Council Report March 21, 2017<br />

The process of evaluation used by the Evaluation Team to determine which<br />

submission, if any, would result in pre-qualification, involved a general assessment<br />

to ensure submission compliance and additional criteria relevant to the Town’s<br />

requirements for this process based upon the following:<br />

Criteria<br />

Number<br />

Evaluation Criteria<br />

Weight<br />

Factor (%)<br />

1 Similar Experience 20<br />

2 References 15<br />

3 Schedule of Unit Prices 30<br />

4 Resumés of Key Personnel 10<br />

5 Resources 15<br />

6 Quality Control & Cost Control Program 5<br />

7 Safety Qualifications, Policy Statement & Record 5<br />

Total: 100<br />

The responding consultants and their respective RFPQ scores are as follows:<br />

Consultant<br />

RFPQ Score<br />

WSP Canada 82.4<br />

SNC Lavalin (GEM) 80.4<br />

SOLA Engineering 76.9<br />

Stantec Consulting 75.2<br />

Peto MacCallum 74.0<br />

Cambium 70.4<br />

AECON (AME) 67.8<br />

Amec Foster Wheeler Environment & Infrastructure 67.5<br />

Exp Services 65.2<br />

DST Consulting Engineers 63.2<br />

Of those consultants who achieved a minimum RFPQ score of 70 points, the top<br />

five (5) consultants are proposed to form the pre-qualified roster; namely:<br />

Pre-Qualified Geotechnical Roster<br />

RFPQ Score<br />

WSP Canada 82.4<br />

SNC Lavalin (GEM) 80.4<br />

SOLA Engineering 76.9<br />

Stantec Consulting 75.2<br />

Peto MacCallum 74.0<br />

Page 4 of 5