4. ENVIRONMENTAL DATA<br />
Environmental data for the BAT production processes are generally known with a high<br />
degree of reliability, while data for storage and transfer are more uncertain and of much less<br />
importance. Hence, data for production will be given the highest attention.<br />
4.1 Production Input Requirements<br />
4.1.1 Feedstock<br />
The typical feedstock requirements for modern plants are (approximately):-<br />
Conventional reforming: 22.1 GJ(LHV*).t -1 NH 3<br />
Excess air reforming : 23.4 GJ(LHV).t -1 NH 3<br />
Autothermal reforming : 24.8 GJ(LHV).t -1 NH 3<br />
Partial oxidation : 28.8 GJ(LHV).t -1 NH 3<br />
* Lower Heating Value<br />
4.1.2 Fuel<br />
Assuming an efficient stand-alone plant with no energy export and no other import than feedstock<br />
and fuel, the fuel requirements are (approximately):-<br />
Conventional reforming: 7.2-9.0 GJ(LHV).t -1 NH 3<br />
Excess air reforming : 5.4-7.2 GJ(LHV).t -1 NH 3<br />
Autothermal reforming : 3.6-7.2 GJ(LHV).t -1 NH 3<br />
Partial oxidation : 5.4-9.0 GJ(LHV).t -1 NH 3<br />
The uncertainty in autothermal reforming is mainly due to the type of compressor drives.<br />
4.1.3 Water and air<br />
In the steam reforming processes process steam is taken from the plant steam system, usually<br />
from an extraction turbine. The net consumption according to the stoichiometic conversion is<br />
0.6-0.7kg.kg -1 NH 3 , the total supply at a S/C ratio of 3.0 will be about 1.5kg.kg -1 NH 3 . In partial<br />
oxidation much less steam is fed to the gasification reactor, but additional steam is needed<br />
in shift conversion (1.2kg.kg -1 NH 3 in total).<br />
Process air supply: In conventional reforming the nitrogen supply equals the ammonia nitrogen<br />
content plus the purge losses, ie. about 0.85kg N 2 .kg -1 NH 3 or about 1.1kg air.kg -1 NH 3 . In<br />
the excess air reforming and gas heated reformer cases the process air requirements are about<br />
50% and 100% higher, respectively. In the partial oxidation process the amount of air fed to<br />
the air separation unit is approximately 4kg.kg -1 NH 3 , based on the oxygen requirement.<br />
Boiler feedwater: Assuming all steam condensates are recycled, only the process steam consumption<br />
has to be replaced by outside water. This will be 0.7-1.5kg.kg -1 NH 3 (see above),<br />
depending on process condensate recycle or not. Small additional losses and potential<br />
import/export have to be allowed for in practice.<br />
Air and/or water for cooling: Will differ from one site to another.<br />