B620<br />

Mapping and GIS<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality, Natural Systems<br />

Basin(s) General Fund (District), Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers,<br />

Pinellas-Anclote River, Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

N/A<br />

Project Manager DICKS, STEVE<br />

Task Manager(s)<br />

DICKS, STEVE<br />

Status Ongoing<br />

Description<br />

This is a continuing initiative with the goal of providing Geographic Information System (GIS), aerial photo<br />

interpretation and photogrammetric mapping services to support Governing and Basin Board activities. GIS support<br />

includes the input, management, analysis and distribution of spatial data, the design and implementation of databases,<br />

software training and map production. Aerial photo interpretation includes land use and cover mapping in support of<br />

land acquisition, Surface Water Improvement and Management (SWIM), engineering, planning and environmental<br />

studies. Photogrammetric support includes the mapping of topographic information, collection of aerial photographs<br />

and satellite imagery and the production of digital orthophotographs. This program also supports the distribution of<br />

data to the public and routine maintenance activities. The annual budget includes administrative costs for salaries,<br />

travel, training, plotting and photographic supplies, maps and other data purchases, etc.<br />

Benefits<br />

Mapping and GIS has been a continuing activity since 1987 and is required to support the District's GIS, digital<br />

orthophoto, aerial mapping and other data collection, maintenance and management activities. The District's GIS<br />

database is an integral component of planning, engineering, regulatory, and land acquisition and management<br />

activities. In a rapidly growing area such as the District, continued maintenance and expansion is needed for the GIS<br />

database to meet new demands and is required to protect the historical investment in the system. The data are<br />

currently accessed by over 450 District staff using the ArcGIS software, and serves as the foundation for the Water<br />

Management and Land Resources Information Systems. Additionally, the data collected by the Mapping and GIS<br />

Section are viewable and downloadable from the District's Internet web site.<br />

Costs<br />

In addition to plotting/printing supplies, office supplies and travel/training the FY20<strong>10</strong> funding include: Adminstrative<br />

Assistant Contractor ($30,633 - Governing Board), GIS Programming Contractor ($220,000 - Governing Board),<br />

Parcel Updates $48,000 - Governing Board). Funds for the GIS Programming Contractor are transferred to the<br />

Information Resources Department at the beginning of the fiscal year.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 0 (<strong>21</strong>7,561) 866,780 946,467<br />

0 1,595,686<br />

011 Alafia River Basin 0 0 37,509 27,245<br />

0 64,754<br />

013 Hillsborough River Basin 0 0 37,984 27,245<br />

0 65,229<br />

014 Northwest Hillsborough Basin 0 0 36,559<br />

0<br />

0 36,559<br />

015 Coastal Rivers Basin 0 0 37,509 27,245<br />

0 64,754<br />

016 Pinellas-Anclote River Basin 0 0 39,409 27,245<br />

0 66,654<br />

019 Withlacoochee River Basin 0 0 39,409 27,245<br />

0 66,654<br />

020 Peace River Basin 0 0 41,784 27,245<br />

0 69,029<br />

0<strong>21</strong> Manasota Basin 0 0 40,829 31,785<br />

0 72,614<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$2,<strong>10</strong>1,933<br />

Critical Project Milestones Projected Amended Actual<br />

0<strong>21</strong> - Manasota Basin 183


B620<br />

Mapping and GIS<br />

The following are major activities for FY20<strong>10</strong><br />

Transfer GIS Contractor Funds to IRD and Fill Position <strong>10</strong>/30/09<br />

Issue work order for parcel update. 12/30/09<br />

Status As Of: August 31, 2009<br />

Mapping and GIS is an ongoing support activity and to date there were no unforeseen expenditures or activities in<br />

FY2009. The section will continue supporting ad hoc requests for GIS data as well as conducting routine data<br />

maintenance activities. Significant activities completed in 2009 include:<br />

Migration of the District GIS software to the ArcGIS 9.3.1 release.<br />

Conversion of GIS database from the Universal Transverse Mercator Projection to State Plane Feet for improved<br />

compatibility with local governments (migration to be fully completed October 4).<br />

Conversion of GIS database to ESRI Spatial Data Type.<br />

Replacement of ArcIMS map viewers with ArcServer technology (currently in testing, will go into production Oct. 4).<br />

Staff are currently closing out FY2009 projects and preparing for FY20<strong>10</strong>.<br />

0<strong>21</strong> - Manasota Basin 184


B630<br />

Field Operations 0<strong>21</strong><br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Natural Systems<br />

Basin(s) General Fund (District), Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers,<br />

Pinellas-Anclote River, Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

N/A<br />

Project Manager HAGBERG, JEFFREY<br />

Task Manager(s)<br />

Status Ongoing<br />

HINKLE, RANDY, BAILEY, TIM<br />

Description<br />

Annual field maintenance activities for this basin are generally for maintenance of well sites which include mowing,<br />

painting, tree trimming, fence installation and repair. Various types of well sites include groundwater sampling wells,<br />

data collection wells, and rainfall wells/gauges. Additional requirements at well sites includes erosion and access road<br />

stabilization and maintenance. These maintenance areas are District owned, but were not acquired using Save Our<br />

Rivers (SOR), P2000, and Forever Florida funds. In the Manasota Basin, costs are primarily for maintenance activities<br />

at 24 well sites.<br />

Benefits<br />

Keeping well sites maintained for Hydrologic Data and Resource Data crews to collect data easily and in a safe<br />

manner. In addition, maintenance requirements at well sites include materials for road stabilization and fencing repairs.<br />

Costs<br />

The budget includes salaries, central garage charges, rental equipment, parts, supplies, landfill disposal fees, land<br />

maintenance materials (limerock, shell, rock, fill), and fencing repairs.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 3,694,451 127,000 628,462 626,838<br />

0 5,076,751<br />

011 Alafia River Basin 327,383 0 64,695 78,558<br />

0 470,636<br />

013 Hillsborough River Basin 2,481,504 600,000 596,677 396,495<br />

0 4,074,676<br />

014 Northwest Hillsborough Basin <strong>21</strong>6,973 0 34,070<br />

0<br />

0 251,043<br />

015 Coastal Rivers Basin 3<strong>10</strong>,399 0 62,966 61,824<br />

0 435,189<br />

016 Pinellas-Anclote River Basin 670,273 0 133,958 170,611<br />

0 974,842<br />

019 Withlacoochee River Basin 806,639 <strong>10</strong>7,000 163,428 198,041<br />

0 1,275,<strong>10</strong>8<br />

020 Peace River Basin 1,129,960 347,000 265,197 145,889<br />

0 1,888,046<br />

0<strong>21</strong> Manasota Basin <strong>21</strong>6,058 0 36,079 39,785<br />

0 291,922<br />

Status As Of: September 03, 2009<br />

Total:<br />

Future<br />

Funding<br />

Field Operations crews have mowed and maintained well and data collection sites as needed during this reporting<br />

period.<br />

0<strong>21</strong> - Manasota Basin 185<br />

Total<br />

Funding<br />

$14,738,<strong>21</strong>3


P259<br />

Youth Water Resources Education<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality, Natural Systems<br />

Basin(s) General Fund (District), Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers,<br />

Pinellas-Anclote River, Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager HULL, MARY MARGARET<br />

Task Manager(s)<br />

Status Ongoing<br />

TORRUSIO, MARY<br />

Description<br />

This Basin Initiative provides funding for a variety of water resources education programs to county school districts,<br />

private schools, homeschool groups and nonformal educators. Program components consist of school board<br />

agreements, teacher training workshops, mini-grants for classroom projects, field trip program support, Envirothon<br />

support and educational resources for students and educators. Agreements with the majority of school districts<br />

throughout the District are completed annually, which provide baseline water resources education programs to<br />

students and teachers. Teacher training efforts ensure that teachers understand and are able to teach students about<br />

relevant basin issues. Training sessions provide background information, materials, experiences and opportunities to<br />

explore topics of importance in the basin. Teacher workshops are conducted by District staff and/or educators who<br />

have been trained by District staff. Participants evaluate the effectiveness of teacher workshops, providing another<br />

method of improving performance. Workshops include information about the District and the basins, as well as basic<br />

hydrology and water management issues. The mini-grant program provides funds directly to teachers to implement<br />

classroom water education projects centered on current basin issues. Classroom projects are designed to increase<br />

knowledge and understanding of the impacts of human activities on the water resources in their basin and to effect<br />

behavior change in regard to water resources conservation and protection. Mini-grant projects must fall into one of six<br />

categories: watersheds, water conservation and supply, water quality, flood protection/drought education, alternative<br />

water sources or natural systems. Projects must also support the District's Strategic Plan. Measurable outcomes<br />

include documentation and evaluation of individual mini-grants including pre- and post-assessment scores, sample<br />

student work generated from the project, video or photographic documentation, and final reports by teachers and<br />

representative students. Mini-grant recipients are required to participate in annual sharing days, which provide an<br />

opportunity for mini-grant participants to showcase their projects and provide model programs for other teachers who<br />

would like to implement water projects in their classrooms. The District provides a variety of educational resources to<br />

educators and students including student newsletters with accompanying teacher's guides, water-testing equipment,<br />

surface and groundwater models, and others. The District also provides kits and boxes specific to water conservation<br />

(the grades K-3 Water Conservation Kit) and watersheds (the grades K-3 Watershed Resource Box and the grades<br />

4-8 Watershed Education Resources Box) that teach students about the importance of water conservation and healthy<br />

watersheds, while meeting Sunshine State Standards and preparing students for the Florida Comprehensive<br />

Assessment Test. Each of these resources includes a big book, several smaller books, a teacher's guide and other<br />

tools and materials used for role-playing and demonstrations. Each county has received kits and boxes for circulation,<br />

and these materials are available through the mini-grant program.<br />

Benefits<br />

The Youth Water Resources Education project forwards the District's mission by providing students, teachers and<br />

families with classroom materials and opportunities for hands-on learning experiences that equip them to make<br />

informed decisions about water resources.<br />

Costs<br />

The proposed FY20<strong>10</strong> budget for youth education totals $906,000. Funding is shared among the basins as follows:<br />

Alafia River $58,900; Hillsborough River $189,650; Coastal Rivers $59,200; Pinellas-Anclote River $256,250;<br />

Withlacoochee River $59,200; Peace River $195,550; Manasota $87,250. The District provides $40,000 in additional<br />

funding support. Budget lines below include costs for staff to manage the projects. This program directly reached<br />

553,201 students and teachers in FY2009 through programs, publications and mini-grants. Additional mini-grants are<br />

planned in the Hillsborough River Basin, as Hillsborough County Water Resource Services is requesting to provide<br />

$50,000 from the county's water restrictions violation revenue to extend the reach of mini-grants. Because most, if not<br />

all, of those involved in youth education programs also receive publications, a conservative estimate puts District<br />

outreach at 66 percent of the students in the District at a cost of $1.69 per person.<br />

Additional Information<br />

The FY2009 budget for youth education was $906,000. Funding was shared among the basins as follows: Alafia River<br />

$58,900; Hillsborough River $129,600; Northwest Hillsborough $60,050; Coastal Rivers $59,200; Pinellas-Anclote<br />

River $256,250; Withlacoochee River $59,200; Peace River $195,550; Manasota $87,250. Staff reached a total of<br />

537,670 students and teachers in FY2008 through programs, mini-grants and outreach. A total of 137 school board<br />

0<strong>21</strong> - Manasota Basin 186


P259<br />

Youth Water Resources Education<br />

mini-grants were completed, impacting more than 94,000 students. Water resources education program agreements<br />

with 12 separate school boards impacted more than <strong>10</strong>3,000 students and teachers. The 17 teacher workshops<br />

involved 318 teachers who will reach more than 45,000 students per year. More than 9<strong>21</strong>,000 pieces of youth<br />

education materials were distributed to students and teachers throughout the District. In FY2008, the Youth Education<br />

Section continued its three-year program evaluation to determine successful program elements, to identify ways to<br />

improve impact and to develop effective ways to impart behavior change. The three-year evaluation will conclude in<br />

FY20<strong>10</strong>.<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 205,535 0 58,197 58,895<br />

0 322,627<br />

011 Alafia River Basin 426,778 0 70,467 69,444<br />

0 566,689<br />

013 Hillsborough River Basin 911,257 0 140,833 <strong>21</strong>1,328 50,000 1,313,418<br />

014 Northwest Hillsborough Basin 420,682 0 68,191<br />

0<br />

0 488,873<br />

015 Coastal Rivers Basin 425,923 0 69,096 71,115<br />

0 566,134<br />

016 Pinellas-Anclote River Basin 2,115,711 0 269,993 274,432<br />

0 2,660,136<br />

019 Withlacoochee River Basin 420,451 0 68,355 69,571<br />

0 558,377<br />

020 Peace River Basin 1,087,312 0 209,130 <strong>21</strong>5,064<br />

0 1,511,506<br />

0<strong>21</strong> Manasota Basin 572,406 0 <strong>10</strong>0,493 <strong>10</strong>2,236<br />

0 775,135<br />

District Budgeted - Outside Revenue<br />

Hillsborough - Youth & Water Rstr Edu<br />

(P259)<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

0 0 0 50,000<br />

Total:<br />

Future<br />

Funding<br />

0<br />

Total<br />

Funding<br />

50,000<br />

$8,812,895<br />

Critical Project Milestones Projected Amended Actual<br />

FY2009 Budgeted Funds<br />

Program commence for school board agreements 8/1/08 8/1/08<br />

Mini-grants selected <strong>10</strong>/15/08 <strong>10</strong>/<strong>10</strong>/08<br />

Mini-grant projects complete 5/30/09 5/29/09<br />

School board agreement program complete 7/30/09 7/30/09<br />

Final reports submitted to District 8/30/09 8/30/09<br />

FY20<strong>10</strong> Budgeted Funds<br />

Program commence for school board agreements 8/3/09 8/28/09 8/28/09<br />

Mini-grants selected <strong>10</strong>/16/09<br />

Mini-grant projects complete 5/29/<strong>10</strong><br />

School board agreement program complete 7/30/<strong>10</strong><br />

Final reports submitted to District 8/31/<strong>10</strong><br />

Status As Of: September <strong>10</strong>, 2009<br />

Outreach: (1) Youth education staff coordinated a field trip to the Weekiwachee Preserve for 125 students from the Boys<br />

and Girls Club of Hernando County on August 5. The children had an opportunity to participate in a guided hike and<br />

watershed education exercises as well as learn about water quality monitoring and land management techniques. (2) On<br />

August 18, staff attended the Lake Wales Charter School Health Fair to distribute Splash! mini-grant and District<br />

recreation information to approximately 400 Polk County teachers. (3) Staff presented information about District<br />

resources to 15 teachers at the Pinellas Secondary Science Planning Day on August <strong>21</strong>. Mini-grants: The Splash!<br />

mini-grant program for the 2009-20<strong>10</strong> school year, available at WaterMatters.org/mini-grants, received 209 applications.<br />

The deadline for teachers to submit their applications was September 11, 2009. Applications are currently under review<br />

for funding consideration. Notification of Splash! mini-grant awards are completed by October 16. School Board<br />

0<strong>21</strong> - Manasota Basin 187


P259<br />

Youth Water Resources Education<br />

Coordination: Staff has opened purchase orders for school board agreements in Charlotte, Citrus, Hardee, Hernando,<br />

Highlands, Hillsborough, Levy, Manatee, Pasco, Pinellas, Polk, Sarasota and Sumter counties. Each school board<br />

agreement funds baseline water resources education programs for K-12 students and educators during the 2009-20<strong>10</strong><br />

school year. The goal of these programs is to develop skills among educators and students that will help them take a<br />

critical look at local and regional water resources issues. Teacher Training: (1) One District-sponsored Great Water<br />

Odyssey facilitator training was held August <strong>10</strong> at the Tampa Service Office. Four teachers and three District staff<br />

members were trained on the fourth- and fifth-grade editions of the program. (2) One Project WET workshop occurred at<br />

Cahoon Elementary in Hillsborough County on August 12. A total of 29 elementary science, math and language arts<br />

teachers participated in the six-hour workshop. (3) On August 13, youth education staff conducted a middle school<br />

science in-service day training for 40 Hernando County seventh- and eighth-grade teachers at the Springs Coast<br />

Environmental Education Center. Publications: Approximately 587,764 youth education publications have been<br />

distributed this calendar year, and 817,319 youth publications have been distributed to date in fiscal year 2009.<br />

ACTION-TO-DATE: On time.<br />

0<strong>21</strong> - Manasota Basin 188


P268<br />

Public Education<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Alafia River, Hillsborough River, Coastal Rivers, Pinellas-Anclote River, Withlacoochee River,<br />

Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager PUTNAM, BETH<br />

Task Manager(s)<br />

Status Ongoing<br />

STERNBERGER, VIRGINIA, MORGAN, DORIAN, DURELL, SYLVIA, ROE, MELISSA<br />

Description<br />

This Basin Initiative provides funding for a variety of projects designed to inform and educate the public about the<br />

importance of managing and protecting the water resources. All programs align directly with one or more of the<br />

District's areas of responsibilities, with the District's Strategic Plan and with basin priorities. The District's broad range<br />

of public education programs and materials reflect the variety of backgrounds and interests of the District's residents<br />

and visitors. Some of the projects are implemented Districtwide with support from all the Basin Boards, while some are<br />

basin-specific and supported only by the Basin Board(s) that will benefit from the project(s). Districtwide programs<br />

include media messaging, educational material development, surveys and other research/evaluation measures,<br />

Florida-Friendly LandscapingTM education, and translation services for Spanish materials. Basin-specific programs<br />

reflect differing priorities as well as unique opportunities. Examples are Community Education Grants, watershed<br />

education programs, homeowners association outreach, the Pilot Irrigation Program, exhibits and signage, special<br />

events and partnerships with local environmental education centers, nonprofits and others.<br />

Benefits<br />

The programs listed benefit the District through an increase in awareness and understanding of water management<br />

and water resource issues, as well as an increase in behaviors that conserve and protect the District's water resources<br />

and watersheds.<br />

Costs<br />

Funding for public education is budgeted within the basins for FY20<strong>10</strong> as follows: Alafia River -- $59,493; Hillsborough<br />

River -- $228,648; Coastal Rivers -- $67,517; Pinellas-Anclote River -- $257,<strong>10</strong>6; Withlacoochee River -- $87,079;<br />

Peace River -- $154,423; Manasota -- $<strong>10</strong>2,715. In addition, the Governing Board contributes $525,000 to media<br />

messaging and $280,275 to support other public education efforts for a total of $1,762,256. Funds support a variety of<br />

education and outreach efforts Districtwide. FY20<strong>10</strong> funding for media messaging totals $902,0<strong>10</strong>. The cost/benefit of<br />

those reached via media messaging is measured in impressions and is projected to cost the District less than six<br />

hundredths of a cent per impression. Based on the total number of people reached through the public education<br />

materials and programs in FY2008 (2,099,000+), the cost/benefit ratio for the remaining $820,245 budgeted for public<br />

education in FY20<strong>10</strong> is projected to be approximately $0.40 per person. Budget lines below include costs for staff to<br />

manage the projects.<br />

Additional Information<br />

Funding for public education was budgeted within the basins for FY2009 as follows: Alafia River - $59,733;<br />

Hillsborough River - $162,074; Northwest Hillsborough - $68,164; Coastal Rivers - $67,533; Pinellas-Anclote River -<br />

$283,842; Withlacoochee River - $92,502; Peace River - $158,800; Manasota - $<strong>10</strong>2,715. In addition to this total of<br />

$995,363, the Governing Board contributed $525,000 to media messaging and $318,600 to support other public<br />

education efforts. Funds support a variety of educational and outreach efforts Districtwide. Budget lines below include<br />

costs for staff to manage the projects. Based on the total number of people reached through the public education<br />

materials and programs in FY2008 (2,099,000+), the cost for FY2009 is projected to be approximately $0.63 per<br />

person. This cost/benefit ratio does not include those reached via media messaging, which is measured in<br />

impressions, and is projected to cost the District less than six hundredths of a cent per impression.<br />

0<strong>21</strong> - Manasota Basin 189


P268<br />

Public Education<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 2,603,597 755,000 925,442 942,490<br />

0 5,226,529<br />

011 Alafia River Basin 469,353 6,600 74,330 74,602<br />

0 624,885<br />

013 Hillsborough River Basin 1,171,679 38,365 182,198 260,276<br />

0 1,652,518<br />

014 Northwest Hillsborough Basin 507,599 8,400 84,037<br />

0<br />

0 600,036<br />

015 Coastal Rivers Basin 477,784 11,989 78,436 81,780<br />

0 649,989<br />

016 Pinellas-Anclote River Basin 2,414,737 28,200 311,696 294,313<br />

0 3,048,946<br />

019 Withlacoochee River Basin 637,0<strong>10</strong> 0 <strong>10</strong>3,334 <strong>10</strong>0,692<br />

0 841,036<br />

020 Peace River Basin 1,032,416 0 179,511 179,826<br />

0 1,391,753<br />

0<strong>21</strong> Manasota Basin 777,362 0 118,800 124,<strong>21</strong>5<br />

0 1,020,377<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$15,056,069<br />

Critical Project Milestones Projected Amended Actual<br />

Barrier and Benefit Survey<br />

Survey instrument one written 5/1/08 6/19/08<br />

Survey one results 5/30/08 7/20/08 7/18/08<br />

Survey instrument two written 6/20/08 9/15/08 <strong>10</strong>/24/08<br />

Survey two results 7/18/08 11/20/08 12/18/08<br />

Survey instrument three written 8/8/08 1/15/09 1/15/09<br />

Survey three results 8/29/08 4/30/09 4/30/09<br />

CBSM education intervention plans complete 9/26/08 4/30/09 6/16/09<br />

FY2009 Community Education Grant Activities<br />

Application deadline 8/22/08 8/22/08<br />

Basin Board Education Committee input 11/<strong>21</strong>/08 11/<strong>21</strong>/08<br />

Announcement of allocations to CE Grant recipients 1/23/09 1/12/09 1/12/09<br />

Basin Boards informed of grant allocations 2/13/09 1/22/09 2/22/09<br />

Grant-recipient required workshops 2/27/09 2/27/09<br />

End of projects' work period 7/31/09 7/31/09<br />

Final reports due 7/31/09 8/31/09 8/31/09<br />

Requests for reimbursements 8/31/09 8/31/09 8/31/09<br />

FY2009 Media Messaging<br />

Fall media buy <strong>10</strong>/14/08 <strong>10</strong>/14/08<br />

Spring plan developed 11/30/08 11/30/08<br />

Fall media buy final report 12/30/08 12/30/08<br />

Winter media buy 1/5/09 1/5/09<br />

Spring media buy 3/1/09 3/1/09<br />

Summer media buy plan 4/28/09 4/28/09<br />

Summer media buy 5/17/09 5/15/09<br />

Media buy final report 6/1/09 7/31/09 7/31/09<br />

FY20<strong>10</strong> Community Education Grant Activities<br />

Application deadline 8/<strong>21</strong>/09 8/<strong>21</strong>/09<br />

Basin Board Education Committee input 11/20/09<br />

Announcement of allocations to CE Grant recipients 1/22/<strong>10</strong><br />

Basin Boards informed of grant allocations 2/12/<strong>10</strong><br />

Grant-recipient required workshops 2/23/<strong>10</strong><br />

End of projects' work period 7/31/<strong>10</strong><br />

Requests for reimbursements 8/31/<strong>10</strong><br />

Final reports due 8/31/<strong>10</strong><br />

0<strong>21</strong> - Manasota Basin 190


P268<br />

Public Education<br />

FY20<strong>10</strong> Media Messaging<br />

Winter media buy plan <strong>10</strong>/30/09<br />

Winter media buy 1/4/<strong>10</strong><br />

Winter media buy final report 4/30/<strong>10</strong><br />

Pilot Irrigation Project<br />

Finish focus group research 9/30/07 9/30/07<br />

Take test meter readings of pilot neighborhoods 9/30/07 <strong>10</strong>/24/07<br />

Finish survey research 2/28/08 5/1/08 6/9/08<br />

Develop pilot project plans 5/31/08 9/30/08 <strong>10</strong>/6/08<br />

Begin pilot project in designated neighborhoods 7/1/08 12/1/08 12/1/08<br />

Take meter read #1 7/31/08 12/30/08 12/30/08<br />

Take meter read #2 8/31/08 1/31/09 2/9/09<br />

Take meter read #3 9/30/08 3/20/09 4/<strong>10</strong>/09<br />

Evaluate pilot program based on meter readings <strong>10</strong>/15/08 <strong>10</strong>/15/09<br />

Begin phase two with needed revisions 1/1/09 7/1/09 7/1/09<br />

Take meter read #1 1/31/09 7/31/09 7/31/09<br />

Take meter read #2 2/28/09 8/31/09 9/15/09<br />

Take meter read #3 3/30/09 9/30/09<br />

Pilot end date 3/31/09 <strong>10</strong>/30/09<br />

WWIPP<br />

Conduct campaign with pretest 7/31/09 9/30/09<br />

Evaluate program impact with posttest 6/30/<strong>10</strong><br />

Final report and fact sheet due 8/31/<strong>10</strong><br />

Status As Of: September 18, 2009<br />

Community Education Grants (CEG): The FY2009 Community Education Grant program is now complete. Final reports<br />

and invoices are being received and processed. FY20<strong>10</strong> applications, available on the District's web site at<br />

WaterMatters.org/CommunityGrants, were due August <strong>21</strong>, 2009. Florida-Friendly Landscaping Education: The District is<br />

currently coordinating with University of Florida's Institute of Food and Agricultural Sciences to present a series of<br />

workshops designed to help board members and property managers of homeowner associations understand what the<br />

new the SB2080 law means and what resources are available to assist them. Seven workshops are planned for October<br />

with two in Hillsborough County and one each in Pasco, Pinellas, Polk, Manatee and Sarasota counties. The<br />

Pasco/Pinellas HOA FYN coordinator, Doris Heitzmann, reports that 14 site visits and seven presentations to138<br />

association board members were made this quarter. The Hillsborough/Polk HOA FYN coordinator, Lisa Strange, reports<br />

that six site visits and nine presentations to a total of 431 association board members were made this quarter. Media<br />

Messaging: (1) The District's FY20<strong>10</strong> media messaging campaign is being developed and staff is using the research<br />

conducted in FY2009 to more effectively reach the target audiences. Several draft ads were tested with focus groups in<br />

August by the District's media research consultant to help staff determine which ads to produce for next year's campaign.<br />

An ad was chosen and will be produced in October. (2) Staff is developing its plan for an integrated campaign to include<br />

paid and non-paid promotion of the Skip-A-Week concept. The campaign is set to begin as early as November and will<br />

run through February 20<strong>10</strong>. Behavior Change Pilots: "Florida-Friendly Irrigating (FFI), It Just Makes Sense" is a pilot<br />

irrigation program asking residents in selected neighborhoods in Sumter, Polk and Charlotte counties to skip a week of<br />

irrigation during the months of December, January and February, and watch the weather and wait to water during July,<br />

August and September, when rainfall can allow residents to turn off their systems for extended periods of time.<br />

Evaluation is being conducted to see if behavior change can be detected by comparing the water use of the education<br />

and control groups during the Skip a Week program months of December, January and February. In addition, campaign<br />

components for the summer portion of the program -- Watch the Weather, Wait to Water--are currently underway.<br />

Program interventions informed residents that yards need only about ¾" of water every three to five days in the summer,<br />

which is often provided by rainfall alone. A letter from the FFI Team was sent as a July utilities bill stuffer to 422 Villages,<br />

4,000 Lakeland and 60,000 Port Charlotte residents. How-to videos started airing on government access channels and<br />

other outlets in mid-June to remind residents that the rainy season is on the way and to check their rain sensors, do a<br />

catch-can test and remember to look for the signs that their yard needs water before running their irrigation systems. The<br />

program's web site, WaterMatters.org/ItJustMakesSense, was updated to reflect the Watch the Weather, Wait to Water<br />

message. As one of the education interventions, residents in the pilot areas were invited to attend a free rain barrel<br />

workshop to be held in their area July 11. Research: (1) The three surveys to determine barriers and benefits associated<br />

with nine specific behaviors related to watershed protection and conservation are complete. The first survey gathered<br />

data related to pet waste, fertilizer use and pesticide use behaviors. The second survey collected data related to raising<br />

the lawnmower height, rerouting the downspout into the landscape and installing a rain sensor. Topics on the final survey<br />

included proper car oil disposal, installing a low-flow showerhead and proper septic system maintenance. (2) The<br />

0<strong>21</strong> - Manasota Basin 191


P268<br />

Public Education<br />

District's project manager is working with the webmaster to create a searchable data repository to house the District's<br />

social research data for use by staff and cooperators. The site was opened to members of the Social Marketing<br />

Resource Group to pretest the site's usability and report any problems to the project manager. The site is in its final<br />

stages of editing and will be available for full use once the findings from the Barrier and Benefit studies are included. (3)<br />

The purchase order for the Irrigation Literacy Evaluation, Phase II: Water-Wise Irrigation Practices and Perceptions<br />

Campaign project has been opened. Phase II includes the review of survey data collected within Pinellas County during<br />

Phase I to develop ideal scenarios that will be modeled to determine the most successful targeted water-wise irrigation<br />

education approach. The University of Florida approved the International Review Board protocol, and project work has<br />

begun.<br />

0<strong>21</strong> - Manasota Basin 192


F032<br />

Peace River Regional Reservoir Expansion<br />

Project Type WS&R Dev.<br />

AOR(s)<br />

Water Supply<br />

Basin(s) General Fund (District), Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager GOODWIN, AUDRIE<br />

Task Manager(s)<br />

Status Ongoing<br />

Peace River/Manasota Regional Water Supply Auth.<br />

ARMSTRONG, BRIAN<br />

Description<br />

The Peace River Regional Reservoir Expansion is an alternative water supply project that will expand the surface<br />

water storage capacity of the Peace River Manasota Regional Water Supply Authority's water supply facilities by<br />

constructing a six (6) billion gallon reservoir. The total cost to construct the reservoir is approximately $77 million.<br />

Benefits<br />

In combination with project F033, which expands the Authority's water treatment plant capacity from 24 to 48 mgd, this<br />

project will enable the Authority to supply up to their permitted amount of 32.7 mgd on an annual average basis.<br />

Costs<br />

The total estimated project cost is $77,049,654. The District's share is $37,986,143 which includes District ad valorem<br />

funding of $28,409,224 and SB444 funding of $9,576,919. The District ad valorem cost may be reduced depending on<br />

future funding received from the State, as described in Senate Bill 444. It is anticipated that, of the District's projected<br />

total funding contribution of $28,409,224, the District Governing Board will contribute $14,526,959, the Manasota<br />

Basin Board will contribute $<strong>10</strong>,560,764, and the Peace River Basin Board will contribute $3,3<strong>21</strong>.501. The Governing<br />

Board met their total funding match in FY2009 and therefore does not have a FY20<strong>10</strong> funding contribution. The<br />

FY20<strong>10</strong> request of $644,694 represents funding from the Peace ($600,777) and Manasota ($43,917) Basin Boards<br />

that will maintain the contract percentages.<br />

Additional Information<br />

The Peace River facility is located in DeSoto County and provides potable water to residents of Charlotte, DeSoto and<br />

Sarasota Counties. As configured in 2005, the Facility includes a surface water withdrawal from the Peace River, a<br />

625 million gallon reservoir (85 acres), a 24 mgd surface water treatment plant, and <strong>21</strong> Aquifer Storage and Recovery<br />

(ASR) wells with a total storage capacity of approximately 6 billion gallons. Because the Peace River experiences<br />

significant periods of low flow, it is important for the Authority to have sufficient capacity to store excess flows during<br />

wet periods for use during dry periods when river flows are insufficient to meet demands. Withdrawals from the Peace<br />

River are prohibited when flows, as measured at the Arcadia gage, are less than 84 mgd (130 cubic feet per second<br />

(cfs)). The Authority's customers have identified an additional demand of 15 mgd beyond the 18 mgd that is currently<br />

provided by the Authority's Facility, for a total 2015 demand of 33 mgd. Because of the uncertainty associated with<br />

permitting new ASR wells due to mobilization of arsenic in the aquifer, the Authority proposed removing the ASR<br />

component of the Peace River Facility Expansion Project (F033). As a result, the Authority needed additional storage<br />

capacity and requested amending this project to increase reservoir capacity from two (2) to six (6) billion gallons. In<br />

October 2005, the Peace River and Manasota Basin Boards and the Governing Board approved increasing the size of<br />

the reservoir and deleting the additional ASR wells from the Facility Expansion project. The combination of this project<br />

and the Peace River Facility Expansion (F033) will allow the Authority to deliver a permitted capacity of 32.7 mgd to its<br />

customers at a total cost of $167,192,854. The project is a critical component of the District's SWUCA water supply<br />

plan by providing users in the coastal areas, where there is the greatest threat of saltwater intrusion, with supplies<br />

other than ground water. Of the total project cost ($77 million), approximately 90 percent ($69.5 million) is expected to<br />

be needed for construction, and the remainder for design, permitting, and administration.<br />

0<strong>21</strong> - Manasota Basin 193


F032<br />

Peace River Regional Reservoir Expansion<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 8,474,060 1,852,024 4,234,813 5,573<br />

0 14,566,470<br />

020 Peace River Basin 2,3<strong>21</strong>,456 500,046 500,000 600,777<br />

0 3,922,279<br />

0<strong>21</strong> Manasota Basin 6,123,474 1,351,983 3,085,656 43,917<br />

0 <strong>10</strong>,605,030<br />

District Budgeted - Outside Revenue<br />

Water Protection & Sust T.F.<br />

(Alternative Wtr)<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

8,112,643 1,464,277 0<br />

0<br />

0<br />

9,576,920<br />

Project Funds Not Budgeted by the<br />

District<br />

PR/MRWSA 38,418,817 0 0<br />

0<br />

0 38,418,817<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$77,089,516<br />

Critical Project Milestones Projected Amended Actual<br />

Design Commence 2/1/03 2/5/03<br />

Draft Agreement returned from Contract Administration 5/1/03 6/6/07<br />

Peace River Basin Board Approval of Agreement 6/2/03 6/13/03<br />

Manasota Basin Board Approval of Agreement 6/2/03 6/18/03<br />

Governing Board Approval of Agreement 6/2/03 6/24/03<br />

Contract Executed 8/1/03 12/18/03<br />

Notice to Proceed 8/1/03 12/18/03<br />

Basis of Design Report 9/30/05 11/9/05<br />

Execute Amended Agreement 12/31/05 3/28/06<br />

Detailed Plans and Specifications 9/30/06 9/30/06<br />

Permitting 9/30/06 5/7/07<br />

Bidding 11/15/06 6/8/07<br />

Award Construction Contract 11/30/06 7/25/07<br />

50% Construction Completion 11/30/07 8/31/08<br />

Completion of Construction <strong>10</strong>/31/08 3/31/<strong>10</strong><br />

Contract Termination <strong>10</strong>/1/16<br />

Status As Of: September <strong>10</strong>, 2009<br />

Final design for the Regional Reservoir Expansion was completed in 2007 and the Environmental Resource Permit<br />

(ERP)s for mitigation and reservoirs were issued respectively by April 2007 and October 2007. In June 2007, the<br />

Authority received three bids for the reservoir expansion. The low bid of $64,9<strong>10</strong>,500 was <strong>21</strong> percent higher than the<br />

engineer's estimate. The Authority asked the District to provide additional funding for the increased costs and as a result<br />

the Peace River and Manasota Basin Boards and the Governing Board approved an additional $3,703,704 in 2008<br />

funding and $7,812,582 in 2009 funding for the reservoir project. The Governing Board granted various easements to<br />

PRMRWSA in November after receiving survey information and draft easements. The Authority Board approved the<br />

reservoir construction contract at its July 25, 2007 meeting and issued a limited notice to proceed to the Contractor to<br />

begin initial work and permitting. In addition, the Army Corps of Engineers issued the companion permit to the ERP on<br />

May 18, 2007. The District agreed to convey a perpetual exclusive easement and a perpetual nonexclusive easement to<br />

the Authority by September 2007. The District will also convey a conservation easement to the DEP over the mitigation<br />

area to satisfy permit requirements established by DEP. District and Authority staff agreed on public use issues<br />

associated with the Reservoir Expansion project. DEP approved the commencement of construction in December 2007.<br />

In preparation for the construction, District and Authority staff relocated all recreational amenities to accommodate the<br />

project. The dedication ceremony was held on May 15, 2009, with FDEP Secretary Mike Sole and SWFWMD Executive<br />

Director Dave Moore in attendance. Installation of the soil cement and the outlet tower were complete by May 2009. The<br />

project reached the substantial completion milestone on June 25, 2009; five days ahead of the updated schedule. In<br />

total, approximately 3.6 million yards of fill have been moved to build the reservoir's embankment.<br />

0<strong>21</strong> - Manasota Basin 194


F032<br />

Peace River Regional Reservoir Expansion<br />

ACTION-TO-DATE: On-time/Ahead of Schedule<br />

The project appears to be at least six months ahead of schedule and will reach the Final Completion of Construction by<br />

September 2009. Overall, construction is considered to be 99 percent complete. Sodding was completed in June 2009,<br />

however sodding maintenance/repair is ongoing.<br />

At the request of the Office of Governor Charlie Crist, the District has been communicating regularly with the cooperator<br />

concerning the Governor's Accelerate Florida initiative to stimulate Florida's economy. An information request was sent<br />

to the cooperator on October 15, 2008. District staff followed up with an email and phone call regarding the cooperator's<br />

efforts to accelerate the project. The cooperator responded, "PRMRWSA and their construction subcontractors have<br />

agreed and executed contracts with early completion incentives. The District has allocated $7,812,582 in FY2009 funding<br />

toward this project to assist meeting this accelerated schedule. This project is anticipated to meet its accelerated<br />

schedule milestone in early summer 2009."<br />

0<strong>21</strong> - Manasota Basin 195


F033<br />

Peace River Facility Expansion<br />

Project Type WS&R Dev.<br />

AOR(s)<br />

Water Supply<br />

Basin(s) General Fund (District), Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager GOODWIN, AUDRIE<br />

Task Manager(s)<br />

Status Ongoing<br />

Peace River/Manasota Regional Water Supply Auth.<br />

ARMSTRONG, BRIAN<br />

Description<br />

The Peace River Facility Expansion is an alternative water supply project that involves expansion of the Peace River<br />

Manasota Regional Water Supply Authority's water treatment facilities. Whereas, F032 is for the design and<br />

construction of a six billion gallon reservoir, this project is for the design and construction associated with expanding<br />

the surface water treatment plant capacity from 24 to 48 mgd. Additionally, this project will construct five miles of a<br />

20-inch pipeline from the Authority's facilities to extended areas of DeSoto County to supply up to 5.5 mgd to the<br />

county.<br />

Benefits<br />

In combination with F032, this project will enable the Authority to supply up to their permitted quantity of 32.7 mgd on<br />

an annual average basis from the Peace River.<br />

Costs<br />

The total estimated project cost is $90,143,200. The District share is $41,862,232 which includes District ad valorem<br />

funding of $25,943,940 and SB444 funding of $15,918,292. The District's ad valorem cost may be reduced depending<br />

on future funding received from the state, as described in Senate Bill 444. It is anticipated that, of the District's<br />

projected total funding contribution of $25,943,940, the District Governing Board will contribute $14,618,384, the<br />

Manasota Basin Board will contribute $8,625,340, and the Peace River Basin Board will contribute $2,700,<strong>21</strong>6. The<br />

Governing Board met their total funding match in FY2009 and therefore does not have a FY20<strong>10</strong> funding contribution.<br />

The FY20<strong>10</strong> request of $2,165,568 represents funding from the Peace ($440,678) and Manasota ($1,724,890) Basin<br />

Boards that will maintain the contract percentages.<br />

The funding table below includes lapsed 2008 Governing Board funds of $997,525.<br />

Additional Information<br />

The project originally included the construction of 24 Aquifer Storage and Recovery (ASR) wells for storage of excess<br />

river flows. However, because of the uncertainty involved in permitting ASR wells due to mobilization of arsenic in the<br />

aquifer, the Authority has deferred the ASR component of this project. The Authority provides public drinking water to<br />

residents of Charlotte, DeSoto and Sarasota counties. As configured in 2005, the facility includes a surface water<br />

withdrawal from the Peace River, a 625 million gallon reservoir (85 acres), a 24 mgd surface water treatment plant,<br />

and <strong>21</strong> ASR wells capable of storing up to a total of six billion gallons. Because of the Peace River's seasonal flow<br />

pattern, characterized by significant periods of low flow that are insufficient for providing potable supply, the Peace<br />

River facility must possess the necessary capacity to capture, treat, and store high flows from the river when they<br />

occur so that sufficient reserves are available to meet customer demand during low flow periods. The Authority's water<br />

use permit allows them to supply up to 32.7 mgd on an annual average basis from the Peace River and prohibits<br />

withdrawals when river flow, as measured at the Arcadia gage, is less than 130 cubic feet per second (cfs). The<br />

reservoir and ASR wells provide water during the dry season when withdrawal from the river is prohibited to assure the<br />

environmental health of the downstream estuary. This project also includes the design and construction of a potable<br />

water transmission pipeline known as the DeSoto County Water Transmission Main, which extends from the Peace<br />

River Facility south across the Peace River, then south along Hwy 17, to the Wal-Mart Distribution Facility. This supply<br />

line is to serve potable water customers that DeSoto County Utilities has identified. The combination of this project and<br />

the Peace River Reservoir Expansion (F032) will result in approximately 24 mgd of additional supply at a total cost of<br />

$167,192,854. The project is a critical component of the District's SWUCA water supply plan by providing users in the<br />

coastal areas, where there is the greatest threat of saltwater intrusion, with supplies other than ground water. Of the<br />

total project cost ($90.1 million), approximately $84.7 million is expected to be needed for construction, and the<br />

remainder for design, permitting, and administration.<br />

0<strong>21</strong> - Manasota Basin 196


F033<br />

Peace River Facility Expansion<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 9,890,493 163 5,757,000 5,573<br />

0 15,653,229<br />

020 Peace River Basin 2,500,172 44 200,000 440,678 757,032 3,897,926<br />

0<strong>21</strong> Manasota Basin 6,613,473 1<strong>21</strong> 2,012,071 1,724,890<br />

0 <strong>10</strong>,350,555<br />

District Budgeted - Outside Revenue<br />

Water Protection & Sust T.F.<br />

(Alternative Wtr)<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

15,918,289 0 0<br />

0<br />

0<br />

15,918,289<br />

Project Funds Not Budgeted by the<br />

District<br />

EPA Grant 9,000,000 0 0<br />

0<br />

0 9,000,000<br />

PR/MRWSA 35,499,860 0 1,656,227<br />

0<br />

0 37,156,087<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$91,976,086<br />

Critical Project Milestones Projected Amended Actual<br />

Transmission Line Design Commence 9/1/02 <strong>10</strong>/1/03<br />

Consultant Selection 1/1/03 1/1/03<br />

Transmission Line Design Complete 3/1/03 5/1/03<br />

Draft Agreement to Contract Administration 4/1/03 6/9/03<br />

Draft Agreement returned from Contract Administration 5/1/03<br />

Transmission Line Construction Commence 6/1/03 7/30/04<br />

Peace River Basin Board Approval of Agreement 6/2/03 6/13/03<br />

Manasota Basin Board Approval of Agreement 6/2/03 6/18/03<br />

Governing Board Approval of Agreement 6/2/03 6/24/03<br />

Contract Executed 8/1/03 <strong>10</strong>/13/04<br />

Notice to Proceed 8/1/03 <strong>10</strong>/15/04<br />

Transmission Line Construction Complete 3/1/04 9/7/05<br />

Construction Complete <strong>10</strong>/31/06 1/1/06<br />

Bidding 11/15/06 2/8/07<br />

Award Construction Contract 11/30/06 3/19/07<br />

Plans and Specifications 9/30/07 11/30/06<br />

50% Completion 11/30/07 2/4/08<br />

<strong>10</strong>0% Completion 3/31/<strong>10</strong><br />

Contract Closeout <strong>10</strong>/1/16<br />

Status As Of: September <strong>10</strong>, 2009<br />

In February 2007, the Authority received one bid for Contract 2 for major components of the Facility Expansion. The bid<br />

was approximately $17 million over the original engineer's estimate of probable cost. After receiving the bid, Authority<br />

staff and the contractor negotiated a revised project cost $14 million below the original bid price. The Authority's Board<br />

approved the revised cost and authorized staff to enter into an agreement with the contractor. Even with the newly<br />

negotiated bid price, the overall revised project cost remained $19 million over the original project cost in the contract<br />

between the District and the Authority. The Authority requested additional funding as a result of the increased costs and<br />

an additional $3,756,693 in 2008 Water Protection and Sustainability Trust Funds and $8,205,398 in 2009 District<br />

funding were allocated to this project. Construction of the Facility Expansion Project will occur through three separate<br />

contracts. The first contract, completed in May, focused on site preparation. The second contract is for construction of a<br />

maintenance building, dewatering facility, filters, storage tanks, thickeners, and chemical feed and disinfection stations.<br />

The third contract is for construction of an operations center. A portion of the expanded facilities has been online since<br />

November 2008.<br />

ACTION-TO-DATE: On-time/Ahead of Schedule<br />

0<strong>21</strong> - Manasota Basin 197


F033<br />

Peace River Facility Expansion<br />

Construction continues on the facility and is considered 96 percent complete. The project appears to be on schedule for<br />

completion well ahead of the March 20<strong>10</strong> Final Completion of Construction deadline. Current activities include upgrading<br />

the high service pumps in the pump building, and addressing punch list items.<br />

It the request of the Office of Governor Charlie Crist, the District has been communicating regularly with the cooperator<br />

concerning the Governor's Accelerate Florida initiative to stimulate Florida's economy. An information request was sent<br />

to the cooperator on October 15, 2008. District staff followed up with an email and phone call regarding the cooperator's<br />

efforts to accelerate the project. The cooperator responded, "PRMRWSA and their construction subcontractors have<br />

agreed and executed contracts with early completion incentives. The District has allocated $8,205,398 in FY2009 funding<br />

toward this project to assist meeting this accelerated schedule. This project met its accelerated schedule milestone - the<br />

new facilities have been used to treat over 1.5 billion gallons of water."<br />

0<strong>21</strong> - Manasota Basin 198


H008<br />

Lake Hancock Lake Level Modification<br />

Project Type WS&R Dev.<br />

AOR(s)<br />

Water Supply, Natural Systems<br />

Basin(s) General Fund (District), Alafia River, Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager DOWNING, HARRY<br />

Task Manager(s)<br />

Status Ongoing<br />

BLASCHKA, STEVEN, LETASI, SCOTT, HILL, CHERYL<br />

Description<br />

The Lake Hancock Lake Level Modification Project is part of the proposed strategy for achieving minimum flows and<br />

levels recovery for the upper Peace River established by the District. The goal of the Lake Level Modification Project is<br />

to store water by raising the control elevation of the existing outflow structure on Lake Hancock and to slowly release<br />

the water during the dry season to help meet the minimum flow requirements in the upper Peace River between<br />

Bartow and Zolfo Springs. Historically, Lake Hancock fluctuated more than a foot higher than it has during the past<br />

several decades. The project proposes to increase the normal operating level from 98.7 feet to <strong>10</strong>0.0 feet National<br />

Geodetic Vertical Datum (NGVD) by modifying the P-11 outfall structure. See H009 (Lake Hancock Outfall Structure<br />

P-11 Modification) for a description of that project. This proposed project will further the District's recent efforts to<br />

restore minimum flows in the upper Peace River, which is a major component of the District's SWUCA Recovery Plan.<br />

As such, it is funded as a Water Supply and Resource Development (WSRD) project.<br />

Benefits<br />

Raising the normal operating water level of Lake Hancock to <strong>10</strong>0.0 feet NGVD will provide the storage to meet<br />

approximately 50% of the Minimum Flows and Levels Requirements of the upper Peace River. It was also determined<br />

that raising of the operating level along with other District projects will help restore wetland function for several hundred<br />

acres of contiguous lands to Lake Hancock.<br />

Costs<br />

This is a multi-year funded project. Funding for this project is shared by the Governing Board (50 percent), Peace<br />

River Basin Board (25 percent), Alafia River Basin Board (12.5 percent) and Manasota Basin Board (12.5 percent).<br />

Basin Board funding percentages are based on Alafia, Manasota, and Peace Basin impacts to the loss of flows from<br />

the upper Peace River Watershed from ground-water withdrawals. As of 2008, the District has budgeted $5,554,000 of<br />

which $1,350,000 is from state appropriations and Ecosystem Trust Fund. For continued funding of future project<br />

steps, District staff is requesting $500,000 in FY2009 for implementing the project, broken down as follows: District<br />

$250,000 Peace River Basin Board $125,000, Manasota and Alafia River Boards each $62,500. The funding is for<br />

design, permitting, and construction of project area mitigation and replacement of the P-11 Structure necessary to<br />

raise the operating level of the Lake to <strong>10</strong>0 feet NGVD. Land costs are not included. In additional to H008, a<br />

$2,500,000 was funded in FY2003 and another $2,500,000 in FY2009 through field operations (Project H009) for the<br />

replacement of the P-11 structure.<br />

Additional Information<br />

This project is being conducted in 3 Steps: Step (1) provided the preliminary evaluations and incremental probable<br />

costs for raising the normal high operating levels of Lake Hancock to 99.5, <strong>10</strong>0.0, and the target <strong>10</strong>0.5 feet from the<br />

current level of 98.7 feet. Step (1) is complete with a recommended target level up to <strong>10</strong>0.0 feet. The results of Step 1<br />

were presented to the boards with a staff recommendation for moving forward with Step (2) of the project in October<br />

2004. Step (2) involves the generation of the detailed information necessary to submit a complete Conceptual<br />

Environmental Resource Permit (ERP) Application, and to specifically identify impacts to private lands for acquisition<br />

and other mitigation needs (environmental, facilities, etc). Major components of the Conceptual ERP include: pre and<br />

post condition analysis; private property, dwelling, environmental, and infrastructure mitigation; outfall structure<br />

operation characteristics; and an anticipated fluctuation schedule for the Lake. Step (3) is the implementation of the<br />

mitigation components as specified in the Conceptual ERP. Costs for design, ERPs, and construction for<br />

environmental and infrastructure mitigation requirements have not been determined. The Project will be coordinated<br />

with H014 which will look at improving water quality released from the lake.<br />

0<strong>21</strong> - Manasota Basin 199


H008<br />

Lake Hancock Lake Level Modification<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 2,267,673 (9,254) 133,132 1,508,263 2,787,000 6,686,814<br />

011 Alafia River Basin 566,089 0 38,594 379,313 696,750 1,680,746<br />

020 Peace River Basin 1,111,623 0 <strong>10</strong>7,294 836,759 1,393,500 3,449,176<br />

0<strong>21</strong> Manasota Basin 566,089 0 35,506 379,313 696,750 1,677,658<br />

District Budgeted - Outside Revenue<br />

Ecosystem Trust Fund - Lk Hancock Lk<br />

Level<br />

State Approp - WRAP - Prior Year<br />

Funds<br />

Water Protection & Sust T.F. (Surface<br />

Wtr Rstr)<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

1,050,000 0 0<br />

0<br />

0 0 250,000<br />

0<br />

300,000 0 0<br />

0<br />

Total:<br />

Future<br />

Funding<br />

0<br />

0<br />

0<br />

Total<br />

Funding<br />

1,050,000<br />

250,000<br />

300,000<br />

$15,094,394<br />

Critical Project Milestones Projected Amended Actual<br />

1. Step (1) Preliminary Evaluation<br />

1. Preliminary Identification of Potentially Affected Parcels <strong>10</strong>/30/02 <strong>10</strong>/30/02<br />

2. Advertise Request for Proposals 12/20/02 12/20/02<br />

3. Select and Approve Consulting Firm 12/30/02 12/30/02<br />

4. Develop Project Scope of Work 12/30/02 2/27/03<br />

5. Begin Contract Negotiations 2/27/03 3/15/03<br />

6. Enter into Contract 5/23/03 5/14/03<br />

7. Provide Preliminary Results 4/28/04 6/15/04<br />

8. Board Action for Step (2) 9/27/04 <strong>10</strong>/26/04<br />

2. Step(2) Preliminary Design and Conceptual Permitting<br />

1. Amend Contract with BCI, Inc. for Conceptual Permitting 11/3/04 11/3/04<br />

2. Permitting of NCLF Phase III Expansion 3/29/05 3/29/05<br />

3. NCLF Evaluation for Project Effects 3/31/05 12/20/05<br />

4. Develop Project Mitigation Strategies 6/30/05 12/30/05<br />

5. Approve Mitigation Strategies 8/30/05 7/25/06<br />

6. Submit CERP Application <strong>10</strong>/14/05 8/31/06<br />

7. Obtain CERP 3/31/06 6/14/07<br />

8. Board Authorization of Project 9/25/07 9/25/07<br />

9. USACE Notice of Intent 9/26/07 12/12/07<br />

3. Step (3) P-11 Design and Construction<br />

1. Post P-11 Request For Proposals 3/31/08 2/8/08<br />

2. Select P-11 Engineering Firm 6/30/08 6/6/08<br />

3. Execute Agreement - P-11 Engineering Firm 8/31/08 <strong>10</strong>/8/08<br />

4. Notice to Proceed - P-11 Engineering Firm 9/15/08 <strong>10</strong>/29/08<br />

5. 30% P-11 Design Completion (Conceptual) 3/8/09 3/20/09 3/20/09<br />

6. 60% P-11 Design Completion 7/8/09 <strong>10</strong>/1/09 7/20/09<br />

7. Submit P-11 Environmental Resource Permit 8/1/09 <strong>10</strong>/30/09<br />

8. 90% P-11 Design Completion <strong>10</strong>/8/09 11/30/09<br />

9. Final P-11 Design Completion 1/8/<strong>10</strong><br />

<strong>10</strong>. Post P-11 Request For Bids 2/15/<strong>10</strong><br />

11. Select P-11 Lowest Responsive Bidder 5/15/<strong>10</strong><br />

12. Execute Agreement - P-11 Construction Contractor 6/30/<strong>10</strong><br />

13. Notice to Proceed - P-11 Construction Contractor 7/1/<strong>10</strong><br />

14. P-11 Construction Commences 8/1/<strong>10</strong><br />

0<strong>21</strong> - Manasota Basin 200


H008<br />

Lake Hancock Lake Level Modification<br />

15. P-11 Construction Completion 12/31/11<br />

3. Step (3) River Lake Stormwater Pond<br />

1. Complete Design 11/30/08 3/30/09<br />

2. Submit Environmental Resource Permit 1/1/09<br />

3. Begin Construction 2/15/09<br />

4. Complete Stormwater Pond Construction 4/15/09<br />

3. Step(3) FDOT Design and Conceptual Permitting<br />

1. Submittal of FDOT Permits 11/19/07 8/15/09<br />

Status As Of: August 31, 2009<br />

Status History: The Preliminary Evaluation Report (Step 1) for Lake Hancock by BCI, Inc., is complete and was<br />

approved by the Governing Board in October 2004 for initiating preliminary design and conceptual permitting to raise the<br />

lake operating level from 98.7 to <strong>10</strong>0.0 feet (Step 2). With the approval of the Governing Board (October 26, 2004),<br />

District staff amended the contract and entered into a Work Order with BCI Engineers and Scientists, Inc. to begin Step<br />

(2) of the project on November 3, 2004. The Governing Board at their January 24, 2006 meeting authorized staff to<br />

submit a conceptual ERP application to the FDEP and the United States Army Corps of Engineers to raise the control<br />

elevation up to <strong>10</strong>0 feet NGVD to help meet the low flow requirements of the upper Peace River, upon reaching<br />

agreement through a Memorandum of Agreement (MOA) with Polk County. The Board authorized staff to develop a<br />

MOA with Polk County for the Lake Level Modification Project. With the approval of the MOA by the District at the July<br />

2006 meeting, a Conceptual ERP application was submitted to FDEP on August 31, 2006 for permitting. A Conceptual<br />

ERP was received from FDEP on June 14, 2007. The USACE Public Notice of Intent to permit was completed in<br />

December 2007 and approval was later received in April 2008. District staff have met with affected property owners in<br />

August and September, 2007 to discuss (1) project effects, (2) whether their property would be needed to implement the<br />

project, and (3) Board meetings and schedules. Current Status: Land Resources is currently negotiating with private land<br />

owners and purchasing their properties when successful negotiations are achieved. District staff is currently working on<br />

FDOT permits for Highway 540 and the Polk Parkway, and has contracted with BCI, Engineers and Scientists, Inc. to<br />

implement (Step 3), the design, permitting, and development of construction documents for mitigation required upstream<br />

of the P-11 Structure. The District has contracted the engineering consulting firm DMK & Associates to design the new<br />

Lake Hancock Outfall Structure (P-11). DMK has completed the P-11 60% design plans and specifications and will be<br />

subitting an application to FDEP for an ERP to construct the new P-11 structure. ACTION-TO-DATE: On-time, this<br />

project already has an accelerated schedule and District staff will continue to make sure the project tasks are being<br />

completed on schedule.<br />

0<strong>21</strong> - Manasota Basin 201


H009<br />

Lake Hancock Outfall Structure P-11 Modification<br />

Project Type WS&R Dev.<br />

AOR(s)<br />

Flood Protection, Natural Systems<br />

Basin(s) General Fund (District), Alafia River, Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager LETASI, SCOTT<br />

Task Manager(s)<br />

Status Ongoing<br />

LETASI, SCOTT, GANUN, JIM, BARTLETT, MIKE<br />

Description<br />

Funding under Project H009 is provided for the replacement of the Lake Hancock P-11 Water Control Structure. This<br />

project is directly related to Project H008, Lake Hancock Lake Level Modification. Project H009 is contingent on the<br />

successful completion of Project H008 in 3 steps: Step (1) provide the preliminary evaluations and incremental<br />

probable costs for raising the normal high operating levels of Lake Hancock to 99.5, <strong>10</strong>0.0, and the target <strong>10</strong>0.5 feet<br />

from the current level of 98.7 feet. Step (1) is complete with a recommended target level up to <strong>10</strong>0.0 feet. The results<br />

of Step 1 were presented to the boards with a staff recommendation for moving forward with Step (2) of the project in<br />

October 2004. Step (2) involves the generation of the detailed information necessary to submit a complete Conceptual<br />

Environmental Resource Permit (ERP) Application, and to specifically identify impacts to private lands for acquisition<br />

and other mitigation needs (environmental, facilities, etc). Major components of the Conceptual ERP include: pre and<br />

post condition analysis; private property, dwelling, environmental, and infrastructure mitigation; outfall structure<br />

operation characteristics; and an anticipated fluctuation schedule for the Lake. Step (3) is the implementation of the<br />

mitigation components as specified in the Conceptual ERP. Costs for design, ERPs, and construction for<br />

environmental and infrastructure mitigation requirements have not been determined. Once these steps have been<br />

completed, construction documents will be completed for the replacement of Structure P-11 and the District will post a<br />

request for bids. Funding for this project is shared by the Governing Board (50 percent), Peace River Basin Board (25<br />

percent), Alafia River Basin Board (12.5 percent) and Manasota Basin Board (12.5 percent). Basin Board funding<br />

percentages are based on Alafia, Manasota, and Peace Basin impacts to the loss of flows in the Upper Peace River<br />

Watershed from ground-water withdrawals.<br />

Benefits<br />

Raising the normal operating water level of Lake Hancock to <strong>10</strong>0.0 feet NGVD will provide the storage to meet<br />

approximately 50% of the Minimum Flows and Levels Requirements of the upper Peace River. It was also determined<br />

that raising of the operating level along with other District projects will help restore wetland function for several hundred<br />

acres of contiguous lands to Lake Hancock. Project H009 will involve the actual replacement of the present control<br />

structure to achieve these goals.<br />

Costs<br />

The probable cost are projected to be a total of $5,000,000 for this structural replacement project. This cost does not<br />

include any land acquisition costs. Funds encumbered under Project H009 were approved in FY2003 in the amount of<br />

$2,500,000 and an additional $2,500,000 was approved in the FY2009 for implementing the structure replacement<br />

project. The FY2009 funds are from the West Central Florida Water Restoration Action Plan FY2009 State funds. The<br />

FY2003 and FY2009 funds do not include any land acquisition cost.<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 1,250,000 0 0 2,473<br />

0 1,252,473<br />

011 Alafia River Basin 312,500 0 0 825<br />

0 313,325<br />

020 Peace River Basin 625,000 0 0 825<br />

0 625,825<br />

0<strong>21</strong> Manasota Basin 312,500 0 0 825<br />

0 313,325<br />

District Budgeted - Outside Revenue<br />

State Approp - WRAP - Prior Year<br />

Funds<br />

Prior<br />

Funding<br />

0<strong>21</strong> - Manasota Basin 202<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

0 0 2,500,000<br />

0<br />

Total:<br />

Future<br />

Funding<br />

0<br />

Total<br />

Funding<br />

2,500,000<br />

$5,004,948


H009<br />

Lake Hancock Outfall Structure P-11 Modification<br />

Status As Of: August 31, 2009<br />

Status History: See Project H008 for a detailed history on the project. Milestones and updates will be provided for this<br />

project once the P-11 design has been completed. As described in the project description steps 1 and 2 have been<br />

completed. Current Status: The engineering consulting firm DMK & Associates has been contracted to design the new<br />

Lake Hancock Outfall Structure (P-11). Project Milestones will be followed as part of project H008. The design process<br />

detailed in H008 has been accelerated so that construction of the new P-11 structure (H009) can start as soon as<br />

possible.<br />

0<strong>21</strong> - Manasota Basin 203


H015<br />

FARMS Back-Plug Program<br />

Project Type WS&R Dev.<br />

AOR(s)<br />

Water Quality, Natural Systems<br />

Basin(s) Alafia River, Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager BRUMBAUGH, DAVID<br />

Task Manager(s)<br />

Status Ongoing<br />

COUGHLIN, KEVIN, SUMMERALL, LINDA<br />

Description<br />

Punta Gorda's in-stream drinking water reservoir is sustained by Class I surface water bodies comprised of the Shell<br />

and Prairie Creek watersheds. In 2000, the City of Punta Gorda contacted FDEP and the District with concerns for<br />

declining water quality trends observed in the reservoir. Investigations indicated that irrigation pumping from deep<br />

wells was a primary source adversely impacting the watersheds through degraded agricultural runoff, ultimately<br />

leading to a decline in water quality of the Punta Gorda reservoir downstream. In 2002, the Back-Plug Program was<br />

initiated primarily to improve water quality in the watershed systems of the SWUCA. The back-plug program was<br />

included in the Facilitating Agricultural Resources Management Systems (FARMS) Program in 2005.<br />

Benefits<br />

Well back-plugs may become a procedure recommended for agricultural growers wanting to significantly improve crop<br />

yields by decreasing highly mineralized sources of groundwater used for irrigation, and to mitigate potential impacts to<br />

public surface water supplies.<br />

Costs<br />

Qualifying landowners are reimbursed up to a maximum of $6,500 per well for back-plug procedures, with final<br />

amounts of reimbursement determined by borehole dimensions of the back-plugged interval. The Shell, Prairie, and<br />

Joshua Creek (SPJC) watersheds are considered priority areas for this program.<br />

Additional Information<br />

A brochure and webpage is available from SWFWMD summarizing the FARMS Back-Plug Program.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 646,068 (30,000) 51,054 45,296<br />

0 712,418<br />

011 Alafia River Basin 43,876 0 7,736 <strong>10</strong>,777<br />

0 62,389<br />

020 Peace River Basin 683,380 0 <strong>21</strong>,389 23,067<br />

0 727,836<br />

0<strong>21</strong> Manasota Basin 24,899 0 8,034 11,455<br />

0 44,388<br />

Status As Of: September 02, 2009<br />

Total:<br />

Future<br />

Funding<br />

A total of 63 wells have been back-plugged in the SWUCA overall to date, with 46 of these wells located in the SPJC<br />

priority watersheds. Analytical results for samples collected from the 46 back-plugged wells in the SPJC area indicated<br />

conductivity, total dissolved solids (TDS) and chloride were decreased by 47%, 47% and 63%, respectively, with<br />

pumping yields reduced by 23% as a result of back-plugging procedures. For the 17 wells in the SWUCA (outside of the<br />

SPJC area), seven wells were back-plugged in the Peace River watershed, six in the Alafia River watershed, two in the<br />

Manatee River watershed, one in the Myakka River watershed, and one in the Horse Creek watershed. Analytical results<br />

for all back-plugged wells combined in the SWUCA indicated conductivity, TDS and chloride were decreased by 46%,<br />

46% and 60%, respectively. Combined SWUCA pumping yields were reduced by 24% as a result of back-plugging<br />

procedures. Routine monitoring results of select back-plugged wells so far have indicated sustained improvements to the<br />

quality of groundwater used for irrigation purposes.<br />

0<strong>21</strong> - Manasota Basin 204<br />

Total<br />

Funding<br />

$1,547,031


H017<br />

Facilitating Agricultural Resource Management Systems Program<br />

Project Type WS&R Dev.<br />

AOR(s)<br />

Water Supply, Water Quality<br />

Basin(s) General Fund (District), Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers,<br />

Pinellas-Anclote River, Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager ORENDORFF, BILL<br />

Task Manager(s)<br />

Status Ongoing<br />

Fl. Department of Agriculture & Consumer Services<br />

ESTES, CAROLE, SUMMERALL, LINDA<br />

Description<br />

The Facilitating Agricultural Resource Management Systems (FARMS) Program is an agricultural Best Management<br />

Practice (BMP) cost-share reimbursement program. The program is a public/private partnership developed by the<br />

District and the Florida Department of Agriculture and Consumer Services (FDACS). The purpose of the FARMS<br />

initiative is to provide an incentive to the agricultural community, within the District, to implement agricultural BMPs that<br />

will provide resource benefits that include water quality improvement; reduced Upper Floridian aquifer withdrawals;<br />

and/or conserve, restore, or augment the area's water resources and ecology. FARMS is intended to assist in the<br />

implementation of the District's Regional Water Supply Plan.<br />

Benefits<br />

The goal for the FARMS Program is to offset 40 mgd of ground water within the District by 2025. Ground water use<br />

reductions not only benefit the Upper Floridan aquifer but also can improve surface water quality in areas where<br />

ground water is highly mineralized. According to the District's Water Management Information System (WMIS), there<br />

are 6,395 permitted agricultural permits in the District, with a combined permitted annual average daily ground water<br />

quantity of 699,485,000 gpd. Since actual use of permitted quantities is dependent on hydrologic conditions, one of the<br />

main goals of the FARMS program is to provide cost-share that helps reduce ground water use, regardless of<br />

hydrologic conditions. Therefore, FARMS projects not only offset ground water use with surface water but also try to<br />

increase the overall efficiency of irrigation water use. Each project's performance is tracked to determine its<br />

effectiveness. To date, total ground water offset accomplished through the FARMS Program by District funding has<br />

cost $1.40 per <strong>10</strong>00 gallons.<br />

Costs<br />

From the inception of the FARMS Program through FY2007 a total of $<strong>10</strong>,837,563 has been spent on FARMS<br />

projects with $4,700,599, or 43.4 percent coming from the farming participants and $6,136,964, or 56.6 percent, from<br />

public funding through the FARMS budget. Public funding sources for total project reimbursement is as follows: basin<br />

boards - 6.9 percent, Governing Board - <strong>10</strong>.3 percent, State Appropriations - 27.5 percent, and FDACS - 11.8 percent.<br />

Additional Information<br />

FARMS also funds a limited amount of non-project related outreach activities and data collection efforts in support of<br />

the Program. These include: IFAS Flatwood Citrus BMP Implementation. The District will provide $50,000 to this<br />

project for three years for a total of $150,000. This is an outreach effort by IFAS that furthers the goals of FARMS<br />

Program in the SPJC watersheds, in addition to growers within Manatee, Hardee, Sarasota, DeSoto, and Charlotte<br />

Counties IFAS Row Crop BMP Implementation. The District will provide $50,000 to this project for two years, and<br />

$55,000 in the final year for a total of $155,000. This is also an outreach effort by IFAS that furthers the goals of<br />

FARMS Program in Hillsborough, Manatee, Hardee, Sarasota, DeSoto, and Charlotte Counties. Finally for the Upper<br />

Myakka Surface-Water Quality Monitoring Network - funding for the deployment of data sondes at seven USGS gage<br />

sites in the UMRW has been approved. The network will assist in better understanding agricultural impacts on Flatford<br />

Swamp and in determining the effectiveness of FARMS projects.<br />

0<strong>21</strong> - Manasota Basin 205


H017<br />

Facilitating Agricultural Resource Management Systems Program<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 3,313,387 (1,800,492) 1,036,850 890,628<br />

0 3,440,373<br />

011 Alafia River Basin 225,416 (57,834) <strong>10</strong>4,585 82,096<br />

0 354,263<br />

013 Hillsborough River Basin 59,311 (45,000) 82,812 77,992<br />

0 175,115<br />

019 Withlacoochee River Basin 82,147 (<strong>10</strong>,000) 36,153 47,534<br />

0 155,834<br />

020 Peace River Basin 1,771,986 (944,030) 382,313 485,303<br />

0 1,695,572<br />

0<strong>21</strong> Manasota Basin 1,130,962 90,227 168,237 65,167<br />

0 1,454,593<br />

District Budgeted - Outside Revenue<br />

DACS - FARMS (H017) 1,417,416 33,495 0<br />

0<br />

0 1,450,911<br />

Ecosystem Trust Fund - FARMS 5,000,000 (3,244,618) 0<br />

0<br />

0 1,755,382<br />

State Approp - WRAP - Prior Year<br />

Funds<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

0 (607,193) 1,400,000<br />

0<br />

0<br />

792,807<br />

Project Funds Not Budgeted by the<br />

District<br />

Applicant Contribution 3,086,014 0 0<br />

0<br />

0 3,086,014<br />

Status As Of: September 03, 2009<br />

Total:<br />

Future<br />

Funding<br />

The FARMS Program has 78 active Board Approved projects in five of the District's nine Basins. The Program is<br />

intended to address issues within the District with the Southern Water Use Caution Area (SWUCA) and the Northern<br />

Tampa Bay Water Use Caution Area being targeted as areas of primary importance. Projected offset from the board<br />

approved projects is 13,541,828 gallons per day (gpd). Peace River Basin The Peace River Basin has 50 board<br />

approved active FARMS project with a projected offset of 8,699,793 gpd. Of the 50 projects in this Basin, 31 are<br />

operational with average groundwater offsets of approximately 3,168,464 gpd. Thirteen projects are under construction in<br />

this basin, and 6 more are in the contracting process. The Peace River Basin Board includes the Shell, Prairie, and<br />

Joshua Creek (SPJC) watershed, which is one of two priority areas designated for the FARMS Program. Thirty four of<br />

the 50 projects, including twenty three of the operational projects, are within the SPJC Priority area. Manasota Basin<br />

The Manasota Basin has fifteen board approved projects with a projected offset of 4,131,535 gpd. Of the fifteen projects<br />

in the Manasota Basin, eight are now operational, with groundwater offsets of approximately 2,844,424 gpd. Two projects<br />

are under construction, and five are in the contracting process. The Manasota Basin includes the other FARMS priority<br />

area, the Upper Myakka River Watershed. Ten of the fifteen projects are in the Upper Myakka River Watershed Priority<br />

area, including six of the operational projects. Hillsborough River Basin The Hilllsborough River Basin has two board<br />

approved FARMS Projects with projected offsets of 170,250 gpd. One project is now operational, Parke Family<br />

Hydrofarms, with an average groundwater offset of <strong>10</strong>,143 gpd. The other project is under construction. Green Swamp<br />

Basin FARMS has one operational project approximately 1 mile outside the SWUCA in the Green Swamp Basin. This<br />

project is offsetting approximately 36,931 gpd of groundwater. Alafia River Basin The Alafia Basin had six board<br />

approved projects with projected offsets of 488,850 gpd. Four projects are operational with groundwater offsets of<br />

approximately 441,846 gpd. Two projects are in the contracting phase. Withlacoochee River Basin. The Withlacoochee<br />

River Basin Board approved its first FARMS project at the February board meeting. This project is under construction,<br />

but it is projected to offset approximately 15,000 gpd of groundwater. FARMS is also providing partial funding for three<br />

regional projects. These projects are being coordinated through the Florida Department of Agriculture and Consumer<br />

Services. Two of them will help implement BMP programs for citrus growers and row crop farmers, and the other is the<br />

Mini-FARMS program that is described in greater detail under project number H529.<br />

0<strong>21</strong> - Manasota Basin 206<br />

Total<br />

Funding<br />

$14,360,864


H024<br />

Upper Peace River Resource Development<br />

Project Type WS&R Dev.<br />

AOR(s)<br />

Water Supply, Natural Systems<br />

Basin(s) Alafia River, Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager TURNER, DAWN<br />

Task Manager(s)<br />

Status Ongoing<br />

MORRIS, LISANN, HERD, KEN<br />

Description<br />

This project involves the identification and evaluation of potential water resource development projects in the upper<br />

Peace River watershed above Zolfo Springs. The vehicle to accomplish this is the District's Watershed Management<br />

Program (WMP). The project includes performing the 1) Topographic Information, 2) Watershed Evaluation, and 3)<br />

Watershed Management Plan elements of the WMP. Work on the Topographic Information, Watershed Evaluation,<br />

and Watershed Management Plan tasks for the area contributing flow to the river between the confluence with the<br />

Peace Creek Canal and the Highway 640 bridge crossing in Homeland are nearing completion. FY2007 funds are<br />

being used to perform Watershed Evaluation tasks for the area contributing flow to the river between the Highway 640<br />

bridge crossing in Homeland and Zolfo Springs. These tasks include the collection of hydrologic and hydraulic<br />

information for both the existing condition and the committed future condition reflected in approved reclamation plans.<br />

FY2008 funds were used to evaluate a potential surface water storage area adjacent to the river. FY2009 and FY20<strong>10</strong><br />

funds will be used to further evaluate potential surface water storage facilities, and perform Topographic Information,<br />

Watershed Evaluation, and Watershed Management Plan tasks. Future funding will be needed to complete the<br />

Topographic Information, Watershed Evaluation, and Watershed Management Plan tasks for the area between<br />

Homeland and Zolfo Springs. Preferred Best Management Practices (BMPs) will be further developed through the<br />

Implementation of BMPs process under separate activity codes, and will require additional funding.<br />

Benefits<br />

The water resource development projects that are ultimately selected for implementation will enhance low flows, water<br />

quality, and natural systems within the upper Peace River.<br />

Costs<br />

The anticipated project cost is $3,150,000. For FY20<strong>10</strong>, $250,000 of project funding is appropriated in the following<br />

Basin budgets: Governing Board ($125,000), Peace River Basin ($62,500), Alafia River Basin ($31,250), and the<br />

Manasota Basin ($31,250). FY20<strong>10</strong> funds will be used to complete Topographic Information, Watershed Evaluation,<br />

and Watershed Management Plan tasks. For FY2009, $250,000 is appropriated in the following budgets: Governing<br />

Board ($125,000), Peace River Basin ($62,500), Alafia River Basin ($31,250), and the Manasota Basin ($31,250).<br />

$41,142 of the FY2009 funds will be used to obtain LiDAR for an area within the river floodplain that was inundated<br />

when the original LiDAR data was obtained. The remaining FY2009 funds are being used for the technical evaluation<br />

of suitable water storage areas adjacent to the Peace River, and to optimize design opportunities for MFL recovery.<br />

For FY2008, $250,000 was appropriated in the following budgets: Governing Board ($125,000), Peace River Basin<br />

($62,500), Alafia River Basin ($31,250), and the Manasota Basin ($31,250). $200,000 was used for an evaluation of a<br />

potential surface water storage area. The remaining $50,000 of FY2008 funds was liquidated. For FY2007, $250,000<br />

was appropriated in the following budgets: Governing Board ($125,000), Peace River Basin ($62,500), Alafia River<br />

Basin ($31,250), and the Manasota Basin ($31,250). In FY2007, $250,000 in revenue will be received from state<br />

appropriations and distributed as follows: Governing Board ($125,000), Peace River Basin ($62,500), Alafia River<br />

Basin ($31,250), and the Manasota Basin ($31,250). When each element is completed the project budget and scope<br />

may require refinement based upon the information gathered. The District funding amounts shown in the table include<br />

staff salaries.<br />

Additional Information<br />

The WMP includes five major elements: 1) Topographic Information, 2) Watershed Evaluation, 3) Watershed<br />

Management Plan, 4) Implementation of Best Management Practices, and 5) Maintenance of Watershed Parameters<br />

and Models. Implementing elements of the WMP with local governments is one of the Comprehensive Watershed<br />

Management (CWM) initiative strategies and one of the District's Strategic Priorities. In 2002, the District completed<br />

the technical work necessary for establishing minimum flows in the upper Peace River, and the first draft of the Peace<br />

River Cumulative Impacts Analysis Report. The Upper Peace River Watershed has been heavily impacted by mining,<br />

development activities, and groundwater withdrawals. Proposed minimum "low" flows are currently not being met at<br />

the Bartow and Ft. Meade gage sites. The District has developed the Southern Water Use Caution Area (SWUCA)<br />

Recovery Strategy that proposes concepts for development of water resource projects. Two of the concepts are<br />

storage of wet season rainfall in surface water reservoirs for later release during periods of low or no flow; and the<br />

hydraulic optimization of areas impacted by mining, including the reconnection of closed basin areas. Two projects,<br />

0<strong>21</strong> - Manasota Basin 207


H024<br />

Upper Peace River Resource Development<br />

the Upper Peace River Minimum Flow Enhancement project (H004), and the Old Lands Phosphate project (H011),<br />

were initiated in FY2003 to accomplish similar goals. The Upper Peace River Minimum Flow Enhancement project<br />

included funding for a feasibility analysis, and design and permitting of a surface water reservoir on reclaimed mine<br />

land. The District evaluated a reservoir site located on the east side of the Peace River just south of County Highway<br />

640, and began the land acquisition process. The property owner rejected the District's offer for purchase, which<br />

terminated the efforts for this site. As part of the Old Lands Phosphate project, District staff identified other potential<br />

reservoir locations, and areas that no longer contribute runoff to the river as a result of mining activities that could be<br />

hydraulically reconnected. Both of these projects are consistent with the Upper Peace River Resource Development<br />

project. Projects H004 and H011 were discontinued as individual projects, and incorporated into the Upper Peace<br />

River Resource Development project. Alternative reservoir sites are being evaluated, and District staff are collecting<br />

available information from property owners, mine companies, FDEP Bureau of Mine Reclamation, and others. FY2004<br />

funds were used to complete elements of a Watershed Evaluation to identify the connectivity of the Upper Peace<br />

River system from the confluence of Saddle Creek and Peace Creek, south to Zolfo Springs. Work Order #1 tasks<br />

focused on the identification of system connectivity through phosphate lands located between the confluence of<br />

Saddle Creek and Peace Creek, and Zolfo Springs. The First Amendment was executed to expand the scope of work<br />

to complete the Watershed Evaluation tasks for the area above County Highway 640 at Homeland, and encumber<br />

FY2005 funds. The Second Amendment was executed to prepare a Watershed Management Plan for the area that<br />

contributes flow to the River between the confluence of Saddle Creek and the Peace Creek Canal, and Homeland;<br />

and encumber FY2006 funds. The Watershed Management Plan element will include a water resource assessment<br />

and an alternative analysis that will include a cost/benefit evaluation of potential water resource development projects.<br />

A Third Amendment was executed to extend the contract expiration date from December 31, 2008 to December 31,<br />

2009. A second Agreement was developed to encumber FY2007 funds to perform Watershed Management Program<br />

elements for the area contributing flow to the river between the Highway 640 bridge crossing at Homeland, and Zolfo<br />

Springs. Future funding will be needed to complete the Watershed Management Plan for the area between Homeland<br />

and Zolfo Springs. When each task is completed the project budget will be refined based on the information<br />

developed. The District is cooperating with FEMA to modernize the flood insurance rate maps (FIRMs) in Polk County.<br />

Information developed with this project will be used to update the FIRMs representing this watershed.<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 1,085,176 0 131,354 130,283 1,250,000 2,596,813<br />

011 Alafia River Basin 223,856 0 32,613 33,861 312,500 602,830<br />

020 Peace River Basin 436,<strong>10</strong>5 0 63,863 65,111 625,000 1,190,079<br />

0<strong>21</strong> Manasota Basin 234,763 0 32,613 34,161 312,500 614,037<br />

District Budgeted - Outside Revenue<br />

Ecosystem Trust Fund - Upper Peace<br />

Rvr Rstr<br />

Water Protection & Sust T.F. (Surface<br />

Wtr Rstr)<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

250,000 0 0<br />

0<br />

250,000 0 0<br />

0<br />

Total:<br />

Future<br />

Funding<br />

0<br />

0<br />

Total<br />

Funding<br />

250,000<br />

250,000<br />

$5,503,759<br />

Critical Project Milestones Projected Amended Actual<br />

1. Original Agreement<br />

Draft Original Agreement to Management Services 7/26/04 8/24/04<br />

Draft Original Agreement returned from Management Services 8/26/04 8/25/04<br />

Execute Original Agreement (First Agreement) 9/17/04 9/30/04<br />

Notice to Proceed - Work Order #1 9/24/04 <strong>10</strong>/22/04<br />

Submittal of Final Report related to Work Order #1 4/22/05 4/22/05<br />

Execute Contract Amendment 1 to the First Agreement 9/<strong>21</strong>/05 9/<strong>21</strong>/05<br />

0<strong>21</strong> - Manasota Basin 208


H024<br />

Upper Peace River Resource Development<br />

Recognition of the SWFWMD, Peace, Alafia & Manasota Basin Bds. will be<br />

provided on all reports<br />

<strong>10</strong>/31/05 12/31/09<br />

Notice to Proceed - Work Order #2 for geotechnical testing 11/30/05 1/9/06<br />

Notice to Proceed - Work Order #3 (Watershed Evaluation) 11/30/05 11/17/05<br />

Submittal of Final Report related to Work Order #2 2/28/06 4/19/06<br />

Notice to Proceed - Work Order #4 (Feasibility of Alternatives) 5/19/06 5/19/06<br />

Execute Contract Amendment 2 6/2/06 7/24/06<br />

Submittal of Final Report related to Work Order #3 6/17/06 <strong>10</strong>/3/06<br />

Notice to Proceed - Work Order #5 for geotechnical testing 7/28/06 7/28/06<br />

Contract Expiration - Original Agreement 7/29/06 12/31/09<br />

Submittal of Final Report related to Work Order #5 9/28/06 3/27/07<br />

Notice to Proceed - Work Order #6 Watershed Mgt. Plan <strong>10</strong>/31/06 <strong>10</strong>/25/06<br />

Submittal of Final Report related to Task 2.2.7.1 of Work Order #4 12/22/06 2/<strong>21</strong>/07<br />

Submittal of Final Report related to Task 2.2.7.3 of Work Order #4 12/22/06<br />

Submittal of Final Report related to Task 2.2.7.2 of Work Order #4 12/22/06<br />

Notice to Proceed - Work Order #7 (Summary Report) 7/20/07 7/20/07<br />

Submittal of Final Report related to Work Order #7 8/31/07 8/31/07<br />

Notice to Proceed - Work Order #8 (Sinkhole Survey) <strong>10</strong>/31/07 12/14/07<br />

Submittal of Final Deliverables related to Work Order #8 1/31/08 6/<strong>10</strong>/08<br />

Notice to Proceed - Work Order #9 (Survey) 5/31/08 5/15/09<br />

Submittal of Final Report related to Work Order #6 11/30/08<br />

1. Original Agreement<br />

Final Deliverables WO#9 (Survey) 8/31/08 <strong>10</strong>/24/08<br />

Notice to Proceed - Work Order #<strong>10</strong> (Additional Field Reconnaissance) 11/<strong>10</strong>/08 11/<strong>10</strong>/08<br />

Final Deliverables WO#<strong>10</strong> (Additional Field Reconnaissance) 3/<strong>10</strong>/09<br />

2. Second Agreement<br />

Draft Second Agreement to Management Services 12/1/06 5/29/07<br />

Draft Second Agreement returned from Management Services 1/1/07 6/7/07<br />

Execute Second Agreement - Zolfo Springs 1/31/07 7/11/07<br />

Notice to Proceed - Zolfo Springs Work Order #1 2/9/07 7/20/07<br />

Submittal of Final Report - Zolfo Springs WO #1 2/9/08<br />

Contract Expiration - Second Agreement (Zolfo Springs) 1/31/09<br />

Status As Of: August 19, 2009<br />

An Agreement was executed with HDR to further evaluate CS-11 as a potential surface water reservoir to enhance low<br />

flows in the upper Peace River. Tasks involved probable design criteria and conceptual cost estimates on rehabilitation<br />

of CS-11 to a reservoir along with assisting staff with negotiations on the possible purchase of the property from the<br />

current owner. The evaluation will build upon the feasibility assessment performed by Ardaman and Associates as part of<br />

the Surface Water Resource Assessment Inventory and Approach Development task. Ardaman and Associates will<br />

continue to develop the Upper Peace River Watershed Management Plan. Hydrologic and hydraulic data collected as<br />

part of the Upper Peace River Resource Development project is also being used in the development of the Peace River<br />

Integrated Model (P687). The Agreement with Ardaman was executed on September 30, 2004. As part of the Watershed<br />

Management Plan, Ardaman conducted geotechnical testing and surface water modeling to evaluate potential reservoir<br />

sites. The Ardaman evaluations indicate CS-11 could be modified to function as a surface water reservoir. The tasks<br />

associated with Work Orders #1, #2, #3, #5, #7, #8, & #9 have been completed, and associated final deliverables have<br />

been approved. Tasks related to Work Orders #4, #6, & #<strong>10</strong> are on-going. A draft of the first of 3 reports related to Work<br />

Order #4 was received on January 26, 2007. Staff reviewed the draft, and provided comments to the consultant on<br />

January 30, 2007. Data collection for Work Order #6 has been completed. The final report related to Work Order #6 was<br />

due on November 30, 2008. However a time extension was granted until December 31, 2009. Work Order #7 was issued<br />

on July 20, 2007 for the preparation of a summary report to consolidate recent geotechnical and engineering evaluation<br />

information regarding the feasibility of using CS-11 as a water storage area for MFL recovery. The water discharged<br />

back into the river will need to be of sufficient quantity to overcome the influence of sinkholes in and adjacent to the<br />

streambed in order to meet MFLs in the upper river. A draft summary report was received in August 2007. Comments<br />

were provided to the consultant. Final version of the WO#7 summary report received May 27, 2009. Work Order #8 was<br />

executed on December 14, 2007 to survey sinkhole areas to determine if low flows can be redirected around the sinkhole<br />

features, and to identify the hydraulic control elevation in the streambed that may be backing water up into these<br />

features. An evaluation of the survey data will be conducted as part of the SWUCA Recovery - Upper Peace Karst Berms<br />

(H064) project. Please refer to the PIMS entry for H064 for further information on that project. Work Order #9 was<br />

0<strong>21</strong> - Manasota Basin 209


H024<br />

Upper Peace River Resource Development<br />

developed to collect survey data for several cross-sections and bridge crossings within the upper Peace River and two of<br />

its tributaries, Bear Branch and Six Mile Creek. Notice to Proceed was issued on May 15, 2008. Notice to Proceed for<br />

Work Order #<strong>10</strong> was issued on November <strong>10</strong>, 2008. Work Order #<strong>10</strong> includes the collection of additional survey<br />

information within the City of Bartow for areas that discharge to the Peace River. This work has been completed. The<br />

original agreement focuses on the area above Homeland. A second consultant services agreement was developed to<br />

focus on the area contributing flow to the river between Homeland and Zolfo Springs. The Second Agreement was<br />

executed on July 11, 2007. Work Order #1 was issued against the Second Agreement on July 20, 2007; and involves the<br />

completion of Watershed Evaluation tasks for the area between Homeland and Zolfo Springs. Status History: The first<br />

contract currently encumbers $150,000 of FY2004 funds, $500,000 of FY2005 funds, and $500,000 of FY2006 funds.<br />

The Second Consulting Services Agreement encumbers $500,000 of FY2007 funds. $200,000 in FY2008 funding was<br />

used to retain HDR to further evaluation the use of CS-11. The remaining $50,000 in FY2008 funds was liquidated.<br />

$250,000 was budgetted in FY2009. $360,000 of H004 Upper Peace River Minimum Flow Enhancement project funds<br />

were transferred to this project to retain a consultant to perform detailed geotechnical analyses, obtain topographic<br />

information, prepare cost/benefit analyses, prepare preliminary and final design plans, and obtain permits needed to<br />

construct a reservoir. The H004 funds were previously Board encumbered. The amount shown in the Prior Funding<br />

column of the funding table has been revised to reflect the funds transferred from the H004 project. Tasks associated<br />

with Work Orders #1, #2, #3, #5, #7, #8, & #9 have been completed, and associated final deliverables have been<br />

approved. Tasks related to the First Agreement - Work Orders #4, #6, & #<strong>10</strong> are on-going. As of this writing, the<br />

following has been expended: $779,241 has been invoiced and paid in accordance with the Original Agreement with<br />

Ardaman; $292,362 has been paid in accordance with the Second Agreement with Ardaman; and $41,142 has been<br />

expended to obtain additional LiDAR data. Of the $250,000 in FY2009 funding, $15,000 will be used to retain a<br />

consultant to provide technical support in responding to questions on the conceptual design for CS-11; $41,142 will be<br />

used to obtain topographic information for an area that was inundated when the LiDAR data was obtained. An additional<br />

$3,350 was added to the HDR contract to finish technical support for CS-11 land negotiations and $<strong>10</strong>,000 was added as<br />

contigency in case any new issues arise. The remaining $181,357 of FY2009 will be encumbered without a contract to be<br />

used for more detailed evaluation of other potential reservoir sites in the Upper Peace Watershed. The remaining<br />

FY2009 funding is distributed as follows: Governing Board ($91,929), Alafia Basin Board ($<strong>21</strong>,732), Peace River Basin<br />

Board ($45,964), Manasota Basin Board ($<strong>21</strong>,732).<br />

0<strong>21</strong> - Manasota Basin 2<strong>10</strong>


H048<br />

Myakka River Watershed Initiative<br />

Project Type WS&R Dev.<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality, Natural Systems<br />

Basin(s) General Fund (District), Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager MORRIS, LISANN<br />

Task Manager(s)<br />

Status Ongoing<br />

STARKS, ROBERTA, SZAFRANIEC, MARY, RIALS, MARK, SMITH, RANDY, ARNOLD, DAVE<br />

Description<br />

The Myakka River Watershed is approximately 600 square miles in size and spans about 66 miles from Myakka Head<br />

to its outfall in Charlotte Harbor. It includes portions of several counties including Hardee, Desoto and Charlotte with<br />

the majority of the watershed located in Manatee and Sarasota counties. The 34-mile segment of the Myakka River in<br />

Sarasota county has been designated a Wild and Scenic River by the State of Florida and, together with the estuarine<br />

portions of the river, it is designated an Outstanding Florida Water by the Florida Department of Environmental<br />

Protection. The river is the second largest source of freshwater inflow for Charlotte Harbor, which is generally viewed<br />

as one of the most productive estuaries in Southwest Florida and is a SWIM waterbody. The Initiative is a<br />

comprehensive project that will illustrate the effects of land use conversions and alterations and evaluate best<br />

management practices (BMPs) for restoration alternatives. The objective of this initiative is to restore water quality,<br />

natural system, and floodplain impacts in the watershed in ways that can also provide a benefit to water supplies in the<br />

Southern Water Use Caution Area (SWUCA). The Topographic Information, Watershed Evaluation, and Watershed<br />

Management Plan elements of the District's Watershed Management Program (WMP) are included in this initiative.<br />

This effort will build upon existing data and analyses as well as the Sarasota County Lower Myakka Watershed<br />

Management Plan, K487, and the City of North Port Big Slough Watershed Management Plan, K883. Evaluation will<br />

also be performed on existing and proposed activities within the watershed, including a list of identified issues and a<br />

program to address long-term water resource issues will be developed.<br />

Benefits<br />

The Initiative will result in a better understanding of the dynamics of the river and watershed, determine how<br />

alternations have affected these systems, evaluate potential water resource impacts from future land use changes,<br />

and provide alternatives to better manage the water resource within the Myakka River watershed.<br />

Costs<br />

The estimated cost for the WMP of the Initiative is approximately $4.9 million. As a result of FY2009 funding from the<br />

State, some activities can start sooner than expected. The match of state funding to existing budgeted District funds<br />

provided an amount of $276,000 that will be amended into the agreement to cover increased coordination efforts with<br />

potential users of the excess water in Flatford and update the GIS database to the new version of GWIS. To initiate<br />

water quality monitoring $18,392 was transferred to the appropriate District sections.<br />

Funding History: Back at the February <strong>21</strong>, 2006 Governing Board <strong>Meeting</strong>, a transfer of funds ($500,000) from the<br />

Water Supply and Resource Development reserves was approved to hire consultants to obtain digital topographic<br />

information using LiDAR in eastern Manatee County ($380,000) and to initiate the water budget analysis for the Upper<br />

Myakka watershed ($120,000). The FY2007 funding ($2 million) continued the Upper Myakka water budget, the<br />

Watershed Evaluation for the entire watershed, and initiates the Watershed Management Plan element within the<br />

Upper Myakka. The $2 million FY2007 budget was funded as follows: $575,000 from the Governing Board, $517,500<br />

from the Manasota Basin Board, $57,500 from the Peace River Basin Board, and $850,000 from state appropriations.<br />

$1.77 million was obtained for FY2008 to complete the Watershed Evaluation element, continue the Watershed<br />

Management Plan element, complete the Independent quality assurance review of existing parameters and models<br />

previously developed for the Myakka River in unincorporated Sarasota County (K487) and the Big Slough tributary<br />

(K883). The FY008 funding was divided as follows: $635,000 from the Governing Board, $571,500 from the Manasota<br />

Basin Board, $63,500 from the Peace River Basin Board, and $500,000 from the State Funding. The funding<br />

distribution, percentage wise, is Governing Board (50%), Manasota Basin Board (45%) and Peace River Basin Board<br />

(5%). Contracting for independent, peer review of the Water Budget for the Upper Myakka and the purchase of the<br />

necessary software licenses for the MikeSHE model were accomplished with FY2008 funds. The remaining $765,000<br />

in funding is being used to complete the Watershed Management Plan through the Alternatives Analysis.<br />

Because this project was able to secure State Funding for FY2009 in the amount of $1,000,000, additional budget will<br />

not be needed to leverage ad valorum funding budgeted in previous fiscal years to match the state grant. When each<br />

element is completed, the project budget and scope may require refinement based on the information gathered. The<br />

District funding amounts shown in the table include staff salaries. Future funding will be required for implementation of<br />

selected BMPs.<br />

Additional Information<br />

0<strong>21</strong> - Manasota Basin <strong>21</strong>1


H048<br />

Myakka River Watershed Initiative<br />

A WMP includes five major elements: 1) Topographic Information, 2) Watershed Evaluation, 3) Watershed<br />

Management Plan, 4) Implementation of Best Management Practices, and 5) Maintenance of Watershed Parameters<br />

and Models. Implementing elements of the WMP is one of the Comprehensive Watershed Management (CWM)<br />

initiative strategies and one of the District's Strategic Priorities. Funding was requested to continue the Watershed<br />

Management Plan including: GIS data base development, watershed parameterization, computer modeling, floodplain<br />

analysis, floodplain delineation, and alternative analysis of BMPs within the Upper Myakka. Since all task under the<br />

Watershed Management Plan will not be completed within, the necessary funding to complete the project has be<br />

distributed between to FY2009. Objectives of the Initiative include: 1) ensuring an adequate supply of the water<br />

resource, 2) providing flood protection, 3) protecting and enhancing water quality and preventing the further<br />

degradation of the water resource, and 4) preserving, protecting and restoring natural systems. There is a significant<br />

amount of research, study and other data available for the watershed from the District and other Myakka stakeholders<br />

that can and will be used during the course of the project. Stakeholder involvement and contribution of available<br />

information will be important for the Initiative's ultimate success.<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 1,267,098 500,000 31,686 31,194<br />

0 1,829,978<br />

020 Peace River Basin 148,468 0 12,626 4,919<br />

0 166,013<br />

0<strong>21</strong> Manasota Basin 1,140,816 0 27,341 32,184<br />

0 1,200,341<br />

District Budgeted - Outside Revenue<br />

Ecosystem Trust Fund - Myakka Rvr<br />

W/S Init<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

1,350,000 0 1,000,000<br />

0<br />

Total:<br />

Future<br />

Funding<br />

0<br />

Total<br />

Funding<br />

2,350,000<br />

$5,546,332<br />

Critical Project Milestones Projected Amended Actual<br />

1. Aerial Mapping Services<br />

Execute Work Order for Aerial Topographic Mapping 2/24/06 2/24/06<br />

Complete Aerial Topographic Mapping <strong>10</strong>/31/06 1/30/06 3/22/07<br />

3. WMP Consulting Services<br />

Execute Consultant Services Agreement 11/13/06 12/4/06<br />

Complete Work Order #1 5/8/07 5/8/07<br />

Complete Work Order #5 9/27/07 6/16/08<br />

Complete Work Order #4 12/3/07 1/18/08<br />

Complete Work Order #3 4/1/08 5/17/08<br />

Complete Work Order #2 5/22/08 5/14/08<br />

3. WMP Consulting Services<br />

Complete Work Order #6 3/3/08 3/31/08<br />

Complete Work Order #8 4/2/08 4/1/09<br />

Complete Work Order #7 5/15/08 8/1/08<br />

Execute Amendment 1 5/22/09 5/22/09<br />

3.WMP Consulting Services<br />

Execute Work Order #9 9/9/08 9/9/08<br />

Execute Work Order #<strong>10</strong> 1/31/09 3/31/09 4/<strong>10</strong>/09<br />

Complete Work Order #9 4/30/09 9/30/09<br />

4. WMP Consulting Services<br />

SAI Agreement Termination <strong>10</strong>/31/<strong>10</strong> 1/<strong>10</strong>/11<br />

WMP Consulting Services<br />

Execute Work Order #13-Jones Edmunds 4/24/09 7/<strong>10</strong>/09<br />

Execute Work Order #12-Singhofen 4/24/09 7/<strong>10</strong>/09<br />

0<strong>21</strong> - Manasota Basin <strong>21</strong>2


H048<br />

Myakka River Watershed Initiative<br />

Complete Work Order #11 8/31/09 9/30/09<br />

Complete Work Order #<strong>10</strong> 2/<strong>10</strong>/<strong>10</strong><br />

WMP Consulting Services-Dewberry<br />

Execute Work Order #14 4/24/09 8/17/09<br />

Status As Of: September 01, 2009<br />

Status History: At the February <strong>21</strong>, 2006 Governing Board <strong>Meeting</strong>, a transfer of funds ($500,000) from the Water<br />

Supply and Resource Development reserves was approved to hire consultants to obtain LiDAR in eastern Manatee<br />

County ($380,000) and to initiate the water budget analysis for the Upper Myakka watershed ($120,000). The notice to<br />

proceed for the LiDAR work order was executed on February 24, 2006. The LiDAR vendor informed staff that the sensor<br />

used to acquire the data earlier this spring experienced hardware problems and the data are not usable. The vendor<br />

recollected the LiDAR data and the Eastern Manatee/Upper Myakka LiDAR was approved and delivered to the WMP<br />

consultant. The Request for Proposals to perform the Watershed Management Program elements was posted on May<br />

19, 2006. Oral presentations of the three respondents were given on July 25, 2006. Singhofen & Associates, Inc. (SAI)<br />

was selected and approved on August 8, 2006. The SAI agreement was executed on December 4, 2006. Copies of the<br />

executed agreement were transmitted to Manatee County, City of North Port, Sarasota County, and PRMRWSA. A<br />

kick-off meeting was held with the Myakka River stakeholders on February 14, 2007, to present the project and collect<br />

information from staff with projects, knowledge, and/or data within the watershed.<br />

Work Order #1 deliverables (collecting and reviewing existing information, developing the methodology and approach for<br />

completing the surface water, water quality, and water budget modeling and preparing the project management, quality<br />

assurance, and outreach plan) were completed. Work Order #2 was executed on June 12, 2007, to develop the Upper<br />

Myakka River water budget model. Work Orders #3 and 4 were executed to complete the digital topographic information<br />

element, geospatially reference existing survey data from throughout the watershed, develop content for a web page,<br />

complete historic land use mapping, and identify model-specific features for the geodatabase. Changes in the processes<br />

of the Watershed Management Program as a result of FEMA work have delayed the development of Work Order #6.<br />

Imagery (late 1940s and early 1950s) is being utilized for historic land use mapping in the water budget analysis. Training<br />

on the Mike SHE (integrated computer model for the water budget) was held for District staff. Coordination efforts<br />

continue with the H063 PRMRWSA Source Feasibility study. Work Order #6 that includes historic vegetation<br />

investigation in Flatford Swamp, and preliminary sub-basin and watershed delineations was executed January 2, 2008.<br />

The kick-off meeting for the the peer review was held March 20, 2008. The historic land-use mapping and the digital<br />

terrain information are complete. The consultant has completed the future land use and historic land use hydrologic<br />

scenario runs. The Myakka website can now be accessed on watermatters.org. The Upper Myakka Water Budget was<br />

presented to the Watershed Summit sponsored by the Charlotte Harbor National Estuary Program. The MRWI was<br />

presented to the Florida State conference of Agricultural and Biological Engineers in early June 2008. The peer review<br />

document was received in early July 2008. Peer review comments have been addressed. In an effort to accelerate the<br />

project, staff was able to initiate water quality monitoring for a major portion of the Class 3 constituents, along with<br />

coordination efforts with potential users and updates to the GIS database as a result of state funding from FY2009.<br />

These efforts can begin now instead of waiting for additional funding in the next fiscal year. This requires an amendment<br />

to the current Singhofen & Associates agreement increasing the funding amount by $276,000 to cover the updated<br />

database efforts and increased coordination efforts. The District's Chemistry Lab and Water Quality Monitoring Program<br />

sections are managing the water quality monitoring element. The consultant is waiting on recommendations for utilizing<br />

the recent Sarasota County Lidar from the District before proceeding. The consultant team presented removal scenarios<br />

of excess water from Flatford swamp and screening for potential uses at a meeting April 30, 2009. Watershed Evaluation<br />

work orders have been delayed again as coordination efforts are worked through at the District. The consultant team<br />

continues to explore possible alternatives for users of excess water from Flatford Swamp. Initial meetings with potential<br />

users will continue for the next several months.Current Status: Consultant has completed a preliminary alternatives<br />

analysis in the Tatum Sawgrass area of the watershed. The consultant has started development of the hydraulic event<br />

modeling for the river as well as several tributary sub-watersheds that will assist with future permitting of best<br />

management practices to address alterations within the study area.<br />

0<strong>21</strong> - Manasota Basin <strong>21</strong>3


H051<br />

PR/MRWSA Reg Integ Loop Sys Phase 2 Interconnect<br />

Project Type WS&R Dev.<br />

AOR(s)<br />

Water Supply<br />

Basin(s) General Fund (District), Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager FERGUSON, JOHN<br />

Task Manager(s)<br />

Status Ongoing<br />

Peace River/Manasota Regional Water Supply Auth.<br />

ARMSTRONG, BRIAN<br />

Description<br />

The Regional Integrated Loop System project is a series of transmission pipelines that will be developed to regionally<br />

transfer and deliver water from existing and future alternative supplies to demand centers within the Peace<br />

River/Manasota Regional Water Supply Authority's four county region. The Phase II Interconnect project is a<br />

component of the Regional Integrated Loop System that will provide needed regional transmission capacity between<br />

the Peace River Facility and the City of North Port. The transmission line will be a 36-to-48 inch diameter pipeline<br />

extending approximately 5.5 miles from the Peace River Facility, generally along the existing 36-inch regional<br />

transmission main (RTM) corridor to Serris Boulevard, where it will interconnect with the City of North Port's<br />

transmission/distribution system. In addition to serving the City of North Port, Phase II provides back-up capacity to the<br />

existing 36-inch RTM, and comprises a critical segment for the extension of future regional transmission capacity to<br />

the City of North Port's Myakkahatchee Creek Water Treatment Facility, the Englewood Water District treatment<br />

facilities, and the Carlton Water Treatment Facility.<br />

Benefits<br />

The initial segment of the Phase 2 Interconnect will allow the City of North Port to receive additional water from the<br />

Authority's ongoing expansion project. The City currently requires this project to transmit the quantities of water they<br />

are contracted to purchase from the Authority in FY2012. Development of additional segments will further integrate<br />

regional resources; maximize surface water for public supply; provide rotational capacity and the ability to rest sources;<br />

provide for reserve capacity for emergency transfers; provide alternatives to the development of groundwater in the<br />

Southern Water Use Caution Area (SWUCA); and better match supply, demand and financial investment on a regional<br />

basis. The use of alternative sources with the maximization of surface water for public supply is consistent with the<br />

District's Regional Water Supply Plan.<br />

Costs<br />

The total estimated cost for the H051 Phase 2 Interconnect is $15,400,000 with the requested District share being<br />

$7,700,000. The District funding will be divided between the Governing Board, $3,850,000 (50%); Manasota Basin,<br />

$2,8<strong>10</strong>,00 (36.5%); and the Peace River Basin, $1,039,500 (13.5%). District funding in FY20<strong>10</strong> is anticipated to be:<br />

General fund $1,500,000; Manasota $500,000; Peace River $200,000; for a total of $2,200,000.<br />

The Funding table below shows funds that were budgeted in "FY2007" and "FY2008" and "Cumulative Transfers".<br />

Those funds lapsed at the end of their fiscal years, as the project was not pursued at those times. A negative<br />

adjustment is made under "prior funding" to show the actual total funding.<br />

The long-term project cost of all additional Phase 2 components for joining the Englewood Water District, City of<br />

Venice, and the Carlton WTP has been estimated at $<strong>10</strong>6,378,<strong>21</strong>7.<br />

Additional Information<br />

The Loop Feasibility/Routing Study was authorized by the Authority in May 2005 and the report was issued in June<br />

2006. The Feasibility/Routing Study identified the preferred loop pipeline routing, environmental impacts, major<br />

connection points, preliminary pipe sizing, proposed schedule of project phasing, and time frames for construction.<br />

The Study's recommended Phase 2 route connects the Peace River Water Treatment Plant with the Myakkahatchee<br />

Creek Water Treatment Plant and then branches into two segments. The one segment loops northwest to Sarasota<br />

County's Carlton Water Treatment Facility, and the other segment runs southwest and connects to the public water<br />

systems of the Englewood Water District and the City of Venice.<br />

In August 2007, the Authority Board approved the first work order for Phase 2 of the Regional Loop System and<br />

issued a notice to proceed. In December 2007, the Authority's consultant released a preliminary design report for the<br />

Phase 2. In May 2008, the Authority chose to postpone the project in favor of an alternate connection between North<br />

Port's system near the Snover Waterway and the existing regional line connecting the Carlton and Peace River WTPs.<br />

As a result, the District reallocated the FY2007 and FY2008 funds towards other projects.<br />

After much discussion between the City of North Port, Sarasota County, and the Authority over shared capacities, the<br />

Snover Waterway connection was considered insufficient to meet all the partners' combined needs. In November<br />

2008, the Authority revised a shorter version the Phase 2 project, which calls for a segment between the Peace River<br />

WTP and the North Port's Serris Blvd connection. The pipeline would be the length needed to deliver an increased<br />

capacity to the City, but would retain the greater transmission capacity needed for future extensions. In February 2009,<br />

0<strong>21</strong> - Manasota Basin <strong>21</strong>4


H051<br />

PR/MRWSA Reg Integ Loop Sys Phase 2 Interconnect<br />

The Authority's consultant released a technical memorandum which updated the cost estimate from the 2007<br />

Preliminary Design report. The cost for a 36-inch diameter, 5.5 mile long pipeline with a transmission capacity of 13.5<br />

mgd was updated from $12,000,000 to $15,400,000.<br />

The project is scheduled for completion by September 2012. The City is currently exceeding their 1.192 mgd annual<br />

average capacity entitlement in the existing pipeline from the Peace River Facility. The City will require an additional<br />

1.758 mgd transmission capacity by 2011, and a total of 3.20 mgd transmission capacity by 2014.<br />

The City of North Port, Charlotte County, and the Authority entered into a three party temporary interlocal agreement<br />

for the capacity use of existing water main. The City and County approved the agreement on May 26, 2009, and the<br />

Authority board approved the agreement on June 3, 2009. This agreement will allow the City of North Port additional<br />

capacity until September 30, 2012, which is the scheduled completion date for the Phase 2 interconnect. Also on May<br />

26, 2009, The City of North Port approved the interlocal agreement for the Phase 2 interconnect. The agreement was<br />

approved at the Authority Board meeting on June 3, 2009.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 3,200 (3,200) 0 1,501,785 2,750,000 4,251,785<br />

020 Peace River Basin 2,001 (2,001) 0 200,860 742,500 943,360<br />

0<strong>21</strong> Manasota Basin 2,001 (2,001) 0 501,913 2,007,500 2,509,413<br />

Project Funds Not Budgeted by the<br />

District<br />

PRMRWSA 0 0 600,000 2,200,000 4,900,000 7,700,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$15,404,558<br />

Critical Project Milestones Projected Amended Actual<br />

Permitting / Property aquisition 5/29/09<br />

Design 11/27/09<br />

Construction 12/31/<strong>10</strong><br />

Status As Of: August 31, 2009<br />

The Authority executed Work Order No. 2 with King Engineering Associates (King) on September 2nd, 2009 for the<br />

project coordination, BODR, final design, permitting, and bidding award services of the Phase 2 Interconnect. King was<br />

intially contracted in June 2007 for the project.<br />

Accelerate Florida: The Authority has been notified of the Accelerate Florida Program. This project will be shovel-ready<br />

December 20<strong>10</strong>.<br />

0<strong>21</strong> - Manasota Basin <strong>21</strong>5


H052<br />

PR/MRWSA Reg Integ Loop Sys Phase 3A Interconnect<br />

Project Type WS&R Dev.<br />

AOR(s)<br />

Water Supply<br />

Basin(s) General Fund (District), Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager FERGUSON, JOHN<br />

Task Manager(s)<br />

Status Ongoing<br />

Peace River/Manasota Regional Water Supply Auth.<br />

ARMSTRONG, BRIAN, GOODWIN, AUDRIE<br />

Description<br />

The Regional Integrated Loop System Program is a series of transmission pipelines that will be developed to regionally<br />

transfer and deliver water from existing and future alternative supplies to demand centers within the Peace<br />

River/Manasota Regional Water Supply Authority's (Authority) four county region. This project, Phase 3A, proposes to<br />

construct a pipeline from Sarasota County's Carlton Water Treatment Facility north across the Myakka River to an<br />

existing County utility line. Eventually the interconnect will extend into Manatee County once all phases have been<br />

completed.<br />

Benefits<br />

Development of this project will further integrate regional resources; maximize surface water for public supply; provide<br />

rotational capacity and the ability to rest sources; provide for reserve capacity for emergency transfers; provide<br />

alternatives to the development of groundwater in the Southern Water Use Caution Area; and better match supply,<br />

demand and financial investment on a regional basis.<br />

Costs<br />

The total estimated cost for the Phase 3A project is $42,570,000, with the requested District's share<br />

being $<strong>21</strong>,285,000. District funding will be divided by the Governing Board, $<strong>10</strong>,642,500 (50%); the Peace River Basin<br />

Board, $2,873,475 (13.5%); and the Manasota Basin Board, $7,769,025 (36.5%.) The District funding in FY 20<strong>10</strong> is:<br />

Governing Board ($4,087,983), Peace River Basin Board ($0), and the Manasota Basin Board ($2,118,404) for a total<br />

of $6,206,387. Total funding budgeted to date (FY2008 and FY2009) is $12,729,517, split between to Governing<br />

Board ($6,554,517), the Peace River Basin Board ($1,709,750), and the Manasota Basin Board ($4,465,250)<br />

Additional Information<br />

This project would provide potable water service to areas of northern Sarasota County and Manatee County. Phase<br />

3A is the initial segment in the overall Integrated Regional Loop System Phase 3. Subsequent expansions (Loop<br />

System Phases 3B, 4A and 4B) include additional interconnect facilities in northern Sarasota County and southern<br />

Manatee County, allowing regional water delivery service to those communities. Total cost for the entire Phase 3 &<br />

4 program is estimated to be $146,207,442.<br />

On April 2008, District staff received the Preliminary Engineering Basis of Design Report for Phases 3A and 3B. The<br />

Feasibility/Routing Study identified the preferred loop pipeline routing, environmental impacts, major connection<br />

points, preliminary pipe sizing, proposed schedule of project phasing, and time frames for construction. Major<br />

components of Phase 3A include above ground storage, a pumping station and approximately nine miles of 48-inch<br />

diameter transmission pipeline. The pipeline route is generally from the Carlton Water Treatment Plant westward<br />

across the Myakka River following an established utility corridor; west along Laurel Road, north along Knights Trail<br />

Road, and parallel along Cow Pen Slough to a point near the Central County Landfill and State Road 681.<br />

Components co-located at the Carlton Water Treatment Plant would include a pumping station with a <strong>10</strong> mgd capacity<br />

and above-ground storage. It is anticipated that a portion of the project's storage component, a 5 million gallon above<br />

ground storage tank, will be acquired from Sarasota County by the Authority. The transmission capacity of the pipeline<br />

will have a minimum design capacity of 37 mgd. Future upgrades to the pumping station will be needed to reach that<br />

capacity. Phase 3A will provide an additional water delivery point to Sarasota County and the potential for an inter-tie<br />

between the Authority's RTS and the City of Venice water system.<br />

The Cooperative Funding Agreement between the District and the Authority for Phase 3A was executed on November<br />

<strong>10</strong>, 2008. The Agreement is back-dated to July 25, 2007 and will remain in effect through November 1, 2011. . The<br />

Interlocal Agreement between the Authority and Sarasota County was signed by the County on March 32, 2009 and by<br />

the Authority on April 1, 2009.<br />

The Authority submitted RAI responses for the FDEP ERP for the pipeline and the FDEP Myakka River Wild & Scenic<br />

River Permit on May 8, 2009. Also on May 8, 2009, permit applications were submitted for the FDEP drinking water<br />

permit for the pipeline and pump station, and for Sarasota County's Site & Development Permit.<br />

On June 3, 2009, the Authority board approved a work order for final design services of a new 5 million gallon storage<br />

tank to be located at the Carlton WTP.<br />

0<strong>21</strong> - Manasota Basin <strong>21</strong>6


H052<br />

PR/MRWSA Reg Integ Loop Sys Phase 3A Interconnect<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 1,930,237 (3,000) 4,633,169 4,093,812 1,174,548 11,828,766<br />

020 Peace River Basin 523,304 (2,001) 1,191,295 2,612 317,128 2,032,338<br />

0<strong>21</strong> Manasota Basin 1,408,804 (2,001) 3,061,943 2,123,<strong>21</strong>7 857,420 7,449,383<br />

Project Funds Not Budgeted by the<br />

District<br />

PR/MRWSA 3,850,000 0 8,879,517 8,555,483<br />

0 <strong>21</strong>,285,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$42,595,487<br />

Critical Project Milestones Projected Amended Actual<br />

Preliminary Design / Basis of Design - Phase 3 7/31/08 3/31/08<br />

Final Design - Phase 3A 3/31/09<br />

Permitting / Property Aquisition - Phase 3A 4/30/09<br />

Construction - Phase 3A 5/31/<strong>10</strong><br />

Status As Of: August 31, 2009<br />

The Authority held a pre-qualification submittal meeting for interested contractors on August 7, 2009, and received<br />

comments from several contractors on the pre-qualification criteria. RFQs will be advertised on August 15-16, and<br />

submittals will be due by September 15. The Authority board will be asked to approve the list of pre-qualified contractors<br />

at their October 7, 2009 board meeting.<br />

The FDEP Myakka Wild and Scenic River permit was acquired on August 5, 20<strong>10</strong>. The FDEP drinking water construction<br />

permit was acquired on August 24, 2009. The FDOT utility permit was recieved on July 2nd, 2009. The USACOE permits<br />

were issued on July 30, 2009. A FDEP environmental resource permit is expected by October <strong>10</strong>, 2009.<br />

Accelerate Florida Update: Notice was sent to PRMRWSA regarding the Accelerate Florida Initiative, although this<br />

project will not be "shovel ready" in the required time period. The Authority may consider including an early completion<br />

bonus clause in the construction contract. The Authority and County are attempting to have the pipeline in service by<br />

April 20<strong>10</strong>, several months ahead of the original schedule.<br />

0<strong>21</strong> - Manasota Basin <strong>21</strong>7


H059<br />

City of Bradenton Reservoir Expansion<br />

Project Type WS&R Dev.<br />

AOR(s)<br />

Water Supply<br />

Basin(s) General Fund (District), Manasota<br />

Cooperator(s)<br />

City of Bradenton<br />

Project Manager MORRIS, LISANN<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This is an ongoing Cooperative Funding project requested by the City of Bradenton to develop an alternative water<br />

supply project that will provide additional storage capacity at the Bill Evers Reservoir and capture excess flow from the<br />

Braden River during the wet season's high flow periods. The project is for the design, permitting and construction of an<br />

upland, offstream storage facility on City-owned property adjacent to the City's water supply reservoir. The requested<br />

FY20<strong>10</strong> funding will be used toward construction of the reservoir though the contract end date will be extended due to<br />

delays in final geotechnical analysis. The proposed facility would be made of earthen dike construction. The Project<br />

includes a raw water intake at the existing reservoir plus pumping and piping for filling the new storage facility; systems<br />

to provide turnover and prevent stratification and stagnation of water in the new storage facility; and equipment and<br />

piping for withdrawing water from the new storage facility.<br />

Benefits<br />

The City plans to increase the size of the reservoir storage area from 580 to 755 million gallons because of the<br />

uncertainty of arsenic mobilization and ASR. Without ASR, the projection for raw water supply capacity must increase<br />

to 2.62 MGD from 2.15 MGD to meet demands through 2025. In their cooperative funding application, the City stated<br />

that if ASR proves to be a viable option for treated water storage, the City will have excess water available to<br />

participate in a regional water supply effort.<br />

Costs<br />

The estimated cost for the H059 Raw Water Storage is $17,372,000 with the District share at $8,686,000. District<br />

funding in FY20<strong>10</strong> is divided as follows: General fund $1,003,000; Manasota $1,003,000. Water Protection and<br />

Sustainablility Trust Funds in the amount of $43,541 were transferred into the project. These funds will be split evenly<br />

between the District and City decreasing construction costs accordingly. When each phase (such as<br />

design\permitting) is completed the project budget and scope and schedule may require refinement based on the<br />

information gathered.<br />

Additional Information<br />

At their March 2006 meeting, the Governing Board established a policy regarding Cooperative Funding for potable<br />

water supply projects submitted by local governments in areas served by a water supply authority (WSA). Funding<br />

criteria is dependent on whether or not the local government is a member\customer of the WSA. The City of<br />

Bradenton is located in the service area of the Peace River/Manasota Regional Water Supply Authority (Authority), but<br />

is not a member of the Authority. The City must coordinate their water supply needs with the Authority so that they are<br />

consistent with regional plans. Affirmative written documentation from the Authority supporting the project must<br />

accompany the City's application. The Authority supplied a written statement in early May 2006 indicating coordination<br />

with the City and consistency of the project with the Authority's regional plan. This project is also consistent with the<br />

SWUCA Recovery Plan in providing water supply from an alternative source (surface water), and has the potential to<br />

reduce demand on the Upper Floridian aquifer.<br />

0<strong>21</strong> - Manasota Basin <strong>21</strong>8


H059<br />

City of Bradenton Reservoir Expansion<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 183,815 0 503,514 1,006,564 2,665,000 4,358,893<br />

0<strong>21</strong> Manasota Basin 183,764 0 503,414 1,006,944 2,665,000 4,359,122<br />

Project Funds Not Budgeted by the<br />

District<br />

City of Bradenton 350,000 0 2,247,000 2,006,000 4,083,000 8,686,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$17,404,015<br />

Critical Project Milestones Projected Amended Actual<br />

Draft Agreement to Management Services 11/30/06 1/17/07<br />

Draft Agreement Returned from Management Services 12/31/06 2/17/07 2/7/07<br />

Contract Execution 1/15/07 3/30/07 3/<strong>21</strong>/07<br />

Topographic Survey 8/31/07 9/25/07 9/4/07<br />

Preliminary Design <strong>10</strong>/31/07 11/1/07<br />

Geotechnical Evaluation 2/28/08 3/31/09 4/30/09<br />

Final Design 9/30/08 12/31/09<br />

Construction Permitting 5/31/09 1/4/<strong>10</strong><br />

Bidding and Contractor Selection 4/1/<strong>10</strong><br />

Observation and Geotech Services During Construction 8/2/<strong>10</strong><br />

Construction of Proposed Facilities 8/2/<strong>10</strong><br />

Engineering Services During Construction 8/2/<strong>10</strong><br />

Status As Of: September 02, 2009<br />

Status History: Cooperative funding agreement was executed on March <strong>21</strong>, 2007. The kick-off meeting was held May 2,<br />

2007 in Bradenton. The consultant completed the survey and preliminary geotechnical exploration tasks. A status<br />

meeting was held September <strong>21</strong>, 2007. That afternoon, the team toured the TBW C.W. Bill Young Regional Reservoir.<br />

The Preliminary Design & Engineering Report is complete. The City submitted its FY2009 Cooperative funding<br />

application with an updated reservoir size increased to 755 MG to offset the uncertainty of the arsenic mobilization in<br />

ASR. The design level geotechnical evaluation and final design have been delayed due to the proposed size change in<br />

the storage facility. ASR arsenic mobilization issues will not be remedied before the reservoir expansion is complete.<br />

Activities planned for next quarter are a kick-off meeting for final design phase, preliminary permitting meetings with<br />

regulatory staff, complete design level geotechnical investigation, and completion of 60 percent design levels. The<br />

consultant met with FDEP in September 2008 for pre-application meeting. A meeting was held on March 19, 2009 to<br />

discuss the FY20<strong>10</strong> cooperative funding application, schedule and project status for the "Accelerate Florida Initiative".<br />

The consultant responded to comments on the draft geotechnical investigation report and that report is complete. Letter<br />

was received requesting line item revisions for tasks with total project cost not to change. Current Status: The second<br />

permitting meeting was held on July 8, 2009. FDEP requested wetland delineations be checked in the field by both<br />

parties before review of ERP begins. Consultant continues work on final design. City and District are working on<br />

amendment #2 to add FY20<strong>10</strong> money and extend contract end date.<br />

0<strong>21</strong> - Manasota Basin <strong>21</strong>9


H060<br />

Punta Gorda Shell Creek WTP Expansion to <strong>10</strong> MGD (Completed)<br />

Project Type WS&R Dev.<br />

AOR(s)<br />

Water Supply<br />

Basin(s) General Fund (District), Peace River, Manasota<br />

Cooperator(s)<br />

Punta Gorda<br />

Project Manager GOODWIN, AUDRIE<br />

Task Manager(s)<br />

Status Completed<br />

ARMSTRONG, BRIAN<br />

Description<br />

This project expanded the City of Punta Gorda's Shell Creek Water Treatment Plant (WTP) from 8 to <strong>10</strong> mgd. Project<br />

elements included rehabilitating existing filters and improving the facility's chemical mixing and disinfection processes.<br />

Although the facility recently received a re-rating from the DEP from 8 to <strong>10</strong> mgd, these improvements were necessary<br />

for the plant to treat a sustained capacity of <strong>10</strong> mgd.<br />

Benefits<br />

The City of Punta Gorda will have the ability to supply additional water to the regional system. The intent is to make<br />

water available to address a potential water supply shortfall that may occur while the Peace River/Manasota Regional<br />

Water Supply Authority (Authority) completes its facility expansion in 20<strong>10</strong>. This project will assist in maximizing<br />

surface water for public supply; providing rotational capacity and the ability to rest sources; providing reserve capacity<br />

for emergency transfers; limiting development of ground water in the Southern Water Use Caution Area; and better<br />

matching supply, demand, and financial investment on a regional basis.<br />

Costs<br />

Total estimated project cost was $3,000,000 while the District's share initially was $1,500,000. The entire District<br />

share was allocated in FY2007.<br />

Additional Information<br />

The City of Punta Gorda originally planned an expansion of its Shell Creek WTP capacity to meet future public supply<br />

demands through 2016. The expansion was initially scheduled to occur in two stages, from 8 to <strong>10</strong> mgd by January<br />

2008 (later amended to June 2009) and from <strong>10</strong> to 15 mgd by 2014. The City submitted a separate cooperative<br />

funding application for each expansion in FY2007. This project (H060) was only for the expansion from 8 to <strong>10</strong> mgd.<br />

The Authority identified the Shell Creek WTP as a potential source for providing 2 mgd towards the Authority's GAP<br />

Plan. The GAP Plan addresses a possible water supply shortfall that may occur prior to full utilization of the Authority's<br />

Facility Expansions (F032 & F033). In addition to the WTP expansion (H060), the City of Punta Gorda submitted a<br />

cooperative funding application (H087) for the future construction of a 2 mgd RO facility at or near the Shell Creek<br />

WTP to meet their future public supply demands.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 756,994 (5,441) 1,295<br />

0<br />

0 752,848<br />

020 Peace River Basin 207,8<strong>10</strong> (4,533) 648<br />

0<br />

0 203,925<br />

0<strong>21</strong> Manasota Basin 553,586 (4,533) 648<br />

0<br />

0 549,701<br />

Project Funds Not Budgeted by the<br />

District<br />

Punta Gorda 1,500,000 0 0<br />

0<br />

0 1,500,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$3,006,474<br />

Critical Project Milestones Projected Amended Actual<br />

Begin WTP Improvements and re-rate from 8 to <strong>10</strong> mgd <strong>10</strong>/1/06 <strong>10</strong>/1/06<br />

Basin Board Notification of Contract Execution 4/25/07 4/25/07<br />

0<strong>21</strong> - Manasota Basin 220


H060<br />

Punta Gorda Shell Creek WTP Expansion to <strong>10</strong> MGD (Completed)<br />

Contract Executed 6/14/07 6/14/07<br />

Project Completion 1/31/08 6/30/09 3/1/09<br />

A. Complete Design and Equipment Delivery<br />

North Filter Improvements 8/<strong>10</strong>/07 8/<strong>21</strong>/07 8/<strong>21</strong>/07<br />

Sludge Bed Refurbishment 8/<strong>21</strong>/07 8/<strong>21</strong>/07<br />

Televise Underdrain 9/4/07 7/16/08<br />

Chemical Feed - New Flash Mix System <strong>10</strong>/5/07 11/2/07<br />

Solids Contact Unit Equipment Replacement <strong>10</strong>/30/07 11/30/07<br />

Dewatering Canopy 11/29/07 4/28/08 5/30/08<br />

Chemical System Improvements 1/1/08 6/1/08 11/15/08<br />

B. Complete Construction<br />

Ground Storage Tank Modification 8/13/07 8/13/07<br />

Sludge Drying Bed Refurbishment 11/6/07 12/20/07 12/20/07<br />

Chemical Feed - New Flash Mix System 11/7/07 3/1/08 5/14/08<br />

North Filter Improvements 11/15/07 11/19/07 11/15/07<br />

Solids Contact Unit Equipment Replacement 11/16/07 12/<strong>21</strong>/08 12/20/07<br />

South Filter Improvements 1/3/08 1/1/08 12/<strong>21</strong>/08<br />

Dewatering Canopy 1/<strong>10</strong>/08 5/12/08 5/30/08<br />

Chemical System Improvements 6/1/08 3/1/09 3/1/09<br />

Status As Of: July 06, 2009<br />

The contract was executed on June 14, 2007 by the District's Executive Director and the Mayor of Punta Gorda. All<br />

project activities were completed on March 1, 2009. The District received final payment for the project in June 2009.<br />

ACTION-TO-DATE: Complete.<br />

Final project punchlist items and Chemical System Improvements were completed on March 1, 2009. This project was<br />

completed on schedule and under budget.<br />

At the request of the Office of Governor Charlie Crist, the District has been communicating regularly with the cooperator<br />

concerning the Governor's Accelerate Florida initiative to stimulate Florida's economy. An information request was sent<br />

to the cooperator on October 15, 2008. District staff followed up with an email and phone call regarding the cooperator's<br />

efforts to accelerate the project. Since the project is complete, there are no needed tasks to accelerate the project.<br />

0<strong>21</strong> - Manasota Basin 2<strong>21</strong>


H062<br />

CF Industries Aquifer Recharge and Recovery Project<br />

Project Type WS&R Dev.<br />

AOR(s)<br />

Water Supply, Water Quality<br />

Basin(s) General Fund (District), Alafia River, Peace River, Manasota<br />

Cooperator(s)<br />

CF Industries<br />

Project Manager KELLEY, MIKE<br />

Task Manager(s)<br />

Status Withdrawn<br />

Description<br />

CF Industries is developing an Aquifer Recharge and Recovery Project (ARRP) on a portion of its South Pasture mine<br />

in Hardee County. The project will store mine stormwater in an existing sand-clay mix area; naturally treat the water<br />

through two reclaimed wetland cells constructed in an adjacent sand-clay mix area; filter the water through a sand<br />

tailings filter basin; and then recharge an estimated 2 to 4 mgd of the naturally treated water into the Floridan aquifer.<br />

The goal of the natural treatment system is to treat the water to primary and secondary drinking water standards so<br />

that it can be recharged into the Upper Floridan aquifer to increase water levels and provide additional water to help<br />

meet local and regional water demands. Project components include design and construction of the treatment<br />

wetlands and sand filtration basin; construction of intake control structures to and from the mine, reservoir and<br />

treatment systems; and, construction of an injection well and two monitor wells. The project will be conducted in two<br />

phases: Phase 1 includes design, permitting, and construction of the wetlands treatment system and sand filtration<br />

basin; and, Phase II includes construction and testing of the recharge well. CF Industries' original FY2009<br />

Cooperative Funding request was modified to postpone construction and testing of the recharge well until at least<br />

FY20<strong>10</strong>. Total District funding now being requested for FY2009 is $400,675 and will be used for construction of a<br />

stormwater collection and discharge system. This will increase the District's previous total funding committment from<br />

$2,250,000 to $2,605,729.<br />

Benefits<br />

This is an innovative alternative water supply project that could provide significant benefits to the Southern Water Use<br />

Caution Area (SWUCA) by maintaining or increasing Upper Floridan aquifer levels. Utilizing excess surface waters<br />

and safely injecting those waters into the aquifer is one of several strategies the District is pursuing as part of its<br />

SWUCA Recovery Strategy. The information collected from this project will be used to demonstrate the full-scale<br />

feasibility of this type of treatment technology and can be applied to future natural treatment and aquifer recharge<br />

projects in the area. This project was identified in the District's most recent update of the Regional Water Supply Plan<br />

as a water supply development option under the Heartland Water Alliance planning area.<br />

Costs<br />

The total cost of the project including reclamation funds from CF Industries is $7,042,314, with the District funding up<br />

to 50 percent of eligible costs to a maximum of $2,605,729. District funding will be shared by the Governing Board (50<br />

percent), Peace River Basin Board (25 percent), Alafia River Basin Board (12.5 percent), and Manasota Basin Board<br />

(12.5 percent). CF Industries' original FY2009 Cooperative Funding Initiative request was for $1,148,445 to complete<br />

the project. However, based on discussions with District staff, CF Industries has postponed construction and testing of<br />

their recharge well until at least 20<strong>10</strong>, reducing their FY2009 funding request to $400,675. The FY2009 Governing and<br />

Basin Boards shares are, Peace River Basin Board: $<strong>10</strong>0,169; Manasota & Alafia River Basin Boards: $50,084 each;<br />

Governing Board: $200,338. Due to delays CF Industries did not request FY20<strong>10</strong> funding.<br />

Additional Information<br />

The project consists of constructing the major components required to operate the ARRP, which will include the<br />

design and construction of the treatment wetlands and sand filtration basin, intake control structures to and from the<br />

mine, reservoir and treatment systems, and the construction of an injection well and two monitor wells. In anticipation<br />

of receiving formal approvals and variances from the required regulatory agencies, CF Industries commenced<br />

construction of the project in March 2007. It is expected to take approximately two years to complete the installation of<br />

the necessary infrastructure. Another two years will be required to thoroughly test the system. Project costs for the first<br />

fiscal year, FY2007, are estimated at $1,751,620, with the District's approved share not-to-exceed $875,8<strong>10</strong> (Peace<br />

River Basin Board: $<strong>21</strong>8,953; Manasota & Alafia River Basin Boards: $<strong>10</strong>9,476 each; Governing Board: $437,905).<br />

These funds were transferred from the Water Supply and Resource Development Reserves to each of the<br />

participating boards. Project approved funds for FY2008 were $1,074,138, with the District's funded share<br />

not-to-exceed $395,789(Peace River Basin Board: $97,927; Manasota & Alafia River Basin Boards: $49,474 each;<br />

Governing Board: $198,914).<br />

0<strong>21</strong> - Manasota Basin 222


H062<br />

CF Industries Aquifer Recharge and Recovery Project<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 198,914 437,905 205,950 5,242 406,948 1,254,959<br />

011 Alafia River Basin 49,474 <strong>10</strong>9,476 53,634 1,048 <strong>10</strong>1,737 315,369<br />

020 Peace River Basin 97,927 <strong>21</strong>8,985 <strong>10</strong>3,752 1,048 203,474 625,186<br />

0<strong>21</strong> Manasota Basin 49,474 <strong>10</strong>9,476 51,571 1,048 <strong>10</strong>1,737 313,306<br />

District Budgeted - Outside Revenue<br />

Water Protection & Sust T.F.<br />

(Alternative Wtr)<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

193,814 0 0<br />

0<br />

0<br />

193,814<br />

Project Funds Not Budgeted by the<br />

District<br />

CF Industries 3,191,233 0 400,675 844,677<br />

0 4,436,585<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$7,139,<strong>21</strong>9<br />

Critical Project Milestones Projected Amended Actual<br />

Phase I<br />

Governing Board Approval 11/30/06 11/30/06<br />

Basin Board Approvals 12/15/06 12/15/06<br />

FDEP Underground Inj. Permit Application 1/1/07 1/1/07<br />

Effective Date 1/2/07<br />

CF Industries Sitework/Wetland Const. Commence 3/15/07<br />

Wetland Berm, Pump, Filter Construction Commence 4/1/07<br />

FDEP Reclamation Modification Application 11/1/07 11/1/07<br />

Execute Contract 4/15/08<br />

FDEP Underground Inj. Permit Issued 1/1/09<br />

FDEP Reclamation Modification Issued 1/1/09<br />

CF Industries Sitework/Wetland Construct. Complete 1/1/09<br />

Wetland Berm, Pump, Filter Construction Complete 7/1/09<br />

Phase II<br />

Recharge/Monitor Wells Construction Commence <strong>10</strong>/1/09<br />

Recharge/Monitor Wells Construction Complete 4/1/<strong>10</strong><br />

Status As Of: September 03, 2009<br />

CF Industries has decided to withdraw their coop funding request and proceed with the project without District funds. The<br />

cooperative funding agreement documents were not returned from CF Industries. Telephone and email communications<br />

have been made with Craig Kovach and Gary Blitch of CF Ind. The major issues in the draft agreement were non-profit<br />

through sale, termination without cause, an additional monitor well, annual report content, and performance standards.<br />

The FDEP UIC permit for well construction and testing has been issued. CF Ind. is in the process of permitting their<br />

expansion of the mine. On site, the wetland treatment cell 1 is complete and growing in well; cell 2 is being herbicided<br />

and planted with native plant species. A small holding pond near the sand filtration basin is being permitted through the<br />

Corps of Engineers. A site visit was conducted on August 19 and pictures are available.<br />

0<strong>21</strong> - Manasota Basin 223


H063<br />

PR/MRWSA Regional Resource Development Feasibility Study<br />

Project Type WS&R Dev.<br />

AOR(s)<br />

Water Supply<br />

Basin(s) General Fund (District), Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager MORRIS, LISANN<br />

Task Manager(s)<br />

Status Ongoing<br />

Peace River/Manasota Regional Water Supply Auth.<br />

Description<br />

This project will conduct feasibility studies on three potential alternative water supply sources that were identified in the<br />

Peace River/Manasota's Regional Water Supply Authority's Integrated Regional Water Supply Master Plan (IRWSMP).<br />

The sources include Cow Pen Slough/Dona Bay, Upper Myakka\Flatford Swamp and Shell Creek. The project will<br />

provide the following:<br />

Identify major supply opportunities in the three source areas<br />

Refine yield estimates<br />

Identify locations for treatment, storage and pipeline facilities<br />

Identify associated opportunities to improve environment<br />

Provide general design criteria for facilities<br />

Develop potential supply configurations and preliminary cost estimates<br />

Benefits<br />

This project and the associated feasibility studies will allow the Authorty to move forward with developing its next water<br />

supply source\sources through their Regional Resource Development program. The program focuses on maximizing<br />

surface water for public supply, reducing development pressure on groundwater in the SWUCA, providing rotational<br />

and reserve capacity for resting sources, and optimizing the regional financial investment in water supply and<br />

transmission capacity.<br />

Costs<br />

The total estimated project cost is $2,500,000. The District's anticipated total funding contribution for the project is<br />

$1,250,000. It is anticipated that, of the District's projected total funding contribution of $1,250,000, the District<br />

Governing Board will contribute $612,500, the Manasota Basin Board will contribute $447,125 (73 percent of the total<br />

basin board contribution), and the Peace River Basin Board will contribute $165,375 (27 percent of the total basin<br />

board contribution). Funding from the Ecosystem Management and Restoration Trust Fund in the amount of $50,000<br />

will be split evenly($25,000/$25,000) between the cooperators to reduce contributions.<br />

Additional Information<br />

The Peace River/Manasota Regional Water Supply Authority (Authority) is comprised of Charlotte, DeSoto, Manatee<br />

and Sarasota Counties. In accordance with its Master Water Supply Contract, the Authority is obligated to timely<br />

develop and deliver new water supply sources and facilities to meet the needs of its customers. Building upon the<br />

planning efforts of the Water Planning Alliance, the District, and Local Governments, the Authority has developed a<br />

draft IRWSMP which will serve as a road-map for meeting Authority member and customer water needs in the future.<br />

The IRWSMP will contain a Regional Resource Development program that will analyze and prioritize potential new<br />

water supply sources within the region. Initially the Authority submitted a FY2008 Cooperative Funding application to<br />

proceed with preliminary engineering of selected regional water supply source(s). After discussions between the<br />

District and Authority staff, the Authority's FY2008 application was revised to only include the feasibility portion of the<br />

Regional Resource Development program. It is anticipated that the Authority will need 20% ($500,000) of the total<br />

project cost in FY2007 and the remainder ($2,000,000) in FY2008. As a result, an out of cycle funding request will be<br />

brought to the June Manasota and Peace River Basin Boards and Governing Board for approval. Upon completion of<br />

the feasibility analysis, the Authority will move forward with final design and construction of the selected source(s). The<br />

first new regional water supply capacity is anticipated to be available in 2017.<br />

0<strong>21</strong> - Manasota Basin 224


H063<br />

PR/MRWSA Regional Resource Development Feasibility Study<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 520,157 125,000 6,708<br />

0<br />

0 651,865<br />

020 Peace River Basin 144,760 33,750 1,118<br />

0<br />

0 179,628<br />

0<strong>21</strong> Manasota Basin 372,141 91,250 2,236<br />

0<br />

0 465,627<br />

District Budgeted - Outside Revenue<br />

Ecosystem Trust Fund - Central W<br />

Coast SW Enhanc<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

50,000 0 0<br />

0<br />

0<br />

50,000<br />

Project Funds Not Budgeted by the<br />

District<br />

PR/MRWSA 1,225,000 0 0<br />

0<br />

0 1,225,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$2,572,120<br />

Critical Project Milestones Projected Amended Actual<br />

Contract Approved 8/17/07 9/18/07<br />

Work Order #1-deliverable #1 11/7/07 12/31/07<br />

Work Order #1-deliverable #2 12/7/07 12/31/07<br />

Execute Work Order #2 1/<strong>10</strong>/08 1/<strong>10</strong>/08<br />

Execute Work Order #3 5/7/08 5/7/08<br />

Draft Final Report deliverable 8/29/08 <strong>10</strong>/13/08 11/11/08<br />

Final Report 12/30/08 3/29/09 9/3/09<br />

Status As Of: September 03, 2009<br />

Status History: The Authority received three submittals on April 25 for consultant services to conduct water supply<br />

feasibility studies of the Shell Creek, Cow Pen Slough/Dona Bay, and Upper Myakka River Systems and authorized<br />

contract negotiations with the top ranked firm, the PBS&J team. In addition, District staff brought an out of cycle funding<br />

request for $250,000 to the June Peace River Basin Board and Governing Board that was approved, contingent on<br />

approval by the Manasota Basin Board in July. The remaining $1,000,000 was funded in the FY2008 budget. Several<br />

scoping meetings took place with the consultant and contracts are executed. Scope and Work Order #1 of the Authority's<br />

Consultant Contract was approved by their Board. Existing data collection and evaluation and field reconnaissance visits<br />

to all three proposed areas by the consultant, the Authority, and District staff are complete. A Coordination meeting was<br />

held between District Ecologic Evaluation staff and Source Feasibility Study team. The first deliverable from Work Order<br />

#1 was a techinical report summarizing inventoried data and relevant technical reports and/or models and a database of<br />

the inventoried data. The second deliverable from Work Order #1 was a document describing preliminary alternatives<br />

recommended for efforts conducted in subsequent phases of the feasibility studies. Additional water quality testing for<br />

parameters such as corrosiveness, Giardia, Cryptosporidium, TOC (Total Organic Carbon), took place to allow for a<br />

balanced comparison between the proposed sites. Two joint meetings were held with the MRWI team to discuss<br />

hydrologic alternative scenarios in the Upper Myakka. The final Work Order for the project was executed covering<br />

preliminary water treatment processes, intake structure identification, transmission mains location, the Source Water<br />

Feasibility Study Report, Reliability Model update, and Public <strong>Meeting</strong>s. Five Authority Technical Advisory Committee<br />

(TAC) meetings were held on June 30, July 22, August 15, September 22, and October 24, 2008 to provide project<br />

updates. Proposed conjunctive use was a major topic at those meetings. The results of the Feasibility Study was<br />

presented at Authority Board workshop on November 5, 2008. Comments on the Draft Source Feasibility Report were<br />

discussed at the TAC meeting on December 12, 2008. The Consultant is complete with the final report. The cooperative<br />

funding agreement with the Authority expired March 30, 2009. The Authority assured the District, the work will be<br />

complete, but the decision-making process on which projects will move forward into the next phase of design will<br />

continue until late spring 2009. Authority Staff has recommended the next source of water be from brackish groundwater<br />

and re-permitting the Peace River facility to utilize the allowable revised flow quantity from the middle Peace River MFL.<br />

Based on current demand projections, the Authority anticipates no new supply needed from 20<strong>10</strong>-2013, 3 mgd from<br />

2014-2019, 5 mgd from 2020-2023, and 8 mgd from 2024-2029. Current Status: The Final Source Feasibility Report was<br />

0<strong>21</strong> - Manasota Basin 225


H063<br />

PR/MRWSA Regional Resource Development Feasibility Study<br />

approved at the September 2, 2009 Authority Board meeting. Staff has received the final deliverables and is closing out<br />

the project.<br />

0<strong>21</strong> - Manasota Basin 226


H069<br />

PR/MRWSA Reg Loop System Ph 1A<br />

Project Type WS&R Dev.<br />

AOR(s)<br />

Water Supply<br />

Basin(s) General Fund (District), Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager FERGUSON, JOHN<br />

Task Manager(s)<br />

Status Ongoing<br />

Peace River/Manasota Regional Water Supply Auth.<br />

ARMSTRONG, BRIAN, GOODWIN, AUDRIE<br />

Description<br />

The Regional Integrated Loop System project is a series of transmission pipelines that will be developed to regionally<br />

transfer and deliver water from existing and future alternative supplies to demand centers within the Peace River<br />

Manasota Regional Water Supply Authority's four county region. This project will connect the water supply systems of<br />

the Authority, Charlotte County and the City of Punta Gorda so that the additional water from the recently expanded<br />

facility on Shell Creek can be shared regionally. Construction of the interconnect consists of approximately 12 miles of<br />

a 24 inch diameter line interconnecting the Shell Creek facility to the Peace River facility, and includes a sub-aqueous<br />

crossing of the lower Peace River. The project will have a minimum design capacity of 6 million gallons a day.<br />

Benefits<br />

Development of this project will integrate regional resources; maximize surface water for public supply; provide<br />

rotational capacity and the ability to rest sources; provide for reserve capacity for emergency transfers; provide<br />

alternatives to the development of groundwater in the Southern Water Use Caution Area (SWUCA); and better match<br />

supply, demand, and financial investment on a regional basis.<br />

Costs<br />

The total estimated cost for the Phase 1A project is $19,015,000, with the requested District's share being<br />

$12,007,500. The District funding is divided between the Governing Board, $6,003,750 (50%); the Manasota Basin<br />

Board, $4,382,738 (36.5%); and the Peace River Basin Board, $1,6<strong>21</strong>,012 (13.5%). Ad Valorum shares were<br />

budgeted in FY2008, and funding received from the West Central Florida Water Restoration Action Plan (WRAP) was<br />

applied in FY2009.<br />

$5,000,000 in WRAP funding was budgeted in FY2009 in place of Ad Valorum funding. When the availablity of<br />

the WRAP funding was evident, the District's FY2008 project budget was reduced from a total of $7,407,4<strong>10</strong> to<br />

$7,007,500. This reduction is not represented in the funding table below. The actual FY2008 shares were: Governing<br />

Board $3,503,750, Manasota Basin $2,557,738, Peace River Basin $946,012.<br />

Additional Information<br />

The Phase 1A pipeline was designed as an alternative to two separately proposed pipelines, the Authority's Integrated<br />

Regional Loop system Phase 1 (H050) and Charlotte County's Emergency Interconnect (L636). The original Phase 1<br />

route was designed to interconnect the Peace River and Shell Creek water treatment plants via an extension of the<br />

DeSoto County Regional Transmission System southward along US-17. Charlotte County was also planning to<br />

construct an emergency interconnect consisting of a sub-aqueous crossing of the Peace River, to interconnect the<br />

water supply systems of Charlotte County and Punta Gorda. Discussions were initiated in 2006 to combine the<br />

projects and achieve the benefits of both pipelines. The revised and expanded pipeline (H069), was approved by both<br />

Charlotte County and the Authority Board in June 2006. This expanded pipeline is designed to transfer up to 6 MGD<br />

between the Authority, Charlotte County, and Punta Gorda. In creating this interconnect, water provided by Punta<br />

Gorda to Charlotte County will offset the County's demand on the Peace River facility. This offset can then be made<br />

available to other Members of the Authority or placed into storage to create additional reliability for the regional<br />

system.<br />

The PRMRWSA Board awarded the design consultant contract to DMK Associates for Phase 1A in September 2007.<br />

Subsequently in October 17, 2007, the project was issued a notice to proceed. In February 2008, DMK presented the<br />

Preliminary Engineering Report which District staff reviewed. In June 2008, the Authority presented a draft of the Basis<br />

of Design Report to the District for review. District staff attended a meeting on the BODR, during which the pipeline<br />

route options were accepted. Also discussed was additional monitoring and treatment for water blending between<br />

treatment plants. The Cooperative Funding Agreement between the District and Authority was executed in September<br />

2008. The contract period is back-dated to July 25, 2007 and remain in effect through February 2012.<br />

In February, 2009, the Authority submitted a draft amendment to the existing interlocal agreement with Charlotte<br />

County and the City of Punta Gorda to reflect the current project. The amendment includes the sale transfer of the<br />

interconnect's northern segment. Charlotte County has already installed and put into service this 3000' long segment,<br />

which runs from the DeSoto/Charlotte County border southward to a connection by a new shopping center. The<br />

Authority intends to purchase this segment and anticipates the cost to be eligible for funding. South of the Peace<br />

0<strong>21</strong> - Manasota Basin 227


H069<br />

PR/MRWSA Reg Loop System Ph 1A<br />

River, an approximately 2 mile segment will utilize the City of Punta Gorda's existing infrastructure. The amendment<br />

allows for the shared capacity of this segment.<br />

On May 18, 2009, the Authority held a technical coordination meeting with Charlotte County's Utilities, Public Works,<br />

and Real Estate Services departments to discuss road crossings, right of way usage, and easement acquisitions.<br />

The original Phase 1 interconnect (H050), which would run east of Phase 1A and provide rotational capacity between<br />

the two water facilities, was resubmitted for FY20<strong>10</strong> funding but was postponed again in June 2009 due to economic<br />

challenges. The project will likely be resubmitted for District funding in FY2011.<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 3,7<strong>10</strong>,271 0 3,338 4,111<br />

0 3,717,720<br />

020 Peace River Basin 1,002,189 0 2,590 2,009<br />

0 1,006,788<br />

0<strong>21</strong> Manasota Basin 2,707,140 0 648 4,238<br />

0 2,712,026<br />

District Budgeted - Outside Revenue<br />

State Approp - WRAP - Prior Year<br />

Funds<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

0 0 5,000,000<br />

0<br />

0<br />

5,000,000<br />

Project Funds Not Budgeted by the<br />

District<br />

PRMRWSA 7,007,500 0 0<br />

0<br />

0 7,007,500<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$19,444,034<br />

Critical Project Milestones Projected Amended Actual<br />

Preliminary Design/Basis of Design 7/31/07 6/1/08<br />

Final Design 6/30/09<br />

Permitting / Property Aquisition 7/31/09<br />

Construction 8/1/11<br />

Contract Expires 2/1/12<br />

Status As Of: August <strong>10</strong>, 2009<br />

The Authority held a pre-qualification submittal meeting for interested contractors on August 7, 2009, and received<br />

comments from several contractors on the pre-qualification criteria. RFQs will be advertised on August 15-16, and<br />

submittals will be due by September 15. The Authority board will be asked to approve the list of pre-qualified contractors<br />

at their October 7, 2009 board meeting.<br />

Accelerate Florida Update: The Authority has been notified of the Accelerate Florida Program. Current<br />

design/permitting work is moving at an efficient pace. The Authority may consider including early completion bonuses in<br />

the construction contract. Permitting must be completed prior to construction commencement.<br />

0<strong>21</strong> - Manasota Basin 228


H076<br />

Regional Reclaimed Water Partnership Initiative<br />

Project Type WS&R Dev.<br />

AOR(s)<br />

Water Supply, Water Quality<br />

Basin(s) General Fund (District), Alafia River, Peace River, Manasota<br />

Cooperator(s)<br />

Tampa Electric Company<br />

Project Manager RAMOY, ALISON<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This alternative water supply project is proposed to maximize the beneficial use of reclaimed water flows that are not<br />

currently being beneficially used by the City of Lakeland, and potentially other utilities, such as Polk County, Plant City,<br />

Mulberry and Hillsborough County. The project is best described as being composed of two elements. The first<br />

element is a traditional reclaimed water supply project consisting of transmission pipelines and storage to provide<br />

reclaimed water to industrial users from one or more domestic wastewater treatment facilities. This element is<br />

proposed to be implemented in at least two phases.<br />

Phase I consists of the design and construction of approximately 15 miles of reclaimed water transmission main from<br />

the City of Lakeland's wastewater effluent wetland treatment system to the Tampa Electric Company's (TECO) Polk<br />

Power Station (WUP# 11747) for power generation expansion (Unit 6). Phase I also includes the additional treatment<br />

necessary, including one deep disposal well, for TECO to treat the water to an acceptable level for cooling and other<br />

potential uses.<br />

Phase II , of the first element, may bring additional reclaimed water to TECO to meet additional power generation<br />

expansion needs at the Polk Power Station (Unit 7). Phase II may also provide reclaimed water to customers in<br />

addition to TECO, such as Mosaic. It is likely that storage will be necessary for this phase, which could involve the<br />

reclamation and conversion of Mosaic's N-5 Reservoir to a reclaimed water storage reservoir. The source of<br />

reclaimed water for this second phase is being evaluated and could include Hillsborough County's Valrico Wastewater<br />

Treatment Facility. District staff and project participants will be ensuring the project infrastructure, including pipe<br />

capacities, are sized appropriately in anticipation of future flows that may be used to serve other users.<br />

Recharge is being explored as part of the second element, which is more innovative in concept and seeks to create<br />

opportunities for additional potable groundwater withdrawals in the SWUCA through direct or indirect recharge of<br />

reclaimed water into the Upper Floridan aquifer in southern Hillsborough County and/or western Polk County. FY2008<br />

funding was approved by the Governing Board to be used for the initiation of a feasibility study to be conducted by a<br />

specialized consultant to investigate treatment needs, costs and water resource benefits (potential new groundwater<br />

withdrawals) achieved through direct or indirect recharge of reclaimed water into the Upper Floridan aquifer. The<br />

feasibility study is being solely funded and managed by the District.<br />

Benefits<br />

The implementation of Phase I will provide TECO with approximately 6 mgd of an alternative water source for power<br />

generation expansion at the Polk Power Station. While flows have not been finalized, Phase II will provide TECO with<br />

reclaimed water for a future power generation expansion. Discussions with potential Phase II project participants<br />

have revealed that additional reclaimed water flows may be utilized by other customers, such as Mosaic. Utilization of<br />

reclaimed water will eliminate surface water discharges, ultimately resulting in a reduction of nitrogen loading to Tampa<br />

Bay. The potential project benefit of recharge to the Upper Floridan aquifer of the SWUCA in the vicinity of southern<br />

Hillsborough County or western Polk County is being explored and if feasible could provide for additional groundwater<br />

withdrawals in the SWUCA.<br />

Costs<br />

Phase I is estimated to cost $65,686,800, and the District is being asked to fund 50 percent, or $32,843,400. The<br />

funding approved for Phase I in FY2009, includes $8,354,642 from the Governing Board, $2,540,354 from the Alafia<br />

River Basin Board, and $5<strong>21</strong>,640 from the Peace River Basin Board, for a total of $11,416,636 in District funding. An<br />

additional $2,500,000 from the Water Restoration Action Plan Fund has been allocated to Phase I in FY2009. The<br />

funding approved in FY20<strong>10</strong> for Phase I includes $5,000,000 from the Governing Board, $1,611,780 from the Alafia<br />

River Basin Board, and $600,000 from the Peace River Basin Board, for a total of $7,<strong>21</strong>1,780 in District funding.<br />

Though the Manasota Basin Board approved $31,250 in FY2009, the funding was returned to the Basin Board due to<br />

further project refinement, which does not include a water resource benefit in this basin. The Governing Board also<br />

allocated $50,000 from the FY2008 budget to assist TECO in the cost analyses of evaluating potential reclaimed water<br />

supply routes for Phase I. However, a route was selected without having to utilize the $50,000 that was set aside, so it<br />

was returned to the Governing Board's Water Supply and Resource Development Reserves (H<strong>10</strong>0).<br />

Phase II has not yet been initiated. The preliminary cost estimate is $70,000,000.<br />

Recharge: The Governing Board also allocated $500,000 from the FY2008 budget to be used for a feasibility study to<br />

0<strong>21</strong> - Manasota Basin 229


H076<br />

Regional Reclaimed Water Partnership Initiative<br />

investigate reclaimed water aquifer recharge.<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 0 500,000 8,356,093 5,011,656 6,732,493 20,600,242<br />

011 Alafia River Basin 0 1,500,000 1,046,983 1,620,040 3,366,246 7,533,269<br />

020 Peace River Basin 0 0 528,269 608,260 3,366,246 4,502,775<br />

0<strong>21</strong> Manasota Basin 0 0 32,701<br />

0<br />

0 32,701<br />

District Budgeted - Outside Revenue<br />

State Approp - WRAP - Prior Year<br />

Funds<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

0 2,500,000 0<br />

0<br />

0<br />

2,500,000<br />

Project Funds Not Budgeted by the<br />

District<br />

TECO 0 0 5,623,015 17,239,935 8,730,450 31,593,400<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$66,762,387<br />

Critical Project Milestones Projected Amended Actual<br />

Phase I<br />

Agreement Effective <strong>10</strong>/1/08 <strong>10</strong>/1/08<br />

Agreement Executed 12/31/08 2/24/09<br />

Begin Infrastructure Design 3/15/09<br />

Begin Disposal Well Design 3/1/<strong>10</strong><br />

Begin Water Quality Testing 8/31/<strong>10</strong><br />

Complete Disposal Well Design 9/30/<strong>10</strong><br />

Begin Disposal Well Construction 1/1/11<br />

Complete Infrastructure Design 3/31/11<br />

Begin Infrastructure Construction 4/30/11<br />

Complete Water Quality Testing 4/30/13<br />

Complete Infrastructure Construction 4/30/13<br />

Complete Disposal Well Construction 4/30/13<br />

Phase I Completion 1/31/14<br />

Phase I Contract Closeout 12/31/14<br />

Recharge<br />

Begin Aquifer Recharge Study <strong>10</strong>/1/08 <strong>10</strong>/1/08<br />

Complete Aquifer Recharge Study 3/31/09 3/31/09<br />

Status As Of: September 03, 2009<br />

Phase I: The District has allocated a total of $11,416,636 in FY2009 towards completion of the project. An additional<br />

$2,500,000 from the WRAP fund was also allocated in FY2009. The Cooperative Funding Agreement was approved by<br />

the Governing Board, and subsequently signed by the Executive Director, on February 24, 2009. Additional funding was<br />

approved for FY20<strong>10</strong>. TECO has submitted a revised project schedule in which many of the milestone dates have<br />

changed since certain tasks will now be initiated before others. The project schedule will be adjusted accordingly.<br />

ACTION TO DATE: On time. TECO issued the Request for Qualifications (RFQ) for (1) preliminary engineering and (2)<br />

oversight of well construction and the drilling contractor on June 8 and June 15, respectively. A Request for Proposal<br />

(RFP) for construction of a Class I Exploratory Injection Well was also released on June 19. Selections are forthcoming.<br />

Recharge: The Governing Board approved a $500,000 transfer from the FY2008 budget to be used for the feasibility<br />

study. All project tasks have been completed. The results of the project were presented to the Governing Board on<br />

March 31, 2009. District staff is received requests for FY20<strong>10</strong> funding to conduct feasibility analyses of two direct aquifer<br />

0<strong>21</strong> - Manasota Basin 230


H076<br />

Regional Reclaimed Water Partnership Initiative<br />

recharge projects and two indirect recharge projects. These feasibility studies will expand upon the work done for the<br />

RRWPI project and will assess site specific hydrogeologic conditions and costs.<br />

0<strong>21</strong> - Manasota Basin 231


H079<br />

PRMRWSA Regional Resource Development - Phase I<br />

Project Type WS&R Dev.<br />

AOR(s)<br />

Water Supply<br />

Basin(s) General Fund (District), Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager MORRIS, LISANN<br />

Task Manager(s)<br />

Status Ongoing<br />

Peace River/Manasota Regional Water Supply Auth.<br />

FERGUSON, JOHN<br />

Description<br />

The Regional Resource Development program will, in several phases, develop up to 35 mgd in average daily capacity<br />

of alternative/conjunctive drinking water supplies based on results of the Authority's Source Water Feasibility Study<br />

(H063). The new capacity is needed to meet regional reliability targets and growing regional needs. The new supplies<br />

are proposed for development at Shell/Prairie Creek, Cow-Pen Slough/Dona Bay, Upper Myakka/Flatford, and the RV<br />

Griffin Reserve. In May/June 2009 the Authority Board is scheduled to consider which alternative/conjunctive supply<br />

projects to move into preliminary design, so no specific project is available to review at this time.<br />

Benefits<br />

The Regional Resource Development program will focus on the objectives listed below: 1) Maximize surface water for<br />

public supply which in turn limits development pressure on groundwater in the SWUCA; 2) Provide rotational and<br />

reserve capacity enabling improved resource management opportunities such as source resting; 3) Participate in<br />

conjunctive projects that improve resource conditions while yielding economical water supply; 4) Optimize the regional<br />

financial investment in water supply and transmission capacity.<br />

Costs<br />

Because the process to chose the next project is taking longer than originally anticipated no additional funds will be<br />

allocated to this project for FY20<strong>10</strong>. Because the specific resource configuration has not been chosen yet, the District<br />

has set aside $600,000 from the West-Central Florida Water Resource Action Plan funding for FY2009. Total project<br />

cost of developing all three sources has a conceptual estimate of $514,000,000 with the District share including the<br />

WRAP funding at $257,000,000.<br />

Additional Information<br />

The Peace River/Manasota Regional Water Supply Authority (Authority) is comprised of Charlotte, DeSoto, Manatee<br />

and Sarasota Counties. In accordance with its Master Water Supply Contract, the Authority is obligated to timely<br />

develop and deliver new water supply sources and facilities to meet the needs of its customers. The Authority's<br />

Integrated Master Water Supply Master Plan (December 2006 draft) identified a need of up to 51.4 mgd of additional<br />

supply development to reliably meet member demands by 2025, and also evaluated six potential supply sources to<br />

meet future needs. The Source Water Feasibility study, initiated in July 2007 focus' on the three sources identified<br />

above as the highest potential future sources for the region. Though demand projections from members and<br />

customers has decreased development of new sources will be conducted in phases during the next 20 years to meet<br />

growing demands and critical system reliability requirements.<br />

0<strong>21</strong> - Manasota Basin 232


H079<br />

PRMRWSA Regional Resource Development - Phase I<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 0 0 11,381 8,252 66,535,863 66,555,496<br />

020 Peace River Basin 0 0 3,643 2,553 25,441,139 25,447,335<br />

0<strong>21</strong> Manasota Basin 0 0 8,550 4,046 70,394,877 70,407,473<br />

District Budgeted - Outside Revenue<br />

State Approp - WRAP - Prior Year<br />

Funds<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

0 0 600,000<br />

0<br />

0<br />

600,000<br />

Project Funds Not Budgeted by the<br />

District<br />

PR\MRWSA 0 0 600,000 15,750,000 161,950,000 178,300,000<br />

Status As Of: September 03, 2009<br />

Total:<br />

Future<br />

Funding<br />

Status History: On November 5, 2008, the options from the H063 Feasibility Study were formally presented to the<br />

Authority board. These options include: three potential reservoir sites in the Upper Myakka Basin and a new surface<br />

water treatment facility, yielding <strong>10</strong> mgd; three potential reservoir sites by Shell and Prairie creeks and expansion of the<br />

existing facility on Shell Creek, for an additional 12 to 20 mgd; the Dona Bay option of diverting water from Cow Pen<br />

Slough to a reservoir on the Venice Minerals site, then transmitting stored water to a surface water treatment expansion<br />

at the Carlton plant, yielding an additional 5 to 15 mgd; and the development of new or existing brackish groundwater<br />

wells to yield an estimated 5 mgd. $600,000 in WRAP funds has been budgeted by the District for the development of<br />

the selected project. A funding agreement between the District and Authority was executed in December 2008 to secure<br />

these funds. A meeting was held with the Authority on May 1, 2009. With the current funding, they are looking to do some<br />

brackish groundwater exploration after a consultant is chosen for the next phase. Memorandums of Understanding<br />

(MOU) are being developed for water supply projects with potential partners to assist with the development and<br />

scheduling of future water sources. At the June 3, 2009 PRMRWSA Board <strong>Meeting</strong> MOUs with the City of Punta Gorda<br />

and DeSoto County were approved. The Punta Gorda project is a 5 to 8 mgd brackish water groundwater supply. The<br />

DeSoto County project is an up to 5 mgd brackish groundwater supply. The next step then in the process is to develop a<br />

contract for the specific project providing details of items such as operation, ownership etc.Current Status: The Authority<br />

continues to meet with potential partners on developing regional water supply projects for this next phase.<br />

0<strong>21</strong> - Manasota Basin 233<br />

Total<br />

Funding<br />

$341,3<strong>10</strong>,304


H086<br />

Manatee County Regional <strong>10</strong> MG Reclaimed Water Storage Tank<br />

Project<br />

Project Type WS&R Dev.<br />

AOR(s)<br />

Water Supply, Water Quality<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Manatee County<br />

Project Manager MCGOOKEY, SCOTT<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This project will construct a <strong>10</strong> Million Gallon (MG) reclaimed water storage tank in support of the Manatee County<br />

Agricultural Reuse System (MARS). MARS is a regional system that consists of the over <strong>21</strong> miles of transmission lines<br />

that interconnect Manatee County's three regional Wastewater Treatment Facilities (WWTF). The MARS system<br />

supplies reclaimed water for irrigation of agricultural, residential, and recreational customers, thereby decreasing<br />

dependence on potable groundwater. New residential developments, some with golf courses, have been replacing<br />

agricultural demand and many are planned or under construction along the transmission route. These developments<br />

are potential customers of the MARS System. The MARS system is designed to distribute over 30 mgd. Currently the<br />

County relies on one 3 MG tank at the Spencer Parrish Pumping Station and one .75 MG tank at it's North Wastewater<br />

Reclamation Facility to meet peak demand. Wastewater plant peak flows are processed during the daytime and used<br />

primarily at night. This condition requires the county system to have sufficient tank storage to meet the nightime peak<br />

demand. The addition of this <strong>10</strong> MG tank, and two more planned <strong>10</strong> MG tanks, will better enable the County's regional<br />

system to provide for the nightly peak demand events, without comprimising pressure and water quality. This tank will<br />

be located at the County's Southwest Wastewater Reclamation Facility.<br />

Benefits<br />

This <strong>10</strong> MG reclaimed water storage tank will better enable the County to accommodate its customer base as it<br />

evolves from purely agriculture to a mix including residential. The storage will assist the county in providing reclaimed<br />

water for irrigation purposes throughout its system to its customers during nightly peak demand events, without<br />

comprimising pressure and water quality.<br />

Costs<br />

The total project construction costs are estimated to be $4,500,000. The District's share is $2,250,000 or fifty percent,<br />

of which the county is requesting $1,125,000 from the Governing Board and $1,125,000 from the Manasota Basin<br />

Board in FY20<strong>10</strong>.<br />

Additional Information<br />

The proposed <strong>10</strong> MG Reclaim Water Storage Tank is an enhancement to the existing Manatee County Agricultural<br />

Reclaim System (MARS). This system reduces demand for public potable water for irrigation, improves overall<br />

utilization of existing SWFWMD water resources and provides on demand high quality irrigation water for our urban<br />

and agricultural customers. MARS is an integral part of Manatee County water conservation program. The County's<br />

overall program includes existing metering and loss reduction programs, water conservation rate structures, urban<br />

and agricultural reclaim water irrigation supply, public education, SWUCA based level of service for water supply at<br />

1<strong>10</strong> gpfcpd, land development codes requiring non-potable sources for irrigation in new developments, water supply<br />

protection ordinances and the use of aquifer storage and recovery for potable and potentially reclaim waters.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 0 0 0 1,126,563<br />

0 1,126,563<br />

0<strong>21</strong> Manasota Basin 0 0 0 1,126,563<br />

0 1,126,563<br />

Project Funds Not Budgeted by the<br />

District<br />

Manatee County 0 0 0 2,250,000<br />

0 2,250,000<br />

0<strong>21</strong> - Manasota Basin 234<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$4,503,126


H086<br />

Manatee County Regional <strong>10</strong> MG Reclaimed Water Storage Tank<br />

Project<br />

Critical Project Milestones Projected Amended Actual<br />

Complete CFI Agreement 11/30/09<br />

Bid Ground Storage Tank 2/15/<strong>10</strong><br />

Start Construction 4/30/<strong>10</strong><br />

Complete Construction 4/29/11<br />

Status As Of: August 25, 2009<br />

CFI agreement being drafted by DIstrict staff. County drafting Exhibit B (Project Plan) of the draft agreement.<br />

0<strong>21</strong> - Manasota Basin 235


H087<br />

City of Punta Gorda Reverse Osmosis Facility<br />

Project Type WS&R Dev.<br />

AOR(s)<br />

Water Supply, Water Quality, Natural Systems<br />

Basin(s) General Fund (District), Peace River, Manasota<br />

Cooperator(s)<br />

City of Punta Gorda<br />

Project Manager FERGUSON, JOHN<br />

Task Manager(s)<br />

MORRIS, LISANN<br />

Status Proposed<br />

Description<br />

This project is a Reverse Osmosis (RO) facility to be co-located with the City of Punta Gorda's existing <strong>10</strong> mgd water<br />

treatment facility. The RO facility would provide 2 mgd of treated brackish groundwater for blending with treated<br />

surface water to reduce levels of Total Dissolved Solids (TDS). This project would also provide water to the four county<br />

region (Charlotte, Sarasota, Desoto, and Manatee) through the Peace River Manasota Regional Water Supply<br />

Authority's Phase 1A Interconnect (H069). Project components would include final design\permitting and construction.<br />

Benefits<br />

Construction of the RO facility for brackish groundwater treatment will provide a blending source to reduce levels of<br />

TDS, which would improve the quality and seasonal reliability of the surface water treatment facility. The brackish<br />

water could be used as an alternative source and could potentially serve as a future recovery strategy for proposed<br />

MFLs on Shell Creek. The City has indicated in their application this water would be available to the Peace River<br />

Manasota Regional Water Supply Authority.<br />

Costs<br />

The City estimated the total project cost at $36,700,000. The City budgeted $1,000,000 in FY2009 for the project, prior<br />

to submitting a District funding request. The total District eligible cost through construction is estimated at<br />

$35,700,000, with $17,850,000 in funding requested. The anticipated District FY20<strong>10</strong> funding is scheduled as:<br />

Governing Board $1,000,000, Manasota Basin Board $500,000, and the Peace River Basin Board $270,000.<br />

Additional Information<br />

The City currently has an interlocal agreement to transfer 1 mgd under the Authority's GAP permit. The GAP permit<br />

expires on January 30, 2013. This project, along with the development of an off-line reservoir, are under examination<br />

as part of an MFL recovery strategy for Shell Creek. The 2 mgd RO facility may employ some of the City's existing<br />

ASR wells transitioned into brackish water supply wells. A deep injection well will be required to dispose of RO<br />

concentrate. The treated groundwater will be used conjunctively with surface water when TDS levels are high during<br />

periods of drought. The RO facility may be incrementally expanded to 8 mgd in future phases, based on the<br />

permittability of brackish groundwater sources. Additional aquifer performance data will be required to determine total<br />

groundwater availability in the area. Future phases of the RO facility may also be designed for the treatment of surface<br />

water with high TDS levels.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 0 0 0 1,004,694 7,925,000 8,929,694<br />

020 Peace River Basin 0 0 0 272,607 2,139,750 2,412,357<br />

0<strong>21</strong> Manasota Basin 0 0 0 503,763 6,015,250 6,519,013<br />

Project Funds Not Budgeted by the<br />

District<br />

City of Punta Gorda 0 0 1,000,000 2,000,000 14,850,000 17,850,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$35,711,064<br />

Critical Project Milestones Projected Amended Actual<br />

0<strong>21</strong> - Manasota Basin 236


H087<br />

City of Punta Gorda Reverse Osmosis Facility<br />

Preliminary Design Report 12/15/09<br />

Final Design and Permiting 12/15/<strong>10</strong><br />

Complete Construction <strong>10</strong>/1/11<br />

Status As Of: June 25, 2009<br />

A Memorandum of Understanding (MOU) between the City and the Authority was approved by the Punta Gorda City<br />

Council on May 20, 2009, and by the Authority Board on June 3, 2009. The MOU is for considering the development of 5<br />

to 8 mgd in brackish groundwater supply capacity at or near the Shell Creek Water Treatment Facility.<br />

0<strong>21</strong> - Manasota Basin 237


H088<br />

Dona Bay Water Supply Development and Management Project<br />

Project Type WS&R Dev.<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality, Natural Systems<br />

Basin(s) General Fund (District), Peace River, Manasota<br />

Cooperator(s)<br />

Sarasota County<br />

Project Manager MORRIS, LISANN<br />

Task Manager(s)<br />

HEYL, MIKE<br />

Status Ongoing<br />

Description<br />

This cooperative funding application proposes a multi-phase implementation plan for the Dona Bay Watershed<br />

Management Plan (DBWMP), previously cooperatively funded by the basin under L493. The project proposes to divert,<br />

store and transport excess freshwater flows from Cow Pen Slough prior to discharging them into the Dona Bay Estuary<br />

providing an alternative water supply in the SWUCA as well as environmental benefits to the bay. The water would be<br />

ultimately transported to the County's Carlton Facility for treatment and distribution. The potential capacity is estimated<br />

in 3, 5, <strong>10</strong>, and 15 mgd phases. The DBWMP was finalized in June 2007, and as design has progressed, the<br />

implementation plan has evolved. The project covers initial elements including design, permitting and construction for<br />

a new weir structure in the Cow Pen Slough canal near the historic ridge line, the phased adaptation of the Venice<br />

Minerals site to a reservoir (first 3 mgd), a conveyance system from the proposed weir to join the future Venice<br />

Minerals site, the West Pinelands wetlands restoration, and a pilot treatment study to determine the most efficent and<br />

effective way to treat surface and groundwater in that area. Because of uncertainties such as water supply demands,<br />

the Albritton reservoir that is part of future phases is not included in the project at this time. Certain initial project<br />

components will be sized to accommodate the increased capacities once Albritton is brought online. The County,<br />

District and Authority staff are working through several funding issues such as Authority involvement in the project,<br />

and the most suitable water treatment system for the project through the Dona Bay Work Group. Currently the MOU<br />

between the County and Authority agreeing to work together to develop a Dona Bay Project agreement is scheduled to<br />

go before County and Authority Boards for approval in July 2009.<br />

Benefits<br />

The objective is to decrease excess freshwater flows to Dona Bay. The elements listed in the FY20<strong>10</strong> application, the<br />

new weir, West Pinelands mitigation area, conveyance to the future Venice Minerals reservoir and initial adaptation of<br />

the Venice Minerals site could increase the watershed hydro period and storage capacity. The County has been<br />

working with District staff and has provided an estimate of approximately 5 tons/yr of nitrogen removed from the bay if<br />

Venice Minerals is used as a retention pond and an additional 9 tons/yr of nitrogen removal if surface water is utilized<br />

for water supply. If the pilot test proposed in phase 1 of the project determines intermediate groundwater is the most<br />

effective source for the intial 3-5 mgd, the environmental benefits to the Bay from this withdrawal will not be realized .<br />

Costs<br />

The request for FY20<strong>10</strong> funding of $1,800,000 would be split between the Governing Board for $900,000, the Peace<br />

River Basin Board for $243,000 and the Manasota Board $657,000. The County has already begun design\permitting<br />

for West Pinelands restoration, the new weir in Cow Pen Slough, phased modifications of the Venice Minerals mine to<br />

a reservoir, and the conveyance from the new weir to Venice Minerals. These FY20<strong>10</strong> funds would be used to finish<br />

design\permit tasks not started in FY2009 and\or begin initial work such as area excavation for the modification of<br />

Venice Minerals. Another option discussed at the Dona Bay Work Group was to proceed with the pilot treatment test<br />

as a partnership between the Authority and the County. The total project cost is estimated at approximately $53<br />

million at this time. The District share is requested to be 50 percent, or approximately $26.5 million. As previously<br />

mentioned, the County and Authority continue to discuss options for sharing the water from this project regionally. If an<br />

agreement can be reached that meets the intent of District Policy 130-4, then Governing Board funding may be<br />

available for the project.<br />

Additional Information<br />

The current Dona Bay watershed has been significantly impacted by man-made drainage activities, which increased<br />

the efficiency and volume of freshwater being discharged to its tidal estuary. In addition, historical maps indicate that a<br />

significant portion of the current watershed may have been diverted to Dona Bay by the man-made Cow Pen Slough<br />

canal. Towards this outcome, Sarasota County has acquired lands that are strategically located in the watershed and<br />

initiated monitoring of freshwater flows to, and natural system and water quality indicators in, the tidal portions of Dona<br />

Bay. The Dona Bay Watershed Management Plan (DBWMP) (L493) was cooperatively funded during FY2006 and<br />

FY2007 as a comprehensive watershed plan for the Dona Bay watershed.<br />

0<strong>21</strong> - Manasota Basin 238


H088<br />

Dona Bay Water Supply Development and Management Project<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 0 0 0 514,017 12,940,740 13,454,757<br />

020 Peace River Basin 0 0 0 4,944 3,493,998 3,498,942<br />

0<strong>21</strong> Manasota Basin 0 0 0 259,593 9,446,733 9,706,326<br />

Project Funds Not Budgeted by the<br />

District<br />

Sarasota County 0 0 1,200,000 1,800,000 24,681,471 27,681,471<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$54,341,496<br />

Critical Project Milestones Projected Amended Actual<br />

Initiate Design and Permitting <strong>10</strong>/29/09<br />

Complete Design and Permitting 7/29/11<br />

Initiate Construction 7/29/11<br />

Status As Of: September 03, 2009<br />

Staff continues to monitor the progress between Sarasota County and the Authority as they work through the MOU to<br />

jointly move forward with the Dona Bay Water Supply project. A meeting was held August <strong>21</strong>, 2009 to get an update on<br />

environmental benefits information and to discuss the possibility of proceeding with the Water Quality Pilot Treatment<br />

task as soon as possible. County staff indicated the Authority and District personnel would have an opportunity to review<br />

the Request For Qualifications that is scheduled to be advertised for this component. A letter from the Authority indicated<br />

regional interest in this task would be required to make it eligible for Governing Board funds.<br />

0<strong>21</strong> - Manasota Basin 239


H089<br />

Flatford Swamp Hydrologic Restoration\Implementation<br />

Project Type WS&R Dev.<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality, Natural Systems<br />

Basin(s) General Fund (District), Manasota<br />

Cooperator(s)<br />

Project Manager MORRIS, LISANN<br />

Task Manager(s)<br />

Status Ongoing<br />

STARKS, ROBERTA, SZAFRANIEC, MARY, ARNOLD, DAVE<br />

Description<br />

Implementation phase of the Flatford alternative from the Myakka River Watershed Initiative (H048). The Initiative is a<br />

comprehensive project illustrating the effects of land use conversions and alterations and evaluation of best<br />

management practices (BMPs) for restoration. The objective of this initiative is to restore water quality, natural system,<br />

and floodplain impacts in the watershed in ways that can also provide a benefit to water supplies in the Southern<br />

Water Use Caution Area (SWUCA). Hydrologic alternations and excess runnoff has adversely impacted Flatford<br />

Swamp in the upper Myakka watershed. The Flatford alternative will remove excess flows from Flatford Swamp and<br />

some portions of the surrounding area to improve the natural systems. This project will include design\permitting and<br />

construction. Also included will be training for District staff on use of the Upper Myakka Water Budget<br />

Model(developed under H048) which will be utilized to track performance of the proposed BMPs after construction.<br />

The FY20<strong>10</strong> funding for will initiate design\permitting and initial evaluation of natural systems restoration opportunities.<br />

Benefits<br />

The Flatford Swamp hydrologic restoration alternative will work to re-establish hydro-periods close to historic levels<br />

estimated by the Upper Myakka Water Budget model and for natural systems restoration.<br />

Costs<br />

The estimated cost for the H089 Flatford Swamp Hydrologic Restoration ranges from $45,000,000 to $1<strong>10</strong>,000,000<br />

from early conceptual estimates. District funding in FY20<strong>10</strong> is divided as follows: General fund $400,000; Manasota<br />

$400,000. The long-term project cost of all additional Phase 2 components for joining the Englewood Water District,<br />

City of Venice, and the Carlton WTP has been estimated at $<strong>10</strong>6,378,<strong>21</strong>7. For FY20<strong>10</strong> the plan is to initiate<br />

design\permitting of the preferred Flatford Swamp alternative for hydrologic restoration and to perform an initial<br />

evaluation of natural systems restoration opportunities. The restoration alternatives matrix of Flatford Swamp options<br />

(H048) is expected to be completed in early 20<strong>10</strong> when total costs for the next phase will be more defined.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 0 0 0 479,969 20,000,000 20,479,969<br />

0<strong>21</strong> Manasota Basin 0 0 0 477,312 20,000,000 20,477,312<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$40,957,281<br />

Critical Project Milestones Projected Amended Actual<br />

WMP Consultant Services-Prelim. Design<br />

Develop Contract Amendment 3/31/<strong>10</strong><br />

Status As Of: September 02, 2009<br />

Work continues on H048 to refine preferred alternatives for hyrdologic restoration before moving these options into<br />

preliminary design.<br />

0<strong>21</strong> - Manasota Basin 240


K114<br />

Bradenton - ASR Program<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

City of Bradenton<br />

Project Manager ELLISON, DON<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This project is to permit and construct up to three additional monitoring wells, and perform two additional cycle tests at<br />

the City of Bradenton's Downtown aquifer storage and recovery (ASR) site. The project is a continuation of the City's<br />

Downtown ASR project that is located at the High Service Pump Station (HSPS) in Downtown Bradenton and will<br />

provide 1.5 mgd of potable water during the <strong>10</strong>0-day dry season. The wells will be constructed to address FDEP<br />

monitoring requirements for sites mobilizing arsenic in the subsurface. These wells are estimated to be about 550 feet<br />

deep and completed into the aquifer storage zone, and will be located within several hundred feet of the ASR well. The<br />

wells are being required by the FDEP. Funding requested for the project includes engineering fees for the required<br />

Area of Review analysis, an update to the Well Inventory, and additional storage zone monitoring wells required by<br />

FDEP. Funding is also being requested to modify FDEP permit No.133098-074-UC/MN for construction of the<br />

additional monitoring wells; for the design, bid, award, construction and testing of up to three additional monitoring<br />

wells; and for the extension of Cycle Testing to include Cycles 7 and 8.<br />

Benefits<br />

This project is expected to provide 1.5 mgd potable supply during a typical <strong>10</strong>0 day dry season which is needed to help<br />

the city provide a more reliable source of water during periods of low flow in Braden River. The information from this<br />

project will also support the Districts efforts to find methods to minimize arsenic mobilization in the aquifer during ASR<br />

activities.<br />

Costs<br />

The total cost for all prior and ongoing project work is $2,684,250 ($1,342,125 each) and is contained in two separate<br />

contracts. The first contract was completed in October 2005 and covered the construction and testing of an ASR well<br />

and monitoring well for a total amount of $1,625,000 ($812,500 each). The second contract was initiated in FY 2007<br />

and covers the construction of up to three new monitoring wells and continuation of cycle testing through FY20<strong>10</strong> for a<br />

total amount of $1,059,250 ($529,625 each). With the allocation of $<strong>10</strong>1,650 from the Water Protection Sustainability<br />

Trust Fund Program, the City's and District's equal shares of the second contract have been reduced to $478,800<br />

each. The District's budget as it appears below does not reflect the $655,000 that was funded in FY2000 and prior<br />

years, nor the $529,625 that was transferred into the project in FY2006 from project L513, the City's reservoir ASR<br />

site.<br />

Additional Information<br />

The existing ASR well (1.5 mgd injection/recovery capacity) and piping was constructed in 2003 with cooperative<br />

funding from the District. The City has completed 6 cycle tests as required by Florida Department of Environmental<br />

Protection (FDEP) permit No.133098-074-UC/MN. Cycle test results have identified arsenic mobilization in the<br />

subsurface and further plans for cycle testing is on hold until a new approach to control the arsenic mobilization<br />

problem within acceptable Drinking Water Standards is developed. Continuation of cycles tests 7 and 8 is on hold until<br />

the City identifies an acceptable approach, the additional monitoring wells at this point are to identify the extent of<br />

arsenic contamination in the aquifer. The City has one storage zone monitoring well offsite with arsenic exceeding the<br />

Drinking Water Standard of <strong>10</strong> ppb.<br />

0<strong>21</strong> - Manasota Basin 241


K114<br />

Bradenton - ASR Program<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 292,980 448,350 12,271 6,304<br />

0 759,905<br />

District Budgeted - Outside Revenue<br />

Water Protection & Sust T.F.<br />

(Alternative Wtr)<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

0 <strong>10</strong>1,650 0<br />

0<br />

0<br />

<strong>10</strong>1,650<br />

Project Funds Not Budgeted by the<br />

District<br />

City of Bradenton 687,125 0 0<br />

0<br />

0 687,125<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$1,548,680<br />

Critical Project Milestones Projected Amended Actual<br />

1. Critical Project Milestones<br />

District Recognition/Signage: YES <strong>10</strong>/1/00 <strong>10</strong>/1/00<br />

2. First Contract for ASR well Construction and Cycles 1-6<br />

Preparation of Plans and Specs <strong>10</strong>/1/00 <strong>10</strong>/30/02 <strong>10</strong>/30/02<br />

Permitting 9/1/01 9/30/02 9/30/02<br />

Well Construction 1/1/02 11/20/03 11/20/03<br />

ASR Cycle Testing Through Cycle 6 2/1/02 12/20/04 <strong>10</strong>/1/05<br />

First Contract Amendment 2/25/02 5/3/02<br />

Final Report 3/28/02 7/20/05 <strong>10</strong>/1/05<br />

Project Complete 5/27/02 9/20/05 <strong>10</strong>/1/05<br />

Contract Termination <strong>10</strong>/1/02 <strong>10</strong>/1/05 <strong>10</strong>/1/05<br />

3. Second Contract (Pending) for Montioring Wells and Additional Cycle Tests<br />

Task 1 Cycle 6a Recovery and Design Equipment Upgrades 6/30/06 6/30/06<br />

Task 2 SZMW-3 Design, Permitting <strong>10</strong>/30/06 12/30/09<br />

Request Basin Board Transfer of Funds 12/30/06 12/30/06<br />

Contract Execution 1/30/07 1/24/07<br />

Task 3 SZMW-3 Construction <strong>10</strong>/30/07 12/30/09<br />

Task 4 Cycle Test 7 <strong>10</strong>/30/08 12/20/07<br />

Task 5 Feasibility Study Update <strong>10</strong>/30/08<br />

Task 6 SZMW-4 & SZMW-5 Design, Permitting, Construction 5/30/09<br />

Task 7 SZMW-4 and SZMW-5 Construction <strong>10</strong>/30/09<br />

Task 8 Cycle Tests 8 and 9 <strong>10</strong>/30/<strong>10</strong><br />

Task 9 Final Report, Application for Operations Permit <strong>10</strong>/30/11<br />

Second Contract<br />

Contract Completion Date 12/30/11<br />

Status As Of: September 14, 2009<br />

The scope of work for the first contract to construct and test an ASR well at the Downtown Booster Station site has been<br />

completed and all submittals have been received. Arsenic concentrations exceeding the drinking water standard (DWS)<br />

were observed in the monitoring well 200 feet away at the end of the cycle test 6. This new data indicates that the arsenic<br />

standard would be exceeded at the property line 75 feet away. In response to the arsenic mobilization issue at this site<br />

the City, FDEP, and District have been developing strategies to address the issue. Part of the strategy developed was to<br />

install additional monitoring wells and to continue cycle testing to demonstrate that the arsenic issue is limited in extent<br />

and not posing a threat to the aquifer. The strategy was, at the time consistent with guidance received from the FDEP<br />

indicating that as long as the arsenic concentrations were below the DWS at the property boundary, the site would be<br />

eligible for an operational permit. The City submitted a request for FY2007 funding through the District's Cooperative<br />

Funding Program to proceed with this additional work. Because of the urgent need to address the arsenic mobilization<br />

issue, the City made a request to the Manasota Basin Board at it's April 2006 meeting to transfer $550,000 in FY2006<br />

funds from the City's ASR project at the Evers Reservoir (L513) for use in this project. The request was approved by the<br />

0<strong>21</strong> - Manasota Basin 242


K114<br />

Bradenton - ASR Program<br />

Basin Board at it's April meeting and the City has thus withdrawn their FY2007 cooperative funding application. The<br />

District and City have executed the contract for this additional testing. Since that time the FDEP has changed their<br />

position on permitting ASR facilities with the arsenic issue and is now indicating that any site with arsenic anywhere that<br />

exceeds the DWS would not be permitted for operational use. The only option at this time is to explore pre-treatment of<br />

the injection water to produce compatible water qualities between the injectant and the native water in the aquifer.<br />

Recognizing this requirement, the District approached the City with a request to participate in a pre-treatment study to<br />

remove dissolved oxygen and other oxidants from the injection water which are suspected of being the primary causes of<br />

the arsenic mobilization. The property line monitoring well(s) will still be necessary, but it is contingent on the<br />

implementation of the pre-treatment option. The scope of work for the pre-treatment option has been developed by the<br />

City and bids have been awarded for construction under a separate contract. The City has completed construction of the<br />

pre-treatment system and started cycle testing with de-oxygenated water on December 2, 2008. Equipment problem<br />

arose after two weeks of operation and was shut down for repair in January. Repairs have been completed and the full<br />

scale cycle test injecting 140 mg of de-oxygenated water began in August 2009.<br />

0<strong>21</strong> - Manasota Basin 243


K120<br />

North Port - Water ASR - Phase V<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Project Manager KELLEY, MIKE<br />

Task Manager(s)<br />

Status Ongoing<br />

City of North Port, City of North Port - Public Utilities<br />

Description<br />

This project consists of an Aquifer Storage and Recovery (ASR) Program in the City of North Port to create an<br />

alternative water supply by treating excess wet season flows from Myakkahatchee Creek and storing it in the<br />

mineralized Floridan aquifer. The location is downtown North Port at the water treatment plant. The goal of the project<br />

is to develop a 1.5 million gallon per day dry season supply. FY2008 funding is for Phase V of the project which is for<br />

the installation and testing of a degasification system and for the injection and recovery of treated water, cycle test 4.<br />

Longer duration cycle tests will follow. These cycle tests should determine the effectiveness of removing dissolved<br />

oxygen from injected water on arsenic mobilization in the aquifer and recovered water. Phase V will finish this project.<br />

Benefits<br />

The goal of this ASR project is to develop a 1.5 million gallons per day (mgd) dry season supply (equivalent to an<br />

annual average of 4<strong>10</strong>,000 mgd). ASR is an effective method of optimizing the supply of water available from the<br />

Myakkahatchee Creek. Combined with the City's allocation from the Peace River/Manasota Regional Water Supply<br />

Authority (PR/MRWSA), this ASR project has the potential to enable the City of North Port to meet its needs until<br />

approximately 2014.<br />

Costs<br />

The FY20<strong>10</strong> funding request for $60,000 is to continue FDEP required sampling and testing of water quality in the<br />

monitor wells through 2009 and 20<strong>10</strong> while this project is on stand by. This project will continue when we have<br />

favorable, recovery water quality results from the cycle testing at the Bradenton ASR site. The estimated total cost to<br />

conduct Phase V of the project is $619,000 and will be shared by the Manasota Basin Board and the City of North Port<br />

on a 50/50 cost-share basis ($309,500 each). The Basin's contribution will be provided as follows: $75,000 previously<br />

approved in the Basin's FY2007 budget; $126,000 that is in the FY2008 budget; and the remaining $<strong>10</strong>8,500 is in the<br />

FY2009 and future budget years. Funding for FY2009 is combined with approved funding for FY2008 to expand Phase<br />

V of the project to monitor and finish cycle test 4, and run additional longer cycle tests at the City's ASR site. The total<br />

cost of the project is approximately $2,000,000 including prior phases I-IV and funding through FY20<strong>10</strong>. The Manasota<br />

Basin Board and the City of North Port each contributed about $1,000,000.<br />

Additional Information<br />

Phase I determined ASR was the most effective method of optimizing the supply of water available from North Port<br />

Utility's only local source, the Myakkahatchee Creek. The objective of Phase I was to determine the feasibility of ASR<br />

at the North Port water treatment facility, and compare its merits and disadvantages with those of other forms of water<br />

storage, primarily aboveground facilities. During Phase II, the City's consultant designed the ASR well system and<br />

acquired construction and water use permits from the FDEP and the District. They also applied for a Class V injection<br />

well permit from the FDEP. Phase III included construction and testing of the ASR well and monitor wells, and project<br />

report writing. Phase III was initiated July 2001 and is complete. Line item adjustments have been made to Phase III to<br />

change the focus of this ASR project from treated raw water to fully treated potable water ASR. Cycle tests one and<br />

two were included in Phase III. Phase IV of the City's pilot ASR Program includes engineering services, hydrogeologic<br />

field work, data collection and analysis, laboratory analytical services and completion report to accommodate the third<br />

cycle test as required by the FDEP UIC permit for the project. The third cycle test was not included, as it was not<br />

anticipated to be required by the FDEP at the time the Phase III agreement was finalized. The Phase III agreement is<br />

being extended to 12/31/2005 to allow sufficient time to complete all activities related to finalization of the second cycle<br />

test. Completion of the cycle test was hampered for a couple of reasons. First, the start of the injection portion of the<br />

test was delayed due to a lack of water when the city was providing emergency water supplies to the PR/MRWSA<br />

after Hurricane Charley hit the area in August 2004. The second major reason was the fact that the recovery portion of<br />

the test was halted prematurely when the recovered water, which was directly discharged into Myakkahatchee Creek,<br />

exceeded the standard for arsenic concentration of 50 micrograms/liter (ug/L). The DEP was contacted and the<br />

second cycle test is considered complete. A third cycle test began 8/2/2005 and injected a million gallons per day of<br />

treated water for 75 days which was to remain in storage 30 days. Recovery is delayed due to the construction of a lift<br />

station to pump recovered water to the wastewater treatment plant because initial recovered water is anticipated to<br />

exceed the 50 ug/L arsenic limit. When recovered water quality is below 50 ug/L arsenic the discharge will be to<br />

