07.03.2017 Views

The 2016/2017 Stuttgart office market report

Again in 2016 the Stuttgart office market reached new record levels. The turnover of floor space came to 432,000 square metres for the year, a growth of almost 50 percent. At the same time rents rose slightly, and the vacancy ratio fell by 2.8 percent. As in past years, the main growth driver was industry, but the IT and telecommunication sectors have also been responsible for increasing demand.

Again in 2016 the Stuttgart office market reached new record levels. The turnover of floor space came to 432,000 square metres for the year, a growth of almost 50 percent. At the same time rents rose slightly, and the vacancy ratio fell by 2.8 percent. As in past years, the main growth driver was industry, but the IT and telecommunication sectors have also been responsible for increasing demand.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

24 I <strong>Stuttgart</strong> – Central<br />

<strong>The</strong> “TSS Innovation Center” project in <strong>Stuttgart</strong> Vaihingen; source: Bülow AG<br />

Fasanenhof<br />

An upturn was already being forecast for<br />

Fasanenhof’s industrial park some years<br />

ago and has now occurred. In <strong>2016</strong> over<br />

19,000 m² of space was thus let; exceptional<br />

performance seen in terms of the<br />

10-year average of 6,900 m². <strong>The</strong> majority<br />

of take-up was in one completely<br />

renovated property, namely the<br />

DO.T building (Design Office Tower).<br />

In 2015 “Design Offices” moved into<br />

this building to commence operation<br />

of the first co-working centre at a<br />

location outside of <strong>Stuttgart</strong>’s central<br />

business district, where it also operates<br />

a centre. <strong>The</strong> clear success of the<br />

Fasenhof centre led the company to<br />

rent additional space in the building<br />

in <strong>2016</strong>.<br />

Public amenities, including a gym,<br />

restaurants and bars and local shops,<br />

have also improved significantly<br />

thanks to the substantial increase in<br />

<strong>office</strong> user numbers. Two further hotels<br />

in the 2- to 3-star segment, whose<br />

construction is planned in the next<br />

24 months, will ensure the required<br />

supply of accommodation facilities.<br />

In <strong>2016</strong> GFT, an IT sector company,<br />

completed its new building for startup<br />

companies. <strong>The</strong> obvious need for<br />

more <strong>office</strong> space for start-up companies<br />

has resulted in GFT further<br />

expanding the space it offers by an<br />

additional 10,000 m². <strong>The</strong> “Campus<br />

Fasanenhof” development project<br />

with approx. 14,000 m² of <strong>office</strong> space<br />

has now achieved a stage of maturity<br />

which will enable construction to begin<br />

in <strong>2017</strong>.<br />

Vaihingen/Möhringen und<br />

STEP<br />

Changes at the Vaihingen/Möhringen<br />

industrial park are now very apparent.<br />

<strong>The</strong> extended light rail transit system<br />

went into operation in <strong>2016</strong> and modernization<br />

of public areas was also<br />

completed. Book wholesaler KNV moved<br />

into its newly built headquarter<br />

building in August <strong>2016</strong> and all the<br />

old buildings on the former KNV site<br />

have now been demolished. <strong>The</strong> new<br />

owner, Daimler AG, will begin construction<br />

of a new <strong>office</strong> campus in<br />

<strong>2017</strong>. <strong>The</strong> project volume is expected<br />

to be in the range of approx. 75,000<br />

m².<br />

Parallel to Daimler AG’s decision another<br />

user also decided to locate in<br />

Vaihingen – Allianz AG will be building<br />

a 120,000 m² <strong>office</strong> complex on a<br />

site which it formerly used as a sports<br />

Vaihingen/<br />

Möhringen/STEP<br />

ground, with completion scheduled<br />

for 2020. In all it is expected that some<br />

9,000 to 10,000 new jobs will be created<br />

at the “Synergie Park” site. In order<br />

to address the related transportation<br />

challenges in good time, extensive<br />

studies and discussions were conducted<br />

in <strong>2016</strong>. In addition to short-term<br />

measures in the area itself, the widening<br />

of Nord-Süd-Strasse is planned<br />

as the main access road to the site.<br />

In total some 111,000 m² of space was<br />

let or occupied by owner-occupiers in<br />

the Vaihingen/Möhringen district in<br />

<strong>2016</strong>. A further new building is currently<br />

under construction at <strong>Stuttgart</strong><br />

Engineering Park (STEP), STEP Building<br />

8.3. As already repeatedly the<br />

case at STEP in the past, more than<br />

50 % of the new building’s space had<br />

already been let before construction<br />

commenced. Completion is scheduled<br />

for early 2018. In <strong>2016</strong> new contracts<br />

for a total of approx. 31,000 m²<br />

of space were concluded at STEP, the<br />

majority of which related to re-letting<br />

of the former “Debitel Tower”, STEP<br />

Building 6.<br />

< 500 m 2 501 - 1,000 m 2 1,001 - 2,000 m 2 2,001 - 5,000 m 2 > 5,001 m 2<br />

Ø rental price 4 % 14 % 6 % 12 % 64 %<br />

m 2 5,661 20,172 7,841 16,671 90,855<br />

Ø Mietpreis Vaihingen: 13.10 €/m 2 , Möhringen: 10.30 €/m 2<br />

Prime rent Vaihingen: 14.00 €/m 2 , Möhringen: 13.50 €/m 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!