Myakkahatchee Creek. The recovered water during Cycle Test 3 was all discharged into the sanitary sewer system.<br />

0<strong>21</strong> - Manasota Basin 244


K120<br />

North Port - Water ASR - Phase V<br />

The arsenic levels remained above the maximum contaminate level (<strong>10</strong> ug/l) in the recovered water. The FDEP<br />

construction and testing permit is complete for Cycle Tests 4 through 6.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 790,902 0 113,147 65,402<br />

0 969,451<br />

Project Funds Not Budgeted by the<br />

District<br />

City of North Port 845,932 0 <strong>10</strong>7,820 60,000<br />

0 1,013,752<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$1,983,203<br />

Critical Project Milestones Projected Amended Actual<br />

1. PHASE I<br />

Board Approval of Contract 11/24/98 11/24/98<br />

Execute Contract 1/11/99 1/11/99<br />

Feasibility Report Completed <strong>10</strong>/28/99 <strong>10</strong>/28/99<br />

Contract Termination 12/31/99 12/31/99<br />

2. PHASE II<br />

Board Approval of Contract 4/25/00 4/25/00<br />

Board Approval of Contract 6/19/00 6/19/00<br />

Contract Termination 6/19/01 6/19/01<br />

3. PHASE III<br />

Basin Board Approval of Agreement 5/16/01 5/16/01<br />

Governing Board Approval of Agreement 5/31/01 5/31/01<br />

Contract Executed 7/20/01 8/8/01<br />

FDEP Permitting (Construction and Testing) 7/31/01 7/31/01<br />

Well Construction and Testing Completed 8/15/02 3/1/03<br />

ASR Cycle Testing Completed 11/15/03 9/30/05<br />

Final Report 12/31/03 12/31/05 12/31/05<br />

Contract Termination 12/31/03 12/31/05 12/31/05<br />

4. PHASE IV<br />

Basin Board Approval of Agreement 12/15/03<br />

Governing Board Approval of Agreement 12/15/03<br />

Contract Executed 9/1/04 9/27/04<br />

Final Report 12/31/05 12/31/07 12/14/07<br />

Contract Termination 12/31/05 12/31/07 12/31/07<br />

FDEP Permit Required ASR Cycle 3 Testing Completed 8/15/06 12/15/06 12/15/06<br />

5. PHASE V<br />

Cooperative Funding Agreement 3/1/08 3/1/08<br />

Status As Of: September 03, 2009<br />

The request for 20<strong>10</strong> funds is for monitoring activities associated with the temporary delay in construction of the City's<br />

degasification system at their ASR site. A delay was requested by the District to ensure there is adequate time to confirm<br />

the performance of the degasification equipment being used for a pilot project currently underway at the City of<br />

Bradenton's ASR site. Results of that project are expected to be available in summer 20<strong>10</strong>. The requested funding will<br />

cover the standby maintenance, sampling, testing and reporting that is required by the FDEP that was not originally<br />

anticipated and will also require amending the contract. Jerry Manning of North Port has been contacted concerning a<br />

request to reduce sampling frequency, the contract amendment for a time extension and the additional funding budget.<br />

In the summer of 20<strong>10</strong> (rainy season), the first of three cycle tests will be run with pretreated injection water to achieve<br />

0<strong>21</strong> - Manasota Basin 245


K120<br />

North Port - Water ASR - Phase V<br />

low oxygen levels. The recovery water quality data will provide information necessary to obtain an operational permit<br />

from the FDEP. The North Port the cooperative funding agreement, Phase V, for FY2009 is in effect. Groundwater<br />

sampling and testing from monitor wells are ongoing. An FDEP UIC permit modification has been applied for to reduce<br />

the frequency of sampling during the standby period. The water quality has returned to ambient conditions and the ASR<br />

well flow has been shut off. The consultant is working on the coordination and engineering of the degasification<br />

equipment.<br />

ACTION-TO-DATE: Delayed. The project has been delayed as noted in the status above. An information request<br />

concerning the Accelerate Florida Program was mailed to the cooperator on October 15, 2008. District follow-up email on<br />

January 12, 2009 prompted an email from Jennifer Desrosiers, North Port Business Manager, January 29, 2009. She<br />

sent a spreadsheet of preliminary action plans for projects with District funding. She states that she is eager to accelerate<br />

North Port projects. Specific to this ASR project she says "This project is being monitored pursuant to our SWFWMD<br />

contract and we are awaiting the results of the pre-treatment study being conducted at the Bradenton ASR project site to<br />

remove dissolved oxygen and other oxidants from the injection water to mitigate the arsenic problem."<br />

0<strong>21</strong> - Manasota Basin 246


K253<br />

Manatee - Imp. BMPs Wares Creek<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Flood Protection<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Manatee County<br />

Project Manager FRIES, GEORGE<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This is a multi-year funded project to perform the Implementation of Best Management Practices (BMPs) element of<br />

the District's Watershed Management Program (WMP) for the Wares Creek Watershed. Implementation of BMPs<br />

includes the following tasks: design, development of construction documents, construction permitting, land acquisition,<br />

bidding and contractor selection, construction of the BMPs and construction engineering and inspection. Wares Creek<br />

is an intermediate-scale system that conveys stormwater from a 6.23 square mile watershed that flows from the<br />

unincorporated areas of Manatee County north through the City of Bradenton before discharging to the Manatee River.<br />

The Wares Creek Flood Protection Project is a joint effort between Manatee County (County) and the United States<br />

Army Corps of Engineers (USACE), as authorized by the U.S. Congress in the Water Resources Development Act of<br />

1996, to reduce flood damage within the Cedar Hammock (Wares Creek) Drainage Basin located in west central<br />

Manatee County. The USACE has proposed channel widening and bank stabilization of Wares Creek to reduce flood<br />

levels to within-bank for a storm event of a <strong>10</strong>-year magnitude. Wares Creek channel improvements will begin at the<br />

confluence of Wares Creek with the Manatee River and end at the 44th Avenue West crossing (Cortez Road).<br />

Benefits<br />

The project will provide additional capacity within the stream banks and, thereby, provide an improved level of service.<br />

These improvements will address structure flooding along Wares Creek by providing flood protection for homes<br />

currently inundated and damaged during the <strong>10</strong>-year flood event. Based on an analysis prepared by the USACE, the<br />

project will provide a positive benefit/cost ratio.<br />

Costs<br />

Funding for this project has been provided in the Manasota Basin Board budgets for FY2000 ($346,000); FY2001<br />

($862,000); FY2002 ($431,000); FY2004 ($892,500); FY2005 ($500,000); FY2006 ($3,000,000); FY2007<br />

($2,000,000); and FY2008 ($2,885,036) for a total funding commitment through FY2008 of $<strong>10</strong>,916,536. The total<br />

projected cost for this project is $55.2 million of which the District's share is $14,254,000. The County will contribute<br />

$14,254,000. Additional funding of $2,150,000 will be provided by the Florida DEP and $24.5 million will be provided<br />

by the US Army Corps of Engineers. As reported by the Manatee County Environmental Manager at the April 2009<br />

Basin Board meeting, the County expects to request $820,000 in cooperative funding in FY2011. Future funding of<br />

$2,517,464 will be required to complete the District's obligation to fund the project. When each element is completed<br />

the project budget and scope may require refinement based on the information gathered. The District funding amounts<br />

shown in the table include staff salaries.<br />

Additional Information<br />

The WMP includes five major elements: 1) Topographic Information, 2) Watershed Evaluation, 3) Watershed<br />

Management Plan, 4) Implementation of BMPs, and 5) Maintenance of Watershed Parameters and Models.<br />

Implementing elements of the WMP with local governments is one of the Comprehensive Watershed Management<br />

(CWM) initiative strategies and one of the District's Strategic Priorities. The WMP provides a method to evaluate the<br />

capacity of a watershed to protect, enhance and restore water quality and natural systems while achieving flood<br />

protection. This project involves the Implementation of BMPs. The total project cost (construction plus easement<br />

acquisition) was estimated to be $13.4 million in 1996 and in 2005 was estimated at $55.2 million of which $24.5<br />

million is the responsibility of the USACE while the remaining $30.7 million is the responsibility of the local sponsor,<br />

Manatee County. In FY2000 the Basin Board agreed to participate with Manatee County in the project by providing<br />

one-half of the County's required share of 5% of the total project cost. The Basin Board budgeted $346,000 in<br />

FY2000 and a cooperative funding agreement was executed. A second cooperative funding agreement was<br />

developed in FY2001 for the Wares Creek Project for rights-of-way and easement acquisitions necessary to construct<br />

the creek enhancements. In FY2001 the Basin Board provided funding of $862,000; in FY2002: $431,000; and in<br />

FY2004: $892,500. In FY2005 the County requested additional funding of $500,000 for right-of-way and easement<br />

acquisition because of the steady increase in land values in Manatee County since the original estimate was<br />

developed in 1996. The Board budgeted the additional funds and the agreement was amended to incorporate these<br />

funds. For FY2006 the County requested that the project scope be amended to incorporate the additional construction<br />

work needed to extend the project to the Manatee River and to provide additional funding for easement acquisitions<br />

and project construction. The Basin Board, at its April 2005 meeting, agreed to this change in scope and scale of the<br />

0<strong>21</strong> - Manasota Basin 247


K253<br />

Manatee - Imp. BMPs Wares Creek<br />

project. Furthermore, the Basin Board, at its August 2005 meeting budgeted $3,000,000 for FY2006 for this project.<br />

For FY2007 the county sought additional funding of $2,000,000 to be applied towards the land acquisition and<br />

easement expenses and the non-federal share of construction including dredging of the lower Wares Creek between<br />

the Manatee Avenue Bridge and the Manatee River. A new cooperative funding expenditure agreement has been<br />

developed to incorporate the change in scope and the additional funds. The District is also co-funding project L200<br />

with the City of Bradenton which will replace 4 bridges across Wares Creek within the city limits and will provide<br />

additional flow capacity within the stream banks.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin <strong>10</strong>,953,357 0 4,170 3,198 3,337,464 14,298,189<br />

Project Funds Not Budgeted by the<br />

District<br />

Florida DEP (Bradenton) 0 0 500,000<br />

0<br />

0 500,000<br />

Florida DEP (Manatee County) 1,650,000 0 0<br />

0<br />

0 1,650,000<br />

Manatee County <strong>10</strong>,916,536 0 2,000,000 1,337,464<br />

0 14,254,000<br />

U.S. Army Corps of Engineers 0 0 24,507,500<br />

0<br />

0 24,507,500<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$55,209,689<br />

Critical Project Milestones Projected Amended Actual<br />

1. Critical Project Milestones<br />

District signage will be provided on all construction signs. 12/1/02<br />

2. 5% Construction<br />

District Agreement Execution 5/31/00 5/31/00<br />

USACE Execution of the Memorandum of Agreement 1/31/01<br />

Permitted Construction Drawings 3/15/01<br />

Begin Construction 12/1/02<br />

Contract Termination 3/31/05 3/31/06<br />

3. Rights-of-Way Acquisitions<br />

Draft Agreement to Management Services 12/15/00 1/18/01<br />

Survey Work Began 12/18/00 12/18/00<br />

Draft Agreement Returned from Management Services 1/31/01 3/12/01<br />

Basin Board Approval of Agreement 2/<strong>21</strong>/01 2/<strong>21</strong>/01<br />

Governing Board Approval of Agreement 2/26/01 2/26/01<br />

Contract Executed 4/15/01 8/23/01<br />

Notice to Proceed 9/5/01 <strong>10</strong>/2/01<br />

4. FY 2005 Funding<br />

Draft Agreement to Management Services 6/30/04 6/30/04<br />

Draft Agreement Returned from Management Services 7/15/04 7/15/04<br />

Contract Executed 8/15/04 <strong>10</strong>/28/04<br />

Notice to Proceed 8/16/04 11/1/04<br />

Project Complete 12/30/04 12/31/06<br />

Contract Termination 12/31/04 12/31/06<br />

5. New Agreement (FY 2006/2007/2008 funding)<br />

Contract Executed 3/31/07 3/6/08<br />

Notice to Proceed 3/31/07 3/7/08<br />

Funds Encumbered 4/15/07 3/24/08<br />

Project Complete 12/31/12<br />

0<strong>21</strong> - Manasota Basin 248


K253<br />

Manatee - Imp. BMPs Wares Creek<br />

Contract Termination 12/31/12<br />

Status As Of: August 24, 2009<br />

Status History: County staff appeared before the Manasota Basin Board at the April 2005 meeting and requested an<br />

amendment to the cooperative funding agreement to permit the County to use the Land Acquisition and Easement<br />

funding for construction as well as easement acquisition. As discussed by County staff, the cost of the entire project was<br />

estimated, at that time, to exceed $55,000,000. County staff made a presentation to the Basin Board at its July 2007<br />

meeting to discuss project status, economics and direction. County staff is continuing the acquisition of land and<br />

easements necessary for the project. Additional ACOE funding for the project was included in the President's proposed<br />

FY2009 budget. The FDEP and the ACOE continue to meet to work out dredge spoil disposal locations and other issues.<br />

The County has submitted three requests for reimbursement for land and easement acquisition which have been<br />

approved. The County attorney's staff is working on the Project Partnership Agreement (PPA) between the County and<br />

the ACOE. The Board of County Commissioners (BCC) has authorized staff to begin eminent domain proceedings<br />

against Bradenton Tropic Palms Mobile Home Park. The County attorney's staff is also working with the City of<br />

Bradenton on an agreement to utilize the former City Hall site (now in private ownership) located at Manatee Avenue and<br />

Wares Creek as a temporary spoil storage site. According to information provided by Charlie Hunsicker of Manatee<br />

County Natural Resources Department to the BOCC at the meeting of December 15, 2008 Federal funding for the<br />

project will be delayed until at least March 2009 which, in turn, will delay commencement of construction until<br />

October/November 2009 at the earliest. ACTION-TO-DATE: Delayed. The FDEP has issued the required permit. The<br />

County and the ACOE are planning to dispose of the dewatered dredged material at the County landfill. The cost and<br />

funding for this disposal have not been decided upon at this time. Land acquisition for the most southerly (upstream)<br />

phase of the work has begun now that the FDEP permit is in place. The USACE and the FDEP are negotiating conditions<br />

of the PPA. These negotiations were expected to be completed by July 2009 but are now projected to be completed by<br />

October 2009. Bidding and Contractor selection are still expected in the fall of 2009 with construction commencing in<br />

February 20<strong>10</strong>.<br />

0<strong>21</strong> - Manasota Basin 249


K269<br />

Sarasota Co. - N. Sarasota Co. Reclaimed Water ASRs<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply, Water Quality<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Sarasota County<br />

Project Manager MCGOOKEY, SCOTT<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This project consists of the design, permitting, and construction of three 1.2 mgd reclaimed water aquifer storage and<br />

recovery (ASR) wells with ultra-violet (UV) disinfection. These ASRs will be constructed at the County's Central County<br />

Wastewater Treatment Facility (WWTF). The ASRs will provide wet weather storage for the County's Northern<br />

Regional Reuse System, consisting of four interconnected county WWTFs's and a interconnection with the City of<br />

Sarasota's Reuse System.<br />

Benefits<br />

The project will provide storage of approximately 1,200,000 gpd for 120 days or 144 million gallons per year for each of<br />

three proposed ASR wells for a total of 432 million gallons per year stored. This will yield a flow of approximately<br />

888,000 gpd of reclaimed water to offset existing ground-water withdrawals and potable service and better serve<br />

existing reclaimed water users such as Palmer Ranch, Manor Care of Boynton Beach, Plaza Oaks, Silver Oak, and the<br />

Hamptons Development.<br />

Costs<br />

The total project cost is estimated to be $6,443,546, and the District's share is requested to be 50 percent, or<br />

$3,2<strong>21</strong>,773. The Manasota Basin has funded $2,011,743 so far, between FY2000 and FY2007, and the WPSTF<br />

provided $164,864 in FY2006/7, for a total of $2,176,607 already budgeted for the project. The Manasota Basin will<br />

fund $1,127,598 in future years. The cost, amortized at 8 percent over 30 years, is $1.75 per thousand gallons of<br />

traditional water offset. Any additional funds are for staff time. The future funds identified for the project are contingent<br />

upon approval of such amounts by the District Governing and Basin Boards in the annual budget(s).<br />

Additional Information<br />

This is a multi-year project that will expand Sarasota County's reclaimed water system by providing wet weather<br />

storage for the interconnected reclaimed water systems of the Sarasota County and City of Sarasota. This regional<br />

system has five wastewater treatment plants with a permitted capacity of 18.5 mgd and a reuse flow of 5.4 mgd that<br />

are now interconnected. This wet weather storage will increase the system's efficiency. Cost history: The original<br />

project was submitted to the SWFWMD in 1998 and was approved for multi-year funding beginning in FY2000 and<br />

ending in FY2005 with a total cost of $3,030,000. Following a lengthy hearing resulting in DEP issuing a permit to<br />

proceed with construction of the first of three ASR wells, a first amendment was approved in 2006, which increased<br />

the total cost and apportioned the District's share as follows: Cost Breakout: FY2000 = $<strong>10</strong>0,000 FY2001 = $550,000<br />

FY2002 = $390,000 FY2003 = $405,000 FY2006 = $311,607 ($286,743 ad valorem $24,864 WPSTF) FY2007 =<br />

$420,000 ($280,000 ad valorem $140,000 WPSTF) FY20<strong>10</strong> = $350,000 FY2011 = $350,000 and FY2012 = $427,598.<br />

The County has updated the costs, revised the timeline and also determined that split flow UV disinfection is needed<br />

for this project to ensure that water quality can consistently meet drinking water standards prior to injection into the<br />

aquifer. An added benefit of installing UV disinfection is documented effectiveness in treating water borne pathogens<br />

that are not amenable to chlorine disinfection. The cost of the UV disinfection system for each well is estimated at<br />

$580,000. Of the total project cost of $6,443,546, approximately 83 percent ($5,320,247) is expected to be needed for<br />

construction, and the remainder ($1,123,299) for design and administration.<br />

0<strong>21</strong> - Manasota Basin 250


K269<br />

Sarasota Co. - N. Sarasota Co. Reclaimed Water ASRs<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 1,750,092 286,743 3,661 3,820 1,097,383 3,141,699<br />

District Budgeted - Outside Revenue<br />

Water Protection & Sust T.F.<br />

(Alternative Wtr)<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

164,864 24,864 0<br />

0<br />

0<br />

189,728<br />

Project Funds Not Budgeted by the<br />

District<br />

Sarasota County 1,725,000 0 0<br />

0 1,414,341 3,139,341<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$6,470,768<br />

Critical Project Milestones Projected Amended Actual<br />

Agreement Executed: 5/<strong>10</strong>/00 5/<strong>10</strong>/00<br />

Start Permitting and Design: 5/<strong>10</strong>/00 5/<strong>10</strong>/00<br />

Complete Permitting and Design Well #1: 8/1/01 9/17/04<br />

District Recognition/Signage: YES 5/1/02 5/1/02<br />

Start Well # 1 Construction: 5/1/02 9/6/05<br />

Complete Construction Well #1: 12/30/02 4/30/06 4/30/06<br />

Engineering Report Well #1: 7/31/03 7/31/06 7/31/06<br />

Start wellhead & UV construction: 9/30/03 1/31/<strong>10</strong><br />

Complete wellhead & UV construction: 12/16/03 9/30/<strong>10</strong><br />

Begin Cycle tesing Well # 1: 6/30/04 11/30/<strong>10</strong><br />

Start Well # 2 & # 3 Construction: 6/30/04 1/31/11<br />

Complete Construction Well #2 & #3: 12/31/04 6/30/11<br />

Final Invoice: 6/30/05 9/30/12<br />

Project Completion: 12/31/05 12/31/12<br />

Status As Of: August 25, 2009<br />

The first reclaimed water ASR well system has been designed, permitted, and is under construction. The consultant,<br />

PBS&J, is overseeing the construction. Diversified Well Drilling started on the Storage Zone Monitor Well (SZMW) on<br />

September 6, 2005. The SZMW was completed February 28, 2006. The driller has completed the Lower Zone Monitor<br />

Well (LZMW) and the Upper Zone Monitor Well (UZMW). A larger drill rig was mobilized and started drilling the ASR test<br />

well February 2006. Construction of the ASR test was substantially complete by May 31, 2006. PBS&J has prepared a<br />

final engineering report for construction and construction testing of the ASR. Design of the Central County Wastewater<br />

Treatment Facility expansion, and the pumps, piping and UV treatment system for the ASR, is complete. The County<br />

requested to add UV disinfection equipment and additional funding for this project in a FY2006 cooperative funding<br />

initiative proposal. This was approved by the Basin Board and an amendment was executed on October 9, 2006 to<br />

include the changes in scope and funding. The County and the District have agreed to put this project on hold pending a<br />

resolution to the arsenic issue. The District is involved in studies to look for ways to meet the EPA and DEP water quality<br />

requirements for arsenic. Results from these studies have been delayed due to the drought and are now scheduled to be<br />

available in January 20<strong>10</strong>. To date, the Manasota Basin Board has encumbered $<strong>10</strong>0,000 in FY2000, $550,000 in<br />

FY2001, $390,000 in FY2002, $405,000 in FY2003, $286,743 in FY2006 and $280,000 in FY2007. Water Protection and<br />

Sustainability Trust Fund (WPSTF) provided $164,864 for this project in FY2006/7. The remaining $1,127,598 will be<br />

requested in future fiscal years. The County has spent $972,900 in design and construction costs for this project. To<br />

date, the District has reimbursed the County $449,135 from the Manasota Basin and $74,631 from WPSTF funds.<br />

0<strong>21</strong> - Manasota Basin 251


K883<br />

North Port WMPlan Big Slough<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Flood Protection, Water Quality<br />

Basin(s) Peace River, Manasota<br />

Cooperator(s)<br />

City of North Port<br />

Project Manager ARNOLD, DAVE<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This is a multi-year funded cooperative project with the City of North Port to perform 1) Topographic Information, 2)<br />

Watershed Evaluation, and 3) Watershed Management Plan elements of the District's Watershed Management<br />

Program (WMP) for the portion of the Big Slough watershed area lying within the City of North Port. The project<br />

includes detailed study of 60 square miles within the City, and approximate study of the 135 square mile remainder of<br />

the Big Slough watershed to obtain its influence on conveyance of runoff through the City. Issues in the watershed<br />

include rapid growth, flood protection, natural systems preservation, water quality preservation, protection and<br />

enhancement of the City's surface water reservoir, and protection of the downstream Charlotte Harbor estuary.<br />

FY2003-2006 funding is budgeted to complete the Topographic Information, Watershed Evaluation, Watershed<br />

Management Plan elements. Topographic information includes the acquisition of data and development of the terrain<br />

features in the Geodatabase to be used in the Watershed Evaluation. The Watershed Evaluation includes collection of<br />

existing data, GIS processing of the terrain features to establish catchments and connectivity, field reconnaissance,<br />

refinement of the terrain features and development of the hydraulic element point features. The Watershed<br />

Management Plan element includes: development of watershed parameters for a specific use, GIS processing,<br />

computer modeling, floodplain and water quality analysis, surface water resource assessment, establishment of LOS,<br />

and BMP alternative analysis.<br />

Benefits<br />

The WMP provides a method to evaluate the capacity of a watershed to protect, enhance, and restore water quality<br />

and natural systems, while achieving flood protection. The information developed provides the science for the District's<br />

Resource Management and Environmental Resource Permitting (ERP). It assists local governments: 1) With their land<br />

management responsibilities by establishing a level of service and developing Best Management Practices (BMPs) to<br />

address level of service deficiencies. 2) Provides a Geodatabase and projected results from watershed model<br />

simulations for floodplain and water quality management.<br />

Costs<br />

The total budgeted amount for this project is $1,280,000, of which the District's share is $640,000 provided by the<br />

Manasota Basin. The City is contributing $640,000. Multi-year funding is over FY2003-2006 is budgeted to complete<br />

the project. When each element is completed the project budget may require refinement based on the information<br />

gathered.<br />

Additional Information<br />

The WMP includes five major elements: 1) Topographic Information, 2) Watershed Evaluation, 3) Watershed<br />

Management Plan, 4) Implementation of Best Management Practices, and 5) Maintenance of Watershed Parameters<br />

and Models. Implementing elements of the WMP with local governments is one of the Comprehensive Watershed<br />

Management (CWM) initiative strategies and one of the District's Strategic Priorities. In accordance with Board<br />

approval, a cooperative funding revenue agreement with the City of North Port was developed as a multi-year funded<br />

project contingent on the approval of future funding to complete WMP elements through the Watershed Management<br />

Plan. This required cooperative funding requests each year in FY2003-2006 to accumulate the project budget. The<br />

District is managing the project and entering into purchase orders and agreements to accomplish project tasks. Future<br />

cooperative funding requests and agreements will be required for Implementation of BMPs, and the Maintenance of<br />

Watershed Parameters and Models. The District is cooperating with FEMA to modernize the flood insurance rate<br />

maps (FIRMs) in Sarasota County. Information developed with this project will be used to update the FIRMs<br />

representing this watershed.<br />

0<strong>21</strong> - Manasota Basin 252


K883<br />

North Port WMPlan Big Slough<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 672,831 0 3,342 2,314<br />

0 678,487<br />

District Budgeted - Outside Revenue<br />

North Port - Watershed Mgmt Program<br />

(K883)<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

640,000 0 0<br />

0<br />

Total:<br />

Future<br />

Funding<br />

0<br />

Total<br />

Funding<br />

640,000<br />

$1,318,487<br />

Critical Project Milestones Projected Amended Actual<br />

1. Critical Project Milestones<br />

Draft Agreement to Management Services 12/15/02 1/16/03<br />

Basin Board Approval of Agreement 12/15/02 2/1/03<br />

Draft Agreement Returned from Management Services 1/31/03 2/28/03<br />

Governing Board Approval of Agreement 2/28/03 2/1/03<br />

Cooperator Contract Executed 4/15/03 4/29/03<br />

Consultant Contract Executed <strong>10</strong>/1/03 7/29/03<br />

Notice to Proceed to Consultant <strong>10</strong>/1/03 8/27/03 8/27/03<br />

Watershed Evaluation Commence <strong>10</strong>/1/03 8/27/03 8/27/03<br />

Watershed Evaluation Completion 1/1/05 4/1/05 4/19/05<br />

Watershed Plan Commence 1/1/05 4/1/05 4/20/05<br />

Watershed Plan Completion (project complete) 6/1/06 5/1/09<br />

Project Close-out 6/1/07 7/1/09<br />

Status As Of: September 04, 2009<br />

Status History: The cooperative funding agreement was approved by the Basin and Governing Boards in February 2003.<br />

Since then the agreement has been reviewed and executed by the City and the District. District staff negotiated a<br />

contract with Ardaman and Associates, one of the consultants pre-qualified for performing watershed plans, for services<br />

to be completed with the FY2003-2004 funding. Notice-to-proceed was issued, effective the date of the project kick-off<br />

meeting (08/27/2003). Ardaman Associates submitted the first set of deliverables, consisting of annotated base maps,<br />

GIS coverages, and summary letter of data collection results in December 2003. Since then Ardaman Associates has:<br />

(1) completed the watershed field reconnaissance; (2) is continuing to develop the GIS database and hydrologic and<br />

hydraulic inventories; (3) completed the field survey; (3) completed watershed parameterization and model development.<br />

The late delivery of the Sarasota County LiDAR topographic mapping caused delays in this project, but Ardaman now<br />

has the mapping and is proceeding without delay. Current Status: The project is complete through the Floodplain<br />

Analysis deliverables. Ardaman is working to update the watershed based on toptgraphy and land use changes that<br />

occurred between the 2005 and 2007 Sarasota County LiDAR mapping dates. This includes the process for QA/QC<br />

review, peer review, public review/comments, and Governing Board approval. After the Governing Board approves the<br />

submittal of floodplain results to FEMA for updating the Sarasota County FIS, Ardaman will make any needed revisions<br />

to the the Level of Service and preliminary BMP Analysis deliverables, and proceed with the BMP analysis task.<br />

0<strong>21</strong> - Manasota Basin 253


L007<br />

Manatee - WMPlan BUFFALO CANAL/FROG CREEK<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Manatee County<br />

Project Manager NGUYEN, NAM<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This multi-year funded project is to perform the 1) Topographic Information, 2) Watershed Evaluation, and 3)<br />

Watershed Management Plan elements of the District's Watershed Management Program (WMP) for the BUFFALO<br />

CANAL/FROG CREEK Watershed. The watershed occupies approximately 18.8 square miles in northwestern<br />

Manatee County and discharges into Terra Ceia Bay, an Outstanding Florida Water. The watershed is experiencing<br />

rapid development without the benefits of a detailed Watershed Management Plan.<br />

Benefits<br />

The WMP provides a method to evaluate the capacity of a watershed to protect, enhance, and restore water quality<br />

and natural systems, while achieving flood protection. The information developed provides the science for the District's<br />

Resource Management and Environmental Resource Permitting (ERP). It assists local governments: 1) With their land<br />

management responsibilities by establishing a level of service and developing Best Management Practices (BMPs) to<br />

address level of service deficiencies and 2) Provides a Geodatabase and projected results from watershed model<br />

simulations for floodplain management and water quality management.<br />

Costs<br />

The total budget amount for this project is $400,000, of which the District's share is $200,000 funded by the Manasota<br />

Basin. The County is contributing $200,000. In FY2004, each party funded $50,000 for the project. The remaining<br />

funds were funded in FY2005. When each element is completed the project budget and scope may require refinement<br />

based on the information gathered. The District funding amounts shown in the table include staff salaries.<br />

Additional Information<br />

A WMP includes five major elements: 1) Topographic Information, 2) Watershed Evaluation, 3) Watershed<br />

Management Plan, 4) Implementation of Best Management Practices, and 5) Maintenance of Watershed Parameters<br />

and Models. Implementing elements of the WMP with local governments is one of the Comprehensive Watershed<br />

Management (CWM) initiative strategies and one of the District's Strategic Priorities. A cooperative funding revenue<br />

agreement with Manatee County was developed as a multi-year funded project to complete the WMP elements<br />

through the Watershed Management Plan. The District is managing the project and will enter into purchase orders<br />

and agreements to accomplish project tasks. Future cooperative funding requests and agreements will be required for<br />

a BMP alternative analysis, the Implementation of BMPs, and Maintenance of Watershed Parameters and Models.<br />

With prior year funding the Topographic Information and Watershed Evaluation should be completed. With FY2005<br />

funding the work on the Watershed Management Plan element began and should be completed. Work on Watershed<br />

Management Plan element includes the following tasks: survey, data management and development of watershed<br />

parameters, GIS processing, computer modeling, floodplain analysis, and establishment of LOS.<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 224,661 0 7,175 <strong>10</strong>,174<br />

0 242,0<strong>10</strong><br />

District Budgeted - Outside Revenue<br />

Manatee - Buffalo Canal/Frog Ck W/S<br />

Stdy (L007)<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

200,000 0 0<br />

0<br />

Total:<br />

Future<br />

Funding<br />

0<br />

Total<br />

Funding<br />

200,000<br />

$442,0<strong>10</strong><br />

Critical Project Milestones Projected Amended Actual<br />

0<strong>21</strong> - Manasota Basin 254


L007<br />

Manatee - WMPlan BUFFALO CANAL/FROG CREEK<br />

1. Critical Project Milestones<br />

Recognition of District, Basin Board, County on reports 6/4/03<br />

Select Consultant 6/4/03 6/4/03<br />

Draft Coop Agreement to Management Services 7/15/03 7/15/03<br />

Draft Coop Agreement to Management Services 7/28/03 7/28/03<br />

Approval of Cooperative Agreement by Manasota Basin Board 8/12/03 8/12/03<br />

Approval of Cooperative Agreement by Governing Board 8/26/03 8/26/03<br />

Begin Negotiations with Consultant (K&S) 8/26/03 8/26/03<br />

Execution of Cooperative Agreement by Manatee County <strong>10</strong>/<strong>21</strong>/03 <strong>10</strong>/<strong>21</strong>/03<br />

Execution of Cooperative Agreement by SWFWMD 11/7/03 11/23/03<br />

Consultant Agreement to Management Services 11/26/03 11/26/03<br />

Execution of Agreement by Consultant 1/9/04 1/20/04<br />

Execution of Agreement by SWFWMD 1/30/04 1/30/04<br />

Issue Notice to Proceed to Consultant/ Work Order #1 2/9/04 2/13/04<br />

Terminate Consultant Agreement (K&S) 7/15/05 7/15/05<br />

Execute New Consultant Agreement (JEA) 9/30/05 11/6/06 9/<strong>21</strong>/05<br />

Issue Notice to Proceed to JEA for Work Order #1 <strong>10</strong>/31/05 <strong>10</strong>/28/05<br />

Issue Notice to Proceed to JEA for Work Order #2 11/30/06 12/8/06<br />

Termination of Consultant Agreement <strong>10</strong>/31/<strong>10</strong><br />

Termination of Cooperative Agreement 12/31/<strong>10</strong><br />

1. Critical Project Milestones<br />

Execute Expired Consultant Agreement w/JEA (05CON000119-A) 11/6/06 11/6/06<br />

Execute Expired Cooperative Agreement (04REV0011-A) 1/25/07 1/25/07<br />

Execute First Amendment to Expired Consultant Agreement w/JEA<br />

(05CON000119-A)<br />

1/14/08 1/14/08<br />

Execute First Amendment to Expired Cooperative Agreement (04REV0011-A) 3/20/08 3/20/08<br />

Execute First Amend. to Consultant Agrmt. (05CON000119-B) <strong>10</strong>/1/09<br />

Execute First Amend. to Coop. Agrmt. (04REV0011-B) 11/1/09<br />

2. Watershed Management Program Elements<br />

Commence Element 1, Digital Topographic Information 2/13/04 <strong>10</strong>/28/05 2/13/04<br />

Commence Element 2, Watershed Evaluation 2/13/04 <strong>10</strong>/31/05 <strong>10</strong>/28/05<br />

Complete Element 1, Digital Topographic Information 11/30/05 12/31/06 <strong>10</strong>/3/06<br />

Commence Element 3, Watershed Management Plan 3/1/06 11/1/07 11/1/07<br />

Complete Element 2, Watershed Evaluation 4/1/06 11/1/07 11/1/07<br />

Complete Element 3, Watershed Management Plan 12/31/<strong>10</strong><br />

Status As Of: September 03, 2009<br />

At their August 2003 meetings, both the Manasota Basin Board and the Governing Board approved the FY2004 budget<br />

for the project, approved the cooperative agreement with Manatee County for $400,000, authorized staff to assign a<br />

consultant and enter into contract negotiations, and authorized the Executive Director to execute the consultant contract<br />

up to the FY2004 budgeted amount ($<strong>10</strong>0,000). The Cooperative Funding Agreement was approved by the BCC on<br />

October <strong>21</strong>, 2003, and was executed on November 23, 2003. Keith & Schnars was selected to perform the consultant<br />

services associated with the Buffalo Canal/Frog Creek Watershed Management Program. The agreement and Work<br />

Order #1 with Keith & Schnars were executed on January 30, 2004, and February 11, 2004, respectively. Under the first<br />

work order, Keith and Schnars performed a basic Watershed Evaluation, identified voids in the current topographic<br />

information, and prepared a cost estimate to complete the Topographic Information, Watershed Evaluation, and<br />

Watershed Management Plan elements. Work Order #1 tasks were completed. The consultant services agreement with<br />

Keith & Schnars has been terminated, and staff has negotiated a new agreement with Jones Edmunds & Associates to<br />

complete the project within the original schedule and budget. Agreement with JEA to complete the Watershed Evaluation<br />

and the Watershed Management Plan tasks was executed on September <strong>21</strong>, 2005. The first work order with JEA has<br />

been executed to complete the existing watershed feature data evaluation and assembly and 80% of the hydrologic<br />

feature inventory, hydraulic feature inventory, and field reconnaissance. Under this work order JEA will begin tasks that<br />

are not contingent upon the LiDAR deliverables. Additionally, staff executed a work order with one of the District's<br />

approved aerial mapping vendors to develop digital topographic information for the entire watershed using LiDAR. The<br />

watershed was flown in conjunction with the Peace River topographic mapping project (P692). The digital topographic<br />

information has been approved by the District and has been transmitted to JEA to complete this project. Submitted<br />

deliverables for Work Order #1 have been reviewed by staff. An amendment to the JEA agreement has been executed<br />

on November 6, 2006, to revise the project schedule and amend the contract termination date. Additionally, the<br />

0<strong>21</strong> - Manasota Basin 255


L007<br />

Manatee - WMPlan BUFFALO CANAL/FROG CREEK<br />

cooperative funding agreement has been amended to extend the contract termination date. A second work order with<br />

JEA has been executed to complete the Watershed Evaluation and the Watershed Management Plan. JEA has<br />

submitted the first deliverable, Digital Topographic Information, under Work Order #2 for review. Work Order #2,<br />

Deliverable 1 has been reviewed by District staff. Deliverables 2 & 3, as part of the Watershed Evaluation, are anticipated<br />

to be submitted mid May. Work Order #2, Deliverable 2 has been submitted and is currently under review by District<br />

staff. The remaining tasks under Watershed Evaluation, Work Order #2, Deliverables 3 to 5, were submitted to the<br />

District for review. An update meeting was held with the consultant and Manatee County on November 13, 2007 and<br />

Jones Edmunds showed the project progress thru Watershed Evaluation. Work Order #2, Deliverables 6 and<br />

7-Surveying, has been completed and is currently under review with District staff. The cooperative funding agreement<br />

and the consultant services agreement have been amended to extend the contract termination date from December 31,<br />

2007 to December 31, 2008. District staff has completed the review for Work Order #2, Deliverables 3 thru 7 and<br />

comments have been sent to the consultant to address. Consultant is 90% complete with work pertaining to Work Order<br />

#2, Invoice 8 - Watershed Parameterization. Work Order #2, Invoice 8 - Watershed Parameterization is currently under<br />

review by the District. The District has provided comments to the consultant on Work Order #2, Invoice 8 - Watershed<br />

Parameterization. They are to be addressed in the next submittal. Currently, the consultant is wrapping up the model<br />

development and floodplain delineation tasks. Both tasks are projected to be completed by December 31, 2008. An<br />

extension to the cooperator and consultant agreements is required to complete the Level of Service task, which will<br />

follow the additional tasks of peer review, public notification/meeting, 45-day review and comment period to the project,<br />

as part of a separate agreement. Work Order #2, Invoices 9 & <strong>10</strong> deliverable was submitted on January <strong>10</strong>, 2009.<br />

Review comments were discussed with JEA on January 27, 2009. A resubmittal of Work Order #2, Invoices 9 & <strong>10</strong><br />

deliverable was submitted on May 18, 2009. A new cooperator agreement, extending the termination date to December<br />

31, 2009 has been sent to Manatee County for signature. Likewise, a new consultant agreement, extending the<br />

termination date to October 31, 2009 has been sent to JEA and executed on January 29, 2009 by the District. Current<br />

Status: A final submittal of Work Order #2, Invoice <strong>10</strong> was submitted on August 14, 2009. A discussion of this submittal,<br />

along with the usage of a multi-day storm will be held with the County September 8, 2009. A first amendment to the JEA<br />

agreement has been sent to them for signature, extending the expiration date to October 31, 20<strong>10</strong>. Likewise, an<br />

amendment to the cooperative agreement will need to be done to extend the expiration date. A purchase order for peer<br />

review has been executed to bring on Engineering & Applied Science, Inc. to conduct peer review of floodplain results.<br />

0<strong>21</strong> - Manasota Basin 256


L0<strong>10</strong><br />

Manatee - WMPlan GAMBLE CREEK<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Manatee County<br />

Project Manager NGUYEN, NAM<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This multi-year funded project is to perform the 1) Topographic Information, 2) Watershed Evaluation, and 3)<br />

Watershed Management Plan elements of the District's Watershed Management Program (WMP) for the GAMBLE<br />

CREEK Watershed. The watershed occupies approximately 56 square miles in northern Manatee County and<br />

discharges into the Manatee River. The watershed is experiencing rapid development without the benefits of a detailed<br />

Watershed Management Plan.<br />

Benefits<br />

The WMP provides a method to evaluate the capacity of a watershed to protect, enhance, and restore water quality<br />

and natural systems, while achieving flood protection. The information developed provides the science for the District's<br />

Resource Management and Environmental Resource Permitting (ERP). It assists local governments: 1) With their land<br />

management responsibilities by establishing a level of service and developing Best Management Practices (BMPs) to<br />

address level of service deficiencies and 2) Provides a Geodatabase and projected results from watershed model<br />

simulations for floodplain management and water quality management.<br />

Costs<br />

The total budget amount for this project is $900,000, of which the District's share is $450,000 funded by the Manasota<br />

Basin. The County is contributing $450,000. Each party funded $125,000, $200,000, and $125,000 for the project in<br />

FY2004, FY2005, and FY2006 respectively. When each element is completed the project budget and scope of work<br />

may be refined based on the information gathered. The District funding amounts shown in the table include staff<br />

salaries.<br />

Additional Information<br />

A WMP includes five major elements: 1) Topographic Information, 2) Watershed Evaluation, 3) Watershed<br />

Management Plan, 4) Implementation of Best Management Practices, and 5) Maintenance of Watershed Parameters<br />

and Models. Implementing elements of the WMP with local governments is one of the Comprehensive Watershed<br />

Management (CWM) initiative strategies and one of the District's Strategic Priorities. A cooperative funding revenue<br />

agreement with Manatee County was developed as a multi-year funded project to complete the WMP elements<br />

through the Watershed Management Plan. The District is managing the project and will enter into purchase orders<br />

and agreements to accomplish project tasks. Future cooperative funding requests and agreements will be required for<br />

a BMP alternative analysis, the Implementation of BMPs, and Maintenance of Watershed Parameters and Models.<br />

With FY2004 and FY2005 year funding the Topographic Information and Watershed Evaluation should be completed.<br />

With FY2005 funding the work on the Watershed Management Plan element began and should be completed with<br />

FY2006 funds. Work on Watershed Management Plan element will include the following tasks: survey, data<br />

management and development of watershed parameters, GIS processing, computer modeling, floodplain analysis,<br />

and establishment of LOS.<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 478,250 0 7,175 <strong>10</strong>,174<br />

0 495,599<br />

District Budgeted - Outside Revenue<br />

Manatee - Gamble Ck W/S Mgmt Plan<br />

(L0<strong>10</strong>)<br />

Prior<br />

Funding<br />

0<strong>21</strong> - Manasota Basin 257<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

125,000 0 0<br />

0<br />

Total:<br />

Future<br />

Funding<br />

0<br />

Total<br />

Funding<br />

125,000<br />

$620,599


L0<strong>10</strong><br />

Manatee - WMPlan GAMBLE CREEK<br />

Critical Project Milestones Projected Amended Actual<br />

1. Critical Project Milestones<br />

Recognition of District, Basin Board, County on reports 6/4/03 6/4/03<br />

Select Consultant 6/4/03 6/4/03<br />

Draft Coop Agreement to Management Services 7/15/03 7/15/03<br />

Approval of Cooperative Agreement by Manasota Basin Board 8/12/03 8/12/03<br />

Approval of Cooperative Agreement by Governing Board 8/26/03 8/26/03<br />

Begin Negotiations with Consultant 8/26/03 8/26/03<br />

Execution of Cooperative Agreement by Manatee County <strong>10</strong>/<strong>21</strong>/03 <strong>10</strong>/<strong>21</strong>/03<br />

Execution of Cooperative Agreement by SWFWMD 11/23/03 11/23/03<br />

Consultant Agreement to Management Services 11/26/03 11/26/03<br />

Execution of Agreement by Consultant 2/6/04 2/2/04 2/2/04<br />

Execution of Agreement by SWFWMD 2/13/04 2/18/04<br />

Issue Notice to Proceed to Consultant/ Work Order #1 2/13/04 2/25/04<br />

Requisition to Encumber FY2006 Funds <strong>10</strong>/18/05 <strong>10</strong>/18/05<br />

First Amendment to Consultant Agreement <strong>10</strong>/31/05 <strong>10</strong>/17/05<br />

Execution of Consultant's Work Order #2 by SWFWMD 11/18/05 5/29/07 5/29/07<br />

Execution of Consultant's Work Order #3 by SWFWMD 7/9/07 7/9/07<br />

Execution of Consultant's Work Order #4 by SWFWMD 3/28/08 5/27/08<br />

Termination of Consultant Agreement 6/30/<strong>10</strong><br />

Termination of Cooperative Agreement <strong>10</strong>/1/<strong>10</strong><br />

1. Critical Project Milestones<br />

Execute Expired Consultant Agreement (04CONC00013-A) 3/20/07 3/20/07<br />

Execute Expired Cooperative Agreement (04REV00<strong>10</strong>-A) 6/14/07 6/14/07<br />

Execute First Amendment to Expired Consultant Agreement (04CONC00013-A) 9/15/08 9/15/08<br />

Execute First Amendment to Expired Cooperative Agreement (04REV00<strong>10</strong>-A) 12/29/08 12/29/08<br />

Execute Third Amend. to Consultant Agrmt. (04CONC00013-A) <strong>10</strong>/1/09<br />

Execute Second Amend. to Coop. Agrmt. (04REV00<strong>10</strong>-A) <strong>10</strong>/1/09<br />

2. Watershed Management Program Elements<br />

Commence Element 1, Digital Topographic Information 2/25/04 2/25/04<br />

Commence Element 2, Watershed Evaluation 5/25/04 2/25/04<br />

Complete Element 1, Digital Topographic Information 11/30/05 2/25/06 12/1/07<br />

Complete Element 2, Watershed Evaluation 5/1/06 12/25/06 12/1/07<br />

Commence Element 3, Watershed Management Plan 5/1/06 2/25/07 11/1/07<br />

Complete Element 3, Watershed Management Plan <strong>10</strong>/1/<strong>10</strong><br />

Status As Of: September 03, 2009<br />

At their August 2003 meetings, both the Manasota Basin Board and the Governing Board approved the FY2004 budget<br />

for the project, approved the cooperative agreement with Manatee County for $900,000, authorized staff to assign a<br />

consultant and enter into contract negotiations, and authorized the Executive Director to execute the consultant contract<br />

up to the FY2004 budgeted amount ($250,000). The Cooperative Funding Agreement was approved by the BCC on<br />

October <strong>21</strong>, 2003, and was executed on November 23, 2003. PBS&J was selected to perform the consultant services<br />

associated with the Gamble Creek Watershed Management Program. The agreement and Work Order #1 with PBS&J<br />

were executed on February 18, 2004, and February 25, 2004, respectively. Under the first work order, PBS&J performed<br />

a basic Watershed Evaluation, identified voids in the current topographic information, and prepare a cost to complete the<br />

Topographic Information, Watershed Evaluation, and Watershed Management Plan elements. The consultant has<br />

submitted the report on the preliminary evaluation of the watershed and probable costs to complete the first three<br />

elements of the WMP. The First Amendment to the PBS&J's services agreement was executed on October 17, 2005, to<br />

amend the compensation and budget to included approved FY2005 and FY2006 funds. Work Order #2 will complete the<br />

Watershed Evaluation. Work Order #2 was executed on November 18, 2005. Additionally, a work order to develop digital<br />

topographic information for the entire watershed using LiDAR has been executed with 3001, Inc. The watershed was<br />

flown in conjunction with the Peace River topographic mapping project (P692). By doing so, the project realized a<br />

significant cost savings. Aerial mapping deliverables have been approved by Staff. Work Order #3 to collect all remaining<br />

field measurements has been developed, but staff is waiting on supplementary information to be provided by the<br />

consultant. Completion of the Watershed Evaluation and commencement on the Watershed Management Plan have<br />

been delayed due to delays in the digital topographic information development. Both the consultant services agreement<br />

and cooperative agreement are being amended to extend the contract termination date. The agreement with PBS&J has<br />

0<strong>21</strong> - Manasota Basin 258


L0<strong>10</strong><br />

Manatee - WMPlan GAMBLE CREEK<br />

been extended to October 8, 2008. A project status meeting was held on April 27, 2007 to assess Work Order #2 and set<br />

up Work Order #3. Consultant's field crews have had difficulties gaining access to farm properties to complete field<br />

measurements and therefore delaying the completion of Work Order #2. Work Order #2 will be amended for the work<br />

that could not be done and Work Order #3 will be developed to wrap up the Watershed Evaluation and commence the<br />

Watershed Management Plan. Work Order #3 was executed on 7/9/07. Deliverable 1 of Work Order #3 is anticipated in<br />

September 2007. Work Order #3, Deliverables 1 thru 3, covering the processing of LiDAR data to generate a TIN/DEM,<br />

wrapping up the work for Watershed Evaluation and surveys as part of the Watershed Management Plan has been<br />

delivered to the District for review. District staff is wrapping up the review for Work Order #3, Deliverables 1 thru 3 and<br />

comments will be send to the consultant thereafter. More time was taken for this review is a result of the implemented<br />

increase level of effort to better QA/QC the submittal. The consultant has been instructed to prepare Work Order #4 and<br />

to arrange a project update meeting with Manatee County. A project status meeting with Manatee County was held on<br />

May 14, 2008. Work Order #4 has been signed by the District and a notice to proceed has been given to the consultant,<br />

May 29,2008. Work Order #4, Deliverables 1 thru 3 was delivered to the District on August 22, 2008. A stakeholders<br />

meeting was held on October 8, 2008 at the Manatee County Public Works Department. The 20 largest property owners<br />

and local engineering consultants in the area were invited. The purpose of the meeting was to present our findings from<br />

the work that PBS&J has done thru the Watershed Evaluation element and to get their input based on their knowledge of<br />

the area. Work Order #4, Deliverable 4 was submitted to the District on November 4, 2008. The District's comments for<br />

deliverables 1 thru 4 of Work Order 4 were sent to PBS&J to address. Work Order #4, Deliverable 5 - Calibrated<br />

computer model was submitted to the District on May 1, 2009. The District is currently reviewing the submittal and a<br />

meeting at Manatee County has been set up for May 20, 2009 for the consultant to discuss the model and present the<br />

preliminary floodplain. District & Manatee County comments to Work Order #4, Deliverable 5 were sent to PBS&J on<br />

7/14/09 to address. The District has selected Royal Consulting Services, Inc. to perform the peer review of floodplain<br />

results produced by PBS&J. PBS&J agreement will be modify to reduce by $33,000, to be used for the peer review.<br />

Current Status: A second amendment to the cooperative agreement is currently being routed for signatures, extending<br />

the expiration date to October 1, 20<strong>10</strong>. A third amendment to PBS&J agreement is being routed for signatures, reducing<br />

the project budget by $33,000 to be used to hire Royal Consulting Services, Inc. to peer review the floodplain results.<br />

District and Manatee County has provided comments to PBS&J Work Order #4, Deliverable 5. PBS&J is currently<br />

addressing those comments.<br />

0<strong>21</strong> - Manasota Basin 259


L015<br />

Sarasota County Surface Water Monitoring Program<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Sarasota County<br />

Project Manager PRATER, CORRINA<br />

Task Manager(s)<br />

HEYL, MIKE<br />

Status Ongoing<br />

Description<br />

This FY20<strong>10</strong> cooperative funding project from Sarasota County is for continued rainfall and stream gauge data<br />

collection and analysis at 13 surface water monitoring sites. The County requested to continue the development of the<br />

stage-discharge curves for the sites. The request also included the continuation of field measurements for one more<br />

year to quantify sites influenced by tidal fluctuations. The data and analyses will be used to improve watershed model<br />

calibration and verification, and to quantify freshwater flows to the bays and estuaries. Data collection results and<br />

analyses will support several ongoing projects including the development of watershed plans for Lemon Bay and<br />

Roberts Bay. The County and SWFWMD cooperatively funded the collection of field measurements in FY2004 and<br />

FY2007. In addition to the rating curves, the project will produce one year of daily discharge measurements for each<br />

site. These monitoring sites are important to establishing the volume and timing of freshwater flows into Sarasota's<br />

bays and estuaries and several of the sites are useful for ongoing District MFL studies.<br />

Benefits<br />

The project is intended to provide daily watershed discharge at up to 23 sites. The County and SWFWMD have<br />

cooperatively funded the field measurements for 13 sites since August 2004. Continued collection of rainfall and<br />

stream stage data in FY2008, FY2009, and FY20<strong>10</strong> will support several ongoing projects including the development of<br />

watershed plans for Lemon Bay and Roberts Bay.<br />

Costs<br />

The total project budget is $1,369,516. For FY2007 Sarasota County requested $<strong>10</strong>0,000 from the Manasota Basin<br />

Board. For FY2008 the Manasota Basin Board budgeted an additional $<strong>10</strong>0,000 with an equal match from Sarasota<br />

County. The Manasota Basin Board budgeted $60,000 for the project in its FY2009 budget. The County will provide an<br />

equal match of $60,000 for FY2009. In FY20<strong>10</strong>, the District is requested to fund $60,000. The County will provide an<br />

equal match of $60,000 . The District funding amounts shown in the table include staff salaries, travel and central<br />

garage charges.<br />

Additional Information<br />

A final project report of all data collected through the FY2007 scope of work was received in December 2007. FY2005<br />

and FY2006 Cooperative Funding Applications in the amount of $275,000 District match were approved by the<br />

District. Subsequent to approval, the County declined to use the funds which were then forfeited.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 561,283 0 63,463 61,770<br />

0 686,516<br />

Project Funds Not Budgeted by the<br />

District<br />

Sarasota County 563,000 0 60,000 60,000<br />

0 683,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$1,369,516<br />

Critical Project Milestones Projected Amended Actual<br />

Phase 1<br />

Forward Cooperative Agreement to Contract Administration <strong>10</strong>/31/03 11/<strong>21</strong>/03<br />

Submit Cooperative Agreement to County 12/31/03 12/11/03<br />

0<strong>21</strong> - Manasota Basin 260


L015<br />

Sarasota County Surface Water Monitoring Program<br />

Execution of Agreement by SWFWMD 3/31/04 3/17/04<br />

Issue Notice to Proceed to County 3/31/04 3/17/04<br />

Execution of Agreement by County 3/31/04 3/9/04<br />

County Issue Notice to Proceed to Consultant 4/30/04 7/27/04<br />

Submit Contract Extension to County 7/31/05 8/16/05<br />

Execution of FY2004 Amendment by County 9/30/05 4/30/06<br />

Termination of FY2004 Cooperative Agreement <strong>10</strong>/31/05 7/28/04<br />

Execution of FY2004 Amendment by SWFWMD <strong>10</strong>/31/05 6/30/06<br />

Termination of FY2004 Cooperative Agreement, Amended <strong>10</strong>/31/06 <strong>10</strong>/31/06<br />

Draft Contract for FY2007 Funding <strong>10</strong>/31/06 11/6/06<br />

Submit Cooperative Agreement for County Signature 12/30/06 1/22/07<br />

Board of County Commissioner Approval 2/27/07 3/13/07<br />

Execution of Agreement for FY2007 Funding by SWFWMD 3/<strong>21</strong>/07 3/<strong>21</strong>/07<br />

FY2007 Data Collection Completed 9/30/07 9/30/07<br />

FY2007 Data Final Report Completed 12/31/07 12/31/07<br />

Expiration Date for FY2007 Agreement 3/31/08 12/31/07<br />

Phase 2<br />

Draft New Agreement for FY2008 Funding 9/30/07 2/28/08 6/15/08<br />

Forward Cooperative Agreement for County Signature 11/15/07 6/30/08 7/30/08<br />

Execution of Agreement by County 12/28/07 8/31/08 9/24/08<br />

Execution of Agreement by SWFWMD 1/31/08 9/<strong>10</strong>/08 <strong>10</strong>/1/08<br />

FY 2008 Data Collection Completed 9/30/08 9/30/08<br />

Termination Date for FY 2008 Cooperative Agreement 12/31/08 12/31/08<br />

Phase 3<br />

Draft Amendment to Agreement for FY2009 Funding 9/15/08 1/15/09 3/4/09<br />

Draft FY09 Amendment to Contracts Section 9/22/08 1/15/09 3/9/09<br />

Forward FY09 Amendment for County Signature <strong>10</strong>/15/08 2/15/09 3/31/09<br />

Execution of FY09 Amendment by County <strong>10</strong>/31/08 3/5/09 6/23/09<br />

Execution of FY09 Agreement by District 11/7/08 3/15/09<br />

Status As Of: August 24, 2009<br />

Data collection efforts for FY2009 began October 1, 2008. The agreement to continue the project through FY2009 with<br />

additional funding is undergoing review by the County. The scope for FY2009 remains mostly unchanged with the same<br />

monitoring stations in place. One additional task has been added to the monitoring effort to collect an additional high flow<br />

/discharge event at each station. The FY2009 agreement will be back-dated to October 1, 2008 to coincide with the start<br />

of FY2009 data collection efforts. The amendment was mailed to the cooperater and received back on June 17, 2009.<br />

The amendment will be routed for final execution.<br />

0<strong>21</strong> - Manasota Basin 261


L019<br />

Sarasota - Update W. Para. & Models<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Sarasota County<br />

Project Manager TURNER, DAWN<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This is a multi-year funded project to perform Digital Topographic Information, Watershed Evaluation, Watershed<br />

Management Plan, and Maintenance of Watershed Parameters and Models elements of the District's Watershed<br />

Management Program (WMP) for multiple watersheds within Sarasota County. The county's area is approximately 570<br />

square miles and includes 28 watersheds. The Topographic Information, Watershed Evaluation and Management<br />

Plan elements were completed by the cooperator for 18 watersheds before implementation of the District's Watershed<br />

Management Program Guidelines and Specifications (G&S). This project involves the Maintenance of Watershed<br />

Parameters and Models to the District's G&S where the Topographic Information, Watershed Evaluation and Plan will<br />

reflect the changes in the watershed due to land alterations approved through County and District permitting. Tthe<br />

County wishes to perform maintenance of the watershed parameters and model(s) to reflect approved County capital<br />

improvement projects (CIPs) and developments 35 acres or greater in size or with 8 acres or more of proposed<br />

impervious cover. $400,000 ($200,00 District's share) was approved for FY2009 to continue annual model and<br />

parameter maintenance. In November 2008, the County notified District staff they will not accept the FY2009 funds.<br />

Instead, they will continue the project with funds remaining from previous years, and request funding in FY20<strong>10</strong>.<br />

FY20<strong>10</strong> funding will be used to continue annual model and parameter maintenance to include new information on land<br />

alterations from County CIPs and private land developments, and new topographic information.<br />

Benefits<br />

The WMP provides a method to evaluate the capacity of a watershed to protect, enhance, and restore water quality<br />

and natural systems, while achieving flood protection. The information developed provides the science for the District's<br />

Resource Management and Environmental Resource Permitting (ERP). It assists local governments: 1) With their land<br />

management responsibilities by establishing a level of service and developing Best Management Practices (BMPs) to<br />

address level of service deficiencies. 2) Provides a Geodatabase and projected results from watershed model<br />

simulations for floodplain management and water quality management. The continuous maintenance of watershed<br />

parameters in the GIS database as land alterations are approved will provide the most up to date information about the<br />

watershed.<br />

Costs<br />

The total budget amount for this project varies by year depending on the County's anticipated need for maintenance of<br />

the watershed parameters and models. For FY2005, the District and County each funded $356,666 to perform<br />

updates to the Little Sarasota Bay watershed and Dona Bay watershed models and perform maintenance. For<br />

FY2007, the District share is $356,666 and will be funded entirely by the Manasota Basin. The County will contribute<br />

$766,667. For FY2008, the total maintenance budget is $400,000 with the Manasota Basin and County each<br />

contributing $200,000. $400,000 ($200,00 District's share) was also approved for FY2009. However, in November<br />

2008, the County notified District staff they will not accept the FY2009 funds. Instead, they will continue the project with<br />

funds remaining from previous years, and request funding in FY20<strong>10</strong>. FY20<strong>10</strong> funding will be used to continue annual<br />

model and parameter maintenance to include new information on land alterations from County CIPs and private land<br />

developments, and new topographic information. For FY20<strong>10</strong>, the total maintenance budget is $400,000 with the<br />

Manasota Basin and County each contributing $200,000. Future funding requests will be required to continue<br />

maintenance of watershed parameters and the models. The District funding amounts shown in the table include staff<br />

salaries.<br />

Additional Information<br />

A WMP includes five major elements: 1) Topographic Information, 2) Watershed Evaluation, 3) Watershed<br />

Management Plan (develop and update), 4) Implementation of Best Management Practices, and 5) Maintenance of<br />

Watershed Parameters and Models. Implementing elements of the WMP with local governments is one of the<br />

Comprehensive Watershed Management (CWM) initiative strategies and one of the District's Strategic Priorities. The<br />

County completed Watershed Management Plans for 18 watersheds throughout 1999-2002. The update process<br />

began in FY2003 with the update of the Whitaker Bayou Watershed Management Plan (see K872). Approved funds<br />

for both the Whitaker Bayou Watershed Management Plan and the Myakka River Watershed Management Plan<br />

(K487) are reflected in the prior funding below. The FY2004 funding amount includes the costs to develop digital<br />

topographic information for the entire county using LiDAR technology, to update portions of the existing models to the<br />

0<strong>21</strong> - Manasota Basin 262


L019<br />

Sarasota - Update W. Para. & Models<br />

District's G+S, and to maintain the models. Development of the topographic information and the model updates will be<br />

performed in conjunction with the FEMA Map Modernization project for Sarasota County (see M115). District FY2004<br />

funds were used to develop the topographic information, approximately $1,079,500 of the $2,000,000 in FEMA funds<br />

from the M115 project are going towards updating the models and flood insurance rate maps, and Sarasota County's<br />

FY2004 funds were used to incorporate recent County CIP and private developments greater than 35 acres in size or<br />

with more than 8 acres of proposed impervious cover. With FY2005 funding the model updates in association with the<br />

FEMA Map Modernization project (M115) are continuing, additional coastal areas are being added into the models,<br />

and new County CIP and private land developments are being incorporated as well. With FY2007 funds maintenance<br />

will continue to incorporate new developments and update additional watersheds to the District's G+S. FY2008 fand<br />

FY2009 funding will support maintenance activities. A cooperative funding expenditure agreement with the County, or<br />

a contract amendment, as appropriate, will be developed each year contingent on the approval of funding. A<br />

cooperative funding request will be required from the County each fiscal year. The County will manage the update and<br />

maintenance of the models, where the District's project manager must approve any agreements to accomplish project<br />

tasks. As the updates are completed, the Maintenance of Watershed Parameters and Models will be funded in the<br />

future to be consistent with the District's maintenance project (see B206 and B315).<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 2,430,905 0 2<strong>10</strong>,890 205,085 200,000 3,046,880<br />

District Budgeted - Outside Revenue<br />

FEMA Mapping Activity Statement 1,079,500 0 0<br />

0<br />

0 1,079,500<br />

Project Funds Not Budgeted by the<br />

District<br />

Sarasota County 3,748,333 0 0 200,000 200,000 4,148,333<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$8,274,713<br />

Critical Project Milestones Projected Amended Actual<br />

1. Critical Project Milestones<br />

Reference Project M115 for milestones for FY2004 funding 12/31/04<br />

Recognition of District, Basin Board, County on reports 12/31/09<br />

2. FY2005 Cooperative Funding Agreement<br />

Agreement to Management Services 1/30/05 1/18/05<br />

Negotiate FY2005 Cooperative Funding Agreement with County 4/1/05 11/7/05<br />

Board of County Commissioners Approval 3/<strong>21</strong>/06 4/11/06<br />

Contract Execution 5/15/06 5/4/06<br />

Notice to Proceed 5/15/06 5/4/06<br />

Contract Termination 6/30/08 6/30/09<br />

3. FY2007 Cooperative Funding Agreement<br />

Negotiate FY2007 Cooperative Funding Agreement 8/1/07 7/30/07<br />

FY2007 Agreement to Management Services 8/1/07 8/1/07<br />

Board of County Commissioners Approval 9/30/07 9/25/07<br />

Contract Execution <strong>10</strong>/15/07 <strong>10</strong>/23/07<br />

Submit Requisition for FY2008 Funding 11/9/07 1/25/08<br />

Contract Termination 12/31/09<br />

3. FY2007 Cooperative Funding Agreement<br />

First Amendment to Management Services 9/30/08 1/8/09<br />

County Commission Approval of 1st Amendment 12/1/08 2/11/09<br />

Execute First Amendment 12/31/08 2/19/09<br />

0<strong>21</strong> - Manasota Basin 263


L019<br />

Sarasota - Update W. Para. & Models<br />

Status As Of: August 19, 2009<br />

Reference project M115 for status of topographic information and model updates performed by the District with FY2004<br />

funding. Both the Manasota Basin Board and Governing Board approved changing the management of the FY2004<br />

funds from the County to the District, using the $420,000 in Basin Board funds to update Watershed Management Plans<br />

in conjunction with the FEMA Map Modernization project, and using FEMA funds to serve as the match for the Basin<br />

Board's FY2004 funds. Cooperative Funding Agreement 06C00000087 encumbers FY2005 and FY2006 funds<br />

($713,332 total, $356,666 District's share). Under the agreement two coastal areas that were not previously studied will<br />

be incorporated into the appropriate watershed models. Because the County's existing watershed models were<br />

developed prior to the District's WMP G&S, staff has had to negotiate a compromise on how the G&S will be satisfied. In<br />

addition, seventeen recent developments will be incorporated into existing watershed models as routine maintenance<br />

activities. The agreement and associated documents were approved by the Sarasota BOCC on April 11, 2006, and were<br />

executed by the District on May 4, 2006. A Second Agreement, No. 07C00000<strong>10</strong>5 was executed, and encumbers<br />

FY2007 and FY2008 funds ($356,666 and $200,000 respectively). The First Amendment to Agreement #07C00000<strong>10</strong>5<br />

was executed to expand the scope of work to include updates to the Upper Myakka River/Howard Creek and Lower<br />

Myakka River watersheds. In 2007, the Florida Department of Emergency Management (FDEM) obtained LiDAR<br />

topographic data for the coastal portion of the County. Consequently, Agreement 07C00000<strong>10</strong>5 includes the<br />

development of LiDAR topographic data for the rest of the County, which has come to be called the "Buy-Up" area. Both<br />

the FDEM data and the LiDAR data for the Buy-Up area were scheduled to be complete in January 2008. The LiDAR<br />

data for both areas was only recently delivered (August 2008), 8 months after the anticipated delivery date. The LiDAR<br />

data was finally approved for use on October <strong>10</strong>, 2008. Please refer to M115 for further information regarding the<br />

resulting impacts to the Sarasota Map Modernization project schedule. Current Status: The maintenance reports<br />

associated with the a number of developments have been submitted related to the cooperative agreement using FY2005<br />

funds. Project status meetings have been held with the County's consultants regarding the updates being performed for<br />

Little Sarasota Bay and Dona Bay. The County's consultants are completing the Watershed Evaluation element for their<br />

respective basin areas. In addition, funding will also be allocated for maintenance activities associated with CIPs and<br />

approved developments and to update the existing models based on comments provided by the District, County, and/or<br />

FEMA during the review of the preliminary FIRMs for Sarasota County. For Agreement #06C00000087, a total of<br />

$336,602 of the $356,000 in District funds has been invoiced and paid. The First Amendment to the Agreement<br />

06C00000087 extended the contract expiration date from June 30, 2008 to June 30, 2009. The second Agreement<br />

(Agreement #07C00000<strong>10</strong>5) encumbers FY2007 funds, ($356,666), & FY2008 funds, ($200,000). The First Amendment<br />

to Agreement 07C00000<strong>10</strong>5 was executed to add the Upper and Lower Myakka River watersheds to the list of County<br />

watershed models that may be updated. County staff notified the District they will not have the matching funds for this<br />

project in FY2009. Therefore, the FY2009 funding ($400,000 total, $200,000 District share) has not been added to the<br />

Agreement. Aerial mapping of the portion of the County not covered by the State of Florida Department of Emergency<br />

Management's LiDAR mapping project has been completed to support maintenance. However, delivery of the final<br />

LiDAR topographic information was delayed over <strong>10</strong> months. For Agreement # 07C00000<strong>10</strong>5, a total of $325,784 of the<br />

$556,666 in District funds has been invoiced and paid.<br />

0<strong>21</strong> - Manasota Basin 264


L200<br />

Bradenton - Wares Creek Bridge Replacement<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Flood Protection<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

City of Bradenton<br />

Project Manager FRIES, GEORGE<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This is a multi-year funded project to perform the Implementation of Best Management Practices (BMPs) element of<br />

the District's Watershed Management Program (WMP) for the Wares Creek Watershed. Implementation of BMPs<br />

includes: design, development of construction documents, construction permitting, land acquisition, bidding and<br />

contractor selection, construction of the BMPs and construction engineering and inspection. The watershed is highly<br />

urbanized and covers an area of approximately 2.41 square miles (1,546 acres) and is located in the City of Bradenton<br />

and Manatee County. The City of Bradenton is proposing to replace 4 bridges over Wares Creek. They are the 9th<br />

Ave. West, 12th Ave. West, 14th Ave. West, and 17th Ave. West bridges. In addition, improvements to existing<br />

stormwater facilities that discharge into Wares Creek at the 20th Street West stormwater management system will be<br />

constructed as part of this project. These BMPs were evaluated as part the City of Bradenton Comprehensive<br />

Stormwater Management Study funded by the City, and selected for implementation in the BMP alternative analysis.<br />

The proposed improvements are also included in the City's Five-Year Capital Improvement Plan. For FY2009 funding<br />

was requested to begin construction of the 12th Avenue West Bridge and for topographic survey, geotechnical<br />

investigation and design of the 20th Street West stormwater management system. The proposed BMPs will address<br />

level of service deficiencies. For FY20<strong>10</strong> funding is requested to complete the construction of the 12th Avenue Bridge<br />

and to begin construction of the 14th Avenue Bridge and to complete the design of the 20th Street West Stormwater<br />

Management System.<br />

Benefits<br />

These BMPs are in conjunction with the $55,000,000 United States Army Corps of Engineer's (USACE) Cedar<br />

Hammock (Wares Creek) Flood Control Channel improvements project, in which the USACE will dredge and widen<br />

the creek to provide an increased level of flood protection. The District is co-funding the Wares Creek project with<br />

Manatee County (K253) to provide the local sponsor's funding obligation. The USACE did not participate in funding the<br />

replacement of the City's bridges or improvements to the City's existing stormwater systems. The bridge replacements<br />

target flood protection on an intermediate conveyance way, and address the local government's level of service<br />

deficiencies by reducing flood levels where the bridges are over topped, homes damaged, and private property and<br />

streets are flooded.<br />

Costs<br />

Funding for this project was provided in the Manasota Basin Board budgets of FY2005 ($50,000); FY2006 ($200,000);<br />

FY2007 ($500,000); FY2008 ($500,000); FY2009 ($500,000); and FY20<strong>10</strong> ($500,000) for a total funding commitment<br />

to date of $2,250,000. The total projected cost for this project is $7,800,000 of which the District's multi-year share is<br />

$3,900,000 and the City's share is $3,900,000. The probable construction costs for this project are based on a BMP<br />

alternative analysis developed by the cooperator. Future funding is required to complete the project. When each<br />

element is completed the project budget and scope may require refinement based on the information developed. The<br />

District funding amounts shown in the table includes staff salaries.<br />

Additional Information<br />

The WMP includes five major elements: 1) Topographic Information, 2) Watershed Evaluation, 3) Watershed<br />

Management Plan, 4) Implementation of BMPs, and 5) Maintenance of Watershed Parameters and Models.<br />

Implementing elements of the WMP with local governments is one of the Comprehensive Watershed Management<br />

(CWM) initiative strategies and one of the District's Strategic Priorities. The WMP provides a method to evaluate the<br />

capacity of a watershed to protect, enhance, and restore water quality and natural systems while achieving flood<br />

protection. A cooperative funding expenditure agreement with the City has been developed contingent on the approval<br />

of future funding to complete the Implementation of BMPs. With FY2005 funding the work on the Implementation of<br />

BMPs began and included the following tasks: topographic surveys, geo-technical investigations, hydrologic and<br />

hydraulic investigation and preparation of a preliminary design report. For FY2006 funding was requested for<br />

development of the construction documents and obtaining permits for the four bridges. For FY2007 funding was<br />

requested to begin construction of the 9th Avenue Bridge, for construction engineering and inspection and for survey,<br />

geotechnical investigation and start of design on the 20th Street West stormwater management system. In FY2008<br />

funding was requested to complete construction of the 9th Avenue West Bridge. For FY2009, funding was requested<br />

to complete construction of the 12th Avenue West Bridge and begin construction of the 14th Avenue West bridge and<br />

0<strong>21</strong> - Manasota Basin 265


L200<br />

Bradenton - Wares Creek Bridge Replacement<br />

for design and geotechnical investigation at the 20th Street West Stormwater Management System. This is a<br />

multi-year funded project that will require a cooperative funding request each fiscal year until completed. The project<br />

will be ranked and compete for funding in future fiscal years. The City will manage this project, where the District<br />

project manager must approve any agreements to accomplish project tasks.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 1,260,498 0 503,200 503,242 1,650,000 3,916,940<br />

Project Funds Not Budgeted by the<br />

District<br />

City of Bradenton 1,250,000 0 500,000 500,000 1,650,000 3,900,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$7,816,940<br />

Critical Project Milestones Projected Amended Actual<br />

1. Critical Project Milestones<br />

District logo will be provided on construction signs 12/1/07 5/1/<strong>10</strong><br />

2. Cooperator Agreement<br />

Agreement to Contracts Administration 8/1/04 <strong>10</strong>/20/04<br />

Agreement back from Contracts Administration 9/<strong>10</strong>/04 11/1/04<br />

Contract Executed <strong>10</strong>/1/04 12/29/04<br />

Notice to Proceed to City <strong>10</strong>/2/04 12/29/04<br />

2A. Consultant Services (FY2005 Funding)<br />

Consultant Selected (JEA) 3/1/05 11/30/04 11/22/04<br />

Survey & Geotechnical Complete 8/31/05 4/30/05 8/25/05<br />

Hydraulic & Hydrologic Investigation 12/31/05 6/30/06 3/31/06<br />

3. First Amendment (FY2006 Funding)<br />

Amendment Executed 9/<strong>21</strong>/05 9/<strong>21</strong>/05<br />

FY2006 Funds Encumbered <strong>10</strong>/1/05 1/6/06<br />

3A. Consultant Services (FY2006 Funding)<br />

Preliminary Plans (4 bridges) <strong>10</strong>/1/05 6/12/06<br />

Final Plans & Specifications (9th Ave W & 17th Ave W bridges) 8/31/06<br />

Permitting (9th Ave W & 17th Ave W bridges) 4/1/07<br />

4. Second Amendment (FY2007 Funding)<br />

Amendment Executed <strong>10</strong>/1/06 8/14/06<br />

FY2007 Funds Encumbered <strong>10</strong>/2/06 1/23/07<br />

4A. Consultant & Construction Services (FY2007 Funding)<br />

Hydraulic & Hydrologic Modeling 1/30/07 8/31/08<br />

Final Plans and Specifications for the 9th Ave. Bridge 2/28/07 3/31/09<br />

Permitting for the 9th Ave. Bridge 3/31/07 7/31/09<br />

Bidding & Contr. Selection for 9th Ave. Bridge 5/31/07 11/30/09<br />

Final Plans & Specs for 12th, 14th & 17th Ave. Bridges 5/31/07 8/31/07<br />

Complete Survey, Borings & 30% Design of 20th St. Stormwater Facility<br />

Improvements<br />

6/30/07 6/30/09<br />

Contract award for 9th Ave. Bridge 6/30/07 3/1/<strong>10</strong><br />

Commence Construction of 9th Ave. Bridge 9/1/07 5/1/<strong>10</strong><br />

Complete Construction of 9th Ave. Bridge 6/1/<strong>10</strong> 4/1/11<br />

4B. Third Amendment (FY2008 Funding)<br />

Amendment Executed <strong>10</strong>/1/07 7/26/08<br />

FY2008 Funds Encumbered <strong>10</strong>/2/07 6/4/08<br />

0<strong>21</strong> - Manasota Basin 266


L200<br />

Bradenton - Wares Creek Bridge Replacement<br />

4C. Fourth Amendment (FY2009 Funding)<br />

Amendment Executed 1/31/09 3/27/09<br />

FY2009 Funds Encumbered 2/1/09 11/7/08<br />

4D. Consultant & Construction Services (FY2009 Funding)<br />

Plans & Profiles for 4bridges sufficient to submit for permits 12/31/08<br />

Bidding & Contr. Selection for 12th Ave. Bridge 11/30/<strong>10</strong><br />

Contract Award for 12th Ave. Bridge 3/1/11<br />

Commence Construction of 12th Ave. Bridge 5/1/11<br />

5. Contract Completion<br />

Cooperator Agreement Expiration <strong>10</strong>/1/07 12/31/11<br />

Status As Of: August 24, 2009<br />

Status History: The Cooperative Funding Agreement was executed on December 29, 2004. The City contracted with<br />

Jones Edmunds & Associates (JEA) to perform the engineering work on the project. Topographic surveying and<br />

geo-technical work were completed and existing hydraulic & hydrologic data were collected. The City requested<br />

additional cooperative funding for FY2006 and a contract amendment to incorporate the FY2006 funds was executed on<br />

September <strong>21</strong>, 2006. A preliminary hydrologic and hydraulic report was submitted. The City applied for FY2007 funding<br />

to perform additional field survey work, to perform additional hydraulic and hydrologic studies and to begin construction of<br />

the 9th Avenue Bridge. The Preliminary Design Report was submitted on June 12, 2006 and comments were provided to<br />

the City. The hydraulic modeling of Wares Creek was submitted for review and comments on October 20, 2006. District<br />

staff met with the City's consultant in March 2007 to discuss the results of the hydraulic modeling. A pre-application<br />

meeting with Sarasota Regulatory staff was held on April 25, 2007 to discuss the project. City staff is concerned with the<br />

status of the water quality certificate (WQC) which the Army Corps of Engineers (ACOE) is requesting from the FDEP, in<br />

particular, with the conditions which might be attached to the WQC and what additional work may be required in order for<br />

the City to obtain a permit from the District. The consultant is continuing work on the modeling of the creek hydraulics<br />

and hydrology. A progress meeting was held at District headquarters on April 28, 2008 to discuss the modeling effort,<br />

future cooperative funding, ACOE permitting status and other items. The City's consultant (JEA) met with the Sarasota<br />

Regulatory staff on August 20, 2008 for a second pre-application meeting. District staff met with the city project manager<br />

and the consultant on October 16, 2008 to discuss project status and progress. Action-to-date: This project has been<br />

delayed partly in response to the delays in the ACOE proceeding with the Wares Creek Dredging project. The City is<br />

working with FDOT to see if Federal stimulus funding is available for this project. The City's consultant is continuing with<br />

data gathering and modeling in preparation for submitting a permit application for the 9th Avenue Bridge. The fourth<br />

amendment to the cooperative funding agreement was executed. This amendment adds the FY2009 cooperative funding<br />

and revises the project schedule.<br />

0<strong>21</strong> - Manasota Basin 267


L206<br />

FYN Builder/Dev Charlotte, Manatee, Sarasota<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply, Water Quality, Natural Systems<br />

Basin(s) Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager DURELL, SYLVIA<br />

Task Manager(s)<br />

Status Completed<br />

Charlotte County, Charlotte Harbor National Estuary Program, Manatee County, Manatee County<br />

Cooperative Extension Service, Sarasota Bay Estuary Program, Sarasota County<br />

Description<br />

This program provided education on Florida-friendly landscaping primarily to builders, developers and landscape and<br />

irrigation professionals through conferences, workshops, one-on-one interactions, newspaper articles, electronic<br />

media and distribution of printed materials. The coordinator also certified the landscape section of the model homes<br />

being reviewed for the Florida Green Building Coalition's certification criteria. Because new home building declined and<br />

to enhance consistency, outreach to builders, developers and landscape professionals has been consolidated under<br />

the Florida Water Star GoldSM program (B277). For that reason, and at staff's request, Manatee County withdrew its<br />

application for funding of the FYN Charlotte, Manatee, Sarasota Builder/Developer program for FY20<strong>10</strong>.<br />

Benefits<br />

Reognizing that the majority of decisions concerning new landscapes are made by builders, developers, landscape<br />

and irrigation professionals, this program benefitted water resources by promoting the use of the nine Florida Yards &<br />

Neighborhoods principles to that audience. Approximately 5,000 builders, developers, landscape and irrigation<br />

specialists and realtors received education annually on Florida-friendly landscaping and best management practices<br />

through personal meetings and workshops.<br />

Costs<br />

The total cost of the FY2009 project was $141,000, with the District contibuting $70,500, (Manasota $52,875): (Peace<br />

River $17,625). District funds supported the contracted outreach coordinator's salary, travel, training, materials and<br />

office expenses. Manatee County provided in-kind support for administrative and supervisory support, office expenses<br />

including a computer, telephone, office supplies and promotional materials. Budget lines below included costs for staff<br />

to manage the project.<br />

Additional Information<br />

The District funded education outreach to builders and developers in the tri-county area from FY2005 to FY2009.<br />

Education was based on the nine Florida-friendly landscapingTM principles that were created by the University of<br />

Florida/Institute of Food and Agricultural Sciences for the FYN program: Right Plant, Right Place, Water Efficiently,<br />

Fertilize Appropriately, Mulch, Attract Wildlife, Manage Yard Pests Responsibly, Recycle, Reduce Stormwater Runoff<br />

and Protect the Waterfront. Education outreach for the six months the FY2009 program was active includes the<br />

following: 27 group presentations/workshops to 80 people; 1,378 contacts with individuals; 177 building or green<br />

industry contacts; 22 FWSG contacts; 203 HOA,COA contacts; 3 realtor contacts; 1 exhibit attracting 30,000 people;<br />

900 pieces of educational materials distributed and 4 newsletter articles that potentially reached 1,050 people per<br />

issue and 5 newspaper articles that potentially reached 276,<strong>10</strong>1 people.<br />

0<strong>21</strong> - Manasota Basin 268


L206<br />

FYN Builder/Dev Charlotte, Manatee, Sarasota<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 76,242 0 20,005<br />

0<br />

0 96,247<br />

0<strong>21</strong> Manasota Basin 224,468 0 53,708<br />

0<br />

0 278,176<br />

Project Funds Not Budgeted by the<br />

District<br />

Charlotte County 45,000 0 15,000<br />

0<br />

0 60,000<br />

Manatee County 95,000 0 46,000<br />

0<br />

0 141,000<br />

Sarasota Bay Estuary Program 53,000 0 3,500<br />

0<br />

0 56,500<br />

Sarasota County <strong>10</strong>3,000 0 6,000<br />

0<br />

0 <strong>10</strong>9,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$740,923<br />

Critical Project Milestones Projected Amended Actual<br />

FY2008<br />

Purchase order created <strong>10</strong>/1/07 <strong>10</strong>/1/07<br />

First advisory committee meeting 1/17/08 1/17/08<br />

First task report 1/17/08 1/17/08<br />

Second advisory committee meeting 4/17/08 4/17/08<br />

Second task report 4/30/08 4/17/08<br />

Third advisory committee meeting 7/17/08 8/14/08 8/14/08<br />

Third task report 7/24/08 7/24/08<br />

Project complete 9/30/08 9/30/08<br />

Fourth advisory committee meeting: <strong>10</strong>/16/08 <strong>10</strong>/16/08<br />

Fourth task report: <strong>10</strong>/31/08 <strong>10</strong>/<strong>10</strong>/08<br />

FY2009<br />

Purchase order created <strong>10</strong>/<strong>10</strong>/08 11/1/08 <strong>10</strong>/27/08<br />

First advisory committee meeting 1/13/09 1/13/09<br />

First task report 1/30/09 1/3/09<br />

Second advisory committee 4/15/09 4/14/09<br />

Second task report 4/30/09 4/15/09<br />

Project complete 9/30/09 5/30/09 5/30/09<br />

Status As Of: August 20, 2009<br />

ACTION TO DATE: Completed. Manatee County has withdrawn its application for funding of the FYN Charlotte,<br />

Manatee, Sarasota Builder/Developer program for FY20<strong>10</strong>. Michelle Atkinson, former FYN Builder & Developer<br />

Coordinator for Charlotte, Manatee and Sarasota counties, is now the FYN coordinator for homeowner outreach in<br />

Manatee County. Total FY2009 funding for this project was $70,500. The final invoice was approved 7/16/2009.<br />

Expenditures for FY2009 total $41,125, leaving a balance of $29,375. Education outreach for the six months the program<br />

was active includes the following: 27 group presentations/workshops to 80 people; 1,378 contacts with individuals; 177<br />

building or green industry contacts; 22 FWSG contacts; 203 HOA,COA contacts; 3 realtor contacts; 1 exhibit attracting<br />

30,000 people; 900 pieces of educational materials distributed and 4 newsletter articles that potentially reached 1,050<br />

people per issue and 5 newspaper articles that potentially reached 276,<strong>10</strong>1 people.<br />

0<strong>21</strong> - Manasota Basin 269


L2<strong>10</strong><br />

Implementation of BMPs - Phillippi Creek/Celery Fields<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Sarasota County<br />

Project Manager LOPEZ, MANNY<br />

Task Manager(s)<br />

Status Ongoing<br />

PRESTON, MATT<br />

Description<br />

This is a multi-year funded project to perform the Implementation of Best Management Practices (BMPs) element of<br />

the District's Watershed Management Program (WMP) for the Phillippi Creek Watershed. The watershed covers an<br />

area of approximately 56 square miles and is located in Sarasota County (County). This BMP will be implemented in<br />

the Celery Fields improvement area and specifically includes construction of additional storage to the existing south<br />

cell of the Celery Fields Regional Stormwater Facility. Implementation of the BMP includes the following tasks:<br />

construction and construction engineering and inspection. The proposed BMP will address level of service<br />

deficiencies. In addition, 120-acres of the southern cell pond of Celery Fields will be excavated to create a wetland<br />

habitat that will provide natural systems benefits.<br />

Benefits<br />

The project will provide additional storage within the watershed and, thereby, provide an improved level of service.<br />

These improvements will address structure flooding downstream along Phillippi Creek by providing flood protection for<br />

15 homes currently inundated and damaged during a <strong>10</strong>0-year flood event. Based on an Expected Damages Analysis,<br />

the expected flood damages to be mitigated by the project for a <strong>10</strong>0-year flood event is approximately $2.17 million.<br />

This project is also expected to improve water quality through increased residence times.<br />

Costs<br />

The current total budget for this project is $16.873 million. The FDEP is providing the County with a grant of<br />

$<strong>10</strong>,079,880 toward the project. The District's contribution is $2,903,060, which is being funded entirely by the<br />

Manasota Basin. The County will contribute $4,383,560. Implementation costs for the project are significantly greater<br />

than originally estimated in 2001. The District funding amounts shown in the table include staff salaries, travel and<br />

central garage.<br />

Additional Information<br />

A WMP includes five major elements: 1) Topographic Information, 2) Watershed Evaluation, 3) Watershed<br />

Management Plan, 4) Implementation of Best Management Practices, and 5) Maintenance of Watershed Parameters<br />

and Models. Implementing elements of the WMP with local governments is one of the Comprehensive Watershed<br />

Management (CWM) initiative strategies. A WMP provides a method to evaluate the capacity of a watershed to<br />

protect, enhance, and restore water quality and natural systems, while achieving flood protection. This project involves<br />

the Implementation of BMPs which includes design, development of construction documents, construction permitting,<br />

land acquisition, bidding and contractor selection, construction of the BMPs and construction engineering and<br />

inspection. The original budget for the project was around $2.9 million and was based on a November 2001<br />

preliminary design report prepared by the County. The County is managing the project, and the District project<br />

manager must approve any agreements to accomplish project tasks.<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 2,912,911 0 4,171 12,381<br />

0 2,929,463<br />

Project Funds Not Budgeted by the<br />

District<br />

Florida Department of Environmental<br />

Protection<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

<strong>10</strong>,079,880 0 0<br />

0<br />

0<br />

<strong>10</strong>,079,880<br />

Sarasota County 4,383,560 0 0<br />

0<br />

0 4,383,560<br />

0<strong>21</strong> - Manasota Basin 270<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$17,392,903


L2<strong>10</strong><br />

Implementation of BMPs - Phillippi Creek/Celery Fields<br />

Critical Project Milestones Projected Amended Actual<br />

1. Contract Development and Execution<br />

Draft Agreement to Management Services 1/7/04 1/6/05<br />

Negotiate Cooperative Funding Agreement with County 9/27/04 1/3/05<br />

Draft Agreement returned from Management Services 2/1/05 1/14/05<br />

Board of County Commissioners Approval 4/1/05 2/22/05<br />

Notice to Proceed 5/1/05 3/4/05<br />

Requisition to Encumber FY2006 Funds <strong>10</strong>/18/05 <strong>10</strong>/18/05<br />

Draft Amendment to Management Services 12/15/06 5/31/07 7/16/07<br />

Draft Amendment returned from Management Services 1/22/07 6/30/07 8/2/07<br />

Board of County Commissioners Approval 2/28/07 7/30/07 9/25/07<br />

Execute Amendment 3/30/07 8/31/07 <strong>10</strong>/9/07<br />

Requisition to Encumber FY2008 Funds <strong>10</strong>/30/07 <strong>10</strong>/30/07<br />

2. Critical Project Milestones<br />

Alternatives Analysis Complete 4/30/05 3/4/05<br />

Acquire All Permits, Government Approvals, & Real Property Rights for Project 8/26/05 3/30/09 6/1/09<br />

Complete Design and Permitting <strong>10</strong>/11/05 5/30/09 6/<strong>10</strong>/09<br />

Bidding and Contractor Selection 3/13/06 7/30/09 7/7/09<br />

Commence Construction 3/18/06 9/30/09<br />

Complete Construction 1/12/07 6/30/<strong>10</strong><br />

Construction Site Signage will Recognize Funding 12/15/07 9/30/09<br />

3. Project Close Out<br />

Submit As-Builts 2/11/07 7/30/<strong>10</strong><br />

Contract Termination 12/31/07 11/30/11<br />

Status As Of: August 27, 2009<br />

Sarasota County has completed the bid review process and has selected Brooks & Freund, LLC as the construction<br />

contractor for the project. The pre-construction conference was held August 2009. Project construction mobilization has<br />

begun; construction is scheduled to begin mid September 2009. ACTIONS-TO-DATE: On Schedule. Project construction<br />

is scheduled for completion in October 20<strong>10</strong>.<br />

0<strong>21</strong> - Manasota Basin 271


L230<br />

Longboat Key Backup Potable Water Supply Interconnect<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Longboat Key<br />

Project Manager MCBRIDE, TAMERA<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This project includes the design and construction of a subaqueous crossing of New Pass with approximately 2,400<br />

linear feet of 16-inch diameter potable water pipeline. The original proposal was for a 2,000 linear foot 12-inch pipeline;<br />

however, the pipeline was lengthened and rerouted due to permitting issues. The Town of Longboat Key will connect<br />

to the potable water supply system of the City of Sarasota on City Island from Longboat Key's potable water supply<br />

system on the south side of the key. The project will provide the Town with an unspecified amount of back-up potable<br />

water in the event supplies are not available from the Town's current supplier, Manatee County. It was originally<br />

anticipated that the City would supply the Town in emergency situations only, such as if a natural disaster interrupted<br />

supply from Manatee County. However, the Town now envisions that the City will eventually serve as a back-up<br />

supplier in order to meet the Town's peak demands.<br />

Benefits<br />

The project will enable the Town of Longboat Key to receive a reliable supply of potable water in the event supplies are<br />

not available from Manatee County.<br />

Costs<br />

The District's share of the project is expected to be $1,000,000. The Manasota Basin Board originally budgeted<br />

$50,000 toward completion of the project in FY2005, and an additional $200,000 was transferred from the Water<br />

Supply and Resource Development fund for a total contribution of $250,000 in FY2005. The basin board budgeted<br />

$250,000 in FY2006, $250,000 in FY2007, and $250,000 in FY2008. A cost benefit cannot be calculated, since no new<br />

water supplies will be developed as a result of the project.<br />

Additional Information<br />

The total eligible cost of the project is $2,000,000, of which design represents $500,000 and construction represents<br />

$1,500,000. The Town will be solely responsible for the upsizing of 3.5 miles of existing 8, <strong>10</strong>, and 12-inch water<br />

mains along Gulf of Mexico Drive, and for the pump system and emergency generator upgrades at the south and<br />

mid-key water stations. This $2,200,000 portion of the project is not eligible for funding.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 1,008,204 0 4,629 5,016<br />

0 1,017,849<br />

Project Funds Not Budgeted by the<br />

District<br />

Longboat Key 6,156,958 0 0<br />

0<br />

0 6,156,958<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$7,174,807<br />

Critical Project Milestones Projected Amended Actual<br />

Draft Agreement to Management Services 3/<strong>21</strong>/05 3/28/05<br />

Draft Agreement Returned from Management Services 4/8/05 4/28/05<br />

Contract Execution 4/22/05 6/20/05<br />

Notice to Proceed 4/22/05 6/23/05<br />

Commence Design 4/29/05 6/20/05<br />

0<strong>21</strong> - Manasota Basin 272


L230<br />

Longboat Key Backup Potable Water Supply Interconnect<br />

Basin Board Notification of Agreement Execution 6/15/05 <strong>10</strong>/12/05 <strong>10</strong>/12/05<br />

Signage Erected 7/31/06 12/<strong>10</strong>/07 4/30/08<br />

Commence Construction 7/31/06 11/30/07 12/<strong>10</strong>/07<br />

Project Complete 12/31/07 12/31/09<br />

Contract Close-out 12/31/08 3/31/<strong>10</strong><br />

Status As Of: August 28, 2009<br />

A total of $1,000,000 has been budgeted for the project through FY2008. Construction began (December <strong>10</strong>, 2007). The<br />

first invoice was received in January 2009 and was reviewed by the District's project manager. Additional backup was<br />

requested for the invoice on March 18, 2009, but it has not been received. The Longboat Key project manager indicated<br />

they are working on an invoice resubmittal package. Construction completion has been delayed to December 31, 2009<br />

because of permitting complications and slow progress on the chemical treatment system and metering compound. The<br />

contract close-out date has been affected and an agreement to extend the contract period was executed and mailed to<br />

the Cooperator on February 20, 2009.<br />

Pipeline Design, Permitting, and Construction The pipeline design was completed. The Town forwarded the <strong>10</strong>0 percent<br />

design level plans and technical specifications to the District on July 26, 2007. Staff was notified that the final design of<br />

the pipeline alignment differs slightly from the 60 percent design level because of permitting issues.<br />

A Department of Health permit was received on March 5, 2007 and a Florida Department of Transportation permit was<br />

received on April 23, 2007. The Town submitted a Joint Application Environmental Resource Permit (ERP)/Dredge and<br />

Fill/Submerged Land Lease, which includes permits required by the District, Army Corps of Engineers (ACOE), and the<br />

Florida Department of Environmental Protection (FDEP). The District issued an exemption to the ERP portion of the<br />

permit on December 20, 2006, and the ACOE issued a Regional General Permit on March 8, 2007 for dredge and fill<br />

activities. The Sovereign Submerged Lands Lease was fully executed on August 9, 2007. A copy of the fully executed<br />

and recorded easement was returned to the FDEP Department of State Lands on August 27, 2007. The City of Sarasota<br />

entered an access agreement with the contractor on April 3, 2008. The District's Sarasota Regulation Department<br />

accepted the planned pipe transport alternative on April <strong>10</strong>, 2008. The final pipeline alignment did fall outside the<br />

Sovereign Submerged Land Lease easement in a small area. The Town and Engineer adjusted the easement<br />

description and lease language, and SWFWMD forwarded the updated survey to the FDEP on April 22, 2009. The Town<br />

received an updated land lease easement from the FDEP on June 5, 2009. The full execution was recorded at the<br />

Sarasota County Clerk of Court on July 31, 2009.<br />

The District received the bid set plans and technical specifications on August 2, 2007. The bid was awarded to Expertech<br />

Network Installation (US) Inc. and notice to proceed was issued for a December <strong>10</strong>, 2007 commencement date. The<br />

contractor mobilized on January 18, 2008 and began drilling on January 30, 2008. Drilling was slower than originally<br />

anticipated by the contractor due to equipment issues and the apparent presence of rock. Drilling of the pipeline hole was<br />

completed May 12, 2008, and the pipeline was pulled under New Pass into place on May 14, 2008. Pressure testing and<br />

chlorination of the pipe was conducted the week of May 26, 2008. The contractor performed confirmation surveying on<br />

August 26-27, 2008 and September 5-6, 2008 and was found to be acceptable on October 13, 2008 by the consulting<br />

engineer, CDM. On November <strong>10</strong>, 2008, CDM approved the contractor's first request for payment covering work from<br />

March 1, 2008 to July 30, 2008. On June 23, 2009, the Expertech Florida office was closed and the project data was<br />

transferred to the Expertech Canada office. A final pay request for the construction was received on August 17, 2009.<br />

South Key Station No. 2 Design and Permitting A District Environmental Resource Notice General Permit was approved<br />

on January 16, 2008. An application for a Specific Permit to construct potable water system components was received<br />

from the Department of Health on February 25, 2008. A Site Plan Exemption wasreceived from the Town of Longboat<br />

Key Planning, Zoning, and Building Department on June <strong>10</strong>, 2008. The South Key Station No. 2 Improvements project<br />

was advertised for bid on June 24, 2008. The bid opened August 6, 2008, was awarded August <strong>21</strong>, 2008, and was<br />

executed October 20, 2008. The preconstruction conference was held on November 4, 2008 and the Notice to Proceed<br />

was issued on November 11, 2008. The contractor mobilized on January 12, 2009. Construction on the meter compound<br />

has commenced and is 40% complete. The chemical equipment should be installed in September 2009 and site<br />

preparations have commenced.<br />

ACTION-TO-DATE: Delayed. An information request concerning the Accelerate Florida Program was mailed to the<br />

cooperator on October 15, 2008. The District's project manager followed up with an email on January 16, 2009 and a<br />

phone call on February 9, 2009. The Town responded with a letter dated February 12, 2009 that stated the following:<br />

"The project is currently in construction. The drilling portion of the project is completed and final billing should be received<br />

soon. The chemical blending and meter compound portions of the project are on the horizon. The contractor is in shop<br />

drawing submittal phase with those portions of the project. We are working with the contractor to get those last few<br />

pieces of the project completed as soon as practical without hindering portions of the project that are not included in the<br />

L230 project."<br />

0<strong>21</strong> - Manasota Basin 273


L238<br />

SEC Southern Coastal Watershed Education<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Peace River, Manasota<br />

Cooperator(s)<br />

Science and Environment Council of Sarasota<br />

Project Manager STERNBERGER, VIRGINIA<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This Cooperative Funding Initiative project is a continuation of the SEC program designed to work collaboratively with<br />

its members to convene policy discussions and enhance public understanding about water and watershed<br />

conservation based on science. The FY20<strong>10</strong> program components include two decision-maker and policymaker<br />

workshops on water and low-impact development (LID). The first workshop will identify local water and LID issues. The<br />

second will refine and come to a consensus on solutions. The SEC also plans to enhance the general public's<br />

understanding of watersheds by producing a 20-minute video that explains the concept of a watershed and<br />

demonstrates ways SEC member organizations protect their watershed. Lastly, the SEC will again coordinate a<br />

Watershed Awareness Week in Sarasota County. The program was developed by SEC to enhance the general<br />

public's understanding of watersheds in Sarasota County and to show how their actions as stewards can help protect<br />

water resources. Evaluation will be conducted by SEC member organizations and will include surveys, attendance<br />

statistics, number of website hits, an assessment of visitor comments (written and voice), and number of promotional<br />

brochures distributed.<br />

Benefits<br />

This program educates 181,700 residents on how productivity and vitality of natural systems, storm water, water<br />

supply, wastewater and land use are all part a watershed. The SEC plans to build on previously successful education<br />

components to engage discussion between decision-makers and policymakers on water use and LID and enhance the<br />

public's understanding of how they affect the watershed in Sarasota County.<br />

Costs<br />

The total cost of the FY20<strong>10</strong> project is $120,000, with the District contributing $60,000 (Manasota). District funds will<br />

pay for implementing a two-part workshop, creating and distributing a 20-minute video and coordinating Watershed<br />

Awareness Week in Sarasota County. The program is expected to reach 181,700 residents at a cost to the District of<br />

$.33 per person. The budget lines below include costs for staff to manage the project.<br />

Additional Information<br />

The FY2009 total project cost was $120,000, with the District contributing $60,000 (Manasota). District funding was<br />

used to develop three outdoor interpretive signs, mobile phone audio messages, a brochure mapping the trail of the<br />

interpretive signs and mobile phone audio messages, a second Watershed Awareness Week and a decision-makers<br />

workshop. The project will reach 300,000 residents at a cost to the District of $.20 per resident.<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 3,300 0 0<br />

0<br />

0 3,300<br />

0<strong>21</strong> Manasota Basin 84,493 0 62,070 62,092<br />

0 208,655<br />

Project Funds Not Budgeted by the<br />

District<br />

Science and Environment Council of<br />

Sarasota County<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

99,000 0 60,000 60,000<br />

Total:<br />

Future<br />

Funding<br />

0<br />

Total<br />

Funding<br />

<strong>21</strong>9,000<br />

$430,955<br />

Critical Project Milestones Projected Amended Actual<br />

0<strong>21</strong> - Manasota Basin 274


L238<br />

SEC Southern Coastal Watershed Education<br />

FY2008 Budgeted Funds<br />

Initiate purchase order <strong>10</strong>/1/07 1/14/07 1/14/07<br />

Outdoor interpretive signs complete <strong>10</strong>/15/08 <strong>10</strong>/15/08<br />

Indoor educational kiosk panels complete <strong>10</strong>/15/08 <strong>10</strong>/15/08<br />

Educational brochures complete <strong>10</strong>/15/08 <strong>10</strong>/15/08<br />

Watershed Awareness Week talk-back boards <strong>10</strong>/31/08 11/28/08 11/7/08<br />

Watershed Awareness Week <strong>10</strong>/31/08 11/28/08 11/7/08<br />

FY2009 Budgeted Funds<br />

Initiate purchase order <strong>10</strong>/1/08 2/27/09 2/27/09<br />

Outdoor interpretive signs installed 9/30/09<br />

Mobile messages complete 9/30/09 7/31/09<br />

Brochure complete 9/30/09<br />

Decision-makers workshop 9/30/09 6/5/09<br />

Watershed Awareness Week talk-back boards <strong>10</strong>/30/09<br />

Watershed Awareness Week <strong>10</strong>/30/09<br />

Project close <strong>10</strong>/30/09<br />

FY20<strong>10</strong> Budgeted Funds<br />

Initiate purchase order <strong>10</strong>/1/09<br />

Decision-makers workshop complete 6/30/<strong>10</strong><br />

Video complete 9/30/<strong>10</strong><br />

Watershed Awareness Week <strong>10</strong>/25/<strong>10</strong><br />

Project close <strong>10</strong>/31/<strong>10</strong><br />

Status As Of: August 20, 2009<br />

The outdoor interpretive signs are completed and will be installed at Aquarian Quest, G.Wiz-The Science Museum and<br />

Crowley Museum & Nature Center; 13 mobile phone audio messages have been completed and are available to the<br />

public by calling (941) 926-6813, accompanying instructional signage has been completed; the two-part decision-makers<br />

workshop occurred on May 29 and June 5, Watershed Awareness Week is scheduled for October 12-18, 2009. ACTION<br />

TO DATE: On time.<br />

0<strong>21</strong> - Manasota Basin 275


L506<br />

North Port Water Conservation and Retrofit Program<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

City of North Port - Public Utilities<br />

Project Manager MUSICARO, MELISSA<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

The project consists of providing financial incentives for water customers that install water saving devices including low<br />

volume toilets, low volume showerheads and rain sensors. The City currently services 15,000 potable water accounts,<br />

with a large increase anticipated over the next 20 years. The objectives of the retrofit program are to reduce water<br />

demand and provide financial incentives for the retrofitting of an estimated 140 homes. As an incentive to sign-up for<br />

the program, the City plans to provide the shower heads for their customers if the owner agrees to purchase and install<br />

a low volume toilets. The City will provide an estimated $<strong>10</strong>0 credit to the customers water bill upon low volume toilet<br />

installation. The City will also participate in paying half the cost of rain sensors, upon inspection of installed sensors.<br />

Benefits<br />

The various devices to be installed for this project have different life spans. Therefore, the estimated water savings<br />

was determined using a weighted average. The estimated total water savings over the 20 year life of the project is<br />

7,525 gpd.<br />

Costs<br />

The total project cost for the FY2006 project is $50,000. The City of North Port approved funding in the amount<br />

of $25,000 from the Manasota Basin Board. The total cost/benefit is estimated to be $1.83 per 1,000 gallons saved<br />

over a 20 year period.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 29,516 0 645<br />

0<br />

0 30,161<br />

Project Funds Not Budgeted by the<br />

District<br />

City of North Port 25,000 0 0<br />

0<br />

0 25,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$55,161<br />

Critical Project Milestones Projected Amended Actual<br />

Draft Agreement to Contract Administration: 1/31/06 3/<strong>21</strong>/06<br />

Draft Agreement returned from Contract Administration: 2/28/06 3/28/06<br />

Contract Executed: 5/31/06 5/1/06<br />

Rebates Commence: 5/31/06 6/30/06<br />

Basin Board Notification: 6/1/06 8/9/06<br />

Notice to Proceed: 6/1/06 5/3/06<br />

Rebates Complete: 11/30/07 7/1/07<br />

Project Complete: 12/31/08<br />

Contract Termination: 5/1/09<br />

Status As Of: August 31, 2009<br />

The Agreement was executed in May 2006. The toilet rebates are complete, with a total of 280 toilets installed. A total of<br />

280 low flow showerheads have been distributed. The City has received 90% of the customer satisfaction surveys that<br />

0<strong>21</strong> - Manasota Basin 276


L506<br />

North Port Water Conservation and Retrofit Program<br />

were sent out to participating customers. To date, a total of $<strong>21</strong>,156 has been reimbursed to the City. The final project<br />

report was submitted in January 2009. The District project manager has reviewed and commented on the final report and<br />

the revised final version was received on by July 8, 2009. The final invoice will be reimbursed to the city.<br />

0<strong>21</strong> - Manasota Basin 277


L509<br />

Manatee County Rain Sensor Installation Project<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Manatee County<br />

Project Manager MCGOOKEY, SCOTT<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This project provides incentives to encourage existing Manatee County homeowners and businesses who use potable<br />

water as a landscape irrigation source to install a rain sensor device on their existing automatic irrigation system.<br />

Manatee County Board of County Commissioners has initiated a Water Conservation Rebate Incentive Program<br />

targeted on reducing or eliminating the use of potable water for landscape irrigation. This program addresses the<br />

Manatee County Comprehensive Plan policies on water conservation and is supported by increased rates for potable<br />

water use in landscape irrigation. The Rain Sensor Shut-off Device rebate provides a cost share program (50% of cost<br />

up to $50) to any eligible customer who installs a rain sensor device on their automatic irrigation system. Recipients<br />

must provide documentation of cost and are subject to a site verification. Project participants must receive their<br />

potable water from and be billed by Manatee County Utilities Operations which includes the western unincorporated<br />

service area of Manatee County and the cities of Anna Maria, Bradenton Beach and Holmes Beach. It is estimated<br />

there will be 250 sensors installed at a cost of $50 each.<br />

Benefits<br />

Saving <strong>10</strong>0 gpd per site (based upon the water savings data of a 1997 Hernando County Utility Department study).<br />

The estimated water savings is 25,000 gallons per day.<br />

Costs<br />

The total project cost is $12,500 and the Manasota Basin Board Budgeted $6,250 in FY2006.The cost benefit, based<br />

on the total cost amortized at 8% interest over 5 years, is $0.33 per thousand gallons saved.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 12,035 0 1,670<br />

0<br />

0 13,705<br />

Project Funds Not Budgeted by the<br />

District<br />

Manatee County 6,250 0 0<br />

0<br />

0 6,250<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$19,955<br />

Critical Project Milestones Projected Amended Actual<br />

Draft Agreement to Contract Administration: 1/31/06 2/28/06<br />

Draft Agreement returned from Contract Administration: 2/28/06 3/20/06<br />

Contract Executed: 8/31/06 1/24/07<br />

Notice to Proceed: 9/1/06 1/25/07<br />

Program Implementation: 12/31/06 12/31/06<br />

Basin Board Notification: 4/11/07 4/11/07<br />

Rebates Complete: 12/31/07 8/1/09 8/25/09<br />

Contract Termination: 12/31/09<br />

Status As Of: August 25, 2009<br />

The Manatee County Extension Service has distributed program fliers/applications at several classes and community<br />

0<strong>21</strong> - Manasota Basin 278


L509<br />

Manatee County Rain Sensor Installation Project<br />

events but no new applications were received. A request has been submitted to Manatee County's information<br />

department for a listing of all County utility water customers that were on record before September 1998, the cutoff date<br />

for eligibilty to participate in the rain sensor program. The Manatee County Cooperative Extension Information<br />

Technology Department has handed out flyers at training classes and at exhibits, has publicized the program in local<br />

monthly papers, put notes on the face of the water bills, and has it on there website. The program is now complete. The<br />

final report is being drafted. To date, the District has reimbursed Manatee County $99.70 for six rain sensor rebates.<br />

0<strong>21</strong> - Manasota Basin 279


L5<strong>10</strong><br />

FYN Manatee County<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply, Water Quality, Natural Systems<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Project Manager DURELL, SYLVIA<br />

Task Manager(s)<br />

Status Ongoing<br />

Manatee County, Manatee County Cooperative Extension Service<br />

Description<br />

This Florida Yards & Neighborhoods (FYN) project provides education on Florida-friendly landscaping to homeowners,<br />

students and new owners of Florida Water StarSM Gold (FWSG) Certification homes. In addition, the FYN coordinator<br />

will be available as a resource for homeowners, builders and landscape professionals who are working on FWSG<br />

projects. Effectiveness will be measured by the number of participants in workshops, one-on-one interactions, and<br />

school visits; potential exposure to newspaper articles and electronic media; and distribution of education materials.<br />

Benefits<br />

In past years, approximately 34,600 people have received education annually either on a personal basis at workshops,<br />

classes and exhibits or through distribution of education materials. In addition, several million people have<br />

been exposed each year to education through mass media outlets, such as newspaper articles and county<br />

government television programming. Education increases knowledge and promotes behavior change related to<br />

conservation of water and protection of water quality and natural systems.<br />

Costs<br />

The total cost of the FY20<strong>10</strong> program is $1<strong>10</strong>,000, with the District contributing $50,000 (Manasota). District funds<br />

support salary and benefits for the coordinator. The program is expected to reach 35,000 Manatee County residents at<br />

a cost to the District of approximately $1.43 per person. The budget lines below include costs for staff to manage the<br />

project.<br />

Additional Information<br />

The total cost of the FY2009 program was $1<strong>10</strong>,000, with the District contributing $50,000 (Manasota). The<br />

District has funded this program since 2007. Education is based on the nine Florida-Friendly LandscapingTM<br />

principles that were created by the University of Florida/Institute of Food and Agricultural Sciences (UF/IFAS) for the<br />

Florida Yards & Neighborhoods Program: Right Plant, Right Place, Water Efficiently, Fertilize Appropriately, Mulch,<br />

Attract Wildlife, Manage Yard Pests Responsibly, Recycle, Reduce Stormwater Runoff and Protect the Waterfront.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 162,628 0 51,622 52,435<br />

0 266,685<br />

Project Funds Not Budgeted by the<br />

District<br />

Manatee County 187,400 0 50,000 60,000<br />

0 297,400<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$564,085<br />

Critical Project Milestones Projected Amended Actual<br />

FY2008<br />

Purchase order created <strong>10</strong>/1/07 <strong>10</strong>/18/07<br />

First task report 1/31/08 1/31/08<br />

Second advisory committee meeting 4/14/08 4/14/08<br />

Second task report 4/30/08 4/17/08<br />

Third advisory committee 7/<strong>21</strong>/08 7/<strong>21</strong>/08<br />

Third task report 7/31/08 7/31/08<br />

0<strong>21</strong> - Manasota Basin 280


L5<strong>10</strong><br />

FYN Manatee County<br />

Fourth advisory committee meeting 9/18/08 <strong>10</strong>/15/08 <strong>10</strong>/15/08<br />

Fourth task report 9/30/08 <strong>10</strong>/15/08 <strong>10</strong>/15/08<br />

Project complete 9/30/08 9/30/08<br />

FY2009<br />

Purchase order created <strong>10</strong>/1/08 11/1/08 <strong>10</strong>/27/08<br />

First task report 1/30/09 1/30/09<br />

Second advisory committee meeting 4/14/09 4/30/09<br />

Second task report 4/30/09 4/30/09<br />

Third advisory committee meeting 7/14/09 7/14/09<br />

Third task report 7/31/09 7/31/09<br />

Project complete 9/30/09<br />

Fourth task report <strong>10</strong>/31/09<br />

FY20<strong>10</strong><br />

Purchase order created <strong>10</strong>/12/09<br />

First advisory committee meeting 12/<strong>10</strong>/09<br />

First task report 1/29/<strong>10</strong><br />

Second advisory committee meeting 3/11/<strong>10</strong><br />

Second task report 4/30/<strong>10</strong><br />

Third advisory committee 6/<strong>10</strong>/<strong>10</strong><br />

Third task report 7/30/<strong>10</strong><br />

Fourth advisory committee meeting 9/16/<strong>10</strong><br />

Project complete 9/30/<strong>10</strong><br />

Fourth task report <strong>10</strong>/29/<strong>10</strong><br />

Status As Of: August 20, 2009<br />

The third task period report includes the following accomplishments: 18 group presentations for 417 people; 975<br />

personal/telephone/email/mail contacts; 2 building industry contacts with 260 people; 3 homeowners association<br />

contacts involving 22 people; 2 exhibits attracting 850 people; 2 yard recognitions; 1 newsletter article potentially<br />

reaching 2,625 people; 7 newspaper articles potentially reaching 302,225 readers; 916 pieces of educational items<br />

distributed; and 12 hours contributed by 8 volunteers. Michelle Atkinson, FYN coordinator, will be filmed making a<br />

presentation on Florida-friendly landscaping for later use on the community television station of the Tara community.<br />

Atkinson gave an overview of the FWSG program to the Manatee/Sarasota Home Builders Association's Green Council.<br />

The District is coordinating with University of Florida's Institute of Food and Agricultural Sciences (UF/IFAS) to present a<br />

series of workshops designed to help homeowners associations understand what the SB 2080 means and what<br />

resources are available to assist them. A workshop in Manatee County is scheduled for October <strong>21</strong>. ACTION TO DATE:<br />

On time.<br />

0<strong>21</strong> - Manasota Basin 281


L512<br />

Manatee County Shallow Well Rebate Program<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Manatee County<br />

Project Manager MCGOOKEY, SCOTT<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This project consists of a shallow well rebate program to provide incentives and assistance to encourage existing<br />

homeowners/businesses of Manatee County who use potable water as a landscape irrigation source to convert to a<br />

shallow well (surficial/intermediate) system. This area includes the western unincorporated service area of Manatee<br />

County and the cities of Anna Maria, Bradenton Beach and Holmes Beach.<br />

Benefits<br />

It is estimated that there will be <strong>10</strong>0 wells installed each year, saving 493 gpd per site, within the retail service area of<br />

Manatee County Water System. The estimated water savings from this project is 49,300 gpd.<br />

Costs<br />

The total project cost is $50,000, and the District's share is requested to be $25,000. The Manasota Basin is<br />

requested to fund $25,000 in FY2006. The cost, amortized at 8 percent over 20 years, is $0.28 /<strong>10</strong>00 gal saved. Any<br />

additional funds are for staff time.<br />

Additional Information<br />

This shallow well rebate program provides a cost share (50% of cost up to $500) to any eligible customer who<br />

converts to a shallow well (surficial/intermediate) system and meets all criteria set forth by the Shallow Well Feasibility<br />

Study, conducted during FY2004 and FY2005. Rebate payments are subject to the recipient's submittal of the<br />

documented cost to the Utility Operations Department, Water Conservation Section and a completed site inspection of<br />

every well installation.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 35,123 0 3,661 2,281<br />

0 41,065<br />

Project Funds Not Budgeted by the<br />

District<br />

Manatee County 25,000 0 0<br />

0<br />

0 25,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$66,065<br />

Critical Project Milestones Projected Amended Actual<br />

Begin advertising: 12/1/05 12/1/05<br />

Draft Agreement to Contract Administration: 1/15/06 2/1/06<br />

Start processing rebates: 1/31/06 1/31/06<br />

Agreement Executed / Notice to Proceed: 5/31/06 5/22/06<br />

Complete processing rebates: 1/31/07 <strong>10</strong>/15/09<br />

Final Report: 7/15/07 11/16/09<br />

Final Invoice: 9/15/07 12/15/09<br />

Contract Termination: 12/31/07 12/31/09<br />

Status As Of: August 28, 2009<br />

The County began advertising the program in December 2005. In May 2006, a billing insert was mailed describing the<br />

0<strong>21</strong> - Manasota Basin 282


L512<br />

Manatee County Shallow Well Rebate Program<br />

program and fifty applications were received. The County sent out an advertisement with the March 2008 utility bills and<br />

received thirty-three requests for applications. To date, a total of two hundred and twenty applications have been<br />

requested from the County. Fifty rebates have been processed by the County. The County has issued 56 rebates and<br />

has submitted forty-two rebates to the District for reimbursement. The program has proceeded slower than expected.<br />

The County requested an extension to the agreement with the District to allow more applicants to take advantage of the<br />

rebate program. A first amemdment was executed 11/27/2007 that extended the project to July 15, 2009. To date, the<br />

District has reimbursed the County a total of $<strong>10</strong>,500.<br />

0<strong>21</strong> - Manasota Basin 283


L520<br />

Around the Bend Nature Tours Manatee/Sarasota<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Quality, Natural Systems<br />

Basin(s) Peace River, Manasota<br />

Cooperator(s)<br />

Around the Bend Nature Tours<br />

Project Manager HULL, MARY MARGARET<br />

Task Manager(s)<br />

Status Ongoing<br />

TORRUSIO, MARY<br />

Description<br />

This Cooperative Funding Initiative (CFI) project will educate students and adults about local environmental systems.<br />

Around the Bend Nature Tours provides more than 2,000 students and teachers with site-specific programs that focus<br />

on watersheds and include various Manatee and Sarasota County Conservation Lands and SWFWMD lands<br />

(including Emerson Point Park, Riverview Pointe, Rye Wilderness Park, Duette Park or any SWFWMD area that is<br />

deemed appropriate). These environmental education programs benefit students, parents, teachers and homeschool<br />

groups and utilize Around the Bend Nature Tours guides and materials. The program's effectiveness is measured<br />

through student pre/posttest data and a teacher evaluation tool.<br />

Benefits<br />

This program adresses watershed education and natural systems through hands-on field study programs for youth and<br />

adults. Additionally, several of the field trip sites are on District-owned lands, so promotion of the District's land<br />

stewardship efforts will be included in the programming. Cooperator has a long history with the District and is well<br />

versed in Florida's standards-based education guidelines. This program also works with many homeschool groups, a<br />

target audience with which the District's youth education staff would like a greater reach.<br />

Costs<br />

The total cost of the FY20<strong>10</strong> program is $76,390, with the District contributing $27,940 (Manasota). The project is<br />

projected to reach 2,475 people at a cost to the District of $11.29 per person. Budget line below includes cost for staff<br />

to manage the project.<br />

Additional Information<br />

The total cost of the FY2009 program was $69,150, with the District contributing $28,000 (Manasota). During FY2009,<br />

the program's goal was to reach 2,000 people at a cost to the District of $14 per person. The cooperator conducted 53<br />

student field trips, reaching 2,156 students and 334 adults. The field trips took place at Emerson Point Preserve in<br />

Palmetto, The Haley House in Terra Ceia Preserve, Rye Preserve in East Manatee County, Durante Park on Longboat<br />

Key, DeSoto National Memorial in NW Bradenton, Leffis Key in Bradenton Beach, and Ken Thompson Park in<br />

Sarasota. All field studies are standards-based and hands-on. Curricula are site-specific so that students can make<br />

meaningful connections with the environment and truly understand the importance of local habitats. Local history and<br />

watershed studies are included at each site. The District has supported this project since FY2006.<br />

0<strong>21</strong> - Manasota Basin 284


L520<br />

Around the Bend Nature Tours Manatee/Sarasota<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 17,900 0 0<br />

0<br />

0 17,900<br />

0<strong>21</strong> Manasota Basin 46,925 0 28,930 28,886<br />

0 <strong>10</strong>4,741<br />

Project Funds Not Budgeted by the<br />

District<br />

Around the Bend Nature Tours 1,900 0 1,750 3,450<br />

0 7,<strong>10</strong>0<br />

Braden River Middle School 2,000 0 0<br />

0<br />

0 2,000<br />

FL Division of Historical Resources 0 0 0 30,500<br />

0 30,500<br />

Manatee County Conservation Lands 4,500 0 0<br />

0<br />

0 4,500<br />

Pinellas County Environmental Fund 23,650 0 24,900<br />

0<br />

0 48,550<br />

Sarasota Bay Estuary Program 29,000 0 14,500 14,500<br />

0 58,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$273,291<br />

Critical Project Milestones Projected Amended Actual<br />

FY2009 Budgeted Funds<br />

Purchase order opened <strong>10</strong>/27/08 <strong>10</strong>/31/08<br />

Field trips end 9/1/09 6/2/09<br />

Final report due to District 9/30/09 6/12/09<br />

FY20<strong>10</strong> Budgeted Funds<br />

Initiate purchase order <strong>10</strong>/1/09<br />

Field trips end 9/1/<strong>10</strong><br />

Final report and invoice due to District 9/30/<strong>10</strong><br />

Status As Of: September <strong>10</strong>, 2009<br />

The FY2009 final report has been completed and final invoice has been paid. Cooperator has been notified of approval<br />

of FY20<strong>10</strong> funding and District staff is working with cooperator to develop a scope of work for the FY20<strong>10</strong> project.<br />

ACTION-TO-DATE: On time.<br />

0<strong>21</strong> - Manasota Basin 285


L601<br />

(Completed) Manatee County Indoor Water Conservation Project<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Manatee County<br />

Project Manager MCGOOKEY, SCOTT<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This project consists of offering financial incentives to single-family, multi-family, and commercial customers for<br />

replacing conventional toilets with water-conserving equivalents. This project will target the replacement of<br />

approximately 600 conventional toilets with ultra-low volume (ULV) toilets, which use up to 1.6 gallons per flush (gpf).<br />

In addition, approximately 600 low-flow showerheads will be provided to participating customers to replace<br />

conventional showerheads. The project will provide rebates for toilets at $<strong>10</strong>0 per fixture.<br />

Benefits<br />

This FY2007 project is anticipated to save an estimated 11,850 gallons of water per day. The toilets and showerheads<br />

to be installed for this project have different life spans. The estimated water savings above was determined using a<br />

weighted average based on the total benefit for the life of the project.<br />

Costs<br />

The total project cost is $85,650, and the Manasota Basin Board has funded $42,825 in FY2007. The cost amortized<br />

at 8 percent over 20 years, is $1.99 per thousand gallons saved (calculated using a weighted average based on the<br />

total benefit for the life of the project).<br />

Additional Information<br />

In addition to providing financial assistance for the installation of low flow toilets, a goal of this project is to educate all<br />

program participants on methods of indoor water conservation and proper maintenance practices to ensure low flow<br />

toilets remain a water conservative fixture. Educational materials on flapper replacement and other water conservation<br />

techniques will be disseminated to all program particpants. The county has hired Viewtech Financial Services as<br />

the consultant to administer the project.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 46,258 0 1,670<br />

0<br />

0 47,928<br />

Project Funds Not Budgeted by the<br />

District<br />

Manatee County 42,825 0 0<br />

0<br />

0 42,825<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$90,753<br />

Critical Project Milestones Projected Amended Actual<br />

Contract Executed 5/31/07 8/1/07<br />

Rebates Commence 5/31/07 8/3/07<br />

Notice to Proceed 6/1/07 8/3/07<br />

Basin Board Notification 6/13/07 9/15/07<br />

Rebates Complete 4/30/08 5/30/08<br />

Final Report 8/31/09 6/26/09<br />

Status As Of: August 28, 2009<br />

The final invoice for L601 has been received and evaluated. The final invoice has been processed for payment and<br />

0<strong>21</strong> - Manasota Basin 286


L601<br />

(Completed) Manatee County Indoor Water Conservation Project<br />

$42,157.16 has been reimbursed and $667.84 remains. The final report was received on June 26, 2009. The County<br />

issued 869 toilet rebates and gave away 52 showerheads. Total savings from the project is over 7 mg a year or 27.1 gpd<br />

per toilet. Project was completed on time.<br />

0<strong>21</strong> - Manasota Basin 287


L604<br />

Manatee - WMPlan Little Manatee River<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Manatee County<br />

Project Manager NGUYEN, NAM<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This multi-year funded project is to perform the 1) Topographic Information, 2) Watershed Evaluation, and 3)<br />

Watershed Management Plan elements of the District's Watershed Management Program (WMP) for the LITTLE<br />

MANATEE <strong>RIVER</strong> Watershed. The watershed occupies approximately 79.0 square miles within northern Manatee<br />

County and discharges into Tampa Bay, a SWIM waterbody. The watershed is beginning to experience rapid<br />

residential development to the west of Interstate 75 that is expected to expand to the east in the near future.<br />

Topographic information includes the acquisition of data and development of the terrain features in the Geodatabase<br />

to be used in the Watershed Evaluation. The Watershed Evaluation includes collection of existing data, GIS<br />

processing of the terrain features to establish catchments and connectivity, field reconnaissance, refinement of the<br />

terrain features and development of the hydraulic element point features. The Watershed Management Plan element<br />

includes: development of watershed parameters for a specific use, GIS processing, computer modeling, floodplain and<br />

water quality analysis, surface water resource assessment, establishment of LOS, BMP alternative analysis.<br />

Benefits<br />

The WMP provides a method to evaluate the capacity of a watershed to protect, enhance, and restore water quality<br />

and natural systems, while achieving flood protection. The information developed provides the science for the District's<br />

Resource Management and Environmental Resource Permitting (ERP). It assists local governments: 1) With their land<br />

management responsibilities by establishing a level of service and developing Best Management Practices (BMPs) to<br />

address level of service deficiencies. 2) Provides a Geodatabase and projected results from watershed model<br />

simulations for floodplain and water quality management.<br />

Costs<br />

The total budget amount for this project is $1 million, of which the District's share is $500,000 to be funded by the<br />

Manasota Basin. The County will contribute $500,000. Previously approved FY2007 funding included $500,000 from<br />

the Basin's budget with a revenue from Manatee County for $250,000. Previously approved FY2008 funding included<br />

$500,000 from the Basin's budget with a revenue from Manatee County for $250,000. Due to the recent tax cuts,<br />

Manatee County has notified us that they are not able to contribute the $250,000 as originally planned for FY2008.<br />

When each element is completed the project budget and scope may require refinement based on the information<br />

gathered. The District funding amounts shown in the table include staff salaries.<br />

Additional Information<br />

A WMP includes five major elements: 1) Topographic Information, 2) Watershed Evaluation, 3) Watershed<br />

Management Plan, 4) Implementation of Best Management Practices, and 5) Maintenance of Watershed Parameters<br />

and Models. Implementing elements of the WMP with local governments is one of the Comprehensive Watershed<br />

Management (CWM) initiative strategies and one of the District's Strategic Priorities. The District has been working<br />

with the County for several years through the Watershed Management Program Coordination to develop a five year<br />

implementation schedule by watershed based on their projected funding levels, and funding available from others for<br />

example FEMA or State appropriations. A cooperative funding revenue agreement with Manatee County has been<br />

developed as a multi-year funded project contingent on the approval of future funding to complete the WMP elements<br />

through the Watershed Management Plan. This is a multi-year funded project that will require a cooperative funding<br />

request each fiscal year until completed. If approved, this project will be ranked as a 1A project in future fiscal years.<br />

The District will manage the project and will enter into work orders and agreements to accomplish project tasks.<br />

Future cooperative funding requests and agreements will be required for a BMP alternative analysis, the<br />

Implementation of BMPs, and the Maintenance of Watershed Parameters and Models.<br />

0<strong>21</strong> - Manasota Basin 288


L604<br />

Manatee - WMPlan Little Manatee River<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 511,394 0 8,<strong>21</strong>6<br />

0<br />

0 519,6<strong>10</strong><br />

District Budgeted - Outside Revenue<br />

Manatee - WMPlan Little Manatee River<br />

(L604)<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

500,000 0 0<br />

0<br />

Total:<br />

Future<br />

Funding<br />

0<br />

Total<br />

Funding<br />

500,000<br />

$1,019,6<strong>10</strong><br />

Critical Project Milestones Projected Amended Actual<br />

1. Critical Project Milestones<br />

Recognition of the SWFWMD, Manasota Basin Board and Manatee County will<br />

be included on all reports<br />

9/29/06<br />

Select Consultant 9/29/06 9/29/06<br />

Develop Draft Agreement with Manatee County 11/20/06 11/30/06<br />

Cooperative Funding Agreement to Contract Administration 11/27/06 12/8/06<br />

Execution of Cooperative Agreement by Manatee County 12/29/06 1/23/07<br />

Execution of Cooperative Agreement by SWFWMD 1/19/07 1/25/07<br />

Begin Negotiations with Consultant 1/30/07 2/8/07<br />

Execution of Consultant Agreement by SWFWMD 9/30/07<br />

Issue Notice to Proceed to Consultant/ Work Order #1 9/30/07<br />

Requisition to Encumber FY2008 Funds <strong>10</strong>/1/07 <strong>10</strong>/1/07<br />

Termination of Cooperative Agreement 3/1/<strong>10</strong><br />

Termination of Consultant Agreement 3/1/<strong>10</strong><br />

Status As Of: September 03, 2009<br />

Notice of anticipated funding has been sent to County's project manager. A meeting has been requested to discuss<br />

scope of work and consultant selection. District and Manatee County staff met on October 12, 2006, to discuss the<br />

proposed scope of work and specific project needs. Hillsborough County had developed a model for the watershed that<br />

the District recently reviewed under Project B126. The model and the results of the District's independent review will<br />

serve as the base for the Watershed Management Plan within the Manatee County portion of the watershed. District staff<br />

are currently negotiating with one of its pre-selected vendors to complete aerial topographic mapping for the portions of<br />

the watershed that currently do not have digital topographic information. Boyle Engineering Corp. has been selected as<br />

the consulting firm to perform this project. The Cooperative Funding Agreement was executed on 1/25/2007. Mapping<br />

and GIS staff is putting together a Work Order with Earth Data to begin aerial topographic mapping for portions of the<br />

watershed that currently do not have digital topographic information. District staff will begin talks with Boyle Engineering<br />

and will be putting together a consultant agreement. A Work Order was executed with Earth Data for the aerial<br />

topographic mapping work. District staff initiated communication with Boyle Engineering on 2/8/07 to begin the consultant<br />

services agreement process. A draft consultant services agreement has been sent to Boyle for review. Boyle<br />

Engineering provided Fee Schedule for their team. A consultant agreement is being routed through our contract, legal<br />

sections for review. County's project manager has indicated that due to recent tax cuts they will not be able to contribute<br />

the $250,000 as originally planned for FY2008. District staff has met with County on 8/<strong>21</strong>/07 to develop a work plan to<br />

move the project forward using only the FY2007 fundings. Boyle Engineering has submitted a project budget for review.<br />

District staff is finishing the consultant services agreement and will be working with the consultant to develop Work Order<br />

#1. The consultant services agreement has been placed on hold by the Department's Director due to the reprioritization<br />

of projects within the department. The LiDAR data acquisition by Earth Data is in its final phase and will be delivered to<br />

the District mid January 2008. The consultant services agreement is still on hold and the consultant has been notified of<br />

the situation. We're still waiting for the delivery of the LiDAR data acquisition by Earth Data. The LiDAR acquisition has<br />

been completed and the data is available for usage as of 04/29/2008. The consultant services agreement with Boyle<br />

Engineering for the watershed management plan will be delay until further notice to enable Manatee County to shift<br />

FY2007 funding contribution to other higher priority projects. Current Status: It is anticipated that the project will be<br />

terminated and any left over funds will be balance forward. The District is reviewing the project budget to identify how<br />

much has been spent and what the remaining funds are. The District will notify Manatee County once these figures are<br />

completed.<br />

0<strong>21</strong> - Manasota Basin 289


L608<br />

Palmetto Reclaimed Water ASR<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply, Water Quality<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Palmetto<br />

Project Manager MCGOOKEY, SCOTT<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This project consists of the design, construction, permitting, ultraviolet (UV) disinfection, cycle testing, and operational<br />

permitting for a 1.2 mgd reclaimed water Aquifer Storage Recovery (ASR) well for the City of Palmetto. The ASR well<br />

will be located at the City's Wastewater Treatment Facility (WWTF). This ASR well will help reduce the demands on<br />

potable water supplies and eliminate the need for surface water discharge of excess reclaimed water to Terra Ceia<br />

Bay.<br />

Benefits<br />

This reclaimed water ASR well will store an estimated 144 million gallons of reclaimed water during wet weather<br />

periods to help offset approximately 276,000 gallons per day (gpd) of future groundwater supply. The City is projecting<br />

a new irrigation demand of 2.2 million gallons per day (mpd) from approximately 3,696 additional residential units from<br />

planned developments by 20<strong>10</strong>. Reclaimed water flows normally discharged from the City's WWTF to Terra Ceia Bay<br />

will be stored in the ASR well.<br />

Costs<br />

The total project cost is $2,340,000 and the District's share is requested to be $1,134,000. The Manasota Basin<br />

contributed $389,000 in FY2007 and $272,000 in FY2008. The WPSTF contributed $72,000 in FY2007 and $136,000<br />

in FY2008. The Manasota Basin will asked to provide $405,000 in additional funds in FY2011. The cost, amortized at<br />

8 percent over 30 years is $2.05 per <strong>10</strong>00 gallons offset, assuming the City will require the new developments to fund<br />

the connection to the City's reuse system. The future funds identified for the project are contingent upon approval of<br />

such amounts by the District Governing and Basin Boards in the annual budget(s).<br />

Additional Information<br />

The City of Palmetto completed a reclaimed water ASR feasibility study in October 2005 that recommended the City<br />

develop a reclaimed water ASR to provide wet weather storage at the Palmetto WWTF site. The City is prepared to<br />

move forward with the construction and permitting of a test well. If this ASR well is successful, one additional<br />

reclaimed water ASR well is planned at the WWTF site. The City has been in communication with Manatee County<br />

and the City of Bradenton about the future development of a regional system and, depending on the results of those<br />

communications, this project could ultimately be an integral part of a more regional system. Of the total project cost of<br />

$2,340,000, approximately 79 percent ($1,850,000) is expected to be needed for construction, and the remainder<br />

($490,000) for design and administration.<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 669,318 0 3,661 3,820<br />

0 676,799<br />

District Budgeted - Outside Revenue<br />

Water Protection & Sust T.F.<br />

(Alternative Wtr)<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

208,000 0 0<br />

0<br />

0<br />

208,000<br />

Project Funds Not Budgeted by the<br />

District<br />

City of Palmetto 661,000 0 0<br />

0 405,000 1,066,000<br />

0<strong>21</strong> - Manasota Basin 290<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$1,950,799


L608<br />

Palmetto Reclaimed Water ASR<br />

Critical Project Milestones Projected Amended Actual<br />

Draft Agreement to Contract Administration: 9/30/06 9/30/06<br />

Agreement Executed / Notice to Proceed: 11/30/06 1/24/07<br />

Start construction of reclaimed water ASR: 9/1/07 3/5/08<br />

Complete construction of reclaimed water ASR: 8/30/<strong>10</strong><br />

Start Cycle Testing: 9/1/<strong>10</strong><br />

Complete Cycle Testing & Obtain Operational Permit: 12/31/<strong>10</strong><br />

Final Invoice: 4/30/11<br />

Contract Termination: 6/30/11<br />

Status As Of: August 25, 2009<br />

The agreement with the City was executed on January 24, 2007. The public hearing for the draft FDEP ASR construction<br />

permit was held on January 23, 2007. The FDEP ASR Construction Permit was issued in April 2007. The City of<br />

Palmetto has agreed with the District to construct the Storage Zone Monitor Well (SZMW) / Exploratory Well as the first<br />

well. This will allow us to gather information about the target aquifer, a drinking water aquifer, and a lower aquifer to<br />

determine if it's suitable for ASR development. If that lower zone is not a drinking water aquifer, and it's suitable for ASR,<br />

it may allow us to bypass the arsenic requirements for ASRs in the drinking water aquifers. The consultant has prepared<br />

the bid specifications for the exploratory well and the City advertised the project for bidding to select a driller. The bid<br />

opening occurred on January 9, 2008. Hausinger and Associates Inc. was the lowest bidder. The City approved the<br />

contract with Hausinger and Associates Inc. on February 18, 2008. Construction started March 5, 2008 on the<br />

exploratory well. The pilot hole was drilled to <strong>10</strong>40 feet in depth. It was determined by the consultant that the lower zone,<br />

a non USDW zone, is not suitable for ASR development. The decision was made to perform all water quality and<br />

geological tests and back plug this well to a depth of about 520 feet bls. This well was completed and will be the Storage<br />

Zone Monitor Well (SZMW) for this ASR. The ASR will need to be constructed in the Swuannee Limestone aquifer which<br />

is between 400 and 520 feet bls. A technical memorandum on the exploratory/SZMW was completed and submitted to<br />

FDEP in December 2008. The project has been placed on hold pending the results of the District's arsenic pretreatment<br />

study at the City of Bradenton ASR project which has been delayed due to the drought and is now scheduled to be<br />

available in January 20<strong>10</strong>. To date, the District has reimbursed the City $223,809 for it's share of design and construction<br />

of the exploratory/SZMW.<br />

0<strong>21</strong> - Manasota Basin 291


L6<strong>10</strong><br />

Sarasota County - Watershed Plan: Lemon Bay<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Sarasota County<br />

Project Manager LOPEZ, MANNY<br />

Task Manager(s)<br />

Status Ongoing<br />

HEYL, MIKE, GARCIA, LIZANNE<br />

Description<br />

The purpose of this project is to develop a comprehensive watershed plan for Lemon Bay. The plan will focus on water<br />

resource issues such as restoration of historic or more natural hydrologic regimes in the basin, improvements to water<br />

quality and habitat restoration. The plan will attempt to identify ways to reduce excess flows into the bay, and thereby<br />

assist in reducing pollutant loads, improve water quality and habitat conditions. The Lemon Bay watershed includes<br />

several localities of concern with regard to documented declining water quality trends: Elevated nutrients for Alligator<br />

Creek and Forked Creek; Elevated nutrients and low dissolved oxygen levels for Gottfried Creek, and elevated<br />

nutrients from direct run-off to Lemon Bay. These areas of concern suggest a need to develop and implement ways<br />

to reduce nutrient loading from the watershed. An essential element of the project will be updating and fine-resolution<br />

improvements to the current AdICPR flood model.<br />

Benefits<br />

This regional initiative promotes and furthers the implementation of the Sarasota Bay CCMP, SWFWMD's Southern<br />

Coastal Watershed CWM Plan; and Sarasota County's Comprehensive Plan. The Lemon Bay Watershed<br />

Management Plan will be developed in cooperation with the District, the DEP Lemon Bay Aquatic Preserve Program,<br />

the Charlotte Harbor National Estuary Program, the Lemon Bay League, the DEP Bureau of Watershed Management,<br />

and all other interested stakeholders.<br />

Costs<br />

The total cost of plan development is $600,000. The District's share is $300,000, and the County's share is $300,000.<br />

The District's share is funded by the Manasota Basin Board over two fiscal years: FY2007 ($150,000) and FY2008<br />

($150,000). The FY2007 budget is $300,000 with the District and County each contributing half ($150,000). For<br />

FY2007, the District's share is split between the Manasota Basin Board ($75,000) and the State's Water Protection<br />

and Sustainability Trust Fund ($75,000). The FY2008 budget is $300,000 with the County and the District each<br />

contributing half ($150,000). The District's FY2008 share is to be funded entirely by the Manasota Basin Board. The<br />

District funding amounts shown in the table include staff salaries, travel and central garage charges.<br />

Additional Information<br />

The completed plan will be presented to the Board of County Commissioners for adoption, and will include short term<br />

and long term projects for improvements that may include wastewater reuse, stormwater reuse, smart growth, revised<br />

land development standards, sediment control, wetland or floodplain restoration, flood level abatement, aquifer<br />

protection, and restoration of natural flow regimes. The northern half of Lemon Bay (WBID 1983A) has been listed as<br />

verified impaired for nutrients based on an exceedance of the 11ug/l chlorophyll-a guideline in the Impaired Waters<br />

Rule (62-303, FAC). Lemon Bay has also been listed as impaired for bacteria based on a downgrading of shellfish<br />

harvesting classification from approved to conditional. Development of the plan will include formation of a watershed<br />

stakeholders group working through the Neighborhood Environmental Stewardship Team (NEST) program to<br />

encourage public participation in the process.<br />

0<strong>21</strong> - Manasota Basin 292


L6<strong>10</strong><br />

Sarasota County - Watershed Plan: Lemon Bay<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 235,185 0 8,901 5,663<br />

0 249,749<br />

District Budgeted - Outside Revenue<br />

Water Protection & Sust T.F. (Surface<br />

Wtr Rstr)<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

75,000 0 0<br />

0<br />

0<br />

75,000<br />

Project Funds Not Budgeted by the<br />

District<br />

Sarasota County 300,000 0 0<br />

0<br />

0 300,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$624,749<br />

Critical Project Milestones Projected Amended Actual<br />

1. Contract Development & Execution<br />

Develop Draft Agreement with Sarasota County 11/30/06 3/15/07 4/15/07<br />

Cooperative Funding Agreement to Contract Administration 12/15/06 4/20/07 4/20/07<br />

Execution of Cooperative Agreement by Sarasota County 4/15/07 5/31/07 6/26/07<br />

Execution of Agreement by SWFWMD 4/30/07 7/15/07 7/20/07<br />

Issue Notice to Proceed 5/5/07 7/30/07 7/20/07<br />

2. Critical Project Milestones<br />

Literature Search and Review (Draft) 1/30/08 3/30/08 3/30/08<br />

Watershed Characterization (Draft) 3/15/08 5/30/08 6/30/08<br />

Develop / Review Sediment Abatement Projects 6/30/08 6/30/08<br />

Prepare Working Draft of Watershed Plan for Review 7/30/09 8/3/09<br />

Review of Working Draft by Project Team - Completed 9/14/09<br />

Status As Of: August 26, 2009<br />

The working Draft Watershed Management Plan is complete and is undergoing review by the project team members.<br />

Edits, comments and revisions will be collected and incorporated into a final Draft by late October 2009.<br />

0<strong>21</strong> - Manasota Basin 293


L611<br />

Sarasota County - Watershed Plan: Roberts Bay<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Sarasota County<br />

Project Manager LOPEZ, MANNY<br />

Task Manager(s)<br />

Status Ongoing<br />

HEYL, MIKE, GARCIA, LIZANNE<br />

Description<br />

The purpose of this project is to develop a comprehensive Watershed Plan for Roberts Bay. The plan will focus on<br />

water resources issues such as restoration of historic or more natural hydrologic regimes in Roberts Bay, and<br />

improvements to water quality and habitat restoration. The plan will attempt to identify ways to reduce flow volumes<br />

into the Bay, and thereby assist in reducing pollutant loads and improving water quality. The Roberts Bay watershed<br />

includes two localities of concern with regard to documented declining water quality trends: Increasing trends of<br />

historic chlorophyll a levels at Roberts Bay, and elevated nutrient levels based on Trophic State Index (TSI) for West<br />

Clark Lake. Conditions at both of these localities indicate a need to reduce nutrient loading from the watershed. An<br />

essential element of the project will be updating and improving the existing AdICPR flood model and pollutant loading<br />

model.<br />

Benefits<br />

Development of the plan will allow the County to consolidate and update goals and objectives from the District's SWIM<br />

Plan and the Sarasota Bay Estuary Program (SBEP) into one strategy that would include comprehensive monitoring of<br />

water quality and pollutant loads, detailed mapping, flood and pollutant load modeling, and prioritized practical project<br />

proposals to improve water quality, restore natural run-off regimes, provide water supply, and protect natural<br />

resources.<br />

Costs<br />

The total cost for plan development is $600,000. The District's share is $300,000, and the County's share is $300,000.<br />

The District's share is funded by the Manasota Basin Board over two fiscal years: FY2007 ($150,000) and FY2008<br />

($150,000). The FY2007 budget is $300,000, with the District and County each contributing half ($150,000). For<br />

FY2007, the District's share is split between the Manasota Basin Board ($75,000) and the State's Water Protection<br />

and Sustainability Trust Fund ($75,000). The FY2008 budget is $300,000 with the County and the District each<br />

contributing half ($150,000). The District's FY2008 share is funded entirely by the Manasota Basin Board. The District<br />

funding amounts shown in the table include staff salaries, travel and central garage charges.<br />

Additional Information<br />

Development of the plan will include formation of a watershed stakeholders group working through the Neighborhood<br />

Environmental Stewardship Team (NEST) program to encourage public participation in the process. The completed<br />

plan will be presented to the Board of County Commissioners for adoption, and will include short term and long term<br />

projects for improvements that may include wastewater reuse, stormwater reuse, smart growth, revised land<br />

development standards, sediment control, wetland or floodplain restoration, flood level abatement, aquifer protection,<br />

and restoration of natural flow regimes.<br />

0<strong>21</strong> - Manasota Basin 294


L611<br />

Sarasota County - Watershed Plan: Roberts Bay<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 235,185 0 8,901 5,663<br />

0 249,749<br />

District Budgeted - Outside Revenue<br />

Water Protection & Sust T.F. (Surface<br />

Wtr Rstr)<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

75,000 0 0<br />

0<br />

0<br />

75,000<br />

Project Funds Not Budgeted by the<br />

District<br />

Sarasota County 300,000 0 0<br />

0<br />

0 300,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$624,749<br />

Critical Project Milestones Projected Amended Actual<br />

1. Contract Development & Execution<br />

Develop Draft Agreement with Sarasota County 11/30/06 2/28/07 3/30/07<br />

Cooperative Funding Agreement to Contract Administration 12/20/06 5/5/07 5/11/07<br />

Execution of Cooperative Agreement by Sarasota County 1/25/07 5/31/07 6/26/07<br />

Execution of Agreement by SWFWMD 2/25/07 7/15/07 7/20/07<br />

Issue Notice To Proceed 3/1/07 7/30/07 7/22/07<br />

2. Critical Project Milestones<br />

Literature Search and Review 11/30/07 12/30/07<br />

Watershed Characterization (Draft) 1/<strong>10</strong>/08 1/15/08<br />

Develop Plan Goals and Objectives (Draft) 1/28/08 5/30/08 5/30/08<br />

Develop / Review Sediment Abatement Plan 6/30/08 6/30/08<br />

Prepare Working Draft Watershed Plan 8/3/09 8/3/09<br />

Review of Working Draft WMP by Project Team - Completed 9/30/09<br />

Status As Of: August 26, 2009<br />

The working Draft Watershed Management Plan is complete and is undergoing review by the project team members.<br />

Edits, comments and revisions will be collected and incorporated into a final Draft WMP by late October 2009.<br />

0<strong>21</strong> - Manasota Basin 295


L613<br />

Sarasota Imp. BMPs South Pelican Drive<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Flood Protection, Water Quality<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Sarasota County<br />

Project Manager SMITH, RANDY<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This project is to perform the Implementation of Best Management Practices (BMPs) element of the District's<br />

Watershed Management Program (WMP) for the Hudson Bayou Watershed in Sarasota County. This project will be<br />

implemented in the South Pelican Drive improvement area which has experienced chronic flooding over the past few<br />

years, especially during hurricane Jeanne in 2004. The project will eliminate structural flooding and improve residential<br />

roadway access by providing additional storage and improving conveyance. This will be accomplished through<br />

construction of an attenuation storage pond downstream of the flooded structures and upsizing conveyance pipes and<br />

channels between the flooded areas. The project is also expected to improve water quality by increasing residence<br />

time in the new storage area. This project includes construction of the BMP's and associated construction engineering<br />

and inspection.<br />

Benefits<br />

The project is expected to meet level of service criteria during a 25-year storm event, eliminate structural flooding of<br />

four structures and improve residential roadway access by providing additional storage and improving conveyance.<br />

The project is also expected to improve water quality by increasing residence times in the new storage area. The flood<br />

hazard mitigation benefit/cost ratio calculated by the County is 1.03.<br />

Costs<br />

The original FY2007 estimated project cost for construction was $594,000 and the District's share of $200,000 was<br />

funded by the Manasota Basin Board. The County was unable to secure the land necessary for the project, which has<br />

forced design changes and increased costs. The new estimated project cost for construction is $1,577,940. The<br />

District funding amounts shown in the table below include staff salaries, travel and central garage charges.<br />

Additional Information<br />

The WMP includes five major elements: 1) Topographic Information, 2) Watershed Evaluation, 3) Watershed<br />

Management Plan, 4) Implementation of BMPs, and 5) Maintenance of Watershed Parameters and Models.<br />

Implementing elements of the WMP with local governments is one of the Comprehensive Watershed Management<br />

(CWM) initiative strategies. The County previously budgeted funds for the project design, development of construction<br />

documents, construction permitting, land acquisition, and bidding and contractor selection. The probable construction<br />

costs for this project were based on the BMP alternative analysis developed by the County in its Hudson Bayou Master<br />

Plan completed in September 1994 and updated in April 1997. The County and the City of Sarasota will be required to<br />

acquire a joint drainage easement to implement the BMP. A cooperative funding expenditure agreement with the<br />

County was developed to complete the Implementation of BMPs. The County will manage the project, where the<br />

District project manager must approve any agreements to accomplish project tasks.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 206,711 0 3,311 3,493<br />

0 <strong>21</strong>3,515<br />

Project Funds Not Budgeted by the<br />

District<br />

Sarasota County 1,534,791 0 1,136<br />

0<br />

0 1,535,927<br />

0<strong>21</strong> - Manasota Basin 296<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$1,749,442


L613<br />

Sarasota Imp. BMPs South Pelican Drive<br />

Critical Project Milestones Projected Amended Actual<br />

1. Contract Development & Execution<br />

Negotiate Cooperative Funding Agreement with County <strong>10</strong>/31/06 1/5/07<br />

Cooperative Funding Agreement to Contract Administration 1/5/07 2/15/07 2/7/07<br />

Contract sent to County for BOCC Approval 3/14/07 3/14/07<br />

Signed Contract returned from County 4/2/07 4/30/07<br />

Contract Executed 4/16/07 5/3/07<br />

Notice to Proceed sent to County 4/16/07 5/5/07<br />

2. Critical Project Milestones<br />

Complete Design and Permitting 6/5/07 2/28/<strong>10</strong><br />

Bidding and Contractor Selection 11/5/07 4/1/<strong>10</strong><br />

Commence Construction 11/5/07 6/1/<strong>10</strong><br />

Complete Construction 1/5/09 6/1/11<br />

3. Project Close Out<br />

Submit As-Builts 5/5/09 8/1/11<br />

Contract Termination <strong>10</strong>/1/<strong>10</strong><br />

Status As Of: August 26, 2009<br />

Notice of FY2007 funding approval was sent to the County's project manager. A meeting was held with the County to<br />

discuss the scope of work and schedule. The County submitted a FY2008 funding request in the amount of $150,000 to<br />

cover additional costs associated with design changes that have occurred because the County was unable to secure<br />

land for the proposed stormwater pond. The Manasota Basin Board did not include the requested additional funding<br />

amount of $150,000 in its FY2008 budget because the project was on hold pending design changes. An e-mail was sent<br />

to the cooperator on August <strong>21</strong>, 2007 notifying that the additional funding request was not approved. On August <strong>21</strong>, 2007<br />

District staff requested information on how the County is going to make-up for the $150,000 shortfall. The Hazard<br />

Mitigation Grant in the amount of $258,375 that the County applied for has been denied. The land originally identified for<br />

the pond site could not be acquired. The County tried to negotiate land acquisition from the railroad company for an<br />

alternative pond site but the railroad company was not interested. The County is considering reducing the original level of<br />

service projection and using an existing downstream pond and shallow street swales to meet the water quality<br />

component. The County appropriated the remainder of the project costs in the FY2008 budget. The County submitted a<br />

revised project schedule on August 26, 2008 which extends beyond the contract termination date. District staff has<br />

advised the County that a no cost time extension will need to be requested to extend the contract. District staff met with<br />

the County on December 29, 2008 to discuss the project status. The County's project manager assured District staff that<br />

the issues holding up the progress of the project are being resolved. The project design is currently holding at 20 percent<br />

because the County is trying to resolve some modeling issues.<br />

0<strong>21</strong> - Manasota Basin 297


L614<br />

Sarasota Imp. BMPs Matheny Creek<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Flood Protection, Water Quality<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Sarasota County<br />

Project Manager SMITH, RANDY<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This is a multi-year funded project to perform the Implementation of Best Management Practices (BMPs) element of<br />

the District's Watershed Management Program (WMP) for the Matheny Creek Watershed in Sarasota County.<br />

This project will be implemented in the Siesta Heights improvement area. Intense rainfall combined with inadequate<br />

drainage facilities and high tides cause frequent flooding within the improvement area. The Siesta Heights culvert<br />

system will be enlarged and include grassed swales above the proposed storm drains and a Nutrient Separating Baffle<br />

Box to provide water quality treatment. This project includes construction of the BMP only. The proposed BMP will<br />

address level of service deficiencies and improve water quality.<br />

Benefits<br />

The project is expected to meet level of service criteria during a 25-year storm event that eliminates structural flooding<br />

of four structures and improves roadway access by improving conveyance. The project is also expected to improve<br />

water quality with increased grassed swale storage and installation of a baffle box sediment trap. According to the<br />

County, the project will provide approximately $833,000 in present-value flood mitigation benefits assuming a 50-year<br />

useful life.<br />

Costs<br />

The total budget amount for this project is $1,<strong>10</strong>0,000, of which the District's share is $425,000. The District<br />

appropriated $<strong>21</strong>2,500 in their FY2007 and FY2008 budgets. The District's share is being funded entirely by the<br />

Manasota Basin Board. The County will contribute $675,000 and is seeking $568,131 from FEMA through the Hazard<br />

Mitigation Grant Program. If the County receives the FEMA grant, the project budget will be refined according to<br />

Board Policy 130-4. When each task is completed the project budget may require refinement based on the<br />

information gathered. The District funding amounts shown in the table include staff salaries, travel and central<br />

garage charges.<br />

Additional Information<br />

The WMP includes five major elements: 1)Topographic Information, 2)Watershed Evaluation, 3)Watershed<br />

Management Plan, 4)Implementation of BMPs, and 5)Maintenance of Watershed Parameters and Models.<br />

Implementing elements of the WMP with local governments is one of the Comprehensive Watershed Management<br />

(CWM) initiative strategies. The probable construction cost for this project was based on the BMP alternative analysis<br />

developed by the County in its Matheny Creek Basin Master Plan. The County previously budgeted funds for the<br />

project design, development of construction documents, construction permitting, land acquisition, and bidding and<br />

contractor selection. Work will be performed in current County and Florida Department of Transportation rights-of-way.<br />

A cooperative funding expenditure agreement with County was developed as a multi-year funded project contingent on<br />

the approval of future funding to complete the Implementation of BMPs. The County will manage the project, where<br />

the District project manager must approve any agreements to accomplish project tasks.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 431,885 0 3,476 6,133<br />

0 441,494<br />

Project Funds Not Budgeted by the<br />

District<br />

Sarasota County 675,000 0 0<br />

0<br />

0 675,000<br />

0<strong>21</strong> - Manasota Basin 298<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$1,116,494


L614<br />

Sarasota Imp. BMPs Matheny Creek<br />

Critical Project Milestones Projected Amended Actual<br />

1. Contract Development & Execution<br />

Negotiate Cooperative Funding Agreement with County <strong>10</strong>/31/06 1/5/07<br />

Draft Agreement to Management Services 1/5/07 2/15/07 2/2/07<br />

Agreement returned from Management Services 3/14/07 3/14/07<br />

Contract sent to County for BOCC Approval 3/14/07 3/14/07<br />

Signed Contract returned from County 4/2/07 4/30/07<br />

Contract Execution 4/16/07 5/3/07<br />

Notice to Proceed 4/16/07 5/3/07<br />

2. Critical Project Milestones<br />

Complete Design and Permitting 6/5/07 4/1/09 4/1/09<br />

Bidding and Contractor Selection 11/5/07 <strong>10</strong>/30/09<br />

Commence Construction 11/5/07 12/31/09<br />

Complete Construction 1/5/09 9/1/<strong>10</strong><br />

3. Project Close Out<br />

Submit As-Builts 5/5/09 11/1/<strong>10</strong><br />

Contract Termination 11/30/<strong>10</strong><br />

Status As Of: August 26, 2009<br />

Notice of FY2007 funding approval was sent to the County's project manager. A meeting was held with the County in<br />

August 2006 to discuss the scope of work and schedule. The County submitted a FY2008 funding request in the amount<br />

of $<strong>21</strong>2,500 to cover second year funding of the multi-year funded project. Notice to Proceed was sent to the cooperator<br />

effective May 3, 2007. The Manasota Basin Board included the second year funding request of $<strong>21</strong>2,500 in its FY2008<br />

budget. The ERP modification for the baffle box is completed. The FDOT utility drainage permit and temporary<br />

construction easements were acquired. The County is updating the construction plans to accommodate utility<br />

adjustments along US 41. District staff met with the County on December 29, 2008 to discuss the project status. Design<br />

and Permitting were completed in April 2009. The construction component of the project was advertised for bid on<br />

August 22, 2009. The contractor pre-bid meeting is scheduled for September 3, 2009.<br />

0<strong>21</strong> - Manasota Basin 299


L615<br />

Sarasota Imp. BMPs Alligator Creek<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Flood Protection, Water Quality<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Sarasota County<br />

Project Manager SMITH, RANDY<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This is a multi-year funded project to perform an element of the District's Watershed Management Program (WMP) for<br />

the Implementation of Best Management Practices (BMPs) in the Alligator Creek Watershed. The watershed covers<br />

an area of approximately <strong>10</strong>.7 square miles and is located in Sarasota County. This project will implement several<br />

improvements in the following areas: 1) Banyan Drive - culverts and pond expansion with wetland plantings, 2)<br />

Briarwood area - upsizing of culverts and outfall pipe, 3) Bal Harbour Drive - stormwater collection system, 4) Venice<br />

East Drive - modify the control structure at Heron Lakes, and 5) Venice East Boulevard - installation of box culvert.<br />

Several of the roadways contiguous to these improvement areas become impassable during the <strong>10</strong>, 25, and <strong>10</strong>0-year<br />

storm events that result in a health and welfare threat to residents by creating changes in traffic flow and emergency<br />

vehicle routing. In addition, the project is expected to improve water quality by installing several Nutrient Separating<br />

Baffle Boxes to reduce non-point source pollutant loads. This project is also expected to improve water quality by<br />

increasing residence time through conversion of the old Briarwood wastewater treatment percolation ponds into<br />

stormwater ponds and by expanding the existing lake system storage capacity. This project includes construction of<br />

the BMP only.<br />

Benefits<br />

The project is expected to meet level of service criteria during a 25-year storm event, improving roadway access by<br />

increasing conveyance and providing additional storage in the watershed. The project is also expected to improve<br />

water quality by increasing residence times and installing several Nutrient Separating Baffle Boxes to reduce non-point<br />

source pollutant loads. According to the County, the project will provide approximately $2.3 million in present-value<br />

flood mitigation benefits assuming a 50-year useful life.<br />

Costs<br />

The total budget amount for this project is $4,220,000, of which the District's share is $1,500,000 over FY2007,<br />

FY2008 and FY2011. The District appropriated $750,000 in their FY2007 budget and $375,000 in their FY2008<br />

budget. The County withdrew its FY20<strong>10</strong> funding request of $375,000 because those funds would not be expended<br />

until FY2011. The County will request the remaining funds in FY2011 to complete the project. The District's share is<br />

being funded entirely by the Manasota Basin Board. The County budgeted $2,720,000 over FY2006, FY2007, FY2008,<br />

and FY2009. When each task is completed the project budget may require refinement based on the information<br />

gathered. The District funding amounts shown in the table include staff salaries, travel and central garage charges.<br />

Additional Information<br />

The WMP includes five major elements: 1) Topographic Information, 2) Watershed Evaluation, 3) Watershed<br />

Management Plan, 4) Implementation of BMPs, and 5) Maintenance of Watershed Parameters and Models.<br />

Implementing elements of the WMP with local governments is one of the Comprehensive Watershed Management<br />

(CWM) initiative strategies. The probable construction cost for this project was based on the BMP alternative analysis<br />

developed by the County in its Alligator Creek Basin Master Plan. The County previously budgeted funds for the<br />

project design, development of construction documents, construction permitting, land acquisition, and bidding and<br />

contractor selection. The County will be required to acquire easements in order to implement the BMPs. A cooperative<br />

funding expenditure agreement with County was developed as a multi-year funded project contingent on the approval<br />

of future funding to complete the Implementation of BMP's. The County will manage the project, where the District<br />

project manager must approve any agreements to accomplish project tasks.<br />

0<strong>21</strong> - Manasota Basin 300


L615<br />

Sarasota Imp. BMPs Alligator Creek<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 1,131,885 0 3,476 6,793 375,000 1,517,154<br />

Project Funds Not Budgeted by the<br />

District<br />

Sarasota County 2,345,000 0 375,000<br />

0<br />

0 2,720,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$4,237,154<br />

Critical Project Milestones Projected Amended Actual<br />

1. Contract Development & Execution<br />

Negotiate Cooperative Funding Agreement with County <strong>10</strong>/31/06 1/4/07<br />

Draft Agreement to Management Services 1/5/07 2/15/07 2/2/07<br />

Agreement returned from Management Services 3/16/07 3/20/07<br />

Contract sent to County for BOCC approval 3/16/07 3/28/07<br />

Signed Contract returned from County 4/2/07 5/18/07 5/14/07<br />

Contract Execution 4/16/07 5/25/07 5/15/07<br />

Notice to Proceed 4/16/07 5/28/07 5/17/07<br />

2. Critical Project Milestones<br />

Complete Design and Permitting 5/17/07 <strong>10</strong>/1/<strong>10</strong><br />

Bidding and Contractor Selection <strong>10</strong>/16/07 2/1/11<br />

Commence Construction <strong>10</strong>/16/07 3/1/11<br />

Complete Construction 6/16/09 3/1/12<br />

3. Project Close Out<br />

Submit As-Builts <strong>10</strong>/16/09 5/1/12<br />

Contract Termination 11/30/<strong>10</strong><br />

Status As Of: August 26, 2009<br />

Notice of FY2007 funding approval has been sent to the County's project manager. A meeting was held in August 2006<br />

with the County to discuss the scope of work and schedule. The County submitted an FY2008 funding request in the<br />

amount of $750,000 to cover second year funding of the multi-year funded project. The contract was sent to the County<br />

for signature on March 28, 2007. Due to budgetary constraints District staff only included $375,000 in the FY2008<br />

funding request. The Manasota Basin Board included the second year funding request of $375,000 in their FY2008<br />

Budget. The County requested the remaining $375,000 in FY2009 to complete the project. The County withdrew its<br />

FY2009 funding request because those funds would not be expended until FY20<strong>10</strong>. The County submitted a revised<br />

project schedule that extends beyond the contract termination date. District staff has notified the County that a no cost<br />

time extension would be required to extend the contract. District staff met with the County on December 29, 2008 to<br />

discuss the project status. The County requested the remaining $375,000 in FY20<strong>10</strong> to complete the project. The County<br />

withdrew its FY20<strong>10</strong> funding request because those funds would not be expended until FY2011. The County is currently<br />

trying to resolve unexpected stage rises indicated by the modeling effort. The project design is currently at 65 percent.<br />

0<strong>21</strong> - Manasota Basin 301


L617<br />

Sarasota NAVD88 Vertical Control Densification<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Sarasota County<br />

Project Manager OWENS, JIM<br />

Task Manager(s)<br />

Status Completed<br />

Description<br />

This project consists of land surveying to establishing geodetic quality vertical control, adjustment of field<br />

measurements to ensure that survey measurements meet established National Geodetic Survey (NGS) specifications,<br />

and the construction of physical survey monuments adhering to NGS specifications for approximately two hundred<br />

miles of level lines in Sarasota County. The data will be published on the NGS (www.ngs.noaa.gov) and Land<br />

Boundary Information System (www. labins.org) web sites for access by the surveying and mapping community. This<br />

project will result in survey elevations in the North American Vertical Datum of 1988 (NAVD88) and is part of a larger<br />

effort by federal, state and local governments to migrate from the older and less accurate National Geodetic Vertical<br />

Datum of 1929 (NGVD29) to the more accurate NAVD88 system.<br />

Benefits<br />

The establishment of an accurate and easily accessible vertical control survey network is an important component in<br />

the development of updated Federal Emergency Management Agency Flood Insurance Rate Maps (FEMA FIRM). The<br />

historical vertical datum used for FIRM maps, NGVD29, was established in the early part of the 20th century and was<br />

based on surveying technologies available at that time. Over time the NGVD29 control network has been degraded as<br />

benchmarks were destroyed or disturbed. Additionally, the inherent inaccuracies of the NGVD29 network do not allow<br />

it to be efficiently used in conjunction with modern surveying technologies such as global positioning systems (GPS).<br />

The District, along with federal, state and local agencies, is in the process of migrating from the older NGVD29 system<br />

to the more accurate NAVD88 control network.The vertical control network supports two aspects of FIRM creation and<br />

update. First, it provides the basic framework upon which all topographic information is collected using ground or aerial<br />

mapping surveys. A common survey framework is required to ensure that topographic mapping projects throughout<br />

the District are consistent and suitable for surface water modeling. Second, the vertical control network is used by<br />

surveyors to establish finished floor elevations, base flood elevations, elevation certificate information, and drainage<br />

infrastructure data. The densification of the existing survey control network will decrease the spacing between survey<br />

control benchmarks and therefore reduce costs for public and private surveyors to establish accurate vertical<br />

elevations.<br />

Costs<br />

This is a one-year project. The total project cost for contractual services is $200,000 with the Manasota Basin Board's<br />

share being $<strong>10</strong>0,000. Sarasota County will provide $<strong>10</strong>0,000 of the project cost. Additional costs are associated with<br />

staff time required to manage the project.<br />

Additional Information<br />

This project will be administered by the District. The County will reimburse the District for 50% of all costs associated<br />

with contractual services. Geodetic surveying services will be performed by the Department of Environmental<br />

Protection's (DEP), Bureau of Survey and Mapping, and will be coordinated with the NGS. DEP has provided similar<br />

surveying services for the District in the past, they also have completed similar work for the St Johns River and South<br />

Florida Water Management Districts. This project builds upon the base control network funded by the Governing<br />

Board under project B134 - NAVD88 Migration. Similar cooperative projects have been completed, or are underway,<br />

for Hillsborough, Pasco and Manatee Counties. The cooperator can meet all funding requirements for the project.<br />

0<strong>21</strong> - Manasota Basin 302


L617<br />

Sarasota NAVD88 Vertical Control Densification<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin <strong>10</strong>7,299 0 959<br />

0<br />

0 <strong>10</strong>8,258<br />

District Budgeted - Outside Revenue<br />

Sarasota Co - NAVD88 Control<br />

Densification(L617)<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

<strong>10</strong>0,000 0 0<br />

0<br />

Total:<br />

Future<br />

Funding<br />

0<br />

Total<br />

Funding<br />

<strong>10</strong>0,000<br />

$208,258<br />

Critical Project Milestones Projected Amended Actual<br />

Draft Cooperative Agreement to Management Services 11/3/06 11/6/06<br />

Draft Cooperative Agreement returned from Management Services 12/22/06 11/15/06<br />

Cooperative Agreement Contract executed 1/7/07 1/31/07<br />

Cooperative Agreement Notice to Proceed 2/28/07 2/20/07<br />

FDEP Surveying Contract Agreement to Management Services 3/1/07 2/27/07<br />

FDEP Contract returned from Management Services 3/15/07 3/9/07<br />

FDEP Contract executed 4/15/07 6/15/07 7/28/07<br />

FDEP Contract Notice to Proceed 6/1/07 6/23/07 8/1/07<br />

Fieldwork Complete 4/30/08 2/4/08<br />

FDEP Deliverables Complete 6/30/08 5/9/08<br />

Project Complete 9/30/08 6/6/08<br />

Contract Close Out 9/30/08 8/18/08<br />

Status As Of: December 15, 2008<br />

The FDEP/NGS staff have completed the initial formatting of the observation data and all data are submitted to the NGS<br />

for final adjustment and publishing. The FY2007 Sarasota Cooperative Agreement (L617) is complete; the District project<br />

manager coordinated this project with the Sarasota County Surveying and Mapping Department, FDEP Bureau of Survey<br />

& Mapping and the National Geodetic Survey (NGS). The FDEP field crews established a network of 317<br />

second-order NAVD88 benchmarks throughout Sarasota County.<br />

0<strong>21</strong> - Manasota Basin 303


L618<br />

Sarasota - Watershed Management Plan: Coastal Fringe<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Project Manager LOPEZ, MANNY<br />

Task Manager(s)<br />

Status Ongoing<br />

Sarasota County, Sarasota County Watershed Management<br />

TURNER, DAWN<br />

Description<br />

This proposed, multi-year funded project is to perform the 1) Topographic Information, 2) Watershed Evaluation, and<br />

3) Watershed Management Plan elements of the District's Watershed Management Program (WMP) for several<br />

coastal watersheds in Sarasota County. Watershed Management Plans will be updated for (1) the North Roberts Bay<br />

Coastal Watershed, (2) the Lemon Bay Coastal Watershed, and (3) portions of the Sarasota Bay, Little Sarasota Bay,<br />

Dona/Roberts Bay Coastal Watersheds. Combined, these Coastal Watershed areas cover approximately 25 square<br />

miles within the County. The only areas excluded from Sarasota's Coastal Fringe are a small portion of the Little<br />

Sarasota Bay Coastal (Vamo Road area) Basin and the Lyons Bay portion of the Dona Bay Coastal Basin, which are<br />

currently being developed under a separate contract. The Coastal Fringe Watershed updates include developing<br />

portions of the Watershed Management Program, as defined by the District, beginning with the North Roberts Bay<br />

Coastal Watershed as Phase 1. The North Roberts Bay Coastal Watershed is approximately 5.9 square miles in the<br />

coastal fringe of the Phillippi Creek and Matheny Creek Basins, including Siesta Key from Midnight Pass to Siesta<br />

Drive. Phase 2 includes the Lemon Bay Coastal Watershed, which is approximately 7.2 square miles, excluding the<br />

area outside of the County. Phase 3 includes portions of the Sarasota Bay, Little Sarasota Bay, Dona/Roberts Bay<br />

Coastal Watersheds. The total area in Phase 3 is approximately 9.2 square miles. These areas currently do not have<br />

the benefit of a Watershed Management Plan. FY2007 funding is for the development of Topographic Information and<br />

performance of the North Roberts Bay coastal watershed. FY2008, FY2009 and FY20<strong>10</strong> funding will continue the<br />

development and update of watershed plans for the remaining coastal areas including Little Sarasota Bay and Lemon<br />

Bay Coastal watersheds.<br />

Benefits<br />

The WMP provides a method to evaluate the capacity of a watershed to protect, enhance, and restore water quality<br />

and natural systems, while achieving flood protection. The information developed provides the science for the District's<br />

Resource Management and Environmental Resource Permitting (ERP). It assists local governments: 1) With their land<br />

management responsibilities by establishing a level of service and developing Best Management Practices (BMPs) to<br />

address level of service deficiencies and 2) Provides a Geodatabase and projected results from watershed model<br />

simulations for floodplain management and water quality management through the Total Maximum Daily Loads<br />

(TMDL) process for their National Pollution Discharge Elimination System (NPDES) permit requirements.<br />

Costs<br />

The estimated total budget amount for this multi-year project is $1,966,632, of which the District's share is $983,316 to<br />

be funded over several fiscal years. For FY2007, the Manasota Basin Board originally budgeted $500,000 with an<br />

equal match from Sarasota County. However, Sarasota County was only able to fund $246,491 of the original<br />

$500,000. Correspondingly, the District only encumbered $246,491 in FY2007 as part of the cooperative funding<br />

agreement. For FY2008, the Manasota Basin Board budgeted and encumbered $200,000 into the cooperative<br />

agreement. However, because of budget shortfalls, Sarasota County was unable to provide any funding in FY2008.<br />

To date, the District has encumbered $446,491 in funding for the project. For FY2009, Sarasota County encumbered<br />

$34,422 for project work. To date, Sarasota County has encumbered $280,913 for the project. Sarasota County has<br />

resumed it's requests for cooperative funding for this multi-year project in FY20<strong>10</strong> with a request for $200,000 and<br />

presumably an equal match. For FY20<strong>10</strong>, the District is budgeting $39,031 and anticipates the County will provide<br />

$200,000 in funding in order to reach the same level of funding as the District. As each project element is completed<br />

the project budget may require refinement based on the information gathered. The District funding amounts shown in<br />

the table include staff salaries, travel and central garage charges.<br />

Additional Information<br />

A WMP includes five major elements: 1) Topographic Information, 2) Watershed Evaluation, 3) Watershed<br />

Management Plan, 4) Implementation of Best Management Practices, and 5) Maintenance of Watershed Parameters<br />

and Models. Implementing elements of the WMP with local governments is one of the Comprehensive Watershed<br />

Management (CWM) initiative strategies. Future funding will be required in future years in order to complete<br />

development the Watershed Management Plan for the Sarasota Bay Coastal watershed including: survey, GIS data<br />

base development, watershed parameterization, computer modeling, floodplain analysis, and floodplain delineation,<br />

Level of Service (LOS) determination, and BMP Alternative Analysis. A cooperative funding expenditure agreement<br />

0<strong>21</strong> - Manasota Basin 304


L618<br />

Sarasota - Watershed Management Plan: Coastal Fringe<br />

with Sarasota County was developed as a multi-year funded project contingent on the approval of future funding to<br />

complete the WMP elements through the Watershed Management Plan. Because of delays caused by the<br />

unavailability of LiDar information, project work and consequently, project expenditures have not risen to the level of<br />

current project funding. Current funding is sufficient to carry project work through FY2009 without additional<br />

contributions from the District. Sarasota County will need to budget and encumber additional funding in FY20<strong>10</strong> in<br />

order to reach the same level of funding as the District. Sarasota County is the lead manager on the project, where<br />

the District's project manager must approve any agreements with consultants to accomplish project tasks. Future<br />

cooperative funding requests and agreements will be required for the Implementation of BMPs and the Maintenance<br />

of Watershed Parameters and Models.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 706,781 0 4,718 39,031 336,825 1,087,355<br />

Project Funds Not Budgeted by the<br />

District<br />

Sarasota County 246,492 0 34,422 200,000 502,403 983,317<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$2,070,672<br />

Critical Project Milestones Projected Amended Actual<br />

Contract Development & Execution<br />

Develop Draft Agreement with Sarasota County 12/20/06 5/25/07 7/1/07<br />

Cooperative Agreement to Contract Administration 1/27/07 7/15/07 7/23/07<br />

Execution of Cooperative Agreement by Sarasota County 3/30/07 6/30/07 8/28/07<br />

Execution of Cooperative Agreement by SWFWMD 5/<strong>10</strong>/07 9/5/07 9/12/07<br />

Issue Notice to Proceed 5/16/07 9/15/07 9/13/07<br />

Phase 1 - North Roberts Bay<br />

Receive / Review LiDAR Information 2/<strong>10</strong>/08 8/31/08 <strong>10</strong>/30/08<br />

Digital Topographic Information - Start 3/<strong>10</strong>/08 12/31/08 1/7/09<br />

Watershed Evaluation - Begin 5/<strong>10</strong>/08 2/25/09 2/25/09<br />

Digital Topographic Information - Approved 7/<strong>10</strong>/08 9/30/09<br />

Watershed Evaluation - Approved 8/<strong>10</strong>/08 12/30/09<br />

Watershed Management Plan - Begin 9/<strong>10</strong>/08 12/30/09<br />

Watershed Management Plan - Approved 12/30/08 4/30/<strong>10</strong><br />

Status As Of: August 26, 2009<br />

Currently, deliverables for feature inventory, terrain information and other watershed parameters are complete and have<br />

been delivered for review. Minor corrections and other changes have been forwarded and will be incorporated into<br />

revised versions of the deliverables. ERP files (permits) have been requested for review and developing additional<br />

information on features and elevations. Work continues on the watershed evaluation.<br />

0<strong>21</strong> - Manasota Basin 305


L623<br />

Venice Imp. BMPs Hatchett Creek Eastgate (Withdrawn)<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Flood Protection, Water Quality<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

City of Venice<br />

Project Manager PRATER, CORRINA<br />

Task Manager(s)<br />

NORTON, NANCY<br />

Status Withdrawn<br />

Description<br />

This project is to perform the Implementation of Best Management Practices (BMPs) element of the District's<br />

Watershed Management Program (WMP) for the Hatchett Creek Watershed in Sarasota County. This BMP will be<br />

implemented in the Eastgate improvement area. The project will improve flood protection level of service deficiencies<br />

by enlarging outfall pipes and providing additional storage within the watershed by increasing the size of the retention<br />

area. The proposed project will include an open swale ditch system or a stormwater retention pond to improve water<br />

quality by increasing residence time of stormwater runoff prior to discharge. With FY2007 funding, the work on the<br />

Implementation of BMPs will begin and includes the following tasks: hydraulic evaluation, design, development of<br />

construction documents, construction permitting, bidding and contractor selection, and construction of the BMPs.<br />

FY2008 funding will be used for the following tasks: evaluation, development of construction documents, construction<br />

permitting and construction of the BMPs.<br />

Benefits<br />

The project will improve level of service deficiencies by improving conveyance and providing additional storage within<br />

the watershed. The project is also expected to improve water quality by increasing residence times in the new storage<br />

area.<br />

Costs<br />

The total budgeted amount for this project is $305,000, of which the District's share is $92,500. The District's share is<br />

being funded entirely by the Manasota Basin Board. The City will contribute $<strong>21</strong>2,500. The City has previously<br />

expended approximately $120,000 for temporary flood mitigation activities within the project area, such as regrading<br />

drainage swales. For FY2007, $55,000 is appropriated in the Basin's budget. For FY2008, $37,500 is appropriated<br />

from the Manasota Basin to continue the project. When each task is completed the project budget may require<br />

refinement based on the information gathered. The probable construction costs for this project are based on the BMP<br />

alternative analysis developed by Sarasota County in the Hatchett Creek Master Plan. The District funding amounts<br />

shown in the table include staff salaries.<br />

Additional Information<br />

The WMP includes five major elements: 1) Topographic Information, 2) Watershed Evaluation, 3) Watershed<br />

Management Plan, 4) Implementation of BMPs, and 5) Maintenance of Watershed Parameters and Models.<br />

Implementing elements of the WMP with local governments is one of the Comprehensive Watershed Management<br />

(CWM) initiative strategies. Implementation of BMPs includes the following tasks: design, development of construction<br />

documents, construction permitting, land acquisition, bidding and contractor selection, construction of the BMPs and<br />

construction engineering and inspection. The City previously budgeted funds for the improvement area for performing<br />

temporary mitigation by regrading drainage swales. A cooperative funding expenditure agreement with the City will be<br />

developed to complete the Implementation of BMPs. The City will manage the project, where the District project<br />

manager must approve any agreements to accomplish project tasks.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 98,564 0 4,780<br />

0<br />

0 <strong>10</strong>3,344<br />

Project Funds Not Budgeted by the<br />

District<br />

City of Venice <strong>21</strong>2,500 0 0<br />

0<br />

0 <strong>21</strong>2,500<br />

0<strong>21</strong> - Manasota Basin 306<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$315,844


L623<br />

Venice Imp. BMPs Hatchett Creek Eastgate (Withdrawn)<br />

Critical Project Milestones Projected Amended Actual<br />

1. Contract Development & Execution<br />

Draft Agreement to Management Services 3/19/07 2/28/07<br />

Contract returned from Management Services 4/9/07 5/1/07<br />

Contract sent to City 4/16/07 5/3/07<br />

Signed contract returned from City 5/14/07 6/4/07<br />

Contract Execution 5/28/07 6/6/07<br />

Notice to Proceed 6/4/07 6/7/07<br />

2. Critical Project Milestones<br />

Acquire All Permits, Government Approvals, & Real Property Rights for Project 6/4/08<br />

Complete Design and Permitting 6/4/08<br />

Bidding and Contractor Selection 9/4/08<br />

Commence Construction 11/4/08<br />

Complete Construction 2/4/09<br />

3. Project Closeout<br />

Submit As-Builts 2/19/<strong>10</strong><br />

Contract Termination 3/19/<strong>10</strong><br />

Status As Of: October 29, 2008<br />

On February 22, 2008, the City submitted a request for construction with no-permit required to the Sarasota Regulation<br />

Department for upsizing the pipes at Laurel and Cypress. The City was originally going to construct a stormwater pond in<br />

a local park off-site and have the water transported to this pond. During the pre-application meeting with Sarasota's<br />

Regulation Department, they were informed that they would not receive a permit if they were transporting the water off<br />

site. They decided to remove the pond from the plans and pursue construction with no permit required. On March 27,<br />

2008 the City received notification from the Sarasota Regulation that a permit is not required for construction. The<br />

revised construction with no-permit required will change the original project intent. The District received an updated<br />

scope of work from the City on April 18, 2008. The District had concerns regarding whether the new scope of work<br />

modified the objectives of the original plan. A meeting occurred on April 29, 2008 between the District and the City. The<br />

District expressed their concerns regarding the change in scope of work and the potential loss of water quality<br />

improvement. The District received a letter on May 12, 2008 from the City Engineer with the water quality improvement<br />

calculations and cost benefit analysis. The District had concerns regarding the accuracy of the calculations. District Staff<br />

contacted the City's Engineer and discussed the validity of the letter. Both concurred that there was no water quality<br />

improvement without the stormwater pond. On June 13, 2008, the District received a letter from the City requesting to<br />

withdraw the project due to an inability to improve water quality. District Staff sent a letter on June 26, 2008 accepting the<br />

City's withdrawal request. A recap indicating contract termination will be included as an information item at the Manasota<br />

Basin Board October 2008 meeting. Funds from this project have been liquidated and balance forwarded.<br />

0<strong>21</strong> - Manasota Basin 307


L624<br />

Venice Imp. BMPs Hatchett Creek-Venice<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Flood Protection, Water Quality<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

City of Venice<br />

Project Manager PRATER, CORRINA<br />

Task Manager(s)<br />

Status Ongoing<br />

NORTON, NANCY<br />

Description<br />

This project is to perform the Implementation of Best Management Practices (BMPs) element of the District's<br />

Watershed Management Program (WMP) for the Hatchett Creek Watershed in Sarasota County. This BMP will be<br />

implemented in the Venice Avenue improvement area. The existing stormwater system on Venice Avenue, U.S.41<br />

Bypass and Warfield Avenue is undersized and causes flooding of the roadways. Venice Avenue and U.S. 41 Bypass<br />

are evacuation routes and Warfield Avenue is an access road for the City of Venice Utilities Department, water<br />

treatment plant and area businesses. Extensive flooding has caused the closure of the Warfield Avenue and U.S. 41<br />

Bypass intersection 3 to 4 times a year when daily rainfall exceeds 3 inches. The proposed stormwater system will be<br />

designed to a <strong>10</strong>0-year, 24-hour rainfall event. The existing stormwater system on Warfield Avenue will be enlarged<br />

and replaced with new pipe, curb inlets and outfall pipes. Two additional curb inlets and connector pipes will be added<br />

at the intersection of U.S. 41 Bypass and Venice Avenue. In addition, stormwater will be directed to the retention pond<br />

at East Venice Avenue and Warfield Avenue. The existing pond may require modification due to the added water<br />

volume being treated. The proposed BMP will address level of service deficiencies. With FY2007 funding the work on<br />

the Implementation of BMPs will begin and includes the following tasks: evaluation, design, development of<br />

construction documents, construction permitting, bidding and contractor selection, and construction of the BMPs.<br />

Benefits<br />

The project will improve level of service deficiencies by improving conveyance and providing additional storage within<br />

the watershed. The project is also expected to improve water quality by increasing residence times in the storage area.<br />

Repairing the damaged stormwater pipes that are seeping sediment into the system and Hatchett Creek outfall will<br />

enhance stormwater quality.<br />

Costs<br />

The total budget amount for this project is $351,670, of which the District's share is $175,835. The District's share is<br />

being funded entirely by the Manasota Basin. The City is contributing $175,835 over FY2007 and FY2008. When each<br />

task is completed the project budget may require refinement based on the information gathered. The District funding<br />

amounts shown in the table include staff salaries, travel and central garage charges.<br />

Additional Information<br />

The WMP includes five major elements: 1) Topographic Information, 2) Watershed Evaluation, 3) Watershed<br />

Management Plan, 4) Implementation of BMPs, and 5) Maintenance of Watershed Parameters and Models.<br />

Implementing elements of the WMP with local governments is one of the Comprehensive Watershed Management<br />

(CWM) initiative strategies. Future funding to complete the project will be provided by the City that will satisfy its<br />

cooperative funding match requirements. The City will manage the project, where the District project manager must<br />

approve any agreements to accomplish project tasks.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 179,805 0 6,490 3,947<br />

0 190,242<br />

Project Funds Not Budgeted by the<br />

District<br />

City of Venice 175,835 0 0<br />

0<br />

0 175,835<br />

0<strong>21</strong> - Manasota Basin 308<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$366,077


L624<br />

Venice Imp. BMPs Hatchett Creek-Venice<br />

Critical Project Milestones Projected Amended Actual<br />

1. Contract Development & Execution<br />

Negotiate Cooperative Funding Agreement with City <strong>10</strong>/31/06 9/14/06<br />

Draft Agreement to Management Services 3/19/07 2/28/07<br />

Agreement returned from Management Services 4/9/07 5/1/07<br />

Contract sent to City for Approval 4/16/07 5/3/07<br />

Signed Contract returned from City 5/14/07 6/4/07<br />

Contract Execution 5/28/07 6/6/07<br />

Notice to Proceed 6/4/07 6/7/07<br />

2. Critical Project Milestones<br />

Acquire All Permits, Government Approvals, & Real Property Rights for Project 6/4/08 4/4/08<br />

Complete Design and Permitting 6/4/08 4/4/08<br />

Bidding and Contractor Selection 9/4/08<br />

Commence Construction 11/4/08<br />

Complete Construction 12/31/09<br />

3. Project Closeout<br />

Submit As-Builts 2/19/<strong>10</strong><br />

Contract Termination 3/19/<strong>10</strong><br />

Status As Of: August 24, 2009<br />

The City has decided to add a baffle box into the plans to meet their water quality improvement goals. With the baffle<br />

box, this project will meet all original intentions. The City has requested a no cost time extension due to a delay with their<br />

contract development with FEMA. An amendment was developed and routed. The amendment was mailed to the City<br />

and will be signed at their Council meeting in September. Construction Bid documents have been developed and District<br />

staff is currently reviewing them.<br />

0<strong>21</strong> - Manasota Basin 309


L627<br />

City of North Port Water Conservation and Retrofit Project<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

City of North Port - Public Utilities<br />

Project Manager MUSICARO, MELISSA<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This project consists of offering financial incentives to single-family customers for replacing conventional toilets with<br />

water-conserving equivalents, and installing rain sensors on automatic irrigation systems. For customers that<br />

participate in the program, the City also provided approximately 412 low-flow (2.5 gallons per minute, or gpm) shower<br />

heads to replace conventional models (5-7 gpm). The project targeted the replacement of approximately 824<br />

conventional toilets with low-flow toilets, which use up to 1.6 gallons per flush (gpf). The project also targeted the<br />

installation of approximately 412 rain sensor devices. The City provided a $<strong>10</strong>0 credit to the customers' water bill upon<br />

low-flow toilet installation and inspection, and a $50 credit for the purchase and installation of a rain sensor.<br />

Benefits<br />

This project is anticipated to save an estimated 22,145 gallons of water per day. The various devices to be installed for<br />

this project have different life spans. The estimated water savings was calculated using a weighted average based on<br />

the total benefit for the life of the project.<br />

Costs<br />

The total project cost is $137,600, and the Manasota Basin Board approved funding in the amount of $68,800 in<br />

FY2007. The cost amortized at 8 percent over 20 years, is $1.71 per thousand gallons saved (calculated using a<br />

weighted average based on the total benefit for the life of the project).<br />

Additional Information<br />

In addition to providing financial assistance for the installation of low- flow toilets, a goal of this project is to educate all<br />

program participants on methods of indoor water conservation and proper maintenance practices to ensure low flow<br />

toilets remain a water conservative fixture. Educational materials on flapper replacement and other water conservation<br />

techniques will be disseminated to all program particpants. The City plans to hire a consultant to administer the<br />

project.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 72,233 0 1,934 3,033<br />

0 77,200<br />

Project Funds Not Budgeted by the<br />

District<br />

City of North Port 58,500 0 0<br />

0<br />

0 58,500<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$135,700<br />

Critical Project Milestones Projected Amended Actual<br />

Draft Agreement to Contract Administration 1/1/07 1/2/07<br />

Draft Agreement returned from Contract Administration 1/31/07 1/9/07<br />

Contract Executed 3/31/07 3/7/07<br />

Notice to Proceed 4/1/07 3/8/07<br />

Basin Board Notification 6/13/07 6/16/07<br />

Rebates Commence 8/1/07 3/1/07<br />

Rebates Complete 8/1/08 <strong>10</strong>/31/08<br />

0<strong>21</strong> - Manasota Basin 3<strong>10</strong>


L627<br />

City of North Port Water Conservation and Retrofit Project<br />

Project Complete 9/1/09<br />

Contract Termination 12/31/09<br />

Status As Of: August 31, 2009<br />

The Agreement was executed on March 7, 2007. Toilet rebates are complete, with a total of 715 toilets installed and 32<br />

showerheads distributed. The city continues to receive customer satisfaction surveys; to date, all participants are<br />

satisfied with the new toilets. The final project report will be submitted in September 2009.<br />

0<strong>21</strong> - Manasota Basin 311


L693<br />

Water Exhibits in the Glazer Children's Museum of Tampa<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers, Pinellas-Anclote River,<br />

Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

The Children's Museum of Tampa<br />

Project Manager HULL, MARY MARGARET<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

The Glazer Children's Museum of Tampa is relocating to a new museum site in Riverfront Park in downtown Tampa.<br />

This multi-year project is part of the City of Tampa's efforts to revitalize the downtown business district. This is the third<br />

and final phase of a project to develop and install water exhibits in the museum. In FY2007, the District funded the<br />

planning and development phase for interactive water exhibits. FY2008 funds paid for detailed specifications,<br />

structural engineering, fabrication of support structure, construction of entrances, partial platform construction and<br />

other expenses related to fabrication. In the conceptual phase, District staff and BBEC members were included in<br />

several planning sessions for the design of the interactive water exhibits to ensure they incorporate the District's<br />

message. These exhibits include Water's Journey, which is a three-story climbing structure where visitors "become" a<br />

drop of water and make their way across the watershed, down through the aquifer, up to the city, down a storm drain<br />

and into a swamp. Another exhibit is the Water Bank, which is styled to look like an ATM. Here visitors explore some<br />

of the issues of water supply and demand. Sample depositors of water into the ATM are rain, reservoir, desalination<br />

plants, etc. Withdrawals of water are made by wildlife, wetlands, cities, people, industry, agriculture, etc. Interest is<br />

earned by saving water through a variety of water conservation actions, such as turning the water off when brushing<br />

teeth, using Florida-Friendly LandscapingTM principles, etc. The FY2009 funding is for exhibit construction and<br />

installation.The museum is scheduled to open to the public in May/June 20<strong>10</strong>.<br />

Benefits<br />

The exhibits are multidisciplinary and designed to engage diverse learning styles. The museum is projected to draw<br />

<strong>10</strong>0,000 people annually. The interactive water exhibits address three elements of the District's AORs -- water supply,<br />

water quality and natural systems -- in simple, easy-to-understand terms. Additionally, this project targets children ages<br />

0-<strong>10</strong> years and accompanying adults. This segment of the population was identified in an independent evaluation of<br />

the District's youth education program as one to which the District needed to expand its reach. This project helps<br />

accomplish this goal.<br />

Costs<br />

The total cost of the project (including building construction and all exhibits throughout the museum) is estimated to be<br />

$20 million. The total contribution from the District, including FY2007, FY2008 and FY2009, is $617,442. In FY2007,<br />

the basins shared $112,500 for the planning and development phase for interactive water exhibits. FY2008 funds were<br />

for detailed specifications, structural engineering, fabrication of support structure, construction of entrances, partial<br />

platform construction and other expenses related to fabrication. FY2009 funds are for completion of the exhibit<br />

fabrication, installation and education program development. Phase 3 FY2009 funding request of $252,471 is<br />

allocated as follows:<br />

Alafia River: 12% $29,968;<br />

Hillsborough River: 27% $68,900;<br />

Northwest Hillsborough: 15% $37,340;<br />

Coastal Rivers: 9% $22,249;<br />

Pinellas-Anclote: 14% $35,396;<br />

Withlacoochee River: 5% $12,8<strong>21</strong>;<br />

Peace River: 8% $20,550;<br />

Manasota: <strong>10</strong>% $25,247.<br />

The funding splits for this project are based on cooperator-supplied projections of museum attendance. This project<br />

anticipates reaching <strong>10</strong>0,000 people per year at a cost (for the total project, all phases) to the District of $6.18 per<br />

person. Typical museum exhibits have a <strong>10</strong>-year life span. This project, therefore, has the potential to reach 1 million<br />

visitors over a <strong>10</strong>-year period at a cost to the District of $0.62 per person. The budget lines below include costs for<br />

staff to manage the project.<br />

0<strong>21</strong> - Manasota Basin 312


L693<br />

Water Exhibits in the Glazer Children's Museum of Tampa<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

011 Alafia River Basin 44,818 0 29,968<br />

0<br />

0 74,786<br />

013 Hillsborough River Basin <strong>10</strong>2,175 0 69,090<br />

0<br />

0 171,265<br />

014 Northwest Hillsborough Basin 56,915 0 37,340<br />

0<br />

0 94,255<br />

015 Coastal Rivers Basin 25,960 0 23,001 777<br />

0 49,738<br />

016 Pinellas-Anclote River Basin 63,5<strong>21</strong> 0 35,396<br />

0<br />

0 98,917<br />

019 Withlacoochee River Basin 15,940 0 13,573 777<br />

0 30,290<br />

020 Peace River Basin 27,455 0 <strong>21</strong>,302 777<br />

0 49,534<br />

0<strong>21</strong> Manasota Basin 31,339 0 25,999 777<br />

0 58,115<br />

Project Funds Not Budgeted by the<br />

District<br />

Glazer Children's Museum of Tampa 291,457 0 5,231,463<br />

0<br />

0 5,522,920<br />

Other Funding Sources 6,072,500 0 13,018,602<br />

0<br />

0 19,091,<strong>10</strong>2<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$25,240,922<br />

Critical Project Milestones Projected Amended Actual<br />

FY2007 Budgeted Funds<br />

FY2007 purchase order opened 4/30/07 4/26/07<br />

Confirmation and layout of exhibits in building 6/30/07 6/30/07<br />

Schematic design and fabrication documents 12/30/07 12/14/07<br />

FY2008 Budgeted Funds<br />

FY2008 contract executed 5/15/08 9/15/08 9/<strong>10</strong>/08<br />

Project meeting with Museum staff and architect 7/6/09 7/6/09<br />

FY2008 components completed 12/31/09<br />

FY2009 Budgeted Funds<br />

FY2009 contract executed 9/1/09 9/30/09<br />

Building construction complete 3/1/<strong>10</strong><br />

Exhibts installed 7/1/<strong>10</strong><br />

FY2009 components completed 8/1/<strong>10</strong><br />

Museum grand opening 9/30/<strong>10</strong><br />

Status As Of: September <strong>10</strong>, 2009<br />

Construction of the Museum building is under way and expected to be complete by March 20<strong>10</strong>. Once the building<br />

construction is complete; exhibit installation will take an additional 4 to 6 months. The fabrication of the major exhibit,<br />

Water's Journey, will happen concurrently with the building's construction. The project manager attended a meeting with<br />

Museum staff and the Water's Journey and Water Bank exhibits designer, Reb Haizlip (also the new building's architect),<br />

at the Glazer Children's Museum offices on July 6. The contract for the project's final Phase 3 is being routed through<br />

District staff. ACTION-TO-DATE: On time.<br />

0<strong>21</strong> - Manasota Basin 313


L854<br />

Bradenton/Manatee Co./Palmetto Reuse Interconnect Study<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply, Water Quality<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

City of Bradenton<br />

Project Manager MCGOOKEY, SCOTT<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This project is to perform a detailed study of the interconnection of the existing reclaimed water reuse systems of the<br />

City of Bradenton with the City of Palmetto and the City of Bradenton with Manatee County (MARS). The study will<br />

determine the amounts of reclaimed water from the City of Bradenton that can be beneficially reused during the next<br />

20 years by the City of Palmetto and Manatee County, and develop preliminary designs for the pumping, transmission<br />

and control facilities required to interconnect the three reuse systems. In addition to a final report, a 20-year agreement<br />

between the two cities and the city and county for implementing and operating the interconnected systems will be a<br />

project deliverable.<br />

Benefits<br />

This interconnection study will provide the City of Bradenton, Manatee County, the City of Palmetto, and the District<br />

with an implementable plan for interconnection of the three reuse systems.<br />

Costs<br />

The total project cost is estimated to be $120,000 and the District's share is $40,000 in FY2008. The City of Bradenton<br />

will fund $80,000 and plans to receive $20,000 from Manatee County and $20,000 from the City of Palmetto. Any<br />

additional funds are for staff time.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 47,2<strong>21</strong> 0 3,661 779<br />

0 51,661<br />

Project Funds Not Budgeted by the<br />

District<br />

City of Bradenton 40,000 0 0<br />

0<br />

0 40,000<br />

City of Palmetto 20,000 0 0<br />

0<br />

0 20,000<br />

Manatee County 20,000 0 0<br />

0<br />

0 20,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$131,661<br />

Critical Project Milestones Projected Amended Actual<br />

Agreement Executed: 1/31/08 2/25/08<br />

Begin Interconnect Study: 3/31/08 3/31/08<br />

Complete Interconnect Study: 5/29/09 5/30/09<br />

Status As Of: August 25, 2009<br />

The agreement was executed on February 25, 2008. The consultant, Jones, Edmunds & Associates, Inc. was given a<br />

notice to proceed on March 31, 2008. A project kick-off meeting was held May 19, 2008. Draft interlocal agreements<br />

between the City of Bradenton and City of Palmetto and between the City of Bradenton and Manatee County have been<br />

prepared and reviewed by the City attorney. Data show that the City of Palmetto will have adequate reclaimed water from<br />

it's own reuse system to meet there needs for the next twenty years. An agreement between the City of Bradenton and<br />

Manatee County for the City to provide MARS the desired quantities of reclaimed water appears unlikely. The study of<br />

the interconnect between Bradenton and Palmetto was completed May 25, 2009. The study of the interconnect between<br />

0<strong>21</strong> - Manasota Basin 314


L854<br />

Bradenton/Manatee Co./Palmetto Reuse Interconnect Study<br />

Bradenton and Manatee County was completed May 30, 2009. This project is now complete. The final invoice is being<br />

prepared by the City of Bradenton.<br />

0<strong>21</strong> - Manasota Basin 315


L867<br />

Sarasota County GIS Dataset Development<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Flood Protection, Water Quality, Natural Systems<br />

Basin(s) General Fund (District), Manasota<br />

Cooperator(s)<br />

Sarasota County<br />

Project Manager FITOS, EKATERINA<br />

Task Manager(s)<br />

Status Ongoing<br />

TURNER, DAWN, DICKS, STEVE, FITOS, EKATERINA<br />

Description<br />

Sarasota County Environmental Services is creating and maintaining a comprehensive Geographic Information<br />

System (GIS) database to support surface water modeling and stormwater asset management functions. This project<br />

enhances the quality of the data supporting modeling activities by gathering accurate locations and characteristics of<br />

key stormwater assets. Among many potential applications, these data will aid in the development and management of<br />

watershed management plans through hydrologic model maintenance/updates and point and non-point pollutant<br />

source identification. The funding will be used to enhance the County's current stormwater infrastructure database that<br />

consists of control structures, inlets, pipes, pipelines, ditches, swales and retention/detention ponds. These data will be<br />

used by the County to generate and maintain a common database that will support water quality, hydrologic and<br />

hydraulic models. This database will also be compatible with the District's GIS database standards.<br />

Benefits<br />

Drainage infrastructure is a critical component in the calibration and verification of hydrologic and hydraulic models.<br />

When fully calibrated, these models generate accurate stage-area relationships, allowing County staff to generate<br />

precise floodplain maps needed to estimate flood risks. When paired with topographic data, Sarasota County will be<br />

able to move ahead with Federal Emergency Management Agency Map Modernization efforts. The improved database<br />

will allow the County to initiate proactive flood protection measures that include the rapid assessment and identification<br />

of potential flooding hot spots, and development of complex what-if scenarios. The database will also support water<br />

quality management efforts and to ensure fishable and swimable waters. County staff will be better equipped to identify<br />

and model key water monitoring locations within coastal watersheds.<br />

Costs<br />

Costs for FY2009 include $<strong>10</strong>0,000 from the Manasota Basin Board and $150,000 from Sarasota County. The cost of<br />

the project through FY2008 is $306,742. The Manasota Basin Board is contributing $<strong>10</strong>0,000 and Sarasota County is<br />

$206,742.<br />

Additional Information<br />

As part of the hydrologic model and for the purposes of this project, horizontal survey data collection refers to<br />

structures such as pump stations, weirs, ponds and wetlands which combine to form part of a drainage infrastructure.<br />

By collecting this information through the means of a horizontal survey the data can be used for more accurate<br />

modeling in the event of severe weather impacts or for planning purposes due to urbanization.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin <strong>10</strong>1,278 0 <strong>10</strong>1,420 <strong>10</strong>2,727 200,000 505,425<br />

Project Funds Not Budgeted by the<br />

District<br />

Sarasota County 306,742 0 200,000 200,000 500,000 1,206,742<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$1,712,167<br />

Critical Project Milestones Projected Amended Actual<br />

Phase 2 - FY 2008<br />

Contract Execution 12/19/07 9/15/08 9/5/08<br />

0<strong>21</strong> - Manasota Basin 316


L867<br />

Sarasota County GIS Dataset Development<br />

Notice to Proceed 1/3/08 9/15/08 9/5/08<br />

Task 1 - Project Initiation <strong>Meeting</strong> and Field Collection 2/25/08 5/31/08 4/25/08<br />

Task 2 - Field Data Collection 3/15/08 12/31/08<br />

Task 3 - Establish Connectivity and Office QA/QC 3/15/08 1/31/09<br />

Phase 3 - FY 2009<br />

Contract Execution 1/15/09 5/30/09<br />

Notice to Proceed 1/30/09 6/1/09<br />

Task 1 - Project Initiation <strong>Meeting</strong> and Field Collection 1/31/09 1/<strong>21</strong>/09<br />

Task 2 - Field Data Collection 2/28/09<br />

Task 3 - Establish Connectivity and Office QA/QC 3/31/09<br />

Phase 4 - FY 20<strong>10</strong><br />

Contract Execution 9/1/09<br />

Notice to Proceed <strong>10</strong>/1/09<br />

Task 1 - Project Initiation <strong>Meeting</strong> and Field Collection <strong>10</strong>/1/09<br />

Task 2 - Field Data Collection 7/30/<strong>10</strong><br />

Task 3 - Establish Connectivity and Office QA/QC 9/30/<strong>10</strong><br />

Status As Of: August 25, 2009<br />

FY2008 - Phase 2: Project has been completed and closed out. FY2009 - Phase 3: The District and the County met on<br />

June 18th to discuss the project schedule, timeline and deliverables. The District, upon review of Phase 2 deliverables,<br />

made minor modification to the Scope of Work. The Agreement has been routed through the District. The original signed<br />

copies of the agreement have been forwarded to the County for signature at the September 8th Board of County<br />

Commissioner meeting. FY20<strong>10</strong> - Phase 4: The County has been updated on the budget status for this project.<br />

ACTION-TO-DATE: Delayed. For Phase 2, the County has contracted with the Consultant, and initiated work on the<br />

project since February 2009. The Agreement being routed is dated to be retro-active upon execution by both parties.<br />

0<strong>21</strong> - Manasota Basin 317


L869<br />

(Completed) Englewood Reuse Transmission - Park Forest<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply, Water Quality<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Englewood Water District<br />

Project Manager MCGOOKEY, SCOTT<br />

Task Manager(s)<br />

Status Completed<br />

Description<br />

This project consists of the design and construction of approximately 3,800 feet of 6" and 4" reuse transmission line to<br />

connect the Park Forest Subdivision to the Englewoods Reuse System. The Park Forest Subdivision currently uses<br />

stormwater and groundwater to irrigate the existing 73 residences of the Development.<br />

Benefits<br />

The project provides 43,800 gallons per day (gpd) of reclaimed water to 73 residential customers to offset <strong>21</strong>,900 gpd<br />

of potable groundwater supply.<br />

Costs<br />

The total project cost is estimated to be $240,000. The District's FY2008 share will be $117,500 with $5,000 budgeted<br />

from the WPST Fund. The Englewood Water District will be responsible for the remaining funds of $117,500. The<br />

cost, amortized at 8% over 30 years is $2.64 per <strong>10</strong>00 gallons offset.<br />

Additional Information<br />

The reclaimed water will be supplied under pressure to the developments irrigation system. The development has<br />

been experiencing problems getting sufficient quantity from its groundwater sources. Of the estimated total cost of<br />

$240,000, design is estimated to cost $65,000 and the remaining $175,000 has been allocated for construction. The<br />

reclaimed water will be supplied under pressure to the developments irrigation system. The development has been<br />

experiencing problems getting sufficient quantity from its groundwater sources. Of the estimated total cost of<br />

$240,000, design is estimated to cost $65,000 and the remaining $175,000 has been allocated for construction.<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 1<strong>21</strong>,134 0 1,465<br />

0<br />

0 122,599<br />

District Budgeted - Outside Revenue<br />

Water Protection & Sust T.F.<br />

(Alternative Wtr)<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

5,000 0 0<br />

0<br />

Project Funds Not Budgeted by the<br />

District<br />

Englewood Water District 117,500 0 0<br />

0<br />

0 117,500<br />

Total:<br />

Future<br />

Funding<br />

0<br />

Total<br />

Funding<br />

5,000<br />

$245,099<br />

Critical Project Milestones Projected Amended Actual<br />

Agreement Executed: 3/31/08 4/16/08<br />

Begin Design and Permitting: 4/25/08 4/23/08<br />

Complete Design and Permitting: 8/30/08 8/30/08<br />

Start Construction: 11/30/08 12/8/08<br />

Complete Construction: 3/31/09 3/13/09<br />

Project Complete: 6/30/09 4/29/09<br />

0<strong>21</strong> - Manasota Basin 318


L869<br />

(Completed) Englewood Reuse Transmission - Park Forest<br />

Status As Of: June 16, 2009<br />

The design and permitting is complete. The mandatory pre-bid meeting was held September 23, 2008. Eleven<br />

contractors purchased bid packages. Bid opening was held October 14th with bid award on November 6, 2008.<br />

Construction started on the project December 8, 2008 and was completed March 13, 2009. The Park Forest<br />

development is now receiving reclaimed water. EWD submitted a final invoice for $81,126.38 which included $5,000 of<br />

WPSTF's. The invoice was paid by the District April 29, 2009. This project is complete.<br />

0<strong>21</strong> - Manasota Basin 319


L874<br />

Aqua Utilities Reuse Transmission - Eastern Lakewood Ranch<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply, Water Quality<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Aqua Utilities Florida, Inc.<br />

Project Manager MCGOOKEY, SCOTT<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This project consists of the design and construction of 7,500 feet of 12" reclaimed water transmission line, 16,500 feet<br />

of 20" reclaimed water line, and a pump station to provide reclaimed water to the residential and agricultural areas in<br />

the eastern part of Lakewood Ranch. The reuse transmission main will interconnect the Lakewood Ranch Phase VII-D<br />

Lake, with new residential developments and existing agricultural areas along Loraine Road, south of University<br />

Boulevard, and east along University Boulevard from Loraine Road.<br />

Benefits<br />

The project will provide approximately 1.15 mgd of reclaimed water to meet the near term residential and agricultural<br />

demands. Residential demand will be 0.57 mgd and agricultural demand 0.58 mgd. At build-out it will provide 1.5 mgd<br />

to meet the irrigation need in this eastern area of Lakewood Ranch. It is projected that <strong>10</strong>0% of the reuse water will<br />

replace future and existing groundwater demand from the Floridan aquifer.<br />

Costs<br />

The total project cost is estimated to be $3,274,000 and the District's share is $734,800 in FY2008 and $818,500 in<br />

FY2009 for a total of $1,553,300. The WPSTF has budgeted $167,400 in FY2008. The cost, amortized at 8 percent<br />

over 30 years, is $0.53 per <strong>10</strong>00 gallon offset. Any additional funds are for staff time.<br />

Additional Information<br />

The agricultural customer is Shreoder Manatee (Water Use Permit 207846.022). Beyond the immediate residential<br />

need, at build-out the project will provide 1.5 mgd of reclaimed water to meet the irrigation need in this eastern area of<br />

Lakewood Ranch. It is projected that <strong>10</strong>0% of the reclaimed water will replace future and existing groundwater<br />

demand from the Floridan aquifer. Of the $3,274,000 total cost, design is estimated to cost $320,000, and the<br />

remaining $2,954,000 is allocated for construction.<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 738,409 0 822,335 2,331<br />

0 1,563,075<br />

District Budgeted - Outside Revenue<br />

Water Protection & Sust T.F.<br />

(Alternative Wtr)<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

167,400 0 0<br />

0<br />

0<br />

167,400<br />

Project Funds Not Budgeted by the<br />

District<br />

Aqua Utilities 734,800 0 818,500<br />

0<br />

0 1,553,300<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$3,283,775<br />

Critical Project Milestones Projected Amended Actual<br />

Begin Design: 11/30/07 12/14/07<br />

Execute Agreement: 1/31/08 3/24/08<br />

Complete Design: 9/30/08 9/19/08<br />

Start Construction: 11/30/08 1/5/09<br />

0<strong>21</strong> - Manasota Basin 320


L874<br />

Aqua Utilities Reuse Transmission - Eastern Lakewood Ranch<br />

Complete Construction: 11/1/09 8/31/09<br />

Status As Of: August 31, 2009<br />

Processing the agreement was initially delayed due to funding considerations concerning WPSTF funds and acquisition<br />

of the required insurance documentation. The agreement with Aqua Utilities was executed on March 24, 2008. DMK<br />

Associates was selected to design the project and has completed the field study and design work on the transmission<br />

line and pump station. The construction contract was awarded to the low bidder, Woodruff and Sons, Inc.. Construction<br />

on the transmission line began in January 2009 and all the 12 inch and 20 inch reuse pipeline was installed as of April<br />

16, 2009. The concrete pads, pumps and controls were installed the end of July. The system has been tested and is<br />

substantially complete. Awaitnig final walk-through and development of punch list. First invoice is being processed for<br />

payment. The District's entire funding commitment has been encumbered, of which to date $0 has been reimbursed.<br />

This project is consistent with Governor Crist's Accelerate Florida Initiative to stimulate Florida's economy.<br />

Action-to-date: Ontime.<br />

0<strong>21</strong> - Manasota Basin 3<strong>21</strong>


L879<br />

Southwest Wastewater Reclamation Facility ASR Monitoring Well<br />

System (cancelled)<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply<br />

Basin(s) Peace River, Manasota<br />

Cooperator(s)<br />

Manatee County<br />

Project Manager ELLISON, DON<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

The proposed project is a continuation of Manatee County's Southwest Wastewater Reclamation Facility Reclaimed<br />

Water Aquifer Storage and Recovery (ASR) Project (F007) and will develop a 1 to 2 mgd dry season supply. If<br />

successful, the County will expand the capacity of the ASR system to provide a dry season supply of up to <strong>10</strong> mgd. In<br />

fiscal year (FY) 2008 the County will construct two additional storage zone monitoring wells to determine the extent of<br />

arsenic mobilization in the aquifer. The County and District continue to work with the Florida Department of<br />

Environmental Protection (FDEP) to discuss possible solutions to the arsenic problem, including the possibility of<br />

installing a degasification system at the County's site.<br />

Benefits<br />

If successful, this project will increase the utilization of reclaimed water to offest groundwater withdrawals in the<br />

Southern Water Use Caution Area. The funding request made by the County will be used to find a way to solve the<br />

arsenic issue and proceed with the final ASR cycle testing necessary to obtain an operation permit at their Southwest<br />

Reclaimed Water ASR site. The existing ASR well is capable of yielding 1 to 2 mgd of reclaimed water during the dry<br />

season, however, if a solution to the arsenic issue could be implemented and an operational permit is issued,<br />

expansion of reclaimed ASR up to <strong>10</strong> mgd might be possible. There are no cost benefit calculations for this project, as<br />

benefits will be associated with future reuse projects that will be possible if a solution to the arsenic problem can be<br />

found.<br />

Costs<br />

The total cost for the additional monitoring wells is $500,000 with the Manasota Basin's share not-to-exceed $250,000.<br />

The Basin's total share is being requested for FY2008.<br />

Additional Information<br />

Under the original F007 project, Manatee County obtained a construction and testing permit; constructed an ASR well;<br />

and performed several cycle tests. During cycle testing the County encountered a problem with the mobilization of<br />

arsenic in the aquifer, which is common at ASR facilities throughout the State. Upon the discovery of the arsenic<br />

problem in FY2006, the FDEP requested the County construct two additional storage zone monitoring wells to<br />

determine if the extent of arsenic in the aquifer was limited to property owned by the County. The FDEP, however, has<br />

recently modified their regulatory stance to require the drinking water standard for arsenic be met at all times in the<br />

aquifer no matter how limited it is spatially. This occurred during or after the time when the County submitted their<br />

Cooperative Funding request. Though there remains concern about installing additional monitoring wells at this time,<br />

the County is committed to addressing the arsenic issue over the next year and is working with the FDEP and District<br />

staff to finalize their plans. Therefore, the County has asked that their request continue to be considered for funding in<br />

light of the uncertainty in the final approach that will be selected to resolve FDEP's concerns about the arsenic issue.<br />

The County would like to wait on results of the Pre-treatment Pilot study being conducted by the District and the City of<br />

Bradenton as to what if any additional requirements the FDEP will have. The county has cancelled this funding request<br />

and will resubmit for funding in the future if they decide to proceed with the project.<br />

0<strong>21</strong> - Manasota Basin 322


L879<br />

Southwest Wastewater Reclamation Facility ASR Monitoring Well<br />

System (cancelled)<br />

Prior Cumulative FY 2009 FY20<strong>10</strong><br />

Funding Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

255,932 0 6,057<br />

0<br />

0<strong>21</strong> Manasota Basin 0 261,989<br />

Project Funds Not Budgeted by the<br />

District<br />

Manatee County 250,000 0 0<br />

0<br />

0 250,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$511,989<br />

Critical Project Milestones Projected Amended Actual<br />

Contract<br />

Kick off <strong>Meeting</strong> (Conference Call) 2/14/08 2/2/08<br />

Prepare Draft Scope of Work 3/22/08<br />

Prepare Contract for Internal Review 4/18/08<br />

Execute Contract 6/27/08<br />

Contract Completion Date 5/25/09<br />

Project Schedule<br />

FDEP <strong>Meeting</strong> on Permit Renewal 4/18/08<br />

Prepare Permit Renewal and Consent Order 7/25/08<br />

FDEP Permit Renewal Notice to Issue <strong>10</strong>/11/08<br />

Execute Contract withDrilling Contractor <strong>10</strong>/11/08<br />

Complete Monitoring Well Installations 1/20/09<br />

Status As Of: May <strong>21</strong>, 2008<br />

The county notified the District that it is cancelling this project and doesn't need the funding. They will resubmit for<br />

cooperative funding if they decide to proceed with this project in the future.<br />

0<strong>21</strong> - Manasota Basin 323


L949<br />

Manatee County Water Conservation Program<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Manatee County<br />

Project Manager MCGOOKEY, SCOTT<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This project consists of offering financial incentives to single-family, multi-family, and commercial customers for<br />

replacing conventional toilets with water-conserving equivalents. This project will target the replacement of<br />

approximately 900 conventional toilets with ultra-low volume (ULV) toilets, which use up to 1.6 gallons per flush (gpf).<br />

In addition, approximately 900 low-flow showerheads will be provided to participating customers to replace<br />

conventional showerheads. The project will provide rebates for toilets at $<strong>10</strong>0 per fixture. This proposed project is the<br />

second phase to the Manatee County Indoor Water Conservation Project (L601) funded in FY2007.<br />

Benefits<br />

This FY2008 project is anticipated to save an estimated 17,250 gallons of water per day or 6,296,250 gallons per year.<br />

Costs<br />

The total project cost is $126,144. The Manasota Basin Board funding share of 50 percent is $63,072 in FY2008.<br />

Manatee County's 50 percent share is $63,072. The cost amortized at 8 percent over 20 years, is $2.07 per thousand<br />

gallons. The savings is calculated using a weighted average due to the varying life expectancies of the different water<br />

saving equipment.<br />

Additional Information<br />

In addition to providing financial assistance for the installation of low flow toilets, a goal of this project is to educate all<br />

program participants on methods of indoor water conservation and proper maintenance practices to ensure low flow<br />

toilets remain a water conservative fixture. Educational materials on flapper replacement and other water conservation<br />

techniques will be disseminated to all program particpants. The county plans to hire a consultant to administer the<br />

project. In regard to low flow showerheads, the county plans to initiate a showerhead exchange or new showerhead<br />

inspection program to verify the replacement of high volume showerheads.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 82,503 0 1,718 2,277<br />

0 86,498<br />

Project Funds Not Budgeted by the<br />

District<br />

Manatee County 63,072 0 0<br />

0<br />

0 63,072<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$149,570<br />

Critical Project Milestones Projected Amended Actual<br />

Program Implementation 4/1/08 6/30/08<br />

Complete Rebates 6/30/09 3/2/09<br />

Distribution Report 7/30/09 7/9/09<br />

Final Report 9/30/<strong>10</strong><br />

Project Closeout 1/31/11<br />

Status As Of: August 28, 2009<br />

From April 2009 to May 2009, Manatee County rebated 266 toilets. Manatee County has now completed 1,486 toilet<br />

0<strong>21</strong> - Manasota Basin 324


L949<br />

Manatee County Water Conservation Program<br />

rebates. The Distribution report was received on July 9, 2009. The estimated savings is over 8 mg per year. To date, the<br />

District has reimbursed Manatee County $61,768.50 for this project and has a balance of $1,303.50 for showerheads.<br />

From 5/15/2008 to date, Manatee County has retrofitted 160 high-flow showerheads with low-flow models. Manatee<br />

County has received all the funds allocated by the District for toilet rebates. Manatee County will continue to retrofit<br />

high-flow showerheads with low-flow models until the remaining 740 low-flow showerheads are dispursed.<br />

0<strong>21</strong> - Manasota Basin 325


N013<br />

Development of Landscape Fertilizer BMPs - Phase 1<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Quality<br />

Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers, Pinellas-Anclote River,<br />

Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

University of Florida<br />

Project Manager SMITH, RANDY<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

The objective of this project is to verify the accuracy of the Florida Yards and Neighborhoods (FYN) and Florida Green<br />

Industries best management practices (BMPs) fertilizer recommendations across a wide range of common landscape<br />

plants. Plant growth, biomass allocation, shoot nutrient status, foliar characteristics and aesthetic quality will be<br />

evaluated. Plants will be irrigated uniformly as needed according to IFAS recommendations. Irrigation amounts will be<br />

recorded and will allow for water-use efficiency to be calculated when combined with plant biomass measurements.<br />

The interaction between fertilizer rates and water-use efficiency of plants will offer insight into the effect of fertility<br />

recommendations on landscape water consumption. Soil nutrient status will also be monitored over the evaluation<br />

period.<br />

Benefits<br />

This project represents a significant step to develop and implement accurate, science-based fertilizer BMPs for urban<br />

(residential and commercial) landscapes. This study aims to improve the quality of stormwater that leaves an urban<br />

landscape by influencing the amount of fertilizer that is applied to these landscapes. The results of the project will be<br />

applicable to ornamental plants grown in residential and commercial landscapes. This research will provide scientific<br />

data on the fertilizer needs of landscape plants and will improve the accuracy, credibility and long-term viability of<br />

statewide BMP programs, such as the Florida Yards and Neighborhoods (FYN) program.<br />

Costs<br />

The total project cost is anticipated to be $1,132,158 with the District contributing $566,079 and the University<br />

contributing $566,079 worth of in-kind services. The FY2009 budget amount for the first part of Phase I of this project<br />

is $79,400, with the University of Florida - IFAS contributing $39,700 worth of in kind services and $39,700 to be<br />

funded by the District. The District's share of the FY2009 budget was spilt evenly among all Basins. The University of<br />

Florida - IFAS submitted a FY20<strong>10</strong> Cooperative Funding request for $41,500 to continue Phase I of the project.<br />

Additional funds are anticipated to be requested in FY2011 to complete Phase I of the project. Additional funds are<br />

anticipated to be requested in FY2012, FY2013 and FY2014 to complete the final phase (Phase II) of the project. The<br />

District funding amounts shown in the table include staff salaries, travel and central garage charges.<br />

Additional Information<br />

Non-point nutrient losses in stormwater runoff and leachate from urban landscapes have been implicated in the<br />

degradation of water quality in Florida. Information on the nutrient requirements of plant material in a landscape setting<br />

is very limited, most of which pertains only to trees and shrubs. Therefore, there is a critical need to develop more<br />

accurate fertilizer recommendations and validate existing and proposed landscape fertilizer BMPs to quantify their<br />

impact on water consumption and quality. In order to make reasonable fertilizer recommendations, it is necessary to<br />

have information about the nutritional requirements of the most demanding components of the landscape. Additionally,<br />

knowledge of the nutrient requirements allows plants to be zoned based on their fertilizer requirements, similar to the<br />

zoning recommendations for water requirements promoted by FYN (right plant/right place). This zoning will result in a<br />

more targeted and efficient approach to fertilizer application and reduce nutrient losses to the environment. The<br />

University of Florida - IFAS is committed to the development of science-based water conservation and flood protection<br />

ordinances and state-of-the art best management practices. The research activities of the faculty help to provide the<br />

important scientific data to make these ordinances and BMPs possible. In addition, Extension activities of faculty at<br />

the University of Florida - IFAS help to ensure that these science-based ordinances and BMPs are implemented.<br />

0<strong>21</strong> - Manasota Basin 326


N013<br />

Development of Landscape Fertilizer BMPs - Phase 1<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 0 0 0 51,530 497,944 549,474<br />

011 Alafia River Basin 0 0 5,582<br />

0<br />

0 5,582<br />

013 Hillsborough River Basin 0 0 5,582<br />

0<br />

0 5,582<br />

014 Northwest Hillsborough Basin 0 0 5,581<br />

0<br />

0 5,581<br />

015 Coastal Rivers Basin 0 0 5,582<br />

0<br />

0 5,582<br />

016 Pinellas-Anclote River Basin 0 0 5,582<br />

0<br />

0 5,582<br />

019 Withlacoochee River Basin 0 0 4,962<br />

0<br />

0 4,962<br />

020 Peace River Basin 0 0 4,962<br />

0<br />

0 4,962<br />

0<strong>21</strong> Manasota Basin 0 0 4,962<br />

0<br />

0 4,962<br />

Project Funds Not Budgeted by the<br />

District<br />

University of Florida - IFAS, In-Kind<br />

Services<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

0 0 39,700 41,500<br />

Total:<br />

Future<br />

Funding<br />

484,878<br />

Total<br />

Funding<br />

566,078<br />

$1,158,347<br />

Critical Project Milestones Projected Amended Actual<br />

1. Contract Development & Execution<br />

Negotiate Cooperative Funding Agreement 9/17/08 11/3/08<br />

Cooperative Funding Agreement to Contract Administration 11/20/08 12/23/08 1/22/09<br />

Contract sent to Cooperator for Approval 12/14/08 1/23/09 3/19/09<br />

Signed Contract returned from Cooperator 1/15/09 4/30/09 6/19/09<br />

Contract Executed 1/31/09 5/15/09 6/22/09<br />

Notice to Proceed sent to Cooperator 1/31/09 5/15/09 6/24/09<br />

2. Phase I - Critical Project Milestones<br />

Literature Review 2/13/09 1/31/09<br />

Construct Trial Landscape and Trellis Beds 2/27/09 2/27/09<br />

Obtain and Install Plants 3/27/09 3/18/09<br />

Complete Data Collection <strong>10</strong>/30/09<br />

Draft Final Report 11/30/09<br />

Final Report 12/15/09<br />

Contract Termination 2/28/<strong>10</strong><br />

Status As Of: August 26, 2009<br />

On August 5, 2008 the District project manager met with the cooperator and requested a draft scope of work for the<br />

project. Notice of FY2009 funding approval has been sent to the cooperator. A draft contract was sent to the cooperator<br />

for review on September 24, 2008. The District project manager received the draft contract with comments back from the<br />

cooperator on November 13, 2008. The contract was sent to the cooperator for signature on March 19, 2009. The<br />

contract was executed on June 22, 2009 and the Notice to Proceed was sent to the Cooperator on June 24, 2009. The<br />

Literature Review, Construction of Trial Landscape and Trellis Beds, and Installation of Plants has been completed. The<br />

cooperator has submitted a FY20<strong>10</strong> Cooperative Funding application requesting $41,500 to continue Phase I of the<br />

project.<br />

0<strong>21</strong> - Manasota Basin 327


N014<br />

The Florida Aquarium Watershed Education Initiative<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply, Water Quality, Natural Systems<br />

Basin(s) Alafia River, Hillsborough River, Coastal Rivers, Pinellas-Anclote River, Withlacoochee River,<br />

Peace River, Manasota<br />

Cooperator(s)<br />

The Florida Aquarium, Inc.<br />

Project Manager HULL, MARY MARGARET<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This Cooperative Funding Initiative (CFI) project will educate teachers and students about Florida's water resources<br />

and natural environment. The Florida Aquarium provides a comprehensive water resources education initiative that<br />

focuses on three distinct programs for elementary, middle and high school students and teachers. These programs<br />

are outlined below and include: What's in Your Watershed? summer camp, Science Education at Sea (SEAS) teacher<br />

training program and Regional Ocean Conference for Students (ROCS) workshop for teachers and students. While<br />

the initiative primarily reaches students and teachers throughout Hillsborough County, it also draws schools from Polk,<br />

Pinellas, Pasco and Manatee counties. What's in Your Watershed? is a summer camp program designed to teach<br />

low-income, at-risk upper elementary and middle school students from local YMCAs and Boys and Girls Clubs in<br />

Hillsborough County the importance of the Tampa Bay watershed. The camp provides an opportunity for youth to<br />

engage in interactive role-playing to learn about watersheds, water quality, water conservation and habitat protection.<br />

Throughout the program, each student takes part in three field explorations within the Tampa Bay watershed. SEAS is<br />

a teacher education program that provides workshops for elementary, middle and high school teachers, focusing on<br />

estuaries and incorporating the learning objectives of the Florida Comprehensive Assessment Test. It allows teachers<br />

to explore current and future environmental issues and challenges facing those resources. The ROCS workshop<br />

component is an innovative addition to the project. It gives middle and high school students the opportunity to study<br />

several major water quality issues associated with local watersheds. Students identify the issues and create action<br />

plans that are achievable and beneficial for the environment. SWIM staff participate in this conference. The What's in<br />

Your Watershed? program will be evaluated through a portfolio of student work, student and parent evaluation of the<br />

program using a written survey, instructor evaluation of the program and student pre/post assessements. The SEAS<br />

program evaluation will include a combination of pre/post assessments, workshop surveys and teacher journals. The<br />

ROCS workshop will be evaluated through pre/post assessments.<br />

Benefits<br />

The cooperator estimates that the FY20<strong>10</strong> program will reach 147 students and 80 teachers directly and 7,500<br />

students indirectly. The FY2009 addition of ROCS strengthens the project. ROCS is an intensive workshop experience<br />

for high school students, providing opportunities for them to learn about local issues and related science and then<br />

create action plans that will result in positive environmental changes within their communities. The FY20<strong>10</strong> project<br />

includes a new "What's in Your Watershed?" summer camp that addresses the important priority of getting traditionally<br />

underserved, inner-city youth outside exploring the Tampa Bay watershed. The program will give youth opportunities to<br />

explore current environmental issues and to use critical thinking to develop strategies for addressing impacts on their<br />

local watersheds. Parents are also included as part of the summer camp enrichment events.<br />

Costs<br />

The total cost of the FY20<strong>10</strong> project is $44,741, with the District contributing $<strong>21</strong>,402 (Alafia River $5,174;<br />

Hillsborough River $<strong>10</strong>,686; Coastal Rivers $1,<strong>10</strong>8; Pinellas-Anclote River $1,<strong>10</strong>9; Withlacoochee River $1,<strong>10</strong>9;<br />

Peace River $1,<strong>10</strong>8; Manasota $1,<strong>10</strong>8). The dollar amount allocated per basin is determined by the number of<br />

participants projected to participate in the programming from each basin. District funding supports a summer camp,<br />

teacher training programs and a workshop for teachers and students. The program is projected to reach 147 students<br />

and 80 teachers directly and 7,500 students indirectly at a cost to the District of $2.77 per person. Budget lines below<br />

include costs for staff to manage the project.<br />

Additional Information<br />

The total FY2009 project cost was $42,944, with the District contributing $<strong>21</strong>,194 (Alafia River $5,273; Hillsborough<br />

River $5,274; Northwest Hillsborough $5,273; Coastal Rivers $1,054; Pinellas-Anclote River $1,056; Withlacoochee<br />

River $1,154; Peace River $1,055; Manasota $1,055). Basin budget breakdowns were established based on a list of<br />

program participants provided by the cooperator. The District funded a summer camp, teacher training programs and<br />

a workshop for teachers and students. This program was projected to reach 140 students and 79 teachers directly<br />

and 6,000 students indirectly at a cost to the District of $3.53 per person.<br />

0<strong>21</strong> - Manasota Basin 328


N014<br />

The Florida Aquarium Watershed Education Initiative<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

011 Alafia River Basin 0 0 6,025 5,951<br />

0 11,976<br />

013 Hillsborough River Basin 0 0 6,026 11,463<br />

0 17,489<br />

014 Northwest Hillsborough Basin 0 0 6,025<br />

0<br />

0 6,025<br />

015 Coastal Rivers Basin 0 0 1,806 1,885<br />

0 3,691<br />

016 Pinellas-Anclote River Basin 0 0 1,808 1,886<br />

0 3,694<br />

019 Withlacoochee River Basin 0 0 1,906 1,886<br />

0 3,792<br />

020 Peace River Basin 0 0 1,807 1,885<br />

0 3,692<br />

0<strong>21</strong> Manasota Basin 0 0 1,807 1,885<br />

0 3,692<br />

Project Funds Not Budgeted by the<br />

District<br />

The Florida Aquarium, Inc. 12,700 0 <strong>21</strong>,750 22,570<br />

0 57,020<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$111,071<br />

Critical Project Milestones Projected Amended Actual<br />

FY2009 Budgeted Funds<br />

Open purchase order 11/3/08 1/5/09<br />

Program components completed 9/15/09 9/30/09<br />

Final report received by the District 9/30/09 <strong>10</strong>/15/09<br />

FY20<strong>10</strong> Budgeted Funds<br />

Inititate purchase order <strong>10</strong>/1/09<br />

Program components completed 9/15/<strong>10</strong><br />

Final report and invoice received by the District 9/30/<strong>10</strong><br />

Status As Of: August 26, 2009<br />

SEAS teacher workshops are scheduled for September 12 and 26. The September 12 workshop has 12 teachers<br />

currently registered; <strong>21</strong> teachers from Hillsborough and Pinellas counties are currently registered for the September 26<br />

workshop. Both workshops are expected to fill to capacity. The Art-O-Fishal Fun Summer Camp sessions were held<br />

June 15-19, June 22-26, July 6-<strong>10</strong> and July 13-17. A total of 78 students participated. The Florida Aquarium worked with<br />

Metropolitan Ministries, United Way Agencies, Hillsborough Kids Inc. and Hillsborough County Schools to recruit student<br />

participants. Cooperator has been notified of approval of FY20<strong>10</strong> funding and District staff is working with cooperator to<br />

develop a scope of work for the FY20<strong>10</strong> project. ACTION-TO-DATE: On time.<br />

0<strong>21</strong> - Manasota Basin 329


N046<br />

Great Explorations Water Planet Pinellas<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers, Pinellas-Anclote River,<br />

Withlacoochee River, Manasota<br />

Cooperator(s)<br />

Great Explorations<br />

Project Manager HULL, MARY MARGARET<br />

Task Manager(s)<br />

Status Cancelled<br />

Description<br />

Great Explorations is an interactive children's museum in St. Petersburg. Water Planet: Lessons in Stewardship is a<br />

two-phase set of water education exhibits. Phase 1 educates the audience on Florida-friendly landscaping, water<br />

conservation, protecting wetlands, wildlife and water quality. Interactive exhibits include Explore a Wetland featuring<br />

larger-than-life plants and wildlife with interactive signage; a plant repopulation nursery; a play area where visitors learn<br />

the importance of responsible water usage in daily life; Nature Trading Post where visitors can research and trade<br />

natural items such as shells and gain trading points by removing trash from local waters; and Fish Tales where visitors<br />

can learn all about our local fish, fishing and boating rules and monofilament recycling. Phase 2 will include educating<br />

the audience about groundwater, how to keep water clean, flooding and erosion, wind and weather. The goal is to<br />

complete Phase 1 by November 2009. This exhibit was created with input from community focus groups; museum<br />

Board members, staff and Youth Apprentices; and outside design professionals. Members of several environmental<br />

groups, including the District, met with museum staff members and contributed ideas to further define exhibit<br />

components and determine environmental lessons. The museum serves 150,000 annual visitors.<br />

Benefits<br />

The District benefits from teaching children and their families about water conservation and protection. Great<br />

Explorations reaches 150,000 people annually through museum attendance, special events and programming. The<br />

exhibits provide engaging learning experiences consistent with District priorities for this audience. As an added benefit,<br />

the museum recently received a multi-year grant to provide after-school programming for 50 at-risk children and<br />

summer programming for 85. These children will become an ongoing focus group participating in pre- and posttesting<br />

and helping evaluate the effectiveness of the messages on participants and their families.<br />

Costs<br />

The total cost of the project - $150,000 - was originally planned to be phased over two years. Phase 1 in FY2009 is<br />

$75,000, with contributions from the following Basins: Alafia River--$2,150, Coastal Rivers--$2,135, Hillsborough<br />

River--$5,594, Pinellas-Anclote River--$60,375, Manasota--$1,700, Northwest Hillsborough--$2,675, and<br />

Withlacoochee River -- $371. These percentages are based on cooperator-supplied attendance figures. With 150,000<br />

visitors, the cost of the total project (both phases) is $1 per person. Exhibit life is generally ten years, reducing the cost<br />

to the District over this period. Because of the project delays during Phase 1, the cooperator did not submit a proposal<br />

for FY20<strong>10</strong>, but plans to submit a proposal for Phase 2 in FY2011.<br />

Additional Information<br />

In 2003, the museum opened the Great Splash! water education exhibit, which has been moved and improved over<br />

the years. Funding came from the District, the National Oceanic & Atmospheric Administration through the Pinellas<br />

County Environmental Fund, the Tampa Bay National Estuary Program (TBNEP), Progress Energy, Tampa Bay<br />

Water and others. Museum staff developed and continue to present stage demonstrations and classroom programs to<br />

complement these water education exhibits. A recent grant from TBNEP is funding a program that brings at-risk<br />

children into the museum to participate in water-related activities, attend water science demonstrations and discover<br />

how to learn more on their own.<br />

0<strong>21</strong> - Manasota Basin 330


N046<br />

Great Explorations Water Planet Pinellas<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

011 Alafia River Basin 0 0 2,902<br />

0<br />

0 2,902<br />

013 Hillsborough River Basin 0 0 6,346<br />

0<br />

0 6,346<br />

014 Northwest Hillsborough Basin 0 0 3,427<br />

0<br />

0 3,427<br />

015 Coastal Rivers Basin 0 0 2,887<br />

0<br />

0 2,887<br />

016 Pinellas-Anclote River Basin 0 0 61,127<br />

0<br />

0 61,127<br />

019 Withlacoochee River Basin 0 0 1,123<br />

0<br />

0 1,123<br />

0<strong>21</strong> Manasota Basin 0 0 2,452<br />

0<br />

0 2,452<br />

Project Funds Not Budgeted by the<br />

District<br />

Great Explorations 0 0 75,000<br />

0 75,000 150,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$230,264<br />

Critical Project Milestones Projected Amended Actual<br />

Purchase order opened 11/<strong>10</strong>/08 4/20/09<br />

First task report due 3/31/09<br />

Second task report due 6/30/09<br />

Third task report due 9/15/09<br />

Final report received by the District 9/30/09 11/30/09<br />

Status As Of: April 23, 2009<br />

The Project manager contacted the cooperator on January 30, 2009 and provided a copy of the Accelerate Florida letter.<br />

The project is not on track for completion as proposed by the cooperator. District was informed on March 13 that the<br />

museum's Executive Director has resigned. On March 26, the cooperator requested to withdraw the FY2009 project due<br />

to changes in leadership and economic constraints.<br />

0<strong>21</strong> - Manasota Basin 331


N081<br />

City of North Port Brackish Groundwater Exploration<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Project Manager KELLEY, MIKE<br />

Task Manager(s)<br />

Status Cancelled<br />

City of North Port - Public Utilities<br />

Description<br />

This project is a brackish groundwater exploration and test of the feasibility of developing a brackish groundwater<br />

supply. It is located in the northeast area of the City known as the Kelce Ranch. The location in southeastern Sarasota<br />

County is in the southern portion of the SWUCA. The intent of the program is to investigate the geology and<br />

hydrogeology in this area to define water quality and aquifer characteristics within both the surficial, intermediate and<br />

upper Floridan aquifer systems through construction of wells at three sites. These three sites are midway between<br />

ROMP 9 and ROMP 9.5 monitor well sites. The data collected from this test well program will add to our understanding<br />

of the geology and hydrology of southeastern Sarasota county. The City may request additional funding in future years<br />

to implement the project's water treatment facility and infrastructure.<br />

Benefits<br />

Based upon the geohydrologic data obtained, new production wells into the intermediate or upper Floridan aquifer<br />

system could be constructed to disperse pumping in this region while providing a groundwater source for the City<br />

which is necessary to mitigate the seasonality and sustainability of the Myakkahatchee Creek surface water treatment<br />

system. These production wells will also provide a back-up supply to the regional system through existing<br />

interconnections with the Authority and Charlotte County.<br />

Costs<br />

The total cost of the project is estimated to be $1,736,600. The District's funding commitment is requested to be 50<br />

percent of eligible project costs not to exceed $867,800. The Basin's share of the project is requested to be provided<br />

as follows: $367,800 in the FY2009 budget year and $500,000 in FY20<strong>10</strong>. The City of North Port needs to budget<br />

additional dollars in future years to implement water supply development that would result in additional supplies being<br />

available<br />

Additional Information<br />

Due to the dramatic changes in water quality between the two ROMP sites (9 and 9.5), it is important to clearly<br />

understand the water quality and geologic changes across the site. Each site would include two test wells and two<br />

monitor wells: one test and one monitor well will be completed into permeable zone 3 (PZ-3) of the intermediate and<br />

one test and one monitor well will completed into the surficial aquifer. The intermediate aquifer system is<br />

discontinuous and heterogeneous in nature. The northeastern most site will have two additional Upper Floridan wells.<br />

Aquifer performance tests will be run at each site in the intermediate and surficial aquifers. Additionally, exploration of<br />

the Avon Park formation will provide hydrogeologic and water quality profiles at one site in the Upper Floridan Aquifer<br />

System. A seven day aquifer performance test will be run in the Avon Park to get aquifer characteristics that are not<br />

available at ROMP 9.5. Since there is over a 6 mile distance between the outermost wells, this project would help<br />

detect where the water quality of the Floridan aquifer begins to diminish. Initial drilling would commence at the site<br />

closest to ROMP 9.5 and proceed sequentially along a southwesterly transect towards ROMP 9.0. The Floridan well<br />

would be drilled first to provide initial hydrogeologic data for construction of the subsequent PZ-3 and surficial wells at<br />

each site. The City of North Port currently relies primarily on surface water from the Myakkahatchee Creek and<br />

Cocoplum Waterway as their primary source of potable supply. In addition the City receives supply from the Peace<br />

River Manasota Regional Water Supply Authority.<br />

0<strong>21</strong> - Manasota Basin 332


N081<br />

City of North Port Brackish Groundwater Exploration<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 0 0 372,959<br />

0<br />

0 372,959<br />

Project Funds Not Budgeted by the<br />

District<br />

Applicant Share 0 0 372,959 500,000<br />

0 872,959<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$1,245,918<br />

Critical Project Milestones Projected Amended Actual<br />

Phase I<br />

Design & Permitting 7/1/09<br />

Construction of wells 11/1/09<br />

Initial testing 8/1/<strong>10</strong><br />

Status As Of: July 09, 2009<br />

The City of North Port is postponing the N081, City of North Port Brackish Groundwater Exploration Project and we will<br />

no longer need the FY2009 budgeted funds ($367,800.) for this project. The City (Cindy Mick, Utilities Director) informed<br />

District staff of this decision in a meeting held on July 1, 2009 to discuss the River Bank Filtration Project and future<br />

funding. The City will be sending written notification (either email or a letter) to the District. District staff attending the<br />

meeting were John Ferguson, Ken Herd, Owen Thornberry, Ross Morton, and Brian Armstrong and me. Cindy Mick,<br />

Jerry Manning, Pat Zoeller, Jennifer Desrosiers and John Evano attended from the City. Pat Lehman and Mike Coates<br />

were there representing the Peace River Manasota Regional Water Supply Authority. The purpose of this project was to<br />

determine the feasibility of developing a brackish groundwater supply in the northeast portion of the City known as the<br />

Kelce Ranch. Funding for the project was to be provided by the Manasota Basin Board. The reasons for withdrawing this<br />

project are the financial condition of the developer of Kelce ranch, the slowdown in the housing market and the City's<br />

inability to get access agreements to project sites.<br />

0<strong>21</strong> - Manasota Basin 333


N082<br />

City of North Port Myakkahatchee Creek Water Treatment Plant<br />

RBF/RO Reliability Project<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

City of North Port - Public Utilities<br />

Project Manager FERGUSON, JOHN<br />

Task Manager(s)<br />

Status Ongoing<br />

ARMSTRONG, BRIAN, GOODWIN, AUDRIE<br />

Description<br />

The City of North Port Myakkahatchee Creek Water Treatment RBF/RO Plant Reliability Project is an alternative water<br />

supply project that consists of a facility with river bank filtration (RBF) and Reverse Osmosis (RO) for the treatment of<br />

1.5mgd of finished potable water. This project will make the Myakkahatchee Creek, typically a seasonal source,<br />

operable on a year round basis.<br />

Benefits<br />

Development of this project will increase the reliability of the Myakkahatchee Creek surface water treatment plant<br />

(MCWTP). The key benefits include: 1) the enhancement of a newly permitted surface water supply that will maximize<br />

usage of surface water; 2) the utilization of an RBF intake, which is an innovative approach to pre-treat surface water<br />

to provide a natural, sustainable treatment process; and 3) the addition of high quality RO treated water to increase<br />

the use of the local surface water supply for the City of North Port to meet their own needs and free up additional water<br />

critical to the needs of the regional system, particularly during the seasonal dry periods.<br />

Costs<br />

The total cost of the RBF/RO project is $17,732,000, with the requested Distict share being $7,150,000. District<br />

funding is provided entirely by the Manasota Basin Board. District funding in FY20<strong>10</strong> is $500,000. Total funding<br />

budgeted to date (FY2009) is $900,000 from the Manasota Basin Board.<br />

The total project cost above includes pilot studies and existing facility upgrades paid for by the City of North Port. The<br />

District eligible costs are for the RBF and RO facilities, which total $14,300,000.<br />

Additional Information<br />

The objective of this project is to increase the reliability of the MCWTP in order to meet increasing demands and<br />

future regulations. The City of North Port currently operates a conventional surface water treatment plant that was<br />

designed with a treatment capacity of 4.4 MGD, but consistent and reliable production at full capacity has been<br />

prevented by poor source water quality. The historic water source, Myakkahatchee Creek, is now complimented by a<br />

newly permitted supplemental source, Cocoplum Canal, but both sources exhibit considerable seasonal variability in<br />

flow and water quality. Elevated TDS and sulfate levels, particularly during the dry season, create challenges in<br />

meeting water quality regulations with the current treatment system. <strong>Meeting</strong> the finished water turbidity levels is an<br />

additional challenge. These issues have resulted in the current water treatment plant being used primarily on a<br />

seasonal basis. The City currently utilizes this system complimentary and in tandem with potable water purchased<br />

from the Peace River/Manasota Regional Water Supply Authority.<br />

The proposed MCWTP RBF/RO Reliability Project includes the full-scale preliminary design, final design, and<br />

construction of a 2.0 mgd RBF system and a RO system capable of producing 1.5 mgd of finished potable water. The<br />

RO concentrate will be disposed through the City's wastewater treatment facility. The RBF/RO treatment system will<br />

compliment City improvements made to the existing 4.4 mgd conventional treatment plant. .<br />

In July 2008, the City completed a Water Treatment Plant Enhancement Study to evaluate treatment alternatives that<br />

would increase the reliability and water quality of the MCWTP. The MCWTP Enhancement Study proposed<br />

the improvements for the existing conventional MCWTP as well as the integration strategy of the new RBF-RO facility.<br />

This study included an assessment of the existing conventional MCWTP, along with preliminary pilot test results<br />

evaluating reverse osmosis (RO) in combination with river bank filtration (RBF) pre-treatment for reducing TDS and<br />

sulfate. According to the study, 1.5 mgd from the RO facility could be blended with 3.3 mgd of finished water from the<br />

existing system to meet the regulatory limit of 500 mg/l TDS during the seasonal periods of poorest raw water<br />

quality in the Cocoplum canal. This would allow the MCWTP to operate on a consistent and year-round basis instead<br />

of being limited to seasonal operation. In addition, this project will result in better quality finished water, increased<br />

production, and will maximize the use of surface water supplies.<br />

The City of North Port completed the four-month pilot-scale test of the RBF-RO system and published the pilot study<br />

in October 2008. The City continued the pilot skid operation and data gathering for several additional months through<br />

the sponsorship of a company conducting R&D of system components. District staff met with City staff on January 6,<br />

2009, to discuss portions of the project eligible for funding and details of the Cooperative Funding agreement. The<br />

District clarified that funding would be for RBF/RO treatment, and the improvements to the existing facility were<br />

ineligible. The Cooperative Funding Agreement between the District and the City was executed on March 17, 2009.<br />

0<strong>21</strong> - Manasota Basin 334


N082<br />

City of North Port Myakkahatchee Creek Water Treatment Plant<br />

RBF/RO Reliability Project<br />

On May 28, 2009, The City selected McKim & Creed for the permitting, design, and construction management<br />

services of the RBF/RO project.<br />

District staff met with the City on July 1, 2009, to discuss project timelines, funding issues, and the relationship with<br />

the RBF/RO project and the Regional Integrated Loop System Phase II project (H051). The City was advised that the<br />

Manasota Basin was facing a tight budget year and the amount of FY20<strong>10</strong> funding for the project was likely to be<br />

reduced. The City assured the District that the project remains a priority to them, due to the expiration of a water<br />

quality variance for TDS in July 25, 2012. The City stated that without quality water from the RO system for blending,<br />

the MCWTP would not meet the new quality standards during the yearly dry season after the varience expires.<br />

The City held the Project kick-off meeting on July 9, 2009.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 0 0 901,943 505,954<br />

0 1,407,897<br />

Project Funds Not Budgeted by the<br />

District<br />

City of North Port 385,000 0 3,947,000 3,240,000 3,0<strong>10</strong>,000 <strong>10</strong>,582,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$11,989,897<br />

Critical Project Milestones Projected Amended Actual<br />

RBF facilites permitting complete, construction commence 6/1/<strong>10</strong><br />

RBF construction complete 1/31/11<br />

RO facilities construction commence 3/2/12<br />

RO facilities construction complete, start-up 12/31/12<br />

Final Project Complete 6/1/13<br />

Status As Of: August 31, 2009<br />

On August 5, 2009, the District sent a letter to the City of North Port explaining that staff were recommending a budget of<br />

$500,000 for FY20<strong>10</strong> funding, due to budgetary restraints. The City's FY20<strong>10</strong> cooperative funding request was for<br />

$3,240,000. The letter also explained that the District may not be able to fund a full 50% share of the project, but<br />

recognizes the public benefit of the project and its importance to the City. Future funding is contingent on the annual<br />

approval of the Manasota Basin budget.<br />

Accelerate Florida Update: The City has prepared an RFP for the design of the RBF/RO system and has already begun<br />

the construction of improvements necessary to integrate the new system into the conventional MCWTP. Action steps<br />

would include 1) Advertise the RFP for the engineer 2) Hire the engineer 3) Advertise for RFB for construction of<br />

wells/riverbank filtration issues 4) Hire contractor for construction 5) Construct the wells 6) Advertise for RFB for<br />

construction of RO system 7) Construct the RO system. The City is willing to escalate this project with design/build if<br />

Federal Stimulus funding is available.<br />

0<strong>21</strong> - Manasota Basin 335


N084<br />

City of North Port Reuse Storage Tank and High Service Pump<br />

Station<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply, Water Quality<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Project Manager MCGOOKEY, SCOTT<br />

Task Manager(s)<br />

Status Ongoing<br />

City of North Port, City of North Port - Public Utilities<br />

Description<br />

This project will construct a 2.5 million gallon ground storage tank and design and expand the high service pump<br />

station by adding a 3.3 mgd pump. The benefits of this project will include improving system pressures, peak demand<br />

storage capacity, expand the customer base of the reuse system, and will provide a higher level of service to the<br />

customers. The Heron Creek Development (531,300 gallons per day [gpd]) has 2350 Equivalent Residential<br />

Connections and a golf course. The reuse supply contract between the City and Heron Creek is for up to 500,000 gpd<br />

of reclaimed water. The City currently provides an average of 200,000 gpd to Heron Creek with the existing system.<br />

With the new tank and high service pump they will be able to provide the additional 300,000 gpd to Heron Creek and<br />

provide reclaimed water to additional future customers.<br />

Benefits<br />

The City plans to increase reuse flows to the Heron Creek Development by approximately 0.3 mgd to provide an offset<br />

of 0.18 mgd of existing and future groundwater use by residential, commercial, and golf course customers. This project<br />

will also provide the infrastructure that will enable the City to serve four additional customers with approximately 1.6<br />

mgd of reclaimed water when additional lines are constructed. The project supports the City's Reuse Master Plan and<br />

will allow the City to meet the demands of future growth in the City's service area.<br />

Costs<br />

The total project cost is $2,<strong>10</strong>2,500 and the District's share is requested to be fifty percent or $1,051,250. The City<br />

plans to spend $202,500 in FY2009 and the Manasota Basin Board has budgeted $<strong>10</strong>1,250 which is fifty percent. The<br />

Manasota Basin has been requested to provide $950,000 in additional funds in FY20<strong>10</strong>. The cost, amortized at 8<br />

percent over 30 years is $3.38 per <strong>10</strong>00 gallons offset. The future funds identified for the project are contingent upon<br />

approval of such amounts by the District Governing and Basin Boards in the annual budget(s).<br />

Additional Information<br />

This project is to implement one of the recommendations of the City's Reuse Master Plan, supported and funded by<br />

SWFWMD. The City of North Port's existing WWTP is permitted to provide 1.88 mgd of public access reclaimed water<br />

to the customers of the system, which consist primarily of two major golf courses, the new City Complex, the North<br />

Port Skate Park, roadway medians, and several bulk residential users. Growth in North Port has resulted in the need<br />

for two additional WWTPs that will be constructed over the next 5-<strong>10</strong> years, the West Villages District (WVID) WWTP<br />

and the Panacea WWTP. Both of these two facilities will be designed to provide public access reclaimed quality water<br />

to the customers in the region. In addition, the existing City's WWTP will be expanded to 7.0 mgd within the next 5<br />

year period; therefore, the permitted capacity will be modified to reflect the new reclaimed water availability. This<br />

project will allow the City to provide future reclaimed water service to the following new customers: *The Primary<br />

School, Middle School and High School along Price Boulevard - 0.6 mgd *The Police Training Center on Price<br />

Boulevard - 0.1 mgd *The Sembler Development and Butler Park - 0.7 mgd *Existing Residential and Commercial<br />

Areas along Pan American Boulevard - 0.2 mgd Demands by these new customers will serve to increase reclaimed<br />

water use by nearly 1.6 million gallons per day (mgd).<br />

0<strong>21</strong> - Manasota Basin 336


N084<br />

City of North Port Reuse Storage Tank and High Service Pump<br />

Station<br />

Prior Cumulative FY 2009 FY20<strong>10</strong><br />

Funding Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0 0 <strong>10</strong>1,250 953,052<br />

0<strong>21</strong> Manasota Basin 0 1,054,302<br />

Project Funds Not Budgeted by the<br />

District<br />

City of North Port 0 0 <strong>10</strong>1,250 950,000<br />

0 1,051,250<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$2,<strong>10</strong>5,552<br />

Critical Project Milestones Projected Amended Actual<br />

Start Construction Storage Tank 7/1/08 7/1/08<br />

Complete Construction Storage Tank 3/31/09 4/30/09<br />

Start Pump Station Design 3/31/09 4/<strong>10</strong>/09<br />

Complete Pump Station Design 7/15/09 8/19/09<br />

Start Construction Pump Station <strong>10</strong>/1/09<br />

Complete Construction of Pump Station 12/31/09<br />

Agreement Terminated 6/30/<strong>10</strong><br />

Status As Of: September 02, 2009<br />

The District received the project scope of work from the City on December 11, 2008. A draft of the agreement was sent<br />

to the City for review on December 31, 2008. The City's comments have been incorporated into the draft agreement. The<br />

agreement was executed February 19, 2009. The construction of the storage tank started July 1, 2008 and was<br />

completed April 2009. The design of the pump station started April <strong>10</strong>, 2009 and was completed August 19, 2009. The<br />

City plans to have the contractor, that is currently upgrading the WWTP, construct the pump station to reduce costs by<br />

eliminating mobilization and demobilization costs. The pump station is scheduled to start October 1, 2009 and be<br />

complete by December 31, 2009. The District budgeted $<strong>10</strong>1,250 in FY2009 and plans tobudget $950,000 in FY20<strong>10</strong> for<br />

a total funding commitment of $1,051,250. To date, $0 has been reimbursed.<br />

0<strong>21</strong> - Manasota Basin 337


N086<br />

(Withdrawn) City of Venice Plumbing Rebate and Retrofit<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

City of Venice<br />

Project Manager MCGOOKEY, SCOTT<br />

Task Manager(s)<br />

Status Withdrawn<br />

MCGOOKEY, SCOTT<br />

Description<br />

This project consists of offering financial incentives to potable water customers for replacing conventional toilets and<br />

urinals with water-conserving equivalents, and installing rain sensors on automatic irrigation systems . For customers<br />

that participate in the program, the City will also provide approximately 500 water conservation kits (consisting of items<br />

such as low-flow showerhead, bath and/or kitchen faucet aerators, a toilet tank dam or tummy, toilet flapper valve,<br />

toilet tank leak detection dye tablet, and water conservation educational materials.) This project will target the<br />

replacement of approximately 300 conventional toilets and <strong>10</strong>0 urinals with low-flow toilets and urinals, which use up to<br />

1.6 gallons per flush (gpf). The project will also target the installation of approximately <strong>10</strong>0 rain sensor devices. The<br />

City will provide a $<strong>10</strong>0 credit to the customers' water bill upon low-flow toilet or urinal installation and inspection and a<br />

$50 credit for the purchase and installation of a rain sensor. In order to assure that the replaced conventional toilets or<br />

urinals will not be reinstalled at another location, the City will require permanent disposal of the conventional toilet or<br />

urinal as a condition of the rebate.<br />

Benefits<br />

This project is anticipated to save an estimated 34,860 gallons of water per day, based on weighted savings and<br />

lifespans of the various water conserving devices.<br />

Costs<br />

The total cost of this project is estimated to be $94,000, of which the Manasota Basin is requested to fund 50 percent,<br />

or $47,000. Funding in the amount of $47,000 has been budgeted in FY2009. The cost-benefit is $1.39/1,000 gallons,<br />

amortized over 30 years at eight percent interest.<br />

Additional Information<br />

In addition to providing financial assistance for the installation of low- flow toilets and urinals, a goal of this project is to<br />

educate all program participants on methods of indoor water conservation and proper maintenance practices to<br />

ensure low flow toilets and urinals remain a water conservative fixture. Educational materials on flapper replacement<br />

and other water conservation techniques will be disseminated to all program particpants.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 0 0 50,298<br />

0<br />

0 50,298<br />

Project Funds Not Budgeted by the<br />

District<br />

City of Venice 0 0 47,000<br />

0<br />

0 47,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$97,298<br />

Critical Project Milestones Projected Amended Actual<br />

Execute Agreement 3/31/09<br />

Program Implementation 3/31/09<br />

Distribution Report <strong>10</strong>/31/09<br />

Final Report <strong>10</strong>/31/<strong>10</strong><br />

Contract Closeout 5/31/11<br />

0<strong>21</strong> - Manasota Basin 338


N086<br />

(Withdrawn) City of Venice Plumbing Rebate and Retrofit<br />

Status As Of: April 08, 2009<br />

The City has experienced a reduction in revenue due to the current economic conditions and can no longer provide<br />

funding for this project. The City of Venice has requested to withdraw the project. The City plans to resubmit this project<br />

when economic conditions improve. Budgeted funds will be returned to the Basin.<br />

0<strong>21</strong> - Manasota Basin 339


N087<br />

(Withdrawn) Bradenton - Palmetto Reuse Interconnect<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply, Water Quality<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

City of Bradenton<br />

Project Manager MCGOOKEY, SCOTT<br />

Task Manager(s)<br />

Status Withdrawn<br />

Description<br />

The project includes topographic survey, geotechnical investigation, design, development of construction documents,<br />

construction permitting, and construction of a new reuse pumping station at the City of Bradenton Water Reclamation<br />

Facility and extension of a new 16-inch transmission main north along 3rd Street West and across the Manatee River<br />

to the tie-in point with the PARS reclaimed water distribution system. The total length of new 16-inch transmission to<br />

be constructed is estimated to be 11,400 feet.<br />

Benefits<br />

This project will provide for beneficial reuse of approximately 2.5 mgd of reclaimed water and reduce the effluent<br />

discharge into the Manatee River. The customers will be identified in the FY2008 Interconnect Study (L854) that is<br />

scheduled to be complete August 30, 2008.<br />

Costs<br />

The total project cost is $3,650,000 and the District's share is requested to be $1,825,000. The City plans to spend<br />

$330,000 in FY2009 and the Manasota Basin Board has budgeted $165,000 which is fifty percent. The Manasota<br />

Basin will be requested to provide $625,000 in additional funds in FY20<strong>10</strong> and $1,035,000 in FY2011. The cost,<br />

amortized at 8 percent over 30 years is $0.59 per <strong>10</strong>00 gallons offset.<br />

Additional Information<br />

The Manasota Basin Board and the City of Bradenton have completed a feasibility study for expansion of the City's<br />

existing reclaimed water reuse system. After identification of numerous potential reclaimed water users, evaluation of<br />

15 alternatives, and coordination with both Manatee County and the City of Palmetto, a plan for expansion of the<br />

system by interconnecting with the Manatee County Area Reuse (MARS) system and the City of Palmetto Area Reuse<br />

(PARS) system has been selected. These two options are being further examined by the Bradenton / Palmetto /<br />

Manatee interconnect study (L854) during FY2008. The FY2009 funding requested is for completing the topographical<br />

survey, geotechnical investigation, design, development of construction documents, and permitting of the facilities for<br />

tie-in to the PARS system.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 0 0 168,661<br />

0 1,035,000 1,203,661<br />

Project Funds Not Budgeted by the<br />

District<br />

City of Bradenton 0 0 165,000 625,000 1,035,000 1,825,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$3,028,661<br />

Critical Project Milestones Projected Amended Actual<br />

Start Design 1/31/09<br />

Complete Design 9/15/09<br />

Start Construction 2/15/<strong>10</strong><br />

Complete Construction 6/30/11<br />

0<strong>21</strong> - Manasota Basin 340


N087<br />

(Withdrawn) Bradenton - Palmetto Reuse Interconnect<br />

Status As Of: February 27, 2009<br />

District staff has drafted the agreement and has been waiting for the results of the Bradenton/Manatee Co./Palmetto<br />

Reuse Interconnect Study (L854), before finalizing the agreement. The preliminary results of that study indicates the this<br />

project is not needed. The study points out that the City of Palmetto's reclaimed water supply will be sufficient to meet<br />

that City's requirements for the next twenty years. The City of Bradenton has excess reclaimed water supply that needs<br />

to be beneficially utilized. Interconnecting the City of Bradenton's reclaimed water system with the City of Palmetto's will<br />

not produce the benefit anticipated. The City of Bradenton has requested to withdraw this project.<br />

0<strong>21</strong> - Manasota Basin 341


N088<br />

(Withdrawn) Bradenton - MARS Reuse Interconnection Project<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply, Water Quality<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

City of Bradenton<br />

Project Manager MCGOOKEY, SCOTT<br />

Task Manager(s)<br />

Status Withdrawn<br />

Description<br />

This project includes topographic survey, geotechnical investigation, design, development of construction documents,<br />

construction permitting, and construction of a new 2.5 mgd reuse pumping station at the existing River Run ground<br />

storage tank and extension of a new 18-inch transmission main south and east to connect to the west end of the City's<br />

existing 16-inch transmission main at 45th Street East and State Road 70. This existing 16-inch main was installed as<br />

a "dry" line during the reconstruction of State Road 70 and extends east from 45th Street East to the east side of the<br />

Braden River. A new 18-inch transmission main will be extended from the east end of this existing main to the tie-in<br />

point with the MARS transmission system. The total length of new 18-inch transmission to be constructed is estimated<br />

to be <strong>21</strong>,<strong>10</strong>0 feet.<br />

Benefits<br />

This project will provide an annual average of 2.5 mgd of additional reclaimed water to the MARS system for beneficial<br />

reuse and reduce the effluent discharge into the Manatee River by an equal amount. The customers will be identified in<br />

the FY2008 Interconnect Study (L854) that is scheduled to be complete August 30, 2008.<br />

Costs<br />

The total project cost is $3,785,000 and the District's share is requested to be $1,982,500. The City plans to spend<br />

$350,000 in FY2009 and the Manasota Basin Board budgeted $175,000 which is fifty percent. The Manasota Basin is<br />

requested to provide $1,000,000 in additional funds in FY20<strong>10</strong> and $717,500 in FY2011. The cost, amortized at 8<br />

percent over 30 years is $0.61 per <strong>10</strong>00 gallons offset.<br />

Additional Information<br />

With cooperative funding by the Manasota Basin Board, the City of Bradenton has completed a feasibility study for<br />

expansion of its existing reclaimed water reuse system. After identification of numerous potential reclaimed water<br />

users, evaluation of 15 alternatives, and coordination with both Manatee County and the City of Palmetto, a plan for<br />

expansion of the system by interconnecting with the Manatee County Area Reuse (MARS) system and the City of<br />

Palmetto Area Reuse (PARS) system has been selected. This project was further investigated during FY2008 by the<br />

Bradenton/Palmetto/Manatee County Interconnect study. For FY2009, funding is requested for completing the<br />

topographical survey, geotechnical investigation, design, development of construction documents, and permitting of<br />

the facilities for tie-in to the MARS system.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 0 0 178,786<br />

0 717,500 896,286<br />

Project Funds Not Budgeted by the<br />

District<br />

City of Bradenton 0 0 175,000 1,000,000 717,500 1,892,500<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$2,788,786<br />

Critical Project Milestones Projected Amended Actual<br />

Start Design 1/31/09<br />

Complete Design 9/15/09<br />

0<strong>21</strong> - Manasota Basin 342


N088<br />

(Withdrawn) Bradenton - MARS Reuse Interconnection Project<br />

Start Construction 2/15/<strong>10</strong><br />

Complete Construction 6/30/11<br />

Status As Of: February 27, 2009<br />

District staff has drafted the agreement and has been waiting for the results of the Bradenton/Manatee Co./Palmetto<br />

Reuse Interconnect Study (L854), before finalizing the agreement. The preliminary results of that study indicates the this<br />

project is not desired. The study points out that the MARS sytem only needs additional reclaimed water supply during<br />

some periods in the dry system. Manatee County does not want to commit to take specified quantities for any set<br />

periods. The City of Bradenton has excess reclaimed water supply and needs to have a dependable customer to<br />

beneficially utilize that reclaimed water. Interconnecting the City of Bradenton's reclaimed water system with the County's<br />

MARS System will not produce the benefit anticipated. The City of Bradenton has requested to withdraw this project.<br />

0<strong>21</strong> - Manasota Basin 343


N<strong>10</strong>5<br />

The Bridges - Stormwater Reuse (Withdrawn)<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply, Water Quality, Natural Systems<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Project Manager ZAJAC, CHRIS<br />

Task Manager(s)<br />

Status Withdrawn<br />

Gulf Coast Strategic Investments<br />

Description<br />

The Gulf Coast Community Foundation (Foundation) of Venice is a nonprofit organization that is committed to<br />

improving the quality of life in the communities it serves (from Osprey to Boca Grande). Gulf Coast Strategic<br />

Investments (GCSI) is a subsidiary of the Foundation and is also a nonprofit. GCSI is currently planning a 145-acre<br />

mixed-use community promoting innovation in the City of Venice, known as the Bridges. Accordingly, GCSI will be<br />

incorporating a <strong>10</strong>,000 sf green roof and cistern system into its stormwater management system. GCSI will also<br />

construct a stormwater recycling system to treat the stormwater and provide an alternative water supply for<br />

non-potable outdoor irrigation. The UCF green roof design provides for a closed-loop water reuse system, reduction of<br />

pollutant loads, potential reduction of peak discharge rates, and creation of natural habitat. CGSI proposes to partner<br />

with the District in bringing the innovation of green roofs to Southwest Florida.<br />

Benefits<br />

This project will incorporate Low Impact Development (LID) and stormwater Best Management Practices (BMPs) into<br />

its development thus reducing the need for potable water for irrigation. The project will result in improved stormwater<br />

treatment over traditional designs by recycling the water captured in the cistern and using it for on-site irrigation. The<br />

project will provide approximately 33,000 gpd from the stormwater recycling system to meet a portion of the irrigation<br />

needs at The Bridges development. The treated stormwater will be used along with reclaimed water from the City of<br />

Venice and intermediate groundwater to meet the 115,000 gpd total demand of the development. Priority of use will be<br />

stormwater, reclaimed water, then intermediate groundwater.<br />

Costs<br />

The total project cost is $372,180 and is for construction only. The Manasota Basin Board approved $112,500 in<br />

FY2009 and the WPSTF will provide $43,541. The cooperator will match the $112,500 in FY2009. In FY20<strong>10</strong> the<br />

cooperator is requesting the Manasota Basin Board fund $51,820. The cooperator will match the $51,820 in FY20<strong>10</strong>.<br />

The District funding amounts shown in the table include staff salary, travel and central garage charges.<br />

Additional Information<br />

As a not-for-profit foundation, the Gulf Coast Community Foundation of Venice does not administer water<br />

conservation of flood protection ordinances. However as part of their grant program, the Foundation does require new<br />

buildings to meet the Florida Green Building Coalition standards, which promote water conservation and efficiency<br />

practices. Accordingly, the Bridges project will promote water conservation and efficiency practices such as Florida<br />

Friendly landscaping and low-impact development practices, as well as indoor and outdoor water efficiency.<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 0 0 119,474<br />

0<br />

0 119,474<br />

District Budgeted - Outside Revenue<br />

Water Protection & Sust T.F.<br />

(Alternative Wtr)<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

0 43,541 0<br />

0<br />

0<br />

43,541<br />

Project Funds Not Budgeted by the<br />

District<br />

Gulf Coast Strategic Investments 0 0 112,500 51,820<br />

0 164,320<br />

0<strong>21</strong> - Manasota Basin 344<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$327,335


N<strong>10</strong>5<br />

The Bridges - Stormwater Reuse (Withdrawn)<br />

Critical Project Milestones Projected Amended Actual<br />

1. Contract Development<br />

Draft Agreement 9/1/08<br />

Contract Executed <strong>10</strong>/15/08<br />

2. Project Tasks<br />

Select Contractor 2/15/09<br />

Begin Construction 3/15/09<br />

Construction Complete 3/15/<strong>10</strong><br />

Close Out Contract 5/15/<strong>10</strong><br />

Status As Of: March 06, 2009<br />

Personal communications with the cooperator's consultant the week of February 16th indicated that the project was<br />

being postponed indefinitely due to the poor economy. The District project manager suggested that the cooperator<br />

withdraw the project until the project is ready for construction. On March 5, 2009 the District project manager received a<br />

letter from the cooperator requesting complete withdrawal of the project from District funding.<br />

0<strong>21</strong> - Manasota Basin 345


N<strong>10</strong>7<br />

Braden River Soil Moisture Sensor Project<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Braden River Utilities, Bradenton River Utilities<br />

Project Manager MUSICARO, MELISSA<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

The project consists of providing rebates for the installation of up to 400 soil moisture sensor (SMS) devices to control<br />

irrigation for existing and new residential and non-residential customers in the Lakewood Ranch Development. The<br />

project objective is to reduce irrigation water use and conserve water resources. Braden River Utilities will monitor the<br />

water use and savings for the participating homes, and compare it to that of non-participating homes as part of the<br />

project evaluation to determine water savings. The project will include rebates of up to $495 for eligible customers for<br />

the installation of SMS systems. The utility will administer the program and implement the following measures: work<br />

with homeowners and businesses to install SMS systems, install master meters on 2 subdivisions irrigation mains to<br />

track water use, and use of the Field Guide to Soil Moisture Sensor Use in Florida. BRU will work with the local<br />

Manatee Extension Service office to conduct follow up inspections for the installed SMS devices. Manatee County<br />

Extension will also monitor and document the condition of the landscapes.<br />

Benefits<br />

The water savings benefit is to be determined.<br />

Costs<br />

The total project cost is $200,000, and the Manasota Basin Board approved funding in the amount $<strong>10</strong>0,000 in<br />

FY2009. The cost benefit is to be determined.<br />

Additional Information<br />

BRU proposed this project as a means to save water, as well as to evaluate this method of water conservation for<br />

potential implementation in future development in Lakewood Ranch. District and BRU staff have refined project scope<br />

details to ensure information about water use of project participants can be compared to water use of non-participants<br />

to help both BRU and the District make decisions about promoting the use of soil moisture sensors. The number of<br />

project participants may be reduced since the District is solely funding the water meter for monitoring the<br />

non-participating homes.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 0 0 <strong>10</strong>0,125 2,741<br />

0 <strong>10</strong>2,866<br />

Project Funds Not Budgeted by the<br />

District<br />

Braden River Utilities 0 0 <strong>10</strong>0,000<br />

0<br />

0 <strong>10</strong>0,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$202,866<br />

Critical Project Milestones Projected Amended Actual<br />

Draft Agreement to Contracts Administration 8/3/09<br />

Draft Agreement returned from Contracts Administration 9/30/09<br />

Contract Executed <strong>10</strong>/1/09<br />

Notice to Proceed <strong>10</strong>/2/09<br />

Sensor Installation Commence <strong>10</strong>/31/09<br />

Sensor Installation Complete <strong>10</strong>/1/<strong>10</strong><br />

0<strong>21</strong> - Manasota Basin 346


N<strong>10</strong>7<br />

Braden River Soil Moisture Sensor Project<br />

Data Collection/ Evaluation Complete 5/31/11<br />

Contract Termination 12/31/11<br />

Status As Of: June 29, 2009<br />

The agreement has been drafted and the District project manager and cooperator are finalizing the scope of work. Most<br />

of the scope of work has been negotiated but there are critical elements that have not been resolved. The draft scope<br />

includes customer surveys to be mailed to project participants at the completion of the project to gauge customer<br />

satisfaction with the devices and the overall project. The City has reservations about the customer surveys in that the city<br />

may not have the resources to develop and distribute the surveys. District staff has asked the City to request a letter from<br />

Manatee County Extension, with Manatee County Extension accepting the responsibility of completing the scope tasks.<br />

The scope tasks Manatee County Extension Service with the following: conduct follow-up inspections of landscapes,<br />

confirm proper installation of soil moisture sensors, conduct educational workshop for participants. District staff<br />

requested and received the the letter mentioned above. The agreement is anticipated to be executed by July 31, 2009.<br />

0<strong>21</strong> - Manasota Basin 347


N115<br />

Manatee County Indoor Water Conservation Project<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Manatee County<br />

Project Manager MCGOOKEY, SCOTT<br />

Task Manager(s)<br />

Status Ongoing<br />

MCGOOKEY, SCOTT<br />

Description<br />

This project consists of offering financial incentives to single-family, multi-family, and commercial customers for<br />

replacing conventional toilets (3.5 gallons per flush or greater) with water-conserving equivalents. This project will<br />

target the replacement of approximately 900 conventional toilets with ultra-low volume (ULV) toilets, which use up to<br />

1.6 gallons per flush (gpf) or High Efficiency Toilets (HET's) that use up to 1.28 gpf. The project will provide rebates for<br />

toilets at $<strong>10</strong>0 per fixture with a maximum of two toilets per unit. This proposed project is the third phase to the<br />

Manatee County Indoor Water Conservation Project originally funded in FY2007.<br />

Benefits<br />

This FY2009 project is estimated to save 20,079 gallons per day (gpd), or 7,328,835 gallons per year.<br />

Costs<br />

The total project cost is $126,144. The Manasota Basin Board has funded 50 percent, or $63,072, in FY2009.<br />

Manatee County's share is $63,072. The cost amortized at 8 percent over 20 years, is $1.46 per thousand gallons.<br />

The savings is calculated using a weighted average due to the varying life expectancies of the different water saving<br />

equipment.<br />

Additional Information<br />

Manatee County currently services over 90,000 potable water accounts and anticipates continued growth over the<br />

next 20 years. This program is an indoor conservation component to Manatee County's existing Water Conservation<br />

Incentive Program for the County's retail water customers. The program also addresses the Manatee County Board of<br />

County Commissioner's policies on water conservation and is supported by the Utilities recent development of a<br />

conservation based tiered rate structure for potable water. One year of account-level metered water-use data prior to<br />

and one year of metered water use after the retrofit installation will be collected as the raw data for the final savings<br />

analysis. Manatee County Utilities will provide actual billing data and ensure <strong>10</strong>0 percent fixture inspection. This<br />

project will also institute an educational program designed to assist customers in long-term maintenance related to<br />

water savings, such as selecting parts for repairs, leak detection and choosing proper replacement flapper models for<br />

their HET or ULV toilets. This effort will ensure the retrofit fixture will remain a water-conserving fixture for its<br />

life-expectancy. Bi-monthly status reports will be provided to the District to update project accomplishments.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 0 0 64,792 5,366<br />

0 70,158<br />

Project Funds Not Budgeted by the<br />

District<br />

Manatee County 0 0 63,072<br />

0<br />

0 63,072<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$133,230<br />

Critical Project Milestones Projected Amended Actual<br />

Execute Agreement 5/1/09 5/1/09<br />

Start Rebates 5/18/09 5/15/09<br />

Final Distribution report 8/31/<strong>10</strong><br />

0<strong>21</strong> - Manasota Basin 348


N115<br />

Manatee County Indoor Water Conservation Project<br />

Final Report 9/30/11<br />

Final Invoice 9/30/11<br />

Project Complete 1/31/12<br />

Status As Of: August 28, 2009<br />

The agreement was executed May 1, 2009 and the project started May 15, 2009. The County has issued 592 toilet<br />

rebates by the end of July 2009. The County plans to reguest it's first reimbursement by September 15, 2009. The<br />

District has reimbursed $0 of the $63,072 budgeted for this project.<br />

0<strong>21</strong> - Manasota Basin 349


N139<br />

Low Impact Development Manual<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Quality, Natural Systems<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Sarasota County<br />

Project Manager ZAJAC, CHRIS<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This project will expand upon an existing Low Impact Development (LID) manual that was created in 2008 by Sarasota<br />

County. LID is a sustainable stormwater management strategy that is gaining wide acceptance in order to meet<br />

regulatory compliance. The Sarasota County Comprehensive Plan states that the County shall provide design<br />

standards for LID measures to mitigate the effect of impervious surfaces and stormwater pollutants on increased<br />

runoff volumes. LID design measures may include, but are not limited to, bioretention areas, porous pavement, roof<br />

gardens, rainwater/stormwater recycling, etc. To initiate the effort, Sarasota County contracted with the engineering<br />

firm of Jones Edmonds and Associates, Inc. (JEA) to complete an assessment of possible LID techniques that may be<br />

effective in Sarasota County. In September 2007, the assessment was completed and focused on three main<br />

categories (1) practices that promote infiltration, (2) non-structural practices that help minimize or control runoff<br />

generation, and (3) practices that promote reuse. The County has developed a design standards manual specific to<br />

the Sarasota County area. The manual was completed in September 2008 and includes design specifications,<br />

construction requirements, potential pollutants to be removed, and site limitations for four techniques; detention with<br />

biofiltration, pervious pavements, stormwater reuse, and greenroofs. The County is currently expanding the manual by<br />

adding two new sections on bioretention for high water table conditions and cisterns for rainwater harvesting. The<br />

County is requesting cooperative funding in FY20<strong>10</strong> to add three more sections to the manual. The new sections will<br />

include vegetated filter strips, soil amendments and tree box planters.<br />

Benefits<br />

The technologies promoted in the manual will reduce potable water use needed to support landscapes by using<br />

cisterns, rain barrels and rain gardens. These technologies will also protect natural systems by reducing the load of<br />

non-point source pollutants and reduce runoff entering receiving waterbodies while promoting recharge to the aquifer.<br />

Costs<br />

The total project cost is $130,000. In FY20<strong>10</strong> the Manasota Basin Board will fund $65,000 while the cooperator will<br />

match $65,000. The District funding amounts shown in the table include staff salary, travel and central garage<br />

charges.<br />

Additional Information<br />

The District's Strategic Program Office Department has been involved in the development of the LID manual and has<br />

provided training to District and County staff. The first training was held on December 19, 2008 and the second on<br />

January 30, 2009. The District is currently developing a spreadsheet tool to assist with permitting the LID technologies<br />

included in the manual.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 0 0 0 68,852<br />

0 68,852<br />

Project Funds Not Budgeted by the<br />

District<br />

Sarasota County 0 0 0 65,000<br />

0 65,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$133,852<br />

Critical Project Milestones Projected Amended Actual<br />

0<strong>21</strong> - Manasota Basin 350


N139<br />

Low Impact Development Manual<br />

1. Contract Development & Execution<br />

Develop Scope of Work 8/15/09 8/13/09<br />

Draft Agreement to Cooperator 9/1/09 8/13/09<br />

Execute Contract <strong>10</strong>/31/09<br />

2. Project Tasks<br />

Select Contractor 1/31/<strong>10</strong><br />

Draft Final Report 6/15/<strong>10</strong><br />

Final Report 7/15/<strong>10</strong><br />

Status As Of: August 26, 2009<br />

The cooperator was sent an electronic copy of the draft agreement for review on August 13, 2009.<br />

0<strong>21</strong> - Manasota Basin 351


N143<br />

FYN Sarasota County<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply, Water Quality, Natural Systems<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Sarasota County Extension Service<br />

Project Manager DURELL, SYLVIA<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This Florida Yards & Neighborhoods (FYN) project provides education on Florida-friendly landscaping primarily to<br />

homeowners but will also include outreach to local government employees, staff/associates in big box stores and<br />

garden centers, members of garden clubs and plant societies, and owners of Florida Water StarSM Gold (FWSG)<br />

Certification homes. In addition, the FYN coordinator will be available as a resource for homeowners, builders and<br />

landscape professionals who are working on FWSG projects. Effectiveness will be measured by the number of<br />

participants in workshops, one-on-one interactions and school visits; potential exposure to newspaper articles and<br />

electronic media; and distribution of printed education materials.<br />

Benefits<br />

This program's outreach to homeowners and students will expand an already very successful homeowners/community<br />

association FYN program in Sarasota County. Education increases knowledge and promotes behavior change related<br />

to conservation of water and protection of water quality and natural systems.<br />

Costs<br />

The total cost of the FY20<strong>10</strong> program is $115,600, with the District contributing $50,000 (Manasota). District funds<br />

support salary, benefits and professional training for the coordinator. The Sarasota Bay Estuary Program has<br />

committed $<strong>10</strong>,000 toward program materials. The cost of the program is based on reaching half of the county's<br />

population (184,767) at a cost to the District of approximately $.27 per person. The budget lines below include costs<br />

for staff to manage the project.<br />

Additional Information<br />

This is the first year of District funding for the program. Education is based on the nine Florida-Friendly<br />

LandscapingTM principles that were created by the University of Florida/Institute of Food and Agricultural Sciences<br />

(UF/IFAS) for the Florida Yards & Neighborhoods program: Right Plant, Right Place, Water Efficiently, Fertilize<br />

Appropriately, Mulch, Attract Wildlife, Manage Yard Pests Responsibly, Recycle, Reduce Stormwater Runoff and<br />

Protect the Waterfront.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 0 0 0 53,586<br />

0 53,586<br />

Project Funds Not Budgeted by the<br />

District<br />

Sarasota Bay Estuary Program 0 0 0 <strong>10</strong>,000<br />

0 <strong>10</strong>,000<br />

Sarasota County 0 0 0 53,600<br />

0 53,600<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$117,186<br />

Critical Project Milestones Projected Amended Actual<br />

FY20<strong>10</strong><br />

Purchase order created <strong>10</strong>/12/09<br />

First advisory committee meeting 1/<strong>21</strong>/<strong>10</strong><br />

First task report 1/29/<strong>10</strong><br />

Second advisory committee meeting 4/14/<strong>10</strong><br />

0<strong>21</strong> - Manasota Basin 352


N143<br />

FYN Sarasota County<br />

Second task report 4/30/<strong>10</strong><br />

Third advisory committee meeting 7/15/<strong>10</strong><br />

Third task report 7/30/<strong>10</strong><br />

Fourth advisory committee meeting <strong>10</strong>/15/<strong>10</strong><br />

Fourth task report <strong>10</strong>/29/<strong>10</strong><br />

Status As Of: September 04, 2009<br />

Project manager will work with the FYN coordinator to create a scope of work for activities in FY20<strong>10</strong>. A purchase order<br />

is expected to be open by <strong>10</strong>/12/2009. The District is coordinating with University of Florida's Institute of Food and<br />

Agricultural Sciences (UF/IFAS) to present a series of workshops designed to help homeowners associations understand<br />

what the SB 2080 means and what resources are available to assist them. A workshop in Sarasota County is scheduled<br />

for October <strong>21</strong>. ACTION TO DATE: On time.<br />

0<strong>21</strong> - Manasota Basin 353


N151<br />

Manatee County NAVD88 Vertical Control Densification<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Manatee County<br />

Project Manager OWENS, JIM<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

The establishment of an accurate and easily accessible vertical control survey network is an important component in<br />

the development of updated Federal Emergency Management Agency Flood Insurance Rate Maps (FEMA FIRM). The<br />

District, in cooperation with the National Geodetic Survey and the Florida Department of Environmental Protection, has<br />

completed the Distict-wide vertical control densification. This project will further enhance the existing vertical control<br />

network to support FEMA FIRM mapping, topographic data collection and modeling activities. The newly-established<br />

vertical control network will allow the District and local governments to transition from the older and less accurate<br />

vertical control survey network known as the National Geodetic Vertical Datum of 1929 to the more accurate North<br />

American Vertical Datum of 1988 (NAVD88) system. In Manatee County this includes running level loops and<br />

establishing bench marks based on NAVD88 along state and county roadways. This project will enable the surveying<br />

community to make an orderly transition to NAVD88 and will allow Manatee County to be on the same vertical datum<br />

as the District and to comply with the federal surveying and mapping requirements. This project will densify the<br />

NAVD88 vertical control in Manatee County and will compliment the District's NAVD88 migration project.<br />

Benefits<br />

Densification of benchmarks will support the development of Watershed Management Plans for Polk County thus<br />

contributing to flood protection, natural systems, water quality and water supply. Manatee County participates in the<br />

National Flood Insurance Program administered by FEMA and requires that all finished floor elevations be above the<br />

<strong>10</strong>0 year floodplain. This project is a key component in meeting this requirement. Also, the establishment and<br />

implementation of the NAVD 1988 will enable more accurate elevations and mapping throughout the District, and the<br />

conversion to the modern vertical datum will allow the ability to establish accurate and reliable elevations using Global<br />

Positioning System (GPS) technology. Manatee County is a participant in FEMA's Community Rating System and has<br />

a Class 6 rating. A major emphasis of this project is to help Manatee County move from a Class 6 to a Class 5<br />

Community System Rating with FEMA. Manatee County is also coordinating this project with the City of Bradenton and<br />

the City of Palmetto.<br />

Costs<br />

Total cost for contractual services in FY20<strong>10</strong> is $150,000 of which the District's share is $75,000. The County will<br />

contribute $75,000. The District's share of funding for this project is within the Manasota Basin. Additional costs are<br />

associated with staff time required to manage the project.<br />

Additional Information<br />

This project will be administered by the County. The vertical control network survey work will be completed by qualified<br />

professional surveying and mapping consultants. All newly-established vertical control network data produced by this<br />

project will be made available through Internet access via LABINS web site and the Manatee County web site.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 0 0 0 76,949 75,000 151,949<br />

Project Funds Not Budgeted by the<br />

District<br />

Manatee County 0 0 0 75,000 75,000 150,000<br />

0<strong>21</strong> - Manasota Basin 354<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$301,949


N151<br />

Manatee County NAVD88 Vertical Control Densification<br />

Critical Project Milestones Projected Amended Actual<br />

150<br />

Execute Cooperative Agreement between the County and the District 12/31/09<br />

180<br />

Execute Contract with the Consultants 2/1/<strong>10</strong><br />

30<br />

Initial project planning and develop Scope of Work 9/1/09<br />

420<br />

Final deliverables 9/30/<strong>10</strong><br />

60<br />

Submit cooperative agreement for approval <strong>10</strong>/1/09<br />

Status As Of: June 15, 2009<br />

The Manatee County Board of County Commissioners are committed to funding the project as planned.<br />

0<strong>21</strong> - Manasota Basin 355


N181<br />

Science Curriculum Enhancement Program<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply, Water Quality, Natural Systems<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Science and Environment Council of Sarasota<br />

Project Manager HULL, MARY MARGARET<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This Cooperative Funding Initiative (CFI) project will enhance student awareness about local water and watershed<br />

conservation based on science, building on a pilot program developed in collaboration with the Sarasota County<br />

School Board. The components of the proposed project are a teacher workshop to provide tools for teachers to<br />

integrate water-related lessons into their curriculum, in-class instruction and a series of field trips to SEC member<br />

sites. Student participants will engage in inquiry-based activities, lessons and interaction with science professionals<br />

and technicians. In-class instruction will take place several days before each field trip and serve as an orientation to<br />

the field trip site, introduction to the lesson and discussion of careers in the field. By participating in this program, the<br />

goal is that students will understand the importance of preserving and managing our watershed. While not all will<br />

choose science or water-related careers, they will have a better understanding of the role scientists and water<br />

managers play. Evaluation includes student pre- and post-testing, and teacher evaluation forms.<br />

Benefits<br />

The project's goal is to provide comprehensive science education opportunities to Sarasota County students in grades<br />

8 through <strong>10</strong>. The basin has prioritized partnering with science-based organizations and the SEC is a group of<br />

non-profit and government organizations that operate or support conservation and science-based facilities. SEC's<br />

mission is to promote science, conservation and environmental issues in Sarasota County for maintaining and<br />

improving quality of life through education, public outreach, demonstration, information gathering and analysis, and<br />

special projects. By collaborating on projects, the SEC can offer services and provide educational materials that no<br />

one organization can do alone. Through collaboration, the collective knowledge and expertise of all the organizations<br />

allows SEC to strengthen science curriculum. Through this initiative, the focus of curriculum enhancement will be<br />

water-related. The program is based on results of a previously funded two-year research study at Brooker High School.<br />

Costs<br />

The total FY20<strong>10</strong> project cost is $66,800, with the District contributing $33,400 (Manasota). District funding will be<br />

used to fund an estimated 54 field trips, transportation, teacher workshop stipends, promotion materials, program<br />

evaluation and administration. It will be offered to Sarasota County 8th, 9th and <strong>10</strong>th grade science students and<br />

geared for the on-level student.The program is projected to reach 390 students and 14 teachers at a cost to the<br />

District of $82.67 per participant. Students will receive a discount (5 to 15 percent less) for the field trips offered as<br />

part of this cooperative funding project. Budget line below includes costs to manage the project.<br />

Additional Information<br />

The SEC partners/contributors include Aquarian Quest, Charlotte Harbor Environmental Center, Crowley Museum and<br />

Nature Center, Florida West Coast Resource Conservation and Development Council, Friends of Myakka River,<br />

Friends of Oscar Scherer State Park, G.WIZ, Historic Spanish Point, Lemur Conservation Foundation, Marie Selby<br />

Botanical Gardens, Mote Marine Laboratory, New College, Ringling College of Art and Design, Sarasota Bay Estuary<br />

Program, Sarasota Audubon, Sarasota Conservation Foundation, Sarasota County Extension and Florida House<br />

Learning Center and Sarasota County Government. Research-phase funding was through Sarasota County School<br />

Board, with support from Basin Initiative for youth education (P259) from the District's Manasota Basin Board.<br />

0<strong>21</strong> - Manasota Basin 356


N181<br />

Science Curriculum Enhancement Program<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 0 0 0 33,400<br />

0 33,400<br />

Project Funds Not Budgeted by the<br />

District<br />

Science & Environmental Council of<br />

Sarasota (SEC)<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

0 0 0 33,400<br />

Total:<br />

Future<br />

Funding<br />

0<br />

Total<br />

Funding<br />

33,400<br />

$66,800<br />

Critical Project Milestones Projected Amended Actual<br />

FY20<strong>10</strong> Budgeted Funds<br />

Initiate purchase order <strong>10</strong>/1/09<br />

Final report and invoice due to District 11/20/09<br />

Complete lesson plans, activities for pre-visits and field trips 1/29/<strong>10</strong><br />

Promote field trip packages to teachers 2/26/<strong>10</strong><br />

Schedule field trips 2/26/<strong>10</strong><br />

Teacher workshop 3/15/<strong>10</strong><br />

Conduct pre-visits and field trips 5/28/<strong>10</strong><br />

Student and teacher assessments 5/28/<strong>10</strong><br />

Evaluate and refine program 8/16/<strong>10</strong><br />

Conduct pre-visits and field trips <strong>10</strong>/29/<strong>10</strong><br />

Evaluate program <strong>10</strong>/29/<strong>10</strong><br />

Student and teacher assessments <strong>10</strong>/29/<strong>10</strong><br />

Status As Of: September <strong>10</strong>, 2009<br />

Cooperator has been notified of approval of FY20<strong>10</strong> funding and District staff is working with cooperator to develop a<br />

scope of work for the FY20<strong>10</strong> project. ACTION-TO-DATE: On time.<br />

0<strong>21</strong> - Manasota Basin 357


N188<br />

City of Bradenton NAVD88 Vertical Control Densification<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

City of Bradenton<br />

Project Manager OWENS, JIM<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

The establishment of an accurate and easily accessible vertical control survey network is an important component in<br />

the development of updated Federal Emergency Management Agency Flood Insurance Rate Maps (FEMA FIRM). The<br />

District, in cooperation with the National Geodetic Survey and the Florida Department of Environmental Protection, has<br />

completed the Distict-wide vertical control densification. This project will further enhance the existing vertical control<br />

network to support FEMA FIRM mapping, topographic data collection and modeling activities. The newly-established<br />

vertical control network will allow the District and local governments to transition from the older and less accurate<br />

vertical control survey network known as the National Geodetic Vertical Datum of 1929 to the more accurate North<br />

American Vertical Datum of 1988 (NAVD88) system. In the City of Bradenton this includes running level loops and<br />

establishing bench marks based on NAVD88 along city roadways. This project will enable the surveying community to<br />

make an orderly transition to NAVD88 and will allow the City of Bradenton to be on the same vertical datum as the<br />

District and to comply with the federal surveying and mapping requirements. This project will densify the NAVD88<br />

vertical control in the City of Bradenton and will compliment the District's NAVD88 migration project. The City of<br />

Bradenton will coordinate all vertical control surveying with Manatee County (N151).<br />

Benefits<br />

Densification of benchmarks will support the development of Watershed Management Plans for Polk County thus<br />

contributing to flood protection, natural systems, water quality and water supply. The City of Bradenton participates in<br />

the National Flood Insurance Program administered by FEMA and requires that all finished floor elevations be above<br />

the <strong>10</strong>0 year floodplain. This project is a key component in meeting this requirement. Also, the establishment and<br />

implementation of the NAVD 1988 will enable more accurate elevations and mapping throughout the District, and the<br />

conversion to the modern vertical datum will allow the ability to establish accurate and reliable elevations using Global<br />

Positioning System (GPS) technology.<br />

Costs<br />

Total cost for contractual services in FY20<strong>10</strong> is $136,600 of which the District's share is $68,300. The City of<br />

Bradenton will contribute $68,300. The District's share of funding for this project is within the Manasota Basin.<br />

Additional costs are associated with staff time required to manage the project.<br />

Additional Information<br />

This project will be administered by the City of Bradenton. The vertical control network survey work will be completed<br />

by qualified professional surveying and mapping consultants. All newly-established vertical control network data<br />

produced by this project will be made available through Internet access via LABINS web site and the Manatee County<br />

web site.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 0 0 0 70,249<br />

0 70,249<br />

Project Funds Not Budgeted by the<br />

District<br />

City of Bradenton 0 0 0 68,300<br />

0 68,300<br />

0<strong>21</strong> - Manasota Basin 358<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$138,549


N188<br />

City of Bradenton NAVD88 Vertical Control Densification<br />

Critical Project Milestones Projected Amended Actual<br />

150 days<br />

Execute Cooperative Agreement between the County and the District 12/31/09<br />

180 days<br />

Execute Contract with the Consultants 2/1/<strong>10</strong><br />

30 days<br />

Initial Project Planning and Develop the Scope of Work 9/1/09<br />

420 days<br />

Final deliverables 9/30/<strong>10</strong><br />

60 days<br />

Submit cooperative agreement for approval <strong>10</strong>/1/09<br />

Status As Of: June 15, 2009<br />

The City of Bradenton is committed to funding the project as planned.<br />

0<strong>21</strong> - Manasota Basin 359


N206<br />

G.WIZ Water Wonders Workshop<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Quality, Natural Systems<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

G.WIZ-The Science Museum<br />

Project Manager HULL, MARY MARGARET<br />

Task Manager(s)<br />

Status Ongoing<br />

TORRUSIO, MARY<br />

Description<br />

This Cooperative Funding Initiative (CFI) project seeks to educate students and adults in Sarasota County about<br />

conservation and protection of local environmental resources. While G.WIZ partners with the school districts of<br />

Sarasota and Manatee counties to involve students and teachers in the field trips to G.WIZ, this project targets 138<br />

adults and 1,380 students in grades 5-7 in Sarasota County. The program's purpose is to excite students about<br />

science in an informal educational setting that encourages curiosity and understanding through hands-on activities<br />

about water quality, water conservation and protection of water resources. Overall, the program proposes to increase<br />

both their awareness and knowledge of water resources with the ultimate goal that they become engaged stewards of<br />

our natural resources. The project's success is measured by pre/post student assessments as well as teacher<br />

evaluations.<br />

Benefits<br />

This project will provide students with hands-on experiences with water resources. The Sarasota County school<br />

systems will benefit by participating in a supplemental environmental education program that incorporates multi "Big<br />

Idea" Strands from the Next Generation Sunshine State Science Standards. This in turn supplements and enforces<br />

scientific proficiency as teachers prepare their students for the Florida Comprehensive Assessment Test (FCAT).<br />

Costs<br />

The total cost of the FY20<strong>10</strong> project is $71,124, with the District's Manasota Basin Board contributing $38,839. District<br />

funding will be used to fund 30 field trips, transportation and workshop supplies. The proposed program would<br />

reach 1,380 students and 138 adults at a cost to the District of $25.58 per person. The budget line below includes<br />

costs for staff to manage the project.<br />

Additional Information<br />

The project has been funded by the West Coast Inland Navigational District (WCIND) in Manatee County for the past<br />

six academic years. G.WIZ would like to increase the number of students reached in Sarasota County to bring this<br />

program to the same level of impact that is offered to Manatee County students and as funded by WCIND.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 0 0 0 39,616<br />

0 39,616<br />

Project Funds Not Budgeted by the<br />

District<br />

G.WIZ 0 0 0 32,285<br />

0 32,285<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$71,901<br />

Critical Project Milestones Projected Amended Actual<br />

FY20<strong>10</strong> Budgeted Funds<br />

Initiate purchase order <strong>10</strong>/1/09<br />

Educational workshops begin 11/2/09<br />

Educational workshops end 7/30/<strong>10</strong><br />

Final report and invoice due to the District 8/31/<strong>10</strong><br />

0<strong>21</strong> - Manasota Basin 360


N206<br />

G.WIZ Water Wonders Workshop<br />

Status As Of: September <strong>10</strong>, 2009<br />

Cooperator has been notified of approval of FY20<strong>10</strong> funding and District staff is working with cooperator to develop a<br />

scope of work for the FY20<strong>10</strong> project. ACTION-TO-DATE: On time.<br />

0<strong>21</strong> - Manasota Basin 361


N<strong>21</strong>8<br />

Englewood Reclaimed Water Supply Project<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply, Water Quality<br />

Basin(s) Peace River, Manasota<br />

Cooperator(s)<br />

Englewood Water District<br />

Project Manager MCGOOKEY, SCOTT<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This project consists of the design and construction of a supplemental reclaimed water supply well and the<br />

modification of the intake structure at the onsite reuse pond at the Englewood WRF to provide additional dry weather<br />

irrigation supplies. Reclaimed water is produced at the Englewood WRF, which serves portions of Charlotte and<br />

Sarasota counties. Current reclaimed water storage includes a 1 MG above ground storage tank, wet weather storage<br />

ponds (onsite and offsite), and a fully permitted ASR system. The ASR well provides 0.5 mgd of reclaimed water<br />

during peak demand periods and has become a critical component of the reuse system. Without previous SWFWMD<br />

funding assistance for the ASR program, EWD reuse would not be as efficient and connection of many current<br />

customers would not have been possible. Installing an additional supply well into the ASR storage zone will increase<br />

the rate at which stored water can be recovered during peak demand. A well approximately 600 feet in depth is<br />

required, along with a pump and appurtenances to produce an additional 0.5 mgd, or about 15 mg of water during<br />

each peak month used. Re-engineering the onsite wet weather pond will more effectively utilize available storage and<br />

freshwater in the surficial aquifer at the WRF. Lowering the pump intake from the existing pond will provide additional<br />

water for irrigation. Reuse demands during dry weather periods often exceed the available supply. This project will<br />

provide additional reuse supply to existing customers during peak demand periods. These customers include Lemon<br />

Bay Golf, Oyster Creek Golf, and Rotunda West Utilities in Charlotte County and Myakka Pines Golf, Englewood<br />

Sports Park, Boca Royale Golf, and Gran Paradiso Subdivision in Sarasota County.<br />

Benefits<br />

The project will provide approximately 82,192 gpd of additional reuse supply that will be used evenly between the<br />

identified customers in Charlotte and Sarasota Counties. This project will offset approximately 61,644 gpd. The<br />

cost/benefit ratio for the total estimated project cost of $260,000 averaging 61,644 gpd using an 8% annual interest<br />

rate amortized over 30 years is $1.02/<strong>10</strong>00 gallons.<br />

Costs<br />

The total cost of the project is estimated at $260,000. Since the benefits are evenly split between customers in the<br />

Peace and Manasota Basins, EWD is requesting $65,000 from each Basin Board for a total of $130,000 (50%) in<br />

FY20<strong>10</strong> funding. Design costs are estimated at $60,000 and construction at $200,000.<br />

Additional Information<br />

Without previous SWFWMD funding assistance for the ASR program, EWD reuse would not be as efficient and<br />

connection of many current customers would not have been possible. This project will further increase this efficiency<br />

and help EWD meet existing contracted amounts. EWD won the 2008 FWEA David York Award for small facilities (<<br />

5 mgd), another example of the benefits that the previous funding assistance has had. Reuse demands during dry<br />

weather periods often exceed the available supply. Additional reuse customers have been identified but the ability to<br />

serve these users during peak demand periods will be problematic without additional supplemental sources. With the<br />

lack of available fresh groundwater or surface water EWD is faced with developing alternative supplemental sources.<br />

Supplemental sources currently identified include the following: Installing an additional supply well into the ASR<br />

storage zone to increase the rate at which stored water can be recovered. A well approximately 600 feet in depth is<br />

required, along with a pump and appurtenances to produce an additional 0.5 mgd, or about 15 mg of water during<br />

each peak month used. Re-engineering the onsite wet weather pond to more effectively utilize available storage and<br />

freshwater in the surficial aquifer at the WRF. Lowering the pump intake from the existing pond will provide additional<br />

water for golf course irrigation to Lemon Bay Golf Course, and may allow EWD to add other golf course storage ponds<br />

to be supplied from this pond. EWD advertises and helps enforce the District's watering restrictions, aids in<br />

xeriscaping education, and have imposed a steep graduated rate structure to discourage high water usage. The EWD<br />

has a policy requiring any new significant development desiring utilities to include a reclaimed water irrigation system<br />

in its infrastructure. EWD's reuse customers are conservation minded and only use the water deemed necessary to<br />

adequately maintain the irrigated area.<br />

0<strong>21</strong> - Manasota Basin 362


N<strong>21</strong>8<br />

Englewood Reclaimed Water Supply Project<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 0 0 0 65,000<br />

0 65,000<br />

0<strong>21</strong> Manasota Basin 0 0 0 68,077<br />

0 68,077<br />

Project Funds Not Budgeted by the<br />

District<br />

Englewood Water District 0 0 0 130,000<br />

0 130,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$263,077<br />

Critical Project Milestones Projected Amended Actual<br />

Start Design and Permitting 11/30/09<br />

Complete Design and Permitting 7/1/<strong>10</strong><br />

Start Construction of Well & Intake Structure 12/31/<strong>10</strong><br />

Complet Well Installation 4/1/11<br />

Complete Re-engineering Onsite Pond 5/1/11<br />

Status As Of: August 25, 2009<br />

CFI agreement being drafted by DIstrict staff. EWD is drafting Exhibit B (Project Plan) of the draft agreement.<br />

0<strong>21</strong> - Manasota Basin 363


N231<br />

Manatee County Toilet Rebate Project - Phase IV<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply, Water Quality<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Manatee County<br />

Project Manager MCGOOKEY, SCOTT<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This Ultra Low-Flow Toilet Rebate (ULFT) incentive program is for the County's retail water customers (residential,<br />

multi-family, and commercial). The County currently services over 90,000 potable water accounts and anticipates<br />

continued growth over the next 20 years. The objectives of this retrofit program are to reduce water demand and<br />

provide financial incentives for the replacement of an estimated 900 toilets. This program addresses the Manatee<br />

County Board of County Commissioners policies on water conservation and is supported by the recently increased<br />

Water Conservation Rates for potable water use. Any retail water customer who agrees to replace a 3.5 gal or more<br />

toilet with a ultra-low flush (ULF) that uses 1.6 gallons per flush (gpf) or less and/or High Efficiency Toilets (HET), will<br />

receive a $<strong>10</strong>0.00 rebate for each toilet (maximum of two (2) toilets per unit). This project will also focus on educating<br />

the new low volume toilet users on the proper maintenance, specifically flappers and leak detection, necessary to<br />

ensure that each toilet remains a water conserving fixture. Rebate payments are subject to the recipient's submittal of<br />

the completed application, documented cost, and will be distributed upon inspection of the completed installation and<br />

verification that the old toilet is ready for disposal.<br />

Benefits<br />

The estimated total water saving for this project is <strong>21</strong>,425 gpd.<br />

Costs<br />

The total cost for this project is estimated to be $126,144. The cost/benefit is $1.62 per k/gallons, assuming a 20-year<br />

life. The County has requested $63,072 (fifty percent) from the Manasota Basin Board in FY20<strong>10</strong>.<br />

Additional Information<br />

This incentive program is an enhancement to the County's existing Water Conservation Program. The program<br />

includes existing metering and loss reduction programs, water conserving rate sturctures, urban and agricultural<br />

reclaimed water irrigation supply (with the metering of all users and consumption based billing for all new users),<br />

public education, Florida Friendly based landscape codes, SWUCA based level of service for water supply at 1<strong>10</strong><br />

gpfcpd, land development codes requiring non-potable sources for irrigation in new development, water supply<br />

protection ordinances, and the use of aquifer storage and recovery for both potable and reclaimed water.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 0 0 0 66,149<br />

0 66,149<br />

Project Funds Not Budgeted by the<br />

District<br />

Manatee County 0 0 0 63,072<br />

0 63,072<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$129,2<strong>21</strong><br />

Critical Project Milestones Projected Amended Actual<br />

Agreement Executed 3/12/<strong>10</strong><br />

Begin Rebate Program 5/1/<strong>10</strong><br />

Complete Rebate Program 5/31/11<br />

Final Report 9/14/12<br />

0<strong>21</strong> - Manasota Basin 364


N231<br />

Manatee County Toilet Rebate Project - Phase IV<br />

Status As Of: August 28, 2009<br />

CFI agreement being drafted by DIstrict staff. County is drafting Exhibit B (Project Plan) of the draft agreement.<br />

0<strong>21</strong> - Manasota Basin 365


M1<strong>10</strong><br />

Manatee - FEMA Map Modernization<br />

Project Type FEMA/Map Mod.<br />

AOR(s)<br />

Flood Protection<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Project Manager LETASI, SCOTT<br />

Task Manager(s)<br />

Federal Emergency Management Agency<br />

NGUYEN, NAM<br />

Status Ongoing<br />

Description<br />

This project is to perform Federal Emergency Management Agency (FEMA) flood insurance rate map (FIRM)<br />

modernization which includes 1) Topographic Information, 2) Watershed Evaluation, and 3) Watershed Management<br />

Plan elements of the District's Watershed Management Program (WMP) for numerous Manatee County watersheds.<br />

The County covers an area of approximately 762 square miles. Under this project the FIRMs will reflect updated flood<br />

hazard risk areas and be modernized to a digital product.<br />

Benefits<br />

The WMP provides a method to evaluate the capacity of a watershed to protect, enhance, and restore water quality<br />

and natural systems, while achieving flood protection. The information developed provides the science for the District's<br />

Resource Management and Environmental Resource Permitting (ERP). It assists local governments: 1) With their land<br />

management responsibilities by establishing a level of service and developing Best Management Practices (BMPs) to<br />

address level of service deficiencies. 2) Provides a Geodatabase and projected results from watershed model<br />

simulations for floodplain management and water quality management. The FIRMs are used by local governments for<br />

land management and building permitting to satisfy the minimum requirements of the National Flood Insurance<br />

Program.<br />

Costs<br />

The total budget amount for this project is $900,000. FEMA is expected to contribute all the funds for the project in<br />

FY2008. When each element is completed the project budget will be refined based on the information gathered.<br />

Additional Information<br />

The WMP includes five major elements: 1) Topographic Information, 2) Watershed Evaluation, 3) Watershed<br />

Management Plan, 4) Implementation of Best Management Practices, and 5) Maintenance of Watershed Parameters<br />

and Models. Implementing elements of the WMP with local governments is one of the Comprehensive Watershed<br />

Management (CWM) initiative strategies and one of the District's Strategic Priorities. The District is cooperating with<br />

FEMA to modernize the FIRMs in Manatee county. Information developed with this project will be used to update and<br />

modernize the FIRMs for the entire county. Staff has worked with the FEMA to improve and formalize the District's<br />

relationship with a federal agency that shares flood protection responsibilities. FEMA and the District executed a<br />

Cooperating Technical Partners (CTP) Memorandum of Agreement on September 14, 2001. As a CTP, the District is<br />

eligible for federal grants and matching funds to further efforts to modernize the flood insurance rate maps (FIRMs).<br />

The District executed a Mapping Activity Statement with FEMA that identifies costs, responsibilities, and specific<br />

activities to complete the FEMA Map Modernization effort for watersheds in Manatee county. The District will<br />

coordinate with the local government(s), will manage the project, and will enter into purchase orders and agreements<br />

to accomplish project tasks. With FEMA funding several tasks of the Watershed Evaluation and Watershed<br />

Management Plan elements for priority watersheds within the County will be accomplished. Watersheds will be<br />

prioritized based on the needs of the local governments and the District. Because of funding constraints some<br />

watersheds will not be studied in detail. The risk information from the current FIRMs will be transferred to the<br />

modernized, digital maps. These watersheds will be studied in detail when additional funding is available through the<br />

cooperative funding process. Work on the Watershed Management Plan element for the priority watersheds will<br />

include the following tasks: survey, data management and development of watershed parameters, GIS processing,<br />

computer modeling, and floodplain analysis. Future cooperative funding request(s) will be required to complete<br />

remaining Watershed Evaluation and Watershed Management Plan tasks (e.g. LOS determination, surface water<br />

resource assessment, and BMP alternative analysis).<br />

0<strong>21</strong> - Manasota Basin 366


M1<strong>10</strong><br />

Manatee - FEMA Map Modernization<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 879 0 0<br />

0<br />

0<br />

879<br />

District Budgeted - Outside Revenue<br />

FEMA Mapping Activity Statement 900,000 0 0<br />

0<br />

0 900,000<br />

Status As Of: September 01, 2009<br />

Total:<br />

Future<br />

Funding<br />

Status Update: This project is currently on hold. The District has not received funding from FEMA; therefore the project<br />

can not be started.<br />

0<strong>21</strong> - Manasota Basin 367<br />

Total<br />

Funding<br />

$900,879


M115<br />

Sarasota - FEMA Map Modernization<br />

Project Type FEMA/Map Mod.<br />

AOR(s)<br />

Flood Protection<br />

Basin(s) General Fund (District), Manasota<br />

Cooperator(s)<br />

Project Manager TURNER, DAWN<br />

Task Manager(s)<br />

Status Ongoing<br />

Federal Emergency Management Agency<br />

Description<br />

This project is to perform Federal Emergency Management Agency (FEMA) flood insurance rate map (FIRM)<br />

modernization which includes 1) Topographic Information, 2) Watershed Evaluation, and 3) Watershed Management<br />

Plan elements of the District's Watershed Management Program (WMP) for numerous Sarasota county watersheds.<br />

The county covers an area of approximately 570 square miles. Under this project the FIRMs will reflect updated flood<br />

hazard risk areas and be modernized to a digital product.<br />

Benefits<br />

The WMP provides a method to evaluate the capacity of a watershed to protect, enhance, and restore water quality<br />

and natural systems, while achieving flood protection. The information developed provides the science for the District's<br />

Resource Management and Environmental Resource Permitting (ERP). It assists local governments: 1) With their land<br />

management responsibilities by establishing a level of service and developing Best Management Practices (BMPs) to<br />

address level of service deficiencies. 2) Provides a Geodatabase and projected results from watershed model<br />

simulations for floodplain management and water quality management. The FIRMs are used by local governments for<br />

land management and building permitting to satisfy the minimum requirements of the National Flood Insurance<br />

Program.<br />

Costs<br />

The total budget amount for this project is $2.42 million. FEMA is contributing $2 million for the project. $420,000 in<br />

Manasota Basin Board funds approved in FY2004 for project L019 were used towards updating the digital topographic<br />

information for the entire County in conjunction with this FEMA map modernization effort. When each element is<br />

completed the project budget will be refined based on the information gathered.<br />

Additional Information<br />

The WMP includes five major elements: 1) Topographic Information, 2) Watershed Evaluation, 3) Watershed<br />

Management Plan, 4) Implementation of Best Management Practices, and 5) Maintenance of Watershed Parameters<br />

and Models. Implementing elements of the WMP with local governments is one of the Comprehensive Watershed<br />

Management (CWM) initiative strategies and one of the District's Strategic Priorities. The District is cooperating with<br />

FEMA to modernize the FIRMs in Sarasota County. Information developed with this project will be used to update and<br />

modernize the FIRMs for the entire county. Staff has worked with the FEMA to improve and formalize the District's<br />

relationship with a federal agency that shares flood protection responsibilities. FEMA and the District executed a<br />

Cooperating Technical Partners (CTP) Memorandum of Agreement on September 14, 2001. As a CTP, the District is<br />

eligible for federal grants and matching funds to further efforts to modernize the flood insurance rate maps (FIRMs).<br />

The District executed a Mapping Activity Statement with FEMA that identifies costs, responsibilities, and specific<br />

activities to complete the FEMA Map Modernization effort for watersheds in Sarasota county. The District will<br />

coordinate with the local government(s), will manage the project, and will enter into purchase orders and agreements<br />

to accomplish project tasks. With FEMA funding several tasks of the Watershed Evaluation and Watershed<br />

Management Plan elements for priority watersheds within the county will be accomplished. Watersheds will be<br />

prioritized based on the needs of the local governments and the District. Because of funding constraints some<br />

watersheds will not be studied in detail. The risk information from the current FIRMs will be transferred to the<br />

modernized, digital maps. These watersheds will be studied in detail when additional funding is available through the<br />

cooperative funding process. Work on the Watershed Management Plan element for the priority watersheds will<br />

include the following tasks: survey, data management and development of watershed parameters, GIS processing,<br />

computer modeling, and floodplain analysis. FEMA is responsible for working with the local communities for the<br />

adoption of the DFIRMs. Future cooperative funding request(s) will be required to complete remaining Watershed<br />

Evaluation and Watershed Management Plan tasks (e.g. LOS determination, surface water resource assessment, and<br />

BMP alternative analysis).<br />

0<strong>21</strong> - Manasota Basin 368


M115<br />

Sarasota - FEMA Map Modernization<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 41,966 0 32,089 16,584<br />

0 90,639<br />

District Budgeted - Outside Revenue<br />

FEMA Mapping Activity Statement 2,000,000 0 0<br />

0<br />

0 2,000,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$2,090,639<br />

Critical Project Milestones Projected Amended Actual<br />

1. FEMA Cooperative Agreement<br />

Cooperating Technical Partners Memorandum of Agreement 9/14/01 9/14/01<br />

Cooperating Technical Partners Agreement Executed 8/12/02 8/12/02<br />

Mapping Activity Statement Executed 9/30/03 9/26/03<br />

01A - Scoping 8/30/04 8/30/04<br />

02 - Digital Topographic Data Development <strong>10</strong>/1/04 5/31/08<br />

03 - Independent QA/QC of Topographic Information 11/1/04 5/31/08<br />

01C - Review of Existing Info, Reconnaissance, & Field Surveys 2/1/05 7/31/06<br />

04 - Hydrology 2/1/05 7/31/08<br />

06 - Hydraulics 2/1/05 7/31/08<br />

05 - Independent QA/QC of Hydrology 3/1/05 8/31/08<br />

07 - Independent QA/QC of Hydraulics 3/1/05 8/31/08<br />

08 - Floodplain Mapping (Detailed & Redelineation) 4/1/05 7/31/08<br />

09 - Independent QA/QC of Floodplain Mapping 5/2/05 8/31/08<br />

<strong>10</strong> - Base Map Acquisition and Preparation 5/2/05 7/31/08<br />

11 - DFIRM Production 6/1/05 11/30/08<br />

12 - Merge Revised and Effective Flood Hazard Data 6/1/05 11/30/08<br />

12A - Application of DFIRM Graphic and Database Specs 6/1/05 11/30/08<br />

13 - Issue Preliminary DFIRMs and FIS to Communities 9/2/05 11/30/08<br />

01B - Outreach <strong>10</strong>/1/05 11/30/09<br />

14 - Post-Preliminary Processing (by FEMA) 12/2/05 11/30/09<br />

2. Watershed Update Consultant (BCI)<br />

Execute Consultant Contracts for Watershed Updates 6/18/03 6/11/04<br />

Execute Consultant Contract for Digital Topo Information 1/9/04 1/9/04<br />

Contract Termination for Watershed Updates 1/8/07 1/8/08<br />

3. Watershed Update Consultant (JEA)<br />

Execute Consultant Contracts for Watershed Updates 6/1/04 6/<strong>10</strong>/04<br />

Execute First Amendment 3/31/06 3/13/06<br />

Contract Termination for Watershed Updates 6/26/06 12/31/08<br />

First Amendment to 04CONC0000040-B 5/15/08 <strong>10</strong>/20/08<br />

4. DFIRM Consultant Agreement (URS)<br />

Execute Consultant Contract for DFIRM Production 1/9/04 1/15/04<br />

Contract Termination for DFIRM Production 1/14/07 7/14/08<br />

Execute No Cost, Time Extension 3/16/07<br />

Status As Of: August 24, 2009<br />

1. FEMA: In March 2008, staff submitted a request to FEMA to request additional time to revise and update the<br />

watershed models based on quality assurance reviews performed by the District, the County, local governments, and the<br />

District's consultants. The request was approved, and the performance period was extended to March 31, 2009. Further<br />

revisions, verification, and additions are necessary to appropriately represent the hydrologic and hydraulic characteristics<br />

of the watersheds, and reflect 2007 terrain data. Additional time is also required to complete subsequent reviews, public<br />

outreach on the preliminary floodplain information, and to accommodate a public review and comment period. An<br />

additional time extension request was submitted to FEMA in March 2009 to extend the performance period through May<br />

0<strong>21</strong> - Manasota Basin 369


M115<br />

Sarasota - FEMA Map Modernization<br />

31, 20<strong>10</strong>. The time extension has been approved. 2. Watershed Updates (BCI): The agreement with BCI was executed<br />

on January 8, 2004 to conduct the scoping activity, and generate digital topographic information (DTI) via LiDAR for the<br />

entire county. Notice to proceed (NTP) for Work Order (WO) #1 was issued effective January 15, 2004. WO#2 to<br />

perform the scoping activity was executed on February 8, 2004; and NTP was issued effective January 15, 2004.<br />

Delivery of DTI was delayed for well over a year. The delay impacted the schedules of all the other elements and<br />

consultants contributing to this project. Project scoping was completed in August 2004. The First Amendment to BCI's<br />

agreement was executed to include updates to the County's existing Dona/Roberts Bay and Lemon Bay watershed<br />

models to reflect the new DTI, convert models from NAVD29 to NAVD88, and begin updating the Ainger and Forked<br />

Creek models to the District's G&S. BCI completed the conversion for its assigned watersheds and deliverables were<br />

received on January 23, 2006. The BCI Agreement was amended as of February 13, 2007 to extend the contract<br />

termination date to January 8, 2008. BCI WO#4 was executed to allow BCI to complete remaining update tasks. Draft<br />

models and associated GIS data for Curry Creek, Hatchet Creek, Alligator Branch, and the Island of Venice were<br />

received on October 14, 2008. The submittal was reviewed by District staff, and comments were provided to BCI on<br />

December 12, 2008. The $750,400 in FEMA funds encumbered to the agreement with BCI has been expended.<br />

$587,281 in B206 funding is being used to completed the models, and the peer and public review process. 3. Watershed<br />

Updates (JEA): Agreement JEA was executed and WO#1 issued to update the existing Little Sarasota and Sarasota<br />

watershed model. JEA completed conversion of these models from NGVD29 to NAVD88. WO #2 was then executed to<br />

begin the update of the Phillippi Creek watershed parameters and model to the District's G&S. Deliverables were<br />

received in March 2007 and reviewed by District, County, and municipal staff. It was determined that significant revisions<br />

were needed to address issues with the original model, and that the work cannot be completed in time to use for DFIRM<br />

generation. Further updates to the Phillippi Creek model were postponed. The consultant services agreement with JEA<br />

was amended to include floodway analyses and ArcHydro tool development to automate repetitive hydrologic and<br />

hydraulic modeling tasks (M118). The First Amendment to JEA's agreement was executed on March 13, 2006. WO#3<br />

was executed on May 16, 2006 for the conceptual design of ArcHydro tools. WO#4 was executed on May 8, 2007 to<br />

develop the ArcHydro tool for Irregular Weirs. WOr #5 was executed to perform limited updates to the remaining<br />

Sarasota Bay and Little Sarasota Bay models, and convert the lower Myakka River model to NAVD88. Draft deliverables<br />

were submitted for WO #5. WO #6 was issued to update the Hudson and Whitaker Bayou models to reflect 2007 terrain<br />

data and incorporate ERP information. Draft deliverables were received on November 3, 2008 and December 30, 2008<br />

respectively. District and County review comments were provided to JEA on December 3, 2008 and February 5, 2009<br />

respectively. $729,550 of the FEMA funds have been encumbered to the agreement with JEA, of which $673,575 has<br />

been expended. $140,291 in B206 funding are being used to complete the models, and the peer and public review<br />

process. 4. DFIRM Production (URS): The agreement with URS Southern was executed on January 15, 2004, to<br />

produce the countywide Digital Flood Insurance Rate Maps (DFIRMs) and Flood Insurance Study (FIS), and to support<br />

public outreach. The URS Agreement was amended twice, ultimately extending the contract expiration date from July 14,<br />

2008 to June 1, 20<strong>10</strong>. WO #1 was executed on February 16, 2004 to identify the data to be used for DFIRM production,<br />

and prepare a detailed approach and project outline. URS completed these tasks. WO #2 was executed to prepare the<br />

base maps and perform outreach. URS submitted draft base maps and redelineations for review and approval in<br />

February 2009. District, FEMA, County, and local government staff reviewed the information and provided comments to<br />

URS in April 2009. Staff executed WO#3 with URS to incorporate the final deliverables from model updates and the Big<br />

Slough WMPlan (K883) to produce the preliminary DFIRMs and FIS. A meeting/conference call was held on June 29,<br />

2007 between all consultants associated with the project to coordinate schedules, review deliverable requirements, and<br />

identify points of contact. URS was asked to stop work on production of the preliminary DFIRMs until model updates are<br />

completed. On March 24, 2008 WO#3 was re-issued to reflect the work completed before the stop work order. NTP for<br />

WO#4 was issued on June 5, 2008 for the preparation of the DFIRMs, DFIRM database, and FIS report using the<br />

watershed models that are currently under development, and watershed models previously developed by the County.<br />

Several of the County models have not been signed and sealed by a professional engineer. The County has retained<br />

professional engineers to review and certify the models. The following County models have now been certified, and have<br />

been provided to the URS to include on the draft maps: Lemon Bay, Cow Pen Slough, Phillippi Creek, Little Sarasota<br />

Bay, Lower Myakka River, Upper Myakka/Howard Creek. $520,000 of the FEMA funds have been encumbered to the<br />

agreement with URS, of which $278,000 has been expended. $1<strong>10</strong>,597 in B206 funding has been added to the<br />

agreement to cover the cost of incuding the County's certified models and participate in public meetings.<br />

0<strong>21</strong> - Manasota Basin 370


M118<br />

FEMA Map Modernization Management Support<br />

Project Type FEMA/Map Mod.<br />

AOR(s)<br />

Flood Protection<br />

Basin(s) General Fund (District), Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers,<br />

Pinellas-Anclote River, Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager TURNER, DAWN<br />

Task Manager(s)<br />

Status Ongoing<br />

Federal Emergency Management Agency<br />

Description<br />

This project is to provide management support for Federal Emergency Management Agency (FEMA) flood insurance<br />

rate map (FIRM) modernization projects throughout the District (please reference projects M<strong>10</strong>1-M116). Under these<br />

Map Modernization projects the FIRMs will reflect updated flood hazard risk areas and be modernized to a digital<br />

product. The updated flood hazard risk areas are being developed by the District through the 1) Topographic<br />

Information, 2) Watershed Evaluation, and 3) Watershed Management Plan elements of the District's Watershed<br />

Management Program (WMP). Map Modernization management support (MMMS) funds supplement the ongoing<br />

activities already being performed by staff including, but not limited to coordination and effort in building partnerships,<br />

information technology systems, program management planning, hydrologic and hydraulic review, and outreach.<br />

Benefits<br />

The WMP provides a method to evaluate the capacity of a watershed to protect, enhance, and restore water quality<br />

and natural systems, while achieving flood protection. The information developed provides the science for the District's<br />

Resource Management and Environmental Resource Permitting (ERP). It assists local governments: 1) With their land<br />

management responsibilities by establishing a level of service and developing Best Management Practices (BMPs) to<br />

address level of service deficiencies. 2) Provides a Geodatabase and projected results from watershed model<br />

simulations for floodplain management and water quality management. The FIRMs are used by local governments for<br />

land management and building permitting to satisfy the minimum requirements of the National Flood Insurance<br />

Program.<br />

Costs<br />

The total amount for MMMS is $1,013,240 to be funded by FEMA. The District has received a total of $713,240 in<br />

FEMA MMMS to date that has been included in the Governing Board's FY2005, FY2006, and FY2007 budgets as<br />

revenue. District Staff anticipate an additional $150,000 to be funded by FEMA for ongoing MMMS activities in both<br />

FEMA's FY2008 and FY2009 ($300,000 in total). Each year FEMA notifies the District how much funding is available<br />

for MMMS. The District funding amounts shown in the table represents staff salaries.<br />

Additional Information<br />

The WMP includes five major elements: 1) Topographic Information, 2) Watershed Evaluation, 3) Watershed<br />

Management Plan, 4) Implementation of Best Management Practices, and 5) Maintenance of Watershed Parameters<br />

and Models. Implementing elements of the WMP with local governments is one of the Comprehensive Watershed<br />

Management (CWM) initiative strategies and one of the District's Strategic Priorities. The District is cooperating with<br />

FEMA to modernize the FIRMs throughout the District. Staff has worked with the FEMA to improve and formalize the<br />

District's relationship with a federal agency that shares flood protection responsibilities. FEMA and the District<br />

executed a Cooperating Technical Partners (CTP) Memorandum of Agreement on September 14, 2001. As a CTP,<br />

the District is eligible for federal grants and matching funds to further efforts to modernize the FIRMs. Each year the<br />

District enters into a cooperative agreement with FEMA for MMMS funding that defines the activities that will be<br />

performed. $250,000 in funding (grant EMA-2004-CA-5038) for FY2005 is being used to provide a meeting facilitator<br />

for ongoing coordination meetings between the water management districts, FEMA Region 4, and the Florida<br />

Department of Community Affairs; develop a District-wide FIRM paneling scheme; determine the feasibility of<br />

expanding the District's role in distributing digital FIRMs to the public; maintaining the digital FIRMs; and revising the<br />

FIRMs simultaneously with the ERP application review. For FY2005, a total of $300,000 was actually budgeted in the<br />

General Fund with associated revenue. The $50,000 difference between expected funding and actual was rolled into<br />

the FY2006 budget. For FY2006 FEMA has granted (EMA-2005-CA-5244) the five water management districts<br />

$120,000 in MMMS to hire an outreach facilitator and develop design storm rainfall depth criteria for the entire State.<br />

The District will manage the project and contract with consultants on behalf of the other water management districts.<br />

In addition, the District received additional MMMS ($144,000) in FY2006 to support outreach efforts, allow the District<br />

to develop quality control/quality assurance tools, and support staff travel to meetings and conferences related to this<br />

effort. For FY2007, the District has received $129,620 from FEMA (grants EMA-2006-CA-5631 and<br />

EMA-2006-CA-5624) for continued travel support, outreach efforts, management assistance, and an XML-based<br />

export to for the District's Geographic Watershed Information System to populate FEMA's database. The District has<br />

recently received an additional $69,620 under EMA-2007-CA-5723 for continued travel and programmatic assistance.<br />

0<strong>21</strong> - Manasota Basin 371


M118<br />

FEMA Map Modernization Management Support<br />

For FY2008, the District is proposing to budget $150,000 in revenue for continued MMMS. The District will coordinate<br />

with the local government(s), will manage the project, and will enter into purchase orders and agreements to<br />

accomplish project tasks.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 20,095 (400) 31,349 14,306<br />

0 65,350<br />

District Budgeted - Outside Revenue<br />

FEMA Mapping Activity Statement 950,000 0 150,000 70,000<br />

0 1,170,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$1,235,350<br />

Critical Project Milestones Projected Amended Actual<br />

1. Critical Project Milestones<br />

FEMA & District Recognition on Reports 3/31/<strong>10</strong><br />

2. FY2005<br />

Develop Mutually Agreeable Scope of Work for MMMS 9/30/04 9/30/04<br />

Execute FEMA Agreement Articles and Related Forms 11/30/04 11/24/04<br />

Develop Consultant Agreement 11/30/04 11/19/04<br />

Draft Agreement to Management Services 1/7/05 1/7/05<br />

Draft Agreement returned from Management Services 1/<strong>21</strong>/05 2/4/05<br />

Contract Execution 3/4/05 3/1/05<br />

Notice to Proceed 3/4/05 3/1/05<br />

Develop First Amendment to Consultant Service Agmt 7/7/06 8/2/06<br />

Draft Amendment to Management Services 7/12/06 8/2/06<br />

Contract Termination 7/<strong>21</strong>/06 3/1/08<br />

Amendment Execution 9/18/06 9/18/06<br />

3. FY2006 - District<br />

Develop Cooperative Agreement for MMMS (District) 6/7/05 6/1/07<br />

Execute FEMA Agreement Articles and Related Forms <strong>10</strong>/31/05 12/2/05<br />

District Outreach Facilitator Purchase Order Execution 2/28/06 3/2/06<br />

District Outreach Facilitator Purchase Order Termination 12/31/06 12/31/06<br />

3. FY2006 - FL WMD<br />

Develop Application for competitive MMMS (FL WMD) 6/1/05 5/18/05<br />

Execute FEMA Agreement Articles and Related Forms <strong>10</strong>/31/05 12/2/05<br />

Develop State Outreach Facilitator Purchase Order 1/30/06 2/<strong>21</strong>/06<br />

State Outreach Facilitator Purchase Order Execution 2/28/06 3/2/06<br />

Develop Rainfall Frequency Analysis Purchase Order 6/1/06 6/1/06<br />

Rainfall Frequency Analysis Purchase Order Execution 6/30/06 7/20/06<br />

State Outreach Facilitator Purchase Order Termination 12/31/06 12/31/06<br />

Rainfall Frequency Analysis Purchase Order Termination 6/30/07 9/30/07<br />

4. FY2007<br />

Develop Application for competitive MMMS 3/27/06 3/27/06<br />

Develop Cooperative Agreement for MMMS 5/26/06 5/26/06<br />

Execute FEMA Agreement Articles and Related Forms 9/22/06 9/28/06<br />

Execute FEMA Agreement Articles and Related Forms 9/22/06 9/29/06<br />

Develop XML-base Export System Purchase Order 11/30/06<br />

XML-base Export System Purchase Order Execution 11/30/06<br />

Develop Map Modernization Program Assistance Agreement 7/31/07<br />

Map Modernization Program Assistance Agreement Execution 9/30/07<br />

0<strong>21</strong> - Manasota Basin 372


M118<br />

FEMA Map Modernization Management Support<br />

XML-base Export System Purchase Order Termination 9/30/07<br />

FY2008<br />

Develop Mutally Agreeable Scope of Work for MMMS 6/25/08 6/25/08<br />

Execute FEMA Agreement Articles 6/25/08 6/25/08<br />

Execute 76-<strong>10</strong>A Form 7/3/08 8/12/08<br />

Status As Of: August 24, 2009<br />

FY2005: A fully executed FEMA Form 76-<strong>10</strong> to MMMS Grant, EMA-2004-CA-5038 has been returned to the District. The<br />

form awards funds pursuant to the approved Statement of Work. Forms SF424 and FEMA 20-20 have also been<br />

executed by the Executive Director and transmitted to FEMA to support these funds. The consultant agreement with<br />

URS Corporation Southern was executed on March 1, 2005. All FY2005 funds have been encumbered via an<br />

amendment to URS' agreement, which was executed in September 2006. Work Orders #1, #2, and #3 have been<br />

executed. Work Order #1 is to incorporate a Hazard Mitigation Component into the District's Business Plan for Map<br />

Modernization. Work Order #2 is to develop a District-wide flood insurance rate map (FIRM) paneling scheme to support<br />

the District's efforts in modernizing and updating the FIRMs throughout the District. The draft paneling scheme has been<br />

prepared and submitted to surrounding water management districts (South Florida, St. Johns River, and Suwannee<br />

River). Work Orders #3 & #4 supply a moderator for ongoing coordination meetings among staff from the five water<br />

management districts regarding Map Modernization and a Sharepoint site for staff to access minutes and associated<br />

documents. Work Order #5 has been executed as of February 23, 2007, to determine the District's ability and resulting<br />

issues of reviewing Letters of Map Change (LOMC) simultaneously with ERPs. Two meetings have been held with<br />

District staff (MAN, TPA-REG, RPM), FEMA Region 4, and Hillsborough County staff. Work Order #6 directs the<br />

consultant team to present how different types of developments are reviewed and permited by the District, FEMA, and<br />

local government (Hillsborough County). This agreement will expire on October 31, 2008. After the grant expires, the<br />

remaining project funds will be released, and re-encumbered to other consultant services agreements for Map<br />

Modernization Management Support. To date, $136,896 of the FY2005 funds have been expended. FY2006: An<br />

additional $120,000 was provided by FEMA for the five water management districts. These funds were approved to<br />

facilitate Map Modernization outreach for all five districts to support the development of statewide isopluvial maps for<br />

various design storm events. The District will contract with consultants and manage the projects on behalf of the other<br />

four water management districts. A purchase order was issued to UCF for $60,000 to begin resolving design rainfall<br />

depth differences between WMDs. UCF has completed the literature review, data collection, data quality assurance,<br />

statistical analysis of the rainfall data, and an initial spatial analysis of the data. UCF requested a no-cost time extension<br />

to complete the project by December 30, 2007. Final deliverables have been received and approved, and the final<br />

invoice has been paid. The District also received FEMA funidng for outreach consulting services to support the Map<br />

Modernization effort of all the WMDs ($45,000), and for specific needs of the District ($48,000). These funds were used<br />

to retain Bender Consulting to provide outreach planning support to review completed and ongoing outreach efforts<br />

associated with each project and provide messages and direction to enhance future outreach. Bender Consulting has<br />

completed all tasks and the purchase order has been closed out. A total of $93,000 was expended. $63,000 in FY2006<br />

funds were also provided for the development of quality control and assurance tools. The funds were encumbered<br />

through an amendment to JEA's service agreements for the Sarasota County Map Modernization (M115) project. The<br />

FY2005 consultant agreement with URS has been amended to include $20,000 in FY2006 and $15,000 in FY2007 funds<br />

for ongoing meeting facilitators services. Work Order #4 was executed with URS to provide facilitation services for four<br />

(4) additional quarterly meetings. Remaining funds are to reimburse the District for travel and video conferencing<br />

expenses. Funds that have not been expended have been board encumbered ($13,000). FY2007: The District was<br />

granted an additional $60,000 in competitive MMMS for FY2007 to develop tools to export from the District enhanced<br />

ArcHydro database to FEMA's data capture standards. In addition, the District has been awarded $69,200 in MMMS from<br />

FEMA to continue travel associated with Map Modernization, coordination meeting facilitation, and programmatic<br />

assistance. A Purchase Order was executed with ESRI to develop the export tool within the ArcHydro environment, and<br />

a total of $59,479 was expended for this work. The remaining $5<strong>21</strong> of the grant funds will be used for a future purchase<br />

order with ESRI. FY2008: The District received $69,620 in FY2008 funding for ongoing programmatic assistance, and to<br />

reimburse the District for travel expenses related to Map Modernization projects. An Areement with Dewberry was<br />

executed on May 23, 2008 for Map Modernization programmatic assistance. The agreement encumbered the $39,620 in<br />

FY2007 funds, and $63,620 in FY2008 funds. Notice to Proceed for Work Order #1 was provided on June 25, 2008.<br />

FY2007 and FY2008 travel funds ($<strong>10</strong>,000 and $6,000 respectively) were board encumbered at the end of the respective<br />

fiscal year. To date, a total of $782,339 has been provided by FEMA for Map Modernization Management Support, of<br />

which $430,146 has been expended.<br />

0<strong>21</strong> - Manasota Basin 373


Table of Contents<br />

BasinBookReport-FY20<strong>10</strong> v2.0 Production September 28........................................................................................................................ 1<br />

Z0<strong>10</strong> - Boards & Executive Services - Peace River Basin................................................................................................ 1<br />

Z030 - Planning - Peace River Basin................................................................................................................................ 2<br />

Z050 - Information Resources - Peace River Basin.......................................................................................................... 3<br />

Z060 - Communications - Peace River Basin................................................................................................................... 4<br />

Z074 - Risk Management - Peace River Basin................................................................................................................. 5<br />

Z090 - Community Affairs - Peace River Basin................................................................................................................. 6<br />

Z300 - Resource Data and Restoration Department - Peace River Basin........................................................................ 7<br />

Z500 - Resource Projects - Peace River Basin................................................................................................................. 8<br />

Z600 - Operations - Peace River Basin............................................................................................................................. 9<br />

Z700 - Land Resources - Peace River Basin.................................................................................................................... <strong>10</strong><br />

Z9<strong>10</strong> - Commissions - Peace River Basin......................................................................................................................... 11<br />

Z930 - Contingencies - Peace River Basin....................................................................................................................... 12<br />

S001 - Jack Creek............................................................................................................................................................. 13<br />

S017 - Prairie/Shell Creek................................................................................................................................................. 14<br />

S029 - Upper Lake Marion Creek Watershed................................................................................................................... 15<br />

S030 - RV Griffin Reserve................................................................................................................................................. 16<br />

S035 - Bowlegs Creek....................................................................................................................................................... 17<br />

S036 - Charlotte Harbor State Buffer Preserve................................................................................................................. 18<br />

S040 - Lower Peace River (Deep Creek).......................................................................................................................... 19<br />

S051 - Bright Hour Watershed.......................................................................................................................................... 20<br />

S054 - Lake Hancock........................................................................................................................................................ <strong>21</strong><br />

S099 - Save Our Rivers Administration............................................................................................................................. 23<br />

SA01 - Jack Creek Hydr. Rest.......................................................................................................................................... 24<br />

SB54 - Polk Nature Discovery Center Education.............................................................................................................. 26<br />

W014 - Lake Hancock Outfall Treatment System............................................................................................................. 28<br />

W032 - HCC Foundation Field Trip Program.................................................................................................................... 29<br />

W331 - Biennial Seagrass Mapping of Tampa Bay, Sarasota Bay, Charlotte Harbor...................................................... 31<br />

W436 - Elizabeth Place Water Quality and Natural Systems Enhancement..................................................................... 33<br />

W501 - SWIM Plan Implementation - Charlotte Harbor.................................................................................................... 35<br />

W506 - CHEC Charlotte Harbor/Lemon Bay SWIM Watershed Education....................................................................... 37


W507 - CHEC Peace River Watershed Education............................................................................................................ 39<br />

W5<strong>10</strong> - Restoration of Natural Systems at Thornton Key................................................................................................. 41<br />

W511 - Alligator Creek Restoration Project....................................................................................................................... 42<br />

W513 - Charlotte County Fourth-Grade Field Studies Program........................................................................................ 45<br />

W5<strong>21</strong> - Charlotte Harbor Water Quality Monitoring........................................................................................................... 47<br />

W526 - Charlotte Harbor National Estuary Program......................................................................................................... 49<br />

W527 - Peace River Water Quality Monitoring.................................................................................................................. 51<br />

W547 - Water Quality in the Peace and Myakka Basins, Charlotte Harbor, and Lemon Bay........................................... 53<br />

W553 - Coral Creek Habitat Restoration Project............................................................................................................... 55<br />

W554 - (Completed) Report and Summary Analysis of Water Quality Conditions for Peace and Myakka rivers............. 57<br />

W555 - Evaluating the Effects of Restoration on Estuarine Fishes................................................................................... 59<br />

W556 - FDOT - Cape Haze Pioneer Trail Hydrologic Restoration.................................................................................... 61<br />

W557 - Characterizing Seagrass Communities of Eastern Charlotte Harbor................................................................... 63<br />

W559 - Assessment of 2008 Seagrass Maps in Charlotte Harbor And Lemon Bay......................................................... 65<br />

W776 - SWIM Plan Implementation - Winter Haven......................................................................................................... 67<br />

W781 - South Lake Conine Watershed Restoration Project............................................................................................. 69<br />

W794 - Winter Haven Chain of Lakes Sediment Removal Feasibility Study.................................................................... 71<br />

W796 - Chain of Lakes Water Quality Management Plan................................................................................................. 73<br />

W798 - Winter Haven Downtown Watershed Improvement Plan...................................................................................... 75<br />

B063 - USGS Peace River Basin Surface Water Flow, Level, and Water Quality Data Collection................................... 77<br />

B099 - Quality of Water Improvement Program - Peace River Basin............................................................................... 80<br />

B131 - Hotel/Motel/Restaurant Water Conservation Program (Water CHAMP/PRO)....................................................... 82<br />

B136 - Florida Automated Weather Network (FAWN) Data Dissemination and Education.............................................. 85<br />

B163 - Peace R. - Historical Land Cover Mapping............................................................................................................ 87<br />

B198 - Lake Jackson MFL Recovery Feasibility Study..................................................................................................... 90<br />

B206 - Maintenance of Watershed Parameters & Models................................................................................................ 93<br />

B<strong>21</strong>7 - Ridge Lakes Stormwater Improvement................................................................................................................. 97<br />

B<strong>21</strong>9 - Land Use and Cover Mapping............................................................................................................................... <strong>10</strong>0<br />

B226 - Determine Total Water Budget & Irrig. Req.for Mature Southern Highbush Blueberries....................................... <strong>10</strong>2<br />

B229 - Field Evaluation of Bahiadwarf, For Water Use Efficiency, Turf Quality, Mowing Requirement and Persi............ <strong>10</strong>4


B238 - Crop Coefficients and Water Use for Peppers in Southwest Florida..................................................................... <strong>10</strong>6<br />

B239 - Determine Water Requirements For Genetically Altered Lantana Camara Nursery and Landscape Plants......... <strong>10</strong>8<br />

B240 - Reducing Water Consumption in Polyethylene-Mulched Tomato and Pepper Fields after Methyl Bromide Pha.. 1<strong>10</strong><br />

B241 - Reduction of Water Use for Citrus Cold Protection............................................................................................... 112<br />

B242 - Potential to Use ASR in the Avon Park Formation................................................................................................ 114<br />

B243 - Long-Term Water Budget Analysis of Lake Starr, Polk County Florida................................................................. 116<br />

B244 - USGS - Hydrogeology and Quality of Groundwater in Highlands County............................................................. 118<br />

B246 - Water Conservation/FYN Regional Builder/Developer Specialist.......................................................................... 120<br />

B251 - National Hydrography Database (NHD)................................................................................................................ 123<br />

B256 - Automated Citrus Irrigation Management to Reduce Water Consumption............................................................ 125<br />

B257 - Reducing Nursery and Landscape Water Use by Genetically Altering Nandina Plants........................................ 127<br />

B260 - Upper Peace River System - Freshwater MFLs.................................................................................................... 129<br />

B263 - Evaluation of Different On-Farm Blueberry Systems To Improve Irrigation Efficiency.......................................... 131<br />

B264 - Citrus Irrigation Management to Increase Young Tree Growth & Productivity on Flatwoods Ridge Soils............ 133<br />

B265 - Optimizing Irrigation For Shade Tree Production.................................................................................................. 135<br />

B266 - Accounting For Interception of Sprinkler Irrigation Water by Container Grown Plants.......................................... 137<br />

B268 - Charlie Creek Freshwater MFLs............................................................................................................................ 139<br />

B269 - Horse Creek Freshwater MFLs.............................................................................................................................. 141<br />

B273 - MFL Stream Diversion and Assessment Project................................................................................................... 143<br />

B276 - (Cancelled) Grants for Reclaimed Irrigation Projects (GRIP) Program................................................................. 145<br />

B277 - Florida Water Star Gold Certification..................................................................................................................... 147<br />

B301 - Charlotte - Maintenance of Watershed Parameters and Models........................................................................... 150<br />

B303 - Desoto - Maintenance of Watershed Parameters and Models.............................................................................. 152<br />

B304 - Hardee - Maintenance of Watershed Parameters and Models.............................................................................. 154<br />

B306 - Highlands - Maintenance of Watershed Parameters and Models......................................................................... 156<br />

B314 - Polk - Maintenance of Watershed Parameters and Models.................................................................................. 158<br />

B620 - Mapping and GIS................................................................................................................................................... 160<br />

B630 - Field Operations 020............................................................................................................................................. 162<br />

B670 - Structure Operations 020....................................................................................................................................... 163<br />

G004 - Aquatic Plant Management - Peace River Basin.................................................................................................. 165


P259 - Youth Water Resources Education........................................................................................................................ 166<br />

P268 - Public Education.................................................................................................................................................... 169<br />

F032 - Peace River Regional Reservoir Expansion.......................................................................................................... 173<br />

F033 - Peace River Facility Expansion............................................................................................................................. 176<br />

H008 - Lake Hancock Lake Level Modification................................................................................................................. 179<br />

H009 - Lake Hancock Outfall Structure P-11 Modification................................................................................................ 182<br />

H014 - Lake Hancock Outfall Treatment System.............................................................................................................. 184<br />

H015 - FARMS Back-Plugging Program........................................................................................................................... 187<br />

H017 - Facilitating Agricultural Resource Management Systems Program...................................................................... 188<br />

H024 - Upper Peace River Resource Development.......................................................................................................... 190<br />

H027 - Charlotte County Regional Reclaimed Water Expansion...................................................................................... 194<br />

H034 - Peace Creek Canal Watershed............................................................................................................................. 196<br />

H048 - Myakka River Watershed Initiative........................................................................................................................ 199<br />

H051 - PR/MRWSA Reg Integ Loop Sys Phase 2 Interconnect....................................................................................... 202<br />

H052 - PR/MRWSA Reg Integ Loop Sys Phase 3A Interconnect..................................................................................... 204<br />

H060 - Punta Gorda Shell Creek WTP Expansion to <strong>10</strong> MGD (Completed)..................................................................... 206<br />

H062 - CF Industries Aquifer Recharge and Recovery Project......................................................................................... 208<br />

H063 - PR/MRWSA Regional Resource Development Feasibility Study.......................................................................... 2<strong>10</strong><br />

H069 - PR/MRWSA Reg Loop System Ph 1A.................................................................................................................. <strong>21</strong>3<br />

H072 - Polk County Comprehensive Water Supply Plan Joint Study............................................................................... <strong>21</strong>5<br />

H073 - Polk County SWRUSA Carter Rd 1 Billion Gallon Reclaim Storage & Pumping Station...................................... <strong>21</strong>8<br />

H076 - Regional Reclaimed Water Partnership Initiative.................................................................................................. 220<br />

H079 - PRMRWSA Regional Resource Development - Phase I....................................................................................... 223<br />

H080 - Polk Central Florida Water Resource Development Project.................................................................................. 225<br />

H084 - Arcadia-DeSoto Interconnect................................................................................................................................ 227<br />

H085 - Charlotte County Regional Reclaimed Water Expansion Phase 2........................................................................ 229<br />

H087 - City of Punta Gorda Reverse Osmosis Facility..................................................................................................... 231<br />

H088 - Dona Bay Water Supply Development and Management Project......................................................................... 233<br />

H090 - NERUSA Holly Hill Reclaimed Water Storage and Pumping and Lower Floridan Aquifer Well............................ 235<br />

H091 - Polk County SWRUSA Reclaimed Water Connection to TECO............................................................................ 237


K280 - Charlotte - Imp. BMPs Greater Port Charlotte....................................................................................................... 239<br />

K459 - Charlotte County School Board - Imp. BMPs Punta Gorda Campus..................................................................... 242<br />

K725 - FYN Polk County................................................................................................................................................... 244<br />

L028 - (Completed) Englewood Lemon Bay High School Reuse Extension..................................................................... 246<br />

L151 - Sebring - WMPlan Sebring..................................................................................................................................... 248<br />

L152 - Avon Park - WMPlan Avon Park............................................................................................................................ 251<br />

L153 - Lake Placid Reuse................................................................................................................................................. 253<br />

L206 - FYN Builder/Dev Charlotte, Manatee, Sarasota.................................................................................................... 255<br />

L<strong>21</strong>5 - Rotunda ASR Well Conversion for Reuse Water................................................................................................... 257<br />

L314 - Highlands WMPlan Carter Creek........................................................................................................................... 259<br />

L324 - Lakeland - Lk Parker Stormwater BMP Imp........................................................................................................... 261<br />

L353 - Polk WMPlan Lakes Crooked, Clinch, and Reedy................................................................................................. 263<br />

L473 - Highlands WMPlan Lake Placid............................................................................................................................. 265<br />

L479 - Lk Hollingsworth Westside SW Treatment............................................................................................................. 267<br />

L485 - (Cancelled) Charlotte County Golf Course Reuse Storage.................................................................................... 269<br />

L486 - Charlotte - WMPlan Charlotte Harbor.................................................................................................................... 271<br />

L553 - Dundee Reclaimed Water Use System Project..................................................................................................... 273<br />

L633 - DeSoto - WMPlan Desoto County.......................................................................................................................... 275<br />

L640 - (Completed) Punta Gorda Reuse Feasibility Study............................................................................................... 277<br />

L649 - (Completed) Hydrologic Rest-Highlands Hammock St Pk..................................................................................... 278<br />

L671 - Polk County Aquifer Recharge Project to Relieve Flooding and Augment GW Supplies...................................... 280<br />

L672 - Polk - WMPlan Polk County................................................................................................................................... 282<br />

L673 - Polk - Imp. BMPs Lake Belle and Tractor Lake..................................................................................................... 286<br />

L674 - Polk - Imp. BMPs Saddlebag Lake........................................................................................................................ 288<br />

L679 - Hardee - WMPlan Horse Creek............................................................................................................................. 290<br />

L680 - Bartow - WMPlan Bartow....................................................................................................................................... 292<br />

L693 - Water Exhibits in the Glazer Children's Museum of Tampa................................................................................... 294<br />

L770 - Lk Gibson Stormwater Mgmt System Retrofit........................................................................................................ 296<br />

L856 - Charlotte County Toilet Rebate Program............................................................................................................... 298<br />

L897 - Highlands - Lake Clay Stormwater Retrofit............................................................................................................ 300


L900 - LE/AD Polk County Watershed Education............................................................................................................. 302<br />

L902 - Lake Wales - Imp. BMPs Twin Lakes.................................................................................................................... 304<br />

L912 - Lower Floridan Aquifer Reuse Supplement Well Feasibility Study........................................................................ 306<br />

L914 - City of Lakeland Plumbing Retrofit Project............................................................................................................. 308<br />

L915 - City of Lakeland Pre-Rinse Spray Valve Retrofit Project....................................................................................... 3<strong>10</strong><br />

L917 - Polk County Lake Bathymetric Mapping................................................................................................................ 312<br />

L918 - Lake Gwyn Surface Water Restoration and Flood Protection................................................................................ 314<br />

N001 - Auburndale Reuse and Alternative Sources Study............................................................................................... 316<br />

N004 - Polk is Florida-Friendly.......................................................................................................................................... 318<br />

N013 - Development of Landscape Fertilizer BMPs - Phase 1......................................................................................... 320<br />

N014 - The Florida Aquarium Watershed Education Initiative.......................................................................................... 322<br />

N024 - Polk County NWRUSA Reclaimed Water Storage & Pumping Station................................................................. 324<br />

N063 - Chain of Lakes Natural Resource Center Education Program.............................................................................. 326<br />

N065 - City of Haines City Southern Area Reuse Transmission Extension...................................................................... 328<br />

N072 - (Completed) Lake Eva Water Quality Improvement Project.................................................................................. 330<br />

N074 - Winter Haven Toilet Rebate Project...................................................................................................................... 332<br />

N075 - City of Winter Haven Northern Reuse Service Area Reclaimed Main Extension.................................................. 334<br />

N112 - City of Lakeland Plumbing Retrofit Project - Phase II............................................................................................ 336<br />

N113 - Charlotte County Toilet Rebate Project - Phase II................................................................................................. 338<br />

N122 - Implementation of BMPs Saddle Creek Watershed.............................................................................................. 340<br />

N126 - Charlotte County - Imp. BMPs at Charlotte Harbor Redevelopment Area............................................................ 342<br />

N147 - Garden Grove Pines Stormwater Retrofit.............................................................................................................. 344<br />

N150 - Polk County NAVD88 Vertical Control Densification............................................................................................. 345<br />

N156 - Polk County SWRUSA Carter Road Reclaimed Water Main................................................................................ 347<br />

N161 - Polk County Utilities Rain Sensor Rebate............................................................................................................. 348<br />

N162 - FYN Charlotte County........................................................................................................................................... 350<br />

N165 - Mobile Irrigation Lab for Highlands Soil and Water Conservation District............................................................. 352<br />

N<strong>21</strong>8 - Englewood Reclaimed Water Supply Project........................................................................................................ 354<br />

N2<strong>21</strong> - Winter Haven Smart Controller Pilot Project......................................................................................................... 356<br />

P727 - City of Lake Wales Reuse Project......................................................................................................................... 358


M<strong>10</strong>4 - Hardee - FEMA Map Modernization...................................................................................................................... 360<br />

M<strong>10</strong>6 - Highlands - FEMA Map Modernization................................................................................................................. 363<br />

M114 - Polk County Watershed Management Program: FEMA Map Modernization........................................................ 365<br />

M118 - FEMA Map Modernization Management Support................................................................................................. 368


Z0<strong>10</strong><br />

Boards & Executive Services - Peace River Basin<br />

Project Type On-Going Activities<br />

AOR(s)<br />

Management Services<br />

Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers, Pinellas-Anclote River,<br />

Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

N/A<br />

Project Manager KAVOURAS, LOU<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

The Boards and Executive Services Department provides administrative support to the Basin Board. These support<br />

activities include noticing, scheduling and preparing the agenda and minutes for regular and special meetings and<br />

workshops. Other functions include preparing meeting and travel arrangements and correspondence for Board<br />

members. The Deputy Executive Director for Outreach, Planning and Board Services is the primary staff liaison for<br />

members. The Deputy also assists with the conduct of meetings, works with the Governor's staff to ensure the legal<br />

constitution of Boards, coordinates with appropriate staff to ensure follow up on meeting issues, conducts new<br />

member orientation and ensures compliance with the Sunshine Laws. In addition, the Deputy and staff coordinate<br />

Board field trips, including planning, scheduling, meals, logistics and arranging for staff support. This budget item also<br />

provides funds for equipment and facility rental, legal advertisements for meeting notices, miscellaneous office<br />

supplies and printing and Board member travel reimbursements (e.g., meals, conference registration, mileage, etc.).<br />

Status As Of: March 13, 2007<br />

As of this date, this project will not show an update. Ongoing project details are shown in the project description.<br />

020 - Peace River Basin 1


Z030<br />

Planning - Peace River Basin<br />

Project Type On-Going Activities<br />

AOR(s)<br />

Management Services<br />

Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers, Pinellas-Anclote River,<br />

Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager SPRINGSTEAD, CHAN<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

Planning is an Executive support function responsible for long-range comprehensive planning and near-term strategic<br />

planning. Department staff administer the Comprehensive Watershed Management initiative; provide Basin Board<br />

support; and assist the Basin Board with development of resource management priorities. Planning Department staff<br />

support the Basin Board through the following tasks. Project Management Database project worksheets that are used<br />

in the Budget <strong>Notebook</strong> for each Basin Board meeting are reviewed to ensure accuracy and completeness. Planning<br />

staff work with project managers to identify any significant issues and resolve any discrepancies. Staff take the lead in<br />

preparing for joint Governing and Basin Board Planning Workshops and for the Basin Board's Annual Planning<br />

Workshop. Basin Board meetings are attended and presentations are made to the Board on an as-needed basis. Staff<br />

often coordinate responses to issues raised during meetings. Staff respond to Board Member questions and requests<br />

via oral and written communications. Staff assist Basin Board members by creating and providing presentations on<br />

Basin-specific issues. At the Board's request, research is conducted and special issues are presented during Board<br />

meetings. Department staff assist the Community Affairs Coordinators with Cooperative Funding kick-off meetings<br />

held for local governments and other potential cooperators. Assistance is provided for new Board member<br />

orientations.<br />

Status As Of: March 13, 2007<br />

As of this date, this project will not show an update. Ongoing project details are shown in the project description.<br />

020 - Peace River Basin 2


Z050<br />

Information Resources - Peace River Basin<br />

Project Type On-Going Activities<br />

AOR(s)<br />

Management Services<br />

Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers, Pinellas-Anclote River,<br />

Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager LEWIS, JIM<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

Video production and conferencing staff provides audio-visual, archive tape, and video teleconferencing support for<br />

Basin Board and Governing Board meetings, including staff presentations. Audio-visual staff provides support for<br />

annual Basin Board planning workshops, and the semiannual Governing Board/Basin Board planning workshops, as<br />

well as other non-regularly scheduled workshops not held in a District office, as needed. Based on the time devoted to<br />

these activities, including travel, the appropriate salary percentage is allocated to each Basin Board.<br />

Status As Of: March 13, 2007<br />

As of this date, this project will not show an update. Ongoing project details are shown in the project description.<br />

020 - Peace River Basin 3


Z060<br />

Communications - Peace River Basin<br />

Project Type On-Going Activities<br />

AOR(s)<br />

Management Services<br />

Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers, Pinellas-Anclote River,<br />

Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

N/A<br />

Project Manager MOLLIGAN, MICHAEL<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

The Communications Department is an Executive support function responsible for a broad range of activities that<br />

support the District's mission, Governing and Basin boards, and other departments. Departmental functions include<br />

projects funded by the Governing and Basin boards, such as public information and media coordination; youth and<br />

public education programs and initiatives in coordination with local governments and other community organizations;<br />

promotion of sound water conservation practices; presentation of projects to the Basin boards in the budget adoption<br />

process; and graphics support for Basin Board presentations. Communications Department staff support the Basin<br />

Board through the following tasks. Basin Board meetings are attended on an as-needed basis to make presentations,<br />

answer questions, and participate in budget discussions. Reponses are prepared to answer Board Member questions<br />

and requests via oral and written communications. Educational materials are developed, reviewed, updated, promoted,<br />

and distributed. Assistance is provided to cooperators to develop education projects that support the District's mission.<br />

Education and grant programs are promoted at schools and to cooperators. Support is provided to the Basin Board<br />

Education Committee. Media contact summaries and articles are disseminated. The District's web site is maintained.<br />

Status As Of: March 13, 2007<br />

As of this date, this project will not show an update. Ongoing project details are shown in the project description.<br />

020 - Peace River Basin 4


Z074<br />

Risk Management - Peace River Basin<br />

Project Type On-Going Activities<br />

AOR(s)<br />

Management Services<br />

Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Pinellas-Anclote River, Withlacoochee<br />

River, Peace River<br />

Cooperator(s)<br />

Project Manager PETRUCCELLI, LUCY<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

The funds budgeted for this project apply to insurance on insured water control structures in this basin. Those<br />

structures with their corresponding insured values include: Alligator Creek Salinity Barrier - $<strong>21</strong>6,000, Peace Creek<br />

P-3 -$71,000, P-5 - $439,000, P-6 - $262,000, P-7 - $67,000, P-8 - $253,000, P-11 - $328,000, and G-90 - $898,000.<br />

Governing Board Policy 120-1, directs that a Risk Management function be maintained to protect the assets of the<br />

District using an appropriate market based financing measure of a blend of self-insurance, insurance or transfer of<br />

risk. Budgeting a known minimal expenditure annually for insurance premiums has been more cost effective for the<br />

individual basins than establishing permanent reserves equal to the value of an individual structure or maximum<br />

probable loss should any structure be damaged or destroyed. Property coverage is currently provided in layers through<br />

several property insurance carriers. The current deductible is set at $5,000 on all losses except flood and wind.<br />

Status As Of: October <strong>21</strong>, 2008<br />

Property insurance renewal rates for period <strong>10</strong>/01/2008-09/30/2009 were .40/$<strong>10</strong>0 of insured value. All funds for FY<br />

2009 have been expended to cover the annual premium for insurance on the insured structures. There will be no further<br />

status reports this fiscal year unless there is a property damage claim reported on a structure<br />

020 - Peace River Basin 5


Z090<br />

Community Affairs - Peace River Basin<br />

Project Type On-Going Activities<br />

AOR(s)<br />

Management Services<br />

Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers, Pinellas-Anclote River,<br />

Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager RATHKE, DAVID<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

Basin Board funds budgeted are for the administration and coordination of the Cooperative Funding program, including<br />

conducting cooperator workshops, processing applications, communicating with applicants and participating in project<br />

ranking. Basin Board funds are budgeted for the Community Affairs Coordinator (CAC) to attend and participate in<br />

Basin Board meetings and new Board member orientations and briefings and for the CAC's responses to Board<br />

member information requests, as well as other "as needed" services to the Basin Board. Funds are also budgeted for<br />

the CAC's administration of the FARMS Program (but not for individual FARMS projects) within the Basin.<br />

Status As Of: March 13, 2007<br />

As of this date, this project will not show an update. Ongoing project details are shown in the project description.<br />

020 - Peace River Basin 6


Z300<br />

Resource Data and Restoration Department - Peace River Basin<br />

Project Type On-Going Activities<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers, Pinellas-Anclote River,<br />

Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager DEHAVEN, ERIC<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

The Resource Conservation and Data Department is involved in the development of innovative agricultural water<br />

conservation projects that are designed to reduce ground water withdrawals and improve water quality within the<br />

Southern Water Use Caution Area (SWUCA). The department also focuses on the collection of baseline water<br />

resources data including water quality data and lithologic/hydrologic information of District aquifer systems. Finally, the<br />

Department provides infrastructure support by constructing wells that form the backbone of various resource<br />

monitoring initiatives such as wellfield recovery and Minimum Flows and Levels (MFLs) establishment. The<br />

department includes four sections comprised of professional, technical, and administrative staff. The Administrative<br />

section administers the operating budget, Governing and Basin Board funded projects, as well as the administration of<br />

large-scale, long-term projects such as the Facilitating Agricultural Resource Management Systems Program<br />

(FARMS), Water Quality Monitoring Program (WQMP), Regional Observation Monitoring Program (ROMP) and<br />

Quality of Water Improvement Program (QWIP).<br />

Status As Of: March 13, 2007<br />

As of this date, this project will not show an update. Ongoing project details are shown in the project description.<br />

020 - Peace River Basin 7


Z500<br />

Resource Projects - Peace River Basin<br />

Project Type On-Going Activities<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers, Pinellas-Anclote River,<br />

Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

N/A<br />

Project Manager HAMMOND, MARK<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

The Resource Projects Department addresses issues related to water supply, flood protection, water quality, and<br />

natural systems and consists of the Conservation Projects, Ecologic Evaluation,<br />

Engineering, Environmental, Hydrologic Evaluation, and Water Supply and Resource Development sections. The<br />

District's goal for water supply is to ensure an adequate supply of the water resource to provide for all existing and<br />

future reasonable and beneficial uses while protecting and maintaining water resources and related natural systems.<br />

The Department's efforts involve activities associated with the regional water supply planning, alternative water<br />

supplies, conservation, and reclaimed water strategic initiatives. The District's goal for flood protection is to minimize<br />

flood damage to protect people, property, infrastructure and investment. The Department's efforts primarily involve<br />

activities associated with the floodplain management strategic initiative and support for the flood and emergency<br />

response initiative. The District's goal for natural systems is to preserve, protect, and restore natural systems in order<br />

to support their natural hydrologic and ecologic functions. The Department's efforts involve minimum flows and levels<br />

and wetland system restoration. The District's goal for water quality is to protect and improve water quality to sustain<br />

the environment, economy and quality of life. The Department's efforts involve diagnostic, monitoring and<br />

implementing water quality improvement projects. The funds budgeted here are for coordinating the Water Supply<br />

and Resource Development Program, Water Resource Assessment Projects, Minimum Flows and Levels Program,<br />

Watershed Management Program, FEMA Map Modernization, and Cooperative Funding Programs, as-requested<br />

attendance at citizen meetings, and those unforeseen basin analyses which occur during the year. The Department<br />

works on ongoing projects and reviews, evaluates, and ranks each Fiscal Year's Cooperative Funding projects related<br />

to water supply, water quality, natural systems, and flood protection. Staff makes recommendations regarding these<br />

projects, and other items proposed in each year's budget. Staff also works to address any budget issues identified at<br />

Basin Board meetings. The funds budgeted here are for staff time related to coordinating those activities that do not<br />

relate to specific budgeted projects. These include the staff time of the Director, managers and several staff.<br />

Status As Of: March 15, 2007<br />

As of this date, this project will not show an update. Ongoing project details are shown in the project description.<br />

020 - Peace River Basin 8


Z600<br />

Operations - Peace River Basin<br />

Project Type On-Going Activities<br />

Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers, Pinellas-Anclote River,<br />

Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager HOLTKAMP, MIKE<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

The Operations Department consists of six sections including Administration, Field Operations, Aquatic Plant<br />

Management, Hydrologic Data, Structure Operations and Mapping and GIS. The Administration section provides<br />

support for departmental management, planning, budgeting, and clerical functions. The Field Operations section is<br />

responsible for maintenance and restoration of all District-owned lands including fence construction, mowing, culvert<br />

installations, road and bridge maintenance and construction, fire line maintenance, prescribed burn support, erosion<br />

control, and well site preparation/restoration. The Aquatic Plant Management section is responsible for aquatic and<br />

ditch bank vegetation management operations on District flood control systems, the control of exotic aquatic plants on<br />

natural waters throughout the District, and the control of aquatic vegetation around water control structures and lake<br />

level gauges. Additionally, the Aquatic Plant Management section controls/eradicates infestations of upland invasive<br />

species including Brazilian pepper, Australian pine, cogongrass and tropical soda apple on all District-owned<br />

conservation lands. The Hydrologic Data section is responsible for designing, installing, and maintaining data<br />

collection sites in support of the District's resource monitoring and technical analysis, as well as data analysis and<br />

database management. The Structure Operations section inspects, operates, maintains, and repairs all District-owned<br />

flood and water conservation structures as well as salinity barriers throughout the District. This section also directs and<br />

operates the District's Emergency Operations Center (EOC), which is part of a state and nationwide storm tracking<br />

and emergency response network. The Mapping and GIS section is responsible for providing and maintaining all<br />

mapping and Geographical Information System database support. Included in this project are administrative salary<br />

allocations associated with overseeing field operations and maintenance, aquatic plant management, emergency<br />

operations, Supervisory Control and Data Acquisition (SCADA), and structure operations programs throughout the<br />

Basin, as applicable. Funds expended have been to prepare for Basin Board meetings as required or provide data to<br />

Board members, local agencies or the public.<br />

Status As Of: May 12, 2009<br />

Ongoing project details are shown in the project description.<br />

020 - Peace River Basin 9


Z700<br />

Land Resources - Peace River Basin<br />

Project Type On-Going Activities<br />

AOR(s)<br />

Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers, Pinellas-Anclote River,<br />

Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager SUTTON, ERIC<br />

Task Manager(s)<br />

Status Ongoing<br />

BLASCHKA, STEVEN, WALSH, TOM, LOVE, KEVIN, MILLER, WILL<br />

Description<br />

The Land Resources Department consists of five sections, including Administration, Land Acquisition, Land<br />

Management, Survey, and Land Use and Protection. The Administration section provides support for departmental<br />

management, planning, budgeting and clerical functions. The Land Acquisition section acquires lands as set forth in<br />

the District's Florida Forever Workplan. These lands are acquired for various functions including flood control, water<br />

storage and management, conservation and protection of water resources, aquifer recharge and recovery, water<br />

resource development, and preservation of wetlands, streams, lakes, and other natural systems. The Land<br />

Management section is responsible for the management and protection of natural and cultural resources on District<br />

lands. Major functions include natural systems restoration, prescribed burning, forest management, exotic species<br />

control, and monitoring. The Survey section is responsible for providing land surveying assistance in support of various<br />

projects and programs within the District. The Land Use and Protection section is responsible for land use activities on<br />

District lands including development of recreational trails and facilities, monitoring of public and private uses,<br />

management of the security officer program and maintaining visitor safety. Included in this project are activities on<br />

District-managed lands purchased with funds other than Florida Forever, Preservation 2000 and Save Our Rivers such<br />

as surveying costs (salaries and equipment rental), miscellaneous land use requests (salaries), resource protection<br />

(utilities and maintenance) and structural flood control projects.<br />

Status As Of: March 13, 2007<br />

As of this date, this project will not show an update. Ongoing project details are shown in the project description.<br />

020 - Peace River Basin <strong>10</strong>


Z9<strong>10</strong><br />

Commissions - Peace River Basin<br />

Project Type Prop. App.&Tax Coll.<br />

AOR(s)<br />

Management Services<br />

Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers, Pinellas-Anclote River,<br />

Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager PILCHER, LINDA<br />

Task Manager(s)<br />

Status Ongoing<br />

CACIOPPO, MIKE, LINSBECK, CATHY<br />

Description<br />

These funds pay the commissions due to the counties within the Basin for tax collection and property appraisals.<br />

Status As Of: September 01, 2009<br />

During the eleven months ended August 31, 2009, $345,459 was remitted in commissions to Property Appraisers and<br />

Tax Collectors and $1,<strong>21</strong>7 was returned to the Basin in excess fees. Property Appraiser and Tax Collector commissions<br />

are statutorily prescribed and are based on property tax levies and collections, respectively. Amounts collected in excess<br />

of the underlying Property Appraiser and Tax Collector budgets are returned to the Basin as excess fees. Excess fees<br />

not recorded as accounts receivable as of September 30, 2008 are reflected as current FY2009 revenue.<br />

020 - Peace River Basin 11


Z930<br />

Contingencies - Peace River Basin<br />

Project Type Reserves<br />

AOR(s)<br />

Management Services<br />

Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers, Pinellas-Anclote River,<br />

Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager PILCHER, LINDA<br />

Task Manager(s)<br />

Status Ongoing<br />

CACIOPPO, MIKE, LINSBECK, CATHY<br />

Description<br />

Funds are budgeted for contingencies to be used at the Board's discretion. The goal is to set aside an amount equal to<br />

approximately 5 percent (2.5 percent minimum target) of the ad valorem based budget (ad valorem taxes plus interest<br />

plus balance forward multiplied by 5 percent).<br />

Status As Of: September 01, 2009<br />

To date, the Basin Board has not allocated any of its contingency funds.<br />

020 - Peace River Basin 12


S001<br />

Jack Creek<br />

Project Type SOR<br />

AOR(s)<br />

Water Quality, Natural Systems<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Project Manager LOVE, KEVIN<br />

Task Manager(s) NELSON, BRIAN, SOWDERS, GINA, HAGBERG, JEFFREY, MILLER, WILL, GREEN,<br />

STEPHANIE<br />

Status Ongoing<br />

Description<br />

In 1989, the Governing Board authorized the acquisition of 3,200 acres of land in Highlands County, referred to as the<br />

Jack Creek project. The Jack Creek project includes a significant part of Jack Creek, its <strong>10</strong>0-year floodplain, and<br />

outlying forested areas associated with the creek system and local lake outflow wetlands. The project area also<br />

includes portions of sand pine scrub and mixed scrub, among Florida's most unique threatened upland habitats. Jack<br />

Creek and its associated swamps serve as the natural drainage basin for the immediate area, as well as the water<br />

conveyance system for lakes in the area. The well-drained scrub areas surrounding the Jack Creek system appear to<br />

offer good recharge potential throughout the year. To date, some 1,284 acres have been acquired in fee simple within<br />

the project. As a part of the approval of the 2001 Land Acquisition Five-Year Plan, the Governing Board decided to no<br />

longer pursue acquisition of the remaining lands within the project.<br />

Benefits<br />

Pursuant to Section 373.1391(1)(a), Florida Statutes, lands within the project are managed and maintained in such a<br />

way as to ensure a balance between public access, general public recreational purposes, and restoration and<br />

protection of their natural state and condition.<br />

Costs<br />

FY2009 and FY20<strong>10</strong> - The Land Resources Department budget consists of salaries and central garage for prescribed<br />

burning, resource monitoring, land maintenance, fence repair and recreational monitoring. The budget also includes<br />

contractual services for mowing and security. The Aquatic Plant Management Section has budgeted funds for salaries,<br />

central garage charges and herbicides to treat infestations of invasive plant species. Field Operations has<br />

budgeted for salaries, rental equipment, contracted services, central garage charges, parts, supplies, and land<br />

maintenance materials to support Land Management's requirements. Costs for these activities are <strong>10</strong>0 percent<br />

reimbursed through the state's Water Management Lands Trust Fund.<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding<br />

District Budgeted - Outside Revenue<br />

(SOR)<br />

020 Peace River Basin 89,824 58,603<br />

Status As Of: August 27, 2009<br />

Access was granted to Wade Ulrey, Research Scientist with Archbold Biological Station for the Study of Black Bears on<br />

Jack Creek.<br />

020 - Peace River Basin 13


S017<br />

Prairie/Shell Creek<br />

Project Type SOR<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Project Manager LOVE, KEVIN<br />

Task Manager(s) NELSON, BRIAN, SOWDERS, GINA, HAGBERG, JEFFREY, MILLER, WILL, GREEN,<br />

STEPHANIE<br />

Status Ongoing<br />

Description<br />

The Prairie Creek project, consisting of 5,385 acres was approved by the Governing Board for acquisition in 1991. In<br />

1995, as a part of the Preservation 2000 Remaining Needs and Priority report, lands along Shell Creek were included.<br />

The Prairie/Shell Creek project now consists of 24,837 acres within Charlotte and DeSoto Counties. The lands<br />

proposed for acquisition include a greenway corridor from the mouth of the Peace River to the District's Bright Hour<br />

Watershed project to the north and to the State's Babcock-Webb Wildlife Management Area to the south.<br />

Approximately 609 acres have been acquired in fee simple within the project in Charlotte County. Lands proposed for<br />

acquisition include 13,895 acres in fee simple and <strong>10</strong>,624 acres proposed for less-than-fee acquisition.<br />

Benefits<br />

Pursuant to Section 373.1391(1)(a), Florida Statutes, lands within the project are managed and maintained in such a<br />

way as to ensure a balance between public access, general public recreational purposes, and restoration and<br />

protection of their natural state and condition.<br />

Costs<br />

FY2009 - The Land Resources Department budget consists of salaries and central garage for prescribed burning,<br />

resource monitoring, land maintenance, fence repair and recreational monitoring. The budget also includes contractual<br />

services for security. Recreational improvements consist of an entrance sign, small kiosk and parking improvements.<br />

The Aquatic Plant Management Section has budgeted funds for salaries, central garage charges and herbicides to<br />

treat infestations of invasive plant species. Field Operations has budgeted for salaries, rental equipment, contracted<br />

services, central garage charges, parts, supplies, and land maintenance materials to support Land Management's<br />

requirements. FY20<strong>10</strong> - The Land Resources Department budget consists of salaries and central garage for<br />

prescribed burning, resource monitoring, land maintenance, fence repair and recreational monitoring. The budget also<br />

includes contractual services for security.<br />

Costs for these activities are <strong>10</strong>0 percent reimbursed through the state's Water Management Lands Trust Fund.<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding<br />

District Budgeted - Outside Revenue<br />

(SOR)<br />

020 Peace River Basin 68,637 63,339<br />

Status As Of: August 27, 2009<br />

Land Resources Department added a new rule sign and sign in box at the Northern walk-through entrance.<br />

020 - Peace River Basin 14


S029<br />

Upper Lake Marion Creek Watershed<br />

Project Type SOR<br />

AOR(s)<br />

Water Quality, Natural Systems<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Project Manager MILLER, WILL<br />

Task Manager(s)<br />

Status Ongoing<br />

South Florida Water Management District<br />

SOWDERS, GINA, LOVE, KEVIN, HAGBERG, JEFFREY<br />

Description<br />

In 1991 the Governing Board authorized staff to pursue the acquisition of 1,898 acres of land in Polk County, referred<br />

to as the Upper Lake Marion Creek Watershed project adjacent to lands under protection by the South Florida Water<br />

Management District (SFWMD). The relatively undisturbed creek system flows north out of Lake Marion, joins Snell<br />

Creek and ultimately flows southeast to Lake Hatchineha. The entire Lake Marion Creek basin extends over 18,300<br />

acres and includes portions of both the Southwest and South Florida Water Management Districts. To date, the<br />

SWFWMD has acquired 277 acres in fee simple and approved an additional 1,6<strong>21</strong> acres for fee simple acquisition.<br />

This district has entered into an agreement with the SFWMD to provide management of SWFWMD-owned lands<br />

since, due to the property's proximity to SFWMD-managed lands, the SFWMD can manage the property more<br />

efficiently and cost effectively.<br />

Benefits<br />

Pursuant to Section 373.1391(1)(a), Florida Statutes, lands within the project are managed and maintained in such a<br />

way as to ensure a balance between public access, general public recreational purposes, and restoration and<br />

protection of their natural state and condition.<br />

Costs<br />

The Land Resources Department's FY2009 and FY20<strong>10</strong> budgets include monies for payment to the SFWMD for<br />

management of lands owned by the SWFWMD and staff time for contract monitoring. Costs for these activities are<br />

<strong>10</strong>0 percent reimbursed through the state's Water Management Lands Trust Fund.<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding<br />

District Budgeted - Outside Revenue<br />

(SOR)<br />

020 Peace River Basin 14,308 9,620<br />

Status As Of: August 27, 2009<br />

This property is managed by the SFWMD. No significant activities by SWFWMD this period.<br />

020 - Peace River Basin 15


S030<br />

RV Griffin Reserve<br />

Project Type SOR<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager LANE, CHUCK<br />

Peace River/Manasota Regional Water Supply Auth.<br />

Task Manager(s) NELSON, BRIAN, LANE, CHUCK, HAGBERG, JEFFREY, MILLER, WILL, GREEN, STEPHANIE,<br />

ELLIOTT, PAUL<br />

Status Ongoing<br />

Description<br />

In 1991 the Governing Board authorized staff to pursue acquisition of 8,568 acres in DeSoto County, now referred to<br />

as the RV Griffin Reserve project. In 1996, the Governing Board increased the project size to 31,667 acres, with a<br />

majority of the additional lands lying in Sarasota County. The project includes lands supporting and surrounding the<br />

existing facilities at the Peace River/Manasota Regional Water Supply Authority treatment plant. Lands in the project<br />

area include mixed hardwood forests along the river; however, the majority of the lands in DeSoto County consist of<br />

pine flatwoods, rangelands, pastures, and pine plantations. The project lands support and protect present potable<br />

water supplies. To date, some 5,917 acres have been acquired in fee simple, and a conservation easement over<br />

another 3,804 acres known as the Lewis Longino Preserve. An additional 9,034acres have been approved for<br />

acquisition in fee simple, and 12,616 acres have been approved for acquisition using less-than-fee simple techniques.<br />

Benefits<br />

Pursuant to Section 373.1391(1)(a), Florida Statutes, lands within the project are managed and maintained in such a<br />

way as to ensure a balance between public access, general public recreational purposes, and restoration and<br />

protection of their natural state and condition.<br />

Costs<br />

FY2009 - The Land Resources Department Peace River Basin budget consists of salaries and central garage for<br />

prescribed burning, resource monitoring, land maintenance, fence repair and recreational monitoring. The budget also<br />

includes contractual services for security. Recreation improvements include an entrance sign, kiosk, improved parking<br />

area and trail signs. Field Operations has budgeted for salaries, rental equipment, central garage charges, parts,<br />

supplies, and land maintenance materials to support Land Management's requirements. The Aquatic Plant<br />

Management Section has budgeted funds for salaries, central garage charges and herbicides to treat infestations of<br />

invasive plant species. Monies in the Manasota Basin budget consist of salaries and central garage for conservation<br />

easement monitoring. FY20<strong>10</strong> - The Land Resources Department Peace River Basin budget consists of salaries and<br />

central garage for monitoring the land management arrangement between the District and the Peace River/Manasota<br />

Regional Water Supply Activity and monitoring the conservation easement over the Lewis Longino Preserve in the<br />

Manasota Basin. Costs for these activities are <strong>10</strong>0 percent reimbursed through the State's Water Management Lands<br />

Trust Fund.<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding<br />

District Budgeted - Outside Revenue<br />

(SOR)<br />

0<strong>10</strong> General Fund (Districtwide) 0<br />

0<br />

020 Peace River Basin 89,134 12,799<br />

0<strong>21</strong> Manasota Basin 1,481 1,535<br />

Status As Of: December 31, 2008<br />

The Peace River/Manasota Regional Water Supply Authority has taken over management of the property and<br />

construction of the new reservoir is ongoing.<br />

020 - Peace River Basin 16


S035<br />

Bowlegs Creek<br />

Project Type SOR<br />

AOR(s)<br />

Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Project Manager LANE, CHUCK<br />

Task Manager(s)<br />

Polk County Natural Resources, United States Department of Agriculture<br />

LANE, CHUCK<br />

Status Ongoing<br />

Description<br />

The Bowlegs Creek/Crooked Lake study area, as identified in the District's Florida Forever Work Plan, is an area<br />

encompassing 15,329 acres, representing opportunities to protect important water resource ecosystems in the east<br />

central region of the District Examples of the benefits in acquiring the land within this project area include protecting<br />

important areas and habitat for aquifer recharge associated with the Lake Wales Ridge (Ridge), and protecting the<br />

water quality of Crooked Lake and the other Ridge lakes receiving flow from Crokked Lake (Lake Clinch and Lake<br />

Reedy). Crooked Lake is one of the largest lakes within the Ridge and is the only designated by the Outstanding<br />

Florida Water (OFW) in Polk County. The lake has good water quality as a result of existing shoreline vegetation<br />

coverage and relatively little urbanization along the lake. Although, the alteration of natural lands throughout the region<br />

has resulted in habitat loss and fragmentation, this tract represents one of the few larger tracts remaining relatively<br />

intact and more importantly, is the last remaining large tract adjacent to a large Ridge lake.<br />

Benefits<br />

The property is located in the headwaters of the Crooked Lake drainage basin and provides a number of water<br />

resource and ecological benefits to the Lake Wales Ridge region including flood storage, water quality protection and a<br />

relatively undisturbed habitat buffer to Crooked Lake.<br />

Costs<br />

Funds in the FY2009 and FY20<strong>10</strong> budgets are for reimbursement to Polk County for 50% of land management costs<br />

and salaries for contract management. District costs for these activities are <strong>10</strong>0 percent reimbursed through the<br />

state's Water Management Lands Trust Fund.<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding<br />

District Budgeted - Outside Revenue<br />

(SOR)<br />

020 Peace River Basin 35,<strong>10</strong>0 35,<strong>10</strong>0<br />

Project Funds Not Budgeted by the<br />

District<br />

Polk County 0<br />

0<br />

Status As Of: December 31, 2008<br />

The District and Polk County closed on the Stuart Tract on 12/31/08. The management agreement between the County<br />

and the District is complete and will be presented to the Board of County Commissioners.<br />

020 - Peace River Basin 17


S036<br />

Charlotte Harbor State Buffer Preserve<br />

Project Type SOR<br />

AOR(s)<br />

Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Florida State Parks<br />

Project Manager SOWDERS, GINA<br />

Task Manager(s)<br />

Status Ongoing<br />

SOWDERS, GINA, LOVE, KEVIN, GREEN, STEPHANIE<br />

Description<br />

In 1995 the Governing Board authorized the acquisition of the Myakka River/Charlotte Harbor project consisting of<br />

approximately 38,000 acres in Charlotte and Sarasota Counties. In 1998 the Governing Board authorized the<br />

acquisition of an additional 6,639 acres as a part of the Charlotte Harbor project. The Charlotte Harbor Save Our<br />

Rivers project was jointly purchased between the District and the State of Florida's Conservation and Recreation<br />

Lands (CARL) program. Lands within the project area are characterized by a variety of natural lands including isolated<br />

freshwater marshes, tidal marshes, and tidal swamps. To date 7,529 acres have been acquired in fee simple and are<br />

a part of the Charlotte Harbor State Buffer Preserve. There are no more lands slated for acquisition within the project.<br />

Under a management agreement with the State, the Department of Environmental Protection's Division of Recreation<br />

and Parks is the lead land manager for the project. The following recreational improvements/amenities are available<br />

within the Preserve: canoeing and boating, with future development of a small boat launch facility, fishing, and<br />

extensive hiking trails.<br />

Benefits<br />

Pursuant to Section 373.1391(1)(a), Florida Statutes, lands within the project are managed and maintained in such a<br />

way as to ensure a balance between public access, general public recreational purposes, and restoration and<br />

protection of their natural state and condition.<br />

Costs<br />

Funds included in the FY2009 and FY20<strong>10</strong> budgets are for staff time to monitor the District's agreement with the<br />

State. Costs for these activities are <strong>10</strong>0 percent reimbursed through the state's Water Management Lands Trust Fund.<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding<br />

District Budgeted - Outside Revenue<br />

(SOR)<br />

020 Peace River Basin 3,282 3,434<br />

Status As Of: August 27, 2009<br />

On June 23, 2009 the governing Board approved the lease agreement between Florida DEP, Charlotte County, and the<br />

District for the establishment of a public boat ramp. Documents have been returned to Florida DEP for final signature and<br />

execution.<br />

020 - Peace River Basin 18


S040<br />

Lower Peace River (Deep Creek)<br />

Project Type SOR<br />

AOR(s)<br />

Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Project Manager LOVE, KEVIN<br />

Task Manager(s) NELSON, BRIAN, SOWDERS, GINA, HAGBERG, JEFFREY, MILLER, WILL, GREEN,<br />

STEPHANIE, ELLIOTT, PAUL<br />

Status Ongoing<br />

Description<br />

In 1994 the Governing Board authorized the acquisition of approximately 40,000 acres within Hardee and DeSoto<br />

Counties known as the Lower Peace River Corridor project. Lands acquired and proposed for acquisition within the<br />

project include an extensive network of tributaries, floodplain swamps and connected headwaters. The project covers<br />

a corridor over 35 miles along the Peace River between Zolfo Springs at the upstream reaches, downstream to the<br />

Charlotte/DeSoto County line. Acquisition of lands within this project will provide protection for the receiving waters of<br />

Charlotte Harbor. To date, 12,<strong>10</strong>5 acres have been acquired in fee simple in this project and an additional 39,354<br />

acres have been approved for future acquisition. Recreational activities available include on-foot access and primitive<br />

camping, which is available with a special use permit. Approximately 12 miles of multi-use trails are under<br />

development.<br />

Benefits<br />

Pursuant to Section 373.1391(1)(a), Florida Statutes, lands within the project are managed and maintained in such a<br />

way as to ensure a balance between public access, general public recreational purposes, and restoration and<br />

protection of their natural state and condition.<br />

Costs<br />

FY2009 - The Land Resources Department budget consists of salaries and central garage for prescribed burning,<br />

resource monitoring, land maintenance, fence repair and recreational monitoring. The budget also includes contractual<br />

services for mowing, security and demolition. The Aquatic Plant Management Section has budgeted funds for salaries,<br />

central garage charges and herbicides to treat infestations of invasive plant species. Additionally, contractual funds<br />

have been budgeted to outsource locating and treating infestations of the invasive species Old World climbing fern<br />

within the Coker Prairie swamp. Old World climbing fern is spreading within as well as outside District-owned portions<br />

of the swamp. Due to the difficulty of assessing known areas of infestation and moving from site to site within the<br />

swamp, existing staff can not complete this job and stay up with required work on other properties. Field Operations<br />

has budgeted for salaries, rental equipment, contracted services, central garage charges, parts, supplies, and land<br />

maintenance materials to support Land Management's requirements. FY20<strong>10</strong> - The Land Resources Department<br />

budget consists of salaries and central garage for prescribed burning, resource monitoring, land maintenance, fence<br />

repair and recreational monitoring. The budget also includes contractual services for mowing and security.<br />

Recreational improvements include an entrace sign and pole barn.<br />

Costs for these activities are <strong>10</strong>0 percent reimbursed through the state's Water Management Lands Trust Fund.<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding<br />

District Budgeted - Outside Revenue<br />

(SOR)<br />

020 Peace River Basin 162,745 91,091<br />

Status As Of: August 27, 2009<br />

No significant activities have occurred since last update.<br />

020 - Peace River Basin 19


S051<br />

Bright Hour Watershed<br />

Project Type SOR<br />

AOR(s)<br />

Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Project Manager MILLER, WILL<br />

Task Manager(s)<br />

Status Ongoing<br />

SOWDERS, GINA, LOVE, KEVIN, GREEN, STEPHANIE<br />

Description<br />

In 1998 the Governing Board authorized the less-than-fee acquisition of 51,158 acres in DeSoto County, referred to as<br />

the Bright Hour Watershed. To date 32,227 acres have been acquired by the District via perpetual conservation<br />

easements (less-than-fee). An additional 19,311 acres have been identified for potential purchase of conservation<br />

easements within the watershed. The project area consists of extensive, high quality prairie, hammock, marsh and<br />

slough systems that provide water management benefits for a traditionally water-poor region. Hydrologic values<br />

include protection of the headwaters of several important creek systems, such as Prairie and Shell Creeks. Water<br />

storage, conveyance and flood control are also provided by the watershed's poorly drained landscape. Habitat<br />

protection for numerous rare plant and animal species and globally imperiled, high quality natural communities is<br />

amply afforded by this project.<br />

Benefits<br />

Since the lands within the project are not owned in fee simple, land management activities consist of monitoring the<br />

terms of the conservation easements.<br />

Costs<br />

Funds included in the FY2009 and FY20<strong>10</strong> budgets are for staff time for annual monitoring of the conservation<br />

easements. Costs for this activity are <strong>10</strong>0 percent reimbursed through the state's Water Management Lands Trust<br />

Fund.<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding<br />

District Budgeted - Outside Revenue<br />

(SOR)<br />

020 Peace River Basin 2,090 2,156<br />

Status As Of: August 27, 2009<br />

No significant activities have occurred since last update.<br />

020 - Peace River Basin 20


S054<br />

Lake Hancock<br />

Project Type SOR<br />

AOR(s)<br />

Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Polk County<br />

Project Manager MILLER, WILL<br />

Task Manager(s) BLASCHKA, STEVEN, NELSON, BRIAN, LANE, CHUCK, LOVE, KEVIN, HAGBERG, JEFFREY,<br />

ELLIOTT, PAUL<br />

Status Ongoing<br />

Description<br />

Lake Hancock is located southeast of the city of Lakeland and north of the city of Bartow in Polk County. At 4,553<br />

acres, Lake Hancock is the largest lake associated with the Peace River, and the third largest lake in Polk County.<br />

Lake Hancock has been recognized as having some of the poorest water quality in the state. The lake is characterized<br />

by persistent blue-green algae blooms, high nutrient concentrations and low dissolved oxygen levels in the water<br />

column and vegetation, fish, and wildlife populations indicative of eutrophic to hypereutrophic conditions. A<br />

requirement of the statutorily mandated minimum flow establishment is the development of a recovery strategy. Part of<br />

the proposed strategy for the Upper Peace River is to restore storage in Lake Hancock and release some of the water<br />

during the dry season to help meet the flow requirements. Historically, Lake Hancock fluctuated more than a foot<br />

higher than it has during the past several decades. This lowering was due to the dredging of the outfall canal as was<br />

common in the early part of the last century. This project proposes to reverse those impacts by modifying or replacing<br />

the District's outfall canal structure so that water levels can be maintained at historical levels. Presently, Structure P-11<br />

is topped when water levels in Lake Hancock exceed 98.7. This project will be coordinated with other Lake Hancock<br />

restoration efforts. In particular, there will be a supporting hydrologic analysis to determine where property interests<br />

may need to be acquired due to increased lake elevations (see H008). Land acquisition within the Lake Hancock<br />

project is a necessary element of the lake's restoration. In support of the Lake Leve project and to continue a<br />

significant greenway from the Peace River watershed to the Green Swamp, the District identified areas along the<br />

shores of Lake Hancock for potential acquisition. To date, the District and Polk County have cooperatively acquired<br />

1,267 acres (Circle "B" Bar Reserve) and the District has acquired an additional 4,5<strong>21</strong> acres. Polk County manages<br />

Circle "B" Bar Reserve for passive, nature-based recreation opportunities such as bicycling, running, hiking, horseback<br />

riding, picnicking, fishing, canoeing, kayaking, and environmental education. The County is building a Resource<br />

Education/Visitor Center (see SA54) and conduct interpretive and interactive programs that will improve public<br />

awareness and encourage stewardship and protection of natural resources. Center will be completed in the fall of<br />

2008.<br />

Benefits<br />

Pursuant to Section 373.1391(1)(a), Florida Statutes, lands within the project are managed and maintained in such a<br />

way as to ensure a balance between public access, general public recreational purposes, and restoration and<br />

protection of their natural state and condition.<br />

Costs<br />

FY2009 - The Land Resources Department budget consists of salaries and central garage for land maintenance,<br />

fence repair and contract management. The budget also includes contractual services for servicing the air conditioning<br />

unit at the on-site security residence, security, payment to Polk County for 50 percent of the management costs for<br />

the Circle B Bar Reserve, and a land use alternatives analysis for lands within the project. Funds are also included to<br />

repair the plumbing at the maintenance facility on the property. Field Operations has budgeted for salaries, rental<br />

equipment, contracted services, central garage charges, parts, supplies, and land maintenance materials to support<br />

Land Management's requirements. FY20<strong>10</strong> - The Land Resources Department budget consists of salaries and central<br />

garage for land maintenance, fence repair and contract management. The budget also includes contractual services<br />

for security, mowing, maiteneance at the security residence, land clearing and payment to Polk County for 50 percent<br />

of the management costs for the Circle B Bar Reserve.<br />

Costs for these activities are <strong>10</strong>0 percent reimbursed through the state's Water Management Lands Trust Fund.<br />

020 - Peace River Basin <strong>21</strong>


S054<br />

Lake Hancock<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding<br />

District Budgeted - Outside Revenue<br />

(SOR)<br />

020 Peace River Basin 274,442 222,662<br />

Project Funds Not Budgeted by the<br />

District<br />

Polk County 12,670<br />

0<br />

Status As Of: February 23, 2009<br />

The Aquatic Plant Management Section treated one acre of tropical soda apple during this period.<br />

020 - Peace River Basin 22


S099<br />

Save Our Rivers Administration<br />

Project Type SOR<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality, Natural Systems<br />

Basin(s) General Fund (District), Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers,<br />

Pinellas-Anclote River, Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager SUTTON, ERIC<br />

Task Manager(s)<br />

Status Ongoing<br />

NELSON, BRIAN, WALSH, TOM, LOVE, KEVIN, HAGBERG, JEFFREY, MILLER, WILL<br />

Description<br />

The Save Our Rivers Administration project contains monies for those items not attributable to one unique project<br />

during the budget cycle. Examples are studies affecting all conservation lands, preparation of resource evaluation<br />

reports, heavy equipment used solely on conservation lands, overtime, staff time, vehicle charges and equipment<br />

rental.<br />

Benefits<br />

Pursuant to Section 373.1391(1)(a), Florida Statutes, lands within the project are managed and maintained in such a<br />

way as to ensure a balance between public access, general public recreational purposes, and restoration and<br />

protection of their natural state and condition.<br />

Costs<br />

In addition to salaries and central garage charges, the FY2009 budget includes funds for tree removal in cases where<br />

trees fall from District property onto adjoining owners' property in the Coastal, Hillsborough and Pinellas-Anclote<br />

Basins; and aerial flights to view exotic species in the Hillsborough, Manasota and Peace Basins. The FY20<strong>10</strong> budget<br />

includes salaries, central garage charges, tree removal in cases where trees fall from District property onto adjoining<br />

owners' property in the Coastal and Hillsborough Basins, and aerial flights to view exotics speciec in the General Fund.<br />

Costs for these activities are <strong>10</strong>0 percent reimbursed through the state's Water Management Lands Trust Fund.<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding<br />

District Budgeted - Outside Revenue<br />

(SOR)<br />

0<strong>10</strong> General Fund (Districtwide) 1,724,876 937,997<br />

011 Alafia River Basin <strong>10</strong>,596 7,549<br />

013 Hillsborough River Basin 34,096 12,549<br />

015 Coastal Rivers Basin 25,344 15,641<br />

016 Pinellas-Anclote River Basin 12,090 7,932<br />

019 Withlacoochee River Basin 7,090 7,932<br />

020 Peace River Basin 24,096 7,549<br />

0<strong>21</strong> Manasota Basin 24,096 7,549<br />

Status As Of: March 12, 2009<br />

With the exception of the District fund, the Save Our Rivers (SOR) Administration project is used primarily to budget<br />

monies for SOR, Preservation 2000 and Florida Forever (reimbursable) projects. Generally, funds are not charged to this<br />

project, but transferred to other reimbursable projects within the Basin. An example is overtime. Staff knows at budget<br />

time that overtime will be required within the basins for work on SOR projects, but does not know for which projects, so<br />

monies will be budgeted in S099. When overtime is used later in the year, the monies will show as being spent for the<br />

actual project the staff member worked on (i.e., S009- Starkey, S016 - Weekiwachee Preserve, etc.). In the District funds<br />

monies are primarily used for SOR program administration, purchase of equipment and contractual services.<br />

020 - Peace River Basin 23


SA01<br />

Jack Creek Hydr. Rest.<br />

Project Type SOR<br />

AOR(s)<br />

Natural Systems<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Project Manager RHINESMITH, PHILIP<br />

Task Manager(s)<br />

KOLASA, KEITH<br />

Status Ongoing<br />

Description<br />

As part of the District's Hydrologic and Wetlands Restoration program, the District's Jack Creek tract located in<br />

Highlands County has been assessed for restoration needs. The health of wetlands within the tract has declined as a<br />

result of over-drainage from the construction of the Josephine Canal. The historic canopy of loblolly bay trees has<br />

been replaced by invasive species. Proposed restoration for this project will center on rehydration of the tract's<br />

degraded wetlands. This project will provide surface water modeling, design, and permitting for restoration of the Jack<br />

Creek tract. Hydrologic restoration of the Jack Creek tract will be consistent with the District's SWUCA objectives.<br />

Benefits<br />

This project will complete design and permitting in preparation of hydrologic restoration to be completed. Restoration<br />

will focus on enhancing the wetlands within the tract by restoring the natural hydroperiod (seasonal water fluctuation).<br />

The augmentation of surface water levels will result in 80 acres of wetland restoration. Rehydration of wetlands within<br />

the property will increase water storage within this region of the District as well as provide aquifer recharge.<br />

Costs<br />

A total of $751 in remaining funds was encumbered in FY2005 to cover the anticipated costs for design and<br />

permitting. In FY2007 a total of $3,035 was budgeted for staff time. In FY2008 a total of $336,058 was budgeted for<br />

consultant services and construction for a total available budget of $357,156. These activities are reimbursed at <strong>10</strong>0<br />

percent from the State's Water Management Lands Trust Fund.<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding<br />

District Budgeted - Outside Revenue<br />

(SOR)<br />

020 Peace River Basin 6,530 <strong>10</strong>,772<br />

Critical Project Milestones Projected Amended Actual<br />

1. Project Feasibility and Alternatives<br />

Report Draft Completed 12/1/06 12/1/06<br />

Final Restoration Plan 2/1/07 2/1/07<br />

2. Contract Development & Execution<br />

Start Design 4/1/07 11/15/09<br />

Complete Design 6/1/07 3/31/<strong>10</strong><br />

2. Contract Development & Execution<br />

Consultant Agreement 3/1/07 9/9/09<br />

3. Permitting<br />

Pre Application <strong>Meeting</strong> w/ FDEP 8/1/07 4/30/<strong>10</strong><br />

Permitting Complete <strong>10</strong>/1/07 6/15/<strong>10</strong><br />

4. Construction<br />

Construction Commence 12/1/07 8/15/<strong>10</strong><br />

Construction Completed 4/1/08 12/15/<strong>10</strong><br />

Status As Of: August <strong>21</strong>, 2009<br />

An evaluation of the Jack Creek tract was completed as a task identified in project B171. The evaluation provided<br />

recommendations for completing hydrologic restoration for this tract and a cost estimate for restoration. This project<br />

(SA01) will utilize the conceptual design plan being completed under project B171 to complete final design and permitting<br />

020 - Peace River Basin 24


SA01<br />

Jack Creek Hydr. Rest.<br />

for restoration on the Jack Creek Tract. The primary wetland and the subject of the hydrologic study has undergone<br />

significant degradation over the last 35 years due to dewatering associated with the Jackson-Josephine canal that<br />

traverses the edge of the Jack Creek tract. The concept for this project will be to divert water from the canal into the<br />

wetland to provide rehydration of the wetland and aquifer recharge. The final restoration plan was submitted by PBS&J<br />

Consultants to the District in January 2007. The District selected Mactec to complete the design, permitting and<br />

construction services for the project. The consultant contract is routing internally for review.<br />

020 - Peace River Basin 25


SB54<br />

Polk Nature Discovery Center Education<br />

Project Type SOR<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Alafia River, Hillsborough River, Peace River<br />

Cooperator(s)<br />

Polk County Natural Resources<br />

Project Manager HULL, MARY MARGARET<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This Cooperative Funding Initiative (CFI) project consists of education and outreach about watersheds at Polk Nature<br />

Discovery Center on the Circle B Bar Reserve. Through this project, school-aged youth and the general public<br />

experience the watersheds in which they live, including the Peace River watershed. Polk County middle school<br />

students, homeschool students, teachers and parents are the target audiences. The FY20<strong>10</strong> project will provide bus<br />

transportation and classroom supplies to conduct water and natural resource educational programs for school groups<br />

visiting the Center. An estimated 7,000 seventh-grade students and teachers from Alafia River, Hillsborough River and<br />

Peace River basins will be informed of the region's water issues and water's natural role in central Florida. The<br />

District's previously funded water exhibits will be used as education tools as part of the student field trip program. The<br />

on-site stormwater pond serves as an outdoor classroom. Pretests that evaluate knowledge of, attitudes toward, and<br />

behaviors about water resources will be completed prior to visiting the Center. Posttests will be completed after the<br />

visit to document any knowledge increase as well as attitude and potential behavior change.<br />

Benefits<br />

This project enhances the District's watershed education efforts by addressing key objectives for watershed education<br />

through the following messages: water is a limited resource, good stewardship of water resources begins in one's own<br />

backyard, everyone lives in a watershed, and wildlife diversity depends upon healthy wetlands and good water quality.<br />

It is anticipated that 12,650 people will visit the Circle B Bar Reserve annually. The middle school field trip program is<br />

estimated to reach 7,000 seventh-grade students in Polk County schools. Existing District educational publications and<br />

tools will be used as supplemental material, along with the new exhibits Everyone Lives in a Watershed, The Green<br />

Swamp and The Lakes. Students will be introduced to hydrological concepts through interactive curriculum activities.<br />

Using the location of the center, which is adjacent to a marsh system that flows into Lake Hancock, field activities will<br />

reinforce key water resource concepts. Lake Hancock has been identified as a major source of pollutants to the Peace<br />

River. Reducing the pollutant load to the river and ultimately to Charlotte Harbor has been a goal of the District. Direct,<br />

hands-on water resources education will enhance a deeper understanding of the water issues of today and in the<br />

future.<br />

Costs<br />

The total cost of the FY20<strong>10</strong> project is $65,000, with the District contributing $32,500 (Alafia River $4,225;<br />

Hillsborough River $5,200; Peace River $23,075). District funds will be used for bus transportation for field trips to<br />

the center. The field trip program is projected to reach 7,000 students per year at a cost to the District of $4.64 per<br />

student. The budget lines below include costs for staff to manage the project.<br />

Additional Information<br />

The total cost of the FY2009 program is $44,666 (Alafia River $5,807, Hillsborough River $7,147, Peace River<br />

$31,712). This funding pays for the development of a field trip program for Polk County middle school students. The<br />

field trip program is planned to reach 5,150 students per year at a cost of $8.67 per student.<br />

020 - Peace River Basin 26


SB54<br />

Polk Nature Discovery Center Education<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding<br />

District Budgeted - Outside Revenue<br />

(SOR)<br />

011 Alafia River Basin 6,559 4,027<br />

013 Hillsborough River Basin 7,899 4,777<br />

020 Peace River Basin 32,465 18,527<br />

Project Funds Not Budgeted by the<br />

District<br />

Polk County Natural Resources 163,833 32,500<br />

Critical Project Milestones Projected Amended Actual<br />

FY2007 Budgeted Funds<br />

Bid process for exhibit design and construction initiated by cooperator 6/30/07 6/30/07<br />

Purchase order opened to Polk County Natural Resources 7/30/07 7/24/07<br />

Exhibit design/construction vendor selected 9/30/07 11/30/07 11/30/07<br />

Exhibit design specifications finalized 11/30/07 1/30/08 1/30/08<br />

Bid awarded to vendor 1/15/08 1/15/08<br />

Exhibit construction begins 1/30/08 8/4/08 <strong>10</strong>/14/08<br />

Exhibits installed at center 8/30/08 <strong>10</strong>/15/08 <strong>10</strong>/20/08<br />

Center's grand opening 11/1/08 11/1/08<br />

Final report and invoice due to the District 11/20/09 3/13/09 5/29/09<br />

FY2009 Budgeted Funds<br />

Open purchase order for FY2009 1/5/09 12/17/08<br />

Environmental educator hired by School Board; curriculum under development 3/1/09 2/20/09<br />

Curriculum field-testing begins 8/17/09 8/17/09<br />

Program components complete <strong>10</strong>/30/09<br />

Final report and invoice due to the District 11/20/09<br />

FY20<strong>10</strong> Budgeted Funds<br />

Initiate purchase order <strong>10</strong>/1/09<br />

Educational programming begins 11/2/09<br />

Educational programming complete 8/28/<strong>10</strong><br />

Final report and invoice due to the District 9/30/<strong>10</strong><br />

Status As Of: September <strong>10</strong>, 2009<br />

The curriculum to be used as part of the middle school field trip program is developed and being field tested with<br />

7th-grade classroom teachers. A teacher workshop to train teachers how to use the curriculum occurred in August at the<br />

center. District staff reviewed the draft interactive enhancement for the watershed exhibit and the cooperator is in the<br />

final design stage for the interactive enhancement. Cooperator has been notified of approval of FY20<strong>10</strong> funding and<br />

District staff is working with cooperator to develop a scope of work for the FY20<strong>10</strong> project. ACTION-TO-DATE: On time.<br />

020 - Peace River Basin 27


W014<br />

Lake Hancock Outfall Treatment System<br />

Project Type SWIM<br />

AOR(s)<br />

Water Quality, Natural Systems<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Project Manager HAGBERG, JANIE<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

See H014<br />

Additional Information<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 0 349,083<br />

0<br />

0 349,083<br />

020 Peace River Basin 0 349,627<br />

0<br />

0 349,627<br />

District Budgeted - Outside Revenue<br />

State Trust Funds (SWIM) 0 698,364<br />

0 5,400,000 6,098,364<br />

U.S. EPA - Lake Hancock (H014) 0 492,200<br />

0<br />

0 492,200<br />

Status As Of: July 18, 2008<br />

see H014<br />

020 - Peace River Basin 28<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$7,289,274


W032<br />

HCC Foundation Field Trip Program<br />

Project Type SWIM<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Alafia River, Hillsborough River, Pinellas-Anclote River, Peace River<br />

Cooperator(s)<br />

Hillsborough Community College Foundation<br />

Project Manager HULL, MARY MARGARET<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This Surface Water Improvement and Management (SWIM) project includes four different field trip programs for<br />

elementary, middle and high school students in Hillsborough, Pasco, Pinellas and Polk counties. The four sites for the<br />

field trips are English Creek, Upper Tampa Bay, Cockroach Bay and Hillsborough River State Park. The programs are<br />

designed to give participants a better understanding of Florida's water resources through 120 hands-on field<br />

experiences with HCC science professionals and ultimately to create the next generation of environmental stewards.<br />

The project's effectiveness is measured through student pre/posttests and teacher surveys.<br />

Benefits<br />

Tampa Bay was identified as the highest priority on the District's Surface Water Improvement and Management<br />

(SWIM) priority list in 1988. Further, this project is designed to implement an environmental education initiative in<br />

Tampa Bay. These field expeditions help the District reach its educational goals by emphasizing water quality<br />

improvement, water conservation and protection of natural systems within the District. By participating in this project,<br />

5,000 students and teachers learn to be environmental stewards in their community and the District, promoting a future<br />

of improved water quality, water conservation and natural systems preservation in Florida.<br />

Costs<br />

The total FY20<strong>10</strong> project cost is $234,135, with the District contributing $85,040 (Alafia $14,464; Hillsborough $60,364;<br />

Pinellas-Anclote $5,<strong>10</strong>6; Peace $5,<strong>10</strong>6). The dollar amount allocated for each contributing Basin Board is determined<br />

by the participating schools within each basin. District funds will be used for 120 field trips, four one-day teacher<br />

workshops, trail signage and maintenance, printing of curriculum materials, and aquatic and water quality testing<br />

supplies. The program is projected to reach 5,040 students and teachers at a cost to the District of $16.87 per person.<br />

Budget lines below include costs to manage the project.<br />

Additional Information<br />

The total FY2009 project cost was $<strong>21</strong>8,385, and the District's share of $85,086 was funded by SWIM ($42,543) and<br />

the remaining funding was split among the following basin boards: Alafia $7,232; Hillsborough $25,<strong>10</strong>0; Northwest<br />

Hillsborough $5,<strong>10</strong>5; Pinellas-Anclote $2,553; and Peace $2,553. Basin budget breakdowns were established based<br />

on a list of program participants provided by the cooperator. District funding is used to fund 120 field trips, a four-day<br />

teacher training program, supplies and materials, and transportation for students. This program is projected to reach<br />

5,000 students at a cost to the District of $17 per person. The District has supported this project since FY2007.<br />

020 - Peace River Basin 29


W032<br />

HCC Foundation Field Trip Program<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

011 Alafia River Basin 7,285 7,377 14,943<br />

0 29,605<br />

013 Hillsborough River Basin 12,951 25,600 60,364<br />

0 98,915<br />

014 Northwest Hillsborough Basin 5,666 5,207<br />

0<br />

0 <strong>10</strong>,873<br />

016 Pinellas-Anclote River Basin 540 2,604 5,<strong>10</strong>6<br />

0 8,250<br />

020 Peace River Basin 539 2,603 5,<strong>10</strong>6<br />

0 8,248<br />

District Budgeted - Outside Revenue<br />

State Trust Funds (SWIM) 26,980 43,389<br />

0<br />

0 70,369<br />

WMLTF (SWIM) - Prior Year Funds 0 0 479<br />

0<br />

479<br />

Project Funds Not Budgeted by the<br />

District<br />

HCC Foundation 173,800 133,300 149,095<br />

0 456,195<br />

Other funding sources 32,000 0<br />

0<br />

0 32,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$714,934<br />

Critical Project Milestones Projected Amended Actual<br />

FY2009 Budgeted Funds<br />

Purchase order opened <strong>10</strong>/27/08 11/24/08<br />

Teacher training workshops 6/30/09 9/25/09 9/25/09<br />

Field trips end 7/31/09 9/25/09 9/25/09<br />

Registration for 2009-20<strong>10</strong> field trips 8/1/09 8/1/09<br />

Final report and invoice received by the District 9/30/09 <strong>10</strong>/30/09<br />

FY20<strong>10</strong> Budgeted Funds<br />

Initiate purchase order <strong>10</strong>/1/09<br />

Teacher training workshop 6/29/<strong>10</strong><br />

Field trips end 7/30/<strong>10</strong><br />

Teacher training workshop 8/14/<strong>10</strong><br />

Final report and invoice received by the District 9/30/<strong>10</strong><br />

Status As Of: September <strong>10</strong>, 2009<br />

The cooperator completed 120 field trips to Upper Tampa Bay Park, Cockroach Bay, English Creek and Hillsborough<br />

River State Park, with 92 completed during the school year and 28 occurring during the summer. Three teacher training<br />

workshops occurred during August and September. Text for trail signage has been submitted to the District for review.<br />

All trail maintenance has been completed. Project manager is awaiting final report and invoice. Cooperator has been<br />

notified of approval of FY20<strong>10</strong> funding and District staff is working with cooperator to develop a scope of work for the<br />

FY20<strong>10</strong> project. ACTION-TO-DATE: On time.<br />

020 - Peace River Basin 30


W331<br />

Biennial Seagrass Mapping of Tampa Bay, Sarasota Bay, Charlotte<br />

Harbor<br />

Project Type SWIM<br />

AOR(s)<br />

Water Quality, Natural Systems<br />

Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Pinellas-Anclote River, Peace River,<br />

Manasota<br />

Cooperator(s)<br />

Project Manager KAUFMAN, KRIS<br />

Task Manager(s)<br />

Status Ongoing<br />

Charlotte Harbor National Estuary Program, Pinellas County, Sarasota Bay Estuary Program,<br />

Tampa Bay Estuary Program<br />

Description<br />

This SWIM initiative project involves mapping and monitoring seagrass within four SWIM priority waterbodies: Tampa<br />

Bay, Sarasota Bay, Lemon Bay, and Charlotte Harbor. In addition to SWIM waterbodies, contractual services for the<br />

St. Joseph Sound/Clearwater Harbor Biennial GIS Mapping of Seagrass (See K150) are completed under a single<br />

agreement to benefit from economy of scale. Specifically, the District's consultant will provide digital aerial<br />

photography, photointerpretation, and GIS-based mapping in order to generate calculations of seagrass acreage and<br />

distribution within each of the named waterbodies. The project is conducted every two years to monitor the long-term<br />

health of these vital resources. Funds budgeted in FY2009 and requested for FY20<strong>10</strong> are for the 2009 - 20<strong>10</strong> effort.<br />

The digital format utilized in 2004 and 2006 allowed for more detailed GIS analysis to be conducted beyond creation of<br />

the original seagrass map product and will allow for efficient transfer of the imagery to fill agency and public requests.<br />

A new task started during the 2007-2008 effort was to scan historical photography from previous seagrass mapping<br />

efforts in the 1990s and early 2000s at high resolution. The intent is to continue this effort in 20<strong>10</strong> and complete the<br />

georeferencing needed to and create digital GIS imagery layers that will then be uploaded to the District's GIS system.<br />

SWIM is utilizing a pre-qualified firm procured under the Mapping & GIS Section's RFP 006-07 as the consultant for<br />

the 2009 - 20<strong>10</strong> phase of mapping. District funds shown in the table include staff salaries.<br />

Benefits<br />

The mapping of seagrasses within each estuary allows the District, the Estuary Programs, and other entities to monitor<br />

the health and distribution of seagrasses. Seagrass health is used as an indicator of water quality conditions. Thus,<br />

this project can assist with water resource management decision making, specifically in evaluating the effectiveness of<br />

water quality improvement projects.<br />

Costs<br />

The project costs for mapping SWIM waterbodies in 2009 - 20<strong>10</strong> is estimated at $350,000. Costs associated with this<br />

upcoming effort are included in the FY2009 and FY20<strong>10</strong> budgets. The FY2009 budget was $175,000, with 50 percent<br />

from State SWIM and 50 percent from five basin boards (Alafia River, Hillsborough River, Pinellas-Anclote River,<br />

Manasota, and Peace River). The FY20<strong>10</strong> budget is $175,000, with the five basin boards contributing. At their April<br />

meetings, the basin boards approved amending their FY2009 budgets to include reallocated State SWIM funds to<br />

cover 50 percent of the District's proposed FY20<strong>10</strong> costs ($87,500). The remaining funds ($87,500) are included in<br />

the five basin boards FY20<strong>10</strong> proposed budgets. District funds shown in the table include staff salaries.<br />

Additional Information<br />

The next phase of mapping will begin in December 2009. Seagrass mapping for SWIM waterbodies (W331) and St.<br />

Joseph Sound Clearwater Harbor (K150) will be completed under one agreement at a total estimated cost of<br />

$350,000. Seagrass meadows serve as nurseries for a variety of commercially and recreational important species of<br />

fin fish and shellfish, and they are highly dependent upon the maintenance of good water quality. The project meets<br />

the goals and objectives of the Tampa Bay, Sarasota Bay, and Charlotte Harbor SWIM Plans, the Tampa Bay Estuary<br />

Program, Sarasota Bay Estuary Program, and Charlotte Harbor National Estuary Program. The 2008 effort is ongoing,<br />

with the most recent completed mapping results from 2006. Between 2004 and 2006, seagrass coverage in Tampa<br />

Bay increased by approximately 4.7%. In Sarasota Bay, which has a more highly urbanized watershed than Tampa<br />

Bay, seagrass increased 7% in coverage from 2004 to 2006. From 2004 to 2006, Charlotte Harbor seagrass coverage<br />

increased by 1%. The only SWIM waterbody to experience a loss in coverage between 2004 and 2006 was Lemon<br />

Bay with a 1% decrease.<br />

020 - Peace River Basin 31


W331<br />

Biennial Seagrass Mapping of Tampa Bay, Sarasota Bay, Charlotte<br />

Harbor<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

41,620 11,334 20,004<br />

011 Alafia River Basin 0 72,958<br />

013 Hillsborough River Basin 41,620 11,334 20,004<br />

0 72,958<br />

014 Northwest Hillsborough Basin 41,620 11,334<br />

0<br />

0 52,954<br />

016 Pinellas-Anclote River Basin 41,620 11,334 20,004<br />

0 72,958<br />

020 Peace River Basin <strong>10</strong>8,412 29,365 20,004<br />

0 157,781<br />

0<strong>21</strong> Manasota Basin <strong>10</strong>5,499 28,334 20,004<br />

0 153,837<br />

District Budgeted - Outside Revenue<br />

State Trust Funds (SWIM) 268,877 <strong>10</strong>3,035<br />

0<br />

0 371,912<br />

State Trust Funds (SWIM) - Prior 2006 165,904 0<br />

0<br />

0 253,404<br />

WMLTF (SWIM) - Prior Year Funds 0 0 12,520<br />

0 12,520<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$1,2<strong>21</strong>,282<br />

Critical Project Milestones Projected Amended Actual<br />

1. Critical Project Milestones<br />

Request for Proposals 6/15/03 7/11/03<br />

Begin Review of Proposals 8/15/03 9/22/03<br />

Draft Agreement to Management Services <strong>10</strong>/31/03 12/17/03<br />

Contract Executed 11/15/03 1/16/04<br />

Photography Shot for 2003/2004 1/31/04 1/17/04<br />

Final Report for 2003/2004 12/31/04 12/31/04<br />

First Amendment to the 2003/2004 Agreement 12/1/05 12/13/05<br />

Consultant Notice to Proceed 12/1/05 12/13/05<br />

Acquisition of Aerial Photography 1/31/06 2/15/06 2/<strong>10</strong>/06<br />

Final Deliverables for 2005/2006 12/31/06 12/31/06<br />

Agreement Expiration Date 12/31/06 12/31/06<br />

2. Critical Project Milestones<br />

Processing of Technical Specifications and Purchase Order <strong>10</strong>/30/07 11/30/07<br />

Purchase Order with scope of work Opened 11/30/07 11/30/07<br />

Work Order #1 Opened 12/13/07 12/13/07<br />

Consultant imagery acquisition 1/30/08 2/15/08 2/15/08<br />

Consultant ortho-imagery production 3/31/08 3/31/08<br />

Consultant photointerpretation <strong>10</strong>/31/08 <strong>10</strong>/31/08<br />

Consultant GIS validation 11/30/08 11/30/08<br />

Consultant draft final deliverables 12/31/08 12/31/08<br />

Status As Of: September 14, 2009<br />

The purchase order and first work order were opened December 2007. The first work order is complete, and all final<br />

deliverables accepted by the District. District staff and cooperating agencies completed the Post Map Production<br />

Classification Accuracy Assessment in April. The 2008 District seagrass acreage estimates were presented to all three<br />

Estuary Programs at the May Seagrass Working Group <strong>Meeting</strong>. Results show increases in bay-wide acreage for St.<br />

Joe/Clearwater Harbor, Tampa Bay, Sarasota Bay, and Lemon Bay, while Charlotte Harbor experienced minor<br />

decreases in acreage. The second work order for completion of the post map production classification accuracy<br />

assessment analysis is processed and staff are compiling data to provide to the consultant. The third work order was<br />

issued to complete high resolution scanning of historical aerials.<br />

020 - Peace River Basin 32


W436<br />

Elizabeth Place Water Quality and Natural Systems Enhancement<br />

Project Type SWIM<br />

AOR(s)<br />

Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Polk County, Polk County Natural Resources<br />

Project Manager THORNTON, SHELLEY<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This project is in response to a FY2008 cooperative funding project from Polk County. The objective of this project is to<br />

acquire additional parcels of land adjacent to an existing wetland system, remove the nuisance vegetation, restore the<br />

wetland hydroperiods and provide water quality treatment. This project will increase the available flood storage and<br />

allow for additional untreated stormwater runoff to be directed onto the site for water quality treatment prior to<br />

discharging to Banana Lake. This project includes land and easement acquisition, design, permitting and construction<br />

to restore and enhance an existing wetland system in the Banana Lake watershed.<br />

Benefits<br />

This project will improve water quality and enhance natural systems. The additional acreage provided adjacent to the<br />

wetland will increase the open water area for storage and increase the littoral shelf area available for additional wetland<br />

planting.<br />

Costs<br />

The total estimated project cost is $1,409,0<strong>21</strong>. The FY2008 project cost is $500,000, with Polk County and the District<br />

each contributing half ($250,000). The District share is split between the Peace River Basin Board ($125,000) and<br />

State SWIM ($125,000). The FY2009 project cost is $500,000, with Polk County and the District each contributing half<br />

($250,000). The District share is split between the Peace River Basin Board ($125,000) and State SWIM<br />

($125,000). Polk County has applied for a 319 grant from FDEP in the amount of $800,000 for construction and public<br />

education signage. District funds shown in the table include staff salaries.<br />

Additional Information<br />

During the past <strong>10</strong> years a significant portion of the 285 acre basin has been developed for residential use.<br />

Stormwater runoff has been conveyed to retention ponds which border the wetland area adding to increased seasonal<br />

high water flows. In 2004, this increase directly impacted four homes adjacent to the wetland, causing one to be<br />

permanently abandoned. In 2006 Polk County, in cooperation with the Federal Emergency Management Agency<br />

(FEMA), purchased and demolished the abandoned home site at a cost of $320,000 for the structure. FEMA<br />

contributed $220,000 and Polk County contributed $<strong>10</strong>0,000 to purchase the abandoned home site. This abandoned<br />

home site is to be included in the additional acreage to be incorporated into the existing wetland system.<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 127,134 126,829 2,<strong>21</strong>8<br />

0 256,181<br />

District Budgeted - Outside Revenue<br />

State Trust Funds (SWIM) 127,134 126,828<br />

0<br />

0 253,962<br />

WMLTF (SWIM) - Prior Year Funds 0 0 2,<strong>21</strong>8<br />

0 2,<strong>21</strong>8<br />

Project Funds Not Budgeted by the<br />

District<br />

FDEP 319 Grant 800,000 0<br />

0<br />

0 800,000<br />

Polk County Natural Resources 439,0<strong>21</strong> 250,000<br />

0<br />

0 689,0<strong>21</strong><br />

020 - Peace River Basin 33<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$2,001,382


W436<br />

Elizabeth Place Water Quality and Natural Systems Enhancement<br />

Critical Project Milestones Projected Amended Actual<br />

1. Contract Development and Execution<br />

Draft agreement sent to Management Services 12/17/07 2/18/08<br />

Agreement returned from Management Services 3/28/08 4/9/08<br />

Agreement sent to Cooperator 4/18/08 4/11/08<br />

Signed agreement returned from Cooperator 5/9/08 6/16/08<br />

Agreement fully executed 5/23/08 6/18/08<br />

Notice to Proceed 5/26/08 6/18/08<br />

2. Project Tasks<br />

Design Complete 3/1/09 9/30/09<br />

Construction Commenced 12/31/09 2/1/<strong>10</strong><br />

Construction Completed 12/31/<strong>10</strong><br />

Status As Of: September 01, 2009<br />

An agreement between the District and Polk County was executed on June 18, 2008. The City was issued a Notice to<br />

Proceed on June 19, 2008. The agreement between Polk County and their consultant, PEC was approved by Polk<br />

County on June 18, 2008 and a Notice to Proceed was issued in July 2008. A kick-off meeting was held in July 2008<br />

where Polk County informed the District that they will not be able to acquire an 8.5 acre parcel, which includes the<br />

existing wetland due price negotiations with the owner. PEC is focusing their restoration efforts on an 3.5 acre parcel the<br />

County currently owns. In addition, the County is in the process of purchasing a portion of an adjacent property, just<br />

northeast of the parcel currently owned by Polk County, to incorporate into the enhanced wetland design. The consultant<br />

submitted for an Environmental Resource Permit (ERP) in July 2009 and is currently addressing comments.<br />

020 - Peace River Basin 34


W501<br />

SWIM Plan Implementation - Charlotte Harbor<br />

Project Type SWIM<br />

AOR(s)<br />

Water Quality, Natural Systems<br />

Basin(s) Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager GARCIA, LIZANNE<br />

Task Manager(s)<br />

Status Ongoing<br />

Charlotte Harbor National Estuary Program<br />

KAUFMAN, KRIS<br />

Description<br />

This project provides for the administration and implementation of projects as outlined in the SWIM Plan for Charlotte<br />

Harbor. The FY2009 budget will include staff salaries and administrative costs to implement projects in the SWIM<br />

Plan. Administration and implementation includes assessment of implementation progress, a review and refinement of<br />

the Pollutant Load Reduction Goal (PLRG) for the waterbody, periodic SWIM Advisory Committee meetings, new<br />

project development (rationale and justification), development of relevant contracts and Requests for Proposals,<br />

invoicing, project related presentations, field visits, and miscellaneous duties as they arise. Included in the FY2006<br />

budget was $50,000 for a historical benthic habitat mapping and change analysis of Charlotte Harbor. The project will<br />

be similar to the effort completed for Tampa Bay in determining historical seagrass coverage from 1950s aerial<br />

photography. This benthic habitat map will allow the District and the Charlotte Harbor National Estuary Program<br />

(CHNEP) to refine goals being set for this system.<br />

Benefits<br />

This project's support of the Charlotte Harbor SWIM Plan creates an opportunity for a cohesive effort between the<br />

District, the CHNEP, and other state and local agencies to better implement resource management decisions and<br />

restoration activities. SWIM projects are eligible for state matching funds with the state funding 50 percent of the<br />

project costs and the District funding the remaining 50 percent.<br />

Costs<br />

The FY2008 and FY2009 ongoing costs for the Charlotte Harbor SWIM Plan Implementation are funded 12.5 percent<br />

from the Manasota Basin, 37.5 percent from the Peace River Basin, and 50 percent from the State SWIM Program<br />

and include staff salary, travel and central garage.<br />

Additional Information<br />

In 1987, the Florida Legislature established the Surface Water Improvement and Management (SWIM) Act having<br />

recognized that water quality and habitat in surface waters throughout the state have degraded or were in danger of<br />

being degraded. The Act requires the five water management districts to maintain a priority list of water bodies of<br />

regional or statewide significance within their boundaries, and develop plans and programs for the improvement of<br />

those water bodies. To date, ten SWIM water bodies in the District have had plans developed and approved by the<br />

state. Several plans have been updated one or more times as required by the Act. The Charlotte Harbor SWIM Plan<br />

was first approved in 1993 and last updated in November 2000. Since the first plan, the District has initiated a number<br />

of restoration and diagnostic assessment projects. Included within these are: 1) implementation of a water quality<br />

monitoring program, 2) development of a pollutant loading model, 3) investigation of a resource-based pollutant load<br />

reduction goal, 4) assessment of toxin levels, 5) identification of cumulative impacts to freshwater inflow reductions, 6)<br />

seagrass mapping efforts, 7) various habitat restoration projects, and 8) involvement in numerous public outreach and<br />

education activities.<br />

020 - Peace River Basin 35


W501<br />

SWIM Plan Implementation - Charlotte Harbor<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 86,378 2,438 859<br />

0 89,675<br />

0<strong>21</strong> Manasota Basin 28,793 813 776<br />

0 30,382<br />

District Budgeted - Outside Revenue<br />

State Trust Funds (SWIM) 62,778 3,249<br />

0<br />

0 66,027<br />

State Trust Funds (SWIM) - Prior 2006 76,230 0<br />

0<br />

0 76,230<br />

WMLTF (SWIM) - Prior Year Funds 0 0 1,634<br />

0 1,634<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$263,948<br />

Critical Project Milestones Projected Amended Actual<br />

1. SWIM Plan Critical Project Milestones<br />

Next Update of SWIM Plan 6/1/07 12/31/09<br />

Status As Of: June 23, 2009<br />

SWIM Plan Update:The last update of the SWIM Plan for Charlotte Harbor became effective in 2000. District staff<br />

continue to work with the Charlotte Harbor National Estuary Program, the Florida Department of Environmental<br />

Protection and local governments to implement projects in the 2000 Plan. Current projects being implemented in the<br />

Charlotte Harbor watershed include W506, W511, W5<strong>21</strong>, W527, W528, W553, W555, W556, W558, W559. Updates for<br />

these projects are included under the individual project numbers. Status of the activities implemented with the Charlotte<br />

Harbor National Estuary Program are provided under project number W526. The CHNEP completed the Comprehensive<br />

Conservation and Management Plan in 2008 and are working on a couple of key projects that will be completed by the<br />

end of 2009. District staff have completed the outline for the Charlotte Harbor SWIM Plan and are assembling references<br />

and other documents to update the SWIM Plan.<br />

020 - Peace River Basin 36


W506<br />

CHEC Charlotte Harbor/Lemon Bay SWIM Watershed Education<br />

Project Type SWIM<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Peace River, Manasota<br />

Cooperator(s)<br />

Charlotte Harbor Environmental Center<br />

Project Manager STERNBERGER, VIRGINIA<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This Surface Water Improvement and Management project with the Charlotte Harbor Environmental Center provides<br />

public involvement and water quality education opportunities to more than 4,000 residents in the Charlotte<br />

Harbor/Lemon Bay watersheds. The program's goal is to foster a sense of stewardship and encourage actions that<br />

benefit the watershed through focused education/outreach programs. The FY20<strong>10</strong> program components include a<br />

volunteer water quality monitoring program, estuary wading trips, a three-day water workshop for local residents,<br />

community events, estuary boat trips, hiking trips; six barrier island education trips, reprint and distribution of "Keep it<br />

Clean" Lemon Bay booklets, and reprint and distribution of "Watershed" Lemon Bay DVDs. Effectiveness will<br />

be measured by number of participants, number of materials distributed, pre- and posttests and surveys.<br />

Benefits<br />

The Peace River discharges into Charlotte Harbor, a SWIM priority water body and a designated "estuary of national<br />

significance." The project fosters a sense of stewardship for the Peace River, Charlotte Harbor, Lemon Bay and<br />

related freshwater resources through focused education opportunities for public participation and schools. The<br />

program provides an opportunity for comparison of different areas within the Charlotte Harbor and Lemon Bay<br />

watersheds. These programs are consistent with the District's watershed management and watershed education<br />

initiatives. Education was named as one of the top priorities of the Manasota and Peace River basin boards. CHEC<br />

has the expertise and experience to provide quality education in a variety of methods leading to increased knowledge<br />

and behavior modificiation among participants.<br />

Costs<br />

The total cost of the FY20<strong>10</strong> project is $89,446, with the District contributing $39,250. The District's share is split<br />

between the Peace River Basin Board ($16,283), the Manasota Basin Board ($3,342) and State SWIM (19,625).<br />

District funds will pay for materials and program expenses. Each basin's share is based on anticipated work within that<br />

basin. The program is projected to reach 4,230 residents at a cost to the District of $9 per person. The budget lines<br />

below include costs for staff to manage the project.<br />

Additional Information<br />

The total cost of the FY2009 project was $85,835, with the District contributing $34,726 (Manasota $3,473; Peace<br />

River $13,890; SWIM $17,363). This program is reaching 4,230 residents at a cost to the District of $8 per resident.<br />

District funding is allocated toward staff time, materials and program expenses. The District has supported this project<br />

since FY2000.<br />

020 - Peace River Basin 37


W506<br />

CHEC Charlotte Harbor/Lemon Bay SWIM Watershed Education<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 77,299 14,757 16,283<br />

0 <strong>10</strong>8,339<br />

0<strong>21</strong> Manasota Basin 38,134 3,689 4,089<br />

0 45,912<br />

District Budgeted - Outside Revenue<br />

State Trust Funds (SWIM) 60,432 18,445<br />

0<br />

0 78,877<br />

State Trust Funds (SWIM) - Prior 2006 76,737 0<br />

0<br />

0 76,737<br />

WMLTF (SWIM) - Prior Year Funds 0 0 20,371<br />

0 20,371<br />

Project Funds Not Budgeted by the<br />

District<br />

Charlotte Harbor Environmental Center 85,050 51,<strong>10</strong>9 35,000<br />

0 171,159<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$501,395<br />

Critical Project Milestones Projected Amended Actual<br />

FY2008 Budgeted Funds<br />

Initiate purchase order <strong>10</strong>/1/07 <strong>10</strong>/31/07 <strong>10</strong>/31/07<br />

First task report due 12/31/07 12/11/07<br />

Second task report due 3/31/08 3/31/08<br />

Third task report due 6/30/08 6/16/08<br />

Fourth task report due 9/16/08 9/29/08 9/29/08<br />

Project close 11/14/08 3/31/09 3/31/09<br />

FY2009 Budgeted Funds<br />

Initiate purchase order <strong>10</strong>/1/08 12/4/08 12/4/08<br />

First task report 12/31/08 12/29/08<br />

Second task report 3/31/09 3/31/09<br />

Third task report due 6/30/09 6/30/09<br />

Fourth task report due 9/30/09<br />

Project close 11/20/09<br />

FY20<strong>10</strong> Budgeted Funds<br />

Initiate purchase order <strong>10</strong>/12/09<br />

First task report due 12/31/09<br />

Second task report 3/31/<strong>10</strong><br />

Third task report 6/30/<strong>10</strong><br />

Fourth task report 9/15/<strong>10</strong><br />

Project close 9/30/<strong>10</strong><br />

Status As Of: August 19, 2009<br />

The cooperator planned and conducted 2 volunteer water quality monitoring training workshops in Lemon Bay (reaching<br />

32) and 1 results presentation (reaching 11); conducted a three-day SWIM Water School in March (reaching 56);<br />

implemented 7 speaking programs (reaching 2<strong>10</strong>); attended 9 educational events (reaching 3,226); held 35 wading trips<br />

(involving 654); conducted 24 Journey Through the Estuary boat trips (involving 247); led 7 hiking trips (involving 154);<br />

and reprinted 500 copies of the Lemon Bay DVD. ACTION TO DATE: On time.<br />

020 - Peace River Basin 38


W507<br />

CHEC Peace River Watershed Education<br />

Project Type SWIM<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Charlotte Harbor Environmental Center<br />

Project Manager STERNBERGER, VIRGINIA<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This Surface Water Improvement and Management project with the Charlotte Harbor Environmental Center develops<br />

and provides watershed education outreach programs to residents that focus on awareness and protection of the<br />

Peace River watershed and Charlotte Harbor. This project will reach approximately 5,000 residents in Charlotte,<br />

DeSoto, Hardee and Polk counties. Specifically, participants will learn how to correctly operate their irrigation systems,<br />

properly fertilize their landscapes, utilize integrated best management practices and incorporate Florida-friendly<br />

landscaping, leading to a reduction of pollution in stormwater runoff. The FY20<strong>10</strong> program components include<br />

coordinating a volunteer monitoring program in the City of Punta Gorda, conducting interpretive bus tours in the Peace<br />

River basin, attending community events, leading educational hikes to Shell Creek and Prairie Creek properties,<br />

reprinting and distributing "Keeping the Peace" watershed guide booklets and evaluation to determine knowledge and<br />

behavioral changes. Effectiveness will be measured by number of participants, number of materials distributed, pre-<br />

and posttests and surveys.<br />

Benefits<br />

The Peace River discharges into Charlotte Harbor, a SWIM priority water body and a designated "estuary of national<br />

significance." Through education, residents will learn specific behaviors that will have a positive impact on watersheds,<br />

leading to more sustainable water resources.<br />

Costs<br />

The total cost of the FY20<strong>10</strong> project is $62,198, with the District contributing $29,000. The District's share is split<br />

between the Peace River Basin Board $14,500 and State SWIM $14,500. This program is projected to reach 5,000<br />

residents at a cost to the District of $5.80 per resident. The budget line below includes costs for staff to manage the<br />

project.<br />

Additional Information<br />

The total cost of the FY2009 project was $71,248, with the District contributing $18,<strong>10</strong>1 (Peace River $9,051; SWIM<br />

$9,050). Originally, the Peace River Basin Board approved funding for $34,050. A portion of this project was for the<br />

Hardee Volunteer Water Monitoring program for $<strong>21</strong>,799. Staff transferred this amount to SWIM to coordinate this<br />

portion of the project. After further review, SWIM concluded these funds would benefit the District more as an<br />

education program and the $<strong>21</strong>,799 was returned to Communications. At the April 2009 meetings, the Peace River<br />

and Manasota basin boards approved the final transfer of $15,949 from W507 to W513 (Charlotte County<br />

Fourth-Grade Field Trip). The CHEC Peace River Watershed Education project will reach 5,000 residents at a cost to<br />

the District of $4 per person.<br />

020 - Peace River Basin 39


W507<br />

CHEC Peace River Watershed Education<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 22,949 18,439 15,247<br />

0 56,635<br />

District Budgeted - Outside Revenue<br />

State Trust Funds (SWIM) 22,949 18,438<br />

0<br />

0 41,387<br />

WMLTF (SWIM) - Prior Year Funds 0 0 15,246<br />

0 15,246<br />

Project Funds Not Budgeted by the<br />

District<br />

Charlotte Harbor Environmental Center 43,176 37,198 30,000<br />

0 1<strong>10</strong>,374<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$223,642<br />

Critical Project Milestones Projected Amended Actual<br />

FY2008 Budgeted Funds<br />

Initiate purchase order <strong>10</strong>/1/07 <strong>10</strong>/31/07 <strong>10</strong>/31/07<br />

First task report due 12/31/07 12/31/07<br />

Second task report due 3/31/08 3/31/08<br />

Third task report due 6/30/08 6/30/08<br />

Fourth task report due 9/16/08 11/14/08 12/14/08<br />

Project close 11/14/08 1/30/09 1/30/09<br />

FY2009 Budgeted Funds<br />

Initiate purchase order <strong>10</strong>/1/08 11/15/08 11/13/08<br />

First task report due 12/31/08 1/30/09 1/30/09<br />

Second task report due 3/30/09 4/30/09<br />

Third task report due 6/30/09 6/30/09<br />

Fourth task report due 8/16/09 8/16/09<br />

Final report and project close 11/13/09<br />

FY20<strong>10</strong> Budgeted Funds<br />

Initiate purchase order <strong>10</strong>/1/09<br />

First task report 12/31/09<br />

Second task report 3/30/<strong>10</strong><br />

Third task report 6/30/<strong>10</strong><br />

Fourth task report 9/16/<strong>10</strong><br />

Project close 9/30/<strong>10</strong><br />

Status As Of: August 19, 2009<br />

The cooperator held a two-hour volunteer water monitoring training session for four volunteers; conducted its first water<br />

quality monitoring event and five speaking engagements, reaching more than 120 participants; reprinted and distributed<br />

500 "Keeping the Peace" booklets; attended four community events (reaching 875); completed one upriver bus tour and<br />

one downriver bus tour (reaching more than 30 participants). ACTION TO DATE: On time.<br />

020 - Peace River Basin 40


W5<strong>10</strong><br />

Restoration of Natural Systems at Thornton Key<br />

Project Type SWIM<br />

AOR(s)<br />

Natural Systems<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Charlotte Harbor Environmental Center<br />

Project Manager POWERS, STEPHANIE<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This proposed project is in response to a request from the Charlotte Harbor Environmental Center (CHEC) to restore<br />

and enhance approximately 13 acres of intertidal wetland and upland habitat in Lemon Bay. Thornton Key is 31-acre<br />

island site that was purchased in 2007 by Charlotte County. The proposed plan targets the restoration of degraded salt<br />

marsh habitat and associated coastal maritime forest through nuisance and exotic species eradication.<br />

Benefits<br />

Upon completion, the project will provide significant benefits to habitat and water quality.<br />

Costs<br />

The total project cost is approximately $29,000. The District's FY20<strong>10</strong> contribution is $14,375. At their April 2009<br />

meeting, the Peace River Basin Board approved amending its FY2009 budget to include reallocated State SWIM<br />

funds to cover 50 percent ($7,188) of the FY20<strong>10</strong> costs. The remaining costs ($7187) are funded by the<br />

Pinellas-Anclote River Basin Board. CHEC will be providing $14,375 to match District funding. District funds shown in<br />

the table include staff salaries.<br />

Additional Information<br />

Charlotte Harbor is generally viewed as one of the most productive estuarine systems in Southwest Florida. Although<br />

it is appropriately considered a healthy system, problems exist in the areas of hydrologic alterations, water quality<br />

degradation, and habitat loss. The SWIM Plan for Charlotte Harbor focus on management strategies for the Peace<br />

and Myakka Rivers, in addition to Charlotte Harbor proper, to reduce point and non-point source pollution and to<br />

preserve and restore habitat. The objectives of this project are consistent with the SWIM Plan goals for Charlotte<br />

Harbor.<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 0 0 9,072<br />

0 9,072<br />

District Budgeted - Outside Revenue<br />

WMLTF (SWIM) - Prior Year Funds 0 0 9,073<br />

0 9,073<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$18,145<br />

Critical Project Milestones Projected Amended Actual<br />

Contract Development and Execution<br />

Receive Scope of Work from Cooperator 9/16/09 9/9/09<br />

Create and Issue Purchase Order to Cooperator <strong>10</strong>/14/09<br />

Contract Expiration<br />

Project Close Out 12/31/<strong>10</strong><br />

Status As Of: August 25, 2009<br />

A scope of work has been requested from the cooperator. Once the scope has been received, this project will be<br />

administered through a purchase order.<br />

020 - Peace River Basin 41


W511<br />

Alligator Creek Restoration Project<br />

Project Type SWIM<br />

AOR(s)<br />

Water Quality, Natural Systems<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Florida Department of Environmental Protection<br />

Project Manager POWERS, STEPHANIE<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This multi-year project is a Surface Water Improvement and Management (SWIM) Program initiative consisting of the<br />

hydrologic restoration of approximately 677 acres of freshwater and saltwater wetland and salttern areas critical to<br />

early life stages of many commercially-important fishes in Charlotte Harbor. The Alligator Creek project is located on a<br />

1,600 acre site that is owned by the Florida Department of Environmental Protection (FDEP) and is located south of<br />

Punta Gorda abutting Charlotte Harbor. The restoration activities are being performed in phases based on available<br />

funds. The current phase (Phase II) includes construction of Projects 1-A, 3, <strong>10</strong>, 11 and 16. Project 16 will be<br />

constructed concurrently with the other projects, but under a separate agreement with the U.S. Army Corps of<br />

Engineers (USACE).<br />

Benefits<br />

Completion of Projects 1-A, 3, <strong>10</strong>, 11 and 16 would restore the historic hydroperiod and associated coastal habitats to<br />

approximately 600 acres of wetland and salttern areas which have been severely impacted by anthropogenic activities.<br />

Projects 5, 6, 8, 13 and 14 would restore an additional 77 acres of coastal ecosystems.<br />

Costs<br />

The construction contract for projects 1-A, 3, <strong>10</strong>, and 11 is for $1,000,750.86. The funding agreement with the<br />

USACE for Project 16 is for $615,384.62, of which the District is to contribute $<strong>21</strong>5,384.62. It is anticipated that<br />

additional funding during future fiscal years will be necessary to meet all construction expenses and District staff will<br />

seek grant funding to help offset construction costs. District funds shown in the table include staff salaries.<br />

Additional Information<br />

Charlotte Harbor is generally viewed as one of the most productive estuarine systems in Southwest Florida. Although<br />

it is appropriately considered a healthy system, problems exist in the areas of hydrologic alterations, water quality<br />

degradation, and habitat loss. The SWIM Plan for Charlotte Harbor focus on management strategies for the Peace<br />

and Myakka Rivers, in addition to Charlotte Harbor proper, to reduce point and non-point source pollution and to<br />

preserve and restore habitat. The objectives of this project are consistent with the SWIM Plan goals.<br />

020 - Peace River Basin 42


W511<br />

Alligator Creek Restoration Project<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 666,335 4,000 3,787 400,000 1,074,122<br />

District Budgeted - Outside Revenue<br />

Ecosystem Trust Fund - Alligator Ck<br />

Rstr (SWIM)<br />

Ecosystem Trust Fund - Charlotte Hbr<br />

Rstr<br />

FCMP - Alligator Creek Restoration<br />

(SWIM)<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

800,000 0<br />

0<br />

<strong>10</strong>0,000 0<br />

0<br />

139,400 0<br />

0<br />

0<br />

0<br />

0<br />

800,000<br />

<strong>10</strong>0,000<br />

139,400<br />

NOAA - Alligator Creek 50,000 0<br />

0<br />

0 50,000<br />

State Trust Funds (SWIM) 323,804 4,000<br />

0<br />

0 327,804<br />

State Trust Funds (SWIM) - Prior 2006 408,794 0<br />

0<br />

0 408,794<br />

WMLTF (SWIM) - Prior Year Funds 0 0 3,787<br />

0 3,787<br />

Project Funds Not Budgeted by the<br />

District<br />

U.S. Fish and Wildlife Service 16,700 0<br />

0<br />

0 16,700<br />

USACE 400,000 0<br />

0<br />

0 400,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$3,320,607<br />

Critical Project Milestones Projected Amended Actual<br />

1. Critical Project Milestones - Phase II<br />

Permit Application Sent to SWFWMD and ACOE 11/16/00 11/16/00<br />

RFP for Final Design and Permits sent to Management Services 4/30/01 4/16/01<br />

RFP released 9/28/01 <strong>10</strong>/9/01<br />

Consultant Selection Short List Approved by Basin Board 2/1/02 2/1/02<br />

Draft Contract to Management Services 6/7/02 6/7/02<br />

Contract Executed 8/7/02 <strong>10</strong>/9/02<br />

Draft Conceptual Design Report 11/7/02 12/6/02<br />

Draft Conceptual Design Report 11/7/02 12/6/02<br />

90 Percent Plan Submittal 3/6/03 3/6/03<br />

<strong>10</strong>0 Percent Plan Submittal 6/6/03 7/2/03<br />

<strong>10</strong>0 Percent Plan Submittal 9/6/03 9/11/03<br />

Permits Received 3/27/04 6/23/04<br />

Request for Bids 8/16/05 8/16/05<br />

Execute Contract with USACE 12/11/07 12/11/07<br />

2. Critical Project Milestones - Phase III<br />

Request for Proposals 6/12/09<br />

Select Consultant 8/31/09<br />

Execute Agreement with Consultant <strong>10</strong>/31/09<br />

Commence Preliminary Design 11/15/09<br />

Complete Design and Permitting 11/30/<strong>10</strong><br />

Status As Of: August 25, 2009<br />

Phase II has been closed out. The Phase III RFP was released June 12, 2009, and a mandatory pre-proposal meeting<br />

was held on June 25, 2009. Proposals are due from the consultants by July 31, 2009. Project staff will review the<br />

proposals and award the project on August 31, 2009.<br />

ACCELERATED ACTION TO DATE: District and FDEP staff have released the Phase III RFP and will review the<br />

020 - Peace River Basin 43


W511<br />

Alligator Creek Restoration Project<br />

proposals in a timely manner to secure a consultant to design and permit the project.<br />

020 - Peace River Basin 44


W513<br />

Charlotte County Fourth-Grade Field Studies Program<br />

Project Type SWIM<br />

AOR(s)<br />

Water Quality, Natural Systems<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Project Manager HULL, MARY MARGARET<br />

Task Manager(s)<br />

Status Ongoing<br />

TORRUSIO, MARY<br />

Description<br />

This Surface Water Improvement and Management (SWIM) project provides in-depth field experiences to all Charlotte<br />

County elementary schools. This is the twenty-first year that the Charlotte Harbor Environmental Center (CHEC) has<br />

been offering this program, which is designed to give students a better understanding of the water systems of Florida.<br />

The goal of the two-day outdoor education program is to bring an understanding and appreciation of the beauty,<br />

complexity and fragility of local water systems to 1,500 fourth-grade students as well as to the participating 300<br />

teachers, aides and adult chaperones. The activities consist of environmental field studies at Alligator Creek Preserve,<br />

the lower Peace River, Cedar Point Environmental Park and Lemon Bay. Students collect and identify native, estuarine<br />

and freshwater specimens that inhabit the rivers, harbor and bay. Students learn about upland and freshwater wetland<br />

habitats. They also learn about freshwater creeks, the importance of trees and plants in water conservation, and the<br />

role of fire in preserving the upland ecosystems. Pre- and posttest tools will assess the field trips' effectiveness.<br />

Teacher training is provided to participating teachers and is approved and supported by Charlotte County Public<br />

Schools.<br />

Benefits<br />

Throughout coordination of the program, CHEC has built a strong partnership with Charlotte County, the City of Punta<br />

Gorda, the School Board of Charlotte County, and the Peace River Audubon Society. Many students have not<br />

previously been exposed to hands-on environmental field trips, and the experience can foster a personal connection to<br />

the sites visited, ultimately leading to understanding and appreciation of water systems.<br />

Costs<br />

The total cost of the FY20<strong>10</strong> project is $94,140, with the District contributing $34,000. The District's share is split<br />

between the Peace River Basin Board $17,000 and State SWIM $17,000. District funds will be used for 1<strong>10</strong> field trips<br />

and water quality monitoring supplies. This program is projected to reach 1,800 students and adults at a cost to the<br />

District of $18.89 per person. The budget line below includes costs for staff to manage the project.<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 0 0 17,000<br />

0 17,000<br />

District Budgeted - Outside Revenue<br />

State Trust Funds (SWIM) 0 0<br />

0<br />

0<br />

0<br />

WMLTF (SWIM) - Prior Year Funds 0 0 17,000<br />

0 17,000<br />

Project Funds Not Budgeted by the<br />

District<br />

Charlotte Harbor Environmental Center 0 0 60,191<br />

0 60,191<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$94,191<br />

Critical Project Milestones Projected Amended Actual<br />

FY20<strong>10</strong> Budgeted Funds<br />

Initiate purchase order <strong>10</strong>/1/09<br />

020 - Peace River Basin 45


W513<br />

Charlotte County Fourth-Grade Field Studies Program<br />

Schedule field trips 5/31/<strong>10</strong><br />

Field trips begin 8/30/<strong>10</strong><br />

Field trips end 5/31/11<br />

Final report and invoice due to the District 8/31/11<br />

Status As Of: September <strong>10</strong>, 2009<br />

Cooperator has been notified of approval of FY20<strong>10</strong> funding and District staff is working with cooperator to develop a<br />

scope of work for the FY20<strong>10</strong> project. ACTION-TO-DATE: On time.<br />

020 - Peace River Basin 46


W5<strong>21</strong><br />

Charlotte Harbor Water Quality Monitoring<br />

Project Type SWIM<br />

AOR(s)<br />

Water Quality<br />

Basin(s) Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager SZAFRANIEC, MARY<br />

Task Manager(s)<br />

Status Ongoing<br />

Charlotte County, Florida Fish and Wildlife Conservation Commission<br />

KAUFMAN, KRIS<br />

Description<br />

This project is an ongoing SWIM Initiative to monitor water quality in Charlotte Harbor, a SWIM priority waterbody and<br />

designated estuary of national significance. The purpose of the water quality monitoring is to establish a long-term<br />

database of water quality conditions within the estuary to provide essential data for planning and management<br />

purposes, such as implementation of the Charlotte Harbor SWIM Plan. The District began collecting and analyzing<br />

monthly water quality samples from Charlotte Harbor in 1993. In 2000, the District worked with staff from Charlotte<br />

County (County) and the Florida Fish and Wildlife Conservation Commission (FFWCC) to develop an implementation<br />

plan for long-term water quality monitoring. As a result of these discussions, the District, County, and FFWCC agreed<br />

to cooperatively monitor water quality in Charlotte Harbor. The District and the FFWCC are responsible for collection of<br />

25 samples per month. The County is responsible for analyzing each sample for 11 water quality parameters, including<br />

nutrients, color and turbidity. The District is responsible for estuarine water quality data compilation, quality<br />

assurance/quality control, updates to a District approved database and upload of the data to the State's STOrage and<br />

RETrieval (STORET) database. Internet publication of the data for this project are completed under W547.<br />

Benefits<br />

The project created a multi-agency cooperative effort that provides a long-term water quality dataset to assist in<br />

establishing the health of the Charlotte Harbor study area and provide information on changes in water quality.<br />

Costs<br />

Water quality sampling task: At their April 2009 meetings, the Peace River Basin and Manasota Basin Boards<br />

approved amending its FY2009 budget to include reallocated State SWIM funds to cover 50 percent ($19,125) of the<br />

FY20<strong>10</strong> costs. The remaining costs ($19,125) are funded by the Peace River Basin and the Manasota Basin Boards.<br />

Additional Information<br />

Charlotte Harbor is generally viewed as one of the most productive estuarine systems in southwest Florida. Although it<br />

is appropriately considered a healthy system, problems exist in the areas of hydrologic alterations, water quality<br />

degradation, and habitat loss. The SWIM Plan for Charlotte Harbor focus on management strategies for the Peace<br />

and Myakka Rivers, in addition to Charlotte Harbor proper, to reduce point and non-point source pollution and to<br />

preserve and restore habitat. The objectives of this project are consistent with these strategies. This coordinated effort<br />

involves two separate agreements: 1) an agreement between the District and the County outlining responsibilities of<br />

both parties but does not involve the transfer of funds, and 2) an agreement between the District and the FFWCC<br />

outlining sampling services and reimbursement rates for water quality monitoring.<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 136,865 17,846 23,915<br />

0 178,626<br />

0<strong>21</strong> Manasota Basin 45,623 5,949 8,979<br />

0 60,551<br />

District Budgeted - Outside Revenue<br />

State Trust Funds (SWIM) 66,371 23,794<br />

0<br />

0 90,165<br />

State Trust Funds (SWIM) - Prior 2006 174,171 0<br />

0<br />

0 193,296<br />

WMLTF (SWIM) - Prior Year Funds 0 0 3,768<br />

0 3,768<br />

020 - Peace River Basin 47<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$526,406


W5<strong>21</strong><br />

Charlotte Harbor Water Quality Monitoring<br />

Critical Project Milestones Projected Amended Actual<br />

1. Critical Project Milestones<br />

Draft Agreement to Contracts 12/31/00 11/<strong>21</strong>/00<br />

Basin Board Approval of Agreement 4/30/01 12/13/00<br />

Governing Board Approval of Agreement 4/30/01 12/19/00<br />

Contract Executed 5/1/01 5/7/01<br />

First Water Quality Monitoring Event 5/12/01 5/12/01<br />

Notice to Proceed 6/1/01 5/9/01<br />

FFWCC First Amendment to Contracts Management 3/26/04 4/2/04<br />

FFWCC First Amendment Fully Executed 5/31/04 9/27/04<br />

Charlotte County First Amendment Fully Executed 3/30/05 3/30/05<br />

FFWCC Second Amendment to Contract Fully Executed 5/22/07 5/22/07<br />

Charlotte County Second Amendment Fully Executed 3/26/08 4/28/08<br />

Status As Of: September 09, 2009<br />

A second amendment to the original agreement was executed in May 2007 with the FFWCC. A second amendment to<br />

the original with Charlotte County was executed on April 28, 2008. These amendments allow for an additional three-year<br />

"No Cost Time Extension" extending each party's committment to the project through March 31, 2011. Currently, the<br />

Charlotte Harbor Environmental Center (CHEC) is presenting the results of these efforts on its website,<br />

http://www.checflorida.org, allowing the public to view results in terms of both status and trends in water quality. CHEC<br />

submitted the second and third quarterly reports, the draft final report and invoices. For FY20<strong>10</strong>, $<strong>10</strong>,000 of the<br />

remaining funds from project W547 will be used for data management under a separate purchase order with Benchmark<br />

Labs as part of this project.<br />

020 - Peace River Basin 48


W526<br />

Charlotte Harbor National Estuary Program<br />

Project Type SWIM<br />

AOR(s)<br />

Water Quality, Natural Systems<br />

Basin(s) Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager GARCIA, LIZANNE<br />

Task Manager(s)<br />

Status Ongoing<br />

Charlotte Harbor National Estuary Program<br />

KAUFMAN, KRIS, POWERS, STEPHANIE, GARCIA, LIZANNE<br />

Description<br />

This project provides for the funding of the Annual Workplan for the Charlotte Harbor National Estuary Program<br />

(CHNEP). The District participates in three main areas. First the District's SWIM program, usually funded by the basin<br />

boards and State, carries out the projects that will address water quality and habitat restoration within the Harbor.<br />

Second, the District has contributed annual funding to the CHNEP since 1997 to carry out the administration and<br />

implement of projects identified in the CHNEP Comprehensive Conservation and Management Plan. And finally, the<br />

District provides staff to sit on the technical, management and policy (Governing or Basin Board member) committees<br />

of the program. The District's annual budget includes funding support to the CHNEP and District staff salaries, travel<br />

and central garage to administer the project, which includes attending board meetings and other workshops and<br />

invoicing.<br />

Benefits<br />

This project support of the CHNEP creates an opportunity for a cohesive effort between the District, CHNEP and other<br />

state and local agencies to implement resource management decisions and restoration activities. Additionally, this<br />

project provides for leveraging funding between the partners. Projects contained within the CHNEP Annual Workplan<br />

address management issues concerning hydrologic alterations, water quality degradation, and habitat loss within the<br />

Peace and Myakka River watersheds and the Charlotte Harbor estuary.<br />

Costs<br />

The District has provided funding to the CHNEP on an annual basis since 1997. The District's annual funding<br />

commitment for the CHNEP is $1<strong>10</strong>,000, which is split between the Manasota Basin Board (25%) and the Peace River<br />

Basin Board (75%). If State SWIM funds are available, they will be applied to the District's contribution. District funds<br />

are used to implement projects outlined in the Annual Workplan. District funds shown in the table include staff<br />

salaries.<br />

Additional Information<br />

In 1987, the Florida Legislature established the Surface Water Improvement and Management (SWIM) Act, having<br />

recognized that water quality and habitat in surface waters through out the state have degraded or were in danger of<br />

being degraded. The Act requires the District to maintain a priority list of waterbodies of regional or statewide<br />

significance within their boundaries. Charlotte Harbor is designated as a priority waterbody. Charlotte Harbor was<br />

identified by the United States Environmental Protection Agency (USEPA) in 1995 as an estuary of Federal<br />

Significance and subsequently included in the National Estuary Program. As a result of this designation, the Charlotte<br />

Harbor National Estuary Program was established to assist the region in developing a comprehensive plan for the<br />

restoration and protection of Charlotte Harbor. Partners in the CHNEP include the Southwest Florida and South<br />

Florida Water Management Districts, USEPA, Florida Department of Environmental Protection, other state and federal<br />

agencies, and local governments from the watershed. The goals and strategies for the Harbor are identified in the<br />

Comprehensive Conservation and Management Plan (CCMP) for Charlotte Harbor which provides guidance to each<br />

entity on their contribution to restore the Harbor. Since 1993, the District has completed several habitat restoration<br />

projects and diagnostic assessments, including seagrass mapping, water quality monitoring, and development of a<br />

pollutant load reduction goal for the Harbor.<br />

020 - Peace River Basin 49


W526<br />

Charlotte Harbor National Estuary Program<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 319,008 45,024 43,726 82,500 490,258<br />

0<strong>21</strong> Manasota Basin <strong>10</strong>6,335 15,008 16,165 27,500 165,008<br />

District Budgeted - Outside Revenue<br />

State Trust Funds (SWIM) 179,543 60,031<br />

0<br />

0 239,574<br />

State Trust Funds (SWIM) - Prior 2006 368,701 0<br />

0<br />

0 368,701<br />

WMLTF (SWIM) - Prior Year Funds 0 0 59,891<br />

0 59,891<br />

Project Funds Not Budgeted by the<br />

District<br />

CHNEP 1,087,725 1<strong>10</strong>,000<br />

0<br />

0 1,197,725<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$2,5<strong>21</strong>,157<br />

Critical Project Milestones Projected Amended Actual<br />

2. FY2007 Annual Workplan Critical Project Milestones<br />

FY 2007 Contract with CHNEP Executed 4/1/07 6/11/07<br />

FY 2007 Contract Close Out 12/31/09<br />

3. FY2008 Annual Workplan Critical Project Milestones<br />

FY2008 Contract with CHNEP Executed 12/1/07 8/26/08<br />

FY2008 Contract Close Out 12/31/<strong>10</strong><br />

4. FY2009 Annual Workplan Critical Project Milestones<br />

FY2009 Contract with CHNEP Executed 12/1/08 12/18/09<br />

FY2009 Contract Close Out 12/31/11<br />

Status As Of: August 27, 2009<br />

FY2007 Contract: The FY2007 Agreement was executed on 6/11/2007 and expires 12/31/2009. Projects include<br />

addressing environmental data and information needs to measure the health of the estuary, identifying opportunities for<br />

water quality and habitat restoration projects and to measuring the success of these projects. FY2008 Contract: The<br />

FY2008 agreement was executed in 08/2008 and expires 12/31/20<strong>10</strong>. Projects include refinement of water quality<br />

targets and pre-development vegetation mapping in the CHNEP watershed. FY2009 Contract: The FY2009 agreement<br />

was executed on December 13, 2009. Projects include setting seagrass targets and finalizing the water quality targets<br />

necessary to maintain seagrass health. FY20<strong>10</strong> Contract: District staff have been working with the CHNEP Director to<br />

develop a project for the work plan to replace the data reporting project that was formerly done by CHEC under contract<br />

to the NEP. Management Conference: The Management and Policy Committees met in August 2009. There were<br />

several important topics on the agenda. 1) The approval of a report summarizing the key points discussed at the<br />

workshop, including those from the presenters, the peer reviewers, and the participants. While the District does not<br />

necessarily agree with all the presentations given at the workshop or the abstracts that were submitted, the report does<br />

appear to summarize the topics discussed and the District's comments were incorporated into the report.2) The<br />

refinement of water quality targets and the setting of seagrass targets, which had not previously been set for Charlotte<br />

Harbor. Seagrass Targets. District staff have worked closely with the consultant and the CHNEP to develop the targets<br />

and the District supported this action item. The Management Committee recommended that the Policy committee<br />

approve a contract with a consultant to complete the triennial review of water quality status and trends. 3) There was<br />

considerable discussions on the CHNEP taking public interest money and that this should be discussed throughout the<br />

management conference so that a policy may be developed.<br />

020 - Peace River Basin 50


W527<br />

Peace River Water Quality Monitoring<br />

Project Type SWIM<br />

AOR(s)<br />

Water Quality<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Project Manager KAUFMAN, KRIS<br />

Task Manager(s)<br />

Status Ongoing<br />

WOLDEN, CATHERINE<br />

Description<br />

This project is an ongoing SWIM Initiative to monitor water quality in the Peace River. The District participated in a<br />

multi-agency cooperative effort to monitor the river from 1997 to 1998. It was determined a long term effort was<br />

needed to characterize water quality conditions and pollutant loadings in the river system. The current project began in<br />

2000 and funding will be used to continue the monthly water quality monitoring program at ten United States<br />

Geological Service (USGS) stream stations along the Peace River. The data provided from this project will be used in<br />

conjunction with streamflow measurements provided by an existing USGS program to estimate monthly pollutant<br />

loading at the ten gauge sites (See W554 & W547).<br />

Benefits<br />

This data will be used to develop future water quality improvement projects as needed. The project's data is regularly<br />

used to create publications such as, "Water Quality Conditions and Pollutant Loads and Yields in the Peace and<br />

Myakka River Basins" (See W554). Ongoing projects in the watershed such as the Lake Hancock Outfall Treatment<br />

Project have analyzed the data in order to understand current conditions as well as justify recommendations for action.<br />

Costs<br />

The FY20<strong>10</strong> funds for this project are funded from the Peace River Basin. The funds are for the District's Water<br />

Quality Monitoring Program (WQMP) staff to collect samples and the District Laboratory to analyze the samples.<br />

District funds shown in the table include staff salaries.<br />

Additional Information<br />

The Peace River discharges into Charlotte Harbor, a SWIM priority waterbody and is designated as an "estuary of<br />

national significance." Charlotte Harbor is generally viewed as one of the most productive estuarine systems in<br />

Southwest Florida. Although it is appropriately considered a healthy system, problems exist in the areas of hydrologic<br />

alterations, water quality degradation, and habitat loss. The SWIM Plan for Charlotte Harbor focus on management<br />

strategies for the Peace and Myakka Rivers, in addition to Charlotte Harbor proper, to reduce point and non-point<br />

source pollution and to preserve and restore habitat. The objectives of this project are consistent with these strategies.<br />

The District began water quality monitoring projects along the Peace and Myakka Rivers in 2000 (See W528). Since<br />

2001, the District has also supported sampling in the tidal portions of the Peace and Myakka Rivers by the Florida Fish<br />

and Wildlife Conservation Commission (FFWCC) (See W5<strong>21</strong>).<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 142,435 20,481 38,933<br />

0 201,849<br />

District Budgeted - Outside Revenue<br />

State Trust Funds (SWIM) 81,941 20,480<br />

0<br />

0 <strong>10</strong>2,4<strong>21</strong><br />

State Trust Funds (SWIM) - Prior 2006 90,738 0<br />

0<br />

0 90,738<br />

WMLTF (SWIM) - Prior Year Funds 0 0 38,932<br />

0 38,932<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$433,940<br />

Critical Project Milestones Projected Amended Actual<br />

020 - Peace River Basin 51


W527<br />

Peace River Water Quality Monitoring<br />

1. Critical Project Milestones<br />

First Sampling Event <strong>10</strong>/3/00 <strong>10</strong>/3/00<br />

1. Critical Project Milestones<br />

FY2008 Monthly Sampling Complete 9/30/08 9/30/08<br />

FY2009 Monthly Sampling Complete 9/30/09 9/30/09<br />

FY20<strong>10</strong> Monthly Sampling Complete 9/30/<strong>10</strong><br />

Status As Of: September 01, 2009<br />

Water quality sampling is ongoing. Samples have been collected from October 2000 through August 2009. Field data<br />

has been submitted to the laboratory for inclusion into their database through June 2009.<br />

020 - Peace River Basin 52


W547<br />

Water Quality in the Peace and Myakka Basins, Charlotte Harbor,<br />

and Lemon Bay<br />

Project Type SWIM<br />

AOR(s)<br />

Water Quality<br />

Basin(s) Peace River, Manasota<br />

Cooperator(s)<br />

Charlotte Harbor Environmental Center<br />

Project Manager SZAFRANIEC, MARY<br />

Task Manager(s)<br />

Status Ongoing<br />

KAUFMAN, KRIS<br />

Description<br />

This ongoing project is in response to a funding request from Charlotte Harbor Environmental Center (CHEC) for<br />

on-line publication of water quality maps and graphs. Water quality data from various sources collected within the<br />

Peace River Basin, Myakka River Basin, Charlotte Harbor, and Lemon Bay are included in the maps. The project<br />

involves mapping and graphing of of District Peace and Myakka River basin water quality data on the CHEC website.<br />

In FY2005, the project expanded its coverage to include Sarasota County's Northern Lemon Bay water quality<br />

sampling effort, Florida Department of Environmental Protection (FDEP) volunteer water quality project, and FDEP<br />

Lemon Bay monitoring network. An FY2009 cooperative funding request was received for continuation of the display of<br />

the project's sixth year of multi-agency monitoring. Benchmark Labs will be responsible for the data management<br />

tasks as part of this project.<br />

Benefits<br />

Information provided through this project will offer technical support for environmental management activities<br />

conducted by the District's SWIM Program, FDEP, the Peace River/ Manasota Regional Water Supply Authority, the<br />

Charlotte Harbor National Estuary Program, and other local and regional organizations. Publication of the data in the<br />

STORET databases and website provides an historical record of the changes in water quality within each system.<br />

Costs<br />

The FY2009 budget is $66,000, with the Charlotte Harbor Environmental Center and the District each contributing half<br />

($33,000). The District share is split between State SWIM ($33,000), the Peace River Basin ($16,500), and the<br />

Manatsota Basin ($4,125). The cost to each basin board is determined by its watershed's (Peace River and Myakka<br />

River watersheds) relative influence on water quality in Charlotte Harbor. District funds shown in the table include staff<br />

salaries. The District and CHEC agreed to reduce the scope of work to only cover the CHEC website display of water<br />

quality mapping and graphing for a total cost of $28,000, with the District and CHEC each contributing half ($14,000).<br />

$<strong>10</strong>,000 of the remaining funds will be used for the data management under a separate purchase order with<br />

Benchmark Labs. The Basin Boards approved the transfer of remaining funds for CHEC's fourth grade education<br />

project.<br />

Additional Information<br />

Since 2003, the CHEC has been presenting the results of these efforts on its web site www.checflorida.org/chec/water<br />

quality, allowing the public and scientists to view the results in terms of both status and trends in water quality. The<br />

cooperative project is executed through purchase orders and associated scopes of work. The SWIM Plan for<br />

Charlotte Harbor focuses on management strategies for the Peace and Myakka Rivers, in addition to Charlotte Harbor<br />

proper, to reduce point and non-point source pollution and to preserve and restore habitat. The objectives of this<br />

project are consistent with these strategies.<br />

020 - Peace River Basin 53


W547<br />

Water Quality in the Peace and Myakka Basins, Charlotte Harbor,<br />

and Lemon Bay<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

42,072 13,920<br />

0<br />

020 Peace River Basin 7,500 63,492<br />

0<strong>21</strong> Manasota Basin 25,711 4,640<br />

0 2,500 32,851<br />

District Budgeted - Outside Revenue<br />

State Trust Funds (SWIM) 47,901 18,560<br />

0<br />

0 66,461<br />

State Trust Funds (SWIM) - Prior 2006 29,817 0<br />

0<br />

0 29,817<br />

Project Funds Not Budgeted by the<br />

District<br />

Charlotte Harbor Environmental Center 112,500 33,000 34,000<br />

0 179,500<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$372,1<strong>21</strong><br />

Critical Project Milestones Projected Amended Actual<br />

1. Critical Project Milestones<br />

FY2004 First Quarter Report 12/30/03 12/19/03<br />

Second Quarter Report 3/30/04 3/24/04<br />

Third Quarter Report 6/30/04 12/<strong>21</strong>/04 12/<strong>21</strong>/04<br />

Final Report 9/30/04 5/<strong>21</strong>/05 5/<strong>21</strong>/05<br />

FY2005 P.O. Open 3/22/05 3/22/05<br />

FY2005 First Quarter Report 5/15/05 6/30/05 6/29/05<br />

Second Quarter Report 8/15/05 9/30/05 9/30/05<br />

Third Quarter Report <strong>10</strong>/15/05 11/15/05 11/15/05<br />

Fourth Quarter Report 2/15/06 3/<strong>10</strong>/06 4/13/06<br />

FY2006 P.O. Open 3/30/06 3/30/06<br />

FY2006 First Quarter Report 5/30/06 5/24/06<br />

Second Quarter Report 8/30/06 8/31/06<br />

Third Quarter and Draft Final Report 11/30/06 4/1/07 3/23/07<br />

Fourth Quarter and Final Report 2/28/07 4/1/07 3/23/07<br />

FY2007 P.O. Open 3/30/07 3/<strong>21</strong>/07<br />

FY2006 P.O. Final Invoice Paid 5/3/07 5/3/07<br />

FY2007 First Quarter Report 5/30/07 5/3/07<br />

FY2007 Second Quarter Report 8/30/07 6/30/07<br />

FY2007 Third Quarter Report 11/30/07 11/30/07<br />

FY2008 P.O. Open 1/7/08 1/7/08<br />

FY2007 Fourth Quarter Report 2/28/08 2/5/08<br />

FY2008 First Quarter Report 5/30/08 6/30/08 6/30/08<br />

FY2008 Second Quarter Report 8/30/08 1/14/09 2/27/09<br />

FY2008 Third Quarter Report 11/30/08 1/29/09 2/27/09<br />

FY2008 P.O. Terminates 12/31/08 12/31/09<br />

FY2008 Fourth Quarter Report 3/31/09 7/15/09 7/27/09<br />

Status As Of: September 09, 2009<br />

The FY2009 final scope of work was approved and the purchase order was opened, January 28, 2009. Currently, CHEC<br />

is presenting the results of these efforts on its web site, http://www.checflorida.org. The District and CHEC agreed to<br />

reduce the scope of work to only cover the CHEC website display of water quality mapping and graphing for a total cost<br />

of $28,000, with the District and CHEC each contributing half ($14,000). $<strong>10</strong>,000 of the remaining funds will be used for<br />

the data management under a separate purchase order with Benchmark Labs. The Basin Boards will be requested to<br />

approve the transfer of remaining funds for CHEC's fourth grade education project.<br />

020 - Peace River Basin 54


W553<br />

Coral Creek Habitat Restoration Project<br />

Project Type SWIM<br />

AOR(s)<br />

Water Quality, Natural Systems<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Florida Department of Environmental Protection<br />

Project Manager POWERS, STEPHANIE<br />

Task Manager(s)<br />

Status Ongoing<br />

THORNTON, SHELLEY<br />

Description<br />

This multi-year project is a Surface Water Improvement and Management (SWIM) Program initiative consisting of the<br />

hydrologic and habitat restoration of degraded and impacted wetlands. It is also expected to provide water quality<br />

treatment for presently-untreated stormwater flows into the District and FDEP-owned project area. The project area is<br />

approximately 2,600 acres. Proposed restoration of the creek includes: restoration/enhancement of historic and<br />

man-made creek channels, intertidal, low-salinity and freshwater habitats, complementary marshes and uplands;<br />

removal of invasive, exotic vegetation; and construction of stormwater treatment features to improve water quality for<br />

the Charlotte Harbor. A preliminary assessment of restoration and stormwater treatment opportunities will need to be<br />

conducted first, followed by project design and permitting, and, finally, construction. The District is the lead agency in<br />

procuring the services of an engineering consultant and a construction contractor. The FDEP will be the entity<br />

responsible for long-term operation and maintenance of the site. A related project was submitted by the FDOT through<br />

the FY2008 Cooperative Funding Initiative (see Project No. W556, FDOT - Cape Haze Pioneer Trail Hydrologic<br />

Restoration Project). The Cape Haze Pioneer Trail Hydrologic Restoration Project is expected to improve tidal flushing<br />

in an approximately 1<strong>10</strong> acre tidal creek which has been impounded since the early 1900s due to the construction of a<br />

railroad causeway across the East Fork of Coral Creek.<br />

Benefits<br />

This project will provide restoration of impacted wetlands and treatment of stormwater on District-owned lands. A<br />

preliminary assessment of restoration and stormwater treatment opportunities will be conducted to determine the<br />

specific acreage of wetlands restored and to estimate the amounts of pollutant removal that can be achieved.<br />

Costs<br />

The total estimated project budget is $1,200,500 for feasibility study, design, permitting, and construction of Phase I.<br />

These funds are split between the Peace River Basin Board ($400,250), State SWIM ($150,250), and a State<br />

Appropration ($250,000). The FY2009 funds will be used to evaluate and design alternatives to improve the existing<br />

ecosystem. The FY20<strong>10</strong> proposed project cost for construction is $400,000. At their April 2009 meeting, the Peace<br />

River Basin Board approved amending its FY2009 budget to include reallocated State SWIM funds to cover 50<br />

percent of the District's proposed FY20<strong>10</strong> costs ($200,000). The remaining funds ($200,000) are included in the<br />

Peace River Basin Board's FY20<strong>10</strong> proposed budget. It is anticipated that additional funding during future fiscal years<br />

will be necessary to meet all construction expenses and District staff will seek grant funding to help offset construction<br />

costs. District funds shown in the table include staff salaries.<br />

Additional Information<br />

Approximately 2,600 acres of the District/FDEP-owned lands surround the East and West Forks of Coral Creek, which<br />

flows into Charlotte Harbor near Placida, south of the Rotonda in Charlotte County. Charlotte Harbor is a SWIM<br />

priority waterbody as well as a designated estuary of national significance as part of the National Estuary Program.<br />

The project is consistent with the habitat restoration and water quality improvement goals of the District's SWIM Plan<br />

for Charlotte Harbor. The project site is part of the 43,000 acre Charlotte Harbor Preserve State Park. The FDEP is<br />

the entity responsible for the management of the site. The property contains a number of habitat types (e.g., tidal<br />

creeks, mangrove swamps, salt marshes, saltterns, salt and freshwater ponds, freshwater wetlands, pine flatwoods,<br />

scrub and other uplands) which have been impacted by anthropogenic activities. Much of the hydrology of the site has<br />

also been impacted by ditching and dredge and fill activities that occurred as recently as the mid-1970s. Further, the<br />

construction of a dam across the West Fork eliminated the saltwater signature from the upper half of the West Fork,<br />

thus creating a 270 acre freshwater impoundment now dominated by cattails. It appears that a significant volume of<br />

the stormwater runoff from the Rotunda development discharges into the West Fork without much water quality<br />

treatment. Similarly, the East Fork also appears to receive untreated stormwater discharges from a residential area to<br />

the north. Elevated nitrogen levels have been observed in Coral Creek by Charlotte Harbor National Estuary Program<br />

water quality studies. In addition to hydrologic and habitat restoration, it is envisioned that the restoration of this site<br />

would incorporate some level of treatment for stormwater runoff entering the site.<br />

020 - Peace River Basin 55


W553<br />

Coral Creek Habitat Restoration Project<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 258,539 157,855 208,261 1,500,000 2,124,655<br />

District Budgeted - Outside Revenue<br />

Charlotte Co - Coral Creek (W553) 0 0 71,500<br />

0 71,500<br />

Ecosystem Trust Fund - Coral Ck<br />

(SWIM)<br />

250,000 0<br />

0<br />

0 250,000<br />

State Trust Funds (SWIM) 8,537 157,855<br />

0<br />

0 166,392<br />

State Trust Funds (SWIM) - Prior 2006 0 0<br />

0<br />

0 200,000<br />

WMLTF (SWIM) - Prior Year Funds 0 0 8,260<br />

0 8,260<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$2,820,807<br />

Critical Project Milestones Projected Amended Actual<br />

Consultant Contract Development and Execution<br />

Advertise Request for Proposals 11/17/06 11/17/06<br />

Consultant Selection 2/2/07 2/23/07<br />

Draft Agreement Sent to Management Services 3/16/07 8/8/07<br />

Agreement Returned from Management Services 8/29/07 11/29/07<br />

Agreement Sent to Consultant 9/6/07 12/18/07<br />

Signed Agreement returned from Consultant <strong>10</strong>/4/07 12/20/07<br />

Agreement fully executed <strong>10</strong>/18/07 1/18/08<br />

Notice to Proceed <strong>10</strong>/24/07 2/11/08<br />

Agreement Expiration 12/31/<strong>10</strong><br />

Design Phase<br />

Conceptual Design and Feasibility Report 6/15/08 2/27/09<br />

30% Design Plans 1/31/09 6/1/09<br />

60% Design Plans and Permitting 6/30/09 8/1/09<br />

Final Design Plans and Construction Specifications <strong>10</strong>/1/09<br />

Status As Of: August 25, 2009<br />

The District has incorporated a stormwater component into the overall restoration plan for Coral Creek. An agreement<br />

has been drafted to receive $71,500 from the County for construction of the component. The consultant has provided the<br />

preliminary 30% design plan to the District. Work Order #3, which will finalize design plans for the project, has been<br />

received from the consultant. An amendment is being drafted to include funding for this final iteration of design planning<br />

and permitting.<br />

020 - Peace River Basin 56


W554<br />

(Completed) Report and Summary Analysis of Water Quality<br />

Conditions for Peace and Myakka rivers<br />

Project Type SWIM<br />

AOR(s)<br />

Water Quality<br />

Basin(s) Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager KAUFMAN, KRIS<br />

Task Manager(s)<br />

Status Completed<br />

Charlotte Harbor Environmental Center<br />

Description<br />

This SWIM cooperative funding project will create a water quality summary report for the Peace and Myakka river<br />

systems. The project is needed to compile data from multiple inter-agency monitoring efforts into a single<br />

comprehensive water quality summary and analysis. Results of this report can be incorporated into ongoing resource<br />

management efforts in the Peace River, Myakka River, and Charlotte Harbor. The project scope contains the following<br />

elements: 1) summaries and statistical analyses of water quality data collected for water year (WY) 2005 in the Peace<br />

and Myakka basins, 2) estimated loads and yields for WY2002 through WY2005, and 3) an integrative analysis of<br />

trends in surface water quality for WY2002 through WY2005. Water years are 12 month periods, starting October 1st<br />

and ending September 30th of the following year, during which a complete annual hydrologic cycle occurs.<br />

Benefits<br />

The information provided by this report will be used by District staff, the Charlotte Harbor National Estuary Program,<br />

the Florida Department of Environmental Protection, and the public for assessing the health of these systems. The<br />

reports will assist in resource management decision making and will guide future restoration efforts.<br />

Costs<br />

The total project cost is $30,000 with CHEC contributing $15,000. The District's share is $15,000. The Peace River<br />

Basin is funding $3,750, the Manasota Basin is funding $3,750, and State SWIM is funding the remaining $7,500.<br />

District funds shown in the table include staff salaries.<br />

Additional Information<br />

Charlotte Harbor is generally viewed as one of the most productive estuarine systems in Southwest Florida. Although<br />

it is appropriately considered a healthy system, problems exist in the areas of hydrologic alterations, water quality<br />

degradation, and habitat loss. The SWIM Plan for Charlotte Harbor focus on management strategies for the Peace<br />

and Myakka Rivers, in addition to Charlotte Harbor proper, to reduce point and non-point source pollution and to<br />

preserve and restore habitat. The objectives of this project are consistent with these strategies. The District began<br />

water quality monitoring projects along the Peace and Myakka Rivers in 2000 (See W527 & W528). Since 2001, the<br />

District has also supported sampling in the tidal portions of the Peace and Myakka Rivers by the Florida Fish and<br />

Wildlife Conservation Commission (FFWCC) (See W5<strong>21</strong>). The proposed project will follow the example of previous<br />

publications created by the Charlotte Harbor Environmental Center (CHEC), e.g., the 2002 publication, titled, "Water<br />

Quality Conditions and Pollutant Loads and Yields in the Peace and Myakka River Basins," which featured data from<br />

WY2001.<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 5,486 362<br />

0<br />

0 5,848<br />

0<strong>21</strong> Manasota Basin 5,487 361<br />

0<br />

0 5,848<br />

District Budgeted - Outside Revenue<br />

State Trust Funds (SWIM) <strong>10</strong>,971 723<br />

0<br />

0 11,694<br />

Project Funds Not Budgeted by the<br />

District<br />

Charlotte Harbor Environmental Center 15,000 0<br />

0<br />

0 15,000<br />

020 - Peace River Basin 57<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$38,390


W554<br />

(Completed) Report and Summary Analysis of Water Quality<br />

Conditions for Peace and Myakka rivers<br />

Critical Project Milestones Projected Amended Actual<br />

1. Critical Project Milestones<br />

Issued Purchase Order 12/31/06 5/11/07 5/<strong>10</strong>/07<br />

Notice to Proceed 12/31/06 5/11/07<br />

Project Kick Off <strong>Meeting</strong> 5/11/07 5/11/07<br />

First Progress Report 8/31/07 6/30/07<br />

Second Progress Report 9/30/07 12/17/07<br />

Third Progress Report <strong>10</strong>/31/07 3/31/08 3/31/08<br />

Fourth Progress Report and Final Report 12/15/07 3/31/08 3/31/08<br />

Final Report 12/31/07 3/31/08 3/31/08<br />

1. Critical Project Milestones<br />

Acceptance of Final Report 4/30/08 1/30/09 5/26/09<br />

Status As Of: September 01, 2009<br />

A three month no cost time extension through 03/31/2008 was approved to finish the review and editing process of the<br />

draft and final reports. Due to the highly technical nature of the document and numerous calculations, longer review and<br />

revision times were needed to ensure all data, interpretations, and conclusions contained within the document are<br />

accurate. The final draft document review was completed by District staff and changes to the document are being<br />

completed. A final draft was received by the District in January 2009, District staff responded with a second round of<br />

comments. A final report was submitted May 20, 2009 and accepted by the District May 26,2009. The final invoice has<br />

been paid and the purchase order closed. Project records have been sent to Contracts.<br />

020 - Peace River Basin 58


W555<br />

Evaluating the Effects of Restoration on Estuarine Fishes<br />

Project Type SWIM<br />

AOR(s)<br />

Natural Systems<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Mote Marine Laboratory<br />

Project Manager POWERS, STEPHANIE<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This project is in response to a cooperative funding request from Mote Marine Laboratory to examine the effects of<br />

SWIM habitat restoration activities, specifically the Alligator Creek Wetlands Restoration Project (W511) in Charlotte<br />

Harbor, on economically-important estuarine fishes such as juvenile snook, red drum, and tarpon. The Alligator Creek<br />

Project is a major District restoration effort. This project provides the District with an opportunity to help determine the<br />

effectiveness of the Alligator Creek Wetland Restoration Project. Mote Marine Laboratory will take advantage of three<br />

years of pre-restoration monitoring from four tidal creeks representing a range of anthropogenic degradation. Sampling<br />

will continue through restoration and post-restoration monitoring of fish assemblages and seeks to address the effects<br />

of wetland restoration projects on mangrove creek fishes. Restoration is seen as an effective means to repair<br />

anthropogenic ecological damage, but quality data on the extent that restoration projects improve estuarine ecology is<br />

rare. Likewise, there is little data on the extent that restoration of natural freshwater flows reverses these negative<br />

impacts. Quantitatively understanding how habitat restoration projects impact fishes is critical so that appropriate<br />

conservation and management measures can be enacted. The results of this project will be used as part of the<br />

monitoring and evaluation effort of the Alligator Creek Wetlands Restoration Project. This project will help validate the<br />

results of existing SWIM habitat restoration projects and the habitat restoration goals for the District's SWIM Plan for<br />

Charlotte Harbor, and will also help guide future restoration efforts in the Harbor and around the state. Phase I<br />

monitoring was completed December 31, 2006. Phase II of this project, with budget approval, will commence on<br />

October 1, 2008.<br />

Benefits<br />

This project will document and quantify how the restoration of historic freshwater inflow patterns improve estuarine<br />

ecology for economically-important fishes as specifically applied to an existing SWIM project, i.e., the Alligator Creek<br />

Wetlands Restoration Project (W511). Results from this project will be used as part of the monitoring effort for the<br />

Alligator Creek project. This project will also result in guidance on how future conservation and management measures<br />

should be appropriately enacted.<br />

Costs<br />

The total project cost is estimated to be $612,500. The District's FY2009 portion of the total cost is requested to be<br />

$75,000. Of this amount, 50 percent ($32,500) will come from State SWIM funds and 50 percent ($32,500) will come<br />

from the Peace River Basin Board. Mote Marine Laboratory, through grants from the Florida Sea Grant Program,<br />

Florida Fish and Wildlife Conservation Commission, and the Charlotte Harbor National Estuary Program, will provide<br />

$75,000 in this fiscal year. The District provided project funding in FY2007, matching Mote's $400,000. District funds<br />

shown in the table include staff salaries.<br />

Additional Information<br />

Florida's southwest coastline has been drastically altered for development, water management, agriculture, mining,<br />

and mosquito control purposes, which has modified freshwater flows into estuaries and caused changes to estuarine<br />

ecology. Freshwater inflow is a major ecological structuring factor in estuaries which influences the abundance and<br />

distributions of vegetation, vertebrates and invertebrates that use estuaries for some or all of their life cycles. Further,<br />

it has been shown (in Charlotte Harbor and in other estuaries) that freshwater flow alterations negatively impact<br />

estuarine fishes, especially the economically-important species. This project will document and quantify how the<br />

restoration of historic freshwater inflow patterns improves estuarine ecology.<br />

020 - Peace River Basin 59


W555<br />

Evaluating the Effects of Restoration on Estuarine Fishes<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 33,748 23,325 475<br />

0 57,548<br />

District Budgeted - Outside Revenue<br />

State Trust Funds (SWIM) 33,746 23,325<br />

0<br />

0 57,071<br />

WMLTF (SWIM) - Prior Year Funds 0 0 475<br />

0<br />

475<br />

Project Funds Not Budgeted by the<br />

District<br />

Mote Marine Laboratory 487,500 0<br />

0<br />

0 487,500<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$602,594<br />

Critical Project Milestones Projected Amended Actual<br />

Critical Project Milestones<br />

Issue Notice to Proceed 12/31/06 12/30/06<br />

Sampling Commences 1/2/07 <strong>10</strong>/1/06<br />

Final Report 12/1/07 1/2/08<br />

Contract Expiration 12/31/07 12/31/07<br />

Status As Of: August 25, 2009<br />

This project is being administered through a purchase order. The first quarter of sampling began in October 2008 and<br />

the fourth quarter of sampling has begun. A final report will be submitted in October 2009, after all sampling has been<br />

completed.<br />

020 - Peace River Basin 60


W556<br />

FDOT - Cape Haze Pioneer Trail Hydrologic Restoration<br />

Project Type SWIM<br />

AOR(s)<br />

Water Quality, Natural Systems<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Florida Department of Transportation<br />

Project Manager POWERS, STEPHANIE<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This project is in response to an FY2008 cooperative funding request from the Florida Department of Transportation<br />

(FDOT) to restore habitat and improve water quality in the upper reaches of the East Fork of Coral Creek in Charlotte<br />

County. In the early 1900s, a railroad causeway was constructed across Coral Creek effectively reducing the<br />

bank-to-bank open water width from approximately 1,000 feet down to around 30 feet. This activity significantly<br />

reduced tidal exchange and caused sedimentation in Coral Creek. Charlotte County acquired the railroad right-of-way<br />

and converted the northern segment to a rails-to-trails bike/pedestrian path, known as the Cape Haze Pioneer Trail.<br />

The District owns land on both sides of the trail. The trail presently terminates at the northern shore of Coral Creek.<br />

The County had coordinated with the FDOT through a Local Agency Participation (LAP) agreement to bridge the<br />

existing 30 foot opening and continue the trail to the south, but construction funds were redirected toward the<br />

hurricane recovery efforts after Hurricane Charlie passed through the area in August 2004. District and FDOT funds<br />

would be used for the engineering design, environmental permitting and construction for the removal of the existing<br />

causeway. Non-District funds would be used for the construction of the new elevated boardwalk.<br />

Benefits<br />

The project is anticipated to restore tidal exchange and improve estuarine and intertidal habitats to approximately 1<strong>10</strong><br />

acres of the East Fork of Coral Creek. It would also remove significant areas of exotic vegetation growth from project<br />

areas. Additional benefits include extending the Pioneer Trail to the south, thus continuing public access to the<br />

southern segment of the rails-to-trails. Further, this project compliments the goals of the Coral Creek Habitat<br />

Restoration Project (W553), at SWIM initiative project, presently in the design phase.<br />

Costs<br />

The FY2008 project cost is $60,000 for design and permitting, with the FDOT and the District each contributing half<br />

($30,000). The District share is split between the Peace River Basin Board ($15,000) and State SWIM ($15,000).<br />

Future funding requests will be made to finance construction of the project.<br />

Additional Information<br />

Coral Creek flows into Charlotte Harbor near Placida, south of the Rotunda in Charlotte County. Charlotte Harbor is a<br />

SWIM priority waterbody as well as a designated estuary of national significance as part of the National Estuary<br />

Program. The project is consistent with the habitat restoration and water quality improvement goals of the District's<br />

SWIM Plan for Charlotte Harbor. The project site adjacent to an ~2,600 acre parcel co-owned by the District and the<br />

FDEP, and is part of the Charlotte Harbor Preserve State Park. It appears that a significant volume of the stormwater<br />

runoff from a residential area to the north discharges into the East Fork without much water quality treatment.<br />

Elevated nitrogen levels have been observed in Coral Creek by Charlotte Harbor National Estuary Program water<br />

quality studies.<br />

020 - Peace River Basin 61


W556<br />

FDOT - Cape Haze Pioneer Trail Hydrologic Restoration<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 17,602 3,425 1,<strong>21</strong>4<br />

0 22,241<br />

District Budgeted - Outside Revenue<br />

State Trust Funds (SWIM) 17,602 3,424<br />

0<br />

0 <strong>21</strong>,026<br />

WMLTF (SWIM) - Prior Year Funds 0 0 1,<strong>21</strong>3<br />

0 1,<strong>21</strong>3<br />

Project Funds Not Budgeted by the<br />

District<br />

FDOT 30,000 697,500<br />

0<br />

0 727,500<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$771,980<br />

Critical Project Milestones Projected Amended Actual<br />

Critical Project Milestones<br />

Draft agreement Sent to Management Services 3/18/08 3/18/08<br />

Agreement Returned from Management Services 4/24/08 4/24/08<br />

Agreement Sent to Cooperator 6/3/08 6/3/08<br />

Signed Agreement Returned from Cooperator 9/1/08 9/26/08<br />

Agreement Fully Executed 9/15/08 9/30/08<br />

Notice To Proceed 9/22/08 <strong>10</strong>/1/08<br />

Status As Of: August 25, 2009<br />

The consultant has completed 60% design plans and is preparing to submit permit applications. The FDOT project<br />

manager has requested an extension to the agreement to incorporate the project construction period. An amendment will<br />

be drafted based on this request.<br />

020 - Peace River Basin 62


W557<br />

Characterizing Seagrass Communities of Eastern Charlotte Harbor<br />

Project Type SWIM<br />

AOR(s)<br />

Water Quality, Natural Systems<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Project Manager KAUFMAN, KRIS<br />

Task Manager(s)<br />

Status Ongoing<br />

Charlotte Harbor Environmental Center<br />

Description<br />

This SWIM cooperative funding project is investigating the influence of coastal freshwater creeks on seagrass<br />

communities of eastern Charlotte Harbor. The following coastal creeks (listed from north to south) occur within the<br />

SWFWMD boundary along the "East Wall" of Charlotte Harbor: Alligator Creek, Rock Creek, Whiddon Creek, Silcox<br />

Creek, Big Mound Creek, Winegourd Creek, Zemel/Clark Creek, and Bear Branch. The land uses and land covers<br />

surrounding these creeks have been altered over the last decade, by ecological restoration and large residential<br />

development. Furthermore, a District funded project documenting smaller parcels in need of restoration identified a<br />

dozen more potential projects in this area. The coastal creeks are influenced by changes in the associated local<br />

watersheds, by volume of freshwater discharge, nutrients, true color, or a variety of other indicators. This project is<br />

monitoring seagrass to characterize its response to environmental variability associated with these coastal creeks.<br />

Benefits<br />

Understanding the affects of fresh water influences and land use changes on Charlotte Harbor seagrasses will assist<br />

the District in identifying restoration needs for the area and will contribute to water resource management decision<br />

making. Data collected will be utilized by the Charlotte Harbor National Estuary Program's ongoing water quality target<br />

setting efforts and will provide supplemental information for the District Biennial Seagrass Mapping project (W331).<br />

Costs<br />

The FY2008 budget is $40,000, with the Charlotte Harbor Environmental Center and the District each contributing half<br />

($20,000). The District share is split between the Peace River Basin Board ($<strong>10</strong>,000) and State SWIM ($<strong>10</strong>,000).<br />

District funds shown in the table include staff salaries.<br />

Additional Information<br />

Estuarine submerged aquatic vegetation (SAV) communities of Charlotte Harbor include several species of<br />

seagrasses, epiphytes, and macroalgae. These important components of estuarine ecology provide food, habitat, and<br />

other "functions" that support a myriad of ecological and economic relationships, blue crabs, snook, and snook fishing<br />

among them. Seagrasses depend on a balance of salinity and nutrients to survive. Several studies published in the<br />

last five years report declines in water quality of the area, while two recent reports using a variety of data sources<br />

suggest either no change or decreasing seagrass abundance and distribution in Charlotte Harbor proper, within<br />

District boundaries.<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin <strong>10</strong>,732 724 709<br />

0 12,165<br />

District Budgeted - Outside Revenue<br />

State Trust Funds (SWIM) <strong>10</strong>,731 724<br />

0<br />

0 11,455<br />

WMLTF (SWIM) - Prior Year Funds 0 0 709<br />

0<br />

709<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$24,329<br />

Critical Project Milestones Projected Amended Actual<br />

1. Contract Developement and Execution<br />

Draft Purchase Order Scope of Work Submitted to District 6/30/07 9/1/07 2/5/08<br />

020 - Peace River Basin 63


W557<br />

Characterizing Seagrass Communities of Eastern Charlotte Harbor<br />

District Processing of Purchase Order <strong>10</strong>/1/07 11/15/07 2/19/08<br />

Notice to Proceed <strong>10</strong>/2/07 12/1/07 3/5/08<br />

Purchase Order Termination 6/11/08 8/30/09<br />

2. Project Tasks<br />

Project Kick-off <strong>Meeting</strong> <strong>10</strong>/15/07 3/15/08 3/15/08<br />

Seagrass and Water Quality Sampling to Begin 11/1/07 3/31/08 3/31/08<br />

First Progress Report 12/31/07 7/31/08 7/31/08<br />

Second Progress Report 3/31/08 <strong>10</strong>/31/08 <strong>10</strong>/31/08<br />

Third Progress Report 6/30/08 2/28/09 2/28/09<br />

Fourth Progress Report and Draft Final Report 9/30/08 6/30/09 8/3/09<br />

Project Status and Report Review <strong>Meeting</strong> <strong>10</strong>/15/08 6/4/09 6/4/09<br />

Final Report 12/31/08 8/31/09<br />

Laboratory Data Products Submitted by Mote Marine Laboratory 5/8/09 8/15/09 8/15/09<br />

Status As Of: September 01, 2009<br />

A purchase order for the project was opened on March 5, 2008. CHEC was given their notice to proceed with receipt of<br />

the purchase order. The first quarter sampling for the project was anticipated to be completed by March 31, 2008,<br />

coordination with CHEC's outside lab required delay of the sampling. A purchase order modification was processed to<br />

extend the project's time line and sampling schedule. A second purchase order modification extended the termination<br />

date to December 31, 2009 in order for the cooperator to complete the final deliverables.<br />

020 - Peace River Basin 64


W559<br />

Assessment of 2008 Seagrass Maps in Charlotte Harbor And Lemon<br />

Bay<br />

Project Type SWIM<br />

AOR(s)<br />

Natural Systems<br />

Basin(s) Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager KAUFMAN, KRIS<br />

Task Manager(s)<br />

Status Ongoing<br />

Charlotte Harbor Environmental Center<br />

Description<br />

This FY2009 SWIM cooperative funding project will assess the accuracy of mapping classifications used in the<br />

District's ongoing Biennial Seagrass Mapping Project (See W331). This effort will supplement the District's well<br />

established accuracy assessment of the maps. While the District assesses the project's ability to correctly identify the<br />

presence of seagrass, the cooperative funding project will conduct a more in-depth evaluation of the mapping<br />

categories: patchy seagrass, continuous seagrass, and tidal flat. Estimates of inter-annual change in seagrass habitat<br />

based on aerial photos finds little change between habitat classes during the past nearly 20 years of study. However, a<br />

recent analysis of more localized data from the Florida DEP seagrass transect data (CHEC 2006) found decreases in<br />

abundance and distribution of seagrasses around Charlotte Harbor and Lemon Bay. Furthermore, of the quadrats<br />

sampled by DEP that occurred in tidal flat polygons, most did contain some seagrass, some up to 25% coverage. The<br />

following tasks regarding the 2008 seagrass maps produced by the District for the Charlotte Harbor and Lemon Bay<br />

segments are proposed for this project: 1. assess map accuracy by defining spatial variability of seagrass abundance<br />

in classified polygons using variation in percent cover by seagrass in square-meter quadrats; 2. quantify seagrass<br />

abundance in classified polygons using percent cover by seagrass in square-meter quadrats; 3. describe abundance<br />

and distribution of seagrass at its deepest depth of occurrence to verify map estimates of deep edge/maximum depth<br />

of distribution of seagrass species. The public will be able to access all data via www.checflorida.org.<br />

Benefits<br />

This project will provide the District and end users of District seagrass maps with new highly detailed information on<br />

the accuracy of classifying seagrass as patchy or continuous. The District, county governments, and Estuary Programs<br />

will be able to use the data in ongoing water quality/water clarity target setting and other resource protection projects.<br />

Costs<br />

The FY2009 project cost is $40,000, with CHEC and the District each contributing half ($20,000). The District share is<br />

split between Peace River and Manastoa Basin Boards ($5,000 each) and State SWIM ($<strong>10</strong>,000).<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 0 5,402 709<br />

0 6,111<br />

0<strong>21</strong> Manasota Basin 0 5,402 709<br />

0 6,111<br />

District Budgeted - Outside Revenue<br />

State Trust Funds (SWIM) 0 <strong>10</strong>,802<br />

0<br />

0 <strong>10</strong>,802<br />

WMLTF (SWIM) - Prior Year Funds 0 0 1,418<br />

0 1,418<br />

Project Funds Not Budgeted by the<br />

District<br />

Charlotte Harbor Environmental Center 0 20,000<br />

0<br />

0 20,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$44,442<br />

Critical Project Milestones Projected Amended Actual<br />

020 - Peace River Basin 65


W559<br />

Assessment of 2008 Seagrass Maps in Charlotte Harbor And Lemon<br />

Bay<br />

1. Contract Development and Execution<br />

Finalize scope of work and process purchase order <strong>10</strong>/1/08 12/31/08 1/<strong>21</strong>/09<br />

Notice to Proceed <strong>10</strong>/5/08 1/<strong>21</strong>/09<br />

Purchase Order Termination 9/30/09 12/31/09<br />

2. Critical Milestone<br />

Project Kick Off <strong>Meeting</strong> <strong>10</strong>/15/08 1/9/09 1/9/09<br />

Field Work Commenced 4/15/09 1/26/09 1/26/09<br />

First Progress Report 6/15/09 1/30/09 3/27/09<br />

2. Critical Milestone<br />

Second Progress Report 2/27/09 6/5/09 6/5/09<br />

Third Progress Report 3/27/09 6/5/09 6/5/09<br />

Draft Final Report 5/29/09 8/24/09<br />

Final Report 6/26/09 9/<strong>21</strong>/09<br />

Status As Of: September 01, 2009<br />

The project scope of work was finalized and submitted on December 31, 2008. A purchase order with attached scope<br />

was opened. District and CHEC staff held a project meeting January 9, 2009 to discuss project scheduling and project<br />

design. Field work for the District's classification accuracy assessment was completed April 2009. District and cooperator<br />

staff met June 4, 2009 to discuss project progress and final report formatting. The purchase order and associated scope<br />

of work were revised for time extensions of project milestones.<br />

020 - Peace River Basin 66


W776<br />

SWIM Plan Implementation - Winter Haven<br />

Project Type SWIM<br />

AOR(s)<br />

Water Quality, Natural Systems<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Winter Haven<br />

Project Manager SZAFRANIEC, MARY<br />

Task Manager(s)<br />

Status Ongoing<br />

GARCIA, LIZANNE<br />

Description<br />

This project provides for the administration and implementation of projects as outlined in the SWIM Plan for the Winter<br />

Haven Chain of Lakes. The FY2009 budget will include staff salaries and administrative costs to implement projects in<br />

the SWIM Plan. Administration and implementation includes assessment of implementation progress, a development<br />

of a Pollutant Load Reduction Goal (PLRG) for the waterbody, periodic SWIM Advisory Committee meetings, new<br />

project development (rationale and justification), development of relevant contracts and Requests for Proposals,<br />

invoicing, project related presentations, field visits, and miscellaneous duties as they arise.<br />

Benefits<br />

This project's support of the Winter Haven SWIM Plan creates an opportunity for a cohesive effort between the District,<br />

and other state and local agencies to better implement resource management decisions and restoration activities.<br />

SWIM projects are eligible for state matching funds with the state funding 50 percent of the project costs and the<br />

District funding the remaining 50 percent.<br />

Costs<br />

The FY20<strong>10</strong> ongoing costs for the Winter Haven Chain of Lakes SWIM Plan Implementation is funded 50 percent<br />

from the Peace River Basin, and 50 percent from the State SWIM Program and include staff salary, travel and central<br />

garage.<br />

Additional Information<br />

The Winter Haven Chain of Lakes (WHCL) is a priority waterbody on the District's Surface Water Improvement and<br />

Management (SWIM) priority list. The WHCL is composed of 19 interconnected lakes located in and around the City<br />

of Winter Haven in north-central Polk County. The first WHCL SWIM Plan was completed in 1990 and updated in<br />

1998. The WHCL SWIM Plan proposed to continue implementing stormwater treatment projects as funding becomes<br />

available. This project provides for the administration and implementation of the projects as outlined in the adopted<br />

SWIM Plan, which includes setting a pollutant load reduction goal (PLRG). The State of Florida water policy requires<br />

the District to set a PLRG for each of its water bodies and to adopt the PLRG in a SWIM plan, other watershed<br />

management plan, or District-wide or basin specific plan. Lakes in the chain express some of the best and poorest<br />

water quality in the state. The management of the system is complicated by the lakes being connected. The objective<br />

of the recently completed PLRG modeling project was to use either the District's Linked Watershed/Waterbody model<br />

(LWWM) or other appropriate watershed and waterbody models to simulate pollutant loadings to and water quality<br />

dynamics in WHCL to finalize the PLRG for the WHCL. This model and the Winter Haven Chain of Lakes Water and<br />

Nutrient Budget (PBSJ, September 2004) will be used in the planned next SWIM Plan update. This update was<br />

anticipated in FY2007. This update has been deferred until the City of Winter Haven and the District complete the<br />

Chain of Lakes Water Quality Management Plan (W796). In addition to this project, the District and the City are<br />

implementing a Sediment Removal Feasibility (W794) study for three lakes in the Chain as well as additional<br />

stormwater treatment projects.<br />

020 - Peace River Basin 67


W776<br />

SWIM Plan Implementation - Winter Haven<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 47,1<strong>21</strong> 5,620 3,089<br />

0 55,830<br />

District Budgeted - Outside Revenue<br />

State Trust Funds (SWIM) 13,427 5,620<br />

0<br />

0 19,047<br />

State Trust Funds (SWIM) - Prior 2006 50,541 0<br />

0<br />

0 50,541<br />

WMLTF (SWIM) - Prior Year Funds 0 0 3,089<br />

0 3,089<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$128,507<br />

Critical Project Milestones Projected Amended Actual<br />

1. PLRG Consultant Agreement Development and Execution<br />

Contract Executed <strong>10</strong>/1/02 9/17/02<br />

Collecting and Analyzing Existing Data 4/5/03 1/27/03<br />

Notice To Proceed <strong>10</strong>/5/03 9/23/02<br />

PLRG Simulations 7/31/04 <strong>10</strong>/31/04 <strong>10</strong>/31/04<br />

Final Project Report 9/30/04 12/31/04 12/30/04<br />

PLRG Contract Close Out 12/31/04 3/15/05<br />

2. Critical Project Milestones<br />

Begin SWIM Plan Update 12/30/06 6/8/<strong>10</strong><br />

Complete SWIM Plan Update 5/1/<strong>10</strong> 12/8/<strong>10</strong><br />

Status As Of: September 09, 2009<br />

The Florida Department of Environmental Protection (FDEP) has developed Total Maximum Daily Loads (TMDL) for<br />

phosphorus for eight lakes in the Southern Chain (Cannon, Howard, Idylwild, Jessie, Lulu, May, Mirror, and Shipp).<br />

District staff are participating with the FDEP, the City or Winter Haven and other stakeholders in the preparation of a<br />

Basin Management Action Plan (BMAP), which is the next step in the FDEP's TMDL process. The District is working with<br />

the City of Winter Haven on the Chain of Lakes Water Quality Management Plan (W796). This study will incorporate<br />

existing information, obtain additional data, and use the previously developed nutrient budget and pollutant load reduction<br />

goal (PLRG) studies to develop empirical water quality models of the lakes. The water quality models will be used to<br />

evaluate alternatives and best management practices that could be used to meet the TMDLs and PLRGs. The results of<br />

the this study (W796), the PLRG study and, upon completion, the results of the Sediment Removal Feasibility Study<br />

(W794) will be used for the SWIM Plan update. Updates for these projects may be found under the appropriate project<br />

numbers.<br />

020 - Peace River Basin 68


W781<br />

South Lake Conine Watershed Restoration Project<br />

Project Type SWIM<br />

AOR(s)<br />

Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Winter Haven<br />

Project Manager SZAFRANIEC, MARY<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This project is in response to a cooperative funding request from the City of Winter Haven for a watershed restoration<br />

project that will provide water quality improvement to stormwater discharging into South Lake Conine and will consist<br />

of design, permitting, and construction of the project. Lake Conine is a 236 acre lake within the Winter Haven Northern<br />

Chain of Lakes, which has been classified as a Surface Water Improvement and Management (SWIM) priority<br />

waterbody. During the 1970's and 1980's, Lake Conine had some of the worst water quality in Polk County. The<br />

primary reason for this degradation was the inflow of treated wastewater from the City of Winter Haven's Wastewater<br />

Treatment Plant #2. In 1990, the treatment plant discharge was removed from the lake and converted to reuse water<br />

for irrigation. Since the removal of the wastewater discharge, the water quality of the lake has improved but remains<br />

poor. Lake Conine has been identified as an impaired waterbody by the Florida Department of Environmental<br />

Protection. One of the primary pollution sources is a 228 acre highly urbanized watershed that discharges untreated<br />

stormwater to the south side of the lake. This untreated stormwater is the subject of this proposed project. It is<br />

estimated that this drainage area annually discharges: 495 pounds of phosphorus; 2,255 pounds of nitrogen; 365<br />

pounds of heavy metals; 63,452 pounds of suspended solids; and <strong>10</strong>,164 pounds of oxygen demanding substances<br />

(Dames and Moore, 1990) into Lake Conine. The treatment of this drainage area is listed as a priority in the Winter<br />

Haven Chain of Lakes SWIM Plan.<br />

Benefits<br />

The goal of this project will be to remove approximately 70% of the stormwater pollution from the subject watershed by<br />

using physical, chemical and biological processes. The proposed project would be 33.5 acres in size and would<br />

ultimately include parking, walking paths, boardwalks, fishing piers, and educational exhibits which would be funded by<br />

the City in the future. Additional project benefits include: wildlife habitat improvement through wetland enhancement;<br />

flood storage and watershed hydrologic benefits; groundwater recharge; and water conservation.<br />

Costs<br />

The total project cost is $1,200,000, with the City and the Distrct each contributing half ($600,000). The City's share<br />

includes $112,000 for land acquisition. The District's share is phased over multiple years. The District's FY2009<br />

budget totals $267,500, and is split 50/50 between the Peace River Basin Board and State SWIM ($133,750.) District<br />

funds shown in the table include staff salaries.<br />

Additional Information<br />

The Winter Haven Chain of Lakes is a District Surface Water Improvement and Management (SWIM) priority<br />

waterbody and consists of 19 interconnected lakes divided into a southern and northern chain. Many of these lakes<br />

have been negatively impacted through historical point and non-point sources of pollution and many have been listed<br />

as impaired. The South Lake Conine Watershed Restoration Project is consistent with the District's SWIM Plan for the<br />

Winter Haven Chain of Lakes.<br />

020 - Peace River Basin 69


W781<br />

South Lake Conine Watershed Restoration Project<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 173,661 137,7<strong>21</strong> 2,481<br />

0 313,863<br />

District Budgeted - Outside Revenue<br />

State Trust Funds (SWIM) 173,659 137,720<br />

0<br />

0 311,379<br />

WMLTF (SWIM) - Prior Year Funds 0 0 2,480<br />

0 2,480<br />

Project Funds Not Budgeted by the<br />

District<br />

City of Winter Haven 329,500 267,000<br />

0<br />

0 596,500<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$1,224,222<br />

Critical Project Milestones Projected Amended Actual<br />

1. Contract Development and Execution<br />

Draft agreement sent to Management Services 12/31/06 12/31/06<br />

Draft agreement returned from Management Services 1/19/07 2/16/07<br />

Agreement sent to Cooperator 1/26/07 2/19/07<br />

Signed Agreement returned from Cooperator 2/23/07 5/31/07<br />

Agreement fully executed 3/9/07 6/7/07<br />

Notice to Proceed 3/16/07 6/7/07<br />

2. Project Tasks<br />

Design and Permitting complete 12/31/08 2/28/<strong>10</strong><br />

Construction complete 12/31/09 12/31/<strong>10</strong><br />

3. Agreement Expiration Dates<br />

Agreement expiration 12/31/<strong>10</strong><br />

Status As Of: September 09, 2009<br />

A cooperative agreement with the City of Winter Haven was executed on 6/7/07. The City and the District accepted the<br />

Scope of Work submitted by the Consultant on 2/22/08. The agreement between the City and the Consultant was<br />

approved by the City Commission on 3/<strong>10</strong>/2008. Notice to proceed was issued on 3/18/2008, via Task Order #1. The<br />

Consultant is now gathering and analyzing preliminary data that is needed to complete design and permitting.<br />

020 - Peace River Basin 70


W794<br />

Winter Haven Chain of Lakes Sediment Removal Feasibility Study<br />

Project Type SWIM<br />

AOR(s)<br />

Water Quality<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Winter Haven<br />

Project Manager GARCIA, LIZANNE<br />

Task Manager(s)<br />

Status Ongoing<br />

SZAFRANIEC, MARY<br />

Description<br />

This study will quantify the nutrient inputs from sediment into Lakes May, Shipp and Lulu in the Southern Chain of<br />

Lakes in Winter Haven. The project will also study the feasibility to remove or inactivate the sediments if they are found<br />

to be contributing significant amounts of nutrients to the overlying water column. If sediment removal or inactivation is<br />

feasible, the City would request funding in future years for implementation of the study recommendations. This initial<br />

study will also identify additional information required to perform future design and permitting work. City staff<br />

recommends that the benefits of muck removal should be reviewed while opportunities for land acquisition for<br />

sediment disposal still exist. The City would be responsible for hiring a consultant to perform the study.<br />

Benefits<br />

The project will assist the District and the City of Winter Haven in making management decisions regarding the<br />

removal or inactivation of sediments from the Lakes May, Shipp and Lulu to improve water quality.<br />

Costs<br />

The FY2005 project cost was $150,000 with the City of Winter Haven and the District each contributing half ( $75,000).<br />

The District's share is split between the Peace River Basin Board ($30,000) and the State SWIM Program ($45,000).<br />

The FY2009 ongoing costs shown in the table include staff salary, travel and central garage related to project<br />

management.<br />

Additional Information<br />

The Winter Haven Chain of Lakes is a SWIM priority water body. The SWIM Plan for the Winter Haven Chain of<br />

Lakes references the need to quantify the effects of nutrient loading from sediments to the overlying water column.<br />

The Southern Chain of Lakes in Winter Haven has historically been subject to numerous point and non-point sources<br />

of pollution. All point sources of pollution have been removed from the lakes but the lingering effects of these<br />

discharges remain. Non-point sources of pollution have discharged into all of the above mentioned lakes through<br />

drainage pipes carrying untreated stormwater and the City, in cooperation with the District, has implemented several<br />

stormwater treatment projects throughout the Chain. City staff performed a survey of the accumulated sediments in<br />

Lakes Howard, May, Shipp and Lulu in 1994. An estimated 2.9 million cubic yards of unconsolidated organic<br />

sediments exist in the bottom of the four mentioned lakes. In Lake May, the average depth of these sediments<br />

approaches 7 feet resulting in the sediment/water interface being within 3.5 feet of the water's surface during low<br />

water, allowing wind, wave and boat action to re-suspend the sediments on a continual basis.<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 39,401 2,439 2,462<br />

0 44,302<br />

District Budgeted - Outside Revenue<br />

State Trust Funds (SWIM) 7,072 2,439<br />

0<br />

0 9,511<br />

State Trust Funds (SWIM) - Prior 2006 48,490 0<br />

0<br />

0 48,490<br />

WMLTF (SWIM) - Prior Year Funds 0 0 2,462<br />

0 2,462<br />

Project Funds Not Budgeted by the<br />

District<br />

City of Winter Haven 75,000 0<br />

0<br />

0 75,000<br />

020 - Peace River Basin 71<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$179,765


W794<br />

Winter Haven Chain of Lakes Sediment Removal Feasibility Study<br />

Critical Project Milestones Projected Amended Actual<br />

1. Contract Development and Execution<br />

City of Winter Haven approve agreement 4/15/05 2/22/05<br />

District approve agreement 6/15/05 3/4/05<br />

Notice to proceed sent for agreement 8/15/05 3/9/05<br />

2. Project Phases<br />

Phase I Organic Sediment Study Complete 8/30/06 2/27/07 3/30/07<br />

Phase II Feasibility Study Complete 12/30/06 12/31/07 3/30/07<br />

Final report submitted 8/30/07 11/18/09<br />

3. Agreement Expiration Date<br />

Contract Expiration 12/31/07 1/31/<strong>10</strong><br />

Status As Of: August 28, 2009<br />

The City's consultant collected water and sediment quality and hydrologic data in Lakes May, Shipp and Lulu from<br />

August 2005 to June 2006 to develop water and nutrient budgets that were used to calibrate water quality models for<br />

each of the lakes. The model was then used to evaluate potential improvement of in-lake water quality by removing<br />

sediments from the lakes. The final report for Phase I was received in June 2007 and recommended that sediments be<br />

removed from Lake May and sediments in Lakes Shipp and Lulu be treated with alum to prevent nutrient influx into the<br />

water column. The preliminary cost estimate for sediment removal and inactivation in the three lakes was $7.4 million. In<br />

May 2008, the City's consultant recommended a revision to the original proposal that exceeded the amount of funds<br />

remaining in the cooperative funding agreement. Lakes May and Shipp were identified as priorities for additional data<br />

collection and the total proposed cost for the enhanced data collection is approximately $65,000. The City agreed to<br />

cover the costs above the amount remaining in the cooperative funding agreement. The District approved the scope of<br />

work and the consultant began collecting groundwater seepage data and data related to sediment phosphorus release.<br />

This data collection was to have been completed by January 2009. However, the consultant extended the data collection<br />

at his own cost to improve the data set. As of the last write up, the City and its consultant anticipated collecting additional<br />

data through July 2009 in an attempt to gather data during a period when the sediments become anoxic. Due to some<br />

delays with the sampling equipment, the City and its consultant plan to sample through October 2009. The City has<br />

pledged that they would cover any additional costs as they believe the data will be useful for the Winter Haven Chain of<br />

Lake Water Quality Management Plan (W796). The City requested a no cost time extension to allow for the additional<br />

data collection and completion of the final report. The Second Amendment to the Agreement to allow for the no cost time<br />

extension was fully executed prior to the expiration date of the agreement. The updated schedule is reflected in the<br />

milestones section of this write-up.<br />

020 - Peace River Basin 72


W796<br />

Chain of Lakes Water Quality Management Plan<br />

Project Type SWIM<br />

AOR(s)<br />

Water Quality, Natural Systems<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Winter Haven<br />

Project Manager SZAFRANIEC, MARY<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This project is in response to a funding request from the City of Winter Haven to create water quality management<br />

action plans for the Winter Haven Chain of Lakes. The Winter Haven Chain of Lakes is a District Surface Water<br />

Improvement and Management (SWIM) priority waterbody and consists of 19 interconnected lakes divided into a<br />

southern and northern chain. This project is consistent with the Winter Haven Chain of Lakes SWIM Plan. Many of<br />

these lakes have been negatively impacted through historical point and non-point sources of pollution and many have<br />

been listed as impaired. The project involves incorporating existing information, obtaining additional data, and using<br />

the previously developed nutrient budget and pollutant load reduction goal (PLRG) studies to develop water quality<br />

models of the lakes. The existing water quality models will be used to evaluate alternatives and best management<br />

practices that could be used to meet the TMDLs and PLRGs. A water quality management plan will be created with<br />

affected stakeholders, including governmental agencies, homeowners, special interest groups and interested citizens.<br />

All sources of pollution, including stormwater, point sources, sediments, and septic tanks will be addressed in the plan.<br />

Benefits<br />

The plan will give specific recommendations of projects that could be used to meet the SWIM Plan water quality<br />

goals and PLRGs, as well as FDEP's TMDL goals. The Plan will also provide cost estimates for the recommended<br />

projects and identify potential cooperators for project implementation.<br />

Costs<br />

The total project cost is $250,000, with the City of Winter Haven and the District each contributing 50 percent of the<br />

necessary funding. The Peace River Basin Board is funding 50% of the District's share ($62,500) and the remaining<br />

50% ($62,500) will come from State SWIM funds. District funds shown in the table include staff salaries.<br />

Additional Information<br />

The Winter Haven Chain of Lakes is composed of 19 interconnected lakes within and around the City of Winter Haven<br />

in north central Polk County. Extreme hydrologic changes to the lakes and the high degree of urbanization have<br />

increased nutrient loading to the lakes and degraded water quality. The SWIM Plan for the Winter Haven Chain of<br />

Lakes focuses on implementing stormwater treatment projects to improve water quality. The objectives of this project<br />

are consistent with this goal.<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 78,024 4,849 2,768<br />

0 85,641<br />

District Budgeted - Outside Revenue<br />

State Trust Funds (SWIM) 78,023 4,848<br />

0<br />

0 82,871<br />

Winter Haven - Chain of Lk WS Mgmt<br />

Plan (SWIM)<br />

125,000 0<br />

0<br />

0 125,000<br />

WMLTF (SWIM) - Prior Year Funds 0 0 2,767<br />

0 2,767<br />

Project Funds Not Budgeted by the<br />

District<br />

City of Winter Haven 125,000 0<br />

0<br />

0 125,000<br />

020 - Peace River Basin 73<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$4<strong>21</strong>,279


W796<br />

Chain of Lakes Water Quality Management Plan<br />

Critical Project Milestones Projected Amended Actual<br />

1. Contract Devlopment and Execution<br />

Contract Executed 12/31/05 3/31/06 9/15/06<br />

Notice to Proceed 1/6/06 3/31/06 9/22/06<br />

Amendment Executed 12/26/08 2/4/09 2/4/09<br />

2. Project Phases<br />

Completion of Phase I - Evaluation of Existing Information 7/1/07 11/1/07 1/12/08<br />

Completion of Phase II - Evaluation of Existing Conditions 3/1/08 2/<strong>10</strong>/<strong>10</strong><br />

Completion of Phase III - Preparation of Water Quality Master Plan 11/1/08 7/15/<strong>10</strong><br />

3. Agreement Expiration Date<br />

Agreement to expire 12/31/08 12/31/<strong>10</strong><br />

4. Project Completion<br />

Project Completion 12/31/09 8/31/<strong>10</strong><br />

Status As Of: September 09, 2009<br />

The agreement with the City was executed September 15, 2006. The consultant began Phase I tasks in June 2007. In<br />

Phase I of the project, the Consultant evaluated existing information which includes collection, review and compiling of<br />

existing surface water, groundwater, stormwater and sediment quality and quantity information, data and studies to<br />

achieve a thorough understanding of available information and science in the Winter Haven Chain of Lakes. Phase I<br />

Data Evaluation has been completed and a report has been received. A coordination meeting was held during which the<br />

FDEP requested that Phase II of this project be put on hold until additional data collection by the FDEP is completed. The<br />

result of the additional data collection by the FDEP was a Pre-BMAP Report, which was submitted to the City and the<br />

District by the FDEP's consultant to be incorporated into this project's efforts. This information will be used in Phase II of<br />

the project. A no-cost time extension 1st Amendment has been executed with an expiration date of December 31, 20<strong>10</strong>.<br />

020 - Peace River Basin 74


W798<br />

Winter Haven Downtown Watershed Improvement Plan<br />

Project Type SWIM<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Winter Haven<br />

Project Manager THORNTON, SHELLEY<br />

Task Manager(s)<br />

Status Ongoing<br />

SZAFRANIEC, MARY<br />

Description<br />

This project is in response to a FY20<strong>10</strong> cooperative funding request from the City of Winter Haven and Polk County.<br />

The project will incorporate Low Impact Development (LID) and stormwater Best Management Practices (BMPs) into<br />

the City's lakes management goals thereby improving the water quality of runoff entering surface water and the<br />

surficial aquifer. The project will result in improved stormwater treatment over traditional design methods through the<br />

installation or creation of rain gardens, improved swales, small isolated wetlands and other passive treatment methods<br />

within the downtown area of the City of Winter Haven and the outlying neighborhoods. The project will prioritize those<br />

areas based upon cost, water quality/environmental benefit, permitability, and practicality for construction. Finally,<br />

selected areas will then be brought forward for the design, permitting and construction of BMP's, following concepts of<br />

LID, in an effort to reduce nutrient concentrations in the Chains of Lakes.<br />

Benefits<br />

Most of downtown Winter Haven is located within the Northern and Southern Chain of Lakes watersheds, which are<br />

Surface Water Improvement and Management (SWIM) priority waterbodies. The Chains of Lakes are composed of 24<br />

interconnected lakes within and around the City of Winter Haven in north central Polk County. Hydrologic changes to<br />

the lakes and the high degree of urbanization have increased nutrient loading to the lakes and degraded water quality.<br />

The SWIM Plan for the Winter Haven Chain of Lakes focuses on implementing stormwater enhancement projects to<br />

improve water quality. The objectives of this project are consistent with this goal.<br />

Costs<br />

The total project budget is $125,000, with the City of Winter Haven and the District each contributing half $62,500.<br />

District funds shown in the table include staff salaries.<br />

Additional Information<br />

The proposed project is part of a larger effort funded by Winter Haven called the Sustainable Water Resources<br />

Management Plan (SWRMP). The objective of this plan is to preserve and protect the surface and ground water<br />

resources of Winter Haven for human and environmental use. The backbone of the plan is an interconnected,<br />

hydrologic network of lakes, canals, wetlands, aquifers, open spaces, and parks designed to meet the long-term water<br />

resource needs of the community. The Winter Haven Downtown Watershed Improvement Plan focuses on the<br />

development of a specific plan for LID/BMP improvements, the resulting potential project list within the downtown and<br />

neighborhood areas of the city, and the design, permitting and construction of those identified projects. The overall<br />

SWRMP will be closely coordinated with the District's Watershed Management Plan to meet the objectives of both<br />

plans. Other Items that might be included 1) Public Outreach Program to encourage homeowner use of rain gardens<br />

or other LID practices 2) Highlight the creation of natural systems in small isolated wetlands as a wildlife benefit 3)<br />

Potential for addressing local flooding issues 4) Mitigation banking opportunities within Winter Haven 5) Productive<br />

use of reclaimed water as applied to this project.<br />

020 - Peace River Basin 75


W798<br />

Winter Haven Downtown Watershed Improvement Plan<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 0 0 31,367 62,500 93,867<br />

District Budgeted - Outside Revenue<br />

WMLTF (SWIM) - Prior Year Funds 0 0 31,366<br />

0 31,366<br />

Project Funds Not Budgeted by the<br />

District<br />

City of Winter Haven 0 0 62,500 31,250 93,750<br />

Polk County Natural Resources 0 0<br />

0 31,250 31,250<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$250,233<br />

Critical Project Milestones Projected Amended Actual<br />

1. Contract Development and Execution<br />

Draft agreement sent to Management Services 9/28/09<br />

Agreement returned from Management Services <strong>10</strong>/19/09<br />

Agreement sent to Cooperator <strong>10</strong>/19/09<br />

Signed agreement returned from Cooperator 12/1/09<br />

Agreement fully executed 12/31/09<br />

Notice to Proceed 12/31/09<br />

Status As Of: September 01, 2009<br />

A scope of work has been requested from the Cooperator. Once received, the agreement will be prepared.<br />

020 - Peace River Basin 76


B063<br />

USGS Peace River Basin Surface Water Flow, Level, and Water<br />

Quality Data Collection<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers, Pinellas-Anclote River,<br />

Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

United States Geological Survey<br />

Project Manager KINSMAN, GRANVILLE<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This initiative is to establish and maintain the Peace River Basin's surface water monitoring network, and is jointly<br />

funded by the Peace River Basin Board and the United States Geological Survey (USGS).<br />

Benefits<br />

This project provides basic surface water stage, discharge and/or water quality data collection to support assessing<br />

flooding events, developing surface water management plans, facilitating habitat restoration projects, establishment<br />

and monitoring of minimum flows and levels (MFLs), establishment of total maximum daily loads (TMDLs), land<br />

acquisition and management, and other critical water management activities.<br />

Costs<br />

In FY2009, surface water stage, discharge and/or water quality is measured at 39 sites in the Peace River Basin for a<br />

cost of $434,900. These sites are: Tiger Creek near Babson Park, Livingston Creek near Frostproof, Carter Creek<br />

near Sebring, Josephine Creek near DeSoto City, Peace Creek Drainage Canal near Wahneta, Saddle Creek at SH<br />

542 near Lakeland, Lake Parker Outlet near Lakeland, Saddle Creek at Structure P11 near Bartow, Peace River at<br />

Bartow, Peace River at Ft Meade, Whidden Creek near Ft. Meade, Bowlegs Creek near Ft. Meade, Payne Creek near<br />

Bowling Green, Thompson Branch near Wauchula, Peace River at Zolfo Springs, Charlie Creek near Gardner, Peace<br />

River at Arcadia, Hawthorne Creek at 760A near Nocatee, Joshua Creek at Nocatee, Horse Creek near Myakka<br />

Head, Horse Creek at SR 665 near Limestone, Horse Creek near Arcadia, Horse Creek near Nocatee, Prairie Creek<br />

near Fort Ogden, Shell Creek near Punta Gorda, Prairie Creek at Washington Loop Road, Shell Creek at Washington<br />

Loop Road, Peace Creek near Bartow, Peace River near Bartow, Six Mile Creek near Clear Springs, Barber Branch<br />

near Homeland, Peace River at Clear Springs, Peace River near Homeland, Phosphate Mine Outfall CS-8 near<br />

Bartow, and Charlie Creek near Crewsville. In FY2009, no changes were made to the data collection program in the<br />

Peace River Basin. The increase in FY2009 reflects an annual adjustment to pricing by the USGS. In FY20<strong>10</strong>,<br />

funding for this program will be transferred from the Peace River Basin Board to the Governing Board, and will be<br />

funded under the project code Z661.<br />

020 - Peace River Basin 77


B063<br />

USGS Peace River Basin Surface Water Flow, Level, and Water<br />

Quality Data Collection<br />

Prior Cumulative FY 2009 FY20<strong>10</strong><br />

Funding Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

887,995 0 <strong>10</strong>8,500<br />

0<br />

011 Alafia River Basin 0 996,495<br />

013 Hillsborough River Basin 1,316,655 0 1<strong>21</strong>,600<br />

0<br />

0 1,438,255<br />

014 Northwest Hillsborough Basin 227,774 0 44,700<br />

0<br />

0 272,474<br />

015 Coastal Rivers Basin 1,489,207 0 243,900<br />

0<br />

0 1,733,<strong>10</strong>7<br />

016 Pinellas-Anclote River Basin 397,932 0 57,<strong>10</strong>0<br />

0<br />

0 455,032<br />

019 Withlacoochee River Basin 1,630,847 0 296,880<br />

0<br />

0 1,927,727<br />

020 Peace River Basin 2,295,165 0 434,900<br />

0<br />

0 2,730,065<br />

0<strong>21</strong> Manasota Basin 1,036,520 0 231,900<br />

0<br />

0 1,268,420<br />

Project Funds Not Budgeted by the<br />

District<br />

USGS Alafia River Basin 585,822 0 0<br />

0<br />

0 585,822<br />

USGS Coastal Rivers Basin 409,438 0 0<br />

0<br />

0 409,438<br />

USGS Hillsborough River Basin 675,390 0 0<br />

0<br />

0 675,390<br />

USGS Manasota Basin 202,806 0 0<br />

0<br />

0 202,806<br />

USGS Northwest Hillsborough Basin 23,690 0 0<br />

0<br />

0 23,690<br />

USGS PA Basin 202,338 0 0<br />

0<br />

0 202,338<br />

USGS Peace River Basin 1,356,566 0 0<br />

0<br />

0 1,356,566<br />

USGS Withlacoochee River 789,429 0 0<br />

0<br />

0 789,429<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$15,067,054<br />

Critical Project Milestones Projected Amended Actual<br />

Install flow site on Thirty-mile Creek near Nichols <strong>10</strong>/1/00 <strong>10</strong>/1/00<br />

Install flow site on Whidden Creek near Ft. Meade <strong>10</strong>/1/00 <strong>10</strong>/1/00<br />

Install stage site on Peace River near Nocatee <strong>10</strong>/1/00 8/22/01<br />

Install stage site on Peace River near Gardner <strong>10</strong>/1/00 9/7/01 9/6/01<br />

Install stage site on Peace River near Buchanan <strong>10</strong>/1/00 11/5/01 11/5/01<br />

Install continuous gauging/conductivity station on Peace River @ Punta Gorda <strong>10</strong>/1/01 <strong>10</strong>/1/02 8/29/02<br />

Install and begin monitoring surficial aquifer wells for Lake Placid Seepage<br />

Study<br />

<strong>10</strong>/1/01 6/30/01 6/30/01<br />

Begin discharge measurements on 7 Lake Placid Seepage Study surface water<br />

sites<br />

<strong>10</strong>/1/01 6/30/01 6/30/01<br />

Add specific conductance/temp. measurements on Joshua Creek at<br />

Nocatee/Prairie Creek nr Ft. Ogden<br />

<strong>10</strong>/1/01 <strong>10</strong>/1/01<br />

Install stage/water quality site at Prairie Creek at Washington Loop Road <strong>10</strong>/1/03 1/31/04 1/31/04<br />

Install stage/water quality site at Shell Creek at Washington Loop Road <strong>10</strong>/1/03 1/31/04 1/31/04<br />

Discontinue lake level monitoring at 14 sites <strong>10</strong>/1/03 <strong>10</strong>/1/03<br />

Begin flow monitoring at Peace Ck nr Bartow <strong>10</strong>/1/03 <strong>10</strong>/1/03<br />

Begin flow monitoring at Peace R nr Bartow <strong>10</strong>/1/06 <strong>10</strong>/1/06<br />

Begin flow monitoring at Six Mile Ck <strong>10</strong>/1/06 <strong>10</strong>/11/06<br />

Begin flow monitoring at Barber Branch <strong>10</strong>/1/06 <strong>10</strong>/11/06<br />

Begin flow monitoring at Peace R. at Clear Spgs <strong>10</strong>/1/06 <strong>10</strong>/11/06<br />

Begin flow monitoring at Peace R. nr Homeland <strong>10</strong>/1/06 <strong>10</strong>/11/06<br />

Begin flow monitoring at Phosphate Mine Outfall <strong>10</strong>/1/06 <strong>10</strong>/11/06<br />

Begin flow monitoring at Charlie Ck nr Crewsville <strong>10</strong>/1/06 <strong>10</strong>/30/06<br />

020 - Peace River Basin 78


B063<br />

USGS Peace River Basin Surface Water Flow, Level, and Water<br />

Quality Data Collection<br />

Status As Of: August <strong>21</strong>, 2009<br />

FY2009 data collection is ongoing, with no problems to report. The District's FY2009 commitment to the project is<br />

$434,900, of which $<strong>21</strong>7,450 has been expended (the USGS bills us every six months for these activities).<br />

Accelerated Action-To-Date: On-time<br />

020 - Peace River Basin 79


B099<br />

Quality of Water Improvement Program - Peace River Basin<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply, Water Quality, Natural Systems<br />

Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Pinellas-Anclote River, Peace River,<br />

Manasota<br />

Cooperator(s)<br />

Project Manager STOVER, KEVIN<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

Pursuant to F.S. Ch. 373.206, any abandoned artesian well having a detrimental impact on the District's water<br />

resources must be properly plugged. The District's Quality of Water Improvement Program (QWIP) provides funding<br />

assistance to landowners to come into compliance with the statute. To increase landowner cooperation and the<br />

number of abandoned artesian wells plugged annually, without increasing staff levels, the District's Governing Board<br />

has allocated matching funds to augment the Alafia River, Hillsborough River, Northwest Hillsborough,<br />

Pinellas-Anclote River, Peace River, and Manasota Basins QWIP budget to maintain the Funding Assistance Initiative<br />

since January 1, 1994. The Funding Assistance Initiative was designed to reimburse landowners up to <strong>10</strong>0 percent of<br />

the cost to have their abandoned artesian wells plugged, with a maximum District reimbursement of $5,000 per well<br />

and $15,000 annually per landowner. This incentive has increased landowner cooperation and the number of wells<br />

plugged annually. Under the 50/50 cost sharing program, QWIP plugged an average of 50 wells per year. Under the<br />

Funding Assistance Initiative, the QWIP has reimbursed an average of approximately 200 wells per year.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 1,027,270 76,8<strong>10</strong> 389,793 659,341<br />

0 2,153,<strong>21</strong>4<br />

011 Alafia River Basin 489,957 29,850 113,808<br />

0<br />

0 633,615<br />

013 Hillsborough River Basin 185,860 <strong>10</strong>,000 29,498<br />

0<br />

0 225,358<br />

014 Northwest Hillsborough Basin 126,551 0 <strong>10</strong>,067<br />

0<br />

0 136,618<br />

016 Pinellas-Anclote River Basin <strong>10</strong>0,746 0 11,703<br />

0<br />

0 112,449<br />

020 Peace River Basin 858,005 36,960 157,143<br />

0<br />

0 1,052,<strong>10</strong>8<br />

0<strong>21</strong> Manasota Basin 1,483,799 0 200,434 <strong>10</strong>,000<br />

0 1,694,233<br />

Status As Of: August 25, 2009<br />

Total:<br />

Future<br />

Funding<br />

Since the last update ten wells have been plugged. Since the inception of the program in the mid-1970s, 777 wells have<br />

been plugged in the Peace River Basin. There are 23 additional wells that have been inspected and approved for<br />

plugging. Wells plugged since the last update are as follows: Polk County (1) Sir Richard Giodano - four inch well casing<br />

to unknown depth with a total well depth 272 feet - plugging for a well no longer in use - District reimbursement $1,648;<br />

(2) Polk County Govt. - ten inch well casing to 180 feet with a total well depth 75 feet - plugging for a well no longer in use<br />

- District reimbursement $6,000; (3) Polk Co. Parks & Rec. - four inch well casing to <strong>10</strong>0 feet with a total well depth 397<br />

feet - plugging for a well no longer in use - District reimbursement $2,<strong>21</strong>9; (4) MSD-Mattie - eight inch well casing to 200<br />

feet with a total well depth 434 feet - plugging for a well no longer in use - District reimbursement $4,466; (5) Polk Co.<br />

Utilities - ten inch well casing to 160 feet - total well depth 625 feet - plugging for a well no longer in use - District<br />

reimbursement $6,000; (6) Castro Oakbridge Venture - four inch well casing to unknown depth with a total well depth 141<br />

feet - plugging for a well no longer in use - District reimbursement $1,118; (7) Farmer Nursery - four inch well casing to<br />

unknown depth with a total well depth 137 feet - plugging for a well no longer in use - District reimbursement $1,096; (8)<br />

Irma Tomlinson - four inch well casing to 203 feet with a total well depth 288 feet - plugging for a well no longer in use -<br />

District reimbursement $2,018; 9) Edward Hines - four inch well casing to unknown depth with a total well depth 88 feet -<br />

plugging for a well no longer in use - District reimbursement $827; Highlands County - 1) Mink Associates - twelve inch<br />

020 - Peace River Basin 80<br />

Total<br />

Funding<br />

$6,007,595


B099<br />

Quality of Water Improvement Program - Peace River Basin<br />

well casing to 462 feet with a total well depth 1,174 feet - plugging for a well no longer in use - District reimbursement<br />

$5,000;<br />

020 - Peace River Basin 81


B131<br />

Hotel/Motel/Restaurant Water Conservation Program (Water<br />

CHAMP/PRO)<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply, Water Quality<br />

Basin(s) General Fund (District), Alafia River, Hillsborough River, Coastal Rivers, Pinellas-Anclote River,<br />

Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager ROE, MELISSA<br />

Task Manager(s)<br />

Status Ongoing<br />

Citrus 20/20, Inc., Citrus County, City of Bradenton, City of North Port - Public Utilities, City of<br />

Tampa, City of Venice, Hillsborough County, Longboat Key, Manatee County, Peace<br />

River/Manasota Regional Water Supply Auth., Progress Energy, Sarasota, Sarasota County,<br />

Tampa Water Department<br />

RYAN, GERALYN<br />

Description<br />

This Basin Initiative (BI) project provides education to hotel/motel management and guests with the goal of reducing<br />

water use. The District provides printed materials to all participating properties to assist owners/managers in<br />

determining ways to save water through their properties' operational processes, including, but not limited to, a towel<br />

and linen reuse program. To build on the success of Water CHAMP, the District created the Water Program for<br />

Restaurant Outreach (Water PRO) to promote water conservation in restaurants. The CHAMP coordinator will<br />

promote the program through the Florida Restaurant and Lodging Association, partnerships with utility companies,<br />

direct mail and site visits to association members and independent restaurants. Materials include a button for wait staff<br />

to wear declaring that the restaurant serves water only upon request, information tabletop displays, children's coloring<br />

sheets, coasters and bathroom mirror cling stickers promoting water conservation to be placed on bathroom<br />

mirrors. Both Water CHAMP and PRO are measured for effectiveness by number of participating properties. In<br />

addition, Water CHAMP has proven its success by conducting two water audits on participating properties in 2003 and<br />

2008.<br />

Benefits<br />

Water CHAMP provides the tools and education needed to help hotel/motel staff and guests learn to conserve water.<br />

This program measures the effectiveness of this education effort via actual water savings. The first evaluation of water<br />

savings was conducted by the City of Tampa and Pinellas County Utilities in 2002 and showed that participants saved<br />

an average of 20 gallons of water per occupied room per day. A five-year follow-up water audit was conducted in<br />

cooperation with 16 utility companies to determine the current level of water savings. The audit compared water<br />

consumption of 115 Water CHAMP participants before the program's implementation in 2002 to the amount used<br />

in 2007. The Districtwide audit showed that participants saved an average of 17 gallons of water per occupied room<br />

per day. The slight adjustment in water savings from the first audit to the five-year follow-up audit is attributed to a<br />

larger representative sample of the entire District. Based on the audit results and occupancy rates it is projected<br />

that more than 185 million gallons of water was saved by participating properties in 2009. In addition to water savings,<br />

this program has successfully prompted a change in water-use behavior as well as increased knowledge<br />

and awareness of the need for water conservation to protect the water resources.<br />

Costs<br />

The total cost of the FY20<strong>10</strong> program is $83,692 (District - $7,768; Alafia River - $3,941; Hillsborough River - $13,274;<br />

Coastal Rivers - $6,866; Pinellas-Anclote - $16,613; Withlacoochee River - $6,<strong>10</strong>7; Peace River - $15,113; Manasota -<br />

$14,0<strong>10</strong>.) District funds will be used for CHAMP/PRO properties in the Green Swamp Basin. Funds will be used to<br />

pay for CHAMP/PRO coordinator (District temporary employee) salary, travel, printed materials and costs to educate<br />

the audience and promote the programs through advertising, workshops, tradeshows, professional memberships, etc.<br />

The dollar amount allocated per basin is based on anticipated work within that basin. Based on the average number of<br />

guests exposed to the program, the estimated per person cost for the program is less than $.01. As the program<br />

grows, the cost per person decreases. The cost benefit for the project, using the total cost amortized over five years, is<br />

$0.47 per thousand gallons of water.<br />

Additional Information<br />

The total cost of the program in FY2009 was $83,692, with District funds budgeted for the first time to expand the<br />

program to support the ten hotels/motels in the Green Swamp Basin, which is administered by the Governing Board.<br />

Costs were shared as follows: District - $7,828; Alafia River - $3,550; Hillsborough River - $8,<strong>10</strong>7; Northwest<br />

Hillsborough - $4,070; Pinellas-Anclote - $17,372; Coastal Rivers - $6,563; Withlacoochee River - $6,207; Peace<br />

River - $16,271; and Manasota - $13,724. The District has supported this project since FY2002.<br />

Survey results show a 98 percent approval rating from hotel/motel guests.<br />

020 - Peace River Basin 82


B131<br />

Hotel/Motel/Restaurant Water Conservation Program (Water<br />

CHAMP/PRO)<br />

Prior Cumulative FY 2009 FY20<strong>10</strong><br />

Funding Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0 0 7,909 8,047<br />

0<strong>10</strong> General Fund (Districtwide) 0 15,956<br />

011 Alafia River Basin 16,611 0 3,713 4,096<br />

0 24,420<br />

013 Hillsborough River Basin 32,034 0 8,488 13,999<br />

0 54,5<strong>21</strong><br />

014 Northwest Hillsborough Basin 17,984 0 4,261<br />

0<br />

0 22,245<br />

015 Coastal Rivers Basin 16,614 0 6,781 7,193<br />

0 30,588<br />

016 Pinellas-Anclote River Basin 185,709 0 18,027 19,046<br />

0 222,782<br />

019 Withlacoochee River Basin 15,595 0 6,398 6,712<br />

0 28,705<br />

020 Peace River Basin 72,735 0 16,734 17,305<br />

0 <strong>10</strong>6,774<br />

0<strong>21</strong> Manasota Basin 72,491 0 14,<strong>10</strong>5 14,855<br />

0 <strong>10</strong>1,451<br />

District Budgeted - Outside Revenue<br />

Tampa - Water CHAMP (B131) 0 0 0 5,000<br />

0 5,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$612,442<br />

Critical Project Milestones Projected Amended Actual<br />

Program begins in Pinellas 6/<strong>10</strong>/02 6/<strong>10</strong>/02<br />

Program begins in Hillsborough 6/1/03 6/1/03<br />

Program begins in Citrus and Hernando 9/15/04 11/<strong>10</strong>/04 11/<strong>10</strong>/04<br />

Program begins in Manasota <strong>10</strong>/1/04 <strong>10</strong>/1/04<br />

Program begins in Peace River <strong>10</strong>/1/05 <strong>10</strong>/1/05<br />

Pilot continuing education program in Pinellas 9/1/06 8/1/08<br />

300th property signs up 6/29/07 6/29/07<br />

Education pilot program evaluation complete 1/31/08 4/1/<strong>10</strong><br />

Water PRO developed 5/15/08 5/15/08<br />

400th property signs up 6/26/08 6/26/08<br />

Districtwide water audit 12/31/08 <strong>10</strong>/31/08 <strong>10</strong>/31/08<br />

Pilot restaurant conservation kit in Hillsborough 3/16/09 7/31/09 7/28/09<br />

200th restaurant signs up 9/1/09 5/15/09<br />

Restaurant conservation kit evaluation complete 11/1/09<br />

300th restaurant signs up 12/31/09<br />

Status As Of: August 25, 2009<br />

Water CHAMP: (1) Currently, Water CHAMP has 459 participants, representing more than 49 percent of all the hotels<br />

and 68 percent of all available rooms in the District. (2) The "Sleep Well at a Water-Saving Hotel/Motel" directories have<br />

been updated and distributed to all five Florida welcome centers, the Tampa International Airport's Travelers AID office,<br />

Sarasota Convention and Visitors Bureau, Tampa Bay Beaches Chamber of Commerce in St. Pete Beach, and the<br />

Citrus County Convention and Visitors Bureau. District staff is also working with other local tourist centers to display and<br />

distribute the Water CHAMP hotel directories. (3) Basin updates are as follows: Pinellas-Anclote River Basin has<br />

approximately 322 properties; 136 are CHAMP properties. District staff cooperated with Progress Energy to complete a<br />

housekeeping manual for hotels that emphasizes conserving water and energy. The manual will be distributed during<br />

workshops in the Pinellas-Anclote, Coastal Rivers and Withlacoochee River basins. In partnership with Progress Energy,<br />

"Do Not Disturb, We are Conserving Our Energy" door hangers were purchased from Project Planet Corporation and are<br />

being distributed to hotels/motels within the Pinellas-Anclote River, Withlacoochee River and Coastal Rivers basins.<br />

Hillsborough River and Alafia River basins have approximately 186 properties; 129 are CHAMP properties. Coastal<br />

Rivers and Withlacoochee River basins have approximately 89 properties; 59 are CHAMP properties. Manasota Basin<br />

has approximately 186 properties; 77 are CHAMP properties. Peace River Basin has approximately 144 properties; 57<br />

are CHAMP properties. (4) The following city and county government cable channels are running commercials promoting<br />

020 - Peace River Basin 83


B131<br />

Hotel/Motel/Restaurant Water Conservation Program (Water<br />

CHAMP/PRO)<br />

Water CHAMP and Water PRO: the cities of Lakeland, St. Petersburg, Oldsmar and New Port Richey, and the counties<br />

of Polk, Pinellas and Manatee. Water PRO: Water PRO, an extension of the Water CHAMP program that promotes<br />

water conservation in restaurants, began in May 2008. The CHAMP coordinator promotes the program through the<br />

Florida Restaurant and Lodging Association, partnerships with utility companies, direct mail and site visits to association<br />

members and independent restaurants. In cooperation with the City of Tampa and Hillsborough County, District staff<br />

created a children's restaurant conservation kit to be distributed in Hillsborough County. Each kit includes a children's<br />

activity book, crayons and a child's tattoo. While Hillsborough County purchased the kits ($1 each) directly from the<br />

vendor, the City of Tampa is reimbursing the District $5,000 for 5,000 kits. Currently, there are 228 restaurants<br />

participating in Water PRO. ACTION TO DATE: On time.<br />

020 - Peace River Basin 84


B136<br />

Florida Automated Weather Network (FAWN) Data Dissemination<br />

and Education<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply, Water Quality<br />

Basin(s) General Fund (District), Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers,<br />

Pinellas-Anclote River, Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

University of Florida<br />

Project Manager COHEN, RON<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

The FAWN project started in 1997 and the District's involvement with the project started in 2003. This project collects<br />

and distributes weather and climatic data, and has an educational component to teach the public how to use the data<br />

to conserve water. Funding for the project was distributed over several years and is needed to continue data collection<br />

and dissemination. In FY2009 FAWN is planning additional weather schools, fact sheets and enhanced irrigation<br />

management tools. These elements will help conserve water and reduce fertilizer leaching.<br />

Benefits<br />

Increase the growers' knowledge and provide climatic data to help them reduce water use. The amount of water saved<br />

will be a function of the number of acres planted and their water use, which will change annually based on market and<br />

climatic conditions. Estimated savings are in excess of one billion gallons of water and $500,000 per hour. Therefore<br />

during a cold winter where growers could use cold protection five (5) to ten (<strong>10</strong>) nights, annual savings could be as<br />

much as ten billion gallons of water and $5 million to producers. Few winters require no cold protection, and it would be<br />

reasonable to assume this management tool would average saving five billion gallons of water and $2.5 million<br />

annually. The key to realizing these water use savings is educating the public through schools, written material, trade<br />

shows, etc. In addition to collecting the data, FAWN information is used for workshops and other public events to help<br />

teach the public the significance of weather and climatic data for water conservation and how to use the data. An<br />

in-depth weather school is held annually. FAWN has developed a youth training curriculum. In FY2008-2009 FAWN<br />

will enhance its urban program, develop more educational components and add new weather tools.<br />

Costs<br />

The FY2008 budget includes $<strong>10</strong>0,000 for the FAWN project. Half this funding ($50,000) will come from general<br />

revenue and the remaining amount will be divided evenly between the eight Basin Boards with each budgeting $6,250.<br />

Additional Information<br />

The Florida Automated Weather Network (FAWN) has been a successful, on-going, multi Agency (IFAS, FDAC,<br />

SFWMD, SJRWMD, and Industry) project with about a $500,000 annual budget. They are asking for continued<br />

funding in FY2008. The other cooperators have not yet determined their level of continued support for FAWN.<br />

FAWN's weather data has been used by local Emergency Management personal to supplement the District's and<br />

other sources' climatic data. The project was first funded by the Peace River Basin Board and later expanded to the<br />

Manasota Basin Board. This proposal is to expand the project into the Hillsborough River, Alafia and Withlacoochee<br />

Basin Boards. FAWN has recently received new commitments for additional funds from FDACS, SFWMD and<br />

SJRWMD. FAWN was created in 1997 with a legislative appropriation to the University of Florida, Institute of Food<br />

and Agricultural Sciences (UF/IFAS). These funds were used to create infrastructure and to establish 11 weather sites<br />

that were incorporated with a small UF/IFAS network of five sites in Central Florida. Over the next few years there is a<br />

plan to expand FAWN's network to 33 sites. In 2002 additional funding was obtained from the Florida Division of<br />

Emergency Management to complete the system and in 2003 the Peace River Basin Board recognized the<br />

significance of FAWN and provided a $5,000 grant. A year later the Peace River and the Manasota Basin Boards<br />

entered into a three-year agreement to provide FAWN with $15,000 per year. These funds were to help continue<br />

FAWN's data collection efforts and to expand the program's educational components. That same year FDACS,<br />

SJRWMD and SFWMD approved funds for FAWN. Currently there are <strong>10</strong> FAWN sites within the District located at:<br />

Arcadia, Balm, Bradenton, Bronson, Brooksville, Dover, Frostproof, Lake Alfred, Ona and Sebring. In addition there<br />

are several sites surrounding the District that provide useful information to the citizens of the District. Current and<br />

historical climatic data from these sites, and FAWN irrigation tools, can be accessed on the web at:<br />

http://fawn.ifas.ufl.edu/. The FAWN program was developed to provide real time weather information to help Florida<br />

citizens make informed weather related decisions. This information is used to help conserve water and protect<br />

Florida's natural systems. Irrigators use FAWN data to help determine when and how much to water. Also, FAWN<br />

data is used to assist individuals to determine when to turn off irrigation systems used for cold protection. Urban and<br />

agricultural chemical applicators use FAWN to help make decisions relative to the application of chemicals and<br />

fertilizer. FAWN has been expanded to provide on-line water/irrigation management tools that require weather inputs.<br />

Examples of these tools include insect and disease control, cold protection, irrigation, nutrient management and many<br />

more. The District's Agricultural Advisory Committee has expressed their support for the FAWN program. In addition<br />

020 - Peace River Basin 85


B136<br />

Florida Automated Weather Network (FAWN) Data Dissemination<br />

and Education<br />

to the current tools, FAWN is working with University of Florida scientists to develop others. Some of the studies<br />

already funded by the District will be used to enhance the FAWN program. For example, the Wet Bulb Irrigation Cut<br />

Off management tool has been able to allow strawberry, citrus, fern, vegetable, ornamental growers and home owners<br />

determine when it is safe to shut off irrigation systems used for cold protection.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 137,500 0 50,000 <strong>10</strong>0,000<br />

0 287,500<br />

011 Alafia River Basin 17,187 0 6,250<br />

0<br />

0 23,437<br />

013 Hillsborough River Basin 17,188 0 6,250<br />

0<br />

0 23,438<br />

014 Northwest Hillsborough Basin 17,187 0 6,250<br />

0<br />

0 23,437<br />

015 Coastal Rivers Basin 17,188 0 6,250<br />

0<br />

0 23,438<br />

016 Pinellas-Anclote River Basin 17,187 0 6,250<br />

0<br />

0 23,437<br />

019 Withlacoochee River Basin 17,188 0 6,250<br />

0<br />

0 23,438<br />

020 Peace River Basin 32,187 0 6,250<br />

0<br />

0 38,437<br />

0<strong>21</strong> Manasota Basin 32,188 0 6,250<br />

0<br />

0 38,438<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$505,000<br />

Critical Project Milestones Projected Amended Actual<br />

FY2007 Governing Board Notification 1/2/07 1/1/07<br />

Basin Board Notification 1/3/07 1/3/07<br />

FY2006 Project Ends 3/1/07 3/1/07<br />

FY2007 Data Collection 12/1/07 12/1/07<br />

FY2007 Completion Report 2/27/08 3/1/08<br />

FY2007 Project Ends 2/28/08 7/31/08 7/31/08<br />

FY2008 Contract to Cooperator 3/1/08 2/26/08<br />

FY2007 No Cost Time Extension 3/31/08 3/31/08<br />

FY2009 Contract to Cooperator <strong>10</strong>/1/08 <strong>10</strong>/1/08<br />

FY2008 Data Collection 12/31/08 12/31/08<br />

FY2008 Project Ends 2/28/09 8/31/09<br />

FY2009 Data Collection Ends 12/31/09<br />

FY2009 Completion Report 2/1/<strong>10</strong><br />

Status As Of: August 27, 2009<br />

7/1/2008 - Reviewed task 11. New years data collection has started. 9/1/2008 - Data collection continuing as planned.<br />

11/1/2008 - Reviewed irrigation and Timer fact sheets. 12/<strong>10</strong>/08 - Processed payment. 12/17/2008 - Waiting for new<br />

agreement to be executed. 3/16/2009 - Added National Weather Service forecasting tool. 4/20/2009 - Workshop in<br />

Apopka and annual meeting. 6/<strong>10</strong>/2009 - Data collection, project continuing as planned. 9/1/2009 - Reviewed task<br />

completion report and processed payments. Data collection project continuing as planned.<br />

020 - Peace River Basin 86


B163<br />

Peace R. - Historical Land Cover Mapping<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Flood Protection, Natural Systems<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Project Manager KOLASA, KEITH<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This project will provide the historical land cover information for the Peace River and the Lake Wales Ridge basins in<br />

the form of maps, tables, and a GIS database for the time period prior to the beginning of significant land and water<br />

alterations. The completed product will provide a close approximation of the Basin's condition as it was roughly<br />

<strong>10</strong>0-years ago. The project will result in: (1) an improved, definitive pre-development land cover; (2) documentation of<br />

the historical coverages of ponds, lakes, wetlands, and floodplains; and (3) documentation of the locations and extents<br />

of streams and creeks; and; (4) historic surface water levels for several of the Basin's lakes. The methodology<br />

developed during this project will be transferable to the entire Peace River Basin and to all other basins within the<br />

District. The project deliverables will benefit Peace River Basin MFL work on lakes, hydrologic and water quality<br />

restoration in the Lake Wales Ridge and Peace River basins, the development and implementation of watershed<br />

management plans, SWUCA objectives, and DOT mitigation. Considerable alteration of the watersheds in the Peace<br />

River Basin has occurred since the early 1900s, which has resulted in major changes to the physical configuration of<br />

conveyance channels, lake shorelines, and wetlands. Consequently, functional changes in the Basin's surface water<br />

systems have occurred, including the reduction of recharge capability in the upper Basin, the over drainage of lakes<br />

and wetlands, the reduction of water volume in storage in lakes and wetlands, and the loss of water quality benefits<br />

provided by unimpaired wetlands. To restore and/or retrofit the hydrologic functions of the systems in the Basin, it is<br />

critical to have information on the historical conditions that existed in the Basin before large scale alterations took<br />

place.<br />

Benefits<br />

This project will provide a GIS database describing the historical land cover and historical hydrologic resources that<br />

existed roughly <strong>10</strong>0 years ago for the Peace River Basin and the Lake Wales Ridge Basin. The information will be<br />

used to support efforts in MFLs, SWUCA, and Peace Basin restoration activities. The information is also being applied<br />

to Lake Hancock and Peace River MFL recovery projects. The final products are being used by District staff and staff<br />

from other agencies, such as by FDEP for the Peace River Cumulative Impact Study.<br />

Costs<br />

The total budget amount for this project is $412,450, of which all is being funded by the Peace River Basin Board. Due<br />

to the large size of the Peace River Basin this project was divided into three phases. Funds in FY2004 ($159,491)<br />

were used to complete the historical land cover database for Highlands County and roughly one half of Polk County.<br />

Funds in FY2005 ($168,902) are being used to complete the second half of Polk County and all of Hardee County. In<br />

FY2006 $19,656 was budgeted for staff salaries only. $64,400 was budgeted in FY2007 to complete the DeSoto<br />

County area and $56,415 was budgeted in FY2009 to combine all of the project data from the multiple phases into one<br />

geographical database. The FY2009 funds will also be used to refine the predevelopment map of the Peace Creek<br />

completed during the first phase of the project. The District funding amounts shown in the table below include staff<br />

salaries.<br />

Additional Information<br />

Modern day land cover maps are based solely on soils data and depict many areas as altered land or impacted land.<br />

This project uses a variety of historical maps and data to interpret the natural land cover that existed prior to<br />

disturbance. The data used in this project include the General Land Office Notes (GLOS) from the 1850-60 time<br />

period, early military maps and forest surveys, the 1927 soil survey maps, the 1950 soil maps, and early USGS quad<br />

maps. The first phase of the project was completed by (Jones Edmunds and Associates) JEA Consultants. The<br />

completed database was made available to all District staff on the District's GIS network. The final product was<br />

presented at both the Wetlands Scientist Conference and the ESRI Conference in 2005. The second phase of this<br />

project has been completed by HDR Consultants for the western portion of Polk County, all of Hardee County, and a<br />

portion of Highlands County. The third phase is currently underway. This project has involved three different<br />

consultant agreements.<br />

020 - Peace River Basin 87


B163<br />

Peace R. - Historical Land Cover Mapping<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 418,734 0 56,415 1,977<br />

0 477,126<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$477,126<br />

Critical Project Milestones Projected Amended Actual<br />

1. Phase I (Highlands and Polk)<br />

Advertise RFP 8/29/03 8/29/03<br />

Notice to Proceed/Kick-off meeting <strong>10</strong>/29/03 2/16/04<br />

Prepare soils map & vegetation model 1/30/04 4/30/04<br />

Prepare General Land Office Notes (GLOS) database 4/30/04 6/15/04<br />

Correlate GLOS data with soils data 7/15/04 7/30/04<br />

Final pre-development land cover map 2/15/05 3/28/05<br />

Final surface water features map layer 4/15/05 <strong>10</strong>/30/04<br />

Final report, receipt of all data 6/30/05 6/30/05<br />

Close-out 8/1/05 8/1/05<br />

2. Phase II (Polk and Hardee)<br />

Complete Scope of Work 11/1/04 <strong>10</strong>/25/04<br />

Contracts Administration Review 11/30/04 11/30/04<br />

Advertise RFP 12/<strong>10</strong>/04 12/<strong>10</strong>/04<br />

RFP review and ranking 1/30/05 2/11/05<br />

Contract Negotiations 2/28/05 3/28/05<br />

Contract Approval 3/15/05 5/15/05<br />

Notice to Proceed/Kick-off meeting 3/28/05 6/2/05<br />

Prepare General Land Office Notes (GLOS) database 3/30/06 3/30/06<br />

Prepare soils map & vegetation model 3/30/06 6/15/06<br />

Correlate GLOS data with soils data 3/30/06 8/2/06<br />

Final surface water features map layer 7/30/06 8/2/06<br />

Final hydrography layer 7/30/06 4/20/07 8/2/06<br />

Close-out 8/20/06 8/20/07 9/20/07<br />

Final pre-development land cover map 11/30/06 6/20/07 4/30/07<br />

Final report, receipt of all data 11/30/06 7/20/07 7/20/07<br />

3. Phase III (Desoto)<br />

Complete Scope of Work for Desoto County 3/30/07 5/<strong>10</strong>/07<br />

3. Phase III (Desoto)<br />

Execute Agreement with Consultant 6/20/07 8/12/07<br />

Prepare General Land Office Notes <strong>10</strong>/30/07 1/30/08<br />

Prepare soils map and vegetation model 2/15/08 4/25/08<br />

Correlate GLOS data with soils data 5/15/08 6/18/08<br />

Hydrography layer 7/15/08 12/19/08<br />

Build pre-development land cover map 11/30/08 6/30/09 6/26/09<br />

Draft and Final Report 12/22/08 7/30/09<br />

4. Phase IV (Data Refinement)<br />

Obtain Additional Historical Maps <strong>10</strong>/24/09<br />

Update Hydrography Maps 12/31/09<br />

Refine Land Cover Layer 7/26/<strong>10</strong><br />

Create Final Geodatabase and Upload into District's GIS 12/31/<strong>10</strong><br />

Project Closeout 1/28/11<br />

Status As Of: August 28, 2009<br />

HDR has completed all project tasks including transcribing and geocoding the General Land Office Surveys (GLOS)<br />

notes, the draft and final hydrography layer, and the draft and final soil maps and vegetation model. The Consultant<br />

020 - Peace River Basin 88


B163<br />

Peace R. - Historical Land Cover Mapping<br />

experienced some delays with producing pre-development land cover layer due to inaccuracies with the historical soils<br />

maps from 1927. The final GIS layers have been completed and a draft and final report were both completed by mid July<br />

2007. Final invoices have been processed and the second phase (agreement) was closed out. The third phase which is<br />

underway will map the Desoto County portion of the Peace River Basin. HDR has completed processing and geocoding<br />

of the 1850 GLOS notes including the bearing tree data. HDR has completed both the soils vegetation correlations and<br />

the GLOS data-soils correlation analyses. HDR has completed the streams and waterways features (hydrography) and<br />

has completed 60% of the predevelopment land cover. A no cost time extension was completed to grant additional time<br />

needed to complete the final deliverable. The agreement with HDR for phase IV was approved and work has begun. The<br />

consultant has completed georectification of the historical USGS quads and georectification of the 1914 historical<br />

drainage map.<br />

020 - Peace River Basin 89


B198<br />

Lake Jackson MFL Recovery Feasibility Study<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply, Natural Systems<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Highlands County<br />

Project Manager KOLASA, KEITH<br />

Task Manager(s)<br />

Status Ongoing<br />

WILLIAMS, GARY, ARNOLD, DAVE<br />

Description<br />

This is a multi-year funded project is to develop lake level recovery strategies for Lakes Jackson and Little Jackson<br />

consistent with the Southern Water Use Caution Area (SWUCA) recovery plan. The state's water management<br />

districts are statutorily charged with the establishment of minimum flows and levels for the protection of Florida's water<br />

resources. Several lakes in Highlands County have been identified for minimum levels adoption in the District's Priority<br />

List and Schedule for the Establishment of Minimum Flows and Levels. District staff have developed proposed<br />

minimum levels for lakes Jackson and Little Jackson located within the Josephine Creek Watershed. The proposed<br />

minimum levels incorporate information on the effects of water-use, rainfall and structural alterations (e.g.,<br />

modifications to lake outlets) on lake stage. According to information in the SWUCA recovery plan, the proposed<br />

minimum levels for these lakes are not being met. The first phase of the project, funded in FY2005, completed an<br />

evaluation of the watershed, completed data development needed to run the hydrologic model used to evaluate<br />

recovery options, and provided a preliminary cost of potential recovery alternatives. The second phase, funded in<br />

FY2006 and FY2007, will complete a hydrologic model for these lakes so that potential gains in water level can be<br />

quantified and will complete an integrated hydrologic model for the entire watershed and will further refine recovery<br />

alternatives and costs.<br />

Benefits<br />

This project will identify lake level recovery strategies for Lake Jackson and Little Lake Jackson and will implement<br />

these strategies if determined to be feasible. Minimum Flows and Levels (MFLs) have been established on these two<br />

lakes and recovery strategies are needed to maintain these levels if determined to be feasible. The recovery<br />

alternatives identified under this project may be applicable to other lakes with established MFLs.<br />

Costs<br />

The total project budget is $390,000. FY2005 funds ($80,000) were provided by the Peace River Basin Board. For<br />

FY2006, $<strong>10</strong>0,000 was included in the District's budget ($41,176 from the Peace River Basin and $58,824 from the<br />

Water Protection and Sustainability Trust Fund). The FY2006 originally included an additional $30,000 as revenue<br />

from Highlands County; however, this was later cancelled since a reduction occurred in the scope of work. The<br />

$30,000 budgeted as revenue was allowed to lapse in FY2006 since it was no longer needed for the project. The<br />

Funding for FY2007 ($2<strong>10</strong>,000) includes $<strong>10</strong>5,000 from the Water Protection and Sustainability Trust Fund and<br />

$<strong>10</strong>5,000 provided by the Peace River Basin Board. Future funding will be requested to implement the lake level<br />

recovery alternatives under project H081. The District funding in the table below includes staff salary, travel and<br />

central garage charges.<br />

Additional Information<br />

The specific elements of the District's Watershed Management Program Guidelines and Specifications that will be<br />

completed during this project are: (1) Review of aerial contour maps and acquisition of new information on an as<br />

needed basis; (2) Digitizing available contour information from aerial maps and review of as-built plans and other<br />

information to document existing conditions of the Jackson-Josephine Creek watershed; (3) Development of digital<br />

terrain models for existing conditions topography; (4) Compilation of existing reports, survey information, etc. to<br />

document existing conditions; (5) Map historic floodplain that will be restored along Jackson-Josephine Creek<br />

between Lake Jackson and Lake Josephine and extent of water staging areas; (6) Compilation of regional rainfall,<br />

groundwater level, surface water level, water-use, and water quality data; (7) Assessment of Floridan Aquifer level<br />

data, groundwater modeling results, and, if needed, application of groundwater models to determine existing<br />

conditions; (8) Develop a GIS database for watershed modeling; (9) Formulation of the approach to watershed<br />

modeling; (<strong>10</strong>) Limited survey to update existing information, and; (11) determination of probable or planning level<br />

costs of recovery options.<br />

020 - Peace River Basin 90


B198<br />

Lake Jackson MFL Recovery Feasibility Study<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 270,551 0 12,730 19,0<strong>21</strong><br />

0 302,302<br />

District Budgeted - Outside Revenue<br />

Highlands Co-Lks Jackson/Ltl Jackson<br />

Rvry (B198)<br />

Water Protection & Sust T.F. (Surface<br />

Wtr Rstr)<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

30,000 0 0<br />

0<br />

163,824 0 0<br />

0<br />

Total:<br />

Future<br />

Funding<br />

0<br />

0<br />

Total<br />

Funding<br />

30,000<br />

163,824<br />

$496,126<br />

Critical Project Milestones Projected Amended Actual<br />

1. Phase I<br />

Consultant Selection Process <strong>10</strong>/15/04 <strong>10</strong>/20/04<br />

Draft Agreement and Scope of Work <strong>10</strong>/20/04 <strong>10</strong>/25/04<br />

Contracts Adm Review 11/25/04 11/23/04<br />

Complete Work Order 5/20/05 6/30/05<br />

NTP and Kick-off <strong>Meeting</strong> 5/30/05 7/11/05<br />

Data Compilation 9/20/05 1/20/06<br />

Digitize 1 foot contours <strong>10</strong>/20/05 <strong>10</strong>/15/06<br />

Data Summaries 4/20/06 4/25/06<br />

Map Water Staging Areas 5/20/06 6/20/06<br />

GIS Database Development 6/15/06 12/<strong>10</strong>/06<br />

Formulation of Approach to Watershed Modeling <strong>10</strong>/25/06 6/20/06<br />

Determination of Planning Level Costs 12/25/06 12/<strong>10</strong>/06<br />

2. Phase II<br />

Develop Rev Agreement with Highlands County 3/<strong>10</strong>/06 4/20/06<br />

Contracts Adm Review 4/<strong>10</strong>/06 5/25/06<br />

Draft Consultant Agreement and Scope of Work 4/20/06 6/20/06<br />

Contracts Adm Review 5/20/06 7/15/06<br />

Execute Agreement 7/<strong>10</strong>/06 <strong>10</strong>/16/06<br />

Execute Rev Agreement with Highlands County 7/<strong>10</strong>/06 <strong>10</strong>/16/06<br />

Complete Work Order 12/<strong>10</strong>/06 8/20/08 3/27/09<br />

NTP and Kick-off <strong>Meeting</strong> 4/<strong>10</strong>/07 9/30/08 3/27/09<br />

Watershed Evaluation of Additional Basins 4/<strong>10</strong>/07 4/30/09<br />

Develop Hydrologic Model 12/<strong>10</strong>/07 5/30/09<br />

Calibrate Hydrologic Model 2/25/08 12/30/09<br />

2. Phase II<br />

Refine Cost Benefit Analysis 7/30/08 9/30/09<br />

Final Report and Electronic Deliverables 3/<strong>10</strong>/09 2/1/<strong>10</strong><br />

Status As Of: August 28, 2009<br />

Phase I of this project has been completed at a cost of $80,000. Phase I concluded that recovery alternatives would<br />

potentially help to achieve rasing the lake level by nearly 0.5 ft during normal hydrologic conditions and therefore would<br />

increase the frequency that the lake meets the adopted MFL. The recommended recovery alternatives focus on the<br />

installation of new control structures along the Jackson-Josephine canal, between Structure 2 and Structure 3. The<br />

second phase of this project will focus on developing the hydrologic model needed to further refine the project design<br />

and to further refine the predicted duration that the MFL may be achieved. The second phase of this project was<br />

temporarily put on hold for the last seven months, pending a review of the MFL methodology for Lake Jackson and Little<br />

Lake Jackson. In addition to the revised MFL methodology, the MFL compliance criteria was also re-evaluated using the<br />

newer methodology that is adjusted for rainfall deficits. An inter-department staff meeting was held on January 17th,<br />

2008, April 1, 2008, April 8, 2008, and April 17, 2008 to review the revised compliance criteria. Due to the delays an<br />

amendment was processed to provide more time to complete the project. The amendment also included a change to the<br />

020 - Peace River Basin 91


B198<br />

Lake Jackson MFL Recovery Feasibility Study<br />

project scope of work with a reduction in the watershed evaluation tasks. These tasks were no longer needed since the<br />

information and data recently became available under the Sebring Watershed Management Plan. The revenue<br />

agreement with Highlands County for $30,000 was cancelled since the project scope was reduced and the project cost<br />

was also reduced. The revised scope of work places more emphasis on completing the hydrologic model which is<br />

needed to complete the design and permitting of the MFL recovery project. The amendment for this project has been<br />

approved and the Phase II work order has been issued. The consultant completed the project development task of the<br />

work order and has selected sites for the groundwater elevation monitoring sites. The consultant is also currently making<br />

updates to the hydrologic model (AWSM). District staff met with the consultant in the field on June 25, 2009 to review<br />

sites where geotechnical data is needed.<br />

020 - Peace River Basin 92


B206<br />

Maintenance of Watershed Parameters & Models<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Flood Protection, Water Quality, Natural Systems<br />

Basin(s) General Fund (District), Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers,<br />

Pinellas-Anclote River, Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager MCCLUNG, GORDON<br />

Task Manager(s)<br />

Status Ongoing<br />

Citrus County, Hernando County, Pasco County, Polk County<br />

ALTMAN, GENE, LETASI, SCOTT, TURNER, DAWN, MAYER, RICHARD, WALKER, LARRY<br />

Description<br />

This was a basin initiative to fund the Maintenance of Watershed Parameters and Models element of the District's<br />

Watershed Management Program (WMP) for FY2006 to FY2009. For FY20<strong>10</strong> the unit code is being changed from<br />

B206 to a B300 series, 300 general, and B301 to B316 to better account for the maintenance by county.<br />

Benefits<br />

A WMP provides a method to evaluate the capacity of a watershed to protect, enhance, and restore water quality and<br />

natural systems, while achieving flood protection. The information developed assists local governments with their land<br />

management responsibilities by establishing a level of service and developing Best Management Practices (BMPs) to<br />

address level of service deficiencies. In addition, the information provides the District with the best available<br />

information to evaluate adverse impacts and mitigation of floodplain impacts for proposed ERPs. The continuous<br />

maintenance of watershed parameters in the GIS database as ERP permits are approved and new information is<br />

provided to the District through either aerial topographic mapping and its public review and comment period will<br />

provide the most up to date information about the watershed. If a watershed model has not been developed, the<br />

maintenance of parameters in the GIS processes the information in a format that will save time and funding when the<br />

watershed is modeled.<br />

Costs<br />

In FY2005, the Governing Board contributed $80,000 and each Basin Board contributed an additional $<strong>10</strong>,000 each to<br />

support the development of the District's maintenance process. The maintenance budget for FY2006 is $848,000, of<br />

which the District's share is $808,000. Hernando and Polk Counties contributed $20,000 each in FY2006 for<br />

maintenance within their jurisdiction. The maintenance budget for FY2007 is $1,094,200, the District's share is<br />

$924,200. Hernando County ($25,000), Pasco County ($125,000) and Polk County ($20,000) are contributing the<br />

indicated funding in FY2007 for maintenance. An additional $75,000 in FY2007 funds budgeted by the Coastal Rivers<br />

Basin Board for Spring Hill Lakes Management Plan (L775) has been transferred to this project after the Basin Board<br />

approved Hernando County's request to use these funds to perform maintenance based on percolation information<br />

collected from ERPs and Hernando County. The maintenance budget for FY2008 was $2.167 million, of which the<br />

District's share is approximately $1.597 million. For FY2009 Citrus, Hernando, Marion, and Pasco counties are<br />

contributing funds. For FY2009, funding distribution is as follows: Governing Board $1,797,250 (includes Green<br />

Swamp $57,284) Alafia River $78,203; Hillsborough River $366,486; Northwest Hillsborough $13,050; Coastal Rivers<br />

$431,638; Pinellas-Anclote $86,<strong>21</strong>1; Withlacoochee River $181,495; Peace River $182,333; Manasota $154,450. The<br />

following revenue will be received: Citrus County $90,000; Marion County $31,000; Pasco County $500,000; Polk<br />

County $20,000. The revenue will be distributed as follows: Green Swamp $3,684; Alafia River $3,553; Hillsborough<br />

River $<strong>21</strong>5,980; Coastal Rivers $271,460; Pinellas-Anclote $40,950; Withlacoochee River $92,940; Peace River<br />

$12,433.The budget is based on the projected number of approved ERP permits and the average development area<br />

within each Basin. Local government funds are equally matched by Governing Board and Basin Board funds. The<br />

Governing Board is also providing funds specifically to address public meetings and unforeseen issues with projecting<br />

the floodplains to be used in the FEMA mapping process.<br />

Additional Information<br />

A WMP includes five major elements: 1) Topographic Information, 2) Watershed Evaluation, 3) Watershed<br />

Management Plan, 4) Implementation of Best Management Practices, and 5) Maintenance of Watershed Parameters<br />

and Models. Implementing elements of the WMP with local governments is one of the Comprehensive Watershed<br />

Management (CWM) initiative strategies and one of the District's Strategic Priorities. After the Topographic<br />

Information, Watershed Evaluation and Management Plan elements are completed, the watershed parameters and<br />

models require continuous maintenance to simulate the watershed's characteristics as the land form changes. The<br />

watershed's parameters change with the rapid growth being experienced in the District. If continued maintenance of<br />

the models is not performed, the watershed parameters and model will no longer represent the system. This limits<br />

their value in the areas of ERP and flood protection programs. For FY2005, the District managed this project by<br />

issuing work orders for the tasks needed to develop the maintenance process, and then by monitoring the efforts.<br />

FY2006 funds will be used to begin implementing the maintenance process throughout the District in watersheds with<br />

ongoing or completed Watershed Management Plans. For FY2007 this effort will be continued District wide for all<br />

020 - Peace River Basin 93


B206<br />

Maintenance of Watershed Parameters & Models<br />

watershed where ERPs are approved. Both Hernando County and Polk County contributed funds in FY2006 and<br />

FY2007 for maintenance in their jurisdictions. In addition, Pasco County contributed funds in FY2007 for maintenance<br />

within their jurisdiction. A cooperative funding revenue agreement will be developed with each community contributing<br />

funds towards maintenance. The District will manage the project and enter into purchase orders and agreements to<br />

accomplish project tasks. Future funding will be required each fiscal year to continue maintenance of watershed<br />

parameters and models. In the future those local governments with the technical abilities to perform the maintenance<br />

activities will be encouraged to manage this effort. The District will provide funding assistance to communities that can<br />

and those that cannot provide matching funds. Matching funds will be requested from the Federal Emergency<br />

Management Agency (FEMA) for this basin initiative. Failure to provide ongoing maintenance will diminish the return<br />

on the investment the District has made in their respective Watershed Management Plans.<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 2,551,505 977,172 1,816,661 9,3<strong>10</strong> 947,900 6,302,548<br />

011 Alafia River Basin 143,962 0 76,020<br />

0 89,050 309,032<br />

013 Hillsborough River Basin 315,362 0 156,640<br />

0 6,450 478,452<br />

014 Northwest Hillsborough Basin 76,570 0 13,050<br />

0 15,150 <strong>10</strong>4,770<br />

015 Coastal Rivers Basin 400,933 75,000 178,728<br />

0 611,400 1,266,061<br />

016 Pinellas-Anclote River Basin 156,861 0 48,990<br />

0 163,800 369,651<br />

019 Withlacoochee River Basin 303,723 0 <strong>10</strong>5,913<br />

0 1,415,000 1,824,636<br />

020 Peace River Basin 265,199 0 173,350<br />

0 137,250 575,799<br />

0<strong>21</strong> Manasota Basin 346,020 0 161,892<br />

0 <strong>21</strong>4,400 722,312<br />

District Budgeted - Outside Revenue<br />

Citrus Co - Maint of WS Para & Models<br />

(B302)<br />

Hernando Co - Maint of W/S Para &<br />

Models (B305)<br />

Marion Co - Maint of WS Para & Models<br />

(B311)<br />

Pasco Co - Maint of W/S Para & Models<br />

(B312)<br />

Polk Co - Maint of W/S Para & Models<br />

(B314)<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

0 0 90,000<br />

0<br />

345,000 11,1<strong>10</strong> 0<br />

0<br />

0 0 31,000<br />

0<br />

375,000 0 500,000<br />

0<br />

60,000 0 20,000<br />

0<br />

0<br />

0<br />

0<br />

1,222,400<br />

Total:<br />

Future<br />

Funding<br />

160,000<br />

Total<br />

Funding<br />

90,000<br />

356,1<strong>10</strong><br />

31,000<br />

2,097,400<br />

240,000<br />

$14,767,771<br />

Critical Project Milestones Projected Amended Actual<br />

1. Critical Project Milestones<br />

Recognition of District, Basin Board, & Governing Board on reports 5/31/05 12/18/08<br />

2. FY2005 Consultant Services Agreement (URS)<br />

Draft Agreement to Management Services 3/14/05 4/<strong>21</strong>/05<br />

Draft Agreement returned from Management Services 4/4/05 5/23/05<br />

Contract Execution 5/31/05 6/6/05<br />

Notice to Proceed 5/31/05 6/6/05<br />

Maintenance of Watershed Parameters and Models Planning 7/<strong>21</strong>/06 4/30/07 3/22/06<br />

Contract Termination 7/<strong>21</strong>/06 5/31/07 5/31/07<br />

3. FY2006 Consultant Services Agreements<br />

Draft Agreement to Management Services 6/30/06 8/4/06<br />

Draft Agreements returned from Management Services 7/17/06 8/24/06<br />

020 - Peace River Basin 94


B206<br />

Maintenance of Watershed Parameters & Models<br />

Ten (<strong>10</strong>) Consultant Agreements Execution 9/30/06 11/15/06<br />

First Amendment to Management Services 4/16/07 4/18/07<br />

First Amendment Execution 6/19/07 7/30/07<br />

Contract Termination <strong>10</strong>/31/08 5/31/11<br />

4. FY2007 Consultant Services Agreements<br />

Draft Agreements to Management Services 3/12/07 4/17/07<br />

Draft Agreements returned from Management Services 5/22/07 5/15/07<br />

Consultant Agreements Execution 6/19/07 8/1/07<br />

Notice to Proceed to Consultants 7/1/07 8/<strong>10</strong>/07<br />

Contract Termination 5/31/11<br />

5. Hernando County Maintenance<br />

Draft Agreement to Management Services 3/31/05 3/25/05<br />

Draft Agreement returned from Management Services 4/15/05 4/20/05<br />

Contract sent to County for signature 8/20/06 11/9/06<br />

County Contract Execution 12/<strong>10</strong>/06 12/12/07<br />

County Contract Expiration <strong>10</strong>/31/<strong>10</strong><br />

6. Polk County Maintenance<br />

Draft Agreement to Management Services 8/9/05 8/9/05<br />

Draft Agreement returned from Management Services 8/23/05 8/23/05<br />

Contract sent to County for signature 8/25/05 8/25/05<br />

Contract Execution <strong>10</strong>/31/05 12/2/05<br />

Draft First Amendment to Management Services 7/24/07<br />

Draft First Amendment returned from Management Services 8/24/07<br />

First Amendment sent to County for signature 9/4/07<br />

First Amendment Execution <strong>10</strong>/1/07<br />

Contract Termination 6/30/09<br />

7. Pasco County Maintenance<br />

Draft Agreement to Management Services 4/3/07 4/3/07<br />

Draft Agreement returned from Management Services 4/23/07 4/23/07<br />

Contract sent to County for signature 5/4/07 5/4/07<br />

Contract Execution 7/28/07 7/28/07<br />

Contract Termination 12/31/09<br />

Status As Of: July 15, 2008<br />

FY2005: The consultant services agreement with URS Corporation Southern was executed on June 6, 2005. Notice to<br />

proceed was issued on the same date. Work Order #1 has been developed to investigate the current data (type, quality,<br />

quantity, etc.) entering the District through ERP and to develop a proposed work flow to maintain the watershed<br />

parameters and models as permits are approved. A kick-off meeting with the consultant team and District staff was held<br />

on June 14th to introduce and plan the project with all departments that will be involved, including: Technical Services,<br />

Legal, and Resource Management. The final report has been accepted. Remaining funds are being used to develop<br />

presentation and documentation of an example project to be distributed to cooperators, FEMA, and other District WMP<br />

consultants who will be performing maintenance beginning with FY2006 funds. Work Order #2 has been executed to<br />

document the maintenance process step-by-step. The consultant has completed the example maintenance project along<br />

with accompanying documentation and presentation. This contract has been terminated and the final payment<br />

processed. FY2006 : Staff has developed consultant services agreements with ten (<strong>10</strong>) WMP consultants to begin<br />

maintenance of watershed parameters and models. Maintenance efforts will first be directed at completed and ongoing<br />

Watershed Management Plans. The District's consultants who originally prepared the Watershed Management Plans will<br />

be typically tasked with maintenance of their respective watershed(s). Work orders will be issued as project(s) with<br />

approved ERP(s) are identified or new site conditions data become available. Basin Board funding will only be used for<br />

maintenance activities within the Basin. Consulting services agreements were executed by November 15, 2006, with all<br />

<strong>10</strong> consultants including: Ardaman; Ayres & Associates; BCI; Dyer Riddle Mills & Precourt; Jones Edmunds; Keith<br />

Parsons; Post Buckley Schuh & Jernigan; TBE Group; and URS. Amendments have been executed for these <strong>10</strong><br />

agreements to increase the total compensation for approved FY2007 and anticipated FY2008-2011 funding, extend the<br />

contract termination date, and revise the scope of work to be consistent with current WMP agreement language.<br />

FY2007: An additional nine (9) agreements have been executed with the remaining consultants approved to perform<br />

elements of the District's WMP. All 19 consultant services agreements will support District-wide maintenance. Each<br />

consultant has been assigned specific watersheds for maintenance. Project managers within the Engineering Sections<br />

will be responsible for developing and executing work orders with each of these consultants. Guidelines and<br />

020 - Peace River Basin 95


B206<br />

Maintenance of Watershed Parameters & Models<br />

specifications are being developed for specific maintenance activities. FY2008: Recent maintenance efforts have<br />

included conducting public information meetings in Pasco and Hernando County and maintenance evaluations for<br />

several of the District's watersheds. Hernando Co. Maintenance: Previously performed under Unit Number B705. Fiscal<br />

year budgeted funds are as follows; FY2005 = $11,1<strong>10</strong>, FY2006 = $40,000, FY2007 = $50,000, FY2008 = $600,000,<br />

proposed FY2009 = $400,000; with 50% revenue from the County for continued maintenance of the County's WMPs.<br />

Public review and comment meetings, 3 total, concluded on 08/06/2007. The agreement transmitted to the County on<br />

11/09/2006 for signature was executed on 12/12/2007. Work orders and data sets for countywide ERP evaluation,<br />

inclusion of infiltration as an outfall, and inclusion of LiDAR were transmitted to the consultants to develop cost. E-mail<br />

authorizations providing an upset amount were provided to the firms based on 02/22/2008 cost estimates. Staff is<br />

developing and executing work orders. Most of the hydrologic and hydraulic information has been revised in GIS and the<br />

models. Cost estimates provided on 02/22/2008. Thirty-one watersheds are being maintained. The floodplain results<br />

have been submitted to the District for review for the Hernando County Watersheds. Comments have been provided to<br />

the consultants and are being addressed. A schedule is being developed for the peer review meetings. The Pasco<br />

watersheds are being turned into the District for reviewed. The Sarasota watersheds are on hold until the LiDAR data is<br />

delivered. Polk Co. Maintenance: Previously performed under Project B723. The Cooperative Funding Agreement with<br />

Polk County was executed on December 2, 2005. A total of $80,000 has been encumbered ($40,000 in FY2006, and<br />

$40,000 in FY2007) for continued maintenance of Polk County's WMPs. Work Orders have been issued for maintenance<br />

of the Gator Creek and Itchepackesassa Creek watershed parameters and models. Pasco Co. Maintenance: The<br />

cooperative funding agreement has been executed.<br />

020 - Peace River Basin 96


B<strong>21</strong>7<br />

Ridge Lakes Stormwater Improvement<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Project Manager KOLASA, KEITH<br />

Task Manager(s)<br />

Status Ongoing<br />

Dundee, Florida Department of Transportation<br />

NORTON, NANCY<br />

Description<br />

This is a multi-year project funded as a Basin Initiative to design, permit, and construct stormwater treatment systems<br />

for <strong>10</strong> lakes located within the Lake Wales Ridge, Polk and Highlands Counties. Conceptual plans and cost estimates<br />

for <strong>10</strong> Ridge lakes were funded in FY2005 under project B196. This project will move the conceptual projects forward<br />

to implementation. The first stormwater retrofit will take place on Lake Menzie located in the Town of Dundee. The<br />

system will treat runoff from the commercial area of Dundee and State Road 17, and will consist of a two swales, two<br />

retention basins, and a long infiltration basin (French drain). The completed project will provide water quality<br />

enhancement of Lake Menzie. The Town of Dundee will participate in the project by providing the land for the project.<br />

The project will be constructed within the Town's park land adjacent to the lake. The next project will design and<br />

construct stormwater treatment projects on Lake Isis and Lake Tulane in Avon Park. Staff are continuing to coordinate<br />

with other agencies and local governments to develop future funding.<br />

Benefits<br />

This project will protect and enhance the water quality of ten lakes located within the Lake Wales Ridge chain of lakes<br />

by providing stormwater treatment in areas where direct stormwater discharges have caused water quality impacts.<br />

Costs<br />

In FY2006, $1<strong>10</strong>,000 was budgeted for the design and permitting of stormwater retrofit projects for Lake Menzie and<br />

Marie. Of the $1<strong>10</strong>,000, $55,000 was provided by FDOT, $27,500 was provided by the Water Protection and<br />

Sustainability Trust Fund, and $27,500 was provided by the Peace River Basin Board. In FY2007, $253,000 was<br />

budgeted for the construction of the stormwater system at Lake Menzie. Of the $253,000, $126,500 is provided by<br />

FDOT, $63,250 is from the Water Protection and Sustainability Trust Fund, and $63,250 is from the Peace River<br />

Basin Board. In FY2008, $50,000 was budgeted for completing construction of the stormwater retrofit projects in the<br />

Town of Dundee. The FY2009 funds ($85,000) are being used to complete design and permitting of retrofit project for<br />

Lake Isis and Lake Tulane in Avon Park. The funds requested in FY20<strong>10</strong> ($1<strong>10</strong>,000) will be used for the the<br />

construction of the project on Lake Isis.<br />

Additional Information<br />

This project is based on the results of an assessment completed by District staff of the <strong>10</strong>5 lakes forming the Lake<br />

Wales Ridge chain of lakes. The purpose of the assessment was to identify impacts to these lakes and then develop a<br />

strategy to address these issues. The results of the Ridge Lakes Screening Project revealed that approximately 26<br />

Ridge lakes receive significant direct untreated stormwater discharges from urban land uses. Many of these lakes act<br />

as stormwater catchment basins for the urban land around them. Stormwater remediation was identified as one of the<br />

most important action plans needed to protect and enhance the water quality of the Lake Wales Ridge chain of lakes.<br />

As the first step of beginning the stormwater remediation, conceptual plans are currently being developed for<br />

approximately 20 sites on <strong>10</strong> Ridge lakes under project B196, with funds budgeted in FY2005. Under project B196 a<br />

cost/benefit analysis is also being completed. This project (B<strong>21</strong>7) will carry the most cost effective retrofit sites forward<br />

into design and permitting stages. The FDOT and the Town of Dundee were identified as cooperative funding partners<br />

in FY2006 and agreements were drafted with them to complete projects on two lakes located within the Town of<br />

Dundee. Funding for the design and permitting of a stormwater retrofit for Lake Menzie in Dundee was included in the<br />

FY2007 budget and FY2008. Staff have also continued to work with other agencies and local governments to<br />

develop funding for stormwater on other targeted Ridge Lakes. For example, a stormwater retrofit on Lake Clay has<br />

been developed as an FY2008 cooperative funding project with Highlands County and the Town of Lake Placid for<br />

FY2008 (Project L897).<br />

020 - Peace River Basin 97


B<strong>21</strong>7<br />

Ridge Lakes Stormwater Improvement<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin <strong>21</strong>8,470 0 60,550 145,601<br />

0 424,6<strong>21</strong><br />

District Budgeted - Outside Revenue<br />

FDOT - Ridge Lake SW Improvements<br />

(B<strong>21</strong>7)<br />

State Approp - WRAP - Prior Year<br />

Funds<br />

Water Protection & Sust T.F. (Surface<br />

Wtr Rstr)<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

181,500 0 0<br />

0<br />

0 0 42,500<br />

0<br />

123,250 46,875 0<br />

0<br />

Total:<br />

Future<br />

Funding<br />

0<br />

0<br />

0<br />

Total<br />

Funding<br />

181,500<br />

42,500<br />

170,125<br />

$818,746<br />

Critical Project Milestones Projected Amended Actual<br />

1. Contract Development & Execution<br />

Develop agreement with FDOT <strong>10</strong>/30/05 <strong>10</strong>/30/05<br />

Finalize agreement with FDOT 1/15/06 3/1/07<br />

Develop agreement with Town of Dundee 2/15/06 2/15/06<br />

Finalize agreement with Town of Dundee 3/15/06 4/20/06<br />

2. Consultant Agreement<br />

Select Consultant 6/15/06 4/26/06<br />

Finalize agreement with Consultant <strong>10</strong>/15/06 6/30/07<br />

NTP and Kick-off with Consultant 11/15/06 7/11/07<br />

3. Critical Project Milestones<br />

Preliminary Design for 1st lake 1/15/08 2/<strong>10</strong>/08<br />

Preliminary Design for 2nd lake 1/15/08<br />

Permit Pre-application meeting 2/15/08 4/2/08<br />

Final Design and Permitting for 1st lake 4/15/08 6/4/08<br />

Final Design and Permitting for 2nd lake 4/15/08<br />

4. Construction<br />

Prepare RFB <strong>10</strong>/1/08 <strong>10</strong>/28/08<br />

Contractor Selection 12/5/08 1/28/09<br />

Contractor Contract 1/14/09 3/25/09<br />

Kick-off 2/11/09 4/2/09<br />

Construction Management 7/30/09<br />

Final Inspection and As-Builts 7/31/09<br />

5. Close Out<br />

Town of Dundee Contract Termination 5/30/08 7/30/09<br />

Send Invoices to FDOT 12/30/08 12/30/09<br />

FDOT Revenue Contract Termination 12/30/08 12/30/09<br />

Consultant Contract Termination 12/30/08 7/30/09<br />

Status As Of: September 04, 2009<br />

The first stormwater retrofits to take place was on Lake Menzie in the Town of Dundee. District staff completed a<br />

cooperative agreement with the Town to allow the use of their land to construct the stormwater treatment project. An<br />

ERP exemption was issued for the project on June 04, 2008. In addition, a construction permit was submitted to FDOT<br />

since this project addresses some runoff generated from a state road. A Request for Bid for construction services was<br />

processed and advertised in December 2008. The pre-bid meeting was held on Jan. 5, 2009 with the bid opening<br />

occurring on Jan. <strong>21</strong>st. The bid was successfully awarded to the lowest bidder. The pre-construction kick-off meeting<br />

was held on April 2, 2009. Installation of turbidity barriers, signage, and posting of permits was completed during the third<br />

week of April 2009. Project construction was completed on June 19, 2009. District staff have also begun work on the<br />

retrofit projects for Lakes Isis and Tulane. District staff coordinated a meeting between the Town of Avon Park and the a<br />

private landowner to discuss easement needs for the retrofit project on Lake Isis. The landowner has agreed to assist by<br />

020 - Peace River Basin 98


B<strong>21</strong>7<br />

Ridge Lakes Stormwater Improvement<br />

providing an easement to the Town of Avon Park. District staff will assist the Town with the easement agreement. In<br />

addition, the District will begin design and permitting of the projects on Lakes Isis and Tulane. An agreement has been<br />

prepared with the District's consultant to begin survey work for these next projects. ACTION-TO-DATE: Complete.<br />

Bidding and procurement of a construction contractor was completed on time. Construction of the project on Lake<br />

Menzie was also completed on time.<br />

020 - Peace River Basin 99


B<strong>21</strong>9<br />

Land Use and Cover Mapping<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality, Natural Systems<br />

Basin(s) General Fund (District), Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers,<br />

Pinellas-Anclote River, Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

N/A<br />

Project Manager DAVIS, APRIL<br />

Task Manager(s)<br />

DICKS, STEVE<br />

Status Ongoing<br />

Description<br />

Beginning in 1989, the District initiated a comprehensive Land Use and Cover (LULC) mapping program. This program<br />

results in a Geographic Information System (GIS) data set that identifies over 50 categories of land use and cover (for<br />

example: single family residential, pine forest, wetland forest, row crops, citrus). The mapping categories adhere to the<br />

Florida Department of Transportations Florida Land Use and Cover Classification System (FLUCCS) and are<br />

compatible with similar efforts at the other water management districts. Until 2005 the program was on a five year<br />

update cycle (1989, 1994, 1999, 2004). The rapid development within the District has made the five year update cycle<br />

inadequate. Beginning with the 2005 orthophotos, the update is done on an annual basis.<br />

Benefits<br />

The LULC data collected under this project are widely used to support the District's planning, modeling and land<br />

acquisition programs. These data are also among the most commonly requested by external customers. Accurate<br />

tracking of acreages and locations of key agricultural land use and cover is a key component of the Southern Water<br />

Use Caution Area (SWUCA) Recovery strategy. This information, when coupled with data collected through the<br />

District's Water Use Permitting (WUP) process, provide the most accurate means for tracking these significant water<br />

uses within the SWUCA. These data also provide an important source of information for monitoring permit compliance.<br />

A significant benefit of this program is a consistent, and therefore defensible, estimation of agricultural trends.<br />

Costs<br />

This project was initially funded in FY1989 with updates in FY1994, FY1999, and FY2004. Since FY2005 this project<br />

has been included in the Governing and Basin Board's budgets. The Governing Board contributes fifty percent of the<br />

project cost and the remainder is distributed using a formula that accounts for the relative areas of each basin. This is<br />

an annual funding request to support the continued update of the database. The District does not currently have<br />

sufficient in-house staff resources to support this effort and the funding is used for staff augmentation, consulting<br />

services and fieldwork associated with the project. The budget for FY2009 Land Use Mapping is $240,000 and the<br />

proposed budget for FY20<strong>10</strong> is also $240,000.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 571,<strong>10</strong>1 (123,146) 162,445 254,936 1,604,624 2,469,960<br />

011 Alafia River Basin 37,986 0 9,9<strong>10</strong><br />

0 <strong>10</strong>7,333 155,229<br />

013 Hillsborough River Basin 52,234 0 <strong>10</strong>,631<br />

0 116,463 179,328<br />

014 Northwest Hillsborough Basin 22,993 0 3,374<br />

0 24,701 51,068<br />

015 Coastal Rivers Basin 46,533 0 11,465<br />

0 127,002 185,000<br />

016 Pinellas-Anclote River Basin 56,925 0 6,006<br />

0 57,976 120,907<br />

019 Withlacoochee River Basin 78,772 0 26,246<br />

0 313,875 418,893<br />

020 Peace River Basin 124,307 0 39,032<br />

0 475,627 638,966<br />

0<strong>21</strong> Manasota Basin 70,311 0 17,778<br />

0 206,823 294,912<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$4,514,263<br />

Critical Project Milestones Projected Amended Actual<br />

020 - Peace River Basin <strong>10</strong>0


B<strong>21</strong>9<br />

Land Use and Cover Mapping<br />

2. FY2005 Annual Update<br />

Complete Update 4/30/07 6/30/07 7/6/07<br />

3. FY2006 Annual Update<br />

Begin Update 5/1/07 7/1/07 7/9/07<br />

Complete Update 9/30/07 9/30/07 9/30/07<br />

4. 1995/1999 Northern District Backdating Update<br />

Begin Update <strong>10</strong>/1/07 <strong>10</strong>/15/07 <strong>10</strong>/15/07<br />

Complete Update 9/30/08 3/7/08 3/7/08<br />

4. FY2007 Annual Update<br />

Begin Update <strong>10</strong>/1/07 3/<strong>10</strong>/08 3/17/08<br />

Complete Update 5/30/08 <strong>10</strong>/15/08 <strong>10</strong>/31/08<br />

4. FY2008 Annual Update<br />

Begin Update <strong>10</strong>/16/08 3/2/09 3/27/08<br />

Complete Update 7/31/09 12/31/09<br />

Status As Of: September 25, 2009<br />

The 2007 Land Use and Cover update is complete. The data have been made available to all District staff. The 2008<br />

citrus land use layer is also complete, and has been made available to all District staff. Staff is currently in the process of<br />

updating the 2008 Land Use and Cover dataset and approximately 20% of the District is complete.<br />

020 - Peace River Basin <strong>10</strong>1


B226<br />

Determine Total Water Budget & Irrig. Req.for Mature Southern<br />

Highbush Blueberries<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply, Water Quality<br />

Basin(s) Alafia River, Hillsborough River, Withlacoochee River, Peace River<br />

Cooperator(s)<br />

University of Florida<br />

Project Manager COHEN, RON<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

Blueberry production is a high valued cash crop. The estimated 2003 value of blueberry production in Florida was<br />

about $18.6 million dollars. As the value of other crops decrease more growers have been converting their fields to<br />

blueberries. A 1998 report estimated a 400% increase in blueberry acres by the year 2008. This four-budget year<br />

research project will quantify how much water a typical blueberry plant needs and will develop irrigation guidelines to<br />

help conserve water, reduce potential runoff and water quality impacts.<br />

Benefits<br />

There are about 735Mgals permitted for annual blueberry irrigation. The amount of water saved will be a function of<br />

the number of acres planted and their water use, which will change annually based on market and climatic conditions.<br />

If we assume a 5% savings from this project it would conserve about 37 Mgals per year.<br />

Costs<br />

This project cost $153,000 and will be budgeted in four fiscal years. The Alafia, Hillsborough River, Peace River and<br />

the Withlacoochee River Basin Boards will each budget $9,563 annually for this project.<br />

Additional Information<br />

Southern highbush blueberry acreage and production has steadily increased in Florida during the last decade<br />

(Williamson and Lyrene, 2005). A recent survey of the industry identified Highlands, Polk, Hillsborough and Lake<br />

counties as areas of rapid growth (Williamson and Lyrene, 2000). In fact, Highlands, Polk and Hillsborough counties<br />

ranked 2nd, 3rd and 4th respectively, in blueberry acreage in the state. This is in addition to current blueberry<br />

production in Marion, Hernando, Pasco and Levy Counties. The following table of blueberry acres and water use<br />

comes from the District's regulatory database. * Most individual blueberry operations are below the District's water use<br />

permitting thresholds. The individual acres are not large, but the water use is intensive. Recent observations have<br />

seen growers converting their existing citrus and strawberry acres to blueberries. Most of the acreage planted during<br />

the last decade is grown under a production system known as "pine bark culture" (Williamson and Lyrene, 2000;<br />

Williamson and Lyrene, 2005). Beds of pine bark ranging from 3 (single row beds) to 8 (double row beds) feet wide<br />

and 6 to 8 inches deep are laid out in rows and plants are set directly in the bark rather than in the soil. Blueberry<br />

plants grow rapidly in pine bark but their root systems are restricted to the pine bark layer with some penetration into<br />

the underlying soil. An informal grower survey revealed that Florida blueberry growers irrigated once every 2 to 3 days<br />

during the growing season and apply ½ to ¾ inch of water at each irrigation event. Frequent irrigation is needed<br />

because pine bark beds dry out rapidly due their low water holding capacities and because roots are confined to the<br />

pine bark layer. There is a general thought that the amounts of water applied during each irrigation event are in excess<br />

of what is needed to irrigate the effective root zone. The project is investigating this hypothesis. In these experiments,<br />

IFAS will compare plant growth and yield under "standard" and "reduced" irrigation rates, and determine the total water<br />

budget and crop coefficient of mature, bearing, southern highbush blueberry plants in Florida. Information from this<br />

project will be provided to the growers to help them reduce water use and to the District for use in planning,<br />

conservation and water use permitting. In addition, results from this project will help reduce fertilizer leaching, thus<br />

helping to improve water quality. The project will also allow for more soil storage thus reduce potential off site flooding<br />

issues.<br />

020 - Peace River Basin <strong>10</strong>2


B226<br />

Determine Total Water Budget & Irrig. Req.for Mature Southern<br />

Highbush Blueberries<br />

Prior Cumulative FY 2009 FY20<strong>10</strong><br />

Funding Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

28,688 0 9,563<br />

0<br />

011 Alafia River Basin 0 38,251<br />

013 Hillsborough River Basin 28,688 0 9,563<br />

0<br />

0 38,251<br />

019 Withlacoochee River Basin 28,689 0 9,563<br />

0<br />

0 38,252<br />

020 Peace River Basin 28,689 0 9,563<br />

0<br />

0 38,252<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$153,006<br />

Critical Project Milestones Projected Amended Actual<br />

Agreement to Contracts 9/1/05 9/1/05<br />

Agreement to Cooperator 11/1/05 11/1/05<br />

District Executes Agreement 2/1/06 2/1/06<br />

Notice to Proceed 3/1/06 3/1/06<br />

Basin Board Notification 3/1/06 3/1/06<br />

Year Data Collection 4/1/06 4/1/06<br />

Year Data Collection 12/1/06 12/1/06<br />

Year Data Collection 12/1/07 12/1/07<br />

Contract Extension 3/19/08<br />

Year Data Collection 12/1/08 11/30/08<br />

Year Data Collection 12/1/09<br />

Year Data Collection 12/12/<strong>10</strong><br />

Year Data Collection 12/1/11<br />

Completion Report 5/3/12<br />

Project Ends 8/31/12<br />

Status As Of: August 27, 2009<br />

9/1/2005 - Developing detailed scope of work. 9/9/2005 - Agreement sent to contracts for review. 11/1/2005 - Agreement<br />

in contracts. 12/15/2005 - Sent agreement to cooperator. 1/11/2006 - Cooperator reviewing agreement. 2/16/2006 - Sent<br />

Notice to Proceed 4/17/2006 - Transplanting bushings and setting up data collection system. 6/12/2006 - Data collection<br />

project continuing as designed. 8/15/2006 - Reviewed first report. <strong>10</strong>/12/2006 - Data collection project continuing as<br />

designed. 12/4/2006 - Dormant for winter. 2/15/2007 - Basin Board presentation. 2/25/2007 - Growers filed day at Balm.<br />

5/1/2007 - Data collection project continuing as designed. 7/6/2007 - Reviewed task report. 8/31/2007 - Data collection<br />

project continuing as designed. 11/1/2007 - Data collection project continuing as designed. 11/16/2007 - Problems with<br />

lysemeters may need to install new ones. Could delay results by a year, a no cost contract amendment would be needed.<br />

1/2/2008 - Enhancing lysemeters 2/29/2008 - Plants dormant, researchers are gearing up for data collection. 5/1/2008 -<br />

Installed enhanced lysemeters for better data collection. 7/1/2008 - Data collection project continuing as planned.<br />

9/1/2008 - Data collection project continuing as planned. <strong>10</strong>/15/2008 - Data collection project continuing as planned.<br />

12/17/2008 - Constructing new lysimeters 3/6/2009 - Processing, $<strong>10</strong>,000 cost reduction time extension. 4/20/2009 -<br />

Installing new lysimeters and starting to collect data. 6/<strong>10</strong>/2009 - Data collection project continuing as planned. 9/1/2009 -<br />

Data collection project continuing as planned.<br />

020 - Peace River Basin <strong>10</strong>3


B229<br />

Field Evaluation of Bahiadwarf, For Water Use Efficiency, Turf<br />

Quality, Mowing Requirement and Persi<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply, Water Quality<br />

Basin(s) Hillsborough River, Peace River, Manasota<br />

Cooperator(s)<br />

University of Florida<br />

Project Manager COHEN, RON<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

Lawn and landscape is one of the largest permitted and actual uses of water in the District. Most of this water is used<br />

for turf grass irrigation. It is estimated that about 50% of per capita use is for exterior irrigation. As growth in the District<br />

continues the demand for lawn irrigation will too. In addition, sod production and the associated water use will also<br />

increase. This multi agency year research project will investigate a potentially viable drought tolerant alternative to<br />

current popular grass varieties.<br />

Benefits<br />

Results from this project can be used to reduce and conserve urban turf irrigation, agricultural pasture and sod<br />

production water use. Reduced irrigation will reduce the runoff potential and water quality impacts. The District will use<br />

results from this project in its conservation, planning and regulation programs.<br />

Costs<br />

This multi-agency, 3-year project will cost $317,500. Part of the project cost ($160,000 - $53,333 annually) will come<br />

from a Consortium for Plant Biotechnology Research (CPBR - http://www.cpbr.org) grant. The remaining funds will be<br />

divided evenly between the Hillsborough River, Manasota and Peace River Basin Boards. Each Basin Board will<br />

budget $13,125 in FY2006, FY2007, FY2008 and FY2009.<br />

Additional Information<br />

Part of the project's funding will come from the Consortium for Plant Biotechnology Research (CPBR -<br />

http://www.cpbr.org). Overall project costs have been reduced because of the ability to leverage previous CPBR and<br />

USDA grants that funded the initial research. Bahiagrass (Paspalum notatum Flugge) is a low input, drought tolerant<br />

and disease resistant warm season turfgrass used for residential lawns, pastures and along highways in the<br />

Southeastern US. However turf quality of currently available Bahiagrass cultivars is poor, due to prolific seedhead<br />

production, open growth habit and light green color. Recent laboratory research has developed a generation of<br />

transgenic Bahiagrass (Bahiadwarf) over-expressing a gibberellic acid catabolizing enzyme (GACE) for improved turf<br />

characteristics and reduced mowing requirement. Bahiadwarf prototypes have displayed characteristics such as<br />

denser growth habit, reduced seed head production and reduced mowing requirement, that make this plant more<br />

attractive for public use. A recently funded USDA project has added multiple drought stress protective genes to the<br />

Bahiadwarf, enhancing the plant's environmental friendliness. This project with the University of Florida, IFAS will<br />

investigate and document the drought tolerance of the Bahiadwarf under field conditions. They will compare the<br />

Bahiadwarf to the industry standard St. Augustine grass and wildtype Bahiagrass. To further enhance the Bahiadwarf,<br />

additional transgenic Bahiagrass lines with an improved drought stress response will be generated and compared to<br />

St. Augustine grass and wildtype Bahiagrass. In the second and third year of the project, they will evaluate water use<br />

efficiency, turf quality, mowing requirement and persistence under different irrigation regimes.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

013 Hillsborough River Basin 39,375 0 13,125<br />

0<br />

0 52,500<br />

020 Peace River Basin 39,375 0 13,125<br />

0<br />

0 52,500<br />

0<strong>21</strong> Manasota Basin 39,375 0 13,125<br />

0<br />

0 52,500<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$157,500<br />

Critical Project Milestones Projected Amended Actual<br />

020 - Peace River Basin <strong>10</strong>4


B229<br />

Field Evaluation of Bahiadwarf, For Water Use Efficiency, Turf<br />

Quality, Mowing Requirement and Persi<br />

Agreement to Contracts 8/1/05 8/1/05<br />

Agreement to Cooperator 11/1/05 11/1/05<br />

District Executes Agreement 12/1/05 12/1/05<br />

Notice to Proceed 1/1/06 1/1/06<br />

Basin Board Notification 1/1/06 1/1/06<br />

Governing Board Notification 2/1/06 2/1/06<br />

Year 1. Data Collection 12/1/06 12/1/06<br />

Year 2. Data Collection 12/1/07 12/1/07<br />

Year 3. Data Collection 12/1/08<br />

No Cost Time Extension 6/5/09 6/5/09<br />

Completion Report 9/1/09 5/31/11<br />

Project Ends 1/1/<strong>10</strong> 1/31/12<br />

Status As Of: June <strong>10</strong>, 2009<br />

9/1/2005 - Agreement is being processed by the District. 11/1/2005 - Agreement is being processed by the District.<br />

12/30/2005 - Agreement mailed to cooperator. 1/11/2006 - Cooperator reviewing agreement. 1/23/2006 - Notice to<br />

proceed mailed to IFAS. 3/1/2006 Mobilizing staff and equipment. 4/17/2006 - Data Collection 6/12/2006 - Update<br />

Agreement (Scope of Work) to incorporate enhanced data collection equipment. 8/16/2006 - Data Collection. <strong>10</strong>/12/2006<br />

- Data Collection. 12/4/2006 - Data Collection. 2/28/2007 - Reviewed report, project continuing as designed. 5/1/2007 -<br />

Plant damage because of herbicide, project continuing as designed. 7/6/2007 - Data Collection. 11/1/2007 - Reviewed<br />

task report. 1/2/2008 - Project continuing as planned. 2/29/2008 - Project continuing as planned. 5/1/2008 - Project<br />

continuing as planned. 7/1/2008 - Data collection, project continuing as planned. 9/1/2008 - Data collection, project<br />

continuing as planned. 11/1/2008 - Data collection, project continuing as planned 3/6/2009 - Data collection, project<br />

continuing as planned. 5/31/2009 - Processing no cost time extension to develop a grass that will be easier to produce.<br />

020 - Peace River Basin <strong>10</strong>5


B238<br />

Crop Coefficients and Water Use for Peppers in Southwest Florida<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply<br />

Basin(s) Alafia River, Hillsborough River, Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

University of Florida<br />

Project Manager COHEN, RON<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

Peppers are one of the major row crops grown in the District and in some regions, second only to tomatoes. The<br />

actual amount of water these crops use is based on soils, growing season and climatic conditions. To improve the<br />

crops' water use efficiency and to help conserve water, it is important for the grower and the District to know exactly<br />

how much water the crops require. This lysimeter study will determine how much water pepper plants in Southwest<br />

Florida need, determine crop coefficients and an irrigation schedule to help growers.<br />

Benefits<br />

Currently there are over 8,000 acres directly permitted for pepper production and an additional 17,000 acres that might<br />

be in a rotation with pepper. These sites are permitted for about 16.5 Mgd (27 Mgd for rotational sites). The number of<br />

acres planted and their water use will change annually based on market and climatic conditions. Assuming that results<br />

from this project will help reduce <strong>10</strong>% of that water, the savings could be about 1.7 Mgd. Added benefits to this project<br />

include a potential reduction in pollutant loading and information for AGMOD.<br />

Costs<br />

This two-year project will cost $135,000. These costs will be divided between the five basin boards that have the most<br />

acres permitted for pepper production. Project costs have been prorated between the Alafia (49%), Hillsborough River<br />

(19%), Manasota (15%), Peace River (8%) and the Withlacoochee River (9%) Basin Boards. Basin Board funds will<br />

be budgeted in FY2007, FY2008 and FY2009. Alafia River will budget $<strong>21</strong>,891, Hillsborough River will budget $8,514,<br />

Manasota will budget $4,257, Peace River will budget $3,649 and the Withlacoochee River will budget $6,689 each<br />

year.<br />

Additional Information<br />

Currently, the District and the growers use water use values developed outside of Florida. Although these values<br />

seem to be reasonable, local crop coefficients could help enhance irrigation scheduling and reduce water use. In<br />

addition, the crop coefficients will help decrease the transport of nutrients into the ground and surface water. Water<br />

use within the District is expected to increase by 2020. It is anticipated that a large portion of this increased demand<br />

will be met by water conservation. Since agricultural water use accounts for the largest fraction of the total permitted<br />

water amount in the District, efforts are needed to develop methods to help this water use sector reduce their water<br />

use.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

011 Alafia River Basin 43,782 0 <strong>21</strong>,891<br />

0<br />

0 65,673<br />

013 Hillsborough River Basin 17,028 0 8,514<br />

0<br />

0 25,542<br />

019 Withlacoochee River Basin 13,378 0 6,689<br />

0<br />

0 20,067<br />

020 Peace River Basin 7,298 0 3,649<br />

0<br />

0 <strong>10</strong>,947<br />

0<strong>21</strong> Manasota Basin 8,514 0 4,257<br />

0<br />

0 12,771<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$135,000<br />

Critical Project Milestones Projected Amended Actual<br />

Agreement to Contracts 8/1/06 5/1/07<br />

020 - Peace River Basin <strong>10</strong>6


B238<br />

Crop Coefficients and Water Use for Peppers in Southwest Florida<br />

Agreement to Cooperator 11/1/06 6/1/07<br />

District Executes Agreement 12/1/06 8/31/07<br />

Notice to Proceed 1/1/07 8/31/07<br />

Basin Board Notification 2/1/07 <strong>10</strong>/31/07<br />

Year 1. Data Collection 12/1/08 11/30/08<br />

Year 2. Data Collection 12/1/09<br />

Year 3. Data Collection 12/1/<strong>10</strong><br />

Project Ends 12/31/11<br />

Status As Of: June <strong>10</strong>, 2009<br />

8/15/2006 - Develop agreement. 12/4/2006 - Reviewed draft scope of work. 2/28/2007 - Processing agreement. 5/1/2007<br />

- Agreement in legal for review. 7/6/2007 - Waiting for IFAS to execute the Agreement. 8/31/2007 - Notice to Proceed<br />

has been issued to IFAS. 11/1/2007 - - Data collection continuing as planned. 1/9/2007 - Data collection continuing as<br />

planned. 2/29/2008 - Data collection continuing as planned. 5/1/2008 - Data collection continuing as planned. 7/1/2008 -<br />

Dormant for summer. 9/1/2008 - Field preparation for new growing season. 11/1/2008 - Data collection, project<br />

continuing as planned 12/17/2008 - Data collection, project continuing as planned 3/6/2009 - Data collection, project<br />

continuing as planned. 4/20/2009 - Data collection, project continuing as planned. 4/20/2009 - Data collection, project<br />

continuing as planned. 6/<strong>10</strong>/2009 - Data collection, project continuing as planned.<br />

020 - Peace River Basin <strong>10</strong>7


B239<br />

Determine Water Requirements For Genetically Altered Lantana<br />

Camara Nursery and Landscape Plants<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply, Water Quality, Natural Systems<br />

Basin(s) Alafia River, Hillsborough River, Peace River, Manasota<br />

Cooperator(s)<br />

University of Florida<br />

Project Manager COHEN, RON<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

A large amount of water is permitted for nursery and landscape irrigation. With the increase of urban development it is<br />

anticipated that the overall permitted amount for these uses will also increase. To reduce water use for landscape<br />

irrigation and to conserve water, the District has been promoting Florida Friendly principles. One of the first and most<br />

important principles of this practice is the selection and use of drought-tolerant plants (Koske and Owings). The intent<br />

of this project is to develop a drought tolerant variety of Lantana camara; and determining its water needs for nursery<br />

production and urban landscapes.<br />

Benefits<br />

It is estimated that each year Florida nurseries sell as many as 40 million Lantana plants to other states, of those<br />

plants about 5 million are grown within the District. The number of acres planted and their water use will change<br />

annually based on market and climatic conditions. To quantify an estimated water savings from this project lets<br />

assume one Lantana plant covers 12 square feet (3 ft x 4 ft) and the proposed Lantana plants will save 150 gallons of<br />

water a year, thus these plants could save as much as 750 million gallons of water a year for this District.<br />

Costs<br />

This three-year project will cost $112,790. Currently over 80% of the District's permitted container nursery production<br />

occurs within the jurisdictional region of four basin boards. Funding for this project is prorated between them (Alafia<br />

River (22%), Manasota (22%), Hillsborough River (28%) and Peace River (28%)) boards. The Nursery industry has<br />

provided $12,890 for this project and the Alafia Basin Board will budget $7,350, Hillsborough River will budget $9,350,<br />

Manasota will budget $7,350 and the Peace River will budget $9,350 in FY2007; and $33, 250 (Alafia River - $7,315,<br />

22% , Manasota - $7,315, 22%, Hillsborough River $9,3<strong>10</strong>, 28% and Peace River $9,3<strong>10</strong>, 28%) in both FY2008 and<br />

FY2009.<br />

Additional Information<br />

In the past the industry has provided seed money to start this project and they are supportive of this proposal. Drought<br />

tolerant plants develop various mechanisms that allow them to survive droughts, and stay green while producing<br />

flowers without much water. Lantana depressa and Lantana involucrata are some of the best drought tolerant plants<br />

available and are among the few plants recommended for desert landscaping in Arizona (City of Tucson; Hedding;<br />

Master gardeners of the University of Arizona Pima County Extension Services). In addition they have been used<br />

widely in many other states such as California (UC Sacramento County Extension) and Nevada (Southern Nevada<br />

Water Authority) for landscape water conservation. Lantana depressa and Lantana involucrate are not widely used in<br />

Florida.Several lantana species exist in Florida. Lantana depressa and Lantana involucrata provide year-round color,<br />

use little irrigation, have excellent salt tolerance (Beaulieu), attracts butterflies (Schaefer et al., 2002) and<br />

hummingbirds (Beaulieu), and have limited fertilization and pesticide requirements (Beaulieu; Owings, 2004), which<br />

helps to reduce pollutant loading. Because of these attributes, Lantana depressa and Lantana involucrata, are<br />

recommended for water saving in Florida landscapes (South Florida Water Management District). However, adoption<br />

of these species of Lantana has been poor because they do not have appealing growth habits and flower colors.<br />

Homeowners, nurseryman and landscapers prefer growing Lantana camara. This species of Lantana offers a<br />

spectrum of long-lasting colors and is widely used in the U.S. (Koske and Owings; Russ, 2004). In Florida, Lantana<br />

camara varieties produce abundance of viable pollen and hybridize with Florida's native species, Lantana depressa,<br />

contaminating the native species' gene pool. Consequently, they have been listed as a Category I invasive species by<br />

the Florida Exotic Pest Plant Council (http://www.fleppc.org/). Category I invasive species are defined as invasive<br />

exotics that are altering native plant communities by displacing native species, changing community structures or<br />

ecological functions, or hybridizing with natives. IFAS, FDACS and other entities do not recommend producing or<br />

growing Category I invasive species plants. Genetic sterilization of Lantana camara could control its invasiveness,<br />

thus protecting Florida's native species and ecosystems. Also, it will allow it to be used widely in public and residential<br />

landscapes for water conservation and butterfly attraction. Thus conserving water and reducing pollutant loading into<br />

the state's water resources. This project will develop a variety of Florida Friendly sterile Lantana camara plants. In<br />

addition it will determine the plants water requirements for nursery and landscape irrigation.<br />

020 - Peace River Basin <strong>10</strong>8


B239<br />

Determine Water Requirements For Genetically Altered Lantana<br />

Camara Nursery and Landscape Plants<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

011 Alafia River Basin 14,700 0 7,315<br />

0<br />

0 22,015<br />

013 Hillsborough River Basin 18,700 0 9,3<strong>10</strong><br />

0<br />

0 28,0<strong>10</strong><br />

020 Peace River Basin 18,700 0 9,3<strong>10</strong><br />

0<br />

0 28,0<strong>10</strong><br />

0<strong>21</strong> Manasota Basin 14,700 0 7,315<br />

0<br />

0 22,015<br />

Project Funds Not Budgeted by the<br />

District<br />

FNGLA 12,890 0 0<br />

0<br />

0 12,890<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$112,940<br />

Critical Project Milestones Projected Amended Actual<br />

Agreement to Contracts 8/1/06 8/1/06<br />

Agreement to Cooperator 11/1/06 <strong>10</strong>/1/06<br />

District Executes Agreement 12/1/06 11/1/06<br />

Notice to Proceed 1/1/07 11/1/06<br />

Basin Board Notification 2/1/07 11/1/06<br />

Governing Board Notification 2/1/07 11/1/06<br />

Year 1. Data Collection 12/1/07 12/1/07<br />

Year 2. Data Collection 12/1/08 11/30/08<br />

Year 3. Data Collection 12/1/09<br />

Completion Report <strong>10</strong>/1/<strong>10</strong><br />

Project Ends 1/31/11<br />

Status As Of: August 27, 2009<br />

8/15/2006 - Agreement to Contracts. <strong>10</strong>/12/2006 - Agreement sent to cooperator for review and execution. 11/2/2006 -<br />

Cooperator executes agreement. 11/8/2006 - NOP sent to cooperator. 12/4/2006 - Reviewed task report. 2/28/2007 -<br />

Project continuing as planned. 5/1/2007 - Reviewed task report, project continuing as planned. 7/6/2007 - Site visit<br />

project continuing as planned. 8/31/2007 - Reviewed task report, project continuing as planned. 11/1/2007 - Data<br />

collection continuing as planned 1/2/2008 - Reviewed task completion report, project continuing as designed. 2/29/2008 -<br />

Data collection continuing as planned. 5/1/2008 - Data collection continuing as planned. 7/1/2008 - Review task report,<br />

project continuing as planned. 9/1/2008 - Data collection continuing as planned. 11/1/2008 - Data collection continuing as<br />

planned. 12/17/2008 - Data collection continuing as planned. 3/6/2009 - Data collection, project continuing as planned.<br />

4/20/2009 - Data collection, project continuing as planned. 6/<strong>10</strong>/2009 - Modified scope of work to reduce irrigation<br />

application rates. 9/1/2009 - Data collection, project continuing as planned.<br />

020 - Peace River Basin <strong>10</strong>9


B240<br />

Reducing Water Consumption in Polyethylene-Mulched Tomato and<br />

Pepper Fields after Methyl Bromide Pha<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply<br />

Basin(s) Alafia River, Peace River, Manasota<br />

Cooperator(s)<br />

University of Florida<br />

Project Manager COHEN, RON<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

Tomato and pepper producers use methyl bromide (MBr) to fumigate their beds before production. About 50 to 95% of<br />

the MBr that is injected in to the soil can eventually enter the atmosphere and damage the earth's ozone layer. EPA's<br />

Clean Air Act (Amendments of 1990) requires that MBr and other similar chemicals be phased out. The loss of MBr<br />

has a major impact on the production practices of tomato and pepper producers in our District and can cause an<br />

increase in their water use. This project will provide the water use information needed to address this change in<br />

technology.<br />

Benefits<br />

Water use information from this project will be used by growers to save water and in the District's conservation,<br />

planning and permitting programs. This will help preserve ground water, reduce off-site discharge of pesticides and<br />

nutrients and flooding and improve water quality. Currently there are about 152,000 acres in the District that are<br />

permitted for the production of tomatoes and peppers. These sites are permitted for about 335 Mgd. The number of<br />

acres planted and their water use will change annually based on market and climatic conditions. Assuming that results<br />

from this project will help reduce at a minimum 5% of the permitted water, the savings would be about 17 Mgd.<br />

Costs<br />

This project will cost $150,000. About 98% of the permitted tomato and pepper production is divided between three<br />

basin boards. Project costs have been prorated between the Alafia (22%), Manasota (67%), and Peace River (11%)<br />

Basin Boards. Funds will be budgeted in FY2007 and FY2008, Alafia will budget $33,500, Manasota will budget<br />

$11,000 and the Peace River will budget $5,500 each year.<br />

Additional Information<br />

Tomato and pepper production relies on a relatively large quantity of water to provide the necessary soil moisture to<br />

establish, grow and harvest both crops. These commodities are grown with either seepage or seepage plus drip<br />

irrigation. Both systems require constant irrigation to maintain the water table relatively shallow during crop<br />

establishment, which reduces the soil storage, increases the risks of flooding, off-site discharge and nutrient leaching.<br />

A quick calculation of the irrigation volumes required to produce one acre of tomato indicates that between 4 and 6<br />

ac-inches per acre of water are used to establish and maintain the crop with seepage irrigation. Most existing<br />

recommendations for tomato and pepper production were generated when MBr was a viable option for bed<br />

fumigation. Also, relatively inexpensive low density-polyethylene mulch (LDPE) was used and current environmental<br />

regulations about water run-off and nutrient leaching were not always considered in research projects. Current<br />

production practices have changed considerably since past water and production requirements were developed. This<br />

project will look at the new technology and changes in growing practices. The University of Florida and the State of<br />

Florida have started a vigorous campaign to address the phase out of MBr and the development of Best Management<br />

Practices (BMP). Within that context, the use of new developments in fumigation techniques and mulch materials that<br />

tend to reduce water use makes sense. Current MBr alternatives, such as 1,3-dichloropropene + chloropicrin (1,3-D +<br />

Pic; Telone C-35) and methyl iodide (MI; Midas), have poor efficacy against soil borne pests when applied in saturated<br />

soils, as it was customary for MBr, because these molecules can bind more tightly to water molecules than MBr.<br />

Another reason that justifies exploring reduced water irrigation programs is the use of higher retentive mulch films<br />

(virtually impermeable (VIF) and metalized films). These mulches retain more moisture in the planting beds than<br />

previous materials, which adds another component to fumigant and water management in tomato and pepper<br />

production. No defendable scientific research has been conducted in Florida to reduce water irrigation volumes for<br />

tomato and pepper by combining the lower water requirement of new fumigants and the higher water retention of new<br />

mulch films. This project will determine the effect of varying water management regimes on tomato and pepper<br />

production, and assess the effect of high retentive mulches and MBr alternatives on the water volumes necessary for<br />

tomato and pepper irrigation.<br />

020 - Peace River Basin 1<strong>10</strong>


B240<br />

Reducing Water Consumption in Polyethylene-Mulched Tomato and<br />

Pepper Fields after Methyl Bromide Pha<br />

Prior Cumulative FY 2009 FY20<strong>10</strong><br />

Funding Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

67,000 0 33,500<br />

0<br />

011 Alafia River Basin 0 <strong>10</strong>0,500<br />

020 Peace River Basin 11,000 0 5,500<br />

0<br />

0 16,500<br />

0<strong>21</strong> Manasota Basin 22,000 0 11,000<br />

0<br />

0 33,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$150,000<br />

Critical Project Milestones Projected Amended Actual<br />

Agreement to Contracts 8/1/06 8/26/06<br />

Agreement to Cooperator 11/1/06 <strong>10</strong>/1/06<br />

District Executes Agreement 12/1/06 11/1/06<br />

Notice to Proceed 1/1/07 11/1/06<br />

Basin Board Notification 2/1/07 11/1/06<br />

Governing Board Notification 2/1/07 11/1/06<br />

Year 1. Data Collection 12/1/07 12/1/07<br />

Year 2. Data Collection 12/1/08 11/30/08<br />

Completion Report - Estimated 6/1/09 6/30/<strong>10</strong><br />

Project Ends <strong>10</strong>/31/09 11/30/<strong>10</strong><br />

Year 3. Data Collection 12/1/09 1/1/<strong>10</strong><br />

Status As Of: August 27, 2009<br />

8/15/2006 - Agreement to Contracts. <strong>10</strong>/12/2006 - Agreement is being reviewed by Legal. 11/8/2006 - Sent notice to<br />

proceed. 12/4/2006 - Field preparation. 2/28/2007 - Data collection project continuing as planned. 5/1/2007 - Data<br />

collection project continuing as planned. 7/6/2007 - Dormant for summer. 8/31/2007 - Reviewed task completion report.<br />

Project continuing as designed. 11/1/2007- Data collection project continuing as planned. 1/2/2008 - Field preparation for<br />

next season. 2/29/2008 - Data collection continuing as planned. 5/1/2008 - Data collection continuing as planned.<br />

7/1/2008 - Dormant for summer. 9/1/2009 Field preparation for new season. 11/1/2008 - Data collection, project<br />

continuing as planned. 12/1/2008 - Data collection, project continuing as planned 2/23/09 - Execute no cost time<br />

extension. 4/20/2009 - Data collection, project continuing as planned 6/<strong>10</strong>/2009 - Project dormant for summer. 9/1/2009 -<br />

Starting last season.<br />

020 - Peace River Basin 111


B241<br />

Reduction of Water Use for Citrus Cold Protection<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply, Water Quality<br />

Basin(s) Alafia River, Peace River, Manasota<br />

Cooperator(s)<br />

University of Florida<br />

Project Manager COHEN, RON<br />

Task Manager(s)<br />

Status Completed<br />

Description<br />

This is a multi-agency agricultural water conservation project to assist citrus producers in reducing water use for cold<br />

protection. The project is an expansion and enhancement of a previously successful Peace River and Alafia Basin<br />

Board project (B137). That project was taken statewide by FDACS, SFWMD and SJRWMD. Florida citrus growers use<br />

low volume irrigation to conserve water and to provide a more effective method of freeze protection. One characteristic<br />

of low volume irrigation used for citrus freeze protection is that the decision to use irrigation must be made prior to the<br />

water in the lateral irrigation lines reaching freezing temperatures of 32 degrees F. This project would develop<br />

site-specific methodology to accurately determine minimum temperatures the next morning based on sunset<br />

temperatures recorded the previous evening. This allows for multiple temperature observations on cold nights from the<br />

growing area providing necessary replication of the Brunt equation. In addition, this project will help disseminate this<br />

information in newsletters and other sources, including FAWN to help the growers conserve water.<br />

Benefits<br />

The water saving would be a function of acres normally protected and gallons of water per acre per hour. Systems<br />

started at 8:00 p.m. and operated to 8:00 a.m. the following morning at <strong>10</strong>0 trees/acre and <strong>10</strong> gallon/hour emitters<br />

would require 12,000 gallons of water per acre per night of freeze protection. This volume represents a total of 0.44<br />

acre-inches of water used for freeze protection per night. Implementation of this methodology by <strong>10</strong>% of the permitted<br />

citrus acreage within the Alafia, Manasota and Peace River Basin Boards (35,526 acres) would result in a water<br />

savings of 424,458,000 gallons of water per non-critical freeze night.<br />

Costs<br />

This three-year project will cost $15,000. About 90% of the permitted citrus acres are within three basin boards and<br />

project costs have been prorated between the Alafia (12%), Manasota (8%) and Peace River (80%) Basin Boards. In<br />

FY2007, FY2008 and FY2009 Alafia will budget $600, Manasota will budget $400 and the Peace River will budget<br />

$4,000 each year.<br />

Additional Information<br />

One characteristic of low volume irrigation used for citrus freeze protection is that the decision to use irrigation must<br />

be made prior to the water in the lateral irrigation lines reaching freezing temperatures of 32 degrees F. Mature citrus<br />

foliage is subject to freeze damage at temperatures below 24 degrees F depending on acclimation and tree condition.<br />

Minimum temperatures above 24 degrees F would result in minimal freeze damage of acclimated mature citrus<br />

foliage. Temperatures that would fall between 32 and 24 degrees F would require no water resources for freeze<br />

protection, since these temperatures would be above critical values for acclimated citrus leaves. There is an<br />

opportunity to determine before a freeze event time the actual need for irrigation to protect citrus trees, thus saving<br />

water resources during a freeze event. Temperature models exist that can help predict minimum temperatures for the<br />

following morning at sunset the previous day under stable freeze conditions and are available through the FAWN<br />

(project B136) weather network. These models need to be enhanced for individual locations to develop a high level of<br />

confidence among citrus growers using the models (Brunt equation to predict minimum temperature methodology has<br />

worked for both advective and radiation type freezes). Leaf freezing methodology was developed in the early 1980's<br />

and late 1990's at the University of Florida Fruit Crops Department. Determinations of KP50 (killing point) of citrus<br />

leaves were made weekly on mature citrus leaves to quantify the level of citrus acclimation to cooler temperatures<br />

experienced in the fall and winter months. Data indicated that these leaf-freezing temperatures were dynamic in nature<br />

and changed throughout the winter in response to previous week's growing conditions. This project would develop<br />

site-specific methodology to accurately determine minimum temperatures the next morning based on sunset<br />

temperatures recorded the previous evening this allows for multiple temperature observations on cold nights from the<br />

growing area providing necessary replication of the Brunt equation. In addition, this project will help disseminate this<br />

information in newsletters and other sources, including FAWN to help the growers conserve water. Historical<br />

temperature data indicates (1941-1970) that there is a 75% chance of temperatures reaching 32 degrees F or lower<br />

during any given winter in Tampa and a 95% chance of 32 degrees F or lower in Lake Alfred during any given winter.<br />

Growers using this methodology in the 2000-2001 season based on historical weather data from the FAWN Dover and<br />

Lake Alfred locations had 6 and 7 nights of minimum temperatures below 32 degrees F, respectfully. Growers run<br />

their irrigation system for cold protection when temperatures were predicted to be 32 degrees F or below. This is in<br />

020 - Peace River Basin 112


B241<br />

Reduction of Water Use for Citrus Cold Protection<br />

response to the uncertainty of the actual minimum morning temperatures. This would have resulted in 13 nights of<br />

freeze protection-using water. Minimum temperatures on all 13 nights regardless of location did not reach a minimum<br />

temperature of 26 degrees F. Growers with accurate information of foliage freezing temperatures would not have<br />

realized any additional benefit in protecting foliage if water was used for freeze protection based on this criteria. The<br />

water saving would be a function of acres normally protected and gallons of water per acre per hour. Systems started<br />

at 8:00 p.m. and operated to 8:00 a.m. the following morning at <strong>10</strong>0 trees/acre and <strong>10</strong> gallon/hour emitters would<br />

require 12,000 gallons of water per acre per night of freeze protection. This volume represents a total of 0.44<br />

acre-inches of water used for freeze protection per night. Implementation of this methodology by <strong>10</strong>% of the permitted<br />

citrus acreage within the Alafia, Manasota and Peace River Basin Boards (35,526 acres) would result in a water<br />

savings of 424,458,000 gallons of water per noncritical freeze night. Most of the project costs (i.e., equipment) were<br />

incurred by the Polk County Citrus Advisory Committee. This project will need funds to collect leaf data and to<br />

distribute the information. In addition, the funds will be required for the educational component to help teach the<br />

growers how to use the data.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

011 Alafia River Basin 1,200 0 600<br />

0<br />

0 1,800<br />

020 Peace River Basin 8,000 0 4,000<br />

0<br />

0 12,000<br />

0<strong>21</strong> Manasota Basin 800 0 400<br />

0<br />

0 1,200<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$15,000<br />

Critical Project Milestones Projected Amended Actual<br />

Agreement to Contracts 8/1/06 8/1/06<br />

Agreement to Cooperator 11/1/06 <strong>10</strong>/1/06<br />

District Executes Agreement 12/1/06 11/1/06<br />

Notice to Proceed 1/1/07 11/1/06<br />

Basin Board Notification 2/1/07 12/1/06<br />

Governing Board Notification 2/1/07 12/1/06<br />

Year 1. Data Collection 12/1/07 12/1/07<br />

Year 2. Data Collection 12/1/08 11/30/08<br />

Completion Report 6/1/09<br />

Project Ends 11/30/09<br />

Status As Of: August 27, 2009<br />

<strong>10</strong>/12/2006 - Agreement is being reviewed by Legal. 11/8/2006 - Sent official notice to proceed. 12/4/2006 Mobilizing<br />

equipment. 2/28/2007 - Data collection, mild winter not too much to report. 5/1/2007 - Dormant for summer. 7/6/2007 -<br />

Processed payment, Dormant for summer. 8/31/2007 - Dormant for summer. 11/1/2007 - Dormant for summer. 1/2/2008<br />

- Reporting weather watch to growers and determining plant cold hardness index. 2/29/2008 - Reporting weather watch<br />

to growers and determining plant cold hardness index. 5/1/2008 - Dormant for summer. 71/2008 - Dormant for summer.<br />

9/1/2008 - Processed payment, dormant for summer. 11/1/2008 - Dormant for summer 12/17/2008 - Participated in<br />

Pasco County weather school. 3/9/2009 - Wrapping up project 4/20/2009 - Wrapping up project. Processed final<br />

payment. 9/1/2009 Project ended.<br />

020 - Peace River Basin 113


B242<br />

Potential to Use ASR in the Avon Park Formation<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply<br />

Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Pinellas-Anclote River, Peace River,<br />

Manasota<br />

Cooperator(s)<br />

Project Manager HOOD, JILL<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This study will evaluate the potential for ASR operation in the Avon Park Formation, which is not the injection zone<br />

typically used for ASR in the southern and central areas of the District. Investigators from the University of South<br />

Florida Geology Department will conduct a detailed mineralogical and chemical investigation of the Avon Park<br />

Formation that will culminate in an ASR operation model. Compounds that are regulated by primary and secondary<br />

drinking water standards will be considered, with an initial focus on arsenic and its identified source, pyrite. Major<br />

tasks of the study will include: descriptions of existing cores; sample collection; chemical analysis and interpretation of<br />

cores; collection and analysis of Avon Park Formation groundwater; and modeling a range of ASR scenarios using the<br />

collected data.<br />

Benefits<br />

Water supply continues to be a critical issue in the SWUCA, and this study compliments the District's water supply<br />

planning efforts. This project will enable the District and local governments to make knowledgeable decisions about<br />

future investment in ASR.<br />

Costs<br />

Six Basin Boards have been asked to participate in funding this project at a level of $12,000 each in FY2007 and<br />

$12,000 each in FY2008.<br />

Additional Information<br />

ASR is an important water supply option that is integral to water resources management in the SWUCA. Because of<br />

the significant benefit to future water supply that ASR can provide, the District has funded several ASR projects and<br />

investigative studies to further develop this technology. Over the past several years, there have been growing<br />

concerns about the quality of water retrieved from the current injection zone, the Suwannee Limestone. Elevated<br />

arsenic concentrations have been consistently discovered in injectate that is stored and recovered from the Suwannee<br />

Limestone. The results of this study will be an important tool that can be used to evaluate future ASR development in<br />

the SWUCA.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

011 Alafia River Basin 26,079 0 926<br />

0<br />

0 27,005<br />

013 Hillsborough River Basin 26,079 0 926<br />

0<br />

0 27,005<br />

014 Northwest Hillsborough Basin 26,079 0 926<br />

0<br />

0 27,005<br />

016 Pinellas-Anclote River Basin 26,079 0 926<br />

0<br />

0 27,005<br />

020 Peace River Basin 26,079 0 926<br />

0<br />

0 27,005<br />

0<strong>21</strong> Manasota Basin 26,079 0 926<br />

0<br />

0 27,005<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$162,030<br />

Critical Project Milestones Projected Amended Actual<br />

Contract execution 2/25/07<br />

Contract completion 2/25/09 9/30/09<br />

020 - Peace River Basin 114


B242<br />

Potential to Use ASR in the Avon Park Formation<br />

Status As Of: August <strong>21</strong>, 2009<br />

Contacted USF to remind Dr. Pichler, Principal Investigator, of the upcoming due date of the Final Report. Final Draft<br />

Report should be received by mid-September and contract expires September 30, 2009.<br />

020 - Peace River Basin 115


B243<br />

Long-Term Water Budget Analysis of Lake Starr, Polk County<br />

Florida<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

United States Geological Survey<br />

Project Manager BEACH, MICHAEL<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

The purpose of this cooperative project between the U.S. Geological Survey (USGS) and the District is to analyze the<br />

effects of rainfall and ground-water levels on the lake levels of Lake Starr over a wide range of conditions. This lake is<br />

a 134-acre seepage lake located on the Lake Wales Ridge within the Peace River Basin, about four miles north of<br />

Lake Wales. The project will be based on a <strong>10</strong>-year data set.<br />

Benefits<br />

It is believed that rainfall most affects lake levels when rainfall is above normal. It is also believed that ground-water<br />

levels most affect lake levels when rainfall is generally normal to low and ground-water levels are low due to pumping.<br />

However, if the District is to responsibly manage water resources, it is imperative that the District be able to verify and<br />

quantify these relationships. This ten-year dataset provides the District and the USGS with an extremely wide range of<br />

rainfall and lake level conditions, and the opportunity to significantly improve on the previous work. Additionally, the<br />

developed relationships between rainfall and ground-water levels versus lake levels will provide a measure against<br />

which simpler statistically-based models can be tested in the future.<br />

Costs<br />

The cost of the project is $600,000, to be shared equally between the USGS and the Peace River Basin Board. The<br />

project will take three years to complete, October 2006 through September 2009. District costs for FY2009 will be<br />

$<strong>10</strong>0,000 and will complete the District obligation to this project.<br />

Additional Information<br />

The USGS previously did an analysis on this lake for the 2-year period August 1996 through July 1998. During that<br />

period rainfall was 50.68 inches and 54.04 inches, respectively. These rainfall amounts are very close to the long term<br />

annual average of 51.99 inches. Lake levels during that time fluctuated between <strong>10</strong>3.9 feet and <strong>10</strong>6.6 feet , NGVD: a<br />

range of less than three feet. Since that time, the USGS has continued collecting data: lake levels, ground-water<br />

levels, rainfall, and evaporation. There are now ten years of data that include periods of extreme drought as well as<br />

periods of considerable rainfall. Lake levels over that time have fluctuated between 96.3 to <strong>10</strong>9.8 feet, NGVD: a range<br />

of over 13 feet. Analysis of the extended data will provide a better understanding of the contribution to lake levels from<br />

groundwater, rainfall, and evaporation at the extreme ends of the rainfall and lake level ranges.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 2<strong>10</strong>,486 0 <strong>10</strong>4,859<br />

0<br />

0 315,345<br />

Project Funds Not Budgeted by the<br />

District<br />

USGS 200,000 0 <strong>10</strong>0,000<br />

0<br />

0 300,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$615,345<br />

Critical Project Milestones Projected Amended Actual<br />

Agreement Completed <strong>10</strong>/1/06 12/12/06<br />

Analytic Water Budget and Analysis 9/30/07 2/22/08<br />

Report Preparat & Review 3/31/08<br />

020 - Peace River Basin 116


B243<br />

Long-Term Water Budget Analysis of Lake Starr, Polk County<br />

Florida<br />

Model Development 12/31/08 7/31/09<br />

Project Complete & Report Due 9/30/09 6/30/<strong>10</strong><br />

Status As Of: August 20, 2009<br />

1. The USGS has requested a nine month, no cost extension for this project. Project was delayed due to problems with<br />

the computer codes which have now been resolved. 2. Model results are currently being summarized. 3.A draft report is<br />

planned for the end of December.<br />

020 - Peace River Basin 117


B244<br />

USGS - Hydrogeology and Quality of Groundwater in Highlands<br />

County<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply, Water Quality<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

United States Geological Survey<br />

Project Manager MCBRIDE, TAMERA<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This study will update information on the hydrogeology and water quality of the surficial, intermediate, and Floridan<br />

aquifers in Highlands County and will assess long-term water resource trends. The project will be conducted by the U.<br />

S. Geological Survey and cooperatively funded by the SWFWMD, SFWMD, Highlands County, and the U. S.<br />

Geological Survey. The project will be implemented over a three year period (FY2007 to FY2009) and will enable<br />

water resource managers to better evaluate current hydrologic conditions; define present-day baseline conditions; and<br />

identify what additional hydrologic data are needed.<br />

Benefits<br />

Water supply continues to be a critical issue in the SWUCA, and this study compliments the District's water supply<br />

planning efforts. This project will enable the District and local governments to make knowledgeable decisions about<br />

area water needs and resources.<br />

Costs<br />

FY2009 is the third year of this project, and additional funding requests are not anticipated. The total cost of the<br />

project is estimated to be $580,000 with the U.S. Geological Survey contributing $290,000, the SFWMD contributing<br />

$170,000, and the SWFWMD (Peace River Basin Board) and Highlands County each contributing $60,000.<br />

Additional Information<br />

Water resources in Highlands County have not been comprehensively studied in the last 50 years (Bishop, 1956), and<br />

information gathering is essential to make knowledgeable water resource decisions in the SWUCA. Population and<br />

water use have significantly increased in parts of the county since the last comprehensive study was completed. This<br />

report will enable water resource managers to better evaluate current hydrologic conditions; define present-day<br />

baseline conditions; and identify what additional hydrologic data are needed. This is a three-phase study that<br />

investigators will complete by researching existing information, collecting new data, and generating a written report. In<br />

Phase 1 (FY2007), data was compiled from area stakeholders, and was used to characterize current groundwater<br />

quality conditions, assess long-term trends, and identify data gaps. For Phase 2 (FY2008), groundwater levels were<br />

be measured; maps and hydrogeologic cross-sections were be developed; water level trends will were evaluated; and<br />

groundwater quality samples were collected and analyzed. The results of the study will be published in a USGS<br />

Scientific Investigations Report during Phase 3 (FY2009).<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 0 0 0 5,016<br />

0 5,016<br />

020 Peace River Basin 46,863 0 24,629<br />

0<br />

0 71,492<br />

Project Funds Not Budgeted by the<br />

District<br />

Highlands County 40,000 0 20,000<br />

0<br />

0 60,000<br />

SFWMD 76,000 0 56,000 35,000<br />

0 167,000<br />

USGS 156,000 0 96,000 35,000<br />

0 287,000<br />

020 - Peace River Basin 118<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$590,508


B244<br />

USGS - Hydrogeology and Quality of Groundwater in Highlands<br />

County<br />

Critical Project Milestones Projected Amended Actual<br />

Complete Research Existing Data and Information <strong>10</strong>/1/07 3/1/08 2/12/08<br />

Complete Hydrogeologic Mapping 4/1/08 2/12/08<br />

Complete Water Quality Sampling and Analysis <strong>10</strong>/1/08 <strong>10</strong>/1/08<br />

Submit Report for Final Approval <strong>10</strong>/1/09<br />

Status As Of: August 28, 2009<br />

More than 200 geologists' and geophysical logs were compiled to date for Highlands and adjacent counties. These data<br />

were used to construct more highly-resolved maps depicting the thickness of the surficial aquifer; top and thickness of<br />

the intermediate confining unit/intermediate aquifer system; and the top of the Upper Floridan aquifer in Highlands<br />

County. The source of the logs has been primarily from the files of the FGS, USGS, SFWMD, and SWFWMD. There are<br />

several areas of the county that contain little or no geologic data, which delayed completion of researching existing data.<br />

To help fill the voids, about 180 drillers' logs were obtained from the SFWMD. After careful review, about 40 of the most<br />

reliable logs were used to improve the hydrogeologic maps. Water quality sampling of wells in Highlands County began<br />

on September 28, 2007, and 52 wells were sampled for the major cations and anions and nutrients. Eight of the wells<br />

sampled tapped the surficial aquifer, 14 tapped the intermediate confining unit/intermediate aquifer system, and 30 wells<br />

tapped the Upper Floridan aquifer system. Groundwater quality maps were constructed for Highlands County with the 52<br />

wells sampled by the USGS and 82 other wells sampled by SWFWMD, SFWMD, FDEP, and Highlands County. The<br />

maps show the areal variability of specific conductance, chloride sulfate, hardness, and nitrate in the surficial,<br />

intermediate, and Upper Floridan aquifers.<br />

In August 2009, the first draft of the report was submitted to the USGS supervisor and the reports specialist in Ft.<br />

Lauderdale for review. The report currently includes 49 figures, four tables, and two appendices. After internal USGS<br />

comments are addressed, the draft report will be submitted for District review in September.<br />

020 - Peace River Basin 119


B246<br />

Water Conservation/FYN Regional Builder/Developer Specialist<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply, Water Quality, Natural Systems<br />

Basin(s) Alafia River, Hillsborough River, Coastal Rivers, Pinellas-Anclote River, Withlacoochee River,<br />

Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager DURELL, SYLVIA<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

The Water Conservation/FYN Regional Builder/Developer specialist, a Basin Initiative project, promotes<br />

implementation of indoor and outdoor water conservation to the members of the building industry, government<br />

employees and green building groups. The specialist also provides expert advice to participants in the District's Florida<br />

Water StarSM Gold (FSWG) program and other FWS programs the District implements. Effectiveness will be<br />

measured by the number of professional landscapers and irrigation system installers who incorporate Florida-friendly<br />

landscaping and the FWSG criteria in their projects. Education will be accomplished through one-on-one outreach,<br />

trainings and promotion of the programs' benefits at meetings of industry groups and local governments.<br />

The program's goal is to educate 15 builders, 15 landscape professionals and 15 irrigation specialists in FY20<strong>10</strong>.<br />

Benefits<br />

The program educates builders, developers, and landscape and irrigation professionals on the water conservation and<br />

water quality protection benefits of environmental landscaping best management practices. The specialist will continue<br />

to support FYN coordinators with outreach to builders and developers in their individual counties. In addition to<br />

educating on landscape best management practices, the specialist is involved in indoor water conservation education<br />

through the FWSG program.<br />

Costs<br />

The total cost of the FY20<strong>10</strong> program is $77,500 (Alafia River $5,425; Hillsborough River $18,600; Coastal Rivers<br />

$6,975; Pinellas-Anclote River $17,825; Withlacoochee River $5,425; Peace River $11,625; Manasota $11,625).<br />

Funding provides for project coordination, program expenses and travel expenses for outreach to all basins. The dollar<br />

amount allocated for each contributing basin is based on population. The budget lines below include costs for staff to<br />

manage the project.<br />

Additional Information<br />

The cost of the FY2009 program was $77,500 (Alafia River $5,425; Northwest Hillsborough $5,495; Hillsborough River<br />

$13,<strong>10</strong>5; Coastal Rivers $6,975; Pinellas-Anclote River $17,825; Withlacoochee River $5,425; Peace River $11,625;<br />

Manasota $11,625). FY20<strong>10</strong> is the third year of funding for this outreach. Education is based on the nine<br />

Florida-friendly landscaping principles that were created by the University of Florida/Institute of Food and Agricultural<br />

Sciences for the FYN program: Right Plant, Right Place, Water Efficiently, Fertilize Appropriately, Mulch, Attract<br />

Wildlife, Manage Yard Pests Responsibly, Recycle, Reduce Stormwater Runoff and Protect the Waterfront.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

011 Alafia River Basin 11,629 0 6,271 7,011<br />

0 24,911<br />

013 Hillsborough River Basin 25,947 0 12,612 <strong>21</strong>,035<br />

0 59,594<br />

014 Northwest Hillsborough Basin 14,078 0 7,056<br />

0<br />

0 <strong>21</strong>,134<br />

015 Coastal Rivers Basin 15,<strong>10</strong>1 0 7,865 8,625<br />

0 31,591<br />

016 Pinellas-Anclote River Basin 42,8<strong>21</strong> 0 20,404 18,672<br />

0 81,897<br />

019 Withlacoochee River Basin 14,993 0 7,841 7,011<br />

0 29,845<br />

020 Peace River Basin 31,038 0 14,840 13,278<br />

0 59,156<br />

0<strong>21</strong> Manasota Basin 26,769 0 13,336 13,266<br />

0 53,371<br />

020 - Peace River Basin 120<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$361,499


B246<br />

Water Conservation/FYN Regional Builder/Developer Specialist<br />

Critical Project Milestones Projected Amended Actual<br />

FY2008<br />

Purchase order created 3/1/08 3/3/08<br />

First task report 3/31/08 3/31/08<br />

Second task report 4/30/08 4/30/08<br />

Third task report 5/31/08 5/31/08<br />

Fourth task report 6/30/08 6/30/08<br />

Fifth task report 7/31/08 7/31/08<br />

Sixth task report 8/31/08 8/31/08<br />

Seventh task report 9/30/08 9/30/08<br />

Eighth task report <strong>10</strong>/31/08 <strong>10</strong>/31/08<br />

Ninth task report 11/30/08 11/28/08<br />

Tenth task report 12/31/08 12/31/08<br />

Eleventh task report 1/30/09 1/30/09<br />

Twelfth task report 2/27/09 2/27/09<br />

Project ends 2/28/<strong>10</strong> 2/28/09<br />

FY2009<br />

Purchase order created 3/1/09 3/13/09 3/13/09<br />

First task report 3/31/09 3/31/09<br />

Second task report 4/30/09 4/30/09<br />

Third task report 5/29/09 5/29/09<br />

Fourth task report 6/30/09 6/30/09<br />

Fifth task report 7/31/09 7/31/09<br />

Sixth task report 8/31/09 8/31/09<br />

Seventh task report 9/30/09<br />

FY20<strong>10</strong><br />

Purchase order created <strong>10</strong>/1/09<br />

Purchase order extended <strong>10</strong>/12/09<br />

First task report 11/5/09<br />

Second task report 12/4/09<br />

Third task report 1/5/<strong>10</strong><br />

Fourth task report 2/5/<strong>10</strong><br />

Fifth task report 3/5/<strong>10</strong><br />

Sixth task report 4/5/<strong>10</strong><br />

Seventh task report 5/5/<strong>10</strong><br />

Eighth task report 6/4/<strong>10</strong><br />

Ninth task report 7/5/<strong>10</strong><br />

Tenth task report 8/5/<strong>10</strong><br />

Eleventh task report 9/6/<strong>10</strong><br />

Twelfth task report <strong>10</strong>/5/<strong>10</strong><br />

Status As Of: September 16, 2009<br />

Angela Maraj, the water conservation/FYN regional builder/developer specialist: (1) provided guidance and input for the<br />

creation of the new FNGLA FWS Landscape Design Accredited Professional training, which will be presented for the first<br />

time on 9/30/2009 during the Landscape Show in Orlando and will promote the program to landscape designers to help<br />

more industry professionals learn about FWS; (2) reviewed six landscape plans for residential landscape retrofits for the<br />

Brooker Creek landscape project; (3) made a presentation to homeowners in Charlotte County for the irrigation pilot<br />

program; (4) will assist with the SB2080 workshops being planned by UF and the District by coordinating with FYN<br />

coordinators to ensure consistency in their presentations; (5) is a member of the planning committee for the 4th Annual<br />

Sustainable Communities workshop, scheduled for 11/3/2009 in Sarasota, which has a conference theme on the<br />

water/energy nexus; (6) conducted several FWSG inspections including Hickman Homes in Lakeland and Real building,<br />

Inc. in St. Petersburg, both of which met the certification criteria; (7) is the program liaison with the builder, landscape<br />

designer and irrigation installer for the Polk County Builders Association's Go Green Showcase Home; (8) has discussed<br />

the FWS retrofit program with staff at the Florida House; will provide landscape guidance to staff with Florida Home<br />

Partnership, Inc. for potential FWSG certification; (9) has begun discussing possible collaboration with Sarasota County<br />

020 - Peace River Basin 1<strong>21</strong>


B246<br />

Water Conservation/FYN Regional Builder/Developer Specialist<br />

to present a Rainwater Harvesting Accredited Professional workshop. ACTION TO DATE: On time.<br />

020 - Peace River Basin 122


B251<br />

National Hydrography Database (NHD)<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality, Natural Systems<br />

Basin(s) General Fund (District), Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers,<br />

Pinellas-Anclote River, Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

N/A<br />

Project Manager KARLIN, AL<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

The NHD is a comprehensive set of Geographic Information System (GIS) data that contains information about<br />

surface water features such as lakes, ponds, streams, rivers, springs and wells. This dataset was created by the<br />

United States Geological Survey (USGS) in cooperation with the Environmental Protection Agency (EPA) to provide a<br />

consistent nationwide database to link water-related data to specific streams and waterbodies. The five water<br />

management districts and the FDEP cooperatively created Florida's original version of the NHD in the late 1990's and<br />

early 2000's. The dataset was created using the best available information, hydrographic features found on the USGS<br />

7.5 Minute Topographic Quadrangles. While the original NHD supports many District uses, it often does not have the<br />

level of information required to support detailed modeling efforts. The funding proposed here will be used to upgrade<br />

the NHD dataset for our jurisdiction using detailed hydrographic information captured under the District's Watershed<br />

Management Program. Similar efforts are underway at the St. Johns River Water Management District and are being<br />

evaluated at the South Florida Water Management District.<br />

Benefits<br />

Participating in the NHD update effort provides an effective mechanism for integrating our detailed hydrographic<br />

information into a nationwide database that is distributed by the USGS. Since the NHD is used by the FDEP and other<br />

water management districts, the District's modeling and data collection efforts will benefit from improved data<br />

consistency with those agencies. This project benefits federal, state, local, and private entities by providing access to<br />

the District's detailed hydrographic data in an industry standard format.<br />

Costs<br />

The requested FY2008 funds will be used to fund a contract position and supporting services at FDEP to update the<br />

NHD and transfer the data to the USGS. Funding is split between the Governing Board and Basin Boards. The<br />

Governing Board provides fifty percent of the total project cost with the remainder being split between the Basin Board<br />

based on area. It is anticipated that this will be an annual budget request that will continue to provide updates to the<br />

NHD in coordination with the District's Watershed Management Program. The FY2009 budget will increase by<br />

approximately $2000 to accommodate the FDEP changes for indirect costs.<br />

Additional Information<br />

No federal, state or local government currently updates the NHD for our area. The District does not have sufficient<br />

in-house resources to support this effort and the funding will be used to outsource this work to the FDEP. FDEP is the<br />

primary NHD coordinating body in Florida.<br />

020 - Peace River Basin 123


B251<br />

National Hydrography Database (NHD)<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 30,671 0 15,865<br />

0<br />

0 46,536<br />

011 Alafia River Basin 2,052 0 1,061<br />

0<br />

0 3,113<br />

013 Hillsborough River Basin 2,226 0 1,151<br />

0<br />

0 3,377<br />

014 Northwest Hillsborough Basin 472 0 244<br />

0<br />

0<br />

716<br />

015 Coastal Rivers Basin 2,428 0 1,256<br />

0<br />

0 3,684<br />

016 Pinellas-Anclote River Basin 1,<strong>10</strong>8 0 573<br />

0<br />

0 1,681<br />

019 Withlacoochee River Basin 6,000 0 3,<strong>10</strong>3<br />

0<br />

0 9,<strong>10</strong>3<br />

020 Peace River Basin 9,090 0 4,702<br />

0<br />

0 13,792<br />

0<strong>21</strong> Manasota Basin 3,953 0 2,045<br />

0<br />

0 5,998<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$88,000<br />

Critical Project Milestones Projected Amended Actual<br />

1. Milestone - Myakka Basin<br />

Review linear network for Myakka Sub-basin 11/1/07 6/1/08 5/30/08<br />

Revise NHD network 2/1/08 8/1/08 9/2/08<br />

Review and revise flowpaths/directions 5/1/08 <strong>10</strong>/1/08 11/4/08<br />

Capture lakes/wetlands and QA/QC 6/1/08 12/1/08 2/28/09<br />

Upload Data to National NHD 7/1/08 2/14/09 2/28/09<br />

2. Milestone - Sarasota Bay Basin<br />

Review/revise linear Network 8/1/08 <strong>10</strong>/1/08 8/1/08<br />

Review/Revise flowpaths 9/1/08 12/1/08 8/2/08<br />

Upload Data to National NHD 9/15/08 2/14/09 8/12/08<br />

3. Milestone - Withlacoochee Basin<br />

Project Initiation 3/15/09 4/1/09 4/1/09<br />

Uploading of Primary Area to USGS 12/30/09<br />

Deliver 50% of Basin to SWFWMD 12/30/09<br />

Status As Of: August 03, 2009<br />

Talked with Joe North regarding progress on the Withlacoochee. He indicated that the Sarasota County data were<br />

accepted by the USGS and that progress was being made on the Withlacoochee watershed. We will be conducting our<br />

bi-monthly meeting at SWFWMD on Tuesday, 4 August 2009.<br />

020 - Peace River Basin 124


B256<br />

Automated Citrus Irrigation Management to Reduce Water<br />

Consumption<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality<br />

Basin(s) Alafia River, Hillsborough River, Peace River, Manasota<br />

Cooperator(s)<br />

University of Florida<br />

Project Manager COHEN, RON<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

Agriculture is the largest permitted water use in the District and citrus production is the largest of those permitted uses.<br />

Over 366MGD are permitted for citrus irrigation and most of that water use is in the SWUCA. This project will help<br />

citrus growers reduce their water use by developing tools to automate and improve irrigation scheduling. These tools<br />

can be used by the District's FARMS program to further expand their conservation efforts. Although citrus acres have<br />

been on the decline it seems to have reached a stabilizing point. With the increase in the recent price of citrus the<br />

District might even see an increase in the number of acres. The permitted acres for citrus is still relatively high and<br />

even a minor reduction in water use or fertilizer application could have a significant impact on the District's water<br />

resources. The proposed project will investigate the use of new low-cost automatic irrigation pump controllers with<br />

wireless remote monitoring and control. This low cost system (


B256<br />

Automated Citrus Irrigation Management to Reduce Water<br />

Consumption<br />

Prior Cumulative FY 2009 FY20<strong>10</strong><br />

Funding Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0 0 0 50,000<br />

0<strong>10</strong> General Fund (Districtwide) 0 50,000<br />

011 Alafia River Basin 4,500 0 4,500<br />

0<br />

0 9,000<br />

013 Hillsborough River Basin 4,000 0 4,000<br />

0<br />

0 8,000<br />

020 Peace River Basin 38,500 0 38,500<br />

0<br />

0 77,000<br />

0<strong>21</strong> Manasota Basin 3,000 0 3,000<br />

0<br />

0 6,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$150,000<br />

Critical Project Milestones Projected Amended Actual<br />

Agreement To Contracts <strong>10</strong>/1/07 8/30/07<br />

Agreement To IFAS <strong>10</strong>/15/07 <strong>10</strong>/15/07<br />

Notice To Proceed 12/31/07 12/31/07<br />

Data Collection Yr. 1 12/31/08 12/18/08<br />

Data Collection Yr 2 12/31/09<br />

Data Collection Yr. 3 12/31/<strong>10</strong><br />

Grower's Field Day 12/15/11<br />

Completion Report 3/1/12<br />

Agreement Ends 12/31/12<br />

Status As Of: June <strong>10</strong>, 2009<br />

8/31/2007 - Reviewed final scope of work. 11/1/2007 - Agreement mailed to cooperator for review and execution.<br />

1/2/2008 - Notice to proceed sent to IFAS 3/7/2008 - Mobilizing equipment. 5/1/2008 - Reviewed task I report. Project<br />

continuing as planned. 7/1/2008 - Data collection project continuing as planned. 9/1/2008 - Data collection project<br />

continuing as planned. 11/1/2008 - Data collection project continuing as planned. 12/17/2008 - Data collection project<br />

continuing as planned 3/6/2009 - Data collection project continuing as planned. 4/20/2009 - Data collection project<br />

continuing as planned 6/<strong>10</strong>/2009 - Data collection project continuing as planned.<br />

020 - Peace River Basin 126


B257<br />

Reducing Nursery and Landscape Water Use by Genetically Altering<br />

Nandina Plants<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply, Water Quality, Natural Systems<br />

Basin(s) Alafia River, Hillsborough River, Peace River, Manasota<br />

Cooperator(s)<br />

University of Florida<br />

Project Manager COHEN, RON<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

There are over 5,000 acres of nursery production in the central part of our District and typically they are permitted for<br />

about 1.7 Million gallons of water per acre. With the increase of urban development it is anticipated that the number of<br />

nursery acres will increase and landscape water use will increase. To reduce landscape irrigation and to conserve<br />

water, the District has been promoting Florida Friendly principles. One of the first and most important principles of this<br />

practice is the selection and use of drought-tolerant plants (Koske and Owings). Nandina is a very popular drought<br />

tolerant plant and recently its use has been demising because of it being listed as an invasive species. This project will<br />

develop and determine nursery production and urban landscapes water requirements for a drought tolerant variety of<br />

Nandina. The industry is supportive of this project and is providing funds.<br />

Benefits<br />

It is estimated that each year about 5 million Nandina plants are grown and sold within the central part of the District.<br />

The number of acres planted and their water use will change annually based on market and climatic conditions. To<br />

quantify an estimated water savings from this project lets assume a Nandina plant covers 12 square feet (3 ft x 4 ft),<br />

3,700 plants per acre, 1,375 acres and a 1% to 5% savings for Nandina Nursery Production. This savings will reduce<br />

water use by 332,000 to 66,000 gallons per day. In addition there will be a savings from urban landscape water use.<br />

An added benefit to this project is that it will eliminate an invasive plant species. This will save the District and the<br />

public having to invest public funds to eliminate an invasive plant.<br />

Costs<br />

This five year project will cost the District $125,000. Funding for this project is prorated between four Basin Boards<br />

(Alafia River (22%), Manasota (22%), Hillsborough River (28%) and Peace River (28%)) based on the permitted<br />

nursery acres in their watershed. The Nursery industry will provided $15,000 for this project and the Alafia Basin Board<br />

will budget $5,500, Hillsborough River will budget $7,000, Manasota will budget $5,500 and the Peace River will<br />

budget $7,000 for each year in FY2008, FY2009, FY20<strong>10</strong>, FY2011 and FY2012.<br />

Additional Information<br />

Each year a large amount of water is permitted for nursery and landscape irrigation. With the rapid urban development<br />

in the District, it is anticipated that the amount of water permitted for these uses will increase. To reduce water use for<br />

landscape irrigation and to conserve water, the DISTRICT has been promoting Florida Friendly landscaping principles.<br />

One of the first and most important principles of this practice is the selection and use of drought-tolerant plants.<br />

Nandina plants are of great potential to reducing water usage in the urban landscape. They are well adapted to Florida<br />

soil conditions and well tolerant of droughts. Because of these and their aesthetic values, nandinas are very popular in<br />

nursery production and landscape use. They are particularly liked in low-maintenance landscapes and xeriscaping. In<br />

addition, these plants are extremely tough and practically pest free, thus requiring little use of pesticides. This<br />

characteristic is very beneficial and can help reduce chemical pollution from public or residential landscapes to soil<br />

and water and protect water quality. With the production of copious amounts of fruit berries and seeds, nandina plants<br />

can escape from cultivation into natural areas. Escaped nandinas can become established in natural areas, wet lands,<br />

etc., displacing native plants, disrupting natural plant communities, and changing natural ecosystems. Because of this,<br />

nandina is listed as a Class I invasive species by the Florida Exotic Pest Plant Council (http://ww.fleppc.org/) and not<br />

recommended by University of Florida for propagation, production, and sale in central Florida. The primary cause of<br />

the invasiveness of nandinas is their production of copious berries and seeds. Recent studies have shown that it is<br />

possible to find nandina varieties (one or two) that do not produce berries and seeds, thus not invasive, but this lack of<br />

berry or seed production seems to vary from region to region in Florida. For example, two nandina varieties produced<br />

lots of fruit in north Florida, but did not produce fruit and seed in south Florida. It is not known whether or not these<br />

varieties will produce fruit and seeds in central Florida. In this project, we propose to test these varieties in this District<br />

(southwest Florida) for their berry and seed production to confirm whether or not they are not invasive and safe for<br />

production and use in this District, to determine their water needs and water conservation values for nursery<br />

production and urban landscape use, and to develop new drought-tolerant nandina plants that do not produce seeds<br />

and are not invasive, but friendly to the environment.<br />

020 - Peace River Basin 127


B257<br />

Reducing Nursery and Landscape Water Use by Genetically Altering<br />

Nandina Plants<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 0 0 0 25,000<br />

0 25,000<br />

011 Alafia River Basin 5,500 0 5,500<br />

0<br />

0 11,000<br />

013 Hillsborough River Basin 7,000 0 7,000<br />

0<br />

0 14,000<br />

020 Peace River Basin 7,000 0 7,000<br />

0<br />

0 14,000<br />

0<strong>21</strong> Manasota Basin 5,500 0 5,500<br />

0<br />

0 11,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$75,000<br />

Critical Project Milestones Projected Amended Actual<br />

Agreement to Contracts 8/31/07 8/1/07<br />

Agreement to Cooperator 9/15/07 9/27/07<br />

District Executes Agr. 11/30/07 11/30/07<br />

District Issues NTP 1/5/08 11/16/07<br />

Basin Board Notification 1/31/08 1/31/08<br />

Data Collection Yr. 1 12/31/08 12/18/08<br />

Data Collection Yr. 2 12/31/09<br />

Data Collection Yr. 3. 12/31/<strong>10</strong><br />

Completion Report <strong>10</strong>/31/12<br />

Agreement Ends 5/31/13<br />

Status As Of: August 27, 2009<br />

8/31/2007 - Waiting for final scope of work. 11/1/2007 - Agreement mailed to IFAS. 11/16/2007 - NTP mailed to IFAS<br />

1/2/2008 - Mobilizing equipment to start project. 3/7/2008 - Data collection project continuing as planned. 5/1//2008 -<br />

Data collection project continuing as planned. 7/1//2008 - Data collection project continuing as planned. 9/1/2008 - Data<br />

collection project continuing as planned. 11/1/2008 - Data collection project continuing as planned. 12/17/2008 -<br />

Reviewed task completion reports, project continuing as planned. 3/6/2009 - Data collection project continuing as<br />

planned. 4/20/2009 - Reviewed task report. 6/<strong>10</strong>/2009 - Data collection project continuing as planned. 9/1/2009 - Data<br />

collection project continuing as planned.<br />

020 - Peace River Basin 128


B260<br />

Upper Peace River System - Freshwater MFLs<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply, Natural Systems<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Project Manager MORALES, JON<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

Request funds to complete establishment of minimum flows for the upper Peace River by 2011. By requirements of<br />

Florida statutes, the District must establish Minimum Flows and Levels (MFLs) for water bodies within its jurisdiction.<br />

This project is to provide technical information to support the adoption of MFLs for the freshwater portions of the upper<br />

Peace River system. Low flow thresholds have been established on the upper Peace River. However, methodologies<br />

for developing MFLs were not complete when staff first studied the Peace, so high flow restrictions were not<br />

established. The District staff now has a methodology for developing high flow restrictions and seeks to complete the<br />

MFL of the upper Peace River in 2011. An understanding of ecosystem components is needed so that relationships<br />

between minimum flows and significant harm can be evaluated in a defensible manner. It is necessary for a number<br />

of reasons to document the abundance, diversity, and distribution of plants and animals that are associated with these<br />

resources under seasonally changing flow conditions. Physico-chemical variables (e.g., dissolved oxygen,<br />

temperature), drainage alterations, and extensive hydrologic data also need to be evaluated. While much of the data<br />

can be, or has been, collected and developed in-house, manpower and time limitations and the specialized expertise<br />

required for some analyses dictates that some of it must be consulted out. Funding under this project will accomplish<br />

four goals specific to MFLs development: 1) improve the hydraulic model originally used in the first round of MFL<br />

development; 2) evaluation of hydraulic characteristics of the stream for the purpose of describing floodplain<br />

inundation patterns under various flows; 3) assessment of fish community structure and habitat availability; and 4)<br />

assistance in the analysis of hydrologic and biologic data to establish relationships between river hydrology (stage and<br />

flows) and the ecologic resources that are supported.<br />

Benefits<br />

Completion of this project will support timely adoption of MFLs on this water body consistent with the Board adopted<br />

MFLs priority list and schedule. Funding requested in FY2008 is primarily for use in evaluating the potential reduction<br />

in fish and macroinverterbrate habitat and loss of floodplain wetland connection due to reductions in flow. The use of<br />

external expertise in Geographic Information Systems (GIS) and modeling will allow for the results from the hydraulic<br />

to be utilized in a GIS environment and thus, better describe spatial patterns of floodplain inundation. Funding will also<br />

provide partial support to a cooperative effort by the Florida Fish and Wildlife Conservation Commission to reassess<br />

the fish community of the Peace River. Fish data used in initial MFL development in the upper and middle river relied<br />

on information that is now more than 15 years old, and it is currently suspected that several exotic fish species have<br />

expanded throughout the system.<br />

Costs<br />

Funding for FY2009 is currently for $9,077 which is for parts and supplies. Total requested funding for FY20<strong>10</strong> is<br />

130,000.00.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 64,724 0 8,827 247,<strong>10</strong>7<br />

0 320,658<br />

020 Peace River Basin 60,250 0 250<br />

0<br />

0 60,500<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$381,158<br />

Critical Project Milestones Projected Amended Actual<br />

1. Flow Measurement and Analysis<br />

Flow Data Collection from USGS 7/1/<strong>10</strong><br />

020 - Peace River Basin 129


B260<br />

Upper Peace River System - Freshwater MFLs<br />

Flow Data Analysis Summary 7/30/<strong>10</strong><br />

2. Field Site Selection<br />

Identify Field Sites and Habitats 7/15/<strong>10</strong><br />

Obtain Permission to Access Private Property 8/1/<strong>10</strong><br />

Map Shoals 8/<strong>10</strong>/<strong>10</strong><br />

3. Floodplain Vegetation Analysis<br />

Field Sampling/Survey 9/1/<strong>10</strong><br />

Vegetation Assessment Report 11/30/<strong>10</strong><br />

4. Instream Habitat Assessment<br />

Field Data Collection/Survey 9/15/<strong>10</strong><br />

Habitat Assessment Summary 11/30/<strong>10</strong><br />

PHABSIM Analysis Summary 12/15/<strong>10</strong><br />

5. Hydraulic Model Development<br />

Survey Data Acquisition 11/1/<strong>10</strong><br />

HEC-RAS Model Development 1/30/11<br />

6. MFL Report Development<br />

Data Analysis 3/1/11<br />

Report Preparation 5/1/11<br />

7. Peer Review<br />

Peer Review 7/30/11<br />

Status As Of: September 03, 2009<br />

Ongoing activities for the upper Peace River include the re-assessment of fish communities found in various instream<br />

habitats. This is a three year study initiated last July 2007 by Florida Fish and Wildlife Conservation Commission. Work is<br />

currently in the 2nd year of implementation. Staff has outlined the need to establish PHABSIM sites on this river for 2009.<br />

For the 20<strong>10</strong> budget, staff have also allocated monies to fund a refinement of the HEC-RAS hydraulic model for this river<br />

segment, all in line to be able to establish low and medium "minimum flows" scheduled for 2011.<br />

020 - Peace River Basin 130


B263<br />

Evaluation of Different On-Farm Blueberry Systems To Improve<br />

Irrigation Efficiency<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply, Water Quality<br />

Basin(s) Alafia River, Hillsborough River, Coastal Rivers, Withlacoochee River, Peace River<br />

Cooperator(s)<br />

University of Florida<br />

Project Manager COHEN, RON<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This project will compare different irrigation management techniques under real production conditions to determine the<br />

most efficient way to irrigate blueberry plants. Due to current market conditions and plant diseases, many Central<br />

Florida agricultural producers have converted their production acres to blueberries, which is a high valued cash crop.<br />

Some of the newer blueberry growers have relatively little experience with blueberry irrigation and some of the existing<br />

producers might not be familiar with better ways to manage different irrigation systems. Researchers will create a<br />

demonstration plot in a grower's field. This plot will consist of different soils and irrigation methods to determine which<br />

is best for specific growing conditions. The projects results will be presented to the growers during a field day for them<br />

to learn and visualize the project's results.<br />

Benefits<br />

Information from this project could be used to conserve water. There are about 735 Mgals permitted for annual<br />

blueberry irrigation. The amount of water saved will be a function of the number of acres planted and their water use,<br />

which will change annually based on market and climatic conditions. If we assume a 5% savings from this project, it<br />

would conserve about 37 Mgals per year. Information from this project will provide the District's FARMS additional<br />

tools to help promote conservation.<br />

Costs<br />

This three year project will cost a total of $69,900. Funding for this project is prorated between five Basin Boards<br />

(Peace River - 37%, Withlacoochee River - 22%, Alafia - 13%, Coastal 12% and Hillsborough River 8%) based on the<br />

number of permits for blueberry production in their watershed. In FY2009, FY20<strong>10</strong>, and FY2011, the Basin Boards will<br />

budget each year: Peace River - $9,080, Withlacoochee River - $5,497, Alafia - $3,406, Coastal - $3,<strong>10</strong>5 and<br />

Hillsborough River $2,<strong>21</strong>1.<br />

Additional Information<br />

This project was origionally proposed in FY2008. At that time it was decided to wait until project B226 (Determine<br />

Total Water Budget & Irrig. Req.for Mature Southern Highbush Blueberries) progressed so that information from that<br />

project could be incorporated in this project. Blueberries require an acid soil or a soil that is amended to reach a<br />

certain acidity level. To reach the proper acidity level, many blueberry growers use pine bark that is 1) incorporated<br />

into the upper soil layer, or 2) placed as a layer on top of the soil. There is relatively little knowledge of the water<br />

holding capacity or water movement through these two pine bark amended soil systems. Evaluating the soil water<br />

characteristics of these two types of blueberry pine bark amended soils is important for efficient and responsible water<br />

management. Several new soil moisture-measuring devices have become available in the past five years. These<br />

probes are better than tensiometers because they require less maintenance and can show changes in soil water<br />

status over time. By telling growers if water has moved below the main root zone, these probes can be beneficial in<br />

improving irrigation management. A few of these probes have been evaluated under citrus trees in sandy ridge soils,<br />

but have not been tried in pine bark amended ridge soils. Most growers irrigate in a way that they think will meet the<br />

water needs of the crop. Blueberries are fairly shallow rooted, and it is not known what irrigation duration is needed<br />

with the drip, microsprinkler, or overhead systems to wet the root zone in pine bark amended soil. Soil probes would<br />

be beneficial in seeing how far water moves in these soils. Hence, they could potentially help reduce over irrigation<br />

and deep percolation loss. Probes would be installed at different depths under the drip, microsprinkler, and overhead<br />

systems in the field. Changes in soil water content from the different irrigation systems would be monitored. We would<br />

determine how long it takes for irrigation water to reach different depths in the two soil systems. Water holding<br />

capacity and bulk density of the two soil systems would be determined in the lab or field. Depth of soil wetting would<br />

be determined periodically at different times of the year. The most efficient irrigation system would be determined.<br />

Changes in soil water content at different depths (as roots take up water) would be shown to the grower to help him in<br />

his irrigation scheduling decisions. Knowledge of when deep percolation loss might occur could help reduce over<br />

irrigation.<br />

020 - Peace River Basin 131


B263<br />

Evaluation of Different On-Farm Blueberry Systems To Improve<br />

Irrigation Efficiency<br />

Prior Cumulative FY 2009 FY20<strong>10</strong><br />

Funding Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0 0 0 23,300<br />

0<strong>10</strong> General Fund (Districtwide) 0 23,300<br />

011 Alafia River Basin 0 0 3,406<br />

0<br />

0 3,406<br />

013 Hillsborough River Basin 0 0 2,<strong>21</strong>2<br />

0<br />

0 2,<strong>21</strong>2<br />

015 Coastal Rivers Basin 0 0 3,<strong>10</strong>5<br />

0<br />

0 3,<strong>10</strong>5<br />

019 Withlacoochee River Basin 0 0 5,497<br />

0<br />

0 5,497<br />

020 Peace River Basin 0 0 9,080<br />

0<br />

0 9,080<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$46,600<br />

Critical Project Milestones Projected Amended Actual<br />

Develop Contract 11/3/08 <strong>10</strong>/3/08<br />

Notice To Proceed 2/2/09 2/18/09<br />

Mailed Contract to University 12/1/09 12/1/08<br />

Year 1 Data Collection 12/31/09<br />

Year 2 Data Collection 12/31/<strong>10</strong><br />

Final Report 6/30/11<br />

End of Agreement 1/31/12<br />

Status As Of: June <strong>10</strong>, 2009<br />

2/18/2009 - Sent Notice to proceed. 3/6/2009 - Ordering material. 4/20/2009 - Mobilizing equipment 6/<strong>10</strong>/2009 - Waiting<br />

for equipment to arrive 9/1/2009 - data collection, project continuing as planned.<br />

020 - Peace River Basin 132


B264<br />

Citrus Irrigation Management to Increase Young Tree Growth &<br />

Productivity on Flatwoods Ridge Soils<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply, Water Quality<br />

Basin(s) Alafia River, Hillsborough River, Peace River, Manasota<br />

Cooperator(s)<br />

University of Florida<br />

Project Manager COHEN, RON<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

Due to Citrus Greening, Canker and labor issues the industry has had the University develop different techniques for<br />

economical production of citrus in Florida. On of the most promising techniques, which includes high density planting<br />

of smaller trees, was developed in Spain and commercialized in South Africa, Australia and California. This project will<br />

develop irrigation and nutrient management recommendations for this new method of production to help conserve<br />

water and reduce nutirent loading. Although recent citrus acres have declined District wide, it is still the largest<br />

permitted agricultural water use. Also, with the decline in development and recent price increases, more citrus growers<br />

are planning to expand their operations; therefore, it is important to help find ways for citrus producers to conserve<br />

water. This water conservation project will utilize information developed in Spain and commercialized in South Africa,<br />

Australia and California. The University will investigate and develop new cultural technology including changes to plant<br />

density, nutrient and irrigation management. Plants will be grown with an intensive fertigation management technique<br />

that is designed to provide essentially a non-limiting environment to those roots. This new fertilizer program will require<br />

changes to existing irrigation management programs.<br />

Benefits<br />

Citrus production is the largest agricultural land use in the District. This project will help citrus producers conserve<br />

water and reduce pollutant loading for fertilizer leaching. In addition, the information could be used by the District's<br />

FARMS program to help design better BMP cost share systems. The amount of water saved will be a function of the<br />

number of acres planted and their water use, which will change annually based on market and climatic conditions.<br />

Costs<br />

The project costs have been reduced from $182,500 to $122,300 because some of the ridge elements were removed.<br />

Additional Information<br />

Yield fundamentally drives profit for Florida citrus growers and is thus the key element to a grower's financial success.<br />

Yield is tied directly to tree density and growth rate and is a simple function of numbers of trees and the related total<br />

canopy volume over the unit area. Research over the last several decades has proven that growth of young trees and<br />

productivity of both young and mature trees benefit from high frequency low volume irrigation. Improved tree growth<br />

from intensive irrigation management could reduce the time required from planting to economic breakeven production,<br />

thus provide management options in light of current devastating diseases such as Canker and Huanglongbing (citrus<br />

greening). Florida growers have adopted Best Management Practices (BMPs) that reduce nutrient leaching by limiting<br />

the amount of fertilizer that can be applied, and the time of year when fertilizer can be applied. These BMPs are based<br />

on research under low-intensity management systems. However, production systems that combine grove design and<br />

irrigation management to increase yield and grove operational efficiency have not been studied. High density plantings<br />

of sweet oranges on low-vigor rootstocks have known advantages, but their long-term behavior and changes in the<br />

functional relationship of tree density, growth rate, and yield over time are not well understood. The central hypothesis<br />

of this project is improved and consistent early yields, with increased tree density on low vigor trees and/or improved<br />

irrigation/nutrient management systems that would provide proactive management options in light of current<br />

devastating diseases such as Canker and Huanglongbing (citrus greening). Growers normally achieve their expected<br />

return on investment within 15 to 20 years of planting. If those goals would occur sooner (e.g., <strong>10</strong> to 12 years) through<br />

increased early yields, the grower would benefit even if the grove declines over time due to the diseases mentioned<br />

above and must be replanted. By knowing how to irrigate and manage their irrigation with this new method of<br />

production, the grower would conserve water and reduce the amount of fertilizer thats being leached from the plant<br />

root zone while maintaining an economical viable crop.<br />

020 - Peace River Basin 133


B264<br />

Citrus Irrigation Management to Increase Young Tree Growth &<br />

Productivity on Flatwoods Ridge Soils<br />

Prior Cumulative FY 2009 FY20<strong>10</strong><br />

Funding Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0 0 0 36,500<br />

0<strong>10</strong> General Fund (Districtwide) 0 36,500<br />

011 Alafia River Basin 0 0 3,336<br />

0<br />

0 3,336<br />

013 Hillsborough River Basin 0 0 2,979<br />

0<br />

0 2,979<br />

020 Peace River Basin 0 0 28,<strong>10</strong>6<br />

0<br />

0 28,<strong>10</strong>6<br />

0<strong>21</strong> Manasota Basin 0 0 2,079<br />

0<br />

0 2,079<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$73,000<br />

Critical Project Milestones Projected Amended Actual<br />

Develop Contract <strong>10</strong>/1/08 <strong>10</strong>/1/08<br />

Notice To Proceed 1/2/09 <strong>10</strong>/30/08<br />

No Cost Amendment 3/1/09 3/1/09<br />

Year 1 - Data Collection 12/30/09<br />

Year 2 - Data Collection 12/30/<strong>10</strong><br />

Year 3 - Data Collection 12/30/11<br />

Growers Field Day 7/31/12<br />

Journal Publication 7/31/12<br />

Year 4 - Data Collection 12/30/12<br />

Completion Report <strong>10</strong>/31/13<br />

Contract Ends 6/30/14<br />

Status As Of: September 09, 2009<br />

11/1/2008 - Contract to IFAS for review. 12/18/2008 - Wait for University to return executed agreement. 4/20/2009 - Data<br />

collection continuing as planned 6/<strong>10</strong>/2009 - Data collection continuing as planned 9/1/2009 - modified agreement to<br />

reduce scope and project costs.<br />

020 - Peace River Basin 134


B265<br />

Optimizing Irrigation For Shade Tree Production<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality<br />

Basin(s) Alafia River, Hillsborough River, Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

University of Florida<br />

Project Manager COHEN, RON<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

There are over 5,000 acres of nursery production in the central part of the District and typically they are permitted for<br />

about 1.7 million gallons of water per acre. With the increase of urban development, it is anticipated that the number of<br />

nursery acres will increase and landscape water use will too. This project will investigate ways to reduce nursery and<br />

landscape irrigation by studying the relationships between moderate water stress, photosynthesis and shoot growth of<br />

trees. The goal of the project is to develop irrigation management strategies that take advantage of gas exchange<br />

properties occurring at moderate water stress. These strategies would be linked to the ongoing projects modeling tree<br />

water use based on ETo, further increasing the level of irrigation precision of non-production situations beyond that<br />

which will come from the ETo projects. Plant growth is a two stage process. First, new cells are produced by<br />

meristematic tissues. Second, these cells enlarge. The first phase mainly requires new cellular components which are<br />

derived from photosynthesis and absorbed minerals. The principal requirement for the second phase of growth, cell<br />

enlargement, is hydrostatic (turgor) pressure. Plant water status, mainly as it affects cell turgor pressure, is the primary<br />

driving force in this second phase. In pecans, nearly all leaf expansion occurred at night (Anderson, 1989). This is the<br />

time when water stress in plants is the lowest, and water status and turgor pressure are the highest. This is<br />

hypothesized as the primary reason cyclic irrigation of containerized plants accelerates growth, in that it results in<br />

higher turgor pressures during the night by making more water available in the root ball late in the day. While this<br />

information on leaf expansion was reported in the scientific literature over <strong>10</strong> years ago, it was never pursued much<br />

further and will be investigated in this project.<br />

Benefits<br />

Information from this project will help nursery producers, commercial landscapers and homeowners reduce water use.<br />

The amount of water saved will be a function of the number of acres planted and their water use, which will change<br />

annually based on market and climatic conditions. Assuming an annual 5% water savings from only nursery<br />

production, there would be a total of about 1.9 mgd savings on permitted water use. In addition, information form this<br />

project can be used by the District's FARMS program to help promote water conservation.<br />

Costs<br />

This four year project will cost the District a total of $83,875. Funding for this project is prorated between five Basin<br />

Boards (Peace River - 23%, Hillsborough River 22%, Alafia - 18%, Manasota 18% and Withlacoochee 11%) based on<br />

the number of permits for nursery production in their watershed. In FY2009, FY20<strong>10</strong>, FY2011, and FY2012 the Basin<br />

Boards will budget each year: Peace River $5,159, Hillsborough River $5,008, Alafia River $4,<strong>10</strong>3, Manasota $4,<strong>10</strong>3<br />

and Withlacoochee River $2,595.<br />

Additional Information<br />

Recently, data collection of a project at MREC supported by the Southwest Florida WMD, Horticultural Research<br />

Institute and others quantified the daily water use of live oak and red maple to 7-inch calipers, and Nellie R. Stevens<br />

holly to 5-inch calipers. Preliminary modeling of red maple reported a high correlation of predicted and actual water<br />

loss based on a algorithm incorporating reference evapotranspiration (ETo) and trunk cross sectional area just below<br />

the first major branch (Beeson, 2007). A project with a similar goal using D.D. Blanchard magnolia, Aliee, Chinese elm<br />

and slash pine is currently in the second year. Maximum plant growth occurs when transpiration is maximum because<br />

transpiration and photosynthesis are tightly linked. Reductions in stomata aperture reduce the flow of carbon dioxide<br />

into leaves and water out of leaves. However, for the limited number of tree species studied, slight to moderate<br />

reductions in stomatal aperture cause no to small reductions in photosynthesis, but resulted in relatively large<br />

reductions in transpiration. Thus under moderate water stress, trees and woody plants, in general, tend become more<br />

water efficient with little reduction in photosynthesis (Noble, 1999).<br />

020 - Peace River Basin 135


B265<br />

Optimizing Irrigation For Shade Tree Production<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 0 0 0 20,969<br />

0 20,969<br />

011 Alafia River Basin 0 0 4,<strong>10</strong>3<br />

0<br />

0 4,<strong>10</strong>3<br />

013 Hillsborough River Basin 0 0 5,0<strong>10</strong><br />

0<br />

0 5,0<strong>10</strong><br />

019 Withlacoochee River Basin 0 0 2,595<br />

0<br />

0 2,595<br />

020 Peace River Basin 0 0 5,158<br />

0<br />

0 5,158<br />

0<strong>21</strong> Manasota Basin 0 0 4,<strong>10</strong>3<br />

0<br />

0 4,<strong>10</strong>3<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$41,938<br />

Critical Project Milestones Projected Amended Actual<br />

Develop Agreement <strong>10</strong>/17/08 <strong>10</strong>/6/08<br />

Notice To Proceed 1/2/09 1/30/09<br />

Year I Data Collection 12/31/<strong>10</strong><br />

Year 2 Data Collection 12/31/11<br />

Year 3 Data Collection 12/31/12<br />

Completion Report 5/31/14<br />

Agreement Ends 8/31/14<br />

Status As Of: September 23, 2009<br />

11/1/2008 - Contract sent to IFAS. 12/17/2008 - Waiting for University to return executed Agreement. 4/20/2009 - Data<br />

Collection continuing as planned. 6/<strong>10</strong>/2009 - Reviewed task completion report. 9/1/2009 - Tree growth is behind, will<br />

need to modify project deliverable dates. 9/23/2009 - First Amendment processed to extend deliverable timeframes.<br />

020 - Peace River Basin 136


B266<br />

Accounting For Interception of Sprinkler Irrigation Water by<br />

Container Grown Plants<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality<br />

Basin(s) Alafia River, Hillsborough River, Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

University of Florida<br />

Project Manager COHEN, RON<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

The plant canopy plays a critical role in the interception of sprinkler irrigation water. Depending on the size and<br />

architecture of the canopy, as well as the container spacing, interception of irrigation water can be greater than or less<br />

than the amount of irrigation water that would fall into the container. Typically, interception is considered a water loss<br />

and not accounted for when supplying irrigation water. This project will quantify the amount of water that is intercepted<br />

by the plant and funneled to the plant's container. By accounting for this intercepted water, the overall amount for<br />

irrigation management can be reduced. The industry is supportive of this project and will provide funds to reduce the<br />

overall project results.<br />

Benefits<br />

Information from this project will help container nursery producers improve their irrigation efficiency and conserve<br />

water. The amount of water saved will be a function of the number of acres planted and their water use, which will<br />

change annually based on market and climatic conditions. Using the District's regulatory database and assuming an<br />

annual 5% water savings from only nursery production, there would be an annual savings of about 1.9 mgd.<br />

Costs<br />

This three year project will cost the District a total of $91,125. Funding for this project is prorated between five Basin<br />

Boards (Peace River - 23%, Hillsborough River 22%, Alafia - 18%, Manasota 18% and Withlacoochee 11%) based on<br />

the number of permits for nursery production in their watershed. In FY2009, FY20<strong>10</strong>, and FY2011 the Basin Boards<br />

will budget each year: Peace River $7,471, Hillsborough River $7,255, Alafia River $5,945, Manasota $5,944 and<br />

Withlacoochee River $3,760.<br />

Additional Information<br />

Determining the interception factor (IF) for commonly grown plants with a wide range of plant growth habits (e.g.<br />

globose, upright spreading, broad spreading, etc.) and at different spacings between containers, will help growers<br />

improve their efficiency and reduce water use. For example, sweet viburnum, which has been found to have an IF of<br />

>2 during the last month of production, would only require ¼ inch of irrigation water to supply ½ inch to the container at<br />

that latter stage of production. In two experiments where water scheduling was based upon container weight loss, the<br />

irrigation rate averaged 0.2 inch/day using IF, but would have averaged 0.3 inch/day ignoring IF. This represented a<br />

total water savings of 14 inch (0.1 inch/day over a 140 day crop). As more and more nurseries base irrigation<br />

scheduling on evaporative demand (water loss per container) knowing the interception factor at various stages of<br />

production would be critical in determining the actual irrigation requirements of a crop. For mixed plantings, this<br />

information will add further precision to grouping plants not only by evaporative demand (current BMP), but also by<br />

their irrigation interception characteristics. Currently, this information is limited to a few species (Beeson and Yeager,<br />

2003). Data are needed for a wide range of plant growth habits at different stages (sizes) of plant growth with various<br />

container spacings in order for this information to be useful for growers and water managers.<br />

020 - Peace River Basin 137


B266<br />

Accounting For Interception of Sprinkler Irrigation Water by<br />

Container Grown Plants<br />

Prior Cumulative FY 2009 FY20<strong>10</strong><br />

Funding Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0 0 0 30,375<br />

0<strong>10</strong> General Fund (Districtwide) 0 30,375<br />

011 Alafia River Basin 0 0 5,944<br />

0<br />

0 5,944<br />

013 Hillsborough River Basin 0 0 7,255<br />

0<br />

0 7,255<br />

019 Withlacoochee River Basin 0 0 3,760<br />

0<br />

0 3,760<br />

020 Peace River Basin 0 0 7,471<br />

0<br />

0 7,471<br />

0<strong>21</strong> Manasota Basin 0 0 5,945<br />

0<br />

0 5,945<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$60,750<br />

Critical Project Milestones Projected Amended Actual<br />

Develop Contract <strong>10</strong>/1/08 <strong>10</strong>/1/08<br />

Notice To Proceed 1/2/09 1/6/09<br />

Year 1 - Data Collection 12/30/09<br />

Year 2 - Data Collection 12/30/<strong>10</strong><br />

Publish Web Page 6/30/11<br />

Completion Report 9/30/11<br />

Agreement Ends 3/31/12<br />

Status As Of: August 27, 2009<br />

11/1/2008 - Contract sent to IFAS. 12/18/2008 - Waiting for University to return Agreement. 4/20/2009 - Ordering<br />

equipment 6/<strong>10</strong>/2009 - Reviewed site design plan. 9 /1/ 2009 - Reviewed task completion report 2.<br />

020 - Peace River Basin 138


B268<br />

Charlie Creek Freshwater MFLs<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply, Natural Systems<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Project Manager HOOD, JASON<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

Funds for this project will be utilized to establish minimum flows for Charlie Creek by 2012. Staff anticipates additional<br />

requests in the future as the Minimum Flows and Levels (MFLs) are developed for this waterbody. Florida Statutes<br />

mandate that the District must establish MFLs for water bodies within its jurisdiction. This project is to provide technical<br />

information to support the adoption of MFLs for the freshwater portions of Charlie Creek. An understanding of<br />

ecosystem components is needed so that relationships between minimum flows and significant harm can be evaluated<br />

in a defensible manner. It is necessary for a number of reasons to document the abundance, diversity, and distribution<br />

of plants and animals that are associated with these resources under seasonally changing flow conditions.<br />

Physico-chemical variables (e.g., dissolved oxygen, temperature), drainage alterations, and extensive hydrologic data<br />

also need to be evaluated. While much of the data can be collected and developed in-house, manpower and time<br />

limitations and the specialized expertise required for some analyses dictates that some of it must be consulted out.<br />

Funding under this project will accomplish three goals specific to MFLs development: 1) characterization of wetland<br />

and floodplain vegetation and soils along the river corridor; 2) evaluation of hydraulic characteristics of the stream for<br />

the purpose of describing floodplain inundation patterns under various flows; and 3) assistance in the analysis of<br />

hydrologic and biologic data to establish relationships between river hydrology (stage and flows) and the ecologic<br />

resources that are supported.<br />

Benefits<br />

Completion of this project will support timely adoption of MFLs on this water body consistent with the Board adopted<br />

MFLs priority list and schedule. Funding for FY20<strong>10</strong> is primarily for use in evaluating the potential reduction in fish and<br />

macroinvertebrate habitat due to reductions in flow and includes Physical Habitat Simulation Modeling (PHABSIM)<br />

analysis. Funding for FY2009 was primarily used for evaluating the potential reduction in fish and macroinvertebrate<br />

habitat and loss of floodplain wetland connection due to reductions in flow and includes vegetation transect analysis.<br />

Costs<br />

Funding for FY20<strong>10</strong> is $30,000. Total funding for FY2009 wass $50,000.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 0 0 33,296 39,594<br />

0 72,890<br />

020 Peace River Basin 0 0 26,250<br />

0<br />

0 26,250<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$99,140<br />

Critical Project Milestones Projected Amended Actual<br />

Field Site Selection<br />

Identify Field Sites and Habitats 1/1/<strong>10</strong> 6/24/09<br />

Map Shoals 1/1/<strong>10</strong> 6/24/09<br />

Obtain Permission to Access Private Property 3/1/<strong>10</strong><br />

Floodplain Vegetation Analysis<br />

Field Sampling/Survey 1/1/12<br />

Vegetation Assessment Report 6/1/12<br />

Flow Measurement and Analysis<br />

Flow Data Collection from USGS 1/1/11<br />

020 - Peace River Basin 139


B268<br />

Charlie Creek Freshwater MFLs<br />

Flow Data Analysis Summary 6/1/12<br />

Hydraulic Model Development<br />

Acquisition of LiDAR Data 1/1/11<br />

Survey Data Aquisition 1/1/12<br />

HEC-RAS Model Development 6/1/12<br />

Instream Habitat Assessment/PHABSIM Analysis<br />

Field Data Collection / Survey 1/1/12<br />

Habitat Assessment Summary 6/1/12<br />

PHABSIM Analysis Summary 6/1/12<br />

MFL Report Development<br />

Data Analysis 6/1/12<br />

Report Preparation <strong>10</strong>/1/12<br />

Status As Of: August 19, 2009<br />

PHABSIM site selection is complete. Data collection for the PHABSIM model will begin during the third quarter of 2009.<br />

020 - Peace River Basin 140


B269<br />

Horse Creek Freshwater MFLs<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply, Natural Systems<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Project Manager HOOD, JASON<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

Approved funding will be utilized to establish minimum flows for Horse Creek by 2012. Staff anticipates additional<br />

requests in the future as the Minimum Flows and Levels (MFLs) are developed for this waterbody. Florida Statutes<br />

mandate that the District must establish MFLs for water bodies within its jurisdiction. This project is to provide technical<br />

information to support the adoption of MFLs for the freshwater portions of Horse Creek. An understanding of<br />

ecosystem components is needed so that relationships between minimum flows and significant harm can be evaluated<br />

in a defensible manner. It is necessary for a number of reasons to document the abundance, diversity, and distribution<br />

of plants and animals that are associated with these resources under seasonally changing flow conditions.<br />

Physico-chemical variables (e.g., dissolved oxygen, temperature), drainage alterations, and extensive hydrologic data<br />

also need to be evaluated. While much of the data can be collected and developed in-house, manpower and time<br />

limitations and the specialized expertise required for some analyses dictates that some of it must be consulted out.<br />

Funding under this project will accomplish three goals specific to MFLs development: 1) characterization of wetland<br />

and floodplain vegetation and soils along the river corridor; 2) evaluation of hydraulic characteristics of the stream for<br />

the purpose of describing floodplain inundation patterns under various flows; and 3) assistance in the analysis of<br />

hydrologic and biologic data to establish relationships between river hydrology (stage and flows) and the ecologic<br />

resources that are supported.<br />

Benefits<br />

Completion of this project will support timely adoption of MFLs on this water body consistent with the Board adopted<br />

MFLs priority list and schedule. Funding for FY20<strong>10</strong> is primarily for use in evaluating the potential reduction in fish and<br />

macroinvertebrate habitat due to reductions in flow and includes Physical Habitat Simulation Model (PHABSIM)<br />

analysis. Funding in FY2009 was primarily for field visits to establish study sites and to determine possible stream<br />

gauging needs.<br />

Costs<br />

Total funding for FY20<strong>10</strong> is $30,000 to be funded by the Governing Board. Total requested funding in FY2009 was<br />

$2,000.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 0 0 8,296 39,594<br />

0 47,890<br />

020 Peace River Basin 0 0 1,250<br />

0<br />

0 1,250<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$49,140<br />

Critical Project Milestones Projected Amended Actual<br />

Field Site Selections<br />

Identify Field Sites and Habitats 1/1/<strong>10</strong> 6/24/09<br />

Map Shoals 1/1/<strong>10</strong> 6/24/09<br />

Obtain Permission to Access Private Property 3/1/<strong>10</strong><br />

Floodplain Vegetation Analysis<br />

Field Sampling/Survey 1/1/12<br />

Vegetation Assessment Report 6/1/12<br />

Flow Measurement and Analysis<br />

020 - Peace River Basin 141


B269<br />

Horse Creek Freshwater MFLs<br />

Flow Data Collection from USGS 1/1/11<br />

Flow Data Analysis 6/1/12<br />

Hydraulic Model Development<br />

Acquisition of LiDAR Data 1/1/11<br />

Survey Data Aquisition 1/1/12<br />

HEC-RAS Model Development 6/1/12<br />

Instream Habitat Assessment/PHABSIM Analysis<br />

PHABSIM Analysis Summary 6/1/<strong>10</strong><br />

Field Data Collection/Survey 1/1/12<br />

Habitat Assessment Summary 6/1/12<br />

MFL Report Development<br />

Data Analysis 6/1/12<br />

Report Preparation <strong>10</strong>/1/12<br />

Status As Of: August 19, 2009<br />

PHABSIM site selection is complete. Data collection for the PHABSIM model will begin during the third quarter of 2009.<br />

020 - Peace River Basin 142


B273<br />

MFL Stream Diversion and Assessment Project<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply, Natural Systems<br />

Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers, Pinellas-Anclote River,<br />

Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager MORALES, JON<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

To further validate existing stream Minimum Flows and Levels (MFL) methodology consistent with peer review<br />

recommendation. A frequent focus of criticism of the MFL methodology applied by the District to rivers and estuaries<br />

is the use of a 15 percent habitat loss criterion as a threshold for assessing "significant harm." Quoting from the peer<br />

review of the Braden River MFL, the panel noted:<br />

" The draft report describes the metrics used to define the limit at which further withdrawals would be significantly<br />

harmful to the water resources or ecology of the area as stated in Florida statutes. The authors note that significant<br />

harm was not defined in statute. The District chose to interpret significant harm as the loss of flows associated with<br />

fish passage and maximization of stream bottom habitat with the least amount of flow and quantifiable reductions in<br />

habitat. Overall, this is a reasonable approach from an ecological perspective and likely satisfies the intent of the<br />

statute. The authors state that, [in] general, instream flow analysts consider a loss of more than 15% habitat, as<br />

compared to undisturbed or current conditions, to be a significant impact on that population or assemblage. The<br />

authors further note, in our opinion, correctly, that there are few `bright lines which can be relied upon to judge when<br />

`significant harm occurs. Rather loss of habitat in many cases occurs incrementally as flow decline, often without a<br />

clear inflection point or threshold. Nevertheless, the 15% habitat loss criterion remains one of the least rigorous, most<br />

subjective aspects of the District's approach to setting MFLs. Justification for this threshold is based on common<br />

professional practice in interpreting the results of PHABSIM analyses (Gore at al. 2002), a review of relevant literature<br />

where reported percentage changes ranged from <strong>10</strong> to 33%, and on previous peer reviews that found the 15%<br />

threshold to be reasonable and prudent, especially given the absence of clear guidance in the statute or in the<br />

scientific literature on levels of change that would constitute significant harm (e.g., Shaw et al. 2005). The draft upper<br />

Braden report continues the District's practice of using a 15% change in habitat availability as the threshold for defining<br />

significant harm and now applies this threshold broadly to include both spatial and temporal loss of habitat or<br />

connectivity. The Panel again acknowledges that the use of this criterion is rational and pragmatic, but also recognizes<br />

that the specific value of 15% is subjective and has only modest validation or support from the primary literature. . . . .<br />

More importantly, however, is the need for the District to commit the resources necessary to validate the presumption,<br />

that a 15% decrease in spatial or temporal habitat availability or a 15% increase in violations of the low-flow threshold,<br />

does not cause significant harm. "<br />

This project represents the best means for validating the effect that a given flow reduction has on available habitat and<br />

the biota of a stream segment. District staff proposes to locate an acceptable stream segment in order to conduct<br />

controlled diversions from a defined stream segment in order to evaluate the impact that a range of flow and habitat<br />

reductions has on the biota (e.g., fishes, macroinvertebrates) and water resource values. It is envisioned that such a<br />

project will require a number of years to complete (possibly a decade), and an annual commitment of significant<br />

resources to accomplish.<br />

Benefits<br />

If implemented, this project will provide as definitive a test of the 15 percent habitat loss criterion as is practical under<br />

field conditions, and the results will be widely applicable to stream assessments and the development of environmental<br />

flows though out the country.<br />

Costs<br />

Funding in FY2009 is currently for $150,000. The combined Basin Board's contribution is 50% or $75,000 or $9,375<br />

from each of the eight basin boards, with the remaining 50% ($75,000) to be funded by the Governing Board. A small<br />

amount has been budgeted for parts and supplies and travel. Total requested funding for FY20<strong>10</strong> is $150,000.00.<br />

020 - Peace River Basin 143


B273<br />

MFL Stream Diversion and Assessment Project<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 0 0 84,977 160,407<br />

0 245,384<br />

011 Alafia River Basin 0 0 9,375<br />

0<br />

0 9,375<br />

013 Hillsborough River Basin 0 0 9,375<br />

0<br />

0 9,375<br />

014 Northwest Hillsborough Basin 0 0 9,375<br />

0<br />

0 9,375<br />

015 Coastal Rivers Basin 0 0 9,375<br />

0<br />

0 9,375<br />

016 Pinellas-Anclote River Basin 0 0 9,375<br />

0<br />

0 9,375<br />

019 Withlacoochee River Basin 0 0 9,375<br />

0<br />

0 9,375<br />

020 Peace River Basin 0 0 9,375<br />

0<br />

0 9,375<br />

0<strong>21</strong> Manasota Basin 0 0 9,375<br />

0<br />

0 9,375<br />

Status As Of: September 03, 2009<br />

Total:<br />

Future<br />

Funding<br />

This project is now activated coinciding with the new fiscal year. Staff is still developing project milestones. From an<br />

operational standpoint, staff have narrowed a field site (Gum Springs) for the execution of this project. Current activity<br />

related to this project is mapping of the entire field site for placement of potential experimental and control sites.<br />

Currently, baseline assessment studies are being lined up to avail of the 150K budget for the first year. Inquiries for a<br />

hydraulic pump and a sluice gate mechanism (relative to costs and maintenance) are presently being sought. Staff also<br />

plan to explore soon how to obtain the necessary permits required to operate this flow manipulation study out in the field.<br />

A meeting with Florida DEP scheduled in July was receptive to the issuance of an Environmental Resource Permit based<br />

on certain conditions. All budget monies have already been encumbered for FY2009.<br />

020 - Peace River Basin 144<br />

Total<br />

Funding<br />

$320,384


B276<br />

(Cancelled) Grants for Reclaimed Irrigation Projects (GRIP) Program<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply, Water Quality<br />

Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Pinellas-Anclote River, Peace River,<br />

Manasota<br />

Cooperator(s)<br />

Project Manager MCGOOKEY, SCOTT<br />

Task Manager(s)<br />

Status Cancelled<br />

Description<br />

This program provides funding assistance to new developments for the construction of reclaimed water distribution<br />

systems. This program was recommended by the District's Reclaimed Water Task Force (RWTF) and approved by<br />

the Governing Board for implementation at their February 2008 meeting. The program will provide an incentive to<br />

encourage developers and local governments to jointly design and construct reclaimed water distribution systems in<br />

new residential developments where other alternative water sources are not available to meet outdoor water needs in<br />

the development. The program will promote the construction of reclaimed water distribution systems during the<br />

construction of new developments and therefore reduce the need for the costly alternative of retrofiting reclaimed<br />

water distribution systems in established residential neighborhoods. The program will be available to new<br />

developments where reclaimed water will be available within five years, as indicated in a capital improvement plan.<br />

Benefits<br />

This program will promote the construction of reclaimed water distribution systems during the construction of new<br />

developments and therefore reduce the need for the costly alternative of retrofiting reclaimed water distribution<br />

systems in established residential neighborhoods. The estimated beneficial offset will be based on the number of<br />

residential units in the development and the funds available. Historical information shows an average benefit from<br />

using reclaimed water would be 300 gpd for each residential unit.<br />

Costs<br />

The Alafia River, Hillsborough River, Pinellas-Anclote River, Manasota, and Northwest Hillsborough Basin Boards<br />

have budgeted $500,000 each for this program. The estimated cost for installing the reclaimed water distribution<br />

system in a new development is $1,200 per residential unit. The District will reimburse up to 50 percent of the actual<br />

cost and no more than $600 per residential unit.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

011 Alafia River Basin 0 0 501,540<br />

0<br />

0 501,540<br />

013 Hillsborough River Basin 0 0 501,540<br />

0<br />

0 501,540<br />

014 Northwest Hillsborough Basin 0 0 501,540<br />

0<br />

0 501,540<br />

016 Pinellas-Anclote River Basin 0 0 501,609<br />

0<br />

0 501,609<br />

020 Peace River Basin 0 0 1,609<br />

0<br />

0 1,609<br />

0<strong>21</strong> Manasota Basin 0 0 501,540<br />

0<br />

0 501,540<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$2,509,378<br />

Critical Project Milestones Projected Amended Actual<br />

Start receiving applications <strong>10</strong>/1/08<br />

Close application period 12/5/08<br />

Recommend Projects to Basins 2/27/09<br />

Status As Of: June 16, 2009<br />

The Alafia River, Hillsborough River, Pinellas-Anclote River, Manasota, and Northwest Hillsborough Basin Boards<br />

020 - Peace River Basin 145


B276<br />

(Cancelled) Grants for Reclaimed Irrigation Projects (GRIP) Program<br />

budgeted $500,000 each for this program in FY2009. District staff developed a web page and a program application<br />

process. The program was introduced at the Cooperative Funding Initiative Kick-off <strong>Meeting</strong>s and a news release was<br />

issued October 1, 2008. The program was open for applications during the 20<strong>10</strong> CFI application period between October<br />

1, 2008 and December 5, 2008. Action-to-date: Delayed. No applications were received for the program. This is probably<br />

the result of the apparent economic down-turn in the housing industry. Budgeted funds for this program have been<br />

returned to the Basins to fund other requirements or projects that are ready to proceed.<br />

020 - Peace River Basin 146


B277<br />

Florida Water Star Gold Certification<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply, Water Quality, Natural Systems<br />

Basin(s) General Fund (District), Alafia River, Hillsborough River, Coastal Rivers, Pinellas-Anclote River,<br />

Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager DURELL, SYLVIA<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

Florida Water StarSM Gold (FWSG), a Basin Initiative project, is a higher-tier version of the Florida Water StarSM<br />

(FWS) program, which was originated by the St. Johns River Water Management District (SJRWMD). SJRWMD's<br />

program is now referred to as the silver level. Both certification programs provide incentives for builders and<br />

developers to include indoor and outdoor water efficiency in their new projects. The gold level was adapted to reflect<br />

the advanced level of best management practices being used by builders in this District including criteria that will<br />

reduce impacts to water quality. This higher level of commitment by the builders comes from education on<br />

Florida-friendly landscaping provided within this District for the past several years. In addition, closer alignment with the<br />

best management practices of the University of Florida/Institute of Food and Agricultural Sciences' Florida-Friendly<br />

LandscapingTM principles was necessary. This alignment also led to the added benefit of follow-up visits by FYN<br />

coordinators to new homeowners of FWSG homes to ensure that the water-conserving components of the home are<br />

maintained correctly. FYN coordinators will also act as a resource to area builders and landscape professionals for<br />

FWSG. Currently, only FWSG is being promoted in this District. Feasibility of the delivery of a residential FWS<br />

program (Bronze) in this District is being explored. This is the second year of the FWSG program. As of the end of<br />

FY2009, four properties have been certified FWSG and 11 companies have signed contracts to build <strong>21</strong>6 homes<br />

under the program. Sixty houses are expected to be built as FWSG by fiscal year end.<br />

Benefits<br />

By providing an incentive for builders, developers and homeowners that encourages them to incorporate best<br />

management practices, the District realizes water savings and water quality protection. The demand for water<br />

continues to increase with the expansion in land development, building construction and increased population.<br />

Recognizing that the majority of decisions concerning new landscapes are made by builders, developers,<br />

and landscape and irrigation professionals, the FWSG program provides a plan they can follow that positively impacts<br />

water resources. Because of its high profile and the involvement of the water management districts, this program is of<br />

high interest to the target audience. By requiring water-conserving elements for certification, this project increases<br />

knowledge of water conservation measures of builders and landscape and irrigation specialists. Changes in<br />

behavior occur when a builder signs a contract with the District to build houses according to the FWSG criteria, and<br />

agrees thereafter to include water conserving elements into future projects. Owners of FWSG properties receive the<br />

benefits of the indoor and outdoor water-conserving elements of the program and can promote the certification as a<br />

marketing edge at time of resale. The program's close partnership with the Florida Green Building Coalition<br />

(FGBC) resulted in FWSG outdoor water conservation criteria being incorporated into the FGBC standards.<br />

Costs<br />

The total cost of the FY20<strong>10</strong> program is $<strong>10</strong>0,000, with the District contributing $50,000 and the Basin Boards<br />

contributing $50,000 (Alafia River $3,500; Hillsborough River $12,000; Coastal Rivers $4,500; Pinellas-Anclote River<br />

$11,500; Withlacoochee River $3,500; Peace River $7,500; Manasota $7,500). Funding provides for salary and travel<br />

for a project coordinator to manage the program, advertising costs to promote the program, memberships in trade and<br />

professional associations and fees associated with trade shows and other promotional opportunities for outreach to all<br />

basins. The dollar amount allocated per contributing basin is based on population. The budget lines below include<br />

costs for staff to manage the project.<br />

Additional Information<br />

The total cost of the FY2009 program was $<strong>10</strong>0,000, with the District contributing $50,000 and the Basin Boards<br />

contributing $50,000 (Alafia River $3,500; Hillsborough River $12,000; Coastal Rivers $4,500; Pinellas-Anclote River<br />

$11,500; Withlacoochee River $3,500; Peace River $7,500; Manasota $7,500). This is the second year of funding for<br />

the FWSG Certification program. FWSG supports the Governor's Climate Change Initiative by promoting public<br />

protection, wise use and management of natural resources. A residential FWS program (Bronze) and programs for<br />

commercial buildings and communities are being developed and piloted by SJRWMD, with input from SFWMD and<br />

this District.<br />

020 - Peace River Basin 147


B277<br />

Florida Water Star Gold Certification<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 0 0 52,340 51,224<br />

0 <strong>10</strong>3,564<br />

011 Alafia River Basin 0 0 4,561 4,992<br />

0 9,553<br />

013 Hillsborough River Basin 0 0 8,561 14,000<br />

0 22,561<br />

014 Northwest Hillsborough Basin 0 0 5,061<br />

0<br />

0 5,061<br />

015 Coastal Rivers Basin 0 0 5,561 5,959<br />

0 11,520<br />

016 Pinellas-Anclote River Basin 0 0 14,061 12,738<br />

0 26,799<br />

019 Withlacoochee River Basin 0 0 5,561 4,989<br />

0 <strong>10</strong>,550<br />

020 Peace River Basin 0 0 <strong>10</strong>,061 9,651<br />

0 19,712<br />

0<strong>21</strong> Manasota Basin 0 0 9,061 8,870<br />

0 17,931<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$227,251<br />

Critical Project Milestones Projected Amended Actual<br />

FY2009<br />

Request for quotes issued <strong>10</strong>/15/08 <strong>10</strong>/15/08<br />

Purchase order/scope of work created 11/15/08 11/12/08<br />

First task report 11/30/08 11/30/08<br />

Second task report 12/30/08 12/30/08<br />

FWS/FWSG certifier training 1/16/09 1/16/09<br />

Third task report 1/30/09 1/30/09<br />

Fourth task report 2/27/09 2/27/09<br />

First home kick-off event 3/25/09 3/25/09<br />

Fifth task report 3/31/09 3/31/09<br />

Second house certified 4/17/09 4/17/09<br />

Sixth task report 4/30/09 5/4/09 5/4/09<br />

Seventh task report 5/29/09 5/29/09<br />

Eighth task report 6/30/09 6/30/09<br />

Ninth task report 7/31/09 7/31/09<br />

Third house certified 8/18/09 8/18/09<br />

Tenth task report 8/31/09 8/31/09<br />

Eleventh task report 9/30/09<br />

Twelfth task report <strong>10</strong>/30/09<br />

Project complete <strong>10</strong>/31/09<br />

FY20<strong>10</strong><br />

First task report 11/5/09<br />

Second task report 12/4/09<br />

Third task report 1/5/<strong>10</strong><br />

Fourth task report 2/5/<strong>10</strong><br />

Fifth task report 3/5/<strong>10</strong><br />

Sixth task report 4/5/<strong>10</strong><br />

Seventh task report 5/5/<strong>10</strong><br />

Eighth task report 6/4/<strong>10</strong><br />

Ninth task report 7/5/<strong>10</strong><br />

Tenth task report 8/5/<strong>10</strong><br />

Eleventh task report 9/6/<strong>10</strong><br />

Twelfth task report <strong>10</strong>/5/<strong>10</strong><br />

Status As Of: September 01, 2009<br />

On March 25, 2009, a model home in the Glencairn Cottages community in Dunedin (Pinellas County) was the setting for<br />

020 - Peace River Basin 148


B277<br />

Florida Water Star Gold Certification<br />

a premier event for the FWSG program. The house was the first to be certified as FWSG in the District and the state.<br />

Since then, a second home was certified in Polk County and a third house was certified in Pinellas County. As of the end<br />

of FY2009, 11 companies have signed contracts to build <strong>21</strong>6 homes under the program. Susan Douglas, program<br />

coordinator, met with eight builders in the past two months and also met with the Tampa Bay Builders Association to plan<br />

training for association members. The builder of the Polk Builders Association Parade of Homes Showcase home will<br />

receive the FWSG plaque at the Parade opening ceremony on September <strong>10</strong>. This house will be the fourth certified<br />

FWSG house in the District. Staff met with employees of Florida Home Partnership to plan a certification event for nine<br />

houses in Hillsborough County, which is tentatively planned for November 4. District staff reviewed the new FWS retrofit<br />

program for existing homes and a commercial program. Both programs will be piloted by SJRWMD. Presentations about<br />

the program were made at the Florida Green Building Coalition "Green Trends" conference, the District's Basin Board<br />

Education Committee meeting and Public Supply and Industrial advisory committee meetings. ACTION TO DATE: On<br />

time.<br />

020 - Peace River Basin 149


B301<br />

Charlotte - Maintenance of Watershed Parameters and Models<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Project Manager FRIES, GEORGE<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This is a basin initiative to fund the Maintenance of Watershed Parameters and Models element of the District's<br />

Watershed Management Program (WMP) in Charlotte County. This process will be applied to watersheds where the<br />

parameters and model(s) were developed or updated based on the District's Guidelines and Specifications (G&S) and<br />

where parameters from Environmental Resource Permitting (ERP) submittals can be converted to the District's GIS<br />

system until a model is developed. Funding will be required each year to continue maintenance. With proposed<br />

funding the work of capturing watershed parameter changes resulting from approved ERPs, and updates to<br />

topographic, soils and land use information will continue throughout the District. The funding will also support the peer<br />

review and public outreach process on the preliminary floodplain results, and presenting the results to the Governing<br />

Board for approval.<br />

Benefits<br />

A WMP provides a method to evaluate the capacity of a watershed to protect, enhance and restore water quality and<br />

natural systems, while achieving flood protection. the information developed assists local governments with their land<br />

management responsibilities by establishing a level of service and developing Best Management Practices (BMPs) to<br />

address level of service deficiencies. In addition, the information provides the District with the best available<br />

information to evaluate adverse impacts and mitigation of floodplain impacts for proposed ERPs. The most up-to-date<br />

information about the watershed will be available through the continuous maintenance of watershed parameters in the<br />

GIS database: as ERP permits are approved, new information is provided to the District through aerial topographic<br />

mapping and the public review and comment period. If a watershed model has not been developed, the maintenance<br />

of parameters in the GIS processes the information in a format the will save time and funding when the watershed is<br />

modeled.<br />

Costs<br />

For FY20<strong>10</strong> the funding distribution for Charlotte County is as follows: Governing Board $42,705; Peace River Basin<br />

Board $42,705. The budget is based on the number of approved ERP permits and the average development area<br />

within each basin. The Governing Board is also providing funds specifically to address public meetings and<br />

unforeseen issues with projecting the floodplains to be used in the FEMA mapping process. The District funding<br />

amounts shown in the table include staff salaries.<br />

Additional Information<br />

A WMP includes five major elements: 1) Topographic Information, 2) Watershed Evaluation, 3) Watershed<br />

Management Plan, 4) Implementation of Best Management Practices, and 5) Maintenance of Watershed Parameters<br />

and Models. Implementing elements of the WMP with local governments is one of the District's Strategic Priorities.<br />

After the Topographic Information, Watershed Evaluation and Watershed Management Plan elements are completed,<br />

the watershed parameters and models require continuous maintenance to simulate the watershed's characteristics as<br />

the land form changes. The watershed's parameters change with the continued growth experienced in the District. If<br />

continued maintenance of the models is not performed, the watershed parameters and models will no longer<br />

represent the system. This limits their value in the areas of ERP and flood protection programs.<br />

A revenue agreement will be developed with each community contributing funds towards maintenance. The District<br />

will manage the project and enter into purchase orders and agreements to accomplish project tasks. Future funding<br />

will be required each fiscal year to continue maintenance of watershed parameters and models. In the future those<br />

local governments with the technical abilities to perform the maintenance activities will be encouraged to manage this<br />

effort. The District will provide funding assistance to communities that can and those that cannot provide matching<br />

funds. Matching funds will be requested from the Federal Emergency Management Agency (FEMA) for this basin<br />

initiative. Failure to provide ongoing maintenance will diminish the return on the investment the District has made in<br />

their respective Watershed Management Plans.<br />

020 - Peace River Basin 150


B301<br />

Charlotte - Maintenance of Watershed Parameters and Models<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 0 0 0 43,474<br />

0 43,474<br />

020 Peace River Basin 0 0 0 42,705<br />

0 42,705<br />

Status As Of:<br />

020 - Peace River Basin 151<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$86,179


B303<br />

Desoto - Maintenance of Watershed Parameters and Models<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Project Manager LETASI, SCOTT<br />

Task Manager(s)<br />

Status Proposed<br />

Description<br />

This is a basin initiative to fund the Maintenance of Watershed Parameters and Models element of the District's<br />

Watershed Management Program (WMP) in Desoto County. This process will be applied to watersheds where the<br />

parameters and model(s) were developed or updated based on the District's Guidelines and Specifications (G&S) and<br />

where parameters from Environmental Resource Permitting (ERP) submittals can be converted to the District's GIS<br />

system until a model is developed. Funding will be required each year to continue maintenance. With proposed<br />

funding the work of capturing watershed parameter changes resulting from approved ERPs, and updates to<br />

topographic, soils and land use information will continue throughout the District. The funding will also support the peer<br />

review and public outreach process on the preliminary floodplain results, and presenting the results to Governing<br />

Board for approval.<br />

Benefits<br />

A WMP provides a method to evaluate the capacity of a watershed to protect, enhance, and restore water quality and<br />

natural systems, while achieving flood protection. The information developed assists local governments with their land<br />

management responsibilities by establishing a level of service and developing Best Management Practices (BMPs) to<br />

address level of service deficiencies. In addition, the information provides the District with the best available<br />

information to evaluate adverse impacts and mitigation of floodplain impacts for proposed ERPs. The most up to date<br />

information about the watershed will be available through the continuous maintenance of watershed parameters in the<br />

GIS database: as ERP permits are approved, new information is provided to the District through aerial topographic<br />

mapping and the public review and comment period. If a watershed model has not been developed, the maintenance<br />

of parameters in the GIS processes the information in a format that will save time and funding when the watershed is<br />

modeled.<br />

Costs<br />

For FY20<strong>10</strong> the funding distribution for Desoto county is as follows: Governing Board $5,672 (Basins); Peace River<br />

$5,672 . The budget is based on the projected number of approved ERP permits and the average development area<br />

within each Basin. Local government matching funds are equally matched by Governing Board and Basin Board<br />

funds. The Governing Board is also providing funds specifically to address public meetings and unforeseen issues<br />

with projecting the floodplains to be used in the FEMA mapping process. Future funding to continue maintenance has<br />

been estimated through 2011. The projected annual funding amount for Desoto County ranges from $<strong>10</strong>,000 to<br />

$20,000. The District funding amounts shown in the table includes staff salaries.<br />

Additional Information<br />

A WMP includes five major elements: 1) Topographic Information, 2) Watershed Evaluation, 3) Watershed<br />

Management Plan, 4) Implementation of Best Management Practices, and 5) Maintenance of Watershed Parameters<br />

and Models. Implementing elements of the WMP with local governments is one of the District's Strategic Priorities.<br />

After the Topographic Information, Watershed Evaluation and Management Plan elements are completed; the<br />

watershed parameters and models require continuous maintenance to simulate the watershed's characteristics as the<br />

land form changes. The watershed's parameters change with the continued growth experienced in the District. If<br />

continued maintenance of the models is not performed, the watershed parameters and model will no longer represent<br />

the system. This limits their value in the areas of ERP and flood protection programs.<br />

A revenue agreement will be developed with each community contributing funds towards maintenance. The District<br />

will manage the project and enter into purchase orders and agreements to accomplish project tasks. Future funding<br />

will be required each fiscal year to continue maintenance of watershed parameters and models. In the future those<br />

local governments with the technical abilities to perform the maintenance activities will be encouraged to manage this<br />

effort. The District will provide funding assistance to communities that can and those that cannot provide matching<br />

funds. Matching funds will be requested from the Federal Emergency Management Agency (FEMA) for this basin<br />

initiative. Failure to provide ongoing maintenance will diminish the return on the investment the District has made in<br />

their respective Watershed Management Plans.<br />

020 - Peace River Basin 152


B303<br />

Desoto - Maintenance of Watershed Parameters and Models<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 0 0 0 7,266<br />

0 7,266<br />

020 Peace River Basin 0 0 0 6,497<br />

0 6,497<br />

Status As Of:<br />

020 - Peace River Basin 153<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$13,763


B304<br />

Hardee - Maintenance of Watershed Parameters and Models<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Project Manager LETASI, SCOTT<br />

Task Manager(s)<br />

Status Proposed<br />

Description<br />

This is a basin initiative to fund the Maintenance of Watershed Parameters and Models element of the District's<br />

Watershed Management Program (WMP) in Hardee County. This process will be applied to watersheds where the<br />

parameters and model(s) were developed or updated based on the District's Guidelines and Specifications (G&S) and<br />

where parameters from Environmental Resource Permitting (ERP) submittals can be converted to the District's GIS<br />

system until a model is developed. Funding will be required each year to continue maintenance. With proposed<br />

funding the work of capturing watershed parameter changes resulting from approved ERPs, and updates to<br />

topographic, soils and land use information will continue throughout the District. The funding will also support the peer<br />

review and public outreach process on the preliminary floodplain results, and presenting the results to Governing<br />

Board for approval.<br />

Benefits<br />

A WMP provides a method to evaluate the capacity of a watershed to protect, enhance, and restore water quality and<br />

natural systems, while achieving flood protection. The information developed assists local governments with their land<br />

management responsibilities by establishing a level of service and developing Best Management Practices (BMPs) to<br />

address level of service deficiencies. In addition, the information provides the District with the best available<br />

information to evaluate adverse impacts and mitigation of floodplain impacts for proposed ERPs. The most up to date<br />

information about the watershed will be available through the continuous maintenance of watershed parameters in the<br />

GIS database: as ERP permits are approved, new information is provided to the District through aerial topographic<br />

mapping and the public review and comment period. If a watershed model has not been developed, the maintenance<br />

of parameters in the GIS processes the information in a format that will save time and funding when the watershed is<br />

modeled.<br />

Costs<br />

For FY20<strong>10</strong> the funding distribution for Hardee County is as follows: Governing Board $5,311; Peace River $5,311.<br />

The budget is based on the projected number of approved ERP permits and the average development area within<br />

each Basin. Local government matching funds are equally matched by Governing Board and Basin Board funds. The<br />

Governing Board is also providing funds specifically to address public meetings and unforeseen issues with projecting<br />

the floodplains to be used in the FEMA mapping process. Future funding to continue maintenance has been estimated<br />

through 2011. The projected annual funding amount for Hardee County ranges from $<strong>10</strong>,000 to $20,000. The District<br />

funding amounts shown in the table includes staff salaries.<br />

Additional Information<br />

A WMP includes five major elements: 1) Topographic Information, 2) Watershed Evaluation, 3) Watershed<br />

Management Plan, 4) Implementation of Best Management Practices, and 5) Maintenance of Watershed Parameters<br />

and Models. Implementing elements of the WMP with local governments is one of the District's Strategic Priorities.<br />

After the Topographic Information, Watershed Evaluation and Management Plan elements are completed; the<br />

watershed parameters and models require continuous maintenance to simulate the watershed's characteristics as the<br />

land form changes. The watershed's parameters change with the continued growth experienced in the District. If<br />

continued maintenance of the models is not performed, the watershed parameters and model will no longer represent<br />

the system. This limits their value in the areas of ERP and flood protection programs.<br />

A revenue agreement will be developed with each community contributing funds towards maintenance. The District<br />

will manage the project and enter into purchase orders and agreements to accomplish project tasks. Future funding<br />

will be required each fiscal year to continue maintenance of watershed parameters and models. In the future those<br />

local governments with the technical abilities to perform the maintenance activities will be encouraged to manage this<br />

effort. The District will provide funding assistance to communities that can and those that cannot provide matching<br />

funds. Matching funds will be requested from the Federal Emergency Management Agency (FEMA) for this basin<br />

initiative. Failure to provide ongoing maintenance will diminish the return on the investment the District has made in<br />

their respective Watershed Management Plans.<br />

020 - Peace River Basin 154


B304<br />

Hardee - Maintenance of Watershed Parameters and Models<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 0 0 0 6,905<br />

0 6,905<br />

020 Peace River Basin 0 0 0 6,136<br />

0 6,136<br />

Status As Of:<br />

020 - Peace River Basin 155<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$13,041


B306<br />

Highlands - Maintenance of Watershed Parameters and Models<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Project Manager LETASI, SCOTT<br />

Task Manager(s)<br />

Status Proposed<br />

Description<br />

This is a basin initiative to fund the Maintenance of Watershed Parameters and Models element of the District's<br />

Watershed Management Program (WMP) in Highlands County. This process will be applied to watersheds where the<br />

parameters and model(s) were developed or updated based on the District's Guidelines and Specifications (G&S) and<br />

where parameters from Environmental Resource Permitting (ERP) submittals can be converted to the District's GIS<br />

system until a model is developed. Funding will be required each year to continue maintenance. With proposed<br />

funding the work of capturing watershed parameter changes resulting from approved ERPs, and updates to<br />

topographic, soils and land use information will continue throughout the District. The funding will also support the peer<br />

review and public outreach process on the preliminary floodplain results, and presenting the results to Governing<br />

Board for approval.<br />

Benefits<br />

A WMP provides a method to evaluate the capacity of a watershed to protect, enhance, and restore water quality and<br />

natural systems, while achieving flood protection. The information developed assists local governments with their land<br />

management responsibilities by establishing a level of service and developing Best Management Practices (BMPs) to<br />

address level of service deficiencies. In addition, the information provides the District with the best available<br />

information to evaluate adverse impacts and mitigation of floodplain impacts for proposed ERPs. The most up to date<br />

information about the watershed will be available through the continuous maintenance of watershed parameters in the<br />

GIS database: as ERP permits are approved, new information is provided to the District through aerial topographic<br />

mapping and the public review and comment period. If a watershed model has not been developed, the maintenance<br />

of parameters in the GIS processes the information in a format that will save time and funding when the watershed is<br />

modeled.<br />

Costs<br />

For FY20<strong>10</strong> the funding distribution for Highlands County is as follows: Governing Board $13,982; Peace River<br />

$13,982. The budget is based on the projected number of approved ERP permits and the average development area<br />

within each Basin. Local government matching funds are equally matched by Governing Board and Basin Board<br />

funds. The Governing Board is also providing funds specifically to address public meetings and unforeseen issues<br />

with projecting the floodplains to be used in the FEMA mapping process. Future funding to continue maintenance has<br />

been estimated through 2011. The projected annual funding amount for Highlands County ranges from $30,000 to<br />

$50,000. The District funding amounts shown in the table includes staff salaries.<br />

Additional Information<br />

A WMP includes five major elements: 1) Topographic Information, 2) Watershed Evaluation, 3) Watershed<br />

Management Plan, 4) Implementation of Best Management Practices, and 5) Maintenance of Watershed Parameters<br />

and Models. Implementing elements of the WMP with local governments is one of the District's Strategic Priorities.<br />

After the Topographic Information, Watershed Evaluation and Management Plan elements are completed; the<br />

watershed parameters and models require continuous maintenance to simulate the watershed's characteristics as the<br />

land form changes. The watershed's parameters change with the continued growth experienced in the District. If<br />

continued maintenance of the models is not performed, the watershed parameters and model will no longer represent<br />

the system. This limits their value in the areas of ERP and flood protection programs.<br />

A revenue agreement will be developed with each community contributing funds towards maintenance. The District<br />

will manage the project and enter into purchase orders and agreements to accomplish project tasks. Future funding<br />

will be required each fiscal year to continue maintenance of watershed parameters and models. In the future those<br />

local governments with the technical abilities to perform the maintenance activities will be encouraged to manage this<br />

effort. The District will provide funding assistance to communities that can and those that cannot provide matching<br />

funds. Matching funds will be requested from the Federal Emergency Management Agency (FEMA) for this basin<br />

initiative. Failure to provide ongoing maintenance will diminish the return on the investment the District has made in<br />

their respective Watershed Management Plans.<br />

020 - Peace River Basin 156


B306<br />

Highlands - Maintenance of Watershed Parameters and Models<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 0 0 0 15,576<br />

0 15,576<br />

020 Peace River Basin 0 0 0 14,807<br />

0 14,807<br />

Status As Of:<br />

020 - Peace River Basin 157<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$30,383


B314<br />

Polk - Maintenance of Watershed Parameters and Models<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Flood Protection, Water Quality, Natural Systems<br />

Basin(s) General Fund (District), Alafia River, Hillsborough River, Peace River<br />

Cooperator(s)<br />

Project Manager TURNER, DAWN<br />

Task Manager(s)<br />

Status Ongoing<br />

MCCLUNG, GORDON, WEVER, DONNA<br />

Description<br />

This is a basin initiative to fund the Maintenance of Watershed Parameters and Models element of the District's<br />

Watershed Management Program (WMP) in Polk County. This process will be applied to watersheds where the<br />

parameters and model(s) were developed or updated based on the District's Guidelines and Specifications (G&S) and<br />

where parameters from Environmental Resource Permitting (ERP) submittals can be converted to the District's GIS<br />

system until a model is developed. Funding will be required each year to continue maintenance. With proposed<br />

funding the work of capturing watershed parameter changes resulting from approved ERPs, and updates to<br />

topographic, soils and land use information will continue throughout the District. The funding will also support the peer<br />

review and public outreach process on the preliminary floodplain results, and presenting the results to Governing<br />

Board for approval.<br />

Benefits<br />

A WMP provides a method to evaluate the capacity of a watershed to protect, enhance, and restore water quality and<br />

natural systems, while achieving flood protection. The information developed assists local governments with their land<br />

management responsibilities by establishing a level of service and developing Best Management Practices (BMPs) to<br />

address level of service deficiencies. The information also provides the District with the best available information to<br />

evaluate adverse impacts and mitigation of floodplain impacts for proposed ERPs. In addition, as ERP permits are<br />

approved, new information is provided to the District through aerial topographic mapping and the public review and<br />

comment period. If a watershed model has not been developed, the maintenance of parameters in the GIS processes<br />

will allow the ERP information to be captured in a format that will save time and funding when the watershed is<br />

modeled. As a result, the most up to date information about the watershed will be available in the District¿s GIS<br />

database.<br />

Costs<br />

For FY20<strong>10</strong> the funding distribution for Polk county is as follows: Governing Board $147,771; Alafia River Basin<br />

$22,364; Hillsborough River Basin $2,023; and Peace River Basin $76,993. $20,000 in revenue was received from<br />

Polk County in FY2006, FY2007 and FY2008, (refer to B206 funding description). Due to County budget constraints,<br />

revenue funds will not be provided in FY2009 or FY20<strong>10</strong>. The budget is based on the projected number of approved<br />

ERP permits and the average development area within each Basin. Revenue funds provided by Polk County in prior<br />

fiscal years are equally matched by Governing Board and Basin Board funds. The Governing Board is also providing<br />

funds specifically to address public meetings and unforeseen issues with projecting the floodplains to be used in the<br />

FEMA mapping process. Future funding to continue maintenance has been estimated through 2011. The projected<br />

annual funding amount for Polk County is $20,000. The District funding amounts shown in the table includes staff<br />

salaries.<br />

Additional Information<br />

A WMP includes five major elements: 1) Topographic Information, 2) Watershed Evaluation, 3) Watershed<br />

Management Plan, 4) Implementation of Best Management Practices, and 5) Maintenance of Watershed Parameters<br />

and Models. Implementing elements of the WMP with local governments is one of the District's Strategic Priorities.<br />

After the Topographic Information, Watershed Evaluation and Management Plan elements are completed; the<br />

watershed parameters and models require continuous maintenance to simulate the watershed's characteristics as the<br />

land form changes. The watershed's parameters change with the continued growth experienced in the District. If<br />

continued maintenance of the models is not performed, the watershed parameters and model will no longer represent<br />

the system. This limits their value in supporting the District's Resource Regulation and flood protection programs. A<br />

revenue agreement will be developed with each community contributing funds towards maintenance. The District will<br />

manage the project and enter into purchase orders and agreements to accomplish project tasks. Future funding will<br />

be required each fiscal year to continue maintenance of watershed parameters and models. In the future those local<br />

governments with the technical abilities to perform the maintenance activities will be encouraged to manage this effort.<br />

The District will provide funding assistance to communities that can manage maintenance; and accept cooperative<br />

funding from those that cannot. Matching funds will also be requested from the Federal Emergency Management<br />

Agency (FEMA) for this basin initiative. Failure to provide ongoing maintenance will diminish the return on the<br />

investment the District has made in their respective Watershed Management Plans.<br />

020 - Peace River Basin 158


B314<br />

Polk - Maintenance of Watershed Parameters and Models<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 0 0 0 149,773<br />

0 149,773<br />

011 Alafia River Basin 0 0 0 23,597<br />

0 23,597<br />

013 Hillsborough River Basin 0 0 0 3,256<br />

0 3,256<br />

020 Peace River Basin 0 0 0 78,226<br />

0 78,226<br />

Project Funds Not Budgeted by the<br />

District<br />

Polk County 0 0 0<br />

0 160,000 160,000<br />

Status As Of:<br />

020 - Peace River Basin 159<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$414,852


B620<br />

Mapping and GIS<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality, Natural Systems<br />

Basin(s) General Fund (District), Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers,<br />

Pinellas-Anclote River, Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

N/A<br />

Project Manager DICKS, STEVE<br />

Task Manager(s)<br />

DICKS, STEVE<br />

Status Ongoing<br />

Description<br />

This is a continuing initiative with the goal of providing Geographic Information System (GIS), aerial photo<br />

interpretation and photogrammetric mapping services to support Governing and Basin Board activities. GIS support<br />

includes the input, management, analysis and distribution of spatial data, the design and implementation of databases,<br />

software training and map production. Aerial photo interpretation includes land use and cover mapping in support of<br />

land acquisition, Surface Water Improvement and Management (SWIM), engineering, planning and environmental<br />

studies. Photogrammetric support includes the mapping of topographic information, collection of aerial photographs<br />

and satellite imagery and the production of digital orthophotographs. This program also supports the distribution of<br />

data to the public and routine maintenance activities. The annual budget includes administrative costs for salaries,<br />

travel, training, plotting and photographic supplies, maps and other data purchases, etc.<br />

Benefits<br />

Mapping and GIS has been a continuing activity since 1987 and is required to support the District's GIS, digital<br />

orthophoto, aerial mapping and other data collection, maintenance and management activities. The District's GIS<br />

database is an integral component of planning, engineering, regulatory, and land acquisition and management<br />

activities. In a rapidly growing area such as the District, continued maintenance and expansion is needed for the GIS<br />

database to meet new demands and is required to protect the historical investment in the system. The data are<br />

currently accessed by over 450 District staff using the ArcGIS software, and serves as the foundation for the Water<br />

Management and Land Resources Information Systems. Additionally, the data collected by the Mapping and GIS<br />

Section are viewable and downloadable from the District's Internet web site.<br />

Costs<br />

In addition to plotting/printing supplies, office supplies and travel/training the FY20<strong>10</strong> funding include: Adminstrative<br />

Assistant Contractor ($30,633 - Governing Board), GIS Programming Contractor ($220,000 - Governing Board),<br />

Parcel Updates $48,000 - Governing Board). Funds for the GIS Programming Contractor are transferred to the<br />

Information Resources Department at the beginning of the fiscal year.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 0 (<strong>21</strong>7,561) 866,780 946,467<br />

0 1,595,686<br />

011 Alafia River Basin 0 0 37,509 27,245<br />

0 64,754<br />

013 Hillsborough River Basin 0 0 37,984 27,245<br />

0 65,229<br />

014 Northwest Hillsborough Basin 0 0 36,559<br />

0<br />

0 36,559<br />

015 Coastal Rivers Basin 0 0 37,509 27,245<br />

0 64,754<br />

016 Pinellas-Anclote River Basin 0 0 39,409 27,245<br />

0 66,654<br />

019 Withlacoochee River Basin 0 0 39,409 27,245<br />

0 66,654<br />

020 Peace River Basin 0 0 41,784 27,245<br />

0 69,029<br />

0<strong>21</strong> Manasota Basin 0 0 40,829 31,785<br />

0 72,614<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$2,<strong>10</strong>1,933<br />

Critical Project Milestones Projected Amended Actual<br />

020 - Peace River Basin 160


B620<br />

Mapping and GIS<br />

The following are major activities for FY20<strong>10</strong><br />

Transfer GIS Contractor Funds to IRD and Fill Position <strong>10</strong>/30/09<br />

Issue work order for parcel update. 12/30/09<br />

Status As Of: August 31, 2009<br />

Mapping and GIS is an ongoing support activity and to date there were no unforeseen expenditures or activities in<br />

FY2009. The section will continue supporting ad hoc requests for GIS data as well as conducting routine data<br />

maintenance activities. Significant activities completed in 2009 include:<br />

Migration of the District GIS software to the ArcGIS 9.3.1 release.<br />

Conversion of GIS database from the Universal Transverse Mercator Projection to State Plane Feet for improved<br />

compatibility with local governments (migration to be fully completed October 4).<br />

Conversion of GIS database to ESRI Spatial Data Type.<br />

Replacement of ArcIMS map viewers with ArcServer technology (currently in testing, will go into production Oct. 4).<br />

Staff are currently closing out FY2009 projects and preparing for FY20<strong>10</strong>.<br />

020 - Peace River Basin 161


B630<br />

Field Operations 020<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Flood Protection, Natural Systems<br />

Basin(s) General Fund (District), Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers,<br />

Pinellas-Anclote River, Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

N/A<br />

Project Manager HAGBERG, JEFFREY<br />

Task Manager(s)<br />

MARTIN, MIKE<br />

Status Ongoing<br />

Description<br />

Budget amount is for field maintenance activities associated with District water control structures, canals, and well<br />

sites. Activities include mowing, painting, tree trimming, and fence repair. Various types of well sites include<br />

groundwater sampling wells, data collection wells, and rainfall wells/gauges. Additional requirements at both water<br />

control structures and well sites include erosion control, slope stabilization, fencing, along with road, culvert and<br />

channel maintenance. These maintenance areas are District owned, but were not acquired using Save Our Rivers<br />

(SOR), P2000, and Forever Florida funds and are therefore funded by ad valorum. Currently there are <strong>10</strong> water control<br />

structures and 35 well sites to maintain. Field Operations in the Bartow Service Office also perform manual operations<br />

of all the water control structures in this basin and collect lake level data as needed.<br />

Benefits<br />

Keeping canals and water control structures clear and maintained are required to maintain the designed flow capacity.<br />

In addition, well sites are maintained for Hydrologic Data and Resource Data crews to collect data easily and in a safe<br />

manner. Repairs as necessary for erosion control and slope stabilization at canals and water control structures are<br />

accomplished with the use of materials such as rip-rap rock and filter fabric. In addition, maintenance requirements at<br />

well sites include materials for road stabilization and fencing repairs.<br />

Costs<br />

The budget includes salaries, central garage charges, rental equipment, parts, supplies, landfill disposal fees, land<br />

maintenance materials (limerock, shell, rock, and fill), and fencing repairs; $135,000 (FY2008) and $75,000 (FY2009)<br />

for the Lake Fannie berm repair.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 3,694,451 127,000 628,462 626,838<br />

0 5,076,751<br />

011 Alafia River Basin 327,383 0 64,695 78,558<br />

0 470,636<br />

013 Hillsborough River Basin 2,481,504 600,000 596,677 396,495<br />

0 4,074,676<br />

014 Northwest Hillsborough Basin <strong>21</strong>6,973 0 34,070<br />

0<br />

0 251,043<br />

015 Coastal Rivers Basin 3<strong>10</strong>,399 0 62,966 61,824<br />

0 435,189<br />

016 Pinellas-Anclote River Basin 670,273 0 133,958 170,611<br />

0 974,842<br />

019 Withlacoochee River Basin 806,639 <strong>10</strong>7,000 163,428 198,041<br />

0 1,275,<strong>10</strong>8<br />

020 Peace River Basin 1,129,960 347,000 265,197 145,889<br />

0 1,888,046<br />

0<strong>21</strong> Manasota Basin <strong>21</strong>6,058 0 36,079 39,785<br />

0 291,922<br />

Status As Of: September 03, 2009<br />

Total:<br />

Future<br />

Funding<br />

Field Operations completed routine mowing and maintenance on water control structures and well sites as needed.<br />

Crews completed inspections at P-11 Water Control Structure Weed Barrier and sprayed aquatic weeds on Saddle<br />

Creek as necessary. Peace Creek Canal maintenance has occurred during this reporting period which included aquatic<br />

spraying and mechanical removal of vegetation when needed.<br />

020 - Peace River Basin 162<br />

Total<br />

Funding<br />

$14,738,<strong>21</strong>3


B670<br />

Structure Operations 020<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers, Pinellas-Anclote River,<br />

Withlacoochee River, Peace River<br />

Cooperator(s)<br />

Project Manager CRANE, DAVID<br />

Task Manager(s)<br />

Status Ongoing<br />

GANUN, JIM, BARTLETT, MIKE<br />

Description<br />

The B670 budget provides funding for the annual inspection, operation and maintenance of District water control<br />

structures. The District owns, maintains and operates ten water control structures in the Peace River Basin, most<br />

controlling regional lake systems which are central to the Lakeland-Winter Haven area of Polk County; these also<br />

provide flow to the Peace River. Structures on the eastern chain-of-lakes system in Winter Haven are maintained and<br />

operated by agreement with the Lake Region Lakes Management District (LRLMD). The District retains ownership of<br />

the four structures, P-5, P-6, P-7 and P-8, and reimburses the LRLMD for O&M costs related to these structures.<br />

These four facilities are primarily water conservation structures, but their operation is critical for flood management and<br />

mitigation. The Peace Creek Canal, (which is currently under the auspices of the Peace Creek Canal Commission),<br />

flows from Lake Hamilton and Structure P-8 near Dundee, south and east for <strong>21</strong> miles across broad flat flood plains.<br />

Saddle Creek Canal flows south from Lake Hancock and Structure P-11. These two systems converge near Bartow<br />

and form the headwaters of the Peace River. During high rainfall events, waters typically fill the canals and floodplains<br />

and discharge very slowly to the south, often creating localized flooding. From the confluence of these systems, the<br />

river flows approximately 87 miles into Charlotte Harbor in Charlotte County. Proper operation and maintenance of<br />

these Upper Peace Basin structures is critical for water conservation, aquifer recharge, floodplain management and<br />

downstream water supplies. Structure G-90 on Lake June-in-Winter in Highlands County is another important Peace<br />

Basin structure. The structure discharges flows from Lake Placid and Lake June into Jack Creek and Josephine<br />

Creek. Discharge capabilities are limited due to the potential for flooding downstream developments. An Emergency<br />

Action Plan (EAP) has been developed for the structure. The document contains detailed information for notification<br />

procedures in the event of a developing emergency situation and should be reviewed, updated and tested on a yearly<br />

basis.<br />

Benefits<br />

Structure Operations involves three areas of responsibility: inspections, maintenance (including construction and<br />

repair), and operation. A comprehensive structural/operational inspection program of water control structures, both<br />

above and below water, is required to discover deficiencies related to human safety (both public and District<br />

personnel), operational viability, and structural integrity of the structures. The objectives and benefits of the District's<br />

inspection program, and Structure Operations activities in general, are: (1) early discovery of structural/operational<br />

deficiencies and maintenance problems deficiencies, thereby forestalling costly repairs; (2) to find and mitigate safety<br />

hazards to District personnel and the public; (3) to prevent/preempt structure failure with thorough, regular inspections,<br />

thereby reducing the potential for loss of life and property; and, (4) to comply with applicable state/federal regulations<br />

and guidelines for inspection, operation and maintenance of water control structures. The program has one full-time<br />

inspector, who performs routine monthly inspections and oversees the reporting/work-order processes. The District<br />

also utilizes engineering consultants for inspection services on the more critical structures on a two-year rotational<br />

basis. Structure Operations section work orders are generated from inspection reports and the section's Five-Year<br />

Plan. Structure Maintenance activities range from routine servicing and replacement of equipment, to repair and<br />

construction of water control structures, to perform gate operations under established guidelines in response to<br />

developing weather events. The Structure Operations section is additionally responsible for monitoring water levels<br />

and rainfall totals across the District, and directing structure gate operations which are accomplished either manually<br />

or by remote control.<br />

Costs<br />

The FY2008 budget of $367,950 includes $180,000 to repair or replace the four 72" corrugated metal pipes at P-8<br />

structure . Also at P-8, $28,000, is budgeted to replace the four gate lift devices which are in extremely poor condition.<br />

$35,000 is budgeted to LRLMD for the operation and routine maintenance of structures P-5, P-6, P-7, and P-8.<br />

Additionally, $75,000 is provided for emergency/miscellaneous engineering services, inspections, and the update to<br />

the G-90 Emergency Action Plan. $4,000 is budgeted for the installation of a traffic guardrail system at the Structure<br />

G-90. Approximately $54,000 is budgeted for Parts & Supplies, Rental of Equipment, Salaries, Central Garage,<br />

etc. related to ongoing routine maintenance and operations. The proposed FY 2009 budget includes for non-recurring<br />

expenses, $40,000 for consultant/contractual services related to Emergency Action Plan updating and emergency<br />

miscellaneous consultant services, $35,000 for remotely Control of structure Lake Parker and $35,000 for operation<br />

020 - Peace River Basin 163


B670<br />

Structure Operations 020<br />

maintenace of structures P-5,P-6,P-7, P8, by LaLake Region Lakes Management District. The recuring budget of<br />

approximately $36,000 is budgeted for Parts & Supplies, rental equipment, Central Garage, etc. related to ongoing<br />

routine maintenance and operations.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 1,461,632 (7,414) 371,176 415,862<br />

0 2,241,256<br />

011 Alafia River Basin 1,151,791 0 178,1<strong>10</strong> <strong>10</strong>9,869<br />

0 1,439,770<br />

013 Hillsborough River Basin 5,902,090 (600,000) 631,778 677,155<br />

0 6,611,023<br />

014 Northwest Hillsborough Basin 1,718,950 (6,000) 4<strong>10</strong>,226<br />

0<br />

0 2,123,176<br />

015 Coastal Rivers Basin 77,765 0 0 1,274<br />

0 79,039<br />

016 Pinellas-Anclote River Basin 3,545,269 (2,166,986) 225,160 155,875<br />

0 1,759,318<br />

019 Withlacoochee River Basin 2,517,389 (<strong>10</strong>7,000) 351,888 405,641<br />

0 3,167,918<br />

020 Peace River Basin 2,003,614 (347,000) <strong>21</strong>6,682 209,317<br />

0 2,082,613<br />

Status As Of: September 04, 2009<br />

Total:<br />

Future<br />

Funding<br />

Structure Operations reviewed 60% design plans for the new P-11 Structure that will be constructed to work in<br />

conjunction with the Lake Hancock Wetlands Treatment project. Staff conducted a test in cooperation with FDEP and<br />

FWC at the Lake Gibson outfall to observe conditions downstream. District and Polk County staff met and discussed<br />

clean out of conveyances, which will be conducted cooperatively and with FDOT. Lake Region Lakes Management<br />

District (LRLMD) continues to operate and perform routine maintenance to structures P5, P6, P7 and P8. Remote control<br />

of outfall structures at Lake Gibson and Lake Parker is nearly complete, with actuator installation to be completed by<br />

October 31.<br />

020 - Peace River Basin 164<br />

Total<br />

Funding<br />

$19,504,113


G004<br />

Aquatic Plant Management - Peace River Basin<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Flood Protection<br />

Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Pinellas-Anclote River, Withlacoochee<br />

River, Peace River<br />

Cooperator(s)<br />

Project Manager NELSON, BRIAN<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This project deals with the control of aquatic and ditchbank vegetation within the Peace Basin Canals and District<br />

maintained water control structures. This is an ongoing maintenance project.<br />

Benefits<br />

Excessive amounts of vegetation have the potential to reduce water flow capacity, hinder operation of the water control<br />

structures, hinder recreational use and navigation and cause the canals to become an eyesore.<br />

Costs<br />

The budget for aquatic plant management operations within the Peace River Basin includes salaries/wages,<br />

herbicides and central garage charges.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

011 Alafia River Basin 39,<strong>10</strong>0 0 4,197 3,469<br />

0 46,766<br />

013 Hillsborough River Basin 568,181 0 77,<strong>21</strong>8 111,884<br />

0 757,283<br />

014 Northwest Hillsborough Basin 286,706 0 36,453<br />

0<br />

0 323,159<br />

016 Pinellas-Anclote River Basin 55,631 0 3,900 3,587<br />

0 63,118<br />

019 Withlacoochee River Basin 327,832 0 32,356 25,759<br />

0 385,947<br />

020 Peace River Basin 144,895 0 17,545 14,272<br />

0 176,712<br />

Status As Of: September 11, 2009<br />

Two acres of grass and brush were treated around the water control structures in Polk County.<br />

020 - Peace River Basin 165<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$1,752,985


P259<br />

Youth Water Resources Education<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality, Natural Systems<br />

Basin(s) General Fund (District), Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers,<br />

Pinellas-Anclote River, Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager HULL, MARY MARGARET<br />

Task Manager(s)<br />

Status Ongoing<br />

TORRUSIO, MARY<br />

Description<br />

This Basin Initiative provides funding for a variety of water resources education programs to county school districts,<br />

private schools, homeschool groups and nonformal educators. Program components consist of school board<br />

agreements, teacher training workshops, mini-grants for classroom projects, field trip program support, Envirothon<br />

support and educational resources for students and educators. Agreements with the majority of school districts<br />

throughout the District are completed annually, which provide baseline water resources education programs to<br />

students and teachers. Teacher training efforts ensure that teachers understand and are able to teach students about<br />

relevant basin issues. Training sessions provide background information, materials, experiences and opportunities to<br />

explore topics of importance in the basin. Teacher workshops are conducted by District staff and/or educators who<br />

have been trained by District staff. Participants evaluate the effectiveness of teacher workshops, providing another<br />

method of improving performance. Workshops include information about the District and the basins, as well as basic<br />

hydrology and water management issues. The mini-grant program provides funds directly to teachers to implement<br />

classroom water education projects centered on current basin issues. Classroom projects are designed to increase<br />

knowledge and understanding of the impacts of human activities on the water resources in their basin and to effect<br />

behavior change in regard to water resources conservation and protection. Mini-grant projects must fall into one of six<br />

categories: watersheds, water conservation and supply, water quality, flood protection/drought education, alternative<br />

water sources or natural systems. Projects must also support the District's Strategic Plan. Measurable outcomes<br />

include documentation and evaluation of individual mini-grants including pre- and post-assessment scores, sample<br />

student work generated from the project, video or photographic documentation, and final reports by teachers and<br />

representative students. Mini-grant recipients are required to participate in annual sharing days, which provide an<br />

opportunity for mini-grant participants to showcase their projects and provide model programs for other teachers who<br />

would like to implement water projects in their classrooms. The District provides a variety of educational resources to<br />

educators and students including student newsletters with accompanying teacher's guides, water-testing equipment,<br />

surface and groundwater models, and others. The District also provides kits and boxes specific to water conservation<br />

(the grades K-3 Water Conservation Kit) and watersheds (the grades K-3 Watershed Resource Box and the grades<br />

4-8 Watershed Education Resources Box) that teach students about the importance of water conservation and healthy<br />

watersheds, while meeting Sunshine State Standards and preparing students for the Florida Comprehensive<br />

Assessment Test. Each of these resources includes a big book, several smaller books, a teacher's guide and other<br />

tools and materials used for role-playing and demonstrations. Each county has received kits and boxes for circulation,<br />

and these materials are available through the mini-grant program.<br />

Benefits<br />

The Youth Water Resources Education project forwards the District's mission by providing students, teachers and<br />

families with classroom materials and opportunities for hands-on learning experiences that equip them to make<br />

informed decisions about water resources.<br />

Costs<br />

The proposed FY20<strong>10</strong> budget for youth education totals $906,000. Funding is shared among the basins as follows:<br />

Alafia River $58,900; Hillsborough River $189,650; Coastal Rivers $59,200; Pinellas-Anclote River $256,250;<br />

Withlacoochee River $59,200; Peace River $195,550; Manasota $87,250. The District provides $40,000 in additional<br />

funding support. Budget lines below include costs for staff to manage the projects. This program directly reached<br />

553,201 students and teachers in FY2009 through programs, publications and mini-grants. Additional mini-grants are<br />

planned in the Hillsborough River Basin, as Hillsborough County Water Resource Services is requesting to provide<br />

$50,000 from the county's water restrictions violation revenue to extend the reach of mini-grants. Because most, if not<br />

all, of those involved in youth education programs also receive publications, a conservative estimate puts District<br />

outreach at 66 percent of the students in the District at a cost of $1.69 per person.<br />

Additional Information<br />

The FY2009 budget for youth education was $906,000. Funding was shared among the basins as follows: Alafia River<br />

$58,900; Hillsborough River $129,600; Northwest Hillsborough $60,050; Coastal Rivers $59,200; Pinellas-Anclote<br />

River $256,250; Withlacoochee River $59,200; Peace River $195,550; Manasota $87,250. Staff reached a total of<br />

537,670 students and teachers in FY2008 through programs, mini-grants and outreach. A total of 137 school board<br />

020 - Peace River Basin 166


P259<br />

Youth Water Resources Education<br />

mini-grants were completed, impacting more than 94,000 students. Water resources education program agreements<br />

with 12 separate school boards impacted more than <strong>10</strong>3,000 students and teachers. The 17 teacher workshops<br />

involved 318 teachers who will reach more than 45,000 students per year. More than 9<strong>21</strong>,000 pieces of youth<br />

education materials were distributed to students and teachers throughout the District. In FY2008, the Youth Education<br />

Section continued its three-year program evaluation to determine successful program elements, to identify ways to<br />

improve impact and to develop effective ways to impart behavior change. The three-year evaluation will conclude in<br />

FY20<strong>10</strong>.<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 205,535 0 58,197 58,895<br />

0 322,627<br />

011 Alafia River Basin 426,778 0 70,467 69,444<br />

0 566,689<br />

013 Hillsborough River Basin 911,257 0 140,833 <strong>21</strong>1,328 50,000 1,313,418<br />

014 Northwest Hillsborough Basin 420,682 0 68,191<br />

0<br />

0 488,873<br />

015 Coastal Rivers Basin 425,923 0 69,096 71,115<br />

0 566,134<br />

016 Pinellas-Anclote River Basin 2,115,711 0 269,993 274,432<br />

0 2,660,136<br />

019 Withlacoochee River Basin 420,451 0 68,355 69,571<br />

0 558,377<br />

020 Peace River Basin 1,087,312 0 209,130 <strong>21</strong>5,064<br />

0 1,511,506<br />

0<strong>21</strong> Manasota Basin 572,406 0 <strong>10</strong>0,493 <strong>10</strong>2,236<br />

0 775,135<br />

District Budgeted - Outside Revenue<br />

Hillsborough - Youth & Water Rstr Edu<br />

(P259)<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

0 0 0 50,000<br />

Total:<br />

Future<br />

Funding<br />

0<br />

Total<br />

Funding<br />

50,000<br />

$8,812,895<br />

Critical Project Milestones Projected Amended Actual<br />

FY2009 Budgeted Funds<br />

Program commence for school board agreements 8/1/08 8/1/08<br />

Mini-grants selected <strong>10</strong>/15/08 <strong>10</strong>/<strong>10</strong>/08<br />

Mini-grant projects complete 5/30/09 5/29/09<br />

School board agreement program complete 7/30/09 7/30/09<br />

Final reports submitted to District 8/30/09 8/30/09<br />

FY20<strong>10</strong> Budgeted Funds<br />

Program commence for school board agreements 8/3/09 8/28/09 8/28/09<br />

Mini-grants selected <strong>10</strong>/16/09<br />

Mini-grant projects complete 5/29/<strong>10</strong><br />

School board agreement program complete 7/30/<strong>10</strong><br />

Final reports submitted to District 8/31/<strong>10</strong><br />

Status As Of: September <strong>10</strong>, 2009<br />

Outreach: (1) Youth education staff coordinated a field trip to the Weekiwachee Preserve for 125 students from the Boys<br />

and Girls Club of Hernando County on August 5. The children had an opportunity to participate in a guided hike and<br />

watershed education exercises as well as learn about water quality monitoring and land management techniques. (2) On<br />

August 18, staff attended the Lake Wales Charter School Health Fair to distribute Splash! mini-grant and District<br />

recreation information to approximately 400 Polk County teachers. (3) Staff presented information about District<br />

resources to 15 teachers at the Pinellas Secondary Science Planning Day on August <strong>21</strong>. Mini-grants: The Splash!<br />

mini-grant program for the 2009-20<strong>10</strong> school year, available at WaterMatters.org/mini-grants, received 209 applications.<br />

The deadline for teachers to submit their applications was September 11, 2009. Applications are currently under review<br />

for funding consideration. Notification of Splash! mini-grant awards are completed by October 16. School Board<br />

020 - Peace River Basin 167


P259<br />

Youth Water Resources Education<br />

Coordination: Staff has opened purchase orders for school board agreements in Charlotte, Citrus, Hardee, Hernando,<br />

Highlands, Hillsborough, Levy, Manatee, Pasco, Pinellas, Polk, Sarasota and Sumter counties. Each school board<br />

agreement funds baseline water resources education programs for K-12 students and educators during the 2009-20<strong>10</strong><br />

school year. The goal of these programs is to develop skills among educators and students that will help them take a<br />

critical look at local and regional water resources issues. Teacher Training: (1) One District-sponsored Great Water<br />

Odyssey facilitator training was held August <strong>10</strong> at the Tampa Service Office. Four teachers and three District staff<br />

members were trained on the fourth- and fifth-grade editions of the program. (2) One Project WET workshop occurred at<br />

Cahoon Elementary in Hillsborough County on August 12. A total of 29 elementary science, math and language arts<br />

teachers participated in the six-hour workshop. (3) On August 13, youth education staff conducted a middle school<br />

science in-service day training for 40 Hernando County seventh- and eighth-grade teachers at the Springs Coast<br />

Environmental Education Center. Publications: Approximately 587,764 youth education publications have been<br />

distributed this calendar year, and 817,319 youth publications have been distributed to date in fiscal year 2009.<br />

ACTION-TO-DATE: On time.<br />

020 - Peace River Basin 168


P268<br />

Public Education<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Alafia River, Hillsborough River, Coastal Rivers, Pinellas-Anclote River, Withlacoochee River,<br />

Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager PUTNAM, BETH<br />

Task Manager(s)<br />

Status Ongoing<br />

STERNBERGER, VIRGINIA, MORGAN, DORIAN, DURELL, SYLVIA, ROE, MELISSA<br />

Description<br />

This Basin Initiative provides funding for a variety of projects designed to inform and educate the public about the<br />

importance of managing and protecting the water resources. All programs align directly with one or more of the<br />

District's areas of responsibilities, with the District's Strategic Plan and with basin priorities. The District's broad range<br />

of public education programs and materials reflect the variety of backgrounds and interests of the District's residents<br />

and visitors. Some of the projects are implemented Districtwide with support from all the Basin Boards, while some are<br />

basin-specific and supported only by the Basin Board(s) that will benefit from the project(s). Districtwide programs<br />

include media messaging, educational material development, surveys and other research/evaluation measures,<br />

Florida-Friendly LandscapingTM education, and translation services for Spanish materials. Basin-specific programs<br />

reflect differing priorities as well as unique opportunities. Examples are Community Education Grants, watershed<br />

education programs, homeowners association outreach, the Pilot Irrigation Program, exhibits and signage, special<br />

events and partnerships with local environmental education centers, nonprofits and others.<br />

Benefits<br />

The programs listed benefit the District through an increase in awareness and understanding of water management<br />

and water resource issues, as well as an increase in behaviors that conserve and protect the District's water resources<br />

and watersheds.<br />

Costs<br />

Funding for public education is budgeted within the basins for FY20<strong>10</strong> as follows: Alafia River -- $59,493; Hillsborough<br />

River -- $228,648; Coastal Rivers -- $67,517; Pinellas-Anclote River -- $257,<strong>10</strong>6; Withlacoochee River -- $87,079;<br />

Peace River -- $154,423; Manasota -- $<strong>10</strong>2,715. In addition, the Governing Board contributes $525,000 to media<br />

messaging and $280,275 to support other public education efforts for a total of $1,762,256. Funds support a variety of<br />

education and outreach efforts Districtwide. FY20<strong>10</strong> funding for media messaging totals $902,0<strong>10</strong>. The cost/benefit of<br />

those reached via media messaging is measured in impressions and is projected to cost the District less than six<br />

hundredths of a cent per impression. Based on the total number of people reached through the public education<br />

materials and programs in FY2008 (2,099,000+), the cost/benefit ratio for the remaining $820,245 budgeted for public<br />

education in FY20<strong>10</strong> is projected to be approximately $0.40 per person. Budget lines below include costs for staff to<br />

manage the projects.<br />

Additional Information<br />

Funding for public education was budgeted within the basins for FY2009 as follows: Alafia River - $59,733;<br />

Hillsborough River - $162,074; Northwest Hillsborough - $68,164; Coastal Rivers - $67,533; Pinellas-Anclote River -<br />

$283,842; Withlacoochee River - $92,502; Peace River - $158,800; Manasota - $<strong>10</strong>2,715. In addition to this total of<br />

$995,363, the Governing Board contributed $525,000 to media messaging and $318,600 to support other public<br />

education efforts. Funds support a variety of educational and outreach efforts Districtwide. Budget lines below include<br />

costs for staff to manage the projects. Based on the total number of people reached through the public education<br />

materials and programs in FY2008 (2,099,000+), the cost for FY2009 is projected to be approximately $0.63 per<br />

person. This cost/benefit ratio does not include those reached via media messaging, which is measured in<br />

impressions, and is projected to cost the District less than six hundredths of a cent per impression.<br />

020 - Peace River Basin 169


P268<br />

Public Education<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 2,603,597 755,000 925,442 942,490<br />

0 5,226,529<br />

011 Alafia River Basin 469,353 6,600 74,330 74,602<br />

0 624,885<br />

013 Hillsborough River Basin 1,171,679 38,365 182,198 260,276<br />

0 1,652,518<br />

014 Northwest Hillsborough Basin 507,599 8,400 84,037<br />

0<br />

0 600,036<br />

015 Coastal Rivers Basin 477,784 11,989 78,436 81,780<br />

0 649,989<br />

016 Pinellas-Anclote River Basin 2,414,737 28,200 311,696 294,313<br />

0 3,048,946<br />

019 Withlacoochee River Basin 637,0<strong>10</strong> 0 <strong>10</strong>3,334 <strong>10</strong>0,692<br />

0 841,036<br />

020 Peace River Basin 1,032,416 0 179,511 179,826<br />

0 1,391,753<br />

0<strong>21</strong> Manasota Basin 777,362 0 118,800 124,<strong>21</strong>5<br />

0 1,020,377<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$15,056,069<br />

Critical Project Milestones Projected Amended Actual<br />

Barrier and Benefit Survey<br />

Survey instrument one written 5/1/08 6/19/08<br />

Survey one results 5/30/08 7/20/08 7/18/08<br />

Survey instrument two written 6/20/08 9/15/08 <strong>10</strong>/24/08<br />

Survey two results 7/18/08 11/20/08 12/18/08<br />

Survey instrument three written 8/8/08 1/15/09 1/15/09<br />

Survey three results 8/29/08 4/30/09 4/30/09<br />

CBSM education intervention plans complete 9/26/08 4/30/09 6/16/09<br />

FY2009 Community Education Grant Activities<br />

Application deadline 8/22/08 8/22/08<br />

Basin Board Education Committee input 11/<strong>21</strong>/08 11/<strong>21</strong>/08<br />

Announcement of allocations to CE Grant recipients 1/23/09 1/12/09 1/12/09<br />

Basin Boards informed of grant allocations 2/13/09 1/22/09 2/22/09<br />

Grant-recipient required workshops 2/27/09 2/27/09<br />

End of projects' work period 7/31/09 7/31/09<br />

Final reports due 7/31/09 8/31/09 8/31/09<br />

Requests for reimbursements 8/31/09 8/31/09 8/31/09<br />

FY2009 Media Messaging<br />

Fall media buy <strong>10</strong>/14/08 <strong>10</strong>/14/08<br />

Spring plan developed 11/30/08 11/30/08<br />

Fall media buy final report 12/30/08 12/30/08<br />

Winter media buy 1/5/09 1/5/09<br />

Spring media buy 3/1/09 3/1/09<br />

Summer media buy plan 4/28/09 4/28/09<br />

Summer media buy 5/17/09 5/15/09<br />

Media buy final report 6/1/09 7/31/09 7/31/09<br />

FY20<strong>10</strong> Community Education Grant Activities<br />

Application deadline 8/<strong>21</strong>/09 8/<strong>21</strong>/09<br />

Basin Board Education Committee input 11/20/09<br />

Announcement of allocations to CE Grant recipients 1/22/<strong>10</strong><br />

Basin Boards informed of grant allocations 2/12/<strong>10</strong><br />

Grant-recipient required workshops 2/23/<strong>10</strong><br />

End of projects' work period 7/31/<strong>10</strong><br />

Requests for reimbursements 8/31/<strong>10</strong><br />

Final reports due 8/31/<strong>10</strong><br />

020 - Peace River Basin 170


P268<br />

Public Education<br />

FY20<strong>10</strong> Media Messaging<br />

Winter media buy plan <strong>10</strong>/30/09<br />

Winter media buy 1/4/<strong>10</strong><br />

Winter media buy final report 4/30/<strong>10</strong><br />

Pilot Irrigation Project<br />

Finish focus group research 9/30/07 9/30/07<br />

Take test meter readings of pilot neighborhoods 9/30/07 <strong>10</strong>/24/07<br />

Finish survey research 2/28/08 5/1/08 6/9/08<br />

Develop pilot project plans 5/31/08 9/30/08 <strong>10</strong>/6/08<br />

Begin pilot project in designated neighborhoods 7/1/08 12/1/08 12/1/08<br />

Take meter read #1 7/31/08 12/30/08 12/30/08<br />

Take meter read #2 8/31/08 1/31/09 2/9/09<br />

Take meter read #3 9/30/08 3/20/09 4/<strong>10</strong>/09<br />

Evaluate pilot program based on meter readings <strong>10</strong>/15/08 <strong>10</strong>/15/09<br />

Begin phase two with needed revisions 1/1/09 7/1/09 7/1/09<br />

Take meter read #1 1/31/09 7/31/09 7/31/09<br />

Take meter read #2 2/28/09 8/31/09 9/15/09<br />

Take meter read #3 3/30/09 9/30/09<br />

Pilot end date 3/31/09 <strong>10</strong>/30/09<br />

WWIPP<br />

Conduct campaign with pretest 7/31/09 9/30/09<br />

Evaluate program impact with posttest 6/30/<strong>10</strong><br />

Final report and fact sheet due 8/31/<strong>10</strong><br />

Status As Of: September 18, 2009<br />

Community Education Grants (CEG): The FY2009 Community Education Grant program is now complete. Final reports<br />

and invoices are being received and processed. FY20<strong>10</strong> applications, available on the District's web site at<br />

WaterMatters.org/CommunityGrants, were due August <strong>21</strong>, 2009. Florida-Friendly Landscaping Education: The District is<br />

currently coordinating with University of Florida's Institute of Food and Agricultural Sciences to present a series of<br />

workshops designed to help board members and property managers of homeowner associations understand what the<br />

new the SB2080 law means and what resources are available to assist them. Seven workshops are planned for October<br />

with two in Hillsborough County and one each in Pasco, Pinellas, Polk, Manatee and Sarasota counties. The<br />

Pasco/Pinellas HOA FYN coordinator, Doris Heitzmann, reports that 14 site visits and seven presentations to138<br />

association board members were made this quarter. The Hillsborough/Polk HOA FYN coordinator, Lisa Strange, reports<br />

that six site visits and nine presentations to a total of 431 association board members were made this quarter. Media<br />

Messaging: (1) The District's FY20<strong>10</strong> media messaging campaign is being developed and staff is using the research<br />

conducted in FY2009 to more effectively reach the target audiences. Several draft ads were tested with focus groups in<br />

August by the District's media research consultant to help staff determine which ads to produce for next year's campaign.<br />

An ad was chosen and will be produced in October. (2) Staff is developing its plan for an integrated campaign to include<br />

paid and non-paid promotion of the Skip-A-Week concept. The campaign is set to begin as early as November and will<br />

run through February 20<strong>10</strong>. Behavior Change Pilots: "Florida-Friendly Irrigating (FFI), It Just Makes Sense" is a pilot<br />

irrigation program asking residents in selected neighborhoods in Sumter, Polk and Charlotte counties to skip a week of<br />

irrigation during the months of December, January and February, and watch the weather and wait to water during July,<br />

August and September, when rainfall can allow residents to turn off their systems for extended periods of time.<br />

Evaluation is being conducted to see if behavior change can be detected by comparing the water use of the education<br />

and control groups during the Skip a Week program months of December, January and February. In addition, campaign<br />

components for the summer portion of the program -- Watch the Weather, Wait to Water--are currently underway.<br />

Program interventions informed residents that yards need only about ¾" of water every three to five days in the summer,<br />

which is often provided by rainfall alone. A letter from the FFI Team was sent as a July utilities bill stuffer to 422 Villages,<br />

4,000 Lakeland and 60,000 Port Charlotte residents. How-to videos started airing on government access channels and<br />

other outlets in mid-June to remind residents that the rainy season is on the way and to check their rain sensors, do a<br />

catch-can test and remember to look for the signs that their yard needs water before running their irrigation systems. The<br />

program's web site, WaterMatters.org/ItJustMakesSense, was updated to reflect the Watch the Weather, Wait to Water<br />

message. As one of the education interventions, residents in the pilot areas were invited to attend a free rain barrel<br />

workshop to be held in their area July 11. Research: (1) The three surveys to determine barriers and benefits associated<br />

with nine specific behaviors related to watershed protection and conservation are complete. The first survey gathered<br />

data related to pet waste, fertilizer use and pesticide use behaviors. The second survey collected data related to raising<br />

the lawnmower height, rerouting the downspout into the landscape and installing a rain sensor. Topics on the final survey<br />

included proper car oil disposal, installing a low-flow showerhead and proper septic system maintenance. (2) The<br />

020 - Peace River Basin 171


P268<br />

Public Education<br />

District's project manager is working with the webmaster to create a searchable data repository to house the District's<br />

social research data for use by staff and cooperators. The site was opened to members of the Social Marketing<br />

Resource Group to pretest the site's usability and report any problems to the project manager. The site is in its final<br />

stages of editing and will be available for full use once the findings from the Barrier and Benefit studies are included. (3)<br />

The purchase order for the Irrigation Literacy Evaluation, Phase II: Water-Wise Irrigation Practices and Perceptions<br />

Campaign project has been opened. Phase II includes the review of survey data collected within Pinellas County during<br />

Phase I to develop ideal scenarios that will be modeled to determine the most successful targeted water-wise irrigation<br />

education approach. The University of Florida approved the International Review Board protocol, and project work has<br />

begun.<br />

020 - Peace River Basin 172


F032<br />

Peace River Regional Reservoir Expansion<br />

Project Type WS&R Dev.<br />

AOR(s)<br />

Water Supply<br />

Basin(s) General Fund (District), Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager GOODWIN, AUDRIE<br />

Task Manager(s)<br />

Status Ongoing<br />

Peace River/Manasota Regional Water Supply Auth.<br />

ARMSTRONG, BRIAN<br />

Description<br />

The Peace River Regional Reservoir Expansion is an alternative water supply project that will expand the surface<br />

water storage capacity of the Peace River Manasota Regional Water Supply Authority's water supply facilities by<br />

constructing a six (6) billion gallon reservoir. The total cost to construct the reservoir is approximately $77 million.<br />

Benefits<br />

In combination with project F033, which expands the Authority's water treatment plant capacity from 24 to 48 mgd, this<br />

project will enable the Authority to supply up to their permitted amount of 32.7 mgd on an annual average basis.<br />

Costs<br />

The total estimated project cost is $77,049,654. The District's share is $37,986,143 which includes District ad valorem<br />

funding of $28,409,224 and SB444 funding of $9,576,919. The District ad valorem cost may be reduced depending on<br />

future funding received from the State, as described in Senate Bill 444. It is anticipated that, of the District's projected<br />

total funding contribution of $28,409,224, the District Governing Board will contribute $14,526,959, the Manasota<br />

Basin Board will contribute $<strong>10</strong>,560,764, and the Peace River Basin Board will contribute $3,3<strong>21</strong>.501. The Governing<br />

Board met their total funding match in FY2009 and therefore does not have a FY20<strong>10</strong> funding contribution. The<br />

FY20<strong>10</strong> request of $644,694 represents funding from the Peace ($600,777) and Manasota ($43,917) Basin Boards<br />

that will maintain the contract percentages.<br />

Additional Information<br />

The Peace River facility is located in DeSoto County and provides potable water to residents of Charlotte, DeSoto and<br />

Sarasota Counties. As configured in 2005, the Facility includes a surface water withdrawal from the Peace River, a<br />

625 million gallon reservoir (85 acres), a 24 mgd surface water treatment plant, and <strong>21</strong> Aquifer Storage and Recovery<br />

(ASR) wells with a total storage capacity of approximately 6 billion gallons. Because the Peace River experiences<br />

significant periods of low flow, it is important for the Authority to have sufficient capacity to store excess flows during<br />

wet periods for use during dry periods when river flows are insufficient to meet demands. Withdrawals from the Peace<br />

River are prohibited when flows, as measured at the Arcadia gage, are less than 84 mgd (130 cubic feet per second<br />

(cfs)). The Authority's customers have identified an additional demand of 15 mgd beyond the 18 mgd that is currently<br />

provided by the Authority's Facility, for a total 2015 demand of 33 mgd. Because of the uncertainty associated with<br />

permitting new ASR wells due to mobilization of arsenic in the aquifer, the Authority proposed removing the ASR<br />

component of the Peace River Facility Expansion Project (F033). As a result, the Authority needed additional storage<br />

capacity and requested amending this project to increase reservoir capacity from two (2) to six (6) billion gallons. In<br />

October 2005, the Peace River and Manasota Basin Boards and the Governing Board approved increasing the size of<br />

the reservoir and deleting the additional ASR wells from the Facility Expansion project. The combination of this project<br />

and the Peace River Facility Expansion (F033) will allow the Authority to deliver a permitted capacity of 32.7 mgd to its<br />

customers at a total cost of $167,192,854. The project is a critical component of the District's SWUCA water supply<br />

plan by providing users in the coastal areas, where there is the greatest threat of saltwater intrusion, with supplies<br />

other than ground water. Of the total project cost ($77 million), approximately 90 percent ($69.5 million) is expected to<br />

be needed for construction, and the remainder for design, permitting, and administration.<br />

020 - Peace River Basin 173


F032<br />

Peace River Regional Reservoir Expansion<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 8,474,060 1,852,024 4,234,813 5,573<br />

0 14,566,470<br />

020 Peace River Basin 2,3<strong>21</strong>,456 500,046 500,000 600,777<br />

0 3,922,279<br />

0<strong>21</strong> Manasota Basin 6,123,474 1,351,983 3,085,656 43,917<br />

0 <strong>10</strong>,605,030<br />

District Budgeted - Outside Revenue<br />

Water Protection & Sust T.F.<br />

(Alternative Wtr)<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

8,112,643 1,464,277 0<br />

0<br />

0<br />

9,576,920<br />

Project Funds Not Budgeted by the<br />

District<br />

PR/MRWSA 38,418,817 0 0<br />

0<br />

0 38,418,817<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$77,089,516<br />

Critical Project Milestones Projected Amended Actual<br />

Design Commence 2/1/03 2/5/03<br />

Draft Agreement returned from Contract Administration 5/1/03 6/6/07<br />

Peace River Basin Board Approval of Agreement 6/2/03 6/13/03<br />

Manasota Basin Board Approval of Agreement 6/2/03 6/18/03<br />

Governing Board Approval of Agreement 6/2/03 6/24/03<br />

Contract Executed 8/1/03 12/18/03<br />

Notice to Proceed 8/1/03 12/18/03<br />

Basis of Design Report 9/30/05 11/9/05<br />

Execute Amended Agreement 12/31/05 3/28/06<br />

Detailed Plans and Specifications 9/30/06 9/30/06<br />

Permitting 9/30/06 5/7/07<br />

Bidding 11/15/06 6/8/07<br />

Award Construction Contract 11/30/06 7/25/07<br />

50% Construction Completion 11/30/07 8/31/08<br />

Completion of Construction <strong>10</strong>/31/08 3/31/<strong>10</strong><br />

Contract Termination <strong>10</strong>/1/16<br />

Status As Of: September <strong>10</strong>, 2009<br />

Final design for the Regional Reservoir Expansion was completed in 2007 and the Environmental Resource Permit<br />

(ERP)s for mitigation and reservoirs were issued respectively by April 2007 and October 2007. In June 2007, the<br />

Authority received three bids for the reservoir expansion. The low bid of $64,9<strong>10</strong>,500 was <strong>21</strong> percent higher than the<br />

engineer's estimate. The Authority asked the District to provide additional funding for the increased costs and as a result<br />

the Peace River and Manasota Basin Boards and the Governing Board approved an additional $3,703,704 in 2008<br />

funding and $7,812,582 in 2009 funding for the reservoir project. The Governing Board granted various easements to<br />

PRMRWSA in November after receiving survey information and draft easements. The Authority Board approved the<br />

reservoir construction contract at its July 25, 2007 meeting and issued a limited notice to proceed to the Contractor to<br />

begin initial work and permitting. In addition, the Army Corps of Engineers issued the companion permit to the ERP on<br />

May 18, 2007. The District agreed to convey a perpetual exclusive easement and a perpetual nonexclusive easement to<br />

the Authority by September 2007. The District will also convey a conservation easement to the DEP over the mitigation<br />

area to satisfy permit requirements established by DEP. District and Authority staff agreed on public use issues<br />

associated with the Reservoir Expansion project. DEP approved the commencement of construction in December 2007.<br />

In preparation for the construction, District and Authority staff relocated all recreational amenities to accommodate the<br />

project. The dedication ceremony was held on May 15, 2009, with FDEP Secretary Mike Sole and SWFWMD Executive<br />

Director Dave Moore in attendance. Installation of the soil cement and the outlet tower were complete by May 2009. The<br />

project reached the substantial completion milestone on June 25, 2009; five days ahead of the updated schedule. In<br />

total, approximately 3.6 million yards of fill have been moved to build the reservoir's embankment.<br />

020 - Peace River Basin 174


F032<br />

Peace River Regional Reservoir Expansion<br />

ACTION-TO-DATE: On-time/Ahead of Schedule<br />

The project appears to be at least six months ahead of schedule and will reach the Final Completion of Construction by<br />

September 2009. Overall, construction is considered to be 99 percent complete. Sodding was completed in June 2009,<br />

however sodding maintenance/repair is ongoing.<br />

At the request of the Office of Governor Charlie Crist, the District has been communicating regularly with the cooperator<br />

concerning the Governor's Accelerate Florida initiative to stimulate Florida's economy. An information request was sent<br />

to the cooperator on October 15, 2008. District staff followed up with an email and phone call regarding the cooperator's<br />

efforts to accelerate the project. The cooperator responded, "PRMRWSA and their construction subcontractors have<br />

agreed and executed contracts with early completion incentives. The District has allocated $7,812,582 in FY2009 funding<br />

toward this project to assist meeting this accelerated schedule. This project is anticipated to meet its accelerated<br />

schedule milestone in early summer 2009."<br />

020 - Peace River Basin 175


F033<br />

Peace River Facility Expansion<br />

Project Type WS&R Dev.<br />

AOR(s)<br />

Water Supply<br />

Basin(s) General Fund (District), Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager GOODWIN, AUDRIE<br />

Task Manager(s)<br />

Status Ongoing<br />

Peace River/Manasota Regional Water Supply Auth.<br />

ARMSTRONG, BRIAN<br />

Description<br />

The Peace River Facility Expansion is an alternative water supply project that involves expansion of the Peace River<br />

Manasota Regional Water Supply Authority's water treatment facilities. Whereas, F032 is for the design and<br />

construction of a six billion gallon reservoir, this project is for the design and construction associated with expanding<br />

the surface water treatment plant capacity from 24 to 48 mgd. Additionally, this project will construct five miles of a<br />

20-inch pipeline from the Authority's facilities to extended areas of DeSoto County to supply up to 5.5 mgd to the<br />

county.<br />

Benefits<br />

In combination with F032, this project will enable the Authority to supply up to their permitted quantity of 32.7 mgd on<br />

an annual average basis from the Peace River.<br />

Costs<br />

The total estimated project cost is $90,143,200. The District share is $41,862,232 which includes District ad valorem<br />

funding of $25,943,940 and SB444 funding of $15,918,292. The District's ad valorem cost may be reduced depending<br />

on future funding received from the state, as described in Senate Bill 444. It is anticipated that, of the District's<br />

projected total funding contribution of $25,943,940, the District Governing Board will contribute $14,618,384, the<br />

Manasota Basin Board will contribute $8,625,340, and the Peace River Basin Board will contribute $2,700,<strong>21</strong>6. The<br />

Governing Board met their total funding match in FY2009 and therefore does not have a FY20<strong>10</strong> funding contribution.<br />

The FY20<strong>10</strong> request of $2,165,568 represents funding from the Peace ($440,678) and Manasota ($1,724,890) Basin<br />

Boards that will maintain the contract percentages.<br />

The funding table below includes lapsed 2008 Governing Board funds of $997,525.<br />

Additional Information<br />

The project originally included the construction of 24 Aquifer Storage and Recovery (ASR) wells for storage of excess<br />

river flows. However, because of the uncertainty involved in permitting ASR wells due to mobilization of arsenic in the<br />

aquifer, the Authority has deferred the ASR component of this project. The Authority provides public drinking water to<br />

residents of Charlotte, DeSoto and Sarasota counties. As configured in 2005, the facility includes a surface water<br />

withdrawal from the Peace River, a 625 million gallon reservoir (85 acres), a 24 mgd surface water treatment plant,<br />

and <strong>21</strong> ASR wells capable of storing up to a total of six billion gallons. Because of the Peace River's seasonal flow<br />

pattern, characterized by significant periods of low flow that are insufficient for providing potable supply, the Peace<br />

River facility must possess the necessary capacity to capture, treat, and store high flows from the river when they<br />

occur so that sufficient reserves are available to meet customer demand during low flow periods. The Authority's water<br />

use permit allows them to supply up to 32.7 mgd on an annual average basis from the Peace River and prohibits<br />

withdrawals when river flow, as measured at the Arcadia gage, is less than 130 cubic feet per second (cfs). The<br />

reservoir and ASR wells provide water during the dry season when withdrawal from the river is prohibited to assure the<br />

environmental health of the downstream estuary. This project also includes the design and construction of a potable<br />

water transmission pipeline known as the DeSoto County Water Transmission Main, which extends from the Peace<br />

River Facility south across the Peace River, then south along Hwy 17, to the Wal-Mart Distribution Facility. This supply<br />

line is to serve potable water customers that DeSoto County Utilities has identified. The combination of this project and<br />

the Peace River Reservoir Expansion (F032) will result in approximately 24 mgd of additional supply at a total cost of<br />

$167,192,854. The project is a critical component of the District's SWUCA water supply plan by providing users in the<br />

coastal areas, where there is the greatest threat of saltwater intrusion, with supplies other than ground water. Of the<br />

total project cost ($90.1 million), approximately $84.7 million is expected to be needed for construction, and the<br />

remainder for design, permitting, and administration.<br />

020 - Peace River Basin 176


F033<br />

Peace River Facility Expansion<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 9,890,493 163 5,757,000 5,573<br />

0 15,653,229<br />

020 Peace River Basin 2,500,172 44 200,000 440,678 757,032 3,897,926<br />

0<strong>21</strong> Manasota Basin 6,613,473 1<strong>21</strong> 2,012,071 1,724,890<br />

0 <strong>10</strong>,350,555<br />

District Budgeted - Outside Revenue<br />

Water Protection & Sust T.F.<br />

(Alternative Wtr)<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

15,918,289 0 0<br />

0<br />

0<br />

15,918,289<br />

Project Funds Not Budgeted by the<br />

District<br />

EPA Grant 9,000,000 0 0<br />

0<br />

0 9,000,000<br />

PR/MRWSA 35,499,860 0 1,656,227<br />

0<br />

0 37,156,087<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$91,976,086<br />

Critical Project Milestones Projected Amended Actual<br />

Transmission Line Design Commence 9/1/02 <strong>10</strong>/1/03<br />

Consultant Selection 1/1/03 1/1/03<br />

Transmission Line Design Complete 3/1/03 5/1/03<br />

Draft Agreement to Contract Administration 4/1/03 6/9/03<br />

Draft Agreement returned from Contract Administration 5/1/03<br />

Transmission Line Construction Commence 6/1/03 7/30/04<br />

Peace River Basin Board Approval of Agreement 6/2/03 6/13/03<br />

Manasota Basin Board Approval of Agreement 6/2/03 6/18/03<br />

Governing Board Approval of Agreement 6/2/03 6/24/03<br />

Contract Executed 8/1/03 <strong>10</strong>/13/04<br />

Notice to Proceed 8/1/03 <strong>10</strong>/15/04<br />

Transmission Line Construction Complete 3/1/04 9/7/05<br />

Construction Complete <strong>10</strong>/31/06 1/1/06<br />

Bidding 11/15/06 2/8/07<br />

Award Construction Contract 11/30/06 3/19/07<br />

Plans and Specifications 9/30/07 11/30/06<br />

50% Completion 11/30/07 2/4/08<br />

<strong>10</strong>0% Completion 3/31/<strong>10</strong><br />

Contract Closeout <strong>10</strong>/1/16<br />

Status As Of: September <strong>10</strong>, 2009<br />

In February 2007, the Authority received one bid for Contract 2 for major components of the Facility Expansion. The bid<br />

was approximately $17 million over the original engineer's estimate of probable cost. After receiving the bid, Authority<br />

staff and the contractor negotiated a revised project cost $14 million below the original bid price. The Authority's Board<br />

approved the revised cost and authorized staff to enter into an agreement with the contractor. Even with the newly<br />

negotiated bid price, the overall revised project cost remained $19 million over the original project cost in the contract<br />

between the District and the Authority. The Authority requested additional funding as a result of the increased costs and<br />

an additional $3,756,693 in 2008 Water Protection and Sustainability Trust Funds and $8,205,398 in 2009 District<br />

funding were allocated to this project. Construction of the Facility Expansion Project will occur through three separate<br />

contracts. The first contract, completed in May, focused on site preparation. The second contract is for construction of a<br />

maintenance building, dewatering facility, filters, storage tanks, thickeners, and chemical feed and disinfection stations.<br />

The third contract is for construction of an operations center. A portion of the expanded facilities has been online since<br />

November 2008.<br />

ACTION-TO-DATE: On-time/Ahead of Schedule<br />

020 - Peace River Basin 177


F033<br />

Peace River Facility Expansion<br />

Construction continues on the facility and is considered 96 percent complete. The project appears to be on schedule for<br />

completion well ahead of the March 20<strong>10</strong> Final Completion of Construction deadline. Current activities include upgrading<br />

the high service pumps in the pump building, and addressing punch list items.<br />

It the request of the Office of Governor Charlie Crist, the District has been communicating regularly with the cooperator<br />

concerning the Governor's Accelerate Florida initiative to stimulate Florida's economy. An information request was sent<br />

to the cooperator on October 15, 2008. District staff followed up with an email and phone call regarding the cooperator's<br />

efforts to accelerate the project. The cooperator responded, "PRMRWSA and their construction subcontractors have<br />

agreed and executed contracts with early completion incentives. The District has allocated $8,205,398 in FY2009 funding<br />

toward this project to assist meeting this accelerated schedule. This project met its accelerated schedule milestone - the<br />

new facilities have been used to treat over 1.5 billion gallons of water."<br />

020 - Peace River Basin 178


H008<br />

Lake Hancock Lake Level Modification<br />

Project Type WS&R Dev.<br />

AOR(s)<br />

Water Supply, Natural Systems<br />

Basin(s) General Fund (District), Alafia River, Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager DOWNING, HARRY<br />

Task Manager(s)<br />

Status Ongoing<br />

BLASCHKA, STEVEN, LETASI, SCOTT, HILL, CHERYL<br />

Description<br />

The Lake Hancock Lake Level Modification Project is part of the proposed strategy for achieving minimum flows and<br />

levels recovery for the upper Peace River established by the District. The goal of the Lake Level Modification Project is<br />

to store water by raising the control elevation of the existing outflow structure on Lake Hancock and to slowly release<br />

the water during the dry season to help meet the minimum flow requirements in the upper Peace River between<br />

Bartow and Zolfo Springs. Historically, Lake Hancock fluctuated more than a foot higher than it has during the past<br />

several decades. The project proposes to increase the normal operating level from 98.7 feet to <strong>10</strong>0.0 feet National<br />

Geodetic Vertical Datum (NGVD) by modifying the P-11 outfall structure. See H009 (Lake Hancock Outfall Structure<br />

P-11 Modification) for a description of that project. This proposed project will further the District's recent efforts to<br />

restore minimum flows in the upper Peace River, which is a major component of the District's SWUCA Recovery Plan.<br />

As such, it is funded as a Water Supply and Resource Development (WSRD) project.<br />

Benefits<br />

Raising the normal operating water level of Lake Hancock to <strong>10</strong>0.0 feet NGVD will provide the storage to meet<br />

approximately 50% of the Minimum Flows and Levels Requirements of the upper Peace River. It was also determined<br />

that raising of the operating level along with other District projects will help restore wetland function for several hundred<br />

acres of contiguous lands to Lake Hancock.<br />

Costs<br />

This is a multi-year funded project. Funding for this project is shared by the Governing Board (50 percent), Peace<br />

River Basin Board (25 percent), Alafia River Basin Board (12.5 percent) and Manasota Basin Board (12.5 percent).<br />

Basin Board funding percentages are based on Alafia, Manasota, and Peace Basin impacts to the loss of flows from<br />

the upper Peace River Watershed from ground-water withdrawals. As of 2008, the District has budgeted $5,554,000 of<br />

which $1,350,000 is from state appropriations and Ecosystem Trust Fund. For continued funding of future project<br />

steps, District staff is requesting $500,000 in FY2009 for implementing the project, broken down as follows: District<br />

$250,000 Peace River Basin Board $125,000, Manasota and Alafia River Boards each $62,500. The funding is for<br />

design, permitting, and construction of project area mitigation and replacement of the P-11 Structure necessary to<br />

raise the operating level of the Lake to <strong>10</strong>0 feet NGVD. Land costs are not included. In additional to H008, a<br />

$2,500,000 was funded in FY2003 and another $2,500,000 in FY2009 through field operations (Project H009) for the<br />

replacement of the P-11 structure.<br />

Additional Information<br />

This project is being conducted in 3 Steps: Step (1) provided the preliminary evaluations and incremental probable<br />

costs for raising the normal high operating levels of Lake Hancock to 99.5, <strong>10</strong>0.0, and the target <strong>10</strong>0.5 feet from the<br />

current level of 98.7 feet. Step (1) is complete with a recommended target level up to <strong>10</strong>0.0 feet. The results of Step 1<br />

were presented to the boards with a staff recommendation for moving forward with Step (2) of the project in October<br />

2004. Step (2) involves the generation of the detailed information necessary to submit a complete Conceptual<br />

Environmental Resource Permit (ERP) Application, and to specifically identify impacts to private lands for acquisition<br />

and other mitigation needs (environmental, facilities, etc). Major components of the Conceptual ERP include: pre and<br />

post condition analysis; private property, dwelling, environmental, and infrastructure mitigation; outfall structure<br />

operation characteristics; and an anticipated fluctuation schedule for the Lake. Step (3) is the implementation of the<br />

mitigation components as specified in the Conceptual ERP. Costs for design, ERPs, and construction for<br />

environmental and infrastructure mitigation requirements have not been determined. The Project will be coordinated<br />

with H014 which will look at improving water quality released from the lake.<br />

020 - Peace River Basin 179


H008<br />

Lake Hancock Lake Level Modification<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 2,267,673 (9,254) 133,132 1,508,263 2,787,000 6,686,814<br />

011 Alafia River Basin 566,089 0 38,594 379,313 696,750 1,680,746<br />

020 Peace River Basin 1,111,623 0 <strong>10</strong>7,294 836,759 1,393,500 3,449,176<br />

0<strong>21</strong> Manasota Basin 566,089 0 35,506 379,313 696,750 1,677,658<br />

District Budgeted - Outside Revenue<br />

Ecosystem Trust Fund - Lk Hancock Lk<br />

Level<br />

State Approp - WRAP - Prior Year<br />

Funds<br />

Water Protection & Sust T.F. (Surface<br />

Wtr Rstr)<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

1,050,000 0 0<br />

0<br />

0 0 250,000<br />

0<br />

300,000 0 0<br />

0<br />

Total:<br />

Future<br />

Funding<br />

0<br />

0<br />

0<br />

Total<br />

Funding<br />

1,050,000<br />

250,000<br />

300,000<br />

$15,094,394<br />

Critical Project Milestones Projected Amended Actual<br />

1. Step (1) Preliminary Evaluation<br />

1. Preliminary Identification of Potentially Affected Parcels <strong>10</strong>/30/02 <strong>10</strong>/30/02<br />

2. Advertise Request for Proposals 12/20/02 12/20/02<br />

3. Select and Approve Consulting Firm 12/30/02 12/30/02<br />

4. Develop Project Scope of Work 12/30/02 2/27/03<br />

5. Begin Contract Negotiations 2/27/03 3/15/03<br />

6. Enter into Contract 5/23/03 5/14/03<br />

7. Provide Preliminary Results 4/28/04 6/15/04<br />

8. Board Action for Step (2) 9/27/04 <strong>10</strong>/26/04<br />

2. Step(2) Preliminary Design and Conceptual Permitting<br />

1. Amend Contract with BCI, Inc. for Conceptual Permitting 11/3/04 11/3/04<br />

2. Permitting of NCLF Phase III Expansion 3/29/05 3/29/05<br />

3. NCLF Evaluation for Project Effects 3/31/05 12/20/05<br />

4. Develop Project Mitigation Strategies 6/30/05 12/30/05<br />

5. Approve Mitigation Strategies 8/30/05 7/25/06<br />

6. Submit CERP Application <strong>10</strong>/14/05 8/31/06<br />

7. Obtain CERP 3/31/06 6/14/07<br />

8. Board Authorization of Project 9/25/07 9/25/07<br />

9. USACE Notice of Intent 9/26/07 12/12/07<br />

3. Step (3) P-11 Design and Construction<br />

1. Post P-11 Request For Proposals 3/31/08 2/8/08<br />

2. Select P-11 Engineering Firm 6/30/08 6/6/08<br />

3. Execute Agreement - P-11 Engineering Firm 8/31/08 <strong>10</strong>/8/08<br />

4. Notice to Proceed - P-11 Engineering Firm 9/15/08 <strong>10</strong>/29/08<br />

5. 30% P-11 Design Completion (Conceptual) 3/8/09 3/20/09 3/20/09<br />

6. 60% P-11 Design Completion 7/8/09 <strong>10</strong>/1/09 7/20/09<br />

7. Submit P-11 Environmental Resource Permit 8/1/09 <strong>10</strong>/30/09<br />

8. 90% P-11 Design Completion <strong>10</strong>/8/09 11/30/09<br />

9. Final P-11 Design Completion 1/8/<strong>10</strong><br />

<strong>10</strong>. Post P-11 Request For Bids 2/15/<strong>10</strong><br />

11. Select P-11 Lowest Responsive Bidder 5/15/<strong>10</strong><br />

12. Execute Agreement - P-11 Construction Contractor 6/30/<strong>10</strong><br />

13. Notice to Proceed - P-11 Construction Contractor 7/1/<strong>10</strong><br />

14. P-11 Construction Commences 8/1/<strong>10</strong><br />

020 - Peace River Basin 180


H008<br />

Lake Hancock Lake Level Modification<br />

15. P-11 Construction Completion 12/31/11<br />

3. Step (3) River Lake Stormwater Pond<br />

1. Complete Design 11/30/08 3/30/09<br />

2. Submit Environmental Resource Permit 1/1/09<br />

3. Begin Construction 2/15/09<br />

4. Complete Stormwater Pond Construction 4/15/09<br />

3. Step(3) FDOT Design and Conceptual Permitting<br />

1. Submittal of FDOT Permits 11/19/07 8/15/09<br />

Status As Of: August 31, 2009<br />

Status History: The Preliminary Evaluation Report (Step 1) for Lake Hancock by BCI, Inc., is complete and was<br />

approved by the Governing Board in October 2004 for initiating preliminary design and conceptual permitting to raise the<br />

lake operating level from 98.7 to <strong>10</strong>0.0 feet (Step 2). With the approval of the Governing Board (October 26, 2004),<br />

District staff amended the contract and entered into a Work Order with BCI Engineers and Scientists, Inc. to begin Step<br />

(2) of the project on November 3, 2004. The Governing Board at their January 24, 2006 meeting authorized staff to<br />

submit a conceptual ERP application to the FDEP and the United States Army Corps of Engineers to raise the control<br />

elevation up to <strong>10</strong>0 feet NGVD to help meet the low flow requirements of the upper Peace River, upon reaching<br />

agreement through a Memorandum of Agreement (MOA) with Polk County. The Board authorized staff to develop a<br />

MOA with Polk County for the Lake Level Modification Project. With the approval of the MOA by the District at the July<br />

2006 meeting, a Conceptual ERP application was submitted to FDEP on August 31, 2006 for permitting. A Conceptual<br />

ERP was received from FDEP on June 14, 2007. The USACE Public Notice of Intent to permit was completed in<br />

December 2007 and approval was later received in April 2008. District staff have met with affected property owners in<br />

August and September, 2007 to discuss (1) project effects, (2) whether their property would be needed to implement the<br />

project, and (3) Board meetings and schedules. Current Status: Land Resources is currently negotiating with private land<br />

owners and purchasing their properties when successful negotiations are achieved. District staff is currently working on<br />

FDOT permits for Highway 540 and the Polk Parkway, and has contracted with BCI, Engineers and Scientists, Inc. to<br />

implement (Step 3), the design, permitting, and development of construction documents for mitigation required upstream<br />

of the P-11 Structure. The District has contracted the engineering consulting firm DMK & Associates to design the new<br />

Lake Hancock Outfall Structure (P-11). DMK has completed the P-11 60% design plans and specifications and will be<br />

subitting an application to FDEP for an ERP to construct the new P-11 structure. ACTION-TO-DATE: On-time, this<br />

project already has an accelerated schedule and District staff will continue to make sure the project tasks are being<br />

completed on schedule.<br />

020 - Peace River Basin 181


H009<br />

Lake Hancock Outfall Structure P-11 Modification<br />

Project Type WS&R Dev.<br />

AOR(s)<br />

Flood Protection, Natural Systems<br />

Basin(s) General Fund (District), Alafia River, Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager LETASI, SCOTT<br />

Task Manager(s)<br />

Status Ongoing<br />

LETASI, SCOTT, GANUN, JIM, BARTLETT, MIKE<br />

Description<br />

Funding under Project H009 is provided for the replacement of the Lake Hancock P-11 Water Control Structure. This<br />

project is directly related to Project H008, Lake Hancock Lake Level Modification. Project H009 is contingent on the<br />

successful completion of Project H008 in 3 steps: Step (1) provide the preliminary evaluations and incremental<br />

probable costs for raising the normal high operating levels of Lake Hancock to 99.5, <strong>10</strong>0.0, and the target <strong>10</strong>0.5 feet<br />

from the current level of 98.7 feet. Step (1) is complete with a recommended target level up to <strong>10</strong>0.0 feet. The results<br />

of Step 1 were presented to the boards with a staff recommendation for moving forward with Step (2) of the project in<br />

October 2004. Step (2) involves the generation of the detailed information necessary to submit a complete Conceptual<br />

Environmental Resource Permit (ERP) Application, and to specifically identify impacts to private lands for acquisition<br />

and other mitigation needs (environmental, facilities, etc). Major components of the Conceptual ERP include: pre and<br />

post condition analysis; private property, dwelling, environmental, and infrastructure mitigation; outfall structure<br />

operation characteristics; and an anticipated fluctuation schedule for the Lake. Step (3) is the implementation of the<br />

mitigation components as specified in the Conceptual ERP. Costs for design, ERPs, and construction for<br />

environmental and infrastructure mitigation requirements have not been determined. Once these steps have been<br />

completed, construction documents will be completed for the replacement of Structure P-11 and the District will post a<br />

request for bids. Funding for this project is shared by the Governing Board (50 percent), Peace River Basin Board (25<br />

percent), Alafia River Basin Board (12.5 percent) and Manasota Basin Board (12.5 percent). Basin Board funding<br />

percentages are based on Alafia, Manasota, and Peace Basin impacts to the loss of flows in the Upper Peace River<br />

Watershed from ground-water withdrawals.<br />

Benefits<br />

Raising the normal operating water level of Lake Hancock to <strong>10</strong>0.0 feet NGVD will provide the storage to meet<br />

approximately 50% of the Minimum Flows and Levels Requirements of the upper Peace River. It was also determined<br />

that raising of the operating level along with other District projects will help restore wetland function for several hundred<br />

acres of contiguous lands to Lake Hancock. Project H009 will involve the actual replacement of the present control<br />

structure to achieve these goals.<br />

Costs<br />

The probable cost are projected to be a total of $5,000,000 for this structural replacement project. This cost does not<br />

include any land acquisition costs. Funds encumbered under Project H009 were approved in FY2003 in the amount of<br />

$2,500,000 and an additional $2,500,000 was approved in the FY2009 for implementing the structure replacement<br />

project. The FY2009 funds are from the West Central Florida Water Restoration Action Plan FY2009 State funds. The<br />

FY2003 and FY2009 funds do not include any land acquisition cost.<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 1,250,000 0 0 2,473<br />

0 1,252,473<br />

011 Alafia River Basin 312,500 0 0 825<br />

0 313,325<br />

020 Peace River Basin 625,000 0 0 825<br />

0 625,825<br />

0<strong>21</strong> Manasota Basin 312,500 0 0 825<br />

0 313,325<br />

District Budgeted - Outside Revenue<br />

State Approp - WRAP - Prior Year<br />

Funds<br />

Prior<br />

Funding<br />

020 - Peace River Basin 182<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

0 0 2,500,000<br />

0<br />

Total:<br />

Future<br />

Funding<br />

0<br />

Total<br />

Funding<br />

2,500,000<br />

$5,004,948


H009<br />

Lake Hancock Outfall Structure P-11 Modification<br />

Status As Of: August 31, 2009<br />

Status History: See Project H008 for a detailed history on the project. Milestones and updates will be provided for this<br />

project once the P-11 design has been completed. As described in the project description steps 1 and 2 have been<br />

completed. Current Status: The engineering consulting firm DMK & Associates has been contracted to design the new<br />

Lake Hancock Outfall Structure (P-11). Project Milestones will be followed as part of project H008. The design process<br />

detailed in H008 has been accelerated so that construction of the new P-11 structure (H009) can start as soon as<br />

possible.<br />

020 - Peace River Basin 183


H014<br />

Lake Hancock Outfall Treatment System<br />

Project Type WS&R Dev.<br />

AOR(s)<br />

Water Quality, Natural Systems<br />

Basin(s) General Fund (District), Peace River<br />

Cooperator(s)<br />

Project Manager HAGBERG, JANIE<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

The Lake Hancock projects are critical in the District's strategies for meeting the minimum flows in the Upper Peace<br />

River, improving water quality in the Peace River, and protecting Charlotte Harbor, an estuary of national significance.<br />

The goal of the Lake Hancock Outfall Treatment Project is to improve water quality discharging from Lake Hancock<br />

through Saddle Creek to the Peace River. Historical data has shown that the Saddle Creek drainage basin, one of nine<br />

sub-basins in the Peace River Watershed, contributes approximately 6 percent of the total flow of the Peace River, yet<br />

contributes approximately 13 percent of the watershed's total annual nitrogen load. Nitrogen has been identified as the<br />

primary target nutrient in restoring water quality in the Peace River and preventing degradation of Charlotte Harbor, a<br />

Surface Water Improvement and Management priority water body. The Peace River ecosystem routinely suffers from<br />

algae blooms during periods of low flows and warm weather. These events not only affect the fish and wildlife<br />

associated directly with the river and estuary, but also affect the region's largest potable surface water supply system,<br />

operated by the Peace River/Manasota Regional Water Supply Authority. Many of the basins along the Peace River,<br />

including Lake Hancock, have been identified by the Florida Department of Environmental Protection as impaired<br />

under the Clean Water Act, requiring that Total Maximum Daily Loads be established. Furthermore, nitrogen loads<br />

have been predicted to increase significantly over the next 20 years as a result of growth. Water quality treatment of<br />

discharges from Lake Hancock has been identified as the most cost effective means of reducing nitrogen loads into<br />

the Peace River and Charlotte Harbor. The District has acquired the 3,500-acre, planned Old Florida Plantation<br />

development property. Portions of this tract of land are planned to be utilized for the outfall treatment project. An<br />

engineering consultant has been retained to conduct a feasibility study of applicable treatment technologies; design<br />

and permit the selected alternative; and to provide construction management services. The project involves five tasks:<br />

(1) Research, Monitoring and Data Acquisition, (2) Feasibility Study, (3) Design and Permitting, (4) Construction, and<br />

(5) System Start-up and Operation. Task 1 provides information necessary for evaluation of various treatment<br />

technologies and for design of the full-scale treatment system. Task 2, Feasibility Study, involves two elements: a)<br />

evaluation of applicable treatment technologies and ranking based on expected performance, cost, proof of concept,<br />

and other factors; and b) geotechnical and potential constructability testing. Task 3 involves design and permitting of<br />

the selected treatment system and includes preparing construction plans and specifications. A contractor will be<br />

procured through the competitive bid process for Task 4, construction of the treatment system. Task 5 involves<br />

treatment system start-up and optimization of system performance to achieve target nutrient removal. The District is<br />

responsible for long-term operation and maintenance.<br />

Benefits<br />

The project addresses water quality and natural systems District objectives. The project will improve water quality in<br />

the Upper Peace River listed as impaired under the TMDL Program. Water quality improvements in the Upper Peace<br />

River from the project will improve natural systems along the river. The creation of a 1,000-acre functional marsh<br />

system will provide habitat where historic mining has altered the landscape.<br />

Costs<br />

This is a multi-year funded project. A total of $26,983,383 has been budgeted in H014, W014, and SC54 through<br />

FY2009 as follows: $13,435,446 from Florida Forever, $1,750,000 from state appropriations, $1,792,200 from the<br />

United States Environmental Protection Agency (USEPA), $640,070 from the Governing Board, $640,070 from the<br />

Peace River Basin Board, $325,000 from the Water Protection Sustainability Trust Fund, $7,747,937 from the Water<br />

Management Lands Trust Fund and $655,140 from State SWIM. The FY2009 budget totals $9,302,480 and is<br />

allocated in project numbers W014 and SC54. Of the FY2009 funds, a total of $1,802,480 is budgeted in W014<br />

and includes $327,570 from the Governing Board, $327,570 from the Peace River Basin Board, $655,140 from State<br />

SWIM and $492,200 in revenue from the USEPA. Of the FY2009 funds, a total of $7,747,937 is budgeted in SC54<br />

from the Water Management Lands Trust Fund. The proposed FY20<strong>10</strong> budget (allocated in H014) totaling $2,350,000<br />

includes $1,250,000 from the Governing Board, $300,000 from the Peace River Basin Board, and $800,000 from the<br />

USEPA. District funds shown in the table include staff salaries. Additional funds will be requested in future years for<br />

construction, operation and maintenance.<br />

Additional Information<br />

In 1987, the Florida Legislature established the Surface Water Improvement and Management (SWIM) Act, having<br />

020 - Peace River Basin 184


H014<br />

Lake Hancock Outfall Treatment System<br />

recognized that water quality and habitat in surface waters through out the state have degraded or were in danger of<br />

being degraded. The Act requires the District to maintain a priority list of waterbodies of regional or statewide<br />

significance within their boundaries. Charlotte Harbor is designated as a priority waterbody. Charlotte Harbor was<br />

identified by the United States Environmental Protection Agency (USEPA) in 1995 as an estuary of Federal<br />

Significance and subsequently included in the National Estuary Program. The Charlotte Harbor SWIM Plan identifies<br />

treatment of poor water quality discharging from Lake Hancock as a priority project for the Upper Peace River and<br />

Charolotte Harbor. In addition, the Lake Hancock Outfall Treatment Project is specifically identified by the Florida<br />

Department of Environmental Protection's Peace River Basin Resource Management Plan (March 2007). The<br />

management plan makes a series of recommendations to be undertaken over the next four years to address<br />

cumulative impacts in the basin and begin the long road toward recovery.<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 480,070 0 0 1,291,<strong>10</strong>1 4,996,500 6,767,671<br />

020 Peace River Basin 473,676 0 0 337,479 4,646,500 5,457,655<br />

District Budgeted - Outside Revenue<br />

Ecosystem Trust Fund - Charlotte<br />

Hbr/Upper Peace<br />

1,750,000 0 0<br />

0<br />

0<br />

1,750,000<br />

EPA 319 - Lake Hancock (H014) 0 0 0 800,000<br />

0 800,000<br />

FL Forever-Lk Hancock Outfall<br />

Treatment<br />

13,435,446 0 0<br />

0<br />

0 13,435,446<br />

State SWIM/Surface Wtr Rstr - Prior<br />

Year Fund<br />

325,000 0 0<br />

0<br />

0 325,000<br />

U.S. EPA - Lake Hancock (H014) 500,000 0 0<br />

0<br />

0 500,000<br />

U.S.EPA - Upper Peace River<br />

Restoration<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

800,000 0 0<br />

0<br />

Total:<br />

Future<br />

Funding<br />

0<br />

Total<br />

Funding<br />

800,000<br />

$29,835,772<br />

Critical Project Milestones Projected Amended Actual<br />

1. Critical Project Milestones<br />

Coordination <strong>Meeting</strong> with District staff 8/15/02 8/15/02<br />

Coordination <strong>Meeting</strong> with other agencies 9/30/02 11/22/02<br />

Complete Initial Review/Site Visits of Similar Projects 2/1/03 1/31/03<br />

Draft Request for Proposals 3/1/03 3/1/03<br />

Consultant Agreement Executed 1/25/04 1/24/04<br />

Alternative Treatment Technology Evaluation 12/31/04 4/30/06 4/30/06<br />

Monitoring/Data Acquisition/Research 3/31/05 3/31/05<br />

Basis of Design Report 6/30/07 8/31/07 8/31/07<br />

Design/Permitting 12/31/09<br />

Construction 12/31/11<br />

Status As Of: September 04, 2009<br />

At the February 2006 Governing Board meeting, the Board approved the staff recommendation to adopt a 27 percent<br />

nitrogen load reduction goal and to utilize wetlands as the primary treatment component. The District's consultant<br />

(Parsons) has completed constructability and geotechnical testing at the proposed location of the treatment wetlands and<br />

a Basis of Design Report (BODR). The BODR establishes the objectives, data, and assumptions that form the<br />

foundation of design (configuration of wetland cells and infrastructure). The District conducted a plant establishment<br />

study to evaluate wetland construction methods, different types of wetland plants, exotic plant control techniques, and<br />

water quality trends. Other tasks include habitat enhancement on adjacent District-owned parcels. The objective of<br />

habitat enhancement is to maintain a vegetated corridor along South Saddle Creek for migratory birds. The current<br />

020 - Peace River Basin 185


H014<br />

Lake Hancock Outfall Treatment System<br />

phase includes design and permitting. District staff presented an overview of the 60 percent design and estimated costs<br />

to the August Governing Board. In response to questions from the board, District staff will follow up with individual board<br />

members, provide a tour of the project site on September 23, and will present additional information at the September<br />

Governing Board meeting. Engineering services have been phased and funds added following completion of a phase. An<br />

amendment is needed to the consultant agreement to add funds for final design and construction phase services. Staff<br />

will request approval of the consultant amendment at the board meeting.<br />

ACCELERATED ACTION TO DATE: Currently on hold. Consultant completed conceptual plan for supplemental habitat<br />

enhancement project along Saddle Creek. Potential to utilize project as mitigation for County landfill may delay this<br />

component.<br />

020 - Peace River Basin 186


H015<br />

FARMS Back-Plugging Program<br />

Project Type WS&R Dev.<br />

AOR(s)<br />

Water Quality, Natural Systems<br />

Basin(s) Alafia River, Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager BRUMBAUGH, DAVID<br />

Task Manager(s)<br />

Status Ongoing<br />

COUGHLIN, KEVIN, SUMMERALL, LINDA<br />

Description<br />

Punta Gorda's in-stream drinking water reservoir is sustained by Class I surface water bodies comprised of the Shell<br />

and Prairie Creek watersheds. In 2000, the City of Punta Gorda contacted FDEP and the District with concerns for<br />

declining water quality trends observed in the reservoir. Investigations indicated that irrigation pumping from deep<br />

wells was a primary source adversely impacting the watersheds through degraded agricultural runoff, ultimately<br />

leading to a decline in water quality of the Punta Gorda reservoir downstream. In 2002, the Back-Plugging Program<br />

was initiated primarily to improve water quality in the watershed systems of the SWUCA. The back-plugging program<br />

was included in the Facilitating Agricultural Resources Management Systems (FARMS) Program in 2005.<br />

Benefits<br />

Well back-plugging is recommended for agricultural growers wanting to significantly improve crop yields by decreasing<br />

highly mineralized sources of groundwater used for irrigation, and to mitigate potential impacts to public surface water<br />

supplies.<br />

Costs<br />

Qualifying landowners are reimbursed up to a maximum of $6,500 per well for back-plugging procedures, with final<br />

amounts of reimbursement determined by borehole dimensions of the back-plugged interval. The Shell, Prairie, and<br />

Joshua Creek (SPJC) watersheds are considered priority areas for this program.<br />

Additional Information<br />

A brochure and webpage is available from SWFWMD summarizing the FARMS Back-Plugging Program.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 646,068 (30,000) 51,054 45,296<br />

0 712,418<br />

011 Alafia River Basin 43,876 0 7,736 <strong>10</strong>,777<br />

0 62,389<br />

020 Peace River Basin 683,380 0 <strong>21</strong>,389 23,067<br />

0 727,836<br />

0<strong>21</strong> Manasota Basin 24,899 0 8,034 11,455<br />

0 44,388<br />

Status As Of: September 02, 2009<br />

Total:<br />

Future<br />

Funding<br />

A total of 63 wells have been back-plugged in the SWUCA overall to date, with 46 of these wells located in the SPJC<br />

priority watersheds. Analytical results for samples collected from the 46 back-plugged wells in the SPJC area indicated<br />

conductivity, total dissolved solids (TDS) and chloride were decreased by 47%, 47% and 63%, respectively, with<br />

pumping yields reduced by 23% as a result of back-plugging procedures. For the 17 wells in the SWUCA (outside of the<br />

SPJC area), seven wells were back-plugged in the Peace River watershed, six in the Alafia River watershed, two in the<br />

Manatee River watershed, one in the Myakka River watershed, and one in the Horse Creek watershed. Analytical results<br />

for all back-plugged wells combined in the SWUCA indicated conductivity, TDS and chloride were decreased by 46%,<br />

46% and 60%, respectively. Combined SWUCA pumping yields were reduced by 24% as a result of back-plugging<br />

procedures. Routine monitoring results of select back-plugged wells so far have indicated sustained improvements to the<br />

quality of groundwater used for irrigation purposes.<br />

020 - Peace River Basin 187<br />

Total<br />

Funding<br />

$1,547,031


H017<br />

Facilitating Agricultural Resource Management Systems Program<br />

Project Type WS&R Dev.<br />

AOR(s)<br />

Water Supply, Water Quality<br />

Basin(s) General Fund (District), Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers,<br />

Pinellas-Anclote River, Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager ORENDORFF, BILL<br />

Task Manager(s)<br />

Status Ongoing<br />

Fl. Department of Agriculture & Consumer Services<br />

ESTES, CAROLE, SUMMERALL, LINDA<br />

Description<br />

The Facilitating Agricultural Resource Management Systems (FARMS) Program is an agricultural Best Management<br />

Practice (BMP) cost-share reimbursement program. The program is a public/private partnership developed by the<br />

District and the Florida Department of Agriculture and Consumer Services (FDACS). The purpose of the FARMS<br />

initiative is to provide an incentive to the agricultural community, within the District, to implement agricultural BMPs that<br />

will provide resource benefits that include water quality improvement; reduced Upper Floridian aquifer withdrawals;<br />

and/or conserve, restore, or augment the area's water resources and ecology. FARMS is intended to assist in the<br />

implementation of the District's Regional Water Supply Plan.<br />

Benefits<br />

The goal for the FARMS Program is to offset 40 mgd of ground water within the District by 2025. Ground water use<br />

reductions not only benefit the Upper Floridan aquifer but also can improve surface water quality in areas where<br />

ground water is highly mineralized. According to the District's Water Management Information System (WMIS), there<br />

are 6,395 permitted agricultural permits in the District, with a combined permitted annual average daily ground water<br />

quantity of 699,485,000 gpd. Since actual use of permitted quantities is dependent on hydrologic conditions, one of the<br />

main goals of the FARMS program is to provide cost-share that helps reduce ground water use, regardless of<br />

hydrologic conditions. Therefore, FARMS projects not only offset ground water use with surface water but also try to<br />

increase the overall efficiency of irrigation water use. Each project's performance is tracked to determine its<br />

effectiveness. To date, total ground water offset accomplished through the FARMS Program by District funding has<br />

cost $1.40 per <strong>10</strong>00 gallons.<br />

Costs<br />

From the inception of the FARMS Program through FY2007 a total of $<strong>10</strong>,837,563 has been spent on FARMS<br />

projects with $4,700,599, or 43.4 percent coming from the farming participants and $6,136,964, or 56.6 percent, from<br />

public funding through the FARMS budget. Public funding sources for total project reimbursement is as follows: basin<br />

boards - 6.9 percent, Governing Board - <strong>10</strong>.3 percent, State Appropriations - 27.5 percent, and FDACS - 11.8 percent.<br />

Additional Information<br />

FARMS also funds a limited amount of non-project related outreach activities and data collection efforts in support of<br />

the Program. These include: IFAS Flatwood Citrus BMP Implementation. The District will provide $50,000 to this<br />

project for three years for a total of $150,000. This is an outreach effort by IFAS that furthers the goals of FARMS<br />

Program in the SPJC watersheds, in addition to growers within Manatee, Hardee, Sarasota, DeSoto, and Charlotte<br />

Counties IFAS Row Crop BMP Implementation. The District will provide $50,000 to this project for two years, and<br />

$55,000 in the final year for a total of $155,000. This is also an outreach effort by IFAS that furthers the goals of<br />

FARMS Program in Hillsborough, Manatee, Hardee, Sarasota, DeSoto, and Charlotte Counties. Finally for the Upper<br />

Myakka Surface-Water Quality Monitoring Network - funding for the deployment of data sondes at seven USGS gage<br />

sites in the UMRW has been approved. The network will assist in better understanding agricultural impacts on Flatford<br />

Swamp and in determining the effectiveness of FARMS projects.<br />

020 - Peace River Basin 188


H017<br />

Facilitating Agricultural Resource Management Systems Program<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 3,313,387 (1,800,492) 1,036,850 890,628<br />

0 3,440,373<br />

011 Alafia River Basin 225,416 (57,834) <strong>10</strong>4,585 82,096<br />

0 354,263<br />

013 Hillsborough River Basin 59,311 (45,000) 82,812 77,992<br />

0 175,115<br />

019 Withlacoochee River Basin 82,147 (<strong>10</strong>,000) 36,153 47,534<br />

0 155,834<br />

020 Peace River Basin 1,771,986 (944,030) 382,313 485,303<br />

0 1,695,572<br />

0<strong>21</strong> Manasota Basin 1,130,962 90,227 168,237 65,167<br />

0 1,454,593<br />

District Budgeted - Outside Revenue<br />

DACS - FARMS (H017) 1,417,416 33,495 0<br />

0<br />

0 1,450,911<br />

Ecosystem Trust Fund - FARMS 5,000,000 (3,244,618) 0<br />

0<br />

0 1,755,382<br />

State Approp - WRAP - Prior Year<br />

Funds<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

0 (607,193) 1,400,000<br />

0<br />

0<br />

792,807<br />

Project Funds Not Budgeted by the<br />

District<br />

Applicant Contribution 3,086,014 0 0<br />

0<br />

0 3,086,014<br />

Status As Of: September 03, 2009<br />

Total:<br />

Future<br />

Funding<br />

The FARMS Program has 78 active Board Approved projects in five of the District's nine Basins. The Program is<br />

intended to address issues within the District with the Southern Water Use Caution Area (SWUCA) and the Northern<br />

Tampa Bay Water Use Caution Area being targeted as areas of primary importance. Projected offset from the board<br />

approved projects is 13,541,828 gallons per day (gpd). Peace River Basin The Peace River Basin has 50 board<br />

approved active FARMS project with a projected offset of 8,699,793 gpd. Of the 50 projects in this Basin, 31 are<br />

operational with average groundwater offsets of approximately 3,168,464 gpd. Thirteen projects are under construction in<br />

this basin, and 6 more are in the contracting process. The Peace River Basin Board includes the Shell, Prairie, and<br />

Joshua Creek (SPJC) watershed, which is one of two priority areas designated for the FARMS Program. Thirty four of<br />

the 50 projects, including twenty three of the operational projects, are within the SPJC Priority area. Manasota Basin<br />

The Manasota Basin has fifteen board approved projects with a projected offset of 4,131,535 gpd. Of the fifteen projects<br />

in the Manasota Basin, eight are now operational, with groundwater offsets of approximately 2,844,424 gpd. Two projects<br />

are under construction, and five are in the contracting process. The Manasota Basin includes the other FARMS priority<br />

area, the Upper Myakka River Watershed. Ten of the fifteen projects are in the Upper Myakka River Watershed Priority<br />

area, including six of the operational projects. Hillsborough River Basin The Hilllsborough River Basin has two board<br />

approved FARMS Projects with projected offsets of 170,250 gpd. One project is now operational, Parke Family<br />

Hydrofarms, with an average groundwater offset of <strong>10</strong>,143 gpd. The other project is under construction. Green Swamp<br />

Basin FARMS has one operational project approximately 1 mile outside the SWUCA in the Green Swamp Basin. This<br />

project is offsetting approximately 36,931 gpd of groundwater. Alafia River Basin The Alafia Basin had six board<br />

approved projects with projected offsets of 488,850 gpd. Four projects are operational with groundwater offsets of<br />

approximately 441,846 gpd. Two projects are in the contracting phase. Withlacoochee River Basin. The Withlacoochee<br />

River Basin Board approved its first FARMS project at the February board meeting. This project is under construction,<br />

but it is projected to offset approximately 15,000 gpd of groundwater. FARMS is also providing partial funding for three<br />

regional projects. These projects are being coordinated through the Florida Department of Agriculture and Consumer<br />

Services. Two of them will help implement BMP programs for citrus growers and row crop farmers, and the other is the<br />

Mini-FARMS program that is described in greater detail under project number H529.<br />

020 - Peace River Basin 189<br />

Total<br />

Funding<br />

$14,360,864


H024<br />

Upper Peace River Resource Development<br />

Project Type WS&R Dev.<br />

AOR(s)<br />

Water Supply, Natural Systems<br />

Basin(s) Alafia River, Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager TURNER, DAWN<br />

Task Manager(s)<br />

Status Ongoing<br />

MORRIS, LISANN, HERD, KEN<br />

Description<br />

This project involves the identification and evaluation of potential water resource development projects in the upper<br />

Peace River watershed above Zolfo Springs. The vehicle to accomplish this is the District's Watershed Management<br />

Program (WMP). The project includes performing the 1) Topographic Information, 2) Watershed Evaluation, and 3)<br />

Watershed Management Plan elements of the WMP. Work on the Topographic Information, Watershed Evaluation,<br />

and Watershed Management Plan tasks for the area contributing flow to the river between the confluence with the<br />

Peace Creek Canal and the Highway 640 bridge crossing in Homeland are nearing completion. FY2007 funds are<br />

being used to perform Watershed Evaluation tasks for the area contributing flow to the river between the Highway 640<br />

bridge crossing in Homeland and Zolfo Springs. These tasks include the collection of hydrologic and hydraulic<br />

information for both the existing condition and the committed future condition reflected in approved reclamation plans.<br />

FY2008 funds were used to evaluate a potential surface water storage area adjacent to the river. FY2009 and FY20<strong>10</strong><br />

funds will be used to further evaluate potential surface water storage facilities, and perform Topographic Information,<br />

Watershed Evaluation, and Watershed Management Plan tasks. Future funding will be needed to complete the<br />

Topographic Information, Watershed Evaluation, and Watershed Management Plan tasks for the area between<br />

Homeland and Zolfo Springs. Preferred Best Management Practices (BMPs) will be further developed through the<br />

Implementation of BMPs process under separate activity codes, and will require additional funding.<br />

Benefits<br />

The water resource development projects that are ultimately selected for implementation will enhance low flows, water<br />

quality, and natural systems within the upper Peace River.<br />

Costs<br />

The anticipated project cost is $3,150,000. For FY20<strong>10</strong>, $250,000 of project funding is appropriated in the following<br />

Basin budgets: Governing Board ($125,000), Peace River Basin ($62,500), Alafia River Basin ($31,250), and the<br />

Manasota Basin ($31,250). FY20<strong>10</strong> funds will be used to complete Topographic Information, Watershed Evaluation,<br />

and Watershed Management Plan tasks. For FY2009, $250,000 is appropriated in the following budgets: Governing<br />

Board ($125,000), Peace River Basin ($62,500), Alafia River Basin ($31,250), and the Manasota Basin ($31,250).<br />

$41,142 of the FY2009 funds will be used to obtain LiDAR for an area within the river floodplain that was inundated<br />

when the original LiDAR data was obtained. The remaining FY2009 funds are being used for the technical evaluation<br />

of suitable water storage areas adjacent to the Peace River, and to optimize design opportunities for MFL recovery.<br />

For FY2008, $250,000 was appropriated in the following budgets: Governing Board ($125,000), Peace River Basin<br />

($62,500), Alafia River Basin ($31,250), and the Manasota Basin ($31,250). $200,000 was used for an evaluation of a<br />

potential surface water storage area. The remaining $50,000 of FY2008 funds was liquidated. For FY2007, $250,000<br />

was appropriated in the following budgets: Governing Board ($125,000), Peace River Basin ($62,500), Alafia River<br />

Basin ($31,250), and the Manasota Basin ($31,250). In FY2007, $250,000 in revenue will be received from state<br />

appropriations and distributed as follows: Governing Board ($125,000), Peace River Basin ($62,500), Alafia River<br />

Basin ($31,250), and the Manasota Basin ($31,250). When each element is completed the project budget and scope<br />

may require refinement based upon the information gathered. The District funding amounts shown in the table include<br />

staff salaries.<br />

Additional Information<br />

The WMP includes five major elements: 1) Topographic Information, 2) Watershed Evaluation, 3) Watershed<br />

Management Plan, 4) Implementation of Best Management Practices, and 5) Maintenance of Watershed Parameters<br />

and Models. Implementing elements of the WMP with local governments is one of the Comprehensive Watershed<br />

Management (CWM) initiative strategies and one of the District's Strategic Priorities. In 2002, the District completed<br />

the technical work necessary for establishing minimum flows in the upper Peace River, and the first draft of the Peace<br />

River Cumulative Impacts Analysis Report. The Upper Peace River Watershed has been heavily impacted by mining,<br />

development activities, and groundwater withdrawals. Proposed minimum "low" flows are currently not being met at<br />

the Bartow and Ft. Meade gage sites. The District has developed the Southern Water Use Caution Area (SWUCA)<br />

Recovery Strategy that proposes concepts for development of water resource projects. Two of the concepts are<br />

storage of wet season rainfall in surface water reservoirs for later release during periods of low or no flow; and the<br />

hydraulic optimization of areas impacted by mining, including the reconnection of closed basin areas. Two projects,<br />

020 - Peace River Basin 190


H024<br />

Upper Peace River Resource Development<br />

the Upper Peace River Minimum Flow Enhancement project (H004), and the Old Lands Phosphate project (H011),<br />

were initiated in FY2003 to accomplish similar goals. The Upper Peace River Minimum Flow Enhancement project<br />

included funding for a feasibility analysis, and design and permitting of a surface water reservoir on reclaimed mine<br />

land. The District evaluated a reservoir site located on the east side of the Peace River just south of County Highway<br />

640, and began the land acquisition process. The property owner rejected the District's offer for purchase, which<br />

terminated the efforts for this site. As part of the Old Lands Phosphate project, District staff identified other potential<br />

reservoir locations, and areas that no longer contribute runoff to the river as a result of mining activities that could be<br />

hydraulically reconnected. Both of these projects are consistent with the Upper Peace River Resource Development<br />

project. Projects H004 and H011 were discontinued as individual projects, and incorporated into the Upper Peace<br />

River Resource Development project. Alternative reservoir sites are being evaluated, and District staff are collecting<br />

available information from property owners, mine companies, FDEP Bureau of Mine Reclamation, and others. FY2004<br />

funds were used to complete elements of a Watershed Evaluation to identify the connectivity of the Upper Peace<br />

River system from the confluence of Saddle Creek and Peace Creek, south to Zolfo Springs. Work Order #1 tasks<br />

focused on the identification of system connectivity through phosphate lands located between the confluence of<br />

Saddle Creek and Peace Creek, and Zolfo Springs. The First Amendment was executed to expand the scope of work<br />

to complete the Watershed Evaluation tasks for the area above County Highway 640 at Homeland, and encumber<br />

FY2005 funds. The Second Amendment was executed to prepare a Watershed Management Plan for the area that<br />

contributes flow to the River between the confluence of Saddle Creek and the Peace Creek Canal, and Homeland;<br />

and encumber FY2006 funds. The Watershed Management Plan element will include a water resource assessment<br />

and an alternative analysis that will include a cost/benefit evaluation of potential water resource development projects.<br />

A Third Amendment was executed to extend the contract expiration date from December 31, 2008 to December 31,<br />

2009. A second Agreement was developed to encumber FY2007 funds to perform Watershed Management Program<br />

elements for the area contributing flow to the river between the Highway 640 bridge crossing at Homeland, and Zolfo<br />

Springs. Future funding will be needed to complete the Watershed Management Plan for the area between Homeland<br />

and Zolfo Springs. When each task is completed the project budget will be refined based on the information<br />

developed. The District is cooperating with FEMA to modernize the flood insurance rate maps (FIRMs) in Polk County.<br />

Information developed with this project will be used to update the FIRMs representing this watershed.<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 1,085,176 0 131,354 130,283 1,250,000 2,596,813<br />

011 Alafia River Basin 223,856 0 32,613 33,861 312,500 602,830<br />

020 Peace River Basin 436,<strong>10</strong>5 0 63,863 65,111 625,000 1,190,079<br />

0<strong>21</strong> Manasota Basin 234,763 0 32,613 34,161 312,500 614,037<br />

District Budgeted - Outside Revenue<br />

Ecosystem Trust Fund - Upper Peace<br />

Rvr Rstr<br />

Water Protection & Sust T.F. (Surface<br />

Wtr Rstr)<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

250,000 0 0<br />

0<br />

250,000 0 0<br />

0<br />

Total:<br />

Future<br />

Funding<br />

0<br />

0<br />

Total<br />

Funding<br />

250,000<br />

250,000<br />

$5,503,759<br />

Critical Project Milestones Projected Amended Actual<br />

1. Original Agreement<br />

Draft Original Agreement to Management Services 7/26/04 8/24/04<br />

Draft Original Agreement returned from Management Services 8/26/04 8/25/04<br />

Execute Original Agreement (First Agreement) 9/17/04 9/30/04<br />

Notice to Proceed - Work Order #1 9/24/04 <strong>10</strong>/22/04<br />

Submittal of Final Report related to Work Order #1 4/22/05 4/22/05<br />

Execute Contract Amendment 1 to the First Agreement 9/<strong>21</strong>/05 9/<strong>21</strong>/05<br />

020 - Peace River Basin 191


H024<br />

Upper Peace River Resource Development<br />

Recognition of the SWFWMD, Peace, Alafia & Manasota Basin Bds. will be<br />

provided on all reports<br />

<strong>10</strong>/31/05 12/31/09<br />

Notice to Proceed - Work Order #2 for geotechnical testing 11/30/05 1/9/06<br />

Notice to Proceed - Work Order #3 (Watershed Evaluation) 11/30/05 11/17/05<br />

Submittal of Final Report related to Work Order #2 2/28/06 4/19/06<br />

Notice to Proceed - Work Order #4 (Feasibility of Alternatives) 5/19/06 5/19/06<br />

Execute Contract Amendment 2 6/2/06 7/24/06<br />

Submittal of Final Report related to Work Order #3 6/17/06 <strong>10</strong>/3/06<br />

Notice to Proceed - Work Order #5 for geotechnical testing 7/28/06 7/28/06<br />

Contract Expiration - Original Agreement 7/29/06 12/31/09<br />

Submittal of Final Report related to Work Order #5 9/28/06 3/27/07<br />

Notice to Proceed - Work Order #6 Watershed Mgt. Plan <strong>10</strong>/31/06 <strong>10</strong>/25/06<br />

Submittal of Final Report related to Task 2.2.7.1 of Work Order #4 12/22/06 2/<strong>21</strong>/07<br />

Submittal of Final Report related to Task 2.2.7.3 of Work Order #4 12/22/06<br />

Submittal of Final Report related to Task 2.2.7.2 of Work Order #4 12/22/06<br />

Notice to Proceed - Work Order #7 (Summary Report) 7/20/07 7/20/07<br />

Submittal of Final Report related to Work Order #7 8/31/07 8/31/07<br />

Notice to Proceed - Work Order #8 (Sinkhole Survey) <strong>10</strong>/31/07 12/14/07<br />

Submittal of Final Deliverables related to Work Order #8 1/31/08 6/<strong>10</strong>/08<br />

Notice to Proceed - Work Order #9 (Survey) 5/31/08 5/15/09<br />

Submittal of Final Report related to Work Order #6 11/30/08<br />

1. Original Agreement<br />

Final Deliverables WO#9 (Survey) 8/31/08 <strong>10</strong>/24/08<br />

Notice to Proceed - Work Order #<strong>10</strong> (Additional Field Reconnaissance) 11/<strong>10</strong>/08 11/<strong>10</strong>/08<br />

Final Deliverables WO#<strong>10</strong> (Additional Field Reconnaissance) 3/<strong>10</strong>/09<br />

2. Second Agreement<br />

Draft Second Agreement to Management Services 12/1/06 5/29/07<br />

Draft Second Agreement returned from Management Services 1/1/07 6/7/07<br />

Execute Second Agreement - Zolfo Springs 1/31/07 7/11/07<br />

Notice to Proceed - Zolfo Springs Work Order #1 2/9/07 7/20/07<br />

Submittal of Final Report - Zolfo Springs WO #1 2/9/08<br />

Contract Expiration - Second Agreement (Zolfo Springs) 1/31/09<br />

Status As Of: August 19, 2009<br />

An Agreement was executed with HDR to further evaluate CS-11 as a potential surface water reservoir to enhance low<br />

flows in the upper Peace River. Tasks involved probable design criteria and conceptual cost estimates on rehabilitation<br />

of CS-11 to a reservoir along with assisting staff with negotiations on the possible purchase of the property from the<br />

current owner. The evaluation will build upon the feasibility assessment performed by Ardaman and Associates as part of<br />

the Surface Water Resource Assessment Inventory and Approach Development task. Ardaman and Associates will<br />

continue to develop the Upper Peace River Watershed Management Plan. Hydrologic and hydraulic data collected as<br />

part of the Upper Peace River Resource Development project is also being used in the development of the Peace River<br />

Integrated Model (P687). The Agreement with Ardaman was executed on September 30, 2004. As part of the Watershed<br />

Management Plan, Ardaman conducted geotechnical testing and surface water modeling to evaluate potential reservoir<br />

sites. The Ardaman evaluations indicate CS-11 could be modified to function as a surface water reservoir. The tasks<br />

associated with Work Orders #1, #2, #3, #5, #7, #8, & #9 have been completed, and associated final deliverables have<br />

been approved. Tasks related to Work Orders #4, #6, & #<strong>10</strong> are on-going. A draft of the first of 3 reports related to Work<br />

Order #4 was received on January 26, 2007. Staff reviewed the draft, and provided comments to the consultant on<br />

January 30, 2007. Data collection for Work Order #6 has been completed. The final report related to Work Order #6 was<br />

due on November 30, 2008. However a time extension was granted until December 31, 2009. Work Order #7 was issued<br />

on July 20, 2007 for the preparation of a summary report to consolidate recent geotechnical and engineering evaluation<br />

information regarding the feasibility of using CS-11 as a water storage area for MFL recovery. The water discharged<br />

back into the river will need to be of sufficient quantity to overcome the influence of sinkholes in and adjacent to the<br />

streambed in order to meet MFLs in the upper river. A draft summary report was received in August 2007. Comments<br />

were provided to the consultant. Final version of the WO#7 summary report received May 27, 2009. Work Order #8 was<br />

executed on December 14, 2007 to survey sinkhole areas to determine if low flows can be redirected around the sinkhole<br />

features, and to identify the hydraulic control elevation in the streambed that may be backing water up into these<br />

features. An evaluation of the survey data will be conducted as part of the SWUCA Recovery - Upper Peace Karst Berms<br />

(H064) project. Please refer to the PIMS entry for H064 for further information on that project. Work Order #9 was<br />

020 - Peace River Basin 192


H024<br />

Upper Peace River Resource Development<br />

developed to collect survey data for several cross-sections and bridge crossings within the upper Peace River and two of<br />

its tributaries, Bear Branch and Six Mile Creek. Notice to Proceed was issued on May 15, 2008. Notice to Proceed for<br />

Work Order #<strong>10</strong> was issued on November <strong>10</strong>, 2008. Work Order #<strong>10</strong> includes the collection of additional survey<br />

information within the City of Bartow for areas that discharge to the Peace River. This work has been completed. The<br />

original agreement focuses on the area above Homeland. A second consultant services agreement was developed to<br />

focus on the area contributing flow to the river between Homeland and Zolfo Springs. The Second Agreement was<br />

executed on July 11, 2007. Work Order #1 was issued against the Second Agreement on July 20, 2007; and involves the<br />

completion of Watershed Evaluation tasks for the area between Homeland and Zolfo Springs. Status History: The first<br />

contract currently encumbers $150,000 of FY2004 funds, $500,000 of FY2005 funds, and $500,000 of FY2006 funds.<br />

The Second Consulting Services Agreement encumbers $500,000 of FY2007 funds. $200,000 in FY2008 funding was<br />

used to retain HDR to further evaluation the use of CS-11. The remaining $50,000 in FY2008 funds was liquidated.<br />

$250,000 was budgetted in FY2009. $360,000 of H004 Upper Peace River Minimum Flow Enhancement project funds<br />

were transferred to this project to retain a consultant to perform detailed geotechnical analyses, obtain topographic<br />

information, prepare cost/benefit analyses, prepare preliminary and final design plans, and obtain permits needed to<br />

construct a reservoir. The H004 funds were previously Board encumbered. The amount shown in the Prior Funding<br />

column of the funding table has been revised to reflect the funds transferred from the H004 project. Tasks associated<br />

with Work Orders #1, #2, #3, #5, #7, #8, & #9 have been completed, and associated final deliverables have been<br />

approved. Tasks related to the First Agreement - Work Orders #4, #6, & #<strong>10</strong> are on-going. As of this writing, the<br />

following has been expended: $779,241 has been invoiced and paid in accordance with the Original Agreement with<br />

Ardaman; $292,362 has been paid in accordance with the Second Agreement with Ardaman; and $41,142 has been<br />

expended to obtain additional LiDAR data. Of the $250,000 in FY2009 funding, $15,000 will be used to retain a<br />

consultant to provide technical support in responding to questions on the conceptual design for CS-11; $41,142 will be<br />

used to obtain topographic information for an area that was inundated when the LiDAR data was obtained. An additional<br />

$3,350 was added to the HDR contract to finish technical support for CS-11 land negotiations and $<strong>10</strong>,000 was added as<br />

contigency in case any new issues arise. The remaining $181,357 of FY2009 will be encumbered without a contract to be<br />

used for more detailed evaluation of other potential reservoir sites in the Upper Peace Watershed. The remaining<br />

FY2009 funding is distributed as follows: Governing Board ($91,929), Alafia Basin Board ($<strong>21</strong>,732), Peace River Basin<br />

Board ($45,964), Manasota Basin Board ($<strong>21</strong>,732).<br />

020 - Peace River Basin 193


H027<br />

Charlotte County Regional Reclaimed Water Expansion<br />

Project Type WS&R Dev.<br />

AOR(s)<br />

Water Supply, Water Quality<br />

Basin(s) General Fund (District), Peace River<br />

Cooperator(s)<br />

Charlotte County Utilities<br />

Project Manager BADER, TAMMY<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This is an ongoing multiyear alternative water supply project that involves the design and construction of 46,<strong>10</strong>0 linear<br />

feet of 16-inch diameter and 16,000 linear feet of 12-inch diameter reclaimed water transmission main to be<br />

constructed from the Charlotte County East Port Wastewater Treatment Facility (WWTF), west through Port Charlotte.<br />

The project will also include the design and construction of two 500,000 gallon storage tanks and associated pumping<br />

systems. Customers and reclaimed water use quantities include Charlotte County Stadium (171,000 gpd), Murdock<br />

Junior High School (47,000 gpd), Port Charlotte High School (30,000 gpd), New Challenge School (6,000 gpd),<br />

VOTECH (8,000 gpd), Port Charlotte Middle School (39,000 gpd), Peace River Elementary (37,000 gpd), Riverwood<br />

Golf Club (287,000 gpd)(WUP # <strong>10</strong>169), Charlotte County School Board and various offices (294,000), Charlotte<br />

County Administration Center (4,000 gpd)(WUP # 12309), Florida Department of Transportation (28,500 gpd),<br />

McDonough Park (80,000 gpd), Franz Ross Park (25,000 gpd), Charlotte County ball fields and multiple parks (27,000<br />

gpd)(WUP # 8477), and the medians and park strips on Harbor Boulevard, Kings Highway, and US 41 (189,000 gpd).<br />

The remaining customers that will be served receive their water supply from Charlotte County Utilities (WUP # 7<strong>10</strong>4),<br />

which imports approximately 96% of it's water supply from the Peace River Manasota Regional Water Supply Authority<br />

(WUP # <strong>10</strong>420).<br />

Benefits<br />

The project will serve recreational/aesthetic and commercial customers to utilize approximately 1,272,500 gpd of<br />

reclaimed water and offset approximately 954,250 gpd of traditional supply from the intermediate aquifer.<br />

Costs<br />

The total eligible project cost is $7,250,000, and the District is requested to fund 50 percent, or $3,625,000. Because<br />

this is part of a regional effort to increase the use of reclaimed water, the Peace River Basin budgeted $2<strong>21</strong>,625 in<br />

FY2004, $600,000 in FY2006, $654,525 in FY2008, $272,719 in FY2009 and $<strong>21</strong>1,804 in FY20<strong>10</strong> and the Governing<br />

Board budgeted $2<strong>21</strong>,625 in FY2004, $600,000 in FY2006, $654,525 in FY2008, $272,719 in FY2009 and $<strong>21</strong>1,803 in<br />

FY20<strong>10</strong> for this Water Supply and Resource Development Project. Funds in the amount of $400,000 in<br />

FY2006, $436,350 in FY2008 and $243,660 in FY20<strong>10</strong> (transferred from cancelled Coastal River Basin Project<br />

L812) have been allocated to the project from the Water Protection and Sustainability Trust Fund Program, these<br />

funds will be applied equally to reduce the Peace River Basin Board and Governing Board cost share. The cost-benefit<br />

is $1.83/1,000 gallons, amortized over 30 years at eight percent interest.<br />

Additional Information<br />

This project is proposed for construction in three phases. The capacity of the East Port WRF is 5.0 mgd, and it<br />

produces approximately 3.4 mgd of reuse flow. In addition to the immediate offset benefits described above, this<br />

project comprises approximately two thirds of the necessary transmission main to interconnect the county's East Port<br />

WWTF with the county's West Port WWTF located on the Cape Haze peninsula. Future interconnection and<br />

expansion projects are anticipated to begin in the FY20<strong>10</strong> time frame. Of the total project cost of $7,250,000,<br />

approximately 86 percent ($6,250,000) is expected to be needed for construction, and the remainder ($1,000,000) for<br />

design and administration.<br />

020 - Peace River Basin 194


H027<br />

Charlotte County Regional Reclaimed Water Expansion<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 1,065,878 0 274,816 273,520<br />

0 1,614,<strong>21</strong>4<br />

020 Peace River Basin 1,064,720 0 274,768 275,941<br />

0 1,615,429<br />

District Budgeted - Outside Revenue<br />

Water Protection & Sust T.F.<br />

(Alternative Wtr)<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

836,350 0 0<br />

0<br />

0<br />

836,350<br />

Project Funds Not Budgeted by the<br />

District<br />

Charlotte County 3,206,825 0 0<br />

0<br />

0 3,206,825<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$7,272,818<br />

Critical Project Milestones Projected Amended Actual<br />

Draft Agreement to Contracts Administration <strong>10</strong>/1/03 7/28/04<br />

Draft Agreement from Contracts Administration 8/15/04 9/16/04<br />

Contract Executed 8/31/04 6/30/05<br />

Design Commencement 9/1/04 11/2/04<br />

Signage Erected 9/1/05 12/1/06 8/29/07<br />

Construction Commencement 9/1/05 12/1/06 8/29/07<br />

Construction Completion 9/1/07 12/31/09<br />

Contract Close-out <strong>10</strong>/1/08 12/31/<strong>10</strong><br />

Offset Report <strong>10</strong>/1/11 12/31/11<br />

Status As Of: August 19, 2009<br />

The Peace River Basin Board approved a first amendment to expand the scope of work, extend the timeframe, and<br />

increase the total project cost for this project on April 7, 2006; followed by the Governing Board on April 25, 2006. The<br />

First Amendment to the project was executed on June 20, 2006. The county, in a letter dated October 8, 2007, requested<br />

a no cost time extension to extend the contract period and the construction completion date for this project. A second<br />

amendment was executed on January 28, 2008. Expertech was selected as the Phase 1A contractor and was given<br />

notice to proceed on August 29, 2007. All of the construction, testing, and as-builts associated with Phase 1A and Phase<br />

1B have been completed and on February 27, 2009 CCU applied to FDEP to place the transmission line into operation.<br />

Cardinal Contractors has been selected as the Phase 2 contractor and was given notice to proceed February 2008. The<br />

Contractor started mobilization in March 2008 and work began at the Walenda Avenue and Eagle Street pump station<br />

and storage sites in April. Construction at both sites is complete and the contractor is in the process of testing the pumps<br />

at the two sites simultaneously. To date, $3,497,738 has been encumbered and $667.267 has been budgeted, of which<br />

$3,497,738 has been reimbursed. Governor Crist's Accelerate Florida Initiative ACTION-TO-DATE: On-Time. Project<br />

construction is almost complete and no cooperator action is required.<br />

020 - Peace River Basin 195


H034<br />

Peace Creek Canal Watershed<br />

Project Type WS&R Dev.<br />

AOR(s)<br />

Flood Protection, Water Quality, Natural Systems<br />

Basin(s) General Fund (District), Peace River<br />

Cooperator(s)<br />

Polk County Natural Resources<br />

Project Manager THORNTON, SHELLEY<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This is a multi-year funded project to perform: 1) collection of topographic information, 2) watershed evaluation, and 3)<br />

watershed management plan elements of the District's Watershed Management Program (WMP) for the Peace Creek<br />

Canal Watershed. The watershed covers an area of approximately 230 square miles and is located in Polk County.<br />

The District has identified the Upper Peace River watershed, which includes the Peace Creek Canal system, as an<br />

area that has undergone significant land alterations including land clearing, draining and re-contouring of lands for<br />

residential and commercial purposes, transportation, agriculture, recreation, timbering, power generation, ore and<br />

mineral extraction, and other land uses. These activities required extensive withdrawals of groundwater that has<br />

resulted in significant declines in the level of the Floridan aquifer and flow in the Upper Peace River. This project is to<br />

identify projects that will restore lost basin storage, improve water quality, provide flood protection benefits and<br />

improve natural systems. In 2005, the Governing Board and Peace River Basin Board agreed to take on the<br />

responsibility to maintain and, where possible, improve the water conveyance/storage capabilities of the Peace Creek<br />

Canal. One of the primary tasks includes identification of property ownership, so the District can obtain necessary<br />

easements over the system. The District continues to provide aquatic plant maintenance in the canal and implemented<br />

a permanent spraying schedule in FY2007. The District also continues to remove sediments in strategic reaches of the<br />

canal. In 2007, Polk County requested cooperative funding from the District for the acquisition of 18 residential<br />

properties along the canal that repeatedly flooded. The District provided funding ($250,000) to the County, as matching<br />

funds for the Federal Emergency Management Agency (FEMA) grant, to assist in acquiring these properties. The<br />

purchase of homes and property within floodprone areas is a Best Management Practice that is consistent with the<br />

District's Watershed Management Program.<br />

Benefits<br />

The WMP provides a method to evaluate the capacity of a watershed to protect, enhance, and restore water quality<br />

and natural systems, while achieving flood protection. The information developed provides the science for the District's<br />

Environmental Resource Permitting (ERP). It assists local governments: 1) with their land management responsibilities<br />

by establishing a level of service and developing Best Management Practices (BMPs) to address level of service<br />

deficiencies, 2) provides a Geodatabase and projected results from watershed model simulations for floodplain<br />

management, and 3) water quality management through the Total Maximum Daily Loads (TMDL) process for their<br />

National Pollution Discharge Elimination System (NPDES) permit requirements.<br />

Costs<br />

This is a multi-year funded project. In fiscal years 2005, 2006, 2007 and 2008, $3,600,000 was budgeted as follows:<br />

$1,262,500 from Peace River Basin, $1,262,500 from Governing Board, $950,000 from State appropriations and<br />

$125,000 from the State Surface Water Restoration Fund. The proposed budget for FY2009 is approximately<br />

$680,000, with approximately $340,000 from both the Governing Board and the Peace River Basin Board. District<br />

funds shown in the table include staff salaries.<br />

Additional Information<br />

The WMP includes five major elements: 1) collection of topographic information, 2) watershed evaluation, 3)<br />

watershed management plan, 4) implementation of BMPs, and 5) maintenance of watershed parameters and models.<br />

With prior year funding the topographic information, watershed evaluation, portions of the watershed management<br />

plan, and immediate maintenance were completed. A cooperative funding agreement with Polk County was developed<br />

for the purchase of the 18 homes in the Peace River Estates subdivision.<br />

020 - Peace River Basin 196


H034<br />

Peace Creek Canal Watershed<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 1,347,162 600 337,128 226,873 1,025,000 2,936,763<br />

020 Peace River Basin 1,391,772 0 342,081 257,596 1,025,000 3,016,449<br />

District Budgeted - Outside Revenue<br />

Ecosystem Trust Fund - Peace Ck<br />

Canal (H034)<br />

Ecosystem Trust Fund - Peace Ck<br />

Canal Watershed<br />

Water Protection & Sust T.F. (Surface<br />

Wtr Rstr)<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

250,000 250,000 0<br />

0<br />

700,000 (250,000) 0<br />

0<br />

125,000 0 0<br />

0<br />

0<br />

0<br />

0<br />

500,000<br />

450,000<br />

125,000<br />

Project Funds Not Budgeted by the<br />

District<br />

FEMA 1,500,000 0 0<br />

0<br />

0 1,500,000<br />

Polk County 265,000 0 0<br />

0<br />

0 265,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$8,793,<strong>21</strong>2<br />

Critical Project Milestones Projected Amended Actual<br />

1. Cooperative Agreement<br />

Contract with Polk County Executed 4/17/06 4/17/06<br />

Impl. of BMPs Peace River Estates-Notice to Proceed 12/13/06 12/13/06<br />

Regulatory Review Report Completed 4/8/07 4/8/07<br />

Impl. of BMPs Peace River Estates-Completed 6/1/08 7/25/08<br />

2. Consultant Agreement<br />

Contract with PBS&J Executed 4/30/05 5/<strong>10</strong>/05<br />

Maintenance Evaluation Report Completed 5/30/05 5/30/05<br />

First Amendment to Agreement Executed 8/14/06 8/14/06<br />

Draft Aternatives Report Completed 12/31/06 12/31/06<br />

Second Amendment to Agreement Executed 7/28/08 7/28/08<br />

Third Amendment to Agreement Executed <strong>10</strong>/31/09<br />

Watershed Management Plan Completed 12/31/09<br />

Agreement Expiration 12/31/09<br />

Third Amendment to Agreement Expiration 12/31/<strong>10</strong><br />

Status As Of: September 01, 2009<br />

The agreement with PBS&J to prepare a Watershed Management Plan (WMP) was executed on 5/<strong>10</strong>/2005, which<br />

includes assessing the surface water resources to identify potential improvement projects. A draft Watershed<br />

Management Plan Alternatives Report, which identified restoration opportunities, was completed in December 2006. An<br />

amendment to the agreement with PBS&J was executed on July 28, 2008 to increase the project budget to include funds<br />

necessary to complete the modeling requirements necessary to update the FEMA Digital Flood Insurance Rate Maps<br />

(DFIRMs) and the WMP. The District's consultant continues to work on the Watershed Management Plan. The model for<br />

the FEMA DFIRMs was submitted in March 2009 and is currently under review by Staff. A canal Maintenance Evaluation<br />

Report was completed by PBS&J in May 2005 which identified short and long term maintenance activities which would<br />

improve conveyance in the canal. Twelve sediment removal sites and two culvert replacements have been completed to<br />

date. A Noticed General Permit was approved in February 2009 for three additional sediment removal sites within the<br />

canal. Construction is to be completed by December 2009. Aquatic vegetation removal is performed regularly by the<br />

Operations Department. Staff has identified proposed maintenance easement corridor dimensions along the canal based<br />

on long term maintenance activity needs and is coordinating with the City of Winter Haven and Polk County to review<br />

land use changes and right-of-way use needs for future maintenance. On June 5 and 23, 2009 the District's Basin and<br />

Governing Board's respectively, approved a planned approach to secure permanent access rights for maintenance<br />

activities by obtaining voluntary conveyance of easement rights from individual property owners and through local<br />

020 - Peace River Basin 197


H034<br />

Peace Creek Canal Watershed<br />

government development orders as land transition occurs. Local property owners will be contacted to determine their<br />

interest in donating access rights and staff continues to coordinate with local governments on the review of land use<br />

changes in order to acquire access rights through land transitions. At their August 2009 meetings, the Peace River Basin<br />

Board and Governing Board approved a resolution in support of the abolition of the Peace Creek Drainage District and<br />

the transfer of their responsibilities to the District with respect to the ongoing operation and maintenance of the canal<br />

system<br />

ACCELERATED ACTION TO DATE: Contractor completed one sediment removal project and is currently working on<br />

the remaining two sediment removal sites. The remaining sediment removal sites are anticipated to be completed by<br />

October 2009.<br />

020 - Peace River Basin 198


H048<br />

Myakka River Watershed Initiative<br />

Project Type WS&R Dev.<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality, Natural Systems<br />

Basin(s) General Fund (District), Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager MORRIS, LISANN<br />

Task Manager(s)<br />

Status Ongoing<br />

STARKS, ROBERTA, SZAFRANIEC, MARY, RIALS, MARK, SMITH, RANDY, ARNOLD, DAVE<br />

Description<br />

The Myakka River Watershed is approximately 600 square miles in size and spans about 66 miles from Myakka Head<br />

to its outfall in Charlotte Harbor. It includes portions of several counties including Hardee, Desoto and Charlotte with<br />

the majority of the watershed located in Manatee and Sarasota counties. The 34-mile segment of the Myakka River in<br />

Sarasota county has been designated a Wild and Scenic River by the State of Florida and, together with the estuarine<br />

portions of the river, it is designated an Outstanding Florida Water by the Florida Department of Environmental<br />

Protection. The river is the second largest source of freshwater inflow for Charlotte Harbor, which is generally viewed<br />

as one of the most productive estuaries in Southwest Florida and is a SWIM waterbody. The Initiative is a<br />

comprehensive project that will illustrate the effects of land use conversions and alterations and evaluate best<br />

management practices (BMPs) for restoration alternatives. The objective of this initiative is to restore water quality,<br />

natural system, and floodplain impacts in the watershed in ways that can also provide a benefit to water supplies in the<br />

Southern Water Use Caution Area (SWUCA). The Topographic Information, Watershed Evaluation, and Watershed<br />

Management Plan elements of the District's Watershed Management Program (WMP) are included in this initiative.<br />

This effort will build upon existing data and analyses as well as the Sarasota County Lower Myakka Watershed<br />

Management Plan, K487, and the City of North Port Big Slough Watershed Management Plan, K883. Evaluation will<br />

also be performed on existing and proposed activities within the watershed, including a list of identified issues and a<br />

program to address long-term water resource issues will be developed.<br />

Benefits<br />

The Initiative will result in a better understanding of the dynamics of the river and watershed, determine how<br />

alternations have affected these systems, evaluate potential water resource impacts from future land use changes,<br />

and provide alternatives to better manage the water resource within the Myakka River watershed.<br />

Costs<br />

The estimated cost for the WMP of the Initiative is approximately $4.9 million. As a result of FY2009 funding from the<br />

State, some activities can start sooner than expected. The match of state funding to existing budgeted District funds<br />

provided an amount of $276,000 that will be amended into the agreement to cover increased coordination efforts with<br />

potential users of the excess water in Flatford and update the GIS database to the new version of GWIS. To initiate<br />

water quality monitoring $18,392 was transferred to the appropriate District sections.<br />

Funding History: Back at the February <strong>21</strong>, 2006 Governing Board <strong>Meeting</strong>, a transfer of funds ($500,000) from the<br />

Water Supply and Resource Development reserves was approved to hire consultants to obtain digital topographic<br />

information using LiDAR in eastern Manatee County ($380,000) and to initiate the water budget analysis for the Upper<br />

Myakka watershed ($120,000). The FY2007 funding ($2 million) continued the Upper Myakka water budget, the<br />

Watershed Evaluation for the entire watershed, and initiates the Watershed Management Plan element within the<br />

Upper Myakka. The $2 million FY2007 budget was funded as follows: $575,000 from the Governing Board, $517,500<br />

from the Manasota Basin Board, $57,500 from the Peace River Basin Board, and $850,000 from state appropriations.<br />

$1.77 million was obtained for FY2008 to complete the Watershed Evaluation element, continue the Watershed<br />

Management Plan element, complete the Independent quality assurance review of existing parameters and models<br />

previously developed for the Myakka River in unincorporated Sarasota County (K487) and the Big Slough tributary<br />

(K883). The FY008 funding was divided as follows: $635,000 from the Governing Board, $571,500 from the Manasota<br />

Basin Board, $63,500 from the Peace River Basin Board, and $500,000 from the State Funding. The funding<br />

distribution, percentage wise, is Governing Board (50%), Manasota Basin Board (45%) and Peace River Basin Board<br />

(5%). Contracting for independent, peer review of the Water Budget for the Upper Myakka and the purchase of the<br />

necessary software licenses for the MikeSHE model were accomplished with FY2008 funds. The remaining $765,000<br />

in funding is being used to complete the Watershed Management Plan through the Alternatives Analysis.<br />

Because this project was able to secure State Funding for FY2009 in the amount of $1,000,000, additional budget will<br />

not be needed to leverage ad valorum funding budgeted in previous fiscal years to match the state grant. When each<br />

element is completed, the project budget and scope may require refinement based on the information gathered. The<br />

District funding amounts shown in the table include staff salaries. Future funding will be required for implementation of<br />

selected BMPs.<br />

Additional Information<br />

020 - Peace River Basin 199


H048<br />

Myakka River Watershed Initiative<br />

A WMP includes five major elements: 1) Topographic Information, 2) Watershed Evaluation, 3) Watershed<br />

Management Plan, 4) Implementation of Best Management Practices, and 5) Maintenance of Watershed Parameters<br />

and Models. Implementing elements of the WMP is one of the Comprehensive Watershed Management (CWM)<br />

initiative strategies and one of the District's Strategic Priorities. Funding was requested to continue the Watershed<br />

Management Plan including: GIS data base development, watershed parameterization, computer modeling, floodplain<br />

analysis, floodplain delineation, and alternative analysis of BMPs within the Upper Myakka. Since all task under the<br />

Watershed Management Plan will not be completed within, the necessary funding to complete the project has be<br />

distributed between to FY2009. Objectives of the Initiative include: 1) ensuring an adequate supply of the water<br />

resource, 2) providing flood protection, 3) protecting and enhancing water quality and preventing the further<br />

degradation of the water resource, and 4) preserving, protecting and restoring natural systems. There is a significant<br />

amount of research, study and other data available for the watershed from the District and other Myakka stakeholders<br />

that can and will be used during the course of the project. Stakeholder involvement and contribution of available<br />

information will be important for the Initiative's ultimate success.<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 1,267,098 500,000 31,686 31,194<br />

0 1,829,978<br />

020 Peace River Basin 148,468 0 12,626 4,919<br />

0 166,013<br />

0<strong>21</strong> Manasota Basin 1,140,816 0 27,341 32,184<br />

0 1,200,341<br />

District Budgeted - Outside Revenue<br />

Ecosystem Trust Fund - Myakka Rvr<br />

W/S Init<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

1,350,000 0 1,000,000<br />

0<br />

Total:<br />

Future<br />

Funding<br />

0<br />

Total<br />

Funding<br />

2,350,000<br />

$5,546,332<br />

Critical Project Milestones Projected Amended Actual<br />

1. Aerial Mapping Services<br />

Execute Work Order for Aerial Topographic Mapping 2/24/06 2/24/06<br />

Complete Aerial Topographic Mapping <strong>10</strong>/31/06 1/30/06 3/22/07<br />

3. WMP Consulting Services<br />

Execute Consultant Services Agreement 11/13/06 12/4/06<br />

Complete Work Order #1 5/8/07 5/8/07<br />

Complete Work Order #5 9/27/07 6/16/08<br />

Complete Work Order #4 12/3/07 1/18/08<br />

Complete Work Order #3 4/1/08 5/17/08<br />

Complete Work Order #2 5/22/08 5/14/08<br />

3. WMP Consulting Services<br />

Complete Work Order #6 3/3/08 3/31/08<br />

Complete Work Order #8 4/2/08 4/1/09<br />

Complete Work Order #7 5/15/08 8/1/08<br />

Execute Amendment 1 5/22/09 5/22/09<br />

3.WMP Consulting Services<br />

Execute Work Order #9 9/9/08 9/9/08<br />

Execute Work Order #<strong>10</strong> 1/31/09 3/31/09 4/<strong>10</strong>/09<br />

Complete Work Order #9 4/30/09 9/30/09<br />

4. WMP Consulting Services<br />

SAI Agreement Termination <strong>10</strong>/31/<strong>10</strong> 1/<strong>10</strong>/11<br />

WMP Consulting Services<br />

Execute Work Order #13-Jones Edmunds 4/24/09 7/<strong>10</strong>/09<br />

Execute Work Order #12-Singhofen 4/24/09 7/<strong>10</strong>/09<br />

020 - Peace River Basin 200


H048<br />

Myakka River Watershed Initiative<br />

Complete Work Order #11 8/31/09 9/30/09<br />

Complete Work Order #<strong>10</strong> 2/<strong>10</strong>/<strong>10</strong><br />

WMP Consulting Services-Dewberry<br />

Execute Work Order #14 4/24/09 8/17/09<br />

Status As Of: September 01, 2009<br />

Status History: At the February <strong>21</strong>, 2006 Governing Board <strong>Meeting</strong>, a transfer of funds ($500,000) from the Water<br />

Supply and Resource Development reserves was approved to hire consultants to obtain LiDAR in eastern Manatee<br />

County ($380,000) and to initiate the water budget analysis for the Upper Myakka watershed ($120,000). The notice to<br />

proceed for the LiDAR work order was executed on February 24, 2006. The LiDAR vendor informed staff that the sensor<br />

used to acquire the data earlier this spring experienced hardware problems and the data are not usable. The vendor<br />

recollected the LiDAR data and the Eastern Manatee/Upper Myakka LiDAR was approved and delivered to the WMP<br />

consultant. The Request for Proposals to perform the Watershed Management Program elements was posted on May<br />

19, 2006. Oral presentations of the three respondents were given on July 25, 2006. Singhofen & Associates, Inc. (SAI)<br />

was selected and approved on August 8, 2006. The SAI agreement was executed on December 4, 2006. Copies of the<br />

executed agreement were transmitted to Manatee County, City of North Port, Sarasota County, and PRMRWSA. A<br />

kick-off meeting was held with the Myakka River stakeholders on February 14, 2007, to present the project and collect<br />

information from staff with projects, knowledge, and/or data within the watershed.<br />

Work Order #1 deliverables (collecting and reviewing existing information, developing the methodology and approach for<br />

completing the surface water, water quality, and water budget modeling and preparing the project management, quality<br />

assurance, and outreach plan) were completed. Work Order #2 was executed on June 12, 2007, to develop the Upper<br />

Myakka River water budget model. Work Orders #3 and 4 were executed to complete the digital topographic information<br />

element, geospatially reference existing survey data from throughout the watershed, develop content for a web page,<br />

complete historic land use mapping, and identify model-specific features for the geodatabase. Changes in the processes<br />

of the Watershed Management Program as a result of FEMA work have delayed the development of Work Order #6.<br />

Imagery (late 1940s and early 1950s) is being utilized for historic land use mapping in the water budget analysis. Training<br />

on the Mike SHE (integrated computer model for the water budget) was held for District staff. Coordination efforts<br />

continue with the H063 PRMRWSA Source Feasibility study. Work Order #6 that includes historic vegetation<br />

investigation in Flatford Swamp, and preliminary sub-basin and watershed delineations was executed January 2, 2008.<br />

The kick-off meeting for the the peer review was held March 20, 2008. The historic land-use mapping and the digital<br />

terrain information are complete. The consultant has completed the future land use and historic land use hydrologic<br />

scenario runs. The Myakka website can now be accessed on watermatters.org. The Upper Myakka Water Budget was<br />

presented to the Watershed Summit sponsored by the Charlotte Harbor National Estuary Program. The MRWI was<br />

presented to the Florida State conference of Agricultural and Biological Engineers in early June 2008. The peer review<br />

document was received in early July 2008. Peer review comments have been addressed. In an effort to accelerate the<br />

project, staff was able to initiate water quality monitoring for a major portion of the Class 3 constituents, along with<br />

coordination efforts with potential users and updates to the GIS database as a result of state funding from FY2009.<br />

These efforts can begin now instead of waiting for additional funding in the next fiscal year. This requires an amendment<br />

to the current Singhofen & Associates agreement increasing the funding amount by $276,000 to cover the updated<br />

database efforts and increased coordination efforts. The District's Chemistry Lab and Water Quality Monitoring Program<br />

sections are managing the water quality monitoring element. The consultant is waiting on recommendations for utilizing<br />

the recent Sarasota County Lidar from the District before proceeding. The consultant team presented removal scenarios<br />

of excess water from Flatford swamp and screening for potential uses at a meeting April 30, 2009. Watershed Evaluation<br />

work orders have been delayed again as coordination efforts are worked through at the District. The consultant team<br />

continues to explore possible alternatives for users of excess water from Flatford Swamp. Initial meetings with potential<br />

users will continue for the next several months.Current Status: Consultant has completed a preliminary alternatives<br />

analysis in the Tatum Sawgrass area of the watershed. The consultant has started development of the hydraulic event<br />

modeling for the river as well as several tributary sub-watersheds that will assist with future permitting of best<br />

management practices to address alterations within the study area.<br />

020 - Peace River Basin 201


H051<br />

PR/MRWSA Reg Integ Loop Sys Phase 2 Interconnect<br />

Project Type WS&R Dev.<br />

AOR(s)<br />

Water Supply<br />

Basin(s) General Fund (District), Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager FERGUSON, JOHN<br />

Task Manager(s)<br />

Status Ongoing<br />

Peace River/Manasota Regional Water Supply Auth.<br />

ARMSTRONG, BRIAN<br />

Description<br />

The Regional Integrated Loop System project is a series of transmission pipelines that will be developed to regionally<br />

transfer and deliver water from existing and future alternative supplies to demand centers within the Peace<br />

River/Manasota Regional Water Supply Authority's four county region. The Phase II Interconnect project is a<br />

component of the Regional Integrated Loop System that will provide needed regional transmission capacity between<br />

the Peace River Facility and the City of North Port. The transmission line will be a 36-to-48 inch diameter pipeline<br />

extending approximately 5.5 miles from the Peace River Facility, generally along the existing 36-inch regional<br />

transmission main (RTM) corridor to Serris Boulevard, where it will interconnect with the City of North Port's<br />

transmission/distribution system. In addition to serving the City of North Port, Phase II provides back-up capacity to the<br />

existing 36-inch RTM, and comprises a critical segment for the extension of future regional transmission capacity to<br />

the City of North Port's Myakkahatchee Creek Water Treatment Facility, the Englewood Water District treatment<br />

facilities, and the Carlton Water Treatment Facility.<br />

Benefits<br />

The initial segment of the Phase 2 Interconnect will allow the City of North Port to receive additional water from the<br />

Authority's ongoing expansion project. The City currently requires this project to transmit the quantities of water they<br />

are contracted to purchase from the Authority in FY2012. Development of additional segments will further integrate<br />

regional resources; maximize surface water for public supply; provide rotational capacity and the ability to rest sources;<br />

provide for reserve capacity for emergency transfers; provide alternatives to the development of groundwater in the<br />

Southern Water Use Caution Area (SWUCA); and better match supply, demand and financial investment on a regional<br />

basis. The use of alternative sources with the maximization of surface water for public supply is consistent with the<br />

District's Regional Water Supply Plan.<br />

Costs<br />

The total estimated cost for the H051 Phase 2 Interconnect is $15,400,000 with the requested District share being<br />

$7,700,000. The District funding will be divided between the Governing Board, $3,850,000 (50%); Manasota Basin,<br />

$2,8<strong>10</strong>,00 (36.5%); and the Peace River Basin, $1,039,500 (13.5%). District funding in FY20<strong>10</strong> is anticipated to be:<br />

General fund $1,500,000; Manasota $500,000; Peace River $200,000; for a total of $2,200,000.<br />

The Funding table below shows funds that were budgeted in "FY2007" and "FY2008" and "Cumulative Transfers".<br />

Those funds lapsed at the end of their fiscal years, as the project was not pursued at those times. A negative<br />

adjustment is made under "prior funding" to show the actual total funding.<br />

The long-term project cost of all additional Phase 2 components for joining the Englewood Water District, City of<br />

Venice, and the Carlton WTP has been estimated at $<strong>10</strong>6,378,<strong>21</strong>7.<br />

Additional Information<br />

The Loop Feasibility/Routing Study was authorized by the Authority in May 2005 and the report was issued in June<br />

2006. The Feasibility/Routing Study identified the preferred loop pipeline routing, environmental impacts, major<br />

connection points, preliminary pipe sizing, proposed schedule of project phasing, and time frames for construction.<br />

The Study's recommended Phase 2 route connects the Peace River Water Treatment Plant with the Myakkahatchee<br />

Creek Water Treatment Plant and then branches into two segments. The one segment loops northwest to Sarasota<br />

County's Carlton Water Treatment Facility, and the other segment runs southwest and connects to the public water<br />

systems of the Englewood Water District and the City of Venice.<br />

In August 2007, the Authority Board approved the first work order for Phase 2 of the Regional Loop System and<br />

issued a notice to proceed. In December 2007, the Authority's consultant released a preliminary design report for the<br />

Phase 2. In May 2008, the Authority chose to postpone the project in favor of an alternate connection between North<br />

Port's system near the Snover Waterway and the existing regional line connecting the Carlton and Peace River WTPs.<br />

As a result, the District reallocated the FY2007 and FY2008 funds towards other projects.<br />

After much discussion between the City of North Port, Sarasota County, and the Authority over shared capacities, the<br />

Snover Waterway connection was considered insufficient to meet all the partners' combined needs. In November<br />

2008, the Authority revised a shorter version the Phase 2 project, which calls for a segment between the Peace River<br />

WTP and the North Port's Serris Blvd connection. The pipeline would be the length needed to deliver an increased<br />

capacity to the City, but would retain the greater transmission capacity needed for future extensions. In February 2009,<br />

020 - Peace River Basin 202


H051<br />

PR/MRWSA Reg Integ Loop Sys Phase 2 Interconnect<br />

The Authority's consultant released a technical memorandum which updated the cost estimate from the 2007<br />

Preliminary Design report. The cost for a 36-inch diameter, 5.5 mile long pipeline with a transmission capacity of 13.5<br />

mgd was updated from $12,000,000 to $15,400,000.<br />

The project is scheduled for completion by September 2012. The City is currently exceeding their 1.192 mgd annual<br />

average capacity entitlement in the existing pipeline from the Peace River Facility. The City will require an additional<br />

1.758 mgd transmission capacity by 2011, and a total of 3.20 mgd transmission capacity by 2014.<br />

The City of North Port, Charlotte County, and the Authority entered into a three party temporary interlocal agreement<br />

for the capacity use of existing water main. The City and County approved the agreement on May 26, 2009, and the<br />

Authority board approved the agreement on June 3, 2009. This agreement will allow the City of North Port additional<br />

capacity until September 30, 2012, which is the scheduled completion date for the Phase 2 interconnect. Also on May<br />

26, 2009, The City of North Port approved the interlocal agreement for the Phase 2 interconnect. The agreement was<br />

approved at the Authority Board meeting on June 3, 2009.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 3,200 (3,200) 0 1,501,785 2,750,000 4,251,785<br />

020 Peace River Basin 2,001 (2,001) 0 200,860 742,500 943,360<br />

0<strong>21</strong> Manasota Basin 2,001 (2,001) 0 501,913 2,007,500 2,509,413<br />

Project Funds Not Budgeted by the<br />

District<br />

PRMRWSA 0 0 600,000 2,200,000 4,900,000 7,700,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$15,404,558<br />

Critical Project Milestones Projected Amended Actual<br />

Permitting / Property aquisition 5/29/09<br />

Design 11/27/09<br />

Construction 12/31/<strong>10</strong><br />

Status As Of: August 31, 2009<br />

The Authority executed Work Order No. 2 with King Engineering Associates (King) on September 2nd, 2009 for the<br />

project coordination, BODR, final design, permitting, and bidding award services of the Phase 2 Interconnect. King was<br />

intially contracted in June 2007 for the project.<br />

Accelerate Florida: The Authority has been notified of the Accelerate Florida Program. This project will be shovel-ready<br />

December 20<strong>10</strong>.<br />

020 - Peace River Basin 203


H052<br />

PR/MRWSA Reg Integ Loop Sys Phase 3A Interconnect<br />

Project Type WS&R Dev.<br />

AOR(s)<br />

Water Supply<br />

Basin(s) General Fund (District), Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager FERGUSON, JOHN<br />

Task Manager(s)<br />

Status Ongoing<br />

Peace River/Manasota Regional Water Supply Auth.<br />

ARMSTRONG, BRIAN, GOODWIN, AUDRIE<br />

Description<br />

The Regional Integrated Loop System Program is a series of transmission pipelines that will be developed to regionally<br />

transfer and deliver water from existing and future alternative supplies to demand centers within the Peace<br />

River/Manasota Regional Water Supply Authority's (Authority) four county region. This project, Phase 3A, proposes to<br />

construct a pipeline from Sarasota County's Carlton Water Treatment Facility north across the Myakka River to an<br />

existing County utility line. Eventually the interconnect will extend into Manatee County once all phases have been<br />

completed.<br />

Benefits<br />

Development of this project will further integrate regional resources; maximize surface water for public supply; provide<br />

rotational capacity and the ability to rest sources; provide for reserve capacity for emergency transfers; provide<br />

alternatives to the development of groundwater in the Southern Water Use Caution Area; and better match supply,<br />

demand and financial investment on a regional basis.<br />

Costs<br />

The total estimated cost for the Phase 3A project is $42,570,000, with the requested District's share<br />

being $<strong>21</strong>,285,000. District funding will be divided by the Governing Board, $<strong>10</strong>,642,500 (50%); the Peace River Basin<br />

Board, $2,873,475 (13.5%); and the Manasota Basin Board, $7,769,025 (36.5%.) The District funding in FY 20<strong>10</strong> is:<br />

Governing Board ($4,087,983), Peace River Basin Board ($0), and the Manasota Basin Board ($2,118,404) for a total<br />

of $6,206,387. Total funding budgeted to date (FY2008 and FY2009) is $12,729,517, split between to Governing<br />

Board ($6,554,517), the Peace River Basin Board ($1,709,750), and the Manasota Basin Board ($4,465,250)<br />

Additional Information<br />

This project would provide potable water service to areas of northern Sarasota County and Manatee County. Phase<br />

3A is the initial segment in the overall Integrated Regional Loop System Phase 3. Subsequent expansions (Loop<br />

System Phases 3B, 4A and 4B) include additional interconnect facilities in northern Sarasota County and southern<br />

Manatee County, allowing regional water delivery service to those communities. Total cost for the entire Phase 3 &<br />

4 program is estimated to be $146,207,442.<br />

On April 2008, District staff received the Preliminary Engineering Basis of Design Report for Phases 3A and 3B. The<br />

Feasibility/Routing Study identified the preferred loop pipeline routing, environmental impacts, major connection<br />

points, preliminary pipe sizing, proposed schedule of project phasing, and time frames for construction. Major<br />

components of Phase 3A include above ground storage, a pumping station and approximately nine miles of 48-inch<br />

diameter transmission pipeline. The pipeline route is generally from the Carlton Water Treatment Plant westward<br />

across the Myakka River following an established utility corridor; west along Laurel Road, north along Knights Trail<br />

Road, and parallel along Cow Pen Slough to a point near the Central County Landfill and State Road 681.<br />

Components co-located at the Carlton Water Treatment Plant would include a pumping station with a <strong>10</strong> mgd capacity<br />

and above-ground storage. It is anticipated that a portion of the project's storage component, a 5 million gallon above<br />

ground storage tank, will be acquired from Sarasota County by the Authority. The transmission capacity of the pipeline<br />

will have a minimum design capacity of 37 mgd. Future upgrades to the pumping station will be needed to reach that<br />

capacity. Phase 3A will provide an additional water delivery point to Sarasota County and the potential for an inter-tie<br />

between the Authority's RTS and the City of Venice water system.<br />

The Cooperative Funding Agreement between the District and the Authority for Phase 3A was executed on November<br />

<strong>10</strong>, 2008. The Agreement is back-dated to July 25, 2007 and will remain in effect through November 1, 2011. . The<br />

Interlocal Agreement between the Authority and Sarasota County was signed by the County on March 32, 2009 and by<br />

the Authority on April 1, 2009.<br />

The Authority submitted RAI responses for the FDEP ERP for the pipeline and the FDEP Myakka River Wild & Scenic<br />

River Permit on May 8, 2009. Also on May 8, 2009, permit applications were submitted for the FDEP drinking water<br />

permit for the pipeline and pump station, and for Sarasota County's Site & Development Permit.<br />

On June 3, 2009, the Authority board approved a work order for final design services of a new 5 million gallon storage<br />

tank to be located at the Carlton WTP.<br />

020 - Peace River Basin 204


H052<br />

PR/MRWSA Reg Integ Loop Sys Phase 3A Interconnect<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 1,930,237 (3,000) 4,633,169 4,093,812 1,174,548 11,828,766<br />

020 Peace River Basin 523,304 (2,001) 1,191,295 2,612 317,128 2,032,338<br />

0<strong>21</strong> Manasota Basin 1,408,804 (2,001) 3,061,943 2,123,<strong>21</strong>7 857,420 7,449,383<br />

Project Funds Not Budgeted by the<br />

District<br />

PR/MRWSA 3,850,000 0 8,879,517 8,555,483<br />

0 <strong>21</strong>,285,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$42,595,487<br />

Critical Project Milestones Projected Amended Actual<br />

Preliminary Design / Basis of Design - Phase 3 7/31/08 3/31/08<br />

Final Design - Phase 3A 3/31/09<br />

Permitting / Property Aquisition - Phase 3A 4/30/09<br />

Construction - Phase 3A 5/31/<strong>10</strong><br />

Status As Of: August 31, 2009<br />

The Authority held a pre-qualification submittal meeting for interested contractors on August 7, 2009, and received<br />

comments from several contractors on the pre-qualification criteria. RFQs will be advertised on August 15-16, and<br />

submittals will be due by September 15. The Authority board will be asked to approve the list of pre-qualified contractors<br />

at their October 7, 2009 board meeting.<br />

The FDEP Myakka Wild and Scenic River permit was acquired on August 5, 20<strong>10</strong>. The FDEP drinking water construction<br />

permit was acquired on August 24, 2009. The FDOT utility permit was recieved on July 2nd, 2009. The USACOE permits<br />

were issued on July 30, 2009. A FDEP environmental resource permit is expected by October <strong>10</strong>, 2009.<br />

Accelerate Florida Update: Notice was sent to PRMRWSA regarding the Accelerate Florida Initiative, although this<br />

project will not be "shovel ready" in the required time period. The Authority may consider including an early completion<br />

bonus clause in the construction contract. The Authority and County are attempting to have the pipeline in service by<br />

April 20<strong>10</strong>, several months ahead of the original schedule.<br />

020 - Peace River Basin 205


H060<br />

Punta Gorda Shell Creek WTP Expansion to <strong>10</strong> MGD (Completed)<br />

Project Type WS&R Dev.<br />

AOR(s)<br />

Water Supply<br />

Basin(s) General Fund (District), Peace River, Manasota<br />

Cooperator(s)<br />

Punta Gorda<br />

Project Manager GOODWIN, AUDRIE<br />

Task Manager(s)<br />

Status Completed<br />

ARMSTRONG, BRIAN<br />

Description<br />

This project expanded the City of Punta Gorda's Shell Creek Water Treatment Plant (WTP) from 8 to <strong>10</strong> mgd. Project<br />

elements included rehabilitating existing filters and improving the facility's chemical mixing and disinfection processes.<br />

Although the facility recently received a re-rating from the DEP from 8 to <strong>10</strong> mgd, these improvements were necessary<br />

for the plant to treat a sustained capacity of <strong>10</strong> mgd.<br />

Benefits<br />

The City of Punta Gorda will have the ability to supply additional water to the regional system. The intent is to make<br />

water available to address a potential water supply shortfall that may occur while the Peace River/Manasota Regional<br />

Water Supply Authority (Authority) completes its facility expansion in 20<strong>10</strong>. This project will assist in maximizing<br />

surface water for public supply; providing rotational capacity and the ability to rest sources; providing reserve capacity<br />

for emergency transfers; limiting development of ground water in the Southern Water Use Caution Area; and better<br />

matching supply, demand, and financial investment on a regional basis.<br />

Costs<br />

Total estimated project cost was $3,000,000 while the District's share initially was $1,500,000. The entire District<br />

share was allocated in FY2007.<br />

Additional Information<br />

The City of Punta Gorda originally planned an expansion of its Shell Creek WTP capacity to meet future public supply<br />

demands through 2016. The expansion was initially scheduled to occur in two stages, from 8 to <strong>10</strong> mgd by January<br />

2008 (later amended to June 2009) and from <strong>10</strong> to 15 mgd by 2014. The City submitted a separate cooperative<br />

funding application for each expansion in FY2007. This project (H060) was only for the expansion from 8 to <strong>10</strong> mgd.<br />

The Authority identified the Shell Creek WTP as a potential source for providing 2 mgd towards the Authority's GAP<br />

Plan. The GAP Plan addresses a possible water supply shortfall that may occur prior to full utilization of the Authority's<br />

Facility Expansions (F032 & F033). In addition to the WTP expansion (H060), the City of Punta Gorda submitted a<br />

cooperative funding application (H087) for the future construction of a 2 mgd RO facility at or near the Shell Creek<br />

WTP to meet their future public supply demands.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 756,994 (5,441) 1,295<br />

0<br />

0 752,848<br />

020 Peace River Basin 207,8<strong>10</strong> (4,533) 648<br />

0<br />

0 203,925<br />

0<strong>21</strong> Manasota Basin 553,586 (4,533) 648<br />

0<br />

0 549,701<br />

Project Funds Not Budgeted by the<br />

District<br />

Punta Gorda 1,500,000 0 0<br />

0<br />

0 1,500,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$3,006,474<br />

Critical Project Milestones Projected Amended Actual<br />

Begin WTP Improvements and re-rate from 8 to <strong>10</strong> mgd <strong>10</strong>/1/06 <strong>10</strong>/1/06<br />

Basin Board Notification of Contract Execution 4/25/07 4/25/07<br />

020 - Peace River Basin 206


H060<br />

Punta Gorda Shell Creek WTP Expansion to <strong>10</strong> MGD (Completed)<br />

Contract Executed 6/14/07 6/14/07<br />

Project Completion 1/31/08 6/30/09 3/1/09<br />

A. Complete Design and Equipment Delivery<br />

North Filter Improvements 8/<strong>10</strong>/07 8/<strong>21</strong>/07 8/<strong>21</strong>/07<br />

Sludge Bed Refurbishment 8/<strong>21</strong>/07 8/<strong>21</strong>/07<br />

Televise Underdrain 9/4/07 7/16/08<br />

Chemical Feed - New Flash Mix System <strong>10</strong>/5/07 11/2/07<br />

Solids Contact Unit Equipment Replacement <strong>10</strong>/30/07 11/30/07<br />

Dewatering Canopy 11/29/07 4/28/08 5/30/08<br />

Chemical System Improvements 1/1/08 6/1/08 11/15/08<br />

B. Complete Construction<br />

Ground Storage Tank Modification 8/13/07 8/13/07<br />

Sludge Drying Bed Refurbishment 11/6/07 12/20/07 12/20/07<br />

Chemical Feed - New Flash Mix System 11/7/07 3/1/08 5/14/08<br />

North Filter Improvements 11/15/07 11/19/07 11/15/07<br />

Solids Contact Unit Equipment Replacement 11/16/07 12/<strong>21</strong>/08 12/20/07<br />

South Filter Improvements 1/3/08 1/1/08 12/<strong>21</strong>/08<br />

Dewatering Canopy 1/<strong>10</strong>/08 5/12/08 5/30/08<br />

Chemical System Improvements 6/1/08 3/1/09 3/1/09<br />

Status As Of: July 06, 2009<br />

The contract was executed on June 14, 2007 by the District's Executive Director and the Mayor of Punta Gorda. All<br />

project activities were completed on March 1, 2009. The District received final payment for the project in June 2009.<br />

ACTION-TO-DATE: Complete.<br />

Final project punchlist items and Chemical System Improvements were completed on March 1, 2009. This project was<br />

completed on schedule and under budget.<br />

At the request of the Office of Governor Charlie Crist, the District has been communicating regularly with the cooperator<br />

concerning the Governor's Accelerate Florida initiative to stimulate Florida's economy. An information request was sent<br />

to the cooperator on October 15, 2008. District staff followed up with an email and phone call regarding the cooperator's<br />

efforts to accelerate the project. Since the project is complete, there are no needed tasks to accelerate the project.<br />

020 - Peace River Basin 207


H062<br />

CF Industries Aquifer Recharge and Recovery Project<br />

Project Type WS&R Dev.<br />

AOR(s)<br />

Water Supply, Water Quality<br />

Basin(s) General Fund (District), Alafia River, Peace River, Manasota<br />

Cooperator(s)<br />

CF Industries<br />

Project Manager KELLEY, MIKE<br />

Task Manager(s)<br />

Status Withdrawn<br />

Description<br />

CF Industries is developing an Aquifer Recharge and Recovery Project (ARRP) on a portion of its South Pasture mine<br />

in Hardee County. The project will store mine stormwater in an existing sand-clay mix area; naturally treat the water<br />

through two reclaimed wetland cells constructed in an adjacent sand-clay mix area; filter the water through a sand<br />

tailings filter basin; and then recharge an estimated 2 to 4 mgd of the naturally treated water into the Floridan aquifer.<br />

The goal of the natural treatment system is to treat the water to primary and secondary drinking water standards so<br />

that it can be recharged into the Upper Floridan aquifer to increase water levels and provide additional water to help<br />

meet local and regional water demands. Project components include design and construction of the treatment<br />

wetlands and sand filtration basin; construction of intake control structures to and from the mine, reservoir and<br />

treatment systems; and, construction of an injection well and two monitor wells. The project will be conducted in two<br />

phases: Phase 1 includes design, permitting, and construction of the wetlands treatment system and sand filtration<br />

basin; and, Phase II includes construction and testing of the recharge well. CF Industries' original FY2009<br />

Cooperative Funding request was modified to postpone construction and testing of the recharge well until at least<br />

FY20<strong>10</strong>. Total District funding now being requested for FY2009 is $400,675 and will be used for construction of a<br />

stormwater collection and discharge system. This will increase the District's previous total funding committment from<br />

$2,250,000 to $2,605,729.<br />

Benefits<br />

This is an innovative alternative water supply project that could provide significant benefits to the Southern Water Use<br />

Caution Area (SWUCA) by maintaining or increasing Upper Floridan aquifer levels. Utilizing excess surface waters<br />

and safely injecting those waters into the aquifer is one of several strategies the District is pursuing as part of its<br />

SWUCA Recovery Strategy. The information collected from this project will be used to demonstrate the full-scale<br />

feasibility of this type of treatment technology and can be applied to future natural treatment and aquifer recharge<br />

projects in the area. This project was identified in the District's most recent update of the Regional Water Supply Plan<br />

as a water supply development option under the Heartland Water Alliance planning area.<br />

Costs<br />

The total cost of the project including reclamation funds from CF Industries is $7,042,314, with the District funding up<br />

to 50 percent of eligible costs to a maximum of $2,605,729. District funding will be shared by the Governing Board (50<br />

percent), Peace River Basin Board (25 percent), Alafia River Basin Board (12.5 percent), and Manasota Basin Board<br />

(12.5 percent). CF Industries' original FY2009 Cooperative Funding Initiative request was for $1,148,445 to complete<br />

the project. However, based on discussions with District staff, CF Industries has postponed construction and testing of<br />

their recharge well until at least 20<strong>10</strong>, reducing their FY2009 funding request to $400,675. The FY2009 Governing and<br />

Basin Boards shares are, Peace River Basin Board: $<strong>10</strong>0,169; Manasota & Alafia River Basin Boards: $50,084 each;<br />

Governing Board: $200,338. Due to delays CF Industries did not request FY20<strong>10</strong> funding.<br />

Additional Information<br />

The project consists of constructing the major components required to operate the ARRP, which will include the<br />

design and construction of the treatment wetlands and sand filtration basin, intake control structures to and from the<br />

mine, reservoir and treatment systems, and the construction of an injection well and two monitor wells. In anticipation<br />

of receiving formal approvals and variances from the required regulatory agencies, CF Industries commenced<br />

construction of the project in March 2007. It is expected to take approximately two years to complete the installation of<br />

the necessary infrastructure. Another two years will be required to thoroughly test the system. Project costs for the first<br />

fiscal year, FY2007, are estimated at $1,751,620, with the District's approved share not-to-exceed $875,8<strong>10</strong> (Peace<br />

River Basin Board: $<strong>21</strong>8,953; Manasota & Alafia River Basin Boards: $<strong>10</strong>9,476 each; Governing Board: $437,905).<br />

These funds were transferred from the Water Supply and Resource Development Reserves to each of the<br />

participating boards. Project approved funds for FY2008 were $1,074,138, with the District's funded share<br />

not-to-exceed $395,789(Peace River Basin Board: $97,927; Manasota & Alafia River Basin Boards: $49,474 each;<br />

Governing Board: $198,914).<br />

020 - Peace River Basin 208


H062<br />

CF Industries Aquifer Recharge and Recovery Project<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 198,914 437,905 205,950 5,242 406,948 1,254,959<br />

011 Alafia River Basin 49,474 <strong>10</strong>9,476 53,634 1,048 <strong>10</strong>1,737 315,369<br />

020 Peace River Basin 97,927 <strong>21</strong>8,985 <strong>10</strong>3,752 1,048 203,474 625,186<br />

0<strong>21</strong> Manasota Basin 49,474 <strong>10</strong>9,476 51,571 1,048 <strong>10</strong>1,737 313,306<br />

District Budgeted - Outside Revenue<br />

Water Protection & Sust T.F.<br />

(Alternative Wtr)<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

193,814 0 0<br />

0<br />

0<br />

193,814<br />

Project Funds Not Budgeted by the<br />

District<br />

CF Industries 3,191,233 0 400,675 844,677<br />

0 4,436,585<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$7,139,<strong>21</strong>9<br />

Critical Project Milestones Projected Amended Actual<br />

Phase I<br />

Governing Board Approval 11/30/06 11/30/06<br />

Basin Board Approvals 12/15/06 12/15/06<br />

FDEP Underground Inj. Permit Application 1/1/07 1/1/07<br />

Effective Date 1/2/07<br />

CF Industries Sitework/Wetland Const. Commence 3/15/07<br />

Wetland Berm, Pump, Filter Construction Commence 4/1/07<br />

FDEP Reclamation Modification Application 11/1/07 11/1/07<br />

Execute Contract 4/15/08<br />

FDEP Underground Inj. Permit Issued 1/1/09<br />

FDEP Reclamation Modification Issued 1/1/09<br />

CF Industries Sitework/Wetland Construct. Complete 1/1/09<br />

Wetland Berm, Pump, Filter Construction Complete 7/1/09<br />

Phase II<br />

Recharge/Monitor Wells Construction Commence <strong>10</strong>/1/09<br />

Recharge/Monitor Wells Construction Complete 4/1/<strong>10</strong><br />

Status As Of: September 03, 2009<br />

CF Industries has decided to withdraw their coop funding request and proceed with the project without District funds. The<br />

cooperative funding agreement documents were not returned from CF Industries. Telephone and email communications<br />

have been made with Craig Kovach and Gary Blitch of CF Ind. The major issues in the draft agreement were non-profit<br />

through sale, termination without cause, an additional monitor well, annual report content, and performance standards.<br />

The FDEP UIC permit for well construction and testing has been issued. CF Ind. is in the process of permitting their<br />

expansion of the mine. On site, the wetland treatment cell 1 is complete and growing in well; cell 2 is being herbicided<br />

and planted with native plant species. A small holding pond near the sand filtration basin is being permitted through the<br />

Corps of Engineers. A site visit was conducted on August 19 and pictures are available.<br />

020 - Peace River Basin 209


H063<br />

PR/MRWSA Regional Resource Development Feasibility Study<br />

Project Type WS&R Dev.<br />

AOR(s)<br />

Water Supply<br />

Basin(s) General Fund (District), Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager MORRIS, LISANN<br />

Task Manager(s)<br />

Status Ongoing<br />

Peace River/Manasota Regional Water Supply Auth.<br />

Description<br />

This project will conduct feasibility studies on three potential alternative water supply sources that were identified in the<br />

Peace River/Manasota's Regional Water Supply Authority's Integrated Regional Water Supply Master Plan (IRWSMP).<br />

The sources include Cow Pen Slough/Dona Bay, Upper Myakka\Flatford Swamp and Shell Creek. The project will<br />

provide the following:<br />

Identify major supply opportunities in the three source areas<br />

Refine yield estimates<br />

Identify locations for treatment, storage and pipeline facilities<br />

Identify associated opportunities to improve environment<br />

Provide general design criteria for facilities<br />

Develop potential supply configurations and preliminary cost estimates<br />

Benefits<br />

This project and the associated feasibility studies will allow the Authorty to move forward with developing its next water<br />

supply source\sources through their Regional Resource Development program. The program focuses on maximizing<br />

surface water for public supply, reducing development pressure on groundwater in the SWUCA, providing rotational<br />

and reserve capacity for resting sources, and optimizing the regional financial investment in water supply and<br />

transmission capacity.<br />

Costs<br />

The total estimated project cost is $2,500,000. The District's anticipated total funding contribution for the project is<br />

$1,250,000. It is anticipated that, of the District's projected total funding contribution of $1,250,000, the District<br />

Governing Board will contribute $612,500, the Manasota Basin Board will contribute $447,125 (73 percent of the total<br />

basin board contribution), and the Peace River Basin Board will contribute $165,375 (27 percent of the total basin<br />

board contribution). Funding from the Ecosystem Management and Restoration Trust Fund in the amount of $50,000<br />

will be split evenly($25,000/$25,000) between the cooperators to reduce contributions.<br />

Additional Information<br />

The Peace River/Manasota Regional Water Supply Authority (Authority) is comprised of Charlotte, DeSoto, Manatee<br />

and Sarasota Counties. In accordance with its Master Water Supply Contract, the Authority is obligated to timely<br />

develop and deliver new water supply sources and facilities to meet the needs of its customers. Building upon the<br />

planning efforts of the Water Planning Alliance, the District, and Local Governments, the Authority has developed a<br />

draft IRWSMP which will serve as a road-map for meeting Authority member and customer water needs in the future.<br />

The IRWSMP will contain a Regional Resource Development program that will analyze and prioritize potential new<br />

water supply sources within the region. Initially the Authority submitted a FY2008 Cooperative Funding application to<br />

proceed with preliminary engineering of selected regional water supply source(s). After discussions between the<br />

District and Authority staff, the Authority's FY2008 application was revised to only include the feasibility portion of the<br />

Regional Resource Development program. It is anticipated that the Authority will need 20% ($500,000) of the total<br />

project cost in FY2007 and the remainder ($2,000,000) in FY2008. As a result, an out of cycle funding request will be<br />

brought to the June Manasota and Peace River Basin Boards and Governing Board for approval. Upon completion of<br />

the feasibility analysis, the Authority will move forward with final design and construction of the selected source(s). The<br />

first new regional water supply capacity is anticipated to be available in 2017.<br />

020 - Peace River Basin 2<strong>10</strong>


H063<br />

PR/MRWSA Regional Resource Development Feasibility Study<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 520,157 125,000 6,708<br />

0<br />

0 651,865<br />

020 Peace River Basin 144,760 33,750 1,118<br />

0<br />

0 179,628<br />

0<strong>21</strong> Manasota Basin 372,141 91,250 2,236<br />

0<br />

0 465,627<br />

District Budgeted - Outside Revenue<br />

Ecosystem Trust Fund - Central W<br />

Coast SW Enhanc<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

50,000 0 0<br />

0<br />

0<br />

50,000<br />

Project Funds Not Budgeted by the<br />

District<br />

PR/MRWSA 1,225,000 0 0<br />

0<br />

0 1,225,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$2,572,120<br />

Critical Project Milestones Projected Amended Actual<br />

Contract Approved 8/17/07 9/18/07<br />

Work Order #1-deliverable #1 11/7/07 12/31/07<br />

Work Order #1-deliverable #2 12/7/07 12/31/07<br />

Execute Work Order #2 1/<strong>10</strong>/08 1/<strong>10</strong>/08<br />

Execute Work Order #3 5/7/08 5/7/08<br />

Draft Final Report deliverable 8/29/08 <strong>10</strong>/13/08 11/11/08<br />

Final Report 12/30/08 3/29/09 9/3/09<br />

Status As Of: September 03, 2009<br />

Status History: The Authority received three submittals on April 25 for consultant services to conduct water supply<br />

feasibility studies of the Shell Creek, Cow Pen Slough/Dona Bay, and Upper Myakka River Systems and authorized<br />

contract negotiations with the top ranked firm, the PBS&J team. In addition, District staff brought an out of cycle funding<br />

request for $250,000 to the June Peace River Basin Board and Governing Board that was approved, contingent on<br />

approval by the Manasota Basin Board in July. The remaining $1,000,000 was funded in the FY2008 budget. Several<br />

scoping meetings took place with the consultant and contracts are executed. Scope and Work Order #1 of the Authority's<br />

Consultant Contract was approved by their Board. Existing data collection and evaluation and field reconnaissance visits<br />

to all three proposed areas by the consultant, the Authority, and District staff are complete. A Coordination meeting was<br />

held between District Ecologic Evaluation staff and Source Feasibility Study team. The first deliverable from Work Order<br />

#1 was a techinical report summarizing inventoried data and relevant technical reports and/or models and a database of<br />

the inventoried data. The second deliverable from Work Order #1 was a document describing preliminary alternatives<br />

recommended for efforts conducted in subsequent phases of the feasibility studies. Additional water quality testing for<br />

parameters such as corrosiveness, Giardia, Cryptosporidium, TOC (Total Organic Carbon), took place to allow for a<br />

balanced comparison between the proposed sites. Two joint meetings were held with the MRWI team to discuss<br />

hydrologic alternative scenarios in the Upper Myakka. The final Work Order for the project was executed covering<br />

preliminary water treatment processes, intake structure identification, transmission mains location, the Source Water<br />

Feasibility Study Report, Reliability Model update, and Public <strong>Meeting</strong>s. Five Authority Technical Advisory Committee<br />

(TAC) meetings were held on June 30, July 22, August 15, September 22, and October 24, 2008 to provide project<br />

updates. Proposed conjunctive use was a major topic at those meetings. The results of the Feasibility Study was<br />

presented at Authority Board workshop on November 5, 2008. Comments on the Draft Source Feasibility Report were<br />

discussed at the TAC meeting on December 12, 2008. The Consultant is complete with the final report. The cooperative<br />

funding agreement with the Authority expired March 30, 2009. The Authority assured the District, the work will be<br />

complete, but the decision-making process on which projects will move forward into the next phase of design will<br />

continue until late spring 2009. Authority Staff has recommended the next source of water be from brackish groundwater<br />

and re-permitting the Peace River facility to utilize the allowable revised flow quantity from the middle Peace River MFL.<br />

Based on current demand projections, the Authority anticipates no new supply needed from 20<strong>10</strong>-2013, 3 mgd from<br />

2014-2019, 5 mgd from 2020-2023, and 8 mgd from 2024-2029. Current Status: The Final Source Feasibility Report was<br />

020 - Peace River Basin <strong>21</strong>1


H063<br />

PR/MRWSA Regional Resource Development Feasibility Study<br />

approved at the September 2, 2009 Authority Board meeting. Staff has received the final deliverables and is closing out<br />

the project.<br />

020 - Peace River Basin <strong>21</strong>2


H069<br />

PR/MRWSA Reg Loop System Ph 1A<br />

Project Type WS&R Dev.<br />

AOR(s)<br />

Water Supply<br />

Basin(s) General Fund (District), Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager FERGUSON, JOHN<br />

Task Manager(s)<br />

Status Ongoing<br />

Peace River/Manasota Regional Water Supply Auth.<br />

ARMSTRONG, BRIAN, GOODWIN, AUDRIE<br />

Description<br />

The Regional Integrated Loop System project is a series of transmission pipelines that will be developed to regionally<br />

transfer and deliver water from existing and future alternative supplies to demand centers within the Peace River<br />

Manasota Regional Water Supply Authority's four county region. This project will connect the water supply systems of<br />

the Authority, Charlotte County and the City of Punta Gorda so that the additional water from the recently expanded<br />

facility on Shell Creek can be shared regionally. Construction of the interconnect consists of approximately 12 miles of<br />

a 24 inch diameter line interconnecting the Shell Creek facility to the Peace River facility, and includes a sub-aqueous<br />

crossing of the lower Peace River. The project will have a minimum design capacity of 6 million gallons a day.<br />

Benefits<br />

Development of this project will integrate regional resources; maximize surface water for public supply; provide<br />

rotational capacity and the ability to rest sources; provide for reserve capacity for emergency transfers; provide<br />

alternatives to the development of groundwater in the Southern Water Use Caution Area (SWUCA); and better match<br />

supply, demand, and financial investment on a regional basis.<br />

Costs<br />

The total estimated cost for the Phase 1A project is $19,015,000, with the requested District's share being<br />

$12,007,500. The District funding is divided between the Governing Board, $6,003,750 (50%); the Manasota Basin<br />

Board, $4,382,738 (36.5%); and the Peace River Basin Board, $1,6<strong>21</strong>,012 (13.5%). Ad Valorum shares were<br />

budgeted in FY2008, and funding received from the West Central Florida Water Restoration Action Plan (WRAP) was<br />

applied in FY2009.<br />

$5,000,000 in WRAP funding was budgeted in FY2009 in place of Ad Valorum funding. When the availablity of<br />

the WRAP funding was evident, the District's FY2008 project budget was reduced from a total of $7,407,4<strong>10</strong> to<br />

$7,007,500. This reduction is not represented in the funding table below. The actual FY2008 shares were: Governing<br />

Board $3,503,750, Manasota Basin $2,557,738, Peace River Basin $946,012.<br />

Additional Information<br />

The Phase 1A pipeline was designed as an alternative to two separately proposed pipelines, the Authority's Integrated<br />

Regional Loop system Phase 1 (H050) and Charlotte County's Emergency Interconnect (L636). The original Phase 1<br />

route was designed to interconnect the Peace River and Shell Creek water treatment plants via an extension of the<br />

DeSoto County Regional Transmission System southward along US-17. Charlotte County was also planning to<br />

construct an emergency interconnect consisting of a sub-aqueous crossing of the Peace River, to interconnect the<br />

water supply systems of Charlotte County and Punta Gorda. Discussions were initiated in 2006 to combine the<br />

projects and achieve the benefits of both pipelines. The revised and expanded pipeline (H069), was approved by both<br />

Charlotte County and the Authority Board in June 2006. This expanded pipeline is designed to transfer up to 6 MGD<br />

between the Authority, Charlotte County, and Punta Gorda. In creating this interconnect, water provided by Punta<br />

Gorda to Charlotte County will offset the County's demand on the Peace River facility. This offset can then be made<br />

available to other Members of the Authority or placed into storage to create additional reliability for the regional<br />

system.<br />

The PRMRWSA Board awarded the design consultant contract to DMK Associates for Phase 1A in September 2007.<br />

Subsequently in October 17, 2007, the project was issued a notice to proceed. In February 2008, DMK presented the<br />

Preliminary Engineering Report which District staff reviewed. In June 2008, the Authority presented a draft of the Basis<br />

of Design Report to the District for review. District staff attended a meeting on the BODR, during which the pipeline<br />

route options were accepted. Also discussed was additional monitoring and treatment for water blending between<br />

treatment plants. The Cooperative Funding Agreement between the District and Authority was executed in September<br />

2008. The contract period is back-dated to July 25, 2007 and remain in effect through February 2012.<br />

In February, 2009, the Authority submitted a draft amendment to the existing interlocal agreement with Charlotte<br />

County and the City of Punta Gorda to reflect the current project. The amendment includes the sale transfer of the<br />

interconnect's northern segment. Charlotte County has already installed and put into service this 3000' long segment,<br />

which runs from the DeSoto/Charlotte County border southward to a connection by a new shopping center. The<br />

Authority intends to purchase this segment and anticipates the cost to be eligible for funding. South of the Peace<br />

020 - Peace River Basin <strong>21</strong>3


H069<br />

PR/MRWSA Reg Loop System Ph 1A<br />

River, an approximately 2 mile segment will utilize the City of Punta Gorda's existing infrastructure. The amendment<br />

allows for the shared capacity of this segment.<br />

On May 18, 2009, the Authority held a technical coordination meeting with Charlotte County's Utilities, Public Works,<br />

and Real Estate Services departments to discuss road crossings, right of way usage, and easement acquisitions.<br />

The original Phase 1 interconnect (H050), which would run east of Phase 1A and provide rotational capacity between<br />

the two water facilities, was resubmitted for FY20<strong>10</strong> funding but was postponed again in June 2009 due to economic<br />

challenges. The project will likely be resubmitted for District funding in FY2011.<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 3,7<strong>10</strong>,271 0 3,338 4,111<br />

0 3,717,720<br />

020 Peace River Basin 1,002,189 0 2,590 2,009<br />

0 1,006,788<br />

0<strong>21</strong> Manasota Basin 2,707,140 0 648 4,238<br />

0 2,712,026<br />

District Budgeted - Outside Revenue<br />

State Approp - WRAP - Prior Year<br />

Funds<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

0 0 5,000,000<br />

0<br />

0<br />

5,000,000<br />

Project Funds Not Budgeted by the<br />

District<br />

PRMRWSA 7,007,500 0 0<br />

0<br />

0 7,007,500<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$19,444,034<br />

Critical Project Milestones Projected Amended Actual<br />

Preliminary Design/Basis of Design 7/31/07 6/1/08<br />

Final Design 6/30/09<br />

Permitting / Property Aquisition 7/31/09<br />

Construction 8/1/11<br />

Contract Expires 2/1/12<br />

Status As Of: August <strong>10</strong>, 2009<br />

The Authority held a pre-qualification submittal meeting for interested contractors on August 7, 2009, and received<br />

comments from several contractors on the pre-qualification criteria. RFQs will be advertised on August 15-16, and<br />

submittals will be due by September 15. The Authority board will be asked to approve the list of pre-qualified contractors<br />

at their October 7, 2009 board meeting.<br />

Accelerate Florida Update: The Authority has been notified of the Accelerate Florida Program. Current<br />

design/permitting work is moving at an efficient pace. The Authority may consider including early completion bonuses in<br />

the construction contract. Permitting must be completed prior to construction commencement.<br />

020 - Peace River Basin <strong>21</strong>4


H072<br />

Polk County Comprehensive Water Supply Plan Joint Study<br />

Project Type WS&R Dev.<br />

AOR(s)<br />

Water Supply<br />

Basin(s) Alafia River, Peace River<br />

Cooperator(s)<br />

Project Manager GOODWIN, AUDRIE<br />

Task Manager(s)<br />

Status Ongoing<br />

Polk County, South Florida Water Management District<br />

ARMSTRONG, BRIAN<br />

Description<br />

The Polk County Comprehensive Water Supply Plan will identify and quantify viable public water supply and alternative<br />

water supply sources for various public utility systems within Polk County. Recommendations from the plan will include<br />

project definitions, specific actions, production rates, schedules, project costs and unit water costs. The total cost for<br />

the project is $955,318.<br />

Benefits<br />

Development of this plan will aid in the identification of viable water supply sources for Polk County's increasing water<br />

demands, and advance the preservation of natural resources in the Southern Water Use Caution Area (SWUCA) by<br />

selecting projects that support limited groundwater use.<br />

Costs<br />

As presented in the consultant's proposed Scope of Services and Fee Schedule, the total estimated cost for the<br />

project is $955,318 with the requested District's share being $382,127, SFWMD share being $95,532, and Polk<br />

County's share being $477,659. Total District funding budgeted in FY2009 is $382,127, divided between the<br />

Governing Board $191,063 (50%), the Peace River Basin Board $149,030 (39%), and the Alafia Basin Board $42,034<br />

(11%).<br />

The Funding table below shows the Cumulative Transfers of $477,659 in "District Budgeted - Ad Valorem Based<br />

Revenue" which was budgeted in FY2009 before the SFWMD share of $95,532 was incorporated. As a result, District<br />

Ad Valorem dollars of $95,532 will lapse at the end of fiscal year 2009.<br />

Additional Information<br />

Two previous planning studies were commissioned with District funding to investigate the water supply sources of Polk<br />

County. The current Polk County Comprehensive Water Supply Plan differs from the previous studies in that this plan<br />

will provide Polk County with feasible water supply options, schedules and cost estimates.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 0 238,830 9,946 8,360<br />

0 257,136<br />

011 Alafia River Basin 0 52,542 1,766 1,394<br />

0 55,702<br />

020 Peace River Basin 0 186,287 7,062 6,270<br />

0 199,619<br />

Project Funds Not Budgeted by the<br />

District<br />

Polk County 477,659 0 0<br />

0<br />

0 477,659<br />

SFWMD 95,532 0 0<br />

0<br />

0 95,532<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$1,085,648<br />

Critical Project Milestones Projected Amended Actual<br />

Governing Board Approval of Agreement 1/29/08 1/29/08<br />

Alafia River Basin Approval of Agreement 2/7/08 2/7/08<br />

Effective Contract Date 2/8/08 2/8/08<br />

020 - Peace River Basin <strong>21</strong>5


H072<br />

Polk County Comprehensive Water Supply Plan Joint Study<br />

Peace River Basin Approval of Agreement 2/8/08 2/8/08<br />

Notice to Proceed 2/8/08 2/8/08<br />

50% Completion 3/16/09 1/26/09<br />

Project Completion Date 12/31/09<br />

Contract Termination Date 7/31/<strong>10</strong><br />

Task Description<br />

Task 2 - Identify and Quantify Water Supply Alternatives <strong>10</strong>/15/08 12/15/08 12/15/08<br />

Task 3 - Current Water Supply and Deficit Analysis 12/15/08 12/15/08<br />

Task 4 - Treatment Transmission and Storage Analysis 3/16/09 3/20/09<br />

Task 5 - Implementation Plan 5/11/09 7/28/09 7/31/09<br />

Task 6 - Allowance for Other Detailed Investigations 11/9/09<br />

Task 1 - Project Progress and Coordination 11/9/09<br />

Status As Of: September 03, 2009<br />

Based on the recent results from the Kissimmee River Water Supply Feasibility Study and limitation of future water<br />

sources from outside its boundaries, Polk County (County) requested the District participate in a more detailed analysis<br />

of available ground water and alternative water supplies within Polk County. To fulfill the request of the County, a funding<br />

agreement was created effective from February 8, 2008 to July 31, 20<strong>10</strong>, between the District, Polk County, and<br />

SFWMD. This agreement was approved by the Polk County Board of County Commissioners on April 23, 2008 and was<br />

signed by all parties. The total estimated cost to complete the PCCWSP is $955,318 via a consulting services contract<br />

between the County and Reiss Environmental. The South Florida Water Management District (SFWMD) has agreed to<br />

provide <strong>10</strong> percent of the total project cost, reducing the District's share to 40 percent, or $382,127. On April 25, 2008<br />

District staff attended a meeting with Tampa Bay Water and Polk County to discuss potential opportunities for water<br />

supply to Polk County from Tampa Bay Water. The County and TBW completed a Memorandum of Understanding<br />

(MOU) to aid in the implementation of future collaborative efforts. TBW's Board approved the MOU on October 20, 2008,<br />

while the Polk County BOCC approved the MOU at its meeting on November 5, 2008. Additionally, the County is involved<br />

in several other initiatives to investigate water supply options. One option the County is evaluating is the potential for<br />

additional ground water in southeast Polk County. The County and SFWMD are coordinating to investigate this potential<br />

source as any withdrawals would be located within the SFWMD. The County is also coordinating with the STOPR group,<br />

which includes St. Cloud, Tohopekaliga Water Authority, Orange County, Osceola County, Polk County, and the Reedy<br />

Creek Improvement District. STOPR and SFWMD are currently investigating the potential for water supply from the<br />

Kissimmee River, which should be completed by the end of 2011. On February <strong>21</strong>, 2008, Polk County hosted the project<br />

kick-off meeting with attendance by SWFWMD, SFWMD, Polk County and Polk County Utilities. Reiss Environmental,<br />

Polk County's subconsultant, and Polk County participated in three information sessions with the District to discuss<br />

issues such as conservation, the Upper Peace River and Minimum Flows and Levels. In addition, SFWMD and Polk<br />

County continue to move forward on investigating the Lower Floridan Aquifer in southeast Polk County as a potential<br />

source. The notice to proceed with well construction was September 3, 2008. Throughout the projec, District, County,<br />

and SFWMD staff met to discuss the list of projects, review the progress of the plan and prepare for any upcoming Polk<br />

County BoCC or District Board meetings. At the October 30, 2008 Polk County BOCC workshop, Polk County staff and<br />

their consultant presented the ranked project lists to the Polk County Commissioners. At that time County Manager, Mike<br />

Herr, informed the board that the County was seeking concurrence on the short and long projects lists by the 17 cities<br />

and municipalities. To support this concurrence effort, District staff attended the Lakeland, Winter Haven, Polk City,<br />

Dundee and Frostproof City Council meetings at which the short and long project lists were approved unanimously.<br />

Auburndale, Davenport and Mulberry City Commissions also were in concurrence with the lists. At the December 17,<br />

2008 BoCC meeting, the Commission concurred with the short and long project list of water supply project options and<br />

voted to continue investigations of short list projects. The District reviewed and commented on all Technical<br />

Memorandums which included finalized reports on the Alafia and Peace River and the Conservation Analysis. By<br />

mid-May District staff completed visiting municipalities throughout Polk County to discuss conservation efforts and clarify<br />

demand projections. Additionally, District staff attended the April City Manager's meeting at which Polk County and their<br />

municipalities decided to delay the project until July to allow time to present the information to their city councils.<br />

Currently, District staff is monitoring the coring progress of the Southeast Wellfield, a potential source on the short list.<br />

ACTION-TO-DATE: On-time.<br />

This project is complete however District staff is waiting on final invoices to close out the project. The Final Report was<br />

submitted in July 2009. Presentations covering the results of the report were made at a a Polk County BOCC workshop<br />

on July 20, 2009, the District's Governing Board meeting on July 28, 2009 and the Polk County BOCC meeting on<br />

August 5, 2009. The SFWMD has a similar presentation scheduled for their Governing Board on October 14, 2009.<br />

Other ongoing District staff activities include monitoring the coring progress of the Southeast Wellfield, a potential source<br />

on the short list. District staff is also preparing an outreach effort to coordinate wiht Polk County's cities and<br />

municipalities regarding their water supply options.<br />

At the request of the Office of Governor Charlie Crist, the District has been communicating regularly with the cooperator<br />

020 - Peace River Basin <strong>21</strong>6


H072<br />

Polk County Comprehensive Water Supply Plan Joint Study<br />

concerning the Governor's Accelerate Florida initiative to stimulate Florida's economy. An information request was sent<br />

to the cooperator on October 15, 2008. District staff followed up with an email and phone call regarding the cooperator's<br />

efforts to accelerate the project. Since the project is both near completion and does not involve any construction<br />

activities, there are no needed tasks to accelerate the project.<br />

020 - Peace River Basin <strong>21</strong>7


H073<br />

Polk County SWRUSA Carter Rd 1 Billion Gallon Reclaim Storage &<br />

Pumping Station<br />

Project Type WS&R Dev.<br />

AOR(s)<br />

Water Supply<br />

Basin(s) General Fund (District), Alafia River, Peace River<br />

Cooperator(s)<br />

Polk County Utilities<br />

Project Manager NOURANI, MEHRSHAD<br />

Task Manager(s)<br />

Status Withdrawn<br />

Description<br />

This project consists of the planning, design, permitting and construction of a 1-billion gallon, lined storage reservoir<br />

and associated pumping and piping systems to connect to the SWRUSA Reuse System and the City of Lakeland's<br />

wetland disposal system. The reservoir will hold water that is captured from the City's wetland treatment system for<br />

reclaimed water and wet-weather flows from the County's reclaimed water system. The captured water will be later<br />

pumped, filtered and treated to be used for irrigation on residential lawns, commercial landscapes and recreational<br />

grounds. Additional piping to be designed and constructed with this project is 8,150 ft of pipe along Carter Rd from the<br />

reservoir site to connect to the County's reuse transmission line on County Rd 540A. This line will improve pressures<br />

and reliability within the eastern portion of the SWRUSA reclaimed water system and to add additional users. The<br />

project will be undertaken in 3 phases, the first of which would confirm the feasibility and the available yield from a<br />

cooperative Polk County and City of Lakeland reclaim water system and the design of the Carter Rd Extension. The<br />

feasibility study will also determine the number and type of reclaimed water customers for the City of Lakeland (date to<br />

be determined). The second phase, for which FY2009 funds are requested, will provide the design and permitting for<br />

the reservoir system, the execution of an interlocal agreement with the City to share the land and/or right of way, and<br />

to prepare a management plan for the water resource. The third phase will consist of the construction.The County has<br />

2,398 connections (959,200 gpd) in existing or identified future connections that can be served with irrigation water<br />

supplied from this project. The type of customers include residential, industrial and commercial. The number of<br />

customers for the City of Lakeland will be determined upon completion of the feasibility study being conducted<br />

cooperatively by the County and the City.<br />

Benefits<br />

The City's projected potable water demand is 2 MGD and the County has 2,398 connections (959,200 GPD) in existing<br />

reclaimed water dry-lined or identified future connections that could be served with irrigation water supplied from this<br />

project. The related potable offset of the reuse piping along Carter Road is estimated to be 158,000 gallons per day.<br />

Also, this porject will improve pressures and reliability within the eastern portion of the SWRUSA reclaimed water<br />

system and to add additional users.<br />

Costs<br />

Total cost of the project over 3 fiscal years is $18,<strong>21</strong>5,628. Total District share is approximately $9,<strong>10</strong>7,814.<br />

Requested FY2009 funding from the District is $342,500 for the design, and will be shared by the Governing and Basin<br />

Boards associated with the population of Polk County's and Lakeland's service areas that will receive the project<br />

benefits, as follows: Governing Board = $171,250 (50%); Alafia River Basin = $34,250 (<strong>10</strong>%); Peace River Basin =<br />

$137,000 (40%). The remaining $8,765,314 will be requested for funding in the following years. Alafia River Basin<br />

Board encumbered $36,043 in FY 2009 and Peace River Basin Board encumbered $138,568 in FY2009.<br />

Additional Information<br />

The City's projected demand is 2 million gallons per day and the County has .959 mgd of potable water demand. The<br />

County has identified 2,398 existing and future residential reclaimed water connections with 959,200 gallons per day<br />

reclaimed water flow. The related potable offset of the reuse piping along Carter Road is estimated to be 158,000<br />

gallons per day. The County and the City are currently finalizing an intergovernmental agreement which assigns to<br />

each party responsibility for the cost and maintenance of the system. The County and the City are currently<br />

conducting a feasibility study (not cost to the District) to confirm the benefits and viability of this project. When<br />

finalized, the District will review the study results to confirm District's future funding of this project. The results of the<br />

study will be available by the end of March 2008.<br />

020 - Peace River Basin <strong>21</strong>8


H073<br />

Polk County SWRUSA Carter Rd 1 Billion Gallon Reclaim Storage &<br />

Pumping Station<br />

Prior Cumulative FY 2009 FY20<strong>10</strong><br />

Funding Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0 0 174,237<br />

0<br />

0<strong>10</strong> General Fund (Districtwide) 0 174,237<br />

011 Alafia River Basin 0 0 36,007<br />

0<br />

0 36,007<br />

020 Peace River Basin 0 0 138,532<br />

0<br />

0 138,532<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$348,776<br />

Critical Project Milestones Projected Amended Actual<br />

Contract Execution 12/31/08<br />

Notice to Proceed for Study 3/1/09<br />

Feasibility Study Completion 9/30/09<br />

Land Acquisition/Right of Way 6/30/<strong>10</strong><br />

Design/Permitting 9/30/<strong>10</strong><br />

Construction Completion 9/30/12<br />

Status As Of: November 06, 2008<br />

The County is expected to withdraw from this project because the City of Lakeland is no longer a partner to the County in<br />

this initiative. This project was expected to deliver a 1-billion gallon, lined storage reservoir and associated pumping and<br />

piping systems to be connected to the SWRUSA Reuse System and the City of Lakeland's wetland disposal system. The<br />

Carter Road reservoir was expected to hold water captured from the City's wetland treatment system for reclaimed water<br />

and wet-weather flows from the County's reclaimed water system. The captured water would have been pumped, filtered<br />

and treated for irrigation on residential lawns, commercial landscapes and recreational grounds. However, the City of<br />

Lakeland recently entered into a cooperatively funded reclaimed water project with the District and other partners to<br />

provide reclaimed water for industrial and commercial use within the County.<br />

020 - Peace River Basin <strong>21</strong>9


H076<br />

Regional Reclaimed Water Partnership Initiative<br />

Project Type WS&R Dev.<br />

AOR(s)<br />

Water Supply, Water Quality<br />

Basin(s) General Fund (District), Alafia River, Peace River<br />

Cooperator(s)<br />

Tampa Electric Company<br />

Project Manager RAMOY, ALISON<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This alternative water supply project is proposed to maximize the beneficial use of reclaimed water flows that are not<br />

currently being beneficially used by the City of Lakeland, and potentially other utilities, such as Polk County, Plant City,<br />

Mulberry and Hillsborough County. The project is best described as being composed of two elements. The first<br />

element is a traditional reclaimed water supply project consisting of transmission pipelines and storage to provide<br />

reclaimed water to industrial users from one or more domestic wastewater treatment facilities. This element is<br />

proposed to be implemented in at least two phases.<br />

Phase I consists of the design and construction of approximately 15 miles of reclaimed water transmission main from<br />

the City of Lakeland's wastewater effluent wetland treatment system to the Tampa Electric Company's (TECO) Polk<br />

Power Station (WUP# 11747) for power generation expansion (Unit 6). Phase I also includes the additional treatment<br />

necessary, including one deep disposal well, for TECO to treat the water to an acceptable level for cooling and other<br />

potential uses.<br />

Phase II , of the first element, may bring additional reclaimed water to TECO to meet additional power generation<br />

expansion needs at the Polk Power Station (Unit 7). Phase II may also provide reclaimed water to customers in<br />

addition to TECO, such as Mosaic. It is likely that storage will be necessary for this phase, which could involve the<br />

reclamation and conversion of Mosaic's N-5 Reservoir to a reclaimed water storage reservoir. The source of<br />

reclaimed water for this second phase is being evaluated and could include Hillsborough County's Valrico Wastewater<br />

Treatment Facility. District staff and project participants will be ensuring the project infrastructure, including pipe<br />

capacities, are sized appropriately in anticipation of future flows that may be used to serve other users.<br />

Recharge is being explored as part of the second element, which is more innovative in concept and seeks to create<br />

opportunities for additional potable groundwater withdrawals in the SWUCA through direct or indirect recharge of<br />

reclaimed water into the Upper Floridan aquifer in southern Hillsborough County and/or western Polk County. FY2008<br />

funding was approved by the Governing Board to be used for the initiation of a feasibility study to be conducted by a<br />

specialized consultant to investigate treatment needs, costs and water resource benefits (potential new groundwater<br />

withdrawals) achieved through direct or indirect recharge of reclaimed water into the Upper Floridan aquifer. The<br />

feasibility study is being solely funded and managed by the District.<br />

Benefits<br />

The implementation of Phase I will provide TECO with approximately 6 mgd of an alternative water source for power<br />

generation expansion at the Polk Power Station. While flows have not been finalized, Phase II will provide TECO with<br />

reclaimed water for a future power generation expansion. Discussions with potential Phase II project participants<br />

have revealed that additional reclaimed water flows may be utilized by other customers, such as Mosaic. Utilization of<br />

reclaimed water will eliminate surface water discharges, ultimately resulting in a reduction of nitrogen loading to Tampa<br />

Bay. The potential project benefit of recharge to the Upper Floridan aquifer of the SWUCA in the vicinity of southern<br />

Hillsborough County or western Polk County is being explored and if feasible could provide for additional groundwater<br />

withdrawals in the SWUCA.<br />

Costs<br />

Phase I is estimated to cost $65,686,800, and the District is being asked to fund 50 percent, or $32,843,400. The<br />

funding approved for Phase I in FY2009, includes $8,354,642 from the Governing Board, $2,540,354 from the Alafia<br />

River Basin Board, and $5<strong>21</strong>,640 from the Peace River Basin Board, for a total of $11,416,636 in District funding. An<br />

additional $2,500,000 from the Water Restoration Action Plan Fund has been allocated to Phase I in FY2009. The<br />

funding approved in FY20<strong>10</strong> for Phase I includes $5,000,000 from the Governing Board, $1,611,780 from the Alafia<br />

River Basin Board, and $600,000 from the Peace River Basin Board, for a total of $7,<strong>21</strong>1,780 in District funding.<br />

Though the Manasota Basin Board approved $31,250 in FY2009, the funding was returned to the Basin Board due to<br />

further project refinement, which does not include a water resource benefit in this basin. The Governing Board also<br />

allocated $50,000 from the FY2008 budget to assist TECO in the cost analyses of evaluating potential reclaimed water<br />

supply routes for Phase I. However, a route was selected without having to utilize the $50,000 that was set aside, so it<br />

was returned to the Governing Board's Water Supply and Resource Development Reserves (H<strong>10</strong>0).<br />

Phase II has not yet been initiated. The preliminary cost estimate is $70,000,000.<br />

Recharge: The Governing Board also allocated $500,000 from the FY2008 budget to be used for a feasibility study to<br />

020 - Peace River Basin 220


H076<br />

Regional Reclaimed Water Partnership Initiative<br />

investigate reclaimed water aquifer recharge.<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 0 500,000 8,356,093 5,011,656 6,732,493 20,600,242<br />

011 Alafia River Basin 0 1,500,000 1,046,983 1,620,040 3,366,246 7,533,269<br />

020 Peace River Basin 0 0 528,269 608,260 3,366,246 4,502,775<br />

0<strong>21</strong> Manasota Basin 0 0 32,701<br />

0<br />

0 32,701<br />

District Budgeted - Outside Revenue<br />

State Approp - WRAP - Prior Year<br />

Funds<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

0 2,500,000 0<br />

0<br />

0<br />

2,500,000<br />

Project Funds Not Budgeted by the<br />

District<br />

TECO 0 0 5,623,015 17,239,935 8,730,450 31,593,400<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$66,762,387<br />

Critical Project Milestones Projected Amended Actual<br />

Phase I<br />

Agreement Effective <strong>10</strong>/1/08 <strong>10</strong>/1/08<br />

Agreement Executed 12/31/08 2/24/09<br />

Begin Infrastructure Design 3/15/09<br />

Begin Disposal Well Design 3/1/<strong>10</strong><br />

Begin Water Quality Testing 8/31/<strong>10</strong><br />

Complete Disposal Well Design 9/30/<strong>10</strong><br />

Begin Disposal Well Construction 1/1/11<br />

Complete Infrastructure Design 3/31/11<br />

Begin Infrastructure Construction 4/30/11<br />

Complete Water Quality Testing 4/30/13<br />

Complete Infrastructure Construction 4/30/13<br />

Complete Disposal Well Construction 4/30/13<br />

Phase I Completion 1/31/14<br />

Phase I Contract Closeout 12/31/14<br />

Recharge<br />

Begin Aquifer Recharge Study <strong>10</strong>/1/08 <strong>10</strong>/1/08<br />

Complete Aquifer Recharge Study 3/31/09 3/31/09<br />

Status As Of: September 03, 2009<br />

Phase I: The District has allocated a total of $11,416,636 in FY2009 towards completion of the project. An additional<br />

$2,500,000 from the WRAP fund was also allocated in FY2009. The Cooperative Funding Agreement was approved by<br />

the Governing Board, and subsequently signed by the Executive Director, on February 24, 2009. Additional funding was<br />

approved for FY20<strong>10</strong>. TECO has submitted a revised project schedule in which many of the milestone dates have<br />

changed since certain tasks will now be initiated before others. The project schedule will be adjusted accordingly.<br />

ACTION TO DATE: On time. TECO issued the Request for Qualifications (RFQ) for (1) preliminary engineering and (2)<br />

oversight of well construction and the drilling contractor on June 8 and June 15, respectively. A Request for Proposal<br />

(RFP) for construction of a Class I Exploratory Injection Well was also released on June 19. Selections are forthcoming.<br />

Recharge: The Governing Board approved a $500,000 transfer from the FY2008 budget to be used for the feasibility<br />

study. All project tasks have been completed. The results of the project were presented to the Governing Board on<br />

March 31, 2009. District staff is received requests for FY20<strong>10</strong> funding to conduct feasibility analyses of two direct aquifer<br />

020 - Peace River Basin 2<strong>21</strong>


H076<br />

Regional Reclaimed Water Partnership Initiative<br />

recharge projects and two indirect recharge projects. These feasibility studies will expand upon the work done for the<br />

RRWPI project and will assess site specific hydrogeologic conditions and costs.<br />

020 - Peace River Basin 222


H079<br />

PRMRWSA Regional Resource Development - Phase I<br />

Project Type WS&R Dev.<br />

AOR(s)<br />

Water Supply<br />

Basin(s) General Fund (District), Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager MORRIS, LISANN<br />

Task Manager(s)<br />

Status Ongoing<br />

Peace River/Manasota Regional Water Supply Auth.<br />

FERGUSON, JOHN<br />

Description<br />

The Regional Resource Development program will, in several phases, develop up to 35 mgd in average daily capacity<br />

of alternative/conjunctive drinking water supplies based on results of the Authority's Source Water Feasibility Study<br />

(H063). The new capacity is needed to meet regional reliability targets and growing regional needs. The new supplies<br />

are proposed for development at Shell/Prairie Creek, Cow-Pen Slough/Dona Bay, Upper Myakka/Flatford, and the RV<br />

Griffin Reserve. In May/June 2009 the Authority Board is scheduled to consider which alternative/conjunctive supply<br />

projects to move into preliminary design, so no specific project is available to review at this time.<br />

Benefits<br />

The Regional Resource Development program will focus on the objectives listed below: 1) Maximize surface water for<br />

public supply which in turn limits development pressure on groundwater in the SWUCA; 2) Provide rotational and<br />

reserve capacity enabling improved resource management opportunities such as source resting; 3) Participate in<br />

conjunctive projects that improve resource conditions while yielding economical water supply; 4) Optimize the regional<br />

financial investment in water supply and transmission capacity.<br />

Costs<br />

Because the process to chose the next project is taking longer than originally anticipated no additional funds will be<br />

allocated to this project for FY20<strong>10</strong>. Because the specific resource configuration has not been chosen yet, the District<br />

has set aside $600,000 from the West-Central Florida Water Resource Action Plan funding for FY2009. Total project<br />

cost of developing all three sources has a conceptual estimate of $514,000,000 with the District share including the<br />

WRAP funding at $257,000,000.<br />

Additional Information<br />

The Peace River/Manasota Regional Water Supply Authority (Authority) is comprised of Charlotte, DeSoto, Manatee<br />

and Sarasota Counties. In accordance with its Master Water Supply Contract, the Authority is obligated to timely<br />

develop and deliver new water supply sources and facilities to meet the needs of its customers. The Authority's<br />

Integrated Master Water Supply Master Plan (December 2006 draft) identified a need of up to 51.4 mgd of additional<br />

supply development to reliably meet member demands by 2025, and also evaluated six potential supply sources to<br />

meet future needs. The Source Water Feasibility study, initiated in July 2007 focus' on the three sources identified<br />

above as the highest potential future sources for the region. Though demand projections from members and<br />

customers has decreased development of new sources will be conducted in phases during the next 20 years to meet<br />

growing demands and critical system reliability requirements.<br />

020 - Peace River Basin 223


H079<br />

PRMRWSA Regional Resource Development - Phase I<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 0 0 11,381 8,252 66,535,863 66,555,496<br />

020 Peace River Basin 0 0 3,643 2,553 25,441,139 25,447,335<br />

0<strong>21</strong> Manasota Basin 0 0 8,550 4,046 70,394,877 70,407,473<br />

District Budgeted - Outside Revenue<br />

State Approp - WRAP - Prior Year<br />

Funds<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

0 0 600,000<br />

0<br />

0<br />

600,000<br />

Project Funds Not Budgeted by the<br />

District<br />

PR\MRWSA 0 0 600,000 15,750,000 161,950,000 178,300,000<br />

Status As Of: September 03, 2009<br />

Total:<br />

Future<br />

Funding<br />

Status History: On November 5, 2008, the options from the H063 Feasibility Study were formally presented to the<br />

Authority board. These options include: three potential reservoir sites in the Upper Myakka Basin and a new surface<br />

water treatment facility, yielding <strong>10</strong> mgd; three potential reservoir sites by Shell and Prairie creeks and expansion of the<br />

existing facility on Shell Creek, for an additional 12 to 20 mgd; the Dona Bay option of diverting water from Cow Pen<br />

Slough to a reservoir on the Venice Minerals site, then transmitting stored water to a surface water treatment expansion<br />

at the Carlton plant, yielding an additional 5 to 15 mgd; and the development of new or existing brackish groundwater<br />

wells to yield an estimated 5 mgd. $600,000 in WRAP funds has been budgeted by the District for the development of<br />

the selected project. A funding agreement between the District and Authority was executed in December 2008 to secure<br />

these funds. A meeting was held with the Authority on May 1, 2009. With the current funding, they are looking to do some<br />

brackish groundwater exploration after a consultant is chosen for the next phase. Memorandums of Understanding<br />

(MOU) are being developed for water supply projects with potential partners to assist with the development and<br />

scheduling of future water sources. At the June 3, 2009 PRMRWSA Board <strong>Meeting</strong> MOUs with the City of Punta Gorda<br />

and DeSoto County were approved. The Punta Gorda project is a 5 to 8 mgd brackish water groundwater supply. The<br />

DeSoto County project is an up to 5 mgd brackish groundwater supply. The next step then in the process is to develop a<br />

contract for the specific project providing details of items such as operation, ownership etc.Current Status: The Authority<br />

continues to meet with potential partners on developing regional water supply projects for this next phase.<br />

020 - Peace River Basin 224<br />

Total<br />

Funding<br />

$341,3<strong>10</strong>,304


H080<br />

Polk Central Florida Water Resource Development Project<br />

Project Type WS&R Dev.<br />

AOR(s)<br />

Water Supply<br />

Basin(s) Alafia River, Peace River<br />

Cooperator(s)<br />

Polk County Utilities<br />

Project Manager GOODWIN, AUDRIE<br />

Task Manager(s)<br />

Status Ongoing<br />

ARMSTRONG, BRIAN<br />

Description<br />

The Polk Central Florida Water Resource Development Project will implement a water resource sustainability<br />

project/program as described in the West Central Florida Water Restoration Action Plan. The project will also be<br />

consistent with the current Regional Water Supply Plan and the Polk County Comprehensive Water Supply Plan<br />

(H072).<br />

Benefits<br />

This project/program will aid in the development of viable water supply sources for Polk County's increasing water<br />

demands, and advance the preservation of natural resources in the Southern Water Use Caution Area (SWUCA) by<br />

providing alternatives to groundwater use.<br />

Costs<br />

The total estimated alternative water supply (AWS) demand for Polk County is <strong>10</strong> mgd, which will result in a total<br />

project cost of $150,000,000 as detailed in the District's Long-Range Water Supply and Resourde Development<br />

Funding Plan (Financial Engine). To date this project has received $5,013,750 in legislative appropriation and it has<br />

been allocated towards projects on the Polk County Comprehensive Water Supply Plan Short List including $2.5<br />

Million to H076 Regional Reclaimed Water Partnership Initiative. The remaining $2,513,750 in legislative<br />

appropriation for this project (H080) were transferred/lapsed and then rebudgeted to the projects selected by<br />

Polk County as detailed below. The transferred appropriations will be matched by the cooperator and the District within<br />

each project. As a result of all funding being transferred, this project (H080) is closed out. The proposed District<br />

FY20<strong>10</strong> Request of $1,256,875 will no longer be attributed to H080 but to each specific project selected by Polk<br />

County.<br />

A total of $1,0<strong>10</strong>,973 will be transferred to H090 and divided between the Governing Board ($505,487), and the Peace<br />

River Basin Board ($505,486). A total of $833,332 will be transferred/lapsed and rebudgeted to H091 and divided<br />

between the Governing Board ($416,666), Peace River Basin Board ($208,333) and Alafia River Basin Board<br />

($208,333 - lapsed). A total of $669,445 will be transferred/lapsed and rebudgeted to N024 and divided between the<br />

Peace River Basin Board ($66,945) and Hillsborough River Basin Board ($602,500 - lapsed). The below funding table<br />

will reflect the lapsed and rebudgeted funds after October 1, 2009.<br />

Additional Information<br />

The Polk County Comprehensive Water Supply Plan (H072) identified viable public water supply sources and<br />

alternative water supply sources for various public utility systems within Polk County. As part of the Water Supply<br />

Plan, initially source options were ranked but were later revised to include individual City Implementation Plans for<br />

each municipality. The Water Supply Plan was completed in July 2009 and the projects selected by Polk County for<br />

the Polk Central Florida Water Resource Development project are anticipated to begin in FY2009/FY20<strong>10</strong>.<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 0 (922,153) 0<br />

0<br />

0 (922,153)<br />

020 Peace River Basin 0 (780,764) 0<br />

0<br />

0 (780,764)<br />

District Budgeted - Outside Revenue<br />

State Approp - WRAP - Prior Year<br />

Funds<br />

Prior<br />

Funding<br />

020 - Peace River Basin 225<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

0 (2,500,000) 5,013,750<br />

0<br />

Total:<br />

Future<br />

Funding<br />

0<br />

Total<br />

Funding<br />

2,513,750<br />

$8<strong>10</strong>,833


H080<br />

Polk Central Florida Water Resource Development Project<br />

Status As Of: September 08, 2009<br />

The Polk County Comprehensive Water Supply Plan (PCCWSP) (H072) was completed in July 2009. A preliminary list of<br />

projects from the Water Supply Plan was available in December 2008 to aid in the selection of an alternative water<br />

supply project. On December 17, 2008 the Polk County Board of County Commissioners (BOCC) approved the<br />

agreement with the District designating approximately $2.5 million in West Central Florida Restoration Action Plan<br />

(WRAP) funds to Alternative Water Supply (AWS) projects listed on the PCCWSP (H072) - short list. On August 5, 2009<br />

the Polk County BOCC approved the PCCWSP. In a letter dated May 14, 2009 Polk County prioritized projects to receive<br />

WRAP funds and decided to fund the following three projects: (1) Polk County NERUSA Holly Hill Reclaimed Water<br />

Storage and Pumping and Lower Floridan Aquifer Well (H090); (2) Polk County SWRUSA Reclaimed Water Connection<br />

to TECO (H091); and (3) Polk County NWRUSA Reclaimed Water Storage and Pumping Station (N024). As mentioned<br />

above in the Cost Section of this report, WRAP and District appropriations will be transferred to the projects selected by<br />

Polk County (H090, H091 and N024) and resulting in the closing of this project number (H080).<br />

020 - Peace River Basin 226


H084<br />

Arcadia-DeSoto Interconnect<br />

Project Type WS&R Dev.<br />

AOR(s)<br />

Water Supply<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

City of Arcadia<br />

Project Manager FERGUSON, JOHN<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This interconnect will provide the City of Arcadia an alternative source of water while conserving 73 million gallons a<br />

year of treated potable water. The project consists of the construction of approximately 1200 feet of transmission main,<br />

backflow prevention device, meter, flow control valve, telemetry and other required valving and fittings necessary to<br />

interconnect the DeSoto County regional transmission and distribution water main to the City of Arcadia's raw water<br />

main. Currently, DeSoto County has to flush an average of approximately 200,000 gallons of treated water per day in<br />

order to meet water quality standards and maintain satisfactory chlorine residual within their existing regional<br />

transmission line from the PRMRWSA. The construction of the proposed interconnect will allow DeSoto County to<br />

send water to the City of Arcadia raw water main where it can be utilized to offset water withdrawn from the<br />

Intermediate Aquifer. It is anticipated that the imported water will reduce the City of Arcadia's groundwater withdrawals<br />

by approximately 33 gallons per household per day.<br />

Benefits<br />

The goal of this project would be to offset existing groundwater withdrawals by beneficially using water that is currently<br />

being discharged into a stormwater pond as a result of required flushing. The project would increase proper utilization<br />

of the water resources within the District's jurisdiction through more efficient use of the existing Desoto County water<br />

supplies. Upon completion, the project will provide an additional source of water for the City of Arcadia while reducing<br />

the amount of groundwater being withdrawn from the Intermediate Aquifer.<br />

Costs<br />

The total estimated cost of the project is $150,000 with the requested District share being $112,500 (75%, as<br />

applicable for REDI communities.) The District funding will be divided between the Governing Board, $56,250 (50%);<br />

and the Peace River Basin, $56,250 (50%). District funding is budgeted in FY20<strong>10</strong>.<br />

Project engineering costs are estimated to be $30,000 and construction is estimated at $120,000.<br />

Additional Information<br />

The City of Arcadia requested a reduction in the matching funds based on the Rural Economic Development Initiative<br />

(REDI) since the City meets the requirements for a economically distressed rural community as defined by S.<br />

288.0656. The estimated cost/benefit ratio for this project, calculated at an 8% APR over 5 years is $0.50 per<br />

thousand gallons based on a 5 year interconnect agreement between DeSoto and Arcadia and an anticipated savings<br />

of 200,000 gpd. Project advertising for bids are expected begin by November 1, 2009, construction start up anticipated<br />

on January 1, 20<strong>10</strong>, and substantial completion by March 1, 20<strong>10</strong>.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 0 0 0 56,858<br />

0 56,858<br />

020 Peace River Basin 0 0 0 57,098<br />

0 57,098<br />

Project Funds Not Budgeted by the<br />

District<br />

City of Arcadia 0 0 0 37,500<br />

0 37,500<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$151,456<br />

Critical Project Milestones Projected Amended Actual<br />

020 - Peace River Basin 227


H084<br />

Arcadia-DeSoto Interconnect<br />

Finalize Interconnect Agreement <strong>10</strong>/1/09<br />

Complete Interconnect Design <strong>10</strong>/30/09<br />

Execute agreement with District <strong>10</strong>/30/09<br />

Begin Construction 1/4/<strong>10</strong><br />

Activate Interconnect 3/1/<strong>10</strong><br />

Status As Of: August 31, 2009<br />

The City has authorized Hazen and Sawyer as the project consultant. The consultant is currently preparing the<br />

preliminary design report. The City of Arcadia and DeSoto County are currently developing their interlocal agreement for<br />

the transfer/purchase of water.<br />

020 - Peace River Basin 228


H085<br />

Charlotte County Regional Reclaimed Water Expansion Phase 2<br />

Project Type WS&R Dev.<br />

AOR(s)<br />

Water Supply, Water Quality<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Charlotte County Utilities<br />

Project Manager BADER, TAMMY<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This regional alternative water supply project involves the design and construction of new reclaimed water pipeline,<br />

and also uses existing and abandoned pipeline, to interconnect the east and west service areas of Charlotte County's<br />

reclaimed water system. The regional project consists of the design and construction of 17,500 linear feet of 12-inch<br />

diameter reclaimed water transmission main to be constructed from end of the pipeline, in the eastern part of the<br />

county, constructed as part of Cooperative Funding Initiative Project Number H027 to an existing, abandoned pipe<br />

located on the bridge that crosses the Myakka River. Construction continues from the existing pipeline on the bridge to<br />

reclaimed water storage and pumping facilities located on the site of the West Port Wastewater Reclamation Facility in<br />

the western part of the county. This project will complete the regional line enabling the county to move reclaimed water<br />

flows from an area of lower demand in the west to an area of higher demand in the east. The project also involves the<br />

design and construction of 1,075 gpm in pumping, for an increase from 425 gpm to 1500 gpm, and a 5 MG lined<br />

storage pond, increasing the pond storage from <strong>10</strong> MG to 15 MG, at the West Port site. These facilities are necessary<br />

to consistently meet the reclaimed water demand of existing customers and to take full advantage of the storage<br />

capacity of the reclaimed water ASR well which is to be constructed on the site of the Rotonda WRF as part of<br />

Cooperative Funding Initiative Project Number L<strong>21</strong>5.<br />

Benefits<br />

This project will complete regionalize Charlotte County's reclaimed water system by interconnecting the wastewater<br />

treatment facilities and providing the ability to move flows from areas of low demand to areas of high demand, while<br />

taking full advantage of seasonal and diurnal storage within the system. As a result, reclaimed water flows can be<br />

maximized throughout the service area.<br />

Costs<br />

The total cost of this project is estimated to be $2,800,000, of which, because this is part of a regional effort to<br />

increase the use of reclaimed water, the Peace River Basin and Governing Boards are requested to fund 50 percent,<br />

or $1,400,000. Funding in the amount of $400,000 (split between the Peace River Basin and Governing Board) has<br />

been budgeted in FY20<strong>10</strong> and it is expected that $1,000,000 ($500,000 from the Peace River Basin and $500,000<br />

from the Governing Board) will be requested in future years. No cost-benefit is calculated for this project, as it is<br />

associated with the regional benefits achieved with H027. The future funds identified for the project are contingent<br />

upon approval of such amounts by the District Governing and Basin Boards in the annual budget(s).<br />

Additional Information<br />

This project competes the regional trunk line that will permit transmission of public access reclaimed water from the<br />

East Port WRF located in Central County to the Rotonda WRF located on the Cape Haze peninsula which is<br />

connected to the West Port WRF via an existing transmission main. The project is to be constructed in three stages:<br />

Stage 1 construction will complete the transmission main to the West Port WRF; Stage 2 will increase the pumping<br />

capacity at West Port from the current 425 gpm to approximately 1,500 gpm and will also provide piping and metering<br />

to permit pumping of reclaimed water back across the Myakka River to users located in Central County on SR 776<br />

whenever necessary; Stage 3 will consist of construction of the 5 MG reclaimed water storage pond. Of the total<br />

project cost of $2,800,000, approximately 89 percent ($2,500,000) is expected to be needed for construction, and the<br />

remainder ($300,000) for design and administration.<br />

020 - Peace River Basin 229


H085<br />

Charlotte County Regional Reclaimed Water Expansion Phase 2<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 0 0 0 202,080 500,000 702,080<br />

020 Peace River Basin 0 0 0 201,395 500,000 701,395<br />

Project Funds Not Budgeted by the<br />

District<br />

Charlotte County 0 0 0 1,400,000<br />

0 1,400,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$2,803,475<br />

Critical Project Milestones Projected Amended Actual<br />

Execute Agreement 11/30/09<br />

Commence Design 1/1/<strong>10</strong><br />

Complete Design Stage 1 5/1/<strong>10</strong><br />

Complete Design Stage 2 7/1/<strong>10</strong><br />

Commence Construction Stage 1 8/1/<strong>10</strong><br />

Complete Design Stage 3 <strong>10</strong>/1/<strong>10</strong><br />

Commence Construction Stage 2 11/1/<strong>10</strong><br />

Complete Stage 1 Construction 2/1/11<br />

Commence Stage 3 Construction 2/1/11<br />

Complete Stage 2 Construction 5/1/11<br />

Complete Stage 3 Construction <strong>10</strong>/1/12<br />

Contract Close-out <strong>10</strong>/1/13<br />

Offset Report <strong>10</strong>/1/14<br />

Status As Of: August 31, 2009<br />

A scope of work has been received from the cooperator. A cooperative funding agreement has been prepared and is<br />

expected to be executed late in 2009 or early in 20<strong>10</strong>. To date, $400,000 has been budgeted, of which $0 has been<br />

reimbursed.<br />

020 - Peace River Basin 230


H087<br />

City of Punta Gorda Reverse Osmosis Facility<br />

Project Type WS&R Dev.<br />

AOR(s)<br />

Water Supply, Water Quality, Natural Systems<br />

Basin(s) General Fund (District), Peace River, Manasota<br />

Cooperator(s)<br />

City of Punta Gorda<br />

Project Manager FERGUSON, JOHN<br />

Task Manager(s)<br />

MORRIS, LISANN<br />

Status Proposed<br />

Description<br />

This project is a Reverse Osmosis (RO) facility to be co-located with the City of Punta Gorda's existing <strong>10</strong> mgd water<br />

treatment facility. The RO facility would provide 2 mgd of treated brackish groundwater for blending with treated<br />

surface water to reduce levels of Total Dissolved Solids (TDS). This project would also provide water to the four county<br />

region (Charlotte, Sarasota, Desoto, and Manatee) through the Peace River Manasota Regional Water Supply<br />

Authority's Phase 1A Interconnect (H069). Project components would include final design\permitting and construction.<br />

Benefits<br />

Construction of the RO facility for brackish groundwater treatment will provide a blending source to reduce levels of<br />

TDS, which would improve the quality and seasonal reliability of the surface water treatment facility. The brackish<br />

water could be used as an alternative source and could potentially serve as a future recovery strategy for proposed<br />

MFLs on Shell Creek. The City has indicated in their application this water would be available to the Peace River<br />

Manasota Regional Water Supply Authority.<br />

Costs<br />

The City estimated the total project cost at $36,700,000. The City budgeted $1,000,000 in FY2009 for the project, prior<br />

to submitting a District funding request. The total District eligible cost through construction is estimated at<br />

$35,700,000, with $17,850,000 in funding requested. The anticipated District FY20<strong>10</strong> funding is scheduled as:<br />

Governing Board $1,000,000, Manasota Basin Board $500,000, and the Peace River Basin Board $270,000.<br />

Additional Information<br />

The City currently has an interlocal agreement to transfer 1 mgd under the Authority's GAP permit. The GAP permit<br />

expires on January 30, 2013. This project, along with the development of an off-line reservoir, are under examination<br />

as part of an MFL recovery strategy for Shell Creek. The 2 mgd RO facility may employ some of the City's existing<br />

ASR wells transitioned into brackish water supply wells. A deep injection well will be required to dispose of RO<br />

concentrate. The treated groundwater will be used conjunctively with surface water when TDS levels are high during<br />

periods of drought. The RO facility may be incrementally expanded to 8 mgd in future phases, based on the<br />

permittability of brackish groundwater sources. Additional aquifer performance data will be required to determine total<br />

groundwater availability in the area. Future phases of the RO facility may also be designed for the treatment of surface<br />

water with high TDS levels.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 0 0 0 1,004,694 7,925,000 8,929,694<br />

020 Peace River Basin 0 0 0 272,607 2,139,750 2,412,357<br />

0<strong>21</strong> Manasota Basin 0 0 0 503,763 6,015,250 6,519,013<br />

Project Funds Not Budgeted by the<br />

District<br />

City of Punta Gorda 0 0 1,000,000 2,000,000 14,850,000 17,850,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$35,711,064<br />

Critical Project Milestones Projected Amended Actual<br />

020 - Peace River Basin 231


H087<br />

City of Punta Gorda Reverse Osmosis Facility<br />

Preliminary Design Report 12/15/09<br />

Final Design and Permiting 12/15/<strong>10</strong><br />

Complete Construction <strong>10</strong>/1/11<br />

Status As Of: June 25, 2009<br />

A Memorandum of Understanding (MOU) between the City and the Authority was approved by the Punta Gorda City<br />

Council on May 20, 2009, and by the Authority Board on June 3, 2009. The MOU is for considering the development of 5<br />

to 8 mgd in brackish groundwater supply capacity at or near the Shell Creek Water Treatment Facility.<br />

020 - Peace River Basin 232


H088<br />

Dona Bay Water Supply Development and Management Project<br />

Project Type WS&R Dev.<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality, Natural Systems<br />

Basin(s) General Fund (District), Peace River, Manasota<br />

Cooperator(s)<br />

Sarasota County<br />

Project Manager MORRIS, LISANN<br />

Task Manager(s)<br />

HEYL, MIKE<br />

Status Ongoing<br />

Description<br />

This cooperative funding application proposes a multi-phase implementation plan for the Dona Bay Watershed<br />

Management Plan (DBWMP), previously cooperatively funded by the basin under L493. The project proposes to divert,<br />

store and transport excess freshwater flows from Cow Pen Slough prior to discharging them into the Dona Bay Estuary<br />

providing an alternative water supply in the SWUCA as well as environmental benefits to the bay. The water would be<br />

ultimately transported to the County's Carlton Facility for treatment and distribution. The potential capacity is estimated<br />

in 3, 5, <strong>10</strong>, and 15 mgd phases. The DBWMP was finalized in June 2007, and as design has progressed, the<br />

implementation plan has evolved. The project covers initial elements including design, permitting and construction for<br />

a new weir structure in the Cow Pen Slough canal near the historic ridge line, the phased adaptation of the Venice<br />

Minerals site to a reservoir (first 3 mgd), a conveyance system from the proposed weir to join the future Venice<br />

Minerals site, the West Pinelands wetlands restoration, and a pilot treatment study to determine the most efficent and<br />

effective way to treat surface and groundwater in that area. Because of uncertainties such as water supply demands,<br />

the Albritton reservoir that is part of future phases is not included in the project at this time. Certain initial project<br />

components will be sized to accommodate the increased capacities once Albritton is brought online. The County,<br />

District and Authority staff are working through several funding issues such as Authority involvement in the project,<br />

and the most suitable water treatment system for the project through the Dona Bay Work Group. Currently the MOU<br />

between the County and Authority agreeing to work together to develop a Dona Bay Project agreement is scheduled to<br />

go before County and Authority Boards for approval in July 2009.<br />

Benefits<br />

The objective is to decrease excess freshwater flows to Dona Bay. The elements listed in the FY20<strong>10</strong> application, the<br />

new weir, West Pinelands mitigation area, conveyance to the future Venice Minerals reservoir and initial adaptation of<br />

the Venice Minerals site could increase the watershed hydro period and storage capacity. The County has been<br />

working with District staff and has provided an estimate of approximately 5 tons/yr of nitrogen removed from the bay if<br />

Venice Minerals is used as a retention pond and an additional 9 tons/yr of nitrogen removal if surface water is utilized<br />

for water supply. If the pilot test proposed in phase 1 of the project determines intermediate groundwater is the most<br />

effective source for the intial 3-5 mgd, the environmental benefits to the Bay from this withdrawal will not be realized .<br />

Costs<br />

The request for FY20<strong>10</strong> funding of $1,800,000 would be split between the Governing Board for $900,000, the Peace<br />

River Basin Board for $243,000 and the Manasota Board $657,000. The County has already begun design\permitting<br />

for West Pinelands restoration, the new weir in Cow Pen Slough, phased modifications of the Venice Minerals mine to<br />

a reservoir, and the conveyance from the new weir to Venice Minerals. These FY20<strong>10</strong> funds would be used to finish<br />

design\permit tasks not started in FY2009 and\or begin initial work such as area excavation for the modification of<br />

Venice Minerals. Another option discussed at the Dona Bay Work Group was to proceed with the pilot treatment test<br />

as a partnership between the Authority and the County. The total project cost is estimated at approximately $53<br />

million at this time. The District share is requested to be 50 percent, or approximately $26.5 million. As previously<br />

mentioned, the County and Authority continue to discuss options for sharing the water from this project regionally. If an<br />

agreement can be reached that meets the intent of District Policy 130-4, then Governing Board funding may be<br />

available for the project.<br />

Additional Information<br />

The current Dona Bay watershed has been significantly impacted by man-made drainage activities, which increased<br />

the efficiency and volume of freshwater being discharged to its tidal estuary. In addition, historical maps indicate that a<br />

significant portion of the current watershed may have been diverted to Dona Bay by the man-made Cow Pen Slough<br />

canal. Towards this outcome, Sarasota County has acquired lands that are strategically located in the watershed and<br />

initiated monitoring of freshwater flows to, and natural system and water quality indicators in, the tidal portions of Dona<br />

Bay. The Dona Bay Watershed Management Plan (DBWMP) (L493) was cooperatively funded during FY2006 and<br />

FY2007 as a comprehensive watershed plan for the Dona Bay watershed.<br />

020 - Peace River Basin 233


H088<br />

Dona Bay Water Supply Development and Management Project<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 0 0 0 514,017 12,940,740 13,454,757<br />

020 Peace River Basin 0 0 0 4,944 3,493,998 3,498,942<br />

0<strong>21</strong> Manasota Basin 0 0 0 259,593 9,446,733 9,706,326<br />

Project Funds Not Budgeted by the<br />

District<br />

Sarasota County 0 0 1,200,000 1,800,000 24,681,471 27,681,471<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$54,341,496<br />

Critical Project Milestones Projected Amended Actual<br />

Initiate Design and Permitting <strong>10</strong>/29/09<br />

Complete Design and Permitting 7/29/11<br />

Initiate Construction 7/29/11<br />

Status As Of: September 03, 2009<br />

Staff continues to monitor the progress between Sarasota County and the Authority as they work through the MOU to<br />

jointly move forward with the Dona Bay Water Supply project. A meeting was held August <strong>21</strong>, 2009 to get an update on<br />

environmental benefits information and to discuss the possibility of proceeding with the Water Quality Pilot Treatment<br />

task as soon as possible. County staff indicated the Authority and District personnel would have an opportunity to review<br />

the Request For Qualifications that is scheduled to be advertised for this component. A letter from the Authority indicated<br />

regional interest in this task would be required to make it eligible for Governing Board funds.<br />

020 - Peace River Basin 234


H090<br />

NERUSA Holly Hill Reclaimed Water Storage and Pumping and<br />

Lower Floridan Aquifer Well<br />

Project Type WS&R Dev.<br />

AOR(s)<br />

Water Supply, Water Quality<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Polk County Utilities<br />

Project Manager BADER, TAMMY<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This regional alternative water supply project consists of two major components. The first component of the project will<br />

consist of the construction of an additional 2 million gallon reclaimed water storage tank and high service pumping<br />

facilities off-site from the Northeast Regional Wastewater Treatment Facility (NERWWTF) to expand the total storage<br />

capacity of the Northeast Regional Reclaimed Utility Service Area (NERRUSA) to 15 million gallons to meet future<br />

public access reuse needs within the service area and potentially within the region. The second component of the<br />

project will consist of the design and construction of a Lower Floridan Aquifer (LFA) observation well at the<br />

NERWWTF Holly Hills site. The well will be drilled to about 2,200 feet below land surface and cased to about 1,700<br />

feet below land surface. Once the LFA has been drilled, Polk County will perform a long-term, LFA aquifer<br />

performance test yielding results that can be used regionally.<br />

Benefits<br />

There are no offsets associated with the first component of this project. The NERUSA system has an existing 13<br />

million gallons of storage. The additional storage is needed to address pressure issues that the county experiences<br />

during peak demand periods. The additional storage will also enhance the county's ability to maximize flows within the<br />

system and develops the foundation for the potential interconnection with other WWTFs in the region. The primary<br />

benefit of the second component of this project will be to determine the degree of confinement between the Upper<br />

Floridan aquifer and the Lower Floridan aquifer at the NERWWTF Holly Hills site. This information will be used to<br />

determine the amount of water supply that can be developed from the Lower Floridan aquifer at the NERWWTF Holly<br />

Hills site. Additionally, this information with similar information from other sites in the area will enable the District to<br />

develop a regional hydrogeologic understanding of the Lower Floridan aquifer. The water from the pumped well will be<br />

discharged into Polk County's reuse water system and the storage tank to be built with the first component of this<br />

project.<br />

Costs<br />

The total cost of this project is estimated to be $3,032,920, of which the District is requested to fund 50% or<br />

$1,516,460. Because this is a Water Supply and Resource Development Project, is part of a regional effort to increase<br />

the use of reclaimed water and expand the knowledge of the degree of confinement for the Lower Floridan aquifer,<br />

and is consistent with the Polk County Comprehensive Water Supply Plan (H072), funds in the amount of $1,0<strong>10</strong>,973<br />

from FY2009 have been allocated to the project from the West Central Florida Restoration Action Plan (WRAP)<br />

legislative appropriation. These funds will be applied to equally reduce the Peace River Basin Board and Governing<br />

Board cost share. Funding in the amount of $605,000 (split between the Peace River Basin and Governing Board) has<br />

been budgeted in FY20<strong>10</strong>. It is expected that funding in the amount of $405,973 will be requested in FY2011. No<br />

cost/benefit ratio is calculated for this project, as there are no immediate offsets. The future funds identified for the<br />

project are contingent upon approval of such amounts by the District Governing and Basin Boards in the annual<br />

budget(s).<br />

Additional Information<br />

The Central Florida Coordination Area (CFCA) currently has restrictions on new withdrawals from the LFA. If the<br />

District is to approve such withdrawals from the LFA in the eastern Polk County area, additional data is needed to<br />

support such approval. In particular, knowledge of the degree of confinement for the LFA must be obtained.<br />

Additionally, it must be determined whether or not the water quality in the LFA is likely to be fresh or brackish over<br />

time.<br />

The District, in a cooperative venture with Polk County, previously explored the LFA at the NERWWTF Holly Hill site,<br />

located in northeast Polk County. Testing at this site consisted of a single well test and was unable to ascertain the<br />

degree of confinement. Additionally, the test duration was two weeks during which a minor, upward trend in electrical<br />

conductivity of the water was observed. To address these two issues, a new test with an observation well will be<br />

performed.<br />

The District will drill and construct a LFA observation well at the NERWWTF Holly Hills site. The LFA aquifer test will<br />

last from two to six months depending on the water quality. If the water quality stabilizes early on, the test can be<br />

discontinued after two months. The water from the pumped well will be discharged into Polk County's reuse water<br />

system at the site. Of the total project cost, $539,920 is expected to be for design, administration and the LFA aquifer<br />

020 - Peace River Basin 235


H090<br />

NERUSA Holly Hill Reclaimed Water Storage and Pumping and<br />

Lower Floridan Aquifer Well<br />

performance test, which the county will be completing on its own.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 0 505,487 0 303,864 202,987 1,012,338<br />

020 Peace River Basin 0 505,486 0 304,014 202,896 1,012,396<br />

Project Funds Not Budgeted by the<br />

District<br />

Polk County 0 0 0 1,0<strong>10</strong>,974<br />

0 1,0<strong>10</strong>,974<br />

Status As Of: August 31, 2009<br />

Total:<br />

Future<br />

Funding<br />

A cooperative funding agreement is expected to be approved late in 2009 or early in 20<strong>10</strong>, pending the development of a<br />

project scope of work by the cooperator. To date, $1,615,973 has been budgeted, of which $0 has been reimbursed.<br />

020 - Peace River Basin 236<br />

Total<br />

Funding<br />

$3,035,708


H091<br />

Polk County SWRUSA Reclaimed Water Connection to TECO<br />

Project Type WS&R Dev.<br />

AOR(s)<br />

Water Supply, Water Quality<br />

Basin(s) General Fund (District), Alafia River, Peace River<br />

Cooperator(s)<br />

Project Manager RAMOY, ALISON<br />

Task Manager(s)<br />

Status Ongoing<br />

ARMSTRONG, BRIAN, SCOTT, KATHY, GOODWIN, AUDRIE<br />

Description<br />

This regional alternative supply project consists of the design and construction of a pipeline from the reclaimed water<br />

system in the Polk County Southwest Regional Utilities Service Area (SWRUSA) to the infrastructure associated with<br />

the project delivering reclaimed water from the City of Lakeland to the Tampa Electric Company (TECO) Polk Power<br />

Station. The pipeline sizes and diameters, and the reclaimed water flows and offsets, are being determined. This<br />

project is related to the Regional Reclaimed Water Partnership Initiative (H076), which is designed to maximize<br />

reclaimed water flows not currently being beneficially used by the City of Lakeland, and potentially other utilities, such<br />

as Polk County, Plant City, Mulberry and Hillsborough County. This interconnect will expand the regional infrastructure<br />

of Phase I of the H076 project, which currently includes the design and construction of approximately 15 miles of<br />

reclaimed water transmission main from the City of Lakeland's wastewater effluent wetland treatment system to the<br />

Tampa Electric Company's (TECO) Polk Power Station (WUP# 11747) for power generation expansion (Unit 6).<br />

Benefits<br />

Reclaimed water flows from the Polk County SWRUSA will provide an alternative source of water for cooling and other<br />

purposes at the TECO Polk Power Station.<br />

Costs<br />

The total cost for the project is estimated to be $2,500,000, and the District is being asked to fund 50 percent, or<br />

$1,250,000. The funding approved for FY20<strong>10</strong>, includes $276,512 from the Governing Board, $138,256 from the<br />

Alafia River Basin Board, and $138,256 from the Peace River Basin Board, for a total of $553,024 in District funding.<br />

An additional $833,332 in Water Restoration Action Plan Funds will be transferred from H080 to the project, effectively<br />

reducing the District's Ad Valorem and cooperator's share to $833,334 each. H080 was established to fund projects<br />

identified in the Polk County Comprehensive Water Supply Plan once the plan was completed.<br />

Additional Information<br />

Polk County and TECO have begun discussions regarding a service agreement for the reclaimed water flows.<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 0 416,666 0 276,556<br />

0 693,222<br />

011 Alafia River Basin 0 0 0 138,438<br />

0 138,438<br />

020 Peace River Basin 0 208,333 0 138,450<br />

0 346,783<br />

District Budgeted - Outside Revenue<br />

State Approp - WRAP - Prior Year<br />

Funds<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

0 0 0 208,333<br />

0<br />

208,333<br />

Project Funds Not Budgeted by the<br />

District<br />

Polk County 0 0 0 533,024 300,3<strong>10</strong> 833,334<br />

Status As Of: September 03, 2009<br />

Total:<br />

Future<br />

Funding<br />

District staff is awaiting receipt of a Scope of Work, which will include the Project Milestones, from the county to include<br />

020 - Peace River Basin 237<br />

Total<br />

Funding<br />

$2,220,1<strong>10</strong>


H091<br />

Polk County SWRUSA Reclaimed Water Connection to TECO<br />

in the Cooperative Funding Agreement.<br />

020 - Peace River Basin 238


K280<br />

Charlotte - Imp. BMPs Greater Port Charlotte<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Flood Protection<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Charlotte County<br />

Project Manager FRIES, GEORGE<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This is a multi-year funded project to perform the Implementation of Best Management Practices (BMPs) element of<br />

the District's Watershed Management Program (WMP) for a portion of Greater Port Charlotte in Charlotte County.<br />

Implementation of BMPs includes the following tasks: design, development of construction documents, construction<br />

permitting, land acquisition, bidding and contractor selection, construction of the BMPs and construction engineering<br />

and inspection. The Greater Port Charlotte area was developed prior to District flood protection and current water<br />

quality regulations (pre-1984). Residential development coverage is in a range of 50-70 percent impervious. Property<br />

damage, with numerous repetitive flood loss claims and roadway washouts are flood damage issues to be addressed<br />

by the proposed improvements to the stormwater management infrastructure. Approximately <strong>10</strong> square miles of the<br />

residential area has significant yard flooding with moderate property damage for a 25-year storm event and significant<br />

flood damage occurs in homes during a <strong>10</strong>0-year storm event. The resolution of flood Level of Service (LOS)<br />

deficiencies lies in a comprehensive approach to watershed management and resolution of development practices<br />

within the <strong>10</strong>0-year floodplain. For FY2009 the County requested $1,800,000 in cooperative funding to construct<br />

structures SUN 4.27, LIO 2.87, FOR 1.72 and ELK 1.61. The Basin Board budgeted $200,000 for FY2009. For<br />

FY20<strong>10</strong> the County requested $1,800,000 in cooperative funding to construct Structures SUN 4.70, LIO 3.52, DOR<br />

4.22 and MOR 4.42. The Basin Board budgeted $200,000 for FY20<strong>10</strong>.<br />

Benefits<br />

This project will improve level of service deficiencies in Greater Port Charlotte by providing increased flood protection<br />

to the homes and businesses along the waterways. The existing flood control structures were constructed thirty to<br />

thirty-five years ago of galvanized steel sheeting and are rusted and deteriorated. The replacement structures of<br />

reinforced concrete will have a substantially longer lifespan and will be better able to control water surface elevations in<br />

the area.<br />

Costs<br />

Funding for this project has been provided in the Peace River Basin Board budgets for FY2000 ($708,558); FY2001<br />

($791,500); FY2002 ($487,000); FY2003 ($500,000); FY2004 ($75,000); FY2008 ($500,000); FY2009 ($200,000); and<br />

FY 20<strong>10</strong> ($200,000) for a total funding commitment through FY20<strong>10</strong> of $3,462,058. The County did not apply for<br />

cooperative funding in FY2005, FY2006 or FY2007. The total budgeted amount for this project through FY20<strong>10</strong> is<br />

$9,971,387of which the District's share is $3,462,058 and the County's share is $6,509,329. Based on the most recent<br />

cost estimates in the County's Stormwater Management Master Plan an additional $17 million may be needed in future<br />

years for implementation projects. The County is requesting cooperative funding of up to 50% of these costs in future<br />

years. The District funding amounts shown in the table includes staff salaries.<br />

Additional Information<br />

The WMP includes five major elements: 1) Topographic Information, 2) Watershed Evaluation, 3) Watershed<br />

Management Plan, 4) Implementation of BMPs, and 5) Maintenance of Watershed Parameters and Models.<br />

Implementing elements of the WMP with local governments is one of the Comprehensive Watershed Management<br />

(CWM) initiative strategies and one of the District's Strategic Priorities. The WMP provides a method to evaluate the<br />

capacity of a watershed to protect, enhance, and restore water quality and natural systems while achieving flood<br />

protection. In 1996, the District and the County completed a Stormwater Management Master Plan, targeting the<br />

Newgate and Oyster Creek intermediate conveyance systems in the Cape Haze Area, which is located in west<br />

Charlotte County. In 1998 the District and County completed a Stormwater Management Master Plan, targeting nine<br />

major intermediate conveyance systems, four in the Greater Port Charlotte Area and five in the South County Area.<br />

Both master plan efforts constitute the Greater Port Charlotte Stormwater Management Master Plan, which outlines a<br />

5-year implementation plan of stormwater management infrastructure improvements to improve the LOS to the<br />

targeted levels expressed in the County's Comprehensive Plan. The total amount identified in the master plan's<br />

implementation plan for stormwater management infrastructure improvements was projected to be $13,496,842 in<br />

1998 and is now (2008) estimated to cost $30,000,000. FY2000, FY2001 and FY2002 funding provided for the<br />

replacement of 16 structures in the Fordham Watershed and 7 structures in the Little Alligator Watershed. FY2003<br />

funding was for the design and construction of 2 structures in the Fordham Watershed and FY2004 funding was for<br />

design and permitting of 6 structures for a total of 31 structures. The total contract amount is now (through FY2009)<br />

020 - Peace River Basin 239


K280<br />

Charlotte - Imp. BMPs Greater Port Charlotte<br />

$9,771,387 with the District's share of $3,262,058. A cooperative funding expenditure agreement with Charlotte<br />

County has been developed to complete the Implementation of this BMP. This is a multi-year funded project that will<br />

require a cooperative funding request each fiscal year until completed. The County is managing the project, where the<br />

District project manager must approve any agreements to accomplish project tasks.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 3,090,917 0 202,406 202,420 7,500,000 <strong>10</strong>,995,743<br />

Project Funds Not Budgeted by the<br />

District<br />

Charlotte County 5,268,267 0 1,241,062 1,800,000 9,300,000 17,609,329<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$28,605,072<br />

Critical Project Milestones Projected Amended Actual<br />

1. Critical Project Milestones<br />

Original contract execution 7/13/00 7/13/00<br />

2. First Amendment (FY2001 Funding)<br />

Basin Bd approval of 1st amendment 12/31/00 12/8/00<br />

Gov Bd approval of 1st amendment 12/31/00 12/8/00<br />

1st Amendment to Charlotte County 1/31/01 1/22/01<br />

1st Amendment Execution 2/28/01 3/15/01<br />

3. Second Amendment (FY2002 Funding)<br />

2nd amendment to Charlotte County 11/30/01 11/15/01<br />

Basin Bd approval of 2nd amendment 12/31/01 <strong>10</strong>/16/01<br />

Gov Bd approval of 2nd amendment 12/31/01 <strong>10</strong>/25/01<br />

2nd amendment execution 1/31/02 1/7/02<br />

4. Third Amendment (FY2003 Funding)<br />

Basin Bd approval of 3rd amendment 6/11/03 6/11/03<br />

Gov Bd approval of 3rd amendment 6/24/03 6/24/03<br />

3rd amendment to Charlotte County 7/15/03 6/11/03<br />

3rd amendment execution <strong>10</strong>/15/03 7/9/03<br />

5. Fourth Amendment (FY2004 Funding)<br />

4th amendment approved by Charlotte County 12/7/03 12/7/03<br />

4th Amendment Execution 12/31/03 12/23/03<br />

5A. Fifth Amendment (Time Extension)<br />

Basin Board Approval of 5th Amendment <strong>10</strong>/8/04 <strong>10</strong>/8/04<br />

Governing Board Approval of 5th Amendment <strong>10</strong>/26/04 <strong>10</strong>/26/04<br />

5th Amendment Executed: 11/15/04 1/27/05<br />

5B. Sixth Amendment (FY2008 funds)<br />

Draft Amendment to Contracts Administration 8/15/07 11/29/07<br />

Draft Amendment Returned from Contracts Administration 9/1/07 12/7/07<br />

Amendment Executed <strong>10</strong>/1/07 2/8/08<br />

FY2008 Funds Encumbered <strong>10</strong>/15/07 12/7/07<br />

5C. Seventh Amendment (FY2009 Funding)<br />

Amendment Executed <strong>10</strong>/1/08 12/29/08<br />

FY2009 Funds Encumbered <strong>10</strong>/2/08 11/<strong>10</strong>/08<br />

6. Greater Port Charlotte Structures<br />

Structure LIO 3.52 (Ph 1 complete, Ph 2 in design) 12/31/01 12/31/01<br />

Structure NIA 2.90 (Completed) 12/31/01 12/31/01<br />

020 - Peace River Basin 240


K280<br />

Charlotte - Imp. BMPs Greater Port Charlotte<br />

Structure FOR 5.11 9/30/02 9/30/12<br />

Structure NIA 5.09 12/31/02 9/30/12<br />

Structure NIA 3.48 (Completed) 12/31/02 12/31/07 9/15/07<br />

Structure NIA 5.72 12/31/02 9/30/12<br />

Structure YAL 3.90 (Completed) 12/31/02 12/31/02<br />

Structure ELK 2.67 12/31/02 9/30/08<br />

Structure ELK 2.15 (Completed) 12/31/02 12/31/04 12/31/04<br />

Structure ELK 3.45 (Completed) 12/31/02 12/31/02<br />

Structure ELK 1.61 12/31/02 9/30/12<br />

Structure MOR 2.50 (Completed) 12/31/02 12/31/02<br />

Structure ELK 4.56 12/31/02 9/30/12<br />

Structure HAV 4.33 12/31/02 9/30/12<br />

Structure HAV 4.84 12/31/02 9/30/12<br />

Structure ELK 3.00 (Completed) 12/31/03 9/30/08 3/15/07<br />

Structure FOR 1.72 12/31/03 9/30/12<br />

Structure FOR 2.77 (Completed) 12/31/03 12/31/09 5/15/09<br />

Structure FOR 2.49 (Completed) 12/31/03 12/31/07 6/30/07<br />

Structure FOR 4.60 9/30/04 9/30/12<br />

Structure SUN 4.27 (Under Construction) 9/30/04 12/31/<strong>10</strong><br />

Structure DOR 4.22 (In Design) 9/30/04 9/30/12<br />

Structure MOR 4.42 (In Design) 9/30/04 9/30/12<br />

Structure SUN 3.65 9/30/04 9/30/12<br />

Structure HAV 5.72 12/31/07 9/30/12<br />

Structure DOR 3.70 (Completed) 12/31/08 12/31/09 <strong>10</strong>/31/08<br />

Structure MOR 3.91 12/31/09 9/30/12<br />

Structure MOR 5.08 12/31/09 9/30/12<br />

Structure SUN 4.70 (In Design) 12/31/09 9/30/12<br />

Structure FOR 1.63 12/31/<strong>10</strong> 9/30/12<br />

Structure POMP 2 12/31/<strong>10</strong> 9/30/12<br />

Structure ELK 1.55 12/31/<strong>10</strong> 9/30/12<br />

Structure DOR 4.75 12/31/12 9/30/12<br />

Structure LIO 4.03 12/31/12 9/30/12<br />

Structure DOR 4.89 12/31/12 9/30/12<br />

Structure LIO 4.34 12/31/12 9/30/12<br />

7. Contract Complete<br />

Cooperator Agreement Expiration 12/31/05 12/31/12<br />

Status As Of: August 24, 2009<br />

Project Status: Thirteen of the 36 structures in the current project plan have been completed. The County has been<br />

reimbursed by the District for its share of the construction costs for 11 of those structures. The total cost of the 11<br />

structures is $6,777,888.63 with $3,8<strong>10</strong>,443.18 paid by the County (56%) and $2,967,445.45 paid by the District (44%).<br />

The County has constructed 3 other structures (FOR 3.<strong>21</strong>, ELK 2.67 and MOR 3.91) on its own without benefit of District<br />

cooperative funding at a cost to the County of $2,909,893.62. FOR 3.<strong>21</strong> was not included in the list of structures to be<br />

constructed as part of this Agreement but is located within the Greater Port Charlotte area. The District's funding was<br />

provided in fiscal years (FY) 2001 through 2004 and in FY2008, FY2009 and FY20<strong>10</strong>. The County did not request<br />

cooperative funding in FY 2005, FY2006 or FY2007. Construction of Structure SUN 4.27 began in August 2009 and will<br />

be completed by December 2009. Reimbursement to the County for this structure will deplete all of the cooperative<br />

funding budgeted through FY2009. The County has contracted with a consulting engineer to design 4 structures.<br />

Cooperative funding to construct the remaining structures will be required in future fiscal years. The 8th Amendment,<br />

incorporating the FY20<strong>10</strong> funding, was sent to the County for execution.<br />

020 - Peace River Basin 241


K459<br />

Charlotte County School Board - Imp. BMPs Punta Gorda Campus<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Flood Protection, Water Quality<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Charlotte County School Board<br />

Project Manager FRIES, GEORGE<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This is a project to perform the Implementation of Best Management Practices (BMPs) element of the District's<br />

Watershed Management Program (WMP) for a portion of the Upper Alligator Creek Watershed (North Fork) located in<br />

Punta Gorda. Implementation of BMPs includes the following tasks: design, development of construction documents,<br />

construction permitting, land acquisition, bidding and contractor selection, construction of the BMPs and construction<br />

engineering and inspection. The study area is 280 acres, bounded by Carmalita Street to the north, Education Avenue<br />

to the east, Cooper Street to the west and Taylor Road to the south. The land use is partly residential which was built<br />

in the 1960's but it includes four Charlotte County School Board campuses and facilities: Sallie Jones Elementary<br />

School, Charlotte High School, Punta Gorda Middle School and the Central Operations Center built in 1956, 1926,<br />

1971 and 1966, respectively. The proposed project consists either of (1) improving +/- 8,600 lf. of an intermediate<br />

conveyance way along Education Ave., Henry St. and Cooper St. that includes replacing the inadequate roadway<br />

culvert crossings, or (2) collecting the surface water runoff within the complex through a surface water management<br />

area on the corner of Henry St. and Education St., and diverting it by gravity to Airport St. through a pipe system along<br />

Education St., or (3) combination of both, depending on regulatory constraints.<br />

Benefits<br />

The project will improve level of service deficiencies by improving conveyance and providing additional storage within<br />

the watershed. The project is also expected to improve water quality by increasing residence times in the storage area.<br />

Costs<br />

Funding for this project was provided in the Peace River Basin Board budget for FY2001 ($280,000). The School<br />

Board is also contributing $280,000 to the cost of the project. The District funding amounts shown in the table includes<br />

staff salaries.<br />

Additional Information<br />

The WMP includes five major elements: 1) Topographic Information, 2) Watershed Evaluation, 3) Watershed<br />

Management Plan, 4) Implementation of BMPs, and 5) Maintenance of Watershed Parameters and Models.<br />

Implementing elements of the WMP with local governments is one of the Comprehensive Watershed Management<br />

(CWM) initiative strategies and one of the District's Strategic Priorities. The WMP provides a method to evaluate the<br />

capacity of a watershed to protect, enhance, and restore water quality and natural systems while achieving flood<br />

protection. Finish floor elevations are substandard, with shallow and non-uniformly graded road right-of-way<br />

conveyances, and mismatched culvert sizes and inverts. A mean annual summer rainfall event will flood these<br />

campuses and the adjoining residential areas. The existing collection, storage and conveyance elements will be<br />

improved to provide flood protection, and water quality treatment. The improvements will balance on site storage and<br />

off site conveyance where downstream property owners will not be adversely impacted. A cooperative funding<br />

expenditure agreement with the Charlotte County School Board has been developed to complete the Implementation<br />

of this BMP. The School Board is managing the project, where the District project manager must approve any<br />

agreements to accomplish project tasks.<br />

020 - Peace River Basin 242


K459<br />

Charlotte County School Board - Imp. BMPs Punta Gorda Campus<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 302,895 0 1,017<br />

0<br />

0 303,912<br />

Project Funds Not Budgeted by the<br />

District<br />

Charlotte County School Board 280,000 0 0<br />

0<br />

0 280,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$583,912<br />

Critical Project Milestones Projected Amended Actual<br />

1. Critical Project Milestones<br />

Construction sign will show District logo 4/30/05<br />

2. Cooperator Agreement<br />

Draft agreement to Contracts 12/31/00 1/24/01<br />

Basin Board Approval of Interlocal Agreement 2/28/01 2/16/01<br />

Governing Board Approval of Interlocal Agreement 2/28/01 2/28/01<br />

Contract Executed 3/31/01 7/16/01<br />

Notice to Proceed 3/31/01 7/16/01<br />

No cost time extension executed 9/12/05 9/12/05<br />

2nd no cost time extension executed <strong>10</strong>/2/06 <strong>10</strong>/2/06<br />

3. Consultant Services<br />

Task 1 - Stormwater Mgt. Infrastr. Evaluation & Conceptual Permit 2/28/02 1/31/04 1/31/04<br />

Task 2 - Design, Permitting and Bid Documents 6/30/02 7/31/04 5/<strong>10</strong>/05<br />

4. Construction<br />

Task 3 - Commence Construction 11/16/02 <strong>10</strong>/1/07<br />

Complete Construction 1/16/04 1/31/09<br />

5. Contract Completion<br />

Cooperator Agreement Expiration 7/17/05 7/17/09<br />

Status As Of: August 24, 2009<br />

Status History: The project has two distinct parts: the first part is the Cooperative Funding Agreement between the<br />

School Board and the District for the on-site improvements and the second part is the Inter-local Services Agreement<br />

between the School Board and the County for the off-site improvements. A project kick-off meeting was held on June 2,<br />

2003 and design work began. A contract amendment to extend the completion date to 07/17/2007 was executed. A<br />

second no-cost time extension Amendment to the Agreement was executed to extend the contract completion date from<br />

July 17, 2007 to July 17, 2009. The County planned on advertising for bids for this project, in conjunction with their<br />

Carmelita Avenue project, in March 2007. Right-of-way and easement acquisition are now complete. Bids were received<br />

on July 26, 2007. The Board of County Commissioners awarded a construction contract on August 14, 2007.<br />

Construction began on October 1, 2007 and work on the stormwater management storage area (SMSA) was expected to<br />

be completed by December 31, 2007. Construction of the large collection pipe from Carmelita Avenue into the SMSA is<br />

complete. The remainder of the work involves the reconstruction of Carmelita Avenue and is not the subject of this<br />

agreement. The School Board submitted its second request for reimbursement which was approved. The SMSA has<br />

been completed and the control structures are in place and operational. The School Board staff was requested to submit<br />

an invoice for the remainder of the cooperative funding. The as-built drawings are complete and are being mailed to the<br />

District project manager. Current Status: The work is complete and the School District is expected to submit the final<br />

invoice to the District within the next few weeks.<br />

020 - Peace River Basin 243


K725<br />

FYN Polk County<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply, Water Quality, Natural Systems<br />

Basin(s) Alafia River, Hillsborough River, Peace River<br />

Cooperator(s)<br />

Project Manager DURELL, SYLVIA<br />

Task Manager(s)<br />

Status Ongoing<br />

Polk County, Polk County Cooperative Extension Service<br />

Description<br />

This Florida Yards & Neighborhoods (FYN) project provides education on Florida-friendly landscaping to homeowners,<br />

students and new owners of Florida Water StarSM Gold (FWSG) Certification homes. In addition, the FYN coordinator<br />

will be available as a resource for homeowners, builders and landscape professionals who are working on FWSG<br />

projects. Support of the FYN homeowners/community association coordinator in outreach to residents of communities<br />

will also continue. Effectiveness will be measured by the number of participants in workshops, one-on-one interactions<br />

and student contacts; potential exposure to newspaper articles and electronic media; and distribution of education<br />

materials.<br />

Benefits<br />

In past years, approximately 28,500 people have received education annually either on a personal basis, at<br />

workshops, classes and exhibits or through distribution of education materials and web site visits. In addition, each<br />

year approximately 3.5 million people have been exposed to education through mass media outlets, such as<br />

newspaper articles and county government television programming and web sites. Education increases knowledge<br />

and promotes behavior change related to conservation of water and protection of water quality and natural systems.<br />

Costs<br />

The total cost of the FY20<strong>10</strong> program is $118,426, with the District contributing $51,208 (Alafia River $6,657;<br />

Hillsborough River $8,193; Peace River $36,358). District funds provide salary and benefits for the coordinator and<br />

program and travel expenses. The program is projected to reach 29,000 Polk County residents at a cost to the District<br />

of approximately $1.76 per person. The budget lines below include costs for staff to manage the project.<br />

Additional Information<br />

The total cost of the FY2009 program was $118,426, with the District contributing $51,208 (Alafia River $6,657;<br />

Hillsborough River $8,193; Peace River $36,358). The District has funded this program since 2002. Education is<br />

based on the nine Florida-Friendly LandscapingTM principles that were created by the University of Florida/Institute of<br />

Food and Agricultural Sciences (UF/IFAS) for the FYN program: Right Plant, Right Place, Water Efficiently, Fertilize<br />

Appropriately, Mulch, Attract Wildlife, Manage Yard Pests Responsibly, Recycle, Reduce Stormwater Runoff and<br />

Protect the Waterfront.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

011 Alafia River Basin 29,539 0 6,412 7,449<br />

0 43,400<br />

013 Hillsborough River Basin 35,041 0 8,460 9,779<br />

0 53,280<br />

020 Peace River Basin 242,140 0 39,494 37,982<br />

0 319,616<br />

Project Funds Not Budgeted by the<br />

District<br />

Polk County 326,932 0 68,390 82,068<br />

0 477,390<br />

UF/IFAS 22,000 0 0<br />

0<br />

0 22,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$915,686<br />

Critical Project Milestones Projected Amended Actual<br />

020 - Peace River Basin 244


K725<br />

FYN Polk County<br />

FY2008<br />

Purchase order issued <strong>10</strong>/1/07 <strong>10</strong>/2/07<br />

First task report 1/31/08 1/31/08<br />

Second task report 4/30/08 4/18/08<br />

Third task report 7/31/08 7/31/08<br />

Project complete 9/30/08 9/30/08<br />

Fourth task report <strong>10</strong>/31/08 <strong>10</strong>/2/08<br />

FY2009<br />

Purchase order issued <strong>10</strong>/1/08 11/15/08 11/18/08<br />

First task report 2/2/09 2/2/09<br />

Second task report 4/30/09 4/13/09<br />

Third task report 7/31/09 7/31/09<br />

Project complete 9/30/09<br />

Fourth task report <strong>10</strong>/30/09<br />

FY20<strong>10</strong><br />

First task report 1/29/<strong>10</strong><br />

Second task report 4/30/<strong>10</strong><br />

Third task report 7/30/<strong>10</strong><br />

Project complete 9/30/<strong>10</strong><br />

Purchase order issued <strong>10</strong>/12/<strong>10</strong><br />

Fourth task report <strong>10</strong>/29/<strong>10</strong><br />

Status As Of: September 01, 2009<br />

The third task period report includes the following accomplishments: 13 group presentations for 365 people; 1,194<br />

personal/telephone/email/mail contacts; 6 youth programs for <strong>10</strong>,794 students; 1 building industry contact with 8 people;<br />

2 homeowner association contacts involving <strong>10</strong>7 people; 6 exhibits attracting more than 160,900 people; 1 newsletter<br />

article potentially reaching 89 people; 18 newspaper articles potentially reaching 1.1 million readers; 5 mass media<br />

events potentially reaching 20,914 people; 6,808 pieces of educational items distributed; and 388 hours contributed by<br />

<strong>10</strong>3 volunteers. Anne Yasalonis, FYN coordinator, has created twitter, blogs and Flickr sites online. Activities at Agrifest<br />

educated 6,500 fourth-grade students on the water cycle and water conservation; 3,000 children learned how to save<br />

water at Bok Tower's Earth Day event; and 70 high school students learned about Florida-friendly landscaping at the<br />

Florida Home Builders Association's summer camp. Yasalonis has been assisting in the Polk Is Florida-Friendly project,<br />

which is also funded by the District. To date, there are Florida-friendly landscaping demonstration gardens in the<br />

following cities: Babson Park, Bartow, Davenport Fort Meade, Frostproof, Lake Alfred, Lake Wales, Lakeland and Winter<br />

Haven. The locations will be videotaped for inclusion on educational DVDs and videos. The District is coordinating with<br />

University of Florida's Institute of Food and Agricultural Sciences (UF/IFAS) to present a series of workshops designed to<br />

help homeowners associations understand what SB 2080 means and what resources are available to assist them. A<br />

workshop in Polk County is scheduled for October 12. ACTION TO DATE: On time.<br />

020 - Peace River Basin 245


L028<br />

(Completed) Englewood Lemon Bay High School Reuse Extension<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply, Water Quality<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Englewood Water District<br />

Project Manager MCGOOKEY, SCOTT<br />

Task Manager(s)<br />

Status Completed<br />

Description<br />

This project consists of the design and construction of approximately 7,000 linear feet of 6-inch diameter reuse<br />

transmission line from the Englewood Water District's (EWD) existing reuse system to Lemon Bay High School<br />

Athletic fields and the proposed Charlotte County Oyster Creek Park.<br />

Benefits<br />

The project provides 0.11 mgd of reclaimed water to Lemon Bay High School Athletic fields and the proposed<br />

Charlotte County Oyster Creek Park to offset 0.08 mgd of potable groundwater.<br />

Costs<br />

The total cost is $300,000, and the District's share is requested to be $150,000. The Peace River Basin budgeted<br />

$150,000 in FY2004. The cost, amortized at 8 percent over 30 years, is $.90 per 1,000 gallons offset. Any additional<br />

funds are for staff time.<br />

Additional Information<br />

The new main will advance from the present north-south main on San Cas Drive, west to the proposed Oyster Creek<br />

Park, and then west on to Lemon Bay High School. The Lemon Bay High School athletic fields currently occupy four<br />

irrigated acres and an additional three acres are planned to be constructed in the near future, resulting in<br />

approximately 0.06 mgd of potable water irrigation demand. The newly developed Charlotte County Oyster Creek Park<br />

includes four baseball fields, two football fields, four soccer fields comprising a total of approximately 11 acres and<br />

approximately eight additional acres of other landscaped amenities. If reclaimed water is not provided, the irrigation<br />

source would be groundwater from the surficial or upper intermediate aquifer, which is the main potable water aquifer<br />

system in the project area. Based on the University of Florida Institute of Food and Agricultural Science (IFAS)<br />

irrigation recommendation of 42 inches annually, Oyster Creek Park will have an irrigation demand of approximately<br />

0.06 mgd.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 159,749 0 2,929<br />

0<br />

0 162,678<br />

Project Funds Not Budgeted by the<br />

District<br />

Englewood Water District 150,000 0 0<br />

0<br />

0 150,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$312,678<br />

Critical Project Milestones Projected Amended Actual<br />

Draft Agreement to Contracts Administration <strong>10</strong>/1/03 9/17/04<br />

Draft Agreement sent to Cooperator 8/31/04 <strong>10</strong>/1/04<br />

Contract Executed 9/1/04 8/14/05<br />

Design Commencement 9/1/04 3/1/06 2/28/06<br />

Design Complete 12/1/04 2/1/07 2/23/07<br />

Construction Commencement 1/1/05 3/15/08 3/5/08<br />

Construction Completion <strong>10</strong>/1/05 11/1/08 4/23/08<br />

020 - Peace River Basin 246


L028<br />

(Completed) Englewood Lemon Bay High School Reuse Extension<br />

Contract Termination <strong>10</strong>/1/06 12/31/08 8/22/08<br />

Status As Of: August 26, 2008<br />

Damage to the school from hurricane Wilma has delayed this project. EWD met with the school board on January <strong>10</strong>,<br />

2006 and approved the agreement with the EWD to utilize reclaimed water at the schools athletic fields. The project<br />

design was awarded to Giffels-Webster Engineers on February 28, 2006. Design is now complete. Base maps have<br />

been prepared and the route of the pipe has been approved by Charlotte County Parks Department. Permits have<br />

been processed. A pre-bid meeting was July 17th, 2007 with the bid opening on August 7, 2007. The low bid was<br />

submitted by General Contracting. Notice to Proceed and all easements are secured. Construction began March 5,<br />

2008. On April 23, 2008 the construction was substantially complete. The connection at the school has now been made<br />

and they are receiving reclaimed water. A no-cost time extension amendment was executed March 22, 2006. The<br />

Peace Basin Board encumbered $150,000 in its FY2004 budget. To date, the District has reimbursed EWD $127,240.<br />

This project is now complete.<br />

020 - Peace River Basin 247


L151<br />

Sebring - WMPlan Sebring<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Flood Protection, Water Quality<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

City of Sebring<br />

Project Manager FRIES, GEORGE<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This is a multi-year funded project to perform 1) Topographic Information, 2) Watershed Evaluation, and 3) Watershed<br />

Management Plan elements of the District's Watershed Management Program (WMP) for the City of Sebring<br />

Watershed. The watershed covers an area of approximately 51 square miles and is located in northwest Highlands<br />

County. Issues in the watershed include rapid growth and potential water quality issues because runoff from the city<br />

discharges to Lake Jackson. Since the project began in FY2004 the city has experienced considerable growth in the<br />

form of annexation and the city's land area has more than doubled. With prior years funding the Topographic<br />

Information, Watershed Evaluation and Watershed Management Plan for the then existing incorporated area of the<br />

city were completed. With FY2007 funding the work on the Topographic Information, Watershed Evaluation and<br />

Watershed Management Plan elements for the additional incorporated land began. With FY2008 funding the<br />

remaining work on the Watershed Management Plan, including the BMP Alternative Analysis and the Surface Water<br />

Resource Assessment will be completed.<br />

Benefits<br />

The WMP provides a method to evaluate the capacity of a watershed to protect, enhance, and restore water quality<br />

and natural systems, while achieving flood protection. The information developed provides the science for the District's<br />

Resource Management and Environmental Resource Permitting (ERP). It assists local governments: 1) with their land<br />

management responsibilities by establishing a level of service and developing Best Management Practices (BMPs) to<br />

address level of service deficiencies, and 2) provides a geodatabase and projected results from watershed model<br />

simulations for floodplain management and water quality management.<br />

Costs<br />

The total budgeted amount for this project, including the completed FY2004 work, is $345,000 of which the District's<br />

multi-year share is $258,750. Sebring, located in Highlands County, is a R.E.D.I. community and is seeking a<br />

reduction of the standard 50% funding match to one where the Peace River Basin Board will fund 75% of the project<br />

costs and the city will fund 25%. For FY2008, $25,000 is appropriated in the Basin Board's budget with revenue of<br />

$6,250 from the City of Sebring. When each element is completed the project budget and scope may require<br />

refinement based on the information gathered. The District funding amounts shown in the table include staff salaries.<br />

Additional Information<br />

The WMP includes five major elements: 1) Topographic Information, 2) Watershed Evaluation, 3) Watershed<br />

Management Plan, 4) Implementation of BMPs, and 5) Maintenance of Watershed Parameters and Models.<br />

Implementing elements of the WMP with local governments is one of the Comprehensive Watershed Management<br />

(CWM) initiative strategies and one of the District's Strategic Priorities. A cooperative funding revenue agreement with<br />

the City of Sebring has been developed. The District is managing the project and has entered into purchase orders<br />

and agreements to accomplish project tasks. Future cooperative funding requests and agreements will be required for<br />

the Implementation of BMPs and Maintenance of Watershed Parameters and Models.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 280,746 0 3,194 2,204<br />

0 286,144<br />

District Budgeted - Outside Revenue<br />

Sebring - Water Mgmt Plan (L151) 86,250 0 0<br />

0<br />

0 86,250<br />

020 - Peace River Basin 248<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$372,394


L151<br />

Sebring - WMPlan Sebring<br />

Critical Project Milestones Projected Amended Actual<br />

1. Critical Project Milestones<br />

District logo will appear on all reports 11/1/05 8/1/05<br />

2. Cooperator Agreement<br />

Draft Agreement to Management Services 7/15/03 7/15/03<br />

Draft Agreement Returned from Management Services 7/28/03 7/28/03<br />

Peace River Basin Board Approval of Agreement 8/15/03 8/15/03<br />

Governing Board Approval of Agreement 8/26/03 8/26/03<br />

Cooperator Contract Executed (Revenue Agreement) <strong>10</strong>/1/03 <strong>10</strong>/1/03<br />

First Amend. to Cooperator Contract Executed (Expenditure) 1/30/04 1/30/03<br />

Second Amend. to Cooperator Contract Executed (Revenue) 4/13/04 6/29/04<br />

Third Amend. to Cooperator Contract Executed (FY2005 funding) <strong>10</strong>/1/04 12/1/04<br />

Fourth Amend. to Cooperator Contract Executed (FY2007 funding) (Annexed<br />

Land)<br />

<strong>10</strong>/1/06 8/29/06<br />

Fifth Amend. to Cooperator Contract Executed (FY2008 funding) <strong>10</strong>/1/07 2/12/08<br />

3. Consultant Agreement<br />

Consultant Agreement Executed 1/1/05 12/1/04<br />

Consultant Notice to Proceed (Work Order #1 DTI & WE ) 1/1/05 12/2/04<br />

3A. Work Order #1<br />

Element 1, Digital Topographic Information Commence 5/1/04 7/15/04<br />

Element 1, Digital Topographic Information Complete 3/1/05 2/7/05<br />

Element 2, Watershed Evaluation Commence 5/1/05 2/15/05<br />

Element 2, Watershed Evaluation Complete 11/1/05 9/2/05<br />

4. Work Order #2<br />

Work Order Executed (WMP) 9/13/05 9/13/05<br />

Element 3, Watershed Management Plan Commence 11/1/05 9/13/05<br />

Element 3, Watershed Management Plan Complete 3/1/06 6/1/06 6/1/06<br />

5. Annexed Land<br />

Consultant Agreement Executed 2/28/07 12/4/06<br />

Notice to Proceed to Consultant 3/1/07 12/13/06<br />

Element 1, Digital Topographic Information Commence 3/1/07 12/13/06<br />

Element 2, Watershed Evaluation Commence 7/1/07 1/22/07<br />

Element 1, Digital Topographic Information Complete 9/1/07 2/18/07<br />

Element 3, Watershed Management Plan Commence 9/1/07<br />

Element 2, Watershed Evaluation Complete 11/1/07<br />

Element 3, Watershed Management Plan Complete 9/1/08 4/4/09<br />

6. Contract Completion<br />

Consultant Agreement Expiration (Annexed Land) 12/31/08 12/31/09<br />

Cooperator Agreement Expiration (Annexed Land) 12/31/08 12/31/09<br />

Status As Of: August 24, 2009<br />

Status History: Staff prepared the Cooperative Funding Agreement which was approved by the Boards and signed by the<br />

Executive Director on <strong>10</strong>/01/2003. District staff prepared an amendment to incorporate the FY2005 funding and the<br />

amendment was executed with an effective date of October 1, 2004. The District Staff prepared a contract for<br />

engineering services with BCI to perform the Watershed Management Program. The project kick off meeting was held<br />

on December 17, 2004. Work on the elements of the WMP for the then existing incorporated areas of the city was<br />

completed. The City applied for cooperative funding for FY2007 to continue the WMP in the newly annexed areas of the<br />

city south of Little Lake Jackson. The Basin Board budgeted $120,000 with revenue of $30,000 from Sebring for FY2007<br />

for the next phase of the WMP for the city. A fourth contract amendment to incorporate the FY2007 funding to begin<br />

work on the WMP for the newly annexed land south of Lake Jackson was executed by both parties. The District<br />

continues to be the lead party in this agreement. The project kick off meeting for this phase of the work was held on<br />

12/13/2006 and work began. The Digital Topographic Information deliverable has been submitted and approved. Work<br />

on the Watershed Evaluation began and is continuing. The City applied for additional cooperative funding to complete the<br />

remaining elements of the Watershed Management Plan for the annexed land and the Board budgeted $25,000 in<br />

FY2008. The fifth amendment to the Agreement, to incorporate the FY2008 funding, has been executed. The consultant<br />

is continuing work on the model setup and development. District staff met with the consultant on May 20, 2008 and on<br />

August 20, 2008 to discuss project status. The amendment to the consultant agreement to incorporate the FY2008<br />

020 - Peace River Basin 249


L151<br />

Sebring - WMPlan Sebring<br />

funding has been executed. Current Status: Work on this project has been delayed due to the ongoing corrective work<br />

for the Hernando, Pasco & Sarasota County watersheds. District staff has had periodic meetings with the consultant to<br />

discuss project status and schedule.<br />

020 - Peace River Basin 250


L152<br />

Avon Park - WMPlan Avon Park<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Flood Protection, Water Quality<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Avon Park<br />

Project Manager FRIES, GEORGE<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This is a multi-year funded project to perform 1) Topographic Information, 2) Watershed Evaluation, and 3) Watershed<br />

Management Plan elements of the District's Watershed Management Program (WMP) for the City of Avon Park<br />

Watershed. The watershed covers an area of approximately 16 square miles and is located in northwest Highlands<br />

County. Issues in the watershed include unabated, untreated runoff into lakes Isis, Verona, Tulane, Lelia and Lotela<br />

causing degradation of the water quality within the lakes. Since the project began in FY2004 the city has experienced<br />

considerable growth in the form of annexation. With prior years funding the Topographic Information, Watershed<br />

Evaluation and Watershed Management Plan for the then existing incorporated area of the city were completed. With<br />

FY2007 funding the work on the Topographic Information, Watershed Evaluation and Watershed Management Plan<br />

elements for the additional incorporated land north of the city center began and should be completed.<br />

Benefits<br />

The WMP provides a method to evaluate the capacity of a watershed to protect, enhance, and restore water quality<br />

and natural systems, while achieving flood protection. The information developed provides the science for the District's<br />

Resource Management and Environmental Resource Permitting (ERP). It assists local governments: 1) with their land<br />

management responsibilities by establishing a level of service and developing Best Management Practices (BMPs) to<br />

address level of service deficiencies, and 2) provides a geodatabase and projected results from watershed model<br />

simulations for floodplain management and water quality management.<br />

Costs<br />

The total budgeted amount for this project, including the completed FY2004 work, is $298,000 of which the District's<br />

multi-year share is $223,500. Avon Park, located in Highlands County, is a REDI community and is seeking a<br />

reduction of the standard 50% funding match to one where the Peace River Basin Board will fund 75% of the project<br />

costs and the city will fund 25%. When each element is completed the project budget and scope may require<br />

refinement based on the information gathered. The District funding amounts shown in the table include staff salaries.<br />

Additional Information<br />

The WMP includes five major elements: 1) Topographic Information, 2) Watershed Evaluation, 3) Watershed<br />

Management Plan, 4) Implementation of BMPs, and 5) Maintenance of Watershed Parameters and Models.<br />

Implementing elements of the WMP with local governments is one of the Comprehensive Watershed Management<br />

(CWM) initiative strategies and one of the District's Strategic Priorities. A cooperative funding revenue agreement with<br />

the City of Avon Park has been developed. The District is managing the project and has entered into purchase orders<br />

and agreements to accomplish project tasks. Future cooperative funding requests and agreements will be required for<br />

the Implementation of BMPs and Maintenance of Watershed Parameters and Models.<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 168,863 0 7,116 2,250<br />

0 178,229<br />

District Budgeted - Outside Revenue<br />

Avon Park - Water Mgmt Program<br />

(L152)<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

49,500 0 0<br />

0<br />

Total:<br />

Future<br />

Funding<br />

0<br />

Total<br />

Funding<br />

49,500<br />

$227,729<br />

Critical Project Milestones Projected Amended Actual<br />

020 - Peace River Basin 251


L152<br />

Avon Park - WMPlan Avon Park<br />

1. Critical Project Milestones<br />

District logo will appear on all reports 9/8/04 8/23/04<br />

2. Cooperator Agreement<br />

Draft Agreement to Management Services 7/15/03 7/15/03<br />

Draft Agreement Returned from Management Services 7/28/03 7/28/03<br />

Peace River Basin Board Approval of Agreement 8/15/03 8/15/03<br />

Governing Board Approval of Agreement 8/26/03 8/26/03<br />

Cooperator Agreement Executed <strong>10</strong>/1/03 <strong>10</strong>/1/03<br />

3. Consultant Agreement<br />

Consultant Agreement Executed 2/8/04 2/8/04<br />

Consultant Notice to Proceed Work Order #1 DTI & WE) 2/16/04 2/16/04<br />

Element 1, Digital Topographic Information Commence 2/16/04 2/16/04<br />

Element 2, Watershed Evaluation Commence 4/1/04 4/1/04<br />

Element 1, Digital Topographic Information Complete 5/8/04 5/3/04<br />

Element 2, Watershed Evaluation Complete 9/8/04 3/15/05 11/19/04<br />

4. 1st Amendment to Consultant Agreement (no cost time ext)<br />

Element 3, Watershed Management Plan Commence <strong>10</strong>/30/04 3/15/05<br />

Amendment Executed (including Work Order #2 WMP) 4/14/05 4/14/05<br />

Element 3, Watershed Management Plan Complete 8/8/05 1/15/06 8/18/06<br />

Consultant Agreement Expiration 8/8/05 2/8/06 2/8/06<br />

Cooperator Agreement Expiration 2/16/06 2/16/06<br />

5. Cooperator Agreement (Annexed Land)<br />

Draft Agreement to Contracts Section 7/31/06 7/31/06<br />

Draft Agreement Returned from Contracts Section 8/<strong>10</strong>/06 8/<strong>10</strong>/06<br />

Cooperator Agreement Executed <strong>10</strong>/1/06 8/27/06<br />

FY2007 Funds Encumbered <strong>10</strong>/1/07 <strong>10</strong>/13/07<br />

6. Consultant Agreement (Annexed Land)<br />

Consultant Agreement Executed 2/28/07 11/6/06<br />

Consultant Notice to Proceed 3/1/07 11/14/06<br />

Element 1 Digital Topographic Information Commence 3/1/07<br />

Element 2 Watershed Evaluation Commence 7/1/07 12/15/06<br />

Element 1 Digital Topographic Information Complete 9/1/07 1/30/08<br />

Element 3 Watershed Management Plan Commence 9/1/07<br />

Element 2 Watershed Evaluation Complete 11/1/07<br />

Element 3 Watershed Management Plan Complete 9/1/08 12/31/09<br />

7. Contract Completion (Annexed Land)<br />

Consultant Agreement Expiration 12/31/08 12/31/09<br />

Cooperator Agreement Expiration 12/31/08 12/31/09<br />

Status As Of: August 24, 2009<br />

Status History: Staff prepared the Cooperative Funding Agreement which was approved by the Boards and signed by the<br />

Executive Director on <strong>10</strong>/01/2003. The District is the lead party to the Agreement and is responsible for administration of<br />

the contract with the consultant. The kick off meeting was held on February 24, 2004. The final WMP for the then<br />

existing incorporated areas of the City was submitted and approved. The city applied for cooperative funding for FY2007<br />

to continue the WMP in newly annexed areas of the city. A revenue agreement to incorporate the FY2007 funding was<br />

executed by both parties. The District continues to be the lead party in this agreement. The project kick off meeting was<br />

held on 12/13/2007. Work on the Digital Topographic Information was delayed because delivery of the LiDAR data from<br />

the District was several months behind schedule. The consultant submitted the Digital Topographic Information for<br />

review. The consultant is working on elements of the Watershed Evaluation. The Watershed Parameterization was<br />

submitted and comments were provided to the consultant. The City requested and received FY2008 cooperative funding<br />

to extend the WMP to additional annexed land north of the Avon Park Municipal Airport. An amendment to the revenue<br />

agreement with the City to incorporate the FY2008 cooperative funding was prepared and was sent to the City for<br />

execution. The City Manager notified the District on May 19, 2008 that the City would withdraw from the phase of the<br />

project funded by the FY2008 budget. Work on the remainder of the project is continuing. District staff met with the<br />

consultant on August 20, 2008 to discuss project status. Current Status: Work on this project has been delayed due to<br />

the ongoing corrective work for the Hernando, Pasco & Sarasota County watersheds. District staff has had periodic<br />

meetings with the consultant to discuss project status and schedule. District staff is drafting a work order to incorporate<br />

infiltration and percolation into the watershed model.<br />

020 - Peace River Basin 252


L153<br />

Lake Placid Reuse<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply, Water Quality<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Lake Placid<br />

Project Manager BADER, TAMMY<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This alternative water supply project includes the design and construction of a reclaimed water pump station and a<br />

500,000-gallon capacity reclaimed water ground storage tank located at the town wastewater treatment facility<br />

(WWTF) site, and approximately 6,446 linear feet of <strong>10</strong>-inch, 8-inch, and 6-inch diameter reclaimed water<br />

transmission main.<br />

Benefits<br />

This project will provide approximately 91,000 gallons per day of reuse to the Town of Lake Placid to irrigate town<br />

parks and recreation facilities (81,000 gpd)(WUP # 9494) and citrus groves owned by Bob Paul, Inc. (<strong>10</strong>,000 gpd)<br />

(WUP # <strong>10</strong>077). The project will offset approximately 55,000 gpd of groundwater use currently used by these<br />

properties for irrigation purposes.<br />

Costs<br />

The Peace River Basin's total contribution, requested by the Town of Lake Placid, is based on Rural Economic<br />

Development Initiative (REDI) consideration. The total estimated project cost is $1,374,200, with the Peace River<br />

Basin's share not to exceed $962,574, and the Town's share not to exceed $411,626. This funding contribution ratio<br />

represents a 67.5 percent / 32.5 percent District/Town split, as approved by the Peace River Basin Board. The Peace<br />

River Basin included $<strong>10</strong>0,000 for this project in its FY2004 budget and $414,030 in its FY2005 budget. The Town<br />

requested that the Peace River Basin include $414,030 in its FY2006 budget. However, funds in the amount of<br />

$117,420 were allocated from the Water Protection and Sustainability Trust Fund Program, changing the amount in<br />

FY2006 budgeted by the Peace River Basin to $448,544.<br />

Additional Information<br />

The town has also indicated it is pursuing additional reuse customers that may be served in the future. Of the total<br />

project cost of $1,374,200, approximately 90 percent ($1,234,200) is expected to be needed for construction, and the<br />

remainder ($140,000) for design and administration.<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 849,554 0 1,299 8<strong>10</strong><br />

0 851,663<br />

District Budgeted - Outside Revenue<br />

Water Protection & Sust T.F.<br />

(Alternative Wtr)<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

117,420 0 0<br />

0<br />

0<br />

117,420<br />

Project Funds Not Budgeted by the<br />

District<br />

Town of Lake Placid 411,626 0 0<br />

0<br />

0 411,626<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$1,380,709<br />

Critical Project Milestones Projected Amended Actual<br />

Draft Agreement to Contracts Administration 7/12/04 9/17/04<br />

Draft Agreement Returned from Contracts Administration 8/12/04 11/<strong>10</strong>/04<br />

020 - Peace River Basin 253


L153<br />

Lake Placid Reuse<br />

Contract Executed 9/1/04 1/5/04<br />

Design & Permitting Commencement 12/1/04 12/9/04<br />

Design & Permitting Completion 12/31/04 6/30/07 6/30/07<br />

Signage Erected 3/1/05 5/1/08 6/12/08<br />

Construction Commencement 3/1/05 5/1/08 6/12/08<br />

Construction Completion 3/1/05 5/1/09<br />

Contract Close-out 12/31/06 12/31/<strong>10</strong><br />

Offset Report 12/31/09 12/31/11<br />

Status As Of: August 19, 2009<br />

The engineering consultants (Keith & Schnars) were given notice to proceed on March 17, 2005, and as of June 30,<br />

2007 have completed <strong>10</strong>0% of the design. A no-cost-time extension was executed on September 12, 2005 to allow for<br />

the completion of design and for project construction; extending the contract expiration date to December 31, 2008. A<br />

second amendment was executed on May 22, 2006 to reflect State of Florida funding participation, SB 444. The Town of<br />

Lake Placid requested a third amendment to the project to change the scope of work and extend of the timelines due to a<br />

portion of the pipeline being installed and paid for under a CDBG, which the Peace River Basin approved at its July 27,<br />

2007 meeting. The third amendment was fully executed by the Executive Director on August 2, 2007. The town has<br />

selected RTD Construction, Inc. for the storage tank phase of the project and Flow-Line, Inc. for the reuse mains phase<br />

of the project. A preconstruction meeting was held on June <strong>10</strong>, 2008. RTD was given Notice to Proceed for June 12,<br />

2008 and Flow-Line was given Notice to Proceed for June 16, 2008. RTD has completed construction of the tank,<br />

booster station, and pump, and punch list items are currently being completed. Flow-Line has completed construction of<br />

the transmission mains, pressure testing has been completed, and punch list items are currently being completed. To<br />

date, $962,574 has been encumbered, of which $799,445.86 has been reimbursed and $87,130,16 is pending<br />

reimbursement. Governor Crist's Accelerate Florida Initiative ACTION-TO-DATE: On-Time. Project is 90 percent<br />

complete and no cooperator action is required.<br />

020 - Peace River Basin 254


L206<br />

FYN Builder/Dev Charlotte, Manatee, Sarasota<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply, Water Quality, Natural Systems<br />

Basin(s) Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager DURELL, SYLVIA<br />

Task Manager(s)<br />

Status Completed<br />

Charlotte County, Charlotte Harbor National Estuary Program, Manatee County, Manatee County<br />

Cooperative Extension Service, Sarasota Bay Estuary Program, Sarasota County<br />

Description<br />

This program provided education on Florida-friendly landscaping primarily to builders, developers and landscape and<br />

irrigation professionals through conferences, workshops, one-on-one interactions, newspaper articles, electronic<br />

media and distribution of printed materials. The coordinator also certified the landscape section of the model homes<br />

being reviewed for the Florida Green Building Coalition's certification criteria. Because new home building declined and<br />

to enhance consistency, outreach to builders, developers and landscape professionals has been consolidated under<br />

the Florida Water Star GoldSM program (B277). For that reason, and at staff's request, Manatee County withdrew its<br />

application for funding of the FYN Charlotte, Manatee, Sarasota Builder/Developer program for FY20<strong>10</strong>.<br />

Benefits<br />

Reognizing that the majority of decisions concerning new landscapes are made by builders, developers, landscape<br />

and irrigation professionals, this program benefitted water resources by promoting the use of the nine Florida Yards &<br />

Neighborhoods principles to that audience. Approximately 5,000 builders, developers, landscape and irrigation<br />

specialists and realtors received education annually on Florida-friendly landscaping and best management practices<br />

through personal meetings and workshops.<br />

Costs<br />

The total cost of the FY2009 project was $141,000, with the District contibuting $70,500, (Manasota $52,875): (Peace<br />

River $17,625). District funds supported the contracted outreach coordinator's salary, travel, training, materials and<br />

office expenses. Manatee County provided in-kind support for administrative and supervisory support, office expenses<br />

including a computer, telephone, office supplies and promotional materials. Budget lines below included costs for staff<br />

to manage the project.<br />

Additional Information<br />

The District funded education outreach to builders and developers in the tri-county area from FY2005 to FY2009.<br />

Education was based on the nine Florida-friendly landscapingTM principles that were created by the University of<br />

Florida/Institute of Food and Agricultural Sciences for the FYN program: Right Plant, Right Place, Water Efficiently,<br />

Fertilize Appropriately, Mulch, Attract Wildlife, Manage Yard Pests Responsibly, Recycle, Reduce Stormwater Runoff<br />

and Protect the Waterfront. Education outreach for the six months the FY2009 program was active includes the<br />

following: 27 group presentations/workshops to 80 people; 1,378 contacts with individuals; 177 building or green<br />

industry contacts; 22 FWSG contacts; 203 HOA,COA contacts; 3 realtor contacts; 1 exhibit attracting 30,000 people;<br />

900 pieces of educational materials distributed and 4 newsletter articles that potentially reached 1,050 people per<br />

issue and 5 newspaper articles that potentially reached 276,<strong>10</strong>1 people.<br />

020 - Peace River Basin 255


L206<br />

FYN Builder/Dev Charlotte, Manatee, Sarasota<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 76,242 0 20,005<br />

0<br />

0 96,247<br />

0<strong>21</strong> Manasota Basin 224,468 0 53,708<br />

0<br />

0 278,176<br />

Project Funds Not Budgeted by the<br />

District<br />

Charlotte County 45,000 0 15,000<br />

0<br />

0 60,000<br />

Manatee County 95,000 0 46,000<br />

0<br />

0 141,000<br />

Sarasota Bay Estuary Program 53,000 0 3,500<br />

0<br />

0 56,500<br />

Sarasota County <strong>10</strong>3,000 0 6,000<br />

0<br />

0 <strong>10</strong>9,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$740,923<br />

Critical Project Milestones Projected Amended Actual<br />

FY2008<br />

Purchase order created <strong>10</strong>/1/07 <strong>10</strong>/1/07<br />

First advisory committee meeting 1/17/08 1/17/08<br />

First task report 1/17/08 1/17/08<br />

Second advisory committee meeting 4/17/08 4/17/08<br />

Second task report 4/30/08 4/17/08<br />

Third advisory committee meeting 7/17/08 8/14/08 8/14/08<br />

Third task report 7/24/08 7/24/08<br />

Project complete 9/30/08 9/30/08<br />

Fourth advisory committee meeting: <strong>10</strong>/16/08 <strong>10</strong>/16/08<br />

Fourth task report: <strong>10</strong>/31/08 <strong>10</strong>/<strong>10</strong>/08<br />

FY2009<br />

Purchase order created <strong>10</strong>/<strong>10</strong>/08 11/1/08 <strong>10</strong>/27/08<br />

First advisory committee meeting 1/13/09 1/13/09<br />

First task report 1/30/09 1/3/09<br />

Second advisory committee 4/15/09 4/14/09<br />

Second task report 4/30/09 4/15/09<br />

Project complete 9/30/09 5/30/09 5/30/09<br />

Status As Of: August 20, 2009<br />

ACTION TO DATE: Completed. Manatee County has withdrawn its application for funding of the FYN Charlotte,<br />

Manatee, Sarasota Builder/Developer program for FY20<strong>10</strong>. Michelle Atkinson, former FYN Builder & Developer<br />

Coordinator for Charlotte, Manatee and Sarasota counties, is now the FYN coordinator for homeowner outreach in<br />

Manatee County. Total FY2009 funding for this project was $70,500. The final invoice was approved 7/16/2009.<br />

Expenditures for FY2009 total $41,125, leaving a balance of $29,375. Education outreach for the six months the program<br />

was active includes the following: 27 group presentations/workshops to 80 people; 1,378 contacts with individuals; 177<br />

building or green industry contacts; 22 FWSG contacts; 203 HOA,COA contacts; 3 realtor contacts; 1 exhibit attracting<br />

30,000 people; 900 pieces of educational materials distributed and 4 newsletter articles that potentially reached 1,050<br />

people per issue and 5 newspaper articles that potentially reached 276,<strong>10</strong>1 people.<br />

020 - Peace River Basin 256


L<strong>21</strong>5<br />

Rotunda ASR Well Conversion for Reuse Water<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply, Water Quality<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Charlotte County Utilities<br />

Project Manager BADER, TAMMY<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This ongoing, multiyear, alternative water supply project consists of a feasibility study to evaluate the alternatives for<br />

installation of a reclaimed water ASR and, if feasible, the conversion of one (1) existing potable water supply well<br />

located in the Rotonda area to an Aquifer Storage and Recovery (ASR) well for reuse. Upon the successful completion<br />

of the feasibility study and favorable outcome of the preliminary permitting, Charlotte County Utilities will proceed with<br />

the design, final permitting, construction and testing of the recommended ASR well system and associated piping to<br />

directly connect the ASR well to the reclaimed water transmission system. The ultimate goal of the project is to create<br />

an underground storage reservoir for reuse water produced initially by the Rotunda Wastewater Treatment Facility<br />

(WWTF), and eventually for the combined reuse water in the west county and possibly central county areas.<br />

Benefits<br />

This project will help to satisfy the short term need to provide wet weather storage space for reuse water, beyond what<br />

currently exists at the Rotonda Water Reclamation Facility, which is minimal. The longer term need served by this<br />

project is to provide regional storage capacity for excess wet weather reuse for the entire west county area and<br />

ultimately for the central portion as well, and facilitate the eventual interconnection of the central and west county reuse<br />

systems to provide adequate reuse water for the entire region.<br />

Costs<br />

The total project cost for the feasibility study and ASR well system is estimated to be $3,000,000. The District is<br />

requested to reimburse Charlotte County for up to 50 percent of the eligible project costs up to a maximum of<br />

$1,500,000. The Peace River Basin budgeted $<strong>10</strong>0,000 in FY2005, $380,450 in FY2007, $240,000 in FY2008,<br />

$<strong>21</strong>6,250 in FY2009 and $225,000 in FY20<strong>10</strong>. Funds in the amount of $90,900 in FY2007 and $80,000 in FY2008<br />

have been allocated to the project from the Water Protection and Sustainability Trust Fund; these funds will be applied<br />

to reduce the Peace River Basin Board cost share. It is expected that Charlotte County will request $423,750 in<br />

FY2011 for the sixth and final year of funding for this multi-year project. No cost-benefit is calculated for this project, as<br />

it provides additional storage. The future funds identified for the project are contingent upon approval of such amounts<br />

by the District Governing and Basin Boards in the annual budget(s).<br />

Additional Information<br />

Charlotte County Utilities (CCU) previously completed a feasibility study indicating that such a conversion would be<br />

feasible. However, upon completion of the ASR Reuse Feasibility Study, CCU determined that a new ASR well system<br />

at Rotonda would be advantageous and submitted an application for construction of a Class V Well at the Rotonda<br />

site to the Department of Environmental Protection. Factors determining that the conversion of the potable well would<br />

not work included the capacity and recovery rate of the well and the current DEP stance on permitting ASR wells.<br />

Thus, it was determined a new well would be constructed at Rotonda in a non-drinking water standard zone (greater<br />

than <strong>10</strong>,000 tds). CCU will proceed with the design, final permitting, construction and testing of the recommended<br />

ASR well system and associated piping to directly connect the ASR well to the reclaimed water transmission system.<br />

The predicted recovery rate for the ASR well is expected to be between 70% and 90% (700,000gpd to 900,000gpd) of<br />

the estimated recharge after the buffer zone is achieved. The amount of water to be stored and delivered during<br />

recharge (including the buffer zone) upon the ASR well being placed into service is expected to be between <strong>10</strong>0 to<br />

150 million gallons and 1,000,000 gpd, respectively. The county is also currently cooperating with the District on a<br />

project to interconnect its two major WWTF's. The Charlotte County Regional Reclaimed Water Expansion project<br />

(H027) will construct a major portion of the necessary transmission piping to interconnect Charlotte County's East Port<br />

and West Port WWTF's. CCU's current demand for reclaimed water exceeds 2,000,000 gallons per day (gpd), but the<br />

facility can only produce up to 800,000 gpd and supplemental surface water sources are being utilized to make up for<br />

the additional demand (1,200,000 gpd). This is a stand-alone project; however, upon successful implementation of the<br />

single ASR well system, it is expected that two more ASR well systems will be completed as a second phase of this<br />

project. Of the total project cost of $3,000,000, approximately 73 percent ($2,200,000) is expected to be needed for<br />

construction, and the remainder ($800,000) for design and administration.<br />

020 - Peace River Basin 257


L<strong>21</strong>5<br />

Rotunda ASR Well Conversion for Reuse Water<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 561,623 0 <strong>21</strong>9,646 228,441 423,750 1,433,460<br />

District Budgeted - Outside Revenue<br />

Water Protection & Sust T.F.<br />

(Alternative Wtr)<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

170,900 0 0<br />

0<br />

0<br />

170,900<br />

Project Funds Not Budgeted by the<br />

District<br />

Charlotte County 549,550 0 432,500 432,500<br />

0 1,414,550<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$3,018,9<strong>10</strong><br />

Critical Project Milestones Projected Amended Actual<br />

Draft Agreement to Contracts Administration 9/1/05 9/8/05<br />

Contract Executed 11/30/05 1/31/06<br />

Design Commencement 1/1/06 4/1/07 9/6/07<br />

Feasibility Study Completion <strong>10</strong>/1/06 1/8/07<br />

Permit Received 1/31/08 1/22/09<br />

Signage Erected <strong>10</strong>/1/09<br />

Construction Commencement <strong>10</strong>/1/09<br />

Construction Completion <strong>10</strong>/1/11<br />

Contract Close-out 1/31/12<br />

Offset Report 1/31/13<br />

Status As Of: August 19, 2009<br />

A Cooperative Funding Agreement (effective October 1, 2005) was executed on January 31, 2006. Malcom Pirnie<br />

submitted the final Reuse ASR Feasibility Study on January 8, 2007. A no cost amendment was executed on 02/02/07.<br />

This amendment added additional language and requirements due to Water Protection and Sustainability Trust funds<br />

being allocated in FY2007. A second amendment was executed on January 28, 2008 to reflect the project changes<br />

approved during the regular cooperative funding cycle. The FDEP issued a Permit to Construct the ASR Well on January<br />

22, 2009. Charlotte County submitted bid documents for the construction of the ASR well on May 30, 2009. To date,<br />

$936,700 has been encumbered and $225,000 has been budgeted for this project of which $2<strong>21</strong>,081.25 has been<br />

reimbursed. Governor Crist's Accelerate Florida Initiative ACTION-TO-DATE: On-time. Project construction bid<br />

documents were delivered to the District and were approved according to project requirements. The cooperator is<br />

anticipating construction of the ASR well to be complete by the end of 20<strong>10</strong>. District staff will coordinate with the<br />

cooperator to ensure that bids and contractor selections are made according to project requirements.<br />

020 - Peace River Basin 258


L314<br />

Highlands WMPlan Carter Creek<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Flood Protection, Water Quality<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Highlands County<br />

Project Manager ARNOLD, DAVE<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This is a multi-year funded project to perform 1) Topographic Information, 2) Watershed Evaluation, and 3) Watershed<br />

Management Plan elements of the District's Watershed Management Program (WMP) for the Carter Creek<br />

Watershed. The watershed covers an area of approximately 32 square miles in Highlands County, including nine lakes<br />

and more than 2,<strong>10</strong>0 acres of surface water. Trends toward lake level declines and degraded water quality are priority<br />

issues within this watershed. The project will address these and other issues to improve water quality, natural systems,<br />

and flood protection. FY2005 and 2007 funding is budgeted to complete the Topographic Information, Watershed<br />

Evaluation, and Watershed Management Plan elements. Topographic information includes the acquisition of data and<br />

development of the terrain features in the Geodatabase to be used in the Watershed Evaluation. The Watershed<br />

Evaluation includes collection of existing data, GIS processing of the terrain features to establish catchments and<br />

connectivity, field reconnaissance, refinement of the terrain features and development of the hydraulic element point<br />

features. The Watershed Management Plan element includes: development of watershed parameters for a specific<br />

use, GIS processing, computer modeling, floodplain and water quality analysis, surface water resource assessment,<br />

establishment of LOS, BMP alternative analysis. The Cooperator submitted the project for REDI consideration.<br />

Benefits<br />

The WMP provides a method to evaluate the capacity of a watershed to protect, enhance, and restore water quality<br />

and natural systems, while achieving flood protection. The information developed provides the science for the District's<br />

Resource Management and Environmental Resource Permitting (ERP). It assists local governments: 1) With their land<br />

management responsibilities by establishing a level of service and developing Best Management Practices (BMPs) to<br />

address level of service deficiencies. 2) Provides a Geodatabase and projected results from watershed model<br />

simulations for floodplain and water quality management.<br />

Costs<br />

The total budget for this multi-year project is $650,000, funded in FY2005 and FY2007. Under the REDI project<br />

funding split the Peace River Basin's 75% share totals $487,500, and Highland County's 25% share totals $162,500.<br />

The FY2007 budget is $385,000, of which $96,250 is revenue from the County and $288,750 is the Basin's<br />

contribution. When each element is completed the project budget may require refinement based on the information<br />

gathered.<br />

Additional Information<br />

A WMP includes five major elements: Topographic Information, Watershed Evaluation, Watershed Management Plan,<br />

Implementation of Best Management Practices, and Maintenance of Watershed Parameters and Models.<br />

Implementing elements of the WMP with local governments is one of the Comprehensive Watershed Management<br />

(CWM) initiative strategies. Funding will be used to complete the Topographic Information, Watershed Evaluation, and<br />

Watershed Management Plan elements. A cooperative funding revenue agreement with Highlands County has been<br />

be developed as a multi-year funded project contingent on the approval of future funding to complete the WMP<br />

elements through the Watershed Management Plan. This is a multi-year project that requires a cooperative funding<br />

request each fiscal year until completed. The District is managing the project and entering into purchase orders and<br />

agreements to accomplish project tasks. Future cooperative funding requests and agreements will be required for the<br />

Implementation of BMPs and Maintenance of Watershed Parameters and Models. Cooperator submitted project for<br />

REDI consideration.<br />

020 - Peace River Basin 259


L314<br />

Highlands WMPlan Carter Creek<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 513,875 0 9,840 7,837<br />

0 531,552<br />

District Budgeted - Outside Revenue<br />

Highlands Co - Carter Ck WMP (L314) 162,500 0 0<br />

0<br />

0 162,500<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$694,052<br />

Critical Project Milestones Projected Amended Actual<br />

1. Critical Project Milestones<br />

Draft Agreement to Management Services 1/1/06 1/1/06<br />

Draft Agreement returned from Management Services 4/1/06 2/1/06<br />

Consultant Contract Executed 6/1/06 7/1/06<br />

Watershed Evaluation Start 9/1/06 8/1/06<br />

Watershed Evaluation Complete 11/1/07 4/1/08<br />

Watershed Plan Start 1/1/08 4/1/08<br />

Watershed Plan Complete 4/1/09<br />

Contract Termination <strong>10</strong>/1/09<br />

Status As Of: September 04, 2009<br />

Status History: A cooperative funding agreement, consulting services agreement, and contract for LiDAR mapping have<br />

been executed. Notice to proceed with watershed consulting services was effective the date of the project kick-off<br />

meeting, which was held on August 29, 2006. Current Status: LiDAR mapping is complete/accepted. The consultant has<br />

completed topographic information, watershed evaluation, field reconnaisance, and field survey tasks. A work order has<br />

been issued to complete the remaining project tasks, consisting of model parameterization, model<br />

development/verification, floodplain analysis, level of service analysis, and best management practices assessment. The<br />

consultant's work on the model parameterization task has been put on hold due to discovery of problems with the Peace<br />

River LiDAR, which was used for DTM development within a portion of the Carter Creek project area. District staff is<br />

working with the LiDAR vendor to resolve problems, and submittal of a corrected LiDAR data set expected within two<br />

months. The Carter Creek project will commence again upon receipt/approval of the corrected LiDAR data.<br />

020 - Peace River Basin 260


L324<br />

Lakeland - Lk Parker Stormwater BMP Imp<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Quality, Natural Systems<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

City of Lakeland<br />

Project Manager ZAJAC, CHRIS<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This project involves the engineering design, permitting, and construction of a stormwater treatment system within the<br />

southwest basin of Lake Parker, the most urbanized basin draining to Lake Parker. Earlier studies completed for Lake<br />

Parker indicated that this basin discharges high pollutant loads into the lake. This project will build upon previous City<br />

and District efforts in this problematic basin. The first treatment system was constructed at the lake shore or<br />

downstream portion of this drainage basin (Lake Parker Southwest Outfall Retrofit, P742), and included a large system<br />

of baffle boxes to stop sediments and trash from reaching the lake. This project will focus on the upper reaches of the<br />

watershed and will provide much needed attenuation of stormwater upstream of the previously completed project. This<br />

upstream project will provide significant pollutant load reductions and will increase the effectiveness of the first<br />

completed treatment system. The long-term benefits of the project include a reduction in the loading of sediments,<br />

trash, and nutrients to Lake Parker.<br />

Benefits<br />

The design will include components that will reduce peak flows through storage and release and provide water quality<br />

treatment through attenuation of stormwater. This project will significantly enhance the treatment efficiency of the<br />

previously completed project along the lake shore (P742). The project will treat stormwater in a 595 acre sub-basin<br />

that drains to Lake Parker.<br />

Costs<br />

The total project cost for design, permitting, land acquisition and construction is $3,765,550. The FY2005 cost for<br />

design and permitting is $125,000. The Peace River Basin Board has approved funding in the amount of $62,500 in<br />

FY2005 while the City will fund the remaining $62,500. The prior funding shown in the table below includes a feasibility<br />

study completed in FY2004. The Peace River Basin Board contributed $42,600 while the City contributed $42,600 for<br />

the FY2004 study. The Peace River Basin Board has budgeted $336,725, $470,863 and $187,632 respectively in<br />

FY2007, FY2008 and FY2009. The City will contribute $336,725, $470,863 and $470,863 respectively in FY2007,<br />

FY2008 and FY2009. In FY20<strong>10</strong> the City requested the Peace River Basin Board fund $683,440 while the City will<br />

fund $683,440. Due to budgetary constraints the Peace River Basin Board only included $200,000 in its FY20<strong>10</strong><br />

budget for this project. The District funding amounts shown in the table include staff salaries, travel and central garage<br />

charges.<br />

Additional Information<br />

Lake Parker is listed as an impaired waterbody by the Florida Department of Environmental Protection. The need for<br />

treating stormwater from this basin was identified in the Lake Parker Diagnostic Feasibility Study published by the<br />

District and the City of Lakeland in 1993. The 595-acre sub-basin on the southwest portion of Lake Parker is highly<br />

urbanized and was shown to be a major source of pollutant loading in the Study. Annual loading of total nitrogen (TN)<br />

and total phosphorus (TP) from this basin is 3,970 Kg and 998 Kg, respectively. This represents <strong>10</strong>% and 12% of the<br />

total external loading to the lake of TN and TP, respectively. A BMP evaluation of this basin was completed in FY2004<br />

(Project K857) and identified four retrofit sites in which wet detention ponds could be constructed. The FY2005 project<br />

currently underway will design and permit the retrofit sites identified in the FY2004 BMP evaluation. The design and<br />

permitting is contingent upon the City acquiring the land for these projects.<br />

020 - Peace River Basin 261


L324<br />

Lakeland - Lk Parker Stormwater BMP Imp<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 927,444 0 193,137 204,520<br />

0 1,325,<strong>10</strong>1<br />

Project Funds Not Budgeted by the<br />

District<br />

City of Lakeland 912,688 0 470,863 683,440<br />

0 2,066,991<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$3,392,092<br />

Critical Project Milestones Projected Amended Actual<br />

1. Contract Development & Execution (Design & Permitting)<br />

Agreement sent to Contracts Administration 2/15/05 7/18/05<br />

Agreement Approved By City Council 2/15/05 7/18/05<br />

Contract Executed 5/15/05 8/1/05<br />

Notice to Proceed 6/1/05 8/8/05<br />

2. Project Tasks (Design & Permitting)<br />

City's kick-off meeting 8/<strong>10</strong>/05 11/20/05<br />

Preliminary Design Plans 1/30/07 4/20/07<br />

Land Acquisition 5/31/07 4/6/09<br />

60% Design 6/30/07 2/28/09 11/6/08<br />

Pre-application meeting 9/30/07 3/30/09 11/4/08<br />

Permit Application and RAI <strong>10</strong>/15/07 6/30/09 2/17/09<br />

<strong>10</strong>0% Design <strong>10</strong>/30/07 6/30/09 3/13/09<br />

Engineer's Construction Cost Estimate 12/31/07 8/30/09 4/8/09<br />

3. Contract Development & Execution (Construction)<br />

Contract Executed 3/20/07 3/20/07<br />

First Amendment - Adding FY2008 Funds 1/28/08 1/28/08<br />

Second Amendment - Adding FY2009 Funds 5/1/09<br />

4. Project Tasks (Construction)<br />

Erosion Control Plan and Local Permits 5/30/08 4/29/09<br />

Construction and Inspections <strong>10</strong>/30/08 <strong>10</strong>/30/09<br />

Punch List and Certification of Completion 12/30/08 12/30/09<br />

As-builts and Project Close-out 4/30/09 12/30/09<br />

Status As Of: August 26, 2009<br />

This project will provide the design, permitting and construction of a stormwater treatment system, pending the City's<br />

success in acquiring the necessary lands to complete the project. The City has completed initial survey work and<br />

preliminary design. The City has acquired one parcel of land necessary for the project, completed the final design and<br />

acquired the appropriate permits for construction on that parcel. The City is currently negotiating with the landowner of a<br />

second parcel that is needed to complete the project. The agreement for the construction phase of this project was<br />

executed on March 20, 2007. The construction agreement was amended on January 28, 2008 to add FY2008 funds. A<br />

second amendment to add FY2009 funds is currently under District review (the City has requested that land acquisition<br />

be considered part of their match). The second amendment will be sent to the City for execution as soon as the District<br />

review is complete. Due to delays in land acquisition, the design and permitting contract has been amended to expire in<br />

July 20<strong>10</strong>.<br />

020 - Peace River Basin 262


L353<br />

Polk WMPlan Lakes Crooked, Clinch, and Reedy<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Flood Protection, Water Quality<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Polk County Natural Resources<br />

Project Manager ARNOLD, DAVE<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This is a cooperative project with the City of Frostproof and Polk County to perform 1) Digital Topographic Information,<br />

2) Watershed Evaluation, 3) Watershed Management Plan elements of the District's Watershed Management<br />

Program (WMP) for the lakes Crooked, Clinch, and Reedy watershed. This watershed covers an area of<br />

approximately 65 square miles within Polk County, including the City of Frostproof. Issues within the watersheds<br />

include flood damage, rapid growth, water quality issues, and discharges to Outstanding Florida Waters. FY2007<br />

funding is to complete the project. This project focuses on lake level management and enhancement/restoration of<br />

the lakes Crooked, Clinch, and Reedy conveyance system. The project includes a BMP plan to provide a balanced<br />

water control structure/conveyance system for these lakes that is consistent with the new Lake Clinch outfall (see<br />

project # L352).<br />

Benefits<br />

The WMP provides a method to evaluate the capacity of a watershed to protect, enhance, and restore water quality<br />

and natural systems, while achieving flood protection. The information developed provides the science for the District's<br />

Resource Management and Environmental Resource Permitting (ERP). It assists local governments: 1) With their land<br />

management responsibilities by establishing a level of service and developing Best Management Practices (BMPs) to<br />

address level of service deficiencies. 2) Provides a Geodatabase and projected results from watershed model<br />

simulations for floodplain management, and water quality management through the Total Maximum Daily Loads<br />

(TMDL) process for their National Pollution Discharge Elimination System (NPDES) permit requirements.<br />

Costs<br />

The total budget for this project is $500,000, of which the District's share is $250,000. The FY 2007 budget totals<br />

$500,000, of which $250,000 is revenue from Polk County, and $250,000 is the Peace River Basin's contribution. The<br />

District will manage the project and enter into purchase orders and agreements to accomplish project tasks. When<br />

each element is completed the project budget may require refinement based on the information gathered. Future<br />

cooperative funding requests and agreements will be required for the Implementation of BMPs and Maintenance of<br />

Watershed Parameters and Models.<br />

Additional Information<br />

A WMP includes five major elements: Topographic Information, Watershed Evaluation, Watershed Management Plan,<br />

Implementation of Best Management Practices, and Maintenance of Watershed Parameters and Models.<br />

Implementing elements of the WMP with local governments is one of the Comprehensive Watershed Management<br />

(CWM) management strategies. A FY2007 cooperative funding revenue agreement with Polk County has been<br />

executed to complete the WMP elements through the Watershed Management Plan. Future cooperative funding<br />

requests and agreements will be required for the Implementation of BMPs and Maintenance of Watershed<br />

Parameters and Models.<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 251,<strong>21</strong>2 0 5,255 5,339<br />

0 261,806<br />

District Budgeted - Outside Revenue<br />

Frostproof - Crooked/Clinch/Reedy RDS<br />

(L353)<br />

Prior<br />

Funding<br />

020 - Peace River Basin 263<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

250,000 0 0<br />

0<br />

Total:<br />

Future<br />

Funding<br />

0<br />

Total<br />

Funding<br />

250,000<br />

$511,806


L353<br />

Polk WMPlan Lakes Crooked, Clinch, and Reedy<br />

Critical Project Milestones Projected Amended Actual<br />

1. Critical Project Milestones<br />

Draft Agreement to Management Services 1/1/07 9/1/06<br />

Draft Agreement Returned from Management Services 2/1/07 9/1/06<br />

Cooperator Contract Executed 4/1/07 9/24/07<br />

Consultant Contract Executed 6/1/07 6/15/08<br />

Notice to Proceed to Consultant 7/1/07 8/6/08<br />

Watershed Evaluation Commence 1/1/08 8/6/08<br />

Watershed Evaluation Completion 9/1/08<br />

Watershed Plan Commence 9/1/08<br />

Watershed Plan Completion (project complete) 1/1/09<br />

Project Close-out 6/1/09<br />

Status As Of: September 04, 2009<br />

Based on inclusion of the project in the FY2007 budget, the District developed a cooperative funding agreement and sent<br />

it to Polk County for review and signature. The County held the agreement pending the outcome of the Lake Clinch<br />

Outfall Replacement (project L352) final design and construction bidding. This was done to assure that the L353<br />

watershed plan has accurate information to account for the new Lake Clinch outfall, and determine whether budgeting for<br />

the L352 project is sufficient. Upon acceptance of the L352 construction bid, the County decided to move ahead with<br />

review/signature of the L353 agreement, and the cooperative funding agreement was executed on 09/24/07. The project<br />

consulting services agreement has been executed, and notice to proceed issued. Currently, the consultant is working on<br />

the digital topographic information and watershed evaluation tasks.<br />

020 - Peace River Basin 264


L473<br />

Highlands WMPlan Lake Placid<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Flood Protection, Water Quality<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Highlands County<br />

Project Manager ARNOLD, DAVE<br />

Task Manager(s)<br />

KOLASA, KEITH<br />

Status Ongoing<br />

Description<br />

This is a multi-year funded cooperative project with Highlands County to perform 1) Topographic Information, 2)<br />

Watershed Evaluation, and 3) Watershed Management Plan elements of the District's Watershed Management<br />

Program (WMP) for the Lake Placid Watershed. The watershed covers an area of approximately 20 square miles and<br />

is located in Highlands County. Issues in the watershed include rapid growth, natural systems preservation, flood<br />

protection, and water quality. Prior year funding is to complete Topographic Information and a portion of the<br />

Watershed Evaluation. FY2008 funding should complete the Watershed Evaluation and watershed parameterization<br />

and model development tasks of the Watershed Plan. FY2009 funding will complete the Watershed Plan. Topographic<br />

information includes the acquisition of data and development of the terrain features in the Geodatabase to be used in<br />

the Watershed Evaluation. The Watershed Evaluation includes collection of existing data, GIS processing of the<br />

terrain features to establish catchments and connectivity, field reconnaissance, refinement of the terrain features and<br />

development of the hydraulic element point features. The Watershed Management Plan element includes:<br />

development of watershed parameters for a specific use, GIS processing, computer modeling, floodplain and water<br />

quality analysis, surface water resource assessment, establishment of LOS, BMP alternative analysis.<br />

Benefits<br />

The WMP provides a method to evaluate the capacity of a watershed to protect, enhance, and restore water quality<br />

and natural systems, while achieving flood protection. The information developed provides the science for the District's<br />

Resource Management and Environmental Resource Permitting (ERP). It assists local governments: 1) With their land<br />

management responsibilities by establishing a level of service and developing Best Management Practices (BMPs) to<br />

address level of service deficiencies. 2) Provides a Geodatabase and projected results from watershed model<br />

simulations for floodplain management, and water quality management through the Total Maximum Daily Loads<br />

(TMDL) process for their National Pollution Discharge Elimination System (NPDES) permit requirements.<br />

Costs<br />

The total budget for this project is multi-year funded project is $800,000, to be funded in FY2006 and FY2008-2009.<br />

Under the REDI project funding split the Peace River Basin's 75% share totals $600,000, and Highland County's 25%<br />

share totals $200,000. The FY2008 budget totals $350,000 with the County revenue of $87,500 and the Basin Board<br />

contributing $262,500. FY2009 funding totals $350,000, with County revenue of $87,500, and the District contributing<br />

$262,500. The District's FY2009 share is budgeted at a 50/50 split between the Peace River Basin ($131,250), and<br />

State General Appropriations Act funding ($131,250). When each element is completed the project budget may<br />

require refinement based on the information gathered.<br />

Additional Information<br />

A WMP includes five major elements: Topographic Information, Watershed Evaluation, Watershed Management Plan,<br />

Implementation of Best Management Practices, and Maintenance of Watershed Parameters and Models.<br />

Implementing elements of the WMP with local governments is one of the Comprehensive Watershed Management<br />

(CWM) initiative strategies. The prior funding and proposed FY2008-2009 funding will be used to complete the<br />

Topographic Information, Watershed Evaluation, and Watershed Management Plan elements. A cooperative funding<br />

revenue agreement with Highlands County will be developed as a multi-year funded project contingent on the approval<br />

of future funding to complete the WMP elements through the Watershed Management Plan. This multi-year funded<br />

project requires a cooperative funding request each fiscal year until completed. The District will manage the project<br />

and enter into purchase orders and agreements to accomplish project tasks. Future cooperative funding requests and<br />

agreements will be required for the Implementation of BMPs and Maintenance of Watershed Parameters and Models.<br />

020 - Peace River Basin 265


L473<br />

Highlands WMPlan Lake Placid<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 352,758 0 141,917 20,733<br />

0 515,408<br />

District Budgeted - Outside Revenue<br />

Highlands Co - Lake Placid WMP<br />

(L473)<br />

State Approp - WRAP - Prior Year<br />

Funds<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

112,500 0 87,500<br />

0<br />

0 0 131,250<br />

0<br />

Total:<br />

Future<br />

Funding<br />

0<br />

0<br />

Total<br />

Funding<br />

200,000<br />

131,250<br />

$846,658<br />

Critical Project Milestones Projected Amended Actual<br />

1. Critical Project Milestones<br />

Draft Agreement to Management Services 5/1/06 7/1/06<br />

Draft Agreement Returned from Management Services 7/1/06 8/1/06<br />

Cooperator Contract Executed 9/1/06 <strong>10</strong>/1/06<br />

Consultant Contract Executed 12/1/06 <strong>10</strong>/1/06<br />

Notice to Proceed to Consultant 1/1/07 12/7/06<br />

Watershed Evaluation Commence 1/1/07 5/<strong>21</strong>/07<br />

Watershed Evaluation Completion 1/1/08<br />

Watershed Plan Commence 1/1/08<br />

Watershed Plan Completion (project complete) 2/1/<strong>10</strong><br />

Project Close-out 6/30/11<br />

Status As Of: September 04, 2009<br />

Agreements between the District and Highlands County for cooperative funding, and the District and Brown and Caldwell<br />

for consulting services have been executed. Brown and Caldwell contracted with 3001, a District approved mapping<br />

vendor, to provide LiDAR mapping for the project. Flights for the LiDAR were done over the winter 2006, and processing<br />

was completed in December 2007. Brown and Caldwell is working on the digital topographic information, and watershed<br />

evaluation tasks. The project water quality monitoring plan is complete, and several surface water staff gages and<br />

surficial aquifer wells have been installed on Highlands County road right-of-way and monitoring has begun. Land use<br />

agreements/property permissions are being acquired for gages planned on Fresh Water Commission lands, and Florida<br />

Department of Transportation right-of-way.<br />

020 - Peace River Basin 266


L479<br />

Lk Hollingsworth Westside SW Treatment<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Quality<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

City of Lakeland<br />

Project Manager ZAJAC, CHRIS<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This project entails the installation of underground hydrodynamic separators for the stormwater treatment of four<br />

sub-basins totaling <strong>21</strong>7 acres on the west side of Lake Hollingsworth, Lakeland. The project involves treating<br />

stormwater runoff from thirteen (13) outfalls to Lake Hollingsworth. The requested funds for this project will be used for<br />

construction only as the City has funded the design and permitting of this project.<br />

Benefits<br />

This project will provide improved treatment of stormwater from a <strong>21</strong>7 acre sub-basin along the lake's edge. This<br />

project, in conjunction with other ongoing and completed capital improvement projects, will have a positive cumulative<br />

impact on the long-term water quality of Lake Hollingsworth and downstream receiving waterbodies.<br />

Costs<br />

The original project cost for construction was estimated to be $1,400,000. However, construction bids came in under<br />

budget and the winning bid was awarded for $541,331. The Peace River Basin Board budgeted $189,<strong>21</strong>6 and<br />

$187,632 in its FY2006 and FY2009 budgets respectively with an equal match from the cooperator. The District and<br />

the cooperator have each budgeted $376,848 for a total budget of $753,696. Upon successful project completion the<br />

District will have an excess $<strong>10</strong>6,182 that will be returned to the Basin. The District funding amounts shown in the<br />

table include staff salaries, travel and central garage charges.<br />

Additional Information<br />

Lake Hollingsworth is a headwater lake of the Peace River. Hollingsworth discharges into Banana Lake, Lake<br />

Hancock and ultimately the Peace River. Lake Hollingsworth is listed as an impaired waterbody by the FDEP for five<br />

parameters including nutrients. Land use within the project area has been classified as 88% residential, 6%<br />

commercial, and 6% recreational or open space. The original project design involved the construction of wetland<br />

strands to treat stormwater before discharging into Lake Hollingsworth. The original design would have required the<br />

City to purchase privately owned lands along the lake's edge to complete the project. Due to rising land values the City<br />

has chosen a design alternative that includes underground hydrodynamic separators installed on existing City-owned<br />

property. The City funded the design and permitting portion of this project.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 202,942 0 191,848 1,752<br />

0 396,542<br />

Project Funds Not Budgeted by the<br />

District<br />

City of Lakeland 189,<strong>21</strong>6 0 187,632<br />

0<br />

0 376,848<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$773,390<br />

Critical Project Milestones Projected Amended Actual<br />

1. Contract Development & Execution<br />

Contract Executed <strong>10</strong>/1/05 2/28/06<br />

Notice to Proceed <strong>10</strong>/17/05 3/2/06<br />

First Amendment - No Cost Time Extension 8/14/06 8/14/06<br />

Second Amendment - No Cost Time Extension 1/28/08 1/28/08<br />

020 - Peace River Basin 267


L479<br />

Lk Hollingsworth Westside SW Treatment<br />

Third Amendment - Add FY2009 Funds <strong>10</strong>/<strong>10</strong>/08 11/4/08<br />

2. Critical Project Milestones<br />

Select Contractor 5/30/08 2/<strong>10</strong>/09 1/20/09<br />

Begin Construction 6/30/08 3/<strong>10</strong>/09 4/6/09<br />

Construction Complete 1/30/09 11/30/09<br />

Contract Close Out 3/30/09 1/31/<strong>10</strong><br />

Status As Of: August 26, 2009<br />

The project was originally designed to include wetland strands which would involve the purchase of privately owned lands<br />

along the lake's edge. Due to rising land costs the City has requested several no-cost time extensions until land<br />

acquisition was complete. Because of these rising land values, the City evaluated alternative designs to complete the<br />

project and reduce costs associated with land acquisition. The City has recently chosen an alternative design that<br />

involves the installation of underground hydrodynamic separators to treat stormwater rather than the originally planned<br />

wetland strands. The alternative design will allow the City to complete the project without acquiring privately owned lands,<br />

which should result in significantly reduced total project costs. The City has modified their existing permit and the Peace<br />

River Basin Board has included additional funding for this project in its FY2009 budget. The second amendment to the<br />

contract was executed on January 28, 2008 which extends the contract expiration date from December 31, 2008 to<br />

March 31, 2009. The third amendment has been executed and extends the contract period, revises the scope of work,<br />

and adds FY2009 funds to the existing contract. The bid for construction went out on December 15, 2008. The<br />

cooperator awarded the bid in January 2009. Project construction began on April 6, 2009 and is scheduled to be<br />

completed by November 2009.<br />

020 - Peace River Basin 268


L485<br />

(Cancelled) Charlotte County Golf Course Reuse Storage<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply, Water Quality<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Charlotte County Utilities<br />

Project Manager BADER, TAMMY<br />

Task Manager(s)<br />

Status Cancelled<br />

Description<br />

This alternative water supply project includes the design and construction of two reuse ponds and related<br />

appurtenances to provide diurnal storage at the Deep Creek (WUP# 7815) and Kings Island (WUP# 9066) golf<br />

courses. This project provides diurnal storage to allow the golf courses to fully utilize reuse for irrigation purposes by<br />

eliminating competition for the use of reclaimed water with other irrigation customers, where otherwise there would be<br />

insufficient flow to meet both customers demands at once.<br />

Benefits<br />

The remaining project benefit includes 0.516 mgd of reuse flow to two golf courses, offsetting 0.386 mgd Intermediate<br />

aquifer withdrawal.<br />

Costs<br />

The total project cost of the two reuse ponds, including design, permitting, construction and inspection is estimated at<br />

$1,308,413. The county already budgeted $600,599 in FY2005. Of the remaining $707,814, 85 percent ($601,642) is<br />

estimated to be for construction. The Peace River Basin has encumbered $414,071 in FY2006, of which $120,328 is<br />

expected to be provided by the Water Protection Sustainability Program. The county's remaining share will be<br />

$293,743. The cost in terms of benefit is $.44/1,000 gallons, amortized over 30 years at eight percent interest.<br />

Additional Information<br />

Both of the golf courses associated with the FY2006 project represent new reuse customers to the county's system<br />

and will be connected to existing 6-inch diameter reuse transmission mains. The proposed storage pond and<br />

associated appurtenances at the Deep Creek Golf Course will be constructed on vacant lands located on a county<br />

easement adjacent to the course. The pond located at the Deep Creek Golf Course will have a capacity of 2.12 million<br />

gallons and the reuse pond for the King's Island Golf Club includes approximately 1.00 million gallons of diurnal<br />

storage for golf course irrigation and will be located on on-site vacant lands. Golf-course-related benefits include<br />

providing 0.516 mgd (.258 mgd per course) of reuse flow and offsetting 0.386 mgd (.193 mgd per course) of<br />

Intermediate aquifer withdrawal.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 301,<strong>21</strong>4 (293,743) 1,299<br />

0<br />

0 8,770<br />

Project Funds Not Budgeted by the<br />

District<br />

Charlotte County 894,342 0 0<br />

0<br />

0 894,342<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$903,112<br />

Critical Project Milestones Projected Amended Actual<br />

Draft Project Agreement <strong>10</strong>/31/05 11/22/05<br />

Execute Project Agreement 1/31/06 7/24/06<br />

Begin Design 5/1/06 2/15/07 5/22/07<br />

Complete Design 5/31/07 <strong>10</strong>/31/07<br />

Begin Construction 6/30/07 2/15/08<br />

020 - Peace River Basin 269


L485<br />

(Cancelled) Charlotte County Golf Course Reuse Storage<br />

Complete Construction 7/31/08 11/30/08<br />

Project Close-out 1/31/09<br />

Status As Of: August 05, 2008<br />

Charlotte County had previously requested a second amendment to this project which was scheduled to go for approval<br />

at the August Peace River Basin Board meeting. However, in a letter dated July 31, 2008, Charlotte County has<br />

cancelled the Charlotte County Golf Course Reuse Storage Project. The project has been cancelled due to the<br />

foreclosure of one of the main customers of the project, Kings Island Golf Course. A liquidation memo has been<br />

processed for the $414,071 that was encumbered for this project and the funds will be returned to the Basin Board. Of<br />

the total amount, funds in the amount of $120,328 were allocated to this project from the Water Protection and<br />

Sustainability Trust Fund Program. The trust funds will be reallocated to another eligible project located within the Peace<br />

River Basin.<br />

020 - Peace River Basin 270


L486<br />

Charlotte - WMPlan Charlotte Harbor<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Flood Protection, Water Quality<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Charlotte County<br />

Project Manager FRIES, GEORGE<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This is a multi-year funded project to perform 1) Topographic Information, 2) Watershed Evaluation, and 3) Watershed<br />

Management Plan elements of the District's Watershed Management Program for the portion of Charlotte County<br />

known as Charlotte Harbor Redevelopment Area. The proposed study area is approximately 2.5 square miles and is<br />

located in western Charlotte County. The goal of the project is to create a functional, viable, detailed planning tool with<br />

feasible and permittable drainage alternatives. With FY2006 funding work on the Topographic Information and<br />

Watershed Evaluation will begin and should be completed. With FY2007 funding the work on the Watershed<br />

Management Plan elements will begin and should be completed. Work on the Watershed Management Plan element<br />

will include the following tasks: computer modeling, floodplain analysis, surface water resource assessment (water<br />

quality), establishment of LOS, and BMP alternative analysis.<br />

Benefits<br />

The WMP provides a method to evaluate the capacity of a watershed to protect, enhance, and restore water quality<br />

and natural systems, while achieving flood protection. The information developed provides the science for the District's<br />

Resource Management and Environmental Resource Permitting (ERP). It assists local governments: 1) with their land<br />

management responsibilities by establishing a level of service and developing Best Management Practices (BMPs) to<br />

address level of service deficiencies and 2) provides a geodatabase and projected results from watershed model<br />

simulations for floodplain management and water quality management.<br />

Costs<br />

Funding for this project was provided in the Peace River Basin Board budgets of FY2006 ($125,000) and FY2007<br />

($125,000) for a total funding commitment of $250,000. The total budgeted amount for this project is $500,000 of<br />

which the District's share is $250,000. When each element is completed the project budget and scope may require<br />

refinement based on the information gathered. The District funding amounts shown in the table include staff salaries.<br />

Additional Information<br />

The WMP includes five major elements: 1) Topographic Information, 2) Watershed Evaluation, 3) Watershed<br />

Management Plan, 4) Implementation of BMPs, and 5) Maintenance of Watershed Parameters and Models.<br />

Implementing elements of the WMP with local governments is one of the Comprehensive Watershed Management<br />

(CWM) initiative strategies and one of the District's Strategic Priorities. With prior years funding the Topographic<br />

Information and Watershed Evaluation elements were completed. A cooperative funding revenue agreement with<br />

Charlotte County has been developed as a multi-year funded project contingent on the approval of future funding to<br />

complete the WMP elements through the Watershed Management Plan. This is a multi-year funded project that will<br />

require a cooperative funding request each fiscal year until completed. The District will manage the project and enter<br />

into purchase orders and agreements to accomplish project tasks. Future cooperative funding requests and<br />

agreements will be required for the Implementation of BMPs and Maintenance of Watershed Parameters and Models.<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 263,545 0 7,273<br />

0<br />

0 270,818<br />

District Budgeted - Outside Revenue<br />

Charlotte Co - Charlotte Hbr<br />

Redevelopmnt (L486)<br />

Prior<br />

Funding<br />

020 - Peace River Basin 271<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

250,000 0 0<br />

0<br />

Total:<br />

Future<br />

Funding<br />

0<br />

Total<br />

Funding<br />

250,000<br />

$520,818


L486<br />

Charlotte - WMPlan Charlotte Harbor<br />

Critical Project Milestones Projected Amended Actual<br />

1. Critical Project Milestones<br />

District logo will appear on all reports 12/31/06<br />

2. Cooperator Agreement<br />

Draft Agreement to Contracts Administration 9/20/05<br />

FY2006 Funds Encumbered <strong>10</strong>/1/05 1/3/06<br />

Draft Agreement returned from Contracts Administration <strong>10</strong>/15/05 1/4/05<br />

Agreement Executed 12/1/05 4/5/06<br />

3. Consultant Agreement<br />

Consultant Agreement Executed 2/1/06 4/13/06<br />

Notice to Proceed 2/2/06 4/13/06<br />

Task 1- Topographic Information Commence 2/7/06 7/29/06 4/13/06<br />

Task 2- Watershed Evaluation Commence 3/15/06 4/13/06<br />

Task 1-Topographic Information Complete 4/15/06 1/29/07 <strong>10</strong>/<strong>10</strong>/06<br />

Task 2- Watershed Evaluation Complete 7/15/06 11/17/06<br />

4. Amendment 1 to Consultant Agreement<br />

Amendment Executed 7/<strong>10</strong>/06 7/29/06<br />

Notice to Proceed 7/<strong>10</strong>/06 7/29/06<br />

Work Order #2 (WMP) Executed 7/17/06 7/17/06<br />

5. Amendment 1 to Cooperator Agreement (FY2007 Funding)<br />

Amendment Executed 11/30/06 12/12/06<br />

6. Amendment 2 to Consultant Agreement (FY2007 Funding)<br />

Task 3- Watershed Management Plan Commence 7/17/06 11/17/06 4/13/07<br />

Amendment Executed <strong>10</strong>/26/06 <strong>10</strong>/26/06<br />

Model Development 8/1/07 <strong>10</strong>/13/07<br />

Floodplain Analysis 9/1/07 11/13/07<br />

Level of Service Determination <strong>10</strong>/1/07 12/13/07<br />

Surface Water Resource Assessment 1/1/08 2/15/08<br />

BMP Alternative Analysis 4/1/08 3/15/08<br />

Task 3- Watershed Management Plan Complete 7/1/08 5/31/<strong>10</strong><br />

7. Contract Completion<br />

Consultant Agreement Expiration 7/29/06 6/30/<strong>10</strong><br />

Cooperator Agreement Expiration 6/30/07 6/30/<strong>10</strong><br />

Status As Of: August 24, 2009<br />

Status History: The cooperative funding revenue agreement with Charlotte County was executed on April 6, 2006. The<br />

consultant services agreement with Ardaman & Associates was executed on April 13, 2006. A project kick off meeting<br />

was held on April 25, 2006 and work began. Work on the project was delayed because the LiDAR data from the District<br />

was not available for the consultant until <strong>10</strong>/<strong>10</strong>/2006. The county applied for additional cooperative funding for FY2007<br />

for completion of the WMP including BMP alternative analysis. An amendment to the Revenue Agreement incorporating<br />

the FY2007 funds was executed on December 12, 2006. The County applied for cooperative funding for FY2009 to begin<br />

design work for the stormwater management storage areas within the Redevelopment Area. This request was assigned<br />

Activity Number N126. Work on this project has been delayed due to the ongoing corrective work for the Hernando,<br />

Pasco & Sarasota County watersheds. The Model Development and Floodplain Analysis were submitted for review on<br />

04/15/2008. The consultant presented a status report to the Charlotte Harbor Community Redevelopment Agency<br />

Advisory Committee (CH-CRAAC) on April 24, 2008. A Public Information Session to present the floodplain analysis to<br />

the public was held on June 11, 2008. The Level of Service report has been submitted and is being reviewed internally. A<br />

progress meeting was held on August 20, 2008. Work on the BMP Alternative Analysis has begun. Current Status: A no<br />

cost time extension amendment has been executed. Work on the water quality assessment approach is continuing and<br />

the final report is expected in the next few weeks.<br />

020 - Peace River Basin 272


L553<br />

Dundee Reclaimed Water Use System Project<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply, Water Quality<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Dundee<br />

Project Manager NOURANI, MEHRSHAD<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

The proposal includes the design and construction of approximately 3,900 linear feet of 16-inch and 11,800 linear feet<br />

of 12-inch, and 3,<strong>10</strong>0 lineal feet of <strong>10</strong>-inch reclaimed water transmission main, a high service pump station (1,000<br />

gallon per minute), two 2.25 million gallon storage tanks with a combined storage capacity of 4.5 million gallons, and<br />

other necessary appertences.<br />

Benefits<br />

This project is expected to provide approximately 1.5 mgd of reclaimed water to recreation and residential customers<br />

to offset approximately 0.76 mgd of groundwater typically used for irrigation purposes.<br />

Costs<br />

The project was initially funded in consideration of the Town's Rural Economic Development Initiative (REDI) funding<br />

status. The total project cost is estimated to be $4,016,000 and the District's share ia $3,012,000 (75 percent) and the<br />

Town's share is $969,784. The Peace River Basin Board encumbered $204,000 in FY2006, $417,880 in FY2008; no<br />

funds were requested or budgeted in FY2007. In FY2009, the Basin Board approved a total of $200,000. The Town's<br />

FY20<strong>10</strong> funding request has been denied until the Town can demonstrate its ability to commence and complete<br />

construction of this project. The future funds identified for the project are contingent upon approval of such amounts<br />

by the District Governing and Basin Boards in the annual budget(s).<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 630,128 0 204,539 203,8<strong>21</strong> 2,087,469 3,125,957<br />

District Budgeted - Outside Revenue<br />

Water Protection & Sust T.F.<br />

(Alternative Wtr)<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

136,867 (337,500) 337,500<br />

0<br />

0<br />

136,867<br />

Project Funds Not Budgeted by the<br />

District<br />

Town of Dundee 0 0 969,784<br />

0<br />

0 969,784<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$4,232,608<br />

Critical Project Milestones Projected Amended Actual<br />

Contract details are currently being reviewed<br />

Contract to Cooperator for signature 6/13/06 7/11/06<br />

Contracted Executed 7/14/06 7/14/06<br />

Notice to Proceed 7/17/06 8/14/06<br />

Design Commenced 8/1/06 11/<strong>10</strong>/06<br />

Design Completed 11/30/07<br />

Bid List to District 2/28/08<br />

Bid Award/Notice to Proceed 3/31/08<br />

Construction to Begin 4/7/08<br />

Construction Completion 12/31/08<br />

020 - Peace River Basin 273


L553<br />

Dundee Reclaimed Water Use System Project<br />

Contract close-out 1/31/09<br />

Status As Of: August 31, 2009<br />

District staff is currently reviewing a new work scope and project schedule for this project. On August 7, 2009, District<br />

Mark Hammond, Director of the Resource Projects Department, requested the Board's approval to enter into a new<br />

agreement with the Town of Dundee for its Reclaimed Water System project. The Basin has already budgeted almost<br />

$950,000 for this project. At the Board's request during its June 5 meeting, staff was directed to present the Board an<br />

option so the project could move forward. The Cooperative Agreement for the project expired on January 31, 2009. In<br />

May 2009, the Town proposed three items for the Board's consideration: 1) extend the construction initiation date to June<br />

30, 2014; 2) the Basin Board would reimburse the Town for 75 percent of documented incurred engineering expenses to<br />

date, with understanding that those funds would be reimbursed to the Basin Board in the event construction had not<br />

commenced by June 14, 2014; and 3) the Basin Board would continue to encumber funds to ensure 75 percent funding<br />

by Board would be available by June 2014. Mark Hammond stressed that these proposals would be exceptions to the<br />

normal cooperative funding process and could set a tough precedent with other cooperators. Board members<br />

participated in a long discussion and some expressed concern of the precedent that would be set and monies set aside<br />

that would not be used for projects that are ready to begin. Other concerns included 1) construction of homes has not<br />

begun, 2) the Town's dollars would be better spent on other more important water supply or flood protection projects, e.g.<br />

the upgrade of its wastewater treatment plant and that cost of project may increase in future. The Board also expressed<br />

concern that it would be paying on something that would not begin until far into the future - not abiding by the<br />

cooperative funding procedures. Finally, the Board approved entering into a new agreement with the Town of Dundee for<br />

their Reclaimed Water System project for a total cost of $3,400,000 with the Peace River Basin Board's share not to<br />

exceed $2,584, <strong>21</strong>7: and authorize the Executive Director to sign the Agreement .<br />

020 - Peace River Basin 274


L633<br />

DeSoto - WMPlan Desoto County<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

DeSoto County<br />

Project Manager LETASI, SCOTT<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This is a multi-year funded project to perform 1) Topographic Information, 2) Watershed Evaluation, and 3) Watershed<br />

Management Plan elements of the District's Watershed Management Program (WMP) for the high priority watersheds.<br />

Desoto County has identified the Peace River, Thorton Branch, Deep Creek, and Joshua Creek Watersheds as high<br />

priority watersheds for the WMP. The issues in the watersheds include flood damage, level of service deficiencies,<br />

rapid growth, and water quality. The Watershed Management Plan includes the following tasks: survey, data<br />

management and development of watershed parameters, GIS processing, computer modeling, floodplain analysis,<br />

surface water resource assessment (water quality) establishment of LOS, BMP alternative analysis.<br />

Benefits<br />

The WMP provides a method to evaluate the capacity of a watershed to protect, enhance, and restore water quality<br />

and natural systems, while achieving flood protection. The information developed provides the science for the District's<br />

Resource Management and Environmental Resource Permitting (ERP). It assists local governments: 1) With their land<br />

management responsibilities by establishing a level of service and developing Best Management Practices (BMPs) to<br />

address level of service deficiencies. 2) Provides a Geodatabase and projected results from watershed model<br />

simulations for floodplain management, and water quality management.<br />

Costs<br />

The total budget amount for this project is $225,000, of which the District's share is $168,750 from the Peace River<br />

Basin, the County will contribute $56,250. The FY2008 budget included $168,750 from the Peace River Basin and<br />

$56,250 from the County. Future funding will be required to complete the project. When each element is completed<br />

the project budget will be refined based on the information gathered. Desoto County is a REDI community and pays<br />

25% of the projects total cost. The Districts match is 75% of the total project cost.<br />

Additional Information<br />

The WMP includes five major elements: 1) Topographic Information, 2) Watershed Evaluation, 3) Watershed<br />

Management Plan, 4) Implementation of Best Management Practices, and 5) Maintenance of Watershed Parameters<br />

and Models. Implementing elements of the WMP with local governments is one of the Comprehensive Watershed<br />

Management (CWM) initiative strategies and one of the District's Strategic Priorities. A cooperative funding revenue<br />

agreement with Desoto County will be developed as a multi-year funded project contingent on the approval of future<br />

funding to complete the WMP elements through the Watershed Management Plan. This is a multi-year funded project<br />

that will require a cooperative funding request each fiscal year until completed. The District will manage the project<br />

and enter into purchase orders and agreements to accomplish project tasks. Future cooperative funding requests and<br />

agreements will be required for the Implementation of BMPs and Maintenance of Watershed Parameters and Models.<br />

The District is cooperating with FEMA to modernize the flood insurance rate maps (FIRMs) in the County with FY2005<br />

funding ($770,000). Information developed with this project will be used to update the FIRMs representing these<br />

watersheds. Cooperator submitted the project for Rural Economic Development Initiative (REDI) consideration.<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 569,966 0 3,6<strong>21</strong> 4,278<br />

0 577,865<br />

District Budgeted - Outside Revenue<br />

DeSoto Co - Stormwater Master Plan<br />

(L633)<br />

Prior<br />

Funding<br />

020 - Peace River Basin 275<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

187,500 0 0<br />

0<br />

Total:<br />

Future<br />

Funding<br />

0<br />

Total<br />

Funding<br />

187,500<br />

$765,365


L633<br />

DeSoto - WMPlan Desoto County<br />

Critical Project Milestones Projected Amended Actual<br />

1. Critical Project Milestones<br />

County Agreement Executed 7/1/07 7/15/08 9/5/08<br />

Consultant Agreement Executed <strong>10</strong>/1/07 <strong>10</strong>/1/08<br />

Notice to Proceed <strong>10</strong>/1/07 <strong>10</strong>/15/08<br />

2. Digital Terrain Model<br />

Digital Terrain Model 11/1/07 12/15/08<br />

3. Watershed Evaluation<br />

Begin Watershed Evaluation 12/1/07 1/1/09<br />

Complete Watershed Evaluation 2/1/08 5/15/09<br />

4. Watershed Management Plan<br />

Begin Watershed Management Plan 2/15/08 6/1/09<br />

Complete Watershed Management Plan 7/1/08 <strong>10</strong>/15/09<br />

Status As Of: August 31, 2009<br />

Status History: <strong>Meeting</strong> was conducted with the County's new project manager on November 9, 2006 to discuss the<br />

project and the Cooperative Funding Agreement. In the development of the agreement, the County identified that this<br />

project was mistakenly not in the County's FY2007 budget. On February 23, 2007, Desoto County sent a letter to the<br />

District indicating the County's budgeting error and its commitment to the Watershed Management Program in FY2008.<br />

The FY2007 Peace River Basin Board funds set aside for this project were balanced forward. Therefore, the project was<br />

delayed until FY2008 funding were available. Agreement between the District and Desoto County was executed on<br />

August 1, 2008. Status Current: District staff is currently working with two engineering consultants to complete the<br />

watershed management plans for Deep Creek and Thorton Branch in Desoto County. The District has aquired and<br />

assigned a peer review for these watersheds. The peer review of these watershed is anticipated to begin in October<br />

2009.<br />

020 - Peace River Basin 276


L640<br />

(Completed) Punta Gorda Reuse Feasibility Study<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply, Water Quality<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Punta Gorda<br />

Project Manager BADER, TAMMY<br />

Task Manager(s)<br />

Status Completed<br />

Description<br />

This project consists of a reuse feasibility study to identify the technical and financial elements of a reclaimed water<br />

system. The City of Punta Gorda owns and operates a 4 mgd wastewater treatment plant, and currently disposes all of<br />

its reclaimed water via a deep injection well. The feasibility study would consider a reclaimed water system to treat and<br />

deliver reclaimed wastewater for beneficial use as landscape irrigation.<br />

Benefits<br />

Upon completion of this project, the City will have a reuse feasibility study considering a reclaimed water system to<br />

treat and deliver reclaimed wastewater for beneficial use.<br />

Costs<br />

The total estimated cost of this project is $250,000, of which the Peace River Basin is requested to fund 50 percent, or<br />

$125,000. Funding in the amount of $125,000 has been budgeted for FY2007.<br />

Additional Information<br />

The City wants to develop a reclaimed water system that will assist in achieving goals of the SWUCA, reducing<br />

demands from the public water system and reducing demands from groundwater used for irrigation wells.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 128,988 0 1,299<br />

0<br />

0 130,287<br />

Project Funds Not Budgeted by the<br />

District<br />

Punta Gorda 125,000 0 0<br />

0<br />

0 125,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$255,287<br />

Critical Project Milestones Projected Amended Actual<br />

Draft Project Agreement <strong>10</strong>/31/06 9/1/06<br />

Execute Project Agreement 12/31/06 12/20/06<br />

Begin Feasibility Study 12/31/06 1/5/07<br />

Complete Feasibility Study 5/31/07 12/31/07 1/15/08<br />

Project Close-out 12/31/08 4/30/08<br />

Status As Of: June 06, 2008<br />

A Cooperative Funding Agreement was executed on December 20, 2006. Carollo Engineers was given notice to proceed<br />

on January 5, 2007 and submitted the draft feasibility study on July 5, 2007. Staff provided comments and suggested<br />

changes to the City and engineers on July 24, 2007. The City requested an extension to December 31, 2007 to<br />

incorporate comments and finalize the feasibility study. The City submitted the final reuse feasibility study on January 15,<br />

2008 to complete this project. The City has submitted a request for reimbursement in the amount of $61,480 and staff<br />

has forwarded a G-2 and G-3 to Finance. To date, $125,000 has been encumbered, of which $61,480 has been<br />

reimbursed.<br />

020 - Peace River Basin 277


L649<br />

(Completed) Hydrologic Rest-Highlands Hammock St Pk<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Quality, Natural Systems<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Project Manager ZAJAC, CHRIS<br />

Task Manager(s)<br />

Status Completed<br />

Florida Department of Environmental Protection<br />

Description<br />

This project involved the design, permitting and construction associated with the restoration of natural systems,<br />

including a cutthroat grass-dominated seepage slope within Highlands Hammock State Park in Highlands County. In<br />

FY2004 the Peace River Basin Board funded the Lake Wales Ridge Public Lands Hydrologic and Water Quality<br />

Restoration Project (B171), which identified Highlands Hammock State Park as a high-priority restoration site. The<br />

Lake Wales Ridge Public Lands Hydrologic and Water Restoration Project resulted in a final report identifying four<br />

recommendations for the restoration of natural systems and water quality within the state park. This<br />

project implemented one of those recommendations, the restoration of eroded jeep trails. These eroded jeep<br />

trails resulted in deep gullies acting as ditches to drain water from adjacent seepage slope wetlands. The subsequent<br />

draining of these seepage slope wetlands affected wetland hydroperiods, water storage, and water flow<br />

characteristics. The FY2008 funds have been used to complete the restoration effort that began with FY2007 funds.<br />

Benefits<br />

The project resulted in design plans, the necessary permits, and the restoration of eroded jeep trails to restore the<br />

hydroperiod and sheet-flow characteristics of approximately 381 acres of seepage slope wetlands and flatwoods<br />

communities.<br />

Costs<br />

The total project cost is $<strong>10</strong>0,000. In FY2007, the Peace River Basin Board funded $25,000 with an equal match from<br />

FDEP. The FY2008 budget is $50,000, with the cooperator and the District each contributing half ($25,000). The<br />

FY2008 District share is split between the Peace River Basin Board ($12,500) and the Water Protection and<br />

Sustainability Trust Fund ($12,500). The District funding amounts shown in the table include staff salaries, travel and<br />

central garage charges.<br />

Additional Information<br />

The Lake Wales Ridge watershed has undergone substantial hydrologic alterations since the early 1900's, which has<br />

resulted in lowered lake levels, deterioration of lake water quality, reduced recharge, and local dewatering of the<br />

surficial ground water system. Restoration and retrofit projects to solve these problems may be undertaken on existing<br />

publicly-owned lands to benefit the region. In FY2004 the Lake Wales Ridge Public Lands Hydrologic and Water<br />

Quality Restoration Project (B171) identified four such tracts of land as high priority restoration sites. As a result of this<br />

project, a final report identifying several restoration projects within Highlands Hammock State Park was completed in<br />

December 2006. The Florida Department of Environmental Protection plans to apply for cooperative funding in the<br />

future to complete other restoration projects that were identified as part of the Lake Wales Ridge Public Lands<br />

Hydrologic and Water Quality Restoration Project.<br />

020 - Peace River Basin 278


L649<br />

(Completed) Hydrologic Rest-Highlands Hammock St Pk<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 43,949 0 3,560<br />

0<br />

0 47,509<br />

District Budgeted - Outside Revenue<br />

Water Protection & Sust T.F. (Surface<br />

Wtr Rstr)<br />

Project Funds Not Budgeted by the<br />

District<br />

Fl Department of Environmental<br />

Protection<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

12,500 0 0<br />

0<br />

50,000 0 0<br />

0<br />

Total:<br />

Future<br />

Funding<br />

0<br />

0<br />

Total<br />

Funding<br />

12,500<br />

50,000<br />

$1<strong>10</strong>,009<br />

Critical Project Milestones Projected Amended Actual<br />

1. Contract Development and Execution<br />

Purchase Order #07POSOW0543 1/17/07 1/18/07<br />

Purchase Order #08POSOW0835 2/25/08 2/25/08<br />

2. Project Tasks<br />

FY2007 Project Construction Complete 7/18/07 2/4/08<br />

FY2007 Construction Completion Verification Report 8/18/07 2/4/08<br />

3. Project Tasks<br />

FY2008 Project Construction Complete <strong>10</strong>/1/08 3/25/09 4/24/09<br />

FY2008 Construction Completion Verification Report 11/2/08 4/24/09 4/24/09<br />

Status As Of: June 25, 2009<br />

The District's project manager developed a draft scope of work and sent it to the cooperator for review and comment in<br />

August 2006. Upon review of the draft scope of work it was determined that this project may qualify for an exemption<br />

from permitting. The cooperator, with assistance from the District's project manager, prepared a Project Evaluation and<br />

submitted it to the Bartow Regulation Department for review in October 2006. On November 3, 2006 the Bartow<br />

Regulation Department issued a letter granting an exemption from permitting to complete the proposed project. The<br />

funds requested for this project are being used for construction rather than design and permitting as the original<br />

cooperative funding application indicated. District staff issued a Purchase Order on January 18, 2007 so that project<br />

construction may begin. On June 29, 2007 the cooperator indicated that the project did not receive enough bids and that<br />

the project will be rebid in July. The cooperator has reviewed the second round of bidding and has selected a contractor<br />

for the project. The contractor recently completed one of four identified areas in need of restoration. Due to the delays in<br />

selecting a contractor, the cooperator has requested that the Purchase Order be extended. The new expiration date is<br />

December 30, 2008. The District project manager filed the appropriate documentation to have a second purchase order<br />

developed for the FY2008 funds to complete the remaining three sites. The cooperator advertised the project for bidding<br />

in October 2008. The contractor has been selected and entered into an agreement. Due to delays in obtaining the<br />

necessary insurance requirements from the selected contractor, the cooperator has requested a 60-day extension on the<br />

purchase order. The purchase order has been extended to April 30, 2009. The project was completed on April 24, 2009.<br />

The cooperator requested an extension on the purchase order to allow for final invoice processing. The purchase order<br />

was extended to July 31, 2009. The project manager received the final invoice from the cooperator on June 23, 2009 and<br />

is currently processing the final invoice for payment and project completion.<br />

020 - Peace River Basin 279


L671<br />

Polk County Aquifer Recharge Project to Relieve Flooding and<br />

Augment GW Supplies<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply, Flood Protection<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Project Manager MCBRIDE, TAMERA<br />

Task Manager(s)<br />

Status Ongoing/No FY$<br />

Polk County, Polk County Natural Resources<br />

Description<br />

This is a flood protection project that will evaluate the feasibility of using a collection of wells to expedite the recharge<br />

of excess surface water that is naturally treated by sands in the surficial aquifer. The concept of Recharge Well Fields<br />

(RWFs) is to allow water in the lower part of the surficial aquifer, that is filtered and treated as it moves downward<br />

through the surficial sediments, to recharge the underlying Upper Floridan aquifer via valve-regulated, gravity-driven<br />

connector pipes/recharge wells. For the feasibility project, the county will construct two surficial aquifer test wells to<br />

collect and analyze water quality from the surficial aquifer. This initial data is needed to ensure that the quality of the<br />

surficial aquifer ground water will meet the Florida Department of Environmental Protection (FDEP) water quality<br />

standards for injection into the Upper Floridan aquifer. Additional monitor wells will also be installed and equipped with<br />

continuous recorders to measure water levels. If the quality of the ground water from the surficial aquifer meets FDEP<br />

requirements, then the county will proceed with additional feasibility work to construct an exploratory well and<br />

additional funding for future years will be requested. If water quality does not meet FDEP requirements, the project will<br />

not go forward and further funding will not be requested. This project directly supports ongoing efforts by the District to<br />

restore and enhance historic wetland and floodplain storage in the Peace Creek Drainage District (PCDD).<br />

Benefits<br />

This is an innovative project that could help reduce flooding by diverting and expediting the storage of excess surface<br />

water through recharge to the Upper Floridan aquifer. The project will support ongoing efforts by the District to restore<br />

and enhance historic wetland and floodplain storage in the PCDD. Additional benefits include recharging the Upper<br />

Floridan aquifer in the SWUCA and potentially providing future water supplies for the area.<br />

Costs<br />

The County withdrew their request for FY20<strong>10</strong> funding and FY2009 funding, based on the projected timeline for<br />

completion. The FY2008 funding request was ranked low for the same reason, and did not receive funding. The total<br />

FY2007 cost for this project is $250,000 with the District's share requested to be $125,000. Funding from the District is<br />

being provided by the Peace River Basin Board.<br />

Additional Information<br />

A preliminary analysis, conducted by the consultant, Schreuder, Inc., identified four potential RWF locations where<br />

excess surface water run-off could be detained and recommended the installation of surficial test wells at two of the<br />

sites: 1) Lake Gwyn near Wahneta (Site #1), and 2) Cypresswood Development (Site #2). Polk County will construct<br />

and monitor water quality from a surficial aquifer test well at the two sites. Monthly water samples will be collected and<br />

analyzed to ensure that the quality of the ground water from the surficial aquifer will meet underground injection control<br />

(UIC) water quality standards. Six additional monitor wells will also be installed and equipped with continuous<br />

recorders for each site. After one year of monitoring, Polk County will assess the water quality data collected and<br />

begin the permitting process needed for the installation and operation of the recharge wells. The consultant's concept<br />

of the RWF involves the installation of up to 25 recharge wells per site, with a well infiltration/recharge rate of<br />

approximately 50 to 60 gallon/minute per well (72,000 gpd). If four RWF sites were developed, (25 wells per site; <strong>10</strong>0<br />

recharge wells total) this would represent approximately 7 to 8 million gallons per day of recharge to the Floridan<br />

aquifer. It may take an additional two years for the permitting process, the well installation, and subsequent testing<br />

before a final operational permit can be issued by the FDEP. If the water quality of the ground water from the test wells<br />

cannot meet the UIC criteria, the project will not proceed and additional funding will not be requested.<br />

020 - Peace River Basin 280


L671<br />

Polk County Aquifer Recharge Project to Relieve Flooding and<br />

Augment GW Supplies<br />

Prior Cumulative FY 2009 FY20<strong>10</strong><br />

Funding Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

134,856 0 4,491 6,293<br />

020 Peace River Basin 660,000 805,640<br />

Project Funds Not Budgeted by the<br />

District<br />

Polk County 125,000 0 0 32,500<br />

0 157,500<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$963,140<br />

Critical Project Milestones Projected Amended Actual<br />

Contract Development<br />

Governing Board Approval 9/26/06 9/26/06<br />

1st Draft SOW Submitted 9/27/06 9/27/06<br />

2nd Draft SOW Submitted <strong>10</strong>/25/06 <strong>10</strong>/25/06<br />

3rd Draft SOW Submitted 1/16/07 1/16/07<br />

Execute Contract 7/11/07 7/11/07<br />

MSA between County and Ardaman Signed 8/29/07 8/29/07<br />

Feasibility Study<br />

Complete Wells (2) and Monitor Wells Installation 8/11/07 11/30/08 6/30/09<br />

Surficial Aquifer Performance Test <strong>10</strong>/11/07 9/18/09<br />

Complete WQ and Data Collection; Interpretation/Analysis <strong>10</strong>/11/08 <strong>10</strong>/30/<strong>10</strong><br />

Report Preparation and Review 2/11/09 3/31/11<br />

Complete Upper Floridan Aquifer Monitor Wells Installation (2) 2/11/09 12/30/<strong>10</strong><br />

Contract Close-out 9/30/09 9/30/11<br />

Status As Of: August 28, 2009<br />

County facilities staff have installed the electrical poles and panels at both sites and connected power. The preliminary<br />

sediment and hydrological analyses were completed and written reports were provided. The data was evaluated to<br />

develop well construction specifications. Drilling was completed at both the Lake Gwyn and Cypresswood sites. A<br />

step-drawdown test was completed on March 11, 2009 at the Cypresswood site to determine specific capacity and well<br />

efficiency, which was used to estimate the required pump size for the well. Progress was delayed, because the water<br />

from the Lake Gwyn site well was turbid and required additional development before the pump could be installed. Pump<br />

installations are now complete and sampling commenced on August 19, 2009 at both sites. The project manager<br />

received the third invoice on June 8, 2009 and has noted issues that are currently being addressed with the cooperator.<br />

ACTION-TO-DATE: Delayed. The project has been delayed as noted in the status above. In addition, the Upper Floridan<br />

aquifer wells will not be installed until 12 months of sampling have been completed on the test wells that have already<br />

been installed, and there is reasonable assurance that this project will be permitted. An information request concerning<br />

the Accelerate Florida Program was mailed to the cooperator on October 15, 2008. The District's project manger<br />

followed up with emails on January 16, 2009, February 9, 2009, and February 19, 2009 and multiple phone calls to<br />

request a response to the letter. The County responded with the following email, dated February 25, 2009: "All activities<br />

will be accelerated to the highest extent possible. All wells have been developed satisfactorily at the Cypresswood site,<br />

however further development is necessary at the Lake Gwyn site. Rather than wait for wells at both sites to be developed<br />

before proceeding, we will move forward with capacity testing at Cypresswood, then groundwater sampling once pumps<br />

are set. We will continue to develop the wells at Lake Gwyn and proceed once that is accomplished. The sampling<br />

schedules will be staggered, but it will accelerate activities at Cypresswood. Groundwater sampling turn-around times will<br />

be maximized, as will reporting of those results."<br />

020 - Peace River Basin 281


L672<br />

Polk - WMPlan Polk County<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Flood Protection, Water Quality, Natural Systems<br />

Basin(s) General Fund (District), Alafia River, Hillsborough River, Peace River<br />

Cooperator(s)<br />

Project Manager TURNER, DAWN<br />

Task Manager(s)<br />

Status Ongoing<br />

Polk County, Polk County Natural Resources<br />

Description<br />

This is a multi-year funded project to perform tasks related to the Topographic Information, Watershed Evaluation, and<br />

Watershed Management Plan elements of the District's Watershed Management Program (WMP) for watersheds in<br />

Polk County. Polk County encompasses approximately 2009 square miles within central Florida, of which 1,586 square<br />

miles are located within the District. Within the District, Polk County has 25 major watersheds. Of these, 11 have<br />

already been or currently are the subject of a Watershed Evaluation and/or Watershed Management Plan. This project<br />

will involve the development of Topographic Information, including 1-foot topographic contour maps using LiDAR data<br />

obtained by the District in 2005; the development of Watershed Evaluations and Watershed Management Plans for the<br />

remaining 14 watersheds; and updates of previous Watershed Evaluations and Watershed Management Plans to<br />

reflect changes in the watersheds, and to make the information consistent with the District's Guidelines and<br />

Specifications. Polk County watersheds will be prioritized, and work orders will be issued to consultants for individual<br />

watersheds.<br />

Benefits<br />

The WMP provides a method to evaluate the capacity of a watershed to protect, enhance, and restore water quality<br />

and natural systems, while achieving flood protection. The information developed provides the science for the District's<br />

Resource Management and Environmental Resource Permitting (ERP). It assists local governments: 1) with their land<br />

management responsibilities by establishing a level of service and developing Best Management Practices (BMPs) to<br />

address level of service deficiencies; and 2) provides a Geodatabase and projected results from watershed model<br />

simulations for floodplain management, and water quality management through the Total Maximum Daily Loads<br />

(TMDL) process for their National Pollution Discharge Elimination System (NPDES) permit requirements.<br />

Costs<br />

The total funding amount for this project is $2,856,954 of which the District's share will be $1,428,477. Polk County will<br />

contribute $1,428,477. For FY2007, $836,574 is appropriated in the following Basin budgets: Governing Board acting<br />

for the Green Swamp Basin ($289,978), Peace River Basin ($336,140), Alafia River Basin ($136,326), and the<br />

Hillsborough River Basin ($74,130). $418,287 in revenue will be received from Polk County, and distributed as follows:<br />

Governing Board ($144,989), Peace River Basin ($168,070), Alafia River Basin ($68,163), and the Hillsborough River<br />

Basin ($37,065). Basin funding and revenue distributions are based upon the percent project area within the Basin.<br />

With $836,574 in FY2007, the Topographic Information and Watershed Evaluations for the Polk City and Christina<br />

Watersheds will be completed. Watershed Evaluations will also be initiated for other priority watersheds, including the<br />

Reedy Creek and Bowlegs Creek watersheds. Watershed Evaluation updates will be initiated for the Itchepackesassa<br />

Creek and Poley Creek watersheds. $550,000 in FY2008 funding is appropriated in the following Basin budgets:<br />

Governing Board acting for the Green Swamp Basin ($96,500) Hillsborough Basin ($178,500) Polk County ($275,000).<br />

FY2008 funding will be used to complete Topographic Information, Watershed Evaluation and Watershed<br />

Management Plan tasks for Hillsborough River and Green Swamp watersheds. With FY2008 funds, the Polk City<br />

Watershed Management Plan will be initiated, and an update of the Itchepackesassa Creek Watershed Management<br />

Plan will be completed. FY2009 funding is appropriated in the following Basin budgets: ($74,250 Governing Board,<br />

$74,250 Alafia Basin, $74,250 Hillsborough Basin, and $222,750 Polk County). FY2009 funding is being used to<br />

complete Topographic Information, Watershed Evaluation and Watershed Management Plan tasks for Polk County<br />

watersheds. $524,880 in FY 20<strong>10</strong> is is appropriated in the following Basin budgets: $65,6<strong>10</strong> Governing Board,<br />

$65,6<strong>10</strong> Alafia Basin, $65,6<strong>10</strong> Hillsborough Basin, $65,6<strong>10</strong> Peace Basin, and $262,440 Polk County. FY20<strong>10</strong> funding<br />

is being used to complete Topographic Information, Watershed Evaluation and Watershed Management Plan tasks<br />

for Polk County watersheds. Future funding will be needed in future years to update or complete Watershed<br />

Evaluations and Watershed Management Plans for all of the Polk County watersheds. As tasks are completed, the<br />

project budget and scope will be refined based on the information developed. The District funding amounts shown in<br />

the table include staff salaries.<br />

Additional Information<br />

Polk County desires to create a county-wide Stormwater Master Plan to include data from previous Watershed<br />

Evaluations, Watershed Management Plans, Stormwater and Basin Master Plans, stormwater land development<br />

regulations, standards and criteria, recommended actions to satisfy new regulatory programs (NPDES and TMDL),<br />

020 - Peace River Basin 282


L672<br />

Polk - WMPlan Polk County<br />

operation & maintenance plans, and recommended BMPs. The vehicle to develop this information is the District's<br />

Watershed Management Program. The WMP includes five major elements: 1) Topographic Information, 2)<br />

Watershed Evaluation, 3) Watershed Management Plan, 4) Implementation of Best Management Practices, and 5)<br />

Maintenance of Watershed Parameters and Models. Implementing elements of the WMP with local governments is<br />

one of the Comprehensive Watershed Management (CWM) initiative strategies and one of the District's Strategic<br />

Priorities. A cooperative funding revenue agreement with the County will be developed as a multi-year funded project<br />

contingent on the approval of future funding to complete Watershed Evaluations and Watershed Management Plans<br />

for all of the watersheds. This will require the submission of a cooperative funding request each fiscal year until the<br />

project is completed. If approved, this project will be ranked as a 1A project in future fiscal years. The District will<br />

manage the project and enter into purchase orders and agreements to accomplish project tasks. Cost estimates will<br />

be developed for Watershed Management Plans upon completion of the associated Watershed Evaluation. The<br />

District is cooperating with FEMA to modernize the flood insurance rate maps (FIRMs) in Polk County. Information<br />

developed with this project will be used to update the FIRMs representing this watershed.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 251,929 0 77,892 68,078 65,6<strong>10</strong> 463,509<br />

011 Alafia River Basin 77,071 0 78,223 69,626 65,6<strong>10</strong> 290,530<br />

013 Hillsborough River Basin <strong>21</strong>9,717 0 75,794 68,393 65,6<strong>10</strong> 429,514<br />

020 Peace River Basin 171,863 0 0 67,026 65,6<strong>10</strong> 304,499<br />

District Budgeted - Outside Revenue<br />

Polk Co - WMPlan Polk County (L672) 693,287 0 222,750 262,440 262,440 1,440,917<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$2,928,969<br />

Critical Project Milestones Projected Amended Actual<br />

1. Revenue Contract<br />

Contract to Polk County for signautre 11/7/06 11/7/06<br />

Contract presented to County Commission 1/24/07 1/24/07<br />

Contract Executed 2/28/07 2/13/07<br />

First Amendment Executed 3/<strong>10</strong>/08 3/<strong>10</strong>/08<br />

Contract Expiration 1/31/<strong>10</strong><br />

2. Consultant Services Agreement<br />

PO issued to Woolpert to process LiDAR 2/28/07 2/22/07<br />

LiDAR processing complete 7/31/07 7/31/07<br />

One-foot contour shapefile complete <strong>10</strong>/31/07 <strong>10</strong>/31/07<br />

3. Consultant Services Agreement<br />

Agreement executed with BCI 2/28/07 2/26/07<br />

Notice to Proceed - Polk City Watershed Evaluation 2/28/07 3/12/07<br />

First Amendment to BCI Agreement Executed <strong>10</strong>/1/07 9/24/07<br />

Notice to Proceed - Polk City Watershed Management Plan <strong>10</strong>/31/07 <strong>10</strong>/1/07<br />

Polk City Watershed Evaluation complete 2/28/08 11/24/08<br />

Polk City Watershed Management Plan Complete 12/31/08<br />

BCI Contract Expiration 1/31/<strong>10</strong><br />

4. Consultant Services Agreement<br />

Agreement executed with PBS&J 2/28/07 2/26/07<br />

Notice to Proceed - Christina Watershed Evaluation 2/28/07 3/14/07<br />

First Amendment to PBS&J Agreement Executed 6/19/07 6/19/07<br />

Christina Watershed Evaluation complete 7/31/07 <strong>10</strong>/31/07 8/8/07<br />

020 - Peace River Basin 283


L672<br />

Polk - WMPlan Polk County<br />

PBS&J Contract Expiration 7/31/07 <strong>10</strong>/31/08<br />

Notice to Proceed - Poley Creek Watershed Evaluation 9/28/07 9/<strong>10</strong>/20<br />

Second Amendment to PBS&J Agreement Executed 9/28/07 8/13/07<br />

Poley Creek Watershed Evaluation Complete <strong>10</strong>/31/08 <strong>10</strong>/31/08<br />

5. Consultant Services Agreement<br />

Notice to Proceed - Bowlegs Creek Watershed Evaluation 9/28/07<br />

Agreement with Ardaman Executed 9/28/07 <strong>10</strong>/12/07<br />

Bowlegs Creek Watershed Evaluation Complete 12/31/08<br />

Ardaman Contract Expiration 12/31/09<br />

6. Consultant Services Agreement<br />

Notice to Proceed - Reedy Creek Watershed Evaluation 9/28/07<br />

Agreement with Boyle Executed 9/28/07<br />

Reedy Creek Watershed Evaluation Complete 12/31/08<br />

Boyle Contract Expiration 1/31/<strong>10</strong><br />

7. Consultant Services Agreement<br />

Notice to Proceed - Itchepackesassa Creek Watershed Evaluation 9/28/07 2/14/08<br />

Agreement with Keith and Schnars Executed 9/28/07 9/3/07<br />

Notice to Proceed - Itchepackesassa DTM 9/28/07 2/14/08<br />

First Amendment Executed 2/4/08 2/4/08<br />

Itchepackesassa DTM Complete 5/14/08 6/12/08<br />

Itchepackesassa Creek Watershed Evaluation Complete 7/31/08 3/5/09<br />

Keith and Schnars Contract Expiration 1/31/09 1/31/<strong>10</strong><br />

Itchepackesassa Creek Computer Model Complete 2/27/09<br />

Itchepackesassa Creek Watershed Management Plan Complete 5/29/09<br />

Status As Of: August 24, 2009<br />

The Cooperative Funding Revenue Agreement with Polk County was executed on February 13, 2007. The First<br />

Amendment to the Agreement was executed on March <strong>10</strong>, 2008 to encumber FY2008 funds. A Purchase Order was<br />

issued to Woolpert on February 22, 2007 to complete the processing of LiDAR information, and produce 1 foot<br />

topographic contours. LiDAR: The LiDAR processing and 1 foot contour coverage deliverables have been reviewed and<br />

approved, and the final invoice for these services has been paid. Christina: A Consultant Service Agreement for<br />

development of Digital Topographic Information and preparation of a Watershed Evaluation for the Christina (PBS&J)<br />

watershed was executed, and the associated Work Order and Notices to Proceed was issued on March 14, 2007. A<br />

public kickoff meeting was held for the Christina Watershed Evaluation in the District's Bartow Service Office on April 19,<br />

2007. The meeting was intended to notify area residents and other interested parties about the project, and solicit input.<br />

About 25 residents attended, and participated in a lively discussion about flooding and water quality problems in the<br />

watershed. The First Amendment to the Agreement with PBS&J was executed on June 19, 2007 to extend the contract<br />

expiration from July 31, 2007 to October 31, 2007 to provide sufficient time for additional coordination with affected<br />

residents. The Final Deliverables for the Christina Watershed Evaluation were received in March 2008. The Watershed<br />

Management Plan is being conducted through the L702 project. Please refer to L702 for further information. Poley<br />

Creek: The Second Amendment to the Agreement with PBS&J was executed on August 13, 2007 to add funds for the<br />

Poley Creek Watershed Evaluation. The draft Poley Creek Watershed Evaluation deliverables were submitted to the<br />

District on October 31, 2008. District staff provided comments to PBS&J on March <strong>10</strong>, 2009. Awaiting revised<br />

deliverables. Polk City: A Consultant Service Agreement for development of Digital Topographic Information and<br />

preparation of a Watershed Evaluation for the Polk City (BCI) watershed was executed, and the associated Work Order<br />

and Notices to Proceed was issued on March 12, 2007. The Polk City Watershed Evaluation is nearing completion. An<br />

amendment to the agreement with BCI was executed effective October 1, 2007 to encumber FY2008 funds and expand<br />

the scope of work to include Watershed Management Plan tasks. The Second Amendment encumbers FY2009 funds<br />

that will be used to complete the Watershed Management Plan for Polk City. Itchepackesassa Creek: The Agreement<br />

with Keith and Schnars was executed on September 3, 2007. The first watershed assigned to Keith and Schnars is the<br />

Itchepackesassa Creek watershed. The Itchepackesassa Creek Watershed was the subject of a previous Watershed<br />

Evaluation. However, the Digital Topographic Information and Watershed Evaluation were completed prior to the<br />

development of the District's 2005 LiDAR data for this area. Project funds will be used to incorporate the District's LiDAR<br />

data and changes that have expanded the scope of work to include Watershed Management Plan tasks. The Notice to<br />

Proceed for Work Order #1 for Itchepackesassa Creek DTM generation and the initiation of Watershed Evaluation tasks<br />

was issued on February 14, 2008. The First Amendment to the Agreement was executed on February 4, 2008 to<br />

encumber FY2008 funds and expand the scope of work to include Watershed Management Plan tasks. Notice to<br />

Proceed for Work Order #2 for completion of the Itchepackesassa Creek Watershed Evaluation and initiation of<br />

020 - Peace River Basin 284


L672<br />

Polk - WMPlan Polk County<br />

Watershed Management Plan tasks was issued July 25, 2008. FY2009 will be used to complete the Watershed<br />

Management Plan. Bowlegs Creek: The Agreement with Ardaman and Associates was executed on October 12, 2007<br />

for the Bowlegs Creek Watershed Evaluation. The development of Work Order #1 is currently on-hold to provide time for<br />

District and Ardaman staff to complete DFIRM mapping projects in Hernando, Pasco and Sarasota Counties. Reedy<br />

Creek: An Agreement with Boyle Engineering Corporation was prepared for the Reedy Creek watershed, but has been<br />

on hold as staff resources are being used to complete DFIRM mapping projects in Hernando, Pasco and Sarasota<br />

Counties. The Reedy Creek Watershed Evaluation is expected to begin in FY2009. Status History: The County<br />

requested that FY2007 funds approved for the recently withdrawn Stormwater Assessment Study and GIS parcel<br />

digitization (L675) project be transferred to this project. The total project budget will remain the same. The revised<br />

FY2007 amounts were presented to the Governing Board, Alafia River Basin Board and Hillsborough River Basin Board<br />

at their August 2006 meetings. The funding amount for the Peace River Basin was not changed for FY2007. The FY2007<br />

and future funding amounts shown in the table above have been revised accordingly. The County requested out-of-cycle<br />

FY2007 funding for the Christina Watershed Management Plan. At their December 2006 meeting, the Alafia River Basin<br />

Board approved funding the Christina Watershed Management Plan as a separate FY2007 project. Please refer to<br />

project number L702 for additional information. FY2008 funding will be used to expand the scope of work to include<br />

Watershed Management Plan tasks for watersheds within the Hillsborough River and Green Swamp Basins, including<br />

the Itchepackesassa Creek and Polk City watersheds. The total project budget is $2,<strong>10</strong>0,000. The amount encumbered<br />

through FY2009 is $1,832,074. Of this, the following has been invoiced and paid: $497,540 by Woolpert for LiDAR<br />

processing and the generation of 1 foot contours; $122,304 by PBS&J for the Christina and Poley Creek Watershed<br />

Evaluations; $65,989 by BCI for the Polk City Watershed Evaluation; and $227,690 by Keith and Schnars for the<br />

Itchepackesassa Creek Watershed Management Plan. As consultant invoices are paid, Polk County is being invoiced for<br />

its share. On January 9, 2009 District staff contacted the County to see if the project could be expedited. County staff<br />

indicated the is project is limited by available funding, and additional State or Federal funding would be needed to<br />

expedite the completion of Watershed Management Plans for all of the County watersheds. No further actions are<br />

planned to expedite the project at this time.<br />

020 - Peace River Basin 285


L673<br />

Polk - Imp. BMPs Lake Belle and Tractor Lake<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Flood Protection<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Polk County Natural Resources<br />

Project Manager TURNER, DAWN<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This is a multi-year funded project to perform the Implementation of Best Management Practices (BMPs) element of<br />

the District's Watershed Management Program (WMP) for the Lake Belle and Tractor Lake Watershed improvement<br />

area. The watershed covers an area of approximately 1.4 square miles in southeast Polk County. Proposed BMPs will<br />

address level of service deficiencies. Lake Belle and Tractor Lake are currently closed basins. In lieu of a Watershed<br />

Management Plan, the County retained Professional Engineering Consultants to prepare a feasibility study. The study<br />

entitled Lake Belle Drainage Outfall Evaluation was completed in May 2006, and includes a BMP alternative analysis,<br />

preliminary engineering, and cost estimates. The work performed by Professional Engineering Consultants did not<br />

include conceptual permitting. Recommended BMPs involve improvements to the stormwater management<br />

infrastructure including the installation of a gravity outfall from Tractor Lake to Lake Belle, and a pump outfall from<br />

Lake Belle to a borrow pit on the north side of Hunt Brothers Road. The borrow pit discharges to the south under Hunt<br />

Brothers Road to a second borrow pit. The second borrow pit discharges to the southeast under U.S. 27, then along<br />

the south side of Longleaf Business Park, through the 5R Ranch property to the south loop of the Peace Creek Canal.<br />

Maintenance activities will be performed, and improvements may be constructed within the conveyance system<br />

between the borrow pits and 5R Ranch. Easements will be obtained to construct the lake outfalls and conveyance<br />

system improvements. The pump system will be operated between storm events to recover storage volume above<br />

elevation 117.9 feet NGVD, which is 0.9 feet above the adopted low level guidance elevation for Lake Belle. The pump<br />

will not be used to discharge water during storm events. The Lake Belle Drainage Outfall Evaluation indicates high<br />

water levels in the borrow pits will be increased. Easements may be required over areas impacted by increased water<br />

levels to satisfy Environmental Resource Permit requirements.<br />

Benefits<br />

The Lake Belle Drainage Outfall Evaluation indicates high water levels and durations within Lake Belle and Tractor<br />

Lake will be reduced.<br />

Costs<br />

The projected cost for implementation of this project is $980,000. The District's share is $490,000, and the County's is<br />

$490,000. In FY2007, the Peace River Basin funded $265,000 and Polk County funded $265,000. In FY2008,<br />

$450,000 was provided, with the Basin Board and the County each contributing $225,000. The estimated cost was<br />

obtained from the Lake Belle Drainage Outfall Evaluation, and is based upon preliminary engineering; the costs<br />

include the following tasks: design, development of construction documents, construction permitting, land acquisition,<br />

bidding and contractor selection, construction of the BMPs, construction engineering, and inspection. When each<br />

element is completed the project budget and scope may require refinement based upon the information developed. As<br />

a condition of the funding agreement, the District will not reimburse project costs until all necessary permits have been<br />

obtained and construction has commenced. Once construction has commenced, project costs will be reimbursed by<br />

the District on a 50/50 cost share basis. District funding amounts shown in the table include staff salaries.<br />

Additional Information<br />

The WMP includes five major elements: 1) Topographic Information, 2) Watershed Evaluation, 3) Watershed<br />

Management Plan, 4) Implementation of Best Management Practices, and 5) Maintenance of Watershed Parameters<br />

and Models. Implementing elements of the WMP with local governments is one of the Comprehensive Watershed<br />

Management (CWM) initiative strategies and one of the District's Strategic Priorities. Following three hurricanes in<br />

2004 and four years of above average rainfall, Lake Belle experienced a dramatic rise in water levels (over <strong>10</strong> feet<br />

vertical). This resulted in the flooding of more than a dozen homes and a County road. The Polk County Commission<br />

expended tens of thousands of dollars to conduct emergency pumping to relieve the flooding, and determined that a<br />

long term solution is necessary. A cooperative funding expenditure agreement with Polk County will be developed as a<br />

multi-year funded project contingent on the approval of future funding to complete the Implementation of BMPs. This<br />

will require the submission of a cooperative funding request each fiscal year until the project is completed. If approved,<br />

this project will be ranked as a 1A project in future fiscal years. The County will manage the project, where the District<br />

project manager must approve any agreements to accomplish project tasks. The District is cooperating with FEMA to<br />

modernize the flood insurance rate maps (FIRMs) in Polk County. Information developed with this project will be used<br />

to update the FIRMs representing this watershed.<br />

020 - Peace River Basin 286


L673<br />

Polk - Imp. BMPs Lake Belle and Tractor Lake<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 501,854 0 2,594 2,625<br />

0 507,073<br />

Project Funds Not Budgeted by the<br />

District<br />

Polk County 490,000 0 0<br />

0<br />

0 490,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$997,073<br />

Critical Project Milestones Projected Amended Actual<br />

1. Cooperative Funding Expenditure Agreement<br />

Cooperative Funding Agreement Executed <strong>10</strong>/17/06 <strong>10</strong>/23/06<br />

District Logo on Plans 12/19/07 8/23/08<br />

Design and Permitting Complete 12/19/07 6/25/09<br />

Bidding and Contractor Selection complete 3/31/08 9/8/09<br />

Land acquisition complete 3/31/08<br />

Commence Construction 4/30/08 9/8/09<br />

District Logo on Construction signs 4/30/08<br />

Complete Construction 4/30/09<br />

Contract Expiration 12/31/11<br />

2. Consultant Services Agreement<br />

Design and Permitting Complete 12/19/07<br />

Status As Of: September 11, 2009<br />

The Cooperative Funding Agreement has been executed, and Notice to Proceed was provided to Polk County on<br />

October 23, 2006. The ERP was issued on June 25, 2009. The County has completed their Bid process, and a<br />

contractor has been selected. Notice to Proceed was recently provided to the County's Contractor. The first invoice for<br />

$3,442 was paid. However, the District is not required to reimburse the County until construction commences. Four<br />

subsequent invoices totaling $58,179 have been received. These invoices will now be processed for payment. On<br />

January 9, 2009, District staff contacted the County to see if the project could be expedited. County staff indicated work<br />

cannot begin until a permit is obtained. The County will continue to work toward obtaining an ERP permit.<br />

020 - Peace River Basin 287


L674<br />

Polk - Imp. BMPs Saddlebag Lake<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Flood Protection<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Polk County Natural Resources<br />

Project Manager TURNER, DAWN<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This is a multi-year funded project to perform the Implementation of Best Management Practices (BMPs) element of<br />

the District's Watershed Management Program (WMP) for the watershed contributing to Saddlebag Lake, Lake<br />

Thomas, Parks Lake, Cypress Lake, Little Gum Lake, Big Gum Lake and Stock Lake. The watershed covers an area<br />

of approximately 9.5 square miles in southeast Polk County. Proposed BMPs will address level of service deficiencies.<br />

Saddlebag Lake and Thomas Lake are currently closed basins. In lieu of a Watershed Management Plan, the County<br />

retained Professional Engineering Consultants to prepare a feasibility study. The study entitled Saddlebag Lake<br />

Drainage Outfall Evaluation was completed in May 2006, and includes a BMP alternative analysis, preliminary<br />

engineering, and cost estimates. The work performed by Professional Engineering Consultants did not include<br />

conceptual permitting. Recommended BMPs involve improvements to the stormwater management infrastructure<br />

including the construction of outfall structures and conveyance systems connecting Saddlebag Lake to Lake Thomas,<br />

and Lake Thomas to Cypress Lake. Conveyance system improvements will also be constructed between Parks Lake<br />

and Cypress Lake, and between Cypress Lake and Little Gum Lake. Implementation of the BMPs will allow water<br />

levels within Saddlebag Lake to be controlled at an elevation of <strong>10</strong>1.5 feet NGVD, which is 0.5 feet below the adopted<br />

low level guidance elevation for Saddlebag Lake, and only 0.5 feet above the adopted extreme low elevation. Lake<br />

Thomas will be controlled at the adopted low level guidance elevation of 97.0 feet NGVD. Improvements to the<br />

conveyance system between Parks Lake and Cypress Lake will control Parks Lake at the adopted low level guidance<br />

elevation of <strong>10</strong>0.0 feet NGVD. Improvements between Cypress Lake and Little Gum Lake will control Cypress Lake at<br />

elevation 95.5 feet NGVD, which is 0.5 feet above the adopted low level guidance elevation for Cypress Lake.<br />

Easements will be obtained to construct the lake outfalls and conveyance system improvements. The Saddlebag Lake<br />

Drainage Outfall Evaluation indicates high water levels in Parks Lake, Cypress Lake, Little Gum Lake, Big Gum Lake<br />

and Stock Lake will be increased for one or more design storm events. Easements may be required over areas<br />

impacted by increased water levels to satisfy Environmental Resource Permit requirements.<br />

Benefits<br />

The Saddlebag Lake Drainage Outfall Evaluation indicates high water levels and durations within Saddlebag Lake and<br />

Lake Thomas will be reduced.<br />

Costs<br />

The projected cost for implementation of this project is $2,<strong>10</strong>0,000. The District's share is $1,050,000, and Polk<br />

County's is $1,050,000. The projected cost was obtained from the Saddlebag Lake Drainage Outfall Evaluation, and is<br />

based upon preliminary engineering. In FY2007, the Peace River Basin funded $525,000 and Polk County funded<br />

$525,000. With FY2007 funding, the Implementation of BMPs has been initiated, and includes the following tasks:<br />

design, development of construction documents, construction permitting, land acquisition, bidding and contractor<br />

selection, and the initiation of construction. $525,000 in FY2008 funding has been appropriated in the Peace River<br />

Basin Budget, and Polk County will contribute $525,000. FY2008 funding will be used for land acquisition, construction<br />

of BMPs, construction engineering, and inspection. When each task is completed the project budget and scope will be<br />

refined based on the information developed. As a condition of the funding agreement, the District will not reimburse<br />

project costs until all necessary permits have been obtained, and construction has commenced. Once construction<br />

has commenced, project costs will be reimbursed by the District on a 50/50 cost share basis. District funding amounts<br />

shown in the table include staff salaries.<br />

Additional Information<br />

The WMP includes five major elements: 1) Topographic Information, 2) Watershed Evaluation, 3) Watershed<br />

Management Plan, 4) Implementation of Best Management Practices, and 5) Maintenance of Watershed Parameters<br />

and Models. Implementing elements of the WMP with local governments is one of the Comprehensive Watershed<br />

Management (CWM) initiative strategies and one of the District's Strategic Priorities. Following three hurricanes in<br />

2004 and four years of above average rainfall, water levels in Saddlebag Lake and Lake Thomas increased<br />

dramatically. This resulted in the flooding or abandonment of more than 300 homes. Roads and a domestic<br />

wastewater treatment plant were impacted, jeopardizing several hundred additional homes. The Polk County<br />

Commission expended hundreds of thousands of dollars to conduct emergency pumping to relieve the flooding, and<br />

determined that a long term solution is necessary. A cooperative funding expenditure agreement with Polk County will<br />

020 - Peace River Basin 288


L674<br />

Polk - Imp. BMPs Saddlebag Lake<br />

be developed as a multi-year funded project contingent on the approval of future funding to complete the<br />

Implementation of BMPs. This will require the submittal of a cooperative funding request each fiscal year until the<br />

project is completed. If approved, this project will be ranked as a 1A project in future fiscal years. The County will<br />

manage the project, where the District project manager must approve any agreements to accomplish project tasks.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 1,059,607 (275,000) 2,594 2,625<br />

0 789,826<br />

Project Funds Not Budgeted by the<br />

District<br />

Polk County 1,050,000 0 0<br />

0<br />

0 1,050,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$1,839,826<br />

Critical Project Milestones Projected Amended Actual<br />

1. Cooperative Funding Expenditure Agreement<br />

Executive Cooperative Funding Agreement 11/30/06<br />

District Logo on Plans 3/19/08<br />

Design & Permitting Complete 3/19/08<br />

Bidding and Contractor Selection complete 6/30/08<br />

Land acquisition complete 6/30/08<br />

District Logo on Construction signs 7/31/08<br />

Commence Construction 7/31/08<br />

Complete Construction 7/31/09<br />

Contract Expiration 12/31/11<br />

2. Consultant Services Agreement<br />

Design and Permitting Complete 3/19/08<br />

Status As Of: August 24, 2009<br />

In December 2006, the District entered into an agreement with Polk County for the Saddlebag Lake Watershed<br />

Implementation of Best Management Practices (BMPs) project (L674). The project involves the design, permitting, and<br />

construction of conveyance improvements to enhance flood protection. The total project budget in the agreement,<br />

$2,<strong>10</strong>0,000 ($1,050,000 District¿s share), was based upon the preliminary design. As of this writing, construction is<br />

substantially complete; and County staff indicate the total cost of the project will be less than budgeted. In January <strong>21</strong>,<br />

2009, the District entered into a separate agreement with Polk County for the Saddle Creek Watershed Implementation<br />

of BMPs project (N122). The project involves the construction of bank stabilization measures in the Lake Parker Outfall<br />

System that conveys water from the lake to Saddle Creek. The project budget in the agreement, $540,000 ($270,000<br />

District¿s share), was based on the preliminary design. The County received construction bids in April 2009, and<br />

estimates the project costs will be approximately $550,000 more than the original budget. As a result, the County<br />

requested that $550,000 ($275,000 District¿s share) be transferred from the Saddlebag Lake Watershed project (L674)<br />

to the Saddle Creek Watershed project (N122) to cover the cost increase. At their June 6, 2009 meeting, the Pease<br />

River Basin Board approved the transfer of $275,000 from the Saddlebag Lake Watershed project to the Saddle Creek<br />

Watershed project. The District's fiscal year 2009 budget has been revised accordingly. $1<strong>10</strong>, 901 has been invoiced<br />

and paid to date for the Saddlebag Lake Watershd project. Construction is substantially complete. No further action is<br />

needed to expedite this project.<br />

020 - Peace River Basin 289


L679<br />

Hardee - WMPlan Horse Creek<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Hardee County<br />

Project Manager LETASI, SCOTT<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This is a multi-year funded project to perform 1) Topographic Information, 2) Watershed Evaluation, and 3) Watershed<br />

Management Plan elements of the District's Watershed Management Program (WMP) for the Horse<br />

Creek Watershed. The watershed covers an area of approximately 124 square miles and is located in Hardee County.<br />

The watershed faces flood damage and water quality issues. With FY2007 funding the work on the Horse Creek<br />

Watershed Evaluation as one element. Watershed Management Plan elements for Horse Creek will begin, and with<br />

the FY2008 funding should be completed for approximately 78 square miles of the north most portion of the<br />

Watershed. Future funding will be required for the Watershed Evaluation of the rest of this watershed and other<br />

watersheds, Watershed Management Plan for Horse Creek to complete the survey, watershed modeling development,<br />

floodplain analysis, LOS, surface water resource assessment, and alternate analysis of BMPs.<br />

Benefits<br />

The WMP provides a method to evaluate the capacity of a watershed to protect, enhance, and restore water quality<br />

and natural systems, while achieving flood protection. The information developed provides the science for the District's<br />

Resource Management and Environmental Resource Permitting (ERP). It assists local governments: 1) With their land<br />

management responsibilities by establishing a level of service and developing Best Management Practices (BMPs) to<br />

address level of service deficiencies. 2) Provides a Geodatabase and projected results from watershed model<br />

simulations for floodplain management, and water quality management.<br />

Costs<br />

The total estimated cost of the project is $280,000, of which the District's share is $150,000 from the Peace River<br />

Basin and $80,000 is from FEMA as part of the FIRM Map Modernization (M<strong>10</strong>4). The County will contribute $25,000<br />

in FY2007 and $25,000 in FY2008. The District's share from the Peace River Basin is $75,000 for FY2007 and<br />

$75,000 for FY2008. Hardee County is a REDI Community and will contribute 25% of the project total cost. Future<br />

funding will be required to complete the WMPlan for the southern part of Horse Creek Watershed.<br />

Additional Information<br />

The WMP includes five major elements: 1) Topographic Information, 2) Watershed Evaluation, 3) Watershed<br />

Management Plan, 4) Implementation of Best Management Practices, and 5) Maintenance of Watershed Parameters<br />

and Models. Implementing elements of the WMP with local governments is one of the Comprehensive Watershed<br />

Management (CWM) initiative strategies and one of the District's Strategic Priorities. A cooperative funding revenue<br />

agreement with Hardee County will be developed as a multi-year funded project contingent on the approval of future<br />

funding to complete the WMP elements through the Watershed Management Plan. This is a multi-year funded project<br />

that will require a cooperative funding request each fiscal year until completed. If approved, this project will be ranked<br />

as a 1A project in future fiscal years. The County will manage the project, where the District project manager must<br />

approve any agreements to accomplish project tasks. Future cooperative funding requests and agreements will be<br />

required for the Implementation of BMPs and Maintenance of Watershed Parameters and Models.<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 157,466 0 3,6<strong>21</strong> 982<br />

0 162,069<br />

District Budgeted - Outside Revenue<br />

Hardee Co - Watershed Mgmt Plan<br />

(L679)<br />

Prior<br />

Funding<br />

020 - Peace River Basin 290<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

50,000 0 0<br />

0<br />

Total:<br />

Future<br />

Funding<br />

0<br />

Total<br />

Funding<br />

50,000<br />

$<strong>21</strong>2,069


L679<br />

Hardee - WMPlan Horse Creek<br />

Critical Project Milestones Projected Amended Actual<br />

1. Critical Project Milestones<br />

County Agreement Executed 7/1/07 5/1/07<br />

Consultant Agreement Executed <strong>10</strong>/1/07 7/11/07<br />

Notice to Proceed <strong>10</strong>/15/07 <strong>10</strong>/2/07<br />

2. Digital Terrain Model<br />

Digital Terrain Model 11/1/07 12/12/07<br />

3. Watershed Evaluation<br />

Begin Watershed Evaluation 12/1/07 12/1/07<br />

Completion of the Watershed Evaluation 2/1/08 4/15/08 4/9/08<br />

4. Watershed Management Plan<br />

Begin Watershed Management Plan 2/15/08 4/15/08 4/1/08<br />

Complete Watershed Management Plan 8/1/08<br />

Status As Of: August 31, 2009<br />

Status History: Several meetings between District staff and Hardee County staff were performed in November and<br />

December 2006 to prioritize the watersheds that will be studied in detail as part of the watershed management program.<br />

The County and District are coordinating this project with the FEMA MAP MOD project (M<strong>10</strong>4). Remaining FEMA funds<br />

from the MAP MOD project will be combined with this project's funding to accomplish a Watershed Management Plan for<br />

a larger part of the priority watershed select by the County. A meeting between the District and the County on March 16,<br />

2007 identified Horse Creek as the priority watershed. Due to the current budget constraints, a watershed management<br />

plan can not be performed in the entire 124 square miles of the watershed. The County and District agreed to start in the<br />

northern most subbasins of the watershed and work to the south as future funding is available. A Cooperative Funding<br />

Agreement between the District and Hardee County was executed on May 1, 2007. The project development of this<br />

project has been completed. An agreement between BCI the engineering consultant and the District has been executed<br />

and the first work order has been signed. <strong>Meeting</strong>s between all stakeholders have been completed. The stakeholders<br />

include: BCI, SWFWMD, Mosaic, CF Industries, and Hardee County. BCI has completed the DTI for Horse Creek. The<br />

first amendment to encumber FY2008 funds has been executed by the District. BCI has submitted the final watershed<br />

management plan deliverables. Status Current: The District's review of the modeling results has been completed and the<br />

peer review of the watershed management plan will begin in October 2009.<br />

020 - Peace River Basin 291


L680<br />

Bartow - WMPlan Bartow<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Flood Protection<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Bartow<br />

Project Manager TURNER, DAWN<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This is a multi-year funded project to perform the Watershed Evaluation element of the District's Watershed<br />

Management Program (WMP) for the Bartow watershed. The Bartow watershed is located within the upper Peace<br />

River watershed, and covers an area of approximately 40 square miles in Polk County. The Digital Topographic<br />

Information element, and the hydrologic feature inventory, identification of survey needs, and surface water resource<br />

inventory and approach development tasks of the Watershed Evaluation have already been completed as part of the<br />

Upper Peace River Resource Development (H024) project. Portions of the Bartow watershed are highly urbanized,<br />

and the City would like to perform an inventory of the stormwater infrastructure that is much more detailed than the<br />

one performed for the upper Peace River. With FY2007 funding, the following Watershed Evaluation tasks will be<br />

completed for the Bartow watershed: data evaluation and assembly, hydraulic feature inventory, desktop<br />

reconnaissance, preliminary junction/reach network development, and immediate maintenance evaluation. FY2008<br />

funding has been requested to complete the field reconnaissance, and deliverables tasks. A Watershed Management<br />

Plan is being prepared for the upper Peace River as part of the Upper Peace River Resource Development project.<br />

The plan will include the Bartow watershed, but will not utilize the same level of detail for the infrastructure in the<br />

urbanized areas. If the City desires a more detailed level of service determination and best management practices<br />

alternative analysis for the urbanized areas, additional funding will be required. The District is cooperating with FEMA<br />

to modernize the flood insurance rate maps (FIRMs) in Polk County. Information generated through the Bartow<br />

Watershed Evaluation and the Upper Peace River Watershed Management Plan will be used to update the FIRMs<br />

representing the Bartow area.<br />

Benefits<br />

The WMP provides a method to evaluate the capacity of a watershed to protect, enhance, and restore water quality<br />

and natural systems, while achieving flood protection. The information developed provides the science for the District's<br />

Resource Management and Environmental Resource Permitting (ERP). It assists local governments: 1) with their land<br />

management responsibilities by establishing a level of service and developing Best Management Practices (BMPs) to<br />

address level of service deficiencies; and 2) provides a Geodatabase and projected results from watershed model<br />

simulations for floodplain management, and water quality management through the Total Maximum Daily Loads<br />

(TMDL) process for their National Pollution Discharge Elimination System (NPDES) permit requirements.<br />

Costs<br />

The total funding amount for this project is $320,000, of which the District's share is $160,000. The City will contribute<br />

$160,000. For FY2007, $160,000 is appropriated in the Peace River Basin's budget with a revenue from the City of<br />

Bartow for $80,000. When each element is completed the project budget and scope may require refinement based on<br />

the information gathered. In FY2008, $160,000 is appropriated in the Peace River Basin's budget with a revenue from<br />

the City of Bartow for $80,000. FY2008 funding will be used to complete field reconnaissance of an estimated 1700<br />

hydraulic fearures, and complete final project deliverables.<br />

Additional Information<br />

The WMP includes five major elements: 1) Topographic Information, 2) Watershed Evaluation, 3) Watershed<br />

Management Plan, 4) Implementation of Best Management Practices, and 5) Maintenance of Watershed Parameters<br />

and Models. Implementing elements of the WMP with local governments is one of the Comprehensive Watershed<br />

Management (CWM) initiative strategies and one of the District's Strategic Priorities. A cooperative funding revenue<br />

agreement with the City will be developed as a multi-year funded project contingent on the approval of future funding<br />

to complete the Watershed Evaluation, and the following Watershed Management Plan tasks: level of service<br />

determination and BMPs alternatives analysis. This is a multi¿year funded project that will require a cooperative<br />

funding request each fiscal year until completed. If approved, this project will be ranked as a 1A project in future fiscal<br />

years. The District will manage the project and enter into purchase orders and agreements to accomplish project<br />

tasks. Future cooperative funding requests and agreements will be required for the Implementation of BMPs and<br />

Maintenance of Watershed Parameters and Models.<br />

020 - Peace River Basin 292


L680<br />

Bartow - WMPlan Bartow<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 171,920 0 2,594 1,233<br />

0 175,747<br />

District Budgeted - Outside Revenue<br />

Polk Co - Bartow Watershed Mgmt Plan<br />

(L680)<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

160,000 0 0<br />

0<br />

Total:<br />

Future<br />

Funding<br />

0<br />

Total<br />

Funding<br />

160,000<br />

$335,747<br />

Critical Project Milestones Projected Amended Actual<br />

1. Revenue Agreement<br />

Revenue Agreement to Contracts for approval 9/22/06 9/<strong>21</strong>/06<br />

Revenue Agreement mailed to cooperator for signature <strong>10</strong>/13/06 <strong>10</strong>/9/06<br />

Revenue Agreement Executed <strong>10</strong>/31/06 <strong>10</strong>/24/06<br />

1st Amendment to Revenue Agreement Executed 9/19/08 9/19/08<br />

Revenue Agreement Expiration 1/31/09 12/31/09<br />

2. Consultant Services Agreement<br />

Consultant Services Agreement to Contracts for approval 9/22/06 9/<strong>21</strong>/06<br />

Consultant Services Agreement mailed to Ardaman for signature <strong>10</strong>/13/06 <strong>10</strong>/23/06<br />

Consultant Services Agreement Executed <strong>10</strong>/31/06 12/12/06<br />

Work Order #1 issued to Ardaman <strong>10</strong>/31/06 1/3/07<br />

1st Amendment to Consultant Services Agreement Executed 9/2/08 9/2/08<br />

Consultant Services Agreement Expiration 12/31/08 7/31/09<br />

Work Order #1 Final Deliverables Received 7/31/09<br />

Work Order #2 Final Deliverables Received 7/31/09<br />

Status As Of: August 24, 2009<br />

The Cooperative Funding and the Consultant Services Agreement have been executed. Notice to Proceed was provided<br />

to Ardaman and Associates on January 3, 2007, and a project kickoff meeting was held on February 20, 2007. As part of<br />

the data collection activities, Ardaman staff coordinated with City staff to review and copy pertinent infrastructure data<br />

from City project and permit files. An immediate maintenance evaluation will also be conducted for up to 5 problem<br />

areas. The completion of this work was temporarily on-hold while District consultants focused on the completion of<br />

detailed studies needed for DFIRM map modernization in other counties. The project has recommenced. A meeting was<br />

held with City staff on August 26, 2008 to determine priority areas for the immediate maintenance evaluation work. The<br />

cooperative funding and consultant service agreements were amended to extend contract expiration dates to account for<br />

the temporay delay. A second work order was issued to perform field reconnaissance of approximately 1700 hydraulic<br />

features (storm sewer pipes, inlets, junctions, manholes, and outfalls), with horizontal location of features determined<br />

with sub-meter accuracy and elevations by approximate methods based on LiDAR. Status History: The City is highly<br />

urbanized, and City staff would like to perform a very detailed inventory of the stormwater infrastructure. As part of the<br />

Watershed Evaluation, the inventory information will be linked to GIS. At this level of detail, cost estimates indicate the<br />

$320,000 of anticipated project funds will be sufficient to complete the Watershed Evaluation, but not the Watershed<br />

Management Plan. The on-going Upper Peace River Resource Development (H024) project involves the development of<br />

a Watershed Management Plan that will include the City of Bartow; but will not utilize the same high level of detail. City<br />

staff indicate the level of detail that will be used for the Upper Peace River Resource Development project will meet their<br />

needs related to the identification of flood prone areas, and the development of a Watershed Management Plan. In order<br />

to stay within the approved project budget, the scope of work for this project will include only the Watershed Evaluation.<br />

The Watershed Management Plan element will be performed through the Upper Peace River Resource Development<br />

(H024) project. Data developed through the Bartow Watershed Evaluation, and the Upper Peace River Resource<br />

Development projects will be used to update the FIRMs representing the Bartow watershed. A total of $246,774 has<br />

been invoiced and paid to date. The City is being invoiced for their share. The project is fully funded, and nearing<br />

completion. Consequently, no actions are planned to expedite the project at this time.<br />

020 - Peace River Basin 293


L693<br />

Water Exhibits in the Glazer Children's Museum of Tampa<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers, Pinellas-Anclote River,<br />

Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

The Children's Museum of Tampa<br />

Project Manager HULL, MARY MARGARET<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

The Glazer Children's Museum of Tampa is relocating to a new museum site in Riverfront Park in downtown Tampa.<br />

This multi-year project is part of the City of Tampa's efforts to revitalize the downtown business district. This is the third<br />

and final phase of a project to develop and install water exhibits in the museum. In FY2007, the District funded the<br />

planning and development phase for interactive water exhibits. FY2008 funds paid for detailed specifications,<br />

structural engineering, fabrication of support structure, construction of entrances, partial platform construction and<br />

other expenses related to fabrication. In the conceptual phase, District staff and BBEC members were included in<br />

several planning sessions for the design of the interactive water exhibits to ensure they incorporate the District's<br />

message. These exhibits include Water's Journey, which is a three-story climbing structure where visitors "become" a<br />

drop of water and make their way across the watershed, down through the aquifer, up to the city, down a storm drain<br />

and into a swamp. Another exhibit is the Water Bank, which is styled to look like an ATM. Here visitors explore some<br />

of the issues of water supply and demand. Sample depositors of water into the ATM are rain, reservoir, desalination<br />

plants, etc. Withdrawals of water are made by wildlife, wetlands, cities, people, industry, agriculture, etc. Interest is<br />

earned by saving water through a variety of water conservation actions, such as turning the water off when brushing<br />

teeth, using Florida-Friendly LandscapingTM principles, etc. The FY2009 funding is for exhibit construction and<br />

installation.The museum is scheduled to open to the public in May/June 20<strong>10</strong>.<br />

Benefits<br />

The exhibits are multidisciplinary and designed to engage diverse learning styles. The museum is projected to draw<br />

<strong>10</strong>0,000 people annually. The interactive water exhibits address three elements of the District's AORs -- water supply,<br />

water quality and natural systems -- in simple, easy-to-understand terms. Additionally, this project targets children ages<br />

0-<strong>10</strong> years and accompanying adults. This segment of the population was identified in an independent evaluation of<br />

the District's youth education program as one to which the District needed to expand its reach. This project helps<br />

accomplish this goal.<br />

Costs<br />

The total cost of the project (including building construction and all exhibits throughout the museum) is estimated to be<br />

$20 million. The total contribution from the District, including FY2007, FY2008 and FY2009, is $617,442. In FY2007,<br />

the basins shared $112,500 for the planning and development phase for interactive water exhibits. FY2008 funds were<br />

for detailed specifications, structural engineering, fabrication of support structure, construction of entrances, partial<br />

platform construction and other expenses related to fabrication. FY2009 funds are for completion of the exhibit<br />

fabrication, installation and education program development. Phase 3 FY2009 funding request of $252,471 is<br />

allocated as follows:<br />

Alafia River: 12% $29,968;<br />

Hillsborough River: 27% $68,900;<br />

Northwest Hillsborough: 15% $37,340;<br />

Coastal Rivers: 9% $22,249;<br />

Pinellas-Anclote: 14% $35,396;<br />

Withlacoochee River: 5% $12,8<strong>21</strong>;<br />

Peace River: 8% $20,550;<br />

Manasota: <strong>10</strong>% $25,247.<br />

The funding splits for this project are based on cooperator-supplied projections of museum attendance. This project<br />

anticipates reaching <strong>10</strong>0,000 people per year at a cost (for the total project, all phases) to the District of $6.18 per<br />

person. Typical museum exhibits have a <strong>10</strong>-year life span. This project, therefore, has the potential to reach 1 million<br />

visitors over a <strong>10</strong>-year period at a cost to the District of $0.62 per person. The budget lines below include costs for<br />

staff to manage the project.<br />

020 - Peace River Basin 294


L693<br />

Water Exhibits in the Glazer Children's Museum of Tampa<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

011 Alafia River Basin 44,818 0 29,968<br />

0<br />

0 74,786<br />

013 Hillsborough River Basin <strong>10</strong>2,175 0 69,090<br />

0<br />

0 171,265<br />

014 Northwest Hillsborough Basin 56,915 0 37,340<br />

0<br />

0 94,255<br />

015 Coastal Rivers Basin 25,960 0 23,001 777<br />

0 49,738<br />

016 Pinellas-Anclote River Basin 63,5<strong>21</strong> 0 35,396<br />

0<br />

0 98,917<br />

019 Withlacoochee River Basin 15,940 0 13,573 777<br />

0 30,290<br />

020 Peace River Basin 27,455 0 <strong>21</strong>,302 777<br />

0 49,534<br />

0<strong>21</strong> Manasota Basin 31,339 0 25,999 777<br />

0 58,115<br />

Project Funds Not Budgeted by the<br />

District<br />

Glazer Children's Museum of Tampa 291,457 0 5,231,463<br />

0<br />

0 5,522,920<br />

Other Funding Sources 6,072,500 0 13,018,602<br />

0<br />

0 19,091,<strong>10</strong>2<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$25,240,922<br />

Critical Project Milestones Projected Amended Actual<br />

FY2007 Budgeted Funds<br />

FY2007 purchase order opened 4/30/07 4/26/07<br />

Confirmation and layout of exhibits in building 6/30/07 6/30/07<br />

Schematic design and fabrication documents 12/30/07 12/14/07<br />

FY2008 Budgeted Funds<br />

FY2008 contract executed 5/15/08 9/15/08 9/<strong>10</strong>/08<br />

Project meeting with Museum staff and architect 7/6/09 7/6/09<br />

FY2008 components completed 12/31/09<br />

FY2009 Budgeted Funds<br />

FY2009 contract executed 9/1/09 9/30/09<br />

Building construction complete 3/1/<strong>10</strong><br />

Exhibts installed 7/1/<strong>10</strong><br />

FY2009 components completed 8/1/<strong>10</strong><br />

Museum grand opening 9/30/<strong>10</strong><br />

Status As Of: September <strong>10</strong>, 2009<br />

Construction of the Museum building is under way and expected to be complete by March 20<strong>10</strong>. Once the building<br />

construction is complete; exhibit installation will take an additional 4 to 6 months. The fabrication of the major exhibit,<br />

Water's Journey, will happen concurrently with the building's construction. The project manager attended a meeting with<br />

Museum staff and the Water's Journey and Water Bank exhibits designer, Reb Haizlip (also the new building's architect),<br />

at the Glazer Children's Museum offices on July 6. The contract for the project's final Phase 3 is being routed through<br />

District staff. ACTION-TO-DATE: On time.<br />

020 - Peace River Basin 295


L770<br />

Lk Gibson Stormwater Mgmt System Retrofit<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Flood Protection, Water Quality<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

City of Lakeland<br />

Project Manager ZAJAC, CHRIS<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This project involves the engineering design, permitting, and construction to retrofit the stormwater management<br />

system of Lake Gibson's southwest drainage sub-basin. In 2004, the City of Lakeland received funding from the Peace<br />

River Basin Board (L145 - Lake Gibson Southwest Area: Watershed Management Plan) to conduct a diagnostic<br />

evaluation of the southwest basin to identify the sources of erosion, pollutant loading and flooding. One task in the<br />

evaluation was the design of conceptual plan options to address the issues noted above. The City has chosen one of<br />

the conceptual plan options and has decided to move forward with final design, permitting and construction. The<br />

conceptual plan option that was chosen involves the construction of three wet detention ponds designed to capture<br />

and treat stormwater prior to discharging into the existing conveyance stream which discharges to Lake Gibson. The<br />

design will include components that will reduce peak flows and enhance base flows through storage and release,<br />

provide water quality treatment using treatment wetlands, and reduce flooding through attenuation and downstream<br />

channel restoration. Due to the complexity of the project, it is anticipated that the design and permitting phase will take<br />

approximately nine months to one year to complete. Land acquisition and construction will take approximately three<br />

years to complete. All lands acquired will be used solely for the proposed project. The FY2007 project deliverables will<br />

include sealed construction plans and specifications for all project elements, bid documents and all necessary<br />

state/federal permits. Construction is scheduled to occur in FY2008, FY2009 and FY20<strong>10</strong>.<br />

Benefits<br />

The design will include components that will reduce peak flows and enhance base flows through storage and release,<br />

provide water quality treatment using treatment wetlands, and reduce flooding through attenuation and downstream<br />

channel restoration. The project will treat stormwater from 245 acres of highly urbanized land.<br />

Costs<br />

The total project cost for design, permitting, land acquisition and construction is $4,650,000. The FY2007 cost for<br />

design and permitting is $150,000. The Peace River Basin Board has approved funding in the amount of $75,000 in<br />

FY2007 while the City will fund the remaining $75,000. The Peace River Basin Board has budgeted $562,500 and<br />

$187,632 respectively in FY2008 and FY2009. The cooperator will contribute $750,000 for each FY2008 and FY2009.<br />

Due to budgetary constraints the Peace River Basin Board only included $187,632 in its FY2009 budget for this<br />

project. Because of this, the total funding amount shown in the table does not match the total project cost. In FY20<strong>10</strong><br />

the cooperator is requesting the Peace River Basin Board fund $937,500 while the cooperator will fund $937,500. Due<br />

to budgetary constraints the Peace River Basin Board only included $200,000 in its FY20<strong>10</strong> budget for this project.<br />

The District funding amounts shown in the table include staff salaries, travel and central garage charges.<br />

Additional Information<br />

Lake Gibson is a 489-acre headwater lake in the Peace River Basin. Lake Gibson flows into Lake Parker which<br />

discharges into Lake Hancock via Saddle Creek. Lake Gibson is included on the Florida Department of Environmental<br />

Protection verified list as being impaired for nutrients. The southwest sub-basin of Lake Gibson is 245 acres of highly<br />

urbanized land. This sub-basin includes portions of the Lakeland Mall, US 98 North and a variety of large commercial<br />

properties. A deeply incised creek conveys surface flows from the sub-basin to Lake Gibson. Slopes along the creek<br />

are moderate to severe. The extensive development of land and the associated impervious cover has greatly<br />

increased the peak run-off rates and volumes, and reduced base flow through the creek. This has resulted in erosion<br />

of the stream channel with the deposition of eroded sediments in Lake Gibson, as well as flooding of some<br />

downstream residential properties. A large sediment delta has formed at the confluence of the stream and lake.<br />

Stormwater run-off quality has been sampled and is characterized as poor. Although the southwest sub-basin is<br />

relatively small in size, this tributary to Lake Gibson is a significant source of pollutant loading to the lake. Correcting<br />

the deficiencies in this basin will be an important first step in addressing nutrient enrichment impairment of Lake<br />

Gibson.<br />

020 - Peace River Basin 296


L770<br />

Lk Gibson Stormwater Mgmt System Retrofit<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 643,949 0 192,526 206,055<br />

0 1,042,530<br />

Project Funds Not Budgeted by the<br />

District<br />

City of Lakeland 825,000 0 750,000 937,500 281,184 2,793,684<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$3,836,<strong>21</strong>4<br />

Critical Project Milestones Projected Amended Actual<br />

1. Contract Development & Execution (Design and Permitting)<br />

Agreement sent to Management Services 9/<strong>21</strong>/06 9/28/06<br />

Agreement returned from Management Services <strong>10</strong>/15/06 <strong>10</strong>/19/06<br />

Agreement sent to Cooperator 11/1/06 11/9/06<br />

Signed Agreement returned from Cooperator 12/1/06 12/15/06<br />

Contract Executed 12/15/06 12/20/06<br />

Notice to Proceed 12/15/06 12/29/06<br />

2. Project Tasks (Design and Permitting)<br />

Select Consultant 3/29/07 1/30/07<br />

Project Design 9/29/07 2/28/08 5/16/08<br />

Acquire Permits 11/29/07 4/30/08 5/16/08<br />

Final Construction Plans/Permits 12/29/07 5/31/08 5/16/08<br />

3. Contract Development (Construction)<br />

Agreement sent to Management Services 8/1/07 8/6/07<br />

Agreement returned from Management Services 8/<strong>21</strong>/07 8/24/07<br />

Agreement sent to Cooperator 9/4/07 8/30/07<br />

Signed Agreement returned from Cooperator 9/18/07 9/18/07<br />

Contract Executed <strong>10</strong>/1/07 <strong>10</strong>/1/07<br />

Notice to Proceed <strong>10</strong>/8/07 <strong>10</strong>/11/07<br />

First Amendment - Add FY2009 Funds <strong>10</strong>/<strong>10</strong>/08 11/<strong>10</strong>/08<br />

4. Project Tasks (Construction)<br />

Select Contractor 1/1/08<br />

Begin Construction 2/1/08<br />

Construction Complete 12/1/08 5/31/<strong>10</strong><br />

Approved As-Builts 12/31/08 5/31/<strong>10</strong><br />

Status As Of: August 26, 2009<br />

The agreement between the cooperator and the District (Design and Permitting) was executed on December 20, 2006.<br />

The cooperator was issued a Notice To Proceed on December 29, 2006. The cooperator entered into an agreement with<br />

its selected consultant on January 30, 2007. The cooperator provided the District project manager a copy of the<br />

agreement with its consultant on April 3, 2007. The design phase of this project is complete. The cooperator received a<br />

permit for construction on May 16, 2008. The FY2008 contract (Construction) was executed on October 1, 2007 and<br />

Notice To Proceed given on October 11, 2007. The cooperator has acquired all four parcels of land necessary to<br />

complete the project. The consultant for the cooperator is currently preparing the bid documents. The first amendment<br />

adding FY2009 funds and revising the scope of work has been executed.<br />

020 - Peace River Basin 297


L856<br />

Charlotte County Toilet Rebate Program<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Charlotte County<br />

Project Manager WHITE, BRENT<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This project consists of relacement of existing high-volume toilets (installed with pre-1995 construction) with<br />

low-volume models using 1.6 gallons per flush or less, or the high efficiency toilets (HET's) using approximately 1.3<br />

gallons per flush. Approximately 770 toilet rebates of $<strong>10</strong>0 per year will be offered to multi-family residential and<br />

commercial customers. The project will include education designed to help consumers maximize the water-saving<br />

capabilities of their toilets. These customers can replace up to two toilets per household. A contractor will administer<br />

this program at an estimated $37 for the first toilet and $23 for each additional toilet. This is the first year of a potential<br />

5-year effort.<br />

Benefits<br />

The project is estimated to provide potable water savings of 18,480 gallons per day or 6,745,200 gallons per year.<br />

Costs<br />

The total FY2008 cost for this project is $<strong>10</strong>0,<strong>10</strong>0 with the District funding 50 percent, or $50,050 and Charlotte<br />

County Utilities funding 50 percent, or $50,050. The cost-benefit for the project, using a total cost amortized over 20<br />

years at 8% interest, is $1.50 per thousand gallons.<br />

Additional Information<br />

CCU will provide actual billing data, ensure <strong>10</strong>0 percent fixture inspection, and institute an education program<br />

designed to assist customers in long-term maintenance related to water savings, such as selecting replacements<br />

necessary to ensure that each toilet remains a water-conserving fixture by focusing in leak detection and proper<br />

flapper replacement. The HET models are relatively new to the plumbing industry, and the Environmental Protection<br />

Agency recently completed a list of standards to help consumers select properly performing models. The<br />

applicant understands they must ensure the HET models associated with this project will meet the EPA standards in<br />

order to be eligible for District funding as part of the project.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 52,124 0 1,718 1,802<br />

0 55,644<br />

Project Funds Not Budgeted by the<br />

District<br />

Charlotte County 50,050 0 0<br />

0<br />

0 50,050<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$<strong>10</strong>5,694<br />

Critical Project Milestones Projected Amended Actual<br />

Design Advertising/Marketing Program 7/1/07 8/15/07<br />

Outline Education Program 8/1/07 9/1/07<br />

Develop RFP for Contractor <strong>10</strong>/1/07 <strong>10</strong>/1/07<br />

Contractor Selection Completed 1/1/08 4/16/08<br />

Begin Advertising Program 1/1/08 2/1/08<br />

Execute Agreement with WMD 2/1/08 2/3/08<br />

Program Implementation 2/1/08 5/15/08 5/25/08<br />

020 - Peace River Basin 298


L856<br />

Charlotte County Toilet Rebate Program<br />

Draft Distribution Report to WMD 2/1/09 8/31/09 8/31/09<br />

Final Distribution Report 3/1/09 9/30/09 9/25/09<br />

Draft Final Report to WMD 3/1/<strong>10</strong> 9/30/<strong>10</strong><br />

Final Report 4/30/<strong>10</strong> <strong>10</strong>/30/<strong>10</strong><br />

Final Invoice to District 6/1/<strong>10</strong> 12/1/<strong>10</strong><br />

Project Closeout 1/31/11<br />

Status As Of: September 01, 2009<br />

For Residential Rebates as of August 15, 2009:<br />

Charlotte County has reached the limit (435) for residential toilet rebate reservations<br />

As of August 11, 2009, 422 residential rebates have been processed by the consultant, including inspections, and rebate<br />

issued.<br />

6 residential rebate applications are pending inspection.<br />

The remaining 7 residential rebates are waiting to be processed or are reserved by customers who have not yet<br />

completed the toilet replacement process.<br />

The consultant continues to take phone calls from interested customers. These application requests will be fulfilled as<br />

older reservations expire. Once the 435 residential rebates have been processed, Charlotte County will keep a list of<br />

interested customers to be contacted when the new funding year begins.<br />

For Commercial Rebates as of August 15, 2009:<br />

Charlotte County has 385 commercial/multi-family toilet rebates available.<br />

One multi-family property has completed the rebate process for 52 toilet replacments and 1 is pending.<br />

Charlotte County Public Schools has replaced 309 toilets in older schools beginning in June. Charlotte County Utilities is<br />

currently waiting for the inspections reports. Once these are received and approved, the rebates will be processed.<br />

Once these 309 toilets have been rebated, 23 commercial/multi-family rebates will still be available.<br />

020 - Peace River Basin 299


L897<br />

Highlands - Lake Clay Stormwater Retrofit<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Quality<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Highlands County, Lake Placid<br />

Project Manager KOLASA, KEITH<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This project entails the design, permitting, and construction of a stormwater treatment system within the most<br />

urbanized sub-basin of Lake Clay, Highlands County. Lake Clay was given a high priority for implementation of water<br />

quality and habitat enhancement projects within the assessment of 130 Ridge lakes completed by District staff. One of<br />

the purposes of the Ridge lakes assessment was to identify lakes that would benefit from proactive management<br />

practices to prevent them from degrading. Lake Clay was identified as a lake that has relatively good water quality and<br />

habitat that is in need of protection. The lake is frequently used for recreational purposes including fishing, boating,<br />

and skiing and in turn is an economic resource to the local community. The completed stormwater BMP will reduce<br />

pollutant loads entering the lake through stormwater runoff and will be a proactive measure towards protecting the<br />

lakes water quality and habitat. It is anticipated that reducing pollutant loads from this highly urbanized basin will<br />

protect the lake's existing water quality and habitat. The stormwater retrofit will include the installation of French drains<br />

along existing County and City road easements and also within parking lots of private businesses. Conceptual design<br />

plans and a project cost estimate have already been completed for Lake Clay under project B196, Ridge Lakes<br />

Stormwater Evaluation. District staff will manage the project. The funds approved in FY2008 are being used for the<br />

design and permitting of the project.<br />

Benefits<br />

The completed stormwater treatment system will reduce pollutants to Lake Clay entering through the most urbanized<br />

and problematic basin. Stormwater is currently discharged directly to the lake without any form of treatment. Treating<br />

this runoff is anticipated to enhance the lake's water quality and prevent degradation of its relatively good water quality<br />

and protect the existing recreational uses of the lake.<br />

Costs<br />

The FY2008 budget is $125,000, of which $31,250 is revenue from Highlands County, $46,875 is provided by the<br />

Water Protection and Sustainability Trust Fund (WPSTF), and $46,875 is from the Peace River Basin Board. The<br />

Town of Lake Placid had planned on providing a funding match of $31,250, however this was withdrawn. The FY2008<br />

funds are being used for the design and permitting of the stormwater improvement project. District funds in the table<br />

below include salary, travel and central garage charges.<br />

Additional Information<br />

Lake Clay, a 368 acre lake located in the Grassy Creek watershed, on the northeastern corner of the town of Lake<br />

Placid in Highlands County, has been identified by the SWFWMD staff as receiving significant direct stormwater<br />

discharge (Ridge Lakes Screening, SWFWMD 2003). Lake Clay was also included in the Ridge Lakes Stormwater<br />

Evaluation Project (B196) completed in FY2007 in which conceptual design plans were developed to treat some of the<br />

stormwater discharging to Lake Clay. The total watershed draining immediately to Lake Clay consists of 949 acres.<br />

The dominant land use is a combination of low, medium, and high density residential, commercial structures and<br />

highways. Additionally, this subbasin includes steep slopes, with an elevation change of 70 feet over a <strong>10</strong>00 foot run.<br />

Lake Clay was identified as a lake needing proactive measures to prevent water quality degradation (Ridge Lakes<br />

Screening, SWFWMD 2003), primarily due to the good water quality recorded in the lake, the extensive development<br />

in the watershed, and the absence of stormwater treatment for the watershed. The Town of Lake Placid has identified<br />

this portion of the Lake watershed as a "hot spot" of concern for surface water quality. Stormwater runoff from parking<br />

lots and roads in this subbasin carries unabated pollutants directly to Lake Clay. Contaminant levels, measured in<br />

samples collected by the County, in this runoff water has elevated levels of heavy metals, bacteria, and nutrients.<br />

Given the documented stormwater contamination to Lake Clay in this subbasin, work to retrofit the stormwater flows is<br />

needed. The Water Resource Evaluation completed for Lake Clay (BCI 2006) recommended French drains under<br />

parking lots and under right of way areas as the primary stormwater BMP. The BCI report indicated that this particular<br />

technology should work well because of the well drained soils, Astatula sand, located in this subbasin. This project<br />

may also require the acquisition of additional right of way and installation of other measures to reduce stormwater<br />

runoff to Lake Clay from this and other subbasins.<br />

020 - Peace River Basin 300


L897<br />

Highlands - Lake Clay Stormwater Retrofit<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin <strong>10</strong>0,317 0 7,383 22,230<br />

0 129,930<br />

District Budgeted - Outside Revenue<br />

Highlands Co - Lake Clay SW Retro<br />

(L897)<br />

Lake Placid - Lake Clay SW Retro<br />

(L897)<br />

Water Protection & Sust T.F. (Surface<br />

Wtr Rstr)<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

31,250 0 0<br />

0<br />

31,250 0 0<br />

0<br />

93,750 (46,875) 0<br />

0<br />

Total:<br />

Future<br />

Funding<br />

0<br />

0<br />

0<br />

Total<br />

Funding<br />

31,250<br />

31,250<br />

46,875<br />

$239,305<br />

Critical Project Milestones Projected Amended Actual<br />

Contract Development and Execution<br />

Agreements Sent to Town and County 11/30/07 11/30/07<br />

Agreement sent to Management Services 12/30/07 4/5/08<br />

Agreement returned from Management Services 1/30/08 5/15/08<br />

Final Agreements sent to Town and County 2/15/08 5/20/08<br />

Signed Agreements returned from Town and County 4/15/08 11/17/08<br />

Agreements fully executed 4/30/08 12/26/08<br />

District Consultant Procurement<br />

Consultant Selection 1/15/08 4/15/08<br />

Consultant Agreement 9/30/08 11/30/08<br />

NTP <strong>10</strong>/30/08 12/30/08<br />

Easement Acquisition<br />

Survey and Geotech 1/30/09 2/27/09<br />

Town agreement with land owner 4/30/09<br />

Project Design and Permitting<br />

30% Plans 8/30/09<br />

60% Plans and Pre-Application 12/30/09<br />

Final Design and Permit 3/30/<strong>10</strong><br />

Status As Of: August 25, 2009<br />

This project requires three agreements; one with Highlands County, one with the Town of Lake Placid, and the third with<br />

the project consultant. The Town met with the owner of one of the effected parking lots where stormwater treatment is<br />

needed and an easement is needed to construct the stormwater project. A cooperative agreement (no funding) was<br />

drafted with the Town of Lake Placid in May 2008 to secure easements necessary for the project. The revised<br />

agreements were routed for approval to the District's Contracts staff and were sent to both the Town and County on<br />

Sept. 3, 2008. The Town did not approve the agreement at their Sempterber meeting because of concerns on the long<br />

term costs of maintaining the completed stormwater system. After minor modifications, the Town Council approved the<br />

agreement on Oct. 28, 2008. The District submitted the Notice to Proceed to the Consultant to begin the preliminary<br />

design work on Dec. 15, 2008. A project meeting was held on Jan. <strong>21</strong>, 2009 to review the design alternatives and<br />

easement requirements. A meeting was held between the private landowner, the Town and District on Feb. 5, 2009 to<br />

discuss the donation of the easement to the Town. The Town and landowner drafted a letter of intent for the easement<br />

donation. There was some disagreement on the conditions of the easement. Another meeting was held on April 23, 2009<br />

to resolve the easement concerns. The concerns were resolved and the Town and land owner will proceed with the<br />

easement donation. As of June 20, 2009, this project is experiencing delays associated with the easement agreement<br />

between the Town and the landowner. District and Town staff will meet to review the draft easement agreement.<br />

020 - Peace River Basin 301


L900<br />

LE/AD Polk County Watershed Education<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Alafia River, Hillsborough River, Peace River<br />

Cooperator(s)<br />

Lakes Education/Action Drive (LE/AD)<br />

Project Manager STERNBERGER, VIRGINIA<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This Cooperative Funding Initiative project has provided environmental education to Polk County residents for more<br />

than 20 years. With over 500 lakes in Polk County, water resources education helps residents understand how they<br />

impact their watershed. This is a continuation of the (LE/AD) program and is designed to encourage Polk County<br />

residents to protect their watershed through education on water resources and water quality issues, as well as lake<br />

preservation and protection. FY20<strong>10</strong> program components include creating and distributing quarterly newsletters,<br />

organizing and hosting annual lake cleanup events and the annual Lakeland Cardboard Boat Challenge and<br />

Lakeshore Festival, installing three lakeside display signs and hosting a water resources conference. Effectiveness will<br />

be measured by number of participants, activites accomplished, surveys and pre- and posttests.<br />

Benefits<br />

This project enhances the District's watershed education efforts throughout Polk County by educating 22,000 residents<br />

on how their actions affect water resources and encouraging them to adopt behaviors that protect their local<br />

watershed.<br />

Costs<br />

The total cost of the FY20<strong>10</strong> project is $26,841, with the District contributing $11,716 (Alafia River $1,523;<br />

Hillsborough River $1,875; Peace River $8,318). The dollar amount allocated per basin is determined by population.<br />

The program is estimated to reach approximately 22,000 Polk County residents at a cost to the District of $.53 per<br />

resident. The budget lines below include costs for staff to manage the project.<br />

Additional Information<br />

The total cost of the FY2009 program was $31,516, with the District contributing $14,026 (Alafia River $1,402;<br />

Hillsborough River $2,<strong>10</strong>4; Peace River $<strong>10</strong>,520). District funding was allocated toward special events, a water<br />

resource conference, lakeside display signs and pet waste stations. The program will reach approximately 28,000<br />

Polk County residents at a cost to the District of $.50 per resident.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

011 Alafia River Basin 2,901 0 2,136 2,230<br />

0 7,267<br />

013 Hillsborough River Basin 3,538 0 2,838 2,606<br />

0 8,982<br />

020 Peace River Basin 14,909 0 11,312 9,065<br />

0 35,286<br />

Project Funds Not Budgeted by the<br />

District<br />

Lakes Education/Action Drive 0 0 0 15,125<br />

0 15,125<br />

Other Funding Sources 19,397 0 0<br />

0<br />

0 19,397<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$86,057<br />

Critical Project Milestones Projected Amended Actual<br />

FY2008 Budgeted Funds<br />

Initiate purchase order <strong>10</strong>/1/07 <strong>10</strong>/31/08 <strong>10</strong>/31/08<br />

Water, Wings & Wild Things event 5/12/08 11/1/08 11/1/08<br />

020 - Peace River Basin 302


L900<br />

LE/AD Polk County Watershed Education<br />

Lakes Appreciation Month Celebration 8/1/08 8/1/08<br />

Cardboard Boat Challenge & Lakeshore Festival 8/2/08 9/30/08 8/6/08<br />

Project close 9/16/08 1/15/09 1/15/09<br />

FY2009 Budgeted Funds<br />

Initiate purchase order <strong>10</strong>/1/08 12/15/08 12/15/08<br />

Water Resouces Conference 5/1/09 <strong>10</strong>/30/09<br />

Lakes Appreciation Month Celebration 8/3/09 8/3/09<br />

Cardboard Boat Challenge & Lakeshore Festival 9/25/09<br />

Lakside display signs 9/30/09<br />

Pet waste stations 9/30/09<br />

Project close 9/30/09 11/30/09<br />

FY20<strong>10</strong> Budgeted Funds<br />

Initiate purchase order <strong>10</strong>/1/09<br />

Fall newsletter 11/30/09<br />

Winter newsletter 2/28/<strong>10</strong><br />

Project EAGLE cleanup event 4/30/<strong>10</strong><br />

Spring newsletter 5/30/<strong>10</strong><br />

Lakes Appreciation Month cleanup events 7/30/<strong>10</strong><br />

Summer newsletter 8/31/<strong>10</strong><br />

Cardboard Boat Challenge & Lakeshore Festival 9/30/<strong>10</strong><br />

Lakeside display signs 9/30/<strong>10</strong><br />

Water resources conference <strong>10</strong>/31/<strong>10</strong><br />

Close purchase order 11/30/<strong>10</strong><br />

Status As Of: August 19, 2009<br />

The fall, winter and spring newsletters were mailed to approximately 600 residents. Lakeside cleanup events were held in<br />

July as part of the 8th Annual Lakes Appreciation Celebration. Approximately 200 volunters participated by removing<br />

2,000 pounds of trash and debris from 16 lakes in Lakeland. Participants were recognized at a volunteer appreciation<br />

lunch, held on July 25 at the Circle B Bar Reserve. The Cardboard Boat Challenge and Lakes Festival is scheduled for<br />

Saturday, September 26, at Lake Hollingsworth. The water resources conference has been scheduled for October. The<br />

FY2009 purchase order will be extended through November to meet this deliverable. ACTION TO DATE: On time.<br />

020 - Peace River Basin 303


L902<br />

Lake Wales - Imp. BMPs Twin Lakes<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Flood Protection<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Lake Wales<br />

Project Manager FRIES, GEORGE<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This is a multi-year funded project to perform the Implementation of Best Management Practices (BMPs) element of<br />

the District's Watershed Management Program (WMP) for the Twin Lakes Watershed. Implementation of BMPs<br />

includes the following tasks: design, development of construction documents, construction permitting, land acquisition,<br />

bidding and contractor selection, construction of the BMPs and construction engineering and inspection. The<br />

watershed covers an area of 0.6 square miles and is located in the City of Lake Wales. The goal of this improvement<br />

is to minimize flooding in the residential areas surrounding Twin Lakes. A Watershed Management Plan for the City of<br />

Lake Wales was completed through a cooperative funding agreement with the District (K734). The WMP study area<br />

included the City of Lake Wales as well as areas outside the City limits that are served by the City's drainage system.<br />

One of the projects identified in the WMP for providing adequate flood protection is the Twin Lakes Flood Protection<br />

project. In FY2008 the City requested $300,000 in cooperative funding to design and construct a 23-cfs pumping<br />

station and force main from Twin Lakes to Lake Altamaha for subsequent discharge to Peace Creek through the<br />

existing 48-inch diameter outfall. A channel/pipe connection will be constructed between the east and west lakes so<br />

they can be controlled and pumped from a single location on the westerly edge of the two lakes. The Basin Board<br />

provided $150,000 in cooperative funding. For FY2009 the City is requested and received the remaining $150,000 in<br />

cooperative funding for the project.<br />

Benefits<br />

The project will provide the City with the ability to manage water elevations in Twin Lakes and prevent extensive<br />

structural flooding, as well as road flooding for adjacent roads, including potentially S.R. 60. Water quality benefits<br />

may be provided if pump discharges are run through a pre-fabricated treatment system such as a CDS or Vortex unit.<br />

Costs<br />

The total budgeted amount for this project is $600,000 of which the District's share is $300,000 and the City's share is<br />

$300,000. Since this is a multi-year funded project, for FY2008 $150,000 was included in the Basin Board's<br />

budget. For FY2009 the remaining $150,000 of cooperative funding was budgeted. The probable construction costs<br />

are based on a BMP alternative analysis developed by the cooperator. The District's funding amounts shown in the<br />

table include staff salaries.<br />

Additional Information<br />

Water levels in Twin Lakes rose significantly during 2004 and 2005. The water elevation reached 124.5 NAVD, that is<br />

5.4 feet above the low lake guidance level of 119.<strong>10</strong> NAVD. Seven apartments in an apartment complex located east<br />

of the lakes flooded once and two apartments flooded on a second occasion during this time frame. Computer<br />

modeling results indicate that flooding elevations during the <strong>10</strong>0 year/5-day storm event would exceed those in<br />

2004-2005 by over 14 inches. Under those conditions, numerous other apartment units would also experience<br />

flooding and water elevations would be within two feet of the S.R. 60 road grade. S.R. 60 is an evacuation route. In<br />

addition, it is anticipated that a <strong>10</strong>0-foot portion of Grove Avenue would experience flooding depths up to 18 inches.<br />

Currently the City does not have a readily available way to reduce lake levels. The pumping facility will utilize a<br />

portable pumping unit to allow use of the pump at other locations and to reduce maintenance costs. The facility will<br />

include pump connections for rapid installation of the portable pump. Funding is included to begin the implementation<br />

of the BMP. A cooperative funding expenditure agreement with the City will be developed contingent on the approval<br />

of future funding to complete the Implementation of BMPs. This is a multi-year funded project that will require a<br />

cooperative funding request each fiscal year until completed. The project will be ranked and compete for funding in<br />

future fiscal years.The City will manage the project, where the District project manager must approve any agreements<br />

to accomplish project tasks.<br />

020 - Peace River Basin 304


L902<br />

Lake Wales - Imp. BMPs Twin Lakes<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 152,126 0 153,224 3,264<br />

0 308,614<br />

Project Funds Not Budgeted by the<br />

District<br />

Lake Wales 150,000 0 150,000<br />

0<br />

0 300,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$608,614<br />

Critical Project Milestones Projected Amended Actual<br />

1. Critical Project Milestones<br />

District logo will appear on all construction signs <strong>10</strong>/1/08<br />

2. Cooperator Agreement<br />

Draft Agreement to Contracts Administration 8/15/07 8/17/07<br />

Drat Agreement back from Contracts Administration 9/<strong>10</strong>/07 9/4/07<br />

Contract Executed <strong>10</strong>/1/07 4/1/08<br />

FY2008 Funds Encumbered <strong>10</strong>/3/07 <strong>10</strong>/23/07<br />

Notice to Proceed <strong>10</strong>/1/08 4/2/08<br />

3. Consultant Services<br />

Consultant Selected 4/1/08 6/18/08<br />

Design Plans and Permitting Completed 6/1/08 2/1/09<br />

Bidding & Contractor Selection Complete 8/15/08 3/1/09<br />

4. Construction<br />

Commence Construction <strong>10</strong>/1/08 4/1/09<br />

Complete Construction <strong>10</strong>/1/09 11/30/09<br />

5. Contract Completion<br />

Cooperator Agreement Expiration 12/31/09<br />

Status As Of: August 24, 2009<br />

Status history: One-half of the City's requested cooperative funding was provided in the FY2008 budget. The remaining<br />

one-half of the cooperative funding for this project was provided in the FY2009 budget. The cooperative funding<br />

agreement was executed on 04/01/2008. The City contracted with Post, Buckley, Schuh & Jernigan (PBS&J) for<br />

consulting services. A pre-application meeting with Bartow Regulatory staff was held on August 28, 2008. A field visit was<br />

held on 09/30/2008 with District staff, Bartow REG staff and representatives of the city. The consultant is preparing<br />

easement descriptions for the land needed for the project. Current status: The consultant anticipated submitting a<br />

permit application to the District by the end of January 2009 but the City requested some revisions which may result in a<br />

change in the scope of the project. Those revisions are being reviewed and a recommendation will be made to the city by<br />

the consultant.<br />

020 - Peace River Basin 305


L912<br />

Lower Floridan Aquifer Reuse Supplement Well Feasibility Study<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Dundee<br />

Project Manager BEACH, MICHAEL<br />

Task Manager(s)<br />

Status Completed<br />

Description<br />

This is a preliminary investigation project to determine the feasibility of using poor quality water from the Lower<br />

Floridan aquifer to supplement reuse supplies for the Town of Dundee. The project will determine the degree to which<br />

the likely water quality must be treated for the intended use: landscape irrigation and other outdoor use. The project<br />

will also determine the likely cost to treat the water, including costs associated with disposal of treatment byproducts<br />

(e.g., concentrate disposal). The project should also determine the likelihood that such a project would be permitted.<br />

Benefits<br />

The Lower Floridan aquifer is a potential alternative source of groundwater to the stressed Upper Floridan aquifer in<br />

the SWUCA. This project will explore the feasibility of using naturally occurring low-quality water from the Lower<br />

Floridan aquifer to supplement reuse water supplies for the Town of Dundee in Polk County. Feasibility will depend on<br />

the degree and costs of treatment required for the intended use and the likelihood of permitting such a project. These<br />

costs, information, and assessments would be transferable to other utilities in the area. The costs of the project will be<br />

much lower than drilling a new well because the feasibility will be based on data collected at the ROMP 74X site near<br />

Davenport, Florida.<br />

Costs<br />

The Town of Dundee has been approved for Rural Economic Development Initiative (REDI) funding. The costs for the<br />

project are based on a revised estimate by the Town of Dundee's consultant.<br />

Engineering Dundee $ 19,000 District $ 57,000 Total $ 76,000<br />

************************************************************************************************<br />

Additional Information<br />

As originally proposed by the applicant the project called for a Lower Floridan aquifer well to be constructed for the<br />

The Town of Dundee, on the Lake Wales Ridge. The purpose of the project would be to determine the feasibility of<br />

using water from this source to supplement the reuse supply available from the Town of Dundee's waste water<br />

treatment facility. Reuse lines from this facility are currently being cooperatively funded (Project L553). If feasible, the<br />

exploratory well would then have been used for supplemental supply. However, there are several issues that need to<br />

be resolved prior to constructing the well that can be addressed based on existing data. First, to what level must the<br />

water from this source, known to be of extremely poor quality, be treated if it is to be used to supplement reuse?<br />

Second, what will the cost of this treatment be and the cost of any by product produced during treatment? And third,<br />

is it reasonable to supplement reuse from any source? To answer these questions, the likely water quality and<br />

productivity of the aquifer needs to be known. The District has previously constructed a well into the Lower Floridan<br />

aquifer about ten miles north of the Town of Dundee at ROMP 74X near Davenport. Water quality samples were<br />

collected and an aquifer performance test was conducted. It is also known that water quality generally degrades in the<br />

Lower Floridan aquifer as one moves from north to south. Therefore, it would be expected that water quality and<br />

productivity found in a Lower Floridan well near Dundee would be no better than that found at ROMP 74X. Because<br />

the costs to date of drilling wells into the Lower Floridan aquifer have proven to be very high, it is prudent to do a<br />

feasibility study of the alternative supply based on data from the ROMP 74X site data. It would also be useful to<br />

investigate the costs of developing storage for reuse from a water management perspective since it is probably better<br />

to retain an existing source than exploit a new one. The Town of Dundee has been deemed eligible for the Rural<br />

Economic Development Initiative (REDI) program. As such they would provide 25 percent of the cost of the project<br />

rather than the usual 50 percent.<br />

020 - Peace River Basin 306


L912<br />

Lower Floridan Aquifer Reuse Supplement Well Feasibility Study<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 62,948 0 6,073<br />

0<br />

0 69,0<strong>21</strong><br />

Project Funds Not Budgeted by the<br />

District<br />

Town of Dundee 19,000 0 0<br />

0<br />

0 19,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$88,0<strong>21</strong><br />

Critical Project Milestones Projected Amended Actual<br />

Agreement Complete 5/13/08 5/13/08<br />

Project Complete 9/30/08 8/1/09<br />

Status As Of: June 22, 2009<br />

The project is essentially complete. The District is awaiting final revisions to the consultants report and invoicing from the<br />

Town of Dundee. The new Town Manager has been contacted and is putting the invoice together. The manager has<br />

asked the consultant to submit the final report to the District.<br />

020 - Peace River Basin 307


L914<br />

City of Lakeland Plumbing Retrofit Project<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply<br />

Basin(s) Alafia River, Hillsborough River, Peace River<br />

Cooperator(s)<br />

City of Lakeland<br />

Project Manager WHITE, BRENT<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This project offers financial incentives to water customers within the City of Lakeland's service area for replacement of<br />

existing high-volume indoor plumbing fixtures including showerheads (replacing those using 4.0 gallons per minute, or<br />

gpm, or greater with those using 2.5 gpm or less), faucet aerators (3.0 gpm or greater with 2.2 gpm in kitchens and 1.5<br />

gpm in bathrooms) and toilets (3.5 gallons per flush (gpf) or greater with 1.6 gpf or lower). Approximately 84 percent<br />

of Lakeland's 46,155 residential accounts were built or improved before 1995 (~38,770 homes), making them eligible<br />

for plumbing retrofit incentives. In FY2008, The City of Lakeland expects to distribute 2,200 retrofit kits (maximum two<br />

per customer) and to retrofit up to 4,390 single family and multi-family toilets through an outside contracted consultant.<br />

Single-family residences will be offered up to two toilet rebates per home while multi-family dwellings, with appropriate<br />

representation, will be encouraged to replace all devices at one time. These quantities are planned each year for a<br />

term of five years.<br />

Benefits<br />

This project will provide an estimated potable water savings of 113,197 gallons per day, or 41.31 million gallons per<br />

year for toilet savings and 41.86 gallons per day, or 15,278 gallons per year for the plumbing retrofits (showerheads<br />

and aerators). The total savings is estimated to be 128,475 gallons per day or 46.89 million gallons per year.<br />

Costs<br />

The total FY2008 cost for this project is $600,000 with the District 50 percent funding level allocated amongst the<br />

Peace River basin ($2<strong>10</strong>,000), the Hillsborough River basin ($60,000) and the Alafia River basin ($30,000). The City<br />

of Lakeland's 50 percent share is $300,000. The cost benefit for the project using the total cost amortized over 20<br />

years is $1.33 per thousand gallons of water.<br />

Additional Information<br />

The City of Lakeland will provide actual billing data, ensure <strong>10</strong>0 percent fixture inspection, conduct a scientifically<br />

significant survey to determine customer satisfaction with low-volume devices and institute an education program<br />

designed to assist customers in long-term maintenance related to water savings. The educational portion will provide<br />

participants with materials on leak detection and replacement of devices at the end of the life cycle. Marketing for the<br />

project will begin February 2008 and the distribution of the kits will begin no later than Oct. 1. Approximately 2,200 kits<br />

will be distributed by Sept. 30, 2008. A draft annual distribution report, describing and relating the number of kits<br />

distributed, and the demographics of participating customers will be provided to the District by March 2009 and a final<br />

distribution report incorporating District comments will be provided on May 2009.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

011 Alafia River Basin 31,011 0 1,114 585<br />

0 32,7<strong>10</strong><br />

013 Hillsborough River Basin 60,581 0 628 652<br />

0 61,861<br />

020 Peace River Basin <strong>21</strong>1,061 0 1,162 631<br />

0 <strong>21</strong>2,854<br />

Project Funds Not Budgeted by the<br />

District<br />

City of Lakeland 430,000 0 0<br />

0<br />

0 430,000<br />

020 - Peace River Basin 308<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$737,425


L914<br />

City of Lakeland Plumbing Retrofit Project<br />

Critical Project Milestones Projected Amended Actual<br />

Develop RFP for Contractor <strong>10</strong>/1/07 <strong>10</strong>/3/07<br />

Agreement with SWFWMD 1/1/08 11/<strong>21</strong>/07<br />

Begin Advertising Program 2/1/08 2/1/08<br />

Program Implementation 3/1/08 4/1/08<br />

Draft Distribution Report 3/1/09 <strong>10</strong>/1/09<br />

Final Distribution Report 5/1/09 12/1/09<br />

Draft Final Report 3/1/<strong>10</strong> <strong>10</strong>/1/<strong>10</strong><br />

Final Report 4/1/<strong>10</strong> 11/1/<strong>10</strong><br />

Final Invoice to District 6/1/<strong>10</strong> 12/31/<strong>10</strong><br />

Project Closeout 1/31/11<br />

Status As Of: September 01, 2009<br />

To date the City of Lakeland has rebated 2,193 units. 46 additional rebates are pending as of July 20, 2009. Marketing<br />

efforts include daily public service announcements ran on the City's cable television station, Point of purchase tear off<br />

brochures at all area home improvement stores and project brochures distributed at all public events involving the city.<br />

The City has received a large amount of positive feedback about the current generation of ULF and HET toilets working<br />

as advertised. The City of Lakeland has also receive positive feedback from local home/plumbing supply stores related<br />

to the increase in business attributed to the project. So far, $132,276.78 has been reimbursed and $163,723.22 remains<br />

in the budget.<br />

Action-to-date: On time<br />

020 - Peace River Basin 309


L915<br />

City of Lakeland Pre-Rinse Spray Valve Retrofit Project<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply<br />

Basin(s) Alafia River, Hillsborough River, Peace River<br />

Cooperator(s)<br />

City of Lakeland<br />

Project Manager WHITE, BRENT<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

The City of Lakeland is conducting a pre-rinse spray valve replacement and conservation education program for the<br />

City's food service industry. The program will focus on replacing high water use spray valves utilized to clean food<br />

from dishes, utensils, and pots and pans. The FY2008 project targets water customers in the food service industry to<br />

replace spray valves in 300 locations at no cost to the water customer. Conventional pre-rinse spray valves utilize<br />

from 2.65 to 4.0 gallons per minute and can be responsible for up to fifty percent of food service industry total dish<br />

washing water use. Water efficient pre-rinse spray nozzles use approximately 1.6 gallons per minute. The "Potable<br />

Water Conservation Best Management Practices for the Tampa Bay Region Report" (Tampa Bay Water, 2003)<br />

identifies the use of water-efficient pre-rinse spray valves as a best management practice in Industrial, Commercial<br />

and Institutional facilities (ICI).<br />

Benefits<br />

The total estimated water savings is 60,000 gallons of potable water per day or <strong>21</strong>.9 million gallons per year.<br />

Costs<br />

The total project cost is $45,000. The breakdown of District funding is: Peace River Basin Board - $15,750,<br />

Hillsborough River Basin Board - $4,500 and the Alafia River Basin Board - $2,250. The City of Lakeland's share is 50<br />

percent, or $22,500. The cost benefit for this project, using the total cost amortized over 5 years at 8% interest, is<br />

$0.50 per <strong>10</strong>00 gallons of water.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

011 Alafia River Basin 2,756 0 557 635<br />

0 3,948<br />

013 Hillsborough River Basin 5,006 0 557 660<br />

0 6,223<br />

020 Peace River Basin 16,761 0 1,114 635<br />

0 18,5<strong>10</strong><br />

Project Funds Not Budgeted by the<br />

District<br />

City of Lakeland 22,500 0 0<br />

0<br />

0 22,500<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$51,181<br />

Critical Project Milestones Projected Amended Actual<br />

Develop RFP <strong>10</strong>/1/07 <strong>10</strong>/3/07<br />

Evaluate RFP's and Select Contractor 11/1/07 12/31/07<br />

Choose Consultant 12/1/07 2/5/08<br />

Transfer All Necessary Data to Contractor 12/31/07 2/20/08<br />

Program Implemented 1/1/08 5/1/08<br />

Develop Survey Instrument 4/1/08 5/15/08<br />

Installation Completion of 300 units 9/1/08 12/31/08 12/31/08<br />

Mail All Surveys 11/1/08 12/31/08<br />

Begin Program Evaluation 1/1/09 1/1/09<br />

020 - Peace River Basin 3<strong>10</strong>


L915<br />

City of Lakeland Pre-Rinse Spray Valve Retrofit Project<br />

Final Report to District 1/1/<strong>10</strong><br />

Program closeout 1/31/11<br />

Status As Of: September 01, 2009<br />

Installation of the pre-rinse spray valves ended on 12/31/2008. A total of 252 pre-rinse spray valves have been installed<br />

for a total District cost of $16,632.00. $5,868 remains in the budget. The final report is in the process of being completed.<br />

Action-to-date: On time<br />

020 - Peace River Basin 311


L917<br />

Polk County Lake Bathymetric Mapping<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Alafia River, Hillsborough River, Peace River<br />

Cooperator(s)<br />

Project Manager ZAJAC, CHRIS<br />

Task Manager(s)<br />

Status Ongoing<br />

Polk County, Polk County Natural Resources<br />

Description<br />

This project will complete electronic bottom contours (elevation models) of 75 lakes located in Polk County for<br />

inclusion as a data layer in multi-agency Geographic Information System (GIS) databases. This project will use lake<br />

elevation data that has been previously collected by a District survey consultant and convert it into lake bottom contour<br />

maps and stage volume data. Information relative to lake level monitoring stations and existing public boat ramps will<br />

be included. The deliverables will be uploaded into the County's and District's GIS databases. The updated bottom<br />

contour information will be used for water quality restoration work, water budgets, lake volume calculations, and flood<br />

protection models. Obtaining bottom contours in a digital format will provide a much more accurate calculation of the<br />

lake volume needed for implementation of these type projects. The first phase of this project funded in FY2008<br />

completed bathymetric maps for 48 lakes. Funds requested in FY20<strong>10</strong> will be used to map an additional 27 lakes.<br />

Benefits<br />

Digital elevation models of lakes are currently a data gap within various hydrologic studies and analyses. Completed<br />

elevation models are needed to calculate accurate lake volumes and to determine lake water budgets. This<br />

information will be used for SWUCA related hydrologic studies such as the determination of relationships between lake<br />

levels and the Floridan aquifer. The data will also will be used for setting Minimum Flows and Levels (MFLs) of these<br />

lakes.<br />

Costs<br />

The total project cost is $40,000, with the County contributing $20,000 and the District requested to contribute<br />

$20,000. The County and District each contributed $<strong>10</strong>,000 in FY2008 to complete maps of the first 40 lakes. The<br />

FY20<strong>10</strong> funds will be used to complete mapping of the second group of 27 lakes. The District is requested to fund<br />

$<strong>10</strong>,000 in FY20<strong>10</strong> with an equal match by the County. The District's FY20<strong>10</strong> share is split between the Peace River<br />

Basin Board ($7,400), Hillsborough River Basin Board ($1,500) and Alafia River Basin Board ($1,<strong>10</strong>0). The District<br />

funding amounts shown in the table include staff salaries, travel and central garage.<br />

Additional Information<br />

The majority of the maps were published over 30 years ago as hard copy files and need to be updated as digital<br />

elevation models that can easily be integrated into modern water resource model applications. The completed maps<br />

will be made available to other governmental agencies and the public via the internet and as part of the Polk County<br />

Lakes Access Directory. Coverage will be countywide and include lakes in the Alafia River, Hillsborough River, and<br />

Peace River Basins.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

011 Alafia River Basin 1,<strong>10</strong>0 0 0 1,<strong>10</strong>0<br />

0 2,200<br />

013 Hillsborough River Basin 1,500 0 0 1,500<br />

0 3,000<br />

020 Peace River Basin <strong>10</strong>,198 0 1,795 8,403<br />

0 20,396<br />

Project Funds Not Budgeted by the<br />

District<br />

Polk County <strong>10</strong>,000 0 0 <strong>10</strong>,000<br />

0 20,000<br />

020 - Peace River Basin 312<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$45,596


L917<br />

Polk County Lake Bathymetric Mapping<br />

Critical Project Milestones Projected Amended Actual<br />

1. Contract Development and Execution<br />

Agreement Sent to Management Services 9/4/07 <strong>10</strong>/25/07<br />

Agreement returned from Management Services 9/25/07 11/27/07<br />

Agreement sent to Cooperator <strong>10</strong>/2/07 12/3/07<br />

Signed Agreement Returned from Cooperator <strong>10</strong>/30/07 2/6/08<br />

Contract fully executed 11/13/07 2/26/08<br />

Notice to Proceed 12/17/07 2/29/08<br />

1. Contract Development and Execution<br />

Create Purchase Order for FY20<strong>10</strong> <strong>10</strong>/1/09<br />

2. Data Processing and Review<br />

Data Processing and Review 12/30/08 6/15/08<br />

27 lakes FY20<strong>10</strong> 3/31/<strong>10</strong><br />

3. Bathymetric Map Production<br />

Bathymetric Map Production 4/30/09 6/30/08<br />

27 lakes FY20<strong>10</strong> 8/31/<strong>10</strong><br />

4. Electronic Deliverables<br />

Electronic Deliverables 6/30/09 7/30/08<br />

27 lakes FY20<strong>10</strong> 9/30/<strong>10</strong><br />

5. Data upload to Internet<br />

Data upload to Internet 8/30/09 <strong>10</strong>/20/08<br />

27 lakes FY20<strong>10</strong> 9/30/<strong>10</strong><br />

Status As Of: August 28, 2009<br />

District and County staff held a meeting on June 14, 2007 to review the existing contour data and data requirements and<br />

to exchange bathymetry methodologies. The information was used to develop a cooperative agreement between the<br />

District and the County. District staff provided all available bathymetric data to Polk County so that County staff can<br />

review the data and determine the level of detail that is needed for their reporting needs. The cooperative agreement was<br />

prepared and submitted for internal review on Oct. 2, 2007. The agreement was mailed to the County in November and<br />

was approved by the County on Feb. 6, 2008. USF is the consultant for this project. USF staff have completed the data<br />

processing and first draft of bathymetric maps for 48 lakes in Polk County. A project status meeting was held on June 18,<br />

2008 to review deliverables. The project was completed ahead of schedule and the final deliverables have been<br />

submitted. The County has submitted a cooperative funding application (FY20<strong>10</strong>) to request funding for the second<br />

phase of the project. The second phase, using funds requested in FY20<strong>10</strong>, will complete bathymetric maps for another<br />

group of 27 lakes that currently lack digital bathymetric maps.<br />

020 - Peace River Basin 313


L918<br />

Lake Gwyn Surface Water Restoration and Flood Protection<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Polk County, Polk County Natural Resources<br />

Project Manager THORNTON, SHELLEY<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This project is in response to a cooperative funding request from Polk County for the restoration of Lake Gwyn, a 120<br />

acre depressional wetland east of the community of Wahneta located within the Wahneta Canal watershed that drains<br />

directly to Peace Creek. This project was one of three projects identified for restoring floodplain storage and wetland<br />

functions in this watershed. The Wahneta Canal Watershed Management Plan (WMP), funded by the County and<br />

Basin Board, was completed in 2005. The Wahneta Canal watershed covers an area of 43 square miles and is a<br />

sub-basin within the 232 square mile Peace Creek Canal watershed, which is part of the Peace River headwaters.<br />

The restoration of Lake Gwyn was identified in the WMP as the most viable natural system restoration option since<br />

most of the land needed for the project is under ownership by the State of Florida. The restoration project will<br />

include a feasibility study for the placement of a control structure at the outfall of the lake in order to restore floodplain<br />

storage and wetland functions, while also improving flood conveyance within the Wahneta Canal drainage area.<br />

Included in the same scope of work for the consultant is the design, permitting and construction of the control structure<br />

once the feasibility study has been approved. Restoring the natural storage and wetlands within the study area<br />

through the use of a control structure will also provide additional storage that can be released when needed to help<br />

restore the required minimum flows of the upper Peace River.<br />

Benefits<br />

The project will re-establish the historic surface water levels to provide additional storage volume to attenuate flooding<br />

of the Peace Creek canal and assist in maintaining the minimum flows in the Upper Peace River. The additional open<br />

water will provide aquatic habitat, an improved fishery.<br />

Costs<br />

The FY2008 project cost is $150,000 for a feasibility study, with Polk County contributing $75,000 and the District<br />

contributing $75,000. The FY2009 project cost is $250,000 for design, permitting, land acquisitions/easements and<br />

construction, with Polk County and the District each contributing half ($125,000). District costs will not be used for<br />

land acquisition or easements. District funds shown in the table include staff salaries.<br />

Additional Information<br />

Lake Gwyn was once an open water body drained following the construction of the Wahneta Farms Canal that bisects<br />

the lake diagonally from north to south. Although control structures were installed in an attempt to maintain lake<br />

levels, the historic inflows from Winter Haven now bypass the lake due to high berms along the canal, resulting in dry<br />

conditions the majority of the time. In 2005, Polk County entered into a 50 year lease agreement with the State of<br />

Florida's Board of Trustees for 67.90 acres which encompass the western shoreline of the lake. This lease secures<br />

half of the property under State ownership. Obtaining easements over the remainder of the lake bottom is required in<br />

order to complete restoration of the entire lake.<br />

020 - Peace River Basin 314


L918<br />

Lake Gwyn Surface Water Restoration and Flood Protection<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 45,484 0 66,941 6,294<br />

0 118,719<br />

District Budgeted - Outside Revenue<br />

State Approp - WRAP - Prior Year<br />

Funds<br />

Water Protection & Sust T.F. (Surface<br />

Wtr Rstr)<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

0 0 62,500<br />

0<br />

37,500 0 0<br />

0<br />

0<br />

0<br />

62,500<br />

37,500<br />

Project Funds Not Budgeted by the<br />

District<br />

Polk County Natural Resources 75,000 0 125,000 250,000<br />

0 450,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$668,719<br />

Critical Project Milestones Projected Amended Actual<br />

1. Contract Development and Execution<br />

Draft agreement sent to Management Services 12/31/07 12/17/07<br />

Agreement returned from Management Services 3/14/08 4/9/08<br />

Agreement sent to Cooperator 3/<strong>21</strong>/08 4/11/08<br />

Signed agreement returned from Cooperator 4/11/08 6/19/08<br />

Agreement fully executed 7/7/08 7/9/08<br />

Notice to Proceed 7/8/08 7/11/08<br />

First Amendment Execution 2/2/09 3/23/09 3/3/09<br />

First Amendment Expiration 12/31/<strong>10</strong> 12/31/<strong>10</strong><br />

2. Project Tasks<br />

Feasibility Study/Design/Permitting 6/30/09 8/<strong>21</strong>/09<br />

Construction Commencement 12/31/09<br />

Construction Completion 12/31/<strong>10</strong><br />

Status As Of: September 01, 2009<br />

The agreement was executed on July 9, 2008. Polk County has contracted Moduss Engineering for the feasibility study,<br />

design and permitting. An amendment to the executed agreement to include FY2009 funds, extend the expiration date<br />

and to revise the Scope of Work to include the design, permitting and construction of the project was executed on March<br />

9, 2009. The feasibility study was completed in April 2009. Polk County submitted for an Environmental Resource permit<br />

(ERP) on June 11, 2009 and received a notice of completion on August <strong>21</strong>, 2009. Polk County has submitted for TMDL<br />

grant funds to apply to construction costs.<br />

020 - Peace River Basin 315


N001<br />

Auburndale Reuse and Alternative Sources Study<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Auburndale<br />

Project Manager NOURANI, MEHRSHAD<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

The project consists of a master plan to examine the feasibility of expanding the City of Auburndale's existing<br />

reclaimed water system. In particular, the study will investigate the best use of the city's existing 0.5 mgd excess<br />

reclaimed water supply and the 1.0 mgd of previously used reclaimed water (by the Calpine Power facility) that is<br />

disposed of via sprayfield. The report would identify the potential users, quantities, and offsets, address the required<br />

components, along with sizing and cost, associated with the design and construction of the necessary storage,<br />

pumping, transmission, and distribution systems. The provided options would optimize the beneficial use of reclaimed<br />

water flows and include a multi-year plan for implementing the recommended options.<br />

Benefits<br />

The project would provide options to optimize the beneficial use of reuse flows and create a multi-year plan for<br />

implementing the recommended options.<br />

Costs<br />

The project cost is $50,000, of which 50 percent, or $25,000, was funded by the Peace River Basin Board in FY2009.<br />

Additional Information<br />

The City of Auburndale has adopted ordinances that mandate the use of low-volume toilets and low flow shower<br />

heads and faucets in all construction requiring a building permit. The City also has a school based education program<br />

and inclining rate structure to encourage water conservation. The City has adopted ordinances and regulations to<br />

regulate and restrict uses in zoning districts designated as Flood Hazard Districts. These regulations are intended to<br />

protect and preserve natural open spaces, park lands, swamp lands, water sheds, recharge areas, and lakes and their<br />

canals. To those ends, permitted and permissible uses are basically limited to conservation agriculture, low intensity<br />

recreation, and, with certain limitations, uses otherwise not contrary to the character of these districts.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 0 0 53,141 3,765<br />

0 56,906<br />

Project Funds Not Budgeted by the<br />

District<br />

Auburndale 0 0 50,000<br />

0<br />

0 50,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$<strong>10</strong>6,906<br />

Critical Project Milestones Projected Amended Actual<br />

Notice to Proceed 7/1/09<br />

Agreement Executed 7/16/09<br />

Full Study Commence 7/30/09<br />

Preliminary Study Commence 8/1/09<br />

Study Complete 11/30/09<br />

Agreement Termination 12/31/09<br />

020 - Peace River Basin 316


N001<br />

Auburndale Reuse and Alternative Sources Study<br />

Status As Of: August 31, 2009<br />

The City has submitted the draft reuse feasibility study, which is currently under review.<br />

020 - Peace River Basin 317


N004<br />

Polk is Florida-Friendly<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply, Water Quality<br />

Basin(s) Alafia River, Hillsborough River, Peace River<br />

Cooperator(s)<br />

Polk County Builders Association<br />

Project Manager DURELL, SYLVIA<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This Polk County Builders Association public education program is a Cooperative Funding Initiative (CFI) project that<br />

provides widespread promotion of Florida-friendly landscaping through educational presentations, demonstration sites<br />

and development and distribution of materials. Components of the program include a brochure and poster that<br />

feature a driving map of Florida-friendly demonstration landscapes throughout Polk County and an illustrated list of<br />

plants most suited to the county. The plant list and demonstration sites will also be included in presentations and a<br />

DVD for use in workshops and community events. Questions soliciting a potential homebuyer's interest in<br />

Florida-friendly landscaping will be added to an existing homebuilders' customer survey. An additional survey will be<br />

created and distributed to the public at events to identify barriers to water-use changes and determine which incentives<br />

might foster sustainable changes. Additional partners in this project include Polk County Natural Resources, Polk<br />

County Utility Department, the City of Lakeland, the City of Winter Haven, the City of Haines City, Polk County Florida<br />

Yards & Neighborhoods program and the Friends of the Parks.<br />

Benefits<br />

The multi-organization program will promote widespread adoption of Florida-Friendly LandscapingTM best<br />

management practices including reducing water use and protecting water quality through proper landscape design,<br />

installation and maintenance. The program is projected to reach approximately 87,000 Polk County residents at a cost<br />

to the District of approximately $.27 per person.<br />

Costs<br />

The total cost of the FY2009 project is $59,480, with the District contributing $23,718 (Alafia River $2,609;<br />

Hillsborough River $3,558; Peace River $17,551). District funds support printing, education materials, travel and<br />

contract services for preparation and implementation of educational programs. The budget lines below include costs<br />

for staff to manage the project.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

011 Alafia River Basin 0 0 3,388<br />

0<br />

0 3,388<br />

013 Hillsborough River Basin 0 0 4,337<br />

0<br />

0 4,337<br />

020 Peace River Basin 0 0 18,330<br />

0<br />

0 18,330<br />

Project Funds Not Budgeted by the<br />

District<br />

Polk County Builders Association 0 0 35,763<br />

0<br />

0 35,763<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$61,818<br />

Critical Project Milestones Projected Amended Actual<br />

FY2009<br />

Purchase order created <strong>10</strong>/1/08 <strong>10</strong>/31/08 12/8/08<br />

Project plan approved <strong>10</strong>/31/08 12/1/08<br />

First quarter report 1/30/09 3/31/09 3/31/09<br />

Second quarter report 4/30/09 3/31/09 3/31/09<br />

Third quarter report 7/31/09 9/1/09 9/1/09<br />

020 - Peace River Basin 318


N004<br />

Polk is Florida-Friendly<br />

Deadline reminder letter sent 8/17/09 8/17/09<br />

Project complete 9/30/09<br />

Fourth quarter/final report <strong>10</strong>/30/09<br />

Status As Of: August 31, 2009<br />

Cooperator was mailed a reminder letter that end of the fiscal year is near and to notify project manager as to whether or<br />

not all project deliverables will be completed. An email update from the cooperator reported that all filming and<br />

photography has been completed on the landscape demonstration gardens and the map that was created to direct the<br />

public to the sites has been completed. To date, there are Florida-friendly landscaping demonstration gardens in the<br />

following cities: Babson Park, Bartow, Davenport Fort Meade, Frostproof, Lake Alfred, Lake Wales, Lakeland and Winter<br />

Haven. The locations will be videotaped for inclusion on educational DVDs and videos. ACTION TO DATE: Delayed. The<br />

project is behind in both reporting and billing.<br />

020 - Peace River Basin 319


N013<br />

Development of Landscape Fertilizer BMPs - Phase 1<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Quality<br />

Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers, Pinellas-Anclote River,<br />

Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

University of Florida<br />

Project Manager SMITH, RANDY<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

The objective of this project is to verify the accuracy of the Florida Yards and Neighborhoods (FYN) and Florida Green<br />

Industries best management practices (BMPs) fertilizer recommendations across a wide range of common landscape<br />

plants. Plant growth, biomass allocation, shoot nutrient status, foliar characteristics and aesthetic quality will be<br />

evaluated. Plants will be irrigated uniformly as needed according to IFAS recommendations. Irrigation amounts will be<br />

recorded and will allow for water-use efficiency to be calculated when combined with plant biomass measurements.<br />

The interaction between fertilizer rates and water-use efficiency of plants will offer insight into the effect of fertility<br />

recommendations on landscape water consumption. Soil nutrient status will also be monitored over the evaluation<br />

period.<br />

Benefits<br />

This project represents a significant step to develop and implement accurate, science-based fertilizer BMPs for urban<br />

(residential and commercial) landscapes. This study aims to improve the quality of stormwater that leaves an urban<br />

landscape by influencing the amount of fertilizer that is applied to these landscapes. The results of the project will be<br />

applicable to ornamental plants grown in residential and commercial landscapes. This research will provide scientific<br />

data on the fertilizer needs of landscape plants and will improve the accuracy, credibility and long-term viability of<br />

statewide BMP programs, such as the Florida Yards and Neighborhoods (FYN) program.<br />

Costs<br />

The total project cost is anticipated to be $1,132,158 with the District contributing $566,079 and the University<br />

contributing $566,079 worth of in-kind services. The FY2009 budget amount for the first part of Phase I of this project<br />

is $79,400, with the University of Florida - IFAS contributing $39,700 worth of in kind services and $39,700 to be<br />

funded by the District. The District's share of the FY2009 budget was spilt evenly among all Basins. The University of<br />

Florida - IFAS submitted a FY20<strong>10</strong> Cooperative Funding request for $41,500 to continue Phase I of the project.<br />

Additional funds are anticipated to be requested in FY2011 to complete Phase I of the project. Additional funds are<br />

anticipated to be requested in FY2012, FY2013 and FY2014 to complete the final phase (Phase II) of the project. The<br />

District funding amounts shown in the table include staff salaries, travel and central garage charges.<br />

Additional Information<br />

Non-point nutrient losses in stormwater runoff and leachate from urban landscapes have been implicated in the<br />

degradation of water quality in Florida. Information on the nutrient requirements of plant material in a landscape setting<br />

is very limited, most of which pertains only to trees and shrubs. Therefore, there is a critical need to develop more<br />

accurate fertilizer recommendations and validate existing and proposed landscape fertilizer BMPs to quantify their<br />

impact on water consumption and quality. In order to make reasonable fertilizer recommendations, it is necessary to<br />

have information about the nutritional requirements of the most demanding components of the landscape. Additionally,<br />

knowledge of the nutrient requirements allows plants to be zoned based on their fertilizer requirements, similar to the<br />

zoning recommendations for water requirements promoted by FYN (right plant/right place). This zoning will result in a<br />

more targeted and efficient approach to fertilizer application and reduce nutrient losses to the environment. The<br />

University of Florida - IFAS is committed to the development of science-based water conservation and flood protection<br />

ordinances and state-of-the art best management practices. The research activities of the faculty help to provide the<br />

important scientific data to make these ordinances and BMPs possible. In addition, Extension activities of faculty at<br />

the University of Florida - IFAS help to ensure that these science-based ordinances and BMPs are implemented.<br />

020 - Peace River Basin 320


N013<br />

Development of Landscape Fertilizer BMPs - Phase 1<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 0 0 0 51,530 497,944 549,474<br />

011 Alafia River Basin 0 0 5,582<br />

0<br />

0 5,582<br />

013 Hillsborough River Basin 0 0 5,582<br />

0<br />

0 5,582<br />

014 Northwest Hillsborough Basin 0 0 5,581<br />

0<br />

0 5,581<br />

015 Coastal Rivers Basin 0 0 5,582<br />

0<br />

0 5,582<br />

016 Pinellas-Anclote River Basin 0 0 5,582<br />

0<br />

0 5,582<br />

019 Withlacoochee River Basin 0 0 4,962<br />

0<br />

0 4,962<br />

020 Peace River Basin 0 0 4,962<br />

0<br />

0 4,962<br />

0<strong>21</strong> Manasota Basin 0 0 4,962<br />

0<br />

0 4,962<br />

Project Funds Not Budgeted by the<br />

District<br />

University of Florida - IFAS, In-Kind<br />

Services<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

0 0 39,700 41,500<br />

Total:<br />

Future<br />

Funding<br />

484,878<br />

Total<br />

Funding<br />

566,078<br />

$1,158,347<br />

Critical Project Milestones Projected Amended Actual<br />

1. Contract Development & Execution<br />

Negotiate Cooperative Funding Agreement 9/17/08 11/3/08<br />

Cooperative Funding Agreement to Contract Administration 11/20/08 12/23/08 1/22/09<br />

Contract sent to Cooperator for Approval 12/14/08 1/23/09 3/19/09<br />

Signed Contract returned from Cooperator 1/15/09 4/30/09 6/19/09<br />

Contract Executed 1/31/09 5/15/09 6/22/09<br />

Notice to Proceed sent to Cooperator 1/31/09 5/15/09 6/24/09<br />

2. Phase I - Critical Project Milestones<br />

Literature Review 2/13/09 1/31/09<br />

Construct Trial Landscape and Trellis Beds 2/27/09 2/27/09<br />

Obtain and Install Plants 3/27/09 3/18/09<br />

Complete Data Collection <strong>10</strong>/30/09<br />

Draft Final Report 11/30/09<br />

Final Report 12/15/09<br />

Contract Termination 2/28/<strong>10</strong><br />

Status As Of: August 26, 2009<br />

On August 5, 2008 the District project manager met with the cooperator and requested a draft scope of work for the<br />

project. Notice of FY2009 funding approval has been sent to the cooperator. A draft contract was sent to the cooperator<br />

for review on September 24, 2008. The District project manager received the draft contract with comments back from the<br />

cooperator on November 13, 2008. The contract was sent to the cooperator for signature on March 19, 2009. The<br />

contract was executed on June 22, 2009 and the Notice to Proceed was sent to the Cooperator on June 24, 2009. The<br />

Literature Review, Construction of Trial Landscape and Trellis Beds, and Installation of Plants has been completed. The<br />

cooperator has submitted a FY20<strong>10</strong> Cooperative Funding application requesting $41,500 to continue Phase I of the<br />

project.<br />

020 - Peace River Basin 3<strong>21</strong>


N014<br />

The Florida Aquarium Watershed Education Initiative<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply, Water Quality, Natural Systems<br />

Basin(s) Alafia River, Hillsborough River, Coastal Rivers, Pinellas-Anclote River, Withlacoochee River,<br />

Peace River, Manasota<br />

Cooperator(s)<br />

The Florida Aquarium, Inc.<br />

Project Manager HULL, MARY MARGARET<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This Cooperative Funding Initiative (CFI) project will educate teachers and students about Florida's water resources<br />

and natural environment. The Florida Aquarium provides a comprehensive water resources education initiative that<br />

focuses on three distinct programs for elementary, middle and high school students and teachers. These programs<br />

are outlined below and include: What's in Your Watershed? summer camp, Science Education at Sea (SEAS) teacher<br />

training program and Regional Ocean Conference for Students (ROCS) workshop for teachers and students. While<br />

the initiative primarily reaches students and teachers throughout Hillsborough County, it also draws schools from Polk,<br />

Pinellas, Pasco and Manatee counties. What's in Your Watershed? is a summer camp program designed to teach<br />

low-income, at-risk upper elementary and middle school students from local YMCAs and Boys and Girls Clubs in<br />

Hillsborough County the importance of the Tampa Bay watershed. The camp provides an opportunity for youth to<br />

engage in interactive role-playing to learn about watersheds, water quality, water conservation and habitat protection.<br />

Throughout the program, each student takes part in three field explorations within the Tampa Bay watershed. SEAS is<br />

a teacher education program that provides workshops for elementary, middle and high school teachers, focusing on<br />

estuaries and incorporating the learning objectives of the Florida Comprehensive Assessment Test. It allows teachers<br />

to explore current and future environmental issues and challenges facing those resources. The ROCS workshop<br />

component is an innovative addition to the project. It gives middle and high school students the opportunity to study<br />

several major water quality issues associated with local watersheds. Students identify the issues and create action<br />

plans that are achievable and beneficial for the environment. SWIM staff participate in this conference. The What's in<br />

Your Watershed? program will be evaluated through a portfolio of student work, student and parent evaluation of the<br />

program using a written survey, instructor evaluation of the program and student pre/post assessements. The SEAS<br />

program evaluation will include a combination of pre/post assessments, workshop surveys and teacher journals. The<br />

ROCS workshop will be evaluated through pre/post assessments.<br />

Benefits<br />

The cooperator estimates that the FY20<strong>10</strong> program will reach 147 students and 80 teachers directly and 7,500<br />

students indirectly. The FY2009 addition of ROCS strengthens the project. ROCS is an intensive workshop experience<br />

for high school students, providing opportunities for them to learn about local issues and related science and then<br />

create action plans that will result in positive environmental changes within their communities. The FY20<strong>10</strong> project<br />

includes a new "What's in Your Watershed?" summer camp that addresses the important priority of getting traditionally<br />

underserved, inner-city youth outside exploring the Tampa Bay watershed. The program will give youth opportunities to<br />

explore current environmental issues and to use critical thinking to develop strategies for addressing impacts on their<br />

local watersheds. Parents are also included as part of the summer camp enrichment events.<br />

Costs<br />

The total cost of the FY20<strong>10</strong> project is $44,741, with the District contributing $<strong>21</strong>,402 (Alafia River $5,174;<br />

Hillsborough River $<strong>10</strong>,686; Coastal Rivers $1,<strong>10</strong>8; Pinellas-Anclote River $1,<strong>10</strong>9; Withlacoochee River $1,<strong>10</strong>9;<br />

Peace River $1,<strong>10</strong>8; Manasota $1,<strong>10</strong>8). The dollar amount allocated per basin is determined by the number of<br />

participants projected to participate in the programming from each basin. District funding supports a summer camp,<br />

teacher training programs and a workshop for teachers and students. The program is projected to reach 147 students<br />

and 80 teachers directly and 7,500 students indirectly at a cost to the District of $2.77 per person. Budget lines below<br />

include costs for staff to manage the project.<br />

Additional Information<br />

The total FY2009 project cost was $42,944, with the District contributing $<strong>21</strong>,194 (Alafia River $5,273; Hillsborough<br />

River $5,274; Northwest Hillsborough $5,273; Coastal Rivers $1,054; Pinellas-Anclote River $1,056; Withlacoochee<br />

River $1,154; Peace River $1,055; Manasota $1,055). Basin budget breakdowns were established based on a list of<br />

program participants provided by the cooperator. The District funded a summer camp, teacher training programs and<br />

a workshop for teachers and students. This program was projected to reach 140 students and 79 teachers directly<br />

and 6,000 students indirectly at a cost to the District of $3.53 per person.<br />

020 - Peace River Basin 322


N014<br />

The Florida Aquarium Watershed Education Initiative<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

011 Alafia River Basin 0 0 6,025 5,951<br />

0 11,976<br />

013 Hillsborough River Basin 0 0 6,026 11,463<br />

0 17,489<br />

014 Northwest Hillsborough Basin 0 0 6,025<br />

0<br />

0 6,025<br />

015 Coastal Rivers Basin 0 0 1,806 1,885<br />

0 3,691<br />

016 Pinellas-Anclote River Basin 0 0 1,808 1,886<br />

0 3,694<br />

019 Withlacoochee River Basin 0 0 1,906 1,886<br />

0 3,792<br />

020 Peace River Basin 0 0 1,807 1,885<br />

0 3,692<br />

0<strong>21</strong> Manasota Basin 0 0 1,807 1,885<br />

0 3,692<br />

Project Funds Not Budgeted by the<br />

District<br />

The Florida Aquarium, Inc. 12,700 0 <strong>21</strong>,750 22,570<br />

0 57,020<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$111,071<br />

Critical Project Milestones Projected Amended Actual<br />

FY2009 Budgeted Funds<br />

Open purchase order 11/3/08 1/5/09<br />

Program components completed 9/15/09 9/30/09<br />

Final report received by the District 9/30/09 <strong>10</strong>/15/09<br />

FY20<strong>10</strong> Budgeted Funds<br />

Inititate purchase order <strong>10</strong>/1/09<br />

Program components completed 9/15/<strong>10</strong><br />

Final report and invoice received by the District 9/30/<strong>10</strong><br />

Status As Of: August 26, 2009<br />

SEAS teacher workshops are scheduled for September 12 and 26. The September 12 workshop has 12 teachers<br />

currently registered; <strong>21</strong> teachers from Hillsborough and Pinellas counties are currently registered for the September 26<br />

workshop. Both workshops are expected to fill to capacity. The Art-O-Fishal Fun Summer Camp sessions were held<br />

June 15-19, June 22-26, July 6-<strong>10</strong> and July 13-17. A total of 78 students participated. The Florida Aquarium worked with<br />

Metropolitan Ministries, United Way Agencies, Hillsborough Kids Inc. and Hillsborough County Schools to recruit student<br />

participants. Cooperator has been notified of approval of FY20<strong>10</strong> funding and District staff is working with cooperator to<br />

develop a scope of work for the FY20<strong>10</strong> project. ACTION-TO-DATE: On time.<br />

020 - Peace River Basin 323


N024<br />

Polk County NWRUSA Reclaimed Water Storage & Pumping Station<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply<br />

Basin(s) Hillsborough River, Peace River<br />

Cooperator(s)<br />

Polk County Utilities<br />

Project Manager BADER, TAMMY<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This project consists of the design, permitting and construction of an 80 million gallon (MG), lined storage reservoir<br />

and associated pumping and piping systems for storage and disposal of approximately 1.5 MGD located within the<br />

Northwest Regional Reclaimed Utility Service Area (NWRRUSA) . The project was anticipated to provide reclaimed<br />

water storage for two new planned developments, Neat and Sweet and Fox Branch Ranch. The Fox Branch Ranch<br />

subdivision will no longer be constructed and as a result the county is still negotiating with property owners to secure a<br />

site for the reservoir. The project will be undertaken in 3 phases, the first of which includes design and permitting<br />

services. The second phase includes the land acquisition and right of way easements from the plant site to the<br />

property. The third phase will consist of the construction of the reservoir.<br />

Benefits<br />

The project will increase the public access reuse storage capacity of the Northwest Regional Wastewater Treatment<br />

Facility (NWRWWTF) by 1.5 MGD and will enable the county to maximize reclaimed water use in the NWRRUSA .<br />

Costs<br />

Total cost of the project is $5,535,000, of which the District is requested to fund 50% or $2,767,500. Due to the fact<br />

that the project has population located in both the Hillsborough River the Peace River Basins that will receive the<br />

reclaimed water benefits it was determined that the Hillsborough River Basin Board will fund 90% of the District's<br />

share and the Peace River Basin Board will fund the remaining <strong>10</strong>% of the District's share. The District budgeted<br />

$265,225 in FY2009 ($239,000 from the Hillsborough River Basin (90%) and $26,225 from the Peace River Basin<br />

(<strong>10</strong>%)) and $494,250 in FY20<strong>10</strong> ($444,825 from the Hillsborough River Basin (90%) and $49,425 from the Peace<br />

River Basin (<strong>10</strong>%)). Because this project is consistent with the Polk County Comprehensive Water Supply Plan<br />

(H072), funds in the amount of $669,445 in FY20<strong>10</strong> have also been allocated to the project from the West Central<br />

Florida Restoration Action Plan (WRAP) legislative appropriation. These funds will be applied to reduce the<br />

Hillsborough River Basin Board and Peace River Basin Board cost share. It is expected that funding in the amount of<br />

$1,673,302 will be requested in future years from the respective basins. No cost/benefit ratio is calculated for this<br />

project, as there are no immediate offsets.The future funds identified for the project are contingent upon approval of<br />

such amounts by the District Governing and Basin Boards in the annual budget(s).<br />

Additional Information<br />

It is anticipated that reclaimed water will be pumped into the storage reservoir during wet-season storm events and<br />

later pumped, filtered and treated to be used for irrigation on residential lawns, commercial landscapes and<br />

recreational grounds. The NWRRUSA has approximately 29 subdivisions with an estimated 1,655 homes that can be<br />

delivered reclaimed water. Of the 1,655 residential customers, 800 are currently receiving reclaimed water. This<br />

project will assist the county in providing reclaimed water to the existing 855 potential residential customers, as well as<br />

future potential customers. Once completed, the project will enhance the county's ability to further offset potable<br />

quality water by increasing flows of reclaimed water for irrigation to existing and future industrial/commercial,<br />

residential and recreation/aesthetic customers.<br />

020 - Peace River Basin 324


N024<br />

Polk County NWRUSA Reclaimed Water Storage & Pumping Station<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

013 Hillsborough River Basin 0 0 239,000 444,907 1,505,674 2,189,581<br />

020 Peace River Basin 0 66,945 26,225 55,299 167,628 316,097<br />

District Budgeted - Outside Revenue<br />

State Approp - WRAP - Prior Year<br />

Funds<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

0 0 0 602,500<br />

0<br />

602,500<br />

Project Funds Not Budgeted by the<br />

District<br />

Polk County Utilities 0 0 265,225<br />

0 2,167,553 2,432,778<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$5,540,956<br />

Critical Project Milestones Projected Amended Actual<br />

Contract Execution 9/30/09<br />

Design Commence 2/1/<strong>10</strong><br />

Design Completion 11/30/<strong>10</strong><br />

Construciton Commence 2/1/11<br />

Construction Completion 5/30/12<br />

Contract Closeout 5/30/13<br />

Offset Report 5/30/14<br />

Status As Of: August 19, 2009<br />

The county has provided preliminary designs for the Fox Branch Ranch subdivision, which was supposed to benefit from<br />

this project. However, since the inception of this subdivision plan in 2006, the developer has not sold any lots or homes.<br />

The slow housing market conditions have forced the developer for Fox Branch Ranch to put its plans on hold, and the<br />

County identified alternative sites to build the reservoir on. The county is still negotiating with property owners to secure a<br />

site for the 80 MG reservoir. One of the possible locations is an approximately 24-acre site currently owned by Neat and<br />

Sweet Farms. At a meeting between District and county staff on June <strong>10</strong>, 2009, a 40-acre parcel south of the WWTP<br />

was also identified as a possible location. A Cooperative Funding Agreement has been prepared and is expected to be<br />

executed shortly. To date, $265,225 has been encumbered and $1,163,695 has been budgeted, of which $0 has been<br />

reimbursed.<br />

020 - Peace River Basin 325


N063<br />

Chain of Lakes Natural Resource Center Education Program<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Winter Haven<br />

Project Manager ROE, MELISSA<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This Cooperative Funding Initiative (CFI) project proposes to provide environmental education, programs, workshops<br />

and demonstrations to educate citizens about watersheds, water quality, water conservation, flood protection, natural<br />

systems and sustainability. The Chain of Lakes Natural Resource Center is adjacent to Lake Hartridge Nature Park<br />

and Lake Hartridge, the northernmost lake on the Southern Chain of Lakes in Winter Haven. Program participants will<br />

be encouraged to take action in their homes, schools, churches and workplaces to help protect the watershed and<br />

conserve water. Behavior change resulting from the programs will be measured by surveys and observation. The<br />

program proposal is phased over three years. In FY2009, Phase I consisted of planning and design of a<br />

LEED-certified center, which includes water conservation devices and fixtures to be used as part of visitors'<br />

education and design of Florida-friendly demonstration gardens. In FY20<strong>10</strong>, Phase 2 will include design, fabrication<br />

and installation of the watershed exhibit and the design of interpretive signs. In FY2011, Phase 3 proposes to include<br />

the installation of the Florida-friendly demonstration gardens and interpretive signage, development and<br />

implementation of various Florida-Friendly LandscapingTM workshops and the publishing and printing of education<br />

materials. By the time the three phases are complete, the cooperator estimates reaching 33,000 people per year. The<br />

building, gardens and other components will act as models of sustainable behavior, especially water conservation for<br />

the center's visitors. Upon completion of the project, measurement will consist of pre- and posttests of workshop<br />

participants to gauge their increase in knowledge of Florida-friendly landscaping principles and water resources<br />

protection.<br />

Benefits<br />

This project enhances the outreach of the District's Peace River watershed protection and water conservation<br />

education efforts. Programs will be housed in the new building (building construction is not part of this proposal), which<br />

will serve as a model for green building practices and state-of-the-art water conservation devices. In addition, the<br />

center will highlight the environmental benefits of Florida-friendly landscaping. The project will target behavior change<br />

by incorporating elements of community-based social marketing and includes evaluation. District publications will also<br />

be made available to visitors.<br />

Costs<br />

The total cost of Phase 2 (FY20<strong>10</strong>) is $550,500 with the District contributing $55,500 (Peace River). The project<br />

proposal is phased over three years: Phase 1 (FY2009) was $46,499 and included the planning and design of the<br />

center and design of Florida-friendly demonstration gardens; Phase 2 (FY20<strong>10</strong>) is $55,500 and includes design,<br />

fabrication and installation of the watershed exhibit and design of interpretive signs; Phase 3 (FY2011) is proposed to<br />

be $76,750 and will include installation of Florida-friendly demonstration gardens and interpretive signage,<br />

development and implementation of various Florida-friendly landscaping workshops and publishing and printing of<br />

educational materials. The District's total cost for the three phases is proposed to be $178,749. The program is<br />

projected to reach 33,000 residents annually at a cost to the District of $5.42 per person. The budget lines below<br />

include costs for staff to manage the project.<br />

Additional Information<br />

The District has supported this project since FY2009.<br />

020 - Peace River Basin 326


N063<br />

Chain of Lakes Natural Resource Center Education Program<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 0 0 47,275 56,234 76,750 180,259<br />

Project Funds Not Budgeted by the<br />

District<br />

City of Winter Haven 0 0 86,001 495,000 5<strong>10</strong>,000 1,091,001<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$1,271,260<br />

Critical Project Milestones Projected Amended Actual<br />

FY2009<br />

PO opened 11/7/08 1/12/09 1/12/09<br />

Task 1 - Draft garden plans and cistern design 5/31/09 6/1/09<br />

Task 2 - Final plans / Project complete 9/30/09<br />

FY20<strong>10</strong><br />

Task 1 - Design interpretive signage and watershed/freshwater lakes exhibit 3/31/<strong>10</strong><br />

Task 2 - Construction and installation of watershed/freshwater lakes exhibit 9/30/<strong>10</strong><br />

PO opened 11/30/<strong>10</strong><br />

Status As Of: August 24, 2009<br />

On June 1, 2009, the advisory committee met and reviewed the draft plans and provided comments. This meeting<br />

fulfilled the criteria of the first task. The next meeting will take place in September when plans for the center are<br />

complete. ACTION TO DATE: On time.<br />

020 - Peace River Basin 327


N065<br />

City of Haines City Southern Area Reuse Transmission Extension<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Haines City<br />

Project Manager BADER, TAMMY<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This alternative water supply project consists of a portion of the first phase of three phases in the master plan to<br />

expand the City's Reclaimed Water System to the eastern and southern portion of the City's potable water service<br />

area. The project consists of design and construction of approximately 17,430 linear feet reclaimed water transmission<br />

main ranging in diameter from 24 to 30 inches, an interim reclaimed water booster pumping station, and necessary<br />

appurtenances. This project will offset the irrigation demands on the City's potable water system and potable source<br />

water supply.<br />

Benefits<br />

The project will serve the Haines City High School (.033mgd), a cemetery (.004mgd), one commercial customer<br />

(Paver Modulus / .029mgd)(WUP # 9412), and an industrial customer (Cellynne / .246mgd)(WUP # 12794), providing<br />

312,000 gpd of reclaimed water and offset approximately 302,000 gpd of traditional groundwater supply (WUP #<br />

8522).<br />

Costs<br />

The total cost of this project is estimated to be $4,302,000, of which the Peace River Basin is requested to fund 50<br />

percent, or $2,151,000. Funding in the amount of $1,000,000 has been budgeted in FY2009 (of which $500,000 is<br />

being allocated from outside state funds) and $225,000 in FY20<strong>10</strong>. It is expected that Haines City will request<br />

$1,176,000 in future years for this multi-year project. The cost-benefit is $3.44/1,000 gallons, amortized over 30 years<br />

at eight percent interest. The future funds identified for the project are contingent upon approval of such amounts by<br />

the District Governing and Basin Boards in the annual budget(s).<br />

Additional Information<br />

The goal of this project is to replace existing potable water and potable quality groundwater used for irrigation with<br />

reclaimed water. The City of Haines City's overall reclaimed water objective is to develop a system that will offset<br />

potable quality water by providing reclaimed water for irrigation and other approved non-potable uses. Existing<br />

customers include the Southern Dunes Golf Course, City's East Park including a ball field, a small citrus grove<br />

adjacent to the Wastewater Treatment Facility, and internal reuse water at the City's Wastewater Treatment Facility<br />

(WWTF). In addition, the Resnick Property, north of the WWTF is presently being used by the city as a spray field for<br />

pasture. The city developed and passed an ordinance/code stating "all new developments within the City of Haines<br />

City that will be receiving reclaimed water within 7 years will be required to install dual distribution lines (reclaimed and<br />

potable) as part of the development." This city expects to complete the expansion of their WWTF from 3.0mgd to<br />

6.0mgd by 2011 then to 8.0mgd by buildout and add reuse customers from the four zones indicated in their master<br />

plan over three phases. Customers indicated above are only a portion of those indicated in the city's master plan for<br />

zone 4 of phase 1. The lines and pumping station proposed in this phase of the project are being built to coincide with<br />

the overall plant expansion. Although benefits are listed above, the total benefits of this project will not be seen until all<br />

three phases are complete. The project (phase 1) is expected to take approximately two years to complete and has<br />

been identified as a potential project in the city's reuse mater plan. Of the total project cost of $4,302,000,<br />

approximately 87 percent ($3,742,000) is expected to be needed for construction, and the remainder ($560,000) for<br />

design and administration.<br />

020 - Peace River Basin 328


N065<br />

City of Haines City Southern Area Reuse Transmission Extension<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 0 0 503,398 227,866 1,176,000 1,907,264<br />

District Budgeted - Outside Revenue<br />

Water Protection & Sust T.F.<br />

(Alternative Wtr)<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

0 0 500,000<br />

0<br />

0<br />

500,000<br />

Project Funds Not Budgeted by the<br />

District<br />

City of Haines City 0 0 1,901,000<br />

0<br />

0 1,901,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$4,308,264<br />

Critical Project Milestones Projected Amended Actual<br />

Execute Agreement <strong>10</strong>/1/08 1/7/09<br />

Begin Design <strong>10</strong>/1/08 1/7/09<br />

Complete Design 12/1/08 5/29/09<br />

Begin Construction 3/20/09<br />

Complete Construction 8/20/09<br />

Contract Closeout 8/20/<strong>10</strong><br />

Offset Report 8/20/11<br />

Status As Of: August 19, 2009<br />

A Cooperative Funding Agreement was executed on January 7, 2009 and Boyle Engineering completed design on the<br />

project, May 28, 2009. To date, $1,000,000 has been encumbered and $225,000 has been budgeted, of which $0 has<br />

been reimbursed. The city has approved the selection of Prime Construction Group Inc. as the project's contractor and it<br />

is expected that constrution will begin shortly. Governor Crist's Accelerate Florida Initiative ACTION-TO-DATE: On-time.<br />

Project design is complete and construction bid documents were delivered to the District and approved according to<br />

project requirements. District staff will coordinate with the cooperator to ensure that construction begins in a timely<br />

manner.<br />

020 - Peace River Basin 329


N072<br />

(Completed) Lake Eva Water Quality Improvement Project<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Flood Protection, Water Quality<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Haines City<br />

Project Manager KOLASA, KEITH<br />

Task Manager(s)<br />

Status Completed<br />

Description<br />

The purpose of this Lake Eva stormwater project is to reduce nonpoint source pollutant loadings to the lake and<br />

downstream water bodies. The proposed structure is a nutrient separating baffle box strategically located to collect<br />

untreated stormwater runoff from a 180-acre urban basin, approximately 25% of the Lake Eva watershed. This<br />

stormwater BMP project will reduce a significant amount of pollutant loading to the lake and the downstream water<br />

bodies. Currently, less than 1% of the total contributing area to Lake Eva is served by a permitted stormwater<br />

management system. This project was recommended within the recently completed Haines City Watershed<br />

Management Plan (cooperatively funded by SWFWMD). This proposed stormwater project is ranked third within the<br />

City's Capital Improvement Projects (CIPs) with funding allocated for the project through the City's stormwater utility.<br />

Benefits<br />

This project will enhance water quality of Lake Eva within the heart of Haines City by treating stormwater runoff in a<br />

highly urbanized basin. The basin that will be retrofitted has had a history of water quality related to untreated runoff.<br />

TSS loading from the downtown drainage basin is estimated to be 18,749 lb/yr while nutrient loading (nitrogen and<br />

phosphorus) is estimated to be 620 lb/yr. The installation of the nutrient separating baffle box will reduce TSS by<br />

approximately 80% and the nutrient loading by approximately 60%. The project will be located on City owned land to<br />

eliminate land costs, will minimize culvert relocations to lower overall construction costs and the BMP structure will be<br />

located in an accessible area for ease of maintenance.<br />

Costs<br />

The FY2009 budget is $500,000, of which 50% has been funded by Haines City ($250,000) in their FY2008 budget,<br />

and 50% is requested to be funded by the Peace River Basin Board ($250,000). The funding table below includes<br />

District staff salaries, travel and central garage charges.<br />

Additional Information<br />

The BMP for this water quality improvement project is a nutrient separating baffle box to be installed along an existing<br />

outfall pipe to Lake Eva. The proposed system will capture and treat runoff at the 5th Street outfall where the majority<br />

of the downtown drainage basin flows into Lake Eva (sub-basin of the Lake Eva basin). Lake Eva outfalls to the<br />

Haines City Drainage District (HCDD) Ditch watershed, which drains to Lake Hamilton and ultimately to the Peace<br />

Creek Drainage Ditch. The unit will be placed entirely underground. Ground level hatches are opened and the foliage<br />

and sediment is vacuumed out of the unit during maintenance. A preliminary ICPR model was run to evaluate peak<br />

discharge through the outfall pipe. Model results indicate that a 25 year, 24-hour storm event will produce a discharge<br />

rate of 118 cfs through the pipe. The dimensions of the baffle box proposed for this location are <strong>10</strong>-foot by 16-foot by<br />

<strong>10</strong>.5-foot, which will be able to handle a 25-yr, 24-hr discharge rate through the 60-inch culvert. In combination with<br />

the BMP, the existing outfall pipe will be slip-lined with HDPE, an end-wall treatment will be constructed and<br />

downstream erosion control will be provided. The outfall pipe discharges to an open ditch that has eroded during past<br />

years. The banks of the ditch are very steep and continued erosion causes bank failure. This stormwater BMP<br />

project will also include bank excavation to reduce the steep slope, bank stabilization with geo-textile, and<br />

sodding/landscaping. Landscaping will include upland and wetland native species. A preliminary spreadsheet<br />

pollutant load analysis was performed for the downtown drainage basin using EMC values presented in the Watershed<br />

Management Plan. A pre-application meeting was held with a SWFWMD permitting engineer and environmental staff<br />

on December 12, 2007. SWFWMD staff indicated that the project was feasible and could be permitted through a<br />

General Permit based on the presented information.<br />

020 - Peace River Basin 330


N072<br />

(Completed) Lake Eva Water Quality Improvement Project<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 0 0 252,846 1,977<br />

0 254,823<br />

Project Funds Not Budgeted by the<br />

District<br />

City of Haines City 250,000 0 0<br />

0<br />

0 250,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$504,823<br />

Critical Project Milestones Projected Amended Actual<br />

1. Contract Development & Execution<br />

Agreement Sent to Contracts Administration <strong>10</strong>/5/08 2/2/09<br />

Agreement Approved by City Council 11/5/08 5/<strong>21</strong>/09<br />

Contract Executed 12/30/08 6/12/09<br />

Notice to Proceed 12/30/08 6/12/09<br />

3. Preliminary Design<br />

Preliminary Design 2/28/09 11/7/08<br />

4. Final Design and Permitting<br />

60 and 90 Percent Plans 6/30/09 2/18/09<br />

Permitting 8/30/09 5/8/09<br />

5. Construction<br />

Construction Bidding 11/30/09<br />

Construction Services 6/30/<strong>10</strong><br />

Status As Of: August 28, 2009<br />

The preliminary design plans for this project were revised by the City to modify the outfall location of the stormwater<br />

retrofit. A second permitting pre-application meeting was held on August <strong>21</strong>, 2008 to review the modifications to the<br />

project preliminary design plans and review permit requirements. District staff provided a template of a scope of work to<br />

the City's consultant in September 2008 and a project scope of work was completed by the City and District by the end of<br />

January 2009. The final contract and scope of work was drafted by District staff and submitted for internal review and<br />

approval during the second week of February 2009. The agreement was approved by the City on May <strong>21</strong>, 2009 and the<br />

fully executed by the District on June 12, 2009. The City's Contractor has initiated work on the project and has completed<br />

approximately 50 percent of the project construction. Construction has been completed by the middle of August 2009.<br />

Final invoicing is underway. The project was completed ahead of schedule and below budget.<br />

020 - Peace River Basin 331


N074<br />

Winter Haven Toilet Rebate Project<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Winter Haven<br />

Project Manager BADER, TAMMY<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

The City of Winter Haven has proposed a water fixture retrofit project to offer incentives for water efficient fixtures,<br />

including low flow toilets and retrofit kits. This project will target the replacement of approximately 1,000 conventional<br />

toilets with low-flow toilets, which use up to 1.6 gallons per flush (gpf). Rebates of up to $<strong>10</strong>0 will be offered to<br />

single and multi-family customers (maximum two per customer) that replace an older high water use toilet with a low<br />

flow toilet. Single-family customers can replace up to two toilets per household, while multi-family establishments will<br />

be encouraged to replace all toilets at one time. All toilets will be inspected by the City of Winter Haven. At the time of<br />

inspection, the customer will be provided with a water conservation kit, which includes low flow showerheads and<br />

faucet aerators, along with educational materials on leak detection and proper flapper replacement specific to the<br />

make and model of the low-volume toilet.<br />

Benefits<br />

This project is anticipated to save an estimated 24,175 gallons of water per day. The various devices to be installed for<br />

this project have different life spans, and so the estimated water savings was calculated using a weighted average<br />

based on the total benefit for the life of the project.<br />

Costs<br />

The total project cost is $<strong>10</strong>7,500, and the Peace River Basin Board approved funding in the amount of $53,750 in<br />

FY2009. The cost amortized at 8 percent over 20 years, is $1.22 per thousand gallons saved (calculated using a<br />

weighted average based on the total benefit for the life of the project).<br />

Additional Information<br />

There are approximately 18,384 single family residences in the City of Winter Haven, which are all eligible participants<br />

for the project. The project is proposing to provide low-flow toilets to 1,000 of those homes.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 0 0 55,684<br />

0<br />

0 55,684<br />

Project Funds Not Budgeted by the<br />

District<br />

City of Winter Haven 0 0 53,750<br />

0<br />

0 53,750<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$<strong>10</strong>9,434<br />

Critical Project Milestones Projected Amended Actual<br />

Draft Agreement to Contracts Administration <strong>10</strong>/31/08 11/24/08<br />

Draft Agreement returned from Contracts Administration 11/30/08 12/4/08<br />

Contract Executed 12/31/08 2/19/09<br />

Notice to Proceed 1/30/09 2/24/09<br />

Rebates Commence 3/28/09 2/24/09<br />

Rebates Complete 4/1/<strong>10</strong><br />

Contract Termination 12/31/11<br />

020 - Peace River Basin 332


N074<br />

Winter Haven Toilet Rebate Project<br />

Status As Of: August 19, 2009<br />

A Cooperative Funding Agreement was executed on February 19, 2009 and Notice to Proceed was given on February<br />

24, 2009. To date 376 residences have participated in the program. 608 toilets have been installed, inspected and<br />

rebates equaling $60,535.03 have been issued. To date, $53,750 has been encumbered, of which $30,267.51 is pending<br />

reimbursement.<br />

020 - Peace River Basin 333


N075<br />

City of Winter Haven Northern Reuse Service Area Reclaimed Main<br />

Extension<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Winter Haven<br />

Project Manager BADER, TAMMY<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This is an alternative water supply project in the northern reuse service area that involves the design and construction<br />

of approximately <strong>21</strong>,600 linear feet of reclaimed water transmission main ranging in diameter from 8 to 12 inches and<br />

necessary appurtenances. The project will connect various developments (Hampton Cove, Lakes at Lucerne Park,<br />

Sunset Hills, Royal Hills, Lake Henry Isles, etc.) throughout the northern reuse service area along Buckeye Road,<br />

Conine Drive, Lucerne Park Road, US 17, Havendale Boulevard, and Country Club Road. In all, the project area<br />

includes 2,019 potential customers. The City anticipates a 75% (1,514 hook-ups) connection rate.<br />

Benefits<br />

The project will provide .908 mgd of reclaimed water to 1,514 customers, offsetting 0.454 mgd of traditional<br />

groundwater supply.<br />

Costs<br />

The total cost of this project is estimated to be $2,204,000, of which the Peace River Basin is requested to fund 50<br />

percent, or $1,<strong>10</strong>2,000. Funding in the amount of $320,328 has been budgeted in FY2009 (of which 120,328 has been<br />

transferred and allocated from the Water Protection and Sustainability Trust Fund) and $225,000 has been budgeted<br />

in FY20<strong>10</strong>. It is expected that Winter Haven will request $616,836 in future years for this multi-year project. The<br />

cost-benefit is $1.17/1,000 gallons, amortized over 30 years at eight percent interest. The future funds identified for the<br />

project are contingent upon approval of such amounts by the District Governing and Basin Boards in the annual<br />

budget(s).<br />

Additional Information<br />

The effluent from the City's Plant 2 WWTP is identified as the source for the project. Currently, reclaimed water is<br />

being used for irrigating golf courses, cemeteries, residential developments and numerous parks. The city requires<br />

new development to install the internal reclaimed water distribution mains and dedicate them to the City, so that when<br />

reclaimed water mains are extended in the location of these developments, they can be connected to the city. The<br />

project is expected to take approximately two years to complete and has been identified as a potential project in the<br />

City's reuse mater plan. Of the total project cost of $2,204,000, approximately 94 percent ($2,075,000) is expected to<br />

be needed for construction, and the remainder ($129,000) for design and administration. The project offsets are<br />

related to WUP #4607.<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 0 0 203,348 227,691 616,836 1,047,875<br />

District Budgeted - Outside Revenue<br />

Water Protection & Sust T.F.<br />

(Alternative Wtr)<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

0 120,328 0<br />

0<br />

0<br />

120,328<br />

Project Funds Not Budgeted by the<br />

District<br />

City of Winter Haven 0 0 1,<strong>10</strong>2,000<br />

0<br />

0 1,<strong>10</strong>2,000<br />

020 - Peace River Basin 334<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$2,270,203


N075<br />

City of Winter Haven Northern Reuse Service Area Reclaimed Main<br />

Extension<br />

Critical Project Milestones Projected Amended Actual<br />

Execute Agreement 11/30/08 2/24/09<br />

Begin Design 1/1/09 2/24/09<br />

Complete Design 6/1/09 6/2/09<br />

Begin Construction 9/1/09<br />

Complete Construction 4/1/<strong>10</strong><br />

Contract Closeout 4/1/11<br />

Offset Report 4/1/12<br />

Status As Of: August 19, 2009<br />

A Cooperative Funding Agreement was executed on February 24, 2009 and David C. Carter Consulting Engineering,<br />

LLC has completed design June 2, 2009. The city submitted design plans and bid documents for District approval in<br />

August. While the documents generally appeared to reflect the agreed-upon project and were approved, the city will need<br />

to ensure that another customer is identified. The original Project #6 in Exhibit B for 2,850 linear feet of 12" reclaimed<br />

water line along Havendale Boulevard to connect Spring Lake, serving a potential 186 residential units, was omitted from<br />

the design plans due to development funding. The Peace River Basin Board approved the transfer of $120,328 in Water<br />

Protection and Sustainability Trust Funds from the cancelled L485 cooperative funding project on October 3, 2008 and a<br />

budget transfer has been completed. To date, $320,328 has been encumbered and $225,000 has been budgeted, of<br />

which $0 has been reimbursed. Governor Crist's Accelerate Florida Initiative ACTION-TO-DATE: On-time. The<br />

cooperator has indicated that the anticipated construction date is still scheduled for the beginning of September 2009.<br />

District staff will coordinate with the cooperator monthly to ensure that a contractor is selected and given notice to<br />

proceed with construction in a timely manner.<br />

020 - Peace River Basin 335


N112<br />

City of Lakeland Plumbing Retrofit Project - Phase II<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply<br />

Basin(s) Alafia River, Hillsborough River, Peace River<br />

Cooperator(s)<br />

City of Lakeland<br />

Project Manager WHITE, BRENT<br />

Task Manager(s)<br />

WHITE, BRENT<br />

Status Ongoing<br />

Description<br />

This project offers financial incentives to up to 2,000 residential water customers within the City of Lakeland's service<br />

area for replacement of existing high-volume indoor plumbing fixtures including showerheads (replacing those using<br />

4.0 gallons per minute (gpm) or greater with those using 2.5 gpm or less), faucet aerators (3.0 gpm or greater with 2.2<br />

gpm in kitchens and 1.5 gpm in bathrooms) and toilets (3.5 gallons per flush (gpf) or greater with 1.6 gpf or lower).<br />

Approximately 82 percent of Lakeland's 47,145 residential accounts were built or improved prior to 1995 (~38,770<br />

homes), making them eligible for plumbing retrofit incentives.<br />

Benefits<br />

This project will provide an estimated potable water savings of 82,656 gallons per day (gpd), or approximately 30.16<br />

million gallons per year. The toilet savings is estimated to be 48,888 gpd, the aerators 20,412 gpd and the<br />

showerheads 13,356 gpd.<br />

Costs<br />

The total cost for this project is $293,260 with the District 50 percent funding level allocated amongst the Peace River<br />

Basin Board ($50,000), the Hillsborough River Basin Board ($64,420) and the Alafia River Basin Board ($32,2<strong>10</strong>). The<br />

City of Lakeland's 50 percent share is $146,630. The cost benefit for the project amortized using a weighted average<br />

due to the varying life expectancies of the retrofit devices is $1.01 per 1,000 gallons saved.<br />

Additional Information<br />

Single family residences will be offered up to two toilet rebates per home while multi-family dwellings, with appropriate<br />

representation, will be encouraged to replace all devices at one time. The City of Lakeland will provide actual billing<br />

data, ensure <strong>10</strong>0 percent fixture inspection, conduct a scientifically significant survey to determine customer<br />

satisfaction with low-volume devices and institute an education program designed to assist customers in long-term<br />

maintenance related to water savings. The educational portion will provide participants with materials on leak<br />

detection and replacement of devices at the end of the life cycle. The marketing for the project began February 1,<br />

2009 with the Phase 1 of the Project, and the distribution of the kits will begin no later than October 1, 2009. The<br />

water savings associated with this project should affect public supply water demand, most notably Water Use Permit<br />

#4912. This permit is for 30.2 MGD. This project is located within the Southern Water Use Caution Area and is<br />

consistent with basin Comprehensive Watershed Management (CWM) priorities.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

011 Alafia River Basin 0 0 0 32,2<strong>10</strong><br />

0 32,2<strong>10</strong><br />

013 Hillsborough River Basin 0 0 0 64,420<br />

0 64,420<br />

020 Peace River Basin 0 0 0 52,441<br />

0 52,441<br />

Project Funds Not Budgeted by the<br />

District<br />

City of Lakeland 0 0 0 146,630<br />

0 146,630<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$295,701<br />

Critical Project Milestones Projected Amended Actual<br />

020 - Peace River Basin 336


N112<br />

City of Lakeland Plumbing Retrofit Project - Phase II<br />

Program Implementation / Rebates Begin <strong>10</strong>/1/09<br />

Rebates End / Savings Evaluations Begin <strong>10</strong>/1/<strong>10</strong><br />

Final Report Due 11/1/11<br />

Project Closeout 1/1/12<br />

Status As Of: September 01, 2009<br />

The City of Lakeland has reapplied for this program and it was assigned the same project number as the FY2009<br />

application.<br />

020 - Peace River Basin 337


N113<br />

Charlotte County Toilet Rebate Project - Phase II<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Charlotte County Utilities<br />

Project Manager WHITE, BRENT<br />

Task Manager(s)<br />

WHITE, BRENT<br />

Status Ongoing<br />

Description<br />

This project consists of the replacement of existing plumbing fixtures (Toilets, showerheads and aerators) with water<br />

saving fixtures. The project will replace high-volume toilets (pre-1994) with ultra-low volume (ULV's) or high-efficiency<br />

toilets (HET's) by offering 775 rebates of $<strong>10</strong>0 per year to residential customers of Charlotte County Utilities. ULV's<br />

have a flush rate of 1.6 gallons per flush (gpf) and HET's have a flush rate of 1.28 gpf. Single and multi-family<br />

customers will be able to replace up to two toilets per dwelling. The project will also replace up to 775 showerheads<br />

and aerators with low-flow equivalents. This project will focus on education HET and ULV users on the proper<br />

maintenance necessary to ensure that each toilet remains a water-conserving fixture over a 20-year life expectancy by<br />

focusing on leak detection and proper flapper management.<br />

Benefits<br />

It is estimated that the replaced toilets, once all 775 are rebated, would save approximately 16,839 gallons per day.<br />

The showerheads are expected to save an estimated 4,600 gallons per day and the aerators were anticipated to save<br />

7,031 gallons per day. The total project savings was projected to be 28,470 gallons per day, or <strong>10</strong>,391,696 gallons per<br />

year.<br />

Costs<br />

The total project cost is $114,020, with the Peace River Basin Board and Charlotte County Utilities each funding a 50<br />

percent share, or $57,0<strong>10</strong>. The cost amortized at 8 percent over 20 years, was $1.18 per thousand gallons saved<br />

(calculated using a weighted average based on the total benefit for the life of the project).<br />

Additional Information<br />

This is a continuation of the FY2008 Project, which offerred 385 rebates of up to $<strong>10</strong>0 per toilet for multi-family,<br />

commercial and single-family customers. A contractor is administering the program. One year of account-level<br />

metered water-use data prior to and one year of metered water use after the retrofit installation will be collected as the<br />

raw data for the final savings analysis. Charlotte County Utilities will provide actual billing data and ensure <strong>10</strong>0 percent<br />

fixture inspection through the contractor who is doing the collection. This project will also institute an educational<br />

program designed to assist customers in long-term maintenance related to water savings, such as selecting parts for<br />

repairs, leak detection and choosing proper replacement flapper models for their HET or ULV toilets. ULV Toilets have<br />

a flush rate of 1.6 gpf and HET's have a flush rate of 1.28 gpf. This effort will ensure the retrofit fixture will remain a<br />

water-conserving fixture throughout its life-expectancy. Bi-monthly status reports will be provided to the District to<br />

update project accomplishments.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 0 0 0 59,451<br />

0 59,451<br />

Project Funds Not Budgeted by the<br />

District<br />

Charlotte County Utilities 0 0 0 57,0<strong>10</strong><br />

0 57,0<strong>10</strong><br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$116,461<br />

Critical Project Milestones Projected Amended Actual<br />

020 - Peace River Basin 338


N113<br />

Charlotte County Toilet Rebate Project - Phase II<br />

Program Implementation / Begin rebates <strong>10</strong>/1/09<br />

End of Rebates / Begin Savings Evaluation <strong>10</strong>/1/<strong>10</strong><br />

Final Report due 12/1/11<br />

Contract Closeout 12/31/12<br />

Status As Of: September 01, 2009<br />

Charlotte County Utilities has reapplied for this project and it was assigned the same project number as the FY2009<br />

application.<br />

020 - Peace River Basin 339


N122<br />

Implementation of BMPs Saddle Creek Watershed<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Polk County<br />

Project Manager TURNER, DAWN<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This is one of the original multi-year funded watershed projects as the District was developing their current guidelines<br />

and specifications for the Watershed Management Program. A Watershed Management Plan was developed for the<br />

Saddle Creek Basin. After reviewing the BMPs proposed in the plan, it was determined that we would concentrate on<br />

the maintenance activities proposed due to the cost to benefit evaluation of the flood protection projects. Over the past<br />

few years the County has performed maintenance activities throughout the basin but we have concentrated on looking<br />

at the bank stabilization along the Lake Parker Outfall that goes from Lake Parker to Saddle Creek Park. Phase I<br />

looked at the most downstream section of the outfall where severe erosion was occurring along portions of the outfall<br />

that the County did not have any easements over. The County obtained easements and developed a plan for providing<br />

bank stabilization through this portion of the outfall and constructed this project in 2006. Since that time the County has<br />

been designing and permitting a second phase to the Lake Parker Outfall project using the balance of the funding left<br />

for this project. The County aniticipates the design and permitting of Phase II to be completed in FY 2008. The County<br />

is requesting FY 2009 funding to construct Phase II of the Lake Parker Outfall Bank Stabilization and Flood Protection<br />

project.<br />

Benefits<br />

The project includes construction of BMPs in the Lake Parker Outfall system to maintain conveyance capcity and<br />

reduce errosion of the sidebanks, undercutting of the channel bottom, and the transport of sediments.<br />

Costs<br />

The projected cost for this project is $540,000. The District's share is $270,000, and the County's is $270,000.<br />

FY2009 funding will be used for the construction of BMPs in the Lake Parker outfall system. When each task is<br />

completed the project budget will be refined based on the information developed.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 0 275,000 273,825 1,407<br />

0 550,232<br />

Project Funds Not Budgeted by the<br />

District<br />

Polk County Natural Resources 0 0 270,000<br />

0<br />

0 270,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$820,232<br />

Critical Project Milestones Projected Amended Actual<br />

Bidding and Contractor Selection 7/31/09<br />

Start Construction 9/30/09<br />

Land Acquisition 9/30/09<br />

Complete Construction 12/31/12<br />

Status As Of: August 24, 2009<br />

The Expenditure Agreement was executed on January <strong>21</strong>, 2009. The project activities have been permitted, and the<br />

work is fully funded. The project involves the construction of bank stabilization measures in the Lake Parker Outfall<br />

System that conveys water from the lake to Saddle Creek. The project budget in the agreement, $540,000 ($270,000<br />

020 - Peace River Basin 340


N122<br />

Implementation of BMPs Saddle Creek Watershed<br />

District's share), was based on the preliminary design. The County received construction bids in April 2009, and<br />

estimates the project costs will be approximately $550,000 more than the original budget. In December 2006, the District<br />

entered into an agreement with Polk County for the Saddlebag Lake Watershed Implementation of Best Management<br />

Practices (BMPs) project (L674). The project involves the design, permitting, and construction of conveyance<br />

improvements to enhance flood protection. The total project budget in the agreement, $2,<strong>10</strong>0,000 ($1,050,000 District<br />

share), was based upon the preliminary design. As of this writing, construction is substantially complete. County staff<br />

indicate the total cost of the project will be less than budgeted. As a result, the County requested that $550,000<br />

($275,000 District's share) be transferred from the Saddlebag Lake Watershed project (L674) to the Saddle Creek<br />

Watershed project (N122) to cover the cost increase. At their June 6, 2009 meeting, the Pease River Basin Board<br />

approved the transfer of $275,000 from the Saddlebag Lake Watershed project to the Saddle Creek Watershed project.<br />

The District's fiscal year 2009 budget has been revised accordingly. Construction will be completed in 2009. No further<br />

actions are needed to expedite this project.<br />

020 - Peace River Basin 341


N126<br />

Charlotte County - Imp. BMPs at Charlotte Harbor Redevelopment<br />

Area<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Flood Protection, Water Quality<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Charlotte County<br />

Project Manager FRIES, GEORGE<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This is a project to perform the Implementation of Best Management Practices (BMPs) element of the District's<br />

Watershed Management Program (WMP) for the Charlotte Harbor Redevelopment Area Watershed. Implementation<br />

of BMPs includes the following tasks: design, development of construction documents, construction permitting, land<br />

acquisition, bidding and contractor selection, construction of the BMPs and construction engineering and inspection.<br />

The watershed covers an area of approximately 2.5 square miles and is located in the mid-Charlotte County Planning<br />

District. The Basin Board has previously funded project L486, the Charlotte Harbor Redevelopment Area Watershed<br />

Management Plan, whose purpose is to create a functional, viable, detailed planning tool with feasible and permittable<br />

stormwater management alternatives that will result in a preferred alternative for best managment practices (BMPs).<br />

The next phase of the project will be the implementation of the selected BMPs. The Charlotte Harbor CRA, is one of<br />

the most historic areas in the County and was developed prior to District flood protection and current water quality<br />

regulations (pre-1984). For FY2009, the County requested and received $125,000 in cooperative funding to move<br />

forward on the preliminary design for the selected BMPs.<br />

Benefits<br />

This project will improve level of service deficiencies in the Charlotte Harbor Redevelopment Area by providing<br />

increased flood protection to the homes and businesses within the area.<br />

Costs<br />

For FY2009 the funding amount is $250,000 of which the Basin Board's share is $125,000 and the county's share is<br />

$125,000. Based on cost estimates prepared by the County, an additional $1,250,000 will be needed in future years<br />

for construction of the BMPs. The District funding amounts shown in the table includes staff salaries.<br />

Additional Information<br />

The WMP includes five major elements: 1) Topographic Information, 2) Watershed Evaluation, 3) Watershed<br />

Management Plan, 4) Implementation of BMPs, and 5) Maintenance of Watershed Parameters and Models.<br />

Implementing elements of the WMP with local governments is one of the Comprehensive Watershed Management<br />

(CWM) initiative strategies and one of the District's Strategic Priorities. The WMP provides a method to evaluate the<br />

capacity of a watershed to protect, enhance, and restore water quality and natural systems while achieving flood<br />

protection. The Charlotte Harbor Community Redevelopment Plan, adopted by the Board of County Commissioners in<br />

1994 and amended in 2006 identifies infrastructure improvements as the number one priority in the area. With the<br />

location of the redevelopment area adjacent to Charlotte Harbor, a component of the Charlotte Harbor National<br />

Estuary Program, it is imperative that the proper infrastructure is available to meet the needs of the area.<br />

Implementation of this project is a key element in implementing the Charlotte Harbor Community Redevelopment<br />

Plan. A cooperative funding expenditure agreement with Charlotte County will be developed to complete the<br />

Implementation of this BMP. This is a multi-year funded project that will require a cooperative funding request each<br />

fiscal year until completed. The County will manage the project, where the District project manager must approve any<br />

agreements to accomplish project tasks.<br />

020 - Peace River Basin 342


N126<br />

Charlotte County - Imp. BMPs at Charlotte Harbor Redevelopment<br />

Area<br />

Prior Cumulative FY 2009 FY20<strong>10</strong><br />

Funding Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0 0 127,<strong>21</strong>7 3,273<br />

020 Peace River Basin 625,000 755,490<br />

Project Funds Not Budgeted by the<br />

District<br />

Charlotte County 0 0 125,000<br />

0 625,000 750,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$1,505,490<br />

Critical Project Milestones Projected Amended Actual<br />

Watershed Evaluation 12/31/08<br />

Preferred Alternative BMP Selected 2/28/09<br />

Preliminary Design and Permitting 9/1/09<br />

Construction 9/1/12<br />

Status As Of: August 24, 2009<br />

Current Status: The project was approved for FY2009 cooperative funding. The cooperative funding agreement has been<br />

executed.<br />

020 - Peace River Basin 343


N147<br />

Garden Grove Pines Stormwater Retrofit<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Flood Protection, Water Quality<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Polk County Natural Resources<br />

Project Manager THORNTON, SHELLEY<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This project is in response to a FY20<strong>10</strong> cooperative funding project request from Polk County to alleviate localized<br />

flooding and improve water quality in the Garden Grove Pines subdivision. The existing stormwater collection system<br />

is inadequate to convey the stormwater runoff from the 80 acre drainage basin. The project proposes retrofitting the<br />

existing storm sewer system and the construction of a 2.5 acre wet detention pond for treatment and attenuation. The<br />

stormwater system will be upgraded with a gravity pipe system which will route the stormwater system to a stormwater<br />

pond. The proposed stormwater pond will be constructed on a 3.0 acre parcel of land that formerly served as a<br />

wastewater treatment facility that the County is proposing to purchase. The pond will discharge through a control<br />

structure to an existing wetland system for polishing, then eventually to the Lake Florence outfall ditch.<br />

Benefits<br />

The Garden Grove Pines Stormwater Retrofit project will provide treatment of an 80 acre urban drainage basin that<br />

currently provides little water quality treatment and additional storage for the reduction of localized flooding.<br />

Costs<br />

The total project cost is $400,000, with Polk County and the District each contributing half ($200,000). District funds<br />

shown in the table include staff salaries.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 0 0 0 201,893<br />

0 201,893<br />

Project Funds Not Budgeted by the<br />

District<br />

Polk County Natural Resources 0 0 200,000 200,000<br />

0 400,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$601,893<br />

Critical Project Milestones Projected Amended Actual<br />

1. Contract Development and Execution<br />

Draft agreement sent to Management Services 9/28/09<br />

Agreement returned from Management Services <strong>10</strong>/19/09<br />

Agreement sent to Cooperator <strong>10</strong>/19/09<br />

Signed agreement returned from Cooperator 12/1/09<br />

Agreement fully executed 12/31/09<br />

Notice to Proceed 12/31/09<br />

Status As Of: September 01, 2009<br />

A scope of work has been requested by the Cooperator. Once received, an agreement will be drafted.<br />

020 - Peace River Basin 344


N150<br />

Polk County NAVD88 Vertical Control Densification<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality, Natural Systems<br />

Basin(s) General Fund (District), Alafia River, Hillsborough River, Peace River<br />

Cooperator(s)<br />

Polk County<br />

Project Manager OWENS, JIM<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

The establishment of an accurate and easily accessible vertical control survey network is an important component in<br />

the development of updated Federal Emergency Management Agency Flood Insurance Rate Maps (FEMA FIRM). The<br />

District, in cooperation with the National Geodetic Survey and the Florida Department of Environmental Protection, has<br />

completed the Distict-wide vertical control densification. This project will further enhance the existing vertical control<br />

network to support FEMA FIRM mapping, topographic data collection and modeling activities. The newly-established<br />

vertical control network will allow the District and local governments to transition from the older and less accurate<br />

vertical control survey network known as the National Geodetic Vertical Datum of 1929 to the more accurate North<br />

American Vertical Datum of 1988 (NAVD88) system. In Polk County this includes running level loops and establishing<br />

bench marks based on NAVD88 along state and county roadways. This project will enable the surveying community to<br />

make an orderly transition to NAVD88 and will allow Polk County to be on the same vertical datum as the District and<br />

to comply with the federal surveying and mapping requirements. This project will densify the NAVD88 vertical control in<br />

Polk County within the District's jurisdiction and will compliment the District's NAVD88 migration project.<br />

Benefits<br />

Densification of benchmarks will support the development of Watershed Management Plans for Polk County thus<br />

contributing to flood protection, natural systems, water quality and water supply. Polk County participates in the<br />

National Flood Insurance Program administered by FEMA and requires that all finished floor elevations be above the<br />

<strong>10</strong>0 year floodplain. This project is a key component in meeting this requirement. Also, the establishment and<br />

implementation of the NAVD 1988 will enable more accurate elevations and mapping throughout the District, and the<br />

conversion to the modern vertical datum will allow the ability to establish accurate and reliable elevations using Global<br />

Positioning System (GPS) technology. Polk County is a participant in FEMA's Community Rating System and has a<br />

Class 8 rating.<br />

Costs<br />

The cost of contractual services for this project is $200,000. The District is the lead on this project and will be<br />

reimbursed by Polk County for $<strong>10</strong>0,000. The District's cost is split between the Alafia River Basin ($15,000), the<br />

General Fund ($15,000), the Hillsborough River Basin ($<strong>10</strong>,000), and the Peace River Basin ($60,000) based on<br />

approximate area. Additional costs are associated with staff time required to manage the project.<br />

Additional Information<br />

This project will be administered by the District. The vertical control network survey work will be completed by FDEP<br />

and NGS. All control network data produced by this project will be made available through Internet access via LABINS<br />

web site and the NGS web site.<br />

020 - Peace River Basin 345


N150<br />

Polk County NAVD88 Vertical Control Densification<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 0 0 0 15,000 15,000 30,000<br />

011 Alafia River Basin 0 0 0 16,949 15,000 31,949<br />

013 Hillsborough River Basin 0 0 0 11,949 <strong>10</strong>,000 <strong>21</strong>,949<br />

020 Peace River Basin 0 0 0 61,949 60,000 1<strong>21</strong>,949<br />

District Budgeted - Outside Revenue<br />

Polk Co - Vertical Control Densification<br />

(N150)<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

0 0 0 <strong>10</strong>0,000<br />

Total:<br />

Future<br />

Funding<br />

0<br />

Total<br />

Funding<br />

<strong>10</strong>0,000<br />

$305,847<br />

Critical Project Milestones Projected Amended Actual<br />

150<br />

Execute Cooperative Agreement between the County and the District 12/31/09<br />

180<br />

Execute Contract with the Consultant 2/1/<strong>10</strong><br />

30<br />

Initial Project Planning and Develop Scope of Work 9/1/09<br />

420<br />

Final Deliverables 9/30/<strong>10</strong><br />

60<br />

Submit Cooperative Agreement for Approval <strong>10</strong>/1/09<br />

Status As Of: June 15, 2009<br />

The Polk County Board of County Commissioners are committed to funding the project as planned.<br />

020 - Peace River Basin 346


N156<br />

Polk County SWRUSA Carter Road Reclaimed Water Main<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply, Water Quality<br />

Basin(s) Alafia River, Peace River<br />

Cooperator(s)<br />

Polk County Utilities<br />

Project Manager BADER, TAMMY<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This alternative water supply project consists of the design, permitting and construction of 8,150 feet of 16-inch<br />

reclaimed water transmission main along Carter Road from an existing pipeline on Carter Road, north to connect to<br />

the county's reclaimed water transmission main on County Road 540A.<br />

Benefits<br />

There are 561 dry-lined customers that will receive 224,400 gpd of reclaimed water to offset 134,640 gpd of potable<br />

water. In conjunction with a booster station that the county is planning to install in 2009, this new pipeline will also<br />

improve pressures and reliability within the eastern portion of the Southwest Regional Utility Service Area (SWRUSA)<br />

reclaimed water system.<br />

Costs<br />

The total project cost is $900,000. The District's share is requested to be $450,000. The Alafia River Basin Board has<br />

budgeted $240,000 in FY20<strong>10</strong>. It is expected that the county will request the remaining $2<strong>10</strong>,000 in FY2011. The cost,<br />

amortized at 8 percent over 30 years, is $1.61 per thousand gallons offset. The future funds identified for the project<br />

are contingent upon approval of such amounts by the District Governing and Basin Boards in the annual budget(s).<br />

Additional Information<br />

Of the total project cost of $900,000, approximately 91 percent ($820,000) is expected to be needed for construction,<br />

and the remainder ($80,000) for design and administration.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

011 Alafia River Basin 0 0 0 243,787 2<strong>10</strong>,000 453,787<br />

020 Peace River Basin 0 0 0 2,641<br />

0 2,641<br />

Project Funds Not Budgeted by the<br />

District<br />

Polk County Utilities 0 0 0 240,000 2<strong>10</strong>,000 450,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$906,428<br />

Critical Project Milestones Projected Amended Actual<br />

Contract Execution 12/1/09<br />

Commence Design 1/1/<strong>10</strong><br />

Complete Design 6/30/<strong>10</strong><br />

Commence Construction 9/30/<strong>10</strong><br />

Complete Construction 9/30/11<br />

Contract Closeout 12/31/12<br />

Offset Report 12/31/13<br />

Status As Of: August 31, 2009<br />

A scope of work has been received from the cooperator. A cooperative funding agreement has been prepared and is<br />

expected to be executed late in 2009 or early in 20<strong>10</strong>. To date, $240,000 has been budgeted, of which $0 has been reimbursed.<br />

020 - Peace River Basin 347


N161<br />

Polk County Utilities Rain Sensor Rebate<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply<br />

Basin(s) General Fund (District), Alafia River, Hillsborough River, Peace River<br />

Cooperator(s)<br />

Polk County Utilities<br />

Project Manager BADER, TAMMY<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This project provides financial incentives to encourage Polk County Utilities (PCU) customers to install rain sensors on<br />

automatic irrigation systems installed prior to 1991. Eligible customers will receive up to a $50 rebate per sensor. It is<br />

estimated that in this first phase 1,295 rain sensors will be installed, which is based on approximately five percent of<br />

the eligible accounts throughout PCU's service area. The rebates will be offered to single-family, multi-family, and<br />

commercial customers throughout PCU's service area. Customers will contact PCU's Customer Service Department<br />

for the rebate request. The Permitting Section will verify that the property is eligible (built prior to 1991). Eligible<br />

customers will then receive a rebate application and instructions for purchasing and installing the rain sensor. One<br />

year of pre- and post-rain sensor installation water use data will be collected in order to analyze the water savings. An<br />

inspection company contracted by PCU will verify correct installation of the rain sensors and issue the rebate checks.<br />

Multi-family and commercial customers may receive up to two rebates per account. Addressing outdoor water use will<br />

assist PCU in meeting future demands by using conservation as an alternative water supply measure.<br />

Benefits<br />

Based on a savings rate of <strong>10</strong>0 gallons per day (gpd) per sensor, the project is estimated to save 129,500 gpd.<br />

Costs<br />

The total cost of this project is estimated to be $116,550 and the District is requested to fund $58,275.<br />

Funding budgeted in FY20<strong>10</strong> includes $7,470 from the Green Swamp Basin (General Fund), $12,825 from the<br />

Hillsborough River Basin Board, $20,565 from the Alafia River Basin Board, and $17,415 from the Peace River Basin<br />

Board, for a total of $58,275. Additional funding may be requested in future fiscal years for subsequent phases. The<br />

cost benefit amortized at 8 percent over 5 years is $0.60 per thousand gallons saved.<br />

Additional Information<br />

This is PCU's first rain sensor rebate program with the District. Project participants will also receive a packet of<br />

information on water conservation, covering topics such as indoor and outdoor conservation, retrofitting,<br />

Florida-friendly landscaping, irrigation system tips and detecting water leaks. Additionally, participants will be asked if<br />

they would like an irrigation system evaluation for an additional charge, since this is outside the scope of the rain<br />

sensor rebate program. PCU staff understands that if a customer elects to have an evaluation performed, those<br />

savings will have to be reported separately.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 0 0 0 7,470<br />

0 7,470<br />

011 Alafia River Basin 0 0 0 20,565<br />

0 20,565<br />

013 Hillsborough River Basin 0 0 0 12,825<br />

0 12,825<br />

020 Peace River Basin 0 0 0 23,182<br />

0 23,182<br />

Project Funds Not Budgeted by the<br />

District<br />

Polk County Utilities 0 0 0 58,275<br />

0 58,275<br />

020 - Peace River Basin 348<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$122,317


N161<br />

Polk County Utilities Rain Sensor Rebate<br />

Critical Project Milestones Projected Amended Actual<br />

Contract Execution 12/31/09<br />

Status As Of:<br />

020 - Peace River Basin 349


N162<br />

FYN Charlotte County<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Quality<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Charlotte County BOCC<br />

Project Manager DURELL, SYLVIA<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This Florida Yards & Neighborhoods (FYN) project provides education on Florida-friendly landscaping to homeowners,<br />

students, homeowners association boards and members, condominium managers, landscape and irrigation<br />

specialists, government staff and new owners of Florida Water StarSM Gold Certification homes. In addition, the FYN<br />

coordinator will be available as a resource for homeowners, builders and landscape professionals who are working on<br />

FWSG projects. Effectiveness will be measured by the number of participants in workshops, one-on-one interactions,<br />

and school visits; potential exposure to newspaper articles and electronic media; and distribution of printed education<br />

materials.<br />

Benefits<br />

Education increases knowledge and promotes behavior change related to conservation of water and protection of<br />

water quality and natural systems.<br />

Costs<br />

The total cost of the FY20<strong>10</strong> program is $54,998, with the District contributing $27,499 (Peace River). District funds<br />

support the salary and benefits of the coordinator and travel, training, office expenses, memberships and educational<br />

materials. The cost of the program is projected to reach half of the county's population (77,<strong>21</strong>9) at a cost to the District<br />

of approximately $.36 per person. The budget lines below include costs for staff to manage the project.<br />

Additional Information<br />

This is the first year of District funding for the program. Education is based on the nine Florida-Friendly<br />

LandscapingTM principles that were created by the University of Florida/Institute of Food and Agricultural Sciences<br />

(UF/IFAS) for the Florida Yards & Neighborhoods program: Right Plant, Right Place, Water Efficiently, Fertilize<br />

Appropriately, Mulch, Attract Wildlife, Manage Yard Pests Responsibly, Recycle, Reduce Stormwater Runoff and<br />

Protect the Waterfront.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 0 0 0 29,085<br />

0 29,085<br />

Project Funds Not Budgeted by the<br />

District<br />

Charlotte County 0 0 0 27,499<br />

0 27,499<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$56,584<br />

Critical Project Milestones Projected Amended Actual<br />

FY20<strong>10</strong><br />

Purchase order created <strong>10</strong>/12/09<br />

First advisory committee meeting 1/<strong>21</strong>/<strong>10</strong><br />

First task report 1/29/<strong>10</strong><br />

Second advisory committee meeting 4/14/<strong>10</strong><br />

Second task report 4/30/<strong>10</strong><br />

Third advisory committee meeting 7/15/<strong>10</strong><br />

Third task report 7/30/<strong>10</strong><br />

020 - Peace River Basin 350


N162<br />

FYN Charlotte County<br />

Fourth advisory committee meeting <strong>10</strong>/15/<strong>10</strong><br />

Fourth task report <strong>10</strong>/29/<strong>10</strong><br />

Status As Of: August 31, 2009<br />

Project manager will work with the FYN coordinator to create a scope of work for activities in FY20<strong>10</strong>. A purchase order<br />

is expected to be open by <strong>10</strong>/12/2009. ACTION TO DATE: On time.<br />

020 - Peace River Basin 351


N165<br />

Mobile Irrigation Lab for Highlands Soil and Water Conservation<br />

District<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Project Manager WHITE, BRENT<br />

Task Manager(s)<br />

Highlands County Soil and Water Conservation District<br />

WHITE, BRENT<br />

Status Ongoing<br />

Description<br />

In an effort to conserve water in Highlands County, the Highlands Soil and Water Conservation District (HSWCD) will<br />

promote a Mobile Irrigation Lab (MIL) for the urban areas of the county. The MIL will help bring about the conservation,<br />

development and wise use of land, water and related resources. Partnerships with Highlands County Extension,<br />

Natural Resources Conservation Service and Earth Team volunteers will allow the MIL to operate with minimal<br />

expense. Highlands County Extension Master Gardeners will work along side Irrigation Evaluation Auditors to provide<br />

the expertise to evaluate irrigation systems for homeowners and other urban users. The MIL will operate under the<br />

oversight of the HSWCD and will primarily target urban landowners within Highlands County. HSWCD plans to<br />

complete 35 irrigation evaluations and at least 35 follow-up evaluations. Additionally all irrigation systems that do not<br />

have an automatic shut-off device (ASD) will be provided with the device and installation.<br />

Benefits<br />

The HCSWD estimated benefits as a result of 35 irrigation evaluations is 4,900 gallons per day, in accordance with<br />

data provided by the 2006 SWFWMD Regional Water Supply Plan. The estimated water savings of the rain sensors is<br />

3,500 gpd. Using those figures, total water savings from the program is estimated to be 8,400 gpd.<br />

Costs<br />

The total cost of this project is $<strong>10</strong>,850 with the Peace River Basin Board's share at 70 percent, or $7,595 and the<br />

Highlands County Soil and Water Conservation District share at 30 percent, or $3,255. Highlands County is a qualified<br />

to request a reduction in matching funding requirements under the State's Rural Economic Development Initiative<br />

(R.E.D.I) provisions. The cost benefit amortized at eight percent over five years is $0.86 per thousand gallons saved.<br />

Additional Information<br />

Participation by the landowners/operators on this MIL evaluation and water conservation program will be voluntary and<br />

free of charge. Efforts to publicize the laboratory and market the availability of its services will be critical to its success.<br />

In order to achieve the greatest success, the MIL responsibilities will include but are not limited to the following:<br />

Develop site-specific written irrigation recommendation including, but not limited to, evaluation of irrigation equipment,<br />

management practices, recommended irrigation schedules, and the potential water savings that could be realized by<br />

implementing those recommendations.<br />

Recommend applicable best management practices (BMP) and develop an action plan for implementing those<br />

recommended practices.<br />

Conduct irrigation and BMP follow-up surveys.<br />

A summary of irrigation and BMP site visits along with evaluations, recommendations, and follow up information will be<br />

entered on a data base for accuracy of records.<br />

Estimate the potential and actual water savings that will be obtained as a result of implementing irrigation<br />

recommendations.<br />

HSWCD representatives who are knowledgeable regarding the MIL will hold public information forums to generate<br />

interest and participation in water conservation and BMP efforts.<br />

020 - Peace River Basin 352


N165<br />

Mobile Irrigation Lab for Highlands Soil and Water Conservation<br />

District<br />

Prior Cumulative FY 2009 FY20<strong>10</strong><br />

Funding Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0 0 0 <strong>10</strong>,036<br />

020 Peace River Basin 0 <strong>10</strong>,036<br />

Project Funds Not Budgeted by the<br />

District<br />

Highlands County Soil and Water<br />

Conservation Dist.<br />

0 0 0 3,255<br />

Total:<br />

Future<br />

Funding<br />

0<br />

Total<br />

Funding<br />

3,255<br />

$13,291<br />

Critical Project Milestones Projected Amended Actual<br />

Master Gardeners Complete Irrigation Auditors Certification 12/31/09<br />

Program Implementation 2/28/<strong>10</strong><br />

End New Evaluations and Continue Follow-Ups 3/30/11<br />

Begin Program Evaluation and Savings Calculations 9/30/11<br />

Final Report Due <strong>10</strong>/31/12<br />

Contract Closeout 1/31/13<br />

Status As Of: September 01, 2009<br />

Highlands County Soil and Water Conservation District is in the process of scheduling the irrigation auditor certification<br />

for the UF-Cooperative Extension Master Gardeners so they may administer the program.<br />

020 - Peace River Basin 353


N<strong>21</strong>8<br />

Englewood Reclaimed Water Supply Project<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply, Water Quality<br />

Basin(s) Peace River, Manasota<br />

Cooperator(s)<br />

Englewood Water District<br />

Project Manager MCGOOKEY, SCOTT<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This project consists of the design and construction of a supplemental reclaimed water supply well and the<br />

modification of the intake structure at the onsite reuse pond at the Englewood WRF to provide additional dry weather<br />

irrigation supplies. Reclaimed water is produced at the Englewood WRF, which serves portions of Charlotte and<br />

Sarasota counties. Current reclaimed water storage includes a 1 MG above ground storage tank, wet weather storage<br />

ponds (onsite and offsite), and a fully permitted ASR system. The ASR well provides 0.5 mgd of reclaimed water<br />

during peak demand periods and has become a critical component of the reuse system. Without previous SWFWMD<br />

funding assistance for the ASR program, EWD reuse would not be as efficient and connection of many current<br />

customers would not have been possible. Installing an additional supply well into the ASR storage zone will increase<br />

the rate at which stored water can be recovered during peak demand. A well approximately 600 feet in depth is<br />

required, along with a pump and appurtenances to produce an additional 0.5 mgd, or about 15 mg of water during<br />

each peak month used. Re-engineering the onsite wet weather pond will more effectively utilize available storage and<br />

freshwater in the surficial aquifer at the WRF. Lowering the pump intake from the existing pond will provide additional<br />

water for irrigation. Reuse demands during dry weather periods often exceed the available supply. This project will<br />

provide additional reuse supply to existing customers during peak demand periods. These customers include Lemon<br />

Bay Golf, Oyster Creek Golf, and Rotunda West Utilities in Charlotte County and Myakka Pines Golf, Englewood<br />

Sports Park, Boca Royale Golf, and Gran Paradiso Subdivision in Sarasota County.<br />

Benefits<br />

The project will provide approximately 82,192 gpd of additional reuse supply that will be used evenly between the<br />

identified customers in Charlotte and Sarasota Counties. This project will offset approximately 61,644 gpd. The<br />

cost/benefit ratio for the total estimated project cost of $260,000 averaging 61,644 gpd using an 8% annual interest<br />

rate amortized over 30 years is $1.02/<strong>10</strong>00 gallons.<br />

Costs<br />

The total cost of the project is estimated at $260,000. Since the benefits are evenly split between customers in the<br />

Peace and Manasota Basins, EWD is requesting $65,000 from each Basin Board for a total of $130,000 (50%) in<br />

FY20<strong>10</strong> funding. Design costs are estimated at $60,000 and construction at $200,000.<br />

Additional Information<br />

Without previous SWFWMD funding assistance for the ASR program, EWD reuse would not be as efficient and<br />

connection of many current customers would not have been possible. This project will further increase this efficiency<br />

and help EWD meet existing contracted amounts. EWD won the 2008 FWEA David York Award for small facilities (<<br />

5 mgd), another example of the benefits that the previous funding assistance has had. Reuse demands during dry<br />

weather periods often exceed the available supply. Additional reuse customers have been identified but the ability to<br />

serve these users during peak demand periods will be problematic without additional supplemental sources. With the<br />

lack of available fresh groundwater or surface water EWD is faced with developing alternative supplemental sources.<br />

Supplemental sources currently identified include the following: Installing an additional supply well into the ASR<br />

storage zone to increase the rate at which stored water can be recovered. A well approximately 600 feet in depth is<br />

required, along with a pump and appurtenances to produce an additional 0.5 mgd, or about 15 mg of water during<br />

each peak month used. Re-engineering the onsite wet weather pond to more effectively utilize available storage and<br />

freshwater in the surficial aquifer at the WRF. Lowering the pump intake from the existing pond will provide additional<br />

water for golf course irrigation to Lemon Bay Golf Course, and may allow EWD to add other golf course storage ponds<br />

to be supplied from this pond. EWD advertises and helps enforce the District's watering restrictions, aids in<br />

xeriscaping education, and have imposed a steep graduated rate structure to discourage high water usage. The EWD<br />

has a policy requiring any new significant development desiring utilities to include a reclaimed water irrigation system<br />

in its infrastructure. EWD's reuse customers are conservation minded and only use the water deemed necessary to<br />

adequately maintain the irrigated area.<br />

020 - Peace River Basin 354


N<strong>21</strong>8<br />

Englewood Reclaimed Water Supply Project<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 0 0 0 65,000<br />

0 65,000<br />

0<strong>21</strong> Manasota Basin 0 0 0 68,077<br />

0 68,077<br />

Project Funds Not Budgeted by the<br />

District<br />

Englewood Water District 0 0 0 130,000<br />

0 130,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$263,077<br />

Critical Project Milestones Projected Amended Actual<br />

Start Design and Permitting 11/30/09<br />

Complete Design and Permitting 7/1/<strong>10</strong><br />

Start Construction of Well & Intake Structure 12/31/<strong>10</strong><br />

Complet Well Installation 4/1/11<br />

Complete Re-engineering Onsite Pond 5/1/11<br />

Status As Of: August 25, 2009<br />

CFI agreement being drafted by DIstrict staff. EWD is drafting Exhibit B (Project Plan) of the draft agreement.<br />

020 - Peace River Basin 355


N2<strong>21</strong><br />

Winter Haven Smart Controller Pilot Project<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Winter Haven<br />

Project Manager BADER, TAMMY<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

The City of Winter Haven is proposing a pilot project using smart (ET) controller devices. The city will identify<br />

commercial customers with existing irrigation accounts that are not efficient water users though the utility billing<br />

records. Smart controllers are a relatively new and emerging technology, and may be appropriate for more complex<br />

irrigation systems with multiple clocks and zones (i.e., larger, commercial properties). They estimate or measure<br />

depletion of available plant soil moisture in order to operate an irrigation system, replenishing water as needed while<br />

minimizing excess water use. A properly programmed smart controller requires initial site specific set-up and will make<br />

irrigation schedule adjustments, including run times and required cycles, throughout the irrigation season without<br />

human intervention. The city will identify 50 customers with separate irrigation meters, evaluate irrigation system of<br />

each participant to ensure there are no leaks or broken sprinklers, purchase smart controllers and irrigation contractor<br />

to install smart controllers, and track monthly water consumption using utility billing records. Throughout the duration of<br />

the project, landscapes evaluations will be performed to monitor the health of the landscape.<br />

Benefits<br />

It is expected that the smart controllers will achieve an anticipated savings of 340,000 gallons per day.<br />

Costs<br />

The total cost of this project is estimated to be $45,000, of which the Peace River Basin is requested to fund 50<br />

percent, or $22,500. Funding in the amount of $22,500 has been budgeted in FY20<strong>10</strong>. The estimated cost/benefit ratio<br />

calculated at an 8% annual interest rate, over 5 years is $0.09/<strong>10</strong>00 gallons for the project.<br />

Additional Information<br />

The City of Winter Haven has an ordinance adopting SWFWMD emergency watering restrictions which provides for<br />

enforcement and fines by both the Police and Code Enforcement Departments. There is also a tiered utility rate<br />

structure in place that discourages high consumption of potable water. The city currently tracks and send postcards to<br />

all commercial accounts (with separate irrigation meters) that exceed 50,000 gallons of irrigation demand each month.<br />

Postcard reminders to each of these customers that they are High Irrigation Users, including their specific one day per<br />

week of permitted irrigation. The savings is based on the reduction of each 50 customer accounts from their current<br />

irrigation demand to 50,000 gallons each month. The city did discuss using the University of Florida to help track and<br />

compile data, however because this is a pilot program with only 50 customers, the city did not see the need to contract<br />

with the University.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 0 0 0 25,241<br />

0 25,241<br />

Project Funds Not Budgeted by the<br />

District<br />

City of Winter Haven 0 0 0 22,500<br />

0 22,500<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$47,741<br />

Critical Project Milestones Projected Amended Actual<br />

Contract Execution 12/31/09<br />

020 - Peace River Basin 356


N2<strong>21</strong><br />

Winter Haven Smart Controller Pilot Project<br />

Provide all billing records of program participants to District 3/30/<strong>10</strong><br />

Install devices 6/30/<strong>10</strong><br />

Final report of test and potential savings to District 6/30/12<br />

Contract Closeout 12/31/12<br />

Status As Of: September 22, 2009<br />

A scope of work has been received from the cooperator. A cooperative funding agreement has been prepared and is<br />

expected to be executed late in 2009 or early in 20<strong>10</strong>. To date, $22,500 has been budgeted, of which $0 has been<br />

reimbursed.<br />

020 - Peace River Basin 357


P727<br />

City of Lake Wales Reuse Project<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply, Water Quality<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Lake Wales<br />

Project Manager NOURANI, MEHRSHAD<br />

Task Manager(s)<br />

Status Ongoing<br />

NOURANI, MEHRSHAD<br />

Description<br />

This project consists of a reclaimed water system to be completed in three phases: Phase I, which has completed,<br />

included the construction of a 2 mgd capacity pumping station at the existing Lake Wales wastewater treatment plant<br />

(WWTP) and 14,000 linear feet of 20-inch diameter transmission main from the WWTP to a cluster of 7 rapid<br />

infiltration basins (RIBS) on City-owned property southwest of the WWTP. Phase II is also complete. It included the<br />

design and construction of a high service pumping station and a 2-mg reclaimed water storage tank at the RIB site.<br />

Phase III includes design and construction of approximately 20,970 linear feet of transmission line from the RIB site<br />

to Mayfair residential/commercial development, City-owned soccer fields, City-owned groves, Whispering Ridge<br />

residential development, and Long Leaf Business Park. Phase III design was completed in January 31, 2008. Phase III<br />

transmission line construction is currently underway. The project is scheduled for completion by July 2009.<br />

Benefits<br />

This project provides 2.025 mgd of reclaimed water, offset approximately 1.245 mgd of ground water from the Floridan<br />

Aquifer.<br />

Costs<br />

The total project cost is $5,626,387 and the District's share is $2,092,000. The City is completing this project with<br />

District Cooperative Funding Program dollars and DEP State Revolving Fund (loan) dollars. The Peace River Basin<br />

Board budgeted $699,500 in FY2002, and the remaining portion of the District's share in the future. Budget below<br />

does not reflect prior year funding for $562,500 in FY1997, $130,000 in FY1998 and $700,000 in FY1999. Total<br />

amount encumbered to date is $2,092,000. Total amount expended to date is $1,011,855 and $1,073,917 will remain<br />

to complete this project by December 2009.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 707,137 0 4,368 2,958<br />

0 714,463<br />

Project Funds Not Budgeted by the<br />

District<br />

City of Lake Wales 0 0 0 1,080,145<br />

0 1,080,145<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$1,794,608<br />

Critical Project Milestones Projected Amended Actual<br />

Contract Execution 1/31/97 1/31/98 1/2/99<br />

Phase I Commence Construction <strong>10</strong>/31/97 <strong>10</strong>/31/00<br />

Phase I Completion 6/30/98 5/31/98<br />

Phase II Design Commence 4/25/99 1/30/98<br />

Phase II Complete Design 2/28/01 2/3/03 1/6/05<br />

Phase III (delayed by the City) Desing Commence 3/1/02 9/30/05 5/30/07<br />

Phase III (delayed by the City) Design Complete 12/29/02 3/31/06 1/31/08<br />

Phase III Construciton Commence 1/31/08 12/31/07 1/31/08<br />

Phase III Construction Complete 7/31/09<br />

020 - Peace River Basin 358


P727<br />

City of Lake Wales Reuse Project<br />

Status As Of: August 31, 2009<br />

As of the date of this update the City has not been able to obtain the DEP permit to deliver reclaimed water to residential<br />

customers. The City has completed the installation for the portion of the project which includes the installation of the<br />

reuse line to the City¿s new soccer field, the Whispering Ridge Subdivision and the city maintained grove. The City has<br />

also finalized the reuse components to the Longleaf Business Park. The City continues working with the Department of<br />

Environmental Protection on getting the approval to energize the line and start sending reuse water to the customers<br />

020 - Peace River Basin 359


M<strong>10</strong>4<br />

Hardee - FEMA Map Modernization<br />

Project Type FEMA/Map Mod.<br />

AOR(s)<br />

Flood Protection<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Project Manager LETASI, SCOTT<br />

Task Manager(s)<br />

Status Ongoing<br />

Bowling Green, Federal Emergency Management Agency, Hardee County, Wauchula, Zolfo<br />

Springs<br />

Description<br />

This project is to perform map modernization which includes 1) Topographic Information, 2) Watershed Evaluation,<br />

and 3) Watershed Management Plan elements of the District's Watershed Management Program (WMP) for the<br />

Hardee County Watershed. The watershed covers an area of approximately 637 square miles and is located in<br />

Hardee County. The watershed faces flood damage and water quality issues. With FY2005 funding the work on the<br />

Map Modernization will begin and County-wide Digital Flood Insurance Rate Maps will be produced. In addition to the<br />

DFIRM production, this project will also include five Watershed Management Plans (WMPs). WMPs will be performed<br />

in the these priority watersheds: Alligator Branch, Buzzards Roost Run, City of Wauchula, Upper Horse Creek, and<br />

Thompson Branch.<br />

Benefits<br />

The WMP provides a method to evaluate the capacity of a watershed to protect, enhance, and restore water quality<br />

and natural systems, while achieving flood protection. The information developed provides the science for the District's<br />

Resource Management and Environmental Resource Permitting (ERP). It assists local governments: 1) With their land<br />

management responsibilities by establishing a level of service and developing Best Management Practices (BMPs) to<br />

address level of service deficiencies. 2) Provides a Geodatabase and projected results from watershed model<br />

simulations for floodplain management, and water quality management through the Total Maximum Daily Loads<br />

(TMDL) process for their National Pollution Discharge Elimination System (NPDES) permit requirements.<br />

Costs<br />

The total budget amount for this project is $737,000. FEMA will contribute $737,000. With FY2005 funding the work on<br />

the Map Modernization will begin. When each element is completed the project budget will be refined based on the<br />

information gathered. Future funding will be required for the Watershed Evaluation of other watersheds to complete<br />

the survey, watershed modeling development, floodplain analysis, LOS, surface water resource assessment, and<br />

alternate analysis of BMPs. Approximately $75,000 of the District's FY2009 funding under B206 will be used for public<br />

workshops to present the completed Watershed Management Plans, which will be incorporated into the new<br />

countywide FIRMs.<br />

Additional Information<br />

The WMP includes five major elements: 1) Topographic Information, 2) Watershed Evaluation, 3) Watershed<br />

Management Plan, 4) Implementation of Best Management Practices, and 5) Maintenance of Watershed Parameters<br />

and Models. Implementing elements of the WMP with local governments is one of the Comprehensive Watershed<br />

Management (CWM) initiative strategies. The District is cooperating with FEMA to modernize the flood insurance rate<br />

maps (FIRMs) in Hardee County. Information developed with this project will be used to update the FIRMs<br />

representing this watershed. Staff has worked with the Federal Emergency Management Agency (FEMA) to improve<br />

and formalize the District's relationship with a federal agency that shares flood protection responsibilities. FEMA and<br />

the District executed a Cooperating Technical Partners (CTP) Memorandum of Agreement on September 14, 2001.<br />

As a CTP, the District is eligible for federal grants and matching funds to further efforts to modernize the flood<br />

insurance rate maps (FIRMs). Funds will be used to perform elements of the District's Watershed Management<br />

Program (WMP) within Hardee county. The District will execute a Mapping Activity Statement with FEMA that<br />

identifies costs, responsibilities, and specific activities to complete the FEMA Map Modernization effort for watersheds<br />

in Hardee county. The District will coordinate with the local government(s), will manage the project, and will enter into<br />

purchase orders and agreements to accomplish project tasks. With FEMA funding several tasks of the Watershed<br />

Evaluation and Watershed Management Plan elements for priority watersheds within Hardee county will be<br />

accomplished. Watersheds will be prioritized based on the needs of the local governments and the District. Because<br />

of funding constraints some watersheds will not be studied in detail. The risk information from the current FIRMs will<br />

be transferred to the modernized, digital maps. These watersheds will be studied in detail when additional funding is<br />

available through the cooperative funding process. Work on the Watershed Management Plan element for the priority<br />

watersheds will include the following tasks: survey, data management and development of watershed parameters,<br />

GIS processing, computer modeling, and floodplain analysis. Development of countywide, digital FIRMs and outreach<br />

for the successful adoption of the FIRMs will also be performed. When each element is completed the project budget<br />

will be refined based on the information gathered. Future cooperative funding request(s) will be required to complete<br />

020 - Peace River Basin 360


M<strong>10</strong>4<br />

Hardee - FEMA Map Modernization<br />

remaining Watershed Evaluation and Watershed Management Plan tasks (e.g. LOS determination, surface water<br />

resource assessment, and BMP alternative analysis).<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) <strong>21</strong>,426 400 13,666<br />

0<br />

0 35,492<br />

District Budgeted - Outside Revenue<br />

FEMA Mapping Activity Statement 737,000 0 0<br />

0<br />

0 737,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$772,492<br />

Critical Project Milestones Projected Amended Actual<br />

1. Critical Project Milestones<br />

Cooperating Tech. Partners Memorandum of Agreement 9/14/01 9/14/01<br />

Cooperating Technical Partners Agreement Executed 8/12/02 8/12/02<br />

Mapping Activity Statement Executed 9/30/05 12/20/05<br />

Develop Scoping Consultant Agreement 11/7/05 11/7/05<br />

Draft Consultant Agreement to Management Services 11/7/05 11/7/05<br />

Draft Agreement returned from Management Services 12/1/05 11/30/05<br />

Scoping Consultant Contract Execution 12/30/05 1/12/06<br />

Scoping Consultant Notice to Proceed 12/30/05 2/1/06<br />

Scoping Consultant Contract Termination 7/<strong>21</strong>/06 12/15/06<br />

DFIRM Consultant Contract Executed 4/15/07 3/28/07<br />

Alligator Branch WMP Consultant (K&S) Contract Executed 5/15/07 6/6/07<br />

Thompson Branch WMP Consultant (K&S) Contract Executed 5/22/07 6/6/07<br />

City of Wauchula WMP Consultant (K&S) Contract Executed 6/1/07 6/6/07<br />

Buzzards Roost Run WMP Consultant Contract Executed 6/15/07 6/19/07<br />

Horse Creek WMP Consultant Contract Executed 7/1/07 7/16/07<br />

2. Digital Topographical Information<br />

Begin DTI for Alligator Branch 6/<strong>21</strong>/07 6/<strong>21</strong>/07<br />

Begin DTI for City of Wauchula 6/<strong>21</strong>/07 6/<strong>21</strong>/07<br />

Begin DTI for Thompson Branch 6/<strong>21</strong>/07 6/<strong>21</strong>/07<br />

Begin DTI for Buzzards Roost Run 7/15/07 8/9/07<br />

Begin DTI for Horse Creek 7/<strong>21</strong>/07 9/17/07 <strong>10</strong>/1/07<br />

Complete DTI for Alligator Branch 9/7/07 8/30/07<br />

Complete DTI for City of Wauchula 9/7/07 8/30/07<br />

Complete DTI for Thompson Branch 9/7/07 8/30/07<br />

Complete DTI for Buzzards Roost Run <strong>10</strong>/1/07 2/8/08<br />

Complete DTI for Horse Creek <strong>10</strong>/7/07 12/12/07<br />

3. Watershed Evaluation<br />

Begin WE for City of Wauchula Watershed 9/1/07 8/30/07<br />

Begin WE for Alligator Branch 9/1/07 8/30/07<br />

Begin WE for Thompson Branch & City of Wauchula Watersheds 9/1/07 8/30/07<br />

Begin WE for Buzzards Roost Run 9/<strong>21</strong>/07 2/1/08<br />

Begin WE for Horse Creek <strong>10</strong>/1/07 12/1/07<br />

Complete WE for City of Wauchula Watershed 1/<strong>21</strong>/08 12/19/07<br />

Complete WE for Alligator Branch 1/<strong>21</strong>/08 12/19/07<br />

Complete WE for Thompson Branch & City of Wauchula Watersheds 1/<strong>21</strong>/08 12/19/07<br />

Complete WE for Buzzards Roost Run 2/15/08 5/31/08 5/20/09<br />

Complete WE for Horse Creek 2/<strong>21</strong>/08 3/31/08 4/9/08<br />

020 - Peace River Basin 361


M<strong>10</strong>4<br />

Hardee - FEMA Map Modernization<br />

4. Watershed Management Plan<br />

Begin WMP for Thompson Branch & City of Wauchula Watersheds 1/7/08 2/1/08<br />

Begin WMP for Alligator Branch 1/7/08 2/1/08<br />

Begin WMP for City of Wauchula Watershed 1/7/08 2/1/08<br />

Begin WMP for Buzzards Roost Run 1/31/08 5/15/08 8/<strong>21</strong>/09<br />

Begin WMP for Horse Creek 2/7/08 2/1/08<br />

Complete WMP for Alligator Branch 6/<strong>21</strong>/08<br />

Complete WMP for Thompson Branch & City of Wauchula Watersheds 6/<strong>21</strong>/08<br />

Complete WMP for City of Wauchula Watershed 6/<strong>21</strong>/08<br />

Complete WMP for Buzzards Roost Run 7/15/08<br />

Complete WMP for Horse Creek 7/<strong>21</strong>/08<br />

Preliminary DFIRM and FIS Report 12/15/08<br />

Post-Preliminary Processing <strong>10</strong>/15/09<br />

Status As Of: June 30, 2009<br />

Status History: The Mapping Activity Statement (MAS) was executed on December 20, 2005 by the Executive Director<br />

and FEMA's Regional Project Officer. The Scoping <strong>Meeting</strong> was conducted on July 17, 2006 in the City of Wauchula's<br />

Government Building. Representatives of the SWFWMD, Hardee County, City of Wauchula, and City of Zolfo Springs<br />

attended the scoping meeting. Participants were asked to identify areas of particular concern for their community.<br />

Hardee County, City of Wauchula, and City of Zolfo Springs were also asked to execute a Community Partner<br />

Memorandum of Agreement to confirm their commitment to work with the District and the FEMA to produce updated,<br />

digital FIRM maps for their community. The Scoping Report has been completed and the MOAs between the District and<br />

the following communities have been executed by the District: Hardee County, City of Zolfo Springs, and City of<br />

Wauchula. The MOAs have been sent to FEMA for signature and upon return the communities will receive a fully<br />

executed MOA and a copy of the Final Scoping Report. An Agreement with URS has been executed to provide<br />

consultants services for the DFIRM Production. In addition to the DFIRM production, this project will also include five<br />

Watershed Management Plans (WMPs). An agreement with Keith & Schnars (K&S) was executed in April 2007 to<br />

perform a WMP in the Alligator Branch, City of Wauchula, and Thompson Branch Watersheds. An agreement with URS<br />

was executed in June 2007 to perform a WMP in the Buzzards Roost Run. An agreement with BCI was executed in July<br />

2007 to perform a WMP in the Upper Reaches of the Horse Creek Watershed. The remaining funds, after the<br />

completion of the DFIRM production and the five WMP, will be used for Outreach. All of the digital topographic<br />

information (DTI) element of the WMPs have been completed. for Alligator Branch, City of Wauchula, and Thompson<br />

Branch Watersheds. The District's consultant has finalized the Outreach Plan for Hardee County based on the Outreach<br />

Planning <strong>Meeting</strong> held on August 6, 2008. Status Current: The watershed management plans for Alligator Branch, City of<br />

Wauchula, Horse Creek, and Thompson Branch Watersheds have been completed and reviewed by District staff. URS<br />

has completed the redelineation of effective detailed studies within the county with the new topographic data. The District<br />

is working several consultant to begin the peer review and public workshop process.<br />

020 - Peace River Basin 362


M<strong>10</strong>6<br />

Highlands - FEMA Map Modernization<br />

Project Type FEMA/Map Mod.<br />

AOR(s)<br />

Flood Protection<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Project Manager LETASI, SCOTT<br />

Task Manager(s)<br />

Status Ongoing<br />

Avon Park, City of Sebring, Federal Emergency Management Agency, Highlands County, Lake<br />

Placid, South Florida Water Management District, Sun N' Lake of Sebring<br />

Description<br />

This project is to perform map modernization which includes 1) Topographic Information, 2) Watershed Evaluation,<br />

and 3) Watershed Management Plan elements of the District's Watershed Management Program (WMP) for the<br />

Highlands County Watershed. The County's area within the District is approximately 400 square miles which seperated<br />

into 14 watersheds. The watershed management plan will address flood protection and water quality issues. With<br />

FY2006 funding the work on the Map Modernization will begin. District public workshops for detailed studies are<br />

funded under B206 for FY2009.<br />

Benefits<br />

The District is cooperating with FEMA to modernize the flood insurance rate maps (FIRMs) in Highlands County. The<br />

WMP provides a method to evaluate the capacity of a watershed to protect, enhance, and restore water quality and<br />

natural systems, while achieving flood protection. The information developed provides the science for the District's<br />

Resource Management and Environmental Resource Permitting (ERP). It assists local governments: 1) With their land<br />

management responsibilities by establishing a level of service and developing Best Management Practices (BMPs) to<br />

address level of service deficiencies. 2) Provides a Geodatabase and projected results from watershed model<br />

simulations for floodplain management, and water quality management.<br />

Costs<br />

The total budget amount for this project is $550,000 and FEMA will contribute the $550,000. With FY2006 funding the<br />

work on the Map Modernization will begin. When each element is completed the project budget will be refined based<br />

on the information gathered. Project B206 FY2009 funding of $75,000 will be used for the public workshops for<br />

completed Watershed Management Plans.<br />

Additional Information<br />

The WMP includes five major elements: 1) Topographic Information, 2) Watershed Evaluation, 3) Watershed<br />

Management Plan, 4) Implementation of Best Management Practices, and 5) Maintenance of Watershed Parameters<br />

and Models. Implementing elements of the WMP with local governments is one of the Comprehensive Watershed<br />

Management (CWM) initiative strategies. Information developed with this project will be used to update the FIRMs<br />

representing this watershed. Staff has worked with the Federal Emergency Management Agency (FEMA) to improve<br />

and formalize the District's relationship with a federal agency that shares flood protection responsibilities. FEMA and<br />

the District executed a Cooperating Technical Partners (CTP) Memorandum of Agreement on September 14, 2001.<br />

As a CTP, the District is eligible for federal grants and matching funds to further efforts to modernize the flood<br />

insurance rate maps (FIRMs). Funds will be used to perform elements of the District's Watershed Management<br />

Program (WMP) within Highlands county. The District will execute a Mapping Activity Statement (MAS #8) with FEMA<br />

that identifies costs, responsibilities, and specific activities to complete the FEMA Map Modernization effort for<br />

watersheds in Highlands County. The District will coordinate with the local government(s), will manage the project, and<br />

will enter into purchase orders and agreements to accomplish project tasks. Because of funding constraints some<br />

watersheds will not be studied in detail. The risk information from the current FIRMs will be transferred to the<br />

modernized, digital maps. These watersheds will be studied in detail when additional funding is available through the<br />

cooperative funding process. Work on the Watershed Management Plan element for the detailed watersheds will<br />

include the following tasks: survey, data management and development of watershed parameters, GIS processing,<br />

computer modeling, and floodplain analysis. Development of countywide, digital FIRMs and outreach for the<br />

successful adoption of the FIRMs will also be performed. Future funding will be required for the Watershed Evaluation<br />

of other watersheds to complete the survey, watershed modeling development, floodplain analysis, LOS, surface<br />

water resource assessment, and alternate analysis of BMPs.<br />

020 - Peace River Basin 363


M<strong>10</strong>6<br />

Highlands - FEMA Map Modernization<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 7,422 0 8,482 20,760<br />

0 36,664<br />

District Budgeted - Outside Revenue<br />

FEMA Mapping Activity Statement 600,000 0 0<br />

0<br />

0 600,000<br />

Project Funds Not Budgeted by the<br />

District<br />

FEMA 550,000 0 0<br />

0<br />

0 550,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$1,186,664<br />

Critical Project Milestones Projected Amended Actual<br />

1. Critical Milestones<br />

Execute DFIRM Consultant Agreement 4/1/07 3/20/07<br />

Perform Scoping <strong>Meeting</strong> 7/1/07 6/27/07<br />

Complete Scoping Report 8/15/07 <strong>10</strong>/9/07<br />

2. Digital Terrain Model<br />

Complete Digital Topographic Information 6/15/08 9/5/08<br />

4. Watershed Management Plan<br />

Complete Watershed Management Plans 12/1/08 12/15/<strong>10</strong><br />

Complete WMP Public <strong>Meeting</strong>s 1/30/09 3/15/11<br />

Present WMPs to Board 3/15/09 6/15/11<br />

Preliminary DFIRM and FIS Report 8/15/09 8/31/<strong>10</strong><br />

Post-Preliminary Processing 8/15/<strong>10</strong> 6/15/11<br />

Status As Of: September 01, 2009<br />

Status History: Mapping Activity Statement (MAS) with SWFWMD and FEMA was executed on December 18, 2006. The<br />

District also working with the South Florida Water Management District on this project since they received funds from<br />

FEMA and will be mapping their part of the county. The District has executed an agreement with Dewberry & Davis to<br />

perform the Scoping <strong>Meeting</strong>s and digital FIRMs production (Work Orders 1 and 2). A prescoping meeting was held on<br />

May 9, 2007 in the Engineering Training Room of the Highlands County Building. Highlands County, City of Avon Park,<br />

and City of Sebring were in attendance. Participants were asked to provide data and information for their community to<br />

update the existing flood insurance rate maps (FIRMs). A scoping meeting was help on June 27, 2007 in the Highlands<br />

County Agricultural Civic Center. Highlands County, City of Avon Park, City of Sebring and Town of Lake Placid were in<br />

attendance. Participants were asked to identify areas of particular concern for their community (i.e. flood prone areas,<br />

new development). The communities were also asked to execute a Community Partner Memorandum of Agreement<br />

(MOA) to confirm their commitment to work with the District and the FEMA to produce updated, digital FIRM maps for<br />

their community. In November 2007, Dewberry & Davis submitted the Highlands County Scoping Report to FEMA on the<br />

behalf of both Water Management Districts and later revised the report in March 2008 based on FEMA's comments. A<br />

third work order with Dewberry & Davis has been authorized to address items identified in the scoping report. A progress<br />

meeting with SFWMD, Dewberry, and PBS&J was held on September 25, 2008 to review the panel collar and base<br />

maps. A Highlands County Outreach Plan Development <strong>Meeting</strong> was held on the same day to formulate a plan for the<br />

communities to effectively outreach for the mapping project. Bruce Bender presented on outreach and collect feedback<br />

from the communities to write an outreach plan. On November <strong>10</strong>, 2008, District staff and its consultants met with<br />

representative from the County, Avon Park, and Sebring to discuss technical issues with the watershed management<br />

plans (WMPs). Status Current: The outreach plan has been completed; however it may need to be revised due to project<br />

delays. Topography issues are delaying the completion of the three WMPs; therefore the WMPs will not be incorporated<br />

into the new maps. Milestones will be update in October after District staff has evaluated the topography issues.<br />

020 - Peace River Basin 364


M114<br />

Polk County Watershed Management Program: FEMA Map<br />

Modernization<br />

Project Type FEMA/Map Mod.<br />

AOR(s)<br />

Flood Protection<br />

Basin(s) General Fund (District), Alafia River, Hillsborough River, Peace River<br />

Cooperator(s)<br />

Project Manager TURNER, DAWN<br />

Task Manager(s)<br />

Status Ongoing<br />

Federal Emergency Management Agency<br />

Description<br />

The project involves performing tasks included in the Topographic Information, Watershed Evaluation, and Watershed<br />

Management Plan elements of the District's Watershed Management Program for priority watersheds in Polk County;<br />

and the development of countywide digital Flood Insurnace Rate Maps (FIRMs). Public education and outreach will<br />

also be performed to faciliate successful adoption of the FIRMs. The District obtained LiDAR topographic information<br />

and digital orthophotos for most of Polk county as part of the Peace River Topographic Mapping project (P692).<br />

Through the District's cooperative funding program, the District and County have prepared or are in the process of<br />

preparing Watershed Management Plans for all or portions of 11 of the 25 identified watersheds. With Federal<br />

Emergency Management Agency (FEMA) funding, these plans will be updated to include recent alterations within the<br />

watersheds, and to meet the standards described in the District's Guidelines and Specifications. The remaining<br />

watersheds will be prioritized based on the needs of local governments and the District. Appropriate Watershed<br />

Evaluation and Watershed Management Plan tasks will be accomplished for priority watersheds. However, some of<br />

the lower priority watersheds will not be studied in detail because of funding constraints. In these watersheds the risk<br />

information from the current FIRMs will be transferred to the modernized, digital maps. Future cooperative funding<br />

request(s) will be required to complete Watershed Evaluation and Watershed Management Plan tasks for lower<br />

priority watersheds, and for those tasks that are not associated with the FIRM map updates (e.g. LOS determination,<br />

surface water resource assessment, and BMP alternative analysis). The District will manage the project, coordinate<br />

with local government(s), and enter into purchase orders and agreements to accomplish project tasks. A portion of<br />

Polk county is located within the South Florida Water Management District (SFWMD). The SFWMD will pursue FEMA<br />

funding to update the Polk county FIRMS in their area. The District executed a joint Mapping Activity Statement with<br />

FEMA and the SFWMD that identifies costs, responsibilities, and specific activities to complete the FEMA Map<br />

Modernization effort for watersheds within Polk county.<br />

Benefits<br />

Identification of floodprone areas is critical for the effective implementation of local, state and federal programs<br />

including the regulation of land use changes and site development, emergency preparedness, and emergency<br />

response. The information is also used by public and private entities to assess risk, and make development decisions.<br />

Costs<br />

The Federal Emergency Management Agency provided $1,200,000 for this project.<br />

Additional Information<br />

FEMA is a federal agency with flood protection responsibilties that include the preparation of FIRMs to identify flood<br />

hazards zones. Staff has been working to improve and formalize the District¿s relationship with FEMA. On September<br />

14, 2001, FEMA and the District executed a Cooperating Technical Partners (CTP) Memorandum of Agreement. As a<br />

CTP, the District is eligible for federal grants and matching funds to further efforts to modernize the FIRMs. In FY2004,<br />

FEMA provided over $6 million in grant funds to the District to modernize the FIRMs in Hernando, Marion, Pasco, and<br />

Sarasota counties. In FY2005, FEMA provided an additional $2.7 million in grant funds to the District to modernize the<br />

FIRMS in Polk, Hadee and DeSoto counties. $1.2 million of the FY2005 funding was allocated to the area of Polk<br />

county located within the District. These funds will be used to update previous studies to meet District Guidelines and<br />

Specifications, perform elements of the District's Watershed Management Program (WMP) for priority watersheds,<br />

and develop countywide digital FIRM maps. A WMP includes five major elements: Topographic information,<br />

Watershed Evaluation, Watershed Management Plan, Implementation of Best Management Practices, and<br />

Maintenance of Watershed Parameters and Models. The Topographic Information element provides the foundational<br />

information used to define the watershed's boundaries, storage and conveyance. The Watershed Evaluation element<br />

tasks includes field evaluation of the watershed and its intermediate conveyance system, inventory of water resources<br />

and stormwater management infrastructure, data development and GIS processing of watershed parameters, and an<br />

immediate maintenance evaluation. The Water Management Plan tasks include survey, data management and<br />

development of watershed parameters, GIS processing, computer modeling, floodplain analysis, surface water<br />

resource assessment (water quality), establishment of level of services (LOS), and a best management practices<br />

(BMP) alternative analysis, which includes prioritized recommendations and probable costs. Implementation includes<br />

design, construction permitting, development of construction documents, land acquisition, and construction of the<br />

020 - Peace River Basin 365


M114<br />

Polk County Watershed Management Program: FEMA Map<br />

Modernization<br />

BMPs. Maintenance of Watershed Parameters and Models are required in order to maintain the watershed<br />

parameters and model based on land alteration occurring within the watershed. When each element is completed, the<br />

project budget is refined based on the information gathered. The District's FY2006 funding shown in the table below<br />

will be used for staff time.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 46,026 0 <strong>10</strong>,067 16,942<br />

0 73,035<br />

District Budgeted - Outside Revenue<br />

FEMA Mapping Activity Statement 1,200,000 0 0<br />

0<br />

0 1,200,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$1,273,035<br />

Critical Project Milestones Projected Amended Actual<br />

1. Cooperating Technical Partners Agreement<br />

Cooperating Tech. Partners Memorandum of Agreement 9/14/01 9/14/01<br />

Cooperating Technical Partners Agreement Executed 8/12/02 8/12/02<br />

2. Mapping Activity Statement<br />

Mapping Activity Statement Executed 9/30/05 2/6/06<br />

3. Consultant Agreement - Scoping<br />

Develop Scoping Consultant Agreement 11/7/05 11/7/05<br />

Draft Consultant Agreement to Management Services 11/7/05 11/7/05<br />

Draft Agreement returned from Management Services 12/1/05 11/30/05<br />

Scoping Consultant Contract Execution 12/30/05 1/12/06<br />

Scoping Consultant Notice to Proceed 12/30/05 2/1/06<br />

Scoping Consultant Contract Termination 7/31/06 7/31/06<br />

Polk County Scoping Report complete 1/23/07 1/23/07<br />

4. Consultant Agreement - DFIRM generation<br />

Consultant Agreement to Contracts for approval 4/1/07 6/12/07<br />

Consultant Agreement back from Contracts 4/30/07 6/15/07<br />

Agreement mailed to Consultant for signature 5/14/07 6/<strong>21</strong>/07<br />

Consultant Agreement executed 6/14/07 7/30/07<br />

Notice to Proceed to Consultant 6/14/07 8/2/07<br />

Status As Of: August 24, 2009<br />

The Consultant Services Agreement with Watershed Concepts has been executed, and Notice to Proceed was given on<br />

August 2, 2007. The Agreement includes DFIRM map generation and related tasks for the area of Polk County that is<br />

within the District. The SFWMD will contract with a consultant separately for the generation of DFIRM maps for the<br />

portion of Polk County that is located within the SFWMD. Status History: The Mapping Activity Statement (MAS) was<br />

executed by both Water Management Districts and FEMA as of February 6, 2006. Project funds have been placed in the<br />

District's Smartlink account. The Governing Board approved encumbering the funds without a contract, because the<br />

funds were included in District's FY2005 budget. The consultant services agreement with Tampa Bay Engineering (TBE)<br />

and the first work order for scoping services have been executed. District and TBE staff conducted a pre-scoping<br />

meeting on April 19, 2006. Representatives of the District, Polk County, the City of Winter Haven, and the SFWMD<br />

attended the pre-scoping meeting. The project scope and schedule, and data needs were discussed. The scoping<br />

meeting was conducted on June 22, 2006 in the Bartow Service Office. Representatives of the District, the SFWMD,<br />

Polk County, Mosaic, the cities of Winter Haven, Lake Wales, Lakeland, Frostproof, Lake Alfred, and Auburndale<br />

attended the scoping meeting. Participants were asked to identify areas of particular concern for their community; and to<br />

provide information such as current city limits that will be used in the preparation of the digital FIRM maps. Each local<br />

government was also asked to execute a Community Partner Memorandum of Agreement to confirm their commitment<br />

to work with the District, the SFWMD and the FEMA to produce updated, digital FIRM maps for their community. The<br />

020 - Peace River Basin 366


M114<br />

Polk County Watershed Management Program: FEMA Map<br />

Modernization<br />

Scoping Report was provided to local governments for review and comment on January 23, 2007. One comment was<br />

received, and the scoping map was revised accordingly, and the Scoping Report was submitted to FEMA. After the<br />

original Scoping Report was submitted to FEMA, District staff were notified that the SFWMD would receive $250,000<br />

from FEMA, and that the SFWMD would obtain LiDAR data for the SFWMD portion of Polk County. In addition, it has<br />

been determined that the Post Preliminary Processing task will take at least 11 months to complete. The Scoping Report<br />

was revised to reflect the funding provided to the SFWM and the addition of the LiDAR data for the SFWMD portion of<br />

Polk County; and to revise the project schedule to reflect a longer period for the completion of the Post Preliminary<br />

Processing task, and an associated reduction in the amount of time provided for the completion of model development<br />

and mapping related tasks. The revised Scoping Report was submitted to FEMA on June 12, 2008. SFWMD prepared<br />

an amendment to the Mapping Activity Statement (MAS) agreement with the District and FEMA to reflect the additional<br />

FEMA funding and LiDAR data. The MAS amendment has been fully executed. Staff is continuing to work with each local<br />

government to execute a Community Partner Memorandum of Agreement to confirm their commitment to work with the<br />

District, and the FEMA to produce updated, digital FIRM maps for their community. To date, MOAs have been received<br />

from 6 local governments (Eagle Lake, Lake Wales, Winter Haven, Lake Alfred, Polk City and the City of Auburndale),<br />

and from Polk County. The total budget for this project is $1,200,000. Of this, $39,800 was paid to TBE for consulting<br />

services related to project scoping and the development of the original Scoping Report. $25,000 has been encumbered<br />

to a contract with Bender Consulting for the preparation of a public outreach plan for Polk County, and $697,0<strong>10</strong> has<br />

been encumbered to the agreement with Watershed Concepts for DFIRM generation. One invoice for $9,700 has been<br />

received from Bender Consulting, and is being processed for payment. One invoice has been received from Watershed<br />

Concepts for $56,420 and is being processed for payment.<br />

020 - Peace River Basin 367


M118<br />

FEMA Map Modernization Management Support<br />

Project Type FEMA/Map Mod.<br />

AOR(s)<br />

Flood Protection<br />

Basin(s) General Fund (District), Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers,<br />

Pinellas-Anclote River, Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager TURNER, DAWN<br />

Task Manager(s)<br />

Status Ongoing<br />

Federal Emergency Management Agency<br />

Description<br />

This project is to provide management support for Federal Emergency Management Agency (FEMA) flood insurance<br />

rate map (FIRM) modernization projects throughout the District (please reference projects M<strong>10</strong>1-M116). Under these<br />

Map Modernization projects the FIRMs will reflect updated flood hazard risk areas and be modernized to a digital<br />

product. The updated flood hazard risk areas are being developed by the District through the 1) Topographic<br />

Information, 2) Watershed Evaluation, and 3) Watershed Management Plan elements of the District's Watershed<br />

Management Program (WMP). Map Modernization management support (MMMS) funds supplement the ongoing<br />

activities already being performed by staff including, but not limited to coordination and effort in building partnerships,<br />

information technology systems, program management planning, hydrologic and hydraulic review, and outreach.<br />

Benefits<br />

The WMP provides a method to evaluate the capacity of a watershed to protect, enhance, and restore water quality<br />

and natural systems, while achieving flood protection. The information developed provides the science for the District's<br />

Resource Management and Environmental Resource Permitting (ERP). It assists local governments: 1) With their land<br />

management responsibilities by establishing a level of service and developing Best Management Practices (BMPs) to<br />

address level of service deficiencies. 2) Provides a Geodatabase and projected results from watershed model<br />

simulations for floodplain management and water quality management. The FIRMs are used by local governments for<br />

land management and building permitting to satisfy the minimum requirements of the National Flood Insurance<br />

Program.<br />

Costs<br />

The total amount for MMMS is $1,013,240 to be funded by FEMA. The District has received a total of $713,240 in<br />

FEMA MMMS to date that has been included in the Governing Board's FY2005, FY2006, and FY2007 budgets as<br />

revenue. District Staff anticipate an additional $150,000 to be funded by FEMA for ongoing MMMS activities in both<br />

FEMA's FY2008 and FY2009 ($300,000 in total). Each year FEMA notifies the District how much funding is available<br />

for MMMS. The District funding amounts shown in the table represents staff salaries.<br />

Additional Information<br />

The WMP includes five major elements: 1) Topographic Information, 2) Watershed Evaluation, 3) Watershed<br />

Management Plan, 4) Implementation of Best Management Practices, and 5) Maintenance of Watershed Parameters<br />

and Models. Implementing elements of the WMP with local governments is one of the Comprehensive Watershed<br />

Management (CWM) initiative strategies and one of the District's Strategic Priorities. The District is cooperating with<br />

FEMA to modernize the FIRMs throughout the District. Staff has worked with the FEMA to improve and formalize the<br />

District's relationship with a federal agency that shares flood protection responsibilities. FEMA and the District<br />

executed a Cooperating Technical Partners (CTP) Memorandum of Agreement on September 14, 2001. As a CTP,<br />

the District is eligible for federal grants and matching funds to further efforts to modernize the FIRMs. Each year the<br />

District enters into a cooperative agreement with FEMA for MMMS funding that defines the activities that will be<br />

performed. $250,000 in funding (grant EMA-2004-CA-5038) for FY2005 is being used to provide a meeting facilitator<br />

for ongoing coordination meetings between the water management districts, FEMA Region 4, and the Florida<br />

Department of Community Affairs; develop a District-wide FIRM paneling scheme; determine the feasibility of<br />

expanding the District's role in distributing digital FIRMs to the public; maintaining the digital FIRMs; and revising the<br />

FIRMs simultaneously with the ERP application review. For FY2005, a total of $300,000 was actually budgeted in the<br />

General Fund with associated revenue. The $50,000 difference between expected funding and actual was rolled into<br />

the FY2006 budget. For FY2006 FEMA has granted (EMA-2005-CA-5244) the five water management districts<br />

$120,000 in MMMS to hire an outreach facilitator and develop design storm rainfall depth criteria for the entire State.<br />

The District will manage the project and contract with consultants on behalf of the other water management districts.<br />

In addition, the District received additional MMMS ($144,000) in FY2006 to support outreach efforts, allow the District<br />

to develop quality control/quality assurance tools, and support staff travel to meetings and conferences related to this<br />

effort. For FY2007, the District has received $129,620 from FEMA (grants EMA-2006-CA-5631 and<br />

EMA-2006-CA-5624) for continued travel support, outreach efforts, management assistance, and an XML-based<br />

export to for the District's Geographic Watershed Information System to populate FEMA's database. The District has<br />

recently received an additional $69,620 under EMA-2007-CA-5723 for continued travel and programmatic assistance.<br />

020 - Peace River Basin 368


M118<br />

FEMA Map Modernization Management Support<br />

For FY2008, the District is proposing to budget $150,000 in revenue for continued MMMS. The District will coordinate<br />

with the local government(s), will manage the project, and will enter into purchase orders and agreements to<br />

accomplish project tasks.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 20,095 (400) 31,349 14,306<br />

0 65,350<br />

District Budgeted - Outside Revenue<br />

FEMA Mapping Activity Statement 950,000 0 150,000 70,000<br />

0 1,170,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$1,235,350<br />

Critical Project Milestones Projected Amended Actual<br />

1. Critical Project Milestones<br />

FEMA & District Recognition on Reports 3/31/<strong>10</strong><br />

2. FY2005<br />

Develop Mutually Agreeable Scope of Work for MMMS 9/30/04 9/30/04<br />

Execute FEMA Agreement Articles and Related Forms 11/30/04 11/24/04<br />

Develop Consultant Agreement 11/30/04 11/19/04<br />

Draft Agreement to Management Services 1/7/05 1/7/05<br />

Draft Agreement returned from Management Services 1/<strong>21</strong>/05 2/4/05<br />

Contract Execution 3/4/05 3/1/05<br />

Notice to Proceed 3/4/05 3/1/05<br />

Develop First Amendment to Consultant Service Agmt 7/7/06 8/2/06<br />

Draft Amendment to Management Services 7/12/06 8/2/06<br />

Contract Termination 7/<strong>21</strong>/06 3/1/08<br />

Amendment Execution 9/18/06 9/18/06<br />

3. FY2006 - District<br />

Develop Cooperative Agreement for MMMS (District) 6/7/05 6/1/07<br />

Execute FEMA Agreement Articles and Related Forms <strong>10</strong>/31/05 12/2/05<br />

District Outreach Facilitator Purchase Order Execution 2/28/06 3/2/06<br />

District Outreach Facilitator Purchase Order Termination 12/31/06 12/31/06<br />

3. FY2006 - FL WMD<br />

Develop Application for competitive MMMS (FL WMD) 6/1/05 5/18/05<br />

Execute FEMA Agreement Articles and Related Forms <strong>10</strong>/31/05 12/2/05<br />

Develop State Outreach Facilitator Purchase Order 1/30/06 2/<strong>21</strong>/06<br />

State Outreach Facilitator Purchase Order Execution 2/28/06 3/2/06<br />

Develop Rainfall Frequency Analysis Purchase Order 6/1/06 6/1/06<br />

Rainfall Frequency Analysis Purchase Order Execution 6/30/06 7/20/06<br />

State Outreach Facilitator Purchase Order Termination 12/31/06 12/31/06<br />

Rainfall Frequency Analysis Purchase Order Termination 6/30/07 9/30/07<br />

4. FY2007<br />

Develop Application for competitive MMMS 3/27/06 3/27/06<br />

Develop Cooperative Agreement for MMMS 5/26/06 5/26/06<br />

Execute FEMA Agreement Articles and Related Forms 9/22/06 9/28/06<br />

Execute FEMA Agreement Articles and Related Forms 9/22/06 9/29/06<br />

Develop XML-base Export System Purchase Order 11/30/06<br />

XML-base Export System Purchase Order Execution 11/30/06<br />

Develop Map Modernization Program Assistance Agreement 7/31/07<br />

Map Modernization Program Assistance Agreement Execution 9/30/07<br />

020 - Peace River Basin 369


M118<br />

FEMA Map Modernization Management Support<br />

XML-base Export System Purchase Order Termination 9/30/07<br />

FY2008<br />

Develop Mutally Agreeable Scope of Work for MMMS 6/25/08 6/25/08<br />

Execute FEMA Agreement Articles 6/25/08 6/25/08<br />

Execute 76-<strong>10</strong>A Form 7/3/08 8/12/08<br />

Status As Of: August 24, 2009<br />

FY2005: A fully executed FEMA Form 76-<strong>10</strong> to MMMS Grant, EMA-2004-CA-5038 has been returned to the District. The<br />

form awards funds pursuant to the approved Statement of Work. Forms SF424 and FEMA 20-20 have also been<br />

executed by the Executive Director and transmitted to FEMA to support these funds. The consultant agreement with<br />

URS Corporation Southern was executed on March 1, 2005. All FY2005 funds have been encumbered via an<br />

amendment to URS' agreement, which was executed in September 2006. Work Orders #1, #2, and #3 have been<br />

executed. Work Order #1 is to incorporate a Hazard Mitigation Component into the District's Business Plan for Map<br />

Modernization. Work Order #2 is to develop a District-wide flood insurance rate map (FIRM) paneling scheme to support<br />

the District's efforts in modernizing and updating the FIRMs throughout the District. The draft paneling scheme has been<br />

prepared and submitted to surrounding water management districts (South Florida, St. Johns River, and Suwannee<br />

River). Work Orders #3 & #4 supply a moderator for ongoing coordination meetings among staff from the five water<br />

management districts regarding Map Modernization and a Sharepoint site for staff to access minutes and associated<br />

documents. Work Order #5 has been executed as of February 23, 2007, to determine the District's ability and resulting<br />

issues of reviewing Letters of Map Change (LOMC) simultaneously with ERPs. Two meetings have been held with<br />

District staff (MAN, TPA-REG, RPM), FEMA Region 4, and Hillsborough County staff. Work Order #6 directs the<br />

consultant team to present how different types of developments are reviewed and permited by the District, FEMA, and<br />

local government (Hillsborough County). This agreement will expire on October 31, 2008. After the grant expires, the<br />

remaining project funds will be released, and re-encumbered to other consultant services agreements for Map<br />

Modernization Management Support. To date, $136,896 of the FY2005 funds have been expended. FY2006: An<br />

additional $120,000 was provided by FEMA for the five water management districts. These funds were approved to<br />

facilitate Map Modernization outreach for all five districts to support the development of statewide isopluvial maps for<br />

various design storm events. The District will contract with consultants and manage the projects on behalf of the other<br />

four water management districts. A purchase order was issued to UCF for $60,000 to begin resolving design rainfall<br />

depth differences between WMDs. UCF has completed the literature review, data collection, data quality assurance,<br />

statistical analysis of the rainfall data, and an initial spatial analysis of the data. UCF requested a no-cost time extension<br />

to complete the project by December 30, 2007. Final deliverables have been received and approved, and the final<br />

invoice has been paid. The District also received FEMA funidng for outreach consulting services to support the Map<br />

Modernization effort of all the WMDs ($45,000), and for specific needs of the District ($48,000). These funds were used<br />

to retain Bender Consulting to provide outreach planning support to review completed and ongoing outreach efforts<br />

associated with each project and provide messages and direction to enhance future outreach. Bender Consulting has<br />

completed all tasks and the purchase order has been closed out. A total of $93,000 was expended. $63,000 in FY2006<br />

funds were also provided for the development of quality control and assurance tools. The funds were encumbered<br />

through an amendment to JEA's service agreements for the Sarasota County Map Modernization (M115) project. The<br />

FY2005 consultant agreement with URS has been amended to include $20,000 in FY2006 and $15,000 in FY2007 funds<br />

for ongoing meeting facilitators services. Work Order #4 was executed with URS to provide facilitation services for four<br />

(4) additional quarterly meetings. Remaining funds are to reimburse the District for travel and video conferencing<br />

expenses. Funds that have not been expended have been board encumbered ($13,000). FY2007: The District was<br />

granted an additional $60,000 in competitive MMMS for FY2007 to develop tools to export from the District enhanced<br />

ArcHydro database to FEMA's data capture standards. In addition, the District has been awarded $69,200 in MMMS from<br />

FEMA to continue travel associated with Map Modernization, coordination meeting facilitation, and programmatic<br />

assistance. A Purchase Order was executed with ESRI to develop the export tool within the ArcHydro environment, and<br />

a total of $59,479 was expended for this work. The remaining $5<strong>21</strong> of the grant funds will be used for a future purchase<br />

order with ESRI. FY2008: The District received $69,620 in FY2008 funding for ongoing programmatic assistance, and to<br />

reimburse the District for travel expenses related to Map Modernization projects. An Areement with Dewberry was<br />

executed on May 23, 2008 for Map Modernization programmatic assistance. The agreement encumbered the $39,620 in<br />

FY2007 funds, and $63,620 in FY2008 funds. Notice to Proceed for Work Order #1 was provided on June 25, 2008.<br />

FY2007 and FY2008 travel funds ($<strong>10</strong>,000 and $6,000 respectively) were board encumbered at the end of the respective<br />

fiscal year. To date, a total of $782,339 has been provided by FEMA for Map Modernization Management Support, of<br />

which $430,146 has been expended.<br />

020 - Peace River Basin 370


<strong>MANASOTA</strong> BASIN<br />

STRATEGIC BUDGET PRIORITIES<br />

On October 15, 2008, the Manasota Basin Board held its annual planning workshop<br />

for the purposes of reviewing recent accomplishments, identifying emerging issues<br />

and setting strategic budget priorities for Fiscal Year 20<strong>10</strong>. These priorities provide<br />

guidance to District staff and the Basin Board's cooperators in identifying and<br />

scoping projects for potential Basin Board funding. At the workshop, the Board<br />

agreed on the following strategic budget priorities. The Manasota Basin Board reaffirmed<br />

these priorities for FY2011 at its August 12, 2009, meeting.<br />

� Watershed planning<br />

� Alternative water supply development<br />

Strengthen/maintain regional focus<br />

Expand reuse to include Lake Manatee and Evers Reservoir watersheds<br />

� Conservation<br />

Reduce water demand through education, technology and incentives<br />

� Education<br />

Partner with other science-based organizations<br />

While the above priorities were developed to help ensure that the most critical needs<br />

of the Basin are addressed, the Basin Board funds a wide variety of projects to<br />

assist in the achievement of the mission of the Southwest Florida Water<br />

Management District. These include projects that fall within each of the District's<br />

four areas of responsibility: water supply, flood protection, water quality, and natural<br />

systems.<br />

8/09


Tampa<br />

Bay<br />

275<br />

Manasota Basin<br />

Southwest Florida Water Management District<br />

Bradenton<br />

Sarasota Bay<br />

Palmetto<br />

41<br />

41<br />

301<br />

Braden River<br />

Sarasota<br />

41<br />

Gulf of<br />

Mexico<br />

75<br />

Manatee<br />

301<br />

Parrish<br />

Venice<br />

River<br />

64<br />

70<br />

72<br />

Myakka<br />

Manatee<br />

Lake Manatee<br />

River<br />

Verna<br />

62<br />

Sarasota<br />

41<br />

Myakka City<br />

North Port<br />

Duette<br />

Sidell<br />

75<br />

37<br />

0 5 <strong>10</strong><br />

scale in miles


<strong>PEACE</strong> <strong>RIVER</strong> BASIN<br />

STRATEGIC BUDGET PRIORITIES<br />

At the August 7, 2009, Peace River Basin Board meeting, the Board voted to<br />

reaffirm the Strategic Budget Priorities set for Fiscal Year 20<strong>10</strong>. These priorities<br />

provide guidance to District staff and the Basin Board's cooperators in identifying<br />

and scoping projects for potential Basin Board funding. The following priorities<br />

were re-affirmed by the Peace River Basin Board for FY2011 at the August 7,<br />

2009, meeting.<br />

� Alternative water source research, planning, and development<br />

� Water Conservation Programs, Initiatives, and Projects<br />

� Regional approach to water resource sustainability, both within and across<br />

District boundaries<br />

� Balance Basin funding with needs of the Basin<br />

� Public and youth education programs and initiatives<br />

While the above priorities were developed to help ensure that the most critical<br />

needs of the Basin are addressed, the Basin Board funds a wide variety of<br />

projects to assist in the achievement of the mission of the Southwest Florida<br />

Water Management District. These include projects that fall within each of the<br />

District's four areas of responsibility: water supply, flood protection, water quality,<br />

and natural systems.<br />

8/09


Gulf of<br />

Mexico<br />

Peace River Basin<br />

Southwest Florida Water Management District<br />

41<br />

Charlotte<br />

Harbor<br />

37<br />

62<br />

64<br />

70<br />

72<br />

Lakeland<br />

17<br />

Peace<br />

River<br />

Bartow<br />

Fort Meade<br />

Bowling Green<br />

Wauchula<br />

Auburndale<br />

Polk<br />

Hardee<br />

Zolfo Springs<br />

Arcadia<br />

DeSoto<br />

Punta Gorda<br />

Charlotte<br />

75<br />

98<br />

92<br />

17<br />

17<br />

31<br />

4<br />

27<br />

Haines City<br />

Winter Haven<br />

98<br />

92<br />

17<br />

Lake Wales<br />

27<br />

Frostproof<br />

Avon Park<br />

98<br />

60<br />

Highlands<br />

Sebring<br />

66<br />

Lake Placid<br />

70<br />

64<br />

27<br />

0 5 <strong>10</strong><br />

scale in miles


Turner Agri-Civic Center<br />

2250 NE Roan Street<br />

Arcadia, FL 34266<br />

863-993-4807<br />

www.turnercenter.com<br />

75<br />

41<br />

70<br />

64<br />

72<br />

675<br />

780<br />

Manatee Co.<br />

Sarasota Co.<br />

Sarasota Co.<br />

41<br />

Hardee Co.<br />

DeSoto Co.<br />

72<br />

70<br />

17<br />

E Gibson St.<br />

17<br />

Turner Rd.<br />

DeSoto Co.<br />

Charlotte Co.<br />

17th Ave. NE Turner Ave.<br />

NE Roan St.<br />

31<br />

Turner<br />

Center<br />

NE Roan St.<br />

31<br />

70<br />

70

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!